HomeMy WebLinkAbout1995-0424 PECTHIS ITEM MAY EFFECT YOUR PROPERTY
10 PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of th
Town of Vail will hold a public hearing in accordance with Section 18.66.060 of the
Municipal Code of the Town of Vail on April 24,1995, at 2:00 P.M. in the Town of V
Municipal Building. In consideration of- I
Applicant: Glen Lyon Partners
Planner: Randy Stouder
2. A request for a parking variance and a conditional use permit to allow for a temporary
building to house a laboratory for the Vail Valley Medical Center, located at 181 West
Meadow Drive/Lots E & F, Vail Village Second Filing.
he Applicant- Michael Lauterbach
Planner- Jim Curnutte
4. A request for a minor exterior alteration in the CCII zone district and a landscape variance
to allow for the addition of handicap access located at the Lifthouse Lodge/549 at
Lionshead Circle/Lot 39 Block 1, Vail Lionshead First Filing.
6. A request to amend the Vail Land Use Plan for 16 properties throughout the Town of Vail.
Fifteen properties are proposed to be changed from their current designation to open
space an one property would be changed to the public semi public designation. See the
attached Exhibit A for legal descriptions.
Applicant: Town of Vail
Planners® Jim Curnutte and Russell Forrest
APRIL 24,1995
AGENDA
Pro.ject Orientation/Lunch 12:00 p.m.
Site Visits 1® P.M.
rt
0
E3
f:\everyoneNpec\agendas\042495.wpd
10
Bob Armour
Henry Pratt
Jeff Bowen
Greg Moffet
104-1
Jim Curnutte
Randy Stouder
Russell Forrest
Susan Connelly
Andy Knudtsen
Lori Aker
Public Hea"n 2:00 p.m.
1 A request for a minor subdivision to allow for the relocation of a building envelope,
located at 1139 Sandstone Drive/Lot 3, Block A, Lionsridge, Filing #1 /Indian Creek
Town homes.
Applicant.- Michael Lauterbach
Planner- Jim Curnutte
7
Jim Curnutte stated the acknowledgment is an affidavit stating that the owner has read the
geologic hazard report and understands
Jim Curnutte explained if any part of the property (Lots A and A-2) is in the hazard zone, the
owner
our be required to sign an affidavit, There is no difference between the building
envelope and the property.
Mike Lauterbach still feels he would be signing a report that would be incorrect, but he would
sign it.
Planning and Environmental Corarnission
Minutes
April 24, 1995
Jim Curnutte stated the building site should be referred to as "building envelopes".
Jeff Bowen asked what exactly has Mike Lauterbach sold? Mike Lauterbach stated the whole
Lot #3.
Henry Pratt said it sounds like Mike Lauterbach has sold the land as a separate lot. Mike
Lauterbach said the Town ordinance does not allow for this, property to be lots, but he felt they
should not be considered building envelopes.
Bob Armour questioned the geological report. Jim Curnutte stated again it is just a report for
Mike to sign acknowledging that he has read the report, stating the lot is in a geologic hazard
zone. Mike Lauterbach indicated he has no problem signing this form, but disagrees with the
wording of the affidavit.
Andy Knudtsen indicated the affidavit has always been worded this way whenever any portion VI
the site is in the hazard zone.
The chair asked for public input. There was no public input.
Planning and Environmental Commission
Minutes
April 24, 1995
2
Andy Knudtsen presented the project to the PEC. Staff believes that the project's impacts would
be fairly minimal and staff recommends approval.
Planning and Environmental Commission
Minutes
April 24, 1995
5
Westhaven Drive, with the condition that the sidewalk between the two entries to the parking
garage be constructed and that 15.7 parking spaces be required, and that the applicant must
come back within 12 months to present a comprehensive solution to the entry and sidewalk
issue. Second by Greg Moffet and passed unanimously by a 5-0 vote.
Randy Stouder reviewed the request with the Board. The applicant is requesting clear direction
from the PEC before proceeding with this project. Randy went through each discussion issue in
the staff memo and the Board gave their thoughts as follows:
ME
Greg Moffet is in favor of the office spaces since there is a great need for good office space
within the Town. Kevin Deighan thinks the building should accommodate 1 to 2 person office
spaces as opposed to a few large offices, due to a lack of small office space availability. Jeff
Bowen and Bob Armour both support the proposed office use.
Greg Moffet said a bus shelter is OK with him. Jeff Bowen stated a bus stop is OK, but will 11
;,eldom used. Bob Armour is not sure of bus usage. A shelter seems appropriate.
Randy Stouder stated the TOV Landscape Architect will delineated a buffer zone around the tree
bases.
SITE PLAN PHASE 1,
Minutes
April B4, 1995
5
in the parking lot. The applicant's plan showed a 20'width and that is what currently exists
onsite.
Bob Armour wondered if the Fire Department has any problems. Ken O'Brian stated they have
no problems with the site plan as proposed. The PEC felt that due to the extreme narrowness of
the site, they could live with the 20'travel aisle.
MUMMY— 777q-073-t TV M-1-
'IS(
sure that parking layout works onsite. He requested this staking prior to final PEC review of the
application.
Gordon Pierce, also a project architect, wanted to know if staff and the Board's concerns for
impacts on the streambank are aesthetic or functional. Randy Stouder responded that it is an
environmental issue. The stream banks are so steep, the applicant needs to be as careful as
possible with the south edge of the buildings and the parking lot.
Gordon Pierce wanted clarification that if he stays within the setbacks can it be built? Randy
Stouder stated the applicant must stay out of the stream setback with all structures and grading.
Existing streambank areas should also be preserved, without any disturbance beyond what is
necessary to convey storm runoff down to the creek.
Greg Moffet wanted to know if the current parking is inadequate. Gordon Pierce says the
existing building is over their parking allotment. Ken O'Brian said he needs to get with Randy
Stouder to work out the parking numbers and the site plans so that both Phase I and ll meet th
parking requirements. Gordon Pierce said they would fully comply with the parking requirement
1
Planning and Environmental Conunission
Minutes
April 24, 1995
7
units and deed restricting them would not be acceptable.
WATER QUALITY
Randy Stouder said staff feels the building proposed now is too high. Staff feels a compromi-se
to bring down the roof ridge should be looked at. He suggested lowering the ridge and adding
dormers to break up the long ridge line.
Gordon Pierce disagrees that the height is excessive. The 51/49 percentages expressed in the
brewery approval is too restrictive. You need to look at the overall impact. The view from
different angles should be considered. The buildings across the street would be higher than
what he was proposing.
WIN I'll, I lil III iiiiii iiiiiiijil I I
alm�MM����
UNDERGROUND UTILITIES:
Illir I !Ili 1 1111111 11 1 1. M
i � mat
I MGM -117 Jelyi-Vullullig Ul tile ellille tiectlull 01 U111111U5 willarl ai- In
Lite TuArMys T le -7 r 1' 11" 1 1
players could be brought together at a later date.
Bob Armour wants the applicant to put their lines underground now and the TOV to put theirs
underground now. Jim Viele, co-applicant, stated they will pay their share to put the lines
underground along their frontage. They are anxious for this to happen. Gordon Pierce wants it
done now instead of tearing up landscaping later.
Minut ®s
April 24, 1995
8
Bob Armour asked if the Board has given the applicant enough input? Gordon Pierce said all the
comments have been very helpful. Greg Moffet noted that 2 PEC members were absent (Dalton
Williams and Greg Amsden) and their input was not reflected today.
6. A request for a worksession for an amendment to the Vail Land Use Plan for 16
properties throughout the Town of Vail. Fifteen properties are proposed to be changed
from their current designation to open space and one property would be changed to the
public semi public designation. See the Attachment 1 for legal descriptions.
Applicant- Town of Vail
Planners, Jim Curnutte and Russell Forrest
Mill! !1 11011 1 IN IMIN: 111�111 Jill 1
Jim Curnutte told the Board at their next meeting we will discuss how each parcel will meet the
40 criteria for changing the Land Use Plan. Jeff Bowen, OK, but streamline it.
The PEC felt they do not need a site visit to these properties at the next meeting.
Minutes
A
pril 24 1995
r.
lljllqq�lpl �l��l
MEMORANDUM
TO- Planning and Environmental Commission
FROM: Community Development Department
SUBJECT: A request for a minor subdivision to modify the boundaries of an
existing building envelope and to relocate a twenty foot wide
drainage and utility easement at the Indian Creek Townhomes,
1139 Sandstone Drive/Block A, Lionsridge Subdivision, First Filing.
The applicant is requesting approval of a minor subdivision in order to modify the
boundaries of an existing building envelope, Building Envelope #3, and to relocate a
twenty foot wide drainage and utility easement at the Indian Creek Townhomes, located
at 1139 Sandstone Drive, Block A, Lionsridge Subdivision, First Filing.
In March of 1994, a building permit ,was issued for a second residence in the
subdivision. This building was constructed on the eastern half of lot 1 and upon
completion, a new plat was submitted which created a separate lot around the
residence.
2 •
EIRE]
M
r]
Although this request does not affect any of the below listed zoning criteria, staff is
providing this zoning analysis in order to give the PEC an idea of the development
potential on the entire Indian Creek Townhouse subdivision, when fully built out:
Allowed per the Allowed per t
Approved Proposed
Amended Plat
Zoning,
Residential Cluster
Same
Lot Area-
113,428 sq.ft.
Same
Buildable Lot Area.
69,457 sq.ft.
Same
GRFA Allowance-
17,363 sq.ft. plus a 225
Same
sq.ft. credit per unit
Density-
9 Units
Same*
Site Coverage-
28,356 sq.ft.
Same
Size Of Building Envelope 3:
3,025 sq.ft.
3,080 sq.ft.
• 3
13� ELQnLa-=
The Vail Municipal Code requires that lots in the Residential Cluster zone district
have a minimum frontage of 30 feet. The site currently has a frontage well in
excess of 30 feet, and the proposed minor plat amendments will not affect the
frontage of the lot.
C. Site Dimenaigna
The Vail Municipal Code requires that each site be of a size and shape capable
of enclosing a square area, 80 feet on each side, within its boundaries. The site
currently exceeds the size and shape requirement for lots in the Residential
Cluster zone district, and the proposed minor plat amendments will have no
effect on the size and shape of the lot's boundaries.
The second set of criteria to be considered with a minor subdivision request are
outlined in Section 17.16.110 of the Vail Subdivision Regulations, and are as
follows:
4 40
Staff Re
To provide for the subdivision of property in the future without conflict wi
development on adjacent land. i
Sloff -Basgo n s-e.
The proposed minor plat amendments being reviewed by the PEC would not
appear to create any conflict with development on adjacent land. Notification of
this request was provided to all property owners adjacent to the Indian Creek
Townhomen property. To date no responses or comments have been received
concerning this application.
C. To protect and conserve the value of land throughout the municipality and the
value of buildings and improvements on the land.
Staff Response:
Staff believes that this proposal will not be detrimental to the value of land,
buildings or other improvements throughout the Town, nor in the immediate area
of the Indian Creek Townhomes.
is 5
E. To guide public and private policy and action in order to provide adequate and
efficient transportation, water, sewage, schools, parks, playgrounds, recreational
and other public requirements and facilities and generally to provide that public
facilities will have sufficient capacity to serve the proposed subdivision.
staff -ggaamagj
This section of the subdivision regulations is intended primarily to address large
scale subdivisions, as opposed to the minor plat amendments currently being
considered by the PEC. We do not believe that this proposal will impact any of
the above facilities.
F. To provide for accurate legal descriptions of newly subdivided land and
establish reasonable and desirable construction design standards and
procedures.
Staff -Bgaponse:
This is an inherent goal of the subdivision regulations and legal descriptions will
be provided on the plat for all of the changes being proposed in conjunction with
this minor subdivision application.
G. To prevent the pollution of air, streams, and ponds, to assure adequacy of
drainage facilities, to safeguard the water table and to encourage the wise use
and management of natural resources throughout the municipality in order to
preserve the integrity, stability, and beauty of the community and the value of the
land.
Staff supports the applicant's proposed minor plat amendments. There are no
relocation. Additionally, the proposed shifting of the drainage and utility
easement, approximately 10 feet to the east, will not be detrimental to any
surrounding natural resources.
V. SIMEBECQMMENDAILOIN
The staff is recommending approval of the applicant's request for a minor subdivision
to modify the boundries of building envelope #3 and to relocate the adjacent twenty foot
wide drainage and utility easement at the Indian Creek Townhomes. We believe the
applicant has met the review criteria outlined in Section IV of this memorandum. The
staff recommendation for approval carries with it the following conditions:
6 0
ti
ti
0
0
F:\eveiyone\pec'Tnemos\ auler.424
ATTACHMENT #1
(Approved Development Plan)
j
SANDSTONE DRIVE 50)
_
g
9
j
fouAc 1/2' RaAR W rd WASHER -
Ll 1511
14R 9 1
N. 0.245 ACRES
:2 jjj.6,�,
TRACT A
5 0 ol
--k '5 -2 �-54
Pj2 50, FT CcUllo 5; 5 72',' 4 'W IJI.,50'
7-
a 228 'A CRES 7-
47 '-r
�w 4 A RES C0,0101MV ARSCA
5457254 ro,.,o pw a Pf
204.80'
/ygyi
' cVRl`°2 41P6:YJe 448 "Ab uD 7`r 4,'f aU db'
.
00
r,VNO 1/7' P£9AR WIWASw£R
LS Na ➢5➢➢ CUR lr J
Bop �
�
RNCw ALL a+6N
0010
A9P ro R b�A *�
e8 huaP w-6a.
Ps I®
°°
e— a-
f^°Ao' 8a LA. owl— m
1�
_
S
y�.
6&8 N4Ph,-W Ra*A
MAO 8/7' A EAR WIWA,$H£R B n®1l ea &onkAI e�
8.S N'Q 751P TOO % arm9repe s'oe.:
�t
ego -�aa �
@
J
^
.
( ~
HICN E WRO.NMEWAL
R J
MODE•RA PE' rO HICH
f/
CPN.STRAfNT,S
aox•g aPr
LOr 6
' -
0MRORMEWAL CONSPRA1NIS
cfO s
545—,2.54'w
5147'
°
S4572547
,zrOCE
rf?4C r 4.
F7LflVG tdf? .2
COMMON AR,-A
89,478 souARc rEEr
a
tor r
2.056 ACtsES
�h
Zll
TR OAS$ZAhg
�b sPi "'S4'ta°_ ^a7 GP'
5
Z
Lol°
ia65a
°Nary A—
a
15
6 4z° 55. ®0°
$
n'
°sc3sARe
azasA
1Q. v
N'a57?m4
e
�
.�
f
_ mDs s zA✓AaRL€
BS�a 6na .
PrzT .aa
R S
^
w
!6'4572;54
5�
N
!
A e
o
_ \`
w
�
!Or A —.3
NAs7z's4 � � 2c4.8o°
$+�"'4d• rRAcr
�
g
.seT S/e• a£sA,m R°,�ASOc
v �
A
!
CAP P•C k ALI Z66a6
k
4`45 72'54'E
406.64°
PP
�
FOUNO P..� P.L 66 b 1 (npj
.SANDSTONE taiVE
(50 1 J
�R�
"•
P
MAD AND
° t.J PT✓'.$ P{AT %S A PART Or TM° Fi9«v++ep/SC AfaARA:,pot Paa
fR.ASPC CAP 'PEAK PVC D9JR`
- CR£P'K e'ermrES fY'M' OF:AaA nFiv) Rd'C�DCJ
• 21 +`TC ° ,- A-CA ° &$ifl MNS R(AT i$ Po, AID
"Xcr ➢V PPOe"9&ls N7` d.1CLA -P01..
1) 1073' 8 mV 4 AAF SZMXCr TO vrmopmrw Rio<,7 AS Dr,4C,TOLD N
=WD J10 PC VlfaARA P01,
4% PVLW ARf NV fVVT0A 8S ACRCSS AVI 8'Ml9 %h£ A['Ag
PRORCRP COsMV Of FEES nAT, r'XC'EPr AS SIC- PA+ TAS P. r,
1
.
S.j - £�Fg P ND Y3 G� fY SC F 9*aS ILAF rO PCOC 7D D
XGPAkPlIIC
1%ae.'BafN,°3 .IZZ Rf_'PyN TO DCY9ML'N➢3 RCC ✓ . ZW CAQZ CAm'P,
D� ADO Rvt [3 `A,T Rrcms,
-
61 RATS a- SCA~S- K 44;37`06' R 67046 ruf SOII ST 101,1FR
tor A -,y pvvc A D 319° prso AND PLASnD w N
..
SAX ^ 09.99' TO P'f N ,,H -C3T €R PY LOT A -4 RCW C
-
A FOUW Pfd'RFRAR REAP A MASHER pAMIM L$ PSBP°
7j WS T,.$ AIV 4, ARE nW FVl"f 8 _
a/ TRACT A - GRV7 EASMDVr MR CKANAM UMMM ACT= AND asex �AM
0..) MACr A DPES HDr wThfwAvcAu F° a= RY 446' DATA M Tne f Al a7 4 (
' P01) CA Tf C, AYRbk r CCMMR Ilj
[ 96 T[E'T )
"J LWSR C AxVAN MC?R° M—OO ✓P,'S AR@' 80CA70 N 41D HfPP HAZIns
@ 4®e ®099
&VSR,S FIC6S AND &WW AVO HCA HAZARD ROMIAU HAZ4fiV AS P4A 01AAWt
TO 6P PtC MW OF Wk 7rt "CZTA1
AORCE Aeemd g Pa 44466® as pav muaP rca
C,11 d* 1
a ley pef dasPd 0ekrP 3s
1416#, Mm. pas+a eK� r J"t d➢ owe+^ -TA b°a1 F,
.
$v Ao 6.®7`7`4 maX m+y .SePlaw basmd apw� 0rvy O ,Wl h
cm»meflemq me^a U9R PM gr9.'4 tP oen
M,
840 g ®( o, 0 of c
® �aPtRCaelm's � ®ten A�abre,
(First amended t)
SCALE: I' = 20'
w
BASIS OF EL EVA 7-10N.-
MH A = 128 8.27
RIM ELEV 8248.31
INV OUT = 8244.0'
DA IF RSMOM ImpRo vEmEN r LOO 77ON CER 77FICA 7F
iWAW fr
LOT J,
INDIAN CREEK TOMMOMES
TOWN OF VAIL, EAGLE COUNT)' COLORADO
A` TA #4
rip
SCALE: I' = 20'
w
BASIS OF EL EVA 7-10N.-
MH A = 128 8.27
RIM ELEV 8248.31
INV OUT = 8244.0'
DA IF RSMOM ImpRo vEmEN r LOO 77ON CER 77FICA 7F
iWAW fr
LOT J,
INDIAN CREEK TOMMOMES
TOWN OF VAIL, EAGLE COUNT)' COLORADO
A` TA #4
OU�
MEMORANDUM
In September and December of 1992, the Town Council passed Ordinances 9 and 27, Series
of 1992, to create a new Chapter 18-57 - Employee Housing, to provide for the addition of
Employee Housing Units (EHUs) as permitted or conditional uses within certain zone districts
within the Town of Vail. The definition in that ordinance states,
Section 18.04.105
In this proposal, the applicant is proposing to construct a Type II employee housing unit on a
portion of the second level of a new prim ary/seco ndary residence. The employee housing unit
will be approximately 450 square feet in size and will include one bedroom, one bathroom and
a kitchen/living area, One enclosed parking space will also be provided for the EHU.
5111 1
P.,mumvi I aggy, I tV MUIC; MUt I IV 10 U1 LI IV LULCU
site area (1,573 square feet) may be covered by driveways and surface parking.
Ill. CRITERIA AND FINDINGS
Upon review of Section 18.60 - Conditional Use Permits, the Community Development
Department recommends approval of the conditional use permit based upon the following
factors.-
2
Staff believes that there will be little impact from the proposed Type 11
EHU on light, air, population, transportation, utilities, schools or parks.
3. jEHpct upon traffic with particular reference to congestion automotive
and ety and convenience traffic flow and control, access
maneuverability, and removal of snow from the street and parkaroes-
It is likely that there would be one additional vehicle associated with this
residence. Staff feels that this would be an insignificant impact on the
above-referenced criteria.
4. EE!ff[ge�on �the c�harac�ferof t�hearea �ln w�hic __the proposed use is to be
ed use in relation to
surro jn4!ng-gaps-
The scale and bulk of the existing structure is very similar to those in
existence in the surrounding neighborhood. Since the proposed
employee housing unit will be located within the building, it would not
appear to have a negative effect on the scale and bulk of the residence
in relation to surrounding uses.
a. It shall be a conditional use in the Sincjle--Eam� R�eside�htial
jA2:fFgapm2!y d Prim /Secoh�d Residential zone
districts.
b. It shall be Dermitted only on lots which comDlv with minimum lot
size located.
At 15,730 square feet in size, the lot meets the minimum lot size
requirements in the Primary/Secondary zone district.
3
The proposed EHU will be a third dwelling unit on the site. It
contains a full kitchen and full bathroom facilities.
The EHU is 450 square feet in size. The applicant has
submitted an application for 500 square feet of additional GRFA
utilizing the provision which allows for the use of 250's "up front"
when creating a new Type 11 EHU. No additional 250's will be
allowed on this property in the future.
It shall have no more than two bedrooms.
complies with this criteria.
9. No more
sixtee ;1 11 ii litears of le shall reside in a one ii:
1 bedroom Type
11 EHU. No
older than
bedroom Tvr)e 11 EHU.
Since this unit is a one (1) bedroom Type 11 EHU, the first part of
the above listed regulation will be complied with.
Since no dwelling units currently exist on the property, the
applicant must provide one enclosed parking space for the
proposed EHU.
ftdings:
3. That the proposed use would comply with each of the applicable
provisions of Title 18 of the Vail Municipal Code.
IV. STAFF RECOMMENDATION
1111 OF 111 111 11IR 1 0,11
• 5
Type 11 Employee Housing Unit. Staff believes that the review criteria have been met as
discussed in the memo. Regarding the findings, staff believes that finding B1 is met as the
proposed use is in accordance with the purposes of the zoning ordinance as well as the zone
district. Finding B2 is met, in staff's opinion, as the proposed use is not detrimental to public
health, safety or welfare. Finding B3 is met, in staff's opinion, as the proposal complies with
all of the standards of the zoning code. Staff recommends approval of the request with the
following condition:
1) Prior to the issuance of a building permit for the proposed structure, the
applicant shall sign a deed restriction using the form provided by the Town of
Vail. This document will be recorded at the Eagle County Clerk and Recorder's
Office and will require that the employee housing unit be permanently restricted
for employee housing. I
Please note that under Section 18.60.080 of the Town of Vail Municipal Code, the approval of
a conditional use permit shall lapse and become void if a building permit is not obtained and
construction not commenced and diligently pursued toward completion, or the use for which
the approval has been granted has not commenced within two years from when the approval
becomes final.
o
0 1. 0 '144
FORESI,
R TD
------ OAD
NOKM
SITE PLAN
SCALE: I'- W
VLAGE FIRST FILING
mwm
sums 1 AIL VILLOT S. BLOCK 7
TOWN OF VAIL, EAGLE COUNTY, COLORADO
LOT 6
LOT I
LOY 4
r1l"ll
A -F. .'..
SCALE: P - IV
Plem,
seprberg &
ARsoclates,
0
Archh"to
TOWN OF VAIL, EAGLE COUNTY, COLORADO
KN2
-Tort
NORTH
SCALE: P - IV
_.AAW-VtAft
ePE 9
0
LOT 5, BLOCK 7
VAIL VILLAGE FIRST FILING
TOWN OF VAIL, EAGLE COUNTY, COLORADO
-Tort
_.AAW-VtAft
—j
Of
11
0 0
Pierce,
Segerberg &
Associates,
Architects
I
I
. . . . . . . . . . .....................
Plem,
m
0 - 0 NI
a�
/�< `
9
_
EAST ELEVATION
0 0 0
li lm�
0
SOUTHWEST ELEVATION
\� ��
R'll
The Planning and Environmental Commission
Cif the Town of Vail
Vail CO
HAND DELIVERED
Re: Application of Byrne, et al.
Lot 5, Block 7, 'Vail Village First Filing
TELEPHONE:
(970) 476-0300
TELECOPIER:
(970) 476-4765
KAREN M. DUNN
CERTIFIED LEGAL ASSISTANT
The consideration by the Planning and Environmental Commission
of the foregoing concern is appT
/ Very try W YO)trs,
11
M-09TAW
OW-1
N
El
Ff, N
rN/ is
LAW OFFICES
DUNN, ABPLANALP & CHRISTENSEN, P. C.
A PROFESSIONAL CORPORATION
JOHN W. DUNN
VAIL BANK BUILDING
ARTHUR A. ABIPLANALP, JR.
SUITE 300
ALLEN C. CHRISTENSEN
DIANE L. HERMAN
108 SOUTH FRONTAGE ROAD WEST
CAROL E. DAVIS
VAIL, COLORADO 81657
SPECIAL COUNSEL:
10 April 1995
JERRY W. HANNAH
The Planning and Environmental Commission
Cif the Town of Vail
Vail CO
HAND DELIVERED
Re: Application of Byrne, et al.
Lot 5, Block 7, 'Vail Village First Filing
TELEPHONE:
(970) 476-0300
TELECOPIER:
(970) 476-4765
KAREN M. DUNN
CERTIFIED LEGAL ASSISTANT
The consideration by the Planning and Environmental Commission
of the foregoing concern is appT
/ Very try W YO)trs,
11
M-09TAW
OW-1
N
El
Ff, N
rN/ is
MEMORANDUM
TO.- Planning and Environmental Commission
DATE: April 24, 1995
SUBJECT: A request for a minor exterior alteration in the Commercial Core 11 (CCII)
Zone District to allow for the modification of an existing outdoor dining
deck at the Lifthouse Lodge, 555 East Lionshead Circle, legally
described as a portion of Lot 3, Block 1, Vail Lionshead First Filing,
Applicants: Robert T. and Diane J. Lazier
Planner: Jim Curnutte
ZONING L 1
Allowed per Per the recently
C 11 Zonin Appmygd Plans
Site Area: 0.467 acre same
or 20,334 sq.ft.
Site Coverage: 14,231 s .ft. or 70% 15,497 s .ft. or %
2 0
1; 1
N: 0'
S' 0.5'
E: 8.5'
W- 8'
1,312 sq.ft. gross (6,5%)
512 sq.ft. softscape
(planting)
813 sq.ft. hardscape
(pavi ng/decks)
*Although the property currently has approximately 39986 sq.ft. of hardscape, only 813
square feet (or 20%) may be used for calculating the minimum landscaped area
requirement.
W,
M
As stated in the Zoning Code, the purpose of the CCII zone district is as follows
St R
A ff — es once.
I
It is the staff opinion that the proposed addition of a disability access
ramp at the Lifthouse Lodge property complies with the purpose 401
statement of the CCII Zone District.
The sub-area concept which is in the vicinity of the proposed outdoor dining
deck modification is as follows (see attachment #3 for a map.of the area):
Concept 18: Commercial expansion (one-story) to emphasize pedestrian level.
Patio area enlarged slightly for additional dining space (a sun-
pocket area), and wider, inviting steps which can also be used for
sitting function.
C. Cc Diiance with the Urban esic n Guide Considerations for Lions ea and
Exterior Alteration Criteria
The following design considerations are a critical element of the Lionshead
Urban Design Guide Plan. They identify the key physical characteristics of
Lionshead and provide the tools to insure that new development is consistent
with the established character. The design considerations include the following.-
Height and Massing:
The proposed disability access ramp, and associated modifications to the
Montauk and Pizza Bakery outdoor dining decks, landscape planters and
entry steps, will have no impact on the height and massing of the adjacent
commercial spaces,
2. Roofing:
The proposed disability access ramp will have no affect on the roofing of
the adjacent commercial spaces.
The proposed disability access ramp will have no affect on the facade of
the adjacent commercial structures.
4. Facades - Transparency:
The proposed disability access ramp will have no affect on the facade of
the adjacent commercial structures.
5. Decks and Patios:
sun
M
There are no accent elements associated with the addition of the
proposed disability access ramp.
• 5
8. Service and Delivery:
Service and delivery functions for the Lifthouse Lodge will not change as
a result of the addition of the proposed disability access ramp.
The staff recommendation for approval of the minor exterior alteration includes
the following conditions-
2. The TOV will remove existing perennials in the effected bed. The
applicant shall be required to plant new perennials in the disturbed and
new bed areas. The TOE! Park Superintendent will supply a plant list for
the applicant to follow. All planting bed areas shall receive 12 inches of
the following planting mix-
6 0
•
f:\everyone\pec\memoMazier.424
7
t
ff55 ��
tts�f�j'
m
r
I{
t
r� P
0 0
PI A y-F c
1 1 In 's,
lill
pi
(q:�_EAST SECTION
N d krF [) t pa-, i
vote.
2. A request for a conditional use to allow for a Type 11 Employee Housing Unit (EHU) to be
located at 126 Forest Road/Lot 5, Block 7, Vail Village 1 st Filing.
Applicant: Ron Byrne
Planner: Lauren Waterton
Lauren Waterton is absent. Jim Curnutte indicated Bill Reslock, the applicant's architect called
just a short time ago and asked that the item be tabled.
Jeff Bowen made a motion to table this item, second by Kevin Deighan, passed unanimously by
a 5-0 vote.
3. A request for a minor exterior alteration in the CCII zone district and a landscape variance
to allow for the addition of a disability access ramp located at the Lifthouse Lodge/549
East Lionshead Circle/Lot 3, Block 1, Vail Lionshead First Filing.
Gaalan Aasland stated they wish to start the project tomorrow. It is in the Town's interest and
the business owners to have this ramp. The TOV actually owns the land where the ramp is
proposed to be located (half of Bart & Yetti's deck).
Bob Lazier would like to get approval on this solution, and then look at other possibilities. Bob
Armour appreciates what Ross is saying, but doubts Town Council would pay to have the pavers
raised and the mail regraded.
Ross Davis questioned that if you are not building new space, no ADA improvements are
required.
Planning and Environmental Commission
Minutes
April 24, 1995
3
Henry Pratt asked if we are providing access on Town property to the deck. What does the
Town say about the access? Susan Connelly does not know the answers to these, but will find
out. Henry asked, what if someone sues because of access, the TOV will be named. Jim
Curnutte said there is nothing to prevent the TOV from being named in any suit.
Henry Pratt wanted to know if the ramp is snow melted and who will maintain it. Lazier indicated
it is not snow melted and it is on his property, so he will maintain it.
Kevin Deighan applauds the ADA regulations. He felt the design needs to have snowmelting or
some provision to keep the ramp clean. His experience with lifts is negative and he highly
supports the ramp.
40 Greg Moffet is in favor of the ramp.
Bowen amended his motion to add that the ramp be kept clear of snow by the applicant, second
by Greg Moffet, passed unanimously by a 5-0 vote.
Iq
Planning and Environmental Commission
Minutes
April 24, 1995
4
Planning and Environmental Commission
Community Development Department
A request fora minor SDD amendment to allow for the expansion of the Cascade
Club located in Area A of the Cascade Village SDD (SDD#4) 1295 Westhaven
Drive.
Applicant: Skip Berhhorst, representing L-0 Partnership
Planner: Andy Knudtsen
DE AIP"ION OF THE RE-QUEST
1® AMENDMENT PROCEDURE
Section 18.40. 100 (Amendment Procedures) of the Municipal Code stipulates the following for
minor amendments to Special Development Districts:
"Minor Amendments: Minor modifications consistent with the design criteria outlined in
Section 18,40,02013 may be approved the Department of Community Development.
All minor modifications shall be indicated on a completely revised development plan.
Approved changes shall be noted, signed, dated and filed by the Department of
Community Development,"
Minor Amendments are further defined in Section 18,40.02013 with the following standar&
"Minor Amendments (staff review) shall can modifications to building plans, site or
landscape plans that do not alter the basic intent and character of the approved Special
Development District, and are consistent with the decision criteria of this chapter, Minor
Amendments may include, but not be limited to,
or changes to gross floor area (excluding residential uses), of not more than 5% of
the approved square footage of retail, office, commercial common areas and other
non-residential fl oor area."
Since the proposed request involves less than 5% of the gross floor area of the building, staff has
determined that the proposal can be approved through the minor modification procedure. The
Municipal Code stipulates the Community Development staff shall info rin the Planning and
Environmental commission of the staff action on the application.
III® DEVELOPMENT STATISTICS
Total floor area of Cascade Club: 63,371.5 square feet
5% of total floor area: 3168.6
square feet
Proposed floor area: 3168.0 square feet
FUTURE ADDITIONS
PROPOSED 4/24/95
REMAINING
ALLOWED BY SDD
DEVELOPMENT
FOR THE CASCADE
POTENTIAL
CLUB
Floor Area 4,500 sq. ft.
458
storage
1332 sq. ft.
989
clinic
1428
aerobics room
290
hallway
3168
Total sq. ft.
Parking* 22.5 spaces already
0
storage
6.8 spaces
provided i n s tructure for
4.9
clinic
future addition.
10,8
aerobics room
0
hallway
15.7
Total Spaces
*See section below for discussion of parking requirement,
V. CRITERIA ANA_FVQ1_
The Community Development Department staff believes that there are two key criteria listed in
the definition of Minor Amendment which apply to this request. These include-
N
A
A. Basic Intent and Character of the Approved S
1. Design compatibility and sensitivity to the immediate environment common
neighborhood and adjacent properties relative to architectural design, scale, bulk,
building height, buffer zones, identity, character, visual integrity and an orientation.
Staff believes the proposed design is compatible to the immediate environment, As
previously discussed, the architectural design of the addition is compatible with the
existing building. It has been designed in such a way to minimize the changes to the
appearance of the building. The materials to be used are also compatible with adjacent
buildings in the vicinity.
2. Uses, activity and density which provide a compatible, efficient and workable
relationship with surrounding uses and activity,
The uses will not change with the proposal.
3. Compliance with parking and loading requirements is outlined in Chapter 18.52.
Staff recommends that the parking requirement be 10.8 spaces for the aerobics room.
This rational is based on the fact that the SDD anticipated a 4500 sq. ft. addition for the
• 3
It is important to note that the first two levels of the parking structure are under different
ownership than the third level, Staff understands that the Westin, which owns the first
two levels, has a lease for the use of the third level and is currently working on extend`ng
this lease.
4. Conformity with applicable elements of the Vail Comprehensive Plan, Town policies
and other design plans,
Policy 1. 12 of the Land Use Plan states that "Vail should accommodate most of the
additional growth in existing development areas (infill areas)." Staff believes that the
proposal is consistent with this policy,
There will be no change to the site plan.
7. The circulation system designed for both vehicles and pedestrians addressing on
and off site traffic circulation.
4 •
8. Functional and aesthetic landscaping in an open space in order to optimize and
preserve natural features, recreation, views and function,
Staff docis t believe additional landscaping should be required as part of this project.
9. Phasing plan or subdivision plan that will maintain a workable, functional and
efficient relationship throughout the development of the Special Development
District.
Not applicable.
Prior to issuance of temporary certificate of occupancy for the addition, the applicant shall
construct a sidewalk from the entrance of the Cascade Club to the existing concrete pad
located at the top of Westhaven Drive, across from the existing bus shelter, The side walk
construction plans shall be submitted to the TOV Public Works Department for review
and approval, prior to issuance of a building pen-nit for the addition,
f.\everyone\pec\memo\cascade.424
0 5
V
•
i III
°
Er"77"I'll,
ll
TO: Planning and Environmental Commission
FROM- Community Development Department
DATE: April 24, 1995
SUBJECT: A request for a worksession for a major amendment to the Cascade
Village SDD to allow for the expansion of the Glen Lyon Office Building
located at 1000 South Frontage Road West/Area D, Cascade Village
SDD #4.
Applicants- Gordon Pierce representing Glen Lyon Partnership
Planner- Randy Stouder
H
4 k Phase current 11 of the current proposal involves the construction of a second office
11ft-m-
9
I
M. DESCRIPTION OF PREVIOUS SDD APPROVAL
Staff has summarized the information from the Cascade Village SDD that pertains to
Area D below:
Site: Area D of the Cascade Village SDD
Zoning- 8DD
Area: 1.800 acres
2. The developer shall include in the building construction, energy and water
conservation controls as general technology exists at the time of
construction.
0 3
4
3.
All parking structures shall have pollution control devices to prevent oil
and dirt from draining into Gore Creek.
4.
Protective measures shall be used during construction to prevent soil
erosion into Gore Creek, particularly when construction occurs in Areas A
and D.
5.
A recreation amenities tax is to be assessed at a rate of 75 cents per
square foot of floor area to be paid for each phase before the building
permit is issued.
IV. ZONING STATIRTIr-
The development
statistics for the proposed buildings in Area D (Phase I and 11) are
shown belowe
Allowed b S➢® Proposed Phase I Proposed Phase 11 Total (Phases I & II)
Height:
51°% max. 40 feet 44 feel 31 feet N/A
49% max, 32 feet
Setbacks:
Per development plan:
N: 2 feel N 18 feet N: 47 feel N/A
S: 8 feel S: 31 feet S: 13 feet
E: 30 feel E: 425 feel E: 22 feet
W: 15 feel W 94 feel W: 580 feel
Stream Setback:
50 feet from centerline 59 feel building 50 feel building N/A
50 feet on-grade parking 60 feet on-grade parking
Site Coverage:
37% or 29,010.9 sq. ft. 8.3% or 6,551 sq. ft. 3.8% or 2,972 sq. fl. 12.1 % or 9,523 sq. h.
Landscaping:
60% or 47,044.8 sq. ft. 62.9% or 49,345 sq. ft. 49.2% or 38,575 sq. ft. N/A
Parking:
Per Town of Vail regulations 77 spaces required 95 spaces required 7 short (Phase 1)
(100 spaces enclosed) 70 spaces proposed, all 93 spaces proposed, all 2 short (Phase 11)
Commercial Floor
surface spaces surface spaces
Area:
32,314 sq. ft. 19,234 sq. ft, (11,822 ex.). 3,757 sq. h. 22,991 sq. ft.
Density:
I free market DU allowed -0- 2 EHU's 2 EHU's
2 EHU's required
GRFA:
minimum size for the two -0- 488 sq. ft. 719 sq, ft. short
employee units shall be sq ft
—Aal
795 square feel and 976 sq. ft.
900 square feel.
Common Area:
35% of 32,314 square feel 4,806 sq. ft. 1,181 sq. ft. 5,987 sq. ft,
or 11,309.9 square feel
Loading and Delivery:
I berth required I berth I berth I berth
4
V. ISSUES FOR-DISCUSSION
1 . USE
Is the exclusive use of office space on this site (with the addition of two employee
housing units) appropriate?
Staff believes that removing the micro-brewery from the SDD and replacing it with
a large office building reflects the needs of the community at this time.
2. SITE PLAN - PHASE I
A. aTREAMBANK PROTECTION
Staff would like to see detailed plans showing the specific ways that
buffers will be provided around the two eastern groupings of evergreen
trees. Staff recognizes that the one or two trees located in the center of
the site near the existing office building will be difficult to save. Staff
believes that it is reasonable to remove these trees if the landscape plan
R
C. F RKIN
•
I
3. SITE PLAN - PHASE 11
A. aTREAMBANK PROTECTION
C. BARKING
4. RHASING
19
0 5. LITY
For the 1988 approval of the micro-brewery, building height standards were as
follows:
Maximum of 51% of the roof was allowed to range from 32 feet to
40 feet.
A minimum of 49% of the roof was required to be less than 32 feet.
11
The criteria to be used to evaluate this proposal are the nine Special Development District (SDD)
development standards set forth in the special development district chapter of the Zoning Code.
As this is a worksession, staff has listed the SDD criteria (below) but will not evaluate each
criteria at this time. The criteria are as follows:
9
:Neveryone\pec\memos\glob.424
•
U]
10
I
ll—,,
&S rbe,K &
A.mocl.t,,,
A chlucu
P.C,AJ..,
m. WYbe9.ap
I
2 Pro owd Road Section
m
� \� \ / \\
� \ \� \�
. \�� ~�
®vapmeM AMwsaw Pa Sea
THIRD FLOOR PLAN - PROPOSFD
Iq P,
W,
tz
M 1-
ik
M,
M 1-
ik
M,
_.SQUT�f Q EV�Tlglt_
Pmb I
Wl,,,T EUVATION
pl-
SITE SECTION wz
( � � \
1 x
i L A6
"MU19
WIR =�
pl"m
Sgo'b"I &
Asod.ft,,
\ \� \:
\ -� \\
I'll
. . .......
WEST ELEVATION
11" w mwi �u
I
\ \
z
/ ��
MEMQRANQM
TO- Planning and Environmental Commission
FROM- Community Development Department
DATE: April 24,1995
SUBJECT: This is a request for a worksession to discuss proposed changes to the
Vail Land Use Plan for 18 parcels of property throughout the TOV (as
more fully described on Attachment #1 located at the end of this
memorandum) from their current designations to the open space and the
public/semi-public designations.
Applicant, Town of Vail
Planner: Jim Curnutte and Russ Forest
IINNIBDD III N AND DE PLAN
U"
AMENDMENTS
r�
-0
Public/Semi-Publir (P(zrl% - the public and semi-public category includes I
schools, post office, water and sewer service and storage facilities, cemeteriell
municipal facilities, and other public institutions, which are located throughou
the community to serve the needs of residents. I
K
A. By the Community Development Department
B. By the PEC or Town Council
Proposed changes by any of the three above mentioned applicants requires Am,
demonstration as to 7
wafldn-��
® DISCUSSION I-q5z1 11=-
Since this is a worksession, there is no formal staff recommendation at this time.
However, the staff has identified the following issues which we would like to discuss
further with the PEC at the worksession.-
13
ilk
fAeveryo ne\pec\memo\land use. 424
9
El
ATTACHMENT I
Ref
Legal Description and
T,.p;,ty owner
Unique Features and
__—Cteria3: How
_Cn*rd. 1. Have Criteria 2, He,.
Land Use Plan
Address of property
and Assessors
Cornments/Hazarads
conditions
is the Plan in is the change
Destination
Parcel Number
changed
error to the Plan in
FROM/TO
concert with the
Man in general
1
Unpatted land south of
Town of Vail
Steep area - needed for
MDR/OS
Courbide Townhomes
2101-124-00-00
south trail, #46 in OPL,
4.47 acres. Hazards: High
rock fall and red snow
avalanche.
2
Unplatted land south of Lots
Town of Vail
Steep hillside. 2.48 acres,
LDR/OS
LDR/OS
1-4, Block 2, Bighorn 1st
2101-111-00-00
Hazards: High hazard
Addition
debris flow and rockfall,
red snow avalanche
3
Stream tract directly west of
Town of Vail
1.73 acres. Hazards: None
MDR/OS
MDR/OS
Pitkin Creek
2101-111-00-00
4
Stream Tracts B & E, Vail
Vail Associates
Stream tracts. Hazards:
LDR/OS
Village 11th Filing
P.O. Box 7, Vail,
Flood plain.
CO 81658
5
Tract B, Vail Village 12th Filing
Vail Associates
Hazards: High rockfall,
LDRIOS
2101-034-05-00
6
South half of Tract F, Vail
Town of Vail
Hazards: High debris
LDR/OS
Village 7th Filing.
2101-092-08-00
avalanche, medium
rockfall and snow
avalanche influence.
7
Tract A and Lots 9, 10, 11 Vail
Town of Vail
Hazard on-site. Hazards:
LDR/OS
Village 10th Filing - Fairway
2101-081-16-00
Medium rockfall, high
Court
debris avalanche, red
snow avalanche.
8
Vail Interfaith Chapel, Vail
Vail Religious
Structure covers parcel
MDR/PSP
Road
Foundation
.277 acres. Hazards:
2101-071-09-00
None-
9
Lot 20A, Block 7, Vail Village
Town of Vail
Wetlands on property.
LDR/OS
1st Filing, 274 Beaver Dam
2101-071-13-00
Hazards: None.
Rd.
10
Tracts A, Vail Lionshead 2nd
Town of Vail
Stream Tract Middle Creek
RAS A TAIOS
Filing
2101-064-07-02
runs through it. Hazards:
and
None.
2101-064-07-00
11
Tract A, Vail Village 2nd Filing
Town ofVail
Hazards: None.
TA/OS
2101-064-07-01
12
Tracts C, Vail Lionshead 2nd
Town ofVail
Stream Tract Middle Creek
MDR/OS
Filing
2101-064-07-02
runs through it. Hazards:
and
None.
2101-064-07-00
13
Tract B, Vail Lionshead lot
Town of Vail
Stream Tract. Hazards:
TC/Cis
Filing
No parcel #.
Flood plain.
14
Tract B, Vail Potato Patch
Vail Associates
May make good pocket
LDR/OS
2101-063-01-03
park. Hazards: High rock
fal i.
LAND USE PLAN DESIGNATIONS
OS = Open Space
TA
= Transition Area
MDR = Medium Density Residential R
= Resort Accomadation & Service
LDR = Low
Density Residential
TC
= Tourist Commercial
P = Park
SR
= Ski Base
PSP = Public
Semi Public VMP
= Vail Master Plan
MOUNTAIN
MFADOVIS
,:tt:L
2uKr L;HEEK
MEADOWS
RIVERBEND
8
4857 4897•
4846
4876 4916
2
3 4
TRACT D a
1
0 DI'
4768
816 IF
H A DIT
19
184819 17
4799
83 16
TRACT C 2
48-1
4778 0
4791 1
1 4,OC
3 4
4828
4782 4788
2
TOUNROUSES
5
4640
SUBDIVISION
4792
6
4802 7
4612
4818 9
IC
4822
48422
ti
TOWN OF VAIL BOUNDARY
mum
(D
3035
CONDO'S.
BOOTH FALLS
13th. FILING
5 6
I
13 0 3094
303! Q
G
2965 2975
TRACT C
4 2985
2945
14
0 308
3
93 9 2960
15 10 9 8
3019 3100 3115
16
2
3145 RESHRniviSION OF LOT 72 L
2
92 2940
3015 7
3120
Il
— 3275 VA IL VILLAGE 12th. FILING
4
'765 3
10
2920
17 3011 6
(D
2785 2
TH CREEK
2805 BOOEEK
®
3130
is
10
326
TOWNHOUSES
3 5 4
TRACT A
oyy 0282
1
3140 3150
9 a
245
2875
2900 TRACT B
3255 3235 C
5
RD
11 12 TRACT B
3241
P,
3010
3236
VAIL MOUNTAIN
4
SCHOOL
TRACT C 1
2 3
a 3160
3220 3226 3230
'LOT 2
-AGE
INTERS E 70
TRACT E
URNAROUND HICLE
NOT IN T.O.V. (IN T.O.V.)
1 2
1 2 4 0 RACT A
ASP
"/v 855 2865
2925 2945
2905
10
9 3130
12 8
17
CREEK
2990
3295
4 5
3 10 3030
3110
6 7 8
3050 3070 309
G
807 3
1u lb 850 2880 2
13 840 1 1
ell 289 2930
14 15
292
282 283
TRACT B
VAILVILLAGE 11th. FILING
2910
TRACT C
0
UNPLATTED
RESUBDIVISION
OF TRArT F
1L® VILLAGE
Ilth. FILING
jNPLATTIED
ti
TOWN OF VAIL BOUNDARY
mum
\/All RC)l IMARY
MEMEMM
INTERSTATE 70
( NOT IN T.O�V. )
sNOR [EE1 1309
UNPLATTED 1289
VAIL VALLEY DRIVE
TOWN OF VAIL
MAINT, SHOP
IL ILL
8th. FILING
TENNIS COURTS
LLEY I t El 1
�K
0=
2
1337
3
PARK
1055 1
6 m5 1 111111163 1183 4
1 1307
1297
EAST VAIL WATER 967
SANITATICN BLD TRACT
1031 104
1 2
4
0 04
3
05 8 9 10 0 1193
0 125 1153
a 3
2 22
C0 00!
5
10,45 Lu
7 Q H04
1287 1328 1
207
1054
4
1106SILVERCI C
9 10 14
TRACT
FD
OR
AMPITHEATER
I Z,
6 1022
1157 1187
IIQ7 1136 12, 13 1195
fts3
E
NATURE
A 1 f,7 6 vpLLF-( OR
2 C, 1024 1081
CENTER
601
1012 6
y 1014
1250 1278
620
4
992
'1 A-
4
PARCEL E
4
3
2 24 GOLF COURSE MAINT
8
SOCCER FIELD
3
TRACT
D
1220
TRACT A
994
2
996
5
1200
170
1 2
3 4
5
6 2
F
)RTE A
998
1017 1
7 1
7
1119 1 1 1150 7
VAGE 7
VAIL ILL th.
FILING
5
965 97 3 5
PARCEL D
F'
1 2
2 1
925
FAIRWAY
04
990
E 10t
F1 IN
9
8 7
920 930
6 5,
950 970
4ij,
UNPLATTED
MOUNTAIN
BELL
NE
SOLAR
150
r
VAIL
14 9
I
ABC
SCHOOL,
®E LEARNING TREE
h10UlyrAlN LL R
®.
129
dIN T.O:V.3
TR E
p
II�LI
ING
VAN GE
I
PARKING
POI T
STRUCTURE
VAIL C
N
71
61�
WEST-
508 I E
i®
IFITERNATi
WINDS
548
1 395
I I I
4 250
300
HELIPAD
d
o
LION
U B LE TREE
VAIL
125
Il� �IIL
I
soo VAIL +
5 I
,
LiF555 52ii T LIONSHEAD Cl CLE
TR F
ICE ARENA FILING
113
555 g
30NSHEAD 7 450
{com
321
�/ 2
PO ICE
C
,erci�i)
RCADE fi
C 0
OFFICES
�9MAIN VAIL
531 LODGE AT LI
N HEAD
TRACT A
75
EXIT
�D REETOPS ACT J
GONDOLA 7�_
6
L1 AR
VAIL
b00
452
292 F E
28i
NAT'L BA K
4
LIONSHEAD
CENT
\ I VAIL VALLEY
VAIL CENTER
2 BLDG.
SCOR 10
IO8 121
DSKAAL
HOLIDAY INN
52 Gp R5
1 i
1
13
a
9
HOUSE ALPHORN
ANDAR
GATEwA
1
TRA D UrPLATTED
272 �ES7
TRACT B 2B2 7 MEADOW
141 121
DR.
C 4528
A
LOT 0
12
N 50
SQUAR
j
�°
232 I I
OLIDAY
VAIL VILLAGE 1NIV
AGE
30
l _
fi 5
212 182
4 3142 322 2
162
1 HOUSE
100
M
82
I
ARCADE
°°�✓
44
5
,CT A
381 cap c;�cL€
362
�2 5
525 FOREST AD
FIRIE 15
MEADOW DEPT.
EAST
—SONNEIALP
�s
LIONSHEAD ® 352!
ILL
6
TRACT B
VA PL 42 6
TOT LOT
401
330 41 AO
VILLA Is!
SKIER BRIDGE 63
275 39 38
37 36
CORTIN BANK
22
6
3
3
cl 4 3D
343 333 265 223 i93
153 123
i 17
�,`
eAVA
H5
0
IA
® 443 429
24
27
R R SE
ENNIS
o 5 9
10 19 23 184
154 28 +
84
!
TRACT
aJRTS
463 7 374 354
344 324
31
3
fi 394
25
2C 21 25 22
26 29 64
1
1
SWOP 43 T
434
1 16 265
IS5 30
115
32
WILLOW
3 2
454 42 375
285
353 325 226
186 966 FOR
95
`5 315
9 ILL
®
!
2 327 178 12 19
i7 1
7
9 8 6 ®
346
`
5
35
44 B
7
3 2
586 556
!
TRACT A 1 486 6 5 4 3 2
307' 26
338 14C 227
13217
3 2
�7
L1 4645 446 424 416 366
1 1Fa 15 !�
67 �7 f27
87
107
1
298 i8
1
2 3 7
8 6 10
11 12 13 14 15
16
813
$15 814 8
70-8 796 794
792 794 788 786 764
782
P�
&
806
5
80
769
23 22
76s
17
,
32
28
27 26 25
24 . A 21
7&
_
81! 799
797 795 793
791 V �lx �t � 781
16
-30
29
A\b
\, 1 0.
20
807
805
\ t
\�
778
i
POTATO
34`'x'
X11
PATCH
'775
16
?6i
33
--
TRACT A
765
6
7 70 ra is
RED
_
RESUBMiSION OF
SANDSTONE ROAD
2 3 a 5 s'
2 10
11 12
? VAIL POTATO PA!
7
7
s o 772
774 776
PARCEL A
TRACT D
3EE SHEET 5
POTATO PATCH DR.
TRACT C
czar �c�� YF s
3
754
5
758
1L POTATO F:AT CH
2
6
! 7
4
756
SEA FILING
°
_
2 °c �-�-y� 738
"
736
748
s 29 "`'� 31 740
Ea
°5D t9
!P�k 3 2
RESTAURANT 742
744
I
746
SANDY LANE
�--�f s
Fo
co
POTATO PATCH
6LK. l
CLUB 13
(/)
RED SANDSTONE
ELEMENTARY
SOLAR
VAIL
to
46
` 5
UNPLATTED
551
t
3
PHASE
ASE
INTERSTATE 70
31 PHASE PHASE
{@N T.OeV.I
IV 25
PEDESTRIAN
R E
897
695
3® I
SUtd VAIL
OVERPASS
S
5 PHASE
V
VAN GE
2
PARKING
6
996
7
899
6
69
CREST®
POI T
508 I
STRUCTURE
SANDSTONE
NORTH DAY ' } WINDS
PARKING LOT ` ��
1 !
p
� f 395
t
4
10
TOT LOT
LION
I
InNRHEAQ
5oo VAIL
f
i I
7
@ .
4 LIFTHOUSE LAN 'ARK
2t
52t j
T L @ONSHE Ci CIE
F
5
12
C
N
E705 PL
610
2—
555 3
TR
QZD 45®
ICE AREt
86
I
7DTR T F
®
616
IONSHEAD
RGADE
6(c�m erc @ill 7
321
i t
531
LODGE AT LI N FJcAD
0 VAIL SPA
- A4ONTA
SL'N61RD GONDOLA
t75 600
REETOPS TR J 6
452
L RARY' -
292 .
7V
_,