HomeMy WebLinkAbout2015-04-07 Agenda and Supporting Documentation Town Council Regular SessionVAIL TOWN COUNCIL
REGULAR MEETING AGENDA
VAIL TOWN COUNCIL CHAMBERS
75 S. Frontage Road W.
Vail, CO 81657
6:00 P.M., APRIL 7, 2015
TOWN QFVAIL�
NOTE: Times of items are approximate, subject to change, and cannot
be relied upon to determine at what time Council will consider
an item.
ITEM/TOPIC: Citizen Participation (10 min. )
2. ITEM/TOPIC: Consent Agenda:
1) Water Quality Mapping Contract Award
2) Asphalt Overlay Contract Award
3) Vail Public Library - Bike Path Contract Award
4) EHU Exchange - 1125 Hornsilver Circle
5) EHU Exchange - 1915 Gore Creek Drive (5 min. )
3. ITEM/TOPIC: Any Action as a Result of Executive Session (5 min. )
BACKGROUND: This agenda item has been added to the regular meeting
agenda in order to allow for any official action required as a result of the
executive session.
4. ITEM/TOPIC: Town Manager's Report
1) Vail Golf and Nordic Clubhouse Remodel - Contractor Selection
(5 min. )
5. ITEM/TOPIC: Ford Park 2015 Summer Managed Parking (30 min)
PRESENTER(S): Greg Hall
ACTION REQUESTED OF COUNCIL: The Town Council is asked to
receive community input and provide input and direction on the proposed
changes to the Ford Park 2015 Summer Managed Parking Program.
BACKGROUND: Since 1998 the town staff working with the Ford Park user
groups have presented a Summer Managed Parking Plan to the Vail Town
Council for review and direction.
STAFF RECOMMENDATION: Direct staff to prepare for the Ford Park 2015
Summer Managed Parking Program with an option to preserve parking
spaces to be leased by the user groups on designated special event dates
only and continue to require paid parking on special event dates and use
express bus service from Vail Village and Lionshead Parking Structures.
Continue to explore a long term solution for parking at Ford Park upper
bench parking lot for Implementation in summer 2016.
6. ITEM/TOPIC: Resolution No. 9, Series of 2015, A Resolution of the Vail
Town Council Extending the Deadline for Commencement of Construction of
Improvements ContemplateCWM Amendment to the Existing Vail Golf
Course Conditional Use Permit (PEC12-0036) (10 min)
PRESENTER(S): George Ruther
ACTION REQUESTED OF COUNCIL: Approve, approve with modifications,
or deny Resolution No. 9, Series of 2015.
STAFF RECOMMENDATION: The Community Development
Department recommends the Vail Town Council to approve Resolution No.
9, Series of 2015 as presented.
7. ITEM/TOPIC: First reading of Ordinance No. 5, Series 2015 an Ordinance
making budget adjustments to the Town of Vail General Fund, Capital
Projects Fund, Real Estate Transfer Tax Fund, Heavy Equipment Fund and
Timber Ridge Enterprise Fund. (30 min.)
PRESENTER(S): Kathleen Halloran, Finance Director and Carlie Smith,
Budget Analyst
ACTION REQUESTED OF COUNCIL: Approve or approve with
amendments Ordinance No. 5, Series 2015
BACKGROUND: Please see attached memo
STAFF RECOMMENDATION: Approve or approve with amendments
Ordinance No. 5, Series 2015
8. ITEM/TOPIC: Second Reading Ordinance No. 4, Series of 2015 An
Ordinance Protecting Certain Stream Tract Property in the Town by
Prohibiting the Installation or Maintenance of Private Improvements on Such
Property (10 min.)
PRESENTER(S): Matt Mire, Town Attorney
ACTION REQUESTED OF COUNCIL: Approve, approve with modifications,
or deny Ordinance No. 4, Series of 2015 on second reading.
BACKGROUND: Over time, private improvements such as landscaping,
patios and other improvements from properties adjacent to stream tracts
have been constructed and maintained within the Town's riparian areas
without permission or authorization from the Town. Pursuant to the Town's
authority to regulate for the public health, safety and welfare, the Town
Council desires to clarify by the passage of this Ordinance No. 4 that Town
that certain stream tracts shall be used solely and exclusively as natural
open space, and private improvements or encroachments of any kind are
prohibited in these areas without the prior written authorization of the Town
Council.
STAFF RECOMMENDATION: Approve, approve with modifications, or deny
Ordinance No. 4, Series of 2015 on second reading.
9. ITEM/TOPIC: Appointment to Design Review Board (DRB) (10 min. )
ACTION REQUESTED OF COUNCIL: Town Council will make an
appointment to DRB
BACKGROUND: See attached memo
4/7/2015
10. ITEM/TOPIC: Adjournment (7:40 pm)
4/7/2015
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Citizen Participation
4/7/2015
TOWN OF VAIN
►owx of vn' 1[1
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Consent Agenda:
1) Water Quality Mapping Contract Award
2) Asphalt Overlay Contract Award
3) Vail Public Library - Bike Path Contract Award
4) EHU Exchange - 1125 Hornsilver Circle
5) EHU Exchange - 1915 Gore Creek Drive
ATTACHMENTS:
Water Quality Mapping Award
Gore Valley Trail Improvements Project Contract Award Memorandum
Asphalt Overlay Award Memorandum
Library Path Construction Approval Memorandum
EHU Exchange - 1125 Hornsilver Circle
EHU Exchange - 1915 Gore Creek Drive
4/7/2015
0
rowN of vain
Memorandum
To: Vail Town Council
From: Departments of Public Works and Community Development
Date: April 7, 2015
Subject: Storm Sewer and Drainage Basin Mapping Project — Contract Award
I. PURPOSE
The purpose of this memorandum is to provide a recommendation to move forward in
awarding SGM a contract to perform storm sewer and drainage basin mapping services
in response to a Request for Proposals released by the Town of Vail as part of the
Restore the Gore Strategic Action planning process.
II. BACKGROUND
As of 2012 the Colorado Department of Public Health and Environment (CDPHE),
Water Quality Control Commission, added the portion of Gore Creek from Black Gore
Creek to the Eagle River (Dowd Junction) to Colorado's Section 303(d) list of impaired
waters for aquatic life use. To address the 303(d) listing, and to improve water quality,
the Eagle County Urban Runoff Group (URG) funded the completion of The Gore Creek
Water Quality Improvement Plan (WQIP), completed by Leonard Rice Engineers, which
may be downloaded at https://vail.sharefile.com/d/sd773b7f738745c28.
Building upon the findings in the WQIP, the Town of Vail contracted with Lotic
Hydrological to complete the Restore the Gore Strategic Action Plan currently underway
which includes the following:
Objective 1: Regulatory Measures
Objective 2a: Site Specific Projects
Objective 2b: Riparian Areas
Objective 3: Monitoring and Study Programs
Objective 4: Best Management Practices
Objective 5: Education and Outreach
Objective 6: Prioritization
Objective 7: Planning and Implementation of High -Priority Actions
A critical component of Objective 7 includes the release of a Request for Proposals
(RFP) to identify and evaluate the complete inventory of existing stormwater
infrastructure, and create a database and drainage area map. Without this information
properly maintaining and improving the storm system proves to be inefficient and
challenging.
4/7/2015
Scope of Work
Qualified professionals are asked to provide the development of a complete, spatially
accurate, informative, and cost effective GIS -based inventory database of stormwater
infrastructure within the town's city limits. The town's existing infrastructure inventory
was completed in 2007 and includes approximately 70% of the municipally owned
drainage system. This project requires a review of the existing inventory, updating it to
include newly identified drainage system components and appurtenances, verifying and
refining vertical and horizontal spatial information for all infrastructure components, and
verifying and refining important maintenance related metadata for all infrastructure
components. In order to understand the diversity of landscape elements and land use
types contributing stormwater runoff to various portions of the drainage network, all
contributing drainage areas must be mapped. All information must be compiled in a
topologically correct spatial database that preserves the direction of stormwater flow
throughout the entire drainage network. The completed spatial database will serve as
the foundation for the development of comprehensive infrastructure maintenance
schedules and an asset management program.
Responses to the RFP, released on February 13, 2015, were received on March 6,
2015. Submitting firms included:
• SGM, Glenwood Springs, CO Proposal cost: $125,920
• Michael Baker International, Lakewood CO Proposal cost: $267,579
• Matrix Design Group, Denver, CO Proposal cost: $235,700
SGM was selected by the staff review team due the criteria listed in Section III, as well
as overall value added and prior experience with basin mapping in Vail, and thorough
understanding of Gore Creek water quality issues and challenges unique to Vail
(snowmelt, ski area, 1-70). The contract amount is within budget and if approved, will be
funded as a capital expenditure via the $1.5 million allocated for Gore Creek water
quality improvements and flood repair. The project will be completed by October, 2015.
EVALUATION CRITERIA
Submitting firms were evaluated based upon on the following criteria:
• Prior project experience
• Ability to perform the scope of work
• Approach to scope of work
• On-time and on -budget track record and evidence in proposal
• Total cost of the project
• Completeness of proposal
IV. RECOMMENDATION
Staff recommends the Vail Town Council authorize the Town Manager to enter into an
agreement, in a form approved by the Town Attorney, with SGM, Inc. in an amount not
to exceed $125,920.00 to complete the Storm Sewer and Drainage Basin Mapping
Project.
Town of Vail 4/7/2015 Page 2
TOWN OF
Memorandum
To: Vail Town Council
From: Department of Public Works
Date: April 7, 2015
Subject: Contract Approval Request for Gore Valley Trail Improvements Project —
Lionshead Village to West Meadow Drive
INTRODUCTION
The purpose of this memorandum is to request that the Town Council approve two
contracts for the construction of the Gore Valley Trail Improvements Project. The first
contract is for construction of the path and associated improvements and the second
contract is for the fabrication of two bridges required as part of the project.
II. BACKGROUND
This work for this project includes:
• Reconstruction of the asphalt trail between Lionshead Village and West Meadow
Drive and widening the trail to eleven feet from its current ten feet. A concrete
Alternate has been priced through the bid process and is discussed below.
• Realignment of approximately 150 linear feet of trail from private property to town -
owned property. This includes execution of an Easement and Maintenance
Agreement with the Lodge at Lionshead Phase III to allow portions of the path to
remain on private property.
• Construction of two new bridges
1) Replace existing culverts at Middle Creek with an open -span bridge
2) Install a new bridge as part of the realignment
• Stream bank stabilization work to repair a heavily eroded section of bank
• Installation of storm water improvements with cooperation and financial assistance
from Vail Resorts
• Installation of new light fixtures and electrical system
III. PROJECT SCHEDULE
Construction Kick -Off April 13, 2015 for site preparation
April 20, 2015 for construction start
Trail Open for weekend use June 26, 2015
Final Completion July 16, 2015
The projected completion date is a result of several factors including the potential impacts
of spring runoff for the construction of the bridge abutments and the delivery date of the
bridges. Pending favorable conditions, the project may be completed sooner.
4/7/2015
IV. BID PROCESS
A. Bridges
The town received four (4) bids for the design and fabrication of two steel truss
bridges. The bids ranged between $74,041 and $99,820 with Big R Manufacturing
provided the lowest responsive bid. The design portion of the work was awarded to
Big R Manufacturing on March 9, 2015 in the amount of $11,526.
B. Trail Improvements Construction
The town received four (4) bids for the construction of the trail improvements. The
Base Bids range from $543,522 to $566,466. The concrete Add/Alternates range
between $96,775 and $122,603. The lowest responsive base bid was submitted by
Site Resource Management.
V. PROJECT BUDGET
The Gore Valley Trail Improvements at Vail Library project is budgeted in 2014 and 2015
at $1,185,000. ($240,000 in 2014, $945,000 in 2015). Based on the bids received, the
project will be completed within budget.
VI. CONCRETE OPTION
The bid process provided a cost to construct the trail in either asphalt or concrete. The
concrete option adds $89,000 to the construction contract and changes the lowest
responsive bidder to United Companies.
Other concrete trails in Vail including the Booth Creek Park section and those along the
North Frontage Road have held up very well over a 10-20 year period, requiring little
maintenance. However, staff is unsure of freeze/thaw and heaving implications of
concrete in this shady area.
Asphalt Advantages
• Lower initial cost
• When it fails, easier to maintain
• Matches the rest of the Gore Valley Trail
Asphalt Disadvantages
• Higher maintenance frequency
• Crack -sealing, slurry seals, overlays
Concrete Advantages
• Durability
• High-quality, aesthetically pleasing trail
• Low maintenance
Concrete Disadvantages
• Higher initial cost
• Over a 40 -year life span, concrete is approximately $15,000- $20,000 more expensive
• Concrete could be slick on corners, and control joints an annoyance for bikers
Heaving concerns
Town of Vail 4/7/2015 Page 2
VII. ACTION REQUESTED BY COUNCIL
A. Staff is requesting that the Town Council authorize the Town Manager to enter into a
construction contract with Site Resource Management in the amount of $543,522 for
the construction of the Gore Valley Trail Improvements project.
If the Council decides to construct the trail in concrete, the construction contract will
be awarded to United Companies in the amount of $631,917
B. Staff is requesting that the Town Council authorize the Town Manager to enter into a
contract with Big R Manufacturing in the amount of $62,515 for the fabrication of two
steel truss bridges for the Gore Valley Trail Improvement project.
VIII. STAFF RECOMMENDATION
A. Asphalt vs. Concrete
Staff recommends the path should be constructed in asphalt due to cost and the
concern for heaving in this shady area.
B. Contracts
Staff recommends that the Town Council authorize the Town Manager to enter into
contracts as listed above.
Town of Vail 4/7/2015 Page 3
rowN of vain
Memorandum
To: Town Council
From: Public Works
Date: 04/07/2015
Subject: 2015 Vail Overlay Contract Award
ITEM/TOPIC
2015 Vail Overlay Contract Award
II. ACTION REQUESTED OF COUNCIL
Authorize the Town Manager to enter into an agreement with Elam Construction to
complete the 2015 Vail Overlay Project.
III. BACKGROUND
Bids were received on March 19, 2015 from Elam Construction ($451,024.75) and
United Companies ($481,766.75). The project is budgeted with the Capital Street
Maintenance budget and is within the engineer's estimate. Roads included in the 2015
Vail Overlay Project include Sunburst Drive, Vail Valley Drive (S Frontage Road to
Ptarmigan Road) and Elkhorn Drive. The project is scheduled to be completed by June
12, 2015.
IV. STAFF RECOMMENDATION
Authorize the Town Manager to enter into an agreement, in a form approved by the
Town Attorney, with Elam Construction to complete the 2015 Vail Overlay Project in the
amount not to exceed $451,024.75.
4/7/2015
TOWN OF
Memorandum
To: Vail Town Council
From: Department of Public Works
Date: April 7, 2015
Subject: Contract Approval Request for Gore Valley Trail Improvements Project —
Lionshead Village to West Meadow Drive
INTRODUCTION
The purpose of this memorandum is to request that the Town Council approve two
contracts for the construction of the Gore Valley Trail Improvements Project. The first
contract is for construction of the path and associated improvements and the second
contract is for the fabrication of two bridges required as part of the project.
II. BACKGROUND
This work for this project includes:
• Reconstruction of the asphalt trail between Lionshead Village and West Meadow
Drive and widening the trail to eleven feet from its current ten feet. A concrete
Alternate has been priced through the bid process and is discussed below.
• Realignment of approximately 150 linear feet of trail from private property to town -
owned property. This includes execution of an Easement and Maintenance
Agreement with the Lodge at Lionshead Phase III to allow portions of the path to
remain on private property.
• Construction of two new bridges
1) Replace existing culverts at Middle Creek with an open -span bridge
2) Install a new bridge as part of the realignment
• Stream bank stabilization work to repair a heavily eroded section of bank
• Installation of storm water improvements with cooperation and financial assistance
from Vail Resorts
• Installation of new light fixtures and electrical system
III. PROJECT SCHEDULE
Construction Kick -Off April 13, 2015 for site preparation
April 20, 2015 for construction start
Trail Open for weekend use June 26, 2015
Final Completion July 16, 2015
The projected completion date is a result of several factors including the potential impacts
of spring runoff for the construction of the bridge abutments and the delivery date of the
bridges. Pending favorable conditions, the project may be completed sooner.
4/7/2015
IV. BID PROCESS
A. Bridges
The town received four (4) bids for the design and fabrication of two steel truss
bridges. The bids ranged between $74,041 and $99,820 with Big R Manufacturing
provided the lowest responsive bid. The design portion of the work was awarded to
Big R Manufacturing on March 9, 2015 in the amount of $11,526.
B. Trail Improvements Construction
The town received four (4) bids for the construction of the trail improvements. The
Base Bids range from $543,522 to $566,466. The concrete Add/Alternates range
between $96,775 and $122,603. The lowest responsive base bid was submitted by
Site Resource Management.
V. PROJECT BUDGET
The Gore Valley Trail Improvements at Vail Library project is budgeted in 2014 and 2015
at $1,185,000. ($240,000 in 2014, $945,000 in 2015). Based on the bids received, the
project will be completed within budget.
VI. CONCRETE OPTION
The bid process provided a cost to construct the trail in either asphalt or concrete. The
concrete option adds $89,000 to the construction contract and changes the lowest
responsive bidder to United Companies.
Other concrete trails in Vail including the Booth Creek Park section and those along the
North Frontage Road have held up very well over a 10-20 year period, requiring little
maintenance. However, staff is unsure of freeze/thaw and heaving implications of
concrete in this shady area.
Asphalt Advantages
• Lower initial cost
• When it fails, easier to maintain
• Matches the rest of the Gore Valley Trail
Asphalt Disadvantages
• Higher maintenance frequency
• Crack -sealing, slurry seals, overlays
Concrete Advantages
• Durability
• High-quality, aesthetically pleasing trail
• Low maintenance
Concrete Disadvantages
• Higher initial cost
• Over a 40 -year life span, concrete is approximately $15,000- $20,000 more expensive
• Concrete could be slick on corners, and control joints an annoyance for bikers
Heaving concerns
Town of Vail 4/7/2015 Page 2
VII. ACTION REQUESTED BY COUNCIL
A. Staff is requesting that the Town Council authorize the Town Manager to enter into a
construction contract with Site Resource Management in the amount of $543,522 for
the construction of the Gore Valley Trail Improvements project.
If the Council decides to construct the trail in concrete, the construction contract will
be awarded to United Companies in the amount of $631,917
B. Staff is requesting that the Town Council authorize the Town Manager to enter into a
contract with Big R Manufacturing in the amount of $62,515 for the fabrication of two
steel truss bridges for the Gore Valley Trail Improvement project.
VIII. STAFF RECOMMENDATION
A. Asphalt vs. Concrete
Staff recommends the path should be constructed in asphalt due to cost and the
concern for heaving in this shady area.
B. Contracts
Staff recommends that the Town Council authorize the Town Manager to enter into
contracts as listed above.
Town of Vail 4/7/2015 Page 3
0
rowN of vain
Memorandum
To: Vail Town Council
From: Community Development Department
Date: April 7, 2015
Subject: 12-13-5: Employee Housing Unit Exchange Program — A request authorizing the
Town Manager to execute a release of a deed restriction from an existing
employee housing unit located at Lot 9 Block 1 Vail Village Filing 8/1125
Hornsilver Circle
I. HOUSING AUTHORITY RECOMMENDATION
The Vail Local Housing Authority unanimously recommends the Vail Town Council
approve the proposed exchange of an employee housing unit located at Lot 9 Block 1
Vail Village Filing 8/1125 Hornsilver Circle in exchange for a fee in lieu payment for 960
square feet. The current fees in lieu amount is $134.65 per square foot. Based on that,
the fees in lieu due is currently $129,264.00.
The Vail Local Housing Authority recommends the following motion be made:
"The Vail Town Council authorizes the Town Manager to execute a deed
restriction release and approves the request for an exchange of an employee
housing unit, pursuant to Section 12-13-5, Employee Housing Unit Exchange
Program, Vail Town Code, to allow for the release of an employee housing unit
deed restriction at Lot 9 Block 1 Vail Village Filing 8/1125 Hornsilver Circle, in
exchange for a fee in lieu payment for 960 square feet, and setting forth details in
regard thereto."
III. ATTACHMENT
A. Staff Memorandum dated October 28, 2014.
4/7/2015
TOWN Of
0) VAIL "'
Memorandum
TO: Vail Local Housing Authority
FROM: Community Development Department
DATE: October 28, 2014
SUBJECT: A request for a recommendation to the Vail Town Council for the release of a
deed restriction from an existing employee housing unit located at Lot 9, Block 1
Vail Village Filing 8 also known as 1125 Hornsilver Circle in exchange for a fee in
lieu payment for 960 square feet pursuant to Section 12-13-5, Employee Housing
Unit Deed Restriction Exchange Program, Vail Town Code, and setting forth
details in regard thereto.
Applicant: Laura A. Cook represented by Heather McInerney
Housing Coordinator: Nina Timm
DESCRIPTION OF REQUEST
The applicant, Laura A. Cook, is proposing to exchange a deed restriction from an
existing 480 square foot employee housing unit located at 1125 Hornsilver Circle for a
fee in lieu payment for 960 square feet. The Employee Housing Unit Deed Restriction
Exchange Program requires 1125 Hornsilver Circle to use a square foot multiplier of two
pursuant to 12-13-5D, General Requirements, Vail Town Code.
II. BACKGROUND
1125 Hornsilver Circle was constructed in 2001 and is one of five properties that utilized
the site coverage bonus provided when a Type I employee housing unit is developed. In
order for 1125 Hornsilver Circle to complete an Deed Restriction Exchange either 167.7
square feet (1.5%) of site coverage shall be removed or a site coverage variance must
be approved by the Planning and Environmental Commission.
The applicant has submitted a plan showing how the site coverage would be removed
from the property and they have also submitted an application requesting a site
coverage variance. An approved employee housing unit exchange could not move
forward until there is resolution of the site coverage overage.
Town of Vail 4/7/2015
III. REVIEW CRITERIA
Before acting on an employee housing deed restriction exchange application, the Vail
Local Housing Authority and Vail Town Council shall consider the following criteria with
respect to the application:
1. The proximity and accessibility of the proposed EHU(s) to the commercial job
core and public transportation; and
The applicant is proposing a fee in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
2. The size of the proposed EHU(s) in relation to the minimum employee housing
unit sizes established for commercial linkage mitigation in Section 12-23-3 of this
title; and
The applicant is proposing a fee in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
3. The effect of any homeowners' association dues or maintenance fees imposed
upon the proposed EHU(s) on the affordability of the proposed unit for an
employee; and
The applicant is proposing a fee in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
4. The correlation between any homeowners' association fees imposed upon the
proposed EHU(s) and the services and amenities provided by the homeowners'
association; and
The applicant is proposing a fee in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
5. The extent to which the exchange is consistent with the applicable elements of
the adopted goals, objectives and policies outlined in the Vail comprehensive
plan and is compatible with the development objectives of the Town; and
The proposed exchange will double the square feet of deed restricted employee
housing in Vail. Therefore, the exchange is consistent with the applicable elements of
the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and
is compatible with the development objectives of the Town.
6. The extent to which the exchange presents a harmonious, convenient,
workable relationship among land uses consistent with municipal development
objectives; and
Town of Vail 4/7/2015 Page 2
The proposed exchange will not change the existing harmonious, convenient, workable
relationship among land uses consistent with municipal objectives.
7. The extent to which the exchange provides for the growth of an orderly viable
community and serves the best interests of the community as a whole.
Staff believes the proposed exchange complies with the applicable requirements of the
Town's zoning regulations and is therefore consistent with this criterion.
IV. RECOMMENDATION
The Community Development Department recommends the Vail Local Housing
Authority forwards a recommendation of approval to the Vail Town Council for the
proposed employee housing unit deed restriction exchange pending resolution of the
site coverage overage, based upon a review of the criteria and findings as outlined in
this memorandum and the evidence and testimony presented.
Should the Vail Local Housing Authority choose to forward a recommendation of
approval for this employee housing unit deed restriction exchange, the Community
Development Department recommends the Authority pass the following motion:
"The Vail Local Housing Authority forwards a recommendation of
approval, pending resolution of the site coverage overage, to the Vail
Town Council for the release of a deed restriction from an existing 480
square foot employee housing unit located at Lot 9, Block 1, Vail Village
Filing 8 also known as 1125 Hornsilver Circle in exchange for a fee in lieu
payment for 960 square feet, pursuant to Section 12-13-5, Employee
Housing Unit Deed Restriction Exchange Program, Vail Town Code and
setting forth details in regard thereto. "
Should the Vail Local Housing Authority choose to forward a recommendation of
approval for this employee housing unit deed restriction exchange, the Community
Development Department recommends the Authority make the following findings:
"Based upon the review of the criteria outlined in Section 11 of the October 28,
2014 staff memorandum and the evidence and testimony presented the Vail
Local Housing Authority finds.-
1.
inds.
1. The application meets the general requirements of subsection D of Section 12-
13-5, Vail Town Code,-
2.
ode,
2. The application is consistent with the applicable elements of the adopted
goals, objectives and policies outlined in the Vail Comprehensive Plan and is
compatible with the development objectives of the Town,-
Town
own,Town of Vail 4/7/2015 Page 3
3. The application furthers the general and specific purposes of the zoning
regulations, Section 12-1-2, Vail Town Code and the employee housing
regulations of Section 12-13-1, Vail Town Code; and,
4. The application promotes the health, safety, morals, and general welfare of the
Town and promotes the coordinated and harmonious development of the Town
in a manner that conserves and enhances its natural environment and its
established character as a resort and residential community of the highest
quality. "
V. ATTACHMENT
A. Applicant's Request
Town of Vail 4/7/2015 Page 4
CHARLES A. MUTER
PAUL G. URTZ
R. GREGORY STUTZ, LLC
Of counsel
cam�a,,stutzmillerurtz. com
March 6, 2014
STUTZ,, MILLER & URTZ, LLC
ATTORNEYS AT LAW
LINCOLN CENTER #2850
1660 LINCOLN STREET
DENVER, COLORADO 80264
TELEPHONE (303) 861-1200
FACSMM,E (303) 830-0115
Ms. Nina Timm, Senior Housing Coordinator
Town of Vail
75 S. Frontage Road
Vail, CO 81657
P.O. Box 6500
VAIL, COLORADO 81658
105 Edwards Village Blvd #C-210
EDWARDS, COLORADO 81632
TELEPHONE (970) 569-3300
FACS%4LL,E (970) 569-3301
ISI
Re: 1125 Homsilver Road — Laura Cook — Employee Housing Unit Exchange/Buy-back
Dear Ms. Timm:
Our client, Laura A. Cook, is the owner of the property at 1125 Hornsilver Road in Vail (the "Property").
This Property has a deed restriction for an Employee Housing Unit which dates from 2001. I am enclosing
a copy of the original deed restriction that existed on the Property before Ms. Cook purchased the Property
in 2003.
It is my understanding that the process of applying for the Employee Housing Unit Exchange or Buy-back
program is started by submitting a letter from an architect who has reviewed the property and determined
that the property meets the Gross Residential Floor Area (GRFA) after the exchange or buy-back
eliminating the EHU. To that end please find enclosed a copy of a letter dated March 5, 2014 from Zehren
and Associates, Inc. addressed to me. This letter is signed by Tim Losa as the licensed architect, and states
that the 1125 Hornsilver Road property will still meet the applicable GRFA requirements upon a buy-back
of the EHU portion.
Based upon this letter, I am requesting that the Town of Vail process this request. Upon approval from
your office, my client is prepared to pay the full amount required to buy out the EHU deed restriction. It is
my understanding that the amount will be based upon the square footage of the EHU (480 square feet) and
the amount is $134.65 per square foot at this time which results in $64,632.00. Based upon the applicable
regulation, this amount is multiplied by 2 based upon the location of this EHU, so the total amount should
be $129,264.00.
It is my understanding that this amount will need to be paid once the TOV has determined that the property
will qualify for the EHU exchange program.
Should you need anything further to process this request, please contact me at the Denver office phone
number listed above.
4/7/2015
Nina Timm - TOV
Re: 1125 Hornsilver - EHU
March 6, 2014
Page 2
My client and I look forward to your prompt and favorable processing of this request.
Very truly yours,
Charles A. Miller
CAM/me
Encl.
Cc: Laura A. Cook
4/7/2015
Z E H R E N
AND ASSOCIATES INC
March 5, 2014
Charlie Miller
Stutz, Miller and Urtz, LLC
Stutz, Miller & Urtz, LLC
1660 Lincoln St. Suite 2850
Denver, CO 80264
via electronic mail. cam@stutzmillerurtz.com
CC: Laura Cook
via electronic mail: louracookvail@me.com
Re: 1125 Hornsilver Circle, Vail, Colorado
Employee Housing Unit Conversion
Architect's Project Number 20142309.00
Charlie:
At your request, we have calculated the Gross Residential Floor Area for 1125 Hornsilver Circle,
Vail, Colorado as it relates to the possible elimination of the restrictive covenant governing the
existing employee housing unit located on the property.
Our review is based upon original Drawings prepared by K.H. Webb Architects, dated January
16, 2002 and provided to our firm by the property owner; a general observation of the
structure; and Title 12 of the Vail, Colorado Town Code.
Our review and calculations are not based upon actual field measurements and do not
represent a review of any other potential building or zoning code issues that may exist.
Existing Conditions
According to the adopted zoning map and property records search, the site area is
approximately 10,629 square feet and is zoned Two -Family Primary -Secondary Residential (P -S).
Two -Family Primary Secondary Residential (P -S) Regulation
Two -Family Primary -Secondary Residential (P -S) is regulated by Article D of the Vail Town Code.
• In accordance with Section 12-6D-8. A. of the code, only one dwelling unit is permitted
on the site, as the property is less than 14,000 square feet.
• Density on the property is further regulated under Section 12-6D-8. B. of the code by
Gross Residential Floor Area, (GRFA), which allows:
• Not more than forty six (46) square feet of gross residential floor area (GRFA) for
each one hundred (100) square feet of the first ten thousand (10,000) square feet of
site area; plus
• Thirty eight (38) square feet of gross residential floor area, (GRFA), for each one
hundred (100) square feet of site area over ten thousand (10,000) square feet
ARCHITECTURE • PLANNING • INTERIORS
P.O. BOX 1976, Avon, CO 816204IP7"�0257 . tlosa@zehren.com
Z E H R E N
AND ASSOCIATES INC
Two-Familv Primary Secondary Residential (P -S) GRFA Calculation
The permitted GRFA for the (10,629 sq. ft.) site is calculated as follows:
• 0.46 sq. ft. of GRFA x (first) 10,000 sq. ft. of site area = 4,600 sq. ft. of GRFA
• 0.38 sq. ft. of GRFA x 629 sq. ft. of site area = 239 sq. ft. of GRFA
• 4,600 sq. ft. + 239 sq. ft.= 4,839 sq. ft. of Total GRFA
Gross Residential Floor Area Definition and Exclusions
Gross Residential Floor Area (GRFA) is regulated by 12-15-3 (A.) of the Vail Town Code and is
defined as applicable to the existing structure is as follows:
Gross Residential Floor Area Defined: For residential uses, the total square footage of
all horizontal areas on all levels of a structure, as measured to the outside face of the
sheathing of the exterior walls (i.e., not including exterior wall finishes). Floor area shall
include, but not be limited to, elevator shafts and stairwells at each level, lofts,
fireplaces, bay windows, mechanical spaces, vents and chases, storage areas, and other
similar areas. Garages; attics; vaulted or open to below spaces; basements; crawl
spaces; and roofed or covered decks, porches, terraces, or patios shall be included as
floor area; except the horizontal areas of a structure as set forth herein shall then be
deducted from the calculation of GRFA.
Excluded areas as set forth herein, shall then each be deducted from the total square
footage.
Enclosed Garage Area: Enclosed garage areas of up to three hundred (300)
square feet per vehicle space not exceeding a maximum of two (2) vehicle
parking spaces for each allowable dwelling unit permitted by this title.
Garage area deducted from floor area is awarded on a "per space basis"
and shall be contiguous to a vehicular parking space. Each vehicular
parking space shall be designed with direct and unobstructed vehicular
access.
Alcoves, storage areas, and mechanical areas which are located in a
garage and which are twenty five percent (25%) or more open to the
garage area may be included in the garage area deduction.
Interior walls separating the garage from other areas of a structure may
be included in the garage area deduction.
Crawl Spaces: Crawl spaces accessible through an opening not greater than
twelve (12) square feet in area, with five feet (5') or less of ceiling height, as
measured from the surface of the earth to the underside of structural floor
members of the floor/ceiling assembly above.
ARCHITECTURE • PLANNING • INTERIORS
P.O. BOX 1976, Avon, CO 81620,r/PtM4W00257 . tlosa@zehren.com
Crawl spaces created by a "stepped foundation", hazard mitigation, or
other similar engineering requirement that has a total height in excess
of five feet (5') may be excluded from GRFA calculations at the
discretion of the administrator.
Basements: On the lowest level of a structure, the total percentage of all
exterior wall surfaces of the structure as a whole (interior party walls are not
considered exterior walls for the purposes of this section) that are unexposed
and below existing or finished grade, whichever is more restrictive, shall be the
percentage of the horizontal area of the lowest level deducted from the GRFA
calculations. The percentage deduction calculations shall be rounded to nearest
whole percent. The lowest level exterior wall surface area shall be measured
from the finished floor elevation of that level to the underside of the structural
floor members of the floor/ceiling assembly above. For the purposes of these
calculations, retaining walls and site walls shall not be considered part of the
lowest level exterior walls. The deduction shall be applied to all horizontal areas
on the lowest level of a structure, including garages and employee housing units
also deducted from the calculation of GRFA elsewhere in this title; but the
deduction does not apply to any crawl space or attic.
Vaulted Spaces: Interior vaulted spaces and areas "open to below" with a floor
to ceiling height less than sixteen feet (16'), as measured from the finished floor
to the underside of the structural members of the floor/ceiling assembly above.
Roofed Or Covered Decks, Etc.: Roofed or covered decks, porches, terraces,
patios or similar features or spaces with no more than three (3) exterior walls
and a minimum opening of not less than twenty five percent (25%) of the linear
perimeter of the area of said deck, porch, terrace, patio, or similar feature or
space, provided the opening is contiguous and fully open from floor to ceiling,
with an allowance for a railing of up to forty four inches (44") in height and
support posts with a diameter of eighteen inches (18") or less which are spaced
no closer than ten feet (10') apart. The space between the posts shall be
measured from the outer surface of the post.
Additional Calculation Provisions:
Vaulted Spaces: Any interior space with a floor to ceiling height of sixteen feet (16') or
greater, as measured from the finished floor to the underside of the structural members
of the floor/ceiling assembly above, shall be calculated as GRFA on two (2) levels of a
structure.
ARCHITECTURE . PLANNING . INTERIORS
P.O. BOX 1976, Avon, CO 816204/yj2d -0257 . tlosa@zehren.com
f3
Z E H R E N
AND ASSOCIATES. INC.
Total GRFA Calculation (Reference Plan Diagrams)
Level Gross Floor
Area
Garage
Deduction
Vaulted Space
Deduction
Basement
Deduction
Total GRFA
Lower 2,195
600
61.00
834
761
Main 1,956
0.00
D
60.00
1,956
Upper 1,662
43.13
131
1
1,531
Total 5,813
600
131
834
4,248
Allowable GRFA
6.66
1
13.50
4,839
Additional GRFA Allowed Under Current Zoning
49.50
49.50
591
Basement Deduction Calculation Facade Keyed to Elevation Dia rams
Facade
Gross Area of Exterior Wall
Below Grade Wall Area
A
51.75
27.00
B
61.00
38.76
C
117.00
0.00
D
60.00
60.00
E
43.13
12.40
F
205.31
5.36
G
49.50
29.07
H
9.00
6.66
1
13.50
13.50
J
49.50
49.50
K
63.00
63.00
L
46.18
45.31
M
63.00
54.71
N
85.50
58.95
0
122.00
68.93
P
21.13
11.26
Q
154.88
6.65
R
128.25
0.00
S
53.63
27.31
T
82.69
48.27
U
47.30
43.00
V
45.00
42.08
W
47.30
44.19
X
113.16
0.00
Y
243.00
0.00
Z
36.00
0.00
Total
2011.71
755.91
Percent of Wall Below Grade: 38%
ARCHITECTURE • PLANNING • INTERIORS
P.O. BOX 1976, Avon, CO 81620 4/?72.7257 . tlosa mehren.com
Conclusions
The conversion of the Employee Housing Unit to additional Gross Residential Floor Area within
the single family home would not bring the existing structure out of compliance with the density
provisions of the underlying Primary -Secondary (P -S) zoning.
The existing property is limited to one single family home because the site area is below the
minimum lot size of 15,000 square feet. As such, it is our opinion that a physical connection to
the primary unit, (such as a door); and removal of permanent cooking devices, (the existing
range/oven), should be completed in order to comply with the underlying zoning.
In addition, the exist parking space connected to the employee housing unit can be converted to
habitable space as it is included within the Gross Residential Floor Area calculation and would
not be required when the employee housing unit is removed.
Please do not hesitate to contact me with any questions or concerns.
Sincerely,
Tim Losa
Principal
Zehren and Associates, Inc.
ARCHITECTURE • PLANNING • INTERIORS
P.O. BOX 1976, Avon, CO 81620 4/9�)(�&6257 . tlosa@zehren.com
5.3.01 (updated)
Preliminary Zoning Analysis:
Lai 9, Blk. 1, Vail Village 8* Filing
1125 HomsiNei Circle
Vail, Colorado
Lot Size: .2441 acre/] 0,630 sq. ft. (Non -Worming lot)
(Based on Survey by lee le&w, not dated and Plat (olculations by Eagle Valley Surveying)
Primary/Secondary Zoning
-Skige Family Residence a* permitted with Type 1 EHU
Emp4ee Housing: Type I (for sob/deet residded/3% annual appreciation cap. if sold)
Setbacks: 20'Front
15' Sides
15' Rear
Height: 33' Sbped Roofs
30' Flat Roofs
RFA (Floor Area): 3,683 sq. ft. max. for Single Family with two -car ctamge.
4,908 sq. ft. max. for Single Family with Type 1 EHU with twocor and one -car goroges.
Note: These include 300 sq. ft. Credit per. Garage space.
EHU may be up to 40% max. of floor area.
Site Coverage: 2,126 sq. ft. or 2,658 sq. ft. with EHU.
landscciong: 6,378 sq. ft. or 6,909 sq. ft. with EHU.
Parking: 2.5 sees required/ 4.5 spaces with EHU.
Fireplaces: One EPA Approved Wood Burning Fueploce and two Gas Appliances
OR
Two Gas lag fireplaces and two Gas Appliances
Pease Note that marry other Zoning issues exist which will become relevant as the Design process proceeds.
Also rate that the above numbers are subject to versification by the Town of Vail Manning Staff.
4/7/2015
0
rowN of vain
Memorandum
To: Vail Town Council
From: Community Development Department
Date: April 7, 2015
Subject: 12-13-5: Employee Housing Unit Exchange Program — A request authorizing the
Town Manager to execute a release of a deed restriction from an existing
employee housing unit located at Lot 28 Vail Village West Filing No. 2/1915 Gore
Creek Drive
I. HOUSING AUTHORITY RECOMMENDATION
The Vail Local Housing Authority unanimously recommends the Vail Town Council
approve the proposed exchange of an employee housing unit located at Lot 28 Vail
Village West Filing No. 2/1915 Gore Creek Drive in exchange for a fee in lieu payment
for 458 square feet. The current fees in lieu amount is $134.65 per square foot. Based
on that, the fees in lieu due is currently $61,669.70.
The Vail Local Housing Authority recommends the following motion be made:
"The Vail Town Council authorizes the Town Manager to execute a deed
restriction release and approves the request for an exchange of an employee
housing unit, pursuant to Section 12-13-5, Employee Housing Unit Exchange
Program, Vail Town Code, to allow for the release of an employee housing unit
deed restriction at Lot 28 Vail Village West Filing No. 2/1915 Gore Creek Drive,
in exchange for a fee in lieu payment for 458 square feet, and setting forth details
in regard thereto."
III. ATTACHMENT
A. Staff Memorandum dated March 24, 2015.
4/7/2015
TOWN OF VAIL �
Memorandum
TO: Vail Local Housing Authority
FROM: Community Development Department
DATE: March 24, 2015
SUBJECT: A request for a recommendation to the Vail Town Council for the release of a
deed restriction from an existing employee housing unit located at Lot 28 Vail
Village West Filing No. 2 also known as 1915 West Gore Creek Drive in
exchange for a fees in lieu payment for 458 square feet pursuant to Section 12-
13-5, Employee Housing Unit Deed Restriction Exchange Program, Vail Town
Code, and setting forth details in regard thereto.
Applicant: Ponte Vedra (2008) LLC, represented by Hermes Group
Housing Coordinator: Nina Timm
DESCRIPTION OF REQUEST
The applicant, Ponte Vedra (2008) LLC, is proposing to exchange a deed restriction
from an existing 458 square foot employee housing unit located at 1915 West Gore
Creek Drive for a fees in lieu payment for 458 square feet. The deed restriction for 1915
West Gore Creek Drive requires a multiplier of one pursuant to 12-13-5D, General
Requirements, Vail Town Code. The current fees in lieu amount is $134.65 per square
foot. Based on that, the fees in lieu due is currently $61,669.70.
II. REVIEW CRITERIA
Before acting on an employee housing deed restriction exchange application, the Vail
Local Housing Authority and Vail Town Council shall consider the following criteria with
respect to the application:
1. The proximity and accessibility of the proposed EHU(s) to the commercial job
core and public transportation; and
The applicant is proposing a fees in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
2. The size of the proposed EHU(s) in relation to the minimum employee housing
unit sizes established for commercial linkage mitigation in Section 12-23-3 of this
title; and
Town of Vail
4/7/2015
The applicant is proposing a fees in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
3. The effect of any homeowners' association dues or maintenance fees imposed
upon the proposed EHU(s) on the affordability of the proposed unit for an
employee; and
The applicant is proposing a fees in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
4. The correlation between any homeowners' association fees imposed upon the
proposed EHU(s) and the services and amenities provided by the homeowners'
association; and
The applicant is proposing a fees in lieu payment. Therefore, Staff believes this review
criteria is not applicable to this application.
5. The extent to which the exchange is consistent with the applicable elements of
the adopted goals, objectives and policies outlined in the Vail comprehensive
plan and is compatible with the development objectives of the Town; and
The proposed exchange will replace a restriction that does not require occupancy with a
new EHU that will be restricted to require occupancy, increasing the number of EHUs
that require occupancy in Vail. Therefore, the exchange is consistent with the
applicable elements of the adopted goals, objectives and policies outlined in the Vail
Comprehensive Plan and is compatible with the development objectives of the Town.
6. The extent to which the exchange presents a harmonious, convenient,
workable relationship among land uses consistent with municipal development
objectives; and
The proposed exchange will not change the existing harmonious, convenient, workable
relationship among land uses consistent with municipal objectives.
7. The extent to which the exchange provides for the growth of an orderly viable
community and serves the best interests of the community as a whole.
Staff believes the proposed exchange complies with the applicable requirements of the
Town's zoning regulations and is therefore consistent with this criterion.
III. RECOMMENDATION
The Community Development Department recommends the Vail Local Housing
Authority forwards a recommendation of approval to the Vail Town Council for the
proposed employee housing unit deed restriction exchange based upon a review of the
Town of Vail Page 2
4/7/2015
criteria and findings as outlined in this memorandum and the evidence and testimony
presented.
Should the Vail Local Housing Authority choose to forward a recommendation of
approval for this employee housing unit deed restriction exchange, the Community
Development Department recommends the Authority pass the following motion:
"The Vail Local Housing Authority forwards a recommendation of approval
to the Vail Town Council for the release of a deed restriction from an
existing 458 square foot employee housing unit located at Lot 28 Vail
Village West Filing No. 2 also known as 1915 West Gore Creek Drive in
exchange for a fees in lieu payment, pursuant to Section 12-13-5,
Employee Housing Unit Deed Restriction Exchange Program, Vail Town
Code and setting forth details in regard thereto."
Should the Vail Local Housing Authority choose to forward a recommendation of
approval for this employee housing unit deed restriction exchange, the Community
Development Department recommends the Authority make the following findings:
"Based upon the review of the criteria outlined in Section 11 of the March 24,
2015, staff memorandum and the evidence and testimony presented the Vail
Local Housing Authority finds:
1. The application meets the general requirements of subsection D of Section 12-
13-5, Vail Town Code;
2. The application is consistent with the applicable elements of the adopted
goals, objectives and policies outlined in the Vail Comprehensive Plan and is
compatible with the development objectives of the Town;
3. The application furthers the general and specific purposes of the zoning
regulations, Section 12-1-2, Vail Town Code and the employee housing
regulations of Section 12-13-1, Vail Town Code; and,
4. The application promotes the health, safety, morals, and general welfare of the
Town and promotes the coordinated and harmonious development of the Town
in a manner that conserves and enhances its natural environment and its
established character as a resort and residential community of the highest
quality. "
IV. ATTACHMENT
A. Applicant's Request
Town of Vail Page 3
4/7/2015
TOWN OF VAIN
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Any Action as a Result of Executive Session
BACKGROUND: This agenda item has been added to the regular meeting agenda in order
to allow for any official action required as a result of the executive session.
4/7/2015
TOWN OF VAIN
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Town Manager's Report
1) Vail Golf and Nordic Clubhouse Remodel - Contractor Selection
4/7/2015
TOWN OF VAIN
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Ford Park 2015 Summer Managed Parking
PRESENTER(S): Greg Hall
ACTION REQUESTED OF COUNCIL: The Town Council is asked to receive community
input and provide input and direction on the proposed changes to the Ford Park 2015 Summer
Managed Parking Program.
BACKGROUND: Since 1998 the town staff working with the Ford Park user groups have
presented a Summer Managed Parking Plan to the Vail Town Council for review and direction.
STAFF RECOMMENDATION: Direct staff to prepare for the Ford Park 2015 Summer
Managed Parking Program with an option to preserve parking spaces to be leased by the user
groups on designated special event dates only and continue to require paid parking on special
event dates and use express bus service from Vail Village and Lionshead Parking Structures.
Continue to explore a long term solution for parking at Ford Park upper bench parking lot for
Implementation in summer 2016.
ATTACHMENTS:
Ford Park Summer Parking Memorandum and Exhibits
4/7/2015
rowN of vain
Memorandum
TO: Vail Town Council
FROM: Greg Hall, Director of Public Works and Transportation
DATE: April 7, 2015
SUBJECT: Ford Park 2015 Summer Managed Parking
I. PURPOSE
The purpose of this agenda item is to present an update on the Ford Park 2015 Summer
Parking Program and receive community input and direction from the Town Council.
Information to be presented includes:
Proposed Changes for Summer 2015
2015 Managed Parking Day Calendar
Series of next steps for working toward further modifications for the long term parking
management
Each year representatives from the user groups of Ford Park meet to review the anticipated
activities and events at Ford Park and discuss the days where managed parking will be
required, a program whereby a certain number of event dates are defined and paid parking is
implemented. The Ford Park user groups, as identified in the Ford Park Master Plan, include
Town of Vail, Vail Recreation District, Vail Valley Foundation (Ford Amphitheater) and Betty
Ford Alpine Gardens. In addition, Bravo! Vail and now Walking Mountains, operator of the Vail
Nature Center, have been included in the discussions.
The need to improve managed parking at Ford Park has become a priority now that capital
improvements are complete and sports events will be returning to the athletic fields.
II. BACKGROUND
The 2013 Gerald R. Ford Park Master Plan presents a compilation of all the previous planning
efforts along with new direction and ideas that have evolved from this latest planning effort,
which provided guidance for the outcome of future development within the park and a
framework and direction for the management of the park. The following excerpts are the
impetus of formulating a Ford Park Parking and Transit Management Plan with the user groups
input.
Objective 3.2: Utilize the Parking/Transit Sub -area as the primary means for satisfying
the Park's parking and transit needs.
Policy Statement 3: Provide parking for daily park -use within the Parking/Transit Sub -Area and
utilize the Vail Village Parking Structure to satisfy peak parking demands of the Park.
4/7/2015
Objective 3.2 Action Steps:
Action Step 3.2.1: Town Staff, with coordination from Park stakeholders, shall prepare a Parking
and Transit Management Plan, to include, but not be limited to the use and access of parking
lots, fee structures, transit operations, etc.
Objective 4.2:
Policy Statement 1: Encourage leaseholders in Ford Park to utilize their marketing efforts to
promote walking, biking and the use of Town buses as an alternative to driving to the Park.
Goal #5:
Maintain compatible relationships between all venues and all uses within Ford Park.
Objective 5.1: Manage the carrying capacity of the Park by scheduling events to prevent
overlapping or simultaneous events that exceed the availability of community parking or other
park infrastructure.
Policy Statement 1: The Town of Vail through its designee shall coordinate with leaseholders
an annual schedule for events and uses at all Ford Park venues.
Policy Statement 2: No one event or type of use will be allowed to dominate the usage of the
Park.
Policy Statement 3: The Park is a Town of Vail community facility and in the case of conflicting
uses, functions that best serve the interests of the community will have the highest priority. In all
cases, final decisions regarding the use of the Park shall rest with the Town of Vail.
Policy Statement 4: The day-to-day management and coordination of activities in the Park will
be assigned to the Town of Vail. The Town of Vail, through its designee, will coordinate as
necessary with representation from the Vail Valley Foundation, the Betty Ford Alpine Gardens
and the Vail Recreation District.
Objective 5.1 Action Steps:
Action Step 5.1.1: Expand the master schedule kept by the Town Clerk to include all venues
within the Park.
Action Step 5.1.2: Hold preseason event/activity coordination meetings with all affected
stakeholders.
Action Step 5.1.3: Hold semiannual (or as deemed necessary) coordination and input meetings
with the Town of Vail, leaseholder representatives, and neighborhood and adjacent property
owner representatives.
Starting before the holidays and the subsequent months since, the user groups have been
working collaboratively, as they have every year, to revisit and address the Master Plan items
listed above, with a focus this year on "resolution of parking problems". Each user group was
asked to identify requests and preferences for parking that would speak to their groups' specific
needs, some of which are summarized below:
Keep the parking plan CONSISTENT AND SIMPLE for all users
Eliminate use of orange cones
Town of Vail 4/7/2015 Page 2
Create an area that could be used as reserved parking for user groups' customers on an
as needed basis
Improve overall efficiency of the upper bench parking lot with some consistency to other
parking areas and a simple message
Consider using other parking lots to assist with the demand
Create equitable parking opportunities for user groups and general public
Improve customer service to avoid the negative interactions between TOV employees
and customers
Consider trying something different than the prior year's managed parking program even
if it is on an experimental basis
Improve wayfinding signage around the park
The new parking equipment installed at Ford Park and Soccer Field is programmed for winter
pass parking operations only. Any change in paid parking collections would require significant
investment and time to provide the parking equipment additions.
Operational issues have also been identified and need to be further reviewed against the
various options for enhancement of the managed summer parking at Ford Park:
Mix of general public "pay on entry" and reserved parking "donors" entering in the same
queue
Impacts to the bus lane/drop off lane due to additional activity
Role of parking operations during circumstances when reserved patron does not present
proper credentials for access to parking
Traffic congestion impacts for "pay on entry" or "pay on exit" scenarios with utilization of
parking equipment
Development of a consistent rate structure/potential pass program which meets
objectives of the current managed days
Delivery and installation of the parking equipment in a timely manner once the
operations are determined
III. MANAGEMENT OPTIONS CONSIDERED SUMMER 2015
Status Quo -Same as Last year
Once the calendar is established with the appropriate managed and paid days, the Ford Park
and Soccer Field parking lots are managed by the Town of Vail parking staff.
In order to ensure adequate parking for a specific number of reserved spots for a limited number
of Bravo (50) and Vail Valley Foundation (25) users, spaces were blocked/coned off starting as
early as 1:00 pm in the afternoon. However, the request for additional reserved spaces from the
users was occurring the day of the performance and throughout the summer. During certain
performances the request would exceed 110 spaces. These last minute changes caused a
great deal of confusion to the users of the park during major events as space was not available
to meet the late afternoon demand. This also often triggered many questions from the general
public as to why a lot was full when as many as half the spaces appeared to be available. There
is clearly a desire to offer a higher level of service because we should be able to do better as no
one was happy and none of the goals were met.
Town of Vail 4/7/2015 Page 3
Reserved Section "Nest" upper bench for Ford Park
Preserve the portion of the west end necked down section of the upper bench lot and allow user
groups to lease the entire 47 spaces for customers. The area, referred to as the "nest", would
be managed by their user group. See attached b for a map.
The remaining central portion of the upper bench lot would be available for the general public
approximately 139 spaces.
Reserved Parking using the Gold Peak Children's Center as drop off and
providing additional parking through Soccer Field
The entire upper bench parking lot would be managed as a public lot.
Reservation and drop off would be managed and controlled by the user groups.
Overflow parking storage would be provided at the soccer field on high demand days.
Daily summer paid parking Memorial Day to Labor Day
Use a rate structure that would encourage turnover during the day and ensure spaces available
for the evening along with a reserved section. Determine if a rate structure could be devised
which would not be confusing to public user groups.
Is the operation "pay on entry" or "pay on exit" or both? Determine what equipment needs would
be required to handle the operation. Also, determine if any physical improvements would be
required to handle the operation.
Reserved parking during all events
Upper bench parking lot open to general public in addition to special user groups.
Operate as a "pay lot" with the added feature of a reservation system. Determine if "passes" are
included in the service level as well.
Enhanced bus service
Increase the service level by using an extended in -town shuttle from Memorial Day to Labor
Day. This option could be added at any time; the staging and operational costs are estimated at
$87,000. It would be suggested to implement this service only if there were paid parking on a
daily basis at Ford Park.
IV. PROPOSED 2015 SUMMER MANAGEMENT PLAN -INCREMENTAL
IMPROVEMENTS
Reserved Section "Nest" upper bench for Ford Park
Preserving the portion of the west end necked down section for user groups to lease the 47
spaces with the caveat the user group manage this area professionally This area when valet
parked can accommodate 60-65 spaces. The additional user group parking demand would be
met by using the Golden Peak Children's Ski School which can accommodate 40-50 spaces. If
on the six high demand evenings, additional spaces are necessary, a portion of the Soccer Field
lot would be preserved for any remaining overflow. It would be up to the user groups to manage
the drop-off points and allocation of spaces during this timeframe.
The proposed rental of the "nest" area would be $500 for an evening (4PM-10PM) and $500
during the day from 6 AM to 4 PM. To ensure spaces are available, the staff would recommend
Town of Vail 4/7/2015 Page 4
the parking ticket ordinance be amended to allow the same $38 dollar parking fine be
implemented as is used in the short term spots at the Vail Village Parking garage.
Well placed signs at either end of the "nest' parking lot would inform users of the requirement to
vacate the area after 4PM or be subject to a parking ticket of $38.
The remaining lot would be available for the general public similar to last year but without any
reservations and use of coned off spaces.
V. PROPOSED FUTURE MANAGEMENT STEPS SUMMER 2016 AND BEYOND
Evaluate the effectiveness of the "nest' parking on the public operations and guest experiences.
Determine if user group needs and demands are met
Evaluate the various kinds of complaints regarding the "nest'
o the issuance of parking tickets for those parking in the well signed "nest' after 4pm
o Not meeting all the donor demands at one location
Impacts on bus operations and drop off area
Ensure the integrity of the Federal Highway Administration/Colorado Department of
Transportation lease issues are not compromised
Is this parking meeting the needs of other users as well and is it equitable? Not all users
are treated the same as only select groups can make reservations
Does not solve issue of users arriving ever earlier to avoid the paid parking
Does not address the issue of a cars in the public lot and the owners are not using the
park during peak demand
All spaces are not available to meet the high public demand with the limited supply
Not consistent from day-to-day and event -to -event
Continue discussions with user groups to explore what a full summer paid parking program
might look like with some of the following components:
Evaluate rate structures and parking pass options
Determine if it is possible to provide a reservation system which the town controls and
manages for all the park users
Determine the capital and operational costs to meet the parking program
Obtain public input regarding managed parking options and return to the council with a
recommendation
During the 2016 budget process provide the necessary funding to implement the future
plan
VI. ACTION REQUESTED
The Town Council is asked to receive community input and provide input and direction on the
proposed changes to the Ford Park 2015 Summer Managed Parking Program.
VII. STAFF RECOMMENDATION
Direct staff to prepare for the Ford Park 2015 Summer Managed Parking Program with an
option to preserve parking spaces to be leased by the user groups on designated special event
dates only and continue to require paid parking on special event dates and use express bus
service from Vail Village and Lionshead Parking Structures.
Continue to explore a long term solution for parking at Ford Park upper bench parking lot for
Town of Vail 4/7/2015 Page 5
Implementation in summer 2016.
VIII. ATTACHMENTS
a. Ford Park Managed Parking Day Calendar
b. Ford Park Parking Maps
Town of Vail 4/7/2015 Page 6
Ford Park
Managed Parking Day Calendar
Dates
Event Name
Timeframe
May 2015
Saturday, May 23
Battle Mountain High School Graduation
(12:30 p.m. - 4:30 p.m.)
10:30 a.m. - 4:30 p.m.
Managed vs.
Paid Parking, VMS & PD
Friday, May 29
Vail Mountian School High School Graduation (3:00
p.m. to 6:00 p.m.)
4:00 p.m. - 8:00 p.m.
Managed vs.
Paid Parking, VMS & PD
June 2015
Friday, June 12
Colorado Children's Chorale
No Paid Parking
Tuesday, June 16
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, June 23
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Saturday, June 27
VRD Vail Rugby
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Sunday, June 28
VRD Lacrosse Shoot Out
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Monday, June 29
VRD Lacrosse Shoot Out
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Tuesday, June 30
VRD Lacrosse Shoot Out
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
July 2015
Wednesday, July 1
VRD LSO / Bravo - Dallas
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Thursday, July 2
VRD LSO
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Friday, July 3
VRD LSO / Bravo - Dallas
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Saturday, July 4
VRD LSO / Bravo - Dallas
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Sunday, July 5
VRD LSO / Bravo - Dallas
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Monday, July 6
Bravo - Dallas
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, July 7
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Wednesday, July 8
Bravo - Dallas
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Friday, July 10
Bravo - Philadelphia Orchestra
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Saturday, July 11
Bravo - Philadelphia Orchestra (start time 8 pm)
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Sunday, July 12
VRD Baseball World Series / Philadelphia Orchestra
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Monday, July 13
VRD Baseball World Series
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, July 14
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Wednesday, July 15
VRD Baseball World Series / Philadelphia Orchestra
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Thursday, July 16
VRD Baseball World Series
Family Concert
4:00 p.m. - 8:00 p.m.
10:30 a.m.
Paid Parking, VMS & PD
Managed Parking
Friday, July 17
VRD Baseball World Series / Philadelphia Orchestra
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Saturday, July 18
VRD Baseball World Series / Philadelphia Orchestra
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, July 21
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Friday, July 24
Bravo - NY Philharmonic
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Saturday, July 25
Bravo - NY Philharmonic
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Sunday, July 26
Bravo - NY Philharmonic
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, July 28
VRD Youth Camp
Hot Summer Nights
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Wednesday, July 29
Bravo - NY Philharmonic
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Thursday, July 30
Bravo - NY Philharmonic
4:00 p.m. - 8:00 p.m.
Paid Parking, VMS & PD
Friday, July 31
VRD Soccer T /
Bravo -NY Philharmonic
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
August 2015
Saturday, August 1
VRD Soccer T
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
Sunday, August 2
VRD Soccer T
7:00 a.m. - 7:00 p.m.
Paid Parking, VMS & PD
4/7/2015
4/2/2015
Ford Park
Managed Parking Day Calendar
May 2015
Monday, August 3
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, August 4
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Wednesday, August 5
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Thursday, August 6
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Friday, August 7
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Saturday, August 8
VIDF
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, August 11
Hot Summer Nights
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, August 18
Hot Summer Nights
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
Tuesday, August 25
Hot Summer Nights
4:00 p.m.
- 8:00 p.m.
Paid Parking, VMS & PD
PLEASE NOTE THIS SCHEDULE IS SUBJECT TO CHANGES
4/7/2015
4/2/2015
e Feet
05 0 125 250 500
Ford Park Parking Options
Town of Vail
i 4 _
`Vail Village eParking Structure
(via Frontage Road side walk)
IV `O
E MEADoWD 1 \\\
R
1-4 IL VA LLQ
�r
c
Vail Village Parking Structure
(via nature trail)
GpR!
a
Children's Ski School Lot
(via Vail Valley Drive'`
/J
TOWN OF VAC
This map Wes br tatl by the Town bf Va II GIS Dlvislo n -Use, I this ma p h,, Id bb br general WrPo only. The Town of Vatl- not warrant the ac ,, of the Info rmatio n w t, n herein.
Ford Park - Far East Parking
Ford Park - Central Parking
)st Parking
—�
------------------
' _
I
,7 _77
1 -
-
-
/,
Extended In -Town Route:
Bus Stop
Soccer Field Parking Lot
# Parking Spaces
(includes handicanaed Darkine) # Handicaoaed Parkine Spaces Distance to Amohitheater Distance to Athletic Fields
Village Parking Structure (via sidewalk)
1068 (plus 217 on top deck)
18
2,700'
1,900'
Village Parking Structure (via foot path)
1068 (plus 217 on top deck)
18
2,700'
2,300'
Soccer Field Parking Lot
60
9
1,650'
2,550'
Ford Park - West Nest Parking
47
12
1,300'
800'
Ford Park- Central Parking
139
8
1,200
1,150'
Ford Park - Far East Parking
12
0
1,650'
1,600'
Children' i Lot (via Manor Vail)
30 (45 valet parking)
2
1,600'
-
Children's Ski School Lot (via Vail Valley Drive)
30 (45 valet parking)
2
1,400'
-
q
0
4/7/2015
N
1"=30'
Martin/Martin, Inc.
.•�000000go
Towx of vn' 1[1
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Resolution No. 9, Series of 2015, A Resolution of the Vail Town Council
Extending the Deadline for Commencement of Construction of Improvements Contemplated in
the Amendment to the Existing Vail Golf Course Conditional Use Permit (PEC12-0036)
PRESENTER(S): George Ruther
ACTION REQUESTED OF COUNCIL: Approve, approve with modifications, or deny
Resolution No. 9, Series of 2015.
STAFF RECOMMENDATION: The Community Development Department recommends the
Vail Town Council to approve Resolution No. 9, Series of 2015 as presented.
ATTACHMENTS:
Resolution No. 9, Series of 2015
4/7/2015
RESOLUTION NO. 9
SERIES OF 2015
A RESOLUTION OF THE VAIL TOWN COUNCIL EXTENDING THE
DEADLINE FOR COMMENCEMENT OF CONSTRUCTION OF THE
IMPROVEMENTS CONTEMPLATED IN THE AMENDMENT TO THE
EXISTING VAIL GOLF COURSE CONDITIONAL USE PERMIT (PEC12-
0036)
WHEREAS, the Town is the owner of the Vail Golf Course;
WHEREAS, in November 2011, the Town's voters approved a ballot question
allowing for certain improvements to the Vail Golf Course, including improvements to
the Golf Course Clubhouse;
WHEREAS, in 2013, the Town filed an application to amend the existing
Conditional Use Permit for the Vail Golf Course to allow for the improvements to the Vail
Golf Course, including improvements to the Golf Course Clubhouse, as approved by the
Town's voters in 2011;
WHEREAS, on April 22, 2013, the Town of Vail Planning and Environmental
Commission ("PEC") approved, with conditions, an amendment to the existing Vail Golf
Course Conditional Use Permit (PEC12-0036) (the "Amended CUP") to allow the
improvements approved by the Town's voters in 2011;
WHEREAS, on May 10, 2013, certain homeowners appealed the PEC's decision
to approve the Amended CUP pursuant to § 12-3-3.0 of the Vail Town Code;
WHEREAS, on June 4, 2013, the Town Council heard the appeal, upheld the
decision of the PEC and approved the Amended CUP;
WHEREAS, pursuant to § 12-16-8 of the Vail Town Code, a conditional use
permit will lapse if a building permit is not obtained and construction commenced within
two years from the date the approval becomes final;
WHEREAS, the approval of the Amended CUP became final on June 4, 2013,
which would set the two-year deadline at June 4, 2015;
WHEREAS, the Town Council desires to implement the intent of the Town's
voters by constructing the improvements contemplated in the Amended CUP;
WHEREAS, since the final approval of the Amended CUP, the Town has
encountered difficulties beyond its reasonable control, including without limitation cost
overruns, engineering difficulties and concerns about the effect of ongoing litigation
involving the Vail Golf Course, which difficulties have prevented the Town from
commencing construction of the improvements contemplated in the Amended CUP prior
to June 4, 2015; and
1
7 4/1/2015
413.�I/ ? IVAILIRES120151CLUBHOUSE CUP EXT-R040115.DOC
WHEREAS, the Town Council finds and determines that an extension of the
Amended CUP is in the best interest of the public health, safety and welfare.
NOW THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO THAT:
Section 1. The Town Council hereby finds and determines that the Town has
encountered difficulties beyond its reasonable control, including without limitation cost
overruns, engineering difficulties and concerns about the effect of ongoing litigation
involving the Vail Golf Course, which difficulties have prevented the Town from
commencing construction of the improvements contemplated in the Amended CUP.
Section 2. The Amendment to the existing Vail Golf Course Conditional Use
Permit (PEC12-0036), as approved on June 4, 2013 (the "Amended CUP"), shall not
lapse or become void under § 12-16-8 of the Vail Town Code, and the timeframe for
commencing construction of the improvements contemplated in the Amended CUP shall
be extended until June 4, 2017.
INTRODUCED, PASSED AND ADOPTED this 7t" day of April, 2015.
ATTEST:
Patty McKenny, Town Clerk
Andrew P. Daly, Mayor
2
/ 4/1/2015
41(!7 QW4VAURES120151CLUBHOUSE CUP EXT-R040115.DOC
TOWN OF VAIN
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: First reading of Ordinance No. 5, Series 2015 an Ordinance making budget
adjustments to the Town of Vail General Fund, Capital Projects Fund, Real Estate Transfer
Tax Fund, Heavy Equipment Fund and Timber Ridge Enterprise Fund.
PRESENTER(S): Kathleen Halloran, Finance Director and Carlie Smith, Budget Analyst
ACTION REQUESTED OF COUNCIL: Approve or approve with amendments Ordinance No.
5, Series 2015
BACKGROUND: Please see attached memo
STAFF RECOMMENDATION: Approve or approve with amendments Ordinance No. 5,
Series 2015
ATTACHMENTS:
Ord 5
4/7/2015
TOWN N O F
TO: Vail Town Council
FROM: Finance Department
DATE: March 31, 2015
SUBJECT: 2014 Results and 2015 Supplemental Appropriation
I. SUMMARY
The completion of the 2014 financials sets the stage for this supplemental appropriation of 2015
with the identification of capital projects that span more than one year and need to have funding
re -appropriated to the current year. In Tuesday evening's session, you will be asked to approve
the first reading of Ordinance No. 5 making supplemental appropriations and adjustments to the
2015 budget. The following information is provided for your review:
Summary of Revenue, Expenditures, and Changes in Fund Balances — 2014 Actual
Compared with Amended Budget and 2015 including the proposed supplemental
appropriation
Ordinance No. 5, Series 2015
II. DISCUSSION
2014 RESULTS
Across all funds and revenue accounts for 2014, total revenue of $64.8 million is up 20.8% from
2013 mainly due to increases in sales tax collections, Real Estate Transfer Tax collections,
construction activity and reimbursements from the Vail Reinvestment Authority during the year.
Sales tax collections reached $23.9 million for the first time, a 8.6% increase over 2013 and a
21.6% increase over the pre -recession high reached in 2008. Throughout the year sales tax
collections showed solid increases, with only April (impacted by the timing of Easter), May (only
2.5% of annual collections) and October failing to reach monthly records. Summer activity was
strong with sales tax collections up 8.8% from the prior summer. Winter of 2014-15 is
continuing the trend, with November through February collections all at record highs and an
overall increase of 5.9% over those same months last winter.
Real estate transfer tax collections in 2014 of $6.9 million increased 31 % from prior year due to
significant activity in both higher -priced residential and several large commercial projects.
Construction activity improved, with Construction Use Tax of $1.8 million exceeding prior year
by 25% and permit fee revenue of $2.6 million up 86%.
4/7/2015
Ski Lift tax collections of $4.4 million were up 8.6% from prior year due to a strong start of the
winter season and snowfall.
Parking revenue of $4.5 million has increased by 9% compared to 2013, although has not
reached the $5.0 million high in both 2009 and 2010 when parking demand from guests and
construction activity outweighed parking supply (now increased though both public and private
efforts) and free parking was extended to two hours.
2014 net expenditures totaled $55.7 million compared to $79.5 million budgeted. Of the
$23.9 million variance, $17.5 million is requested for re -appropriation for capital projects
currently underway and approximately $4.7 million of new project funding requested ($3.9
million of which is related to the Vail Golf & Nordic Center) are offset by $1.7 million in savings
from projects completed during the year. The new funding requests are outlined in the next
section "2015 Supplemental" below.
General Fund operating expenditures of $32.7 million came in below budget by $1.1 million, or
3.4%. The savings came from general operating savings of $600,109, salary and benefit
savings of $456,724. Operational savings included professional fees of $166K, utilities of $36K,
professional development of $50K, planning projects of $31 K and various other items.
As a result, the General Fund fund balance ending December 2014 totals $19.7 million, or 55%
of annual revenues.
2015 SUPPLEMENTAL APPROPRIATION
The main purpose of this supplemental is to re -appropriate funds for 2015 capital projects that
were started in 2014 and are continuing into this year, or projects that did not begin as planned
in 2014. There are also adjustments needed to reflect events or decisions that occurred after
the 2015 budget was finalized.
General Fund
Revenue will be increased by $10,000 to offset corresponding expenditures for legal expenses
surrounding the redevelopment of the Vail Valley Medical Center (VVMC).
General Fund expenditures are proposed to decrease by $48,000:
• Cancellation of the U.S. Pro -Cycling Challenge will reduce expenditures by $75,000
• $8,000 increased costs for the 811 "line locate" service to notify the town staff of a
requested "locate" of electrical or irrigation lines. Currently the 811 center instructs
customers to contact the town directly. By purchasing this service, the town is
guaranteed notification of line locate requests.
• $9,000 re -appropriation of uniform expenditure from the 2014 budget due to late arrival
of uniforms in 2015 and for Fire department coats not ordered in 2014.
The above adjustments to the General Fund 2015 budget result in an estimated fund balance of
$19.1 million by the end of 2015, or 55% of annual revenues.
417x'2015
Capital Projects Fund
Revenue will be adjusted by a total increase of $341,582. A majority of these funds ($176.7K)
will be reimbursement from CDOT for continuation of the 1-70 Underpass project and $118.8K
from the continuation of federal grant funding for the bridge at Nugget Lane and Bridge Road.
An estimated $40,000 of reimbursement from the Eagle River Water and Sanitation District
(ERWSD) will offset expenditures for a portion of the Covered Bridge project and $6,091 of
grant dollars from the Fireman's Fund Insurance Co. will offset expenditures in 2015 for some of
the breathing apparatus equipment that has been requested. The remaining fire equipment
requested is funded from proceeds received in 2014 from the sale of a replaced fire truck.
Staff is requesting to supplement 2015 expenditures by a total of $6.2 million, $5.7 million of
which represents projects budgeted in 2014 but not yet completed such as the Guest Service
Enhancements / Wayfinding project, 1-70 Underpass, hybrid bus battery replacement, a transit
center generator, Neighborhood Road and Bridge reconstruction, continued implementation of a
new permitting system for Community Development and energy enhancement programs.
Additional funding requests include the following:
• $417K of funding for the Buy -Down Program in recognition of revenue received during
2014 from Fee -in Lieu collections.
• $109K is requested for an expansion of wireless equipment and service into both East
and West Vail
• $40K of fire equipment ($17.9K for breathing apparatus and $22.1K of radio and
communications equipment) which is paid for by the $6K grant listed above and the
$35K sale of a fire truck.
Transfer of funds from the Vail Reinvestment Authority shows an increase of $1,299,470 to
reflect projects carried over from the prior year such as the 1-70 Underpass and the Lionshead
parking structure entry projects.
All of the above adjustments will result in an estimated fund balance of $21.9 million by the end
of 2015.
Real Estate Transfer Tax (RETT) Fund
Budgeted revenues will increase by $938,133 for the remainder of the $1.165 million
reimbursement from the VRD relating to redevelopment of the Vail Golf and Nordic Center.
Staff is requesting to supplement 2015 expenditures by a total of $16.0 million, $11.8 million of
which relates to projects budgeted in 2014 but not yet completed such as the Ford Park Fields,
Ford Park playground and lower bench improvements, the Vail Golf and Nordic Center, Library
Recreation Path, replacement and addition of trash receptacles to meet the recycling ordinance,
Booth Creek Park redevelopment, a permanent skate park and continued streambank and
water quality improvements.
New funding requests include the following:
• $3.9 million additional project funding of the Vail Golf and Nordic Center as approved by
Council on October 7, 2014. This $3.9 million was originally budgeted in 2016, but is
being moved forward into 2015 should Council approve the selection of a contractor.
• $250K estimated cost for the new "Vail Trail" (please see attached memo for more
details and cost breakout).
The proposed budget adjustments will result in an estimated fund balance of $1.3 million by the
end of 2015.
417312015
Heavy Equipment Fund
Several replacement vehicles were ordered (and budgeted for) in 2014, but delivery will take
place in 2015. A re -appropriation of $415,954 is requested to cover payment for a Ford
Explorer for the detective staff, a Polaris ranger for the landscape and streets crews, a street
sweeper, a sewer jetter, emergency lights and equipment for a fire department vehicle, and a
dump bed for a streets crew vehicle.
Timber Ridge (Enterprise) Fund
A re -appropriation of capital outlay ($572,000) is requested to continue the exterior renovations
such as windows and exterior paint that were approved in the 2014 budget. These repairs have
been bid out to various contractors and work is expected to be competed this summer.
Sufficient fund balance is available in the Timber Ridge Enterprise Fund to cover the proposed
capital outlay leaving an estimated $686K, or 57% of revenue, in fund balance at the end of
2015.
41742015
Vail Trail
Supplemental Budget Request
April 7, 2015
The concept for improving and extending the Vail Trail has been presented to the Town Council at
several Work Session meeting over the past year. The idea is to renovate the existing section of trail
between Golden Peak and the Golf Course Clubhouse, and to extend the trail eastward to the Vail
Memorial Park. When completed, the six -mile trail would provide a beginner level, multi -use, soft
surface trail for residents and guests. The proposed alignment would cross through multiple parcels
including town -owned, private and U.S. Forest Service (USFS) property.
Because of its location, the approval process for the trail includes a Conditional Use Permit from the
town's Planning and Environmental Commission (PEC) as well as clearance and a permit from the USFS.
Both approvals require environmental evaluations for wetlands, wildlife and cultural concerns. The
town's version of the study is termed an Environmental Impact Report (EIR) and the USFS version is the
National Environmental Policy Act (NEPA) process and are similar in terms of the information they
require.
• The Vail Trail proposal has been officially accepted by the USFS as a project and has been given
elevated status for completion of the approval process with TOV participation. It is very important
for the town to take advantage of the review process at this time.
• The USFS will evaluate the trail in its entirety as a "connected action" which means they will
consider impacts of the proposal for areas that may not directly impacts USFS property. This is a
standard action with the USFS approval process
• The town has received two proposals for completion of the EIR and the NEPA reports.
• In addition, the town has received two preliminary proposals from professional trail building
companies for portions of the trail. Preliminary because the final alignments for the trail could be
altered based on the findings of the reports and the potential need for bridges or elevated decks
through wet areas.
• It is feasible that the eastern 1-1/2 miles of this project could be constructed in the fall of 2015
pending approval from the PEC since it is entirely located on town -owned land.
The Supplemental request includes the following:
Environmental Analysis $ 75,000
Design/Public Outreach $ 25,000
2015 Construction Budget $ 150,000
Supplemental Budget Request $ 250,000
Pending approvals from the town's PEC and the USFS, additional trail could be constructed in either
2015 or 2016. Additional funds would be required once the scope of that work is determined.
5
4/7/2015
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
GENERALFUND
2014
Actuals
Variance
Fav I (Unfav)
2015
Original
Budget
1st
Supplemental
2015
Proposed
Comments
2014
Amended
Amended
Revenue
Local Taxes: $ 23,100,000
$ 23,881,131
$ 781,131
$ 24,486,000
$ 24,486,000
Sales Tax Split b/t Gen'I Fund & Capital Fund 62/38
62/38
62/38
62/38
Sales Tax $ 14,322,000
$ 14,322,000
$ -
15,181,000
$ 15,181,000
Property and Ownership 4,353,500
4,358,411
4,911
4,301,000
4,301,000
Ski Lift Tax 3,782,000
4,351,624
569,624
4,418,700
4,418,700
Franchise Fees, Penalties, and Other Taxes 1,116,550
1,121,455
4,905
1,158,779
1,158,779
Licenses & Permits 2,632,801
2,747,488
114,687
1,538,267
1,538,267
Intergovernmental Revenue 1,869,678
2,010,236
140,558
1,835,192
1,835,192
Transportation Centers 3,839,680
4,543,399
703,719
4,023,264
4,023,264
Charges for Services 870,397
947,267
76,870
907,812
907,812
Fines & Forfeitures 276,274
207,723
(68,551)
263,404
263,404
Earnings on Investments 110,000
157,713
47,713
108,236
108,236
Rental Revenue 840,896
1,044,463
203,567
903,087
903,087
Miscellaneous and Project Reimbursements 136,000
215,122
79,122
1 283,000
10,000
293,000
WMC legal to be reimbursed
Total Revenue 34,149,776
36,026,901
1,877,125
34,921,741
10,000
34,931,741
5.5%
Expenditures
Salaries 14,938,480
14,630,258
308,222
16,013,936
16,013,936
Benefits 5,189,962
5,041,460
148,502
5,774,964
5,774,964
Subtotal Compensation and Benefits 20,128,442
19,671,718
456,724
21,788,900
-
21,788,900
Contributions and Special Events 2,126,198
2,068,595
57,603
2,044,028
2,044,028
All Other Operating Expenses 7,197,735
6,597,626
600,109
7,395,314
27,000
7,422,314
WMC Legal $10K; Line locates $8K; uniforms $9K
Heavy Equipment Operating Charges 2,365,254
2,332,918
32,336
2,365,917
2,365,917
Heavy Equipment Replacement Charges 553,826
580,890
(27,064)
592,884
592,884
Dispatch Services 590,961
590,961
-
630,588
630,588
Total Expenditures 32,962,416
31,842,708
1,119,708
34,817,631
27,000
34,844,631
Revenue Over (Under) Expenditures
Castle Peak Senior Care Facility (200,000)
(200,000)
2015 World Alpine Ski Championships (250,000)
(250,000)
(250,000)
-
(250,000)
Pro -cycling event (75,000)
(75,000)
(75,000)
75,000
2015 Nation's Event (375,000)
(375,000)
-
(375,000)
-
(375,000)
Transfer to Dipatch Services Fund -
-
-
(22,338)
-
(22,338)
Surplus Net of Transfers & New Programs 287,360
3,284,193
2,996,833
(618,228)
58,000
(560,228)
Beginning Fund Balance 16,401,973
16,401,973
16,689,333
2,996,833
19,686,166
Ending Fund Balance $ 16,689,333
$ 19,686,166
$ 16,071,105
$ 19,125,938
EHOP balance included in ending fund balance - $ 690,000
not spendable
$ 690,000
$ 690,000
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2015 Proposed
2014 2014 Variance Original list 2015
Amended Actual Fav I(Unfav) Budget Supplemental Amended Comments
Revenue
Total Sales Tax Revenue:
$ 23,100,000
$ 23,881,130
$ 781,130
$ 24,486,000
$ 24,486,000
2015 6% incr from 2014 amended; then 5% per year
Sales Tax Split between General Fund &
62/38
62/38
62/38
62/38
Capital Fund
Sales Tax - Capital Projects Fund
$ 8,778,000
$ 9,799,940
$ 1,021,940
$ 9,305,000
$ 9,305,000
Use Tax
1,800,000
1,803,853
3,853
1,800,000
1,800,000
2015 flat with 2014 forecast; 2014 YTD pacing 26% up from 2013
Federal Grant Revenue
240,000
121,248
(118,752)
240,000
118,752
358,752
2014-2016: Bridges at Nugget Lane and Bridge Rd
Other State Revenue
504,000
327,261
(176,739)
356,000
182,830
538,830
CDOT share of funding for 1-70 Underpass study; re -appropriate $176K from prior year;
$6K grant for fire equipment
Lease Revenue
197,295
197,295
-
197,295
197,295
Per Vail Commons commercial (incr. every 5 years) and residential leases
Employee Housing Fee -In -Lieu
361,805
417,665
55,860
-
2015 $40K reimbursement from ERWSD for waterline work on the Covered Bridge.
2014:$90K contribution to Mobile Comm Van from external agencies ($27.5K received
Project Reimbursement
251,200
290,671
39,471
-
40,000
40,000
in 2013); Reduce budget by $16.8K of Mobile Comm Van funding that will come from
Transfer as show below from prior year's capital contributions from the E911 Board;
$170K Holy Cross grant for lighting replacment (LEDs)
TRAHC
494,466
491,871
(2,595)
494,466
494,466
Principal and interest on loans to TRAHC
Earnings on Investments and Other
36,229
205,795
169,566
103,654
103,654
0.7% rate assumed
Total Revenue
12,662,995
13,655,599
992,604
12,496,415
341,582
12,837,997
Bus Shelters
30,000
273
29,727
30,000
-
30,000
Annual maintenance.
Parking Structures
620,000
610,682
9,318
680,000
-
680,000
Various repairs including deck topping replacement, expansion joint repairs, ventilation,
HVAC, plumbing and other structural repairs.
$165K for Pitkin Creek bus stop and municipal carpet (partial replacement);
Facilities Capital Maintenance
603,563
416,284
187,279
541,760
165,000
706,760
General project covers repairs to town buildings including the upkeep of exterior
(roofing, siding surfaces, windows, doors), interior finishes (paint, carpet, etc), and
mechanical equipment (boilers, air handlers, etc.).
Donovan Park Pavilion
58,670
38,830
19,840
500,000
19,840
519,840
2015: to change ventilation & improve noise, which includes a protective structure on
the outside of the building; replace heating/air system and $50K furniture replacement.
Street Light Improvements
296,000
151,047
144,953
25,000
144,953
169,953
Re -appropriate to continue new street lights and to refurbish residential lighting;
Accelerated replacement approved by Council April 1st.
Capital Street Maintenance
981,200
764,977
216,223
1,116,500
216,223
1,332,723
Ongoing bridge rail project; delay in materials shipment. On-going maintenance to
roads and bridges including asphalt overlays, patching and repairs.
Includes structural maintenance of bridge beams and painting in conjunction with
Covered Bridge Structural Repairs
-
-
50,000
40,000
90,000
ERWSD waterline maintenance (hangs underneath the bridge) $40K for work done on
behalf of ERWSD - see revenue reimbursement above
Flood incident repairs
105,436
-
105,436
-
105,436
105,436
Upper Columbine / Bighorn stream crossing reconstruction
Fire Truck Replacement
620,900
618,017
2,883
-
2,883
2,883
2014 replace pumper truck from 1999; Re -appropriate for purchase of truck equipment
Audio Visual Capital Maintenance
4,599
4,500
99
18,000
18,000
$18K annual maintenance / replacement of audio-visual equipment in town buildings
such as Donovan, Municipal building, Grand View, LH Welcome Center, etc.
Town -wide camera system
130,000
129,615
385
22,000
22,000
includes $22K per year for replacement of cameras and equipment;
Document Imaging
47,664
47,664
-
68,000
68,000
Annual maintenance, software licensing, and replacement schedule for scanners and
servers. Includes 38K for software platform upgrade in 2015.
Software Licensing
48,000
46,195
1,805
60,000
60,000
Annual renewal of software licenses
Hardware Purchases
222,740
222,884
(144) 168,000
168,000
2015 replacement of three GIS printers/scanners; Two additional Simplivity Omnicube
117
nodes in 2015 at a cost of $45K each
Copier replacement
10,000
9,883
Replace 8 -yr old equipment with copier/printer/fax/scanner
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2015
Proposed
2014
2014
Variance
Original
list
2015
Amended
Actual
Fav I(Unfav)
Budget
Supplemental
Amended
Comments
Postage machine replacement
6,100
6,073
27
Outdated software cannot comply with recent USPS postage meter changes; Current
equipment 7 years old
Data Center (Computer Rooms)
15,000
14,926
74
Based on annual replacement schedule of security and power systems for 3 computer
rooms
Website and e-commerce
13,829
13,829
-
12,000
12,000
Internet security & application interfaces; website redevelopment; includes $550/month
for web hosting svcs
ArcGIS Systems
14,000
-
14,000
-
14,000
14,000
Replacement of plotter/scanner/copier for GIS
Fiber Optics in Buildings
173,726
95,691
78,035
15,000
109,000
124,000
Requesting $109K for an expansion of wireless service to West and East Vail (TOV
equipment, not Crown Castle)
Network upgrades
40,000
40,045
(45)
72,000
-
72,000
Replacement of switches and routers
Phone System Infrastructure
142,919
142,919
-
-
-
Replace infrastructure for 15 -year old phone system; Work started in 2013
Public Safety System
61,767
61,767
50,000
50,000
Annual capital maintenance of "County -wide "Computer Aided Dispatch/Records Mgmt
System"; includes patrol car and fire truck laptops and software used to push
information to TOV and other agencies; TOV portion of annual Intergraph software
maintenance
Public AM Radio
5,900
5,900
-
_
-
-
Upgrade AM1610 equipment to make operational (the station has been down for
approx. 1 year); This channel provides road and parking conditions, etc. to the public
Business Systems Replacement
190,218
72,175
118,043
118,043
118,043
$58K to continue Community Development permitting software project; anticipate
project completion this summer
Transit Center Generator
200,000
-
200,000
200,000
200,000
Replacement of generator at the Vail Village transit center; includes re -landscaping and
re -wiring; originally planned for 2014.
Police E -Ticketing system
35,000
34,972
28
_
-
-
Electronic ticketing system; reduces data entry done by officers to record physical
tickets; will interface with Full Court system
Total Maintenance
4,677,231
3,549,148
1,128,083
3,428,260
1,135,378
4,563,638
Enhancement of Town Assets
CDOT Required Parking
218,000
140,859
77,142
-
-
-
2014: Vail Village parking improvements per CDOT requirements
Vail Village Info Booth
1,536,383
1,323,165
213,218
100,000
100,000
For final bills and work completed prior to the 2015 WASC; includes new exterior and
interior cameras
Guest Services EnhancementsfWayfinding
3,161,947
1,785,032
1,376,914
1,376,914
1,376,914
Contination of signage project Guest Service / Wayfinding enhancements outside of
VRA district
Energy Enhancements
566,124
218,180
347,944
347,944
347,944
Implementation of energy audit enhancements; includes continuation of LED lighting
project with shared cost of $170K from Holy Cross.
Fire Equipment
-
-
-
-
22,153
22,153
2015: equipment purchased with proceeds from sale of fire truck ($30K revenue
received in 2014)
Neighborhood Road Reconstruction
25,000
25,000
450,000
25,000
475,000
$25K for design and $450K in 2015 for shared project with ERWSD on Rockledge Rd.
Neighborhood Bridge Reconstruction
300,000
300,000
300,000
300,000
600,000
Reconstruction and design of bridges at Nugget Lane and Bridge Rd.
Fire Breathing Apparatus
-
-
-
-
17,862
17,862
Partial replacement of breathing apparatus equipment, funded by $6K grant listed
above and sale of fire truck in 2014
Parking Entry System / Equipment
733,000
628,398
104,603
104,603
104,603
Replace parking system in both structures (LH parking structure system had been
scheduled for replacement in 2006); Better financial reporting and potential to interface
with variable message signs and other parking systems across town; Partially
reimbursed by VRA ($300K).
Radio Equipment replacement
176,000
173,808
2,192
-
-
Previously $693K budgeted in 2014 for replacement of approximately 59 radios for PW,
PD and Fire. Adjusted to only include radios purchased over 12 years ago (in 2008 the
town replaced a number of radios; these will not be replaced until 2018)
Hybrid Bus Battery Replacement
440,000
-
440,000
440,000
440,000
Replace 7 batteries in 2015; Estimated life of 6 years
Replace Buses
60,002
9,520
50,482
-
50,480
50,480
ADA van for on-call pickups and continuation of bike rack replacements
Bus Camera System
-
-
350,000
-
350,000
Installation of software and cameras in buses
Timber Ridge Legal/Zoning
15,604
14,470
1,134
-
-
Consultant and legal expenses for the continuation of redevelopment of Timber Ridge
Timber Ridge Redevelopment
225,000
159,938
Rockfall mitigation
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
CAPITAL PROJECTS FUND
2015 Proposed
2014 2014 Variance Original list 2015
Amended Actual Fav I(Unfav) Budget Supplemental Amended Comments
Total Enhancements
7,457,059
4,453,368
3,003,691
1,100,000
2,784,956
3,884,956
New Assets
Municipal Redevelopment
43,343
45,419
(2,076)
1,500,000
-
1,500,000
Planning for redevelopment of the municipal building; construction current listed on
unfunded sheet
Frontage Road Developments (VRA)
-
-
-
3,000,000
3,000,000
Previously in 2014; pushed to 2015; From LH Parking structure to Municipal building
to complement the new LH parking structure entry; funded by VRA (see transfers
below
Chamonix Housing Development
-
5,176
(5,176)
1,250,000
1,250,000
Infrastructure, planning and design for future housing development
Welcome Center (VRA)
68,887
31,848
37,039
-
-
Desk and signage improvements
East LionsHead Portal (VRA)
25,000
9,339
15,661
-
-
Completed with savings
1-70 Underpass (VRA)
1,631,586
970,994
660,591
1,000,000
660,591
1,660,591
$1.6M to cover total amount of contract 2014 - 2016; CDOT reimbursements will span
several years, with 2015 amount showed above
Lionshead Parking Structure Entry (VRA)
2,164,962
1,891,915
273,047
-
273,047
273,047
Final construction bills, and to complete landscaping, lighting and artwork installation
Lionshead Medans (VRA)
50,000
7,004
42,996
-
-
Median construction from LH parking structure to Vail Spa; Council cancelled the
project; need some funds for bills already incurred; will reduce further when all bills paid
Mobile Communications vehicle
321,000
321,270
(270)
Budgeted during 2013 to allow for contract to be signed; will pay out funds in 2014
when van is delivered sometime in the fall
Chamonix Housing Marketing Study
12,550
11,300
1,250
Update Housing Market Study
Buy -down Program
402,118
-
402,118
402,118
402,118
Carry forward program funding
Buy -down Program Funded by Pay -in-Lieu
684,814
202,336
482,478
-
900,143
900,143
Carry forward current balance of program funding: Housing funded directly by Pay -in -
Lieu fees collected from developers; Includes revenue collected in 2014 ($417,665)
Total New Assets:
5,404,259
3,496,602
1,907,658
6,750,000
2,235,900
8,985,900
Total Expenditures
17,538,549
11,499,118
6,039,431
11,278,260
6,156,234
17,434,494
Other Financing Sources (Uses)
-
Transferfrom Vail Reinvestment Authority
4,290,435
3,049,280
1,241,155
4,050,000
1,299,470
5,349,470
1-70 underpass $1 M, Frontage Rd improvements $3M; annual LH parking structure
maintenance $50K
Transfer from Debt Service Fund
21,311
21,311
-
-
-
To close out remaining balance in Debt Service Fund
Transfer from Dispatch Fund
16,800
16,800
Transfer from Dispatch for Mobile Comm Van
Revenue Over (Under) Expenditures
(547,008)
5,243,872
5,790,881
5,268,155
(4,515,182)
752,973
Beginning Fund Balance
15,869,058
15,869,058
15,314,050
5,798,881
21,112,931
Ending Fund Balance
15,322,050
21,112,931
20,582,205
21,865,904
11F"P Z1111W
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
REAL ESTATE TRANSFER TAX FUND
2015
Proposed
2014
2014
Variance
Original
1st
2015
Amended
Actual
Fav / (Unfav)
Budget
Supplemental
Amended Comments
Real Estate Transfer Tax
$ 5,900,000
$ 6,849,449
$ 949,449
$ 5,670,000
$ 5,670,000
Golf Course Lease
132,014
128,913
(3,101)
134,654
134,654 Annual lease payment from Vail Recreation District 2% annual increase - deposited to
"Recreation Enhancement Account' (accompanying expenditure listed below)
I ntergoven mental Revenue
119,900
125,394
5,494
20,000
20,000 $20K Lottery fund proceeds
Project Reimbursements
1,165,000
226,868
(938,133)
-
938,133
938,133 Remainder of $1.165M VRD portion for Golf Course Clubhouse construction
Recreation Amenity Fees
338,000
338,341
341
10,000
10,000
Donations
-
32,550
32,550
-
- AIPP Winterfest donations added to public art budget below
Earnings on Investments and Other
61,212
163,651
102,439
28,595
28,595
Total Revenue
7,716,126
7,865,166
149,040
5,863,249
938,133
6,801,382
Maintain Town Assets
Annual Park and Landscape Maintenance
1,430,514
1,182,187
248,327
1,603,001
-
1,603,001 Ongoing path, park and open space maintenance, project mgmt
Management Fee to General Fund (5%)
295,000
342,472
(47,472)
283,500
283,500 5% of RETT Collections - fee remitted to the General Fund for administration
Tree Maintenance
65,000
58,946
6,054
65,000
Regular maintenance for tree health within the town (spraying, removing, new trees); scale
65,000 spraying on town -owned property at approx. $120 per tree; Initiating tree -planting program
for lost trees
Forest Health Management
195,000
198,322
(3,322)
225,000
-
225,000 Pine beetle mitigation in conjunction w/ forest service; Wildfire prevention measures
Street Furniture Replacement
325,000
74,980
250,020
-
250,020
250,020 Re -appropriate for new recycling ordinance trash containers received in 2015
Glen Lyon Bridge
-
-
-
150,000
150,000 Re -decking of recreation path bridge; structural repairs & railings; too large a project to
include in annual rec path captial maintenance
Alpine Garden Support
65,620
65,620
67,000
67,000 Annual operating support of the Betty Ford Alpine Gardens; assumes 2% increase per year
Alpine Garden Education Center
-
-
500,000
500,000 Awarded per Council contributions
Eagle River Watershed Programs
86,000
37,972
48,028
63,240
63,240 Annual support of the Eagle River Watershed Council programs; assumes 2% increase per
year
Actively Green by 2015 Program
37,000
18,500
18,500
20,000
18,500
Council Contribution for continuation of this town -wide recycling education and certification
38,500 program run by Walking Mountains; Re -appropriate 2014 unused because program
spanned across years
Fencing around West Vail Community Garder
18,500
18,500
-
-
-
-
Public Art - Operating
95,920
96,568
(648)
100,248
-
100,248 Art in Public Places programming
Environmental Sustainability
527,500
308,197
219,303
321,586
219,303
Re -appropriate unused recycling rebate program dollars to be used toward public
540,889 education, outreach, fabric bags, etc. Environmental Sustainability programs; 2015
Includes new environmental planner position;
Total Maintenance
3,141,054
2,402,263
738,791
3,398,575
487,823
3,886,398
Rec. Path Capital Maint
104,796
84,756
20,040
103,989
20,040
124,029 Capital maintenance of the town's recreation path system. Re -appropriate $20K for
preliminary planning for the relocation of the trail that runs through the LH gondola area
Park / Playground Capital Maintenance
128,838
126,412
2,426
98,500
-
Annual maintenance items include projects such as playground surface refurbishing,
98,500 replacing bear -proof trash cans, painting/staining of play structures, picnic shelter
additions/repairs, and fence maintenance.
Donovan Park Master Plan
5,000
-
5,000
379,000
5,000
384,000 2015 safety improvements to playground / park (10-11 years old); Re -appropriate $5K
planning
Flood Incident Repairs
847,795
43,252
804,543
-
804,543
804,543 Re -appropriate for re -stabilization of Dowd Junction path
Library Recreation Path Reconstruction
240,000
3,420
236,580
945,000
236,580
Reconstruction of the recreation path from the Vail Library to Lionshead, including 12 ft
1,181,580 wide concrete trail, repairs to eroded culverts at Middle Creek and stream bank erosion
repair (50 ft. section); Construction to begin in 2015. $237K to be used for design.
Stream bank/tract mitigation
1,684,534
84,972
1,599,862
4/7/2
15
1,000,000
Re -appropriate to complete the Gore Creek Strategic Action Plan; Includes estimates for
streambank repairs (from water to bank) and riparian repairs (from bank to land area and
1,000,000 revegetation).; mapping of water infrastructure, community education and outreach. Re -
appropriate $1 M and transfer remaining $600K to 2016 to accompany total project to be
refined once the strategic action plan is complete.
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
REAL ESTATE TRANSFER TAX FUND
2015
Proposed
2014
2014
Variance
Original
1st
2015
Amended
Actual
Fav / (Unfav)
Budget
Supplemental
Amended
Comments
Water Quality / Storm Water 449,900
327,681
122,219
122,219
122,219
Would accompany repairs made with stream bank/tract mitigation for storm water and
culverts.
Skate Park - Temporary 260,000
50,534
209,466
209,466
209,466
Replacement of temporary skate park; Keep in the budget until permanent skate park
finalized
Permanent Skate Park 75,000
-
75,000
75,000
75,000
Design & planning for a permanent skate park at the "Atrium" site.
Ford Park Portal Improvements 250,000
-
250,000
250,000
250,000
TOV portion of improvements to six portals into Ford Park
Vail Trail -
-
250,000
250,000
Placeholder for new Vail Trail
Bike Lanes: N Frontage Rd 1,500,000
347,384
1,152,616
_
-
Moved up to 2014 from 2015 to correspond with CDOT overlay next year; Bike lane
shoulder from Red Sandstone school to Buffehr Creek
Bike Lanes: S Frontage Rd 500,000
173,692
326,308
Bike lane shoulders: In 2013 from West Vail roundabout to Matterhorn; 2014 from
Matterhorn to Cascade to be done in conjuction with Cascade CDOT parking project
Ford Park Playground Safety Improvements 450,000
52
449,948
Moved to Lower Bench Improvements (below)
Ford Park Playground / Lower Bench Impr -
-
-
380,000
961,122
1,341,122
Public restrooms ($511 K), playground safety improvements ($449.9K), and $380K for
lower bench improvements such as the waterline relocation, new pavers and ADA parking
Ford Park parking lot slope re -vegetation 100,000
-
100,000
-
100,000
100,000
Re -vegetate the slope down toward the river at the Ford Park parking lot originally scdhule
in 2014
Booth Creek Playground 385,250
13,078
372,172
372,172
372,172
$120K for design/engineering; remainder for potential start this fall
Booth Creek Park Redevelopment 512,000
-
512,000
-
-
-
Redevelopment of entire park including tennis courts, covered areas and playground
structures; Tennis court ($262K) and playground ($250K) originally budgeted in 2014 will
occur when overall park is reconstructed (budgeted in 2016)
Public Art - General program / art 390,831
37,154
353,677
85,000
359,226
444,226
To purchase sculptures, artwork, art programs and events; remainder is re -appropriated
each year to accumulate enough funds
Public Art - Winterfest 78,730
31,000
47,730
-
80,280
80,280
Carry over balance from 2014 and recognize donations made for Winterfest event.
Total Enhancements 7,962,974
1,323,386
6,639,588
1,991,489
4,845,649
6,837,138
VRD-Managed Facility Projects
Recreation Enhancement Account -
-
134,654
-
134,654
Annual rent paid by Vail Recreation District; to be re -invested in asset maintenance
Golf Course - Other Improvements 834,092
751,891
82,201
31,782
82,201
113,983
2015 golf maintenance building repairs
Dobson Ice Arena 144,475
144,475
-
124,133
-
124,133
Renovate changing rooms and restrooms
Ford Park / Tennis Center Improvements 12,270
371
11,899
85,031
11,899
96,930
Renovate Tennis Club Roof
Athletic Fields 15,604
-
15,604
59,714
15,604
75,318
Renovate Restrooms
Gymnastics Center 50,000
49,606
394
-
-
Unexpected foundation leak required immediate attention
Total VRD-Managed Facility Projects 1,056,441
946,344
110,097
435,314
109,703
545,017
New Assets
Golf Clubhouse and Nordic Center (CCF) 6,268,629
207,282
6,061,347
-
9,961,347
9,961,347
Total includes $1.165M reimbursement from VRD, allocation of Recreation Enhancement
Funds thru 2014 and Conference Center funds of $3.8M (Total project cost originally
estimated at $6.8M, but per Council Sept'14, approved additional $3.9M cost to project.
This was originally budgeted in 2016, but moving forward to accomany the contract for work
Ford Park Improvements & Fields (CCF) 4,080,792
3,455,517
625,275
625,275
625,275
Re -appropriated balance less $380K for lower bench improvements (waterline, pavers and
ADA parking) to the Ford Park Lower Bench Improvements project (see above).
Public Restrooms 511,174
-
511,174
_
-
-
Transfer unused 2014 funds to the Ford Park Lower Bench Improvements project for public
restrooms (budget was split)
Total New Assets: 10,860,595
3,662,799
7,197,796
10,586,622
10,586,622
Total Expenditures 23,021,064
8,334,792
14,686,272
5,825,378
16,029,798
21,855,176
Other Financing Sources (Uses)
Transfer from Conference Center Fund 1,836,318
1,836,318
-
-
Revenue Over (Under) Expenditures (13,468,620)
(469,626)
(12,700,914)
37,871
(15,091,665)
(15,053,794)
Beginning Fund Balance 16,848,758
16,848,758
376,676
12,700,914
16,379,132
Ending Fund Balance $ 3,380,138
$ 16,379,132
$ 3,414,547
$ 1,325,338
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES AND CHANGES IN FUND BALANCE
HEAVY EQUIPMENT FUND
Expenditures
Salaries & Benefits
Operating, Maintenance & Contracts
Capital Outlay
973,366 934,286 39,080 994,189
1,482,474 1,522,728 (40,254) 1,467,757
1,150,864 734,910 415,954 839,700
994,189
1,467,757
Vehicles budgeted in 2014, but taking receipt in
415,954 1,255,654 2015 (Detectives Ford Explorer, Polaris Ranger,
Street Sweeper, Sewer Jetter, Emergency lights
for FD Tahoe, Dumb Bed for Ford 550)'
Total Expenditures
2014
3,191,924
414,780 3,301,646
2015
2015
(453,322)
Proposed
2014
Variance
Original
1st Proposed
2,271,673
Amended
Actual
Fav / (Unfav)
Budget
Supplemental Amended Comments
Revenue
$ 1,633,528
Town of Vail Interagency Charge
$ 3,011,352
$ 2,967,482
$ (43,870)
$ 3,011,352
$ $ 3,011,352
Insurance Reimbursements & Other
-
59,309
59,309
-
-
Earnings on Investments
14,650
14,146
(504)
14,650
14,650
Equipment Sales and Trade-ins
127,380
56,170
(71,210)
148,270
148,270
Total Revenue
3,153,382
3,097,107
(56,275)
3,174,272
3,174,272
Expenditures
Salaries & Benefits
Operating, Maintenance & Contracts
Capital Outlay
973,366 934,286 39,080 994,189
1,482,474 1,522,728 (40,254) 1,467,757
1,150,864 734,910 415,954 839,700
994,189
1,467,757
Vehicles budgeted in 2014, but taking receipt in
415,954 1,255,654 2015 (Detectives Ford Explorer, Polaris Ranger,
Street Sweeper, Sewer Jetter, Emergency lights
for FD Tahoe, Dumb Bed for Ford 550)'
Total Expenditures
3,606,704
3,191,924
414,780 3,301,646
415,954 3,717,600
Revenue Over (Under) Expenditures
(453,322)
(94,817)
358,505 (127,374)
(415,954) (543,328)
Beginning Fund Balance
2,271,673
2,271,673
1,818,351
358,505 2,176,856
Ending Fund Balance
$ 1,818,351
$ 2,176,856
$ 1,690,977
$ 1,633,528
4/7/2015
12
TOWN OF VAIL 2015 BUDGET
SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE
TIMBER RIDGE ENTERPRISE FUND
Expenditures
Operating, Maintenance & Contracts
689,933
622,967
66,966
589,697
2015
Capital Outlay
2014
2014
Variance
2015
1st Proposed
Total Expenditures
Amended
Actuals
Fav / (Unfav)
Budget
Supplemental Amended
Revenue
(382,956)
465,161
848,117
505,151
(572,000) (66,849)
Rental Income
$ 1,315,763
$ 1,341,308
$ 25,545
$ 1,182,948
$ 1,182,948
Other Income
16,658
5,136
(11,522)
11,900
11,900
Total Revenue
1,332,421
1,346,444
14,023
1,194,848
- 1,194,848
Expenditures
Operating, Maintenance & Contracts
689,933
622,967
66,966
589,697
589,697
Capital Outlay
1,025,444
258,316
767,128
100,000
572,000 672,000
Total Expenditures
1,715,377
881,283
834,094
689,697
572,000 1,261,697
Operating Income
(382,956)
465,161
848,117
505,151
(572,000) (66,849)
Non-operating Revenues (Expenses)
Interest on Investments
2,044
1,812
(232)
1,560
- 1,560
Loan Principal Repayment to Capital Projects
(345,966)
(345,966)
-
(351,155)
- (351,155)
Fund
Interest Payment to Capital Projects Fund
(143,748)
(143,743)
(138,487)
- (138,487)
Revenue Over (Under) Expenditures (870,626) (22,736) 847,890 17,069 (572,000) (554,931)
Beginning Fund Balance 1,530,027 1,530,027 663,224 847,890 1,511,114
Ending Fund Balance $ 659,401 $ 1,507,291 $ 680,293 $ 275,890 $ 956,183
4/7/2015
13
ORDINANCE NO. 5
SERIES OF 2015
AN ORDINANCE MAKING BUDGET ADJUSTMENTS TO THE TOWN OF VAIL GENERAL
FUND, CAPITAL PROJECTS FUND, REAL ESTATE TRANSFER TAX FUND, HEAVY
EQUIPMENT FUND, AND TIMBER RIDGE ENTERPRISE FUND OF THE 2015 BUDGET FOR
THE TOWN OF VAIL, COLORADO; AND AUTHORIZING THE SAID ADJUSTMENTS AS SET
FORTH HEREIN; AND SETTING FORTH DETAILS IN REGARD THERETO.
WHEREAS, contingencies have arisen during the fiscal year 2015 which could not have
been reasonably foreseen or anticipated by the Town Council at the time it enacted Ordinance No.
18, Series of 2014, adopting the 2015 Budget and Financial Plan for the Town of Vail, Colorado;
and,
WHEREAS, the Town Manager has certified to the Town Council that sufficient funds are
available to discharge the appropriations referred to herein, not otherwise reflected in the Budget, in
accordance with Section 9.10(a) of the Charter of the Town of Vail; and,
WHEREAS, in order to accomplish the foregoing, the Town Council finds that it should make
certain budget adjustments as set forth herein.
NOW, THEREFORE, BE IT ORDAINED, BY THE TOWN COUNCIL OF THE TOWN OF
VAIL, COLORADO that:
Pursuant to Section 9.10(a) of the Charter of the Town of Vail, Colorado, the Town
Council hereby makes the following budget adjustments for the 2014 Budget and Financial Plan for
the Town of Vail, Colorado, and authorizes the following budget adjustments:
General Fund $ (48,000)
Capital Projects Fund 6,156,234
Real Estate Transfer Tax Fund 16,029,798
Heavy Equipment Fund 415,954
Timber Ridge Enterprise Fund 572,000
Total $ 23,125,986
2. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any
reason held to be invalid, such decision shall not affect the validity of the remaining portions of this
ordinance; and the Town Council hereby declares it would have passed this ordinance, and each
part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or
more parts, sections, subsections, sentences, clauses or phrases be declared invalid.
Ordinance No. 5, Series of 2015
4/7/2015
3. The Town Council hereby finds, determines, and declares that this ordinance is
necessary and proper for the health, safety, and welfare of the Town of Vail and the inhabitants
thereof.
4. The repeal or the repeal and reenactment of any provision of the Municipal Code of
the Town of Vail as provided in this ordinance shall not affect any right which has accrued, any duty
imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced,
nor any other action or proceedings as commenced under or by virtue of the provision repealed or
repealed and reenacted. The repeal of any provision hereby shall not revive any provision or any
ordinance previously repealed or superseded unless expressly stated herein.
5. All bylaws, orders, resolutions, and ordinances, or parts thereof, inconsistent
herewith are repealed to the extent only of such inconsistency. This repealer shall not be construed
to revise any bylaw, order, resolution, or ordinance, or part thereof, theretofore repealed.
INTRODUCED, READ, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON
FIRST READING this 7th day of April, 2015, and a public hearing shall be held on this Ordinance
on the 21st day of April, 2015, at the regular meeting of the Town Council of the Town of Vail,
Colorado, in the Municipal Building of the town.
ATTEST:
Patty McKenny, Town Clerk
Ordinance No. 5, Series of 2015
4/7/2015
Andrew P. Daly, Mayor
Towx of vn' 1[1
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Second Reading Ordinance No. 4, Series of 2015 An Ordinance Protecting
Certain Stream Tract Property in the Town by Prohibiting the Installation or Maintenance of
Private Improvements on Such Property
PRESENTER(S): Matt Mire, Town Attorney
ACTION REQUESTED OF COUNCIL: Approve, approve with modifications, or deny
Ordinance No. 4, Series of 2015 on second reading.
BACKGROUND: Over time, private improvements such as landscaping, patios and other
improvements from properties adjacent to stream tracts have been constructed and
maintained within the Town's riparian areas without permission or authorization from the
Town. Pursuant to the Town's authority to regulate for the public health, safety and welfare,
the Town Council desires to clarify by the passage of this Ordinance No. 4 that Town that
certain stream tracts shall be used solely and exclusively as natural open space, and private
improvements or encroachments of any kind are prohibited in these areas without the prior
written authorization of the Town Council.
STAFF RECOMMENDATION: Approve, approve with modifications, or deny Ordinance No.
4, Series of 2015 on second reading.
ATTACHMENTS:
Ordinance No. 4, Series of 2015
4/7/2015
ORDINANCE NO. 4
SERIES 2015
AN ORDINANCE PROTECTING CERTAIN STREAM TRACT
PROPERTY IN THE TOWN BY PROHIBITING THE INSTALLATION OR
MAINTENANCE OF PRIVATE IMPROVEMENTS ON SUCH PROPERTY
WHEREAS, the Town is the owner of certain real property consisting of natural
riparian area along the creeks and streams within the Town;
WHEREAS, the Town is committed to environmental protection and stewardship
and open space conservation;
WHEREAS, over time, private improvements such as landscaping, patios and
other improvements from properties adjacent to stream tracts have been constructed
and maintained within the Town's riparian areas without permission or authorization
from the Town;
WHEREAS, these private encroachments are not in keeping with the use of
stream tracts as naturalized open space, and further, such private improvements
significantly damage these sensitive riparian areas and impede their use and enjoyment
as public open space; and
WHEREAS, pursuant to the Town's authority to regulate for the public health,
safety and welfare, the Town Council desires to clarify that Town stream tracts shall be
used solely and exclusively as natural open space, and private improvements or
encroachments of any kind are prohibited in these areas without the prior written
authorization of the Town Council.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO, THAT:
Section 1. To protect the public health, safety and welfare by regulating
sensitive stream tract areas in the Town, the Town Council hereby declares that Tract C
shown on the Plat for Vail Village, Eleventh Filing shall be used solely and exclusively
for natural open space purposes and shall be maintained at all times as vacant and
undisturbed land in its natural condition, or for limited public pedestrian or passive
recreational uses as may be determined by the Town to be consistent with the use of
stream tract as natural open space.
Section 2. No person other than the Town shall erect, construct or maintain, or
cause or permit the erection, construction or maintenance of, any encroachment on or
within Tract C, including any area designated as an easement thereon. Encroachments
prohibited by this ordinance mean a private improvement of any kind located in Tract C,
whether temporary or permanent in nature, including without limitation landscaping,
irrigation systems, garden improvements, patios, decks, fencing, retaining walls, sheds,
pathways, gravel, concrete, outdoor furniture, benches and play equipment.
Encroaching activities prohibited by this ordinance also include mowing, trimming or
Ordinance No. 4, Series of 2015 4/71/2015
cutting any grasses, trees or other vegetation in Tract C by any person other than the
Town or without the Town's authorization.
Section 3. Notwithstanding the foregoing, the Town may authorize an
encroachment on Tract C, upon a finding by the Town Council that the encroachment is
not inconsistent with the designated uses of the stream tract and will not detrimentally
impact the stream tract's environmental values. Such authorization shall be evidenced
by a resolution adopted by the Town Council and recorded in the real property records
of Eagle County.
Section 4. The Town Council hereby finds, determines and declares that this
ordinance enacting provisions for the protection of stream tracts in the Town, including
specifically Tract C of the Vail Village, Eleventh Filing, is in accordance and harmony
with those certain deed restrictions set forth in the deed from the Vail Corporation to the
Town of Vail dated December 21, 1999, by which the Town acquired Tract C and which
expressly provides in Section 1.1.b of Exhibit B to the deed that the Town may further
restrict the uses on and within Tract C consistent with the purpose of Tract C as natural
open space. To the extent that private improvements are not otherwise already
prohibited on Tract C, this ordinance shall constitute the Town's further restriction on
Tract C, expressly prohibiting such private improvements.
Section 5. If any part, section, subsection, sentence, clause or phrase of this
ordinance is for any reason held to be invalid, such decision shall not effect the validity
of the remaining portions of this ordinance; and the Town Council hereby declares it
would have passed this ordinance, and each part, section, subsection, sentence, clause
or phrase thereof, regardless of the fact that any one or more parts, sections,
subsections, sentences, clauses or phrases be declared invalid.
Section 6. The Town Council hereby finds, determines and declares that this
ordinance is necessary and proper for the health, safety and welfare of the Town of Vail
and the inhabitants thereof.
INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED
PUBLISHED ONCE IN FULL ON FIRST READING this 17th day of March, 2015 and a
public hearing for second reading of this Ordinance set for the 7th day of April, 2015, in
the Council Chambers of the Vail Municipal Building, Vail, Colorado.
Andrew P. Daly, Mayor
ATTEST:
Patty McKenny, Town Clerk
Ordinance No. 4, Series of 2015 4/-/2015
READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED
this 7th day of April, 2015.
Andrew P. Daly, Mayor
ATTEST:
Patty McKenny, Town Clerk
Ordinance No. 4, Series of 2015 4/7'2015
TOWN OF VAIN
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Appointment to Design Review Board (DRB)
ACTION REQUESTED OF COUNCIL: Town Council will make an appointment to DRB
BACKGROUND: See attached memo
ATTACHMENTS:
Memo Design Review Board Appointment
4/7/2015
TOWN OF
Memorandum
To: Mayor and Town Council
From: Patty McKenny, Town Clerk
Date: April 1, 2015
Subject: Interview and Appointments to Boards and Commissions - DRB
Town Council will have an opportunity to review and appoint one member to the Design Review Board
during the April 7 evening meeting. Terms for the appointments to this board is two years, April 1,
2015 through March 31, 2017.
There was one letter of interest received from Doug Cahill to serve on the DRB. Mr. Cahill had
interviewed for the PEC vacancy during the March 17 meeting and asked if he would also consider
serving on the DRB. Since there were no letters of interest received during the last cycle, the vacancy
advertisement posted again with a new deadline for letters of interest due on March 30th. Please find
attached Mr. Cahill's letter.
Brian Gillette and Tom DuBois have finished serving their second terms ending March 31, 2015. It is
noted that the Municipal Code addresses the duration of terms that supports flexibility in allowing
longer terms in some instances, described below. Further discussion about recruiting community
members to serve in this role may occur.
3-1-1: DURATION OF TERMS:
No member of any permanent Town board or commission shall serve for more than eight (8) consecutive
years. A board or commission member who has served eight (8) consecutive years may serve again after a
period of one year of nonservice. Notwithstanding the foregoing, if there is an insufficient number of
applicants for a vacant position or positions on any permanent Town board or commission, a board or
commission member who has served for more than eight (8) consecutive years shall be eligible to apply for
reappointment.
Attachment:
■ Letter of Interest
4/7/2015
Patty McKenny
From: Doug Cahill <dcahill.bgmd@gmail.com>
Sent: Monday, March 30, 2015 3:10 PM
To: Patty McKenny
Cc: dcahill.vail@gmail.com
Subject: DRB
Vail Town Council
Attn: Patty McKenny <PMcKennv@vailgov.com>
75 South Frontage Road
Vail, CO 81657
Dear Town Council,
I am interested in serving on the Vail Design Review Board. My past experience sitting on the PEC was for
eight years working on projects large and small during that time I sat in on DRB meetings as a PEC
representative and understand its role. The DRB plays an important part in shaping the future of the Town of
Vail while upholding the character and visions that have made it so great. Please except my submittal of
interest to serve on the DRB and my commitment to fulfill an open seat.
Sincerely
Dan CE1//
Doug Cahill
2855 Snowberry Drive
Vail, CO 81657
970-331-3462
Dcahill.vail@gmail.com
4/7/2015
VAIL TOWN COUNCIL AGENDA MEMO
MEETING DATE: April 7, 2015
ITEM/TOPIC: Adjournment (7:40 pm)
4/7/2015
TOWN OF VAIN