Loading...
HomeMy WebLinkAbout2009-0427 PECPLANNING AND ENVIRONMENTAL COMMISSION April 27, 2009 l. 1:OOpm �au�voFV�u � TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT MEMBERS ABSENT Site Visits: 1. Mahoney Residence, 433 Gore Creek Drive 20 minutes A request for a final review of a variance from 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East)/Lot 15, Block 4, Vail Village Filing 1, and setting forth details in regard thereto (PEC090013). Applicant: Mark and Noelle Mahoney, represented by Steven James Riden, Architects Planner: Bill Gibson ACTION: MOTION: SECOND: VOTE: 30 minutes 2. A request for a final review of an amendment to an existing conditional use permit, pursuant to Section 12-16-10, Amendment Procedures, Vail Town Code, and a recommendation to the Vail Town Council of a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12-9A-10, Amendment Procedures, to allow for changes to the fractional fee club unit designations within the Vail Plaza Hotel and Club, located at 16 Vail Road (Vail Plaza Hotel)/ a portion of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC090011 and PEC090012) Applicant: Vail Plaza Development, LLC Planner: Bill Gibson ACTION: MOTION: SECOND: VOTE: 3. A request for a final recommendation to the Vail Town Council for the adoption to the Vail Transportation Master Plan, and setting forth details in regard thereto. Applicant: Town of Vail, represented by Tom Kassmel Planner: Bill Gibson ACTION: MOTION: SECOND: VOTE: 15 minutes of amendments ( PEC090005) 45 minutes 4. A request for a work session to discuss the adoption of the Frontage Road Lighting Master Plan, an element of the Vail Transportation Master Plan, and setting forth details in regard thereto. (PEC090014) Applicant: Town of Vail, represented by Tom Kassmel Planner: Bill Gibson ACTION: MOTION: SECOND: VOTE: Page 1 5 minutes 5. A request for a final review of a variance from 12-6D-6, Setbacks and 12-6D-9, Site Coverage, Vail Town Code, pursuant to Chapter 12-17, Variances, to allow for an addition within the front setback located at 1838 Sierra Trail/Lot 15, Vail Village West Filing 1. (PEC090008) Applicant: John Brennan, represented by LKSM Design, P.C. Planner: Bill Gibson ACTION: Table to May 11, 2009 MOTION: SECOND: VOTE: 6. Approval of April 13, 2009 minutes MOTION: SECOND: VOTE: 7. Information Update The Administrator has determined that public lockers may be installed on the exterior of the Lionshead ski yard public restroom building as a"skier services" use on the first floor in the Lionshead Mixed Use 1 District pursuant to Section 12-7H-3, Permitted and Conditional Uses, First Floor or Street Level, Vail Town Code; located at 600 Lionshead Mall/Lot 2, Lionshead Filing 6, and setting forth details in regard thereto. 8. Adjournment MOTION: SECOND: VOTE: The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479-2138 for additional information. Sign language interpretation is available upon request with 24-hour notification. Please call (970) 479-2356, Telephone for the Hearing Impaired, for information. Community Development Department Published April 24, 2009, in the Vail Daily. Page 2 TO FROM MEMORANDUM Planning and Environmental Commission Community Development Department DATE: April 27, 2009 SUBJECT: A request for a final review of a variance from 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East)/Lot 15, Block 4, Vail Village Filing 1, and setting forth details in regard thereto (PEC090013). Applicant: Mark and Noelle Mahoney, represented by Steve Riden Architect Planner: Bill Gibson SU M MARY The applicants, Mark & Noelle Mahoney, represented by Steve James Riden Architect, are requesting a final review of a variance from 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East)/Lot 15, Block 4, Vail Village Filing 1, and setting forth details in regard thereto. Based upon Staff's review of the criteria outlined in Section VIII of this memorandum and the evidence and testimony presented, the Community Development Department recommends approval, with conditions, of the variance application subject to the findings noted in Section IX of this memorandum. II. DESCRIPTION OF REQUEST The applicants, Mark & Noelle Mahoney, represented by Steve Riden Architect, are requesting a final review of a variance from Section 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East). The applicants are proposing to construct a dormer on the north side of their existing non-conforming dwelling unit at Vail Trails East to match an existing dormer on the south side of the unit. In 2004 the south dormer was approved in error by the Town of Vail, and should have obtained a setback variance for its installation. The proposed dormer does not create additional GRFA (gross residential floor area), but allows for additional light to enter the upper floor of the dwelling unit. The applicants are also proposing to extend the existing non-conforming decks on the east side of the unit adjacent to a Town of Vail owned open space parcel. The existing deck currently encroaches into the setback within three feet of the property boundary. The minimum required setback for an upper level deck in this zone district is 15 feet. The applicants are proposing to expand this non-conforming deck further eastward to the property boundary. � IV V A vicinity map (Attachment A) and the applicants' request (Attachment B) are attached for reference. BACKGROUND The Vail Trails East site was originally subdivided under Eagle County jurisdiction in 1964. The existing building was subsequently constructed under Eagle County jurisdiction in 1965. The subject site was annexed as part of the original Town of Vail August of 1966. Only minor renovations have occurred to the structure since its original construction. In 2004 the existing south dormer was approved in error by the Town of Vail, and should have obtained a setback variance for its installation. A proposal to expand the existing non-conforming deck was also approved in error by the Town of Vail in 2004; however, that expansion was not constructed and the associated building permit has since expired. In 2007, the Planning and Environmental Commission granted a rear setback variance to multiple units at Vail Trails East to allow for the installation of bay windows on the north side of the building. On November 10, 2008, the Planning and Environmental Commission denied the applicants' previous setback variance application to construct an enclosed stair case and deck additions within the setback of the subject property. In denying these previous requests, the Commission found that the proposed encroachments into the side setback would be a grant of special privilege, enforcement of the setback regulation would not result in practical difficulty or unnecessary physical hardship, and enforcement of the setback regulation would not deprive the applicants of privileges enjoyed by the owners. ROLES OF REVIEWING BODIES Order of Review: Generally, variance applications will be reviewed by the Planning and Environmental Commission, and then any accompanying design review application will be reviewed by the Design Review Board. Planninq and Environmental Commission: The Planning and Environmental Commission is responsible for final approval, approval with modifications, or denial of a variance application, in accordance with Chapter 12-16, Conditional Use Permits, Vail Town Code. Town Council: The Town Council has the authority to hear and decide appeals from any decision, determination, or interpretation by the Planning and Environmental Commission and/or Design Review Board. The Town Council may also call up a decision of the Planning and Environmental Commission and/or Design Review Board. APPLICABLE PLANNING DOCUMENTS Staff believes that the following provisions of the Vail Town Code are relevant to the review of this proposal: � TITLE 12: ZONING REGULATIONS Article 12-6H: High Density Multiple-Family District (in part) 12-6H-1: PURPOSE: The high density multiple-family district is intended to provide sites for multiple- family dwellings at densities to a maximum of twenty five (25) dwelling units per acre, together with such public and semipublic facilities and /odges, private recreation facilities and re/ated visitor oriented uses as may appropriately be located in the same zone district. The high density multiple-family district is intended to ensure adequate light, air, open space, and other amenities commensurate with high density apartment, condominium and /odge uses, and to maintain the desirable residentia/ and resort qualities of the zone district by establishing appropriate site deve/opment standards. Certain nonresidential uses are permitted as conditional uses, which re/ate to the nature of Vail as a winter and summer recreation and vacation community and, where permitted, are intended to blend harmoniously with the residential character of the zone district. 12-6H-6: SETBACKS: The minimum front setback shall be twenty feet (20), the minimum side setback shall be twenty feet (20), and the minimum rear setback shall be twenty feet (20). Chapter 12-17: Variances (in part) 12-17-1: Purpose: A. Reasons for Seeking Variance: In order to prevent or to /essen such practical difficulties and unnecessary physical hardships inconsistent with the objectives of this tit/e as would result from strict or literal interpretation and enforcement, variances from certain regulations may be granted. A practica/ difficulty or unnecessary physical hardship may result from the size, shape, or dimensions of a site or the /ocation of existing structures thereon; from topographic or physical conditions on the site or in the immediate vicinity,� or from other physical limitations, street /ocations or conditions in the immediate vicinity. Cost or inconvenience to the applicants of strict or literal compliance with a regulation shall not be a reason for granting a variance. 12-17-6: Criteria and Findings: A. Factors Enumerated: Before acting on a variance application, the planning and environmental commission shall consider the following factors with respect to the requested variance: 1. The re/ationship of the requested variance to other existing or potential uses and structures in the vicinity. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this tit/e without grant of special privilege. � VII. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. 4. Such other factors and criteria as the commission deems applicable to the proposed variance. B. Necessary Findings: The planning and environmental commission shall make the following findings before granting a variance: 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same zone district. 2. That the granting of the variance will not be detrimenta/ to the public hea/th, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict or literal interpretation and enforcement of the specified regulation would result in practica/ difficulty or unnecessary physical hardship inconsistent with the objectives of this tit/e. b. There are exceptiona/ or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone district. c. The strict or literal interpretation and enforcement of the specified regulation would deprive the applicants of privileges enjoyed by the owners of other properties in the same zone district. SITE ANALYSIS Address: Legal Description: Zoning: Land Use Plan Designation Current Land Use: Lot Size: Standard Setbacks (min): North: West Side: East Side: South: Decic: GRFA (max): Site coverage (max.) 433 Gore Creek Drive Lots 7-15, Block 4, Vail Village Filing High Density Multiple Family District Vail Village Master Plan Multiple Family Residential 19,933 sq. ft. (0.4676 acres) Allowed/Required 20 ft. 20 ft. 20 ft. 20 ft. 10 ft/15ft. 250 sq. ft. 10,963 sq. ft. (55%) Existinq 7 ft. 4 ft. 9 ft. 5 ft. 2 ft. N/A 9,266 sq.ft. (46%) SURROUNDING LAND USES AND ZONING North: South East: West: Existinq Use Gore Creek stream tract Residential Residential Residential 4 Proposed no change no change additional bulk/mass no change 0 ft. no changes no change Zoninq District Outdoor Recreation High Density Multiple-Family District High Density Multiple-Family District High Density Multiple-Family District VIII. REVIEW CRITERIA The review criteria for a request of this nature are established by Chapter 12-16, Vail Town Code. 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Staff believes the applicants is proposing to upgrade an existing non-conforming dwelling by constructing a dormer in a manner that is in keeping with the general character and architectural style of the neighborhood and other units within the Vail Trails East building. The Planning and Environmental Commission has previously granted similar setback variances for dormer additions at the nearby Texas Townhomes. However, Staff believes the proposed deck expansion will create unnecessary additional bulk and mass in the east side setback area. On November 10, 2008, the Planning and Environmental Commission denied the applicants' previous setback variance application to construct an enclosed stair case and deck additions within the setback of the subject property. In denying these previous requests, the Commission found that the proposed encroachments into the side setback would be a grant of special privilege, enforcement of the setback regulation would not result in practical difficulty or unnecessary physical hardship, and enforcement of the setback regulation would not deprive the applicants of privileges enjoyed by the owners. 2. The degree to which relief from the strict and literal enforcement of a specified regulation is necessary to achieve uniformity of treatment among sites in the vicinity or to attai this title without a grant of special privilege. interpretation and compatibility and n the objectives of Staff believes the proposed dormer addition is in a manner that is in keeping with the general character and architectural style of the neighborhood, and consistent with the development rights of the other units within the Vail Trails East building. The applicants' existing deck is already non-conforming in regard to the setback requirements. Staff believes proposed deck expansion exceeds the degree of relief from the setback regulations necessary to achieve compatibility and uniformity of treatment. Additionally, since the proposed addition extends beyond the footprint of the existing building and does not further any public policies, so Staff believes this proposal will constitute a grant of special privilege. On November 10, 2008, the Planning and Environmental Commission denied the applicants' previous setback variance application to construct an enclosed stair case and deck additions within the setback of the subject property. In denying these previous requests, the Commission found that the proposed encroachments into the side setback would be a grant of special privilege, enforcement of the setback regulation would not result in practical difficulty or unnecessary physical hardship, and enforcement of the setback regulation would not deprive the applicants of privileges enjoyed by the owners. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. Staff does not believe the proposed dormer will have a significant impact on the public health, safety or welfare, public facilities, or utilities in comparison to existing conditions of the site. However, Staff believes the proposed deck expansion will further reduce the light and air between the already non-conforming Vail Trails East building and the property boundary. On November 10, 2008, the Planning and Environmental Commission denied the applicants' previous setback variance application to construct an enclosed stair case and deck additions within the setback of the subject property. In denying these previous requests, the Commission found that the proposed encroachments into the side setback would be a grant of special privilege, enforcement of the setback regulation would not result in practical difficulty or unnecessary physical hardship, and enforcement of the setback regulation would not deprive the applicants of privileges enjoyed by the owners. 4. Such other factors and criteria as the commission deems applicable to the proposed variance. On November 10, 2008, the Planning and Environmental Commission denied the applicants' previous setback variance application to construct an enclosed stair case and deck additions within the setback of the subject property. In denying these previous requests, the Commission found that the proposed encroachments into the side setback would be a grant of special privilege, enforcement of the setback regulation would not result in practical difficulty or unnecessary physical hardship, and enforcement of the setback regulation would not deprive the applicants of privileges enjoyed by the owners. IV. STAFF RECOMMENDATION The Community Development Department recommends approval, with conditions, of a final review of a variance from Section 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East)/Lot 15, Block 4, Vail Village Filing 1, and setting forth details in regard thereto. This recommendation is based upon the review of the criteria outlined in Section VIII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to approve this variance request with condition(s), the Community Development Department recommends the Commission pass the following motion: "The P/anning and Environmenta/ Commission approves, with conditions, the applicants' request for a variance from Section 12-6H-6, Setbacks, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for an addition within the side setback, located at 433 Gore Creek Drive, Units 15 and 16 (Vail Trails East)/Lot 15, B/ock 4, Vail Village Filing 1, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to approve this variance request with condition(s), the Community Development Department recommends the Commission pass the following conditions: 6 "1. This variance approva/ only applies to the proposed dormer addition, and does not apply to the proposed deck expansion. 2. This approval is contingent upon the applicants obtain Town of Vail design review approva/ for this proposal. " Should the Planning and Environmental Commission choose to approve this variance request with condition(s), the Community Development Department recommends the Commission makes the following findings: "Based upon a review of Section Vlll of the Staff's April 27, 2008, memorandum to the P/anning and Environmenta/ Commission and the evidence and testimony presented, the P/anning and Environmenta/ Commission finds: 1. The granting of this variance will not constitute a granting of special privilege inconsistent with the limitations on other properties classified in the Residential Cluster District. 2. The granting of this variance will not be detrimenta/ to the public hea/th, safety, or we/fare, or materially injurious to properties or improvements in the vicinity. 3. This variance is warranted for the following reasons: a. The strict or literal interpretation and enforcement of the specified regulation would result in practica/ difficulty or unnecessary physical hardship inconsistent with the objectives of this tit/e. b. There are exceptiona/ or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone district. c. The strict or literal interpretation and enforcement of the specified regulation would deprive the applicants of privileges enjoyed by the owners of other properties in the same zone district. " X. ATTACHMENTS A. Vicinity Map B. Applicants' Request 7 Attachment A �!` `� ` � - .� - � �•�, � '� - �. � NQ] � _ �� � � y� � ' �I] _ R: �� 4S — � s�: �`� 3 � �i� _ ,� �; -,�, ,;� ����a�� �o � .-� ~ - " � s ,� �� �. . -�`°° - � # (T � � � � � '. .�• � � k � � . ..��� � ¢tl S •: �y r � m �.� �'� ' � F. � � ��� �. r � F _ �� �.' �yk .--, � �',i r W �•': L r �. - N �� J �'�� ` - _� �, s : � �[a � ` . � �"� �. ,- r. ,- a� M ;'� ❑ � - � � . I s'� � ' � '�':`��. - - � '.�j °� � ;� �.� ^' � r +'� = s� � f�' �' � �, d`�4 '` aF �`�' n� � ` � _ � � � � �F' z ._ '� � _ � �,;,. ' �r : fl� LL ` s � � : � �� , � W � , ��-,� �� .�. � � ��,� F ify {Q �� if} �'���� ,���_ i=— .� �� '� '�'a .� � � �G-�, � �- � � H — - `�.- � � _� . . � m+� i� � � �.. •� �� � � � r �� ,: �-' r �` _��� - •--� � ' - � # � .. - . j � , . 4.{'` � g, , ,, .. , �� � : � � , - �� ❑ � � .�, - .- �,. : �� � , . � 'i.., �i I,CS N ` � : •w`� r •�'"� "- � N � � '�"�� '� �^ � - � � - � +r ��.. { � 4� J ;- .?,� . � �q - �'- • ,if' �, ; � {�^ � .r � � ,r, i �. '. � _ V :��y ' '.Il ` - Ft / ' - � 'r 4'. � _ �y�j �. j. _�/Ty - - . _ .. . . � i� - �•J ° _ 'R� .s� -� 4� . � ,,} � _ _ + � � � � y � �. _ � � �, r L � � '',' ]�`!�d � ��c � - '+ry� ' Li� � � a�'.. r # Y � ., � � � } � " �.� � �. � �� � �� � � � � � � �r , � � .i Y � 1. �°� - � � � � � i... � . _: . . . . , .. i� Attachment B Steven ,James Ri�en A�l-A• Architect P•C• P.�. ���: 3Z� s ��i�, �Q 8 I ii>8-3? i8 97o-3zs-o-� 5s °;'O-jZB-O� I � Fax st�veCari�ic n ( .com 4/7/09 Town o� Vai� P�annin� and �nvironmenta� Commission �/ai�, CQ s 1657 Re: Vai� Trai�s �ast, units I 5/1 6a Dear Commissioners, Mr. an� Mrs. Mai�onec� are see�cin� a variance �rom ti�e strict and Iitera� inter-Pretation o� ti�e setbac�C re�u�ation �or ti�e insta��ation o� a ciormer to ti�e norti� �acing roo� o� (�nit 16a of �/ai� Trai�s �ast. This dormer addition is comPatib�e and identica� to an existing recent�r�. constructed (ZOO9--o5) dormer on the oPPosite souti� �acin� roo�. The existing dormer is identica� in regards to the �ocation �rom the setback as t��e Proposed new dormer. ��is dorTr�er is comPatible w�th an e�evation studc� and exterior renovation Project begun in 2007 whici� inc�udcd a set}�ac�C variancc �or additiona� G}Z�A in the scthac�C c�n thr, narth tlevation anci a��ows each t�F floor unit a dormer oPtion to imProve their r�sPectiv� units. T�is Fro�os�j� ric�cs not inc�uc-ir an� a�riiti�n�il GR�A� /�dditionally a�rcvious�y aPProveci dec�C expansion to a us i6ie wicith +s �ra�c�seci to IIC: C(_)i)ti�.f"IIC.�.tnt3 �C.t �.�C C35�. U� ��ttlf.3 � 5..il'1/� e f'>:.�. ��Iy �['.CK CX���a(151(.)fl W��S ,;3L��.'+f'OVf'.� a ���r cc�nstn,ctic�n .snc� �,c'rmittc.c� �vur.m6cr )_C)C�'f-. � ��r c�cc�C cx��nsion was nc�t ���n,F��ctr_�i c�unnpJ i�ie �<�st �t.��c-` c�( cc>nstr� �ctic�n �rc:�u5e c7� SCasona� timt �c�nstraints ,3nc� a cicsircy noi tc� �iisturh what wai at ti�ai timc a cii���rent owncr o{ unit I(a. � i�r.rr �.�s nc,l �rrn ��n� �,r��inai«-.c c�r ni�r. ��an�� ari�CC�in� t�is a�.�r�,v��. Mr. :�n<�i nl'�rs. M�y�c�ney Furc�asCti ��nit 1�:3 agsumint�T t�:�E i�c�t}� t�.r �,rc��?c�sCC� cir.c� �nrl �n icic„t�� .�I tyt�f'lll�f" �avc �een aFFr�•�r.ci in tht ��st :�nc� as the�-e h:�v� �?ecn no chan�es to the ordinances or ru�es, be�ieved t}�ey cou�d Proceed wit}� desi�n apProva�s an� construction. Ti�e existin� vai� Traiis �ast bui��in� is �ega� non-con�ormin� an� current�y encroaches in the rec�uired set6ac�CS. The ProPosec� dormer and deck would have been comPatib�e with any stn�cture built to existing standards s}�ou�d t}�e setbac6c be at the edge o� existing livab�e sPace. �n other words i� the building itsel� were outside or even adjacent to a rec�uired setbac6c t}�e dormerand deck wou�d comPly W�t�, today's rec�uirements. /�s this is an existin� non-con�ormin� structure, those requirements create a�ardsi�iP �or t}�e aPPlicant and is not a�ranting o� sPeciaj Privi�e�e as that Privi�e�e has i�een �ranted to others within t}�e comP�ex and as we{� as the acijacent ProPerties such as t}�e Texas Town}�omes, Uai� }Zowi�ouses, an� vai� Trai�s. This ProPosa{ also is com�atib�e wit}� the ob�ective o� t�e �/ai� �/i��a�e Master �'1an encouragin� t�e u�erading and recieve�oPment o� residentiai an� commeruaj �aci�ities. T}�is ProPosa� does not }�ave an e%�ect uPon the �iv��t, air, distribution o� PoPu�ation, transPortation, tra�ic�aci�+ties, Pu6iic�aci�ities, utiii�ies, and �ubiic saFety. Than�C You �or your consi�eration in t�is matter be�ore you. �� � �teve� ,�ames }Ziden A�1.A� Arci�itect �.C. .iJ�_II��h� �J 31�11'.�5�� ���It?.�v lrl iiTn�n.� �� � /��\ ��1 l.Iy J y f 1 oar�mo� tinn -�naio y:,i��� aaoo .tir .-��� � i � �_ � �.—�Q�a ^ __� _ .� �_ .LS�'3 S"IM23.L "IIHA '\a91 a\b' St S.LIV!l f � � 1 1 �7 7n7VT�7 �7�..�',�7 I�y ' >e ::� ��.�. � �3LlQY�t`�' (1 A`�' l�lQilvyV , � �!� ir � . � � � ' �341L S3AV[� N3nBlg -;_ .�Eri c r ..s:i � �s � �.���— t � i _ a � — - § �, � � �� ., ° � � �_ ,_. �� � � � ��'-'-J > � a a` � " Y o> � E�,� �����= � o` a $ 6 � o a_ �:nA�' 9 . 7� o - - ` o � � � � �~`�;- p � � ° y rc .... T , ¢ �::.�•-� � ry u k aZ �� � LL �LL LL LL LL � � � ;'��i�j•,'.I�: ..� . � : . � � � �l m � �. :a � �d} �'�"ef? '�r:+ � � � � �u N �yT i��` � � � O � O O � � � �I\l pec. / � � 'Ey,.9' .�\\ � . . r U J� � ul 0> � � � ! u � �7 5 ° m � y . � � � � \ C ` �'tf_. _ P /}S U) ���>L°_`° a O � � n�v rl�R /,,,/ . ��•�e,� .i� t" �e N ��� a : i `� .::. �`/ � ' �.-�-� . % a;:- � � ��k Z �n �'' �q�o .ti R , -•��' � ; _ %' L � a a d/� � �.a% J� , e e .= E Q c+ ` ° 0 1 � � ��� W � n '-�" �� a /� ��..`- y `� f `.:, . l7 c � 't ^ a ° �` + -' � � � � S'a"+ �: i;^�' � "t Q � ` �Z' ° ' � .. � �` a d. y ��fi �5 eC s S°'� � '' � r�;�` b > ,�.� E o° vo n 6F g aui^���C;�n S��� �/ �e� �'%�i9 ;7 W e�c��,..�° ���P��� � ��s ^ /� €`� � .,,�';y't.�� : ��.- Y�o a�,��a��°�-,� 9 ob'� _ .`� �,. . 2; J> >�36�u9�n m�.o��m:.a� � n.�� Se,z /� � '"�° �r; ya ��.. � %' � ���: �:�== . /� � -�-��� �,�-, :���� - ' � ���� .� � 1' � 2 ��-",- ; E '� x��e-� x� ; . . ' % c:'`;'' ,-� e /jl . � � ;i� - j : i �/ �rg � �~� � 'l� % �v � i � / � t � / ���,...; / ,.<`r�'� � � ;�, ,\ � +�r` 6`',.. ..� ' • ,�, /- 1� A ���� i , _ _ �, � "4 � % R^` e �L � , . 4 / ..,�}ct � "� �_�.. .i- '�. ,�,' : �? � /� �` =' • � � � cL. � a % a - .�:�� r.`>\ /� • � \��` `�. �:`¢ • 7 • � , / / �e�f �� .;r.:.' � �a� � - _ ;s`. � a e ' i � � � �� / ..C.1 / , a,s, � /� � x.� ' �Y � e� � :l.i _ � / / fD aFe�.J.�€s� � _ i � �/ 1'!' - F"` €� s E' _ � 's� a � f .: � -� ; � '� �5��' ✓> r � � � � ` �a'r: � • ? � � � (� R � � "�;; �, � F . 1 i. - q`.��'9�� ��N . •; ?,,.:' ' _... . :.'.'/°. � ;0 _ c ,l � Vi - .i _ ' ~��..\ 2:,>>- ei e' a� � ' ' c i'� •-,.��• ` . _ �•�'�. ___'f� ' 2 � e , • � ocrnioZO� �i�an `3ARI4 �133�T� �2lO�J £Ek � � t ' ' �. e0, �o.Y�^ 1Stl3 SII�'211 'IIdA b' 91 Q�IV Sl SLINfI 5s ���(�ii� �'��+}f � h �� �_��`"'" " `�. ' j 'I�QOY�13?3 JL�[�IOHb'L�[ ��:� �;Ri�6 � �' � � � � �13OI�N 53Wt�f��N3A3.15 . . u� af�+fe,.l . @ �; �- 4 ! � f � i � �----- i � � � � � P 4 C a OGSY��+=AB lH3uAt'tt96�1`. OYeW L2M hl �Ili3rtl 1rM �LL TA-�I� � �y,��,�`" u , � � �' �� �j �` f+ V �i � u �� � 3 Fri ' � / m� � � � p_ � .l / F _ g � �— �� � �� �� y � �a / � < � �- -- � � ��a �� o � " � � � � Ra. � , �I " �F �1 ✓ u a � E L c` 1--1 _ °;� �` _- '��' � � s: �� I � Q 8 � �� �� I +� ' � ` .�,^ � � � � „� ° O : S �� ^ I �a � O � i ° ;.. J � � , 4� pa.,� � r_______� _ _ y � ______ __ _____ � ' � iv �rs i a�roya �a o� p � b i �aaois rr, � 2 � � �--------� a �;__ ,, - ---------- ------------------------- - _r____ W V 7_ ..�-c---.-.o..:: -.. ----�'�--"-- –� —@ -----��:..–v:w��'` A-------------A'� � � � 3 � �� a �a � a iF as ^3 a� � � J � � � � , ��..,; � _��._:; :: r��>�{�,. � �--�—"`.�1 - — '' .- -- - �t, � ' � -6� � �_ . � �� �i / ,�.--,w __ � -___--=�_________- • .�r-=1:�� ___ �p ���. � � -' � � o � � � �" , � i , , o , -. � . -- ��-r � � � - -- - ----------------:. .,---------------- � , .----- � �, ..- �� s: � � - _ -�-.-_______ � ��--_�_____-_ __, . I_ � • � � �� 6k !', i --� :� � I i 4 - i 3S � � T:_� �., � ' � �� . �— Y LL � T\ -� '.l.Ultl � :���� , �� � � 0 �_ _____________ ____� ___ ________�� � � � _ , ____ m,i_� - -- _._ �- �- � - -__�1�8 � � � i k�� �� + ,o-. a-,s -t�3t ;, � � .w-, "�� ,s;. ' � � � a 6 gp b O 3 �� x; �� �� z� a� iu �� � � �3 s i � i � ol '1 � �� � ; �1� �� �� o� � :a � a. .a W > � � � �. � Q C/� G O. C. ; Oj a. ,,, . �"�-� '�r tiivl / �nr'�,' °;u�o i<oe '�' �3QIN 53�IVY1 N7/�715 �1 OQtx2t0'10J `"7IF'A `3ARiQ y332iJ 3210'J EE4 1.St�3 S'i]K2LL 'Ttt'A 'ti'9i UNt' si Sl.l�fl '734 O W �2I .L3�IOHb'l�i � � a �_ ��. L ' _ �_ I'JI . ,_I i �—�� �/.fr /G o � � g ° � � � � N ° 3 � ° �a ¢ ¢ z 0 � w ; � � / �} z i =' x / �� F � � x � 9 �� z� � �� � �. sm �I� I � w ------�--, I ; z __ __`,� � o ..t , r �� 'i � E L � � i .-1 . -:..__ _- I ; � � � Fx- I , � • -� i O �; - 'i i Q6 � -- --• I I � � i I o� � ; �z � , w� -- --�� g - , �, : i: I § iil•� ;�; 4 .. 1��E_� : � I ( �� r � } � ' � � =1 :� i n� t ri . .� 5 `; ; , �� � �� � .ay, � 8 � 8 Y 3 c �� �� �; � J 6 "� ;� a '"; r �! a3 L� � 6 a ----, � i i , i i i � i i i i i i i i i � � � _ � `} I �� � � �s ' � � il� � � � � � � � � I � � - --� � � z 0 H C > w .� L E� � O Z C� u. O� c.. ; z� a� z 0 < > u u �- � < U Q w � � �� �. < ow x w3 �m rx =� :� �z .^ C b � � � r m C � r � r a z mX ;� o� �z ,� � � z � h � h ; b r � M ° 9 8� ;,,: ��!z i�ai`:=;' z__' ll-! " i:; � , ;; j - `��� � � � �;4.;1.[� ���, ��i � �—'� ` . MAHONEY REMODEL sTe.�Eh ,rntes RIDEN rasi nrricc.,oL,i',� CN1TS 1� .AND 16A, Vr\CL TRAILS EAST �"'"��� '"� — � a33 G()Rti CREEK DRiVE, VA1L. COIAI2�U�O uEUa�a or ..uuvice� ivsnr�re or •canttr.rs ih �a �� a � � r n < a 0 z �X _. � 9z � z 0 � � r m D -� 0 z �------ i i i i i r--�------� � � � � � � � � � 1 � � � � � � � � � � � � � � � � � � � � � � �--- � � � �:':a;='.; i;=`��;;: -;_- � u S � i� f[ 4 a ' E � � r � 1 .Iiti . t E � °:P F c N ..�� i�� `�`a r ; e M� �a a� � 0 c � � h r m < � � O z T� ; I ' I � ' I � ' I�� :._-- ' 17� �.,' , � � ! _.. : .:-a � �': , , �. � i>.:--,--;. ; � I � � .:---- I �; � \ � , I>� II'•--= -=- I I: � � � ' � 1==- =�= - = � � �--�------ MAHONEY REMODEL � , �� sreve� ,in�t_ES;aioc� a.� UNI?S 15 rV�D 16A, VAIL TR.VLS EAST � "`�' _� 433 GORE CREEK DR1VE, VnIL, COLORADO MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: April 27, 2009 SUBJECT: A request for a final review of an amendment to an existing conditional use permit, pursuant to Section 12-16-10, Amendment Procedures, Vail Town Code, and a recommendation to the Vail Town Council of a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12-9A- 10, Amendment Procedures, to allow for changes to the fractional fee club unit designations within the Vail Plaza Hotel and Club, located at 16 Vail Road (Vail Plaza Hotel)/ a portion of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC090011 and PEC090012) Applicant: Vail Plaza Development, LLC Planner: Bill Gibson I. SUMMARY The applicant, Vail Plaza Development, LLC, is requesting a final review of an amendment to an existing conditional use permit, pursuant to Section 12-16-10, Amendment Procedures, Vail Town Code, and a recommendation to the Vail Town Council of a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12-9A-10, Amendment Procedures, to allow for changes to the fractional fee club unit designations within the Vail Plaza Hotel and Club, located at 16 Vail Road (Vail Plaza Hotel)/ a portion of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. Based upon Staff's review of the criteria outlined in Sections VIII and IX of this memorandum and the evidence and testimony presented, the Staff recommends denial of both requests subject to the findings noted in Section X of this memorandum. II. DESCRIPTION OF THE REQUEST The applicant is proposing to increase the number of dwelling units from one to two, and to decrease the number fractional fee units by one in the Vail Plaza Hotel which is Phase IV of Special Development District No. 6, Vail Village Inn. The applicant is proposing to convert the existing dwelling unit #507 to a fractional fee club unit and convert the existing fractional fee club units #313 and #401 into dwelling units. Fractional fee club unit #313 is a three bedroom unit consisting of 1,801 sq. ft. of gross residential floor area (GRFA) and #401 is a one bedroom unit consisting of 962 sq. ft. of GRFA. The unfinished dwelling unit #507 is currently designed as a three bedroom unit consisting of 5,150 sq. ft. of GRFA. The applicant is proposing to amend the floor plan of this unit to create a total of five bedrooms. A vicinity map (Attachment A) and the applicant's request (Attachment B) have been attached for reference. III. BACKGROUND The Vail Plaza Hotel is located within the Public Accommodation District in which lodges ("buildings designed for occupancy primarily as the temporary lodging place of individua/s or families either in accommodation units or dwelling units...) are allowed as permitted uses and fractional fee club units (an individua/ dwelling unit in a fractiona/ fee club described as such in the project documentation...'� are allowed as conditional uses. While a dwelling unit is "any room or group of rooms in a two-family or multiple-family building with kitchen facilities designed for or used by one family as an independent housekeeping uniY'; a fractional fee club unit must be part of a fraction fee club defined by the Vail Town Code as "a fractiona/ fee project in which each dwelling unit, pursuant to recorded project documentation as approved by the town of Vail, has no fewer than six (6) and no more than twelve (12) owners per unit and whose use is established by a reservation system and is managed on site with a front desk operating twenty four (24) hours a day, seven (7) days a week providing reservation and registration capabilities..." It is clear in the adopting legislation (Ordinance No. 22, Series of 1996) allowing fractional fee club units within the Public Accommodation District, that these units are not intended for full-time occupancy as a dwelling unit when the Town Council found "that a fractiona/ fee club is a form of public accommodation" and "that the quality of fractional fee club unit are an appropriate means of increasing occupancy rates, maintaining and enhancing short-term renta/ availability and diversifying the resort /odging market within the Town of Vail" On February 28, 2000, the Planning and Environmental Commission approved a conditional use permit for a fractional fee club at the Vail Plaza Hotel consisting of 50 fractional fee club units. According to the Staff's memorandum to the Planning and Environmental Commission concerning the fractional fee club: `According to the applicant, the ownership of the club units will be divided into a maximum of 1/12r" interva/s for the 24 winter weeks during the ski season, with the remaining 28 shoulder season and summer weeks would be owned by the hotel. This ownership program allows for the most attractive weeks of the year to be so/d as club units with the proceeds helping to finance the redeve/opment project. The remaining interest in the clubs is then used by the hote/ to support the conference facilities during the summer months. " On August 13, 2001, the Planning and Environmental Commission again approved a conditional use permit for a fractional fee club at the Vail Plaza Hotel consisting of 50 fractional fee club units. According to the Staff Memorandum the Planning and Environmental Commission concerning the fractional fee club: "To further improve the occupancy potentia/ of the fractiona/ fee club, the 50 club units have been designed to include up to two /ock-off spaces per unit. This design creates a tota/ of 108 keys and 216 pillows for the fractiona/ fee club component of the hotel. " Additionally, the Staff Memorandum the Planning and Environmental Commission stated the fractional fee units at the Vail Plaza Hotel: "The applicant is proposing that the club units be so/d on an interval basis. The club units would be so/d for 24 weeks during the winter months with the 2 remaining 28 weeks owned by the hote/ for use as short-term accommodation units. " In both 2000 and 2001, pursuant to Section 12-16-7, Vail Town Code, the Planning and Environmental Commission considered "the ability of the proposed project to create and maintain a high leve/ of occupancy" and that "each of the fractional club units shall be made available for short term rental in a managed program when not in use by the club members". Based upon the statements, representations, and proposals of the applicant; the Commission determined that a conditional use permit was warranted for fractional fee club at the Vail Plaza Hotel. On September 4, 2001, the Vail Town Council adopted Ordinance No. 21, Series of 2001, which amended Special Development District No. 6 to allow for the construction of the Vail Plaza Hotel with one dwelling unit, 99 accommodation units, 18 employee housing units, and 50 fractional fee club units consistent with the August 13, 2001, conditional use permit. As noted above, units #313 and #401 at the Vail Plaza Hotel are currently being illegally occupied as fulltime residential dwelling unit, and not as a fractional fee club unit as required by the approved developed plan. On January 23, 2009, the Town of Vail issued a notice of zoning violation to the Vail Plaza Hotel. On March 13, 2009, the Town of Vail issued the Vail Plaza Hotel a summons to Town of Vail municipal court for this illegal use of the subject fractional fee club units. This matter is tentatively scheduled on the court's May 7, 2009, docket. Unit #507 is currently unfinished and has not yet been issued a final certificate of occupancy. The Town Council has identified need for an accessibility and delivery route connecting the Vail Plaza Hotel and East Meadow Drive has been identified in other recent proposals to amend the Vail Village Inn Special Development District, including the proposed expansion of the Osaki's restaurant and the Colondo Company's proposal to convert retail space to residential. To date, this physical connection has not yet been constructed. IV. APPLICABLE PLANNING DOCUMENTS A. Title 12, Zoning Regulations, Vail Town Code CHAPTER 12-1, TITLE, PURPOSE AND APPLICABILITY (in part) Section 12-1-2: Purpose: A. General: These regulations are enacted for the purpose of promoting the hea/th, safety, mora/s, and general we/fare of the Town, and to promote the coordinated and harmonious deve/opment of the Town in a manner that will conserve and enhance its natura/ environment and its established character as a resort and residential community of high quality. B. Specific: These regulations are intended to achieve the following more specific purposes: 3 1. To provide for adequate light, air, sanitation, drainage, and public facilities. 2. To secure safety from fire, panic, f/ood, ava/anche, accumulation of snow, and other dangerous conditions. 3. To promote safe and efficient pedestrian and vehicular traffic circulation and to lessen congestion in the streets. 4. To promote adequate and appropriately located off-street parking and /oading facilities. 5. To conserve and maintain established community qualities and economic values. 6. To encourage a harmonious, convenient, workable re/ationship among /and uses, consistent with Municipa/ deve/opment objectives. 7. To prevent excessive population densities and overcrowding of the /and with structures. 8. To safeguard and enhance the appearance of the Town. 9. To conserve and protect wildlife, streams, woods, hillsides, and other desirab/e natural features. 10. To assure adequate open space, recreation opportunities, and other amenities and facilities conducive to desired living quarters. 11. To otherwise provide for the growth of an orderly and viable community. CHAPTER 12-2, Definitions (in part) DWELL/NG UN/T: Any room or group of rooms in a two-family or multiple-family building with kitchen facilities designed for or used by one family as an independent housekeeping unit. FRACT/ONAL FEE CLUB UN/T: An individua/ dwelling unit in a fractional fee club described as such in the project documentation and not an accommodation unit within the fractiona/ fee club. No offer of a fractiona/ fee club unit shall be made except pursuant to an application for registration and certification as a subdivision deve/oper of a timeshare program or an exemption from registration approved by the state of Co/orado rea/ estate commission pursuant to Co/orado Revised Statutes 12-61-401 et seq., and the rules and regulations promulgated pursuant thereto. Within ten (10) days after receipt of a written request, the deve/oper of a fractiona/ fee club unit shall provide to the staff of the department of community deve/opment a copy of the application or request for exemption filed with the state of Co/orado rea/ estate commission and/or evidence of approva/ of the application or request for exemption. ARTICLE 12-9A, SPECIAL DEVELOPMENT DISTRICT (in part) 12-9A-1: Purpose and Applicability: A. Purpose: The purpose of the specia/ deve/opment district is to encourage f/exibility and creativity in the deve/opment of /and in order to promote its most appropriate use; to improve the design character and quality of the new deve/opment with the town; to facilitate the adequate and economical provision of streets and utilities; to preserve the natura/ and scenic features of open space areas; and to further the overall goa/s of the community as stated in the Vail comprehensive plan. An approved deve/opment plan for a specia/ deve/opment district, in conjunction with the property's underlying zone district, shall establish the requirements for guiding deve/opment and uses of property included in the specia/ deve/opment district. 0 B. Applicability: Specia/ deve/opment districts do not apply to and are not available in the following zone districts: hillside residential, sing/e-family residential, two-family residentia/ and two-family primary/secondary residential. 12-9A-8: DESIGN CRITERIA AND NECESSARY FINDINGS: A. Criteria: The following design criteria shall be used as the principa/ criteria in evaluating the merits of the proposed specia/ deve/opment district. It shall be the burden of the applicant to demonstrate that submittal materia/ and the proposed deve/opment plan comply with each of the following standards, or demonstrate that one or more of them is not applicable, or that a practica/ solution consistent with the public interest has been achieved: 1. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties re/ative to architectural design, sca/e, bulk, building height, buffer zones, identity, character, visual integrity and orientation. 2. Re/ationship: Uses, activity and density which provide a compatible, efficient and workable re/ationship with surrounding uses and activity. 3. Parking And Loading: Compliance with parking and /oading requirements as outlined in chapter 10 of this tit/e. 4. Comprehensive P/an: Conformity with applicable e/ements of the Vail comprehensive plan, town policies and urban design plans. 5. Natura/ And/Or Geo/ogic Hazard: Identification and mitigation of natura/ and/or geo/ogic hazards that affect the property on which the specia/ deve/opment district is proposed. 6. Design Features: Site plan, building design and /ocation and open space provisions designed to produce a functiona/ deve/opment responsive and sensitive to natura/ features, vegetation and overall aesthetic quality of the community. 7. Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. 8. Landscaping: Functiona/ and aesthetic landscaping and open space in order to optimize and preserve natura/ features, recreation, views and function. 9. Workable P/an: Phasing plan or subdivision plan that will maintain a workable, functiona/ and efficient re/ationship throughout the deve/opment of the special deve/opment district. B. Necessary Findings: Before recommending and/or granting an approva/ of an application for a specia/ deve/opment district, the planning and environmental commission and the town council shall make the following findings with respect to the proposed SDD: 1. That the SDD complies with the standards listed in subsection A of this section, unless the applicant can demonstrate that one or more of the standards is not applicable, or that a practica/ solution consistent with the public interest has been achieved. 2. That the SDD is consistent with the adopted goa/s, objectives and policies outlined in the Vail comprehensive plan and compatible with the deve/opment objectives of the town; and 3. That the SDD is compatible with and suitab/e to adjacent uses and appropriate for the surrounding areas; and 5 4. That the SDD promotes the hea/th, safety, mora/s, and general we/fare of the town and promotes the coordinated and harmonious deve/opment of the town in a manner that conserves and enhances its natura/ environment and its established character as a resort and residential community of the highest quality. 12-9A-10: AMENDMENT PROCEDURES: B. Major Amendments: 1. Requests for major amendments to an approved specia/ deve/opment district shall be reviewed in accordance with the procedures described in section 12-9A- 4 of this article. 2. Owners of all property requesting the amendment, or their agents or authorized representatives, shall sign the application. Notification of the proposed amendment shall be made to owners of all property adjacent to the property requesting the proposed amendment, owners of all property adjacent to the specia/ deve/opment district, and owners of all property within the special deve/opment district that may be affected by the proposed amendment (as determined by the department of community deve/opment). Notification procedures shall be as outlined in subsection 12-3-6C of this tit/e. CHAPTER 12-16: CONDITIONAL USES PERMITS (in part) Section 12-16-1: Purpose; Limitations: In order to provide the f/exibility necessary to achieve the objectives of this tit/e, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusua/ or specia/ characteristics, conditional uses require review so that they may be /ocated properly with respect to the purposes of this tit/e and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious deve/opment between conditional uses and surrounding properties in the Town at /arge. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the Town may prescribe to insure that the /ocation and operation of the conditional uses will be in accordance with the deve/opment objectives of the Town and will not be detrimenta/ to other uses or properties. Where conditions cannot be devised, to achieve these objectives, applications for conditional use permits shall be denied. 12-16-6: CR/TER/A; F/ND/NGS: A. Factors Enumerated: Before acting on a conditional use permit application, the planning and environmental commission shall consider the following factors with respect to the proposed use: 1. Re/ationship and impact of the use on deve/opment objectives of the town. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schoo/s, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic f/ow and control, access, maneuverability, and remova/ of snow from the streets and parking areas. 0 V 1�l! 1�I1� 4. Effect upon the character of the area in which the proposed use is to be located, including the sca/e and bulk of the proposed use in re/ation to surrounding uses. 5. Such other factors and criteria as the commission deems applicable to the proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by chapter 12 of this tit/e. B. Necessary Findings: The planning and environmenta/ commission shall make the following findings before granting a conditional use permit: 1. That the proposed /ocation of the use is in accordance with the purposes of this tit/e and the purposes of the zone district in which the site is /ocated. 2. That the proposed /ocation of the use and the conditions under which it would be operated or maintained will not be detrimenta/ to the public hea/th, safety, or we/fare, or materially injurious to properties or improvements in the vicinity. 3. That the proposed use will comply with each of the applicable provisions of this tit/e. SURROUNDING LAND USES AND ZONING Land Uses Zoninq North: I-70 right-of-way Not Zoned South: Mixed Use Public Accommodation East: Mixed Use SDD #39 (Solaris) West: Multiple Family Public Accommodation and SDD #21 (Gateway) ZONING ANALYSIS Standard Approved Proposed Dwellings 1 unit 2 units (3 bedrooms/5,150 sq.ft.) (1 bedroom/962 sq.ft & 3 bedrooms/1,801 sq,ft,) Fractional Fee 50 units 49 units (eliminate 1 bedroom/962 sq.ft & 3 bedrooms/1,801 sfl (add 5 bedrooms/5,150 sq.ft.) Parking 0.7 per FFU = 1.4 spaces no change (FFU = 0.7 new requirement) 1.4 per DU = 1.4 spaces no change (DUs = 2.8 new requirement) total = 2.8 spaces no change (total = 3.5 new requirement) CONDITIONAL USE PERMIT REVIEW CRITERIA Before acting on a conditional use permit application, the Planning and Environmental Commission shall consider the following factors with respect to the proposed use: 1. Relationship and impact of the use on the development objectives of the Town. The Vail Comprehensive Plan and Zoning Regulations encourage the creation of "hot beds" (accommodation units) and "warm beds" (fractional fee club units) within the commercial cores and the Public Accommodation District which is the underlying zoning for the Vail Plaza Hotel. These "warm bed" units have historically had higher occupancy rates than dwelling units; and therefore, bring more guests to Vail. Greater numbers of 7 1TL111 guests have a positive impact on creating vibrancy and economic viability of the commercial cores than dwelling units. The warm beds are also highly beneficial to the existing retail and restaurant uses in the other phases of the Vail Village Inn Special Development District. Staff does not believe exchanging two completed fractional fee club units for one unfinished dwelling unit is consistent with the Town's development objectives or the intent and purpose of the overall Vail Village Inn development. 2. The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities needs. There are no changes proposed to the exterior of the existing building; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. 3. Effect upon traffic with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking areas. There are no changes proposed to the existing parking. However, there is net parking requirement increase of 0.7 parking spaces when two fractional fee club units (parking rate of 0.7 per unit) are exchanged for one dwelling unit (parking rate of 1.4 spaces per unit). Therefore, Staff believes this proposal will have a negative affect on this criterion. Should the Planning and Environmental Commission choose to approve this request, Staff believes the applicant must be required to meet this increased parking requirement. There are no changes proposed to the exterior of the existing building; therefore, Staff does not believe this proposal will have a negative affect upon the remaining elements of this criterion in comparison to existing conditions. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. There are no changes proposed to the scale or bulk and mass of the existing building; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. SPECIAL DEVELOPMENT DISTRICT AMENDMENT REVIEW CRITERIA Before acting on a major amendment to a special development district amendment application, the Planning and Environmental Commission and Town Council shall consider the following factors with respect to the proposal: 1. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. There are no changes proposed to the exterior of the existing building; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. � 2. Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. The Vail Comprehensive Plan and Zoning Regulations encourage the creation of "hot beds" (accommodation units) and "warm beds" (fractional fee club units) within the commercial cores and the Public Accommodation District which is the underlying zoning for the Vail Plaza Hotel. These "warm bed" units have historically had higher occupancy rates than dwelling units; and therefore, bring more guests to Vail. Greater numbers of guests have a positive impact on creating vibrancy and economic viability of the commercial cores than dwelling units. As described in Section I I I of this memorandum, in 2000 and 2001, the Planning and Environmental Commission and Town Council approved one (1) dwelling unit and fifty (50) fractional fee club unit mix at the Vail Plaza Hotel based upon the following: `According to the applicant, the ownership of the club units will be divided into a maximum of 1/12r" interva/s for the 24 winter weeks during the ski season, with the remaining 28 shoulder season and summer weeks would be owned by the hotel. This ownership program allows for the most attractive weeks of the year to be so/d as club units with the proceeds helping to finance the redeve/opment project. The remaining interest in the clubs is then used by the hote/ to support the conference facilities during the summer months. " "To further improve the occupancy potentia/ of the fractiona/ fee club, the 50 club units have been designed to include up to two /ock-off spaces per unit. This design creates a tota/ of 108 keys and 216 pillows for the fractiona/ fee club component of the hotel. " "The applicant is proposing that the club units be so/d on an interval basis. The club units would be so/d for 24 weeks during the winter months with the remaining 28 weeks owned by the hotel for use as short-term accommodation units. " At that time, the Planning and Environmental Commission and Town Council also considered: "the ability of the proposed project to create and maintain a high leve/ of occupancy";and that, "each of the fractional club units shall be made available for short term rental in a managed program when not in use by the club members". Therefore, Staff does not believe the applicant's proposal to exchange two completed fractional fee club units for one unfinished dwelling unit is consistent with the intent of the original approvals of the Vail Plaza Hotel. 3. Parking and Loading: Compliance with parking and loading requirements as outlined in chapter 10 of this title. There are no changes proposed to the existing parking. However, there is net parking requirement increase of 0.7 parking spaces when two fractional fee club units (parking rate of 0.7 per unit) are exchanged for one dwelling unit (parking rate of 1.4 spaces per unit). Therefore, Staff believes this proposal will have a negative affect on this criterion. � Should the Planning and Environmental Commission choose to approve this request, Staff believes the applicant must be required to meet this increased parking requirement. The applicant is not proposing any changes to the existing loading. Today, there is no accessible or practical physical connection between the Vail Plaza Hotel loading dock and East Meadow Drive. Staff believes the applicant must install the needed accessibility and delivery route connecting the Vail Plaza Hotel loading dock to East Meadow Drive to comply with this criterion. 4. Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies and urban design plans. The Vail Comprehensive Plan and Zoning Regulations encourage the creation of "hot beds" (accommodation units) and "warm beds" (fractional fee club units) within the commercial cores and the Public Accommodation District which is the underlying zoning for the Vail Plaza Hotel. These "warm bed" units have historically had higher occupancy rates than dwelling units; and therefore, bring more guests to Vail. Greater numbers of guests have a positive impact on creating vibrancy and economic viability of the commercial cores than dwelling units. Staff does not believe exchanging two completed fractional fee club units for one unfinished dwelling unit is consistent with the Town's development objectives. 5. Natural and/or Geologic Hazard: Identification and mitigation of natural and/or geologic hazards that affect the property on which the special development district is proposed. There are no natural and/or geologic hazards affecting this property; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. 6. Design Features: provisions designed sensitive to natural community. Site plan, building design and location and open space to produce a functional development responsive and features, vegetation and overall aesthetic quality of the There are no changes proposed to the site planning, location, or open space for the existing building; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. 7. Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. There are no changes proposed to the existing vehicular and pedestrian traffic patterns. However, the net gain of dwelling units increases the parking requirement from 0.7 to 2.4 spaces. Therefore, Staff believes this proposal will have a negative affect on this criterion. Should the Planning and Environmental Commission choose to approve this request, Staff believes the applicant must be required to meet this increased parking requirement. 8. Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. 10 There are no changes proposed to the existing lanscaping; therefore, Staff does not believe this proposal will have a significant negative affect on this criterion in comparison to existing conditions. 9. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. The Town of Vail has no assurance from the applicant when, or if, construction of the Vail Plaza Hotel penthouse unit will occur. Therefore, Staff does not believe exchanging two completed fractional fee club units for one un-built dwelling unit is consistent with the Town's development objectives. IX. STAFF RECOMMENDATION CONDITIONAL USE PERMIT APPLICATION The Community Development Department recommends the Planning and Environmental Commission denies this request for a final review of an amendment to an existing conditional use permit, pursuant to Section 12-16-10, Amendment Procedures, Vail Town Code, to allow for changes to the fractional fee club unit designations within the Vail Plaza Hotel and Club, located at 16 Vail Road (Vail Plaza Hotel)/ a portion of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. Staff's recommendation is based upon the review of the criteria described in Section VIII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to deny this conditional use permit request, the Community Development Department recommends the Commission pass the following motion: "The P/anning and Environmenta/ Commission denies this request for an amendment to an existing conditional use permit, pursuant to Section 12-16-10, Amendment Procedures, Vail Town Code, and a recommendation to the Vail Town Council of a major amendment to Specia/ Deve/opment District No. 6, Vail Village Inn, pursuant to Section 12-9A-10, Amendment Procedures, to allow for changes to the fractiona/ fee club unit designations within the Vail P/aza Hotel and Club, located at 16 Vail Road (Vail P/aza Hotel)/ a portion of Lots M, N, and O, B/ock 5D, Vail Village Filing 1, and setting forth details in regard thereto." Should the Planning and Environmental Commission choose to approve, with conditions, this conditional use permit request, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section Vlll of this Staff memorandum to the P/anning and Environmenta/ Commission dated April 27, 2009, and the evidence and testimony presented, the P/anning and Environmenta/ Commission finds: The proposed conditional use permit amendment is not in accordance with the purposes of the Zoning Regulations and the Public Accommodation and Specia/ Deve/opment Districts as referenced in Section V of this Staff memorandum to the P/anning and Environmenta/ Commission dated April 27, 2009. 11 2. The proposed conditional use permit amendment and the conditions under which it will be operated or maintained are detrimenta/ to the public hea/th, safety, or we/fare or materially injurious to properties or improvements in the vicinity. 3. The proposed conditional use permit amendment does not comply with each of the applicable provisions of Chapter 12-16, Conditional Use Permit, Vail Town Code, as referenced by Section V of this Staff inemorandum to the P/anning and Environmenta/ Commission dated April 27, 2009. " Should the Planning and Environmental Commission choose to approve this conditional use permit for this request, the Community Development Department recommends the Commission makes the following conditions: "1. This conditional use permit approval is contingent upon the applicant obtaining Town of Vail approva/ of the associated major amendment to a special deve/opment district application. 2. This conditional use permit approva/ shall be valid until May 11, 2012; at such time this approva/ shall become null and void. The applicant shall restore the subject fractiona/ fee club units of the Vail P/aza Hote/ temporarily converted to dwelling units by this application back to fractiona/ fee club units prior to expiration of this approval. 3. The applicant shall meet the additiona/ 0.7 parking space requirement generated by this application by providing a payment-in-lieu to the Town of Vail in accordance with the per parking space fee established by Section 12-21-21, Parking Pay-in-Lieu Zones, Vail Town Code. The applicant shall provide payment of at /east one-ha/f (%) the full payment-in- lieu fee ($7, 780.21) to the Town of Vail within 30 days of obtaining approva/ of the associated major amendment to a specia/ deve/opment district application. The applicant shall provide payment of the remaining portion of the payment-in- lieu fee ($7, 780.20) to the Town of Vail in the event that the subject fractiona/ fee club units of the Vail P/aza Hote/ temporarily converted to dwelling units by this application are not reverted back to fractional fee club units prior to expiration of this approval. At the so/e discretion of the Town of Vail, all or any portion, of these payment-in- lieu fees may be appropriated to the design, construction, and/or maintenance of loading and delivery improvements within the Vail Village Inn Special Deve/opment District to outweigh the adverse effects of the increased parking and /oading demands generated by this application. " SPECIAL DEVELOPMENT DISTRICT AMENDMENT APPLICATION The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of denial to the Town Council for a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12-9A-10, Amendment Procedures, to allow for changes to the fractional fee club unit designations within the Vail Plaza Hotel and Club, located at 16 Vail Road (Vail Plaza Hotel)/ a portion of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth 12 details in regard thereto. Staff's recommendation is based upon the review of the criteria described in Section IX of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission pass the following motion: "The P/anning and Environmenta/ Commission forwards a recommendation of denia/ to the Town Council for a major amendment to Specia/ Deve/opment District No. 6, Vail Village Inn, pursuant to Section 12-9A-10, Amendment Procedures, to allow for changes to the fractional fee club unit designations within the Vail P/aza Hote/ and Club, located at 16 Vail Road (Vail P/aza Hotel)/ a portion of Lots M, N, and O, B/ock 5D, Vail Village Filing 1, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section IX this Staff memorandum to the P/anning and Environmenta/ Commission dated April 27, 2009, and the evidence and testimony presented, the P/anning and Environmenta/ Commission finds: 1. That the specia/ deve/opment district amendment does not comply with the standards listed Article 12-9A, Specia/ Deve/opment District, or that a practical solution consistent with the public interest has been achieved. 2. That the special deve/opment district amendment is not consistent with the adopted goa/s, objectives and policies outlined in the Vail comprehensive plan and compatible with the deve/opment objectives of the town; and 3. That the specia/ deve/opment district amendment is not compatible with and suitab/e to adjacent uses and appropriate for the surrounding areas; and 4. That the specia/ deve/opment district amendment does not promote the hea/th, safety, mora/s, and general we/fare of the town and promotes the coordinated and harmonious deve/opment of the town in a manner that conserves and enhances its natura/ environment and its established character as a resort and residential community of the highest quality. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission makes the following conditions: "1. This approva/ shall be valid until May 11, 2012; at such time this approval shall become null and void. The applicant shall restore the subject fractiona/ fee club units of the Vail P/aza Hote/ temporarily converted to dwelling units by this application back to fractional fee club units prior to expiration of this approval. 3. The applicant shall meet the additiona/ 0.7 parking space requirement generated by this application by providing a payment-in-lieu to the Town of Vail in accordance with the per parking space fee established by Section 12-21-21, 13 Parking Pay-in-Lieu Zones, Vail Town Code. The applicant shall provide payment of at /east one-ha/f (%) the full payment-in- lieu fee ($7, 780.21) to the Town of Vail within 30 days of obtaining approva/ of the associated major amendment to a specia/ deve/opment district application. The applicant shall provide payment of the remaining portion of the payment-in- lieu fee ($7, 780.20) to the Town of Vail in the event that the subject fractiona/ fee club units of the Vail P/aza Hote/ temporarily converted to dwelling units by this application are not reverted back to fractiona/ fee club units prior to expiration of this approval. At the so/e discretion of the Town of Vail, all or any portion, of these payment-in- lieu fees may be appropriated to the design, construction, and/or maintenance of loading and delivery improvements within the Vail Village Inn Special Deve/opment District. " X. ATTACHMENTS A. Applicant's Request 14 �F �5; �lk' r.y_ r_+ e �0 l a � U R — Y- � U G rv C a � Q i5 U Q 1 1 1 � ryW �� 5�'� i � ..SR_-. p \�\�1\\• �`K C�'�\ � �. \\� \' ".. �KP. 1 \� �� '..\�\\\\� - 1155. :4�s' ��F� .��Q �ggG rya 6jz �3: g �� 5 8 k , � i--_ I i� —� � I / / � / I / / � � I � , g ����� , 1 �7�i � 7.i 1 �� ` 5'S� . 9r'' '� I ��,- L�\�� Lw�oe�].�s�oa� - s o�� LL f i ti c,.,` � - �`�-�� � - M_�p.a� 7 I� i' I Cz, �R¢,T��_` �S o . q �i�, �^I � ..a��'�' � . � q � !' � \ __`� .� • �\ v�i � N F�� «_ t I � , � � 0.,' ci i��` -- ��ii��s.._'s��` � �3 �� a3� �,.__ ^°�i 1 y ? a p ,? "� r icg - - N g z�a W `- -+ � 3 �o �z - r�c �I�, �gr _ ,� o &ay g6� a3.'J .9e I ( I� � L' �? � i 6¢ i r� g Y�'1= - i � '� .\ej � �y = t'; i� �; � r�p ° 5 d N •. . ^; a p �� � xi i !, t�:1': ; a, €.' ��' � 4 C� �1 y � r � r` - C j, `1 "1' ' .' � h, � oL 8 C�' _a ��`S 6 I � . � n � a � z ' i � .. =sR'.,../ ;+ �a , ��.. " �' � h � � a n r�:.R,�,_ �b'� �� ��•� - �.�� � Q Q� �? v� i 9 �m _.:i � - ir a�° � ��;� m Q��e �� �,r�o� �Ko + � � � �`' Z _ , �- - � O a a�, aN:o • �•t�tS �53t ��W�asec^ o"c� � �- .� �fJ C.� 8 l ' . . -3J � � 3n �� U� a'S C; �� , . . � o. � � �@'Q � � � -��' � , � ��;3 � �o '` � � `i 6�� y`y'i r": ' Y � I � 1 �� °1 r � O � o B � '� � i 'a���-' �i i i�Q �"^� I �`' v, �� p' � a��n� i a �� � �r.��� b � U � a � e � "'.�� - .b,. A ' I _ z��i \ �� -- � � o � -- — I ,(�� : � .crtei � � <� � � —J "ti U _ _' _' _' _ 3 .640lN_ ' _' , . ' � ; �- .s � . , ...,� __.,,,Fl � �, � � ��7� , r � �:__l'-'-I ' " e= � 1 ..�`� a' ; ���� &1 i '� k' �y�� - _ ; � � ° � � �3� 'P -, ^�� � z `ve�d' ' �xy�� 1� ti 0 8� 3� e� g�� � � � g, g� a� 4�^�� 11 C.Cr � k'o°�� 'i - + i� i; �P. ozi e 1 caizG' n k� I _ ' = 1 � � aa�a v i �¢ m _ � o ��U�� = a i . >�st � ' 3- _ <���� � � J a $�� �'a �'---__ fl ��oatl 11 � .`� i - ey i �--- � \ I q: N � _ �' � l '-- �6 3: 1 � 1 �`� �^ ��--: ' �� a�� 11 � ��_Lz i� � - �9�� I °` � x � - e �`�'i� -_� -- ^ :��s ! y:`� �mi �s �� _ . � m � � � � :; q � .(7o.-usL _ � fioy � � . � ; i �� __ —_'---__ _ --_ " »oaWni N0023'00"w ,-t�..a>i __'_--- --- }' -; VAIL ROAO 155.75' (155.91'] x ��F V:. �s �.o.e�.a.� ` Yyf1: a�" .�...� ,y -- ----------- ---------�- -- �!�!� --- ------------------�P-- ---- �nm, �T,`�'i.�.o� • �9 � o ¢I,I e � e � a 0 0 d �UalUI��B��d w.._�.�.,. ._ _,��. i � � � N � � Q7 N LL LL- roa�� � ro ro v' � � � �� �r� �omo ���� J > > ro , a�mm c, ` L ¢ N � � � a ,. '� o a o � J � I — c .� c � 0 �- s � O z W� �\ ��✓ � C _� > a� J N � � > � J � 3 0 J peo� �ien `� �i � � � �� �� C: � C� •rt� �� C� � II p..�� N � M .y ' M V) r� v �,� ro u � �M �� .�� � \'ii �� _ �(,"J _ � �� O p.�.� ro � t �j N g � O N y.�.� � � �V � _ � N � L� ' : .� r� �Z �a _ ��� � ¢ -�� �� � � �y�Q � � � � � � O � d �� I - �-� - — -- - — - - — �; h `i �i _�?�� g �l� � i� � � � ,� �� J � � � � Q C� U} C � � m v C �' C 7 O �.. s � 0 Z P��21 I!�� � ° � �� _ii ' � N j f � d �1 � � j � -Y f.'°`� �a � � �� a� � � � .r► .'r' m.� {� ��..r � �� C> �� � � g o N � �° � v � ; �._. •N . L.L ' � _� o� � .W .� �Z��� �� �� �I���� � � ��� o� �Q �� ���a� y � � D � � tn �� � � �� � � � � � � � � �tn �� n � C � � C �. � n ° � c � ��N s� o �. �o Z � f"h � �► � � w � � o0 r� � �� w � II- � � ��' � o0 = � 1 � � � � O J � � � � A h` �� � � � � � r � a � v .l� � � �:% MEMORANDUM � TO: Planning and Environmental Commission FROM: DATE Community Development Department and Public Works Department April 27, 2009 SUBJECT: A request for a final recommendation to the Town Council for the adoption of amendments to the Vail Transportation Master Plan, and setting forth details in regard thereto. (PEC090005) ��� � IV UI Applicant: Town of Vail, represented by Tom Kassmel Planner: Bill Gibson SU M MARY The Town of Vail, in conjunction with the Colorado Department of Transportation, is. in_,,_- '--------------�----- ------------------- ------- - the process of updating the Vail Transportation Master Plan in response_to the on-going_', , '---- ---------------- ------- � and projected� increases in development_activity,_ the_`esults _of pas�_master planning ', �, � - �------ processes, and pending redevelopment plans. ��,�, '� DESCRIPTION OF REQUEST '`��` �� ,��� � The applicant is proposing to consolidate and update the transportation master planning ���;,, and design efforts that have been on-going for 20 years into a single master plan �;, � document. The proposed plan is based upon existing conditions, current trends, and ','�` anticipated future growth. The proposed master plan is intended to be a guide for the ',�� Town's transportation system for the next 20 years. �� BACKGROUND The Planning and Environmental Commission held work sessions to discuss the proposed master plan amendment at its March 23 and April 13, 2009, public hearings. ROLES OF REVIEWING BODIES Master plan amendment applications will be reviewed by the Planning and Environmental Commission, and the Commission will forward a recommendation to the Town Council. The Town Council will then review the master plan amendment application. :��•iia►ac�:�r�a:�re� The extent to which the amendment furthers the general and specific purposes of the master plan. The proposed amendment updates the Vail Transportation_ Master Plan in ��, '-- - - - response to the on-going and projected�_increases_in�development_activity,_they=� results of_pas� master_planning_processes,_ and pending_redevelopment_plans. J.-'� '-------- -- --- Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 � pt Formatted: Font: (Default) Arial, 11 � pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 � pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Therefore, Staff believes the proposed regulation amendment is consistent with the purposes of the master plan. 2. The extent to which the amendment would better implement and better achieve the applicable elements of the adopted goals, objectives, and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the Town. The proposed amendment updates the Vail Transportation_ Master Plan in ,,,- '---- ------------ response to the on-going and projected�_increases_in�development_activity,_the_ results of_pas� master_planning_ processes, and pending_ redevelopment_plans._ .--- '-------- ---- Staff believes the proposed amendment better implements and achieves the °„ adopted goals, objectives and policies of the Town's Comprehensive Plan than �� the existing outdated plan. The extent to which the amendment demonstrates how conditions have substantially changed since the adoption of the subject regulation and how the existing regulation is no longer appropriate or is inapplicable. Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt The last update to the Vail Transportation_ Master Plan was adopted _in_ 2002. ,_- Formatted: �onr. ��efaUit� nr�ai, ii �--- ------------------- -----� Since then, a significant volume of development _activity _has_occurred and pt �------ -----------� several future development �activities are now anticipated_ __ Many_ of_ these_ -�� Formatted: �onr. ��efaUit� nr�ai, ii --------------------- ---- changes in development were not contemplated, or addressed, in the 2002 ��, pt version of the master plan. � Formattea: Fonr. ��efaUit� nr�ai, ii pt 4. The extent to which the amendment provides a harmonious, convenient, workable relationship among land use regulations consistent with municipal development objectives. As noted above, the proposed amendment is intended to address how conditions have changed since the plans last update in 2002. The purpose of the proposed amendment is to guide the implementation of Vail's transportation system for the next 20 years. Staff believes the proposed text amendments will facilitate and provide a harmonious, convenient, workable relationship among land use regulations consistent with the Comprehensive Plan and development objectives. 5. Such other factors and criteria the Commission and/or Council deem applicable to the proposed text amendment. VI. STAFF RECOMMENDATION The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of approval to the Vail Town Council for the adoption of amendments to the Vail Transportation Master Plan, and setting forth details in regard thereto. Should the Planning and Environmental Commission choose to forward a recommendation of approval of this request; Community Development Department recommends the Commission pass the following motion: "The P/anning and Environmenta/ Commission forwards a recommendation of approva/ to the Vail Town Council for the adoption of amendments to the Vail Transportation Master P/an, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of approval to the Vail Town Council for the proposed amendment, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section /V of Staff's April 27, 2009, memorandum and the evidence and testimony presented, the P/anning and Environmenta/ Commission finds: 1. That the amendment is consistent with the applicab/e e/ements of the adopted goa/s, objectives and policies outlined in the Vail Comprehensive P/an and is compatib/e with the deve/opment objectives of the Town; and 2. That the amendment furthers the genera/ and specific purposes of the Transportation Master P/an; and 3. That the amendment promotes the hea/th, safety, mora/s, and general we/fare of the Town and promotes the coordinated and harmonious deve/opment of the Town in a manner that conserves and enhances its natura/ environment and its established character as a resort and residential community of the highest quality. ° Attachment A Vail Transportation Master Plan Attached are the contextual changes to the proposed Vail Transportation Master Plan document based upon the Planning and Environmental Commission review and comment. In order to save on duplication and reproduction costs, Staff has attached only the edited pages as amendments to the previous document submitted on March 19, 2009. The combination of the two provides the final document, and as mentioned previously, the appendices are available digitally on the Town's web site: ( http://www.vailgov.com/subpage.asp?page_id=893) � Vail Transportation Master Plan Update PREFACE Purpose of the Master Plan The purpose of the Vail Transportation Master Plan is to consolidate and update the transportation planning and design efforts that have been on-going for the past 20 years. This most recent document, which is based on the existing conditions of Vail's transportation system, current trends and the anticipated growth, will guide the implementation of Vail's transportation system for the next 20 years. In order to keep the plan a viable document over this time period, continuous monitoring of the transportation system and periodic updates of the plan are needed, including periodic traffic counts and formal master plan updates. Previous transportation documents are referenced and summarized in the appendices of this document. These referenced documents remain relevant and provide additional insight and guidance for transportation planning and design purposes. The scope of each of these referenced documents focus on various transportation related topics with some overlapping subjects. The redundancy in this is deliberate to create a historical base and provide the necessary background information to predict accurate trends. It is implied that all overlapping, inconsistent information between documents shall be superseded by the most recent and relevant document. _ . This master plan is intended to provide direction for a period of time over the next 20 years. It does not convey approval for any one particular improvement, development, project, or facility. Assumptions made within this report (i.e. trip generation reductions, transit use, etc.) must be justified at the time of application for any one particular improvementldevelopment and may or may not be supported by the town or applicable agency at time of application. Every improvemenUdevelopment shall go through the town and other applicable agency review process prior to implementation. Adoption and Amendment of tl2e Master Plan The Vail Transportation Master Plan was adopted by resolution No. _, Series of 2009, on , 2009, by the Vail Town Council following a recommendation to approve by the Planning and Environmental Commission. Future amendments to this master plan must be approved by resolution or motion by the Town Council following a formal recommendation by the Planning and Environmental Commission. Implementation activities and ordinances will be approved in accordance with the Town of Vail Municipal Code. � FFisa�r,c C� }1 0 LT & ULLEVIG Page i Vail Transportation Master Plan Update The interchanges, West and Main Vail, are locations of significant traffic concentration because they serve as the access to/from I-70 and they are the only means of crossing I-70. As roundabout intersections, the ramp terminal intersections also serve through movements along the Frontage Roads which further contributes to the traffic concentration that takes place at these points. Along the Frontage Road, the other notable heavier-traveled cross-streets during peak times including: ► Lionshead Parking Structure Access — Heavier demand is due to this being a major parking facility within Town. ► Village Parking Structure Access — Heavier demand is due to this being a major parking facility within Town. ► Vail Valley Drive — Heavy demand can be attributed to activity associated with the Golden Peak lift area and associated programs that based there. ► West Vail Commercial — Numerous driveways serve the shopping area in West Vail. Individually, the traffic levels served by each driveway is less than the three heavy cross-streets stated just above, but collectively they represent a major generating center within town. Numerous other cross-streets intersect with the Frontage Roads, but many of these serve localized areas and do not carry significant levels of traffic. The Frontage Roads serve as Vail's arterial system serving the vast majority of the vehicle-miles traveled within the Town. The traffic data shown in Figure 2 approximately represent the 15`h busiest day of the ski season. From past transportation planning efforts conducted in Vail, the 15th highest day represents a"low" of the peak days. Subsequent days of magnitude (16tn, 17tn, etc.) are not dramatically lower than the 15th day as demands levels in order tend to flatten out. Preceding days of magnitude (14`h, 13th, etc.) are not as flat, and transportation demands for these days are noticeably higher. When plotted on a graph, the 15th highest day is approximately the "turning poinY' between peak days and average days. Typical transportation planning will attempt to accommodate the 30th highest hour of a year, and the 15th highest day is a bit more conservative than this in attempt to maintain a quality guest experience. "fhe finding from previous efforts and the notion of maintaining the guest experience has led the Town to adopt the 15�' highest day as the appropriate design level for transportation considerations, and all subsequent analyses presented in this report approximately represent that level of demand. 2. Intersection Levels of Service (LOS) Intersection Levels of Service (LOS) were calculated for numerous intersections including the roundabouts at the interchanges and many of the cross-street intersections and access points along the North and South Frontage Road. For nearly every case, the PM peak hour traffic was the focus of the LOS analyses. The exceptions include the Main Vail interchange and West Vail interchange intersections where the AM peak hour was also analyzed. LOS is a traffic qualitative measure described by a letter designation ranging from A to F. LOS A represents minimal or no delay while LOS F represents excessive delay. The calculations are geared toward estimating the delays for traffic movements and then converting the results to a LOS . FFi�ssuac �� F{OLT 6: IeLLEV1C; Page 6 Vail Transportation Master Plan Update demand by virtue of the need to accommodate these visitors who only want to shop and the employees needed to operate the commercial activity. Other parking areas are also provided throughout town, but most are relatively small providing up to 15 spaces. Other locations such as Ford Park and the Soccer Fields (located east of Golden Peak) can accommodate more vehicles, but these are restricted to permitted vehicles only. The Town of Vail has continued to explore means of adding public parking to the supply within the central areas of Lionshead and Vail Village. A current need of at least 400 additional spaces has been identified by the Town in attempt to reduce the number of days that the Frontage Road is pressed into service to accommodate overflow parking. The 400 spaces are needed to maintain a supply accommodating 90 percent of the demand days, a Town parking objective. This is based on many seasons of collected Frontage Road parking data. However, 1,000 additional spaces would accommodate 99 percent of the current demand days. Over the long- term (20 years), the 1,000 spaces are estimated to accommodate 90 percent of the future demand days. More detail with respect to further parking needs is described later in this report, but the Town's ultimate goal is to add 1,000 spaces for general public use to meet their 90 percent objective. C. Transit The Town of Vail operates a free bus service for residents and guests. The service is among the busiest in the state serving approximately three million riders per year. It is estimated that approximately 14 percent of VaiPs residences use the transit system as a means to commute to work, based on 2000 census data, which ranks higher than most major metropolitan areas. The heaviest used route is the In-Town shuttle which continuously travels between Lionshead and Vail Village; this route makes up 60 to 70 percent of the Towns bus service ridership, and it typically �.�;=n�served with five to seven buses; peak times can see 8 to 10 buses traveling along this route depending on time of day with headways ranging from 5 to 7 minutes. Outlying bus routes each serve a different area of Vail. The East Vail and West Vail bus routes experience the most ridership outside the In-Town Shuttle. West Vail, having a frontage road along the north and south side of I-70, is served by opposing loop services in which one West Vail route runs clockwise along the South and North Frontage Road and the other runs counter- clockwise. While these two routes have offset start times from the Transportation Center, buses along these two opposing routes cross in the Meadow Creek/Intermountain area, and this area receives relatively infrequent service (because two opposing buses drive by at the same time). Most outlying areas are provided service every 15 to 20 minutes; the Meadow Creek/Intermountain area, in which the opposing West Vail bus routes cross, experiences service every 30 minutes, albeit with two buses. This quirk in the service is the result, in part, of limited I-70 crossings and the need to serve both sides of I-70 with transit. . FFi.sri:ac C� I-IOLT & ULL�:V1C Page 16 Vail Transportation Master Plan Update A cursory-level evaluation of existing retail trips was conducted by reviewing the level of traffic turning into the structures today. During the PM peak hour, the outbound traffic conta+ns a significant amount of skier trips, so it is not appropriate to include these outbound traffic with respect to gauging trip generation rates. Inbound PM peak hour traffic contains trips associated with retail and some other uses, so while it is not 100 percent retail traffic, it does serve as an upper limit. At the Lionshead Parking Structure,150 inbound PM peak hour trips exist current; the Lionshead Village contains approximately 150,000 square feet of retail-related use. At the Village Structure, 310 vehicles entered during the PM peak hour; that village contains approximately 300,000 square feet of retail/commercial. These traffic numbers represent a 45 to 50 percent reduction in ITE shopping center trip rates if they were all retail-related, but they are not. Other trip types that are part of the inbound movements to the structures include: ► Library trips (which is open until 6:00 PM on weekends, later on weekdays) ► Dobson Ice Arena trips (which typically has a full schedule including hockey events, figure skating, lessons, and public skating) ► Adventure Center trips. The Adventure Center provides other recreation including tubing, ski biking, snowmobiling, snowshoeing, and a trampoline, and it is remains open until 9:00 PM on weekend nights. ► Residential uses. Several residential complexes within the villages are not able to adequately park their own overnight guests, so the parking structures are used instead. At Lionshead, staff estimates that approximately 100 vehicles are parked overnight at peak times related to selected residential uses. At the Village Structure, between 200 and 300 vehicles are parked overnight related to some of the residential uses there. ► Special events. Both villages routinely host evening events such as concerts, festivals, exhibits, and other attractions. Alf of these attract trips beyond the retail/commercial attraction. As such, the true retail trip rate is even less that the 45 to 50 reduction quoted above. As such, using rates that equate to a 65 to 70 percent reduction for the new retail development is not inconsistent with current trip- making trends in Vail. However, using these reductions in traffic impact studies for an individual development should be used with caution and only be done in coordination with Town staff and CDOT. Again, Appendix E shows the trip estimates for each of the development areas. In total, all of the considered development could generate an additional 2,800 trips per hour during the PM peak hour. The following summarize some of the bigger trip generators (4,350 trips per hour if "pure" ITE trip generation rates were used). ► West Vail — the net increase in square footage and residential units could generate a total of 470 additional trips during the PM peak hour. This would be above and beyond the estimated 800 to 1000 trips per hour generated by the West Vail development today. ► Timber Ridge is estimated to generate an additional 180 trips per hour during the PM peak hour. ► West Lionshead (Ever Vail) has the potential of generating an additional 580 trips per hour during the PM peak hour. � FFi�s��;Fc C� F10LT 6: ULLEVIC; Page 26 Vail I'ransportation Master Plan Llpdate ► Lionshead Parking Structure redevelopment is estimated to generate 275 trips during the PM peak hour. ► The Lionshead Village area (excluding the Lionshead parking structure) is projected to generate an additional 490 PM peak hour trips given the collective development. The Vail Village area redevelopment is projected to generate an additional 260 PM peak hour trips given the collective development potentials. Table 3. Trip Generation Rates Trip Generation Rates (per DU for Res, per 1000 SF otherwise) Use ITE Vail-Remote Vail-Close In Daily Pea'k Daily PeMk Daily Peak Residential — New 5.86 0.54 5 0.5 4 0.4 Residential — Re lace NA NA 0.75 0.08 0.6 0.06 Commercial - Office 11.01 1.49 11 1.49 11 1.49 Commercial — Retail 42.94 3.75 42.94 3.75 15 1.3 Hospital 17.6 1.18 17.6 1.1 NA NA Figure 7 shows the 2025 total PM peak hour traffic projections at the Town's roundabout intersections and many of the Frontage Road cross-streets. In general, future PM peak hour traffic flows along the frontage roads are prajected to increase an estimated �9-40 to 4E1-50 percent over existing traffic flow levels at peak times. The interchanges will experience a greater concentration in traffic with the additional trips. Major cross-streets will still include Vail Valley Drive, both parking structure access points, and West Vail accesses (if access modifications are not constructed). Moderately traveled cross-streets include all of the Lionshead Circles, Village Drive, and Forest Road (given Ever Vail redevelopment and if left intact). B. Traffic Operations Similar to the existing conditions LOS analysis, the roundabout intersections were analyzed for ideal conditions as well as for snow conditions using the same factors and adjustments mentioned before. Figure 8 shows the results of the PM peak hour analyses. Noticeable capacity deficiency highlights include: ► Main Vail Interchange — The north roundabout is projected to operate at a LOS F during the PM peak hour. The south roundabout is projected to function at LOS D, but several approaches are expected to operate at LOS E or LOS F. ► West Vail Interchange — Both roundabouts are projected to operate at LOS F during the PM peak hour. . FEi.ss�,r,c C� I l O L T Sc ULLEVIG Page 27 Vail Transportation Master Plan Update Table 5. Main Vail Interchange North Roundabout - Alternatives Assessment Main Vail Interchange, North Roundabout LOS F projected along WB off-ramp and Spraddle Creek Approach Sno and Ideal Conditions Primary Issue(s): Major traffic conflict is between NB left turn movement (to WB I-70 and Frontage Road) and WB left turn movement from WB I-70 off-ramp. Expand to a full two lane roundabout; add northbound approach lane Realistic Capacity Improvement(s): from under I-70 (possibly reversible lane); add bypass lane from Fronta e Road to WB I-70. Supplemental Traffic Reduction Still Still need to reduce PM peak hour forecasts by 50 to 100 vehicles per Needed for LOS D on otherwise poor operatin a roaches(Sno hour, or 2 to 4 percent. 2025 Traffic Composition: 30% is from proposed development. Potential Measure Traffic Flow Effect Relative Cost (as lsofated Measure)" 1. Add Simba Run underpass. Total traffic�reduced by 150 to 200 High, but measure would provide vph (6 to 8/o). other benefits as well. 2. Encourage use of East Vail Estimated ramp traffic removed is Low; would require VMS along I- Interchange between 100 and 150 vph (4 to 70 and along Bighorn Road. 6 /o . Estimated traffic removed is Low; would impact parking 3.Parking Management Measures between 100 and 150 vph (3 to olic 5% . p y� 4. Express Bus Service linking West Estimated traffic removed is Vail, Lionshead, and Vail Village between 50 and 100 vph (2 to Medium. 4 /o . 5. Extended Skiing Hours Estimated traffic removed is o Low. between 25 and 50 vph (1 to 2/o}. 6. Metering of Outbound Structure Estimated traffic removed is o Low; toll booths already in place. Traffic (toll booths)"' between 50 and 75 vph (2 to 3/o). 7. Expand Regional Transit Service Estimated traffic reduction of (e.g. Summit County Front Range) 1% per every three to four peak Medium to High hour bus tri s. Other Considerations Could reduce intersection's PM Mixed Use Trip Gen Reduction (VW)" peak hour traffic by another 25 v h 1% Employee housing auto disincentive Could reduce intersection's PM (Timber Ridge} peak hour traffic by another 25 to 50 vph (1 to 2% ' Combining measures wiil reduce the etfecf of certain measures as some mitigation measures target the same traffic "group". "` This consideration entails redeveloping the West Vail area to better balance uses and incite internal trip-making. `"`Potentially, improvements in parking control equipment over time may allow for a more rapid exit flow rate. While this will be advantageous to those attempting to exit, it will contribute to the peak traffic concentration along Town roads. Meterin this outbound flow would rovide a little benefit to traffic o erations. � FF�srur.c C� 1-1 O LT & u�i_�vi� Page 34 Vail Transportation Master Plan Llpdate Table 6. Main Vail Interchange South Roundabout - Alternatives Assessment Main Vail Interchange, South Roundabout LOS F projected along WB Frontage Road Approach and along Vail Road a roach sno Primary Issue(s): Major movement is WB right turn to under I-70 (much of which is oriented to WB I-70). Largest conflict with this movement includes the combination of movements onto the EB on-ram . Realistic Capacity Improvement(s): Incorporate second northbound lane under I-70 and re-designate WB Frontage Road lanes to utilize it (right, through/right, and left/through). Still need to reduce PM peak hour forecasts by 50 to 100 vehicles per Supplemental Traffic Reduction Still hour, or 1 to 2 percent. Additional reduction may be desirable to provide Needed for LOS D(Snowy): excess capacity for U-turns from/to the west (due to right-in/right-out access restrictions nearb . 2025 Traffic Composition: 25% is from proposed development. Potential Measure Traffic Flow Effect Relative Cost (as Isolated Measure)* Total traffic reduced by 150 to 200 vph (3 High, but measure would 1. Add Simba Run underpass. to 4o�o� provide other benefits as well. Estimated ramp traffic removed is between Low; would require VMS 2. Encourage use of East Vail 50 and 100 vph (1 to 2%). This measure along I-70 and along Interchange would also create some "shifts" in traffic gighorn Road. entering the roundabout. 3. Parking Management Measures Estimated traffic rem� oved is between 125 Low; would impact parking and 200 vph (2 to 4/o). policy. 4. Express Bus Service linking West Estimated traffic removed is Medium. Vail, Lionshead, and Vail Village between 50 and 100 vph (1 to 2%). 5. Extended Skiing Hours Estimated traffc removed is between 25 Low. and 50 vph (1 /o). 6. Metering of Outbound Structure Estimated traffic removed is between 100 Low; toll booths already in TrafFc (toll booths)"' and 150 vph (2 to 3%). place. 7. Expand Regional Transit Service Estimated traffic reduction of 1% per Medium to High (e.g. Summit County Front Range) every three to four peak hour bus trips. Other Considerations Mixed Use Trip Gen Reduction (VVV)" Could reduce intersection's PM peak hour traffic by 25 (<1 %). Employee housing auto disincentive Could reduce intersection's PM peak hour imber Rid e traffic b another 25 to 50 v h 1% Hospital Access onto Fr. Road ' Combining measures will reduce the effect of certain measures as some mitigation measures target the same traffic "group". " This consideration entails redeveloping the West Vail area to better balance uses and incite internal trip-making. "'Potentially, improvements in parking control equipment over time may allow for a more rapid exit flow rate. While this will be advantageous to those attempting to exit, it will contribute to the peak traffic concentration along Town roads. Meterin this outbound flow would rovide a little benefit to traffic operations. � FF�.ss�;r.c �i �-���T � ULLEVIG Page 35 Vail Transportation Master Plan l.Ipdate Table 7. West Vail Interchange North Roundabout - Alternatives Assessment West Vail Interchan e, North Roundabout LOS F projected along WB Frontage Road Approach and LOS E along SB Chamonix Drive a roach sno Primary Issue(s): Major movement is WB left turn to under I-70, to WB I-70, and NB approach to EB Frontage Road and onto WB I-70. Largest conflict involves NB left turn onto WB I-70 with the left turns from WB Frontage Road. Realistic Capacity Improvement(s): Add northbound approach lane from under I-70. Should also add SB Chamonix a roach lane. Supplemental Traffic Reduction Still Still need to reduce PM peak hour forecasts by 200 to 250 vehicles Needed for LOS D(Snowy): per hour, or 6 to 8 percent. 2025 Traffic Composition: 21% is from proposed development. Potential Measure Traffic Flow Effect Relative Cost (as Isolated Measure)* 1. Add Simba Run underpass. Total traffic reduced by 400 to 450 High, but measure would provide vph (10 to 12 /o). other benefits as well. Estimated traffic removed is 2. Parking Management Measures between 25 to 50 �vph (less Low; would impact parking policy. than 1 % 3. Express Bus Service linking West Estimated traffic removed is Vail, Lionshead, and Vail Village between 75 and 100 vph (2 to Medium. 3 /o . 4. Extended Skiing Hours Estimated traffic�removed is less Low. than 25 vph (<1 /o). 5. Metering of Outbound Structure Low; toll booths already in place. Traffic (Village and LH toll Estimated traffic removed is 0 Metering outbound West Vail booths)""" between 25 and 50 vph (1 to 2/o). commercial traffic may be beneficial. 6. Expand Regional Transit Service Estimated traffic reduction of (e.g. Summit County Front 1% per every three to four peak Medium to High Ran e hour bus tri s. Other Considerations Mixed Use Trip Gen Reduction Could reduce intersection's PM ��„ peak hour traffic by 25 to 50 vph '� % Employee housing auto disincentive Could reduce intersection's PM (Timber Ridge) peak hour traffic by less than 25 v h <1% Could reduce intersection's PM Less West Vail Development peak hour traffic by 25 vph per 10,000 SF reduction in retail. " Combining measures will reduce the effect of certain measures as some mitigation measures target the same traffic "group". �� This consideration entails redeveloping the West Vail area to better balance uses and incite internal trip-making. "'Potentially, improvements in parking control equipment over time may allow for a more rapid exit flow rate. While this will be advantageous to those attempting to exit, it will contribute to the peak traffic concentration along Town roads. Meterin this outbound flow would rovide a little benefit to traffic o erations. . FFi_s��ac Ci i-� o �-r s: ULLEVIG Page 38 Vail Transportation Master Plan Update Table 8. West Vail Interchange South Roundabout - Alternatives Assessment West Vail Interchange, South Roundabout LOS F projected along EB Frontage Road Approach (relative minor) and alon EB Off-ram sno Primary Issue(s): � Major movement is WB right turn to under I-70. This movement's largest conflict includes the eastbound off-ramp left turn to under I-70. Realistic Capacity Improvement(s): Add northbound approach lane from under I-70 (extended back to the south roundabout Supplemental Tra�c Reduction Still Still need to reduce PM peak hour forecasts by 100 to 150 vehicles Needed for LOS D(Snowy): per hour, or 3 to 5 percent. 2025 Tra�c Composition: 21 % is from proposed development. Potential Measure Traffic Flow Effect Relative Cost (as Isolated Measure)* 1. Add Simba Run underpass. Total tra�c reduced by 400 to 450 High, but measure would provide vph (14 to 16 /o). other benefits as well. 2. Parking Management Measures Estimated tra�c removed is o Low; would impact parking policy. between 25 and 50 vph (1 to 2/o). 3. Express Bus Service linking West Estimated tra�c removed is Vail, Lionshead, and Vail Village between 75 and 100 vph (3 to Medium. 4 /o . 4. Extended Skiing Hours Estimated tra�c�removed is less Low. than 25 vph (<1 /o). 5. Metering.of Outbound Structure Estimated tra�c removed is o Low; toll booths already in place. Tra�c (toll booths) between 25 and 50 vph (1 to 2/o). 6. Expand Regional Transit Service Estimated traffic reduction of (e.g. Summit County Front 1% per every three to four peak Medium to High Ran e hour bus tri s. Other Considerations Mixed Use Trip Gen Reduction Could reduce intersection's PM ��„ peak hour tra�c by 25 to 50 vph 1 to 2% Employee housing auto disincentive Could reduce intersection's PM (Timber Ridge) peak hour tra�c by less than 25 v h <1 % Could reduce intersection's PM Less West Vail Development peak hour tra�c by 25 vph per 10,000 SF reduction in retail. ' Combining measures will reduce the effect of certain measures as some mitigation measures target the same tra�c "g roup". *' This consideration entails redeveloping the West Vail area to better balance uses and incite internal trip-making. "'Potentially, improvements in parking control equipment over time may allow for a more rapid exit flow rate. While this will be advantageous to those attempting to exit, it will contribute to the peak tra�c concentration along Town roads. Meterin this outbound flow would rovide a little benefit to traffic o erations. . FEi_ss�Fac C� HOLT 6: u�i_evic Page 39 Vail Transportation Master Plan Update H. Transit �FQi�'Jii}-'vvi�iF?1r��f3Fi-�fi£� ;�"J{��iiC'r€2!<J.'��'c,'�'.�1FJFll�l :�d4i� fcL}l}i{'��•,T,7 ar�Gt,-�:��q�� t!, \/-,'I'o +r-�Y,:i�sr�'f�F1E� #a; y�es#-�z���a�,�-°���„i�Growth within Vail, Eagle County, the "Front Range", and Colorado as a whole will require transit enhancements to maintain the existing percentage of transit ridership and to encourage additional transit usage in the future. This study assumes transit usage will generally maintain its existing levels of approximately 14 percent for the Town of Vail and 10 percent for Eagle County. This is reflected in the reduction taken in the number of future trips generated. The total number of future trip projected is 2800 per hour, this takes into account multi-use trips as well as multi-modal uses. This is an overall 36% reduction from the standard ITE projection of the approximately 4350 trips. Transit enhancements can be generally be categorized as follows; ► Local Transit Enhancements • Bus Capacity — Increase number of buses and service routes • Bus Service — Increase bus service, by reducing headways • Shuttte services ► Regional Transit Enhancements • "Front Range" bus service • Charter buses • Eagle (ECO), Summit and Lake County bus service ► Other Transit Mode Enhancements • Railways (Light, High-Speed) ► Transit Incentives • Making transit • Easier • Faster • Cheaper The Town is currently coordinating with the I-70 PEIS, the RMRA Study, the I-70 Coalition and the Eagle County Collaborative to consider Regional Transit Enhancements and Railways. The Town will need to continue collaboration with these groups and provide input to process and study. The enhancement to Vail's local transit can be directly implemented by the Town to increase service levels for guests and residents. . FFLSBL!FG (� HOLT S. l ULI_E�'1(� Page 47 Vail "I'ransportation Master Plan Update The Eagle County bus system (ECO) would also make use of the Lionshead Transportation Center. It is anticipated that demand served by ECO will grow in the future given the strong potential for growth Down Valley within Eagle County. Potential routing of this service within Vail could also be enhanced with a Simba Run underpass. I. Parking Currently, the town-owned Village Structure and the Lionshead Structure provide 2500 total spaces of public parking. Ford Park offers parking for an additional 250 vehicles during ski season supplemented with transit service to the Village; this parking is restricted to permitted vehicies only. As previously mentioned, the Town has set a goal to establish 400 additional public parking spaces for the near-term planning horizon and a total of 1000 additional public parking spaces for the long-term. These objectives are based on parking demand projections completed in 2001 that include a reduction of 44 to 48 percent for transit usage and on winter season parking data relative to the frequency of using the Frontage Road to serve overflow parking demands, and the additional parking is intended to reduce how often the Town's supply is exceeded. Frontage Road parking statistics are collected nearly every time the Frontage Road is pressed into service. The Town has established an objective to accommodate the 90'h percentile design day, which is approximately equal to the 15`h busiest day during winter ski season; the 400 and 1000 space increase would meet this goal for the short-term and long- term time-frames, respectively. Location options to place the increased parking supply include the following: ► West Lionshead (Ever Vail) as part of that area's redevelopment. Between 300 and 500 additional ublic parking spaces are being considered as part of the West Lionshead plan (beyond parking to be dedicated to development uses). In association with this and the new lift planned for West Lionshead is the potential for a roundabout intersection onto the Frontage Road and transit facilities. ► Lionshead Structure as part of its possible redevelopment. The redevelopment of the Lionshead Structure could incorporate an additional 200 to 300 public spaces for public use (beyond the parking needed to support the proposed uses). Ford Park - Pre{iminary study conducted by the Town has yielded the possibility of adding 300 to 600 spaces at Ford Park, likely belaw the playing fields. The potential of constructing a roundabout at Ford Park would support the additional of parking in this area relative to access onto the Frontage Road, and transit service providing connectivity to the Village would be necessary to support this concept. Sesides serving parking demands during ski season, the provision of parking at Ford Park would support event activity during the summer. The future location of the parking supply within the Main Vail area (Lionshead and Vail Village) may remain a bit out of alignment with the parking demand generators. If the development and redevelopment of Vail comes to fruition as described in this report, there will be a bit of a mismatch with respect to the placement of the parking versus the demand for the parking. Figure 10 illustrates the imbalance. . FELSBURG C� HbLT & ULLE\iIG Page 50 Vail Transportation Master Plan Update VI. FRONTAGE ROAD ACCESS MANAGEMENT PLAN As the Town's Transportation Plan was being developed through this process, CDOT and the Town agreed to develop an Access Management Plan (AMP) for the North and the South Frontage Road. The AMP will serve as a planning tool for CDOT and for the Town in that it defines allowable access from which proposed development can plan. The AMP is a document that CDOT and Town staff agree to in principal; it is not subject to a formal IGA and agency adoption. The plan is intended to show the long-term access onto the Frontage Roads. It is NOT the intent to use the plan as a means of closing access to an existing thriving use. Rather, the plan is used as a framework for new development and redevelopment of properties or possibly when a frontage road construction project (like widening takes place). If development or redevelopment does not occur, then access will continue as it exists today, barring a safety issue. Further, the access locations are not meant to be precise. The plan shows potential access locations that are plus/minus 50 feet or so, and shifts larger than this might be possible as well. Besides showing access onto the roadway, the plan also shows each parcel's access if it is not onto the Frontage Road. Examples of this include a parcel accessing a cross-street (rather than the frontage road) or gaining access through an adjacent parcel. Further, the AMP is based on the assumption that individual parcels will remain under individual ownership. In the event that a development plan incorporates numerous individual parcels as part of a common proposal, then the access scheme needs to be carefully evaluated and could be different than what the AMP shows. The AMP is shown in Appendix G and it recognizes the elements of the plan that have been described to this point. Many of the existing access points are recognized in the plan. The most notable intersection/access change is the Simba Run underpass of I-70. This will create two major intersections onto the frontage road system. Other areas of anticipated change include the following: ► A new access to serve the Vail Valley Medical Center is shown along the South Frontage Road approximately 900 feet west of Vail Road. Additional coordinating with the Medical Center may be needed as their plans continue to evolve. Potential access consolidation should be pursued. . i'7LT7�la'T.�:!-ZT.1� �'1 :T-ZT�JTSS7T�i. �. ' � •� ► The West Lionshead Redevelopment Plan, otherwise known as Ever Vail, entails relocating the South Frontage Road to adjacent to I-70 in the proximity to Forest Road. This along with the development planned in that area will introduce five access points onto the Frontage Road (including the Forest Road roundabout), but it will eliminate 10 accesses serving current uses. � FELSBI;r.c �i �«��T �: ULLE\'IC; Page 53 Vail Transportation Master Plan Update ► West Vail commercial uses are potential candidates for redevelopment at the future time. However, a master plan has not been finalized and there are numerous land owners in this area that still need to coordinate. However, the ANIP is showing a roundabout access and additional partial movement accesses. This would eliminate other access points along the North Frontage Road. ► Timber Ridge is a planned affordable housing project located along the North Frontage Road approximately equidistant between Lions Ridge Loop and Buffehr Creek Road. Its potential access scheme includes two accesses onto the Frontage Road. It should further be noted that the Ever Vail development proposal is being proposed by the Town. Located in Lionshead at Forest Road, the Ever Vail development includes relocating the South Frontage Road up against I-70. This will require a modification to the AMP. . FFi_ssur.c Ci I-IOLT & ULLEVIC; Page 54 MEMORANDUM TO: Planning and Environmental Commission FROM: DATE Public Works Department and Community Development Department April 27, 2009 SUBJECT: A request for a work session to discuss the adoption of the Frontage Road Lighting Master Plan, an element of the Vail Transportation Master Plan, and setting forth details in regard thereto. (PEC090014) Applicant: Town of Vail, represented by Tom Kassmel Planner: Bill Gibson SU M MARY The applicant, Town of Vail, is requesting a work session to discuss the adoption of the Frontage Road Lighting Master Plan, an element of the Vail Transportation Master Plan, and setting forth details in regard thereto. The Public Works Department and Community Development Department request that the Planning and Environmental Commission listens to presentations by Staff and Nancy Johnson with Fabray Lighting, ask questions, and provide any preliminary direction. II. DESCRIPTION OF REQUEST The Town of Vail, in conjunction with the Colorado Department of Transportation, is. in_,,_- '----------- --�---- the process of updating the Vail Transportation Master Plan in response_to the on-going_'�,�, '---- --------------- --- and projected� increases in development_activity,_ the_`esults _of pas�_master planning �, �, � - �------ processes, and pending redevelopment plans. As a separate element of this plan, the�����,'� Town is also in the process of adopting a lighting master plan for both the North and ",o� South Frontage Roads. While the need for improved safety and way finding are the ';��' �� primary drivers for creating this lighting master plan; the Town is also addressing '�';,', aesthetics and environmental stewardship issues in this plan. The proposed lighting ���;, master plan is intended to be implemented in stages as opportunities arises over time. �;, � ,,' Both frontage roads are located within the Federal Highway Administration's (FHWA) ;�� right-of-way (ROW) and are administered thru the Colorado Department of �� Transportation (CDOT). Pursuant to Section 43-2-135, Division of Authority of Streets, Colorado Revised Statutes (CRS) the Town of Vail is responsible for the illumination of the frontage roads. The frontage roads currently have minimal roadway and pedestrian lighting. The existing roadway lighting is limited to the roundabouts, and the existing pedestrian lighting is limited to the commercial core areas and street intersections. With this limited lighting, there are both safety concerns and way finding challenges for all modes of transportation. The overflow vehicle parking that occurs along the frontage roads at peak times is a significant safety concern. Overflow parking occurs on the frontage roads 30 to 50 times per year. This parking occurs at the busiest times during the year, in the busiest locations along the frontage roads, during the shortest daylight hours of the year, during times of inclement weather when road conditions are poor, and the parking occurs on Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 pt Formatted: Font: (Default) Arial, 11 � pt Formatted: Font: (Default) Arial, 11 � pt Formatted: Font: (Default) Arial, 11 pt the opposite side of a visitor's primary destination thus requiring pedestrians to cross the frontage roads. The combination of these factors presents a precarious situation for vehicles entering and exiting parking spaces along the frontage roads, for pedestrians entering and exiting their parked vehicles, and for pedestrian trying to cross the frontage roads at various locations to access the commercial core areas. Other safety concerns include the general inability of vehicle drivers to adequately see pedestrians, bicycles, stopped buses, and other obstacles at night. Nighttime way finding challenges currently exist at the roundabouts and at various local road intersections along the frontage roads. The existing frontage road conditions limit the ability of drivers to determine their necessary direction of travel without becoming lost. Primary vehicle routes need to be illuminated at major intersections to lead drivers who are unfamiliar with the area down the right path. Secondary road intersections also need to be illuminated to allow the unfamiliar driver an opportunity to anticipate upcoming intersections and to give the driver the ability to read relevant signage. Notable destination points such as the Village parking structure, Lionshead parking structure, and Ford Park also need to be property illuminated. The existing Main Vail roundabout is a notable example of poor nighttime way finding. Currently when a vehicle arrives at the Main Vail roundabout it is unclear to most unfamiliar drivers which direction is the primary route. Many unfamiliar drivers mistakenly travel south on Vail Road until they reach a dead-end at Check Point Charlie in the Vail Village. It is not clear to an unfamiliar driver that the primary routes of travel from the Main Vail roundabout are along the West South Frontage Road and the East South Frontage Road. Appropriate lighting design can compliment improved signage to delineate the correct desired direction of travel. The Town anticipates that the proposed lighting master plan will be implemented over time as roadway and private development construction projects occur. Staff believes it is critical that each individual development project adjacent to the frontage roads be coordinated with a comprehensive street lighting master plan. Unfortunately, there are multiple private developments and roadway improvement projects already under construction adjacent to the frontage roads. The roadway and pedestrian lighting improvements associated with this construction is currently being implemented on a project-by-project basis, rather than in a comprehensive and coordinated manner. The proposed lighting master plan is intended to remedy this situation and provide direction into the future. Attached are two preliminary exhibits describing the overall need, the desired overall design, and potential lighting levels along the frontage roads. III. STAFF RECOMMENDATION The Public Works Department and Community Development Department recommend the Planning and Environmental Commission tables this item to its May 11, 2009, public hearing for further review. IV. ATTACHMENTS A. Lighting need, design, and lighting level exhibits � � �� Jwa� . . r� � '� � �� ' f' _ a. � �, n r� M � � C. �,' � w � �-r O � �� �. U�lt4 '� � O � � � � 0 � � � �• � �� G � i�+ r'P �'7 � rr Cp� � � O rt. �"` O � � ��. � � � W �'t . � � �r-{ '� '�"� N � � � � o �, w � � � �; �� o n � � �o n �. O � � � � w SZ. � � w � � � O � O � � � � � � �. s� �� �R ti � � � n �!� � P � � O . � � � rt ` � � � Y � � d � � �. �� `� rr n � o ¢, "o G �-. v, W � n � . � � co UR � � i. n n � �a �i�.. CD ..Ci � `C3 � � �-r �. _� - = T� � . �� o �' � � o �- � �� � � � I�-{ � �. � � � �. . Q, � �• w �, � � � a� S. � o �' a � � 0 w � � m' rr � � �� o� O � � � �. � rt � � H. � � � � � rt � � � � v�i ` 4 ry �' PD rt �y ��'t �.7 v> � (D � � � �. n o �,• � � � � � � c�..,� � � � F . �'w,:? �i" � � o p" �� (fl rt ('D n � � (7R � � rr' (D� � �' � � �� ro CD �' rt (% �' � � G � � � O � � OR � 'r � r� � � �-� � � � \� � . � � � � 3 e. � � ° �; � 7 � ' '� `\ � . , � ��"��_ „ � � � .\ _ i,._. . o � � �� �� � ` � _ �� � �� ' . g ` �� � 0 0 ,� f� r a � r � �c 0 � O «rts � G ro � � � � � � tv � � � � � O� � � � � � � � � � � � � ,.z � , ---�, , _ � ���,,����� {� — �� ��a � � a � ����� �� �, :�� �� �s � ._ ` �,, '' - ��� �. ,;\ -� �JF � �� \� \ �` - ,� `;� s.. ` .Er� .j \ '� I`1 �\. n..-�\„ �- \\':',���� _ \� ;, � ,� � � : , \ `, �� _ \ � "� � ; ,� � i ��°� - ` , �, - �l :y4i I :. G' I i � � c��e � . L� � ' 'y'.., ,� �'4� w�t � 'I' � '� �` t `�� j i ,l ,�; , , '�/ ., :` ,� � 'i ��� �t� ��� ��� , � �� �t�'�° ' - � �i � ,�� � � ��.. �. �� � r `Y.-s��7.`� � -_ J ' : � F �� r i .. / ��' . .,•,1 � - � � a - �� i � �a� ' - � �s ���f �' � ` � " ��'� � i;;� �� i � >. �;' ,� << - n � 1, � c} �, t � �S� � //� IJ .. Ci r� � � �,%1 ��'!� , ✓ I - �� ,'i %r,�f� � �r !! �, , ��,,, , „ � , ./; �� J1I � � 4 � /� � �� �: � f' �����i���; �` _ ,�� , �� , � ,t; �� � ,��f �� ', ,;. y�" �, �� ,, ?; �_ � b G'�� � � �� �'� r� � � f � � �1 .i' �,� �� ;., MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: April 27, 2009 SUBJECT: Information Update: The Administrator has determined that public lockers may be installed on the exterior of the Lionshead ski yard public restroom building as a "skier services" use on the first floor in the Lionshead Mixed Use 1 District pursuant to Section 12-7H-3, Permitted and Conditional Uses, First Floor or Street Level, Vail Town Code; located at 600 Lionshead Mall/Lot 2, Lionshead Filing 6, and setting forth details in regard thereto. Planner: Bill Gibson SUBJECT PROPERTY The subject property is 600 Lionshead Mall/Lot 2, Lionshead Filing 6. II. PLANNING AND ENVIRONMENTAL COMMISSION JURISDICTION Pursuant to Sub-section 12-3-3B-1, Appeal of Administrative Actions; Authority, Vail Town Code, the Planning and Environmental Commission has the authority to call up (i.e. appeal) any decision, determination or interpretation by any Town of Vail administrative official with respect to the provisions, standards, and procedures of the Title 12, Zoning Regulations, Vail Town Code. III. ADMINISTRATIVE ACTION On March 22, 2007, the Planning and Environmental Commission granted approval of a major exterior alteration to allow for the construction of a permanent public restroom building in the Lionshead ski yard adjacent to Chair 8. This is generally the location of the existing temporary public restroom building. The Community Development Department recently received a building permit application for the permanent public restroom building. This building permit application differed from the 2007 application in that exterior public lockers were proposed on the western side of the building. The proposed permanent public restroom building is one story in height, and the location of the proposed public lockers would be defined as "first floor or street level" pursuant to Chapter 12-2, Definitions, Vail Town Code. The proposed public restroom building site is located within the Lionshead Mixed Use 1 District. Pursuant to Section 12-7H-2, Vail Town Code, "commercia/ ski storage" and `public or private /ockers or storage" are permitted uses on the basement or garden level. These uses are not listed as permitted on the first floor or street level in Section 12-7H-3, Vail Town Code, and are therefore prohibited on this level of a building. However, "skier ticketing, ski school, and skier services" are permitted uses on the first floor or garden level. In addition to restrooms, the proposed public restroom building will also include space for the Children's Ski School. In 2007, both the restroom and ski school uses were interpreted as "skier ticketing, ski school, and skier services" uses permitted on the first floor or street level. Chapter 12-2, Definitions, Vail Town Code, defines "commercia/ ski storage" as outlined below in Section IV of this memorandum. Unfortunately, Chapter 12-2 does not define "skier services" or `public or private /ockers or storage" which is a land use unique to the Lionshead Mixed Use 1 District. However, Article 12-8E, Ski Base Recreation 2 District, Vail Town Code, clarifies what uses are associated with skier services by permitting the land use "Skier and guest services including, but not limited to, uses such as basket rental, lockers, ski repair, ski rental, lift ticket sa/es, public restrooms, information/activity desk" on the first floor in the Village ski yard area and the Front Door project. Staff believes the proposed public lockers on the exterior of the permanent Lionshead ski yard public restroom building could be interpreted as "commercia/ ski storage'; `public or private /ockers or storage'; or "skier ticketing, ski school, and skier services" land uses. However, Staff believes these proposed lockers will serve as a guest amenity accessory to the public restrooms consistent with the "skier service" land use description. Staff does not believe these specific lockers are intended as a separate business use such as "commercia/ ski storage". Since the proposed lockers are to be located on the exterior of a public restroom; Staff does not believe the proposed lockers will displace any existing or future first floor retail, restaurants, etc. uses desired by the horizontal zoning principles applied to the Lionshead area. Therefore, the Administrator has determined that public lockers may be installed on the exterior of the Lionshead ski yard public restroom building as a"skier services" use on the first floor in the Lionshead Mixed Use 1(LMU1) District pursuant to Section 12-7H-3, Permitted and Conditional Uses, First Floor or Street Level, Vail Town Code. IV. APPLICABLE REGULATIONS OF THE TOWN CODE Chapter 12-2, Definitions (in part) COMMERC/AL SK/ STORAGE: Storage for equipment (skis, snowboards, boots and po/es) and/or clothing used in skiing re/ated sports, which is available to the public or members, operated by a business, club or government organization, and where a fee is charged for hourly, daily, monthly, seasona/ or annual usage. Ski storage that is part of a/odge, or dwelling unit, in which a fee is not charged, is not considered commercia/ ski storage. F/RST FLOOR OR STREET LEVEL: For the purposes of implementing horizontal zoning within specific zone districts, first f/oor or street /eve/ shall be any floor, or portion of any floor, of a structure /ocated at or nearest to (either above or be/ow) the /eve/ of the adjacent vehicular or pedestrian way, as determined by the administrator or the planning and environmental commission. More than one f/oor, or portion of f/oors, may be defined as first f/oor or street /evel within a sing/e structure. Article 12-7H, Lionshead Mixed Use 1 District 2 � 12-7H-2: PERMITTED AND COND/T/ONAL USES; BASEMENT OR GARDEN LEVEL: (in part) A. Permitted Uses: The following uses shall be permitted in basement or garden leve/s within a structure: Commercial ski storage. Public or private lockers and storage. 12-7H-3: PERMITTED AND COND/T/ONAL USES; F/RST FLOOR OR STREET LEVEL: (in part) A. Permitted Uses: The following uses shall be permitted on the first floor or street /evel within a structure: Skier ticketing, ski school and skier services. Article 12-8E, Ski Base Recreation 2 District 12-8E-2: PERMITTED USES: (in part) A. The following uses shall be permitted within the ski base/recreation 2 district: Ski base oriented uses including the following: Skier and guest services including, but not limited to, uses such as basket rental, lockers, ski repair, ski rental, lift ticket sa/es, public restrooms, information/activity desk. COMMISSION ACTION The Planning and Environmental Commission may call up any administrative decision, determination, or interpretation pursuant to 12-3-3, Appeals, Vail Town Code. Should the Commission choose not to call up or modify the administrator's action; the administrator's action shall become final. 3 g°m�c�m�«dW N aN �� �� y E� m» '�y>-o� �«ma° L at a> m- a 0 c. t . m... yQfo38oa�m Z= �= E�m����.m �= S`°tc yasio`�.�o c.;�'� �wv' �m0°vi-3_C°�p0 O€ vmmo vo 00 °m m o- m m m ao~ " °i`c�1= nF °<Eo-PEm�t oH `°m� • y�mE c�aE Ea`c�� �aNm`c�mos.n�i�UO ¢O � .��mmxm=rr ¢O t�rac�m�mo o,��o o�� ui�>ma!�¢ a¢� �c� n mLwfatnm° ici HmooHa£�a� tnca5 .Ua.r 2 W � SG�>N�E W�N� ���� Z _ Z 5 N O 0 N O Wp <$V J ; > � w ma ¢ zd a � O�" LL pl n � � z��,� O �A �� O � 0 aU 00 O E� a � W C7 W w O H � � H W � m s N ¢ � �F W W a N W m W i > 0 m U s c7 � � ■¢ S � � L �� N� EO_b= 'O C pYmm(0�� m .�CO�iPm C C � C 1` �^�IL" m �����a � — ���� �omm . m� 3 v�i�> m � O �y oV~�«m� C.m.y C�.� W � m3>m� H ft .`�0«mYUI �Q 111 'm��>{� � L'COm �C .0 �>�ytOm� Zocp � � N m 3 m �« C Q N G 0�>0� o i�mC7 O Qa�'vV �� o E- C> ���N��m"p��m N 0 C pm m �mW N�� � ��O Em=a�c�� mc R�N� � mi��.$�is �' � O � c� F. A a�i C � a�i ��o�� cd v U � v�i ��� � � y � � �b � � � � � ... 4, ,b � �b c � >, �-' °; . o a� o¢, � c.� � •� QU �•.� ° a� � .� p � � � N �'" bA � � a �'�' .���`«.� ai c� � •� � � � o � .� w o � � � ° �•° a� �' • � ~ c „ a, .� �U� c.� �„„,� : �'���a w.�;n 3 ¢' �� � � �.>� a' N a � w c� :--� y V � � � � � � c� ¢• � p � ,� �v .� � 3 � � � �.� � •Y � � �' 'p �c� � � � 3w � � � � � � o � ��b�b o�a�� �3��� a� �.�Yo� N 'b �•� o•� � � `' °' a� °' a'� � -v o � � � � � �•°�o o � o a� a� �' a� � �13��•^ a�.� � o a�i ���w�� O 0.�.� � j� C J O11 � C C 7 7 V� J_ a m. mmymnnvaVmmrnm . �ym«��mq�°c�.=�« � OCD mm1 Enm��ma`=�T-m V 10=O�mmmc=m>m � `mda�c>vE�,�m,�mu�i.=_ m 3a�mEE>m`�aa�'°`�g -� >j°cp��a«j�mo�� O �CEm�2��«OVYU� c°a(pEriQw ¢cfwNc m�cm m c_ m -�oDF m_ op-�oa i0c cor-°��£'aZC�C�1 aC7 OV��V� C����maP'�� �� �t���0j. o��>a0 m CN O O�(�����N��� y,. CQyCVV b'�V)� b� �7� Emx°cc-g cs��� � �a,�moo�=m���._ N A N H H m o ca O b � �. 0 0 U �, a� b a a on c � L 6� a O y c u � .� a .� L e.�., a, a 0 a � � o�io � � > � � o�o = 'fl a� o. a� u u � � a � � = �> a, � �� o. A � '� f.� > � ,� o Hx '� cd � w 0 a� � � � a� � � � 3 N U 0 Q ;n c� � w 0 ❑ 0 .� � a a � � a� � � � b � O� O 0 N � � N � b a� � � � a� � ¢. N � ^v � � w 0 a� � .� a� � � 0 0 N � � N � b a� � � � a� � a. � a�i � � � � E � NZ F r � H T oE��a ��m$m °Ecmm � ��V m c p � C m� G Eoy m E�-m$ � m- F m V� C L; O o« p � '.��r'L'C 0� tll � a`o°n�; � V �~ c�l�- W ��i �l9� m N � �>� � ��° �oiH����`� 0 '� W w N � � � � y N m � N 101tl� '� ���r � y �09 � �LY O� C � �Om m �a m , � aN N C n �¢F � � N m lO m ' W Y �� � l0 H mmL ) . 0 3 0� o 0 0 � 10LL°� � a 2 om�� 3 !7 O $ m x ° C1 �4/ O mNoV" � (/� �� n� C V U�� F� �e°maar4�S<� � � 0 � � 0 0 U w 0 �.�+ � � � c� w w 0 � � O U a� � � �° b � � :n � � c� 0 � c� a� � w � .n 0 3 � b � � a� �n � U � � � ��,'� Z 006. "��� 6� v�i� � � �o � � � U �Z �d4� � yd S-�P�� � , � � 4 � � � � � � 0 N ri i, � � a�i > z .� K a� � .o � .� 0 U � � E�._ '_ � OOONy? f/7 .` m>„- Y N N � A J CO��� T N(„)Nd�[1 D �m��« m >'- Ul C O C N��L� y pa'c'3 m.-.d m y� O O�� m N .�NC��gc �W mo-om ` �� m!� U c a.� ���N�a� p�� NY aOm�m � �2 ��?mamrnL C7m0 YNN�NIOC � C y d O - - � y L = O J � �mACNLLgy ��y�^ �C 4F � J � N� t0 N�C� LL�fG N � O�� " m � OI d a'm��cc��mc c' cxaooy$LL d� 0..� E Emo.�mmvm$ m mLO..��oyy 8F� OC N� y0U yN f7% �O�NnV�.OL _ O m L m V"` O H J m �aZ a o��oyU=N� ¢0 � i0mn..OD�o_ O � � N � m � Q N L �G � � SoE� �CE� �oo� c�Ut O n � j Ecw� � °-��cn 0 C > ; � � va�c _ ��dE L '-- r�+ c n = m N^N o�t, - OI N.� G m N N� �p ot�c V � O ��Eo o no°m nL>O �L..DQm t'I � U �N �n�m O�E� D � O O moo n cmD o " m n� � �NN d � n � ,� E -`0rn tE � G �a � N C = co� � U '`' m "o � aC� dj0 O a �L � C � Er t c N n� � O O C N N - v pN o_ N'C N� _- =8 a -� -_ � -- �= Q - = ou :-_�� F •:a O Z' _ uZ �+±?�� LLU _ _ - 6m =_ - 6 `L ' � j_-_:: N - _ __ Z�-- �l --,�J=- _- _ �-_ _ -Z_-_tiw- _ _ _ �Z d 6i_..�,..i__-E: .a� v� � z,�. ,�. ,�. O� � � � V '"' O �� wV ww 00 G d' a� W � W w O F � O - � � _ _ - Z _ -i ' - .�J_.. ..=�-6 _ �' � O � C� br Q a�i � � a�i a���� O � � � U � � � � .ti � '� � .� ... c� ; � b � � 'O � � p .� c� F-� ^O >' O � c� �, p �.� � .� O � .� Q��•�° � � .� o � � � � � � � N .� �? � �" � w� �� � o�>,�a� �W �s c .�w o � � � � �'� � a �.� a,� � �b �v.o�� ����. ����� w~.��3¢' ��a,.?,� c' � a � � �' � ; a ����a ��o� �, -o ,� � 3 � � � �3 � .� � � �' :'O c� �" ¢, Q.' �' v� � � 3 w � 3'0��,� �a�b�b � � � � � �a��� o �.�`" � O � 'O � '� O •� w .w � N � � A.'� ¢,'O O � � � O � � p" .� � � Q3�bn•�� `" � a�i � a'� W °a � . 1'r � y � � � L ^ O U L � '� C D OD C � R L � CL 0 y C O U � � .? L W � C 0 � � a� E �n � a� > '� R R OD :: � a� c. a� U U R C C p R •y � �> '� L A � � � a� E Hx �1�1 � �. a� � � � � , � w O � � .� w .� N 'O � � � � � N � � b a� � � a � c� � � a� � .� N , � � 0 a� U .o � � b0 � 'O N k � � � � � H :'O � � w O � � � .� N � � � � U O � °O c� � w 0 � 0 .� � � a � � a� � � � b � � 0 0 N � O � � b � � b N � � 3 N � 'O c� � �r.i O � � .� a� � -�` _ O� 0 O N 0 � � 'O � c� 'O � c�" a � � � � O 0 N .� w O c� 'O � 0 M � � b � � � N � °�' a� � � � w � � � 3 � N �-�+ �3 � � O 'O W �. N b0 c� � � � a � 0 O N .� Q W O � b � 0 M c�v� � vd'p� 7 � = J �Z � O v� � 4 O �bd STA�� h��� � � � c� 0 Z � � 0 N ri L � � � > 0 z w .� � � O � .0 � O U � � PLANNING AND ENVIRONMENTAL COMMISSION April 13, 2009 l. 1:OOpm �au�voFV�u � TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT Rollie Kjesbo David Viele departed at 4:30 Scott Lindall Susie Tjossem Michael Kurz Swearing in by Loreli Donaldson Training — Matt Mire, Town Attorney MEMBERS ABSENT Bill Pierce Sarah Robinson-Paladino Site Visits: 1. Vail Row Houses — 303 Gore Creek Drive 2. Pinos del Norte — 600 Vail Valley Drive 3. Golf Course Pump House — 1980 South Frontage Road East 45 minutes 45 minutes A request for a final recommendation to the Vail Town Council for the establishment of a new special development district, pursuant to Article 12-9A, Special Development (SDD) District, Vail Town Code, located at 303 Gore Creek Drive, Units 7 through 14 (Vail Rowhouses)/Lots 7 through 13, Block 5, Vail Village Filing 1, and setting forth details in regard thereto. (PEC080074) Applicant: Christopher Galvin, represented by K.H. Webb Architects Planner: Bill Gibson ACTION: Recommendation of approval MOTION: Viele SECOND: Kurz VOTE: 5-0-0 Bill Gibson gave a presentation per the staff inemorandum recommending denial of the proposed special development district. He highlighted changes made to the application since previous public hearings. Dominic Mauriello, of the Mauriello Planning Group, representing the applicant, gave a power point presentation detailing the history of the development and the requests contained within the Special Development District application. Jim Lamont, Vail Homeowners Association, provided greater insight on the history of the site. He believed that the Vail Row Houses were a part of the original Vail filing and that these structures were some of the first structures built in Vail. He added that in 1974 the overhaul to the Zoning Code was the result to the impacts seen by the constructed Mountain Haus. He continued, by suggesting that the creation of a new zone district was more appropriate for these townhouse style structures. He further discussed the height of structures in the neighborhood. He concluded by stating that if an SDD is applied to this development, then serious consideration needs to be given to its application to Vail Trails East and West and the Texas Townhomes. Connie Knight, resident of the Vorlaufer, said did not see a need for a special development district and that the benefit of encouraging redevelopment is not really a benefit. She noted that most of the units have recently remodeled, and this SDD will only help the redevelop one lot. Page 1 She expressed concern that the proposed additional floor area will be built on the Gore Creek side of the buildings. She is against developing two feet from the new property line along the park. She said the Inclusionary zoning change will only result in additional fee-in-lieu money, and not in actual new employee housing. She also noted that the applicant's comparison to the Willows was not appropriate since the Willows projects was a complete tear down. Dominic Mauriello spoke again and noted that the proposed SDD will create a comprehensive plan for the HOA as a whole. Commissioner Kurz asked about creating another zone district versus a special development district. Bill Gibson responded that creating a new zone district was discussed with the applicants. He noted that from an applicant's perspective, creating a new zone district would involve the coordination of many more property owners, would require addressing many issues that may only relate to one the many similar non-conforming properties (i.e. Vail Rowhouses, Vail Trails East and West, Texas Townhomes, etc.) which would likely involve a more complicated and lengthy review process. For the applicant, the same outcomes could be achieved through the SDD process. Dominic Mauriello noted that a blanket rezoning of these similar properties would be difficult given the unique non-conformities of each development site. Commissioner Tjossem noted her support for the proposed SDD. Commissioner Lindall asked Dominic Mauriello to clarify the GRFA cap proposed for Lot 13. Dominic Mauriello clarified that at previous work session the Commission noted concern about the potential bulk and mass for Lot 13 being out of character with the other units given its larger lot size. Therefore, the applicant is proposing to cap the allowable GRFA for this one lot at a rate lower than what is proposed for the other lots. Commissioner Viele noted that the Town should apply similar floor area ratios to this project as it has to other recent projects in the village such as the Willows. He also noted that the applicant's proposal to dedicate land to Roger Staub Park is a significant public benefit. Commissioner Kjesbo stated his support for the application. He described the difficulties in maintaining one-half the existing floor area to maintain the units grandfathered status from his past experience remodeling some of the Vail Rowhouse units. He noted that many of the units could be converted into single units by removing the existing second kitchens, which he believes are sometimes maintained solely to give the owners a second "250 Addition". By allowing the additional floor area without requiring the second kitchen, the lots could become single units and could therefore comply with their required parking space numbers. He recommended that lots that don't remove their second unit could pay-in-lieu for the additional required parking spaces. He noted that site coverage and building height limits will control the bulk and mass on these properties more than GRFA limits. He does not oppose to the GRFA increases. He also noted his support for an SDD rather than creating a new zone district due to the unique circumstances affecting each of the neighboring properties. In making his motion, Commissioner Viele made the additional finding that this application is consistent with the precedents set for redevelopment in the village by the Willows SDD. Page 2 45 minutes 2. A request for a final recommendation to the Vail Town Council for prescribed regulations amendments to Title 11, Sign Regulations, Vail Town Code, pursuant to Section 11-3-3, Prescribed Regulations Amendment, Vail Town Code, to establish regulations for building wrap signs within the Town of Vail, and setting forth details in regard thereto. (PEC090006) Applicant: Vail Valley Foundation Planner: Rachel Friede ACTION: Recommendation of approval (failed) MOTION: Viele SECOND: Tjossem VOTE: 2-3-0 (Kurz, Kjesbo, and Lindall opposed) Rachel Friede gave a presentation per the staff inemorandum recommending denial of the proposed text amendments. Scott Bluhm, representing the Vail Valley Foundation, asked the Commission to consider that the signs would only be permitted on building under construction and not on completed buildings. Commissioners Lindall, Kurz, and Kjesbo were not in support of the project as it was off-site advertising with an inappropriate scale. Commissioners Viele and Tjossem supported the proposal because of visual interest on buildings which are not attractive during construction. Commissioner Tjossem provided Park City as a good example of where these types of signs have been used to add vitality for special events. 5 minutes 3. A request for a final review of a variance from 12-6D-6, Setbacks and 12-6D-9, Site Coverage, Vail Town Code, pursuant to Chapter 12-17, Variances, to allow for an addition within the front setback located at 1838 Sierra Trail/Lot 15, Vail Village West Filing 1. (PEC090008) Applicant: John Brennan, represented by LKSM Design, P.C. Planner: Bill Gibson ACTION: Tabled to April 27, 2009 MOTION: Kurz SECOND: Viele VOTE: 5-0-0 There was no discussion of this item. 30 minutes 4. A request for a recommendation to the Vail Town Council on a proposed major amendment to Special Development District No. 2, Northwoods, pursuant to Article 12-9(A), Special Development District, Vail Town Code, to allow for a lobby addition and locker reconfiguration; located at 600 Vail Valley Drive (Pinos Del Norte, Building C)/Part of Tract B, Vail Village Filing 7, and setting forth details in regard thereto. (PEC090009) Applicant: Pinos Del Norte, represented by Fritzlen Pierce Architects Planner: Nicole Peterson ACTION: Recommendation of approval with condition(s) MOTION: Kurz SECOND: Tjossem VOTE: 4-0-1 (Kjesbo recused) CONDITION(S): 1. Locker setback: The applicant shall submit revised development plans that illustrate the proposed ski storage lockers setback a minimum of 4.5 feet from the west property line, prior to the final review of the development plans by the Town of Vail Design Review Board. 2. Utility Sign-off: The applicant shall receive final review and approval of the location of the proposed lockers within the utility easement along the west property line, by the utility companies, prior to the final review of the development plans by the Town of Vail Design Review Board. Page 3 3. Signs: The applicant shall receive final review and approval of a sign permit for any proposed sign, by the Town of Vail Design Review Board, prior to installation of any signs on the property. 4. DRB approval: The applicant shall receive final review and approval of the proposed development plan, by the Town of Vail Design Review Board, prior to application of a building permit. 5. ERWS Encroachment: The applicant shall receive final review and approval of an encroachment agreement for the proposed lockers in the utility easement, by the Eagle River Water and Sanitation District, prior to issuance of a building permit. 6. Fire Safety: The applicant shall receive final review and approval of a fire safety plan for any proposed changes or alterations to the fire alarm and fire sprinkler systems, by the Town of Vail Fire Department, prior to issuance of a building permit. 7. Revocable ROW: The applicant shall receive final review and approval of a revocable right-of-way permit for any landscaping or improvements in the right-of-way, by the Town of Vail Public Works Department, prior to issuance of a Certificate of Occupancy. Commissioner Kjesbo recused as his company will be performing the work being proposed if approved. Nicole Peterson gave a presentation per the staff inemorandum. Jen McKelvie, from Fritzlen Pierce Architects, stated that the applicant agrees with the Staff memo, except for condition No. 1, which stated, "The applicant shall submit revised deve/opment plans that illustrate the proposed ski storage /ockers setback a minimum of 5 feet from the west property line, prior to the final review of the deve/opment plans by the Town of Vail Design Review Board. " Commissioner Lindall asked why the applicant would not move the lockers to the 5 foot setback. Jen McKelvie, from Fritzlen Pierce Architects, stated that the existing lockers are actually 4.5 feet from the property line. Patrick Pinnett, of NEDBO Construction, representing the applicant stated that the HOA would like to hold gatherings on the patio, which requires more space, which is why the proposal is for an additional 2 foot encroachment into the setback and easement on the west side. He also explained that the existing water line, that is cause for the easement, is quite far from the 10 foot easement, and that the water line is being moved farther away, through current improvements. Commissioner Viele asked if Staff would reconsider, and allow the encroachment, due to the water-line being moved. Warren Campbell stated that Staff believes the proposed lockers should not encroach farther than the existing lockers. Commissioner Viele stated that he did not support condition No. 1 and that a two foot setback was adequate. Commissioners Kurz and Tjossem expressed there support for the project. 5 minutes 5. A request for a final review of a conditional use permit, pursuant to Section 12-8B-3, Conditional Uses, Vail Town Code, to allow for the construction of an accessory building (irrigation pump Page 4 house) at the Vail Golf Course, located at 1980 South Frontage Road East/Unplatted, and setting forth details in regard thereto. (PEC090010). Applicant: Vail Recreation District Planner: Bill Gibson ACTION: Approved with condition(s) MOTION: Viele SECOND: Tjossem VOTE: 5-0-0 CONDITION(S): 1. The approval of this conditional use permit is contingent upon the applicant obtaining approval of the design review application associated with this proposal. Bill Gibson gave a presentation per the staff inemorandum. There was no applicant presentation or public input. The Commissioners expressed their support for the application. 60 minutes 6. A request for a work session to discuss the adoption of amendments to the Vail Transportation Master Plan, and setting forth details in regard thereto. (PEC090005) Applicant: Town of Vail, represented by Tom Kassmel Planner: Bill Gibson ACTION: Tabled to April 27, 2009 MOTION: Kurz SECOND: Lindall VOTE: 4-0-0 Warren Campbell informed the Commission that today staff was requesting a work session and that the Public Works Department would be leading the discussion. Greg Hall and Tom Kassmel of the Public Works Department and Chris Fasching gave a presentation addressing the Commissioner's questions and concerns from the previous work session. Commissioner Kurz asked questions related to transit service. Commissioner Viele asked questions related to existing and future development impact fees. Commissioner Tjossem asked questions related to the potential widening of the frontage roads. Commissioner Viele departed at 4:30 pm. Commissioner Kjesbo asked questions related to increasing the use of the I-70 interchange in East Vail. 5 minutes 7. A request for a final review of a preliminary plan for a major subdivision, pursuant to Chapter 13- 3, Major Subdivision, Vail Town Code, to allow for the creation of two lots for the redevelopment of the properties known as "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West right-of-way/Unplatted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080062) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to June 8, 2009 MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 Page 5 5 minutes 8. A request for final review of conditional use permits, pursuant to Section 12-71-5, Conditional Uses: Generally (On All Levels Of A Building Or Outside Of A Building), Vail Town Code, to allow for the development of a public or private parking lot (parking structure); a vehicle maintenance, service, repair, storage, and fueling facility; a ski lift and tow (gondola), within "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West right-of-way/Unplatted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080063) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to June 8, 2009 MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 5 minutes 9. A request for a final review of major exterior alterations, pursuant to Section 12-71-7, Exterior Alterations or Modifications, Vail Town Code, to allow for the redevelopment of the area known as "Ever Vail" (West Lionshead), with multiple mixed-use structures including but not limited to, multiple-family dwelling units, fractional fee units, accommodation units, employee housing units, office, and commercial/retail uses, located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West right-of-way/Unplatted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080064) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to June 8, 2009 MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 5 minutes 10. A request for a final recommendation to the Vail Town Council for prescribed regulation amendments, pursuant to Section 12-3-7, Amendment, Vail Town Code, to amend Section 12- 10-19, Core Areas Identified, Vail Town Code, to amend the core area parking maps to include "Ever Vail" (West Lionshead) within the "Commercial Core" designation, and setting forth details in regard thereto. (PEC080065) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to June 8, 2009 MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 5 minutes 11. A request for a final recommendation to the Vail Town Council for a zone district boundary amendment, pursuant to 12-3-7, Amendments, Vail Town Code, to allow for a rezoning of properties from Arterial Business District and unzoned South Frontage Road West right-of-way which is not zoned to Lionshead Mixed Use-2, properties known as "Ever Vail" (West Lionshead), located at 953 and 1031 South Frontage Road West and South Frontage Road West right-of-way, (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080061) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to June 8, 2009 MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 Page 6 5 minutes 12. A request for a work session to discuss the prescribed regulations amendments to Title 11, Sign Regulations, Vail Town Code, pursuant to Section 11-3-3, Prescribed Regulations Amendment, Vail Town Code, to allow for housekeeping, clarification and policy shifts for signage within the Town of Vail, and setting forth details in regard thereto. (PEC090007) Applicant: Town of Vail Planner: Rachel Friede ACTION: Withdrawn 13. Approval of March 23, 2009 minutes MOTION: Tjossem SECOND: Kurz VOTE: 3-0-1 (Lindall recused) 14. Information Update 15. Adjournment MOTION: Kurz SECOND: Tjossem VOTE: 4-0-0 The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479-2138 for additional information. Sign language interpretation is available upon request with 24-hour notification. Please call (970) 479-2356, Telephone for the Hearing Impaired, for information. Community Development Department Published April 10, 2009, in the Vail Daily. Page 7