HomeMy WebLinkAbout2.b. Ford Park 2013-2015 Construction Update To: Sybil Navas From: Todd Oppenheimer Date: August 28, 2013 Subject: Ford Park Phase 1B Construction Schedule I. Ford Park Phase 1B Construction Project Ford Park Phase 1B Sport Field Reconstruction and Site/Civil Construction Contracts were awarded to American Civil Constructors (ACC) on August 6, 2013 by the Vail Town Council. The total amount of the combined construction contracts is $4.2M. Scope of Work included in the Ford Park Phase 1B construction includes: • Complete reconstruction and realignment of the 3 softball fields including synthetic turf infields, natural grass outfields, irrigation and subdrainage systems, bleachers and fencing. The new field configuration will allow for the layout of 2 full-size soccer fields. • Improved internal pedestrian walkways and landscaping. • Construction of a new stop area and bus shelter near the new Restroom/Concessions building completed earlier this year. • Realignment of the parking lot entrance, improved delivery truck access, Frontage Road turn lane, new west parking lot and new trash storage building. • Storm sewer and electrical and lighting system improvements. II. Ford Park Phase 1B Construction Schedule There are 3 important construction dates included in the construction contract. These are as follows: • Work scheduled to commence on September 3, 2013 • Work in the ROW to be complete by November 15, 2013 • Parking lot available for winter parking operations on November 16, 2013 ACC has provided a detailed construction schedule outlining their approach to completing the construction contract. This schedule is summarized as follows: Mobilization 9/3/13 – 9/6/13 Demolition, site prep and grading 9/9/13 – 10/17/13 Parking Lots and Fields closed 9/9/13 Parking Lot, bus lane, and building construction 10/3/13 – 11/11/13 Town of Vail Page 2 Parking lots and bus lane reopen 10/25/13 Sport Field construction 10/18/13 – 11/8/13 Stop work for winter 11/8/13 Sport Field sod installation 4/28/14 – 5/13/14 Sport Field sod grow-in to establish 5/14/14 – 8/1/14 Sport Fields events scheduled 5/1/15 III. Ford Park Phase 1B Construction Narrative Construction activities on the Ford Park Phase 1B improvements will begin on September 3, 2013. At that time, ACC will move on to the site and begin setting up construction fencing, erosion control devices and their construction staging area. On September 9, 2013 the parking lots and sport fields will be closed as demolition of existing surfaces and improvements occurs, the site is graded and installation of underground utilities begins. The construction of the new improvements including sport field walkways, drainage, and irrigation, Frontage Road entrances, parking areas, bus stop and shelter, trash building and other work begins on October 3, 2013 and continues through November 11, 2013. The parking areas and bus lane are scheduled to be paved on October 25, 2013. At this point the underground improvements on the sport fields have been completed but the fields have not been topsoiled, final graded or sodded. The majority of the construction will be complete and work will be stopped for the winter on or about November 11, 2013. The topsoiling, final grading and installation of the sod will begin when the site has dried enough to allow access. This date is anticipated to April 28, 2014 with sod installation completed on May 13, 2014. Generally, sod requires 6 to 8 weeks to become established and be able to tolerate extensive use. It is likely that the sport fields would be useable in August 2014. However, due to the uncertainty of weather and other construction related activities no events are scheduled on the sport fields in 2014.