Loading...
HomeMy WebLinkAbout2011-0124 PECPLANNING AND ENVIRONMENTAL COMMISSION January 24, 2011 1:OOpm TOWN *OFi TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 SITE VISITS 1. Arosa Partners Residence & Bob Armour Residence — 2610 & 2688 Arosa Drive 20 minutes A request for the review of a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code, to allow for the re- subdivision of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Drive, and setting details in regards thereto. (PEC110001) Applicant: Arosa Partners & Bob Armour, represented by KH Webb Architects Planner: Bill Gibson ACTION: MOTION: SECOND: VOTE: 30 minutes 2. A request for a recommendation to the Vail Town Council for a major amendment to Special Development District No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village, and for a zone district boundary amendment, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, to include the subject property in the Lionshead Mixed Use 2 District, located at 1000 S. Frontage Road West/Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto. (PEC090036) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: MOTION: SECOND: VOTE: 60 minutes 3. A request for a recommendation to the Vail Town Council for an amendment to the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. (PEC110002) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell ACTION: MOTION: SECOND: VOTE: 20 minutes 4. A request for a review of a flood plain modification permit, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of -way/ Lot 54, Glen Lyon Subdivision and Unplatted parcels (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC11 -0003) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell ACTION: MOTION: SECOND: VOTE: Page 1 5 minutes 5. A request for a recommendation to the Vail Town Council for a prescribed regulation amendment, pursuant to Section 11 -3 -3, Prescribed Regulations Amendment, Vail Town Code, to amend Section 11 -7 -15, Public Parking and Loading Signs for Private Property, to allow signs for public parking on private property, and setting forth details in regard thereto. (PEC100056) Applicant: Solaris Property Owner, represented by Michael Suman Planner: Bill Gibson ACTION: Table to February 14, 2011 MOTION: SECOND: VOTE: 5 minutes 6. A request for final review of conditional use permits, pursuant to Section 12 -71 -5, Conditional Uses: Generally (On All Levels Of A Building Or Outside Of A Building), Vail Town Code, to allow for the development of a public or private parking lot (parking structure); a vehicle maintenance, service, repair, storage, and fueling facility; a ski lift and tow (gondola), within "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West rig ht-of-way/U n platted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080063) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Table to February 28, 2011 MOTION: SECOND: VOTE: 5 minutes 7. A request for a work session on a major exterior alteration, pursuant to Section 12 -71 -7, Exterior Alterations or Modifications, Vail Town Code, to allow for the redevelopment of the area known as "Ever Vail" (West Lionshead), with multiple mixed -use structures including but not limited to, multiple - family dwelling units, fractional fee units, accommodation units, employee housing units, office, and commercial /retail uses, located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West rig ht-of-way/U n platted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080064) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Table to February 28, 2011 MOTION: SECOND: VOTE: 5 minutes 8. A request for review of a variance, pursuant to Chapter 14 -1 -5, Variances, Vail Town Code, from Section 14 -10 -5, Building Materials and Design, Vail Town Code, to allow for the installation of solar panels within two feet of a roof ridge and eave and extending higher than the ridgeline, located at 4918 Meadow Drive, Unit A/Lot 16, Block 7, Bighorn Subdivision Fifth Addition, and setting forth details in regard thereto. (PEC100046) Applicant: Laurent Meillon Planner: Rachel Dimond ACTION: Table to February 14, 2011 MOTION: SECOND: VOTE: 5 minutes 9. A request for an amendment to an Approved Development Plan, pursuant to Section 12- 61 -11, Development Plan Required, Housing Zone District, Vail Town Code, to allow for revisions to the required landscape plan and geologic hazard mitigation plan for the redevelopment of the easternmost 5.24 acres of the Timber Ridge Village Apartments; and a request for the review of a variance, from Section 14 -5 -1, Minimum Standards, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for a crossover drive aisle width of less than thirty -feet (30') within the required parking Page 2 structure, located at 1280 North Frontage Road /Lots 1 -5, Block C, Lions Ridge Subdivision Filing 1,and setting forth details in regard thereto. (PEC100018 /PEC100019) Applicant: Vail Timber Ridge L.L.C. Planner: George Ruther ACTION: Table to February 28, 2011 MOTION: SECOND: VOTE: 5 minutes 10. A request for a final review of a variance from 12- 71 -14, Site Coverage, Vail Town Code, pursuant to Chapter 12 -17, Variances, to allow for additional site coverage below grade, within "Ever Vail" (West Lionshead), located at 934 (BP Site), 953 (Vail Professional Building), 1031 (Cascade Crossing) S. Frontage Road / Unplatted; 862 (VR Maintenance Shop) and 923 (Holy Cross Lot) S. Frontage Road / Tracts A and B, S. Frontage Road Subdivision; 1000 (Glen Lyon Office Building) S. Frontage Road / Lot 54, Glen Lyon Subdivision (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC090035) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Withdrawn 11. Approval of December 13, 2010 and January 10, 2011 minutes MOTION: SECOND: VOTE: 12. Information Update 13. Adjournment MOTION: SECOND: VOTE: The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department Published January 21, 2011, in the Vail Daily. Page 3 MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 24, 2011 SUBJECT: A request for the review of a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code, to allow for the re- subdivision of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Drive, and setting details in regards thereto. (PEC110001) Applicant: Arosa Partners & Bob Armour, represented by KH Webb Architects Planner: Bill Gibson SUMMARY The applicants, Arosa Partners & Bob Armour, represented by KH Webb Architects, are requesting the review of a final plat to allow for the re- subdivision of their properties, Lot 3 and Lot 5 respectively. Based upon Staff's review of the criteria outlined in Sections VII of this memorandum and the evidence and testimony presented, the Staff recommends the Planning and Environmental Commission approves, with a condition, this request subject to the findings noted in Section VIII of this memorandum. II. DESCRIPTION OF THE REQUEST The applicants, Arosa Partners & Bob Armour, represented by KH Webb Architects, are requesting the review of a final plat to modify the property boundary between Lots 3 and 5, Block D, Vail Ridge. This proposed final plat transfers 246 sq.ft. of property from Lot 5 to Lot 3. The proposed Lot 3 will increase to more than 14,000 sq.ft. of lot area, thus increasing the allowable density on this site from one dwelling unit to two dwelling units. A vicinity map (Attachment A), the proposed final plat (Attachment B), and the applicant's request (Attachment C) have been attached for review. III. BACKGROUND The subject properties were originally platted through the Vail Ridge Subdivision in 1965 under Eagle County jurisdiction. Lot 3 was configured with 13,772 sq.ft. of lot area and Lot 5 was configured with 22,536 sq.ft. of lot area. These properties were annexed into the Town of Vail in 1986. The Town of Vail zoned both properties Two - Family Primary /Secondary District. Since Lot 3 is less than 15,000 sq.ft. in size as required by the Two - Family Primary /Secondary District, this property is legally non - conforming in regard to lot area. Currently one single - family residence exists on Lot 3 and a two - family residence exists on Lot 5. In 2000, the Town of Vail adopted Ordinance No. 6 to amend the density standards in the Two - Family and Two- Family Primary /Secondary Districts. The minimum lot size standard in these districts was 15,000 sq.ft. of buildable area. The allowable density in theses districts was also based upon a minimum lot area of 15,000 sq.ft. Properties meeting the 15,000 sq.ft. minimum lot area standards were allowed a density of two dwelling units, but lots smaller than 15,000 sq.ft. were allowed a density of only one dwelling unit. Ordinance No. 6, Series of 2000, did not amend the 15,000 sq.ft. minimum lot size standard in the Two - Family or Two - Family Primary /Secondary Districts. However, Ordinance No. 6 lowered the minimum lot area for a density of two dwelling units from 15,000 sq.ft. to 14,000 sq.ft. in these districts. The stated purpose of this amendment was a follows: "The PEC and staff believe that by lowering the minimum lot size, even by 1, 000 sq. ft., may encourage redevelopment of homes and the creation of Type II EHUs. The majority of lots of less than 15,000 sq. ft. are located in East and West Vail. These lots were annexed to the Town of Vail and applied zoning that did not reflect the plats that were recorded by Eagle County. " IV. APPLICABLE PLANNING DOCUMENTS Title 12, Zoning Regulations, Vail Town Code (in part) ARTICLE 12 -6D: TWO- FAMILY PRIMARY /SECONDARY RESIDENTIAL DISTRICT Section 12 -6D -1: Purpose: The two - family primary/secondary residential district is intended to provide sites for single - family residential uses or two - family residential uses in which one unit is a larger primary residence and the second unit is a smaller caretaker apartment, together with such public facilities as may appropriately be located in the same zone district. The two - family primary/secondary residential district is intended to ensure adequate light, air, privacy and open space for each dwelling, commensurate with single - family and two - family occupancy, and to maintain the desirable residential qualities of such sites by establishing appropriate site development standards. Title 13, Subdivision Regulations, Vail Town Code (in part) CHAPTER 13 -1: GENERAL PROVISIONS (in part) Section 13 -1 -2: Purpose A. Statutory Authority: The subdivision regulations contained in this title have been prepared and enacted in accordance with Colorado Revised Statutes title 31, article 23, for the purpose of promoting the health, safety and welfare of the present and future inhabitants of the town. B. Goals: To these ends, these regulations are intended to protect the environment, to ensure efficient circulation, adequate improvements, sufficient open space and in general, to assist the orderly, efficient and integrated development of the town. These regulations also provide for the proper arrangement of streets and ensure proper distribution of population. The regulations also coordinate the need for public services with governmental improvement programs. Standards for design and construction of improvements are hereby set forth to ensure adequate and convenient traffic circulation, 2 utilities, emergency access, drainage, recreation and light and air. Also intended is the improvement of land records and surveys, plans and plats and to safeguard the interests of the public and subdivider and provide consumer protection for the purchaser; and to regulate other matters as the town planning and environmental commission and town council may deem necessary in order to protect the best interests of the public. C. Specific Purposes: These regulations are further intended to serve the following specific purposes: 1. To inform each subdivider of the standards and criteria by which development proposals will be evaluated, and to provide information as to the type and extent of improvements required. 2. To provide for the subdivision of property in the future without conflict with development on adjacent land. 3. To protect and conserve the value of land throughout the municipality and the value of buildings and improvements on the land. 4. To ensure that subdivision of property is in compliance with the town's zoning ordinances, to achieve a harmonious, convenient, workable relationship among land uses, consistent with town development objectives. 5. To guide public and private policy and action in order to provide adequate and efficient transportation, water, sewage, schools, parks, playgrounds, recreation, and other public requirements and facilities and generally to provide that public facilities will have sufficient capacity to serve the proposed subdivision. 6. To provide for accurate legal descriptions of newly subdivided land and to establish reasonable and desirable construction design standards and procedures. 7. To prevent the pollution of air, streams and ponds, to assure adequacy of drainage facilities, to safeguard the water table and to encourage the wise use and management of natural resources throughout the town in order to preserve the integrity, stability and beauty of the community and the value of the land. Town of Vail Land Use Plan (in part) CHAPTER II — LAND USE PLAN GOALS / POLICIES (in part) 1. General Growth /Development (in part) 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5. Residential (in part) 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. CHAPTER VI — PROPOSED LAND USE (IN PART) 4. Proposed Land Use Categories (in part) LDR - Low Density Residential This category includes single - family detached homes and two - family dwelling units. Density of development within this category would typically not exceed 3 structures per buildable acres. Also within this area would be private recreation facilities such as tennis 3 courts, swimming pools and club houses for the use of residents of the area. Institutional/ public uses permitted would include churches, fire stations, and parks and open space related facilities. V. SURROUNDING LAND USES AND ZONING Current Land Uses Zoning North: Residential Two - Family Primary /Secondary District West: Residential Housing District East: Residential Two - Family Primary /Secondary District South: CDOT 1 -70 ROW n/a VI. ZONING ANALYSIS Addresses: Legal Descriptions: Zoning: Land Use Plan Designation Current Land Use: Geological Hazards: 2610 and 2688 Arosa Drive Lot 3 and Lot 5, Block D, Vail Ridge Subdivision Two - Family Primary /Secondary District Low Density Residential Single - Family Residence & Two - Family Residence None Development Standards Allowed/ Existing Proposed Existing Proposed Required Lot 3 Lot 3 Lot 5 Lot 5 Buildable Area (min sqft) 15,000 13,772 14,018 22,536* 22,290 Street Frontage (min ft) 30 100 & 116 100 & 97 76 95 Size and Shape (min ft) 80x80 >80x >80 >80x >80 >80x >80 >80x >80 Density (max units) 2 _14,000 =2 1 2 2 2 Density (max GRFA sqft) formula 6,033 6,127 7,480 7,448 Site Coverage (max sqft) 20% 2,754 2,804 4,507 4,458 Landscape Area (min sqft) 60% 8,263 8,411 13,522 13,374 *22,536 sq.ft. is the corrected existing Lot 5 area based upon the most recent survey. VII. REVIEW CRITERIA Before acting on a final plat application, the Planning and Environmental Commission shall consider the following factors with respect to the proposed use: 1. The extent to which the proposed subdivision is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and The subject properties are designated as Low Density Residential by the Vail Land Use Plan. The Vail Land Use Plan identifies single - family and two - family dwelling units as the appropriate density for properties in the Low Density Residential category. 0 Both subject properties are located within the Two - Family Primary /Secondary District. Pursuant to this zoning designation either a single - family or two - family residence may be constructed on Lot 5. Since Lot 3 is currently less than 14,000 sq.ft. in lot area, only a single - family residence may be constructed on this site. A two - family residence is currently not allowed to be constructed on Lot 3 due to its legally non - conforming lot area. The proposed final plat will transfer 246 sq.ft. of lot area from Lot 5 to Lot 3. If the Planning and Environmental Commission chooses to approve this proposed final plat, Lot 3 will be configured with 14,018 sq.ft. of lot area. This increase in lot area will make Lot 3 more conforming in regard to the standards of the Two - Family Primary /Secondary District and will allow a two - family residence to be constructed on this site. This increase in allowed density on Lot 3 is consistent with the Low Density Residential designation of the Vail Land Use Plan. Staff believes the proposed final plat is consistent with the Vail Land Use Plan's goals: 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. Staff also believes the proposed final plat is consistent with the purpose of the Town's Subdivision Regulations and purpose of the Two - Family Primary /Secondary Zone District as outlined in Section IV of this memorandum. Staff believes the proposed final plat is consistent with the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town. Staff believes the proposed final plat is therefore consistent with this criterion. 2. The extent to which the proposed subdivision complies with all of the standards of Title 13, Subdivision Regulations, Vail Town Code, as well as, but not limited to, Title 12, Zoning Regulations, Vail Town Code, and other pertinent regulations that the planning and environmental commission deems applicable; and The proposed final plat establishes a property boundary between Lots 3 and 5 that complies with the minimum street frontage (30 ft.) and minimum size and shape dimensions (80 ft. by 80 ft. square) standards prescribed by the Two - Family Primary /Secondary District. Lot 3 is currently legally non - conforming in regard to the minimum lot area standards (15,000 sq.ft.) of the Two - Family Primary /Secondary District. The proposed final plat will bring Lot 3 more into conformance with these lot area standards. Both the existing and proposed Lot 5 configurations comply with these minimum lot area standards. The applicant has configured the proposed property boundary between Lots 3 and 5 to ensure the existing residential structures comply with all requirements of the Two - Family Primary /Secondary District including setbacks, site coverage, landscape area, etc. 5 Staff believes the proposed final plat complies with the applicable requirements of the Town's Subdivision Regulations and Zoning Regulations, and is therefore consistent with this criterion. 3. The extent to which the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and This proposed final plat does not expand the developable area of the subject properties beyond their existing collective boundaries. The proposed final plat is consistent with the Vail Land Use Plan's Low Density Residential designation. The proposed final plat will accommodate additional community growth in an existing developed areas (infill areas) as recommended by the Vail Land Use Plan. The proposed final plat was designed such that the existing residential structures comply with the requirements of the Two - Family Primary /Secondary District. The proposed final plat realigns the property boundary between the subject sites to be parallel with the existing residential structure on Lot 5. Staff believes this realignment creates a more harmonious and workable relationship between this existing structure and the property boundaries. Staff believes the proposed final plat creates lot shapes and sizes that are consistent with the general character of the existing neighborhood. Therefore, Staff does not believe the proposed final plat will have significant negative affects on the future development of the surrounding area in comparison to existing conditions. 4. The extent of the effects on the future development of the surrounding area; and This proposed final plat does not expand the developable area of the subject properties beyond their existing boundaries. The proposed final plat is consistent with the Vail Land Use Plan's Low Density Residential designation. The proposed final plat will accommodate additional community growth in an existing developed areas (infill areas) as recommended by the Vail Land Use Plan. The proposed final plat was designed such that the existing residential structures comply with the requirements of the Two - Family Primary /Secondary District. Therefore, Staff does not believe the proposed final plat will have significant negative affects on the future development of the surrounding area in comparison to existing conditions. 5. The extent to which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or require duplication or premature extension of public facilities, or result in a "leapfrog" pattern of development; and This proposed final plat does not expand the developable area of these properties beyond their existing collective boundaries. Staff does not believe the proposed final plat will have significant negative affects on the community's special patterns in comparison to existing conditions. 6. The extent to which the utility lines are sized to serve the planned ultimate population of the service area to avoid future land disruption to upgrade undersized lines; and A Utility services exist for the subject property. The applicant is coordinating with Holy Cross Energy to establish a new utility easement on Lot 3. This new easement will connect the dead -end easement on Lot 5 to the Arosa Drive street right -of -way. Staff believes the proposed final plat will have a positive affect on utilities in comparison to existing conditions. VIII 7. The extent to which the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole; and This proposed final plat does not expand the developable area of the subject properties beyond their existing collective boundaries. The proposed final plat is consistent with the Vail Land Use Plan's Medium Density Residential designation. The proposed final plat will accommodate additional community growth in an existing developed areas (infill areas) as recommended by the Vail Land Use Plan. Therefore, Staff believes the proposed final plat provides for growth in an orderly manner. 8. The extent to which the proposed subdivision results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features; and This proposed final plat does not expand the developable area of the subject properties beyond their existing collective boundaries. Staff does not believe the proposed final plat will have significant negative affects on the natural environment in comparison to existing conditions. 9. Such other factors and criteria as the commission and /or council deem applicable to the proposed subdivision. STAFF RECOMMENDATION The Community Development Department recommends the Planning and Environmental Commission approves, with a condition, this request for the review of a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code, to allow for the re- subdivision of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Drive, and setting details in regards thereto. Staff's recommendation is based upon the review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to approve this final plat, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission approves this request for a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code, to allow for the re- subdivision of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Drive, and setting details in regards thereto." Should the Planning and Environmental Commission choose to approve this final plat, the Community Development Department recommends the Commission applies the following condition(s): 7 "1. Prior to recording the subject final plat for Lot 3 and Lot 5, Block D, Vail Ridge, the applicant shall grant an electrical utility easement to Holy Cross Energy on Lot 3 to connect the existing easement on Lot 5 to the Arosa Drive right -of -way. " Should the Planning and Environmental Commission choose to approve this final plat, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section VII of the Staff memorandum to the Planning and Environmental Commission dated January 24, 2011 and the evidence and testimony presented, the Planning and Environmental Commission finds: 1. The final plat is in compliance with the criteria prescribed by Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code. 2. The final plat is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the town. 3. The final plat is compatible with and suitable to adjacent uses and appropriate for the surrounding areas. 4. The final plat promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality." IX. ATTACHMENTS A. Vicinity Map B. Proposed Final Plat C. Applicant's Request A M Exemption Plat Review Procedures (Allow for Re- subdivision) Lots 3 & 5, Block D, Vail Ridge (2678 & 2668 Arosa Drive) #� 2607 26 J 2617 :26 17 IN io 2ssa c 'MM" Ab�'A A, r Feet G � 37 -5 75 15037 -5 75 150 . I n { 1ae1 Modified- January 17- 2411 . n rt i 1%7 / ark � Em� �__-�i' "� � 9 CIO - 1 41010 AMENDED FINAL PLAT VAIL RIDGE, A RESUBDIVISION OF LOTS 3 AND 5, BLOCK D TOWN OF VAIL, COUNTY OF EAGLE, STATE OF COLORADO CWNM a DOMM n mr aWnEr.IIN mr n wa+.naAmr owliwe, uc, A rar or.e eMmr wwaa Iraermla sl.ne xe.es w.Amrmw ImA,mr aa.m�. dim sr.wmsa car.eaA nw lsl si w eeYr�rY r eYae a mal a rsr,eelwm.m ease Y a rand vr, e, Danv. cm..en w,wYee r sra.: w loeoe. anYSwxmmD. Trmmvrc roaE.pe, . mwVw pasrnd rains frmi as aEm, r n.apen xe.Ixmz, Y a mam a. Eq. cewcYnw IYas. maea oam .ar mw. a w: I.r a nlr. a�ve Yi aA oar w .eru.a a ..m. w Yn w Erl paw.+. owns w rYa yr lup., a nweerYa, a.a. sws. a yr Dans a Ey.: w ser n.ep ap a m Yr r mnaY+ve aom.e w aew naeEr eeeml. w ..l of al r a w sqr m.a w ar aat smm W m.r w po r awml m Iln. pa a E. w a n. o�ec a«.r. w ae.. r..q nr. maar a ere n.l neeenr +MM r Yo-AYa r erwnre m a eanaenWp oa r aeee IW.W ErenlEV gerwEUrnrsvY rrwerT eewr.r r Er wxE a newsy a ewae a rwA En .rrrr ...r.erw Onrr M »: Ere P.niwa LLC •Tnv rar Ytlly aOaM M The 4TATE 1 cdwrtvaf 1 M aeama GwaaY q Deaorn w Dmrrlry w rwmrespee nYn r w_ M d � a dAlmnPann, LLC,. Tarim EeW mmfwn. .Ef ComYllon Mw: xmay VWk oaW Mlm: STALE ) CpHTV OF ) Tr armq faaCrn d OeJryon w Owrelle w ennrrYr Erm r E8 _ ny q AD.m�MPobrlw. Arma.. r/<arenalenapr: VAVne aT YVawgiY wL Ngay Pieec Omrryp 6l: WwLm Amour HfATE OF 1 CdallV OF 1>u 1 na Yi.msa DaiYr. q o.nrm w oWarp w .nvrs sewn w er _ oeT a AD.. � MraV.en Amon. M'Cmmilw,WpYU: niaee mVMe w qW reD NdaV NUn sasaor M1a6l:Frayn Der. eaA YA .as.. aTATE Df 1 is Cwrtrof 1 .sadv.nu�...na x.A .y DamrrM aar: wrar sa Ymew Iarw fmEe TIM Cmtllkra Irr TY. a..r Dalo.a snr nmb rwr nr a Tr a r Ynr Mrn aoen or oa Ylr seen ia w Armor aml sl, E W I aY Y .w. as Y sr w a.. a r wn w rarY.wae..ar r w..: DrrK_Cwq AD.,A� .awr ebrr W W W GJe, Em0 y r cosh, Apa ira lurvwVeYE CETIIIIeaIE 1. n Iwep, naY mr I w n hgrrael lw wn.eVer Eavre ww M Y+e q a elre q Calwre, w Ea pa Y aa. mn.a w eenNeu r Yb aA prr. seaaas w Men sren sr wa o r w mre am n eetlpopMrgmewww mT rpNa w mmq Mar Mleelbn w brnraad r bb, .remwr w Meet a r11 a4Mblm s M ew w. reYeE va a posy Y aeio M Miata np W br poarg a wLW bkn q YM InWIw YIIMM.Ilwew my rr wrr _Ford A0. M� FlwNng rr Envivr - M Commbtlon colencr. Marr10M pllw �r W aTOw� q Vr STnr9w EmYOmrVel CemmbeYnthe_n1d am CYrA rarmvr eaa.ae raagvr m.mi raraY. CrtlMrw r Tam % IS. waron.e, m rwq awry nr a wan nniar a Iva w rann W r em w p W al► Ia m r pelaY d rl wre Mcba m w pel.n qn F li r m Dreg _n.d D.,m Tnruw a EyY Canty CIM: elr Mcmdr'i CEtiMro Ta.prw ar a�aaYr oardaMwYemrr �rEEe_ ewa m� eMYahrcvarrnoelai —� BY Denry I GRAPHIC SCALE emo��w n oe 1#01 / / LOT 4 LOT 3 lamO n. AMENDED FINAL PLAT VAIL RIDGE, A RESUBDIVISION OF LOTS 3 AND 5, BLOCK D TOWN OF VAIL, COUNTY OF EAGLE. STATE Of COLORADO LOT 1 / LOT 2 l / r /T m 5; Nvaar. - an' M Fur — � rxAx . Fux w s xv6 (w9±aaiti - az. �imli eowal —� RADIUS 12643' DELTA 43W2S' 7.00' •�~ ARC - 965Y TANGENT . 50.71' RADIUS 12647 / '141 DIM - 54.37 M . SO4a5'44 DELTA - 090'31' ARC - 15.07 ` TANGENT - 5.55' sO. CHORD - 15.00' m1 _F�GGT' ERG - I IO'1018V 'Y` / . / / LOT 0 a ke C / � •anFOl x6mx / �� 104 3 / A VAO� OAS / / LOT 23 / t � / ,) NDR N FRDN AIT sTA T - 2 z (cALauTEDk T novs z RADIUS 01� O& DBV9,e eeaeR DELTA - 4'40W 2) •RFCOno• of ARC - 65.04' THE we IT R TANGENT — 34.44' RECERnoN No. O10RD - 5602' END ' 54114'4Y'M T— AxEH^ (1— M—AY No ]0) uO p MT NOIUY— FOUND 165.2 — ANn — L . aE -T ROTATED 4ENSIONS ARE REFERMO 10 111E RE— PLAT FIX+ »ES RECq— FEBRUARY 10. 1963 AT � A mor� w 11wx6rr Nawnn O° : i C.= T 12.27.10 Arosa Partners /Armour Exemption Plat Review Request 2610/2668 Arosa Drive Vail, Colorado DESCRIPTION OF REQUEST: A minor resubdirision of two lots and associated property corners to correct minor encroachments, adjacency issuer and non - conformities among lot sizes. The corrections are required due to an improper layout and location of Arosa Drive in its original Subdivision Plat and the actual road location not being placed properly within the Right of Way. Due to tha improper road location condition, a property corner for lot 3 ii currently within IS' of the non - conforming residence on lot S in the front setback. Also, the parking area for lot S is substantially located in the Right of Way between lot 3 and Arosa Drive, this correction would place lot S r parking in the Right of Way between lot S and Arosa Drive and correct the property rights of Lot 3 and re %rate a property corner so lot Si side /front setback is lessened as a non - conformity. In addition, within this minor subdivision, allocations of lot areas would be adjusted between the two lots to bring lot 3's area above 14000 sq. ft. and the threshold for a conforming duplex to be allowed on lot 3 due to a shift of +1- -146 sq. ft. of property area. In addition, according to the surveyor, that after verification of the 1 -70 Right of Way, lot S it 812 sq. It. smaller than the original Subdivision Plat indicates and this correction will be noted in the re- subdivision process. CRITERIA: A. Before recommending approval, approval with conditions or disapproval of the preliminary plan, the planning and environmental commission shall consider the following criteria with respect to the proposed subdivision. I. The extent to which the proposed subdivision is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and The proposal is consistent with the goals of the Pail Comprehensive plan and lessens non - conformities, and anomalies associated with the improper constructed location of Arosa Drive within an existing Platted Subdivision. 2. The extent to which the proposed subdivision complies with all of the standards of this title, as well as, but not limited to, title 12 , "Zoning Regulations ", of this code, and other pertinent regulations that the planning and environmental commission deems applicable; and The proposed re- subdivision complies with and lessens non - conformities with the Town of Yails current zoning regulations, and it an encouraged pattern to redevelop and upgrade properties. 3. The extent to which the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and The proposed re- subdivision promotes a more harmonious and workable relationship among the two affected properties and does not alter the nature of the neighboring vicinity. 4. The extent of the effects on the future development of the surrounding area; and All Adjacent properties are in similar configurations and like user therefore, the proposal should not have any significant affect on future development on the associated prooertles or alter the nature or fabric in the neighboring vicinity. 5. The extent to which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or require duplication or premature extension of public facilities, or result in a "leapfrog" pattern of development; and The proposed re- subdivision will not modify the above factors, onl improve all of the above lactorr 6. The extent to which the utility lines are sized to serve the planned ultimate population of the service area to avoid future land disruption to upgrade undersized lines; and The proposed re- subdivision will not modify the above factors. 7. The extent to which the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole; and 411 Adjacent properties are in similar configurations and like uses, 8. The extent to which the proposed subdivision results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features; and No Modifications or affects to existing coflditWs proposed. 9. Such other factors and criteria as the commission and /or council deem applicable to the proposed subdivision. At this time, there are no known relevant factors or criteria that are applicable to this application. Necessary Findings: Before recommending and /or granting an approval of an application for a major subdivision, the planning and environmental commission shall make the following findings with respect to the proposed major subdivision: I. That the subdivision is in compliance with the criteria listed in subsection A of this section. The proposed request is fully compllaflt with Town of Yail planning policies and the criteria noted in subsection A. 2. That the subdivision is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town. The proposed request is fully compliant with Town of Yail planning policies and has a net decrease in development potential and is therefore compatible. 3. That the subdivision is compatible with and suitable to adjacent uses and appropriate for the surrounding areas. Adacent properties are in similar configurations and like uses. The net result of the proposal is to lessen non - conformities and not alter the nature or fabric in the neighboring vicinity. 4. That the subdivision promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. (Ord. 29(2005) § 53: 1991 Code: Ord. 2(1983) § 1) The proposed request is fully compliant with Town o/ fail planning policies and is an encouraged pattern to redevelop and upgrade Yai/ Yi/ /age lore properties. 12.27.) 0 Arosa Drive Zoning Analysis: Lot 5, Block D, Vail Ridge. Vail, Colorado Existing Conditions: Lot Size: 0.536 acres / 23,348 sq. ft. Based on Eagle County Records Zoning Two - Family Primary/Secondary Residential Zoning Setbacks: 20' Front (Encroachment Exists) 15' Sides ( +/- 14' at North Boundary) I S' Rear Height 33' Sloped Roofs, 30' Flat Roofs Landscaping. 14,009 sq. ft. required (60% of total site area) Site Coverage: 4,670 sq. ft. allowed (20% of total site area) Parking 5 spaces required if built out to maximum size GRFA (Gross Residential Floor Area): Total Allowable FAR (Floor Area 7,585 sq. ft. of Gross Residential Floor Area (GRFA) Items not included in above numbers: 300 sq. ft. per enclosed garage space up to two per dwelling unit. Attics less than 5' in height, Attics only accessible from the Floor below Basements below grade, above grade portions will count proportionally. Vaulted spaces above 16' in height (these spaces are counted twice). Existing FAR (Floor Area +/- 1,950 sq. ft. of Gross Residential Floor Area (GRFA) Approximate FAR Development Potential Remaining 5,635 sq. ft of Gross Residential Floor Area (GRFA) Please note that the above numbers are subject to verification by the Town of Vail Planning Staff and will vary subject to the individual client's design and decision making process. t V 110 WEST LIONSHEAD CIRCLE, SUITE A SAIL COLORADO 81651 910.411.2990 910.411.2965( F) www.khwebb.com MEMBER Of THE AMERICAN INSTITUTE Of ARCHITECTS 12.21.10 Arosa Drire Zoning Analysis: Lot S, Block D, Vail Ridge. Vail, Colorado Proposed Conditions: Lot Sae: 0.5111 acres / 22,290 sq. ft. Based on Proposed Amended Plat Please note that lot 5 has contributed 246 sq. ft. to lot 3. According to the surveyor, that after verification of the 1 -10 Right of Way, lot 5 is 812 sq. ft. smaller than the original Subdivision Plat indicates and this correction will be noted in the re- subdivision process. Zoning: Two - Family Primary/Secondary Residential Zoning Setbacks: 20' Front (Encroachment Exists) 15' Sides ( +/- 14' at North Boundary) 15' Rear Height 33' Sloped Roofs, 30' Flat Roofs Landscaping. 13,374 sq. ft. required (60% of total site area) Site Coverage: 4,458 sq. ft. allowed (20% of total site area) Parking: 5 spaces required if built out to maximum size GRFA (Gross Residential Floor Area): Total Allowable FAR (Floor Areal 7,447 sq. ft. of Gross Residential Floor Area (GRFA) Items not included in above numbers: 300 sq. ft. per enclosed garage space up to two per dwelling unit. Attics less than S' in height, Attics only accessible from the Floor below Basements below grade, above grade portions will count proportionally. Vaulted spaces above 16' in height (these spaces are counted twice). .e—i Existing FAR (Floor Area +/- 1,950 sq. ft. of Gross Residential Floor Area (GRFA) CU Approximate FAR Development Potential Remaining 3 5,497 sq. ft of Gross Residential Floor Area (GRFA) Please note that the above numbers are subject to verification by the Town of Vail Planning Staff and will vary subject to the individual client's design and decision making process. t 110 WEST LIONSHEAD CIRCLE, SUITE A PAIL COLORADO 81651 910.411.2990 910.411.2965( F) www.khwebb.com Ail' ?HER OF THE AMERICAN INSTITUTE OF ARCHITECTS 12.27.10 Arosa Drire Zoning Analysis: Lot 3, Block D, Vail Ridge. Vail, Colorado Existing Conditions: Lot Sae: 0.32 acres / 13,712 sq. ft. Based on Eagle County Records Zoning. Two - Family Primary/Secondary Residential Zoning Setbacks: 20' Front 15' Sides 15' Rear Height 33' Sloped Roofs, 30' Flat Roofs Landscaping 8,263 sq. ft. required (60% of total site area) Site Coverage: 2,754 sq. ft. allowed (20% of total site area) Parking 5 spaces required if built out to maximum size GRFA (Gross Residential Floor Area): Total Allowable FAR (Floor Area 6,033 sq. ft. of Gross Residential floor Area (GRFA) Items not included in above numbers: 300 sq. ft. per enclosed garage space up to two per dwelling unit. Attics less than 5' in height, Attics only accessible from the floor below Basements below grade, above grade portions will count proportionally. Vaulted spaces above 16' in height (these spaces are counted twice). Existing FAR (Floor Areal -� +/- 2,145 sq. ft. of Gross Residential Floor Area (GRFA) + 415 sq. ft. Garage —M Approximate FAR Development Potential Remaining 3,888 sq. ft of Gross Residential Floor Area (GRFA) + 185 sq. ft. Garage Please note that the above numbers are subject to verification by the Town of Vail Planning Staff and will vary subject to the individual client's design and decision making process. v 710 WEST LIONSHEAD CIRCLE, SUITE A PAIL COLORADO 81657 970.477.2990 970.411. 2965( f) www.khwebb.com MEMBER Of THE AMERICAN INSTITUTE OF ARCHITECTS 12.21.10 Arosa Drive Zoning Analysis: Lot 3, Block D, Vail Ridge. Vail, Colorado Proposed Conditions: Lot Size: 0.3218 acres / 14,018 sq. ft. Based on Proposed Amended Plat Zoning Two - Family Primary/Secondary Residential Zoning Setbacks: 20' Front 15' Sides 15' Rear Height 33' Sloped Roofs, 30' Flat Roofs Landscaping 8,411 sq. ft. required (60% of total site area) Site Coverage: 2,804 sq. ft. allowed (20% of total site area) Parking 5 spaces required if built out to maximum size GRFA (Gross Residential Floor Area): Total Allowable FAR (Floor Area 6,121 sq. ft. of Gross Residential Floor Area (GRFA) Items not included in above numbers: 300 sq. ft. per enclosed garage space up to two per dwelling unit. Attics less than 5' in height, Attics only accessible from the Floor below Basements below grade, above grade portions will count proportionally. Vaulted spaces above 16' in height (these spaces are counted twice). Existing FAR (Floor Area —Q +/- 2,145 sq. ft. of Gross Residential Floor Area (GRFA) + 415 sq. ft. Garage Approximate FAR Development Potential Remaining 3,982 sq. ft of Gross Residential Floor Area (GRFA) + 185 sq. ft. Garage Please note that the above numbers are subject to verification by the Town of Vail Planning Staff and will vary subject to the 3 individual client's design and decision making process. v 710 WEST LIONSHEAD CIRCLE, SUITE A SAIL COLORADO 81651 970.411.2990 970.477.2965( F) www.khwebb.com MEMBER OF THE AMERICAN INSTITUTE Of ARCHITECTS MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 24, 2011 SUBJECT: A request for a recommendation to the Vail Town Council for a major amendment to Special Development District No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village, located at 1000 S. Frontage Road West/Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto. (PEC090036) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell I. SUMMARY The applicant, Ever Vail, LLC, represented by the Mauriello Planning Group, LLC, is requesting a recommendation to the Vail Town Council on a proposed major amendment to Special Development District (SDD) No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village. The request to remove Development Area D (Glen Lyon Office Building) from SDD No. 4 is necessary to allow the lot to be combined with the former Amoco /BP gas station site, Cascade Crossing, the Vail Professional Building, the Holy Cross Lot, the Vail Resorts Maintenance Yard, and portions of South Frontage Road West right -of -way which is to be abandoned. The assemblage of these sites listed above will permit the applicant to establish two new parcels within a new subdivision, thus creating the Ever Vail development site. Upon review of the applicable elements of the Town's planning documents and adopted criteria for review, the Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of approval, with conditions, of the request for a major amendment to Special Development District (SDD) No. 4, Cascade Village. Staff's recommendations are based upon review of the established criteria provided in Sections VIII of this memorandum and the evidence and testimony which was received. II. DESCRIPTION OF THE REQUEST Special Development District Amendment The applicant is requesting a recommendation to the Vail Town Council on a proposed major amendment to SDD No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to remove Development Area D, Glen Lyon Office Building (GLOB) from the SDD. The removal of the GLOB property from SDD No. 4 facilitates its incorporation into the proposed Ever Vail development site. A vicinity map (Attachment A) and a draft amending ordinance are attached for reference (Attachment B). III. BACKGROUND The Vail Resorts Maintenance Shop was annexed into the Town of Vail by Ordinance No. 8, Series of 1969, which became effective on August 23, 1969. The Holy Cross Lot, Vail Professional Building, Cascade Crossing, and former gas station sites were annexed into the Town of Vail by Ordinance No. 26, Series of 1975, which became effective on December 16, 1975. On December 11, 2006, the Planning and Environmental Commission forwarded a recommendation of approval for amendments to the Lionshead Redevelopment Master Plan to include the Vail Professional Building and Cascade Crossing parcels within the Master Plan boundaries and to amend the recommendations for the area known as "West Lionshead ". On February 6, 2007, the Vail Town Council adopted Resolution No. 4, Series of 2007, which implemented the changes to the Lionshead Redevelopment Master Plan regarding West Lionshead and the area known as Ever Vail. On September 24, 2007, the Planning and Environmental Commission forwarded a recommended approval of the preliminary plat by a vote of 6 -0 -0. This application was subsequently withdrawn by the applicant while it was in the Town Council review process. On October 22, 2007, the Planning and Environmental Commission forwarded a recommendation of approval on the proposed rezoning of the two new parcels proposed to be established in the Ever Vail Subdivision by a vote of 5 -1 -0 (Cleveland opposed). This application was subsequently withdrawn by the applicant while it was in the Town Council review process. On August 11, 2008, the Town of Vail Planning and Environmental Commission voted 4 -0 -1 (Viele recused) to forward a recommendation of approval of Resolution No. 19, Series of 2008, for the Vail Land Use Plan map amendment to allow for a change in the land use designation from Community Office to Lionshead Redevelopment Master Plan for the Glen Lyon Office Building site. On September 2, 2008 the Vail Town Council approved Resolution No. 19, Series of 2008, described above. The motion passed 4 -3 -0, with Foley, Hitt and Rogers dissenting. On December 8, 2008 the Town of Vail Planning and Environmental Commission voted 5 -0- 1 (Viele recused) to forward a recommendation of approval to the Vail Town Council for Resolution 26, Series of 2008, which included amendments to the Lionshead Redevelopment Master Plan to incorporate the GLOB within the document. On February 3, 2009 the Vail Town Council adopted Resolution No. 26, Series of 2008, by a vote of 5 -1 -0 (Foley opposed). On March 22, 2009, the Planning and Environmental Commission approved a partial preliminary plan which established the 1 -70 right -of -way. This partial preliminary plan was endorsed by the Town Council on April 21, 2009, for submittal to CDOT for review. On January 10, 2011, the Planning and Environmental Commission unanimously forwarded recommendations of approval to the Vail Town Council for the adoption of the Ever Vail preliminary plan and the zoning of Parcels 1 and 2 of the Ever Vail Subdivision to Lionshead Mixed use 2 District. These recommendations of approval were conditioned upon the recording of the Ever Vail final plat. IV. ROLES OF REVIEWING BOARDS Major Amendment to a Special Development District Planning and Environmental Commission: The PEC shall review the proposal for and make a recommendation to the Town Council based upon the findings made on the criteria located in Chapter 12 -9A, Special Development District, Vail Town Code. Town Council: The Town Council takes into consideration the PEC's recommendation when reviewing an application for a special development district and is responsible for final approval /denial of an SDD. The Town Council shall review the proposal and approve /approve with conditions /deny the application based upon the findings made on the criteria located in Chapter 12 -9A, Special Development District, Vail Town Code. V. APPLICABLE PLANNING DOCUMENTS Lionshead Redevelopment Master Plan (in part) Chapter 2 — Introduction (in part) 2.3 Policy Objectives The Town Council adopted six policy objectives on November 4, 1996 to outline the important issues to be addressed in the master plan and to provide a policy framework for the master planning process. 2.3.1 Renewal and Redevelopment Lionshead can and should be renewed and redeveloped to become a warmer, more vibrant environment for guests and residents. Lionshead needs an appealing and coherent identity, a sense of place, a personality, a purpose, and an improved aesthetic character. 2.3.2 Vitality and Amenities We must seize the opportunity to enhance guest experience and community interaction through expanded and additional activities and amenities such as performing arts venues, conference facilities, ice rinks, streetscape, parks and other recreational improvements. 2.3.3 Stronger Economic Base Through Increased Live Beds In order to enhance the vitality and viability of Vail, renewal and redevelopment in Lionshead must promote improved occupancy rates and the creation of additional bed base ( "live beds" or "warm beds') through new lodging products. Live beds and warm beds are best described as residential or lodging rooms or units that are designed for occupancy by visitors, guests, individuals, or families on a short term rental basis. In order to improve occupancy rates and create additional bed base in Lionshead, applications for new development and redevelopment projects which include a residential component shall provide live beds in the form of accommodation units, fractional fee club units, lodge dwelling units, timeshare units, attached accommodation units (i.e, lock -off units), or dwelling units which are included in a voluntary rental management program and available for short term rental. Further, it is the expressed goal of this Plan that in addition to creating additional bed base through new lodging products, there shall be no net loss of existing live beds within the Lionshead Redevelopment Master Plan study area. 2.3.4 Improved Access and Circulation The flow of pedestrian, vehicular, bicycle and mass transit traffic must be improved within and through Lionshead. 2.3.5 Improved Infrastructure The infrastructure of Lionshead (streets, walkways, transportation systems, parking, utilities, loading and delivery systems, snow removal and storage capacity) and its public and private services must be upgraded to support redevelopment and revitalization efforts and to meet the service expectations of our guests and residents. 2.3.6 Creative Financing for Enhanced Private Profits and Public Revenues Financially creative and fiscally realistic strategies must be identified so that adequate capital may be raised from all possible sources to fund desired private and public improvements. Chapter 4 — Recommendations — Overall study Area (in part) 4.1.5 West Lionshead - Residential/ Mixed -Use Hub West Lionshead includes the Vail Associates Service Yard, Holy Cross site, Vail Professional Building site, Cascade Crossings site, Glen Lyon Office Building site, former gas station site and the Eagle River Water and Sanitation site. This area of Lionshead is generally under utilized and from an aesthetic standpoint is not in keeping with what the Town would like to see Lionshead become as it redevelops in the coming years. The Town of Vail does place a high value on maintaining the office and retail areas in West Lionshead and any redevelopment should reasonably increase the square footage of existing office and have "no net loss" of retail square footage in West Lionshead. With their recent acquisition of additional properties in this area, Vail Resorts has the opportunity to bring lift service to this part of Lionshead. Lift service brings with it great potential for the re- development of this area and in doing so expand all of Lionshead to the west with improved pedestrian connections, new retail and office activity and other improvements. While lift access will certainly energize this area during the winter months, attention should be given to creating a year -round attraction within this area of Lionshead (see detailed plan recommendations in Chapter 5) The master plan recommends that this hub become a residential/ mixed use area with an emphasis on meeting the needs of both the local community and our guests. Appropriate uses could include high density residential development, lodging, community and visitor based office and retail space, employee housing and parking, bus or transit functions and a ski lift connection to Vail Mountain. The catalyst for this mixed use hub is ski lift access to Vail Mountain. Consideration should be given to integrating employee housing into the redevelopment of West Lionshead in accordance with the Town's employee housing policies and regulations. To the extent possible development patterns in this area should reflect north -south orientation of buildings, visual penetrations to the mountain, and a pedestrian oriented environment. The degree of north -south building orientation may be difficult given the relatively narrow east -west orientation of this area. In addition, the introduction of ski lift access in this location creates a catalyst for a structured public parking facility. All service and delivery demands created by development in this area shall be accommodated on -site. The site will continue to accommodate the existing and potentially expanded functions of the Vail sanitation plant. The mountain service yard could be reduced in size, as some functions can be moved to less central locations. It may also be possible to relocate the entire mountain service yard to a new location in the West Lionshead area which would allow for greater flexibility in the redevelopment of this site. However as the area develops it is critical that new uses be connected to the primary pedestrian corridors and that they be served by the Town of Vail in -town transit system. Chapter 5 — Detailed Plan Recommendations (in part) 5.17 West Lionshead West Lionshead includes the Vail Associates Service Yard, Holy Cross site, Vail Professional Building site, Cascade Crossings site, Glen Lyon Office Building site, former gas station site and the Eagle River Water and Sanitation site. 5.17.1 South Frontage Road Improvements and Vehicular Access Planning for West Lionshead must consider two different scenarios: the realignment of South Frontage Road and its retention in the existing alignment. While the introduction of lift service is viable in either of these Frontage Road alternatives, site design will vary depending upon what happens to the Frontage Road alignment. See Figures 4 -9a, and 4 -9b for the Frontage Road realignment alternatives. Notwithstanding these different Frontage Road scenarios, there should be an increase of existing office square footage and "no net loss" of retail square footage as a result of the redevelopment of these parcels. Furthermore, service and delivery for West Lionshead shall occur underground orbe hidden from public view. Service and delivery truck turning maneuvers should not negatively impact traffic flow on the South Frontage Road. With a realignment of vehicular access points, attention should be given to the location of service and parking areas. a. Retention of Existing Frontage Road Alignment If the Frontage Road remains in its current location the Maintenance Yard /Holy Cross parcels, the Vail Professional Building site, and /Cascade Crossing and the Glen Lyon Office Building site all remain viable development sites. The most viable site for a public parking facility would be the Maintenance Yard /Holy Cross parcels. While other lift locations are feasible, the old gas station site is a viable location for a base terminal. This location would require a grade separated pedestrian crossing over the Frontage Road to the Maintenance Yard /Holy Cross parcels. A strong east -west oriented pedestrian corridor with ground floor retail uses would be necessary to create a strong connection between this area and the rest of Lionshead. Under this Frontage Road scenario the Vail Professional Building site and Cascade Crossing could be developed as a contiguous parcel. In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the Plan, opportunities for public transportation and vehicular circulation improvements shall be explored in conjunction with any future redevelopment of the sites. Possible opportunities for improvements may include, an improved mass transit stop, relocated /reduced /shared points of entry/exiting, restricted access points, acceleration/ deceleration lanes, greater sight distances, dedicated turning lanes, landscaped medians and skier drop -off. In the redevelopment of Cascade Crossing and the Glen Lyon Office Building site under the current configuration of the Frontage Road, the bus stops in front of said properties shall be enhanced with, for example, shelters, benches, and landscaping. Pedestrian connections shall be improved from the bus shelters, across the South Frontage Road and to and from the surrounding buildings to provide safe and attractive pedestrian crossing and connections. Improvements may include crosswalks, walkways, pedestrian crossing warning lights, medians, and signage. b. Frontage Road Realignment The greatest benefit of this realignment alternative is that it results in one very large and contiguous development parcel and in doing so integrates the Maintenance Yard /Holy Cross site with the West Day Lot by removal of the barrier created by the existing Frontage Road alignment. It also creates the best pedestrian environment in creating an extension of the Lionshead Retail area in that it provides the potential to establish a convenient and desirable pedestrian connection to the rest of Lionshead. With this alternative the most viable site for a public parking facility would still be the Maintenance Yard /Holy Cross parcels. With the re- location of the Frontage Road lift access out of the old gas station site would not require a grade separated pedestrian crossing to the Maintenance Yard /Holy Cross parcels. However, a grade separated crossing over the Red Sandstone Creek would be needed to link the Holy Cross site with the Vail Professional Building site. This alternative would also present the opportunity for enhancing Red Sandstone Creek to make it more accessible to the community and an aesthetically pleasing water feature. Enhancements might include; streambank stabilization/ beautification, natural stream drop structures, interactive low flow areas and general improvements for wetlands and wildlife habitat. Any modification or enhancement to the creek corridor would be subject to U. S. Army Corp of Engineers approval. A strong east -west oriented pedestrian corridor with ground floor retail uses would be necessary to create a strong connection between this area and the rest of Lionshead. In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the Plan, opportunities for public transportation and vehicular circulation improvements shall be explored in conjunction with any future redevelopment of the Frontage Road and interior roads within the redevelopment of the West Lionshead sites. Possible opportunities for improvements may include improved mass transit stops, relocated /reduced /shared points of entry/exiting, restricted access points, acceleration/ deceleration lanes, roundabouts at major intersections, greater sight distances, dedicated turning lanes, landscaped medians and skier drop -off. 5.17.2 Pedestrian and Bike Access As compared to a separate, free - standing portal, West Lionshead is considered a part of the greater Lionshead area. In order for this area to be successful, it is important to have a strong pedestrian connection with the rest of Lionshead. Streetscape improvements including bike lanes or trails and sidewalks should be incorporated in any redevelopment along West Lionshead Circle and the South Frontage Road to improve the viability of mixed uses in West Lionshead. Improvements to street lighting, walking surfaces, trails, seating areas and public art that facilitate safe and attractive pedestrian and bike movement are strongly encouraged. Said improvements may necessitate the need for access easements through the sites. In the redevelopment of West Lionshead, pedestrian and bike connections shall be made to integrate with the rest of Lionshead and Cascade Village. There is an existing recreation path that runs across the southwest corner of the Glen Lyon Office Building site. If the site redevelops the recreation path shall be enhanced to meet town recreational path standards and to provide a safe and attractive pedestrian and bike experience. The improvements shall include a public easement over the path where necessary. 5.17.3 Preservation of Existing Office and Retail Space There shall be an increase in office space and no net loss of retail space in West Lionshead. Opportunities for increasing the square footage of office and retail beyond the existing conditions in West Lionshead shall be evaluated during the development review process. Currently, West Lionshead offices and businesses offer a variety of local services and amenities, which is important to preserve with the redevelopment of West Lionshead. During the winter months, the proposed ski lift in West Lionshead and the associated parking will generate significant pedestrian traffic and activity. However, consideration should be given to how West Lionshead can be an active and vibrant place year- round. One way this can be accomplished is the reinforcement of a well - crafted program of specialty retailers, offices, and restaurants that attract both tourists and local residents. Also, quality architecture and the creation of appealing outdoor spaces in and of itself will encourage people to visit this area. An active program of public art, residential units that are used for "artists in residence" or a culinary school are examples of uses that could create a catalyst for activity. In conjunction with any application to develop a new ski lift, a market study which analyzes the appropriate amount of office /retail square footage shall be included in the redevelopment of West Lionshead. 5.17.4 Relationship to Red Sandstone Creek and Gore Creek Red Sandstone Creek and Gore Creek abut the Glen Lyon Office Building site, former gas station site, Holy Cross site and the Vail Professional Building site. Any redevelopment of these parcels should consider how the creeks can be enhanced and made an amenity of this redevelopment area. A substantial stand of mature trees exists on the banks of the two creeks, with low lying brush on the shores. Every effort shall be taken to preserve the substantial trees and natural steep slopes along the banks of both creeks. While the natural riparian corridor of these streams needs to remain protected and preserved, the physical and visual relationships and references between adjacent development and the stream tract should be strengthened. Improved public access and utilization of Gore Creek and Red Sandstone Creek for fishing and other recreational purposes is strongly encouraged to create a catalyst for activity and enjoyment of the streams. 5.17.6 Redevelopment Considerations for Glen Lyon Office Building site Consistent with its location at the western edge of West Lionshead and with respect to the extensive frontage along Gore Creek, it is appropriate to recognize certain development limitations and opportunities regardless of the underlying zone district. 5.17.6.1 Height Building heights shall be consistent with Figure 5 -25, West Lionshead Building Massing and Height Limitations. Notwithstanding the height limitations set forth in Figure 5 -25, the maximum height for buildings on the Glen Lyon Office Building site shall not exceed 56 feet. 5.17.6.2 Residential Land Use and Density Existing physical improvements on the Glen Lyon Office Building site include a three -story building with 10, 829 square feet of general office space and a surface parking lot. Because of the site's physical location along Gore Creek, it's accessibility to Lionshead Village, and the adjacent potential redevelopment including a ski -lift and activity center, it may be appropriate to introduce a mix of uses on site. If residential uses are proposed, the use shall be consistent with the Master Plan goal to increase the number of `Live Beds' in Lionshead. Residential density on the site should be studied and proposed in a manner that is compatible with the character and scale of adjacent uses and Gore Creek. Residential uses should be located on the basement or garden level and second floor and above in buildings on -site. If residential uses are proposed on the street level or first floor, the vitality of the pedestrian and bike experience shall be considered along with the function and character of the adjacent uses and structure design. The mixture of land uses on the Glen Lyon Office Building site shall maintain a balance between residential, office/ commercial and recreational uses to serve both the visitor and the permanent resident. 5.17.6.3 Office Land Use Consistent with the Master Plan requirement for an increase of office space, the existing 10, 829 square feet of office space shall be replaced and increased on -site. 5.17.6.4 Employee Housing All (100 %) of the employee housing requirements associated with the Glen Lyon Office Building site, as required by the Vail Town Code, shall be met on -site. 5.17.6.5 Landscape Preservation & Relationship to Red Sandstone & Gore Creeks The Glen Lyon Office Building site borders on the Red Sandstone Creek along the east property line and the Gore Creek along the south property line. The redevelopment of the Glen Lyon Office Building site should consider how the creeks can be enhanced and made an amenity of the area. A substantial stand of mature trees exists on the banks of the two creeks, with low lying brush on the shores. Every effort shall be taken to preserve the substantial trees and natural steep slopes along the banks of both creeks. While the natural riparian corridor of these streams needs to remain protected and preserved, the physical and visual relationships and references between adjacent development and the stream tract should be strengthened. Improved public access and utilization of Gore Creek and Red Sandstone Creek for fishing and other recreational purposes is strongly encouraged to create a catalyst for activity and enjoyment of the streams. Vail Land Use Plan (in part) The goals articulated here reflect the desires of the citizenry as expressed through the series of public meetings that were held throughout the project. A set of initial goals were developed which were then substantially revised after different types of opinions were brought out in the second meeting. The goal statements were developed to reflect a general consensus once the public had had the opportunity to reflect on the concepts and ideas initially presented. The goal statements were then revised through the review process with the Task Force, the Planning and Environmental Commission and Town Council and now represent policy guidelines in the review process for new development proposals. These goal statements should be used in conjunction with the adopted Land Use Plan map, in the evaluation of any development proposal. The goal statements which are reflected in the design of the proposed Plan are as follows: 1. General Growth / Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.2 The quality of the environment including air, water and other natural resources should be protected as the Town grows. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.5 Commercial strip development of the Valley should be avoided. 1.7 New subdivisions should not be permitted in high geologic hazard areas. 1.8 Recreational and public facility development on National Forest lands may be permitted where no high hazards exist if: a) Community objectives are met as articulated in the Comprehensive Plan. b) The parcel is adjacent to the Town boundaries, with good access. c) The affected neighborhood can be involved in the decision - making process. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 1.13 Vail recognizes its stream tract as being a desirable land feature as well as its potential for public use. 2. Skier /Tourist Concerns 2.1 The community should emphasize its role as a destination resort while accommodating day visitors. 2.2 The ski area owner, the business community and the Town leaders should work together closely to make existing facilities and the Town function more efficiently. 2.3 The ski area owner, the business community and the Town leaders should work together to improve facilities for day skiers. 2.4 The community should improve summer recreational options to improve year -round tourism. 2.5 The community should improve non -skier recreational options to improve year -round tourism. 2.7 The Town of Vail should improve the existing park and open space lands while continuing to purchase open space. 2.8 Day skier needs for parking and access should be accommodated through creative solutions such as: a) Increase busing from out of town. b) Expanded points of access to the mountain by adding additional base portals. c) Continuing to provide temporary surface parking. d) Addition of structured parking. 10 3. Commercial 3.2 The Village and Lionshead areas the best location for hotels to serve the future needs of destination skiers. 3.3 Hotels are important to the continued success of the Town of Vail, therefore conversion to condominiums should be discouraged. 3.4 Commercial growth should be concentrated in existing commercial areas to accommodate both local and visitor needs. 3.5 Entertainment oriented business and cultural activities should be encouraged in the core areas to create diversity. More night -time businesses, on -going events and sanctioned "street happenings" should be encouraged. 4. Village Core/ Lionshead 4.1 Future commercial development should continue to occur primarily in existing commercial areas. Future commercial development in the Core areas needs to be carefully controlled to facilitate access and delivery. 5. Residential 5.1 Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 5.2 Quality time share units should be accommodated to help keep occupancy rates up. 5.3 Affordable employee housing should be made available through private efforts, assisted by limited incentives, provided by the Town of Vail, with appropriate restrictions. 5.4 Residential growth should keep pace with the market place demands for a full range of housing types. 5.5 The existing employee housing base should be preserved and upgraded. Additional employee housing needs should be accommodated at varied sites throughout the community. 6. Community Services 6.1 Services should keep pace with increased growth. 6.2 The Town of Vail should play a role in future development through balancing growth with services. 6.3 Services should be adjusted to keep pace with the needs of peak periods. 11 Town of Vail Zoning Regulations VI. Special Development District (in part) 12 -9A -1: Purpose And Applicability: A. Purpose: The purpose of the special development district is to encourage flexibility and creativity in the development of land in order to promote its most appropriate use; to improve the design character and quality of the new development with the town; to facilitate the adequate and economical provision of streets and utilities; to preserve the natural and scenic features of open space areas; and to further the overall goals of the community as stated in the Vail comprehensive plan. An approved development plan for a special development district, in conjunction with the property's underlying zone district, shall establish the requirements for guiding development and uses of property included in the special development district. 12 -9A -2: Definitions: MAJOR AMENDMENT (PEC AND /OR COUNCIL REVIEW: Any proposal to change uses; increase gross residential floor area; change the number of dwelling or accommodation units; modify, enlarge or expand any approved special development district (other than "minor amendments" as defined in this section), except as provided under section 12 -15 -4 , "Interior Conversions'; or 12 -15 -5 , "Additional Gross Residential Floor Area (250 Ordinance)'; of this title. ZONING ANALYSIS The following is a zoning analysis of the development potential of Parcel 2 as depicted on the Ever Vail Preliminary Plan, if adopted as shown. Development Area D is proposed to be incorporated into Parcel 2 of the Ever Vail subdivision Legal Description: Parcel 2, Ever Vail Subdivision Land Use Designation: Lionshead Redevelopment Master Plan Lot Size: 230,650.2 sq. ft./5.295 acres Development Standard LM U -2 Lot Area: 10,000 sq. ft. min. Setbacks: 10 ft. all sides Height: 82.5 ft. max. 71 ft. average Density Control: 185 DUs, unlimited AUs, FFUs, EHUs GRFA: 476,387.5 sq. ft. (based upon 190,555 sq. ft. buildable site area) Site Coverage: 161,455.1 sq. ft. (70 %) 12 Landscaping: 46,130 sq. ft. (20 %) Parking Per Chapter 10 of the Zoning Regulations VII. SURROUNDING LAND USES AND ZONING Land Use Zoning North: CDOT ROW None South: Stream Tract Natural Area Preservation District East: Utility /Mixed Use General Use /Lionshead Mixed Use 2 Districts West: Mixed Use SDD No. 4. Cascade Village VIII. SPECIAL DEVELOPMENT DISTRICT MAJOR AMENDMENT REVIEW CRITERIA The Town Code provides nine design criteria which shall be used in evaluating the merits of a major amendment to an established SDD. It shall be the burden of the applicant to demonstrate that submittal material and the proposed development plan comply with each of the following standards, or demonstrate that one or more of them is not applicable, or that a practical solution consistent with the public interest has been achieved. This application is somewhat unique in that the applicant is requesting that a portion of an established SDD be removed to become part of a proposed development site separate from the current SDD. Staff has performed a review of these criteria based upon the potential impacts to the remaining SDD as follows: A. Consideration of Factors Regarding Special Development Districts A. Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. As is identified under Section III, Background, of this memorandum the Town's adopted processes for amending the Vail Land use Plan and the Lionshead Redevelopment Master Plan were followed to lay the framework for the inclusion of the GLOB in the overall planning being undertaken with regard to the proposed Ever Vail project. The inclusion of the GLOB within the Lionshead Redevelopment Master Plan and thus a change in the land use designation acknowledged the influence that the previous expansion of the Lionshead Redevelopment Master Plan boundaries would have on the GLOB site. The recommendations included in the Master Plan imposed development standards to ensure that the desired scale, bulk, and mass that are desired will be achieved. Future development on the GLOB site will be required to comply with Lionshead Redevelopment Master Plan and the proposed Lionshead Mixed Use 2 13 District. The request to remove Development Area D (GLOB) from SDD No. 4, Cascade Village, will not have any negative effect on the remaining portions of the SDD. SDD No. 4, Cascade Village, was adopted with multiple development areas which resulted in the desired development which include but are not limited to, a hotel, single - family and duplex residential, multi - family residential, and an office building. Each development area in the SDD was granted specific development potential which was to be used within that area and not to be transferred. If approved, this amendment to SDD No. 4 would only occur in conjunction with the recording of the proposed Ever Vail Subdivision Final Plat. Staff believes the proposed amendments comply with this criterion. B. Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. As discussed under Criterion A, the Town's adopted processes for including the GLOB within the Lionshead Redevelopment Master Plan were followed to establish the appropriate development standards to ensure a development outcome on the site which would be compatible, efficient, and workable with the surrounding uses and activities. The inclusion of the GLOB within the Master Plan and now within the proposal for the overall Ever Vail project will result in a comprehensive redevelopment for the western edge of Lionshead. The physical separation of the GLOB site from the remainder of the SDD caused by Gore Creek and steep grades has resulted in the current development on the site being somewhat isolated. Removal of the site from the SDD and inclusion in the proposed Ever Vail project will result in better planning and redevelopment of the site as it will become a part of the whole. Staff believes that the proposal does comply with this criterion. C. Compliance with parking and loading requirements as outlined in Chapter 12 -10 of the Vail Town Code. The application does not include a specific development proposal at this time. All future development proposals will be required to comply fully with the Town's adopted parking and loading requirements as required under the Major Exterior Alteration review process. Staff believes that the application complies with this criterion at this time. D. Conformity with the applicable elements of the Vail Comprehensive Plan, Town policies and Urban Design Plan. Amendments already made to the Vail Land Use Plan and the Lionshead Redevelopment Master Plan established the development standards by which redevelopment on the GLOB site will be reviewed. The portion of the Ever Vail Subdivision that is occupied by the GLOB site will have to comply with Section 5.17.6, Redevelopment Considerations for Glen Lyon Office Building Site, Lionshead Redevelopment Master Plan. Within these site specific recommendations and 14 standards a maximum height of 56 feet is permitted on the site, the 10,829 square feet of office space and all required employee housing units are to be replaced on -site. It is anticipated that the specific development application for the Ever Vail project will comply with the recommendations and standards of the Lionshead Redevelopment Master Plan. Staff believes that the application complies with all the goals and objectives of the Vail Comprehensive Plan, specifically the Lionshead Redevelopment Master Plan. E. Identification and mitigation of natural and /or geologic hazards that affect the property on which the special development district is proposed. According to the Official Town of Vail Geologic Hazard Maps, the Ever Vail development site is not located in any geologically sensitive areas. Staff believes that the application complies with this criterion. F. Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. The application does not include a specific development proposal at this time. Any development proposal will be required to comply with the Town's adopted site coverage and landscaping requirements and will be reviewed for sensitivity to natural features. Staff believes the proposal complies with this criterion. G. A circulation system designed for both vehicles and pedestrians addressing on and off -site traffic circulation. Removal of Development Area D from SDD No. 4 has no impacts to the entirety of the SDD. Within SDD No. 4 the five development areas were provided specific development potential and land uses. No portion of the development potential in the SDD is linked as to create shared interests. Removal of Development Area D does not result in the loss of any development potential. The application does not include a specific development proposal at this time. All future development proposals will be required to comply fully with the Town's adopted transit plan recommendations and requirements and Town of Vail comments regarding pedestrian and vehicular circulation. Staff believes the proposal complies with this criterion. H. Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and functions. Removal of Development Area D (GLOB) from SDD No. 4 has no impacts to the entirety of the SDD. Within SDD No. 4 the five development areas were provided specific development potential and land uses. No portion of the development potential in the SDD is linked as to create shared interests. Removal of Development Area D does not result in the loss of any development potential. 15 The application does not include a specific development proposal at this time. All future development proposals will be required to comply with the Town's adopted site coverage, landscaping requirements. Compliance with the site coverage and landscaping requirements and the review of individual major exterior alteration applications will result in site plan and building designs which are responsive and sensitive to natural features. Town Staff has discussed with the applicant the need to propose amendments to the Lionshead Redevelopment Master Plan to establish adopted view corridors. Additionally, the intent of the applicant is to enhance the recreation opportunities associated with Red Sandstone Creek and Gore Creek through improvements and the proposed establishment of a conservation easement. Staff believes the proposal complies with this criterion. I. Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. The applicant is proposing to remove Development Area D (GLOB) from SDD No. 4, Cascade Village, and therefore this criterion will does not apply. IX. STAFF RECOMMENDATION Special Development District Maior Amendment The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of approval, with conditions, to the Vail Town Council on a proposed major amendment to Special Development District No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village, located at 1000 S. Frontage Road West /Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto. Staff's recommendation is based upon a review of the criteria and findings as outlined in this memorandum and from the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of approval with condition(s) of this major amendment to a special development district, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission forwards a recommendation of approval with conditions of the request for a proposed major amendment to Special Development District No. 4, Cascade Village, pursuant to Section 12 -9A- 10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village, located at 1000 S. Frontage Road West /Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto." 16 Should the Planning and Environmental Commission choose to forward a recommendation of approval with condition(s) of this major amendment to a special development district, the Community Development Department recommends the Commission make the following findings: "Based upon the review of the criteria outlined in Section VIII of the January 24, 2011 staff memorandum and the evidence and testimony presented, the Planning and Environmental Commission finds: 1. The proposal to amend Special Development District No. 4, Cascade Village, complies with the nine design criteria outlined in Section 12 -9A- 8 of the Vail Town Code; and, 2. The applicant has demonstrated to the satisfaction of the Commission, based upon the testimony and evidence presented during the public hearing, that any adverse effects of the requested deviations from the development standards of the underlying zoning are outweighed by the public benefits provided; and, 3. The request is consistent with the development goals and objectives of the Town of Vail Comprehensive Master Plan." Should the Planning and Environmental Commission choose to forward a recommendation of approval of this major amendment to a special development district, the Community Development Department recommends the Commission apply the following conditions: "1. Approval of this major amendment to a special development district is contingent upon the applicant obtaining Town of Vail approval of the associated request to amend the zone district boundaries of the Town of Vail Official Zoning Map to zone Parcels 1 and 2 of the Ever Vail Subdivision to the Lionshead Mixed Use 2 District. 2. Approval of this major amendment to a special development district shall only become effective upon recording of the associated Ever Vail Subdivision Final Plat as approved by the Planning and Environmental Commission and the Vail Town Council in accordance with Title 13, Subdivision Regulations, Vail Town Code. " X. ATTACHMENTS A. Vicinity Map B. Draft Ordinance No. X, Series of 2011 17 Ever Vail Major Amendment to SDD No. Cascade Village, to Remove Development Area "D" a Subject P roperty hismap waac dbyte Town) —I GIS Team. Lke m- map -1dbetrge— p­—mly TM—dill d— nxwaimtte awlrzry— Intmatlonr —d herein. Feet kwhere town.parcel 1'. wwN -Pp. —) 0 250 500 1,000 Last Modified: January 10, 2011 'mYwu�taG.' ORDINANCE NO. X SERIES OF 2011 AN ORDINANCE REPEALING AND RE- ENACTING ORDINANCE NO. 31, SERIES OF 2007, CASCADE VILLAGE, REMOVINF DEVELOPMENT AREA D FROM SDD NO. 4, IN ACCORDANCE WITH SECTION 12- 9A -10, VAIL TOWN CODE; AND SETTING FORTH DETAILS IN REGARD THERETO. WHEREAS, Section 12 -9A -10 of the Zoning Regulations permits major amendments to previously approved development plans for Special Development Districts; and WHEREAS, Resolution No. 19, Series of 2008 changed the land use designation for Development Area D to Lionshead Redevelopment Master Plan in the Vail Land Use Plan; and; WHEREAS, Resolution No. 26, Series of 2008 adopted site specific recommendation for Development Area D within the Lionshead Redevelopment Master Plan, and; WHEREAS, the proposed Ever Vail redevelopment incorporates Development Area D into the overall planning and design for the new base area to Vail Mountain; and; WHEREAS, the Planning and Environmental Commission recommended approval of amendments to SDD No. 4, Cascade Village, on January X, 2011; and; WHEREAS, the proposed major amendment to the Special Development District is in the best interest of the town as it meets the Town's development objectives as identified in the Vail Comprehensive Plan; and WHEREAS, in accordance with the provisions outlined in the Zoning Regulations, the Planning and Environmental Commission held a public hearing on the major amendment application and has submitted its recommendation of approval to the Vail Town Council; and WHEREAS, all notices as required by the Vail Town Code have been sent to the appropriate parties; and WHEREAS, the Vail Town Council considers it in the best interest of the public health, safety, and welfare to amend and re- establish the Special Development District No. 4, Cascade Village, with Development Area D, becoming a part of proposed parcels include within the Ever Vail redevelopment. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF VAI L, COLORADO, THAT: Ordinance No. X, Series of 2011 Section 1. Purpose of the Ordinance Ordinance No. 31, Series of 2007, is hereby repealed and re- enacted by Ordinance No. X, Series of 2011. Section 2. Amendment Procedures Fulfilled, Planning Commission Report. The approval procedures described in Section 12 -9A of the Vail Town Code have been fulfilled, and the Town Council has received the recommendations of the Planning and Environmental Commission for an amendment to the Special Development District No. 4, resulting in the removal of Development Area D. Section 3. Special Development District No. 4 Special Development District No. 4 and the development plans for all sites, hereby remain approved for the development of Special Development District No. 4 within the Town of Vail, unless they have otherwise expired. Section 4. Special Development District No. 4, Cascade Village shall read as follows: Purpose (deletions are shown in stroke thre igW additions are shown in bold) Special Development District No. 4 is established to ensure comprehensive development and use of an area in a manner that will be harmonious with the general character of the Town, provide adequate open space and recreational amenities, and promote the objectives of the Vail Comprehensive Plan. Special Development District No. 4 is created to ensure that the development density will be relatively low and suitable for the area and the vicinity in which it is situated, the development is regarded as complementary to the Town by the Town Council and the Planning and Environmental Commission, and because there are significant aspects of the Special Development District which cannot be satisfied through the imposition of standard zoning districts on the area. 2 Ordinance No. X, Series of 2011 Definitions For the purposes of this chapter, the following definitions shall apply: A. "Special attraction" shall be defined as a museum, seminar or research center or performing arts theater or cultural center. B. "Transient residential dwelling unit or restricted dwelling unit" shall be defined as a dwelling unit located in a multi - family dwelling that is managed as a short term rental in which all such units are operated under a single management providing the occupants thereof customary hotel services and facilities. A short term rental shall be deemed to be a rental for a period of time not to exceed 31 days. Each unit shall not exceed 645 square feet of GRFA which shall include a kitchen having a maximum of 35 square feet. The kitchen shall be designed so that it may be locked and separated from the rest of the unit in a closet. A transient dwelling unit shall be accessible from common corridors, walks, or balconies without passing through another accommodation unit, dwelling unit, or a transient residential dwelling unit. Should such units be developed as condominiums, they shall be restricted as set forth in Section 13 -7 Condominiums and Condominium Conversions, Subdivision Regulations. The unit shall not be used as a permanent residence. Fractional fee ownership shall not be allowed to be applied to transient dwelling units. For the purposes of determining allowable density per acre, transient residential dwelling units shall be counted as one half of a dwelling unit. The transient residential dwelling unit parking requirement shall be 0.4 space per unit plus 0.1 space per each 100 square feet of GRFA with a maximum of 1.0 space per unit. 3 Ordinance No. X, Series of 2011 Established A. Special Development District No. 4 is established for the development on a parcel of land comprising 97 955 96.155 acres and Special Development District No. 4 and the 97 955 96.155 acres may be referred to as "SDD No. 4.11 B. The district shall consist of four separate development areas, as identified in this ordinance consisting of the following approximate sizes: Area Known As Development Area Acreage Cascade Village A 17.955 Coldstream Condominiums B 4.000 Glen Lyon Primary /Secondary and Single Family Lots C 9.100 GleR n r�rterr-34 -3 2-ite D 1$ Tract K E 8.322 Dedicated Open Space 32.078 Roads 4.700 TOTAL 97 955 96.155 Development Plan -- Required -- Approval Procedure Each development area with the exception of Development Areas A ;; Ad v shall be subject to a single development plan. Development Area A shall be allowed to have two development plans for the Cascade Club site as approved by the Town Council. The Waterford and Cornerstone sites shall be allowed one development plan each. appreved by the T-E)WR . A development plan for Development Area E shall be established through the review and approval of a design review application and /or conditional use permit application. The developer shall have the right to proceed with the development plans or scenarios as defined in the development statistics section of this ordinance. Amendments to SDD No. 4 shall comply with Section 12 -9A, Vail Town Code. Permitted Uses 4 Ordinance No. X, Series of 2011 A. Area A. Cascade Village 1. First floor commercial uses shall be limited to uses listed in Section 12 -7B- 3, (Commercial Core 1), Vail Town Code, except for in the CMC building, where office and educational uses shall be permitted on the first floor. The "first floor" or "street level" shall be defined as that floor of the building that is located at grade or street level; 2. All other floor levels besides first floor street level may include retail, theater, restaurant, educational, and office except that no professional or business office shall be located on street level or first floor, with the exception noted above, unless it is clearly accessory to a lodge or educational institution except for an office space having a maximum square footage of 925 square feet located on the first floor on the northwest corner of the Plaza Conference Center building; 3. Lodge; 4. Multi- family dwelling; 5. Single Family dwelling; 6. Primary /Secondary dwelling; 7. Transient residential dwelling unit; 8. Employee dwelling as defined in Section 12 -13 of the Municipal Code; 9. Cascade Club addition of a lap pool or gymnasium. B. Area B, Coldstream Condominiums 1. Two - family dwelling; 2. Multi- family dwelling. C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots 1. Single family dwelling; 5 Ordinance No. X, Series of 2011 2. Two - family dwelling. 3. Type II Employee Housing Unit (EHU) per Chapter 12 -13, of the Municipal Code. fl 4ro I, GIon I ainn (`nmmornial Site BiF i�c n- �rra PFG n° �rra l G L € ai nlnee GlWe as defn-red 1 2_12 of +he M F - (`nrl D. Area E, Tract K 1. Bicycle and pedestrian paths. 2. Interpretive nature walks. 3. Nature preserves. 4. Passive outdoor recreation areas and open spaces. Conditional Uses Conditional uses shall be reviewed per the procedures as outlined in Chapter 12 -16 of the Town of Vail Zoning Regulations. A. Area A, Cascade Village 1. Cascade Club addition of a wellness center not to exceed 4,500 square feet. 2. Special attraction; 3. Ski lifts; 4. Public Park and recreational facilities; 5. Major arcades with no frontage on any public way, street, walkway or mall 6 Ordinance No. X, Series of 2011 area. 6. Transportation Business. 7. Temporary Use of the Tennis Facility for Conferences and Conventions B. Area B, Coldstream Condominiums 1. Public Park and recreational facilities; 2. Ski lifts. C. Area C, Glen Lyon Primary/Secondary and Single - Family Lots 1. Public park and recreational facilities; 2. Ski lifts; fl 4ro I, GIon I jinn GAMMPrnial Site 1 . M re as detirRed in Tn�nin of Vail M61Rinipal GE)de Ghapter 12 D. Area E, Tract K 1. Public parks. 2. Public utility and public service uses. 3. Access roads. 4. Ski lifts and tows. 5. Ski trails. 6. Snowmaking facilities. 7. Other uses customarily incidental and accessory to permitted and conditional uses and necessary for the operation thereof, with the 7 Ordinance No. X, Series of 2011 exception of buildings. Accessory Uses A. Area A. Cascade Village 1. Minor arcade. 2. Home occupations, subject to issuance of a home occupation permit in accordance with the provisions of Title 12, Zoning Regulations, Vail Town Code. 3. Attached garages or carports, private greenhouses, swimming pools, tennis courts, patios, or other recreational facilities customarily incidental to permitted residential uses. 4. Other uses customarily incidental and accessory to permitted or conditional uses, and necessary for the operation thereof. B. Area B, Coldstream Condominiums 1. Home occupations, subject to issuance of a home occupation permit in accordance with the provisions of Title 12, Zoning Regulations, Vail Town Code. 2. Attached garages or carports, private greenhouses, swimming pools, tennis courts, patios, or other recreational facilities customarily incidental to permitted residential uses. Other uses customarily incidental and accessory to permitted or conditional uses, and necessary for the operation thereof. C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots 1. Home occupations, subject to issuance of a home occupation permit in accordance with the provisions of Title 12, Zoning Regulations, Vail Town Code. 2. Attached garages or carports, private greenhouses, swimming pools, tennis 8 Ordinance No. X, Series of 2011 courts, patios, or other recreational facilities customarily incidental to permitted residential uses. 3. Other uses customarily incidental and accessory to permitted or conditional uses, and necessary for the operation thereof. fl 4YOa I, (`_Ion I jinn GGMMPrnial Site �. Location of Business Activity A. All offices, businesses, and shall be operated and conducted entirely within a building, except for permitted unenclosed parking or loading areas, and the outdoor display of goods. B. The area to be used for outdoor display must be located directly in front of the establishment displaying the goods and entirely upon the establishment's own property. Sidewalks, building entrances and exits, driveways and streets shall not be obstructed by outdoor display. 9 Ordinance No. X, Series of 2011 Density -- Dwelling Units, The number of dwelling units shall not exceed the following: A. Area A, Cascade Village In Area A, a minimum of three hundred fifty -two (352) accommodation or transient dwelling units and a maximum of one hundred one (101) dwelling units for a total density of two hundred seventy (270) dwelling units. B. Area B, Coldstream Condominiums Sixty -five (65) dwelling units C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots One - hundred four (104) dwelling units. fl 4ro D GIon I jinn GAMMPrnial Site Density - -Floor Area A. Area A, Cascade Village The gross residential floor area (GRFA) for all buildings shall not exceed 289,145 square feet. B. Area B, Coldstream Condominiums Sixty -five thousand square feet (65,000 sq. ft.) GRFA. C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots GRFA shall be calculated for each lot per Section 12 -6D -8 (Density Control) for the Primary /Secondary district of the Vail Town Code. 10 Ordinance No. X, Series of 2011 Commercial Square Footage A. Area A, Cascade Village Area A shall not exceed 35,698 square feet of commercial area. Development Statistics for Area A. Cascade Village, and Area D, Glen Lyon Commercial Site CHART 1: Area A Completed Projects 11 Ordinance No. X, Series of 2011 Aus DUs GRFA Retail/ Commercial Square Foot On -Site Parking Cascade Structure Parking MILLRACE 1 16 20,000 20 0.00 MILLRACE 11 14 17,534 25 0.00 MILLRACE IIII 3 6,450 7 MILLRACE IV (COSGRIFF) " "" 6 10,450 19 0.00 11 Ordinance No. X, Series of 2011 WESTI N Aus 148 DUs GRFA 55,457 Retail/ Commercial Square Foot On -Site Parking 0.00 Cascade Structure Parking 115 Alfredo =s 104 Seats Cafe 120 58.069 74 Seats 0.00 105 Little Shop 5.856 1,250 0.00 20 Pepi Sports 2,491 W& H Smith, Vaurnot 900 CIVIC BUILDING Cascade Wing 8 15,870 0.00 16 Clancy =s 1,600 0.00 13.3 Theater 4,220 28 College Classrooms 0.00 40 College Office 0.00 4 Theater /Meeting Room 2J 1.387 0.00 11.5 12 Ordinance No. X, Series of 2011 TERRACE WING Rooms 120 58.069 0.00 105 Retail 5.856 0.00 20 PLAZA 1 12 Ordinance No. X, Series of 2011 Rooms 20 7,205 0.00 16 Retail 1,099 0.00 4 Units 27 56 PLAZA II 2 1,100 2 Conference 27 47,500 0.00 35 Retail 925 0.00 3 Cascade Club Addition CASCADE CLUB 4,500 22.5 Retail 300 0.00 1 Bar & Restaurant 252 0.00 3.5 Office in CIVIC 828 0.00 3 Wellness Center 1,386 0.00 7 Office in Club 420 0.00 1.4 13 Ordinance No. X, Series of 2011 LIFTSIDE (WATERFORD) Units 27 56 Employee Units 2 1,100 2 TOTALS 27 47,500 58 Cascade Club Addition Wellness Center 4,500 22.5 13 Ordinance No. X, Series of 2011 Plaza Office ** Parking Spaces 461.9 Less 17.5% Mixed -Use Credit -80.8 925 381.1 .7 Existing Parking in Cascade Structure 421.0 Required Parking in Cascade Structure at Build -Out of Area A With 17.5% mixed -use credit 381.1 TOTALS 288 AU 76 DU (includes 2 EHUS) 239,680 24,598 129 449.9 * *Plaza space has already been counted for a retail parking requirement. The new parking requirement is based on the difference between the retail and office parking requirements. ** *For the purposes of calculating GRFA for the Cosgriff parcel (Millrace IV), no credits shall be given except for 300 s.f. to be allowed for each enclosed parking space. CHART 2: AREA A REQUIRED PARKING Parking for Completed Projects per Chart 1 in Cascade Parking Structure Parking Spaces 461.9 Less 17.5% Mixed -Use Credit -80.8 Total Required Parking at Build -Out of Area A in Cascade Structure 381.1 Existing Parking in Cascade Structure 421.0 Required Parking in Cascade Structure at Build -Out of Area A With 17.5% mixed -use credit 381.1 Development Plans 14 Ordinance No. X, Series of 2011 Site specific development plans are approved for Area A and Area D. The development plans for Area A are comprised of those plans submitted by Vail Ventures, Ltd. and other developers. The development plans for Area D are comprised of those plans submitted by the Glen Lyon Office Building, a Colorado Partnership. The following documents comprise the development plan for the SDD as a whole, Waterford, Cornerstone, Cascade Club Addition Scenario 1 and 2, Millrace IV, and Area D -Glen Lyon Commercial Site and is not all inclusive: 1. Waterford, Sheet #L -2, dated 11- 12 -92, Landscape Plan, Dennis Anderson. 2. Waterford, Sheet #1.1, dated 11- 13 -92, Site /Grading Plan Gwathmey, Pratt, Schultz. 3. Waterford, Sheet #2.1, dated 11- 13 -92, Plan Level 38/43' 3 ", Gwathmey, Pratt, Schultz. 4. Waterford, Sheet #2.2, dated 11- 13 -92, Plan Level 48'- 6 "/53' -0 ", Gwathmey, Pratt, Schultz. 5. Waterford, Sheet #2.3, dated 11 -13 -92 Plan Level 59'- 0:/64' -3" by Gwathmey, Pratt, Schultz. 6. Waterford, Sheet #2.4, dated 11 -4 -92, Plan Level 69'- 6 "/74' -9 ", Gwathmey, Pratt, Schultz. 7. Waterford, Sheet #2.5, dated 11- 13 -92, Plan Level 80'- 0 "/85' -3" Gwathmey, Pratt, Schultz. 8. Waterford, Sheet #2.6, dated 11- 13 -92, Plan Level 90' -6" Gwathmey, Pratt, Schultz. 9. Waterford, Sheet #2.7, dated 11- 13 -92, Plan Level 101' -0" Gwathmey, Pratt, Schultz. 10. Waterford, Sheet #2.8, dated 11- 13 -92, Plan Level 111' -6" Gwathmey, Pratt, Schultz. 11. Waterford, Sheet #2.9, dated 11- 13 -92, Plan Level 122' -0" Gwathmey, Pratt, Schultz. 12. Waterford, Sheet #2.10, dated 12- 14 -92, Roof Plan All Levels Gwathmey, Pratt, Schultz. 15 Ordinance No. X, Series of 2011 13. Waterford, Sheet #3.1, dated 11- 13 -92, Elevations Gwathmey, Pratt, Schultz. 14. Waterford, Sheet #3.2, dated 11- 13 -92, Elevations, Gwathmey, Pratt, Schultz. 15. Waterford, Sheet #4.1, dated 11 -4 -92, Sections Gwathmey, Pratt, Schultz. 16. Waterford, Sheet #4.2, dated 11 -4 -92, Sections, Gwathmey, Pratt, Schultz. 17. Waterford, Sheet #4.3, dated 11 -4 -92, Sections, Gwathmey, Pratt, Schultz. 18. Waterford, Sheet #9.1, dated 10- 20 -92, Unit Plans Gwathmey, Pratt, Schultz. 19. Waterford, Sheet #9.2, dated 10- 20 -92, Unit Plans, Gwathmey, Pratt, Schultz. 20. Waterford, Sheet #9.3, dated 10- 20 -92, Unit Plans Gwathmey, Pratt, Schultz. 21. Waterford, Sheet #9.4, dated 10- 20 -92, Unit Plans, Gwathmey, Pratt, Schultz. 22. Waterford, Sheet #9.5, dated 10- 20 -92, Unit Plans Gwathmey, Pratt, Schultz. 23. Cascade Club Addition Site Plan, Roma, 10/10/88. 24. Cascade Club Floor Plan, Roma, 10/10/88. 25. Millrace III, Sheet #1, dated 5/6/93, Site Plan, Steven James Riden. 26. Millrace III, Sheet #2, dated 4/13/93, Floor Plans for Single Family Residence, Steven James Riden. 27. Millrace III, Sheet #3, dated 5/6/93, Elevations for Single Family Residence, Steven James Riden. 28. Millrace III, Sheets #4 and #5, dated 3/20/93, Floor Plans for Duplex Building, Steven James Riden. 29. Millrace III, Sheets #6 and #7, dated 5/6/93, Elevations for Duplex Building, Steven James Riden. 30. Millrace III, Sheet L1, dated 5/6/93, Site /Landscape Plan, Steven James Riden. 31. Millrace IV, Scenario I, a /k/a Cosgriff Parcel, Site Plan, Arnold Gwathmey Pratt, 10/28/91. 32. Millrace IV, Scenario I, a /k/a Cosgriff Parcel, Elevations Arnold Gwathmey Pratt, 10/22/91. 33. Millrace IV, Scenario I, a /k/a Cosgriff Parcel, Floor Plans Arnold Gwathmey Pratt, 10/23/91. 34. Millrace IV, Scenario I, a /k /a Cosgriff Parcel, Landscape Plan, Dennis Anderson Associates. Ordinance No. X, Series of 2011 16 35. Cosgriff Parcel, Survey, Alpine Engineering, Inc., 10/31/91 stamped. 36. Survey, a part of Cascade Village, Eagle Valley Engineering, Leland Lechner, 6/8/87. 37. Site Coverage Analysis, Eagle Valley Engineering, 10/10/88. 38. Cascade Village Special Development District Amendment and Environmental Impact Report: Peter Jamar Associates, Inc., revised 11/22/88. 39. Topographic Map, Inter - Mountain Engineering, Ltd, 12/1/94 40. Improvement Location Certificate, Eagle Valley Surveying, Inc., 3/2/92 41. The Approved Development Plan for Area A, Westhaven Condominiums, containing the following Sheets: Dwg.9 Title Author Date A -1.0 Title Sheet Morter Architects 03 -15 -05 A -1.1 Vicinity Map Morter Architects 01 -31 -05 A -1.2 GRFA Summary Morter Architects 03 -15 -05 A -1.3 Spring Equinox Sun Shading Morter Architects 01 -31 -05 A -1.4 Summer Solstice Sun Shading Morter Architects 01 -31 -05 A -1.5 Fall Equinox Sun Shading Morter Architects 01 -31 -05 A -1.6 Winter Solstice Sun Shading Morter Architects 01 -31 -05 A -1.7 Site Plan Morter Architects 03 -15 -05 C001 Cover Sheet Alpine Engineering 03 -14 -05 C002 Grading Plan (West Half) Alpine Engineering 03 -14 -05 C003 Grading Plan (East Half) Alpine Engineering 03 -14 -05 C004 Storm Drainage Plan Alpine Engineering 03 -14 -05 C005 Grading and Drainage Details Alpine Engineering 03 -14 -05 C006 Utility Plan Alpine Engineering 03 -14 -05 C007 Utility Details Alpine Engineering 03 -14 -05 C008 Demolition Plan Alpine Engineering 03 -14 -05 L -1 Landscape Plan Dennis Anderson Assoc. 03 -15 -05 L -2 Landscape Plan — Cascade Club Dennis Anderson Assoc. 03 -15 -05 17 Ordinance No. X, Series of 2011 A2.0 Parking Level Plan Morter Architects 03 -15 -05 A2.1 First Floor Plan Morter Architects 03 -15 -05 A2.2 Second Level Plan Morter Architects 03 -15 -05 A2.3 Third Level Plan Morter Architects 03 -15 -05 A2.4 Fourth Level Plan Morter Architects 03 -15 -05 A2.5 Roof Plan Morter Architects 03 -15 -05 A3.1 Building A Elevations Morter Architects 03 -15 -05 A3.2 Building B Elevations Morter Architects 03 -15 -05 A4.0 Building Sections Morter Architects 02 -14 -05 A4.1 Building Sections Morter Architects 02 -14 -05 A4.2 Building Sections Morter Architects 02 -14 -05 42. Approved Development Plan for Area A, Cascade Residences, containing the following sheets, wg. # Title Author Date -2.20 Second Floor Plan RKD Architects 01 -28 -07 -2.30 Third Floor Plan RKD Architects 01 -28 -07 -2.40 Fourth Floor Plan RKD Architects 01 -28 -07 -2.50 ifth Floor Plan RKD Architects 01 -28 -07 -3.10 East and North Building Elevations RKD Architects 01 -28 -07 -3.20 West and South Building Elevations RKD Architects 01 -28 -07 * A maximum of 1000 sq. ft. of common area, in addition to the approved plans, may be added to the Waterford project to allow for compliance with the Uniform Building Code, Uniform Fire Code and American Disabilities Act. The staff shall review all such additions to ensure that they are required by such codes. Area C, Glen Lyon Primary/Secondary and Single Family Lots 1. Building Envelopes for Lots 39 -1 and 39 -2 per sheet, L -1, prepared by Design 18 Ordinance No. X, Series of 2011 Workshop, Inc., dated 11 -9 -98. - . CJ " Wrt:r Development Standards The development standards set out herein are approved by the Town Council. These standards shall be incorporated into the approved development plan pertinent to each development area to protect the integrity of the development of SDD No. 4. They are minimum development standards and shall apply unless more restrictive standards are incorporated in the approved development plan which is adopted by the Town Council. Setbacks A. Area A, Cascade Village Required setbacks shall be as indicated in each development plan with a minimum setback on the periphery of the property (Area A) of not less than twenty feet, with the exception that the setback requirement adjacent to the existing Cascade parking structure /athletic club building shall be two feet as approved on February 8, 1982, by the Planning and Environmental Commission, and with the exception that the setback requirement of a portion of the Westhaven Condominiums building, as indicated on the approved development plans referenced in this ordinance, shall be 14 feet. All buildings shall maintain a 50 foot stream setback from Gore Creek. The Waterford building shall maintain a minimum 20 foot setback from the north edge of the recreational path along Gore Creek. B. Area B, Coldstream Condominiums Required setbacks shall be as indicated on the development plan. C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots Required setbacks shall be governed by Section 12 -6D -7 of the Primary /Secondary zone district of the Vail Town Code. For single - family Lots 39 -1 and 19 Ordinance No. X, Series of 2011 39 -2, development shall occur per the approved building envelopes and is subject to the following: All future development will be restricted to the area within the building envelopes. The only development permitted outside the building envelopes shall be landscaping, driveways (access bridge) and retaining walls associated with driveway construction. At -grade patios (those within 5' of existing or finished grade) will be permitted to project beyond the building envelopes not more than ten feet (10') nor more than one -half (2) the distance between the building envelope and the property line, or may project not more than five feet (5) nor more than one - fourth (3) the minimum required dimension between buildings. fl 4ro I, GIon I jinn (`nmmornial Site Rona iired co4hanLc sh;;Il be ac the approved deyelnnmon4 plane Height A. For the purposes of SDD No. 4 calculations of height, height shall mean the distance measured vertically from the existing grade or finished grade (whichever is more restrictive), at any given point to the top of a flat roof, or mansard roof, or to the highest ridge line of a sloping roof unless otherwise specified in approved development plan drawings. B. Area A, Cascade Village 1. The maximum height for the Westin Hotel, CMC Learning Center, Terrace Wing, Plaza Conference Building and Cascade Parking Structure /Athletic Club is 71 feet. 2. Cornerstone Building: Maximum height of 71 feet. 3. Waterford Building: Maximum height of feet as measured from finished grade to any portion of the roof along the north elevation shall be 55' (South Frontage Road), 56' along the west elevation Westhaven Drive, and 65 feet along the south and east elevation as measured from finished grade. 4. Westhaven Building: A maximum of 55 feet. 5. Millrace III: A maximum of 36 feet. 20 Ordinance No. X, Series of 2011 6. Millrace IV: A maximum of 36 feet. 7. Cascade Club Addition: A maximum of 26 feet. 8. Cascade Entry Tower: A maximum of 36 feet. 9. The remainder of buildings in Area A shall have a maximum height of 48 feet. C. Area B. Coldstream Condominiums The maximum height shall be 48 feet. D. Area C. Glen Lyon Primary /Secondary and Single - Family Lots The maximum height shall be 33 feet for a sloping roof and 30 feet for a flat or mansard roof. ■ Oani�nt I i M ■_ I Iry ■ Site Coverage Area A: Not more than 45% of the total site area may be covered by buildings unless otherwise indicated on the site specific development plans. Area B: No more than 35% of the total site area shall be covered by buildings, provided, if any portion of the area is developed as an institutional or educational center, 45% of the area may be covered unless otherwise indicated on the site specific development plans. Area C: No more than 25% of the total site area shall be covered by buildings, unless the more restrictive standards of Chapter 12 -21 of the Vail Municipal Code apply. I 4r� n _ file mee ten '0/ 27 e -t$t�I ate °Yea ell he ne�ieFed by 1961'�rg$ -�a AF P ­;; h � rnarr- v� -�v o -v th r -crr crn- -pc�vv 21 Ordinance No. X, Series of 2011 Landscaping At least the following percentages of the total development area shall be landscaped as provided in the development plan. This shall include retention of natural landscape, if appropriate. Areas A and B, fifty percent (50 %), and in Areas C ;;Ad B, sixty percent (60 %), of the area shall be landscaped unless otherwise indicated on the site specific development plans. Parking and Loading A. Area A, Cascade Village 1. Off - street parking shall be provided in accordance with Chapter 12 -10, Vail Town Code, except that 75% of the required parking in Area A shall be located within a parking structure or buildings with the exception of Millrace IV, Scenario I, where 66.6% and the Westhaven Condominiums, where 71 % of required parking shall be enclosed in a building. 2. There shall be a total of 421 spaces in the main Cascade Club parking structure. A 17.5 percent mixed -use credit per the Town of Vail parking code, has been applied to the total number of required parking spaces in the Cascade structure. 3. There shall be a total of 58 on -site parking spaces on the Waterford building site with a minimum of 75% of the required space located below grade. No mixed use credit shall be applied to this site. 4. There shall be a minimum of 93 enclosed parking spaces located within the Cornerstone building with 37 of the required spaces available to the public for short -term parking. No mixed use credit has been applied to this lot. 5. The third floor of the Cascade parking structure shall not be used to meet any parking requirements for accommodation units, transient residential dwelling units, employee dwelling units or dwelling units. 6. Phasing: All required parking for Cornerstone and Waterford shall be located on their respective sites. All required parking for the Cascade Club Wellness Center Addition Scenario 1 shall be provided in the Cascade parking 22 Ordinance No. X, Series of 2011 structure. 7. Seventy -five percent of the required parking shall be located within the main building or buildings and hidden from public view from adjoining properties within a landscaped berm for Millrace III. 8. All loading and delivery shall be located within buildings or as approved in the development plan. B. Area B. Coldstream Condominiums Fifty percent of the required parking shall be located within the main building or buildings and hidden from public view from adjoining properties within a landscaped berm. C. Area C, Glen Lyon Primary /Secondary and Single - Family Lots Off - street parking shall be provided in accordance with Chapter 12 -10 of the Municipal Code. Recreation Amenities Tax Assessed The recreational amenities tax due for the development within SDD No. 4 under Chapter 23 Ordinance No. X, Series of 2011 3.20 shall be assessed at a rate not to exceed fifty cents per square foot of GRFA in Development Area B; and at a rate not to exceed fifteen cents per square foot of GRFA in Development Area C; Ind- ;+ ; ra +o n„+ +„ o :9Gee d Se VeR t y fi „o GeR per sq are f.,.,+ of flnnr �ro� in [Deyelnprnept 4ro;; n , and shall be paid in conjunction with each construction phase prior to the issuance of building permits. Conservation and Pollution Controls A. The developer's drainage plan shall include a provision for prevention of pollution from surface runoff. B. The developer shall include in the building construction, energy and water conservation controls as general technology exists at the time of construction. C. The number of fireplaces permitted shall be as set forth in the Town of Vail Municipal as amended. D. If fireplaces are provided within the development, they must be heat efficient through the use of glass enclosures and heat circulating devices as technology exists at the time of development. E. All water features within Development Area A shall have overflow storm drains per the recommendation of the Environmental Impact Report by Jamar Associates on Page 34. F. All parking structures shall have pollution control devices to prevent oil and dirt from draining into Gore Creek. I }�,� v. 'A 4rea D a manhnIo nn the rewery service li tre -sh be prevrced se that the U pper Eagle Valley (`nncnlirl� +or! Q7rti +7 +inn I,ic+rin+ magi mnni+nr RO c+rEaRgth v�� �c�r�.. v-- anc�- v vrrvvrrcracca�artrccr« vrrvracrn- rrn��rrvrrrcrn�- . �+G. In Area D, the brewery management shall not operate the brewery process during temperature inversions. It shall be the brewery owner's responsibility to monitor inversions. 4H. All trash compactors and trash storage areas shall be completely enclosed within Special Development District 4. JLI. Protective measures shall be used during construction to prevent soil erosion into Gore Creek, particularly when construction occurs in Areas A aP;l -B. Ordinance No. X, Series of 2011 24 Additional Amenities and Approval Agreements for Special Development District No. 4. A. The developer shall provide or work with the Town to provide adequate private transportation services to the owners and guests so as to transport them from the development to the Village Core area and Lionshead area as outlined in the approved development plan. B. Area A, Cascade Village 1. The developer of the Westhaven Condominiums building shall construct a sidewalk that begins at the entrance to the Cascade Club along Westhaven Drive and extends to the west in front of the Westhaven building to connect with the recreational path to Donovan Park, as indicated on the approved development plans referenced in this ordinance. The walk shall be constructed when a building permit is requested for the Westhaven Condominiums. The sidewalk shall be part of the building permit plans. The sidewalk shall be constructed subsequent to the issuance of a building permit and prior to the issuance of a temporary certificate of occupancy for the Westhaven Condominiums. 2. The developer shall provide 100 -year floodplain information for the area adjacent to the Waterford and Cornerstone buildings to the Town of Vail Community Development Department before building permits are released for either project. 3. Cornerstone The development plan for this area has expired. See Ordinance No. 8, Series of 1998 for previous requirements. 25 Ordinance No. X, Series of 2011 Employee Housing The development of SDD No. 4 will have impacts on available employee housing within the Upper Eagle Valley area. In order to help meet this additional employee housing need, the developer(s) of Areas A a+Ad -D shall provide employee housing. In Area n +he ahnVe referenned eFnPIG fee Ihni icinrr re`vi firemen+ shall be prr y nn ci +e For the Westhaven Condominiums site, the employee housing requirement shall be met as set forth in Condition 3 herein. The developer(s) of Area A shall build a minimum of 3 employee dwelling units within the Cornerstone Building and 2 within the Liftside (Waterford Building). Each employee unit in the Cornerstone Building shall have a minimum square footage of 600 square feet. There shall be a total of 2 employee dwelling units in the Waterford Building. One shall be a minimum of 300 square feet and the other a minimum of 800 square feet. The developer of the Westhaven Condominiums building shall provide 4,400 square feet of employee housing pursuant to the terms of an agreement reached with the Town of Vail as described in Condition 3. The developer of Area n chill hi iilr! 2 empIGYee GlWelliRg i ini ;,;;c+ i ini+ shell he�ie a minima = (`RF of 900 sq iare fee+ The GRFA and number of employee units shall not be counted toward allowable density or GRFA for SDD No. 4. All Employee Housing Units shall be deed restricted per Chapter 12.13, as amended, of the Vail Town Code prior to issuance of building permits for the respective project. In Area C, Lots 39 -1 and 39 -2, shall be required to provide a Type II, Employee Housing Unit (EHU) per Chapter 12 -13 of the Zoning Regulations of at least 500 sq. ft. each, on each lot. These lots shall not be entitled to the 500 sq. ft. of additional GRFA. The 500 sq. ft. shall be included in the allowable GRFA on these lots. Each lot shall also be entitled to 300 sq. ft. of garage area credit for the employee housing unit, in addition to 26 Ordinance No. X, Series of 2011 the 600 sq. ft. garage area credit allowed per residence. The driveway width of 12 is allowed to remain (no increase in driveway width is required) for all allowed /required dwelling units and employee housing units on these lots. Time Requirements SDD No. 4 shall be governed by the procedures outlined in Section 12 -9A of the Town of Vail Municipal Code, unless such time requirement is amended herein. Section 4. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not effect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. Section 5. The Town Council hereby finds, determines and declares that this ordinance is necessary and proper for the health, safety and welfare of the Town of Vail and the inhabitants thereof. Section 6. The amendment of any provision of the Town Code as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceeding as commenced under or by virtue of the provision amended. The amendment of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. Section 7. All bylaws, orders, resolutions and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall not be construed to revise any bylaw, order, resolution or ordinance, or part thereof, theretofore repealed. 27 Ordinance No. X, Series of 2011 INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED PUBLISHED ONCE IN FULL ON FIRST READING this X day of January, 2011, and a public hearing for second reading of this Ordinance set for the X day of February, 2011, at 6:00 P.M. in the Council Chambers of the Vail Municipal Building, Vail, Colorado. Richard Cleveland, Mayor ATTEST: Lorelei Donaldson, Town Clerk 28 Ordinance No. X, Series of 2011 MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 24, 2011 SUBJECT: A request for a recommendation to the Vail Town Council for an amendment to the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. (PEC110002) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell SUMMARY The applicant, Ever Vail, LLC. represented by the Mauriello Planning Group is requesting a recommendation to the Vail Town Council for an amendment to the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. Amendments to Chapter 4, Master Plan Recommendations — Overall Study Area, and Chapter 5, Detailed Plan Recommendations, are proposed to provide more specific recommendations and standards for the Ever Vail development. Based upon Staff's review of the criteria outlined in Section VI of this memorandum and the evidence and testimony presented, the Community Development Department recommends the Commission forward a recommendation of approval, with conditions, to the Town Council regarding the proposed amendments to the Lionshead Redevelopment Master Plan. II. DESCRIPTION OF THE REQUEST The applicant, Ever Vail, LLC, represented by the Mauriello Planning Group is requesting a recommendation to the Vail Town Council for proposed amendments to the Lionshead Redevelopment Master Plan. The proposed amendments are intended to change those portions of the Master Plan which no longer reflect the desired outcomes of the West Lionshead properties that will comprise the Ever Vail development. The amendments will establish the desired recommendations and standards for the Ever Vail development. The purpose of the amendments are not to amend or otherwise alter the overall goals, objectives and policies stated in the Master Plan. 1 The Master Plan recommendations for West Lionshead (Ever Vail) were adopted in 2007, and included three key concepts that would result in the creation of a new portal to Vail Mountain. Those key concepts are the relocation and realignment of the South Frontage Road, public parking spaces in addition to any zoning requirement, and the incorporation of a ski lift (gondola). The proposed amendments are the result of approximately three years of review of the redevelopment of West Lionshead with the development known now as Ever Vail. The amendments propose to capture the current thinking about the desired results within Ever Vail. The amendments include several images which will exhibit the specific and general goals and objectives of Ever Vail. These concepts for layouts and design include, but are not limited to, the South Frontage Road relocation, the gondola, the transit center, the public parking, the mountain operations service yard, loading and delivery, pedestrian and vehicular circulation, and public plazas and walkways. Staff has attached the applicant's proposed amendments to the Master Plan (Attachment A). Staff has attached their suggested amendments to the applicant's request (Attachment B). The proposed amendments in the attachment are indicated with additional language in bold and language to be removed (deleted) shown in stroke thre III. BACKGROUND On December 11, 2006, the Planning and Environmental Commission forwarded a recommendation of approval for amendments to the Lionshead Redevelopment Master Plan to include the Vail Professional Building and Cascade Crossing parcels within the Master Plan boundaries and to amend the recommendations for the area known as "West Lionshead ". On February 6, 2007, the Vail Town Council adopted Resolution No. 4, Series of 2007, which implemented the changes to the Lionshead Redevelopment Master Plan regarding West Lionshead and the area known as Ever Vail. On September 24, 2007, the Planning and Environmental Commission forwarded a recommended approval of the preliminary plat by a vote of 6 -0 -0. This application was subsequently withdrawn by the applicant while it was in the Town Council review process. On October 22, 2007, the Planning and Environmental Commission forwarded a recommendation of approval on the proposed rezoning of the two new parcels proposed to be established in the Ever Vail Subdivision by a vote of 5 -1 -0 (Cleveland opposed). This application was subsequently withdrawn by the applicant while it was in the Town Council review process. On August 11, 2008, the Town of Vail Planning and Environmental Commission voted 4 -0 -1 (Viele recused) to forward a recommendation of approval of Resolution No. 19, Series of 2008, for the Vail Land Use Plan map amendment to allow for a change in the land use designation from Community Office to Lionshead Redevelopment Master Plan for the Glen Lyon Office Building site. On September 2, 2008 the Vail Town Council approved Resolution No. 19, 2 Series of 2008, described above. The motion passed 4 -3 -0, with Foley, Hitt and Rogers dissenting. On December 8, 2008 the Town of Vail Planning and Environmental Commission voted 5 -0 -1 (Viele recused) to forward a recommendation of approval to the Vail Town Council for Resolution 26, Series of 2008, which included amendments to the Lionshead Redevelopment Master Plan to incorporate the GLOB within the document. On February 3, 2009 the Vail Town Council adopted Resolution No. 26, Series of 2008, by a vote of 5 -1 -0 (Foley opposed). On March 22, 2009, the Planning and Environmental Commission approved a partial preliminary plan which established the 1 -70 right -of -way. This partial preliminary plan was endorsed by the Town Council on April 21, 2009, for submittal to CDOT for review. On January 10, 2011, the Planning and Environmental Commission unanimously forwarded recommendations of approval to the Vail Town Council for the adoption of the Ever Vail preliminary plan and the zoning of Parcels 1 and 2 of the Ever Vail Subdivision to Lionshead Mixed use 2 District. These recommendations of approval were conditioned upon the recording of the Ever Vail final plat. IV. ROLES OF THE REVIEWING BOARDS Lionshead Redevelopment Master Plan Amendments Planning and Environmental Commission: Action: The Planning and Environmental Commission is advisory to the Town Council. The Planning and Environmental Commission shall review the proposal and make a recommendation to the Town Council on the consistency of the proposed amendment with applicable review criteria and the policies, goals and objectives outlined in the Lionshead Redevelopment Master Plan and other applicable master plan documents. Town Council: Action: The Town Council is responsible for final approval /denial of a Lionshead Redevelopment Master Plan amendment. The Town Council shall review and approve the proposal based on the consistency of the proposed amendment with applicable review criteria and the policies, goals and objectives outlined in the Lionshead Redevelopment Master Plan and other applicable master plan documents. V. APPLICABLE PLANNING DOCUMENTS This section of the memorandum contains portion of the Lionshead Redevelopment Master which are pertinent to the application. The proposed amendments are found in the attachments. Lionshead Redevelopment Master Plan (in part) Chapter 1: Executive Summary Recommended Actions The following list summarizes the recommended actions, both public and private, that are contained in the master plan. Please refer to individual chapters for more detail on specific topics and individual properties. Development/ Redevelopment • Encourage, facilitate, and provide incentives for the redevelopment and renovation of existing structures in Lionshead. • Create a Vail Civic Center comprised of the Dobson Ice Arena, the Vail Public Library, and new development on the existing charter bus lot. • Develop the south face of the Lionshead parking structure with ground floor retail/ commercial space and locals/ seasonal housing above. • Develop the Town of Vail infill parcel at the east portal to the Lionshead pedestrian and retail mall; make it an active entry landmark. • Encourage first floor retail expansions in the retail core improving the spatial proportions of public spaces by extending into the pedestrian street. • Encourage, facilitate and provide incentives for the creation of a five -star resort hotel in the Lionshead core. • Encourage, facilitate, and provide incentives for the creation of seasonal housing in the western end of Lionshead. Pedestrian Circulation • Implement the Vail Streetscape Masterplan for the Vail Village - Lionshead connection along West Meadow Drive. • Redevelop the existing east Lionshead pedestrian portal. • Develop, with public - private cooperation, two continuous pedestrian axes (north -south and east -west) through Lionshead. Create new walkways and plazas and replace deteriorated pavements. • Install a snowmelt system in the Lionshead pedestrian mall. • Require pedestrian walks and paths along all streets. • Connect the Gore Creek recreation path below the Gondola lift line. • Provide for pedestrian and bicycle traffic along the South Frontage Road. • Encourage, facilitate, and provide incentives for the creation of one or more new west Lionshead pedestrian portals through redevelopment of Concert Hall Plaza, the Montaneros Condominiums, and the Vail Associates core site. • Create a new north Lionshead pedestrian portal in conjunction with development of a public transportation facility on the north day lot. • Replace the existing skier bridge. • Implement a comprehensive directional signage program. Connections with the Natural Environment Create a passive recreation trail system on the south side of Gore Creek. Establish public view corridors to preserve the visual connections to Lionshead's natural environment. 4 Encourage, facilitate, and provide incentives for the creation of green landscape corridors penetrating into the Lionshead environment. Enhance the western end of the Gore Creek recreation path through landscape and environmental remediation. Vehicular Circulation • Restrict the vehicular traffic on East Lionshead Circle to Town of Vail "in- town" transit, emergency vehicles, and adjacent local property owners. • Provide all necessary improvements to the South Frontage Road including widening, acceleration /deceleration lanes, landscaped medians, and other appropriate measures to facilitate and clarify traffic flows. • Realign the South Frontage Road at the western end of Lionshead. • Realign the West Lionshead Circle and Lionshead Place intersection. • Encourage, facilitate, and provides incentives for the removal of snowcats and winter mountain service vehicles from Forest Road. • Create a central skier drop -off point on the north day lot. • Implement a comprehensive directional signage program for vehicles. Transit • Create dispersed transportation centers in Lionshead to accommodate local and regional transit, local shuttles, skier drop off, and charter buses. Locations for these facilities may include the North Day Lot, the Lionshead Parking Structure, and West Lionshead (aka EverVail). • Remove the existing Concert Hall Plaza bus drop -off. • Relocate the existing Lionshead Place regional bus stop to the north day lot, Lionshead Parking Structure, or West Lionshead area.. • Improve the now difficult left turn from East Lionshead Circle onto the South Frontage Road. • Connect the future development in west Lionshead to the Town of Vail in- town transit route. • Investigate alternative clean transit technologies. • Investigate potential intermodal connections to future non - vehicular regional transit systems. Parking • Add at least one more deck to the Lionshead parking structure. • Conduct studies to establish the user profile of people accessing Lionshead from the parking structure; use this to determine the desired user profile and true parking demand. • Investigate the possibility of a secondary parking structure in the western end of Lionshead. Chapter 2, Introduction 2.1 Purpose of the Master Plan "This master plan was initiated by the Town of Vail to encourage redevelopment and new development initiatives in the Lionshead study area. Both public and private interests have recognized that Lionshead today lacks the economic vitality of Vail and fails to offer a world class resort experience. Lionshead's economic potential has been inhibited by a number of recurrent themes: • Lack of growth in accommodation units ( "hot beds'); • Poor retail quality; • Deterioration of existing buildings; • Uninteresting and disconnected pedestrian environment; • Mediocre architectural character; and the • Absence of incentives for redevelopment. This master is a comprehensive guide for property owners proposing to undertake development or redevelopment of their properties and the municipal officials responsible for planning public improvements. The plan outlines the Town's objectives and goals for the enhancement of Lionshead and proposes recommendation, incentives, and requirements for redevelopment and new development." 2.2 Definition of a Master Plan In the development of the Lionshead Master Plan, the following definition has been used as the basis for this work: A master plan is a guide, a flexible framework for future action. It articulates a community's fundamental land use policies, principles, and goals in a broad and general way. It plans for the future physical development or redevelopment of an area of the community, including its functional and circulation systems and its public facilities. The land use policies in a master plan are generally implemented through zoning ordinances. Existing zoning and land use codes may be modified and new provisions enacted in order to conform to the master plan and carry out the plan's objectives. A master plan does not convey approval for particular development proposals or concepts, nor can it be implemented in a short time frame. After adoption of the Lionshead Master Plan, every development proposal will have to go through the applicable development review and approval process, with its attendant public notices and public hearings. A proposal's adherence to the policies contained in the adopted master plan will be one of the factors analyzed by staff, the Planning and Environmental Commission (PEC), the Design Review Board (DRB), and the Town Council (as applicable) in determining whether to approve or disapprove the specific proposal. 31 2.3 Policy Objectives The Town Council adopted six policy objectives on November 4, 1996 to outline the important issues to be addressed in the master plan and to provide a policy framework for the master planning process. 2.3.1 Renewal and Redevelopment Lionshead can and should be renewed and redeveloped to become a warmer, more vibrant environment for guests and residents. Lionshead needs an appealing and coherent identity, a sense of place, a personality, a purpose, and an improved aesthetic character. 2.3.2 Vitality and Amenities We must seize the opportunity to enhance guest experience and community interaction through expanded and additional activities and amenities such as performing arts venues, conference facilities, ice rinks, streetscape, parks and other recreational improvements. 2.3.3 Stronger Economic Base Through Increased Live Beds In order to enhance the vitality and viability of Vail, renewal and redevelopment in Lionshead must promote improved occupancy rates and the creation of additional bed base ( "live beds" or "warm beds') through new lodging products. 2.3.4 Improved Access and Circulation The flow of pedestrian, vehicular, bicycle and mass transit traffic must be improved within and through Lionshead. 2.3.5 Improved Infrastructure The infrastructure of Lionshead (streets, walkways, transportation systems, parking, utilities, loading and delivery systems, snow removal and storage capacity) and its public and private services must be upgraded to support redevelopment and revitalization efforts and to meet the service expectations of our guests and residents. 2.3.6 Creative Financing for Enhanced Private Profits and Public Revenues Financially creative and fiscally realistic strategies must be identified so that adequate capital may be raised from all possible sources to fund desired private and public improvements. 7 VI. CRITERIA FOR REVIEW OF PROPOSED MASTER PLAN AMENDMENTS The applicants are proposing to amend Chapter 4, Recommendations Overall Study Area, and Chapter 5, Detailed Plan Recommendations of the Plan, to include detailed recommendations for development within the "West Lionshead" area for the Ever Vail Development. Amendments to the Lionshead Redevelopment Master Plan require a public hearing review process as outlined in Section 12 -3 -6 of the Town Code. If approved, amendments are adopted by resolution by the Vail Town Council. According to the Lionshead Redevelopment Master Plan, amendments to the Master Plan must address the following review criteria: How have conditions changed since the plan was adopted? The Lionshead Redevelopment Master Plan was adopted in December of 1998. Since its adoption there have been several resolutions approved to include properties such as the Vail Professional Building, Cascade Crossing, and most recently the Glen Lyon Office Building within the study area boundaries for the Master Plan. These properties were included within the study area boundaries and recommendations and standards for the redevelopment of the sites were incorporated into Chapters 4 and 5 of the Master Plan. The result of the incorporation of these properties and the associated recommendations for redevelopment is the proposed Ever Vail development. Conditions have changed since the adoption of amendments to the West Lionshead recommendations in 2007, which warrant the adoption of amendments to the Master Plan. The Master Plan does not currently reflect the most recent concepts anticipated for the Ever Vail development. Those concepts include the incorporation of the Glen Lyon Office Building site into the planning for Ever Vail, the single phased relocation of the South Frontage Road West, and the basic concepts for bulk, mass, heights, and structure layout to create public spaces and streets. The proposed amendments seek to provide clear direction on the desired outcomes to be associated with Ever Vail. The amendments include text and images which begin to provide greater framework and validity to the plans and designs which have been reviewed in earnest over the past several years. The proposed amendments are also to serve as a reflection of the findings of the fiscal and economic analysis performed by Economic and Planning Systems which was presented to Town Council in late 2010 and early 2011. How is the plan in error? Staff does not believe the plan is in error. The proposed amendments seek to provide the clear direction the Town and applicant are seeking for the Ever Vail development. The amendments attempt to capture the concepts and ideas that the Planning and Environmental Commission, Town Council, Staff, consultants, and the applicant have been discussing since the 2007 amendments to the Master Plan. As Ever Vail will be a project which is completed through multiple phases Staff and the applicant believed that amendments to the Master Plan 9 should be adopted to memorialize several key concepts and ideas in order to preserve them for discussion and inclusion when proceeding with future applications such as the major exterior alteration applications. How would an addition, deletion, or change to the plan be in concert with the plan in general? The proposed amendments are in concert with the Lionshead Redevelopment Master Plan as they are not amending any of the adopted policies, objective, or goals that are currently recommended for the West Lionshead area. Ever Vail is located within the West Lionshead area and the proposed amendments provided greater specificity with regard to the desired outcomes to be achieved through redevelopment on the site. Staff believes the amendments further existing concepts contained within the Master Plan thus they remain in concert with the plan in general. VII. STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission forwards a recommendation of approval, with conditions, to the Vail Town Council of a proposed amendments to the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. Staff's recommendation is based upon a review of the criteria and findings as outlined in this memorandum and from the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of approval of this request; the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission approves with conditions the applicants' request for proposed amendments to the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of approval of this request; the Community Development Department recommends the Commission include the following conditions: "1. The applicant shall provide revised digital images to staff depicting the Simba Run underpass on all figures identified in the amendments, prior to being scheduled for the reading of a Resolution to adopt the changes to the Master Plan. 2. This approval for amendments to the Lionshead Redevelopment Master Plan is contingent upon approval of the associated N special development district major amendment application, recording of the final plat, and the adoption of the proposed Lionshead Mixed Use 2 District zoning for the property. " Should the Planning and Environmental Commission choose to forward a recommendation of approval, with conditions of the applicants' request, staff recommends that the following findings be made as part of the motion: "The Commission finds that the proposed text and figure amendments to the Lionshead Redevelopment Master Plan comply with the review criteria outlined in Section VI of the memorandum to the Planning and Environmental Commission, dated January 24, 2011, and that the amendments, as proposed, further the goals, objectives and policies, as stated in Chapter 2 of the Lionshead Redevelopment Master Plan." VIII. ATTACHMNENTS A. Proposed Amendments to the Lionshead Redevelopment Master Plan 10 Attachment A: Lionshead Redevelopment Master Plan Amendments for Ever Vail This document contains the recommended proposed amendments to the Lionshead Redevelopment Master Plan related to Ever Vail. This recommendation amends existing language in the master plan, with additions shown in bold and deletions in strikethre 4.4.3 Ever Vail View Corridors The photos provided are intended to show a general view to be protected. Due to the existing development on the site and the proposed Ever Vail improvements, the exact views are not possible to photograph at this point in time. Upon completion of Ever Vail, the new view corridors should be photographed, surveyed and adopted in accordance with the provisions of Chapter 12 -22, View Corridors, Vail Town Code. 4.4.3.1 Public View Corridor Six This view corridor looks south to the proposed park area confluence of Red Sandstone Creek and Gore Creek and the lift line up Vail Mountain. Ilk 9 4.4.3.2 Public View Corridor Seven This view corridor is seen from the Central Plaza, up the lift line of the Ever Vail gondola. This view is the defining view of Ever Vail, as it is in the center of the development, taken from a publicly accessible view point. The proposed gondola terminal is in the center of this view, and is integral to the view corridor. -� O z � �i i f FI-A&A Figure 4 -5b: Public View Corridor Seven 1 Figure 4 -5a: Public View Corridor Six 4.4.3.3 Public View Corridor Eight This view corridor is intended to provide a visual connection to Lionshead, and is seen from the pedestrian connection into Ever Vail from West Lionshead Circle. This view is framed by the Vail Spa and Ritz Carlton Residences. f i r-J 1 PI J Figure 4 -5c: Public View Corridor Eight k� s I - M 4.6.2 South Frontage Road Recommendations outlined below address the potential realignment re aligRrne of portions of the frontage road, ingress and egress improvements, bicycle/ pedestrian improvements, and visual improvements. For a detailed discussion of capacity and the impacts of future development on the frontage road, see the traffic impact study contained in appendix A. Figure ^ -Q d n„ +on+i -a- partial - real+gaaMenf ert #e F re ead. - With Vail Resorts' potential acquisition of the Glen Lyon Office Building, and the acquisition of the Vail Professional Building and Cascade Crossing, realignment of the South Frontage Road along the south side of 1 -70 is a reality. Study of this realignment throughout 2007 and 2008 allowed the Town of Vail, Vail Resorts, CDOT and FHWA, to come to a general agreement as to the road section, right -of -way width, and access points. This alignment and design is the preferred alternative, and is indicated in figure 4 -9. } r f �Y yzi � x , y ., • ,S �t-I --, Figure 4 -9: Conceptual Realignment of the South Frontage Road (Staff recommended condition of approval: Expand view to include the western roundabout and Simba Run underpass). 2 POTENTIAL BUS�TRA S7pP bPbSE❑ MIxED UI 8 VilDIN , , A REA G ROV LppR RETAIL Mix ED 115E AQOVE _ SKI AREA SV pP WJ SU IPGAA DE MAO NTE NANCE CON DOLA PARKING STRUCTURE - ESTF' ANA J� QVERPA S I ;� ES "RIAl 7 ��J�J P¢RTAL F7 L1 ` FIGURE 4 -9 - EXISTING FRONTAGE ROAD ALIGNMENT' WEST LIONSHEAD DEVELOPMENT CONCEPT Figure 4 -9 to be deleted. POT E N TI A L B U S JT RAN StT STOP PRp P0 D M"'ED USE BUILDING AREA GOO FLOOR RETAIL r M I x ED L15E A9oYE - SKI AREA SV RT W' SUS G RADE MAINTENANCE PEDEp'TRI ORAL GONDOLA - f PARKING STRUCTURE 1 � -P DE ESTRt V. r i I r FIGURE 4 -9A -- RE- ALIGNED FRONTAGE ROAD r WEST LIONSHEAD DEVELOPMENT CONCEPT Figure 4 -9A to be deleted. 3 POTMVnAL 300 SPACE PER PLATE PARKING STRUCTURE FOOTPRINT OIL WEST DAY LOT MAINTAIN EXISTING FOREST ROAD ALIGNMENT POTENIiALINGIZESSIEGRES9 V Ail. SANTTATION P # _ y T �. � � k , 1 p r � ; r � 1F � f 1 . V POTENTLAL GIffiSSffiGRESS POINT POTENTIAL 400 SPACE PER PLATE PARKING STRUCTURE FOOTPRINT POTENTIAL TRANSIT PICK- UPlDROP -OFF PiRwe 4 -14 -West Licruhead Pw*ng StrucA" Oppommides Figure 4 -14 to be deleted. 11 d�� \A /ec4 I inncheer! 5.17 Ever Vail Ever Vail is a 12.6 acre site and is located in West Lionshead (see Figure 5 -21). Ever Vail \^ II ien�ad includes the Vail Associates Service Yard, Holy Cross site, Vail Professional Building site, Cascade Crossings site, Glen Lyon Office Building site, and the former gas station site and the E ag e River \A /;;4er app Cap si te The subject property is divided into two parcels within the Ever Vail Subdivision and should be zoned Lionshead Mixed Use 2 District. Ever Vail should be redeveloped to enhance and improve the guest and community experience and improve Vail Resorts' ability to service and maintain mountain facilities. Due to the large size of the development site, Ever Vail will likely be redeveloped in phases over time. Ever Vail should be a residential /mixed use hub that includes key components such as a ski lift (gondola), increased office space, new retail space, public parking, realignment of the frontage road, relocated mountain operations and maintenance yard, employee housing, a 100+ room hotel, public transit facilities, a community recreation facility and improvements for connectivity with the rest of Lionshead and Cascade Village for pedestrians, bicycles and vehicles. Figure 5 -21: Conceptual Ever Vail Site Plan (Staff recommended condition of approval: Expand view to include the western roundabout and Simba Run underpass). 5.17.1 South Frontage Road Realignment The relocation of the South Frontage Road in the Ever Vail area has been a concept embodied in this master plan since its adoption in 1998. Ever Vail includes the relocation and realignment of the South Frontage Road consistent with the recommended actions and policy objections found in sections 1.3.4 and 2.3.4. The South Frontage Road realignment should be relocated as detailed in the road relocation plans approved by the Colorado Department of Transportation (CDOT) and as shown in figure 5 -21a. The relocated South Frontage Road includes a 2 -lane roundabout at the eastern end of Ever Vail. This roundabout connects the relocated frontage road with the new extension of West Forest Road. Access to the Eagle River Water and Sanitation District should be maintained both along West Forest Road and via an easement towards the eastern end of Ever Vail. On the South Frontage Road west of Ever Vail, a roundabout with a connection to the Simba Run underpass is anticipated and further described in section 4.6.6. The grades of the relocated South Frontage Road should be designed to accommodate the construction of the roundabout and Simba Run underpass (see figure 5 -21b). b. FFE)Rtage Read Rea 0 g Rr" The greatest benefit of t4s the realignment of the South Frontage Road a is that it results in one *&�y large --and contiguous development parcel and in doing so integrates the Maintenance Yard /Holy Cross site with the West Day Lot (Ritz - Carlton Residences) by removal of the barrier created by the existing Frontage Road alignment. It also creates the best pedestrian environment possible in 31 creating an extension of the Lionshead Retail area in that it provides the potential to establish a convenient and desirable pedestrian connection to the rest of Lionshead. PtL _M1TwW6Ektt�wsl%� I.AA q{pyERfru - 1-4 [• ;Inan l _ 1 �I t YlMl�n � SSwn�w:wya nO'�I■ s 04;0 �' ,. t9 _O I�itW •t � r 1 ■� � tt'.ty. � et► h lw +,V C ■■ 4 w s ■ h, - I Figure 5 -21 a: Conceptual Realignment of the South Frontage Road (Staff recommended condition of approval: Expand view to include the western roundabout and Simba Run underpass). r 7 f i; t .��•" f� _ 1, +, 1" =' T. [t , Figure 5 -21b: Conceptual Grading Plan for Frontage Road Realignment (Staff recommended condition of approval: Expand view to include the western roundabout and Simba Run underpass). 5.17.2 Vehicular Access and Circulation In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the Plan, opportunities for public transportation and vehicular circulation improvements shall be explored in conjunction with any future redevelopment of the South Frontage Road and interior roads within the redevelopment of the West Lionshead sites. Possible opportunities for improvements may include improved mass transit stops, relocated /reduced /shared points of entry /exiting, restricted access points, acceleration/ deceleration lanes, roundabouts at major intersections, greater sight distances, dedicated turning lanes, landscaped medians and skier drop -off. It is essential that Ever Vail provide safe and efficient access points from the road networks adjacent to the site. Ever Vail must provide vehicular access for cars and trucks to and from the Eagle River Water and Sanitation District (ERWSD) site, which is adjacent to the subject property. The design for the relocated South Frontage Road anticipates the construction of a roundabout that connects the South Frontage Road to the North Frontage Road via the Simba Run underpass. To accommodate this roundabout, the South Frontage Road will need to include retaining walls to facilitate a drop in elevation as it moves west (see figure 5 -21b). The Simba Run underpass will cross 1 -70 and provide an additional connection between the north and south sides of Vail. Ever Vail shall comply with the loading and delivery requirements of the Vail Town Code. Furthermore, service and delivery for Ever Vail shall occur underground, fully enclosed and screened from public view. Service and delivery truck turning maneuvers should not negatively impact traffic flow on the South Frontage Road, West Forest Road or Market Street. With a realignment of vehicular access points, attention should be given to the location of service and parking areas. 9 5.17.3 Parking Ever Vail shall be developed as a commercial core that includes mixed use development, pedestrian streets and plazas, direct access to transit options, bicycle and pedestrian connections and access to Vail Mountain. As a commercial core, Ever Vail should be incorporated into the Town's adopted commercial core parking areas, which allow for reduced parking requirements due to proximity to mixed use development. Ever Vail shall meet the parking requirements of the Vail Town Code. The appropriate parking requirements for ski lifts and other potential land uses that do not have a specified parking requirement will be determined by the Planning and Environmental Commission. Section 2.4: Ground Rules for the Master Planning Process, states that there shall be no net loss of parking spaces now existing in Lionshead. Ever Vail must include parking spaces to offset displaced existing parking from the former gas station site and Maintenance Yard/ Holy Cross Site in accordance with section 4.8.1. These spaces are in addition to parking required by the Vail Town Code and any public parking spaces provided by Ever Vail. Ever Vail shall include an additional 400 public parking spaces, as identified in section 4.1.5: West Lionshead — Residential /Mixed Use Hub. These spaces will address long term parking needs, including the Town's goal to eliminate parking from the South Frontage Road as further detailed in Section 4.8.3.3b of this master plan. During development and phasing of Ever Vail, there will be periods of time when surface parking lots and staging areas may be necessary to meet skier parking and construction needs. Surface parking lots shall not be maintained as a long -term solution to meeting parking demand. Skier drop -off is an essential component of a successful ski portal. Skier drop -off at Ever Vail will improve the guest and local experience. The transit facility in Ever Vail should accommodate 10 -14 short -term or skier drop -off parking spaces. Short -term parking is a key aspect to community commercial uses, allowing customers to quickly and conveniently patronize establishments. Outside of skier drop -off and pick -up during peak periods, these spaces could be utilized as short -term parking serving the commercial uses in close proximity, such as the grocery store. Skier drop -off spaces are also envisioned in the parking structure on the west side of Ever Vail. Approximately 50 parking spaces should be available for short term parking and skier drop -off when not in use for children's ski school activities, which traditionally occur one day per week in the winter. These short -term parking spaces, given their location at approximately 500 feet from the gondola, would provide skier drop -off capacity in the event the short -term spaces in the transit facility are displaced due to expansion of bus activity. 5.17.4 Public Transportation Public transportation is an essential element to successfully connect Ever Vail to other portals, neighborhoods, and down valley. Ever Vail needs to provide access for in -town bus service, outlying bus service, ECO Transit buses plus hotel and lodge shuttles. Transit facilities are essential to facilitate the use of public transit, reduce parking demand and provide transit connections for employees housed in Ever Vail. Adequate transit provides an opportunity for employees, skiers, visitors and residents to connect Ever Vail with other neighborhoods and communities. Ever Vail shall include a transit facility located adjacent to the relocated South Frontage Road pursuant to section 1.3.5, which recommends creating dispersed transit facilities in Lionshead. This facility shall be designed to accommodate the Town's outlying bus routes as well as regional bus routes within a covered facility on the ground floor. It is anticipated that the transit facility will accommodate a minimum of four bus bays. In the long- N term and as necessary, the facility may transition to up to 12 buses utilizing a pull off on the South Frontage Road. The transit facilities are envisioned as a bus stop facility with very short dwell times. An area accommodating up to two in -town buses should be located on the eastern end of Ever Vail (see figure 5 -22). Ever Vail should also provide a hotel and lodge shuttle drop -off area to accommodate visitors from other locations within Vail. The drop -off area should be a surface location on the west side of Ever Vail. The bus stop and drop -off area shall be enhanced with shelters, benches, landscaping and other similar improvements. J J Figure 5 -22: Conceptual Transit Facility and Bus Stops LEGEND: oaoP- oFFAR� O P�wc H E Taar�ce V E -2 Figure 5 -22a: Conceptual Transit and Vehicular Circulation E7 ." o" (1) 10 5.17.5 Gondola and Vail Mountain Portal Ever Vail shall include a gondola, which will transport visitors, guests, and residents to Vail Mountain. A gondola will make Ever Vail a mountain portal and will enhance benefits of Ever Vail to guests, locals and employees. The gondola will be located adjacent to Gore Creek and will generally travel to the base of the current Chair 26 where a new mid - station will be located. The gondola will replace Chair 26 and generally terminate in the Eagle's Nest area of Vail Mountain. The gondola route will likely require easements and other approvals from the Town of Vail when the route crosses Town -owned properties. LL E _- • - 4L 0 e _ Figure 5 -22b: Conceptual Gondola and Mountain Portal 5.17.6 Pedestrian and Bike Access As compared to a separate, free - standing portal, � l I innch° °r! Ever Vail is considered a part of the greater Lionshead area. In order for this area to be successful, it is important to have a strong pedestrian connection with the rest of Lionshead. Streetscape improvements including bike lanes or trails and sidewalks should be incorporated in any redevelopment along West Lionshead Circle and the South Frontage Road to improve the viability of mixed uses in � l I innchQ ;;d Ever Vail. Improvements to street lighting, walking surfaces, trails, seating areas and public art that facilitate safe and attractive pedestrian and bike movement are strongly encouraged. Said improvements may necessitate the need for access easements through the sites. In the redevelopment of �Al I innchead Ever Vail, pedestrian and bike connections shall be made to integrate with the rest of Lionshead and Cascade Village. Pedestrian and bicycle enhancements shall include a new bridge connecting the Gore Creek Trail to Ever Vail, the redevelopment of the pedestrian bridge on the west side of Ever Vail, and path enhancements to the Gore Creek Trail connection into Cascade Village and the path connecting to the relocated South Frontage Road. All pedestrian path improvements must meet Town recreation path standards and provide a safe and attractive pedestrian and bike experience. ��� ;aGtiVeP °n ;-;Ad bike improvements shall include a public easement over the paths where necessary. Pedestrian connections between Ever Vail and West Lionshead Circle shall be improved to provide safe and attractive pedestrian crossings. Improvements may include raised crosswalks, change in paving material, safe harbors, medians, and signage. See figure 5 -22c for conceptual pedestrian and bicycle circulation plan. 11 LEGEND: 0 J 1 * 1 r4W r =-- ` Ap Figure 5 -22c: Conceptual Pedestrian and Bicycle Circulation (Staff recommended condition of approval: Expand view to include the western roundabout and Simba Run underpass). 5.17.7 Public Spaces and Plazas Within Ever Vail, pedestrian plazas and walkways are essential to create an extension of Lionshead where pedestrianization has been a key element of success. Elements of successful public spaces include portals, edge definers, public space definers, landmarks and public art. These place- making elements improve pedestrian circulation and provide aesthetically pleasing places to congregate. They further enhance the livability of Ever Vail for employees, residents and guests. The creation of gateways and portal is encouraged as a basic component of redevelopment, especially in transition areas between different domains, or public, semi - public, and private areas. It is essential that public spaces and plazas are not shaded by the sun at peak use times. Further sun shade analysis will need to occur in order to ensure public spaces and plazas are not dark and unwelcoming to users. Outdoor dining decks are encouraged to bridge the gap between public and private space and provide vibrancy to the adjacent streets, walkways and plazas as further detailed in section 4.10 of this Plan. Chapter 8, Architectural Design Guidelines provides guidelines for these elements to ensure they are successfully implemented. Elements of the natural environment need to interact with public spaces in order to connect the urban and natural environments. Within Ever Vail, the improvements to Red Sandstone Creek, as further detailed in section 5.17.10, will provide public spaces for recreation and congregation that connect Ever Vail with the natural environment, as recommended by section 1.3.3. Provisions should be made for public access to streets, paths and plazas through easements or similar mechanisms to create a perceived public domain in Ever Vail. Additional dedications and /or easements are necessary to facilitate the use of property by the public. 12 5.17.8 5 17 3 Preservation of Existing Office and Retail Space Section 4.1.5: West Lionshead- Residential /Mixed Use Hub requires The.r shall -p an increase in office space and no net loss of retail space in �Alest I inn hoar! Ever Vail. Opportunities for increasing the square footage of office and retail beyond the existing conditions in `Ales+' i ^r ° Ever Vail shall be evaluated during the development review process. Currently, �Alest L ie . psh offices and businesses in Cascade Crossing, Vail Professional Building and the Glen Lyon Office Building offer a variety of local services and amenities, which is important to preserve with the redevelopment of West I inncho�r! Ever Vail. During the winter months, the proposed gondola ski loft in W"t I innchead Ever Vail and the associated parking will generate significant pedestrian traffic and activity. However, consideration shall std be given to how innchead- Ever Vail can be an active and vibrant place year- round. One way this can be accomplished is the reinforcement of a well- crafted program of specialty retailers, offices, and restaurants that attract both tourists and local residents. Also, quality architecture and the creation of appealing outdoor spaces in and of itself will encourage people to visit this area. An active program of public art, residential units that are used for "artists in residence" or a culinary school are examples of uses that could create a catalyst for activity. In conjunction with any application to develop a new ski lift, a market study which analyzes the appropriate amount of office /retail square footage shall be included in the redevelopment of �Al I ie r! Ever Vail. A fiscal and economic analysis was completed in December 2010 and is further discussed in section 5.17.9. Depending on the length of phasing, this report may need to be updated. There is approximately 30,000 sq. ft. of office space and 15,000 sq. ft. of retail space within the Glen Lyon Office Building, Cascade Crossings, and Vail Professional Building properties. This office space should be replaced within Ever Vail on the parcel located east of Red Sandstone Creek to provide maximized connectivity of commercial uses to the rest of Lionshead. In order to implement this policy, Ever Vail should include at least 34,000 square feet of office space and 30,000 square feet of retail space. 13 Figure 5 -22d: Conceptual Plan For Plazas, Public Spaces and Connections 5.17.9 Development Pattern, Program and Uses In December of 2010, a Fiscal and Economic Analysis of Ever Vail was prepared by Economic Planning Systems. The analysis found that Ever Vail will likely produce positive fiscal and economic benefits to the Town. Ever Vail should reflect the recommendations of this analysis, namely that retail and restaurant space should be limited to approximately 55,000 to 65,000 square feet in order to create an economically viable commercial project complementary to the existing core commercial areas in Vail. Additional recommendations include the provision of hot beds, meeting space and a grocery store in Ever Vail. The land uses envisioned within Ever Vail are those allowed by the Lionshead Mixed Use 2 zone district. Ever Vail will generally includes 14 separate above grade buildings constructed above two below -grade structures with the bulk and mass conceptually shown in figure 5 -23 below. The overall development program for Ever Vail is envisioned to contain the following land uses: Use Number Range of Square Feet (gross) Dwelling Units 350 -450 500,000- 800,000 Accommodation Units 100 -120 90,000- 100,000 Employee Housing Units 35 -45 40,000- 60,000 Office 1 -6 establishments 30,000- 40 Retail 5 -10 establishments 30,000- 35,000 Eating and Drinking Establishment 3 -6 establishments 20,000- 30,000 Spa 1 -2 establishments 8,000- 15,000 Skier Services / Recreation Facility 1 -2 establishments 10,000- 15,000 Ever Vail west of Red Sandstone Creek should be a residential neighborhood devoid of extensive retail or restaurant uses. However, several non - residential uses should be located on the west side, including, but not limited to, public parking, a space for community recreational activities, a children's ski program meeting area, and other ancillary resort related uses. The concentration of residential land uses on the west side of Ever Vail will serve as a population base for the commercial components within the east side of Ever Vail and for other commercial core areas. 14 Figure 5 -23: Conceptual Bulk and Mass of Ever Vail In furtherance of Policy Objectives 2.3.2 and 2.3.3, Ever Vail shall include a hotel and a 10,000- 15,000 square foot grocery store. These uses were identified in the economic and fiscal analysis as critical elements to the success of Ever Vail. A hotel brings life and energy to Ever Vail and improves the Town's inventory of "live" or "hot" beds, producing increased revenue to the Town. A nightclub or other entertainment facility would be a good addition to the east side of Ever Vail to provide a year -round use that has largely disappeared with the redevelopment of other properties in Town. Ever Vail provides an opportunity to relocate the Vail Resorts warehousing, office, and vehicle /snowcat maintenance facilities currently located on the property to a below grade facility connecting to the snowcat access bridge and trail to Vail Mountain. An alternative location for these facilities is on Vail Mountain instead of within Ever Vail. A number of conditional land uses may be appropriate in Ever Vail, subject to the approval of conditional use permits. These uses may include a ski lift (gondola), public parking facilities, conference and meeting rooms, residential uses on the first floor, recreational uses, and office uses. As identified in section 4.1.5, a ski lift is envisioned as a catalyst for the redevelopment of this site and more specifically, for the development of a structured public parking facility. 5.17.10 5 174 Relationship to Red Sandstone Creek and Gore Creek Red Sandstone Creek and Gore Creek abut the Ever Vail project. The realignment of the South Frontage Road provides increased opportunity to enhance these streams as public amenities. Portions of Red Sandstone Creek and Gore Creek should be enhanced with the preservation of wetland areas and enhancements to make these areas an amenity of Ever Vail and the Town (see figure 5 -24). The project contemplates preservation of large trees where possible and the relocation of others where practical (see figure 5 -24a). Red Sapds Greek ap d G (Qrook the QeR LYGR QffiGe B61ildiRg Site, fGFFneF gas statiGR Site, HGIY GFG66 6449 �;;Ad_ tht-9 V;_3 PFA_f9­r39;iAA;; .M­;;d_bQ aR aMeRity Gf thiS area 4 s­hstaptial stapd Af mat-re trees; exists; AP the hapks; A trees � -,�„d- Pat6iral steep slepes aIGRg -the b R;ks r 'bvm rurc ° cT�T While the natural riparian corridor of these streams needs to remain protected and preserved, the physical and visual relationships and references between adjacent development and the stream tract should be strengthened. Improved public access and utilization of Gore Creek and Red Sandstone Creek for fishing and other recreational purposes is strongly encouraged to create a catalyst for activity and enjoyment of the streams in furtherance of Policy Objective 2.3.2 and as recommended by section 1.3.3. Enhancements such as streambank stabilization/ beautification, natural stream drop structures, interactive low flow areas and general improvements for wetlands and wildlife habitat are strongly encouraged. Any modification or enhancement to the creek corridor shall be subject to U.S. Army Corp of Engineers and Town of Vail approval. Ever Vail shall include a public open space easement along Red Sandstone Creek generally following the 100 -year floodplain line, as recommended by the Town's Comprehensive Open Lands Plan and in furtherance of Policy Objective 2.3.3: Vitality and Amenities. This open space easement also implements the recommended actions of section 1.3.3 by improving connections with the natural environment and by creating green landscape corridors that penetrate into the Lionshead environment. 15 Figure 5 -24: Red Sandstone and Gore Creek Improvements 16 4�r fV � Figure 5 -24a: Conceptual Tree Preservation and Relocation Plan 5.17.11 Employee Housing ,�� � ��• 1y � - S Employee housing has been identified as critical need within the Town of Vail. Employee housing provides an employee base within close proximity to jobs. Employee housing within the Town provides environmental, social and economic benefits including reduced traffic, increased transit use, improved livability and a strengthened sense of community. Section 4.9.4.3 West Lionshead identifies Ever Vail as an appropriate site to create dispersed employee housing opportunities for permanent local residents. Ever Vail is an appropriate site for employee housing due to its proximity to jobs, Vail Mountain, transit and the commercial cores. Community commercial uses, such as the grocery store, should be included in Ever Vail to accommodate the needs of employees living on site. Ever Vail shall meet the adopted Commercial Linkage and Inclusionary Zoning regulations to mitigate the development impact of employee generation. The provision of on -site employee housing must be coordinated with the Ever Vail construction phasing plan. 5.17.12 Development Standards 5.17.12.1 Building Height Buildings in Ever Vail should comply with the height limits of the Lionshead Mixed Use 2 District (82.5' maximum and 71' average). Notwithstanding the height allowances of zoning, buildings shall generally "step down" as they approach Gore Creek and the western end of Ever Vail (see figures 5 -25, 5 -25a and 5 -25b). Buildings along Gore Creek and the western end of Ever Vail shall express no more than three to four stories before 17 "stepping back" to taller building mass. All buildings shall be articulated to avoid large expanses of shear /unbroken wall planes. The pedestrian area connecting the transit facility on the north end of Ever Vail to the gondola on the south end of Ever Vail shall be considered a Primary Retail Pedestrian Frontage for the purpose of measuring building height and "step backs" as described in section 8.4.2.3 of the design guidelines. 5 . t Figure 5 -25: Conceptual Interpolated Grade Plan 119 19 Figure 5 -25a: Conceptual Maximum Average Height Plan Figure 5 -25b: Conceptual Maximum Height Plan 5.17.12.2 Setbacks Setbacks are necessary to provide a buffer between Ever Vail and adjacent properties. Setbacks provide areas for landscaping, public art and other improvements that help reduce the scale of buildings and further connect the urban and natural environments. Along the South Frontage Road, the above -grade setbacks should be significant enough to accommodate mature trees to buffer Ever Vail from the South Frontage Road and 1 -70. Trees and other landscaping must be integrated into the Ever Vail setbacks rather than only in adjacent street right -of -ways in order to ensure landscaping remains should the right -of -way be utilized for roads or utilities. To facilitate subterranean parking structures, below grade setbacks could approach the Ever Vail property boundaries. Shoring may need to occur on adjacent properties. However, footings and foundations, etc. should be located within the Ever Vail property boundaries. Because Ever Vail is one development site, zoning only dictates the setbacks around the perimeter of Ever Vail and does not regulate the separation of buildings internal to the site. Special attention should be paid to the sun shade analysis to ensure that buildings have adequate separation and allow sunlight to penetrate public outdoor spaces such as walkways and plazas. Figure 5 -25c depicts the spatial relationships between buildings, setbacks and landscaping. - ;� Figure 5 -25c: Conceputal Landcaping Plan 5.17.12.3 Landscaping P� � J � J J J _ J J - i J Landscaping serves many purposes, including the provision of shade, aesthetic enhancement, stormwater management and a connection to the natural environment. Landscaped areas also provide snow storage, seating areas and visual variation. It is recognized that Ever Vail may include extensive below grade building site coverage. Landscaping installed over underground structures may be calculated as landscape area when it is permanent and provides adequate soil depth to allow vegetation maturity. However, landscaping over underground structures does not contribute adequately to stormwater management and additional measures will need to be taken to address this issue. Non - permanent landscaping such as potted plants have proven to be ineffective in 20 achieving the intent of the Town's landscaping requirements and are strongly discouraged. Mature trees mitigate the visual impacts of buildings. Large trees should be planted on the north end of Ever Vail to provide a buffer along the South Frontage Road. It is understood that in order to relocate the South Frontage Road and to develop Ever Vail, existing trees will need to be removed. Where possible, existing trees should be relocated rather than removed. 1 1 5 t � Figure 5 -25d: Conceptual Landscape Plan 5.17.12.4 Site Coverage I 4 f r , Redevelopment in Lionshead has commonly included below grade structures to facilitate subterranean parking, storage and loading and delivery. Often, the footprint of these below grade structures is larger than the buildings constructed above. Ever Vail may include two below grade parking structures that will constitute the majority of the site coverage on the site. The anticipated Ever Vail site coverage is further depicted in figure 5 -25e. t l s t f ri * i �W � 21 Figure 5 -25e: Conceptual Site Coverage 5.21.12 o 17 F; Architectural Improvements The architectural design guidelines (Chapter 8) discuss several transition tools that can be used to adapt an existing building to the new character and architectural quality desired for Lionshead. Given the high visibility of the buildings in � l innchead- Ever Vail and the extent to which they influence the quality of the experience of passers -by, all future development of the sites should be closely scrutinized for compliance with the applicable architectural design guidelines. The architectural design guidelines identify the architectural qualities desired in Lionshead. Ever Vail should have a unique architectural character that may be a contemporary expression of alpine architecture. It should nevertheless compliment the materials, forms and style of more traditional Vail architecture. Use of flat roof areas, varied roof forms, fenestration may be considered within Ever Vail beyond the limitations permitted in the design guidelines, in accordance with Section 8.3.3.A: Review Criteria for Deviations to the Architectural Design Guidelines for New Development to facilitate solar energy devices, etc. For properties that are east of Red Sandstone Creek, in West Lionshead, higher densities and building heights may be appropriate, particularly to encourage the development of employee housing. However, any development must meet the overall character and visual intent of this master plan and be compatible with the adjacent existing development of the Marr+ett Ritz - Carlton Residences and the Vail Spa. 22 Cirri ire 5_25 NrrtwithstaR iRg the heig* g the fWCY9TCTl .TtQI helm r_reeL ;;P;J� +he WAR rP er h v i�uvTr ' B tQiT� 1 T aveid large expaRQeQ of c 5.21.13 Green Building The Town has adopted an Environmental Strategic Plan that outlines goals, objectives and policies to promote green building. Ever Vail shall incorporate green building principles and techniques. Ever Vail should be designed, constructed and operated to achieve a LEED ND certification or similar certification program. To accomplish green building, it may be necessary to provide flexibility from Chapter 8: Architectural Design Guidelines. For example, flat roof areas may be incorporated more than typically permitted to allow space for solar energy devices. F a. 17 Q Ded eVe le nme R (: a r, c i d a re+ i err c fer GleR I YGR (lffine Qi 101doNrr Si te E)PPer +i Ri+iec regardless of Zene dic+rir-+ F17F1 He vTVr- i hei r hi 101dinrrS AGIR the (QTeR n Offine Ri 101diRg Site shell ne+ evneed F feet 23 5.20 Eagle River Water and Sanitation District (ERWSD) While this parcel would certainly be a viable development site, the costs to relocate current uses at this site, particularly the treatment facilities, are significant. For this reason it is assumed that the waste water treatment facilities will remain in their existing location. ° V E R N A +„ r°i.,Ga the °n +;r° �rni inr! the +r°a +m °n+ f ;- ., ERWSD property is located within West Lionshead adjacent to Ever Vail. Legal and physical access to ERWSD shall be provided by Ever Vail property owners through Ever Vail to accommodate current uses and future development of the ERWSD property. 24 EDESTRIAWMANUF C0 0 YiF LeL Il k A alp ..�• x L 1 f # qp 4 ;+ k . # %el V. SANL'CA ION PLANT RF-- A1JF,'NM FOREST ROAD CDM=D-W r w ~ y � k � •Y 1 . y f • t •. v F 5 L - L' D SCOPE VA1L A&MHAA "mE H0 1? QP1,+:h'T R ARE VAIL ASSOCl TES SERVICE YARD VEFJOPMENT PARCEL WEST DAY L.OT DEVELOPMENT PAlJCEL F�.c 5 - AVwj LiarLFhftd Ckttak Wot Alsarimague ;4'- South Fmmfi4c Figure 5 -21 to be deleted. 25 Pm:) LkNVrA, A MT CORRMCA 41.4DI1`JkJN EKISTI1G ? ()REST ROAJ�- CON'NSMON VAL SANUA7I N PLAIST PCTENTLI L MOl]}�TC SERVICE AMMESS RO y R ed, + V r . � � +1 V; yM 5 #.� 61 O.t ` w w ti f '� f ti O .v _. 5F FRONT L ROAD YARD L E +lPL YPE 14 O DEVELAFMPI PAR VAELASSOCfA7E.S SERVICE EEVELOPMEYT PARCI1: nAy LOT jawELOpLrEwr PARCkL K- -A WOT LZCWSHBAD CMCIE S-Z -Wdmd pr _ urh FmnF3ge R RdL- AflgAFrZir Figure 5 -22 to be deleted. 26 EXISTING 1:0REST IOAJ ] ALIGNMENT VAIL SANIIPAION PLANT POTEiKT NOD1n%FrArK SERVLCE ACCES$ R4LM P k _ R — i. is •a 4. I r � r y ��� � ' '�++• � � ill, " ti.rk.� i #3� ;. r� AN f # _low dp RRmIr.F. IA VAIL A SOCIATH SERVfCE YARD PEDEM l RiAN CRMLNCz ACROSS SOLMI R L WEST YLOT E9VE1Cft9NT PARCEL VAIL AA4# OATHS MLA P ARCM �LOPMEW P ACE[. WA RQ D Fisvm 5-23 - PC= Lraashead Cirmlafirn A it car L :f' -V dEmmm Eliadmi? Fr ec Famfu Figure 5 -23 to be deleted. 27 -GORE C=-K R5CREALTION PATH 7- PQTIrN' AL WEST DAY LOT D DP �. v -r•. p sow I J16 Lr Knorr r . �r w RE-AL T D F(REST ROAD POTENTLkL VAIL RTLS SERVTCE YA Dl� DPME T WET UG"FTukD T ANSITPP • 7 F AN COk U.IOR M GM CR Mr CORRR WES LI[ N SHFAa c PRIM kItY PEDE.S RLkN w F J-Z4 Figure 5 -24 to be deleted. cQ' (D Q'I N Q'I O 07 (D Q (D (D (D Q 60.5' MAX 49' AVG PEDEATRI4PZ ;>( (oRtAL r � i 71.5' MAX 60' AVG { l PEQESTUtA � A55 „ ,ac•• 82,5' MA 71' AVG l 1 I , 25' , {r ow t EAS' T FIGURE 5 -25 - WEST LiONSHEAD BUILDING MASS / HEIGHT LI MITATIONS l MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 24, 2011 SUBJECT: A request for a review of a flood plain modification permit, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of -way/ Lot 54, Glen Lyon Subdivision and Unplatted parcels (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC11 -0003) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell SUMMARY The applicant, Ever Vail, LLC, represented by the Mauriello Planning Group, is requesting approval of a floodplain modification, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of a portion of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and setting forth details in regard thereto. Based upon Staff's review of the criteria in Section VI of this memorandum and the evidence and testimony presented, the Community Development Department recommends that the Planning and Environmental Commission approves, with conditions, the requested floodplain modification, subject to the findings noted in Section VII of this memorandum. II. DESCRIPTION OF REQUEST The applicant, Ever Vail, LLC, represented by the Mauriello Planning Group, is requesting approval of a floodplain modification, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of a portion of the flood plain associated with Red Sandstone Creek. The portion of the floodplain to be modified is located directly beneath and south of the improvements to be made in association with the new bridge to span the creek in conjunction with the relocated frontage road. This floodplain modification is not for the entirety of Red Sandstone Creek from the new bridge to the confluence with Gore Creek. This partial floodplain modification is requested at this time to allow for the Colorado Department of Transportation (CDOT) review process to proceed and, if approved, will allow this first phase of Ever Vail to begin as soon as desired. A floodplain modification for the remainder of Red Sandstone Creek will occur at a subsequent time when the extent of the improvements to be made are known. Improvements which may affect the floodplain could include the abutments of the new pedestrian bridge connecting the east and west sides of the project, walkways and benches along the creek, stream bank fortifications to protect from erosion, landscaping additions, etc. The proposed floodplain modification results just south of the proposed outfall of Red Sandstone Creek where it emerges from under the new bridge. Today the outfall of Red Sandstone Creek located just south of the 1 -70 east bound lanes flows in numerous channels measuring approximately 90 feet in width. This area is located directly beneath the new bridge which will have a clear span of 42 feet. The proposed bridge improvements will channelize the creek under the bridge and direct it to an armored outfall and result in a reduction in the width of the flow to approximately 30 to 40 feet in width. The resulting change to the stream channel and its floodplain occurs for a distance of approximately 185 feet from the location of the existing outfall on the south side of 1 -70, where it then meets grade with the existing channel. The applicant's request (Attachment A), which includes the floodplain analysis performed by AM EC. III. BACKGROUND On February 6, 2007, the Vail Town Council adopted Resolution No. 4, Series of 2007, which implemented amendments changes to the Lionshead Redevelopment Master Plan regarding West Lionshead, including the area now called Ever Vail. Within these amendments, greater detail was included with regard to the concept of relocating a portion of South Frontage Road West. On January 26, 2009, the Planning and Environmental Commission held a work session at which a revised Frontage Road option was presented to both Staff and the Commission which had not been previously shown. The general consensus was that the Frontage Road was moving in the direction of addressing the concerns of the Commission. On February 17, 2009, the Town Council directed Staff and the applicant to proceed with the design of the South Frontage Road which contained certain improvements within a 20 -foot Town of Vail right -of -way. On February 18, 2009, the Design Review Board conceptually reviewed the proposed South Frontage Road and found the concepts presented for the proposed retaining wall and landscaping associated with the relocated South Frontage Road to be aesthetically acceptable with further review at a later date. On March 8, 2009, the Planning and Environmental Commission tabled this application due to concerns expressed by the applicant regarding Staff's recommendation questioning the future ability to shore under what was being proposed as a 20 -foot Town of Vail right -of -way. 2 On March 22, 2009, the Planning and Environmental Commission approved a partial preliminary plan which established the width of the CDOT right -of -way containing the relocated South Frontage Road, the location of the 20 -foot right - of -way, and the location of a 3 -foot signage, lighting, and sidewalk easement. The Planning and Environmental Commission also approved the design and configuration of the relocated South Frontage Road. This partial preliminary plan was endorsed by the Town Council on April 21, 2009, for submittal to CDOT for review. 0 Im ROLES OF REVIEWING BODIES Planning and Environmental Commission: The Planning and Environmental Commission is responsible for final approval, approval with conditions, or denial of a floodplain modification application. APPLICABLE PLANNING DOCUMENTS Town of Vail Zoning Regulations (Title 12, Vail Town Code) 12 -21 -2, Definitions: (in part) FLOOD HAZARD ZONE: The land in the floodplain subject to a one percent (1 %) or greater chance of flooding in any given year. The area may be designated as zone A on the flood hazard boundary map (FHBM). After detailed ratemaking has been completed in preparation for publication of the FIRM, zone A usually is refined into zones A, AE, AH, AO, Al-99, VO, V1 -30, VE or V. FLOOD INSURANCE RATE MAP (FIRM): An official map on which the federal emergency management agency has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. FLOOD INSURANCE STUDY: The official report provided by the federal emergency management agency that includes flood profiles and water surface elevation of the base flood as well as the flood boundary- floodway map. FLOOD OR FLOODING: A general and temporary condition of partial or complete inundation of normally dry land areas from: A. The overflow of inland or tidal waters. B. The unusual and rapid accumulation or runoff of surface waters from any source. FLOOD PROTECTION SYSTEM: Those physical structural works for which funds have been authorized, appropriated, and expended and which have been constructed specifically to modify flooding in order to reduce the extent of the areas within a community subject to a "special flood hazard" and the extent of the depths of associated flooding. Such a system typically includes hurricane tidal barriers, dams, reservoirs, levees or dikes. These specialized flood modifying works are those constructed in conformance with sound engineering standards. FLOODPLAIN MANAGEMENT: The operation of an overall program of corrective and preventive measures for reducing flood damage, including, but not limited to, emergency preparedness plans, flood control works and floodplain management regulations. FLOODPLAIN OR FLOOD PRONE AREA: Any land area susceptible to being inundated by water from any source (see definition of Flooding). FLOODPROOFING: Any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. FLOODWAY (REGULATORY FLOODWAY): The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. 12- 21 -11: Flood Hazard Zones: (in part) A. Purpose: To promote public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to: 1. Protect human life and health; 2. Minimize expenditure of public money for costly flood control projects; 3. Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; 4. Minimize prolonged business interruptions; 5. Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains; 6. Help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize future flood blight areas; 7. Ensure that potential buyers are notified that property is in a flood area; 8. Ensure that those who occupy the floodplain assume the responsibility for their actions; 9. Protect the natural areas required to convey flood flows and retain flow characteristics; and 10. Obtain and maintain the benefits to the community of participating in the national flood insurance program. 4 B. Basis For Establishing The Areas Of Special Flood Hazard: The areas of special flood hazard identified by the federal emergency management agency in a scientific and engineering report entitled, "The Flood Insurance Study For Eagle County, Colorado, And Incorporated Areas" dated December 4, 2007, with accompanying flood insurance rate maps and flood boundary- floodway maps (FIRM and FBFM) and any revisions thereto are hereby adopted by reference and declared to be a part of this chapter. C. Designation Of The Floodplain Administrator: The town engineer or designee is hereby appointed the floodplain administrator to administer and implement the provisions of this chapter and other appropriate sections of 44 CFR (national flood insurance program regulations) pertaining to floodplain management. D. Duties And Responsibilities Of The Floodplain Administrator: Duties and responsibilities of the floodplain administrator shall include, but not be limited to, the following: 1. Maintain and hold open for public inspection all records pertaining to the provisions of this chapter. 2. Review all permit applications to ensure that the requirements of this chapter have been satisfied and that the proposed improvement will be reasonably safe from flooding. 3. Review, approve or deny floodplain use and modification permits to determine whether proposed improvements meet the provisions of this chapter. 4. Review evidence prior to the issuance of a floodplain use permit that all necessary permits have been obtained from those federal, state, or local government agencies from which prior approval is required. Conditional floodplain use permits may be issued contingent upon receipt of the above mentioned agency permits. 5. Review and verify that no new habitable structure is constructed within the flood hazard zone. 6. Review and verify that a licensed professional engineer or professional land surveyor certified the location of the 100 -year floodplain on all development applications that are adjacent to, or partially located within the 100 -year floodplain, that are proposing improvements that may affect the floodplain. 7. Where interpretation is needed as to the exact location of the boundaries of the areas of special flood hazards (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the floodplain administrator shall make the necessary interpretation. 8. Notify, in riverine situations, adjacent communities and the Colorado division of emergency management, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the federal emergency management agency. 9. Assure that the flood carrying capacity within any altered or relocated portion of any watercourse is maintained. 10. When base flood elevation data have not been provided in accordance with subsection 8 of this section, the floodplain administrator shall obtain, review and reasonably utilize any base flood elevation data and floodway data available from federal, state or other source, in order to administer the provisions of subsection F of this section. 11. When a regulatory floodway has not been designated, the floodplain administrator must require that no new construction, substantial improvements, or other development (including fill) shall be permitted within zones A 1 -30 and AE on the community's FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot (1) at any point within the community. 12. Under the provisions of 44 CFR chapter 1, section 65.12, of the national flood insurance program regulations, a community may approve certain development in zones Al -30, AE, AH, on the community's FIRM which increases the water surface elevation of the base flood by more than one foot (1'), provided that the community first applies for a conditional FIRM revision through FEMA (conditional letter of map revision). 2.Floodplain Modification Permit: 5. Expiration Of Permit: A floodplain permit shall expire two (2) years after its date of issuance if the permittee has not started construction under the permit. VI. CRITERIA AND FINDINGS All floodplain modification permits shall be reviewed and approved by the floodplain administrator and the Planning and Environmental Commission. The following factors shall be used to make a determination in issuance of floodplain permits: (1) The effects upon the efficiency or capacity of the floodway; Red Sandstone Creek is designated as Zone AE (area of special flood hazard with determined surface water elevations), but is not shown in Table 2, Floodway Data, of the Flood Insurance Study. However, for purposes of analysis, the floodplain shown in the Flood Insurance Rate Map and Base Flood Elevations are the most accurate representation of the Floodway. 31 The effects upon the efficiency and capacity of the floodplain and /or floodway are negligible. The 100 -year flow will flow effectively thru the proposed floodplain floodplain modifications as described in the "South Frontage Road Bridge at Sandstone Creek Floodplain Analysis" prepared by AMEC Earth & Environmental. (2) The effects upon persons and personal property upstream, downstream and in the immediate vicinity; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, there will be no adverse effects upon persons and personal property upstream, downstream and in the immediate vicinity. The plan depicts the modified floodplain matching the existing floodplain extents approximately 185 feet downstream from the new bridge improvements. (3) The effects upon the 100 -year flood profile and channel stability; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, the 100 -year floodprofile modified by this project will generally decrease where contained under the new bridge structure and its outfall, then slightly increase just downstream of the new bridge structure where the stream bottom elevation will be raised, and then match the existing profile elevations prior to entering the existing twin box culverts for the South Frontage Road. In all cases, the water surface elevation will be contained within the banks on the creek. (4) The effects upon any tributaries to the main stream, drainage ditches and any other drainage facilities or systems; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, there will be no effects on any tributaries to the main stream, drainage ditches and any other drainage facilities or systems. (5) The danger to life and property due to flooding or erosion damage; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, there will be no increase in danger to life or property due to flooding or erosion damage. The plan includes the addition of varying sized rocks along the stream channel to armor the banks against erosion. (6) The susceptibility of the proposed improvement and its contents to flood damage and the effect of such damage on the individual owner; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, the proposed improvements will not be any more susceptible to flood damage than other typical bridge structure. (7) The danger that materials may be swept onto other lands to the injury of others; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, there will be no increase to the danger that materials may be swept onto other lands to the injury of others. 7 (8) The compatibility of the proposed use with existing and anticipated development; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, (9) The safety of access to the property in times of flood for ordinary and emergency vehicles; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, access by emergency vehicles will not be negatively impacted by this improvement. (10) The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical and water systems; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, the costs of providing governmental services will remain constant. (11) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, the proposed improvement will have some effect on the height and velocity of the floodwaters, being generally lower beneath the bridge and its outfall, higher just downstream of the outfall and matching existing prior to the twin box culverts at the South Frontage Road. Each having negligible negative effects to the site, upstream and downstream of the site, and on the duration, rate of rise and sediment transport of the floodwaters. (12) The effect the proposed changes will have any adverse environmental effect on the watercourse including, without limitation, erosion of stream banks and stream side trees and vegetation and wildlife habitat; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, the proposed improvements will have some environmental effect on the creek. However, due to the existing degraded state of the creek, surrounding banks, wetlands, and vegetation, there will be minimal negative impact. The modification of the creek and proposed plan can be mitigated by reinstating fish habitat, mitigating wetland loss, preserving specimen trees, and protecting the proposed creek banks. (13) The necessity to the facility of a waterfront location, where applicable; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, this modification is necessary and appropriate for the relocation of the South Frontage Road. (14) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; Based upon the proposed plan and engineering analysis prepared by AMEC Earth & Environmental, staff believes, this modification is necessary and appropriate for the relocation of the South Frontage Road. (15) The relationship of the proposed use to the comprehensive plan for that area. The Lionshead Redevelopment Master Plan contemplates the relocation of the South Frontage Road and the crossing of Red Sandstone Creek. The proposed complete realignment of the South Frontage Road will have less impact to the creek than the partial realignment resulting in an angled bridge crossing across the creek. VII. STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission approves, with conditions, the request for a review of a flood plain modification permit, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of- way/ Lot 54, Glen Lyon Subdivision and Unplatted parcels (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. This recommendation is based upon the review of the criteria outlined in Section VI of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to approve this request; the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission approves with conditions the applicants' request for floodplain modifications, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of -way/ Lot 54, Glen Lyon Subdivision and Unplatted parcels (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto." Should the Planning and Environmental Commission choose to approve this 9 request; the Community Development Department recommends the Commission include the following conditions: "1. Prior to construction, the applicant shall comply with the requirements of all applicable local, state, and federal permits and approvals. Specifically, the applicant must obtain Federal Emergency Management Agency (FEMA) approval for the associated Conditional Letter of Map Revision (CLOMAR) and Letter of Map Revision (LOMR) 2. Prior to construction, the applicant shall coordinate all grading associated with this proposal with the State of Colorado Division of Wildlife to ensure the protection of fish and other aquatic species. 3. Within 30 days of completion of the improvements /modifications within the 100 -year floodplain, the applicant shall obtain Town of Vail approval of an as -built survey demonstrating that the 100 -year floodplain was modified in accordance with this approval. 4. This approval of a flood plain modification permit shall expire on January 24, 2012. 5. This approval of a floodplain modification permit shall only be effective in conjunction with the required Colorado Department of Transportation approval of the relocation of the frontage road and the associated bridge." Should the Planning and Environmental Commission choose to approve this request, the Community Development Department recommends the Commission makes the following findings: "The Planning and Environmental Commission finds: (1) That the proposed use or modification adequately addresses the findings in subsection E3a of this section, as determined by the floodplain administrator, unless the applicant can demonstrate that one or more of the standards is not applicable, or that a practical solution consistent with the public interest has been achieved; (2) That the proposed use or modification is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town; and (3) That the proposed use or modification is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and 10 (4) That the proposed use or modification promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. VIII. ATTACHMENTS A. Applicant's Request 11 +'EUE:�IMJAr4 0RIrX;L 1 � Y f �y c / FIUAH Al C� N I � u � ' • r •l rwTRAkI' EF, r i 1 D P 'a � l 4a N r VAI L R ESORTS DEVELOPMENT COMPANY i am.eo lei I v a Ma� Ilo Planning Group Floodplain Modification Submittal to the Town of Vail November 15, 2010 • -- t , , PRC-POSED FRONT: E -- - C4W91HGWh%aTG1YER - -• 0 EVE RVAI L Table of Contents I. Directory ...................................................................................... ..............................3 II. Introduction ................................................................................. ..............................4 III. Floodplain Modification Application Submittal Requirements .... ..............................6 IV. Floodplain Modification Review Criteria ..................................... ..............................7 V. Adjacent Addresses .................................................................... .............................12 VI. Attachments ............................................................................... .............................14 Ever Vail Flood Plain Modification Permit I. Directory Vail Resorts Development Company 137 Benchmark Road Avon, CO 81620 (ph) 970- 754 -2544 Tmillerl @vailresorts.com Mauriello Planning Group PO Box 1127 Avon, CO 81620 (ph) 970.748.0920 dominic @mpgvail.com AMEC Earth & Environmental 1002 Walnut, Suite 200 Boulder, CO 80302 (ph) 303.443.7839 Alpine Engineering, Inc. P.O. Box 97 Edwards, CO 81632 (ph) 970.926.3373 Paladino and Company (ph) 206.522.7600 www.paladinoandco.com Kimley -Horn and Associates, Inc 950 Seventeenth Street Suite 1050 Denver, CO 80202 (ph) 303.228.2300 LandWorks Design, Inc. 3457 Ringsby Court Suite 110 Denver, CO 80202 (ph) 303.433.4257 Peak Land Consultants, Inc. 1000 Lions Ridge Loop Vail, CO 81657 (ph) 970.476.8644 CALLISON 1420 Fifth Avenue #2400 Seattle, WA 98101 -2343 (ph) 206.623.4646 Ever Vail Flood Plain Modification Permit 3 II. Introduction As part of the overall Ever Vail project, the South Frontage Road will be relocated to the north immediately adjacent and parallel to the eastbound lanes of 1 -70. This realignment will require the construction of a bridge across Red Sandstone Creek directly south of the 1 -70 right -of -way. As a result, a Town of Vail Floodplain Modification Permit is required for the work that is needed to complete the road relocation. The existing South Frontage Road crosses Red Sandstone Creek approximately 350 feet south of the proposed location for the new crossing as shown in Figure 1 (USGS Quadrangle: Vail West, Co, Sections 6 and 7 of Township 5S, Range 80W). The project area is shown in Figure 1. r ; t r i� T �i } A floodplain modification is defined by the Vail Town Code as follows: A floodplain modification permit is a permit to allow construction of improvements and /or modifications to the adopted floodplain for all other uses, improvements, or modifications to or within the floodplain that do not fall within the guidelines of the floodplain use permit. However, no habitable structures or improvements shall be allowed to be constructed within the floodplain (12- 21- 11E.2.a.). Ever Vail Flood Plain Modification Permit 4 Figure 1. Project Area for the New Frontage Road Bridge Existing Conditions at Red Sandstone Creek and the 1 -70 CMP: dra Ever Vail Flood Plain Modification Permit III. Floodplain Modification Application Submittal Requirements The Town Code requires the following submittal information forth e review of a floodplain modification permit. Requirement Comments Submitted (1) Elevation of the lowest floor (including basement and These elevations have been submitted with the crawl space) of all new and substantially improved overall Ever Vail submittal, and are also YES structures within or adjacent to the floodplain. included in this submittal. (2) Description of the extent to which any floodplain will This information is included in the attached be altered including why, when, how, and when it will be Hydraulic Analysis and each relevant factor replaced back to its original configuration, and from Section E3 is addressed in Section V of this YES addressing each relevant factor in subsection E3 of this submittal section. (3) Signature of the owners of all property subject to an The property impacted by this application is impact by the proposed improvement. currently owned by Vail Resorts. In the future, YES it will be owned by CDOT. CDOT and Vail Resorts are aware of this application. (4) A site plan drawn to an engineering scale showing the location, dimensions, and elevations of the proposed landscape /grade alterations, existing and proposed structures, relevant landscape/ topographic features, The site plan has been completed by Landworks and the location of the foregoing in relation to the 100- Design and Alpine Engineering and AMEC Earth YES year floodplain. The floodplain line shall be provided on a &Environmental. plan certified by a licensed professional engineer or land surveyor. (5) Detailed topographic cross sections provided by a Peak Land Consultants has provided this licensed professional surveyor of the area proposed to information. The topographic survey and YES be altered, showing existing and proposed conditions. sections are included in this submittal. Required permits will be submitted as they are approved. A 404 permit application is being submitted to the ACOE in 2011. Under the () 6 Co of all other necessary approved permits (i.e., Copy y pp p ( Colorado Discharge Permit System the following building permit, public way permit, ACOE permit, will be submitted: Stormwater Construction dewatering permit, DOW permit, CDHPE permit). Permit; Construction Dewatering Wastewater NA discharge Permit. No permits are required by the Colorado Division of Wildlife but consultation with the DOW has occurred in regards to potential stream habitat improvements for Red Sandstone Creek. (7) An engineered floodplain analysis of the impacts to the floodplain prepared by a qualified licensed A Hydraulic Analysis is included in this professional engineer. submittal. YES (8) Copy of submitted application for a conditional FIRM A CLMOR will be submitted in 2011. A Letter of and floodway revision through FEMA, if applicable. Map Revision (LOMR) will be submitted to NA FEMA within 6 months of the project completion. (9) Environmental impact report, per chapter 12 of this An Environmental Impact Report is being title. submitted as part of this submittal package. YES (10) Any additional information deemed necessary by the floodplain administrator. NA Ever Vail Flood Plain Modification Permit IV. Floodplain Modification Review Criteria Chapter 21, Hazard Regulations, Vail Town Code provides the requirements and review criteria for a flood plain modification permit. The purpose of the flood hazard regulations is as follows: To promote public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to: 1. Protect human life and health; 2. Minimize expenditure of public money for costly flood control projects; 3. Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public, 4. Minimize prolonged business interruptions, 5. Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains, 6. Help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize future flood blight areas, 7. Ensure that potential buyers are notified that property is in a flood area, 8. Ensure that those who occupy the floodplain assume the responsibility for their actions, 9. Protect the natural areas required to convey flood flows and retain flow characteristics, and 10. Obtain and maintain the benefits to the community of participating in the national flood insurance program. All floodplain modification permits are reviewed by the Floodplain administrator and the Planning and Environmental Commission subject to the following criteria: A. The effects upon the efficiency or capacity of the floodway. Our Analysis: There is no designated floodway for Red Sandstone Creek. The impacts to the floodplain boundary were evaluated using HEC -RAS and are discussed in the attached engineering hydraulic analysis. B. The effects upon persons and personal property upstream, downstream and in the immediate vicinity. Our Analysis: There will be no adverse effect upon persons or personal property upstream, downstream or in the immediate vicinity. All new construction will be outside of the newly proposed floodplain. The water surface elevations or velocities do not increase downstream or upstream of the project area and therefore will not adversely impact persons or properties outside of the project area. C. The effects upon the 100 -year flood profile and channel stability. Our Analysis: The impacts to the floodplain boundary were evaluated using HEC -RAS. HEC -RAS results show less than a foot increase in water surface elevation profiles downstream of the project area. The floodplain decreases in width downstream of the new South Frontage Road Bridge, and shortly downstream returns to its existing configuration. The constriction of the floodplain is due to the channelization of flow through the arched culvert. FHWA design specifications were used to create the design details to protect the bridge and prevent scour of the channel during high flow events. A riprap energy dissipation basin has been designed to force a hydraulic jump in order to dissipate energy from flow out of the 1 -70 CMP. The channel bed will Ever Vail Flood Plain Modification Permit be lined with grouted riprap with a median diameter of 12 inches. A drop structure and scour pool will be placed just downstream of the bridge to limit the downstream impact and limit further impacts to Red Sandstone Creek. The area to the west of the creek, just downstream of the bridge, will be graded to create a gradual slope from the southern edge of the retaining wall down to the creek. The area to the east has a steep bank and will not be modified. The attached engineering hydraulic analysis describes the impacts to the floodplain in depth and includes design drawings with channel design details. D. The effects upon any tributaries to the main stream, drainage ditches and any other drainage facilities or systems. Our Analysis: This design will not impact any tributaries to the main stream, drainage ditches or any other drainage facilities. A storm drain will collect water from the east side of the new South Frontage Road and discharge to Red Sandstone Creek just downstream of the new bridge. Storm water will go through a stormwater treatment system (Vortechs Model 16000) before discharging to Red Sandstone Creek. The calculated discharge rate during a 100 -yr flow event is 24 cfs. E. The danger to life and property due to flooding or erosion damage; Our Analysis: There will be no increase in the danger to life or property due to flooding or erosion damage associated with the proposed project. There are no structures within the proposed floodplain. There should be little or no erosion around the bridge since the channel will be armored to prevent scour during the 500 -yr flood event. The downstream channel will be armored with loose river cobble with a median diameter of 6 inches, which is the estimated median diameter of the existing river cobble in this reach. F. The susceptibility of the proposed improvement and its contents to flood damage and the effect of such damage on the individual owner; Our Analysis: The channel below the bridge will be armored to protect the foundation from scour during a 500 -yr flow event. The bridge footers will be protected from downstream erosion by a concrete cutoff wall that is located at the downstream end of the bridge. Design drawings are included as an exhibit to the attached engineering hydraulic analysis G. The danger that materials may be swept onto other lands to the injury of others; Our Analysis: The 1 -70 CMP restricts much of the debris from the headwaters. There is some debris at the site that will be removed, but, for the most part, the amount of debris will remain the same. In addition, there are no other landowners along Red Sandstone Creek. Therefore the probability of a downstream landowner being impacted by debris along Red Sandstone Creek is unlikely. H. The compatibility of the proposed use with existing and anticipated development; Our Analysis: The land adjacent to Red Sandstone Creek Floodplain is currently zoned Arterial Business District to the west and Lionshead Mixed Use — 2 to the east of the creek. The proposed zoning for the entire site is Lionshead Mixed Use — 2. The relocation of the South Frontage Road consolidates the impacts to the creek (both existing and proposed) to one area, allowing for the remainder of the creek (downstream to Gore Creek) to be improved and restored, and to create a community amenity. A complete analysis of the anticipated development of Ever Vail is included in this submittal package. Ever Vail Flood Plain Modification Permit 8 1. The safety of access to the property in times of flood for ordinary and emergency vehicles; Our Analysis: None of these bridges will be flooded. Emergency Vehicles can access the east side of property utilizing the South Frontage Road and Forest Road. Emergency Vehicles can access the west side of property utilizing the South Frontage Road. J. The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical and water systems; Our Analysis: These costs will remain the same. There are no new utilities located within the existing or proposed floodplain boundary. All new utilities will be located above the floodplain and will be accessed via the new South Frontage Road Bridge. K. The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; Our Analysis: The impacts to the floodplain boundary were evaluated using HEC -RAS. HEC -RAS results show less than a foot increase in water surface elevation profiles downstream of the project area. The floodplain boundary decreases in width a short distance downstream of the new South Frontage Road Bridge and shortly downstream returns to its existing configuration. The attached Engineering Hydraulic Analysis describes the impacts to the floodplain in depth. L. The effect the proposed changes will have any adverse environmental effect on the watercourse including, without limitation, erosion of stream banks and stream side trees and vegetation and wildlife habitat; Our Analysis: The realignment of Red Sandstone Creek to accommodate the new South Frontage Road Bridge will have a small environmental effect on the watercourse under the new bridge. The Red Sandstone Creek stream ecosystem in the vicinity of the Site has been diminished due to channelized stream conditions and steep banks caused by fill material from neighboring parcels and the 1 -70 CMP. The stream bottom consists of boulders and cobbles and provides limited habitat for several species of fish. According to the CDOW, the following species of fish could be found in Red Sandstone Creek below the 1 -70 culvert: brown trout, rainbow trout, brook trout, cutthroat trout, and sculpin (Andree, pers. comm.). However, resting and spawning areas for fish are extremely limited in this section of Red Sandstone Creek, especially during spring runoff and critical low flow periods in the late summer, fall, and winter. There are wetlands adjacent to Red Sandstone Creek; however, infringement from development has degraded riparian habitat, which is limited to a narrow band along the stream banks. All wetland impacts will be mitigated as required by the Army Corps of Engineers. A wetland mitigation plan and a 404 Permitting will be completed in 2011. The proposed floodplain will not cause an increase in erosion of stream banks. Many of the trees in the vicinity will be preserved. Some trees have been designated for removal due to their deteriorating health, and one tree will be removed to accommodate the new channel alignment. The vegetation that is impacted during construction will be revegetated as defined in the Landscaping plans created by Landworks Design. Ever Vail Flood Plain Modification Permit 9 M. The necessity to the facility of a waterfront location, where applicable; Our Analysis: A variety of alternatives were evaluated to select an optimal Creek alignment and set of structures that would minimize floodplain impacts downstream of the proposed South Frontage Road Bridge crossing Red Sandstone Creek. In order to span the existing floodplain, a 120' spanned bridge would be required to traverse the floodplain. This alternative was not chosen due to the associated cost and aesthetic considerations. Various bridge spans were evaluated to determine the most appropriate size and style available that will appropriately convey and manage flow through the new structure. A single span bridge with 42- foot clear opening was selected as the most appropriate, cost effective and aesthetic alternative. The span of the proposed bridge was developed using HEC -RAS to model various stream geometries and bridge span options to identify a bridge span length that would not significantly impact water surface elevations of the Creek downstream. Once this span length was determined the remaining design characteristics were determined through an iterative process using Federal Highway Administration (FHWA) standards and HEC RAS modeling. The primary design parameters were based on the following objectives: maintain channel stability by armoring the new channel under the bridge to prevent scour during a 500 -yr flood event, include channel geometry that is similar to the existing stream geometry, and provide sufficient channel conveyance capacity to minimize changes to the existing 100 -year water surface elevation. N. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; Our Analysis: There is no alternative location because of the necessity to cross Red Sandstone Creek. O. The relationship of the proposed use to the comprehensive plan for that area. Our Analysis: The relocated South Frontage Road is identified as a possibility in the Lionshead Redevelopment Master Plan for the West Lionshead area. The existing alignment includes a small radius curve in the road, creating conditions that are unsafe in that area. The Lionshead Redevelopment Master Plan contemplated a South Frontage Road alignment which parallels 1 -70, but returns to the original location at Red Sandstone Creek. This alignment was not acceptable to CDOT, as it maintains an unsafe bend in the road. CDOT has indicated that the only acceptable alignment parallels 1 -70 for the entire distance of the West Lionshead area, joining back up to the existing alignment just west of the existing Glen Lyon Office Building. In addition, the alignment contemplated by the Lionshead Redevelopment Master Plan would have required significant disturbance to Red Sandstone Creek, because the proposed bridge would have run parallel to the creek for a distance. In conclusion, the alignment of the South Frontage Road and the floodplain modification required are in compliance with the Lionshead Redevelopment Master Plan and associated Transportation Master Plans for the traffic network in the Town of Vail. The following findings shall be made before granting of a floodplain permit: (1) That the proposed use or modification adequately addresses the findings in subsection E3a of this section, as determined by the floodplain administrator, unless the applicant can demonstrate that one or more of the standards is not applicable, or that a practical solution consistent with the public interest has been achieved; Ever Vail Flood Plain Modification Permit 10 (2) That the proposed use or modification is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town; and (3) That the proposed use or modification is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and (4) That the proposed use or modification promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. Ever Vail Flood Plain Modification Permit V. Adjacent Addresses 210312109003 GLEN LYON OFFICE BUILDING C/O ANDREW D. NORRIS 1000 S FRONTAGE RD W STE 200 VAIL, CO 81657 210107217002 000728 LIONSHEAD CIR VAIL CORP PO BOX 7 VAIL, CO 81658 210312100005 000934 FRONTAGE RD VAIL CORPORATION PO BOX 959 AVON, CO 81620 -0959 210312100004 001031 FRONTAGE RD SOHO DEVELOPMENT LLC 950 17TH ST STE 1600 DENVER, CO 80202 210312100002 000953 FRONTAGE RD SOHO DEVELOPMENT LLC 950 17TH ST STE 1600 DENVER, CO 80202 210312124001 000923 FRONTAGE RD W VAIL CORP PO BOX 7 VAIL, CO 81658 210312109004 SUB:GLEN LYON SUBDIVISION LOT:39 -2 ROBERT J. ROSEN 2005 QPRT NANCY ROSEN 2005 QPRT 1127 LAKE AVE GREENWICH, CT 06831 210312109005 ORRAS, IGNACIO 777 POST OAK BLVD 550 HOUSTON, TX 77056 210107216001 000846 FOREST RD EAGLE RIVER WATER & SANITATION DIST 846 FOREST RD VAIL, CO 81657 210107200001 210312109002 210312100010 210107200001 210106302004 210107218002 210107218001 TOWN OF VAIL C/O FINANCE DEPT 75 S FRONTAGE RD VAIL, CO 81657 210107217004 000825 FOREST RD GORE CREEK PLACE LLC PO BOX 7 VAIL, CO 81658 000710 LIONSHEAD CIR VAIL SPA CONDOMINIUM ASSOC 710 W LIONSHEAD CIR VAIL, CO 81657 DANN PETER - Registered Agent PO BOX 5480 AVON, CO 81620 001000 LIONS RIDGE LOOP VAIL RUN RESORT COMMUNITY 1000 LIONS RIDGE LOOP VAIL, CO 81657 Vail Run Resort Community Assoc Inc William I Fleischer - Registered Agent 1000 LIONSRIDGE LOOP VAIL, CO 81657 210107217002 RCR Vail LLC 390 INTERLOCKEN CRESCENT STE 1000 BROOMFIELD , CO 80021 Gore Creek Place LLC 390 Interlocken Crescent, Broomfield, CO 80021 210107222004 JPSSE VAIL IMMOBILIERE LLC RUBEN DARIO 115 TORRE 2 602 MEXICO D.F. CP 11580 MEXICO 210107222003 3 GCP INC AV CHAPULTEPEC 18 MEXICO DF 06640 MEXICO 210107222002 MARK GREENHILL REV TRUST - ELIZABETH GREENHILL REV TRUST - MARK GREENHILL FAMILY DESCENDANTS TRUST 153 SHERIDAN RD WINNETKA, IL 60093 210107222001 CAREY, ROBERT B. 6912 E HUMMINGBIRD LN PARADISE VALLEY, AZ 85253 Ever Vail Flood Plain Modification Permit 12 210107222007 SHARE SYNDICATE XIII LLC ALISON BUCHHOLTZ 675 LIONSHEAD PL VAIL, CO 81657 210107222008 JANICE SAUVAGE TRUST NO 1 8650 W TROPICANA AVE 208 LAS VEGAS, NV 89147 210107222006 SCHICIANO, KENNETH 43 HIGHGATE RD WELLESLEY, MA 02481 210107222005 5 GCP INC AV CHAPULTEPEC 18 COL DOCTORES MEXICO DF MEXICO 2103 - 014 -01 -068 TELLEEN, DANIEL E. 122 E MEADOW DR VAIL, CO 81657 2101 - 063 -03 -015 JOSEPH O. BROUGHTON TESTAMENTARY TRUST 240 ASH ST DENVER, CO 80220 2101 - 063 -03 -016 BROUGHTON, JOSEPH O., JR & LINDA K. 240 ASH ST DENVER, CO 80220 2101 - 063 -03 -014 RICHARD E. & MARTHA GRIFFITH DEAN TRUST, RICHARD E. & MARTHA GRIFFITH DEAN TRUSTEES PO BOX 970 TONGANOXIE, KS 66086 SIMBA RUN CONDOMINIUM ASSOCIATION Farrow Hitt 1100 N FRONTAGE RD VAIL, CO 81657 BREAKAWAY WEST ASSOCIATION Christine A. Spaeth PO Box 3717, Eagle, CO 81631 BREAKAWAY WEST ASSOCIATION P.O. Box 1743, Vail, CO 81658 SANDSTONE 70 CONDOMINIUM ASSOCIATION, INC. Vail Tax & Accounting, Inc. BOX 5940 AVON, CO 81620 SANDSTONE 70 CONDOMINIUM ASSOCIATION, INC. PO BOX 1679 AVON, CO 81620 CDOT 4201 E. ARKANSAS AVENUE DENVER, CO 80222 MAURIELLO PLANNING GROUP, LLC POST OFFICE BOX 1127 AVON, CO 81620 2101 - 072 -11 -032 VAIL RESORTS DEV THE FIXED ASSETS DEPARTMENT 390 INTERLOCKEN CRESCENT STE 1000 BROOMFIELD , CO 80021 2101 - 072 -23 -001 WDL Vail Condominium Association, Inc. Graham Frank Post Office Box 959, Avon, CO 81620 The Gore Creek Place Homeowner's Association 728 W. Lionshead Circle Vail, CO 81657 Ever Vail Flood Plain Modification Permit 13 VI. Attachments Attachment A: Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek Attachment B: Hydraulic Design Drawings Ever Vail Flood Plain Modification Permit 14 amec South Frontage Road Bridge at Red Sandstone Creek Engineering Floodplain Analysis Prepared for Vail Resorts Development Company Prepared by AMEC Earth & Environmental 1002 Walnut Street Suite 200 Boulder, Colorado 80302 P: 303.443.7839 F: 303.442.0616 www.amec.com January 18, 2011 Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek Important Notice This floodplain analysis report was prepared exclusively for Vail Resorts Development Company (VRDC) by AMEC Earth & Environmental, Boulder Office (AMEC). The quality of information, conclusions, and estimates contained herein are consistent with the level of effort involved in AMEC's services, and are based upon: i) information available at the time of preparation; ii) data supplied by outside sources; and iii) the assumptions, conditions and qualifications set forth in this report. This report is intended to be used by Vail Resorts Development Company (VRDC) only, subject to the terms and conditions of its contract with AMEC. Any other use of, or reliance on, this report by any third party is at that party's sole risk. Client Contact: Sara Born Doug Laiho AMEC Earth & Environmental, Inc. Boulder Office 1002 Walnut Street, Suite 200 Boulder, Colorado 80302 T. 303.443.7839 Doug. Laiho(a saraborn @alpinehydroecology.com AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek 9 TABLE OF CONTENTS 1.0 INTRODUCTION ........................................................... ..............................3 2.0 FLOODPLAIN ENGINEERING ANALYSIS .................. ..............................3 2.1 EVALUATION OF THE EXISTING FLOODPLAIN BOUNDARY AND DEVELOPMENT OF A NEW EFFECTIVE HEC -RAS MODEL ...................4 2.2 NEW EFFECTIVE HEC -RAS MODELING RESULTS SUMMARY ............6 2.3 DEVELOPMENT OF A HEC -RAS MODEL FOR THE PROPOSED CONDITIONS............................................................... ..............................7 2.4 PROPOSED CONDITIONS — HEC -RAS MODELING RESULTS SUMMARY................................................................... ..............................9 3.0 CONCLUSIONS ........................................................... .............................11 4.0 ENGINEERING STATEMENT ..................................... .............................12 Exhibits Exhibit A: Plan View of Floodplain Boundaries: existing FEMA, new effective and Attachments Attachment A: Existing FEMA floodplain boundary as produced by J.F. Sato and Associates Attachment B: Peak Land Consultants Survey, October 8, 2008 AMEC Earth & Environmental proposed Exhibit B: HEC -RAS tabular results: New Effective Model Exhibit C: South Frontage Road Bridge Hydraulic Design Drawings Exhibit D: HEC -RAS tabular results: Proposed Conditions Exhibit E: HEC -RAS Cross Sections: Proposed Conditions Attachments Attachment A: Existing FEMA floodplain boundary as produced by J.F. Sato and Associates Attachment B: Peak Land Consultants Survey, October 8, 2008 AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek 1.0 Introduction Vail Resorts Development Company, in conjunction with the Town of Vail is planning on moving the 1 -70 South Frontage Road in West Lionshead to the north, immediately adjacent and parallel to the eastbound lanes of 1 -70. This realignment will require the construction of a bridge across Red Sandstone Creek, directly south of the 1 -70 right -of- way. The purpose of this report is to address and evaluate the hydraulic impacts associated with moving the South Frontage Road. The proposed project for the new South Frontage Road Bridge will require realignment and reconstruction of the Creek channel from the 1 -70 CMP discharge location to a location approximately 185 feet downstream. The proposed bridge will be constructed using a Con /Span arch with a clear span of 42 -feet. The Con /Span arch is the structural component of the bridge that will span the creek. The bridge will be 99.35 feet wide. The span of the proposed bridge was developed using HEC -RAS to model various stream geometries and bridge span options to identify a bridge span length that would not significantly impact water surface elevations or velocities of the Creek downstream of the proposed bridge. Once this span length was determined the remaining design characteristics were determined through an iterative process using Federal Highway Administration (FHWA) standards and HEC -RAS modeling. The primary design parameters were based on the following objectives: maintain channel stability by armoring the new channel under the bridge to prevent scour during a 500 -yr flood event, include channel geometry that is similar to the existing stream geometry, and provide sufficient channel conveyance capacity to minimize changes to the existing 100 -year water surface elevations downstream. The project area discussed in this report starts at the discharge location for the existing 1 -70 CMP and ends 185 -ft downstream, where the new channel meets grade with the existing channel morphology. 2.0 Floodplain Engineering Analysis The intent of the engineering analysis is to review the existing Flood Insurance Study (FIS) floodplain boundary, define a new effective Base Flood Elevation (BFE) using more recent topographic data, and define a new BFE for the proposed bridge design. The HEC -RAS files used to model the existing floodplain were acquired from FEMA and modified to represent more recent and accurate survey data. The original FEMA HEC - RAS model will be referred to as the FIS HEC -RAS model. The model used to model the new effective BFE will be referred to as the effective HEC -RAS model. The existing Flood Insurance study (08037CV000A) for Red Sandstone Creek was adopted by FEMA on December 4, 2007. The flood hazard area is depicted on Eagle County, Colorado FIRM Panel 0837C046D as shown in Figure 2 (and included in Attachment A). The existing floodplain zone is defined as Zone AE floodplain. The existing FEMA FIRM represents modeling of Red Sandstone Creek from the confluence with Gore Creek to approximately 2,900 feet upstream, just past Potato Patch Drive. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek Figure 1. Existing FIRM panel for Red Sandstone Creek 2.1 Evaluation of the Existing Floodplain Boundary and development of a New Effective HEC -RAS Model The cross section geometry modeled in FIS HEC -RAS model was examined for accuracy and compared to more recent survey data to verify the precision of the geometry data in the vicinity of the project. Upon comparing the FIS cross sections to more recent topographic data, discrepancies were revealed. Because of the numerous discrepancies between the FIS HEC -RAS geometric data and existing topographic data, Vail Resorts and Development Company (VRDC) contracted Peak Land Consultants to resurvey the cross sections at the same locations along Red Sandstone Creek. Cross sections 406.5, 406, 405.5, 405.3, 405, 404, 403, 402.5, 402, and to 401.5 were surveyed on October 7, 2008. Three new cross sections were also surveyed at this time. This was done to provide more detail for the new effective floodplain boundary analysis. Two of the new cross sections are located between cross AMEC Earth & Environmental LIMIT OF flood insurance is available in this community, contact DETAILED STUDY ational Flood Insurance Program at (800) 638 -6620. 6 264 g2 36 MAP SCALE 1° - 500` cn C^^ ^^^ ZONE AE SO M ANNUAL CHANCE FLOOD DISCHARGE TE LI MITS CONTAINED IN CULVERT g210 TOWN O PANEL 0460D m 820 ZONE X 0800 �-+ M FIRM REDSANDSTONE �; ROAD KLO FLOOD INSURANCE BATE MAP 89 11 EAGLE COUNTY, COLOP" 3 Red Sandstone (j j AND INCORPORATED AREAS ONE w Creek s aT6p IU 8150 PANEL 469 OF 1125 �" � ISEE MAP INOE% F9R FIflM PANEL LAYOUT) ZONE AE JP ty 8140 m uu p GIRGLE I � �Y' —•+i a qMW– Iasaae. raze MM I I I TaraipP A� aezi+ a+eu e ... 1 �5 4es T ZONE w s + AE ZONE X e �p 1% ANN " 510 ( I P FLOOD DI8G"G CON 'IN C L ERT P o e 6090 w Bike o Path m p E y MAP NUMBER ! 08037CO469D FO tP o Z x A 0411E Cascad 5050 WEST i! �4a�xnE DE FFE EFFECTIVE DA t Pazh m a Footbridge ' o w °i o t tiu,, -, 1 Federal- ergencyMacapmentAger�y ypp1� o o c (p m GOREGREEK Z I O N This Is an ofidal copy of a portion Nthe abore rekrenced Rood map k ON, v as extracted Using F -M[L changes line Tnls map does not r .... T CG O �OR A T tiPORTTS h th mendmarrtsurhichmzyhati£ bean made auWequant to the date on the abpet National Flcod Insurance n blak Forthela[esip E LIMI FE nfonnalion rogrem EOOd maps the FEMA FIOOd Map Store at vxrvu.mac femagoa check Figure 1. Existing FIRM panel for Red Sandstone Creek 2.1 Evaluation of the Existing Floodplain Boundary and development of a New Effective HEC -RAS Model The cross section geometry modeled in FIS HEC -RAS model was examined for accuracy and compared to more recent survey data to verify the precision of the geometry data in the vicinity of the project. Upon comparing the FIS cross sections to more recent topographic data, discrepancies were revealed. Because of the numerous discrepancies between the FIS HEC -RAS geometric data and existing topographic data, Vail Resorts and Development Company (VRDC) contracted Peak Land Consultants to resurvey the cross sections at the same locations along Red Sandstone Creek. Cross sections 406.5, 406, 405.5, 405.3, 405, 404, 403, 402.5, 402, and to 401.5 were surveyed on October 7, 2008. Three new cross sections were also surveyed at this time. This was done to provide more detail for the new effective floodplain boundary analysis. Two of the new cross sections are located between cross AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek sections 404 and 405. These new cross section identification numbers are 404.5 and 404.25. The third cross section is located just downstream of cross section 405.5, located just downstream of the 1 -70 CMP discharge. This location was chosen because the cross section ID 405.5 intersects the culvert wing walls, and thus inaccurately represents the stream geometry downstream of the 1 -70 CMP discharge. The cross section locations are shown in plan view in Exhibit A, and a hard copy of the design drawings are located in Attachment A. 2.1.1 Mannings n- Values Manning's n- values for the main channel and overbank portions of Red Sandstone Creek were not changed for the new effective model. The Manning's n- values used are 0.04 and 0.05 for the main channel and the overbank areas, respectively. This is congruent with field observations and aerial photographs. Red Sandstone creek is generally narrow and the streambed consists of cobbles and small boulders and the floodplain is moderately vegetated. 2.1.2 Hydrology The hydrology used in the existing FIS model was adopted and used in the new effective model. 2.1.3 Boundary Conditions — Flow Regime Boundary conditions were changed for the new effective baseline model. The existing FEMA model used a downstream boundary condition of 0.04 feet /feet. The model was run using the sub - critical flow regime. The downstream boundary condition for the new effective model was set at normal depth, based on the average channel slope of 0.05 feet/feet. 2.1.4 Culvert and Bridge Data Entrance and exit loss coefficients were not changed at stream cross sections for the new effective baseline model. Entrance and loss coefficients are 0.1 and 0.3 at stream cross sections. Entrance and loss coefficients at the culverts are 0.5 and 1.0, respectively. The Entrance and loss coefficients at the existing South Frontage Road (Section ID's 402.5 and 402) have been changed to 0.3 and 0.5, respectively. 2.1.5 Cross Sectional Geometry The new cross sectional data from the topographic survey was entered into the new effective HEC -RAS model. The most notable changes to the geometry data are listed below. 1. Sections 406.5 and 406 have updated horizontal geometry to show flow in the horizontal plane, rather than rising above 1 -70. The FIS HEC -RAS model showed flow overtopping 1 -70. 2. The 1 -70 CMP invert elevation on the north side of 1 -70 has been changed to 8120.3 feet. The FIS CMP invert elevation value was 8124.3 feet. 3. The CMP invert elevation on the south side of 1 -70 was changed to 8107.90 feet. The FIS CMP invert elevation measurement was 8105.00 feet. 4. Cross section 405.3 was added to represent the actual stream geometry downstream of the 1 -70 CMP. The new cross section is located 5 feet AMEC Earth & Environmental Floodplain Modification Permit - Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek downstream of cross section ID 405.5 This new location was added because the existing section (ID 405.5) shows the wing walls of the CMP, and misrepresents the general existing channel geometry in that reach. 5. Cross sections 404.5 and 405.25 were added to provide more floodplain elevation data downstream of the new location for the South Frontage Road Bridge. 6. The CMP diameter has been changed to 7 ft. The culvert diameter in the FIS HEC -RAS model was 6 ft. 2.2 New Effective HEC -RAS Modeling Results Summary The new effective HEC -RAS model was run using geometry data created from the most recent survey. Model results in tabular format for the new effective model are presented in Exhibit B. Table 1 provides a summary table to compare the FIS and new effective water surface elevations and velocities during a 100 -yr event. Table 1. Water Surface Elevations and Velocities from FIS HEC -RAS model and the new effective HEC -RAS model. FIS Model Results New Effective Model Results River Station ID W.S. Elev ft Vel Chnl (ft /s) W.S. Elev ft Vel Chnl ft /s 408 8158.02 7.66 8158.02 7.66 407 8140.04 7.63 8140.04 7.62 406.5 8139.2 0.93 8135.03 1.48 406 8139.21 0.84 8135.02 1.73 405.7 1 -70 Culvert 1 -70 Culvert 1 -70 Culvert 1 -70 Culvert 405.5 8109.39 8.8 8110 10.02 405.3 n/a n/a 8108.82 8.45 405.25 n/a n/a 8107.62 3.1 405 8107.12 6.13 8106.77 5.9 404.5 n/a n/a 8099.98 6.16 404.25 n/a n/a 8097.96 6.08 404 8096.39 7.32 8096.35 7.68 403 8088.34 8.19 8089.03 6.51 402.5 8088.56 4.62 8089.06 4.76 402.3 Existing Frontage Rd. Bridge Existing Frontage Rd. Bridge Existing Frontage Rd. Bridge Existing Frontage Rd. Bridge 402 8085.54 7.7 8085.42 7.71 401.5 8083.53 7.54 8083.16 7.55 401 8077.2 5.75 8075.96 6.26 *An n/a value indicates those cross sections do not exist in the specified model. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek The water surface elevations and velocities changed at various cross section locations. The most notable changes are: 1. The water surface elevations at section ID's 406 and 406.5 (north of 1 -70) decrease in elevation by approximately 4 feet. This is most likely due to the increased representation width of the floodplain at the cross sections. The existing FIS model truncated the sections and therefore there was no representation of flow in the horizontal plane 2. Section ID 405.5 shows a higher water surface elevation in the new effective model. This is most likely a result of the FIS model not representing the wing walls, while the new effective geometry represents the wing walls, and the immediate downstream stream morphology. 3. The water surface elevation at section ID 405 is lower in the new effective model. This is mostly likely a result of more detailed geometry that shows a more incised channel. 2.3 Development of a HEC -RAS model for the Proposed Conditions The proposed bridge will be constructed using a Con /Span arch with a clear span of 42- feet. The Con /Span arch is the structural component of the bridge that will span Red Sandstone Creek. The bridge will be 99.35 feet wide. The 1 -70 CMP will be shortened by 10 feet. Each end of the bridge will require a concrete headwall. The upstream headwall will be located adjacent to the east bound lanes of 1 -70 and will retain the adjacent slope. In addition, this will provide an opening for the existing 1 -70 CMP to penetrate the wall. The CMP will extend 1.9 feet beyond the edge of the upstream headwall to prevent seepage behind the retaining wall. The Con /Span arch will have 10 additional inches of vertical clearance over the 1 -70 CMP. In order to convey flow through the Con /Span arch, the channel bed for Red Sandstone Creek is being adjusted to flow through the bridge. FHWA design specifications were used to create the design details to protect the bridge and prevent scour of the channel during high flow events. The channel configuration is based on the need to protect the bridge during high flow events and effectively manage flow during low flow events. A riprap energy dissipation basin has been designed to prevent scour and dissipate energy from flow out of the 1 -70 CMP. The channel bed will be lined with grouted riprap with a median diameter of 18 inches. A drop structure and scour pool will be placed just downstream of the bridge to minimize the longitudinal grade and limit further downstream impacts to Red Sandstone Creek. Detail design computations are included in the CDOT Hydraulic Report. The area to the west of the creek, just downstream of the bridge, will be graded to create a gradual slope from the southern edge of the bridge face down to the creek. Note that the existing South Frontage Road Bridge will not be removed as part of this project. The area will continue to be accessed via the existing South Frontage Road until the Ever Vail development is at or near completion. Design drawings for the proposed project are located in Exhibit C. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek The new effective HEC -RAS model was modified to reflect the new South Frontage Road Bridge location, the realignment of Red Sandstone Creek, and the associated downstream grading changes. A project boundary has been defined by identifying the cross sections where the water surface elevations and velocities have not been impacted by the proposed changes, i.e. the water surface elevation profiles match existing. The project boundaries are cross sections 407 and 402. Cross section ID 407 is located 3 cross sections and 211 feet upstream of the I -70 CMP inlet. Cross section ID 402 is located immediately downstream of the existing frontage road bridge. The water surface elevations and velocities return to existing values at or before these project boundary sections. A new grading plan was created to represent the proposed changes associated with the new South Frontage Road Bridge. The new grading plan was used to create a 3- dimensional surface and cross sections using RiverTools, a program extension to Civil 3D. This program creates cross sections in user specified locations and allows the user to export the geometry into HEC -RAS, as an .sdf file. These cross sections are labeled in blue in Exhibit A. This data was then combined with the new effective HEC -RAS model to compute the impacts to the water surface elevations within the proposed project area. A summary of the primary design changes incorporated into the proposed HEC -RAS model and associated geometry are listed below. 1. The downstream end of the 1 -70 CMP has been cut back 10 ft. The culvert will now discharge directly into the 42 ft Con /Span arch. The new culvert invert elevation will be 8108.30 feet. 2. All cross - sectional data between the 1 -70 CMP and the southern edge of bridge have been replaced with new geometry and numbered accordingly. This geometry represents the new riprap basin and the new stream geometry. Note that the existing HEC -RAS sections were not always perpendicular to the flow line. The geometry data used for the proposed conditions model uses cross sections that are perpendicular to the flow line. For this reason it is difficult to directly compare before and after water surface elevations based on cross section ID's and location alone. When a cross section line from the proposed model was crossing a cross section line from the new effective model it was given a section ID value 0.01 high or lower. If the proposed cross section centerline was above the existing section line then the value was higher and vice versa. For comparison purposes the water surface elevation for the proposed conditions was interpolated based on the plan view of floodplain boundary. Refer to Exhibit A for further clarification. 3. The width of the proposed bridge is 99.35 -ft. For modeling purposes the bridge was shorted to 49 feet long and placed downstream of the 1 -70 CMP stilling basin. This was done so that the stilling basin could be represented in the hydraulic model. HEC -RAS will not allow the modeler to enter a bridge and details for a stilling basin simultaneously. Note the upstream section of the bridge was modeled by creating stream geometry to represent the walls of the bridge. 4. New cross sections were added downstream of the proposed bridge to represent the drop structure, scour pool, and grading downstream of the bridge. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek The hydraulic attributes are the same as those used in the new effective model. The following assumptions were used: • The Manning's n value used to model the reach through the bridge is 0.03. The remaining Manning's n values were consistently 0.04 and 0.05 throughout the model, as used in the existing HEC RAS model. The grouted riprap will be placed below the bridge so that it is protruding from the surface in order to provide for increased roughness. • Flow regime was modeled as subcritical when modeling the 100 -yr water surface elevations. Note that the flow becomes supercritical at various points due to the steep grade and drop structures, but FEMA requires the 100 -yr floodplain boundary be calculated assuming subcritical flow. A mixed flow regime was used to determine the depth of scour during a 500 -yr flood event at the proposed bridge structure. • The downstream boundary condition is the average channel slope of 0.05 feet/feet. • Entrance and loss coefficients are 0.1 and 0.3 at stream cross sections. The Entrance and loss coefficients at the existing South Frontage Road (Section ID's 402.5 and 402) are 0.3 and 0.5. Entrance and loss coefficients for the new bridge (405.3. and 405.15) are also 0.3 and 0.5. Entrance and loss coefficients at the culverts are 0.5 and 1.0, respectively. 2.4 Proposed Conditions — HEC -RAS Modeling Results Summary The proposed HEC -RAS model was run with the new input data to determine the water surface elevations and velocities along Red Sandstone Creek under the proposed conditions. The HEC -RAS model results indicate that the impacts to the 100 -yr water surface elevations are less than a foot outside of the structures. In addition, the floodplain width decreases in width due to the channelization of Red Sandstone Creek. Table 2 summarizes the results during a 100 -yr flow event at key design locations. Note it is important to view this table in conjunction with Exhibit A to see the physical representation of the impacts to the floodplain boundary. The complete tabular results from the HEC -RAS model for the proposed conditions are shown in Exhibit D. HEC -RAS model sections with the 100 -yr water surface elevations for the proposed geometry are shown in Exhibit E. The FIS floodplain boundary, the proposed new effective floodplain boundary, and the proposed floodplain boundary are shown in Exhibit A. Proposed vs. new effective ground and 100 -yr water surface elevations are shown in Figure 3. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek Table 2. Proposed 100 yr Water Surface Elevations at Key Design Locations (HEC -RAS section ID numbers are in parenthesis). Location New Effective BFE Proposed Conditions (100 -yr flow) (100 -yr flow) WSE (ft) Velocity (ft /s) WSE (ft) Velocity (ft /s) — 200 ft upstream of the 1 -70 8140.04 7.62 8140.04 7.62 Culvert (407) 32 ft Downstream of the 8099.98 6.16 8100.50* 3.15 Bridge (404.5, 404.45) 64 ft Downstream of the 8097.96 6.08 8098.52* 8.28 Bridge (404.25, 404.24) 162 ft Downstream of the 8089.03 6.56 8089.02 6.59 Bridge (403) Modeling Boundary — 223 ft 8085.42 7.71 8085.42 7.71 Downstream of the Bridge (402) *Value is interpolated based on the floodplain boundary because the proposed cross sections are perpendicular to the flow, while the existing cross sections are slightly skewed from the perpendicular flow. Cross Section IDs in italics indicated a cross section value in the proposed conditions model. The cross section ID has been given a new value because it crosses the existing cross section, but is slightly skewed from the existing conditions. This was done because the new cross section had to be adjusted to run perpendicular to the flow line. AMEC Earth & Environmental Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek Profile for the 100 -yr Water Surface Elevation: Existing vs. Proposed Conditions 8140 8130 8120 w 8110 c O v W 8100 8090 8080 8070 Distance from cross Section ID 406 (located just upstream of the 1 -70 CMP) f New Effective Model Minimum Channel Elevation New Effective Model 100 -yr WSE —a— Proposed Conditions Minimal Channel Elevation — &—Proposed Conditions 100 -yr WSE Figure 2. Proposed vs. Existing Ground Elevations and Water Surface Elevations during a 100 -yr Flood Event. 3.0 Conclusions The floodplain analysis evaluated the existing adopted Flood Insurance Study (FIS) floodplain boundary and created a new effective baseline model using more recent and accurate survey data. The new effective baseline model was then used as the baseline model from which to create a new HEC -RAS model to represent the proposed design. This model shows a minimal increase in water surface elevation downstream of the project area. The floodplain narrows just downstream of the new South Frontage Road Bridge, and shortly downstream returns to its existing configuration. The water surface elevation profiles for the proposed conditions match the water surface elevation profiles of the new effective model at cross sections 407 and 402.5. FEMA requires that a Conditional Letter of Map Revision ( CLOMR) be submitted for review if the there has been a detailed hydrologic and hydraulic analysis for which the Base (1- percnet - annual- chance) Flood Elevations (BFEs) have been specified. If the project area is within a floodplain boundary, but not designated as a regulatory floodway, then any changes that would result in more than a 1.0 -foot increase in the BFE will require a CLOMR. Red Sandstone Creek has a designated floodplain, but is not in a regulatory floodway. Although the increases to the BFE's downstream of the proposed bridge are less than 1.0 foot, the increases to the BFE's within the proposed Con /Span arch are greater than 1.0 foot. Therefore, a CLOMR will need to be submitted to FEMA AMEC Earth & Environmental 0 100 200 300 400 500 600 700 800 900 1000 Floodplain Modification Permit — Engineering Floodplain Analysis South Frontage Road Bridge at Red Sandstone Creek to verify that the proposed project meets the minimum floodplain management criteria of the National Flood Insurance Program (NFIP) and, if so, what revisions will be made to the effective NFIP map for a community if the project is completed as proposed. 4.0 Engineering Statement This Engineerin Floodplain A sis was prepared under the direction of: i\'p0 RED; /s B y : Dog aiho Lo %/7iC 'This P.E. stamp applies to the floodplain analysis. It does not apply to the design an �• ••••••yy construction of the bridge. AMEC Earth & Environmental M-11M Exhibit A: Plan View of Floodplain Boundaries: existing FEMA, new effective and proposed 1 _ _ TSED 42' (BRIDGE) ON/SP SECTION 404.5 (BRIDGE) EXISTING - -� GRADE J1 7 \ / / IIISSS ( 445 SECTION 404.25 p 25 POSED 41 2 SECTION 404 DPLAIN PROPOSED \ GRADE / 4 9 �5 \ -z --,l �f Y � W .79 7 `- SECTION 402.5 �5�1 1 SECTION 402 / SECTION 401.5 \ EDGE SE WATER ON \ OCTOBER 8TH, 2008 I zw - /� SECTION 401 / SECTION 406 i / SECTION 40 i 1 -70 EXISTING 84" CULVERT BELOW -70 SEC TA 405.5 / SECTION 405.3 / EXISTING FIS FLOODPLAIN / SECTION 405 / \ V� l FFECTIVE BASELINE FLOODPLAIN { SECTION 408.91 /j amet -I Exhibit B: HEC -RAS tabular results: New Effective Model Exhibit B. HEC -RAS tabular results: New Effective Model Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft /s) (sq ft) (ft) Reach -1 415.5100 -year 490 8241.8 8253.94 8253.97 0.000082 1.18 414.36 56.81 0.08 Reach -1 415100 -year 490 8242.8 8253.93 8246.19 8253.96 0.000201 1.43 343.17 48.69 0.09 Reach -1 414.5 Culvert Reach -1 414100 -year 490 8235.4 8238.11 8238.11 8239.2 0.019791 8.37 58.53 27.33 1.01 Reach -1 413.8100 -year 490 8232.7 8235.6 8235.6 8236.58 0.030988 7.95 61.62 31.96 1.01 Reach -1 413100 -year 490 8221.9 8232.39 8232.41 0.000053 0.94 520.73 75.78 0.06 Reach -1 412.4100 -year 490 8221 8232.39 8224.57 8232.4 0.000061 1 488.14 70.83 0.07 Reach -1 412.3 Culvert Reach -1 412.2100 -year 490 8212.3 8215.28 8215.28 8216.37 0.03152 8.38 58.47 27.22 1.01 Reach -1 412100 -year 490 8211.4 8214.19 8214.19 8215.13 0.019618 7.79 62.88 33.89 1.01 Reach -1 411 100 -year 490 8200 8201.96 8201.96 8202.75 0.020674 7.14 68.66 43.79 1 Reach -1 410.5100 -year 490 8188.8 8192.12 8192.12 8193.4 0.020075 9.09 53.91 21.09 1 Reach -1 410100 -year 490 8186.4 8189.59 8189.14 8190.29 0.011589 6.69 73.23 29.41 0.75 Reach -1 409.5 Bridge Reach -1 409.3100 -year 490 8184 8187.42 8187.42 8188.55 0.020111 8.54 57.37 25.77 1.01 Reach -1 409.2100 -year 490 8176.1 8182.61 8183.71 0.014519 8.41 58.29 17.91 0.82 Reach -1 409100 -year 490 8179 8181.22 8181.22 8182.07 0.020172 7.41 66.13 39.19 1.01 Reach -1 408100 -year 490 8156 8158.02 8158.02 8158.93 0.020057 7.66 64 35.43 1 Reach -1 407100 -year 490 8138 8140.04 8140.04 8140.95 0.019936 7.62 64.3 35.8 1 Reach -1 406.5100 -year 490 8125.55 8135.03 8135.07 0.000169 1.48 351.5 94.16 0.11 Reach -1 406100 -year 490 8124.23 8135.02 8127.79 8135.06 0.000246 1.73 335.5 102.32 0.12 Reach -1 405.7 Culvert Reach -1 405.5100 -year 490 8105.61 8110 8110 8111.56 0.02167 10.02 48.88 15.91 1.01 Reach -1 405.3100 -year 490 8104.18 8108.82 8108.82 8109.93 0.020174 8.45 57.96 26.82 1.01 Reach -1 405.25100 -year 490 8104 8107.62 8107.77 0.003864 3.1 158.15 100.06 0.43 Reach -1 405100 -year 490 8104 8106.77 8106.77 8107.31 0.023375 5.9 82.98 77.12 1 Reach -1 404.5100 -year 490 8096.43 8099.98 8099.98 8100.57 0.024028 6.16 79.6 70.06 1.02 Reach -1 404.25100 -year 490 8096.02 8097.96 8097.96 8098.53 0.023246 6.08 80.63 71.59 1.01 Reach -1 404100 -year 490 8092.96 8096.35 8096.35 8097.26 0.0223 7.68 63.79 35.55 1.01 Reach -1 403100 -year 490 8085.41 8089.03 8089.7 0.010955 6.56 74.66 33.03 0.77 Reach -1 402.5100 -year 490 8085.21 8089.06 8087.53 8089.41 0.003958 4.76 102.83 28.59 0.44 Reach -1 402.3 Bridge Reach -1 402100 -year 490 8082.391 8085.42 8085.421 8086.351 0.0200291 7.711 63.54 34.5 1 Reach -1 401.5100 -year 490 8079.851 8083.161 8083.161 8084.041 0.0198191 7.551 64.88 36.76 1 Reach -1 401 100 -year 490 8073.131 8075.961 8075.961 8076.571 0.0222811 6.261 78.281 64.82 1 1 of 1 amet -I Exhibit C: South Frontage Road Bridge Hydraulic Design Drawings amet -I Exhibit D: HEC -RAS tabular results: Proposed Conditions Exhibit D: HEC -RAS Tabular Results: Proposed Conditions Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft /s) (sq ft) (ft) 1 415.5 100 yr 490 8241.8 8253.94 8253.96 0.000082 1.18 414.31 56.8 0.08 1 415 100 yr 490 8242.8 8253.93 8246.19 8253.96 0.000129 1.43 343.17 48.69 0.09 1 414.5 Culvert 1 414 100 yr 490 8235.4 8238.11 8238.11 8239.2 0.019791 8.37 58.53 27.33 1.01 1 413.8 100 yr 490 8232.7 8235.6 8235.6 8236.58 0.019832 7.95 61.62 31.96 1.01 1 413 100 yr 490 8221.9 8232.39 8232.41 0.000053 0.94 520.73 75.78 0.06 1 412.4 100 yr 490 8221 8232.39 8224.57 8232.4 0.000061 1 488.14 70.83 0.07 1 412.3 Culvert 1 412.2 100 yr 490 8212.3 8215.28 8215.28 8216.37 0.020173 8.38 58.47 27.22 1.01 1 412 100 yr 490 8211.4 8214.19 8214.19 8215.13 0.019618 7.79 62.88 33.89 1.01 1 411 100 yr 490 8200 8201.96 8201.96 8202.75 0.020674 7.14 68.66 43.79 1 1 410.5 100 yr 490 8188.8 8192.12 8192.12 8193.4 0.020075 9.09 53.91 21.09 1 1 410 100 yr 490 8186.4 8189.59 8189.14 8190.29 0.011589 6.69 73.23 29.41 0.75 1 409.5 Bridge 1 409.3 100 yr 490 8184 8187.42 8187.42 8188.55 0.020111 8.54 57.37 25.77 1.01 1 409.2 100 yr 490 8176.1 8182.61 8183.71 0.014525 8.41 58.28 17.91 0.82 1 409 100 yr 490 8179 8181.22 8181.22 8182.07 0.020172 7.41 66.13 39.19 1.01 1 408 100 yr 490 8156 8158.02 8158.02 8158.93 0.019908 7.64 64.16 35.44 1 1 407 100 yr 490 8138 8140.04 8140.04 8140.95 0.020068 7.64 64.16 35.79 1.01 1 406.5 100 yr 490 8125.55 8135.03 8135.06 0.000169 1.49 351.23 94.15 0.11 1 406 100 yr 490 8124.23 8135.02 8127.77 8135.06 0.000245 1.73 335.2 102.3 0.12 1 405.99 Culvert 1 405.9 100 yr 490 8107 8109.22 8109.22 8110.19 0.011452 7.9 62.04 32.3 1 1 405.8 100 yr 490 8104 8109.59 8109.7 0.000422 2.65 185.21 40.88 0.22 1 405.7 100 yr 490 8104 8109.59 8109.68 0.000329 2.48 199.55 40.88 07 1 405.6 100 yr 490 8106.89 8109.2 8109.65 0.004127 5.35 92.34 40.88 0.63 1 405.4 100 yr 490 8107 8108.72 8108.72 8109.55 0.011723 7.33 67.03 40.881 1.01 1 405.3 100 yr 490 8105.99 8108.3 8108.14 8108.98 0.008892 6.61 74.12 42 0.88 1 405.28 Bridge 1 405.15 100 yr 490 8099.12 8101.56 8101.56 8102.39 0.020792 7.32 66.97 41.07 1.01 1 405.1 100 yr 490 8098.76 8101.49 8102.04 0.010853 5.97 83.81 48.16 0.76 1 405.05 100 yr 490 8097.68 8101.69 8101.93 0.00296 3.99 130.761 58 0.42 1 405 100 yr 490 8096.48 8101.76 8101.89 0.001059 2.9 182.1 60.35 0.26 1 404.95 100 yr 490 8096 8101.78 8101.87 0.000617 2.49 216 63.44 0.21 1 404.9 100 yr 490 8096 8101.79 8101.87 0.000493 2.31 232.46 65.66 0.19 1 of 2 Exhibit D: HEC -RAS Tabular Results: Proposed Conditions 1 404.85 100 yr 490 8096 8101.78 8101.86 0.000514 2.33 224.77 62.31 0.19 1 404.7 100 yr 490 8096 8101.7 8101.85 0.001184 3.15 171.89 57.23 0.27 1 404.45 100 yr 490 8098.02 8101.48 8101.83 0.004291 4.93 113.88 52.53 0.51 1 404.4 100 yr 490 8098.02 8100.86 8100.86 8101.74 0.015878 7.86 70.24 41.8 0.94 1 404.3 100 yr 490 8096.81 8100.11 8100.11 8101.12 0.014268 8.47 67.62 35.98 0.91 1 404.24 100 yr 490 8095.77 8098.87 8098.87 8099.89 0.015344 8.28 64.89 35.8 0.93 1 404.2 100 yr 490 8095.11 8098.31 8098.31 8099.32 0.015415 8.21 65.13 37.26 0.92 1 404.12 100 yr 490 8093.6 8097.24 8097.24 8098.38 0.019029 8.6 57.17 27.13 1 1 403.99 100 yr 490 8092.34 8096.26 8096.26 8097.55 0.019488 9.11 53.78 21.2 1.01 1 403.95 100 yr 490 8091.27 8095.35 8095.35 8096.59 0.018437 8.95 55.44 23.89 0.99 1 403.8 100 yr 490 8090.39 8094.09 8094.09 8095.2 0.019528 8.43 58.12 26.9 1.01 1 403.79 100 yr 490 8088.84 8092.93 8092.93 8094.19 0.019391 9.03 54.27 21.76 1.01 1 403.78 100 yr 490 8087.48 8091.64 8091.64 8092.96 0.019801 9.2 53.24 20.54 1.01 1 403 100 yr 490 8085.41 8089.02 8089.7 0.011078 6.59 74.37 32.99 0.77 1 402.5 100 yr 490 8085.21 8089.05 8087.53 8089.41 0.003988 4.78 102.58 28.59 0.44 1 402.3 Bridge 1 402 100 yr 490 8082.39 8085.42 8085.42 8086.35 0.020029 7.71 63.54 34.5 1 1 401.25 100 yr 490 8079.85 8083.16 8083.16 8084.041 0.0198191 7.551 64.88 36.76 1 1 401 100 yr 4901 8073.13 8075.96 8075.96 8076.571 0.0222271 6.251 78.34 64.84 1 2of2 amet -I Exhibit E: HEC -RAS Cross Sections: Proposed Conditions RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 � 4m On L RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 L�eitl L EG1my L�eitl M151my 81 33 1M151my eaxs� 8134 sf 8132 8134 8132 81m 813] sf � 812B 8124 81� 0 M 411 m m 100 120 140 160 180 Shtim (fl) Figure 1. HEC -RAS Cross Section ID 406 Figure 2. HEC -RAS Cross Section ID 405.99 Up 1of19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 L 8140 L�eitl EG1my 1M151my sf m eaxs� sf 8134 8132 813] 812B 81� 8124 0 M 411 m m 100 120 140 160 180 Shtim (fl) Figure 2. HEC -RAS Cross Section ID 405.99 Up 1of19 Figure 3. HEC -RAS Cross Section ID 405.99 down RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 Plan: Plan 04 10/25/2010 M 03 4054 aim L�eitl 3 0� EG1my 1M151my 8125 812J 1M151my 81100 8115 Gro�iitl 8110 eaxs� 8105 0 10 M m 4D 50 Shtim (fl) 5 w SIm5 Figure 3. HEC -RAS Cross Section ID 405.99 down Figure 4. HEC -RAS Cross Section ID 405.9 2 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4054 3 0� 81105 L�eitl EG1my 1M151my 81100 Gro�iitl eaxs� 81095 81090 5 w SIm5 81030 810]5 810]0 0 10 20 33 40 50 c Ino(rc) Figure 4. HEC -RAS Cross Section ID 405.9 2 of 19 3of19 Figure 6. HEC -RAS Cross Section ID 405.7 Figure 7. HEC -RAS Cross Section ID 405.6 4 of 19 Figure 8. HEC -RAS Cross Section ID 405.4 RSC_Bndge Pmpos:d Plan: Plan 04 10/25/2010 81100 0 3 L�etl EG1my 1M151my 81095 Gro�iitl eaxs� 81090 MW5 w 81090 81015 81010 SIm5 0 10 m m C m Shtim (fl) Figure 7. HEC -RAS Cross Section ID 405.6 4 of 19 Figure 8. HEC -RAS Cross Section ID 405.4 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4053 MPD Q 03 SImO — L�eitl EG1my 1M151my 81085 Gro�iitl eaxs� 81058 81815 w 81818 81055 mmo 81055 0 10 A m C m Shtim DD Figure 9. HEC -RAS Cross Section ID 405.3 RSC_Bndge Propowd Plan: Plan 04 10/25/2010 03 �� L�eitl EG1my 812J M151my Grmitl BaicSh 8118 811 8114 8112 8118 8106 81m 8104 0 10 A m C m S mDD Figure 10.. HEC-RAS Cross Section ID 405.28 Up 5of19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40515: ACPD 95 6l 5 5 L�eitl EG1my EG1my 1M151my 1M151my 81020 sf eaxs� 811 81015 8118 8101.8 8185 5 w SImS 81 SImO mY 0 10 ZI w 40 57 Shtim (fl) Figure 11. HEC -RAS Cross Section ID 405.28 Figure 12. HEC -RAS Cross Section ID 405.15 6 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40515: ACPD 95 6l 81025 5 L�eitl EG1my 1M151my 81020 Gro�iitl eaxs� 81015 8101.8 5 w SImS SImO 8185 mB0 0 10 ZI w 411 57 Shtim (fl) Figure 12. HEC -RAS Cross Section ID 405.15 6 of 19 Figure 13. HEC -RAS Cross Section ID 405.1 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4051: MPD M 16 6l OS� 81025 L�eitl EG1my M151my elmo L � eaxs� 81015 81010 L�eitl 81055 81050 m 5 mO 0505 1M151my 0 10 m m 411 m BS ]8 Shtim (fl) Figure 13. HEC -RAS Cross Section ID 405.1 Figure 14. HEC -RAS Cross Section ID 405.05 7 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40505 : ACPD SN L � 805 L�eitl EG1my 1M151my eaxs� elna 81@ 81 8105 052 0 10 ZI w 411 m m nl m Shtim (fl) Figure 14. HEC -RAS Cross Section ID 405.05 7 of 19 Figure 15. HEC-RAS Cross Section ID 405 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 404Y: ACPD Si3 4m l � L Mon L�eitl 1M151my EG1my 1M151my eaxs� s11a 8105 eaxs� 0104 mY 8102 0 ZI 411 m m 1110 120 140 160 M Slatim (fl) mm m2 0 10 ZI w 411 m m nl m Shtim (fl) Figure 15. HEC-RAS Cross Section ID 405 Figure 16. HEC -RAS Cross Section ID 404.95 8of19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 404Y: ACPD Si3 L L�eitl EG1my 1M151my eaxs� s11a 8105 81 mY 0 ZI 411 m m 1110 120 140 160 180 Slatim (fl) Figure 16. HEC -RAS Cross Section ID 404.95 8of19 Figure 17. HEC -RAS Cross Section ID 404.9 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 409MPD� as L oa L � � L�eitl L�eitl EG1my EG1my 1M151my 1M151my 811 s eaxs� elna 81. 8Y 0 ZI 40 m m 1110 120 140 168 188 Shtim (fl) Figure 17. HEC -RAS Cross Section ID 404.9 Figure 18. HEC -RAS Cross Section ID 404.85 9 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40485: ACPD 552 } u5 Slm L�eitl EG1my 1M151my eaxs� elna 81@ 81 81m 84 0 ZI 40 m m 100 120 140 168 Shtim (fl) Figure 18. HEC -RAS Cross Section ID 404.85 9 of 19 Figure 19. HEC -RAS Cross Section ID 404.7 ns } RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40445: ACPD 542 oa } u RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 811 4045 M 515 ``II�� ``L 81m 1M151my L�eitl cam EG1my eaxs� 1M151my 8101 8104 Bak Sh 8 w 81 sf 8m mm 0 ZI mm 140 Shtim (fl) 0 10 m x 4o m m To smom arc) Figure 19. HEC -RAS Cross Section ID 404.7 ns } RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40445: ACPD 542 oa } u 811 L�eitl EG1my 1M151my cam Elm eaxs� M 8101 8102 81 8m 0 ZI 411 m m 1110 120 140 Shtim (fl) Figure 20. HEC -RAS Cross Section ID 404.45 10 of 19 a RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4044 M 5B o u RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 81m 4043 MPD S3 � Il5 L 04 � L d5 ' Elm 9L�Id Lie tl EG1my elna �m 81. 8104 mm 81@ 0 Zl 40 m m 1110 128 148 Shtim (fl) mm Figure 21. HEC -RAS Cross Section ID 404.4 Figure 22. HEC -RAS Cross Section ID 404.3 II of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4043 MPD S3 � Il5 L 04 � L d5 ' Elm Lie tl EG1my 1M151my eaxs� 8104 81@ 81 mm m2 0 ZI 411 m m 100 120 148 Shtim (fl) Figure 22. HEC -RAS Cross Section ID 404.3 II of 19 Figure 23. HEC -RAS Cross Section ID 404.24 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 40th: ACPD 511 � 1 L�eitl EG1my 1M151my Elm eaxs� sf sf m EG1my - 8102 sf M151my mm m� me E m m m m 1EE 120 140 Shtim (fl) Figure 23. HEC -RAS Cross Section ID 404.24 Figure 24. HEC -RAS Cross Section ID 404.2 12 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4042 MPD 4� 8110 L�eitl EG1my M151my Elm eaxs� 8 8101 MM sf mm m� me E m w m m 100 120 S . (fl) Figure 24. HEC -RAS Cross Section ID 404.2 12 of 19 Figure 25. HEC -RAS Cross Section ID 404.12 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4mE: ACPD 46] 40412 A m d5 04 d5 MM Lietl EG1my M151my Elm c��m eaxs� s Of 81 02 - 81 mm m� m04 m 100 m� E m m m m 100 120 S . (fl) Figure 25. HEC -RAS Cross Section ID 404.12 Figure 26. HEC -RAS Cross Section ID 403.99 13 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4mE: ACPD 46] L�eitl EG1my 1M151my e1Ea c��m eaxs� sf m 81m 5 w mm mw mot 0 A 411 m m 100 Shtim (fl) Figure 26. HEC -RAS Cross Section ID 403.99 13 of 19 Figure 27. HEC -RAS Cross Section ID 403.95 ns RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 Slm 40101: ACPD 451 L�eitl `� + L 8101 EG1my L�eitl EG1my Elm M151my eaxs� eaxs� sf 8102 sf mm _ mm mm mm m�1 mw m� m 0 10 E m m m m Shtim (fl) Figure 27. HEC -RAS Cross Section ID 403.95 ns RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4018 MPD 4� oa Slm L�eitl EG1my M151my Mat eaxs� 8102 sf mm mm m�1 m� 0 10 m m Shtim (fl) Figure 28. HEC -RAS Cross Section ID 403.8 14 of 19 �� RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 401n ACPD 4fl/ RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 MOB d 5 L�eitl ns Ec1my Of Mat ws lmy L�eitl EG1my rnm eaxs� 8102 81 mm M ms m91 m mm 0 10 m m w 57 m Shtim (fl) mm Figure 29. HEC -RAS Cross Section ID 403.79 Figure 30. HEC -RAS Cross Section ID 403.78 15 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 bm�: ACPD m6 ns oa ns Mat L�eitl EG1my rnm M151my eaxs� M ms m mm mm 0 10 m m Shtim (fl) Figure 30. HEC -RAS Cross Section ID 403.78 15 of 19 Figure 31. HEC-RAS Cross Section ID 403 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4m m } 04 } m 8110 L�eitl EG1my 1M151my s eaxs� 8 MR) M85 0 m 100 150 200 S . (fl) Figure 31. HEC-RAS Cross Section ID 403 Figure 32. HEC -RAS Cross Section ID 402.5 16 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4025 ns } 04 } m silo i sf 8 MR) M85 0 m 100 150 218 250 Shtim (fl) Figure 32. HEC -RAS Cross Section ID 402.5 16 of 19 Figure 33. HEC -RAS Cross Section ID 402.3 Up ns RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 a L w �` m silo L�eitl L�eitl Ec1my ws lmy Ec1my � eaxs� 81 MR) M85 rn 0 m 100 1so a/0 zso Shtim (fl) Figure 33. HEC -RAS Cross Section ID 402.3 Up ns RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 } oa } ns 811 L�eitl Ec1my ws lmy cam rn eaxs� rn m� MR) mm no 0 2D 41 m m 100 120 140 100 S . (fl) Figure 34. HEC -RAS Cross Section ID 402.3 Down 17 of 19 Figure 35. HEC-RAS Cross Section ID 402 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 402 � 1 L�eitl L�eitl EG1my EG1my 1M151my Elm Gro�iitl 1M151my eaxs� 8 m mm eaxs� m mss - mm 0 m 40 m m 100 120 140 100 180 Shtim (fl) M85 m 0 m m m m 100 120 140 100 S . (fl) Figure 35. HEC-RAS Cross Section ID 402 Figure 36. HEC -RAS Cross Section ID 401.25 18 of 19 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 4m1 811 L�eitl EG1my 1M151my Elm Gro�iitl eaxs� 8 m mm M85 m mss 0 m 40 m m 100 120 140 100 180 Shtim (fl) Figure 36. HEC -RAS Cross Section ID 401.25 18 of 19 d5 RSC_Bndge Pmpowd Plan: Plan 04 10/25/2010 � 401 � L 04 L 05 Elm Lie tl EG1my 1M151my 8 Gro�tl eaxs� mm mm m mss m 0 m 1110 150 X0 S .(0) Figure 37. HEGRAS Cross Section ID 401 19 of 19 amet -I Attachment A: Existing FEMA floodplain boundary as produced by J.F. Sato and Associates 8 10 1 17 24 20 iao �cw naoowr 15 16 18 _ 7 19 11 12 13 14 19O, bmvwr ?'4S ORE CREEK 21 S P ® tliGSt SECIIOp IM.NIM NIO b EAGLE RIVER f' 3 23 / 2 ioo ww ba[R wises[ [icraba �� amet -I Attachment B: Peak Land Consultants Survey, October 8, 2008 STA: 0 +47.65 el st] 1A: 0 +44.82 81270 T127.71 897 STA: 1 +21.42 , T E STA: 0 +97 0+ pi]a.iJ 7� STA: 0 +88.86 mA7u STA: 0 +87.68 } STA: 0 +81.93 STA: 0 +76.32 at . STA: 0 +68.66 / 9�1J�.Ot GRAPHIC SCALE 20 0 10 20 40 STA 0 +67.93 [i?w ]x etxae] 0 +56.16 etx4x] ew erixis, e wa.)>� 8 4 "CA/P INV. 8120.3 IN FEET ) 1 Inch = 20 it 1 -70 SECTION 405.25 STA 1 +80.27 ' 84'CMP INV. 8107.9 STA: 1 +63.61 �toass STA 0 +59.70 STA: 1 +48.45 c STA: 1 +42.38 STA 0 +59.30 J toes) � o STA: 0 +56.52 0 � 87 8�.sx s STA: 0 +5235 W07A77 at„ STA 1 +18.2 �osxs` 1: 0 +28.64 / �ttx. ST 0 +96.90 O p s 1 SECTION 405 2 + 3 y STA 0+ 8.88 STA: : +05.62 t u \ p G j / STA 0 +80.44 R Oa.06amt STA: 2 +04.37 STA: 0+76.39 STA 6 0 3 � o,.es \ ! STA: 0 +50 et0151 STA a 5.63 / 7 a 0P \ STA 1 +7 +73.jJfi STA - 114a STA: 1 +46.62 TbP � STA: 1 +4119 \ Y 810138 � EOW STA 1 +3,.31 1 CbY 159 I / 814 813 812 DATUM ELEV 8115.00 811 all 813 DATUM ELEY 8110.00 019 813( 0+00 rm 812 B11 810 DATUM ELEV 8090.00 8111 610 DATUM ELEV 8095.00 0 +50 1 +00 1 +32.36 SECTION 406.5 8120 8110 8100 0 +00 0 +50 0 +87.10 SECTION 405.5 0 +00 0 +50 1 +00 1 +50 SECTION 405.25 \ \ 14.0' BOX CULVERT INV. 8084,0 )X CULVERT \ \ STA: 1 +18.13 ,,56 y,: SECTION 402 NV- 8084.2 ' �TA�1 +19,24 X STA: O +B6.66 101 TA 0 +83.72 110 Emx aw /lam TA: 0 +70.66 i STA: 1 +03.40 19.90 1B/ R STA 0 +96.61 0Oa141 BO�17 ill 60 fi5 SECTION 401.5 a eB U ,a9.e) STA: 1 +48.52 1 + - ya ave 1 1 STA 1 +1 STA:10 +96.75 I STA: 0 +86.89 y 0 STA: 0 +79.M ' STA: 0 +70.58 Toa ,8E Oi N I 1 \ 1 \ \ 1 I w l Z, O I v Y I 28 I U) U I 0 I w ' � I � STA 0+69 03 STA 0 +8242 I ae T� \STA: +98.27 I I r7i13 �y?0 STA: (1 +08.37 E. ' STA: 1+ 23.59 ti STA: STA: 1 +35.11 /. \ )4.4e CORE CREEK 011 810 809 BOB DATUM ELEV 6075.00 811 810 809 808 DATUM ELEV 6075.00 8111 8101 6091 BOBI DATUM ELEV 6070.00 all 810 809 BOB 807 DATUA/ ELEV 6065.00 0 +00 0 +50 1 +00 8110 8100 8090 8080 8110 8100 8090 8080 8070 1 +50 1 +60.63 8101 8110 8091 8100 BOB, 8090 807, 8080 DATUM ELEV 6060.00 0 +00 0 +50 1 +00 1 +50 1 +84.90 SECTION 403 0 +00 0 +50 SECT 0 +00 0 +50 1 +00 1 +50 2 +02.22 SEC - lON 402.5 0 +00 0 +50 1 +00 1 +56.61 SECTION 402 \ 1 \ 1 I I STA: +05.44 STA: 1000.81 STA: 11 1 + SECTION 403 STA 0 +95.11 � +44 _ ��e STA 0 +86.98 0+76 57 1+ � 0 T� ,n _ E0� 9a ° -- Eow t4 0. 4t STA: 1 +75.88 14.0' BOX CULVERT a. e 1+ SECTION 402.5 5.2 TA 1 +11.92 50.2 ( CULVERT V.=8084.4 4 808 STA: oo STA: 1 +27.17 1 +MO2 \ \ 14.0' BOX CULVERT INV. 8084,0 )X CULVERT \ \ STA: 1 +18.13 ,,56 y,: SECTION 402 NV- 8084.2 ' �TA�1 +19,24 X STA: O +B6.66 101 TA 0 +83.72 110 Emx aw /lam TA: 0 +70.66 i STA: 1 +03.40 19.90 1B/ R STA 0 +96.61 0Oa141 BO�17 ill 60 fi5 SECTION 401.5 a eB U ,a9.e) STA: 1 +48.52 1 + - ya ave 1 1 STA 1 +1 STA:10 +96.75 I STA: 0 +86.89 y 0 STA: 0 +79.M ' STA: 0 +70.58 Toa ,8E Oi N I 1 \ 1 \ \ 1 I w l Z, O I v Y I 28 I U) U I 0 I w ' � I � STA 0+69 03 STA 0 +8242 I ae T� \STA: +98.27 I I r7i13 �y?0 STA: (1 +08.37 E. ' STA: 1+ 23.59 ti STA: STA: 1 +35.11 /. \ )4.4e CORE CREEK 011 810 809 BOB DATUM ELEV 6075.00 811 810 809 808 DATUM ELEV 6075.00 8111 8101 6091 BOBI DATUM ELEV 6070.00 all 810 809 BOB 807 DATUA/ ELEV 6065.00 0 +00 0 +50 1 +00 8110 8100 8090 8080 8110 8100 8090 8080 8070 1 +50 1 +60.63 8101 8110 8091 8100 BOB, 8090 807, 8080 DATUM ELEV 6060.00 0 +00 0 +50 1 +00 1 +50 1 +84.90 SECTION 403 0 +00 0 +50 SECT 0 +00 0 +50 1 +00 1 +50 2 +02.22 SEC - lON 402.5 0 +00 0 +50 1 +00 1 +56.61 SECTION 402 20 GRAPHIC SCALE 0 10 20 40 om ( IN FEET ) am 1 ineb = 20 ft +m bass] SECTION 405.25 ` +m STA: 1 +80.21 84 "CHIP INV =8107.9 STA: 1 +63.1 STA 1 +48.45 Eoa ra STA: 1 +42.7 ms] �\ 0 - 0 +8 MP .51 " \ tOfl56 BYWLL 6 S TA: 1+18.27 los2e Inax. r T�WALL � I STA. 0 +96.90 1 SECTION 405 }s , c+ at 4] 0+ 8.88 ti A -] STA: a etoa.o0 STA: 1 +05.62 BI doacIX j / \ -80.44 o]n '6 39 STA 2 +04.37 � .39 \ 00 T 1 o 0 P ].Bfi STA: 1 +75 63 ap ]s STA: 1 +735 STA: 1 +62 \1 N.eJ STA1 +46. 2 W F E N \ STA 1 +43.19 Y atm.sJ I 1 +31.31 n ( / J / TOE STA: 1 +4 .22 I STA: 1 +39. I STA: 1 +77.85 221 ' a SECTION 404.5 c AsPn.u] STA: 1 +91.72 + S TD, STA 1 +32.29 .a ME ]J TOP ' STA 1 +28.55 I gg2222 T�/so A Is0 STA: 1 +24.76 s x STA: 1 +01.61 .1D- 1 1 +0 - ss oi` I STA 0 +86.20 T� STA: 0 +88.20 \ \\ a� \_ STA: 0 +76.83 STA 1 +29.05 - _ DRY Bm STA 0 +60.98 - 1 +0 STA: 0 +64.56 / PEV aca].Is �3 SECTION 404.25 rq a e m o � E° l cn 1. n / 1 / STA 1 +12.66 072.74 - STA: 00 STA: / 1 + 0 " SECTION 404 �C _ 0 +34.37 STA: c A 34 / P�mSTA:11 +01.22 ]0 ;,2, TOP 1 STA /0 +51.71 7! TOE TOP ll w I z / F- F- 0 U / I \ I 0 \ W � 8121 8111 8101 8091 DATUM ELEV 8085.00 8110 CIM DATUM ELEV 8090.00 am om om om am om +m + +m ` +m W +m ° +m 0 +00 0 +50 1 +00 1 +50 2 +p0 812 811 BID 809 DATUM ELEV 8085.00 SECTION 405 SECTION 404.5 8120 8111 8110 8101 8100 8091 8090 DATUM ELEV 0080.00 SECTIO F P P 4 I- 0 +00 0 +50 1 +00 1 +50 2 +00 0 +00 0+50 0+00 0+50 1 +00 1 +53.35 � � I c / / 9 I l / l � 9 %/ 1 I � � J REFER TO SECTIONS C/3 AND C/4 FOR DROP STRUCTURE DETAILS ON SHEET H3. SCOUR POOL (CENTERED AT STA. 1+22). REFER TO SHEETS H3 AND H6. SCOUR POOL RIPRAP I I \ i I I I ^ \ I I \ PLACE 31-134 E O ON EACH SIDE SCOUR POOL TC - i, GRADING TO CRI o \ STEPPED APPEA o l- / x80 8. PLACE A BALE OF 31-134 IN BURIED 2 /3 IN1 ESTABLISH A - 0���� ^ ACCOMPLISH tttt���� - h _ 1 -`U I \ / / / _ \ I I TAILWATER CC o _\ I \ I �\ \ / / CONTROL SHC �00 PLACE RIPRAP (TY / AN ELEVATION OF RIPRAP / r 0 \ / / BOTH SIDES OF TF (PE VL) I KEY RIPRAP 3' IN1 PLACERIPRAP IN TI UNTIL THE PROPO`. g 1+5 MATCHES THE EXIT I I I 1 I � CUTOFF WALL J TO PROTECT BRIDGE FOUNDATION PRE - FORMED SCOUR POOL 0 +80 1+00 1+20 1+40 1+60 STATION (FT) RED SANDSTONE CREEK CL- PR❑FIL-E SCALE: I " =10' O O Q ARCH BRIDGE 0 0 Q UN 3 �1 B4 BOULDERS /EL. =D RIP AP (TYPE MG) DEPTH F 2 -FT BELOW TO ED ES OF BRIDGE 2000 3000 1' -11" ZCIIIIII] -2000 -1000 B TYPICAL_ STREAM SEi 4 SCALE: 2 " =1' CENTER OF CHANNEL TO EDGE OF RIPRAP 18' -3" Al Ok / / I � � 1 � I I I I I I I I � I I / / I / I / I I 8115 8110 8105 8100 8095 STA 1+00.00 —50 —45 —40 —35 —30 —25 —20 —15 —10 —5 0 5 10 15 20 25 30 35 40 45 50 8115 8110 z 0 8105 Q J 8100 w 8095 8090 —50 —45 —40 —35 —30 —25 —20 —15 —10 —5 0 5 10 15 20 25 30 35 40 45 50 OFFSET STA 1+75.00 55 60 65 70 75 8115 8110 8105 8100 8095 8090 55 60 65 70 75 8115 Moli>QIW 8115 8115 8110 8110 z 8105 8105 Q 8100 J 8100 w 8095 8095 8090 8090 —50-45 —50 —45 —40 —35 —30 —25 —20 —15 —10 —5 0 5 10 15 20 25 30 35 40 45 50 55 60 8115 8110 z 8105 o 8100 w — w 8095 8090 8085 STA 2 +25.00 —50 —45 —40 —35 —30 —25 —20 —15 —10 —5 0 5 10 15 20 25 30 35 40 45 50 8115 1 1 1 I I I I I I I I I I I I I I I I I 8115 5 10 15 20 25 30 35 40 45 50 55 60 OFFSET 55 60 65 70 75 PLANNING AND ENVIRONMENTAL COMMISSION December 13, 2010 1:OOPM TOWN *OFi TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT Luke Cartin Micheal Kurz Bill Pierce Henry Pratt John Rediker Tyler Schneidman David Viele arrived at 1:03 Holiday Lunch Site Visits: 1. Ritz - Carlton Residences, 728 West Lionshead Circle 12:30pm 45 minutes A request for a recommendation to the Vail Town Council, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, for a prescribed regulations amendment to Section 12 -16 -7, Use Specific Criteria and Standards, Vail Town Code, to develop criteria to allow for beauty and barber shops with exterior frontage on a public way, street, walkway, or mall area, and a request for the review of a conditional use permit, pursuant to Section 12 -7H -3, Permitted And Conditional Uses; First Floor Or Street Level, Vail Town Code, for a beauty and barber shops, located at 728 West Lionshead Circle /Lot 2, West Day Subdivision, and setting forth details in regard thereto. (PEC100051, PEC100053) Applicant: RCR Vail, LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell Prescribed Regulations Amendment ACTION: Recommendation of approval MOTION: Viele SECOND: Kurz VOTE: 7 -0 -0 Conditional Use Permit ACTION: Approved with a condition MOTION: Viele SECOND: Kurz VOTE: 7 -0 -0 CONDITION(S): This conditional use permit approval is contingent upon the adoption of the prescribed regulations amendments modifying the conditional use permit use specific criteria for beauty and barber shops through the adoption of an ordinance by the Vail Town Council. Warren Campbell presented an overview of the staff memorandum. He requested that two separate motions and votes be made for each application. Commissioner Viele inquired as to the impacts to Lionshead created by the proposed amendments. Warren Campbell explained that staff believed the intent of the 1981 regulations adopted for beauty and barber shops was maintained through the identification of the Lionshead MEMBERS ABSENT Page 1 Redevelopment Master Plan exhibit identifying the primary and secondary malls within Lionshead. He added that the proposed prescribed regulations amendments still resulted in a beauty and barber shops being a conditional use through out all of the Lionshead Mixed Use 1 and 2 zone districts. Commissioner Cartin stated for the record that he was employed by Vail Resorts, however he did not stand to gain financially form this application and was able to remain unbiased. Dominic Mauriello stated that the applicant agreed with staffs recommendation and had a presentation if necessary. He made himself available for questions. Commissioner Rediker stated that he had done some research in the Colorado Revised Statues regarding the definitions for beauty shops /salons and barber shops. The CRS identifies them as very distinct land uses. He highlighted that todays beauty shops tend to have significant retail components with distinguished them from barber shops. He suggested that there should maybe be two distinct defined land uses verse the combined current definition. Additionally he was concerned about the referenced map in the Lionshead Redevelopment Master Plan clearly identifying the primary and secondary malls. He concluded by stating that he did have questions regarding the future changes on West Lionshead Circle when /if Ever Vail was constructed and operational. Warren Campbell responded that the zone districts in the Town Code identified the land use as beauty and barber shops in conjunction when listed. Mr. Campbell stated that he understood the differences between the land uses, however, there has been no instance, to the best of his knowledge, where a potential business or property owner has tried to debate the existing Code definition for a beauty and barber shop. Staff believes the definition has served the community to date, and revising the definition to separate the two or expand upon could easily be done. Dominic Mauriello reminded the Commission that what was being proposed was an amendment to allow a business or property owner to to apply for a conditional use permit verse not be allowed to apply based on the existing provision. The proposed language would still give the Commission the ability to determine if a specific space was appropriate for a beauty or barber shop. Commissioner Kurz suggested that the proposed regulation amendments were appropriate as it allowed a business or property owner to ask the Commission if a particular location was appropriate for a beauty and barber shop. He would like to avoid restricting the ability to ask the question of appropriateness for the land use. He further add, that the current beauty and barber shop industry and business plan varies so greatly that he never knows what he will find when he goes to get his hair cut. Some business have no retail and others have clothes, cosmetics, and other beauty supplies. Commissioner Schneidman inquired as to how Salon Axis was previously located in the Marriott which is in the adjacent structure. Allison Kent, representing the applicant, stated that the salon existed prior to the rezoning of the Marriott to Lionshead Mixed Use 1, which resulted in it being allowed to continue as a legal non- conforming use. Commissioner Rediker suggested that the definition should be broadened and the two land uses separated since they are different. Page 2 Commissioner Kurz stated that the traditional main street barber shop is phasing out to new business models. He reiterated that he wished to see it beauty and barber shop proposal to be evaluated with regards to its merits through the conditional use process. Commissioner Viele made motions per the staff recommendations with the addition of a request for staff to revise the definitions of beauty and barber shops when appropriate in the future. 5 minutes 2. A request for a recommendation to the Vail Town Council, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, for a prescribed regulations amendment to create Chapter 12 -26, Exactions and Dedications, Vail Town Code, to allow for the creation of regulations for mitigation of development impacts, and setting forth details in regard thereto. (PEC100050) Applicant: Town of Vail Planner: George Ruther /Rachel Dimond ACTION: Tabled to January 10, 2011 MOTION: Kurz SECOND: Pratt VOTE: 7 -0 -0 5 minutes 3. A request for an amendment to an Approved Development Plan, pursuant to Section 12- 61 -11, Development Plan Required, Housing Zone District, Vail Town Code, to allow for revisions to the required landscape plan and geologic hazard mitigation plan for the redevelopment of the easternmost 5.24 acres of the Timber Ridge Village Apartments; and a request for the review of a variance, from Section 14 -5 -1, Minimum Standards, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for a crossover drive aisle width of less than thirty -feet (30') within the required parking structure, located at 1280 North Frontage Road /Lots 1 -5, Block C, Lions Ridge Subdivision Filing 1,and setting forth details in regard thereto. (PEC100018 /PEC100019) Applicant: Vail Timber Ridge L.L.C. Planner: George Ruther ACTION: Tabled to January 24, 2011 MOTION: Kurz SECOND: Pratt VOTE: 7 -0 -0 4. Approval of November 22, 2010 minutes MOTION: Kurz SECOND: Viele VOTE: 7 -0 -0 5. Information Update Commissioner Pratt inquired about the a -frame sign in front of Solaris advertising parking and pricing. Warren Campbell explained the previous outcomes of the December 7, 2010, Town Council hearing where staff was instructed to draft an emergency ordinance for review on the 21 st allowing for a 60 day time period for signs similar to the one displayed at Solaris. During this 60 day period staff would be bringing proposed amendments to Title 11, Sign Regulations, Vail Town Code. The Commission will see these amendments on January 10, 2010, public hearing. 6. Adjournment MOTION: Kurz SECOND: Viele VOTE: 7 -0 -0 Page 3 The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department Published December 10, 2010 in the Vail Daily. Page 4 TOWN OF VAIL' MEMBERS PRESENT Luke Cartin Michael Kurz Bill Pierce Henry Pratt John Rediker Tyler Schneidman David Viele PLANNING AND ENVIRONMENTAL COMMISSION January 10, 2011 at 1:00pm TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS ABSENT Site Visits: 1. Lapin Residence — 212 and 232 West Meadow Drive 30 minutes A request for the review of a final plat, pursuant to Section 13 -12 -3, Plat Procedures and Criteria for Review, Vail Town Code, to allow for the resubdivision of Lots 6 and 7, Vail Village Filing 2, located at 212 and 232 West Meadow Drive, and setting details in regards thereto. (PEC100054) Applicant: Mery Lapin, represented by Hans Berglund, Berglund Architects Planner: Rachel Dimond ACTION: Approved with conditions MOTION: Kurz SECOND: Viele VOTE: 7 -0 -0 CONDITIONS: 1. Prior to recording the subject final plat for Lot 6 and Lot 7, Vail Village Filing 2, the applicant shall either relocate the existing Lot 6 driveway entirely within the new Lot 6 property boundaries or the applicant shall grant Lot 6 an access easement across Lot 7 for the existing Lot 6 driveway. Should the applicant choose to relocate the existing Lot 6 driveway, the applicant must obtain Town of Vail design review approval prior to construction. 2. Prior to recording the subject final plat for Lot 6 and Lot 7, Vail Village Filing 2, the applicant shall remove all existing Lot 7 deck encroachments from the Gore Creek stream setback area and the adjacent Town of Vail owned Gore Creek stream tract. Rachel Dimond made a presentation per the Staff memorandum. Commissioner Cartin inquired about the legal issues previously discussed with the PEC and overturned by the Town Council. He asked Staff to provide additional information on what happened. Commissioner Kurz stated that the proposal fits in with the character of the neighborhood. Commissioner Rediker asked about the drainage easement and stream tract encroachments. Rachel Dimond responded that the 5 -foot drainage easement would parallel the property line and be paired with a 5 -foot easement on the adjacent property to provide a 10 -foot drainage easement. The easement could contain a surface swale, subterranean pipes, and water quality measures such as oil and sand separators. Page 1 30 minutes 2. A request for a recommendation to the Vail Town Council for a major amendment to Special Development District No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village, and for a zone district boundary amendment, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, to include the subject property in the Lionshead Mixed Use 2 District, located at 1000 S. Frontage Road West/Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto. (PEC090036) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to January 24, 2011 MOTION: Kurz SECOND: Rediker VOTE: 5 -0 -0 Commissioners Kurz and Rediker stated that they were concerned about making a final determination or recommendation for such a complex project without adequate time for review. Commissioner Cartin recused himself as his employer was the applicant and Commissioner Viele recused himself as he had a financial interest in the Glen Lyon Office Building which is to be a part of the project if approved. This applied to agenda items 2, 3, and 4. Warren Campbell requested that the Chairman read into the record the descriptions for items 3 and 4 on the agenda as the three Ever Vail applications to be heard and the Staff presentation would cover all three as they are interconnected with regard to their review. George Ruther made a brief presentation on the process for the review of the Ever Vail project. Warren Campbell made a presentation per the Staff memorandum. He requested that the Commission table the SDD amendment as a need to notify additional individuals was necessary. The Commission tabled this item. 30 minutes 3. A request for a recommendation to the Vail Town Council for a zone district boundary amendment, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, to allow for a rezoning of properties from Arterial Business District to Lionshead Mixed Use 2 District, located at 953 (Vail Professional Building) and 1031 (Cascade Crossing) South Frontage Road West / Unplatted and a zoning of portions of South Frontage Road West street right -of -way to Lionshead Mixed Use 2 District, located at South Frontage Road West right -of -way (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080061) Applicant: Ever Vail LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Recommendation of approval with conditions MOTION: Kurz SECOND: Pratt VOTE: 5-0-0 CONDITIONS: 1. Approval of this zone district boundary amendment is contingent upon the applicant obtaining Town of Vail approval of the associated major amendment to a special development district to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Development District No. 4, Cascade Village. 2. Approval of this zone district boundary amendment shall only become effective upon recording of the associated Ever Vail Subdivision Final Plat as approved by the Planning and Environmental Commission and the Vail Town Council in accordance with Title 13, Subdivision Regulations, Vail Town Code." Page 2 Tom Miller, representing Vail Resorts Development Company, introduced the project team. Dominic Mauriello presented a recap of the review that has taken place thus far and the process moving forward. He then went into detail regarding the preliminary plan, rezoning, and the SDD amendment. Specifically, he went over changes to the project since the last presentation. Jim Lamont, Vail Homeowners Association, asked about locations for skier drop off. Dominic Mauriello responded by showing skier drop off in the transit center on site. There are 4 bus bays and 13 skier drop off spaces. He added that there was a DEVO drop off 50 plus short term spaces in the west phase of the project. On a non - Saturday, there will be an abundance of skier drop off. Commissioner Pratt asked if a recommendation could be made if the SDD amendment were to be tabled. Warren Campbell responded yes. 30 minutes 4. A request for a review of a preliminary plan for a major subdivision, pursuant to Chapter 13 -3, Major Subdivision, Vail Town Code, to allow for the creation of two lots for the redevelopment of the properties known as Ever Vail (West Lionshead), located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West rig ht-of-way/U n platted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080062) Applicant: Ever Vail LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Recommendation of approval with conditions MOTION: Kurz SECOND: Schneidman VOTE: 5 -0 -0 CONDITIONS: 1. The applicant shall be required to enter into a subdivider's agreement with the Town of Vail, which shall detail all elements negotiated between the applicant and the Town prior to the approval of the preliminary plan by the Town Council. 2. This approval for a preliminary plan is contingent upon approval of the associated special development district major amendment application and the adoption of the proposed Lionshead Mixed Use 2 District zoning for the property. 3. The applicant shall submit the final plat for review and approval by January 10, 2012, per Section 13 -3 -6, Final Plat, Vail Town Code." 30 minutes 5. A request for a recommendation to the Vail Town Council for a prescribed regulation amendment, pursuant to Section 14 -1 -3, Administration of Standards, Vail Town Code, to amend Section 14- 10 -5H, Building Materials and Design, Vail Town Code, to amend regulations for solar panels, and setting forth details in regard thereto. (PEC100055) Applicant: Town of Vail Planner: Rachel Dimond ACTION: Recommendation of approval with conditions MOTION: Kurz SECOND: Viele VOTE: 6 -1 -0 (Cartin opposed) CONDITIONS: 1. Staff shall provide in the ordinance presented to Town Council, additional language addressing maintenance and continued operation. Page 3 2. Staff shall provide in the ordinance presented to Town Council, additional language containing an intent section detailing the goals and objectives of the regulations to minimize visual impacts. 3. Staff shall provide in the ordinance presented to Town Council, additional language addressing the calculation of site coverage for ground mounted panels. 4. Staff shall amend in the ordinance presented to Town Council, a revised definition of solar energy devices which matches the State's definition. 5. Staff shall amend the in the ordinance presented to Town Council, the language to substitute "up to 50" for "40 to 50." Rachel Dimond made a presentation per the Staff memorandum Commissioner Kurz voiced his concern about maintenance. He wants to make sure panels are not aesthetically objectionable and maintained over time. Commissioner Cartin stated that the proposed regulation may be in violation of State law. He also stated the proposed regulations do not address new technologies in solar collection. Rachel Dimond responded that legal counsel believes the Town regulations are not in violation of State law. Commissioner Pratt asked if homeowners have to follow any regulations based on State law. Rachel Dimond responded that homeowners must follow Town regulations. George Ruther briefly touched upon the process and the background of the proposed regulations. Commissioner Rediker asked if any aesthetic requirements would violate State law. Commissioner Kurz stated that the PEC needs to decide whether to move forward to the Town Council to let them decide on compliance with State law. Rediker stated the proposed regulations should say "up to 50" instead of "40 -50." Commissioner Pierce stated that we are trying to adapt to new technologies and the ne4ed for solar panels. Commissioner Rediker asked whether the definition of solar panels matches the State's definition. He suggested Staff expand the definition to include future technologies and includes appurtenant equipment. He suggested more clarity on how to calculate site coverage. Commissioner Pierce asked whether is it better to put panels on the ground for reduction to visual impacts. Commissioner Pratt suggested a statement of intent be added that includes reducing visual impact. Commissioner Cartin added that he is concerned about the stringent regulations and their lack of ability to adjust to new technologies. Commissioner Viele asked if the debate on State law should occur at PEC or Town Council. 45 minutes Page 4 6. A request for a recommendation to the Vail Town Council, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, for a prescribed regulations amendment to create Chapter 12 -26, Exactions and Dedications, Vail Town Code, to allow for the creation of regulations for mitigation of development impacts, and setting forth details in regard thereto. (PEC100050) Applicant: Town of Vail Planner: George Ruther/ Rachel Dimond ACTION: Tabled to February 14, 2011 MOTION: Pratt SECOND: Viele VOTE: 7-0-0 George Ruther made a presentation per the Staff memorandum. Commissioner Kurz asked what the process is for appealing a required exaction or mitigation? George Ruther responded that the appeals process would be PEC, Town Council and then Civil Court. Commissioner Viele asked what authority Staff has to apply for amendments to the adopted regulations. George Ruther clarified that the Town Council, PEC, members of the public or Staff can apply for regulations amendments. Commissioner Pratt suggested that mitigation only be required when projects exceed that which is permitted under the current zoning. George Ruther responded that studies show that development which comply with zoning still have impacts to facilities and services that needs to be financially addressed. Commissioner Kurz voiced concern over the open ended nature of "infrastructure facilities and services." He suggested listing types of impacts and mitigation requirements. He further inquired as to who pays for studies to determine impacts. George Ruther responded that applicants would pay for the studies. He added that the ordinance is trying to address the economic sustainability of the Town. Commissioner Viele suggested that this type of ordinance should go to voters, as it seems like a tax. George Ruther responded that this is not a tax and does not have to go to voters. Commissioner Viele stated that the timing for this ordinance is misplaced givent he county's economic situation and there needs to be regulations on eliminating the negotiations process. Commissioner Kurz stated his concern about the loss of the negotiation process which to his knowledge has worked well thus far. Commissioner Pratt asked if this ordinance would apply to Ever Vail. George Ruther responded that he did not believe it would apply to any applications that have already been submitted. Legal counsel would need to answer this question. Commissioner Pierce suggested there needs to be a distinction between upzoning, SDD deviations and projects that comply with existing zoning. Page 5 Commissioner Pratt stated that allowable zoning should reflect impacts that the Town could absorb, not require the applicant to pay for. George Ruther responded that when West Vail was rezoned in the 1970's and 80's, that the Town would have had to build 5 lane roads and other supporting infrastructure instead of improving infrastructure as needed over time. Commissioner Viele stated that the tax base should pay for changes to infrastructure. Commissioner Pierce stated that the exactions should be more predictable. 5 minutes 7. A request for a recommendation to the Vail Town Council for a prescribed regulation amendment, pursuant to Section 11 -3 -3, Prescribed Regulations Amendment, Vail Town Code, to amend Section 11 -7 -15, Public Parking and Loading Signs for Private Property, to allow signs for public parking on private property, and setting forth details in regard thereto. (PEC100056) Applicant: Solaris Property Owner, represented by Michael Suman Planner: Bill Gibson ACTION: Tabled to January 24, 2010 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 5 minutes 8. A request for final review of conditional use permits, pursuant to Section 12 -71 -5, Conditional Uses: Generally (On All Levels Of A Building Or Outside Of A Building), Vail Town Code, to allow for the development of a public or private parking lot (parking structure); a vehicle maintenance, service, repair, storage, and fueling facility; a ski lift and tow (gondola), within "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West rig ht-of-way/U n platted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080063) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to January 24, 2010 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 5 minutes 9. A request for a final review of a variance from 12- 71 -14, Site Coverage, Vail Town Code, pursuant to Chapter 12 -17, Variances, to allow for additional site coverage below grade, within "Ever Vail" (West Lionshead), located at 934 (BP Site), 953 (Vail Professional Building), 1031 (Cascade Crossing) S. Frontage Road / Unplatted; 862 (VR Maintenance Shop) and 923 (Holy Cross Lot) S. Frontage Road / Tracts A and B, S. Frontage Road Subdivision; 1000 (Glen Lyon Office Building) S. Frontage Road / Lot 54, Glen Lyon Subdivision (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC090035) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to January 24, 2010 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 5 minutes 10. A request for a work session on a major exterior alteration, pursuant to Section 12 -71 -7, Exterior Alterations or Modifications, Vail Town Code, to allow for the redevelopment of the area known as "Ever Vail" (West Lionshead), with multiple mixed -use structures including but not limited to, multiple - family dwelling units, fractional fee units, accommodation units, employee housing units, office, and commercial /retail uses, located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West rig ht-of-way/U n platted (a complete legal Page 6 description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080064) Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Warren Campbell ACTION: Tabled to January 24, 2010 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 5 minutes 11. A request for a final recommendation to the Vail Town Council for prescribed regulations amendments to Title 12, Zoning Regulations and Title 14, Development Standards, Vail Town Code, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, to provide regulations that will implement sustainable building and planning standards, and setting forth details in regard thereto. (PEC090028) Applicant: Town of Vail Planner: Rachel Friede ACTION: Tabled to February 14, 2011 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 5 minutes 12. A request for review of a variance, pursuant to Chapter 14 -1 -5, Variances, Vail Town Code, from Section 14 -10 -5, Building Materials and Design, Vail Town Code, to allow for the installation of solar panels within two feet of a roof ridge and eave and extending higher than the ridgeline, located at 4918 Meadow Drive, Unit A/Lot 16, Block 7, Bighorn Subdivision Fifth Addition, and setting forth details in regard thereto. (PEC100046) Applicant: Laurent Meillon Planner: Rachel Dimond ACTION: Tabled to January 24, 2011 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 13. Approval of December 15, 2010 minutes ACTION: Tabled to January 24, 2011 MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 14. Information Update 15. Adjournment MOTION: Kurz SECOND: Pratt VOTE: 7-0-0 The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department Published January 7, 2011, in the Vail Daily. Page 7 Ad Name: 6079741 D Customer: TOWN OF VAIL /PLAN DEPT /COMM Your account number is: 1023233 PROOF OF PUBLICATION STATE OF COLORADO } }SS. COUNTY OF EAGLE } I, Don Rogers, do solemnly swear that I am a qualified representative ofthe Vail Daily. That the same Daily newspaper printed, in whole or in part and published in the County of Eagle, State of Colorado, and has a general circulation therein; that said newspaper has been published continuously and uninterruptedly in said County of Eagle for a period of more than fifty -two consecutive weeks next prior to the first publication of the annexed legal notice or advertisement and that said newspaper has published the requested legal notice and advertisement as requested. The Vail Daily is an accepted legal advertising medium, only for jurisdictions operating under Colorado's Home Rule provision. That the annexed legal notice or advertisement was published in the regular and entire issue of every number of said daily newspaper for the period of 1 consecutive insertions; and that the first publication of said notice was in the issue of said newspaper dated 1/21/2011 and that the last publication of said notice was dated 1/21/2011 in the issue of said newspaper. In witness whereof, I have here unto set my hand this day, 01/21/2011 General Man ager/Publisher/Editor Vail Daily Subscribed and sworn to before me, a notary public in and for the County of Eagle, State of Colorado this day 01/21/2011 It - Pamela J. Schultz, Notary Public My Commission expires: November 1, 2011 PAMELA J SCMXTZ "ry Pub k State of Colorado PLANNING AND ENVIRONMENTAL COMMISSON January 24, 2011 1:00pm TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 SITE VISITS 1.Arosa Partners Residence & Bob Armour Residence - 2610 & 2688 Arosa Dnve 20 minutes 1.A request for the review of a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Procedures, Vail Town Code, to allow for the re- subdivision of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Dnve, and setting details in regards thereto. (PEC110001) Applicant: Arosa Partners & Bob Armour, represented by KH Webb Architects Planner: Bill Gibson 30 minutes 2.A request for a recommendation to the Vail Town Council for a major amendment to Special Develop- ment District No. 4, Cascade Village, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for the removal of Development Area D (Glen Lyon Office Building) from Special Develop- ment District No. 4, Cascade Village, and for a zone distract boundary amendment, pursuant to Section 12 -3 -7, Amendment, Vail Town Code, to include the subject property in the Lionshead Mixed Use 2 Dis- tract, located at 1000 S. Frontage Road West /Lot 54, Glen Lyon Subdivision, and setting forth details in regard thereto. (PEC090036) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group, LLC Planner: Warren Campbell 60 minutes 3.A request for a recommendation to the Vail Town Council for an amendment to the Lionshead Redevel- opment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever Vail) and setting forth details in regard thereto. (PEC110002) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell 20 minutes 4.A request for a review of a flood plain modification permit, pursuant to Section 12- 21 -11, Flood Hazard Zones, Vail Town Code, to allow for the modification of the flood plain associated with Red Sandstone Creek, generally located at 862, 923, 934, 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of -way/ Lot 54, Glen Lyon Subdivision and Unplatted parcels (a complete legal description is available for inspection at the Town of Vail Community Development Department), and set- ting forth details in regard thereto. (PEC11 -0003) Applicant: Ever Vail, LLC, represented by the Mauriello Planning Group Planner: Warren Campbell 5 m inutes 5.A request for a recommendation to the Vail Town Council for a prescribed regulation amendmet, pur- suant to Section 11 -3 -3, Prescribed Regulations Amendment, Vail Town Code, to amend Section 11 -7 -15, Public Parking and Loading Signs for Pnvate Property, to allow signs for public parking on private proper- ty, and setting forth details in regard thereto. (PE 100056) Applicant: Solans Property Owner, represented by Michael Suman Planner: Bill Gibson ACTION: Table to February 14, 2011 5 minutes 6.A request for final review of conditional use permits, pursuant to Section 12 -71 -5, Conditional Uses: Generally (On All Levels Of A Building Or Outside Of A Building), Vail Town Code, to allow for the development of a public or private parking lot (parking structure); a vehicle maintenance, service, repair, storage, and fueling facility; a ski lift and tow (gondola), within "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West right -of- way /Unplatted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080063) Applicant: Vail Resorts, represented by Maunello Planning Group, LLC Planner: Warren Campbell ACTION: Table to February 28, 2011 5 minutes 7.A request for a work session on a major exterior alteration, pursuant to Section 12 -71 -7, Exterior Alterations or Modifications, Vail Town Code, to allow for the redevelopment of the area known as "Ever Vail" (West Lionshead), with multiple mixed -use structures including but not limited to, multiple - family dwelling units, fractional fee units, accommodation units, employee housing units, office, and commercial /retail uses, located at 862, 923, 934, 953, and 1031 South Frontage Road West, and the South Frontage Road West right -of- way /Unplatted (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC080064) Applicant: Vail Resorts, represented by Maunello Planning Group, LLC Planner: Warren Campbell ACTION: Table to February 28, 2011 5 minutes 8.A request for review of a variance, pursuant to Chapter 14 -1 -5, Varances, Vail Town Code, from Sec- tion 14 -10 -5, Building Matenals and Design, Vail Town Code, to allow for the installation of solar panels within two feet of a roof ridge and save and extending higher than the ridgeline, located at 4918 Meadow Drive, Unit A /Lot 16, Block 7, Bighorn Subdivision Fifth Addition, and setting forth details in regard thereto. (PEC100046) Applicant: Laurent Meillon Planner: Rachel Dimond ACTION: Table to February 14, 2011 5 minutes 9.A request for an amendment to an Approved Development Plan, pursuant to Section 12- 61 -11, Development Plan Required, Housing Zone Distnct, Vail Town Code, to allow for revisions to the required landscape plan and geologic hazard mitigation plan for the redevelopment of the easternmost 5.24 acres of the Timber Ridge Village Apartments; and a request for the review of a variance, from Section 14 -5 -1, Minimum Standards, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, pursuant to Chapter 12 -17, Varances, Vail Town Code, to allow for a crossover drive aisle width of less than thirty -feet (30i) within the required parking structure, located at 1280 North Frontage Road /Lots 1 -5, Block C, Lions Ridge Subdivision Filing 1,and setting forth details in regard thereto. (PEC100018 /P EC100019) Applicant: Vail Timber Ridge L.L.C. Planner: George Ruther ACTION: Table to February 28, 2011 5 minutes 10.A request for a final review of a variance from 12- 71 -14, Site Coverage, Vail Town Code, pursuant to Chapter 12 -17, Variances, to allow for additional site coverage below grade, within "Ever Vail "(West Li 0nshead), located at 934 (BP Site), 953 (Vail Professional Building), 1031 (Cascade Crossing) S. Frontage Road / Unplatted; 862 (VR Maintenance Shop) and 923 (Holy Cross Lot) S. Frontage Road / Tracts A and B, S. Frontage Road Subdivision; 1000 (Glen Lyon Office Building) S. Frontage Road / Lot 54, Glen Lyon Subdivision (a complete legal description is available for inspection at the Town of Vail Community Development Department), and setting forth details in regard thereto. (PEC090035) Applicant: Vail Resorts, represented by Maunello Planning Group, LLC Planner: Warren Campbell ACTION: Withdrawn 11.Approval of December 13, 2010 and January 10, 2011 minutes 12.Infomiation Update 13.Adjoumment The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Heanng Impaired, for information. Community Development Department Published January 21, 2011, in the Vail Daily. (6079741) Ad Name: 6032901 A THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE Customer: TOWN OF VAIL /PLAN DEPT /COMM NOTICE IS HEREBY GIVEN that the Planning and Your account number is: 1023233 Environmental Commission of the Town of Vail will hold a public hearing in accordance with section 12 -3 -6, Vail Town Code, on January 24, 2011, at 1:00 pm in the Town of Vail Municipal Building, in PROOF OF PUBLICATION consideration of: A request for a recommendation to the Vail Town Council for an amendment to the Lionshead Rede- STATE OF COLORADO } velopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the Master Plan, Li- cccc I SS. onshead Redevelopment Master Plan, to amend the recommendations for West Lionshead (Ever COUNTY OF EAGLE } Vail) and setting forth details in regard thereto. (PEC110002) Applicant: Ever Vail, LLC, represented by the Mau - riello Planning Group Planner: Warren Campbell I, Don Rogers, do solemnly swear that I am a qualified A request for a review of a flood plain modification representative ofthe Vail Daily. That the same Daily newspaper permit, pursuant to Section 12- 21 -11, Flood Haz- and Zones, Vail Town Code, to allow for the modifi- printed, in whole or in part and published in the County cation of the flood plain associated with Red Sand - stone Creek, generally located at 862, 923, 934, of Eagle, State of Colorado, and has a general circulation 953, 1000 and 1031 South Frontage Road West, and the South Frontage Road West right -of -way/ therein; that said newspaper has been published continuously Lot 54, Glen Lyon Subdivision and Unplatted par - cels (a complete legal description is available for and uninterrup in said Coun of Eagle fora p eriod of 1� y �J g 1� inspection at the Town of Vail Community Devel- opment Department), and setting forth details in thereto. more than fifty -two consecutive weeks next prior to the first regard (PEC11 -0003) Applicant: Ever Vail, LLC, represented by the Mau - riello Planning Group publication of the annexed legal notice or advertisement and Planner: Warren Campbell that said newspaper has published the requested legal notice A request for the review of a final plat, pursuant to Chapter 13 -12, Exemption Plat Review Proce- and advertisement as req uested. �l dures, Vail Town Code, to allow for the re- subdivi- sion of Lots 3 and 5, Block D, Vail Ridge, located at 2610 and 2688 Arosa Drive, and setting details in regards thereto. (PEC110001) Applicant: Arosa Partners & Bob Armour, repre- The Vail Daily is an accepted legal advertising medium, sented by KH Webb Architects Planner: Bill Gibson only for jurisdictions operating under Colorado's Home The applications and information about the propos- Rule provision als are available for public inspection during office hours at the Town of Vail Community Develop- ment Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the That the annexed legal notice or advertisement was g Town of Vail Community Development Department. Please call 970 - 479 -2138 for additional informa- published in the regular and entire issue of every ti on. number of said daily newspaper for the period of 1 Sign language interpretation is available upon re- quest, with 24 -hour notification. Please call consecutive insertions; and that the first publication of said 970 - 479 -2356, Telephone for the Hearing Im- paired, for information. notice was in the issue of said newspaper dated 1/7/2011 and Published January 7, 2011 in the Vail Daily. (6032901) that the last publication of said notice was dated 1/7/2011 in the issue of said newspaper. In witness whereof, I have here unto set my hand this day, 01/07/2011 General Man ager/Publisher/Editor Vail Daily Subscribed and sworn to before me, a notary public in and for the County of Eagle, State of Colorado this day 01/07/2011 It - Pamela J. Schultz, Notary Public My Commission expires: November 1, 2011 PAMELA J SCMXTZ "ry Pub k State of Colorado