Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2004-0209 PEC
PLANNING AND ENVIRONMENTAL GOMMISSION ~J • f~ PUBLIC MEETING Monday, February 9, 20D4 PROJECT ORIENTATION -Community Development Dept. PUBLIC WELCOME 12:00 pm MEMBERS PRESENT George Lamb Rollie Kjesba John Schofield Erickson Shirley Chas Bernhardt Gary Hartman MEMBERS ABSENT Doug Cahill Site Visits 1, Gore Creek Residences- 730 Lionshead Circle NOTE: If the PEC hearing extends until. fi:00 p.m., the board may break for dinner from 6:DD - 6:3D Public Hearing -Town Council Chambers 2:00 pm 1. A request for a conditional use permit, pursuant to Section 12-7F-I-5, Conditional Uses; Generally {on all levels of a building or outside a building), Vail Town Code, and a request for a major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifications, Vail Town Cade, to allow for the construction of new single-family and two-family residential dwelling units, located at 730, 724, and 714 West Lionshead CirelelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision, and setting forth details in regard thereto (West Day Lot). Applicant: Vail Resorts Development Company, represented by Braun Associates, lnc. Planner: Warren Campbell MOTION: I(jesbo SECOND: Lamb VOTE:6-0 CONDITIONS: Warren Campbell made a presentation per the staff memorandum. Staff is recommending approval of the canditional use permit request allowing 1$ new residences, with the conditions stated in the staff memorandum. The applicant made a presentation on the application to the Commission. The applicant expressed concern with three of the proposed conditions of approval. Speaking under public comment, Jim Lamont stated his concern with the proposed limitation on bed and breakfast operations and home occupations. Upon discussion of the application, the Commission expressed their support for the application as they found that the application complied with the criteria established for a condition use permit and a major exterior alteration. In moving to approve the request, the Commission amended the recommended conditions of approval. canditional Use Permit conditions: 1. That the Developer shall not sell, rent, lease, or otherwise transfer any of the twelve {12) additional parking spaces located within the below grade parking structure. The additional parking spaces shall only be used by those permitted, conditional, or accessory uses allowed on the West Day Lot Development Site. `'. Thy ~~. frt:~r~ dev~lcrmcnt applieat+e~c rc~~irin~ j^in~-p~e~e#~+-ea•~~cr ~cr shall N? ~-~-;,;++;ih tho ~w+ttcn co~~-e-p~rc;.sr". ^,•~co~-ted ,•,~+ in the~c^t C~~y-Let ~~ , yi ~~i~' ~~' YA11i elep~ant Sim Staff was directed to work with the applicant to further define this condition and to return before the Planning and Environmental Commission to present the solution. 3, That the approval of this conditional use permit constitutes approval of a development plan far Parcel 2 of the West Day Lat Development Site and any change to the development plan far Parcel 2 shall require a new conditional use permit approval. 4, That bed and breakfast operations shall be prohibited in Parcel 2 of the West Day Lat Development Site. 5. That two-family residential structures shall be the only permitted or conditional uses allowed in Parcel 2 of the West Day Lot Development Site. Accessory uses shall be permitted useless otherwise specifically prohibited. ~i. Thy`. hcr:nC cs~~~~.c*i,~s-as-~aflnad-Ih C~st+~n 1" " ", ~f. .. ~-~ ~nrlnyR: detailed in Ccst'rn 1 ~ 1 "I 1'?, "-lame-E~s~:~p"`rr~ v~~ ch,~,ll ~~ctrihi+A,~ ~f the \~cat ~Gy ~ ~~ ^Cy.~lcrrn4- The planning and environmental commission shall make the following findings before granting a conditional use permit: (1) That the proposed location of the use is in accordance with the purposes of this title and the purposes of the district in which the site is located. (2) That the proposed location of the use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, ar welfare, or materially injurious to properties or improvements yin the vicinity. (3) That the proposed use will comply with each of the applicable provisions of this title. Maior Exterior Alteration conditions: -1 . ThCt;h ~~+Srman++n #F~n Tn~un ~,f t/ail fnr+he, e-In~rnlnnm©n# mi4irvn}inr~ i.v~~~ ¢oo of ~~~ nnn t~ ms+lna+n nn#imn{A~ InnrAns+r+e ~r~ ~~~1 ~1~'r tr'~~fEn An +Fio C'no f}!~l Grnn}and ~2L19.d ..s yr aYvv,vvv iia~[..r,.y yJiTT GTGi@~ffVTL'GrJ.. r 1 ~etion-cfi the ten, r~ ~,f 1/ it ~r Imo, t~ and WesrF~res~Rea~i. llt~kre-~diss d ^IatiraCnn~r nrtinc+rtain+i A nr~nrn~rnrJ ~~ s f ~--~-~a~i~4 ~,. l~~r "f +F~c tY®C ~ } ~ ~,~ } +a,~{~'rrl~rB rt~on}c ~wrhi®h miti~t.'~'= t~,> I~~'an#nCrfQ`tY~ ~{"ri}FT iL~o rncir-I ~e]nti~,~l ~'r~{~ ter'} ~rscl '' cf `h Staff was directed to work with the applicant to further define this condition and to return before the Planning and Envir o nment a l Commission to pres the solution. e n t i. } ~ ,-, l ~ ~ r ,,. That W,~~ ^~~'Ci~R..~Y~e~ '~, ,..'1 ~E~~ntFQtY~w r~*h, :i'~~ «r,'n~n~~r nnnnrren n#n. fnr e~<'L~ fr chicle :-`~{1 '~rCrw^~ n++hn rtierloo+rianlmm~zcrnnnrr arr~tiinlo -±nnoc~o_ .. ,., r.,..~.,....,.....,,,.~,y.,...' ti Y 1A!^Jl/~}T„l'1 ~ I~.~c~lasc cc d,p~t~~l~;; cr~r~.~~:~*. ICAn. Staff was directed to work with the applicant to further define this condition and tv return before the Planning and Environmental Commission to present the solution. °. Thct, *hA n'~wr ~ra~islzc C:~cocr~cn*~~er cc^°~-^~Rc rcdcctrinn'n~~ncy ~:le assc~r wad-slnnicn ~ha a~preved-develepr~acnt Yr~n. StafF was directed to work with the applicant to further define this condition and to return before the Planning and Environmental Commission to present the solution. 4. That the Developer installs an oiVsand interceptor in the parking structure. The plans for the installation of the interceptor shall be submitted to the Town of Vail for review and approval, prior to applying for a building permit for the construction the approved residences. 5. That the Developer receives approval of a Design Review board set ofi plans for the design of the retaining walls located at the entrance to the parking structure, prior to applying far a building permit far the construction the approved residences. 6. That the Developer submits civil engineered plans far the relocation of the Town of Vail bike path located south. of the development site for review and approval by the Town of Vail Public Works Department, priorto being scheduled far final review by the Design Review Beard. If it is decided not to move the existing bike path the Developer shall provide the Town of Vail with a pedestrian easement for that portion of the existing Town of Vail bike path located on the development site. 7. That the Developer submits an amended Design Review Board application mitigating the height of the exposed walls of the parking structure between the duplex structures. 8. That the Developer revises the height of the retaining wall located at the end of the access road running between the existing Vaif Mountain Marriott Resort and the existing parking structure for the Marriott to be no more than six feet in height. 9. That the Developer submits a complete drainage study which includes, but is not limited ta, calculations for inlets, pipes, and autfal'Is forthe review and approval of the Town of Vail Public Works Department, prior to applying for a building permit for the construction of the residences. 1(}. That the Developer submi#s plans and profiles with crass-sections at 50- foot intervals for the required West Forest Road improvements and at 1tl®-foot intervals far the pedestrianfemergency access road for the review and approval of the Town of Vail Public Works Department, prior to applying for a building permit for the construction of the residences. The planning and environmental commission shall make the following findings before granting approval of a major exterior alteration; (1) That the applicant has proven by a preponderance of the evidence before the Planning and Environmental Commission that the proposed exterior alteration or new development is in compliance with the Lionshead Mixed Use 1 District. (2) That the proposal is consistent with the applicable elements of the Lionshead Redevelopment Master Plan. (3} That the proposal does not otherwise have a significant negative effect on the character of the neighborhood. (4) That the proposal substantially complies with other applicable elements of the Vail Comprehensive Plan. 2. A request far a recommendation to the Vail Town Council far proposed updates to elements of the Town of Vaii Comprehensive Plan, and setting forth details in regard thereto. Applicant; Town of Vail Planner; Elisabeth EckeliGeorge Ruther MOTION: KjesFao SECOND: Bernhardt VOTE:6-a The Commission members strongly urged the Town Council to seriously consider the proposal and that, if approved, Phases No. 1 and 2 proceed concurrently to the extent passible. Chas Rollie fi-0 3. A request for a final review of a proposed amendment to the Town of Vai9 Official Zoning Map to change the zoning of the West Vail Lodge Properties from Commercial Core 3 (CC3) to High Density Multiple Family (HDMF), located at 2278, 2288, 2298 Chamonix Lane and 2211 North Frontage Road/ Lots 1, 2, 3, and Tract C Vail Das Schone Filing 1 and Inn at West Vail Lot 1, Block A, Vail Das Schone Filing 8, in accordance with Section 12-3-7, Vail Town Cade, and setting forth details in regard thereto. Applicant: Vanquish Vail, LLC, represented by Allison Ochs Planner: Matt Gennett Motioro: Bernhardt Second; Hartman Vote: fro TABLED TO FEB'IFtUARY 23, 2{1(34 This item was tabled at the applicant's request and with no discussion by the Commission. 4. A request for a recommendation to the Vail Tawn Council of a major amendment to Special Development District No. 36, Four Seasons Resort, pursuant to Section 12-9A-10, Vail Tawn Code, to allow for amixed-use hotel; a request far a final review of a conditional use permit, pursuant to Section 12-7A-3, Vail Town Code, to allow for Type III Employee Housing Units and a fractional fee club; and a request for a recommendation to the Vail Tawn Council of a proposed rezoning of Lats 9A & 9C, Vail Village 2nd Filing from Public Accommodation (PA) 3 zone district to High Density Multiple Family {HDMF) zone district, located at 28 S. Frontage Rd. and 13 Vail RoadlLots 9A& ~C, Vail Village 2nd Filing, and setting forth details in regard thereto. Applicant: Nicollet Island Development Company Inc. Planner: George Ruther Motion: Bernhardt Second: Hartman Vote:6-0 TABLED TO FEBRWARY 23, 2QU4 This item was tabled at the applicant's request and with no discussion by the Commission. 5. A request for a recommendation to the Vail Town Council for proposed text amendments to Section 12-3-6, Hearings, Vail Town Code, to amend the notice requirements for Town of Vail Design Review Board public hearings, and setting forth details in regard thereto. Applicant: Town of Vail Planner: Russell Forrest WITHDRAWN 6. Approval of the Minutes MOTION: Bernhardt SECOND: Lamb VOTE:6-a 7. Information Update Bogarts Bar and Bristo Appeal • TermslAppointments 8. Adjournment MOTION: Bernhardt SECOND: Lamb VOTE: 6-0 • The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. Please ca[I 47J-2138 far information. Sign language interpretation available upon request with 24 hour notification. Please call 47~- 2356, Telephone for the Hearing Impaired, for information. Community Development Department Published, February 6, 20p4 in the Vaii Daily. 4 PLANNING AND ENVIRONMENTAL COMMISSION A • PUBLIC MEETING Monday, February 9, 2004 PROJECT ORIENTATION -Community Development Dept. PUBLIC W1=LCOME 12:00 pm Site Visits 1. Gore Creek Residences- 730 Lionshead Circle MEMBERS PRESENT MEMBERS ABSENT Doug Cahill NOTE: If the PEC hearing extends until 6:00 p.m., the board may break for dinner from 6:00 - 6:30 Public klearina -Town Council Chambers 2;00 pm A request for a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses; Generally (on all levels of a building or outside a building}, Vail Town Code, and a request for a major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifications, Vail Town Code, to allow for the construction of new single-family and two-family residential dwelling units, located at 730, 724, and 714 West Lionshead CirclelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision, and setting forth details in regard thereto (West Day Lot)_ Applicant: Vail Resorts Development Company, represented by Braun Associates, Inc. Planner: Warren Campbell MOTION: SECOND: VOTE: 2. A request far a recommendation to the Vail Town Council for proposed updates to elements of the Town of Vail Comprehensive Plan, and setting forth details in regard thereto. Applicant: Town of Vail Planner: Elisabeth EckellGeorge Ruther MOTION; SECOND: VOTE: 3. A request for a final review of a proposed amendment to the Tawn of Vail Official Zoning Map to change the zoning of the West Vail Lodge Properties from Commercial Care 3 (GC3} to High Density Multiple Family (HDMF}, located at 2278, 2288,. 2298 Chamonix Lane and 2211 North Frontage Roadl Lots 1, 2, 3, and Tract G Vail Das Schone Filing 1 and Inn at West Vail Lot 1, Block A, Vail Das Schone Filing 3, in accordance with Section 12-3-7, Vail Town Code, and setting forth details in regard thereto. Applicant: Vanquish Vail, LLC, represented by Allison Qchs Planner: Matt Gennett TABLED TO FEBRUARY 23, 2004 4. A request for a recommendation to the Vail Town Council of a major amendment to Special. Development District Na. 36, Faur Seasons Resort, pursuant to Section 12-9A-10, Vail Town Gode, to allow for amixed-use hotel; a request for a final review of a conditional use permit, pursuant to Section 12-7A-3, Vail Tawn Cade, to allow for Type III Employee Housing Units and a fractional fee club; and a request for a recommendation to the Vail Town Council of a proposed rezoning of Lots 9A & 9C, Vail Village 2nd Filing from Public Accommodation (PA} zone district to High Density Multiple Family {HDMF} zone district, located at 28 S. Frontage Rd. and 13 Vail Road/Lots 9A& 9C, Vail Village 2nd Filing, and setting forth details in regard thereto. ~~ ~ r 1 ~` iY TD4YtV dF YAIL Applicant: Nicollet Island Development Company Inc. Planner: George Ruther TABLEC7 TO FEBf~UARY 23, 2{#04 5. A request for a recommendation to the Vail Town C©uncil for proposed text amendments to Section 12-3-6, Hearings, Vail Town Cade, to amend the notice requirements for Town of Vail Design Review Board public hearings, and setting forth details in regard thereto. Applicant: Town of Vail Planner: Russell Forrest 1NITHDRAINN 6. Information Update • Bogarts Bar and Bristo Appeal TermslAppointments 7. Adjournment Mt3TION: SEC©ND: VOTE: The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Deveiopm~nt Department, 75 South Frontage Road. Please call 479-2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479- 2356, Telephone for the Hearing Impaired, for information. Community Development Department Published, February 6, 20i}4 in the Vail Daily. • 2 o ~ °o-~ J o p ~ w ~ ~ U ~ as om o~ E m U ~ c > >- ~~ 'om ~ ~ ~ }'c` /n Q q m ~C u }~ °~c~oa W $ EN ° w ~ o o =E m~ ° U ~w~om m ~i ~"" O >- } T w ~ 4 yw .~ w ~ mm a m~ ~_>G ~ w~ , ~a zQ w ~ ~ c ca F Od ° °~ oim2~~ acv ~ ~ ~U m~ yv 6U Z~ W u~ w m 'c iv Uo , S 6~0 N(`y=m~Ei 0© c~~ O z ~ od ~ ~ ~b &`" ~,vmg~ ~~ a W~ wU ~v ~ Uc ~ C C~y~ ~ wo y(j ~v ~~ c '~~'~E~~ ~ ~ as ~; E ~o N~ z~~ a~ ~rrn ~ 9U fV 00 Cf; C/: d-s r'~ r~+~. r~ o ~ ~ Q 1 Q ~ Q+I ~ GTr ~ Q ~"' W ~"{ "Cy I-i ~ ~ ~ `~„~, O Pr v ~ "-' iG " p G u~ cd O ~, _ F- w ~' ~. o ~ ~' 4r~ ~•' 3 .~~o~~ ~~~ ~'b e ,~W~o~, ~,o°o~ 3 ~~~~ ''~-' o . ~ w .~ -ti ~ U ~ c Y ~ ~ ~. ~ ~ v~ v •G y ~ "" yw ~, b ~ p i. ~ ~ ~ ~ v ~ ~ ,~ a~ ~-' '-? L p "~ F ;~ ~ J "~ O ~~ ~•~ ~ GJ ~•~ ~~~ Ry7 ~ ~ W 30 ""~'.~ ~3~~ ~ ~ ~ ~, r.~,~ ~ y ^C3 y Q ~ Q ~ ~ ~ •~ b C 0~ ~ F, ~ .~ U C O 0. ~ v R~.~ a] O. ~ ~ ~ ~ '~ y ~ ~~L~'~ ~ T~.~ ~A ~' ~ s~ C ~ ~' Q ~ ~ ~ Q. C7 N T N O . 'b --~ U .~.~ O O N 6~i z .~ a~ .° .~ d U 7, Cn C p ~';~ is tr [1 ~ P ~ P C, ~y~a ~ pr, roV Q y 'r~yy} ~ N ry~a~6 t6~E yYJG N O ~' W Q ~a~~~ ~ ~~~04 ~~ ~. ~co ~~LLC o o~ o O ~R~~y;~ ~5° yam ~ ~o~~a~E £Os aE ~ e's+msr-- ~~c A.C cN a ~9r cs .~„w t ~ .. ~~d ~z U7~~ ~ ~`} t7 ~+~ R 2~Y d ym~m p to ~p.~`31'1 r' F- MEMORANDUM TO; Planning and Environmental Commission FRdM: Community Development Department DATE: February 9, 20Q4 SUBJECT; A request for a conditional use permit, pursuant to Section ~ 2-7H-~, Conditional Uses; Generally ion all levels of a building ar outside a building), Vail Town Gode, and a request for a major exterior alteration, pursuant to Sectian 12-7H-7, Exterior Alterations or Modifications, Vail Town Code, to allow for the construction of new single-family and two- family residential dwelling units, located at 730, 724, and 714 Vilest Lionshead CirclelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision, and setting forth details in regard thereto. (West Day Lat) Applicant: Vail Resorts Development Company, represented by Braun and Associates Inc. Planner: Warren Campbell 1, SUMMARY. The applicant, Vail Resorts Development Company (VRDC), represented by Braun Associates, Inc., has scheduled a meeting with the Planning and Environmental Commission to present a proposal for a conditional use permit, pursuant to Section 12-7H~5, Conditional Uses; Generally 4on all levels of a building or outside a building), Vail Town Cade, and a request far a major exterior alteration, pursuant. to Section 12-7H-7, Exterior Alterations or IVlodificatians, Vail Town Code, to allow for the construction of nine new two-family residential structures totaling 18 dwelling units. Staff is recommending that the Planning and Environmental Commission approve with conditions the requests far a conditional use permit and major exterior aiteration. Il. DESCRIPTION OF THE REQUEST The applicant, Vail Resorts Development Campany (VRDC}, represented by Braun Associates, Inc., is requesting a conditional use permit, pursuant to Section t 2-7H-5, Conditional Uses; Generally (on all levels of a building or outside a building}, Vail Town Code, and a request for a major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifications, Vail Tawn Code, to allow for the construction of nine new two-family (duplex) residential structures on the West Day Lot. A vicinity map is attached for reference (Attachment A}. This proposal for nine duplex units, referred to as the Gore Creek Place residences, is a smalE part of an overall development plan for the West Day Lot herein after titled "The West Day Lot Development Site". The West Day Lot Development Site includes the existing Vail Mountain Marriott Parcel 1), a new hotel to be proposed in the future (Parcel 3), and the proposed nine duplex structures along Gore Creek (Parcel 2). The West Day Lat Development Site is attached for reference (Attachment C). This proposal is the second piece in Vail Resorts Development Company's overall Lionshead redevelopment project which is the comprehensive redevelopment of one of three primary portals to Vail Mountain and is intended to create aworld-class arrival point and transition between Lionshead Village and Vail Mountain. The Lionshead redevelopment project includes four areas of redevelopment, the Lionshead Core, West Day Lot, North Day Lot, and the Tennis Court Site. The applicant is proposing to construct nine duplex structures for a total of 1 ~ dwelling units, All of the proposed units will be serviced by a below grade parking structure which will have access off of West Forest Raad. Within the parking structure each unit will have a private two car garage. There will be a total of 12 additional common parking spaces provided for visitors and guest of the hams owners. Also in the garage there will be a boiler room which will house the mechanical equipment far the snow melt system used to heat the pedestrianfemergency vehicle access path. Trash collection for the t8 dwelling units will be done in smaller trash cans with removal to occur within the structure. All 18 dwelling units will have three floors with the lowest floor being able to walk out on grade along the bike path. There are two floor plans proposed for this development. There is an A/B duplex and a BIB duplex. The AIB duplex measures 7,535 square feet in Gross Residential Floor Area ~GRFA) and the BIB duplex measures 6,$©0 square feet in GRFA, The heights of the structures range from 31 to ~t1 feet in height. Along Gore Creek there will be three floors exposed while on the north elevation two floors will be above grade. All 18 dwelling units and the parking structure will have fire sprinkler systems installed, A more complete description of this proposal is included' in ``Lionshead, Redevelopment: West Dav Lot". dated November 3, 2Qfl3, which has been attached for reference (Attachment B). The applicant is tying the existing Vail Mountain Marriott, the proposed Gore Greek Place residences, and the proposed future hotel on the West Day Lot together as a larger overall planned development site, The West Day Lot Development Site, with plat notes tying the three projects together for zoning purposes. A reduced copy of the plans for the proposed residences is attached for reference (Attachment C). lll. BACKGROUNl3 The subject property includes several parcels of land currently used for the Vail Mountain Marriott, the parking structure tar the Vaii Mountain Marriot, and employee parking for Vail Resorts. The Marriott previously "The Mark"') was 2 approved by the Town in 1977 as a hotel and condominium project and was zoned Special Development District Na. 7 lay Ordinance 3, Series of 1977. The project was expanded and modified throughout the 19$0's and 1990'x. In 1999 the Marriott property, along with the rest of Lionshead, was rezoned to Lionshead Mixed Use 1 and SDD No. 7 was repealed. The Marriott as developed today includes 35 dwelling units, 276 hotel rooms,: meeting rooms, a restaurant, and other hotel amenities. The western portion of the site the Morcus Subdivision), known as the West Day Lot, was regraded and used far Vail Resorts employee parking. Prior to the rezoning of this parcel to Lionshead Mixed Use 1 in 1999, the property was zoned Parking District. On November 24, 2003, the Planning and Environmental Commission approved text amendments to Section 12-7H-5, Conditional Uses; Generally (on all levels of a building or outside a building), Vail Town Code,. to allow single-family residential dwellings and two-family residential dwellings as conditional uses in the Lionshead Mixed Use 1 District and Section 12-16-7, Use Specific Criteria and Standards, Vail Town Code, to provide criteria by which asingle-family and two-family residential dwelling proposal within the Lionshead Mixed Use 1 District should adhere. The text amendments were subsequently approved by Town Council upon second reading in Ordinance 36, Series of 2003, on December 16, 2003. IV. ROLES OI` THE REVIEWING BOARDS The purpose of this section of the memorandum is to clarify the responsibilities of the Design Review Board, Planning and Environmental Commission, Town Council, and staff on the current applications submitted an behalf of Vail Resorts Development Company. A. Conditional Use Permit Orafer of Review: Generally, applications wil! be reviewed first by the PEC for acceptability of use and then by the L?RB far compliance of proposed buildings and site planning. Planning and Environmental Commission: Action: The PEC is responsible for final approval/denial of Conditional Use Permit. The PEC is responsible for evaluating a proposal for: 1. Relationship and impact of the use an development objectives of the Tawn. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flaw and control, access, maneuverability, and removal of snow from the streets and parking areas. ~t. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. 5. Sueh other factors and criteria as the Commission deems applicable to the proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by Chapter ~ 2 of this Title. Conformance with development standards of zone district - Lot area - Setbacks - Building Height - density - GRFA - Site coverage - Landscape area - Parking and loading - Mitigation of development impacts Design Review Board: Action; The DRB has NO review authority on a CUP, but must review any accompanying DRB application. The DRB is responsible for evaluating the DRB proposal far: - Architectural compatibility with other structures, the land and surroundings - Fitting buildings into landscape - Configuration of building and grading of a site which respects the topography - Removal/Preservation of trees and native vegetation - Adequate provision for snow storage on-site - Acceptability of building materials and colors - Acceptability of roof elements, eaves, overhangs, and other building forms - Provision of landscape and drainage - Provision of fencing, walls, and accessory structures - Circulation and access to a site including parking, and site distances - Location and design of satellite dishes - Provision of outdoor lighting - The design of parks .. 4 j Staff: The staff is responsible for ensuring that afi submittal requirements are provided and plans conform to the technics! requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, ar denial. Staff also facilitates the review process. Town Council: Actions of DRB or PEC maybe appealed to the T'awn Council or by the Town Council. Town Council evaluates whether ar not the PEC or DRB erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. B. Maiar Exterior Alteration fLMU-11 Order of Review: Generally, applications will be reviewed first by the PEC far impacts of use/a`evelopment and then by the U,4B for compliance of proposed buildings and site planning. Plannina and En~uironmental Commission: Action: The PEC is responsible for final approvalfdenial of a Major Exterior Alteration. The PEC shall review the proposal for: - Conformance with development standards of zone district - Lot area - Setbacks - Building Height - Density - GRFA - Site coverage - Landscape area - Parking and loading - Mitigation of development impacts - Compliance with the goals and requirements of the Lionshead Redevelopment Master Plan (except design guidelines) Design Review Board: Aetion: The I]RB has NO review authority on a Major Exterior Alteration, but must review any accompanying i3RB application. The DRB is responsible for evaluating the proposal for: - Architectural compatibility with other structures, the land and surroundings Fitting buildings into landscape. - Configuration of building and grading of a site which respects the topography - Removal/Preservation of trees and native vegetation - Adequate provision for snow storage on-site - Acceptability of building materials and colors - Acceptability of roof elements, eaves, overhangs, and other building forms - Provision of landscape and drainage - Provision of fencing, walls, and accessory structures - Circulation and access to a site including parking, and site distances - Location and design of satellite dishes - Provision of outdoor lighting - Compliance with the architectural design guidelines of the Lionshead Redevelopment Master Plan. Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The stafif also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of DR13 or PEC maybe appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the PEC or DRB erred with approvals or denials and. can uphold, uphold with modifications, or overturn the board's decision. V. APPLICABLE PLANNING DOCUMENTS Title 12, Zoning Reaufations. Vait Town Code 12-7'H Lionshead Mixed Uses (LMU-1) District din part) f 2- 7N-1: PURPOSE: The Lionshead Mixed Use t District is intended to provide sites for a mixture of multiple-family dwellings, lodges, hotels, fractional fee clubs, time shares, lodge dwelling traits, restaurants, offices, skier services, and commercial establishments in a clustered, unified development. Lionshead Mixed Use i District, in accordance with fhe Lionshead Redevelopment Master Plan, is intended to ensure adequate light, air, open space and other amenities appropriate to the permitted types of buildings and uses and to maintain the desirable qualities of the District by establishing appropriate site development standards. This District is meant to encourage and provide incentives for redevelopment in accordance with the Lionshead Redevelopment Master Plan. This Zone District was specifically developed to provide incentives for properties to redevelop. The ultimate goal of these incentives is to create an economically vibrant lodging, housing, and commercial core area. The incentives in this Zone • • District include increases in allowable gross residential floor area, building height, and density over the previously established zoning in the Lionshead Redevelopment Master Plan study area. The primary goal of the incentives is to create economic conditions favorable to inducing private redevelopment consistent with the Lionshead ,Redevelopment Master Plan. Additionally, the incentives are created to help finance public off-site improvements adjacent to redevelopment projects. With any development/redeveloprnent proposal faking advantage of the incentives created herein, the following amenities will be evaluated: streetscape improvements, pedestrian/bicycle access, public plaza redevelopment, public art, roadway improvements, and similar improvements. 12-7H-5.' CONDITIONAL USES; GENERALLY (ON ALL LEVELS QF A BUILDING OR OUTSIDE DFA BU1LL?ING}: The following conditional uses sha11 be permitted, subject to issuance of a conditional use permit in accordance with the provisions of Chapter 15 of this Title: Bed and breakfast as further regulated by Section 72-74-18 of this Title. Brew pubs. Coin-operated laundries. Commercial storage. Private outdoor recreation facilities, as a primary use. Public buildings, grounds, and facilities. Public or private parking lots. Public park and recreation facilities. Public utility and public service uses. Single-family and two-family residenfla! dwellings. Ski lifts and tows. Television stations. Additional uses determined to be similar to conditional uses described in this subsection, in accordance with the provisions of Section 72-,3-4 of this Title, 72-7H-7: EXTERIOR ALTERATIONS OR MODIFICAT!(7NS: A. Review Required: The construction of a new building or the alteration of an existing building that is not a major exterior alteration as described in subsection B of this section shall be reviewed by fhe design review board in accordance with chapter 71 of this title. 7. Submittal Items Required: The submittal items required for a project that is not a major exterior alteration shall be provided in accordance with section 12-77-4 of this title. B. Major Exterior Alteration: The construction of a new building or the alteration of an existing building which adds additional dwefling units, accommodation units, fractional fee club units, time share units, any project which adds more than one thousand (7,©00} square feet of commercial floor area or common space, or any project which has substantial off site impacts (as determined by the administrator} shall be reviewed by the planning and environmental commission as a major exterior alteration in accordance with this chapter and section 72-3-6 of this Title. Any project which requires a 7 conditional use permit shall also obtain approval of the planning and environmental carnmission in accordance with chapter f 6 of this title. Complete applications for major exterior alterations shall be submitted in accordance with administrative schedules developed by the department of community development for plannr'ng and environmental commission and design review board review. 1. Submittal Items Required, Major Exterior Alteration: The following submittal items are required: a. Application: An application shall be made by the owner of the building or the building owner's authorized agent or representative on a form provided by the administrator. Any application for condominiumized buildings shall be authorized by the condominium association in conformity with al! pertinent requirements of the condominium association's declarations. b. Application, Contents: An application for a major exterior alteration shall incfude the following items: {i) Completed application form, filing fee, and a list of all owners of property located adjacent to the subject parcel. The owner's list steal! incfude the names of all owners, their mailing address, a legal description of the property owned by each, and a general description of the property (including the name of the property, if applicable), and the name and mailing address of the condominium association's representative {if applicable). Said names and addresses shat! be obtained from the current tax records of Eagle Gounty as they appeared not more than thirty {30) days prior to the application submittal date. {2) A written statement describing the proposal and haw the proposal complies with the Lionshead redevelopment master plan and any other releuant sections of the Vail comprehensive pfan. {3) A survey stamped by a licensed surveyor indicating existing conditions an the property including the location of Improvements, topography, and natural features. (4) A current title report to verify ownership, easements, and other encumbrances, including schedules A and B3. (5) Existing and proposed site plan at a minimum scale of one inch equals twenty feet {7" = 20'j, a fi vicinity plan of an appropriate scale to adequate}y show the project location in relationship to the surrounding area, a landscape plan at a minimum scale of one inch equals twenty feet (1" = 20), a roof height plan and existing and proposed building elevations at a minimum scale of one-eighth inch equals one foot (1/S" = 1'). The materia! listed above shall include adjacent buildings and improvements as necessary to demonstrate the project's compliance with the Lionshead redevelopment master plan. (6) Sunshade analysis of the existing and proposed building for the spring/fall equinox (March 21/September 23) and winfer solstice (December 21) at ten o`clock (10:00) A.M. and two o'clock (2:00) P.M_ unless the department of community development determines that the proposed addition has no impact on the existing sun/shade pattern. Thee following sun angle shallbe used when preparing this analysis: Spring/Fait Equinox Sun Angle 10:00 A.M1 40° east of south, 50° declination 2:00 P.M. X12° west of south, 50° declination Winter Solstice Sun Angle 10:00 A.M. 30° east of south, 20° declination 2:0(J P. M. 30° West of South, 20° declination (7) Existing and proposed floor plans at a minimum scale of one-fourth Inch equals one foot (1/4" = 1'} and a square footage analysis of all existing and proposed uses. (&) An architectural or massing model of the proposed development. Said model shall include buildings and major site improvements on adjacent properties as deemed necessary by the administrator. The scale of the model shall be as determined by the administrator. (9) Photo overlays and/or other graphic material fo demonstrate the special relationship of the proposed development fo adjacent properties, public spaces, and adopted views per chapter 22 of this Title. q (10} Parking needs assessment and vehicular circulation analysis, prepared by a qualified professional. (11} Any additional information or material as deemed necessary by the administrator or the town planning and environmental commission (PEC}. The administrator or the planning and environmental commission may, at his/her ar their discretion, waive certain submittal requirements if it is determined that the requirements are not relevant to the proposed development nor applicable to the Lionshead redevelopment master plan. £?. Hearing: The public hearing before the planning and environmental commission shall be held in accordance with section 12-3-6 of this title. The planning and environmental commission may approve the application as submitted, approve the application wr`th conditions or modifications, or deny the application. The decision of the planning and environmental commission may be appealed to the town council in accordance with section 12-3-3 of this title, E. Lapse Of Approval: Approval of an exterior alteration as prescribed by this article shall lapse and become void two (2} years fallowing the date of approval by the design review board unless, prior to the expiration, a building permit is issued and construction is commenced and diligently pursued to completion. Administrative extensions shall be allowed for reasonable and unexpected delays as long as code provisions affecting the proposal have not changed. 12-7H-8: COMPLIANCE BURDEN: It shall be the burden of the applicant to prove by a preponderance of the evidence before the planning and environmental commission and the design review board that the proposed exterior alteration ar new development is in compliance with the purposes of the Lionshead mixed use i district, that fhe proposal is consistent with applicable elements of the Lionshead redevelopment master plan and that the proposal does not otherwise have a significant negative effect on the character of the neighborhood, and that the proposal substantially complies with other applicable elements of the Vail comprehensive plan. 12-7H-9: LOT AREA AND S1TE D1MEA1SlpIVS: The minimum lot or site area shall be ten Thousand (11,000} square feet of buildable area. ;'2- 7H- f 0: SETBACKS: The minr`mum building setbacks shall be ten feet (10'} unless otherwise specified in the Lionshead redevelopment master plan as a build-to Ane, 1Q 12-7H-11: HEIGHT AND BULK: Buildings shall have a maximum average building height of seventy one feet (71') with a maximum height of 82.5 feet, as further defined by the Linnshead redevelopment master plan. All development shall comply with the design guidelines and standards found in the Linnshead redevelopment master plan. Flexibility with the standard, as incorporated in the Lr"onshead redevelopment master plan, shall be afforded to redevelopment projects which meet the intent of design guidelines, as reviewed and approved by the design review board. 12-7H-12: DENSITY (DWELLING UNITS PER ACRE): Up to a thirty three percent (33%) increase over the existing number of dwelling units on a property or thirty five (35) dwelling units per acre, whichever is greater shall be allowed. For the purpose of calculating density, employee housing units, accommodation units, time share units, and fractional fee club units shall not be counted as dwelling units. Additionally, a 'Yodge dwelling unit'; as defined herein, shall be counted as twenty five percent (25%) of~a dwelling unit for the purpose of calculating density. A dwelling unit in a multiple-family building may include one attached accommodation unit no larger than one-third (1/3) of the total floor area of the dwelling. 12-7H-13: GROSS RESIDENTIAL FLOOR AREA (GRFA,-: Uja to two hundred fr`fty (250) square feet of gross residential floor area shall be allawed for each one hundred (100) square feet of buildable site area, or an increase of thirty three percent (33%) over the existing GRFA found on the property, whichever is greater. Multiple-family dwelling units in this zone district shall not be entitled to additional gross residential floor area under the 2,~0 ordinance, section 12-15-5 of this Title. 12-7H-14: SITE GOVER;4GE: Site coverage shall not exceed seventy percent (70 J) of the total site area, unless otherwise specified in the Linnshead redevelopment master plan. 12-7H-15: LANDSGAPING AND SITE DEVELOPMENT: At least Twenty percent (201) of the total site area shall be landscaped unless otherwise specified in the Linnshead redevelopment master plan. 12-71-1-1 &: PARKING AND LOADING: Dff street parking and loading shall be provided in accordance with chapter 70 of this title. At least ane-half (1/2) the required parking shall be located within the main building or buildings. 12-7H-18: M1TlGAT1ON OF DEVELOPMENT IMPACTS: Property owners/developers shall also be responsible for mr'tigatr`ng direct impacts of their development on public infrasfructure and in al! cases mitigation shall bear a reasonable relation to the development impacts. Impacts may be determined based on reports prepared by qualified consultants, The extent of mitigation and public amenity improvements shall be balanced with the goals of redevelopment and will be determined by the planning and environmental commission in review of development projects and conditional use permits. 11 ,Mitigation of impacts may include, but is not limited to, the following: roadway improvements, pedestrian walkway improvements, streetscape improvements, stream tract/bank improvements, public art improvements, and similar improvements. The intent of this section is to only require mitigation for large scale redevelopmentfdevelopment projects which produce substantial off site impacts. ~2-16 Conditional Use Permits (in part) 12-16- i ; Purpose; Limitations; In order to provide the flexibility necessary to achieve the objectives of this title, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusual or special characteristics, conditional uses require review and evaluation sa that they may 6e 1QCated properly with respect to the purposes of this title and with respect to fheir effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and surrounding properties and the town at large. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the town may prescribe to ensure that the location and operation of the conditional uses will 6e in accordance with development objectives of the town and will not be detrimental to other uses ar properties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. 12-16-7: Use Specific Criteria And Standards. The following criteria and standards steal! be applicable to the uses listed below in consideration of a conditional use permit. These criteria and standards shall be in addition to the criteria and findings required by section 12-16-fi of this chapter. A. Uses And Criteria: 11. Single-family and two-family dwellings, in the Lionshead Mixed Use i zone district: Single-family or two-family residential dwellings shall be allowed when: a. Developed as part of a coordinated mixed-use development; b. The low-density residential scale is advantageous to create compatibility with ar a transition to other low density residential development in the vicinity; c. The single-family and two-family residences are designed to the general scale and character of residences in other single-family and two-family zone districts; and d. The proposed development is consistent wlfh the intent and objectives of the Lionshead ,Redevelopment Master Plan. Vail Land Use Plan The Vail Land Use Plan was initiated in ~ 985 and adopted in 1986 by the Vail Town Council. The main purpose of the Land Use Plan is two-fold: 12 1. To articulate the land use goals of the Town. 2. To serve as a guide for decision making by the Town. The Vail Land Use Plan is intended to serve as a basis from which future land use decisions may be made within the Town of Vail. The goals, as articulated within the Land Use Plan, are meant to be used as adapted policy guidelines in the review process for new development proposals. In conjunction with these goals, land use categories are defined to indicate general types of land uses which are then used to develop the Vail Land Use Map. The Land Use Plan is not intended to be regulatory in nature,. but is intended to provide a general framework to guide decision making. Where the land use categories and zoning conflict, existing zoning controls development on a site. The West Day Lot is identified as being a part of the Resort Accommodations and Services land use category. The Resort Accommodations and Services nand use category states: This area includes activities aimed at accommodating the overnight and short term visitor to the area. Primary uses include hotels, Iodges, service stations, and parking structures (with densities up to 25 dwelling units or 50 accommodation units per buildable acre). These areas are oriented toward vehicular access from I-70, with other support commercial and business services included, Also allowed in thv`s category, would be institutional uses and various municipal uses. Lionshead Redevelopment Master Plan The Lionshead Redevelopment Master Plan was adopted on December 15, 1998 by the Vaii Town Council. "The master plan was initiated by the Town of Vail to encourage redevelopment initiatives within the Lionshead sfudy area. Bath pubfic and private interests have recognized that Lionshead today lacks the economv`c vitality of Vail Village, its neighboring commercial district, and fails to offer a world class resort experience. Lionshead's economic potenfial has been inhibited by a number of recurrent themes: lack of growth in accommodation units ("hc~t beds'), poor retail quality, the apparent deterioration of existing buildings, an uninteresting and disconnected pedestrian environment, mediocre architectural character,. and the absence of incentives for redevelopment." There are several portions of the Lionshead Redevelopment Master Plan which reference the West Day Lot and make recommendations for the site. Below are several sections taken directly from the Master Plan. Chapter 4 Master Plan Recommendati©ns -Overall Study Area {in part} Section 4.1 Underlying Physical Framework of Lionshead '~ 4.7.5 West Lionshead - ResidentiafJMixed-Use Hub 13 The western end of Lianshead, currently undeveloped, is home to parking Lots, the Vail Associates service yard, the Vail sanitation planf, the old town shops, and a gas station. Uses proposed by fhe community on this site in the past include increased parking, employee housing, office space., mountain service access, and an eastbound 1-70 on- and off-ramp. The master plan recommends that this hub become aresidential/ mixed use area with an emphasis on meeting the needs of the local community. Appropriate uses could include high density real estate development, lodging, community based office and retail space, employee housing and parking. The opportunity exists for a significant locals or seasonal housing development in this area. To the extent possible development patterns in this area should reflect north-south orientation of buildings, visual penetrations to the mountain, and a pedestrian oriented environment. !n addition there is the opportunity for an underground public parking facility. AI! service and delivery demands created by development in this area shall be accommodated an-site. The site will continue to accommodate the existing and potentially expanded functions of the Vail sanitation plant. The mountain service yard will be reduced in size, as some functions can be moved to less central locations. However the area develops it is critical that new uses be connected to the primary pedestrian carridars and that they be served by the Town of Vail in-town transit system. Section 4.8 Parking 4.8. f.2 West l7ay Lot The west day !ot is also awned by Vail Associates and is utiJr'zed primarily by mountain based Vail Associates employees. Thr's site offers the possibility of ahigher-return development opportunity that may make other less profitable west end developments feasible, and its existing use far parking is virtually certain to change. It is not anticipated that fhe employee base utilizing this surface lot will decrease; therefore, all the current parking (approximately 160 spaces) will have to be replaced. 4.8.3.3 Potential New Parking Sites b. West Lionshead The construction a second public parking structure at the west end of Lianshead has been a planning consideration since the completion of the Vail Transportation Master plan in 1991. This site is currently undeveloped (except for the Vail Associates maintenance yard) and is large enough to meet projected parking demand. Jt is well located in relation to the potential new eastbound 1-70 access ramps. Potential logistical hurdles to the use of this site are as follows: Land Ownership. The entire potential parking structure site (see figure 4- i4J is located on Vail Associates and CDOT ~ ~ i I4 property. Property acquisition from both entities wit! be required. South Frontage Road Realignment. South Frontage Road must be realigned to free up a parcel large enough far a major parking facility. Competing Land Use Priorities. The west end of Lionshead has also been identified as a priority employee housing location 6y the Town of Yail and Vail Associates. Although housing could be constructed on top of a parking structure, a below-grade facility would significantly increase construction costs and bring up several important timing issues. Cost. • Timing. The Lionshead master plan ground rules stipulate that there will be no net loss of existing employee housing through redevelopment. Redevelopment of the care site 6y Vail Associates means that the existing employee housing in the Sunbird Lodge will have to be replaced, most likely an the existing Vail Associates service yard or Hofy Cross site. This scenario puts a west Lionshead employee housing project at ar near the top of the Lionshead redevelopment timeline. Depending on the size requirements of a new west Lionshead parking structure, it is possible that the realignment of fhe frontage road and the construction of fhe parking facility would both have to occur prior fo the construction of the housing project. if fhe employee housing project occurs first, which is more probable, the opportunity far a west end parking structure could be lost, as the remaining available land may be too small for a structure of significant size. The second timing issue is the potential 1-70 interchange at this focation. Planning decisions regarding a future parking structure, housing, or an 1-70 interchange will have to be made at the same time, or important opportunities maybe lost. Convenience. This location for a major parking structure must have regular transit or shuttle service because of its distance from the retail core area and fhe ski yard (greater than a 12CI0-foot walking radius). u 15 Chapter 5 Detailed Plan Recommendations {in part,! 5.77 West Day Lot/ Vail Associates Service Yardf Holy Cross Site Planning far the western end of Lianshead must consider two different scenarios: the realignment of South Frontage Road and its retention in the existing alignment. Higher densities and building heights may be appropriate in this area, particularly to encourage the development of employee housing. However, any development must meet the averalf characfer and visual infant of the master plan and be compatible with the adjacent existing development of the Marriott and the Vail Spa. As depicted in figures 5-2i and 5-22, realignment of South Frontage Road wit! allow these properties to be consolidated far development while maintaining a transit connection Through the property. Within the consolidated parcel, there are four distinct sub-areas separated by location and land use. The first is the existing west day lot, This site has Gare Creek frontage, is removed from the frontage rand, and is the mast appropriate far ahigher-end fee simple or fractional fee development. The second, immediately adjacent to South Frontage Road, should have a strong relationship with the first (potentially by a connecting `greenbelt" as shown in figure 5-24), but ifs less desirable Iocatian suggests a different and potentially higher density product. Affordable housing should also be considered here to accommodate new employee generation. The third, west of the realigned South Frontage Road, has been identified as an appropriate location for high density employee housing. The fourth has the longest road frontage and is the recommended location for a smaller Vai! Associates service yard. From this location, a snow cat access route to the mountain could be developed Through the old fawn shops site and across the river tv the Cascade Ho ski trail. if South Frontage Road is not realigned prior to buildouf on this site, fhere would be a slight reduction in the amount of develapabfe land north of the frontage road (see figure 5-23), and access points fo the properties might be different. Traffic flaw patterns and transit vehicle access would be different. The removal of the central transit/ pedestrian corridor will necessitate either an additional west Lionshead transit stop ar the undesirable situation of people Grassing the frontage read to access a single transit stop. Town of Vail Comprehensive Ut~en Lands Plan In 1994, the Vail Tawn Council adapted the Comprehensive Open Lands Plan. The purpose of the plan is to identify priorities for open space and recreation needs communicated by the citizens of Vail. The Comprehensive Open Lands Plan -Action Plan map identifies a portion of the West Day Lot site as "Undeveloped I'arcei Zoning Varies) Action Not Recommended". The Pian did not reference or recommend any action with the existing site. 16 • Address/Legal Description: 730, 724, and 714 West Lionshead CircielTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision Parcel Size: 7.74 acre (337,197 sq. ft.} Zoning: Lionshead Mixed Use 1 Land Use Designation: Resort Accommodations and Services VI. ZONING ANALYSIS PQTENTIAL Below is a summary and analysis of Town of Vail development standards and regulations. The analysis includes the existing Vail Mountain Marriott and the 1$ Gore Creek Place residences. Development Standard Allowed Existing Proposed Lot Area: 1'0,000 sq. ft. 337,197 sq. ft. 337,197 sq. ft. • Setbacks Ali Sides: Building Height: Density: GRFA: Site Coverage: Landscape Area: Parking: Val. SURROUNDING 1©ft. 71 ft. avg . 82.5 ft. max 10 ft. 70 ft. avg. 80.5 ft. max 270 DUs (351ac.) 36DU (4.71ac.) Unlimited AUs 276 AU 10 ft. 70 ft. avg. 80.5 ft. max 54 DU (7.Olac.} 276 AU 842,992 sq. ft. 149,286 sq. ft. 219„546 sq. ft. 236,037 sq. ft. (70%~ 86,240 sq. ft. (25.6%} 113,621 sq. ft. (33%) 67,439 sq. ft. (20°/p} 16Q,605 sq. ft. (50%) 139,713 sq. ft. (41 %) 76 (1.4/DU} 270 spaces 318 spaces 193 (0.7IAU) LAND USES AND ZONING Land Use North: Residential South: Open Space East: Residential West; Public Utility Vlll. CRITERIA AND FINDINGS Conditional Use Permit: Zoning Lionshead Mixed Use 1 District Natural Area Preservation District Lionshead Mixed Use 1 District General Use District Before acting on the requested conditional use permit application for nine proposed duplex structures, the Planning and Environmental Commission shalt consider the following factors with respect to the proposed use: 17 (1) Relationship and impact of the use on development objectives of the town. Vail Land Use Plan As identified in Section V of this memorandum the West Day Lot is a part of the Resort Accommodations and Services band use category. This land use designation identifies activities aimed at acc©mmodating the overnight and short term visitor with the primary uses being hotels and lodges. While the proposal to construct nine duplex units is not one of the primary uses identified for the land use category the existing Vail Mountain Marriott and the future hotel proposal which are pieces of the overall development plan for this site are hotels and lodges which are aimed at serving the short term visitor. Incorporating the smaller scale duplex structures along the creek will allow the overall development to increase in scale as it moves north away from the creek. Lionshead Redevelopment Master Plan The Lionshead Redevelopment Master Plan contains several sections which speak to the future use of the West Day Lot and are found in Section V of this memorandum. The first reference made regarding this site can be found in Section 4.1.5 which identifies the site as a "residential/mixed use area" with the opportunity existing for "significant locals or seasonal housing". The Plan provides mare detailed recommendations in Section 5.17 which states that this site is "most appropriate for ahigher-end fee simple or fractional fee development". Staff believes that the proposed duplexes meet the goals and objectives of the Lionshead Redevelopment Master Plan. (2) Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. Staff believes that the proposed nine duplex structures will not have any negative effect on the items listed above. The incorporation of the duplexes into the overall development plan for the site allows for smaller scale residential structures along the Gore Greek and the bike path which will allow an open feeling to remain along the Town owned stream tract with larger structures on the north end of the property adjacent to existing larger structures. Section 12-7H-12, Density (Dwelling Units Per Acre), Vai] Town Code, in the Lionshead Mixed Use 1 Zone Dis#rict permits a maximum of 35 dwelling units per acre on this site. The applicant is proposing 1$ dwelling units on this approximate 2.2 acre portion of the "West Day Lot Development Site" which is 8.2 dwelling units per acre. (3) Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking areas. The nine new duplex structures will bring additional cars down the South l~ Frontage Raad and onto West Forest Road. Staff has determined that there will be 13 additional trips generated by the new residences. Furthermore Section 12-7H-1$, Mitigation of Development impacts, Vail Town Code, requires property ownersldevelopers to mitigate direct impacts of develapment proposals on public infrastructure. Staff has determined that a fee of $5,000 per additional trip generated by a development bears "a reasonable relation to the development impacts". Staff has attached a condition to this proposal if it is to be approved requiring a fee of $65,000 for mitigation of development impacts. The proposed development includes a connection from the proposed pedestrian/emergency acaess pathway down to the existing bike path along Gore Creek. Staff is requesting that a pedestrian path be installed from the turn-around at the end of the pedestrian/emergency access pathway to Lionshead Place. This installation of the requested pedestrian path will complete the circulation loop for pedestrians in this area. The applicant is also proposing to relocate the existing bike path off of their property and onto the Town owned stream tract. Staff is recommending that the applicant give the Town easements for the portion of existing bike path on the applicant's property and the new pedestrian/emergency access pathway. Staff does not believe there are any negative effects on the remaining items listed above. (4) Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. Staff believes that the proposed residences will have a positive effect on the area. The scale of the structures is comparable to the residential structures on the south side of Gore Creek. The incorporation of the duplexes in the overall develapment plan for the site allows for smaller residential scale structures to be located along the Gore Creek which will allow for the stream tract to retain a more `"open" feeling with the taller structures located on the norkh portion of the West Day Lot site. 45) Such other factors and criteria as the commission deems applicable to the proposed use. (6) The environmental impact report concerning the proposed use, if an environmental impact report is required by chapter 12 of this title. Staff has reviewed the environmental impact report which is required as a part of this application and found no cause for concern. The applicant shall be required to comply with the recommendations of the report. In addition to the standard criteria far a conditional use permit, the Use Specific Criteria and Standards, Section 12-16-7A(11), Vail Town Code, for Single-family and Two-family dwellings, in the Lionshead Mixed Use 1 zone district must be reviewed prior to acting an this proposal. l9 Single-family or two-family residential dwellings shall be allowed when: (1) Developed as part of a coordinated mixed-use development; The proposed duplex structures are one part of the 7',74 acre West Day Lot Development Site which will include the existing Vail Mountain Marriott hotel, the proposed nine duplex units, and a future proposed hotel. The entire site will be treated as one large development site with zoning requirements applied to all three existing and proposed developments. The applicant does intend to subdivide the individual projects onto separate lots in the future with plat notes found on each plat which would tie all three developments together in perpetuity #ar zoning purposes. The current proposal for nine duplex structures is located an Parcel 2 of the West Day Lat Development Site. (2) The [ow-density residential scale is advantageous to create compatitaitity with or a transition to other low density residential development in the vicinity;. The incorporation of the nine residentially scaled duplex structures slang the Gore Creek will allow for a transition from structures compatible with the residential structures an the south side of Gore Creek to the taller more massive buildings on the northern portion of the West Day Lot. The advantages of incorporating the duplexes into the overall development of the site are numerous. The scale of the structures will allow for the Gore Creek stream tract to retain its "open" feeling, the residences an the south side of Gore Creek will not have the views from their Werth facing windows totally obstructed by a more massive structure, and they will allow the scale of the buildings on the West Day Lot to transition to taller more massive structures which currently existing in Lianshead. The Vail Land Use Plan has designated the residences slang West Forest Road as Low Density Residential and. the West Day Lot Development Site as Resort Accommodations and Services. The incorporation of the nine duplex structures on the southern portion of the West Day Lot Development Site will allow for a better transition between these two different land use designations which are significantly different in terms of the wale of buildings which could be potentially constructed. (3} The single-family and two-family residences are designed to the general scale and character of residences in other singte-family and two-family zone districts; and The proposed duplexes have two standard footprints. There is an AIB duplex and a BIB duplex. The AIB duplex measures 7,535 square feet in Grass Residential Floor Area (GRF'A) and the BIB duplex measures 6,800 square feet in GRFA. Six of the nine struatures are an AIB duplex and the remaining three units are a BIB duplex. An A/B duplex would require a lot size of 58, 700 square feet (t.35 acres} to construct and a BIB duplex would require a lot size of 44;000 square feet X1.01 acres} to 20 construct. The total area of a lot needed to construct six Alb and three BIB duplex structures would require 11.1 acres. The approximate size of Parcel 2 of this proposed development site is 2.23 acres. The proposed duplexes have a maximum height of 41 feet at the tallest location which is southeast save of unit one which is located on east end of the site. Staff believes that the propased structures are designed in the general character of residences in other single-family and two-family zone districts. Staff has referred to the plat for the homes located along West isorest Road just south of this site across Gore Creek, Vail Village 6~" Filing. Lots included on this plat range in size from 15,115 square feet {0.34 acres to 56,550 square feet {1.3 acre). The sizes of hams which would be permitted to be built under the residential zoning districts range from 3,761 to 6,577 square feet of GRFA. The height in its worst case is only eight feet above the maximum height permit in other residential zone districts. This increase in height is caused by the steep grades leading to the Gare Creek which were historically present. The height of the proposed residences is needed for a better transition from the maximum height of 33 feet for the residences along West Forest Road to the maximum $2.5 feet of height with an average of 71 feet in height for the uses on the West Day Lot Development Site. The proposal shows that the south walls of the parking structure are exposed in some instances at a heigh# of eight feet between the duplex structures. While these walls are not retaining walls staff requests that the height of the walls be mitigated by either the placement of retaining walls in front which would create planting beds or by arEificially increase grade in those locations between homes so that in no case more than six feet of parking structure wall is exposed. The materials and scale of architectural features on the proposed duplexes are comparable to #hase seen on proposals for new single- family and two-family residential structures. Staff's believes that the proposed residences are consistent in terms of size, bulk, and mass as those located on the south side of the Gore Creek which are the closest residential structures to the proposed development. (4) The propased development is consistent with the intent and objectives of the Lionshead Redevelopment Master Plan. Lionshead ~Redevelaoment Master Plan The Lionshead Redevelopment Master Plan contains several sections which speak to the future of the West Day Lat and are found in Section V of this rnemorandum. The first reference made regarding this site can be found in Section 4.1.5 which identifies the site as a "residentiallmixed use area" with the opportunity existing for "significant locals ar seasonal housing". The Plan provides more detailed recommendations in Section 5.17 which states that this site is "most appraprrate for ahigher-end fee simple or fractional fee development". Staff believes that the proposed 21 duplexes meet the goals and objectives of the Lionshead Redevelopment Master Plan. The planning and environmental commission shall make the following findings before granting a conditional use permit: (1 } That the proposed location of the use is in accordance with the purposes of this title and the purposes of the district in which the site is located. (2} That the proposed location of the use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, ar welfare, ar materially injurious to properties or improvements in the vicinity. (3) That the proposed use will comply with each of the applicable provisions of this title. Maior Exterior Alteration: In making a decision regarding the approval, approval with modifications, or denial of a major exterior alteration the Planning and Environmental Commission is to utilize Section 12~7H-8 Compliance Burden, Vail Town Code, which states: "It shall be the burden of the applicant to prove by a preponderance of the evidence before the Planning and environmental Commission and the Design Review Board that the proposed exterior alteration or new development is in compliance with the purposes of the Lionshead Mixed ~ i Use I District, that the proposal is consistent with applicable elements ~ of the Lionshead Redevelopment Master Pfan acrd that the proposal does not otherwise have a significant negative effecf on the character of the neighborh©od, and that the proposal substantially complies with F other applicable elements of the t/aIl Comprehensive Plan." ~ 1} That the proposed exterior alteration or new development is in compliance with the purposes of the Lionshead Mixed Use 1 District.. The Lionshead Mixed Use 1 District details the purpose of the district in Section 12-7H-1, Purpose, Vail Tawn Cade, which states: "The Lionshead Mixed Use 1 District is intended to provide sites for a mixture of multiple~famlly dwellings, lodges, hotels, fractional ~ fee clubs, time shares, lodge dwelling units, restaurants, offices, ~i, skier services, and commercial establishments in a clustered, unified development. Lionshead Mixed Use 1 District, in accordance with the Lionshead Redevelopment Master Plan, is Intended to ensure adequate light, air, open space and other amenities appropriate to the permitted types of buildings and uses and to maintain the desirable qualr'ties of the Dr`sfrlct by establishing appropriate site developmenf standards. This District is meant to encourage and provide incentives far redevelopment in accordance with the Lionshead Redevelopment Master Pfan. This Zone District was specifically developed to provide incentives for properties to redevelop. The ultimate goal of these incentives ~.z _ i is to create an economically vibrant lodging, housing; and commercial core area. The incentives in this ,Zone Qistrict include increases in allowable gross residential floor area, building height, and density over the previously established zoning in the Lionshead Redevelopment Master Plan study area. The primary goal of the incentives is fo create economic conditions favorable to inducing private redevelopment consistent with the Lionshead Redevelopment Master Plan. Additionally, the incentives are created to help finance public off site improvements adjacent to redevelopment projects. With any development/redeveiopment proposal taking advantage of the incentives created herein, the following amenities wilt be evafuated.~ streetscape improvements, pedestrian/bicycle access, public plaza redevelopment, public art, roadway improvements, and similar improvements.." Staff believes that the proposed residences are in compliance with the above purpose statement. The incorporation of the proposed nine duplexes as part. of an overall unified development in accordance with the Lionshead Redevelopment Master Plan satisfies the primary purpose the Lionshead Mixed Use 1 Zone District. The scale of the residences will also preserve the quality of air, light, open space and other amenities which fiurther the purpose of the Lionshead Mixed Use 1 Zone District. 2) That the proposal is consistent with applicable elements of the Lionshead Redevelopment Master Plan and that the proposal does not otherwise have a significant negative effect on the character of the neighborhood. ' Staff believes the proposed plan is consistent with the applicable elements of the Lionshead Redevelopment Master Plan and that it does not negatively affect the character of the neighborhood. The Lionshead Redevelopment Master Plan contains several sections which speak to the future use of the West Day Lot and are found in Section V of this memorandum. The first reference made regarding this site can be found in Section 4.1.5 which identifies the site as a "residentiailmixed use area" with the opportunity existing for "significant locals or seasonal housing". The Plan provides mare detailed recommendations in Section 5.17 which states that this site is "most appropriate for ahigher-end fee simple or fractional fee development". Staff believes that the proposed duplexes are consistent with the goals and objectives of the Lionshead Redevelopment Master Plan. 3) That the proposal substantially complies with other applicable elements of the Vail Comprehensive Plan. The two portions of the Vail Comprehensive Plan which specifically mention this site are the Vail Land Use Plan and the Lionshead Redevelopment Master Plan. As identified in Section V of this memorandum the West Day Lot is a part of the Resort Accommodations and Services land use category within the Vail Land Use Plan. This land use designation identifies activities aimed at accommodating the 2~ overnight and short term visitor with the primary uses being hotels and ledges. While the proposal to construct nine duplex units is not one of the primary uses identified for the land use category the existing Vail Mountain Marriott and the future hotel proposal which are pieces of the overall development plan for this site are betels and lodges which are aimed at serving the short term visitor. Incorporating the smaller scale duplex structures along the creek will allow the overall development to increase in scale as it moves north away from the creek. The proposed duplexes also comply with the Lionshead Redevelopment Master Plan as detailed in the criteria above. Staff believes this proposal is in compliance with the Vail Comprehensive Plan. X. STAFF RECOMMENDATION Conditional Use Permit: The Community Development Department recommends that the Planning and Environmental Commission approves with conditions the applicant's request for a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses; Generally (on all levels of a building or outside a building}, Vail Town Code, to allow for the construction gf nine (9} two-family residential structures, located at 73Q, 724, and 714 West Lionshead Circle/Tracts A, 13, C, & D, Morcus Subdivision and Lot 7, Marriott SubdivisionlWest Day Lot Development Site Parcel 2. Staff's recommendation is based upon the review of the criteria outlined in Section Vill of this memorandum and upon the evidence and testimony presented. Should the Planning and Environmental Commission choose to approve the conditional use permit request, staff recommends that the follow conditions be placed upon the approval; 1. That the Developer shall not sell, rent, lease, or otherwise transfer any of the twelve (12) additional parking spaces located within the below grade parking s#ructure. The additional parking spaces shall only be used by those permitted, conditional, or accessory uses allowed on the West Day Lot Development Site. 2. That any future development applications requiring joint property owner signatures shall be submitted with the written consent of the property owners located within the West Day Lot Development Site. 3. That the approval of this conditional use permit constitutes approval of a development plan for Parcef 2 of the West Day Lot Development Site and any change to the development plan far Parcel 2 Shall require a new conditional use permit approval. 4. That bed and breakfast operations shall be prohibited in Parcel 2 of the West Day Lot Development Site. 5. That two-family residential structures shall be the only permitted or conditional uses allowed in Parcel 2 of the West Day Lot Development Site. Accessory uses shall be permitted useless otherwise specifically prohibited. B. That home occupations as defined in Section t 2-2-2, Definitions, Vail Town Code, and as detailed in Section 12-14-12, Home Occupations, Vail 24 Town Code, shall be prohibited in Parcel 2 of the West Day Lot Development Site. The planning and environmental commission shall make the following findings before granting a conditional use permit: ~1} That the proposed location of the use is in accordance with the purposes of this title and the purposes of the district in which the site is located. ~2} That the proposed location of the use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, or welfare, or materially incurious to properties or improvements in the vicinity. ~3} That the proposed use will comply with each of the applicable provisions of this title. Maior Exterior Alteration: The Community Development Department recommends that the Planning and Environmental Commission approves with conditions the applicant's request for a major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifications, Vail Town Code, to allow for the construction of nine {9} two- family residential structures, located at 730, 724, and 714 West Lionshead CirclelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision/West Day Lot Development Site Parcel 2. Staff's recommendation is based upon the review of the criteria outlined in Section VIII of this memorandum and upon the evidence and testimony presented. Should the Planning and Environmental Commission choose to approve the major exterior alteration request, staff recommends that the follow conditions be placed upon the approval: 1. That the Developer submits payment to the Town of Vail for the development mitigation impact fee of $65,000 to mitigate estimated increases in vehicular traffic on the South Frontage Road and West Forest Road. At the discretion of the Town of Vail Director of Public Works, the payment of the fee may be waived in lieu of the Developer constructing approved public improvements which mitigate the impacted associated with the residential development on Parcel 2 of the West Day Lot Development Site. 2. That the Developer provides a pedestrian access path, and any necessary easements for access, from the emergency vehicle turn-around of the pedestrianlemergency vehicle access-way to Lionshead Place as depicted on the approved development plan. 3. That the Developer provides an easements for access of the pedestrianlemergency vehicle access-way depicted on the approved development plan. 4. That the Developer installs an oillsand interceptor in the parking structure. The plans for the installation of the interceptor shall be submitted to the Town of Vail for review and approval, prior to applying for a building permit for the construction the approved residences. ?~ 5. That the Developer receives approval of a Design Review board set of plans for the design of the retaining walls 6ocated at the entrance to the parking structure, prior to applying for a building permit for the construction the approved residences. 6. That the Developer submits civil engineered plans for the relocation of the Town of Vail bike path located south. of the development site for review and approval by the Town of Vail Public Works Department, prior to being scheduled for final review by the Design Review Board. If it is decided not to move the existing bake path the Developer shall provide the Town of Vail with a pedestrian easement for that portion of the existing Town of Vail bike path located on the development site. 7. That the Developer submits an amended Design Review Board application mitigating the height of the exposed walls of the parking structure between the duplex structures. 8. That the Developer revises the height of the retaining wall located at the end of the access road running between the existing Vail Mountain Marriott Resort and the existing parking structure for the Marriott to be no more than six feet in height. 9. That the Developer submits a complete drainage study which includes, but is not limited to, calculations for inlets, pipes, and outfalls for the review and approval of the Town of Vail Public Works Department, prior to applying for a building permit for the construction of the residences. 1©. That the ^eveloper submits plans and profiles with cross-sections at 50- foot intervals for the required West Forest Road improvements and at 100- faot intervals for the pedestrianlemergency access road far the review and approval of the Town of Vail Public Works Department, prior to applying for a building permit far the construction of the residences. The planning and environmental commission shall make the following findings before granting approval of a major exterior alteration: ~1 } That the applicant has proven by a preponderance of the evidence before the Planning and Environmental Commission that the proposed exterior alteration or new development is in compliance with the Lionshead Mixed llse 1 District. (2} That the proposal is consistent with the applicable elements of the Lionshead Redevelopment Master Plan. (3} That the proposal does not otherwise have a significant negative effect on the character of the neighborhood. (4} That the proposal substantially complies with other applicable elements of the Vail Comprehensive Plan. XI. ATTACHMENTS A. Vicinity Map B "lionshead Redeveloe~ment: West Dav dot ". dated November 3, 2003 G. West Day Lot residences reduced plans dated January 23, 2fl04 D. Public Notice 26 • • LIONSHEAD REDE~`.~LOPMEN'T west Day Lat S~brniCtal to the Town of `flail Submitted by: VAIL RESORTS DEVELQPMENT ~o~vrn~.~ Revised Subz-x~.ittal 7.1-~-03 • Attachment: B ~J Lionshead Redevclapment Tr~Ri.R~ [3T i:fl~IT~:NT~ Pace I. Intraductian I II. Detailed Praiect Overvicrv ~ III. ?~'o Net Loss of Parking 11 N. Proiect Pl~asin~ I2 V. Proiect Review Criteria ;3 VL PVlaster Plan Considerations X7 • 1_ rl~rT>~c~I~tlcTri~?_ This report is an updated excerpt from the overall Lionshead Redevelapmc;nt submittal document provided to the Town in July of 2003. The information contained in this document is the infoxtxaation necessary for evaluating the proposed two-family residential development on a portion of the •4Vest Day Lot"~rlarriott property. The document discrtsses the entire West Day Lot project as the entire site is being proposed as one overall coordinated plan with ali development standards applied to the entire parcel. The project for which approval is currently being sought is the low-density residential deveiapirtent an the south edge of~ the property; the Clore Cxeek Residences. This plan includes up to 20 dwelling units in duplex structures. The duplex units can be developed in several formats as there are two floor plans proposed; one layout of approximately 2,bt~0 sq .ft. and the other of approximately 3,400 sq. ft. Depending an market conditions the site could be developed with a xnaximuzn of 20 units (all smaller rinits) or a minimum of 14 units (all larger units) or anywhere between (some big and some small). Flans have been submitted showing 20 dwelling units and I6 dwelling units (the likely development scenario). E1.11 parking. is located in a sub- surfaceparking structtue accessed directly from Forest Road. 'j'ai] Rcsarts -The RedevelaPrnent of t,ionshc:td C] II. DETAILED PROJECT OVERVIEW (Overall Development Site} The West Day Lot is located within an area identified by the Lic~nshead Redevelopment Master Plan far resort lodging and residentiallmixed use development. This site is being redeveloped as a logica3 extension of the existing IVlarriatt Hotel with lodging and residential uses at a scale that mirrors that of the existing neighborhood. This development project includes bath the West Day Lot and ti~larriott properties as one overall project site. The Master Plan identif"ied this neighborhood as a mare tluiet residential area providing the greatest opportunity to expand the Town's bed base. Below are the north and south elevations of the new hotel facility. ~„ _.. ~<,,:,. ~,. ~ .-r.. ~.x...~ wire' %ab „.? ?]~,, ~.i.Y k~'gti. per. ,4"~ ~.,wn~a,.,. Hotel Building -North and South Elevations • Vail Resorts -The Redevelopment o#~I.ianshead C7 1. Existin ; Conditions The project site is currently developed with the Marriott 1-1ote1, an open air parking structure which serves the Marriott Hotel, and an unpaved surface employee parking lot with a capacity of I60 parking spaces. The site has been re-graded over the years. creating rnan-made berms and slopes. The Marriott Hotel currently contains 276 newly renovated hotel rooms, 35 dwelling units, a 4,500 sq. ft. restaurant, and meeting rooms. bite improvements include tennis courts and a swizxrtning pool. 2. Overview of 7'roject -Entire WDL • Design Concept The redevelopment of the West Day Lot builds upon the success of the newly redcvelaped Marriott Hotel (276 hotel rooms and 3~ dwelling units) by proposing a new hotel and residential development on the remainder of the site. The project provides a transition from the high density lodging facilities along West Lionshead Circle to a 1ow- rise and low density duplex style development along Gore Creek, as suggested in the Lionshead Redevelopment Master Flan. This transition is important due to the low density residential uses that exist on the south side of Gore Creek. The project includes attention to the design guidelines including the provision of stepbacks and the transition of wall planes and materials as directed by the Lionshead design guidelines. The proposed plan implements many other goals ofthe Master Plan including concealing parking in subsurface structures, developing residential and lodging uses in this area of Lionshead, developing pedestrian connections to the core of Lionshead, and meeting all of the design standards and guidelines.. Project Components The new hotel building includes 90 hotels roams (44 are hotel lock-offs}, 113 dwelling units, meeting roams, a restaurant, hotel fitness areas, and subsurface parking to serve both the new developrxient and a portion. of the Marriott's parking requirements. Additionally, there is glow-density residential development on the south side of the site containinb up to 20 dwelling units in up to 10 two-family structures. These homes are accessed via a subsurface parking area connecting to 'West Forest Road. Zoning Text Amendment The Lionshead Mixed Use 1 zone district does not list single-family ar tu~o-family residential structures as a permitted or conditional use. At the time this zone district was drafted, then: was not much thought given to these low density use as there did not seem to be a logical location in the Lionshead area to allow such low-density residential uses. Throt-gh carefiil planning= of the 1Vest Day Lot Vail Resorts discovered that law-density Vail ttesorts - Tl~e Re~ievelogment of Lionshead • zesidential uses would he advantageous to create a transition from more intensive lodging uses to the Iow-density residential neighborhoods adjacent to the site. Therefore, Vail Resort's is proposing a text amendment to the Lionshead 1Vlixed [use 1 zone district to aIlot~v single-family and two-family residential structures as a condition~il rise. This azzaendment will allow the proposed Gore Creel: Residences to be approved by the P'lanxting and Environmental Commission subject to the conditional use criteria found in the Zoning lZegttlations. The appraval criteria would allow the Pl?C to distinguish between appropriate and inappropriate locations for single-family and two-family uses within Lionshead. • Vail Resorts - Tl~e Redevelopment pf Lionsttead I t ~ l ~~ ~ a4 _ ~;~} _ ,r ~ f "' ~^ ~ ~` ~.. ~j rr ~~ `yam ~l _ .. - . -'r ~ `ti t" ~ -° r f' ~r+r' ~ y ~ r^ sir ~ f ~ ~,~'}~~ ii.~L ~ ~iw"-,~~ ~ ~~ , _ 'ti " '`' ~ ~ ~. - _~ r~ ~~ f x,:Ta `~,Jr~ i~~ I~1 . ~+ ~ ~ ,s.l+Z~~~~ Mme' ~i I~,~ ~~jrF ?f`~"~_ "~ ~} ~,f~ *~ ~,+~~ ~ ~ -'^!~'a. •,u,, a,~(f y t'om'' -r.r ,~,~' ~ `4 -,+ 1e ~ ~ ' ,~ fir ~y+ - , '~}'r ,x34.'_ ,,t"~1 • 1 ~ y-ys4r.511~,~~"~} ~ - ` Jr y ly }'r 1 rrir5,l~~~~~. ~ j r'id' 1 !~, __ x 3: `~ * ~~ ~r 1 '' -},, 1 I i i~ J^ t fl ~ y ~f~ --~'° 'Sd' I? ~, na ~" F o-°°~ ~ ~ Q? '~ ~-y ~ L i l '~ - _ ,... ~ ,ly :.'11 tit ~ 4,E r1-fa f' p`. j. ~ 5 t I{ ~~r~, ~~-'"~F-- 4'~~-' ~ +5J ~`~~~ 4 '"t - rte. _ ''~. + a,,° ~`'"f1 ~ ~ (7 C.+ + "r r t ri IF ~~ _ ~ I ; ~ I ~ ~ ff~~ ,~ J ~~ ` I ':451° ~ $ ~ ~,.r~r. ~~.} ~. ~ : 'l ~' ~ r~° ~~~ ~' I 1 ~S: ;, 1 f ~' It s ~ ~ ~'~ ^ ~~~ ~ k ~ a'e-.~ tij ,,,,1 = Y -- ~ ~ ~ __ ~f `-I f IvS.~±' ~ ~ i~ .y ''' "„~,, I ~~. ~ il.- ~~.-~ ~'+' X F+~ .,~, ~}''' `k ~.. ivy- \~r,~,.~-,.-•-~ y ~ i1 0~, i ~ t ~ ~ '" ; ~ ~ '9 by L .,=w~J ,1 r~> 1 ~ F~ y'i ly ? 'I : _yi~1-~ ~ ~#;+1` +f ~}s'}}~+Z`.-; ~ I 4:.) Y t . I; y `ter ~+`3 ~ti~C ~~ ~.~t~# 1 ~ ~,~ ~`"~*~:;t;'i'~. + ~ 7 ~ ~. € ~ 'i~ + .. ~_~ _ ~y ~ •~ J til Y„~ I '~ F~'~ wr • v _ _ ~ ~~~ j ~ t u ~ - r {,.~ r I r +++~~~ p ev T ~ a ~ ~a ~' ~r ~ ~ ~ ~ d ~ ~ ~ ~~ ~ U ~ ~ ~ ~ ~ ~ ~ ~~ ~ a ~ ~ o ~ ~ ` ~ ~. ~Q . ; -°~~ o ~ ~' U W ~+. S" U w v . ~.. cC d ...~ o sue. crs kr-3 _ r-~ CL U U ~, a ° c~ ~ ~ OQ [' 1 ~ c~ ~,;, ~ ~ .~ a ~ . r-- N o ~,; ~ ~ ~ ~= yy cn ~ ~^ ~ cd '„~ ~ ~t'~-+ ~ ~, ~ ~ °' O ~ ~ N ~ ~ ~ a O d r ;, r ~ ~ ° Ni ~ ~ ~ ~ N ~ `~ ~ ~ ( `"~ ~ ~ ~ ~ tT ~ t ? r' ~ ~ v G ~ r- ~ N o ~, ~: ~ ~ .:~ :ate ~ ~ ~ N ~ a N y -F O 0 4 .~ CIti M d^~ ["' '~.~J a v~ ~ ~ q 4} ~ ~ ~ ~ ,fj ,~, r. ~ C1 .~ ~ ~ Q =~ ~ `'~ ~~ ~-` o o Q ~ ~ ~ ~ ~ °~ ~ ~~ ~ ~~ ~ s-+ O ,~., r U C7 ~ a ~~ ~ ~~ ~ ~~~ •G~~~ ~ ~ ~ ~ ~ cs~~ M ~ C3ti O r ~ `~•~~ ~ '~' CsD O ~ N CY a~ trry ~ ~ ~1'+ ~ cad C~ Ra ~ e a+ ~ '~' ~ . y 7> Q 4) ~ ~ 1 ~ ~' ~ '"` ~ ~ ~ ~ ~ ~ ~~ ~.J ~ ~ • y ~ ~ d? .. ~ Q ~r-i ~ CX1 ~ Q ~~~+ .~ ~ cd ~ a ~,~~~ ~ ~ ~ ~ ~ ~.~ ~ ~ ~ ~ ~ ~ ~ ~~,~ H ~ ~, ~~ Parkinf~ Detail: Below is a detailed analysis of the parking requirement for the 4~~est Day LatlMarriott Site. Please Hate that net areas were used where applicable to calculate the appropriate parking requirement. Below are floor plans of the three levels of parking provided on the site. Uses I Unit Counts i'arkinn Ratips P:zrkina Requiresi IWDL Hotet 1 f Ctandnminiurn Units ---- - I $4 1,4 sp./unit ] 17.G0 J 11~tfl C110t15e u11iL3 I +~..~ 1,4 sp./Ll: ]J[ 40.~~ I)-1oxe1 Roorns I 4G 0.7 sn•/u~[ 32.20 --- Hotel Lleetin.~Rnoms 3`SO - I 3 sp./330 st_ -_ - - 9.33 _ Motel Restaurant/Bar 2,~fl0 1 sp./25D sf. 40.00 IHUteI Retail (Hotel 1o66y shop) ~ 300 2.3 stz./100U sf. 0,(9 I Sub toxal 210.4 Z' I ~ Less i1ti1[ed Use Credit -12.$0"/0 26.30 ~~Di_. Totall - , - ,= 184.12 2~iarriott 1 ~ ,Condomi:uum l.lnits I 35 1.4 sp./unit 49.00 - IHorel Rooms - 276 0.7 sp./uni[ 193.2U~ PHotel lti[eetin~ Rooms 13 285 1 sp./330 sf. 40.2G~ (Hotel Restaurant/fiat 3 ~00 - -- 1 sp./250 sf. 15.201 _ (Hotel Retail 480 ___ 2.3 sp./1U00 sF. 10.071 I Sub [t~ra! 307.73 -- Less lvlixec] Use Credit =1250°/a i8.~~1 Marrrntt 7"ntal -- 269.27( ----- IGore Creek Resi~irnces IDwellin~ Units _ 2U I.4 so./unit 23.OU1 -- - - I s«~ total zs,oa ~ Less ~!Lixed Use Credit -12.50% 3.5(?~ I Care Creek ftesiclenccs 7'ntsl 2450 ~:3.::Overalf Narl<in~* lZe.cjzirccnent ~"~''~ 15~~;1`.~~;:fi~~4' to„~~~ :nom The proposed development plans include a total of X217 parking spaces. There are 42 parking spaces in excess of the Tory°n's requirement for the uses on this site. However, 37 of these excess spaces are located in the Gore Creek Residences and are not ft~ngible 4vith the other WDL development. Parking is provided on the site as indicated below: West Day Lot Hotel Stntcture: 405 spaces Gore Creek Residences: 54 spaces 1~larriott Hotel: bl spaces • • Vai] Resorts. -The Redevelopment of Lionsheacl 3 N ~ N ,1.9ewart ~ I > ~. ` r . f I ~ ~ fE ~~ ~ ,/ /. h ° ~.'~ ~~~ ~~ ' ~ ~ h -~ ,~K ~-- a~~~` ~.- ,_` ~,: .` ~ ~,, --~- Ni i r l~o,~•l,ar~;,r: ,•~tt+~ ly 3f4U fS 1J}..1[Ljii' Yf 1~1 +Al lwa (~ rx :uef ~Jr~ill I E(fll L7 ........ -~ ~~~~~~~-• lk~1FLV'[ltiT1 ~ 1 9~~91 IIuY Cur ^+ N V 0 & { n G 5; 9 ..._..t ... .. .......... ........... ,~ • I r ~~ ~ i 1 ... 5. :r' .~ ~._ ~ i . ......... ............. .~...~ F .. .. - ; 4hINA)YT 1 ;;.H r W r ....... ~ u, n ~..,. n - .u ... t j ~ ~ ' I t: I !• 4 a _ i. I ~_ ~_ ! f: : ~' / ~..~, r~nu! ,.unr.a c, .,. r. u e °' 1 w~•.~ nav Col Vail Resorts - Thc: F2.edeveiopmcnt of Lionshead t~+ `i;__, w.w..~.. -tJ„ . -.• 1 2''+ f] 13 ~Sf 'tt~~T Pf 1\ r H 11A.6 West Day Lot -Parking Levels f ~r __.... ~ _ It .~.. ~;; r ~ ~ T _-fir - ~.... ff -.E_' ~--'.. .~ ~I ~ ~ ~ ~~~ ,- ~ V { ~. y.f ` ~-- n f ~ .. l ~ r~P4~i ,~`' /fy~ aue+s* /4~A Mn --c-u r ~~.. +,Ke t;av:rRr:?~ w _:I 3SP1i151:\~r\TPI~I\ *RI'1i u ! .~o. ~~, .7, tt~ *~I`S tf`.IU _ _. ___..._.. ,..~~:~~~.~, X1.1 1.115 tc~5+ nn~ ~.n~ West Day Lot -Upper Level T'arking and Loading Loadine and Delivery Detail: The Town of Vail regulations provide a series of formulas to determine the overa[1 loading berth requirement for a redevelopt>nent project. The regulations also contain a series of reduction credits For mixed use projects such as the West Day Lot/Marriott Site. The maximum number of loading bays required of any mixed-use project in the Town of Vail is five loading berths. Vail Resorts Development Company is providing a total of 6 leading berths at various locations on the site. Twa new loading berths are located below the new hotel building in addition to the ~ berths located at the Marriott hotel. • • Vail resorts -The f~eilevel~prnent of Lionshead 9 • EzTZZ~lavee l~ousin~~ Below is a detailed analysis of the net increase in employee housing impacts of the proposed Nest Day Lot redevelopment, The calculation is based on the TQrvn's general methodology for dc[erriunina employee impacts. The formula uses the 15% multiplier since the project is being developed within the density requirements of the Lionshead Mixed Use 1 zone district as consistently used by the Town. Employee housin5 requirements of all. redevelopment sites (including the Front Door) are being met within the building proposed an the North Day Lot. r -_ __._.__----...~ ._. _..._._ ;Westr}a.. Lot .. ......,..,...~_ __-._.__.. _,_.~ ..............._ E..__._. ._._~ v , SC2.FT. -0r-~ UNITS ~ FORMULA EMPLOYEES 15 %MULTIPLIER ,' Spa 6,500 0.0013 B 1.22 RestauranULounge/Kitchen 2,500 0.0050 13 1.88 Meeting Rooms 3,080 4.0010 3 0.46 LQd9in9 90 I 0.250t? 23 ~ 3.38 Mutts-Family Units 133 ' D.4000 53 7.98 m ~ 3 ,.... ;~ Total EmPfa~ree tied Requirerreent ,'; F# a~,~~,"~?''{ ~., ';-.., . ,,,.~. 99.4:1„ ~a"~,;;,, 7d.91 Environmental Impact Report: An environmental impact report (EI12) vas provided to the Town with the original Lionshead Redevelopment subrnittal_ The changes to the West .Day l.ot only minimally change the developrent impacts to the site. The changes include an increase in the number of potential lore-density dwelling units from l2 units to ~~ units. The number of potential building footprints has been reduced from 12 to 10. The EIR as currently submitted sufficiently evaluates the proposed development and na update is necessary; other than an update to the overall traffic report for Lionshead_ This update to the traffic report will. be provided- • Vail Resorts-The Recievelopnienf o1~Lianshead 1(} lll. NQ NET LOSS CAF P.~ZKING A.. Master Plan Policy A ground-rule was established during the master planning process far Lionshead that states that there will be no net lass of parking {public or private) in the Lionshead redevelopment area.. That means that as properties are redeveloped or vacant properties are developed parking must be provided to serve the proposed uses and that employee parking located in Lionshead (the Nest Day Lot and the North Day Lat} must be replaced if displaced by new development. Section 3.9 "Parking" of the Master Plan provides an "assessment of existing parking conditions." That section goes an to identify the North Day Lot and the West Day Lat as existing employee parking areas containing l05 and 160 parking spaces, respectively, ~. 1~'ail 12esarts Paz-king Plan Tl1e parking plans for all ofthe proposed redevelopment sites address two issues: parking required for the new or redeveloped use and parking displaced from the I~rorth Day Lat and the West Day Lat. AlI proposed development projects {i.e,, the North Day Lot, the Core Site, the Nest Day Lot, and the Tennis Court Site) provide alI of the parking required far the uses proposed. Displaced employee parking may be accommodated in the following ways and on the following sites; as surface parking located on the Maintenance CenterlHoly Cross Site or in conjunction with a parking program utilizing Vail Resorts property lactated near the Minturn exit of I-70. A specific employee parking replacennent plan and program will be provided by Vail Resorts prior to approval of the proposed Lionshead redevelopment projects. • Fail Resorts -The Red~velopmezit of Liansheael C U IV. PROJECT PH.gSI`~G $elow is a timeline foz- the phasinglsec~tzeneing of the proposed redevelopment projects. The sequencing of these projects is key to the overall success of the projects. Issues such as funding/cash flow, staging, and commercial disruption are aII interrelated and inter-dependant and can have significant impact upon the ability to construct the overall redevelopment projects. TimelinelSequencinb: Tennis Courts Site: West Day Lot (Homes} Core Site] North Day Lot: Vest Day Lot {Hotel} Anticipated Proieet Start Spring of 2004 Fall of 2004 Spring of 2005 Fall of 2005 Spring of 2006 Anticipated Proiect Completion Fall of 2004 Winter 2005 or Spring 2006 Winter 2006 or Spring 200? Fall of 2006 Winter 2007 or Spring 200$ Vail E;esorts -The Redevei~pment of l.ionshead ]2 • V. PR07ECT RZ;VIIIGV CRITEIZ]A West Div Lot Below is an analysis ofthe Town's conditional use permit review criteria recltzired for the proposed meeting rooms, retail and restaurant uses on the second floor of a building, and lodging morns and dwelling units on the first floor of a building. The analysis also includes the text az•nendznent to allow single and two-family residential in the L:~7z~shead ~,lixed >vJse 1 zone district. Conditional Use Permits - Lac~ftinn of retail., Ioclne units. dwelling units, and meetinrt morns and Conditional Use Permit for the Gore Creek Residences: 1. Relationship and impact of the use on development objectives of the Town. flnalvsa,~•: The proposed uses are part of an overall coordinated development plan for the West Day Lot.. X111 of the proposed uses are consr`stent with thas•e uses and activities ident~ed by the Laonshead Redevelopment .Master Plan for than location. The plan specifically recommends hotels and other residential developrrrent an this area of Liansheacl. Additionally, the 1~ilaster Plan and zoning regulations recognize the need for carstomciry and accessory ztses within a lodging fatality to serve the occupants thereof as well as the general public. Since this building is not located an the primary retail area, there is nv negative impact associated with ledge reams and eondvminaarms vn the first level of the building. The proposed single family residences are being located in an area of the sate which is adjacent to Gvre Creek and the Ivw density Karnes directly across the creek.. The proposed homes will create a tr-ansatavn yr buffer from the more intensive acres in Livnshead to the less dense uses an West Forest Road. The prvpvsed uses and their locations within the building are consistent with the Town's development objectives fnr this area of Lavn.shead. 2. The effect of the use on light and air, distzzbution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities needs- R n al vsas•: The proposed uses wall have Ifttle if any effect on these criteria. Except for the ,Heeling rvvrrrs, the other uses are cvnclataonal far lvcatianal reasons, meaning Vail Resorts -The Redevelopanent ofi Lionshead 13 that tJzey are normally permitted uses on the property but due to their laccrtiori in the building they ar-e eonclitiancrl. The proposed locations for a res•tatlr•ant, conclaminiums, and lodge rooms will therefore have na effect an the listed criter'icr. The meeting r-aams clre accessory to the hotel frrrzetion and therefore da not generate additional trc~fic, produce additional perrrrunent populction, or have effect an the Town's infrastructure. The new condominiums and Gore Creek Residences are intended to serve as vacation units and therefore are unlikely to create a permanent population creating the need for schools, parks, and other recreational trs•es for full-time residents, while still being compatible with a residential environment. hecreationul amenities hove been pr-avided to serve the guests and residents an-site. 3. Effect upon traffic with particular reference #o congestion, automotive anal pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking. areas. Analvsl.s: The proposed reclevelapment project and proposed canclitiancrl arses will improve the traffic circulation to and fr•orn the site and within tlzc= property, All of the required parking crud loading for the project is located below grade in a two-level structure. Access to tl~e site cvrnes directly from YYest ~ionshead Circle and Forest Raad similar to the existing condition but greatly unproved by reducing conflicts and rernavirtg surface parking areas. The laacling areas are accessed directly from the Satrtla Frontage hood into u belaYV grading loading area. All of the drivetivcrys, drive aisles, and loading areas meet the Town's develaprnent standards. The pr-apased plan separates pedestrians and vehicles to the greatest degree possible thus creating safe environment for pedestrians. .Driveways and parkin; areas are either heated or located underground; therefore snow removal will not bc? necessary. The proposed plan adequately addresses all of the issues raised by this criterion. 4. Effect upon the character of the area in which tl~e proposed use is to be located, including the scale and bulk of~the proposed use in relation to surrounding uses. Analysis: The pro,Pased uses and structures are being developed in conformance with the development standards established by zoning. The proposed uses and stnuctures also earnply with the direction provided in the Lionsheucl hedevelopment Mnster Plan, The pre~pased uses will provide needed accornrnaclatians within the west end of ~iorrsheud, The hulk and scale of structures is consistent with that envisianecl by the Liansheacl Redevelopment Master Plctn and the design ,,rruidelines adapted ther•eirz. The proposed uses are consistent with those uses and s•tr-ttcttu•es located on adjacent s°ites, us adjacent sites are developed with residential and lodging uses. Vail ~it:5C3rta - ~37;c Rcclcvclc~l7anent of Lsonshe~ul 14 • Text :lmendnrent - To allotiv single and two-family residential uses irr the LHI'~~Iti 1 District: 1. The extent to which the text amendment furthers the general and specific purposes of the zonin; regulations; and Ancilvsis: The propasecl amendment to the livnshecrd Mired Use 1 zone district will specifically farther ilre goals of the zvnirrg regatlatians by pravicling an vlapvrtunitfr f~ar• site speck review lay the Planning and Environrrrental Camnrission oflaw-density resiclenlial development within the Lianshead area. This amenclrrrent allows an applieant and the Town to cansiderlow-density residential dc:'velvpmerrt where it is ather-wise consistent with the Lianshead Reclevelapment Master Plan, is compatible tivith adjacent uses, and does not interfere with the ecr~norrric vtulr-ty of the ,Lonsheacl area. The prvpased text amendment will promote craardinated and hcrrnraninus develnprnent within the Ta~vn to eanserve acrd maintain carrrrnurrity dualities etnd values, ensure safe and ejjicient pedestrian and vehiczrlar traffic, and provide for the safety and general welfcu-e of the commarnity. 2. The extent to which the text amendment would better implement and better achieve the applicable elements of the adopted ac~als, objectives, and policies outlined in the Vail comprehensive plan and is compatible with the development oiajectives of the town; and An al vsis: The pr©pased text amendment will allow single family and two family development to be considered by the Planning and Envirannrental Cornmissivn within the Lionsheac111rlixed Use I zone district a,s a conditional arse. While Ivw- clensityresidential development is not a desirable? use in many areas of Lianshead there ar-e certain areas where it helps to create transition and compatibility with adjacent uses, as in the case with the xt~est Day Lvt. The proposed te_rt arrrendment will better implement the goals and alajectives of the Town by alfativing the oppartarnityfar the Planning and L'nvironmental Commission to cvnsider• law-clen.sity residential development in lagiccrl areas that promote compatibility rather that a wholesale prohibition of the arse. Vail Resorts -The fhedeveta~inent of Lionshead 15 • ~. The extent to which the text amrendment demonstrates haw conditions have substantiaEly changed since [he adoptian of`the subject regulation and how the existing. regulation is no longer appropriate or is inapplicable; and Analvsis: The proposed test amendment is necessary to correct a wholesale prohibition o~ f'a use that has merit in the Lionsheacl Mired Use ~' zone district. Conditions have not necessarily changed since the adoptian of t1~e regulation, but rather it hcrs been recognized that them may have been an oversight of where such a use might 6e useful and compatible in the redevelopment of Lionshead. 4. The extent to which the text amendment provides a harmonious, convenient, workable relationship among Land use regulations consistent with municipal development objectives; Arralvsis: The proposed amendment to the Lion.shead Mixed LTse 1 zane district will spec~ically further the goals of the zoning rega~lutions by providing an opportunity for site speck review by the Planning and Environmental Commission of law-density residential development within the Lionshead area. This amendment ullows an applicant and the Tawar to consider low-density residential development where it fs otherwise consistent with the L ionshead Redevelopment Ilrlaster Plan, is cvmpcrtible kvitfz ac jcrcent uses, and data's not interfere with the economic vitality of the Lion.shead area. The proposed text amendment will promote coordinated and harmonious development within the Town to conserve and maintain community r~ualities and values, ensure safe and efficient pedestrian and vehicralar truffrc, and provide for the safety and general we~are of the cammxtnity. V~7i1 ttesorts - Tt~e R~:de~eiopment ~f Lionshead ] b r~ i~~~«~ ,~~ ,~~~~~ii.~~n~~~ iii. • PLANNING a,~d CC)MMIJNlTY t7EVELOF'MENT January 26, 204 Mr. V4'arren Carripbell Town Planner Town of Vail 7~ South Frontage Road Vail, CO ~lbb7 RE: Gore Creek Place Dear Warren: Enclosed you will find our revised PEC submittal for Gore Creek Place. As you kt~,o~v, Gore Creek Place is the first phase in the development of the'vVest Day Lot. Plans for the comprehensive development of the 1~1~'est Day Lot were previously submitted to the Town on July 7, ~OD3 and an addendum to this submittal was made on Naven-~ber 3, 20fl3. The DRB has conducted conceptual reviews of the project on December 17`h and nnost recently on January ~ls`. It is our understanding that subject to your review oC this submittal the PEC review of Gore Crock Place will be scheduled for February 9`h. Information submitted with this amended application includes: 1. Existing conditions map 2. Site plan 3. Typical building elevation and composite elevation 4. Landscape plan 5. Grading plan 6. Building height diagran3s 7. Sunshade analysis 8. Title Rep©z-t As you know, the Town Council recently approved a text amendment to the Lionshead Mixed Use-1 District which allows for single and two-family dwellings subject to approval of a conditional use permit. Prior to approving such use the PEC shall consider review criteria specific to this use. The follo~.ving is our analysis of how this proposal conforms to these specific criteria: 1. Develotaed as Hart of a coordinated mixed-use develot~ment: Gore Creek Place is Phase I of the multi-phase development of the }JG'est Day Lot and has been. designed as an integral element of the rest of site. The overall site plan submitted to EdwardsViila~e Center, Suite G209 Ph. - 47D.425.7~•75 01 C5 Ed~.vards Village Baulevarr~ Fax - 47(?.426.757b Post Qffice box 2558 vWww.braunassocia~es.com Edwards, C~lorada 8 1632 the Town on .Tuly ?`, 2043 demonstrates how Gore Creek Place relates to the balance of the L~'est Day Lot, Vail Resorts is very much aware of the fact that proceeding with Goxe Creek Place as a first phase of the Nest Day Lot will. begixa to establish very well defined parameters for howv the balance of the site can be developed. Howevera considerable effort has gone into the design of the site to ensure coordination betwveen the various development phases 2. The low-density residential scale is advantageous to create compatibility with or a transition to other low density residential develonrnent in the vicinity: The West Day Lot is located immediately adjacent to fihe town's stream tract and to adjoining low-density residential development. The parcel is zoned Lionshead Mixed Use - I and allativs for high density development yvith heights of up to 80.5'. The driving factor behind design of Gore Creek Place is provide a more graceful transition beriveen high density development and the adjacent town stream tract and neighborin; low- density residential. The duplex. residences proposed are intended to provide this transition, 3. The single-family and two-family residences are designed to the general scale and _. . __ character ofresidences in other single-.fancily and two-family zone districts: and Buildings proposed for Core Creek Place are ? to ? % stories in height. The buildings with "read" as duplex or single family homes and the scale and massing is very much in keeping with the character oFdevelopment in the xzeighboring adjoining duplex zone district, Proposed ridge heights are generally consistent with height limits for the single-family and duplex zone districts. 4. The proposed development is consistent with the intent and ob+ectives of the Lionshead Redevelopment Master Plan. _ _. _. The Lionshead Master Plan is implemented in large part through the Lionshead Mixed Use 1 and 2 Zone :Districts. The development propased far Gore Creek Place is consistent with the standards outlined in the Lionshead MU -I district and as such is consistent with the intent and objectives of the master plan, .Refer to Vail Resort's original submittal for the redevelopment of Lionshead for additional discussion of haw this development is consistent with these objectives. • Vl. MASTER PLASM CONSII?ERATIQNS The Town of Vail established six policy objectives to serve as the framework for the Lionshead Redevelopment Master Plan. The proposed Vail Resorts Development Cotrapany redevelopment projects implement these policies as indicated below. A, Renewal and Redevelopment The proposed redevelopment projects represent a signiFicant xenewal of the Lionshead area. With the removal and replacement of the existing Sunbird and Gondola buildings in the heart of Lionshead, there will be a tivhalesale change in the character of the Lionshead core. The redeveloped sites will provide a warmer more pedestrian scale to the buildings and introduce amenities necessary for running a 4varld-class resort and ski mountain. All of the sites are being redeveloped to the design standards and qualities presented in the Lionshead Redevelopment 1Wlastar Plan. These projects will help Lionshead achieve a personality and identity of its awn. E. Vitality and Amenities All of the proposed projects include components which help to improve the overall vitality of the Lionshead Area. The redevelopment projects include a ~ve~star hotel, rrteetin; room facilities, a public ice rink, improved retail and restaurant facilities, office uses, employee housing, and other amenities that will help attract skiers, shoppers, and resort guests. C. Stronber Economic Bass; Through Increased Live Beds The proposed redevelopment projects include two new hotel facilities where none exist today. Both hotel facilities include traditional hotel rooms, hotel lock-aft units, and condominiums. The hotel lack-off units and condominiums are to be included in a rental program thxougl~ a series of incentives and disincentives offered to condominium owners, thus encouraging the entire facility to be operated as a hazel property. These new lodging products are new beds being introduced, into Lionshead as no existing lodging facilities exist on these sites today. The proposed projects will improve the economic base of Lionshead with the new beds and lodging products being created. D. Improved Access and Circulation The access and circulation within Lionshead is sarnewhat dysfunctional. Pedestrians are constrained by frequent grade changes, dead and stre~;ts, and confi~sing corridors. Vehicular access tends to conflict with al] other modes of traffic which adds to the confitsion and haphazardness of the Lionshead area. The proposed redevelopment projects create ne~v streets and pedestrian-wavs to help improve the overall access For pedestrians,. skiers, and shoppers. Additionally, buildings are bung redeveloped at more of pedestrian scale and with uses that will draw pedestrians through the Lionshead area, Vehicular circulation is improved with the Vail Resorts - TPte Redevelopment of`Lionshcad 17 addition of belowv grade parking and loading facilities which helps to separate vehicles and pedestrians. The redevelopment projects will improve access and circulation for all wades of transportation. E. Improved Infrastructure The proposed redevelopment projects will help to irzaprove the overall physical in#rastruchzre of Lionshead, The projects provide for below grade parking and loading areas thus improving capacity and aesthetics of these functions. Streetscape improvements such as sidewalks, walkways, and new streets are included in the amenities being proposed for the redeveloped sites. Vail resorts has provided the opporntnity for the Town aF Vail to provide a transit center on the 1`,lorth Day Lot thus improving tlae Town's transit capabilities. The proposed improvements avill help the Town and Vail Resorts meet the service expectations of guests and residences. F. Creative Einancin for Enhanced Private Profits and Public Revenues Vail Resorts is utilizing a series aF financing tools in order to redevelop these properties in Lionshead. Capital is being generated from portions of all of the sites including the Tennis Court Site,. the proposed Core Creek Residences on the West Day Lot, and from the condominium components of the proposed hotels. Without these sources of capital, the redevelopment of Lionshead would not be possible. • Vail Resorts - "Ihc Re~lovclopmeitt of Lionshuad l THIS ITEM MAY AFFECT Yt7UR PROPERTY PUBLIC NOTICE NOTICE ES HEREBY GIVi=N #hat the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6 of the Municipal Code of the Town of Vail on January 12, 2004, at 2:00 P.M. in the Town of Vail Municipal Building, In consideration of: A request for a recommendation to the Vail Town Council of a proposed text amendment to the Zoning Regulations, Title 12, pursuant to Section 12-3-7, Vail Town Code, to allow for revisions to the development standards prescribed in Chapter 12-7A, Public Accommodation (PA) District, Vail Town Code and setting forkh details in regard thereto. Applicant: Nicollet Island Development Company Inc. Planner: George Ruther A request for final review of a conditional use permit, pursuant to Chapter 16-12, Vail Town Code, to allow for changes to the previously approved conditions of approval for the redevelopment of the Vail Mountain School, lacated at 3220 }Catsos Ranch Road! Lots 1 and 2 Vail Mountain School Filing. Applicant: Braun Associates, 9nc_ Planner: Elisabeth Eckel A request for fina9 review of a variance from Section 12-14-17, setback from watercourse, Vail Town Code, to allow for improvements within the setback from Gore Creek, lacated at 68Q West Lions Head PlacelLot 3, Block 1, Vail Lianshead 3`~ Filing, and setting for de#ails in regard there to. Applicant: Antlers Condominium Association Planner: Bill Gibson A request far a recommendation to the Vail Town Council of a proposed Zane District Boundary amendment pursuant to Section 12-3~7, Vail Town Cade, to the Town of Vail Official Zoning Map, to the zoning of the West Vail Lodge Properties, from Commercial Core III (CC3} to High Density Multiple Family (HDMF), located at 2278, 2288, 2298 Chamonix Lane and 2211 North Frontage Road/Inn at West Vail Lat 1 81ock A, Vail Das Schone Filing 1, and setting forth details in regard thereto. Applicant: Vanquish Vail, LLC Planner Matt Gannett A request for a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses;. ~ Generally (an all levels of a building or outside a building), Vail Town Code, and a request fora ~ major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifiications, Vail ~ Town Code, to allow for the construction of new single-family and two-family residential dwelling units, located at 730, 724, and 714 West Lionshead CirclelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision, and setting forth details in regard thereto. (West Day Lot) Applicant: Vail Resorts Development Company, represented by Braun and Associates Attachment: D Inc. Planner: Warren Campbell The applications and information about the proposals are available t'ar public inspection during regular office hears in the project planner's office, located at the Te~wn of Vail Community Development Department, 75 South Fr©ntage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Tawn of Vail Community Development Department. Please call 479-2138 for information. Sign language interpretation available upon request with 24-hour notification. Please call 479- 2356, Telephone for fhe Hearing impaired, for informatian. Community Qevelopment Department Published December 25, 2Q03 in the Vail Daily. i .' _ / y~ t ! l '- J q~~~_m_ ~O~I~f J~y ~ y 1 ~~ I y t yY yY y~ yY Y, y 1 y I 4 l yy y h ~~ Y y '~ y 5 ` ~ Y ti ,4 .` ,\ ~ ~ ~ ~ .. ~ \~ \\ ti g ~\ ` \ \ ~ ,~ ~ ~ ~ \ ~~ ~ `. ~ ~ ~ `~ ~ ` ~~ ~ ~ ~ ~~ \` ~y ~ \ t ` ~ ` ti ~~.~~~~ ~_~~ I I O ~~ ~~ y4 ~\ ~ \ p~, F-i ~ , ~' ~ `~1 W /, ~ 1 ~ •. f W ~ / e ~~ } y I ~~ ~ t I ~ ~ Cz] .3 i y I [, ! N 5 l y ~ I it 4 Yh 1 '~ Y f YYY 4 l i12 G1. 1 1 ~ 1 1 ~ x 4 1 ~ 1 5 ~ [x] Il IV y1 y5 ~ ~ Il ly \\\ 5 1 Q~ 5 1 1 }4 y4 y y#~ ` ~ W 1 P 1 `~Y r r r r r r 1 I ! r r _~ I I a 1 ~---~ ~ ~ ` `~~ 1~--° W ry p7 „'~ °~ U d ~ ~'~n Y`~` -r--ice -Ili~ y t ~ 1. y 4 O 1 r 14 ;y O Yh + ~ 1 4 14 1 1 ~ 1 t 1 ~ 1 1 4 1 1 1 t y ~ tt e \ 1 4 4 1 ~ 45 e Y, ~ t y ~ s W + l 1 ~ ~ Yy yy y y ~ yy ~ yl y ~ 4 l {I O 4y 4Y ~ C7 ~ t 1 t + 1 y } / 4 l 44 1 1 1 y i ~ 1 5 ~ ~ y S y 4 I y I l ~ i I I ~ ~ I f D I 4 1 I II i ~ I I ` I I ly rr y f t ~ , r t ~ ~ r f I r _ -- - ` I fl r r t '` I 4 \\ I \ Y ly ~~ ~1. ~ Y 4', 'i y `` y 4i ~ \\ } 11 t 4\ ~_ {~ 1 ~~ ~, i t. 1 r ~~ >< `r 1 ~ 1 ~' 1 ~ ', _ _--~- ~?-. ~ -~} .l 4y 4S ~ t~- 4 S l i 4 l 7 1-- - -/6 ~i ii ~~ ~ ~~~ .~ i \ ~ r r r ~' r r r ~r ~ I w r r 1 l f f I f Q I I _~ 4 I 1 ~ y I I 4 Y 4 I 1 I 11 yY I Y I y 1 55 . - ~~~~, 441 `4 ~j 4 1 1 ~4 ~~ 4\ I ~1 ~Y 45 I t ~~4 4 41 p~,~ `I ti 4 ~ ~ ~~~ ~~ ~ ~ ~'~ ~ ~ ~ ~ ., ~ ~ ~ ~ ~ / ©~ ''. ~ ~, M ~ ` ~" ~ 4.,- o ~ ~' a - ;` 14 ~~ ~ 4 4 W O ~ y 1 ~ [L'i y 1 ~ ¢ II ~I. ~ ~ t I I I r I I r 1 ~ I I I I I I ~ _ 1 I ~ ~ I I ~ 1 I r J I I 4 4 ~ h l I '~' I I y 4 ,_T_ 1 5 /R 1 1 __ ~ I 1 I I I y i - - Y I 1 " _ ~~. 11 ~ n - ~\ \\\ ~ r f µ ~ , `~ ~ ~ _ y r' ii ~ ~ 111 s~ 151 r ~ a ~ I \ O , ~ * ~ i i, ~ ~ _ ~r t ~, ~ ~ - r ~~ ~ Qr4'11~`w~,~ r ~ ~ - r 1 ~s ,' ~l ~ t + r 3 ~ ~ ~ i r1 ~r5 ~ ~ - `* - '1 h 4 /J "s t~ Q Qk >P ~ ~ ~ ~ 4 ~ t / ~ E 1 ~* ~ k~ ~ ~ 1 ` w O I 14 • ~ w i11~_ ~ rf g ~K~ a ~~ `'~b'~, ~ a r, ~ o ~ ` ems, ,,~ o ~~, ~ ~ ~, r ~ ~ 1 - ~ ~~ >> a r ~1, ~ G~ J 1.4 O 4 ~ ~~ :~~ cj ~ ~~ ~ 4,S~j1 ~ J~'~ {'~, _ ~tx ~ ~ ~ ~~ ~ ~ ~ .~ Y~, ~ 4 ~ ..4 ~1i7 , V ~ ~ 1 1r O • #} -- ll~ _ __ ~* ~ ~ ~ ~~ ~ 11 ~ 1 Q 5 c~ ~ . 1 ~ I s ~ ~17 ,i _ _ ~ ?S~~ 3 ~ ~ ` © ,.. 1 1 ! ~ o r ~ } `dam ; i1 ~ ° .~ o ` ` r ~ ~ ~ ~ ~ ~ ~ chi c3 ~ ~ C *` _ ~ ,. 'q , 4'si ~ > r $1°~'a a~' ° 411 ~~ ,L ~ ~ 4 ~~ t ~.~ r ~ -` $ ~ ~S r C~ Q F ~ ~ ~ pp o ° ~ ~ . ' r ~ r °-- '7 1 C~ ''' at~caooa~o~csoaoa ~.~. } ~ ~,~ a.~ t ~; i 1 ~ `. _.-. ~ i. '•~ b ~ fi ~~ ,,~ ~+ ~ tl , U'6. ~ 4 f •r ~1 ~ ~~1 11 - c' ~• ~ 1 1 - t '• N '~ ~' ~'~+ ~' tie r ] ~ ~ -~` , ~ ~ ~. t ,~ll 4 _ f tr ~ ~ ~~~ ~' '} ~ `` y1 yam-- 4 ,~' \ ~~ y y .,. Y .ATM, 111 ~ J,.L-~.~ ~ ~ _ ~-' 1'~ ~ ~ ~ r a, ~, a~ ~_ \~ , 1~W~ 55~~, ~ 1 ~4 ~* *i~ ` `~ 11,1 ,~! ~~O `` 1 ~~/ ~~ 4 Z ~ ''r" 'd ~ t~ ~ , ~ ~ 9 N 1 ~ 5 ` ~ ~~~ ~ `~ ~ t ~ \ ~ .561- Z _ ® ~~ S `. ; ~. i ~ r ~ ~ ~ 1 1 ti sti ~ ~, ~ ~ s ~ ~ ~r ~ i ~~ g °~ C ` 1o- 4 ~ . _ y, _ ~ ~ a C.r) ~' _ - 1 • 1 . a ~`" '`~~ 4 x 1 ~ }\ ~ ~ + ~ ~ h \ 5 ~ `' ~x~Q~1ti 4 ,~`~'~'' ~ ~~ ti _ _1 ~` ~ ~~ ~ ~• , 'r, ~ ~ ~ ~_ /'1 1 Gi ~.~ 4 1 } 't rf - + S ~ ~ ~ - ~.. ~ 411 a ``~ 55~ ;11 ~ `,'1 ~1t ~ ,1 CV ~ ~ y t'~ 4 I ~ t n L ~~ ~ / ' ~ •.,l b 91 ,1~1 ~ t.t~ 4~G, S ~ /T ~ ~r4 ~ L~----T"~~1,. _ _.~~ ,'} ~~ - ~~r 1~~~ ~ w. v a 1, R ~ ~C',1 g ~ ~l ~ ya1 '~ 1 ~ 1 ~ ~'~ ~• 1 ~• ~ ~ >o ~ ~ y ~~` ~> > l J .. li I I t n 6` +rie .K ~' S E m 1 l i ~ ~ i + ~~~ ~ e!~' ~ 5 •(' y~ II i. ~~' / ~ l Ill ~,, 1 ,~ r r ~ ~ I `~ ri . ~ T : /~~ ) ~ ?' r ~O f' ~ ~ %~ _, • ' W 1 ~* , I• ~o/ 1 f! .. 1 I-, ~4- ~ ,• p ~. • ~ 11 , :~ ~ ~ i ~ l + ,~ -_ . ._ ~.. - • 1 1 ~ ~ a .._. ~1. ~ ~ _ - ~ ., l ... ~~~ f t ~~ ~.~ -~ r` ; /~ +~ ~~ r ~~i i :' ~ ~ y ~ r 5 i y 7 ~ i _ ~ S, p~..y Y Y 4 ~ ~~;~' ~ ~• y ~`' y 4 \ 4 ` ~ ' } y } G? ~~~ `.rr 1 4 y y ~~ i ~, , s `t ';, 1 ~ Y ~ ~ 1t a l .F ~ 't ' ~ t.1 ~ t rt -' 1 ~ ~ ~,~, ~`~ q' ~ ~ } _ • ~~ 1 t1 t , _ ~ ~ r, , `~l S1 ~ t ~ 04 y ~ ~~ •~ t 1, ` ~ • ~ ~ X11 I' ~ ~ a~ •1 ~ d ~. ' ~~ t ~ 4 t ~e i = 1 d ~~~ 1' ~ '~ l y t t a lY~i 11 ~~ t, ~ . ~~ ~ a ` y ~ r` ,y 1 ii ~~ # 1 r~ . ` ~~` . , a ~~ ~ ~ r ~ ~ 1 ly 11 ~~ ~ ~ r 5 ,,. } k ,~. . ~ 1 1 Y ~ ' ~ + 1 ~` 1 1 } '1 ' ~ ~ 1 ~ e 1• ' II ~ r ~~ v ~ r y '' i ', 1 ~ i ~. l •l ~~ , \\t I ~11'tl'' 1 - ~i 1 '~1 ~ f 1~~ I 1 I ~: r ` 6 ` •• + yIl ~Ilt ` ~ ~ Y_ ~ `~• 1• ~- a' ' t ~ 1 ~ ~I V t` _y yl ~' 1 ~! 11 N 1 ~. l r ~ t ~1 >~+ 4 ~~t ~. 1 1 hl ~yy31'1 ~ 1 3 ` i ~. 'y y ~ 4 1 r~ ~. .t 't it l t~ ~ `, t~ t y t l }'t 11 lye ~1 i X ~ ~ t } 1 ., r~1 l c~ 1 `~~u 1 yy1'i t~ t 4 .', y' ; A r i` e l~Y' r 1 t~ 1.' ` ~' ~1 y y ~~ ~ ` ' ~ ~~ 1~-~~- ~1 ~~~•, •• :, ,, ~ `h 5. ~. 1 r ~1 1 ` 1 }..Y'.~` ~t . Y \ \ ' Y_....___.._... 6 8 _ ~ _ uecle "~` _ /I" ~ f ~ '~ I . C }llr r~ ,'~ t5 1° ~i. l l Yrl 1, ,~ , f !;r ~ 1 1r ~. ,„ ; ,, hl „ (r ,. 8 l II I~.,I r .~I I ~~ ~ I r 1 P _., r y, 5 li'} 5 1 r I I V'g . ssva ~ 8 'I I I ~ rvue ~r r ~. ~ I ~ ~ ~ -~~~~ ~ C 4Lr9 i 4 1, I g Y ~~~ III € ,, 5 _'~-i I I ~ Iy"~I }._. ..1 _._...r{ W GOi 46 ti hr ~~ ~ N ~rt ~~a ~ i i ti 't Jy ~ p =~ r ~ a~ ' ~ I ~ e9 ~, 1 I I I~ ~~y~f ~I ~ I ~ _. _ ~ _« ~,,y,~~~~CCCC'~i i ... ... it -Q~ #~. \ ~ raora b n 4 6 V~ „~ I s z ~.r>$ /~, M W a.rrd $ X vxaoe r I ~ s y~e 11 1111}t" ~~ I~;Ir~ ~ 'ti- ~ ~ ~ _ }., rl ~i }r~va ~ r r ~ - i ~ ititir 1!'. 1'i I' } I sy r a ~ f ,~I}.ti ~ ~ I ITV rl'ir !I'r rr. ~ i I~;`Idlll I } I r i z III{f~'tll, ~~ dlt l ry `, r. , Y~Ilrl~~lll~ r rttV-' I r~,. / ~5 Illill l~l~t S ~ Irl ~IY11 ~ ~ ~^3i ', '~,~`e iSp I }}1111;6 I I;"~ i li ~ I II Y 15 }4rl{II ~ I) Ir I , y.... ' ¢~ .`I frl}} III: ~ i' ~ r r i f w td~ I r 1 . r I` I r I e r r I+d j~ r'r ~ ~ gg 1(; l ~ 1' r ill x _ 1 .~i /F~' ;h 7~pslltrl ,lr ir~'! ~~~ ~ - r I ~' ~ ' ~I +~jr~llllij ~ ~ , 1 I irfrr'flr' ~ ,~ ~ ! Illfr rl. 1 Yr~I1 I f. ! l' r X11 S ~ I 'EI I II ,1 g; ~ r d l? , ,~ I f ~ lttl.. , {, ~lr~l%I VII i I iIF.' 1 ~.', ,~"~ r C ,,,~ V 11 - ;il r 's h r ~ '~ rt ~. 14', ~ ~:: 1 I 3 ' y .~ rr, a • } ~ ~' r :, r,~', f ~:~ ~ ,} ~I II ~~I~R t,al l~'l ~ a i ~ i 1 1. ``~ i ~"- ~J w' y I-! I s v ~ ~ ]I+l ~ I ryI I ~ 11 I ~ ~' ~f ~1 r',, rti ~II~ 1I1 ,11~ ~ ~ i~ ~ r r .. 11~ 1 I lji ill d ~n ~r } ' Ilia ~1. Ir.Ci _ ~ ~;:_ if '~~i~l.i. tr ~ ~~` ~ i7i -fr it ~ ~ ~. ~ifil ~" I J l rV:. 1Vrt t I ~ i!_. _ _ _ f I ~; r f I !I f I I' ' y -~~f''~ r , ~~ ,r ,I ! r -- + ~ ' ~ ~:~ 1' ~t ~+ !~, ,1, .' r , ! t f ~ ~-..,~ _ ' III++~~ /rr li r' .~ .. `~ ,:,~ , I r, ~ ,, , !~. y . I `'r ' ' a `7 ~ - _ I ' P jar f/f ~ i r°~`,+r. _,~ ~. "- r ! S ! i, ? r ~d ~ c A~ ~r i ~ -~._ ~ _ ~ _ Jj_ ~ ,j I ~ j/./ -I; III; ~!/r f ~` 1`t 1} 1 d ,; ~ ; ,~ ~ I I I I ~ I . '} ,fir I 1 I ~1 ~ d _ Irrr7l f~ ~' ~.~+ ~~ Y r tI ( ~ 1 '; ,III ~j i' ~'. - ? r ~, r ~ ~ ~~~ ? ~'v ~ ~' ~ ~ ` 1 ~ " S 3,, -~ ~. ~ti 4 e h A '~ \ \ ~~ v yam 'r ~ . ~ i 1 fr f ~ ~ \ ~ 1 ~. 1 ~ V 1~ +, _'`~ f r ~ °~ \ \ \ \ \ \ yyy _~ ~ ~` r f . ~ ~ f ~i ~ ~ 7r $\ ~ \\ '1 i y ~ ~ i3t ~t Li ~ J 1 _~AA9fff ~y ~ 4 Jy 1 Y M~~, \\ ~~ ~ \ f ~"~ ~ ~ t f \ ~, a ~ ~ \~ K~~ ~, ~ i"` l o s j 1 1 ~ 11 It ~~ i ~ ~ \ - ~ A ~ \ ~ \ ~; \ ~ 61\ R} ~ \ ~ ~~ "' y~ ~5~ by 1 ~ ~ v ~ I ~~, ~1 ! „ ( y~ ` ` l f ~~n ' ~ \ \ ~ { ~ ~ ~ J. F ~\'\ vr~ YS a~ ~ ~ i ti 1 \ r y / t Y- /f~ ~ ' ~ ` ~ ~ h ~~ y 1~ , 1 ~~ ` ~ F e t ~ \ 1~~ ~~~ ~ J ~ J ~\ Y~~ ~7~ .y ~ ~ ~ 1 LV ~ ~l 5 f ~ f l r h \ 61,n V ~ ~ ~..~ ~~. J " 1 ~ q Sn~ yi! ~ ' t~ V '~ t / (t, ~ \ 4' a F~ ~+\\ W 5,. tc~. ` ~ ~ V_ 'd ~ ~ 'y ~ ~ m. k~~~ an ~ ' ~~ ~~ti, ~~ x'`71 ~ i .~ FK 1 r.' ' ~ '~ ~,- ~ a 0 •~ 1 ~ 'v w P , , ~ ~~ ~ ~, ~., ~ ~ ~N S ,4 ~. a. .~ ~+~ k, y~y, ~r ,, aF ~fi,~ o. ,7. ~? ~~ ~ 1 Y ~ w ~ A 1 fr E ~% ~ h ~ ~ ~ ~~, ; ~~ ~ yl.,~ \ f 1 1 1 \ ` u = • r \ vt 1 y,~y- ~ ~ ~~ \ ~ ~ ~ w ~~'~ \ ~ $ f ~ ~ ~ h ~ y y Q' ~~ T r ~ a (4 ~~ a 1 t' ~ 'm~ }} e1 ~y~' ~ y ~ J ~' ~ ~ ~ J ti >~~ ~ ^' ~ \ 1 ~~~ ~~ / 1 M t' ~ r / 1V ~ ~ , ~~ `~ 1, ~ _ ~ \ ~ e^_~ ~n} H \ 1^ l ~ ql ~ U) ~ ~ ~'.~ 1111 f \~ }~ ~ ti L~ ~ 11 ~ _ l Q ~ h . L( °'hl ~, u . ~~r J'.I v~~~~~~C } I1 ~1 1` `I l ~4 1 t ~~ ~ 1 ~ N y ~~ ~ ~~ ~ " b ,` ~ .t ,4` ~ ~ ,,' t ii b- ~'~ '. d i1 ~_ `4 e`" 1,41 5 5t ~. .t} ~` ~! '~~ ti \ ~- ._ ~ l ~~ ~ ~ -~ 1 1 ~ e~ 4~~.. ~Mt. `~ ~ _ l z,` a ~ 1 ~~-`` `~`~S ,~ ~~ , -~ `-- ~~, ' ~ _ 11 ~ -- ` ` ti _ I _ I~~~' ~\ t i II ~, r_ 2 - - ~ r ;;~ ~" ~~~` min ~ - - ~~ i ~~~ ~ ~~' ; r 1o ry psi ~ ~.i° i ~ ~ t~, ~ ~~ ~ I ~ i O ~~ 1 ~ I ~1 ~ ~ v~ v I ~ J ~ it I 't I __ . . ___ _ -- -~~ } I ~ ~. \ I ~~ I \\1 _ .~' " 1 9 :. ~0` ~ ~o ~~ ,`~ r ~'1 1 i~ .~ t ~ ~~~ ~ ~ 1 1. ~ ~.. ~ , ~ °~ 1 0 . 4 1 Y'1 ~ ii G 11'111 u ~ C 1 f- 1 ~F llul 1~1\ ,'11;' ,~4 ~ ~ ~~ ~- '~ C1 `1 11'~ () ~l ~\ t ~ ,1 5, ~1.`I,1 b- -'s \\ 1'1 , ~ ,'~, ~ ~~ s ~y .1 ,1 ,,.~ .1 ~ .1 . , .1 `,, `~ 1 ~ 1 ~\ ,~ 1 1 4 , `1 1 ~~~-~ -'~ ,, ~ ,, ~ ~; 4~~~~ 1 ~~1 i y =' Q~ w~ ~= n rr ~'' v tY 7 ~o ^~ ~~ n J 1~I 4 l~ `~ u ~ r'~~ _, _~- ~~ v~a., ~ w ,,~,,, ~~ ~ ~ „, 011 ~1, ,, ~1~ 1 qi~~i ali _-,, '1 ~, ~~, ~. 4 ro ~ 1 i ~ Ny1 ~V u - 'tip ~a I ~` a 1 ill 11 ' ,r!,, `~ ti~'1 { a fly yy V1 41~A .~~t ~~ ~ ,~ ti1~ ~ ~~n 11 S~ t'1 l11 - ` ~ _ ,, ~~~ _ ~o, ; ~ ~a ~C , ~ ;~~ o Z I ~, i Ik ~ i s`. ~~ ~k s 11F 4 IF ~_~ r + _~ x~5` 4~~~ 1P p l1 } '~14f n~ ~ 1 .~~~- 4 ~~ 1~1 b^ , I ~~ ~ ~ ~ ~~ ~ 1, '~ ~, ~, , ~, ~ ~, ~ ` ~ i ,1 i_ , e ~.1 ? ~ t~ n ~r it r" ~, ~ ~ ~ r ,/ ~ ~ r ~ r ~{ $1 ~~ _~-~ n~ ~~-~~n~ ~u u •. _~,. ~~.._ ~~ ~~ _: "~~ ~ ' '. r ~~ ~ a -~ ~,~ ~n ~' o ~~ W ~ n.~ ~~ W, ~~ W ~., F Z ~~ ~ ~TM ~„~ 4 R1 I ~ I L n~n 1~-- Jv V ,1~,1 Fl- `1~ ~ 41 W ~ ryM ~m ~ cr, rv~ u ~ *o r; ~ € Q ...1 11- duns y ~~ g~ ~„ „~ d° ~ ~: ~ ~~ 4~ 1-~ ~ ~ I~ ~4~N ~~~ 3~ ~_ _~ 1~``'' ,~W ~~ ~ ~s .~, m ~ ~tt 1 n N 'J1 1 Il~~ 11-N Q~. F- ` z and I ~~ Q ..~ ~ ~y ~~ ~_~ _ ~- -. - - a • ~ fY ~~~ ~ ~ __ ~_~ ~ I ar ~ r ~ ~_ ~~ Q" 1iF- u- >~ fl e~1,, ~ W ©s+ u~ '~, uu Y~ _ .L3L I] ~. x i~ `1 ,~ '~9" rw,~ s '~y ir;. ~7.t"~;~:. ~.•i t. ' ~ M•, 6 is t d., Z i ~~~+~ p ' r t j 1 ! ' ~ 1 '' ~~ ~~ 1 i _ i ~ t t4 V M1 . ~ ~' 1 ~; . 4 I j ~ ~ ~ ' Y', ~ f f 2 ` ~ ~ _ i ~~ ~. . ,f ~~ ~ ~'.+ ~ „1'. ~ * i ~, , ~~ r., ~ ~'~ ` ~ ~ ~ : ~ t `' 't. t .,. ~ i ~ ~ d~ r ~ y4 4.. ''4, ti ~ ~ ~~ `1^ wV/ F ~~` ~~ ~j~~ 0 ~:5~~~ ~~~~8 as 11 ~ ~~``~ ~~ ~~~ • MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: February 9, 2004 SUBJECT: Review of Town of Vail adopted documents and outline of Comprehensive Plan for beginning the process of updating, combining, and revising necessary elements of the Vail Comprehensive Plan. Applicant: Tawn of Vail Planner: George Ruttier I. SUMMARY The purpose of this memorandum is to 1) provide the Planning and Environmental Commission with a summary of the Town of Veil's various adapted planning documents; 2) propose an outline of the table of contents of the Vail Comprehensive Plan; 3) propose a problem statement which articulates the need for updating, combining and. revising the necessary elements of the Vail Comprehensive Plan; and to 4) provide a list of action steps necessary to accomplish the intended task.. II. DESCRIPTION OF THE REQUEST Staff is requesting that the Planning and Environmental Commission evaluates the proposed outline of the table of contents of the Vail Comprehensive Plan, the proposed problem statement and the preliminary list of action steps necessary to accomplish the intended task. The desired result of this effort is to dedicate resources to the task of revising, combining and updating the various planning documents adopted by the Town of Vail. Following a joint meeting with the Vail Town Council, the Town Council and the Planning and Environmental Commission have identified a need to update, revise, andlor combine the twelve elements of the Vail Comprehensive Plan. In order to more clearly articulate this need, the following problem statement is proposed: "The citizens of the Town of Vail recognize the importance of creating a vision f©r the cor~tir~ued future success of the community. 7o thrs end, the citizens of Vail have documented their vision and stated their goals and desires for the future of the community in multiple long-range planning documents. The plans are to 6e used as policy guidelines and as a genera! framework when making decisions affecting land use, transportation, recreation, new development and redevelopment, open space and the environment, culture, and urban design in the Tawn. These long-range plans comprise the Vail Comprehensive Plan. The Vail Comprehensive Plan is fragmented into twelve individual elements. ,~s such, ifs use as asingle-source, comprehensive planning document is hindered. Due to the current format of the Vail Comprehensive Plan, various conflicting goals, policies, and objectives exist between the individual elements. An all-inclusive, single-source document would be more beneficial and useful In spite of the stated intent, many of the Town's planning documents have not been reviewed on a regular basis. Updates and revisions that have occurred to the plans have after been in reaction to a specific situafion rather than a proactive effort to be responsive to the vision of the community. It is imperative that the stated goats and desires of the citizens of Vail are currenf and accurately reflecfed as Vail continues to grow. If would be share sighted to ignore fhe importance of fhe Vail Comprehensive Plan, fo allow conflicts in the plans fo exist, or fo permit the Vail Comprehensive Plan to become outdated. An opportunity exists fo begin to address fhe comprehensive planning needs of Vail and thereby ensuring the continued future success of Vail. III. SUMMARY OF THE VARIOUS PLANNING DOCUMENTS The outline below combines all of the currently adopted planning documents within the Town of Vail. The proposed outline is just one of the options that may be pursued at the time of the Comprehensive Plan update. Please note that Title 72: Zoning Regulations and the Development Standards Handbook have been omitted from the outline of the Vail Comprehensive Plan. Though their updates are equally important, the scope of those documents is separate from that of the Vail Comprehensive Plan. A. Vail Comprehensive Plan The outline incorporates every adopted planning document that exists within the Town of Vail and was organized according to each document's importance and relevance according to the following criteria: ^ Ease of the revisionlupdate: in-house or outsource ^ Importance of the Plan to Vail's future ^ Impact of the Plan on current development ^ Frequency of use 1. Vail Village Master Plan The update should address several issues that are currently not included in the Plan: a} Means of maintaining a high level of quality development and redevelopment within Vail Village; b} The necessity for Special Development Districts: i.e., the Plan should be current enough to address today's issues appropriately without causing every project to require exceptions from the regulations; c} Unique strategies intended to improve the retail environment;. d} Inclusion of loading and delivery facilities as necessitated by current redevelopment projects. 2 Il. Vail Village Urban Design Guidelines (may also be included in Chapter 1: Vail Village Masfer Plan} -the Guidelines detail ideas about the function and aesthetics of Vail Village and are closely related to the previous chapter. Ill. Sfreefscape Masfer Plan -due to its emphasis on the design and quality of the pedestrian environment, this Plan is also intertwined with and may be combined with Chapter I. 1V_ Transportation Master Plan -this Plan is intricately connected with and may be incorporated into either Chapter I, Vail Village Master Plan, or Ghapter V, Land Use Plan. V. Land Use Plan The update of the 'Land Use plan needs to recognize new and evolving community priorities such as affordable housing, recreational uses, environmental concerns, community facilities, and other related land use issues. Vl. Comprehensive Open Lands Plan -The emphasis on land use, including recreation, the environment, public facilities, housing, and open space designates the update of Comprehensive Open Lands Plan as one of the most important. The Comprehensive Open Lands Plan may be combined with Chapter V, Land Use Plan. VII. Environmental Strategic Plan -Because the environment and related issues are constantly in flux, the Plan should be Updated to reflect the community's goals, current problems, and their short-term and long-term solutions. Its attention to land use issues also necessitates its incorporation into Chapter V, Land Use Pfau. Vlll. Ford ParklDonovan Park Master Plan This plan will need to be edited only in the event that future decisions are made by the Town Council to allow seasonal parking as a conditional use at Ford Park. IX. Ford Park Management Plan The combination of this plan with the o#hers is more important than the update of this plan at this point in time. X Lionshead Redevelopment Masfer Plan The combination of this plan with the others is more important than the update of this plan at this point in time. ?CI. Municipal Cemetery Masfer Plan The combination of this plan with the others is more important than the update of this plan at this point in time. ~Clf_ Rrt In Public Places Strategic Plan The combination of this plan with the others is more important than the update of this plan at this point in time. 3 A mare complete summary of each of the planning documents is outlined in the memorandum to the Planning and Environmental Commission, dated June 23, 2003, and attached for reference (attachment A). IV. OUTLINE OF THE TABLE OF CONTENTS OF THE VAIL COMPREHENSIVE _. ... PLAN The purpose of this section of the staff memorandum is to present a proposed outline for the table of contents of the Vail Comprehensive Plan. The table of contents is a list of key elements that should be included in a comprehensive plan. While it is likely that the final adopted version of the table of contents of the plan will differ from that proposed, staff recommends that the fallowing basic outline of the table of contents be pursued in the formulation of the Vail Comprehensive Plan: Tabfe of Contents I. INTRODUCTION: A. Purpose of the Plan - • uThe Plan is intended to be used as a guide for future Land use and development decisions affecting the Town of Vaif. The Plan provides guidance and direction on a variety of community issues such as - Land Use, Transportation, Utilities and Facilities, Housing Bleeds, Economic 5ustainability, Recreational and Cultural Bleeds, and the Environment. Given the physical conditions constraining the future physical growth and expansion of Vail, future development within the Town wit! primarily be infil! development and the redevelopment of existing property. That said, the focus of this Plan is to proactively seek the desired outcomes of the community citizenry rather than to react to the wishes of developers and speculators. This is a plan for the continued success of Vail." B. Plan Development Process - C. Role of Public Participation - D. Life of the Plan - BACKGROUND: A. Description of Community Character - B. Survey of Environmental Conditions - C. inventory of Community Facilities and Land Use Patterns - D. Analysis of Soria-Economic Conditions and Trends - E. Summary of Existing and Projected PopulationlDemographicTrmds - F. Overview of Regional Influences and Impacts - Ill. KEY ELEMENTS OF THE FLAN A. Vision for Vail's Future B. Community Character and Design Quality C. Preferred Land Use Patterns ~D. Transportation E. Community Facilities and Infrastructure F. Environmental Resources 4 G. Economic SustainabiGty H. Parks and Recreation I. Housing Needs J. Arts, Education, and Culture L Implementation IV. SUB-AREA PLANS A. Outline of site specific plans and special study areas V. STATEMENT OF PLAN GOALS, OBJECTIVES, 8~ POLICIES: A. Identification of the Communities Goals, Objectives and Policies VI. IMPLEMENTATION: A. Plan Adoption Process 13. Using the Plan C. Action Steps D. Plan Updates E. Amending the Plan V. LIST ©F ACTION STEPS The purpose of this section of the staff memorandum to provide the Planning and Environmental Commission with a list of action steps necessary to achieve the goal of creating a "single source" comprehensive p@an for the Town of Vail. Also included with the proposed list of action steps is an anticipated timeframe for completion. Staff has identified the following list of action steps needed to achieve this goal: Phase I -- ldentitilcation and agreement on those planning documents that comprise the Vail Comprehensive Plan; (completed March 1, 2004) 2. Transformation of planning documents into digital format; (completed December 31, 2004) 3. Compilation of `°Vail's Comoreherrsrve Plan" into a single source reference document; {completed March 1, 2005) Phase 11 - 4. Creation of Action Plan to review, update, and/or amend the Plan Elements to include identifying plan conflicts and redundancies, work plans, schedules, roles and responsibilities, community involvement, staffing needs, and funding sources; and (completed June 1, 2005} 5. Implementation of the Action Plan. {ongoing) • 5 ATTACHMENT A MEM©6~ANI3UM Tf): Planning and Environmental Commission FRC3M: Planning Staff DATE; June 23, 2003 SUBJECT: Examination of Town of Vail Adopted Documents in order to develop a prioritized list for beginning the process of revising elements of the Vail Comprehensive Plan.. This memorandum is being provided as a resource to examine the adopted plans included in the Town of Vail Comprehensive Plan. The purpose of the Planning and Environmental Commission reviewing this list is to develop a prioritized list for updating and revising Town of Vail documents which are approaching the end of their lifespan or past their intended lifespan when adopted. It is the expressed goal of the Planning and Environmental Commission to determine which documents are in greatest need of an update and prioritize them for presentation to Town Council so that funding, staff, and other resources can begin to be dedicated to updating and revising documents included in the Vail Comprehensive Plan. • Ford Park/Donovan Park Master Plan Adopted August 6, 1985 Summary: This plan describes the environment of the sites and their history, the master plans for their development, and guidelines for implementation. It outlines the transformation of two open space parcels into Town Parks which will maintain the quality of life for residents and visitors. Lifespan: lone identified • Land Use Plan Adopted November 18, 1986 Summary: The Vail Land Use Plan is intended to serve as a basis from which future land use decisions may be made within the Town of Vail. The goals, as articulated within the Land Use Plan, are meant to be used as adopted policy guidelines in the review process for new development proposals. In conjunction with these goals, land use categories are defined to indicate general types of land uses which are then used to develop the Vail Land iJse Map. The plan also includes a section on community facilities on public lands. Given new community priorities this section needs to be updated to recognize the focus on recreation needs_ The Land Use Plan is not intended to be regulatory in nature, hut. is intended to provide a general framework to guide decision making. • 6 Lifespan: 15 years (2001) {Review and updates to be performed an a 3 to 5 year time table) * Vail Village Master Plan Adopted January 16, 1990 Summary: The Vail Village Master Plan is based on the premise that the Village can be planned and designed as a whale. It is intended to guide the Town in developing land use laws and poIieies for coordinating development by the public and private sectors in Vail Village and in implementing community goals for public improvements. It is intended to result in ordinances and policies that will preserve and improve the unified and attractive appearance of Vail Village. The Master Plan provides a clearly stated set of finals and objectives autlining how the Village will grow in the future. Lifespan: Review plan not less than every 3 years, or as deemed necessary and recammend changes to the Planning anal Environmental Commission. This is a part of the Vail Comprehensive Plan which was to serve for 15 years. {2005} • Streetscape Master Plan Adopted I~lovember 20, 1991 Summary: The Streetscape Master Plan was created to give the pedestrian environment the same comprehensive design and quality of materials that the Town's architectural standards have achieved. The Town was divided into several study areas and far each an inventory was performed and conceptual designs were developed. Site specific details for key areas were also developed,. along with guidelines far material selectian and cost estimates. Lifespan: None identified. States that improvements will need to be implemented aver a period of years. A draft revised streetscape plan has been prepared and is under review by the streetscape task farce, PEC, and Town Council. • Transportation Master Plan Adopted January 1993 Summary: The Transportation Master Plan was written to provide guidance in. developing a coordinated approach to implementing transportation improvements. Tt was to assist in resolving, monitoring, and accommodating growth while preserving those characteristics which have made Vail a leader in transportation planning. Lifespan: 20 years (2013) • The Vai] Village Urban Design Guidelines (Vail Village Design Considerations} Adopted Originally June 11, 1980; Revised January 1 ~, 1993 Summary: The Vail Village Urban Design Guidelines are a plan which represents a collection of ideas about the function and aesthetics of Vail Village. Through diagrams 7 the plans suggests. the intended nature of future improvements so that they work in harmony with the existing character. The plan places the Village into several sub-areas in order to identify problems, successes and develop concepts for implementation. Lifespan: Done identified • Municipal Cemetery Master Plan Adopted 1]ecember 7, 1993 Summary: The Municipal Cemetery Plan was to provide a management and development master plan for a Town cemetery to be located on the upper bench of Donavan Park. The plan explored operation, funding, maintenance, layout, and various ways of memorializing the departed. Lifespan: None identified (This phase was written to satisfy the expected need far burial spaces in the first i 0-15 year period) (2003-200$) • Comprehensive Open Lands Flan 1994 Adopted 1994 Summary: The purpose of the plan was to identify and develap strategies for acquiring or protecting key remaining open lands in Vail that would be valuable for recreation, protecting sensitive environmental resources, extending or connecting trails, providing adequate neighborhood open space, and creating a small amount of contingency land for unseen needs. The plan established an inventory of current open spaces and identified potential acquisitions within the Town. The plan also laid out methods for funding and purchase. Lifespan: The plan detailed a six year implementation plan and strategy (2000) • Environmental Strategic Plan Adopted 1994 Summary: This plan was developed to establish along-term environmental protection workplan. The plan recognized that a major reason Vail has become an internationally renowned resort is due to the area's pristine natural resources. This plan developed a vision far Vail with goals and actions which should be utilized to achieve success. The plan looked at the current state of the environment, trends that may affect Vail, sustainable land use regulation and development, and ecosystem protection.. Lifespan: 4 years (1998) Ford Park Management Plan (An Amendment to the Ford Park/Donovan Park Master Plan 1985) Adopted April 14, 1997 • 8 Summary: The Ford Park Management Plan is to serve as an amendment to the 1985 Master Plan. A great deal of development had occurred since the initial adoption of the Fard Park Master Plan and in an effort to better focus and refine the concepts and goals this amendment was undertaken. It was written to guide the continued success of the park in bath development and operation by establishing six primary goals. Lifespan: None identified • Lionshead Redevelopment Master Plan Adopted December 15, 1'998 Summary; The Lionshead Redevelopment Master Plan was created as it was identified that the buildings in the Lionshead were aging and functionally underutilized. It was also identified that the Lionshead area lacked charm, character, appeal, vibrancy, and consistently underperformed economically. The plan offers some redevelopment incentives to encourage and facilitate investment in improvements to existing buildings anti new construction. Lifespan: 15 to 20 years X2013 to 2018) • Development Standards Handbook Adapted September 21, 1999 • Summary: The Development Standards Handbook was created to be a supplement. to the Town Zoning Code. It provides a more user friendly format and many diagrams which do not occur within the Town Code. The Development Standards apply to new development, as well as remodels and additions, unless specifically exempted. Lifespan: None identified. Will. be changed as updates are needed due to changes in the Town Code. • Art In Public Places Strategic Plan Adopted November 6, 2001 Surnmary; The Art in Public Places Strategic Plan was created to implement site- integrated public art on public and private lands. It includes information on opportunities for public art within the Town, funding mechanisms, and implementation strategies. Lifespan: None identified. Amendments will be proposed by AIPP Board for Town Council adoption. 9 PLANNING AND ENVIRONMENTAL GOMMISSION PUBLIC MEETING Monday, January 26, 2004 PROJECT ORIENTATION - Community Derrelopment Dept. PUBLIC WELCOME 12:00 pm MEMBERS PRESENT John Schofield Erickson Shirley Chas Bernhardt Gary Hartmann Rollie i{jesbo (departed at 4:30 pm) Doug Cahill George Lamb Site Visits : MEMBERS ABSENT 1. West Vail Lodge- 2211 North Frontage Road 2. Gannett Residence - 796 Forest Road Driver: George NOTE: If the PEC hearing extends until 6:00 p,m., the board may break for dinner from 6:00 - 6:30 Public Hearing - T©wn Council Ghambers 2:00 pm 7. A request for a final review of a proposed amendment to the Town of Vail Official Zoning Map to change the zoning of the West Vail Lodge Properties from Commercial Core 3 (CC3} to High De Multiple Family (HDMF~, Located at 2278, 2288, 2298 Chamonix Lane and 2211 North Frontage Lots 1, 2, 3, and Tract C Vail Das Schone Filing 1 and Inn at West Vail Lot 1, Block A, Vail Das Schone Filing 3, in accordance with Section 12-3-7, Vail Town Code, and setting forth details in r thereto. Applicant: Vanquish Vail, LLC, represented by Allison Ochs Planner. Matt Gannett TABLED TO FEBRUARY g, 2004 MOTION: Doug Cahill SECOND: Ge©rge Lamb VOTE: T-0 nsity Roadl egard Matt Gannett made a presentation per the staff memorandum. Staff was recommending denial of the applicant's request pursuant to the criteria outlined in the staff memorandum. The applicant made a presentation to the Commission. There was no public comment on the application. Upon discussion of the application, the Commission encouraged the applicant to explore other options and be more creative in the approach to redevelopment. The Commission expressed an Lnterest in helping the applicant facilitate a resolution provided fhe goals of the Community could be addressed. The Commission expressed little support for a rezoning and suggested the applicant consider the options provided by a special development district. ~~~ ~~~ Ta44'N OF PAIL 2. A request for a recommendation to the Vail Town Council far proposed updates to elements of the Town of Vail Comprehensive Plan, and setting forth details in regard thereto. Applicant: Town of Vail Planner: Elisabeth EckellGeorge Ruttier MOTION: Chas Bernhardt SECOND: Doug Cahill VOTE: 7-0 George Ruttier made a presentation per the staff memorandum. Staff was recommending that the Commission forwards a recommendation of approval to the Vail Town Council There was no public comment on the proposed recommendation. The Commission suggested that a "problem statement" be created as a preamble to the comprehensive plan proposal. Clearly, the purpose of the proposal is to respond to changing times and to bring our plans into the 215' century. It was further recommended that dates be added to the proposed timeline. The Commission urged the Town Council to adequately fund this effort as it is crucial to the future continued success of Vail. 3. A request for a recommendation to the Vail Town Council of a major amendment to Special Development District No. 36, Four Seasons Resort, pursuant to Section 12-9A-10, Vail Town Code, to allow for amixed-use hotel; a request for a final review of a conditional use permit, pursuant to Section 12-7A-3, Vail Town Cade, to allow for Type III Employee Housing Units and a fractional fee club; and a request for a recommendation to the Vail Town Council of a proposed rezoning of Lots 9A & 9C, Vail Village 2nd Filing from Public Accommodation SPA) zone district to High Density Multiple Family (HI~M>=) zone district, located at 28 S. Frontage Rc1. and 13 Vail RoadlLots 9A& 9C, Vail Village 2nd Filing, and setting forth details in regard thereto. Applicant: Nicollet Island Development Company Inc. Planner_ George Ruttier MOTION: Chas Bernhardt SECOND: Doug Cahill VOTE: 7r0 TABLED TO FEBRUARY 9, 2004 4. A request for a recommendation to the Vail Town Council for proposed text amendmen#s to Section 12-3-8, Hearings, Vail Town Code, to amend the notice requirements for Town of Vail Design Review Board public hearings, and setting forth details in regard thereto. Applicant: Town of Vail Planner: Russell Forrest MOTION: Ghas Bernhardt SECOND,. Doug Cahill VOTE: 7-0 TABLED TO FEBRUARY 9, 2004 5. A request for a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses; Generally (on all levels of a building or outside a building), Vail Town Code, and a request for a major exterior alteration, pursuant to Section 12-7H-7, Exterior Alterations or Modifications, Vail Town Code, to allow for the construc#ion of new single-family and two-family residential dwelling units, {orated at 730, 724, and 714 West Lionshead CirclelTracts A, B, C, & D, Morcus Subdivision and Lot 7, Marriott Subdivision, and setting forth details in regard thereto. (West Day Lot) Applicant: Vail Resorts Development Company, represented by Braun Associates, Inc. Planner; Warren Campbell MOTION: Chas Bernhardt SECOND: Doug Gahill VOTE: 7-0 TABLET] TO FEBRUARY 9, 2004 Z • 6. A request far final review of a conditional use permit, pursuant to Chapter 16-12, Vail Town Cade, to allow far changes to the previously approved conditions of approvaV for a seasonal use or structure ~i.e. seasonal ice rink), located at 1778 Vail Valley Drivelan unplatted tract of land within 5ectian 9; Township 5 South, Range 80 West of the Sixth Prime Meridian generally located directly Werth of Lat 3, Sunburs# 3~d Filing within the Vail Golf Course, more specificalVy described as follows: That part of Section 9, Township 5 South, Range S0 West of the 6t~ Principal Meridian, Town of Vail, Eagle County, Colorado, described as follows: Beginning at the most northerly comer of Lo# 3, Sunburst Filing No. 3, according to the final plat for Sunburst 1riling No. 3, recorded in Book 263 at Page 429, in the office of the Eagle County, Colorado, Clerk and Recorder, said point also being on the northerly right-of-way Vine of Sunburst Drive, as shown on said final plat; thence the folVowing two courses along said northerly right-of-way line: (1) 119,32 feet along the arc of a curve to the left, having a radius of 135,00 fee#, a central angle of 50°38'21" and a chord that bears N72°59'22"W, 115.47 feet; (2) S81°41'30"W, 187.43; thence, departing said northerly right-af-way line, N08°18'30"W, 266.90 feet; thence N79°28'56"E, 939.41 feet;. thence S11°28'38"E, 91.78 feet; thence S40°01'19"W, 490.77 feet; thence 577°00'32"W, 165.16 feet to the northerly line of said Lot 3; thence, along said northerly line of Lot 3, 148.02 feet along the arc of a curve to the left, having a radius of 189.10 feet, a central angle of 44°50'53" and a chord that bears N65°08'56"W, 144.27 feet to the point of beginning, containing 6.47 acres, more or less, and setting Earth details in regard thereto. • Applicant: Town of Vail Planner: Bill Gibson 'MOTION: Rollie Kjesbo CONDITION: SEC©ND: Chas Bernhardt VOTE: 7-t? 1. Condition number 8 of the October 14, 2Q02, conditional use permit approval as follows (deletions are shown in ~.rrl r~trr. v~~l;ladditions are shown bold): 8. This condifional use permit shall be valid from October 1st to ~~ May 95 annually. No construcfion andfor installation of the seasonal ice rink, including any related equipment (including the zamboni shed) or structure, shall commence on the site earlier than October 1st annually. Operafian of fhe seasonal ice rink steal! end no !afar Phan April 1 annually, a~ The seasonal ice rink, including all related equipment (including fhe zamboni shed) and sfrucfures, shah be removed from the site by no later Phan Aprils-st May 95 annually. The storage of materials or equipment (including the zamboni) related fo the seasonal ice rink shall not be permitted on the site later than April 1st and earlier than October 1st annually. • BVII Gibson made a presentation per the staff memorandum. Staff was recommending approval of the request. The applVcant reiterated the reasons for the request. There was na public comment. The Commission expressed the importance of establishing realistic expectations for the remove[ date of the lee bubble and agreed with the applicant's requested date change to the previously approved, condition of approval. 9 7. A request for final review of a variance from Section 12-6D-5, Setbacks, Vail Town Code, to allow for an addition in the setback, located at 7961sorest RoadlLot 13, 131ock 1, Vail Village 6~h Filing, and setting forth details in regard thereto. Applicant: Doug and Kathy Gannett, represented by Steven Riden Planner: Sil! Gibson MOTION: George Lamb SECOND: Chas Bernhardt VOTE: 7-0 CONDITIONS: The applicant shall revise the proposal to reduce the size of the addition to the proposed livingfdining room within the setback by 20% or four feet in height. 2. The applicant shall revise the proposal such that all new decks ar patio conform with the required setback requirements, except when replacing existing decks in the same location and coni:Iguration as the existing non-conforming encroachments. Qill Gibson made a presentation per the staff memorandum. Staff was recommending approval with modifications of the application. The applicant presented the proposed request for the Gomrnission's considera#ion. There was no public comment. The Commissioners each stated their concerns about increasing the non-conformity of the structure, but agreed with the findings in the staff memorandum and approved the request with the two conditions outlined in the staff memorandum. In making a motion to approve the request with modifications, the Commission found that a physical hardship and special circumstances existed on the applicant's property. 8. Approval of January 12, 2004 minutes MOTION: Doug SECOND: George VOTE: 6-0 9, Information Update Town of Vail Transportation plan update • Public Accommodation zone district text amendments • TermslAppoinfinents 10. Adjourn MOTION: Doug Cahill SECOND: George Larnb VOTE: 6-0 The applications and information about the proposals are available far public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Qepartment, 75 South Frontage Road. Please call 479-2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479- 2356, Telephone for the Hearing Impaired, far information. Community Development Department Published, January 23, 2004 in the Vai[ Daily. • 4