HomeMy WebLinkAbout2013-0923 PECTOWN OF VAft� PLANNING AND ENVIRONMENTAL COMMISSION September 23, 2013 at 1:00pm TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT MEMBERS ABSENT 60 minutes 1. Gore Creek Water Quality Update — Kristen Bertuglia 45 minutes 2. A request for a recommendation to the Vail Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC130021) Applicant: AMPH, LLC, represented by Mauriello Planning Group Planner: Warren Campbell ACTION: MOTION: SECOND: VOTE: CONDITION(S): 3. A request for a recommendation to the Vail Town Council on the adoption of the 2013 Gerald R. Ford Park Master Plan, an assemblage of the 1985 Ford Park Master Plan, the 1997 Ford Park Management Plan, and the 2012 Ford Park Management Plan Amendment, located at 530, 540, and 580 South Frontage Road East /Unplatted, and setting forth details in regard thereto. (PEC130012) Applicant: Town of Vail Planner: George Ruther ACTION: Table to October 14, 2013 MOTION: SECOND: VOTE: 4. A request for the review of a variance from Section 12- 14 -17, Setback from Watercourse, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for the construction of gross residential floor area within the prescribed setback, located at 1975 Placid Drive Unit 33 /1-ot 33, Vail Village West Filing 2, and setting forth details in regard thereto (PEC130025). Applicant: Rosslyn May Valentine Residence Trust, represented by Richard Bolduc Planner: Joe Batcheller ACTION: Table to October 14, 2013 MOTION: SECOND: VOTE: 5. Approval of September 9, 2012 minutes MOTION: SECOND: VOTE: 6. Information Update 7. Adjournment MOTION: SECOND: VOTE: Page 1 The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Times and order of items are approximate, subject to change, and cannot be relied upon to determine at what time the Planning and Environmental Commission will consider an item. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department Published September 20, 2013 in the Vail Daily. Page 2 TOWN OF VAIL:1 PLANNING AND ENVIRONMENTAL COMMISSION September 23, 2013 at 1:00pm TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT Bill Pierce Henry Pratt Pam Hopkins Susan Bird John Rediker Michael Kurz MEMBERS ABSENT Luke Cartin 60 minutes 1. Gore Creek Water Quality Update — Kristen Bertuglia and Seth Mason Kristen Bertuglia introduced the presentation and Seth Mason Seth Mason, Eagle River Watershed Council gave a power point presentation discussing the findings of the watershed study. Commissioner Kurz inquired as to the elements included in the calculation of impervious area. Seth Mason stated that all hard surfaces were included based upon aerial photography. Commissioner Pierce asked how the boundaries of the impervious area study were determined. Seth Mason explained that while it is understood that most water enters the Gore Creek drainage the study of imperious area was focused on the valley floor and the areas adjacent to the Gore Creek and its tributaries. Commissioner Rediker asked when the threshold standards were development to measure macro - invertebrate life in the creek. Seth Mason spoke to the standards being developed on 2012. Commissioner Kurz inquired if there was data which show which storm water discharges are more problematic and therefore could be addressed. Seth Mason stated that the study didn't study each storm water drainage during multiple rain events. Storm water drains did not turn out to be the smoking gun, but it is likely a contributor to the negative effects in the creek health. Commissioner Kurz spoke to the fact that the Gore Creek in East Vail is steeper and drains faster than the creek as it enters Vail Village. Was it considered that the speed of the water was washing the bugs out? Seth Mason spoke to the research and conversations with experts that resulted in the speed of the water not being considered as a cause for the "scouring" of the bugs from the areas which showed negative impacts. Page 1 Commissioner Pratt asked what the potential source was for the calcium in the water samples and was it a problem. Seth Mason stated he did not know the source (possibly geologic weathering) and that it affected pH by acting as a buffer and generally was not an indicator of poor stream health. Commissioner Kurz asked if anything was occurring in the industry that was looking a bioengineering macro - invertebrates that can withstand certain impacts. Seth Mason stated that he was not aware of any efforts to create more tolerate macro - invertebrates. He mentioned that bug stocking had been discussed. Commissioner Pratt spoke to the water chemistry analysis showed high levels of magnesium and chloride. Seth Mason explained the water chemistry analysis and how magnesium and chloride (used for winter road maintenance) was not identifiable as a smoking gun, but is a contributor. He spoke to the switch from sand to magnesium chloride solutions and the catch 22 that has been created to ensure safe roads and address runoff of materials. Commissioner Pierce inquired as to the meaning of Low Impact Development Seth Mason spoke to the use of bio- swales, pervious surfaces, etc. Commissioner Pierce inquired as to the town's current regulations regarding storm water run -off such as parking lots. Kristen Bertuglia, Warren Campbell, and Greg Hall spoke to the town's regulations. For larger scale commercial and multi - family there are sand and oil separators required. For smaller scale residential projects there are no storm water quality requirements. Storm water quality controls during construction is in place for commercial, multi - family, and residential development. Commissioner Bird spoke to the use of spray on trees and the effects on the creek and the buffer back from the creek. Kristen Bertuglia spoke to the towns methods for apply sprays. Commissioner Pierce asked if there was chemistry analysis which looked specifically are herbicide and pesticide components. Seth Mason spoke to the effort that was currently underway begin in the last year. He spoke to the lack of state standards for those types of elements. Commissioner Pierce stated that the town owns multiple stream tracts and other properties adjacent to the creek and what is the quality of the riparian areas. Kristen Bertuglia spoke to the efforts regarding the removal of private construction on town owned property. Commissioner Pierce spoke specifically to the golf course and the frontage road running parallel and the possibility to practice what we preach. Commissioner Kurz inquired as to the status of the encroachment enforcement. Page 2 Kristen Bertuglia explained that three had been to court and received deferred judgments, others had been submitted to receive summonses, and a plan was taking shape to remove the basketball court. Commissioner Hopkins inquired as to the status of the basketball court. Kristen Bertuglia stated the RFP had been issued and responses were due the following day. Commissioner Kurz asked if Mr. Mason felt that the efforts currently underway were satisfactorily addressing the water quality issue. Seth Mason mentioned the development and adoption of a plan would remove the creek from the 303d list. The partners included in the agreed upon plan would then need to move forward with steps to improve the creek health. Jim Lamont, Vail Homeowners Association, asked if the water testing was done seasonally or during a single season. Seth Mason explained the data collection. The USGS samples every other month. Town of Vail sampling occurs in the summer. Jim Lamont asked if a more systematic study of the storm water outfalls would result in being able to more closely determine the where the problem areas. Seth Mason stated that the result of a study like that may result in clearer outcomes. Jim Lamont asked if any group was charged with follow up studies. Seth Mason stated that there was no plan to continue with those types of studies. Jim Lamont stated that major town projects and investments should include provisions for storm water quality measures. Greg Hall, Public Works Director, spoke to efforts to make improvements. Jim Lamont asked what the amount of investment was in place for the Town of Vail and other organizations to address the water quality. Commissioner Pierce asked if there was a reason why the water coming in town was not impaired, became impaired, and then improved further down stream. Seth Mason explained that the belief that the water treatment plant was provide nutrients for the m acro -i nverteb rates. Commissioner Rediker asked if mapping of storm water outfalls had occurred. Kristen Bertuglia explained that many were mapped, but not the areas they drain. Commissioner Pierce asked if a detention pond would address the use of magnesium chloride or was something more needed. Seth Mason explained that a detention pond would not address that concern but could reduce the peak loads and spread it out over time. Page 3 45 minutes 2. A request for a recommendation to the Vail Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC130021) Applicant: AMPH, LLC, represented by Mauriello Planning Group Planner: Warren Campbell ACTION: Recommendation of approval with condition(s) MOTION: Kurz SECOND: Rediker VOTE: 5 -1 -0 Pratt opposed. CONDITION(S): 1. This SDD major amendment approval is contingent upon the applicant obtaining Town of Vail approval of the associated design review application. 2. The applicant shall mitigate the employee generation impact created by the addition of 839 square feet of GRFA in accordance with the provisions of Chapter 12 -24, Inclusionary Zoning, Vail Town Code. 3. The applicant shall receive and submit in conjunction with the building permit, all applicable Colorado Department of Transportation approvals for all impacts to the South Frontage Road East, including construction staging. 4. The applicant shall amend the recorded condominium map to reflect the increase in floor area and space designation, prior to requesting a planning certificate of occupancy inspection. 5. At the discretion of the Design Review Board, the roof form above the penthouse upper floor deck can be increased to be greater than an 18 inch eave overhang. Warren Campbell gave a presentation per the staff memorandum. He stated that there were several positive changes made to the proposal, but staff found that it did not comply with criterion 1 and therefore was recommending denial. Dominic Mauriello, representing the applicant, reviewed the history of the project for the benefit of the members not present previously. He showed photos indicating the importance of the project interior and exterior and the ill- suited existing conditions. He further highlighted the process the project had been through. He then discussed the changes that the project has incorporated to address the Commissioner's concerns. Commissioner Kurz stated that the changes that were made improved the proposal form the previous design and that he felt it meet the criteria. Commissioner Rediker had no addition comment Commissioner Bird agreed with Commissioner Kurz and felt the proposal complied with the criterion. Commissioner Pratt felt that all changes made since the last review were positive except the reduction of the roof overhang above the upper floor cantilevered deck. He stated that the upper floor deck would be more appropriate if it were integrated into a roof form. He added that the roof form above the upper floor deck should be greater than 18 inches. Page 4 Commissioner Hopkins requested clarification regarding the existing lower level patio that was inset into the roof. Dominic Mauriello showed the existing patio on the floor plans and explained how there was a roof form to the south of the space which would negatively effect light access to the lower floor if it were in- filled and made GRFA. 3. A request for a recommendation to the Vail Town Council on the adoption of the 2013 Gerald R. Ford Park Master Plan, an assemblage of the 1985 Ford Park Master Plan, the 1997 Ford Park Management Plan, and the 2012 Ford Park Management Plan Amendment, located at 530, 540, and 580 South Frontage Road East /Unplatted, and setting forth details in regard thereto. (PEC130012) Applicant: Town of Vail Planner: George Ruther ACTION: Table to October 14, 2013 MOTION: Kurz SECOND: Bird VOTE: 6 -0 -0 4. A request for the review of a variance from Section 12- 14 -17, Setback from Watercourse, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for the construction of gross residential floor area within the prescribed setback, located at 1975 Placid Drive Unit 33 /Lot 33, Vail Village West Filing 2, and setting forth details in regard thereto (PEC130025). Applicant: Rosslyn May Valentine Residence Trust, represented by Richard Bolduc Planner: Joe Batcheller ACTION: Table to October 14, 2013 MOTION: Kurz SECOND: Bird VOTE: 6 -0 -0 5. Approval of September 9, 2012 minutes ACTION: Approval MOTION: Kurz SECOND: Hopkins VOTE: 6 -0 -0 6. Information Update 7. Adjournment MOTION: Kurz SECOND: Rediker VOTE: 6 -0 -0 The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Times and order of items are approximate, subject to change, and cannot be relied upon to determine at what time the Planning and Environmental Commission will consider an item. Please call (970) 479 -2138 for additional information. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department Published September 20, 2013 in the Vail Daily. Page 5 TOWN OF VAI015 Memorandum To: Planning and Environmental Commission From: Community Development and Public Works Departments Date: September 23, 2013 Subject: Gore Creek Water Quality Improvement Plan Completion PURPOSE The purpose of this memorandum is to present to the Planning and Environmental Commission key findings from the Gore Creek Water Quality Improvement Plan (WQIP), and to discuss policy implications and preliminary action steps as a result of the Plan's recommendations. The final WQIP was completed by Leonard Rice Engineers on August 26, 2013, and may be downloaded at: httas: / /vail. sharefile .com /d/sd773b7f738745c28 II. BACKGROUND The Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division (WQCD) on December 6, 2012, added the portion of Gore Creek from Black Gore Creek to the Eagle River (Dowd Junction) to Colorado's Section 303(d) list of impaired waters for aquatic life use. The term "303(d) list" is short for the list of impaired and threatened waters (stream /river segments, lakes) that the Federal Clean Water Act requires all states to submit for EPA approval every two years. The states identify all waters where required pollution controls are not sufficient to attain or maintain applicable water quality standards. Standards are created for metals, nutrients, pollutants such as sediment, and aquatic life (bugs). Gore Creek is currently listed as "provisional ", which means that the cause of impairment is not known, and the stakeholders (the State, the Town, etc.) have ten years to determine the cause of impairment and begin to correct the problem. If a particular pollutant is found, the State of Colorado will require a "Total Maximum Daily Load" (TMDL) study to track progress on the status of the particular pollutant. The listing for "aquatic life use" is based on a new methodology for determining the health of a river using aquatic macro invertebrate (bugs) population characteristics. Bug scores are indicative of the long -term health of Gore Creek, where poor aquatic life may be a precursor to the decline of populations such as trout that depend on them. As part of the Environmental Sustainability Strategic Plan, adopted in 2009, the Vail Town Council identified protection of the natural environment, particularly Gore Creek, as a top priority for immediate and future efforts. Goal #3: Ensure that the natural environment, specifically air and water quality, land use and habitat are maintained to current or improved levels of biological health. Objective 1: Maintain Gore Creek watershed as a Gold Medal Fishery, while working to maintain tributaries. Meet and /or exceed aquatic life standards set by the state of Colorado through the management of urban stormwater. Focused on sustainability and the environment, the Town Council has reaffirmed its commitment over the past several years to continuous improvement of environmental practices by promoting ecosystem protection and a campaign for community awareness and education. Gore Creek Water Quality Improvement Plan In early 2011, Eagle River watershed stakeholders formed the Urban Runoff Group (URG) to address the problem of biological degradation occurring in streams and rivers within the urbanized areas of the Eagle River watershed. URG funding partners and stakeholders include the Town of Vail (TOV), the Eagle River Water & Sanitation District, Eagle County, Vail Resorts, Inc., the Colorado Department of Transportation, the Vail Recreation District, the Town of Avon (TOA), and the Eagle River Watershed Council. The threat of listing Gore Creek and other Eagle River watershed streams on the Clean Water Act's 303 (d) list for aquatic life use impairment called to action the focused effort to develop initiatives aimed at identifying the causes of the biological impacts, and management strategies to protect and improve existing water quality and biological conditions. The Gore Creek Water Quality Improvement Plan (WQIP) is the outcome of the URG's efforts. WQIP Purpose The Water Quality Improvement Plan (WQIP) was developed in order to guide the planning and implementation of measures to improve stream health as indicated by macroinvertebrate (bug) community metrics. The geographic scope of the WQIP includes Gore Creek from the area near the confluence of Black Gore Creek to the mouth of Gore Creek, with emphasis on development of water quality improvement measures for stream reaches through East Vail and Vail Village above Red Sandstone Creek. The Plan identifies measures and strategies to reduce point and nonpoint source pollution including, but not limited to, the following: • Urban drainage Best Management Practices (BMPs) • Stormwater system BMPs • Stream habitat and riparian area improvement and protection measures • Community educational programs and voluntary measures • Regulatory reform to encourage sustainable land use practices • Regulatory reform to establish use restrictions regarding pesticides, herbicides and landscape maintenance practices WQIP Key Findings Unfortunately, the extensive WQIP study did not find only one or two sources of pollutants which could be targeted and addressed to provide improvements to Gore Creek water quality. Using a combination of field observations, data compilation and analyses, Leonard Rice Engineers determined that the biological impairment of Gore Creek is caused by the cumulative impacts of multiple stressors in the following categories: 1) Riparian Buffer /Habitat Degradation • Loss of riparian habitat and buffer zones • Landscaping extends to the stream in many locations • Buildings, roads and other improvements within riparian zone • Eroding stream banks due to loss of natural soil binding vegetation • Natural stream banks replaced by riprap walls and slopes • Stream channelization 2) Impacts of Impervious Cover and Urban Runoff Town of Vail Page 2 • Street and parking area drainage piped directly to stream • Roof drains and subterranean dewatering discharges 3) Pollutants Associated with Land Use Activities and Urban Runoff • Frequent construction disturbance • Sediment and traction materials • Pesticide, herbicide and other chemical use (weed control - lawns and gardens, and pest control — pine beetle) • Lawn and garden fertilizer • Lawn irrigation return flows (fertilizer and herbicides) • De -icers and road salts • Trace metals • Petroleum products • Illegal dumping WQIP Recommendations 1) Regulatory measures a. Adopt a formal Integrated Pest Management Policy b. Restrict or ban the use of pesticides with known toxicity to aquatic life in areas close to Gore Creek c. Establish no -mow zones d. Establish no -spray zones i. Develop voluntary or incentive programs to achieve compliance e. Increase stream setback f. Adopt low impact design (LID) and green building stormwater infrastructure design standards g. Establish more stringent stormwater permitting requirements for development near stream h. Ensure aggressive enforcement of existing State and local regulations to discourage illegal discharges /dumping 2) Education and outreach a. Inform local agency staff, contractors, developers, property owners of construction and home best management practices, riparian area importance, maintenance requirements b. Inform pesticide applicators of existing policies /recommendations and requirements for applications near Gore Creek 3) Site specific projects a. Capital stormwater runoff water quality projects identified in Attachment A, Table 6.5 b. Riparian area /stream tract and bank restoration identified in Attachment B, Table 6.3 i. Town -owned property ii. Privately owned property 4) Monitoring programs and future studies a. Continued stormwater monitoring to provide baseline data for infrastructure improvements and progress Town of Vail Page 3 IV V. b. Continued shared monitoring and cooperation with the many various stakeholders c. Conduct survey of stormwater infrastructure and drainage networks WQIP IMPLEMENTATION PROCESS The Plan's recommendations will need further study and refinement in order to move forward with implementation. The implementation could be in the form of the following: • Revised Town Codes and regulations regarding development standards (setbacks, required streambank and riparian restorations during redevelopment and more stringent storm water runoff treatment requirements) • Restrictions of pesticides, herbicides and landscape maintenance policies and enforcement near waterways • Policy regarding funding options for capital expenditure for improving stream ban k /riparian zone health, stormwater runoff water quality projects, etc. • Further design and cost estimates regarding stormwater runoff water quality improvements The Plan's improvement projects are prioritized starting in East Vail and moving west. It should be noted that much of the land adjacent to Gore Creek from the eastern town boundary to the East Vail Interchange is privately owned and therefore not within the Town of Vail's ability to implement change without amendments to the Vail Town Code. Town staff and the various stakeholders have and will continue to implement many of the recommendations of the Plan which the Town can control or influence without a change in regulations. Many of these actions are provided in Attachment C. NEXT STEPS October - December Continued policy discussion with Vail Town Council regarding no mow zones, stream setbacks, post construction BMPs, and pesticide application regulation November - February Planning and Environmental Commission /public process to develop revised regulations to address water quality and stream health March 2014 Town Council adopts revised regulations March -April 2014 Staff prepares Water Quality Improvement Action Plan STAFF RECOMMENDATION Provide staff input regarding the results of the plan, next steps and proposed process. VI. ATTACHMENTS A) Stormwater BMPs and LID Project Matrix — Table 6.5 B) Riparian Area Improvements Table 6.3 C) Current Town water quality improvement actions D) WQIP Slide Presentation Town of Vail Page 4 X 'L U 9_ O L d J C m cd G CD a-+ f6 3 E O N C a) E s U f6 Q p 4 a fi N c c c s `a_ a `a_ s s a u c c m � ° � c � c E a as � m o, a a, � a, � a, � ti E ti E m cc m s m` s m w n x h H C3 CD o n C 4 c o cc z 0 'u t `C7 .y L V L 3 a ° ° c 0 L13 a v m m ti m C- rx L a 42 � v v ! m Q ° c a -° am L a O tl7 a, ° N D1 a m _ n` 'ta � tp W _ Y U N C CO t R m Q G a) Qi ~ QY "Q c`nn N 7 to W i Y _w to z f�-0 CL a. C E c o ' s c �i = w P t9 ❑ C Q C q� LL Q) E m- o L y o a c,: E z r °_ -o °_° Y o a o- °-m a a C L ? a) E C j ra dA l.1 G rs] J O C C C d O O `� CJ fr m -c3 fY P (9 fY o cf C 6 u'] d u �- .d0 7 � C O O d S3 Q N o ou L m p m Id E O m CJ C7 Ol O n - - n - G m p z Z V] oo m Q 07 O U m O7 m O] O d 07 LL (Y] �' O O Q G G LL 07 O - 07 +`+ Lu V7 C 4 C N N it N N N N N N — — — CU j CU o c a O Ql l0 6 f, W O 00 N 00 N tt a+ Y -4 ko a6 L1 f- LA cd N u7 .-I Ln C) I, m 7 m V, m N 7 N L N N to o H U o 0 S S 0 S 0 En U Q C O O elIj G N V N L+ -(n E Q O O 0 O cD a y Q co .-, N N 7 m � `a U tIa � c� O +n C a 0 � a .. Cl 0 a7 o o N u'1 V � Q y� C cn E tn• � v� va O CC S c f $ `° 0 4 w u) x o a u Q ' O' a] N 7 ' N ' O Ft V)6 Ll v+ L L�i bA d9 o b a N -4 X c� G U N O L d J 2 f6 a m L 3 O N 4- C CN C s U f6 Q C C 0 4 �O N -fl f+ 0 o w SE fi t a w h fi a a t° a N u � a r a ,� o a c c a a � fi c ° a o o O' iE U o u �� e a a ti C C 4 a p ° ° a fi c O � N fi c E° a ° a o o 0 Q'I o chi c 2 2? �° c a `m ° �3 34 a 0 0 0 m� �� 0 0 o a o n R ti v c ¢ a �.Q a e r a a s (Z rm as cr cn E a a x x x d c x x a m •O 'a ` V n p v _ In m c c a a q o f w tm o +` o c .a r � a a r� ° ., a U ❑ a c w v Q L atz m N a c a ti � D au. v $ 4 4 F 41 E � w a� a �, x � � � o .o a m m a� e •o � v O' T G O - a° aa) to 4 cr 72 O i n3 W as 'O p N O yJ v Y ro Q 0 C ;p 7 ro p a� J -C r6 -p to Q O GOO 2 rp �' c g O M0 .n-I CL SO E a o ,� �O p O M13 } Q %c O O ❑. w L t7 P O O ro v GD N LL W H LL 2 LL T U > > > 0- J > m U a) a) a) a) d a) a/ al a cz t7 C7 (7 > 7 7 > 7 7 7 c 4 ID co m m m a m ID m m W m m m m m m m N N N N N N aQ O O U CD a O Li 1 imh d N CD 0 � V m {h a V Ln V d Q 0 � n m T O � 'x a` m T Lr tiD n 00 O1 O - N m t N N N N N N Attachment B — Riparian Area Improvement Projects Table 6.3: Upper and Middle Gore Creek estimated riparian restoration costs for north and south (combined) stream banks Stream Section Stream Reach Map Tile No. Station ID Restoration Area No. & So. Stream banks combined (acres) Estimated Cost (rounded to nearest $100) Upper Gore Reach 1 623 +00 to 619 +00 0.14 $15,600 Upper Gore Reach 2 615 +50 to 613 +00 0.09 $10,000 Upper Gore Reach 613 +00 to 611 +00 0.07 $7,800 Upper Gore Reach 2 611 +00 to 607 +00 0.14 $15,600 Upper Gore Reaches 2 & 3 607 +00 to 601 +00 0.41 $45,700 Upper Gore Reaches 3 & 4 598 +00 to 589 +00 0.31 $34,600 Upper Gore Reach 4 577 +00 to 589 +00 0.07 $7,800 Upper Gore Reaches 5 & 6 566 +00 to 560 +00 0.21 $23,400 Upper Gore Reach 6 560 +00 to 547 +00 0.45 $50,200 Upper Gore Reach 7 547 +00 to 540 +00 0.01 $1,100 Upper Gore Reaches 7 & 8 540 +00 to 526 +00 0.48 $53,500 Upper Gore Reaches 8 & 9 526 +00 to 508 +00 0.48 $53,500 Upper Gore Reach 91 508 +00 to 501 +00 0.24 $26,800 2 Middle Gore Reaches 10, 11, 12 & 131 501+00 to 462 +00 3900 Mear ft $39,000 Middle Gore 2 Reaches 13 & 142 462 +00 to 438 +00 1.65 $184,000 Middle Gore 2 Reaches 14, 15, 16, & 17 438 +00 to 414 +00 0.83 $92,500 Middle Gore 2 Reaches 17 & 18 405 +00 to 389 +00 1.1 $122,600 Middle Gore 2 Reaches 18, 19, 20 & 211 389 +00 to 340 +00 4900 kear ft $48,900 Total All Reaches 623 +00 to 340 +00 6.68 $832,600 Footnotes: Tree planting areas only: total cost per tree = $300.00 and planting distance = 30 feet Town of Vail owed property: buffer width set = 30 feet Attachment C Current Town Water Quality Actions Public Stream Tract • October 6, 2009, Town Council adopted a "zero tolerance" policy for allowing illegal private encroachments on town -owned stream tract lands and instructed Staff to pursue removal of all encroachments • Gore Creek stream tract habitat - public sign campaign — summer 2013 • Homeowner education packet /mailings — summer 2012 Public Education • Newspaper ad campaign — summer 2012/2013 • Public presentations /fly casting workshops on Gore Creek — summer 2012/2013 • Youth education bug program through Camp ECOFun and the Americorps - Environmental Stewardship Program — summer 2013 • Beaver /ecosystem health workshop — spring 2013 Public Works Projects • Water Quality vault installation on South Frontage Rd. in partnership with CDOT — scheduled for the fall of 2013 • Water Quality vault installation on the East Lionshead Circle Streetscape Improvements in the Fall of 2012. • Water quality improvements in both phase 1 and phase 1 B of Ford Park improvements including both water quality vaults and wetlands as green infrastructure. • RAMP funds application for East Vail interchange area water quality improvements. This application is for $1.14 million total funds ($700,000 RAMP, $440,000 Town of Vail) and may include detention ponds, water quality vaults, or other improvements. • Participation in the Urban Runoff Group (URG) process and contribution to the Gore Creek Water Quality Improvement Plan • Stormwater infrastructure — ongoing maintenance of outfalls and water quality vaults, inlets, and street sweeping Pest and Weed Management • The Town of Vail Department of Public Works operates two Pest Management Programs. The Weed Management Program targets invasive plant species, also termed "noxious weeds," (required to be mitigated by law), and the Tree Pest Program, targets insects, such as Mountain Pine Beetle, that are having a negative impact on Town - owned trees. Significant changes have been made in the Town's application of insecticides over the past two years in response to water quality concerns, including the elimination of foliar spraying within 75' of Gore Creek and its tributaries, and the use of pheromone packs as a substitute to spraying for mountain pine beetle. Likewise, the Town has been able to reduce the use of herbicides to approximately 10% of when the Weed Management Program began in 2007. • Pesticides and herbicides in TOV programs are always applied according to the product label, and "the label is the law ". The Environmental Protection Agency (EPA) has been testing water samples from Gore Creek since April of 2013 for the presence of literally hundreds of compounds from caffeine to 2,4 -D. After reviewing some test results, staff has requested that additional products used in TOV pest management programs be added to the list. Recent tests show no elevated quantities of any pesticide in Gore Creek. On -going sampling will be coordinated with storm events and pesticide application times. Current Regulations • An erosion control plan using best management practices is required of all site disturbance • Development is not permitted in wetlands or in the flood plain without Army Corps of Engineers approval, and buildings are to be set back from the center line of Gore Creek by 50 feet • Stormwater permit is required for all disturbances of more than 0.5 acres • No development is permitted on Town stream tract without approval Town of Vail Page 2 e CA �O �I r� V J O O MI O O ■ O U a� � Q W W U � a� bIJ c� W O Q U ■ *t cn Q O U ■ O O a ■ � V a� •+ O � tic bL 4� 4-J '� •� J � J V 4 �, U �� bill •O rl � � V 4-J t4-4 t 4.) � V � •O �Y u � 1 O V ct ct P-� W a N N � n 0 a n n m U C U m 0 °o �I _ u Q� N yi C CL m v u �J O IL m Gl N C s w z 3 o of LS $ w �E � m V O a o tA Q.' M O � o �Y u � 1 O V ct ct P-� W a N N � n 0 a n n m U C U m 0 °o �I _ u Q� N yi C CL m v u �J O IL m Gl N C s .n C7 � o - V O cu Q.' M O � o �Y u � 1 O V ct ct P-� W a N N � n 0 a n n m U C U m 0 °o �I _ u Q� N yi C CL m v u �J O IL m Gl N C s .n C7 � o - O .7 r � a O ct ct n� r1 r ^� V J O ct V •4—j n� 'O 'VJJ nVJ, V J J � O V)Q cn 2 �K' T T N t'7 u) t0 ti co 07 m n T O � E N c T � c T N T M T T LO T NIT r. N i O U 0 x U O M1 O O LO ol O Tt 0 O N 0 O r-I N M-ttLn l0r- W Ol0 r1N M1* Ln r-I r-I r-I r-I r-I r-I O Q i-I O U •O H 0 s *�C .,. ..• r•�>b,. eryJ'� ^��f re'�Y *.� 7�- rr � i-I O U •O H 0 4�-- j Cl� Cl� ct V L.t1J O r� O ct V V O r4- j V J 0 v c v E c 0 v m Fl 0 t v L N C v 0 0 Q m 00 o rl �M k.0 Ln 0 0 0 0 0 J JJ bgb d C) 04 J ' J a�J ' a d� �qJA ' O N Ln i 4 N i II MOM= 1 a Ln L JJ 1 � �J V J V J ct ct O 4 /j O ct V .4-1 4•) H O O co LO rr N 00 LD r N rr rri er5 rr5 n7 Y N N N N sp M Ojj 0 c N r'I ri r'I N Lry 4 rl O Cs O ri r-I N Lf} O r-I O N r-I r1 ri O tV Z 8 T-1 O C? 6 ri T-1 0 N 4+ N `t di dl r ct 4-j a� 4-j N ct O u (zi 4—j C/J O -.-a -, . j 0 W4 V 19 - 'a z° 00 0 00 0 0 0 --- — ------ C0 00 0 0 0 0 0 ol 8 oz, o 0 0 8 00 c 0 0 0 8 0 08 0 0 0 0 0 lowrl. g to w L -d — E5 ld, 22 O r4- j V J W" U N O O N .m i m 0- DC ■ .O C� MO 4- O V C� E ■ 1 L O V N i Q 4= O i C� O ■ V O Ln ca 04j, 06�11' N ca L P-p% lo �--i ct ct 6 N U ct O •W N 4-J 4-J CL U1 N i N -r p O i 0 Q i C) + N t t cr) ti L A4'-- L 0 CL 4-1 — � N a) N U 0 � N � -o � —co�, 7� n ca _ u E cu (a Z -r- E �--i Ct Ct ct N L U O C� 00 N ca N U O C� ct ct 4� ct b,A 4� H 5 V V W ^W' W U O MV N O OF 5 O a� �Tl T 0 c C3 rAj CL OL .0 L �e Ol - P a® ct � V � 74 ry4 i ' V �I T Xy 4 �... �_ y � a e � r p • 0 P i r fi ct w a N 0 Tom( O ct a� � V � r—" V cn c� 4-' V � V O c� V V V C/� .+j W C%� Cl� 4.) c� �0 O O S--I Ct O ct WJ O V 4.� V O a� a� O V P4 n � O 4 +j bq c O j cn cn 4-j �, c Q cn '-� c� N n O C/� 4-j 4� coin 4� sv cn -i 4-j O V Ct 4--I 4-j O loC O Ct V W cn O V a� V O W" a� �d a� O U P4 � IL No I .J a f L� ,a a � d J�. S s �i iL. 4) ^cn h--1 4 MM w � O cn c� , • U bfJ U � 7� �--i cn cn �+ 4-j cn 7� cn •� 'U 4� O Q i �' a) Q � IL No I .J a f L� ,a a � d J�. S s �i iL. -4--j V a.� O .O V 4.� V O W" u a� a� O U 4J cn V � C� O 4 's U 0 � O cn c� 4-j o � � a O cn 4-j 7� 0 0 WJ O O O V 4.� V O U a� a� O V P4 o � C� c 4 's U 0 0 0 WJ O O O V 4.� V O U a� a� O V P4 C� 0 O O bfJ 's ls� 0 C c� Q U O ct a� cn N C/� N d O N O 0 bq O O U W bq O O C� 0 U c� bq O 4-j O 0 4-j 4� O a� Q O cn 4-j 4� C� S--I c� O .4t .cn cn cn U O bq w � O � 4� U Q � H � � U� cn O � 0 0 4-j 4� O a� Q O cn 4-j 4� C� S--I c� O .4t .cn cn cn U O bq w TOWN OF VAIL ` Memorandum To: Planning and Environmental Commission From: Community Development Department Date: September 23, 2013 Subject: A request for a recommendation to the Vail Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A-10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC130021) Applicant: AMPH, LLC, represented by Mauriello Planning Group Planner: Warren Campbell SUMMARY The applicant, AMPH, LLC, represented by Mauriello Planning Group, is requesting a recommendation to the Vail Town Council on a major amendment to Special Development District (SDD) No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to increase the allowable Gross Residential Floor Area (GRFA) to allow for an addition to an existing dwelling unit in The Sebastian. Based upon Staff's review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented, the Community Development Department recommends the Planning and Environmental Commission forwards a recommendation denial, of the major amendment to Special Development District (SDD) No. 6, Vail Village Inn, subject to the findings noted in Section VIII of this memorandum. II. DESCRIPTION OF THE REQUEST The applicant is proposing to add approximately 839 square feet of GRFA to the existing penthouse unit. The proposed addition would result in the unit increasing in size to approximately 5,989 square feet of GRFA. To accomplish the addition the proposal includes the following: • The entry on the first floor of the penthouse would be reconfigured resulting in GRFA being converted to common area hallway for the lodge. The existing roof form over the second floor of the penthouse at the northeast corner of the building would be raised 2 feet in elevation in order to increase the interior height of the space. The second floor would be increased in size by with an expansion to the south. This proposed area would include a new roof form which would extend to the south approximately 26 feet. The roof extension would be an increase in height of approximately 12 feet above the existing roof form. An outdoor patio is proposed to extend approximately 11 feet south of the second floor expansion. In response to comments provide by the Planning and Environmental Commission on September 9, 2013, several changes were made to the proposed plan. Those changes are as follows: • The roof overhang on the south elevation which served as a partial covering of the new patio was reduced from 6 feet to 18 inches. • The shed dormers on the upper floor expansion to the south where changed to traditional gable forms. • The existing dormers on the lower floor of the penthouse (fourth floor) below the addition to the south were clipped. • On the south elevation the new upper floor roof form has been changed to allow the eave to return creating the appearance that it is a dormer. • The reduction in the upper floor roof overhang and the conversion from shed dormers to traditional gable dormers altered the impact of the proposal on the pedestrian view from the south, internal to Vail Village Inn. The applicant has provided a written description of their request, dated September 17, 2013, (Attachment A) and plans dated September 17, 2013 (Attachment B), which are provided for review. Staff included the elevations presented at the September 9, 2013 public hearing into the plans attached for review so that the changes that were made can be identified (Attachment B). Those pages have been identified with a text box stating that they are from the September 9, 2013 proposal. III. BACKGROUND On September 4, 2001, the Vail Town Council adopted Ordinance No. 21, Series of 2001, which amended Special Development District No. 6 to allow for the construction of the Vail Plaza Hotel (The Sebastian) with one dwelling unit, 99 accommodation units, 18 employee housing units, and 50 fractional fee club units. The Planning and Environmental Commission held public hearings to discuss a request to convert 2 fractional fee units to dwelling units and one dwelling unit to a fractional fee unit on April 27, and May 11, 2009. On May 11, 2009, the Planning and Environmental Commission voted 7 -0 -0 to forward a recommendation of approval, with conditions, to the Town Council for the proposed special development district amendment. Town of Vail Page 2 At its May 19, 2009, hearing the Town Council approved the first reading of Ordinance No. 13, Series of 2009, with modifications that reference to the conversion of the penthouse dwelling unit to a fractional fee club unit be stricken, and that the sale of the penthouse unit be a trigger for the expiration of this ordinance in addition to the Commission's recommended triggers of the specific date May 11, 2012, or the issuance of an occupancy certificate for the penthouse unit. On June 2, 2009, the Vail Town Council denied Ordinance No. 13, Series of 2009, upon second reading. The summary minutes are as follows: "Connie Dorsey asked that the applicant not be forced to move until there is a TCO on another unit in the building. During a pause for public comment, Robert Vogel said there was a pattern of deceit being exhibited by the applicant and there was no compelling reason to grant the applicant's request. Fractional owner's legal representative Lindsey Richards spoke against allowing the applicant to continue to live there. The applicant, Waldir Prado, said he had been occupying a vacant unit and no one had been negatively financially impacted. Councilmember Rogers stated, "l don't feel like / was given a straight story on it ... l don't have a good feeling we are going to know what is happening here.../ don't feel like passing this ordinance on second reading is going to help the Town of Vail.../ do have an interest in hot beds. "Rogers then moved to deny the ordinance with Councilmember Newbury seconding. Councilmember Foley said employee housing in the hotel should be satisfactory for any employee of the hotel. Councilmember Hitt said he felt like he had been misled. He also agreed that employee housing should be adequate for the applicant. Newbury said one of the town's overriding policies is to maintain hot beds. Councilmember Cleveland said the solution that was presented was not in the public interest. "lt is inconsistent with the SDD approval plan." Councilmember Daly said there is a lot more revenue the town is giving up than was previously anticipated. The motion passed unanimously, 7 -0." On May 14, 2012, the Planning and Environmental Commission forwarded a recommendation of approval for amendments to SDD No. 6, Vail Village Inn, and approved amendments to the existing conditional use permit (CUP) to convert fractional fee unit 401 to a dwelling unit. This recommendation and CUP amendment approval resulted in no change to GRFA, an increase in the number of dwelling units from 1 to 2, and the reduction of the number of fractional fee units from 50 to 49. On June 19, 2012, the Vail Town Council approved Ordinance No. 7, Series of 2012, which resulted in an increase in the number of allowable dwelling units to 2 and a decrease in the number of fractional fee units to 49. On August 26, 2013, the Planning and Environmental Commission held a work session on the proposal to add approximately 691 square feet of GRFA to the penthouse unit. The Commission offered comment on the proposal with regard to the need to evaluate Town of Vail Page 3 the proposal pursuant to the criteria, the north elevation, and the limited visibility of the proposed expansion. On September 9, 2013, the Planning and Environmental Commission held a public hearing on the request for a recommendation on a major amendment to add GRFA to the existing penthouse unit. A motion for approval failed and a subsequent motion to table the request was approved. The Commission gave direction to review the roof forms and address the concerns stated in the staff memorandum with regard to staff's response to Criterion 1. IV. APPLICABLE PLANNING DOCUMENTS A. Title 12, Zoning Regulations, Vail Town Code CHAPTER 12 -1, TITLE, PURPOSE AND APPLICABILITY (in part) Section 12 -1 -2. Purpose. A. General. These regulations are enacted for the purpose of promoting the health, safety, morals, and general welfare of the Town, and to promote the coordinated and harmonious development of the Town in a manner that will conserve and enhance its natural environment and its established character as a resort and residential community of high quality. B. Specific. These regulations are intended to achieve the following more specific purposes. 1. To provide for adequate light, air, sanitation, drainage, and public facilities. 2. To secure safety from fire, panic, flood, avalanche, accumulation of snow, and other dangerous conditions. 3. To promote safe and efficient pedestrian and vehicular traffic circulation and to lessen congestion in the streets. 4. To promote adequate and appropriately located off - street parking and loading facilities. 5. To conserve and maintain established community qualities and economic values. 6. To encourage a harmonious, convenient, workable relationship among land uses, consistent with Municipal development objectives. 7. To prevent excessive population densities and overcrowding of the land with structures. 8. To safeguard and enhance the appearance of the Town. 9. To conserve and protect wildlife, streams, woods, hillsides, and other desirable natural features. 10. To assure adequate open space, recreation opportunities, and other amenities and facilities conducive to desired living quarters. 11. To otherwise provide for the growth of an orderly and viable community. Town of Vail Page 4 ARTICLE 12 -9A, SPECIAL DEVELOPMENT DISTRICT (in part) 12 -9A -1: Purpose and Applicability: A. Purpose. The purpose of the special development district is to encourage flexibility and creativity in the development of land in order to promote its most appropriate use, to improve the design character and quality of the new development with the town, to facilitate the adequate and economical provision of streets and utilities, to preserve the natural and scenic features of open space areas, and to further the overall goals of the community as stated in the Vail comprehensive plan. An approved development plan for a special development district, in conjunction with the property's underlying zone district, shall establish the requirements for guiding development and uses of property included in the special development district. B. Applicability: Special development districts do not apply to and are not available in the following zone districts. hillside residential, single- family residential, two - family residential and two - family primary/secondary residential. 12- 9A -10. AMENDMENT PROCEDURES. B. Major Amendments. 1. Requests for major amendments to an approved special development district shall be reviewed in accordance with the procedures described in section 12 -9A- 4 of this article. 2. Owners of all property requesting the amendment, or their agents or authorized representatives, shall sign the application. Notification of the proposed amendment shall be made to owners of all property adjacent to the property requesting the proposed amendment, owners of all property adjacent to the special development district, and owners of all property within the special development district that may be affected by the proposed amendment (as determined by the department of community development). Notification procedures shall be as outlined in subsection 12 -3 -6C of this title. V. SURROUNDING LAND USES Town of Vail Zoning Not Zoned Public Accommodation SDD #39 (Solaris) Public Accommodation and SDD #21 (Gateway) Page 5 Land Uses North: 1 -70 right -of -way South: Mixed Use East: Mixed Use West: Multiple Family Town of Vail Zoning Not Zoned Public Accommodation SDD #39 (Solaris) Public Accommodation and SDD #21 (Gateway) Page 5 VI. ZONING ANALYSIS Development Standard Approved/ Existing Proposed Change Density - Dwelling Units 2 DU 2 DU No change - Fractional Fee Units 49 FFU 49 FFU No change - Accommodation Units 100 AU 100 AU No change Gross Residential Floor Area (GRFA) -AU & FFU ( >70 %) 97,788 sq ft (94 %) 97,788 sq ft (93.3 %) No change -DU ( <30 %) 6,136 sq ft (6 %) 6,975 sq ft (6.7 %) +839 sq ft TOTAL 103,924 sq ft 104,763 sq ft +839 sq ft Parking 212.39 spaces 212.39 spaces required (round to required (round to No change 213 spaces) 213 spaces) 218 spaces existing 218 spaces existing VII. SPECIAL DEVELOPMENT DISTRICT AMENDMENT REVIEW CRITERIA Before acting on a major amendment to a special development district amendment application, the Planning and Environmental Commission and Town Council shall consider the following factors with respect to the proposal: 1. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. In response to the application to increase the allowable GRFA for the penthouse in The Sebastian, staff researched the documents on file with regard to the initial review of the Vail Plaza Hotel (The Sebastian). Staff was interested in gaining an understanding of the influences on the approved bulk, mass, and height of the existing structure. Upon conducting this research staff obtained an understanding of the bulk, mass, and height relationships sought between the Vail Plaza Hotel and the adjacent properties. Those relationships can be seen on the approved elevation drawings which include the adjacent Gateway and Vail Village Inn Phase III structures (Attachment B). The inclusion of the adjacent structures on the elevations illustrates the goal of having elements such as roof forms which step down to create a relationship with the adjacent structures. Additionally, it can be seen that the alignment of eaves and a general compatibility with regard to bulk, mass, and height was sought and achieved. As discussed previously, the proposal includes several changes to the roof form in the northeast corner of the existing structure. The proposed changes include the raising of the existing roof form by 2 feet and the expansion of the roof mass south by approximately 26 feet. Staff has a concern with the proposal's impacts on the existing Town of Vail Page 6 roof form's relationships with adjacent structures. Furthermore, staff believes there are impacts on the perceived bulk and mass from the perspective of a pedestrian. While the change to reduce the southern roof extension by 6 feet had a positive impact on this concern, staff believes the overall proposal still has a negative impact on the pedestrian view perspective as seen in the photo rendering. Staff's concern is best illustrated by a comparison of the existing and proposed east and south elevations (Attachment B). The expansion of the second floor of the penthouse unit to the south by approximately 26 feet (reduced from 32 feet) continues to eliminate an intermediate stepping of the roof forms which was intended to establish a rhythm of incremental decreasing height from north to south. This existing stepping of the roof forms results in the southern portion of The Sebastian having a compatible bulk, mass, and height relationship with the existing structures within the SDD. The proposal to eliminate the intermediate step has a negative effect on the intended design. Staff further believes the proposal will have a negative impact on the pedestrian perception of bulk, mass, and height from the southern perspective looking north. The current design allows for the pedestrian perception of height to stop at the eaves of the lowermost roof form which results in the feeling of appropriate and compatible scale between structures. The proposal (reduced by 6 feet from previous proposal) would extend a roof form which is largely unseen currently from this perspective thus altering the perceived height of the structure. The photo rendering provided in the submitted plans illustrates this concern (Attachment B). Staff believes there are alternative designs which would address staff's concerns while maintaining the intent to step the height of the structure down from the north to the south. Staff's concern is with the expansion of the addition to the south and its impacts to the architectural rhythm and the pedestrian view impacts. Staff suggests that pulling the upper floor addition back to a distance where it was minimally perceived from the pedestrian perspective within Vail Village Inn and the incorporation of a roof form which maintained the established architectural rhythm would address these concerns. Further, staff believes a solution to capture additional GRFA would be to enclose the existing lower floor penthouse patio and create a upper floor patio on the lower floor expansion. In reviewing the proposal for compliance with this criterion, staff considered the entirety of The Sebastian structure. Staff did not simply focus on the changes to the northeast corner of the top floor of the structure. This was done in order to determine if staff would have found the structure, as currently proposed, to be of an appropriate scale, bulk, mass, height, character, and relationship to adjacent properties. Staff does not believe the proposed changes would have met this criterion during the entitlement process and therefore cannot find the proposed changes to be in compliance with this criterion. Staff finds the proposal does not comply with this criterion. Town of Vail Page 7 2. Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. The proposal does not propose to change any of the uses, activity, or densities which are currently constructed within the project. The uses, activities and density of The Sebastian were evaluated during the entitlement process and found to be compatible as currently operated and constructed. The proposal to increase the allowable GRFA within the SDD requires mitigation of the impacts to employee generation pursuant to Chapter 12 -24, Inclusionary Zoning, Vail Town Code. The applicant has stated in their written materials that the pay -in -lieu option would be selected if the proposal were approved. An increase in the allowable GRFA by 839 square feet results in a pay -in -lieu fee of $11,297.14 (83.9 sf x $134.65). Staff finds the proposal complies with this criterion. 3. Parking and Loading: Compliance with parking and loading requirements as outlined in chapter 10 of this title. The proposal to add approximately 839 square feet of GRFA to the existing penthouse unit does not change the required parking or loading and delivery requirements for the development. Staff finds the proposal complies with this criterion. 4. Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies and urban design plans. Staff has reviewed the Vail comprehensive plan and found the following documents and associated goals, objectives, statements applicable to this proposal. Vail Land Use Plan (in part) 1. General Growth / Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 4. Village Core / Lionshead 4.1. Future commercial development should continue to occur primarily in existing commercial areas. Future commercial development in the Core areas needs to be carefully controlled to facilitate access and delivery. Town of Vail Page 8 4.2. Increased density in the Core areas is acceptable so long as the existing character of each area is preserved through implementation of the Urban Design Guide Plan and the Vail Village Master Plan. 4.3. The ambiance of the Village is important to the identity of Vail and should be preserved. (Scale, alpine character, small town feeling, mountains, natural settings, intimate size, cosmopolitan feeling, environmental quality.) 5. Residential 5.1. Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. Vail Village Master Plan (in part) V. GOALS, OBJECTIVES, POLICIES AND ACTION STEPS GOAL #1 ENCOURAGE HIGH QUALITY, REDEVELOPMENT WHILE PRESERVING UNIQUE ARCHITECTURAL SCALE OF THE VILLAGE IN ORDER TO SUSTAIN ITS SENSE OF COMMUNITYAND IDENTITY. Obiective 1.1. Implement a consistent development review process to reinforce the character of the Village. Policy 1.1.1: Development and improvement projects approved in the Village shall be consistent with the goals, objectives, policies and design considerations as outlined in the Vail Village Master Plan and Urban Design Guide Plan. Obiective 1.2: Encourage the upgrading and redevelopment of residential and commercial facilities. Policy 1.2.1: Additional development may be allowed as identified by the Action Plan and as is consistent with the Vail Village Master Plan and Urban Design Guide Plan. VII. VAIL VILLAGE SUB -AREAS A major goal of this Plan is to address the Village as a whole and at the same time be sensitive to the opportunities and constraints that may exist on a site specific basis. To facilitate long range planning unique to each area of the Village, ten different sub -areas are delineated in this Plan. Sub -areas were determined based on a number of different considerations. Foremost among these were. • design and site characteristics Town of Vail Page 9 • geographic or physical boundaries • land uses and ownership patterns Each of the ten sub -areas have been evaluated relative to the overall goals, objectives, and policies outlined for Vail Village. The potential improvement projects, referred to as sub -area concepts, which have emerged from this evaluation are graphically represented on the Action Plan. These sub -area concepts are physical improvements intended to reinforce the desired physical form of the Village as outlined in the various elements of the Master Plan. The 10 sub -areas (which follow), provide detailed descriptions of each sub -area concept and express the relationship between the specific sub -area concepts and the overall Plan. The applicable goals and objectives are cited for each of the sub area concepts at the end of each description under "special emphasis. The sub -area concepts described in this Section are meant to serve as advisory guidelines for future land use decisions by the Planning and Environmental Commission and the Town Council. Compliance with the sub -area concepts does not assure development approval by the Town. It is important to note that the likelihood of project approval will be greatest for those proposals that can fully comply with the Vail Village Master Plan. The Urban Design Guide Plan includes additional design detail that is to be used in conjunction with the Vail Village Master Plan sub -area concepts. MIXED USE SUB -AREA ( #1) t7�'� • uea'c ivy P1.47h m b �. •. :3 6 1 •1.2 . �► F , W. LUUGE V- ILLOW. n _ � v• _ r, LAN F. P � .A[A li ._ Fair ..... � r•a�� }r Town of Vail Page 10 The Mixed -Use sub -area is a prominent activity center for Vail Village. It is distinguished from the Village core by the larger scale buildings and by the limited auto traffic along East Meadow Drive. Comprised of five major development projects, this sub -area is characterized by a mixture of residential /lodging and commercial activity. There is a great deal of potential for improvements to both public and private facilities in the area. Among these is the opportunity to develop gateway entries to the Village at the 4 -way stop and at the intersection of Vail Road and Meadow Drive. It is also a long term goal to strengthen the connection between this area and the Village core area by reinforcing the established pedestrian linkages. Pedestrianization in this area may; benefit from the development of retail infill with associated pedestrian improvements along East Meadow Drive and the development of public access to Gore Creek. A significant increase in the Village's overnight bed base will occur in this sub -area with the development of the final, phase of the Vail village Inn project. In addition, commercial and residential /lodging development potential is identified in sub -area concepts 3, 4, 6 and 8. The completion of these projects will essentially leave the sub -area "built out ". �t F J 4.lRA r W", #1 -1 Vail Village In Final phase of Vail Village Inn project to be completed as established by development plan for SDD #6. Commercial development at ground, level to frame interior plaza with greenspace. Mass of buildings shall "step up" from existing pedestrian -scale along Meadow Drive to 4 -5 stories along the Frontage Road. Design must be sensitive to maintaining view corridor from 4 -way stop to Vail Mountain. Special emphasis on 1. 2, 2.3, 2.4, 2.6, 3.2, 4.1, 5.1, 6.1. Town of Vail Page 11 The review of The Sebastian during the entitlement process determined that the project was in compliance with the elements of the Vail Comprehensive Plan. There have been no changes to the Vail Comprehensive Plan with regard to the documents which address this site. Staff believes the proposed change does not have an overall negative impact to the intent of stepping building height up from the pedestrian oriented East Meadow Drive to the South Frontage Road East. As stated in the response to Criterion 1 staff is concerned about the visual impacts on the south side of the structure in the pedestrian plaza. Staff believes there are designs which would permit for some expansion and eliminate the proposal's impact on the pedestrian. Staff finds the proposal complies with this criterion. 5. Natural and /or Geologic Hazard: Identification and mitigation of natural and /or geologic hazards that affect the property on which the special development district is proposed. The Sebastian is not located within any identified geologic hazard. The property during construction identified an impact with ground water and implemented a mechanical system to mitigate the impacts of the ground water on the structure. Staff finds the proposal complies with this criterion. 6. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. The proposal does not include any changes to the site plan, building footprint design or location, or open space provisions. Staff finds the proposal complies with this criterion. 7. Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. The proposal does not include any changes to the pedestrian or vehicular circulation on or off site. Staff finds the proposal complies with this criterion. 8. Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. The proposal does not include any changes to the landscaping or open space on the site as identified on the approved development plan. Staff finds the proposal complies with this criterion. Town of Vail Page 12 9. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. The proposal is intended to be constructed in one phase. Staging for any construction related activity will be reviewed by the Town of Vail staff to ensure impacts are minimized to public rights -of -way and adjacent properties. It is anticipated that the use of the South Frontage Road East right -of -way will be necessary. This right -of -way is controlled by the Colorado Department of Transportation (CDOT) and will require all appropriate review and permits from CDOT should the project move forward. Staff finds the proposal complies with this criterion. 10. Public Benefit: The proposed deviations provide benefits to the town must outweigh the adverse effects of such deviations. The initial entitlement approval for The Sebastian included provisions for the inclusion of public benefits. Staff does not believe this proposal warrants any additional public benefits, beyond the codified provisions for the mitigation of employee housing. VIII. STAFF RECOMMENDATION The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of denial, to the Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. Staff's recommendation is based upon the review of the criteria described in Section VII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission forwards a recommendation of denial to the Town Council for a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of denial for this request, the Community Development Department recommends the Commission makes the following findings: Town of Vail Page 13 "Based upon the review of the criteria outlined in Section Vll this Staff memorandum to the Planning and Environmental Commission dated September 9, 2013, and the evidence and testimony presented, the Planning and Environmental Commission finds. 1. That the special development district amendment does not comply with the standards listed in Article 12 -9A, Special Development District. 2. That the special development district amendment is not consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is not compatible with the development objectives of the town, and 3. That the special development district amendment is not compatible with and suitable to adjacent uses and is inappropriate for the surrounding areas, and 4. That the special development district amendment does not promote the health, safety, morals, and general welfare of the town and does not promote the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission forwards a recommendation of approval to the Town Council for a major amendment to Special Development District No. 6, Vail Village Inn, pursuant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an existing dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission makes the following findings: "Based upon the review of the criteria outlined in Section Vll this Staff memorandum to the Planning and Environmental Commission dated September 9, 2013, and the evidence and testimony presented, the Planning and Environmental Commission finds. Town of Vail Page 14 That the special development district amendment complies with the standards listed Article 12 -9A, Special Development District, or that a practical solution consistent with the public interest has been achieved. 2. That the special development district amendment is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town, and 3. That the special development district amendment is compatible with and suitable to adjacent uses and appropriate for the surrounding areas, and 4. That the special development district amendment promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. " Should the Planning and Environmental Commission choose to forward a recommendation of approval for this request, the Community Development Department recommends the Commission applies the following conditions: "1. This SDD major amendment approval is contingent upon the applicant obtaining Town of Vail approval of the associated design review application. 2. The applicant shall mitigate the employee generation impact created by the addition of 839 square feet of GRFA in accordance with the provisions of Chapter 12 -24, Inclusionary Zoning, Vail Town Code. 3. The applicant shall receive and submit in conjunction with the building permit, all applicable Colorado Department of Transportation approvals for all impacts to the South Frontage Road East, including construction staging. 4. The applicant shall amend the recorded condominium map to reflect the increase in floor area and space designation, prior to requesting a planning certificate of occupancy inspection." IX. ATTACHMENTS A. Written Request dated September 17, 2013 B. Proposed Plans dated September 17, 2013 Town of Vail Page 15 THE SEBASTIAN VAIL VILLAGE INN, PHASE IV MAJOR AMENDMENT TO SPECIAL DEVELOPMENT DISTRICT #6 To allow for an addition to the Penthouse Unit at the Sebastian Submitted to the Town of Vail: June 24, 2013 Revised August 12, 2013 Revised September 17, 2013 ry T H E jebalt Ian ♦ Ti �e[qa FI[so *rs H+ar[i b F[s[x i. u IMauriello Planning Group PEC130021 RECEIVED By David Rhoades at 11:12 am, Sep 17, 2013 I. Introduction The owners of Sebastian, the Marti family, represented by Timbers Resorts, are requesting a major amendment to Special Development District No. 6 (SDD #6) to allow for an addition to the penthouse unit (parcel #: 2101- 082 -85 -051). The addition increases the GRFA by 839 sq. ft., and includes exterior changes to the building, which include changes to the existing secondary roof forms. According to Section 12 -9A -2: Definitions, Vail Town Code, an increase in GRFA is considered a Major SDD Amendment. Based on input from the September 9, 2013, Planning and Environmental Commission, the building forms have been modified in order to reduce the apparent bulk and mass of the addition. The following changes were made: • Roof overhang on the south elevation was reduced from 6 ft. to 18 inches. • Shed dormers flanking the east and west sides have been converted to traditional gable forms • Dormers below the addition on the east and west (fourth floor) have been clipped • Roof form has been brought down on the south elevation to make the addition appear as a dormer, lowering the eave line • Addition is set well back from the pedestrian level view plane The existing penthouse, constructed in 2007, at the Sebastian has never been finished. At this time, the owners would like to complete the penthouse. The penthouse is a 2 -story unit of approximately 5,150 sq. ft. (as indicated on the original approval). When completed, the penthouse unit will be a 5- bedroom unit of approximately 5,989 sq. ft. Oddly designed originally, the head - height in some areas of the existing unit make the floor area unuseable, and to improve the existing layout, the owners are requesting some modifications to the roof form. The location of the change is difficult to photographic due to the existing building and surrounding properties. The addition is therefore essentially not visible from pedestrian areas within the village. The best location to view the proposed locations is from the road leading to the Spraddle Creek neighborhood as indicated in the photo below: r 1 Floor plans are provided below, and a reduction of the complete set of plans has been included in the appendix of this submittal. O. EXISTING MAIN LEVEL ..NMNG T m .., ...�..�..TLCTURE ..P��..� . .. � j J 1 EXISTING UPPER LEVEL � OPROPOSED MAIN LEVEL The Sebastian -Vail Penthouse SCHEMATIC DESIGN Main Level Floor Plans C2�i PROPOSED UPPER LEVEL , The Sebastian -Vail Penthouse SCHEMATIC DESIGN Upper Level Floor Plans II. Background The Sebastian is located at 16 Vail Road. The property is part of Phase IV of Special Development District No 6, Vail Village Inn. This SDD has an underlying zoning of Public Accommodation (PA). SDD #6 was adopted by Ordinance No. 7, Series of 1976, and has been amended .� numerous times since its 'F original adoption. Ordinance No. 16, Series of 2004,_.' amended SDD #6, to allow for changes to the approval of the Vail Plaza Hotel (now known as the Sebastian) and to extend the expiration date of the project. The Vail Plaza Hotel subsequently lost in a bankruptcy filing by its original owner. hotel to Ferruco Vail Ventures LLC in January of 2010 for a purchase price of $46.5 million. Since then, the current owners have invested millions in improvements and the hotel has become a major success, with guests such as the First Lady, Michelle Obama and a feature on the Today Show. The Sebastian has become a major asset to the Town of Vail, and annual tax collections from the property have continued to increase each year. A. The approval for the Sebastian currently includes two whole ownership condo units, consisting of a total of 6,136 sq. ft. of dwelling unit GRFA. The remaining 97,778 sq. ft. of GRFA is within 100 accommodation units and 49 fractional units. One of the two existing whole ownership condo units is the penthouse unit. However, the interior of this unit has never been completed. At this time, the owners are requesting to finish the interior of this unit, along with some exterior modifications which will allow the space to be more useable. The original approval identifies the penthouse unit as having 5,150 sq. ft. of GRFA. The Sebastian currently deviates from the maximum height limitation of the Public Accommodation zone district, which limits height to 48 ft. The maximum height of the Sebastian is 77.25 ft., with the height of the tower element opened in December of 2007 and was A federal bankruptcy court awarded the _T ILE < s 3 at 99.75 ft. The proposed addition to the roof, which is at a maximum of 72.75 ft., does not effect the approved maximum building height and no additional deviation from the approved maximum building height is required. There is no additional parking requirement for this proposal, as parking for the unit has already been assessed. There is an incremental increase to the employee housing requirements as a result of the addition of 839 sq. ft. of GRFA, which is addressed in Section III of this application. The proposed addition will generate an employee housing payment in lieu fee of $1 1,310.60. The property continues to meet the definition of a lodge, with greater than 70% of the floor area dedicated to accommodation units or fractional fee club units and the property remains compliant with all other zoning standards. North Elevation: Existing Proposed: t � - -- - -i - ; : J« LLt 0 2F r - ITS — of II -u ml,II i 111111 I� n uuui l I. �� � T� II �I ml uI Z 0 1 1L1 �- IlLL I v �s ------- J-- - - - - -- — -;r South Elevation: Existing Proposed: 1 y_ I 7 I -- -- -- -- - - - - -- - - 11 �I - - -- -- - - - - -- - - - - - 4 II. Zoning Analysis Due to the nature of the addition, only GRFA and employee housing are affected by the project. Below is an analysis of the proposal with regard to these development standards. Parking, height and density have also been included, though these standards have not changed as a result of this proposal. All other standards remain as approved by Special Development District #6. Standard Existing Proposed Density Fractional Fee Units 49 No Change Accommodation Units 100 Dwelling Units 2 (13.6 du /acre) GRFA 103,924 sq. ft. 104,763 sq. ft. In AU and FFU (Required >70 %) 97,788 sq. ft. (94 %) 97,788 sq. ft. (93.4 %) In DU (Required <30 %) 6,136 sq. ft. (6%) 6,975 sq. ft. (6.6%) Parking Required 21 1.69 spaces (rounds to 212) No Change Provided 218 spaces Height 77.25 ft. (sloping roof) No Change 99.75 ft. (tower) Employee Housing Approved prior to Inclusionary 84 sq. ft. (pay -in -lieu) Requirement 5 III. Criteria for Review for the Major Amendment to a Special Development District Section 12 -9A -8: DESIGN CRITERIA AND NECESSARY FINDINGS, Vail Town Code, provides the criteria for review of a Major Amendment to a Special Development District. These criteria have been provided below, along with an analysis of how this proposal complies with these criteria: I. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. Applicant Response: The architectural design, scale, bulk, buffer zones, identity, character, visual integrity and orientation of the hotel remain largely unchanged as a result of the proposed major amendment. The proposed changes to the roof do not effect the overall maximum building height of the Sebastian. The proposed roof plan is provided below: Aft CHITECTNRE— PLANN'NG %f The Sebastian -Vail Penthouse SCHEMATIC DESIGN Proposed Roof Plan u The changes to the area of the south side of the penthouse unit roof are not visible from many locations within the Village, as indicated in the photos below: Photo I: Taken approximately from in front of A Secret Garden. Photo 2: Taken from deck area of VVI. The changes to the north side of the penthouse roof are visible from the Frontage Road, as indicated in the photo below: Photo 3: Taken from north side of South Frontage Road An analysis of the building stepping of the building is provided below: BUILDING STEPPING 0 0 0 0 q 0 0 0 q q q 4 EXISTING - of I I I I I EXISTING EAST ELEVATION 0 0 0 o Q 0 0 0 q q Q Q PROPOSED EAST ELEVATION PROPOSEDI I As indicated in the analysis, the proposed addition remains true to the character of the existing architecture and is compatible with the character of the neighborhood. Since the original approval of the Sebastian, the character of the Village has changed dramatically, with many projects approved with greater height than was approved here. The additions to the building do not alter the overall character of the building which remains compatible with the immediate environment. 2. Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. Applicant Response: The Sebastian is a mixed -use type of development, including commercial, lodging, recreational, and residential uses. There is no change in use or activity, along with no change to the number of dwelling units for the property. The addition of GRFA to an existing dwelling unit remains consistent with the intended purpose of the underlying zoning of Public Accommodation and the intent of Vail Land Use Plan. Adjacent properties include a similar mix of uses. The density and uses proposed forThe Sebastian do not conflict with the compatibility, efficiency, or workability of the surrounding uses and activities on adjacent properties. 3. Parking And Loading. Compliance with parking and loading requirements as outlined in chapter 10 of this title. Applicant Response: Parking for the penthouse unit was assessed with the original development of the property. The addition of GRFA does not increase the parking requirement for this unit. Currently, the property is required 212 parking spaces and there are 218 parking spaces provided. All parking and loading requirements have been met. 4. Comprehensive Plan: Conformity with applicable elements of the Vail comprehensive plan, town policies and urban design plans. Applicant Response: The Sebastian is within the boundaries of the Vail Village Master Plan. The following general objectives are applicable to this application: Objective 1.2: Encourage the upgrading and redevelopment of residential and commercial facilities. Objective 2.2: Recognize the importance of Vail Village as a mixed use center of activities for our guests, visitors and residents. Objective 2.5: Encourage the continued upgrading, renovation and maintenance of existing lodging and commercial facilities to better serve the needs of our guests. In addition to the general objectives of the Vail Village Master Plan, the Sebastian is located within Mixed Use Sub -Area #1 as indicated in the following map: D 7i- [JI IeE MIXED USE SUB -AREA rP, —11 5s The Vail Village Master Plan offers the following with regard to this property: 5. Natural And /Or Geologic Hazard. Identification and mitigation of natural and /or geologic hazards that affect j`ect the property on which the special development district is proposed. Applicant Response:The proposed addition has has no effect on the above criterion. 6. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. Applicant Response:The proposed addition has no effect on the above criterion. There are no changes proposed to the site plan and all open space provisions remain as originally approved. 10 #1 -1 Vail Village Inn 11 Final phase of Vail Village Inn project to be completed as established by development plan for SDD #6. Commercial development at ground, level to frame interior plaza with ' * =q. greens pace. Mass of buildings shall "step 9 "p u P 9 P" from existing pedestrian -scale along Meadow y— d' Drive to 4 -5 stories along the Frontage Road. Design must be sensitive to maintaining view corridor from 4 -way stop to Vail Mountain. Special emphasis on 1.2, 2.3, 2.4, 2.6, 3.2, 4.1, v •`� vnr�o� iw au+YA 5.1, 6.1. 5. Natural And /Or Geologic Hazard. Identification and mitigation of natural and /or geologic hazards that affect j`ect the property on which the special development district is proposed. Applicant Response:The proposed addition has has no effect on the above criterion. 6. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. Applicant Response:The proposed addition has no effect on the above criterion. There are no changes proposed to the site plan and all open space provisions remain as originally approved. 10 7. Tra ffic: A circulation system designed for both vehicles and pedestrians addressing on and off j`� site traffic circulation. Applicant Response:The proposed addition has no effect on the above criterion. 8. Landscaping. Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. Applicant Response:The proposed addition has no effect on the above criterion. 9. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the special development district. Applicant Response:The proposed addition has no effect on the above criterion. 11 IV. Adjacent Addresses JOHN D GOODMAN PO BOX 1886 0105 EDWARDS VILLAGE BLVD, STE D -201, EDWARDS, CO 81632 9VAIL RD,ASSOC 9VAIL RD. VAIL, CO 81657 JOSEF STAUFER 100 E MEADOW DR #31, VAIL, CO 81657 ARTHUR ANDREW ABPLANALP JR. POST OFFICE BOX 2800, VAIL, CO 81658 -2800 SLIFER MANAGEMENT CO. C/O MS. SALLY HANLON, 385 GORE CREEK DRIVE - R -2, VAIL, CO 81657 MCNEILL PROPERTY MANAGEMENT 2077 N. FRONTAGE RD. #300, VAIL, CO 81657 KEVIN DEIGHAN 12VAIL ROAD, SUITE 600 VAIL, CO 81657 VAIL HOTEL 09 LLC GENERAL COUNSEL 745 SEVENTH AVE NEWYORK, NY 10019 MAURIELLO PLANNING GROUP PO BOX 4777 EAGLE, CO 81631 CDOT 4201 E. ARKANSAS AVENUE DENVER, CO 80222 SOLARIS PROPERTY OWNER LLC 141 E MEADOW DR 211 VAIL, CO 81657 FIRSTBANK OFVAIL FIRSTBANK HOLDING CO PO BOX 150097 LAKEWOOD, CO 80215 -0097 SONNENALP PROPERTIES INC 20VAIL RD VAIL, CO 81657 VILLAGE INN PLAZA - PHASEV CONDOMINIUM ASSOCIATION CROSSROADS REALTY LTD PO BOX 1292 VAIL, CO 81658 TALISMAN CONDOMINIUM ASSOCIATION PTARMIGAN MANAGEMENT 62 E MEADOW DR VAIL, CO 81657 ONEWILLOW BRIDGE ROAD CONDOMINIUM ASSOCIATION, INC. CORPORATION SERVICE COMPANY 1560 BROADWAY STE 2090, DENVER, CO 80202, ONEWILLOW BRIDGE ROAD CONDOMINIUM ASSOCIATION 4148 NORTH ARCADIA DRIVE, PHOENIZ,AZ 85018 -4302 VAIL GATEWAY PLAZA CONDOMINIUM ASSOCIATION, INC. VAILTAX &ACCOUNTING P. O. BOX 5940 AVON, CO 81620 TOWN OFVAIL FINANCE DEPT 75 S FRONTAGE RD VAIL, CO 81657 ONEVAIL ROAD PRIVATE RESIDENCE OWNERS' ASSOCIATION, INC. BALLARD SPAHRANDREWS & INGERSOLL LLP 1225 17TH ST., SUITE 2300, DENVER, CO 80202 ONEVAIL ROAD PRIVATE RESIDENCE OWNERS ASSOCIATION, INC. I VAIL ROAD VAIL, CO 81657 THE RESIDENCES AT SOLARIS CONDOMINIUM ASSOCIATION P.O. BOX 5450 AVON, CO 81620 ONEWILLOW BRIDGE COMMERCIAL, LLC 141 EAST MEADOW DRIVE, SUITE 211 VAIL, CO 81657 ONEWILLOW BRIDGE ROAD ASSOCIATION INC I WILLOW BRIDGE RD VAIL, CO 81657 VAILVILLAGE PLAZA CONDOMINIUM ASSOCIATION PO BOX 2264, C/O SLIFER MANAGEMENT COMPANY, EDWARDS, CO 81632 STEPHEN L STAFFORD 0105 EDWARDS VILLAGE BLVD, SUITE G206, EDWARDS, CO 81632 12 Appendix: Plans for the Proposed Penthouse Unit at the Sebastian 13 -i Ld Ld (f) � 0 n- -i Ld LU 0 z Ln X ,L-L-j � NM 4+ CL d) Cm �R Jai V) =- I io -- 1 11 1 11 'I — -- n�l J w W d D CD LLJ W O a O a J W W J Ui Ui d D 0 Z_ H N X W a� m N o O U � NM C� > (6 N o" o E •`7 J a< Q =' � e R R W y o U ai - Q U N O= U Z Z - Z Q" d ° w �^ U.^ W w- U ;a _a vs = a o �- o_ Fl� —= k _ � y I � I 401 u) w 0❑ n 0 `n P I I 0 ❑0 " I _ to 1 ��° e o Im I i ^ I / / J r '77, I I I I I / I da a 1y 1 a f Z5 / — X / / 6 i I z _ I , m a.' Y m _ ° N e t o m r I.I —t -- I + - - -- — l- i m -- �I r m / m _a vs = a Ld / I I T y = Of I �a I w - - -- uj t4q [ I a kfi$ v, e, 177 h / E -gy R'll- ?I I I� w A r / - , / = i 'CAS lip m o m 1 ----------- ml 1K � m t t CE m t I x l s 1 ----------- Im - -- r 1 — m / ld w� i�m CD LLJ W 0 O 0 LLJ zF LLJ W 0 O 0 LLJ z 0 Q w J ui S H O z 0 z x w a� m N o U 0 = C m j O o N y w E A L 'R on5 X = wo +,, z R � � w N o t/1 U S U z- z w �= a� �.m Ww_ U ;a _a vs = a o �- o_ W7 'EE JE �E 29 b E JE E E E E EJE E� E E I I I I I I I I I I I I I I I5 I I I I h a l l I i — ` s W � II� IIJI \ \ \ O EIEE - I o- 0 - CJ CJ - - I C: J C - -1 - Ell —I 3, 1 o 7 r� li � I I I I I I I li I i z 0 Q w J ui S H O z 0 z x w a� m N o U 0 = C m j O o N y w E A L 'R on5 X = wo +,, z R � � w N o t/1 U S U z- z w �= a� �.m Ww_ U ;a _a vs = a o �- o_ m � a °e sq a 6b o0o n oo em ga E 'E J9 JE i EJi 2 J E E I I I I I I i II III III�� II I I I I I I I I I I I I I i L — -� Lt1Ll - i 0 I I I�I ILL I TAI �I II I j K" in O CL 0 CL M N d d O. z O Q w J W O z 0 w O a O a y U 0 = C W m C L a lip O o Z � N � Q V O c / �A w O �-'Imm Q W 2 U N c� z z= zn Qe Cc .� w =: tz 2 K f Q H'. CO* 0.= d z 0 F- a w O Z W 0 a 0 a� m N o U 0 = C m O o C a= W E A L z O O R }' z R N W y o U Q LU U N z z= z� w �= � a^ ww- vs = a o �- o_ W7 29 b 'EE JE �E E JE E E E E EJE E� E E I I I I I I I I I I I I I I I5 I I I I h a l l I i — ` Hill s W � II� IIJI \ \ \ O EIEE I I - I o- 0 - CI F _ I CJ C -1 � -_ CJ El - E I C: 1-17 - I All' x a a I I I I I o II EllfiEl I I I I I I I I I I I II I I I I &8E I :E I I I I I I z 0 F- a w O Z W 0 a 0 a� m N o U 0 = C m O o C a= W E A L z O O R }' z R N W y o U Q LU U N z z= z� w �= � a^ ww- vs = a o �- o_ z O F— w S H O Z W O d O IL IL a� m N o U j � o �+ N V) hq y C E @ n C O = y o R W L N z R N z t/1 o d) U) W U H Q W S U N z z_ z� w �= a� W w- e- vs = a o �- o_ 'EE ib JE �E E JE E E E E EJE E� I � I I III I`n I II I I I I I I I I I I5 I I I I h a l l I 4 -- i 1 _ + — ` Hill s W � II� IIJI \ I \ \ O I I -- __- I =_ -- _� E LEE -- 0 I . 0 CJ L I CJ C - CJ - = - I I I ` I ElUELID L I I I I I I I I I I II I _ �E I :E I- z O F— w S H O Z W O d O IL IL a� m N o U j � o �+ N V) hq y C E @ n C O = y o R W L N z R N z t/1 o d) U) W U H Q W S U N z z_ z� w �= a� W w- e- vs = a o �- o_ E I a I!�I V $R ERFF $•s �8 i.E a� I d I I 8 I I I 1 — - -.- - - - - - - g _ z I I I - I I I Z O Q ui J W H Q W 0 Z H X W a� m N o U 0 = C m O o C a= W E bA ,z • o R z R � W N o t/1 U R � � Q H � W x U U U Z Z- Z Q" d ° w �^ U.^ W w- U ;a _a vs = a o �- o_ cc N O Is ,s M O N d d IZ In Z O Ui Q w w 0 w O O y o U O = - oa yr is T w CL N< L w 0 k N O CL Q O = }, z V1 � •gyp U) w U Ld r 2 U In z z- =n d ° cc .� w -- � w. 2 =° K f 4„ H'. y- 0.= d E xo E 9s E J E _ J E J E E JE'6E ° w 9 5 Ja I I 1 � I —I — I - -- ,, 1 1 I II _ i ET 1 1 /� 1 x i - I I I I I , I I I I I °E b �E s b G cc N O Is ,s M O N d d IZ In Z O Ui Q w w 0 w O O y o U O = - oa yr is T w CL N< L w 0 k N O CL Q O = }, z V1 � •gyp U) w U Ld r 2 U In z z- =n d ° cc .� w -- � w. 2 =° K f 4„ H'. y- 0.= d I °- � o- o , — — Io - -I .Z /I -.ZZ I 3 � III WI I I II II I u� E� 4•£ ' I I I I I III 1 I. I I. I I. I I I If I 1 I 1 I I 1 1 I I 1 I 1 I I I f I � I f I 1 1 � I i;E; it s uE v �E - 3m z O LU w w 0 w U) O O cL Ir a� m N o U 0 = C m j O o N y d1 w E 8 u (6 n N s' = ao +,, z R � � w N in t/1 U Q W S U z— z° U.^ W w- U ;a _a vs = a rn �� o �- o_ „E gE o8 �E`o SE wE JE r- lu4 - -- - - -- - -- - 61r r. lei I II � I a I 0 0 � I _ I °- � o- o , — — Io - -I .Z /I -.ZZ I 3 � III WI I I II II I u� E� 4•£ ' I I I I I III 1 I. I I. I I. I I I If I 1 I 1 I I 1 1 I I 1 I 1 I I I f I � I f I 1 1 � I i;E; it s uE v �E - 3m z O LU w w 0 w U) O O cL Ir a� m N o U 0 = C m j O o N y d1 w E 8 u (6 n N s' = ao +,, z R � � w N in t/1 U Q W S U z— z° U.^ W w- U ;a _a vs = a rn �� o �- o_ C i� N 1 -- - - -_ I I I i i I I I I 11 I 1 f 1 s .E 3m z 0 Li w V) w 0 w O O Ir a a� m N o U j � o �+ N C E �n • � C a< O = ye R Wo N R � z N c� W U H Q W 2 U U z- z° U.^ W w- U ;a ¢ _a vs = a rn �� o �- o_ SE wE JE JE JE �£ JE`oE _ ¢E5 J C i� N 1 -- - - -_ I I I i i I I I I 11 I 1 f 1 s .E 3m z 0 Li w V) w 0 w O O Ir a a� m N o U j � o �+ N C E �n • � C a< O = ye R Wo N R � z N c� W U H Q W 2 U U z- z° U.^ W w- U ;a ¢ _a vs = a rn �� o �- o_ z 0 F— w J W S H 0 N 0 Z H N X W a� m N o U 0 = C m O o C a= W E A L •R h0' c a- 1 =" Lx 3 = w o R •• gym, z N c� R N w Ld � o t/1 U Q 2 U N Z - Z d ° w �^ U.^ W w- U ;a _a vs = a H o .- o_ E JE J£ JE mE � E E £ i I I ❑❑❑❑ (�— ❑�, —,,' L� L E- D E❑ ❑❑ ❑❑ - -_ -- ,' - LL LJ❑ �o EJE i L =F - LLL id o- - I =1 --- 1 - - - - -= - - - -- — — I I I II I I I II I I II I I I I I I f ° E mE i i Li Li o_£ Li zE •E!E Li LE u= z 0 F— w J W S H 0 N 0 Z H N X W a� m N o U 0 = C m O o C a= W E A L •R h0' c a- 1 =" Lx 3 = w o R •• gym, z N c� R N w Ld � o t/1 U Q 2 U N Z - Z d ° w �^ U.^ W w- U ;a _a vs = a H o .- o_ m to O CL O CL M N d d O. U) z 0 Q w w F- 0 0 LU 0 0 y o U 0 = C ^^� W CL L a o C)k N O ° 1 0- CL z U V) G% w U Q W 2 U (n =n J = d Cc .� U w -- � w. 2 =° K f 4„ H'. CO* 0.= d j8 s° o-- --- �-- L---- �-- - - - - -- , -- o I F — LL -- — ILI II — T---- 7 — — ;I m 3 b mE EE w Bi YEi FE ooQ £E ��SE m to O CL O CL M N d d O. U) z 0 Q w w F- 0 0 LU 0 0 y o U 0 = C ^^� W CL L a o C)k N O ° 1 0- CL z U V) G% w U Q W 2 U (n =n J = d Cc .� U w -- � w. 2 =° K f 4„ H'. CO* 0.= d �F rcd I �a e N n uN Ery e8 a of gE �E zE JE J£ JE 4E o- -I 1---- 1——- - - - -1I - -�— I u I m c i Li Li o_£ Li vE 3£YE SE iE Z O H W J W 2 H (D cn W V) O O cL cL a� m N o U 0 = C m O o C a= W E A L O yss m a- = oe _R a� R u) N W t/1 in ai U a ii w S U N U z z- z° W' t° U .^ W w- U ;a _a vs = a o �- o_ �F rcd Ho oE gE �E zE JE JE �E 4E I I m c i Li Li o_£ Li vE 3£YE SE iE Z O H W J W 2 H (D cn W V) O O a a� m N o U j � o C+ N V) zF C @ m •� � a� = ye R Wo L R N z R w � o H U H Q W S U U z z- z° W' t° U .^ W w- U ;a _a vs = a o �- o_ Z O H Q ui w V) ui ui 0 z x W a� m N o U 0 = C m j O o N y LlJ E 8 u jn bA = W o R z N R v, � w N o t/1 � R � H � W U z z- z° W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ :A a� �b b ffia o° b, I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I /� - ----- —.— — I — — — —. — --- —.— ----- — — — — — o- - - - -- - - -� —I— - -- -- -4 - - - - -- -- - - -II -- //_� - - -- -- L L � a W U im �n ° I Z O H Q ui w V) ui ui 0 z x W a� m N o U 0 = C m j O o N y LlJ E 8 u jn bA = W o R z N R v, � w N o t/1 � R � H � W U z z- z° W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ o- o- _ I� — - - - - -I - -- —� ------ 1-- -4 - - -� -- - -� -- -- -- ---- - - - - -- — ttl_ - i -- - - - - - - - -- - -- -li -- Y a of of � N 9 of nn s° s so s s8 N CL CL M CL U) z O w w 0 w 0 0 y U 0 = C ^^� W m CL N 4 N ` N _ O Q° 1 O CD N o � U s Q W 2 U U z z. =n U .• 2 =° K f 4„ H'. y cm d nD E �E o---- ? - - - -- ------ _- -! - - -j -- -- - - -! -- ----------- -II - -- - -- --- - - -! -- — — -- —' o- o- _ I� — - - - - -I - -- —� ------ 1-- -4 - - -� -- - -� -- -- -- ---- - - - - -- — ttl_ - i -- - - - - - - - -- - -- -li -- Y a of of � N 9 of nn s° s so s s8 N CL CL M CL U) z O w w 0 w 0 0 y U 0 = C ^^� W m CL N 4 N ` N _ O Q° 1 O CD N o � U s Q W 2 U U z z. =n U .• 2 =° K f 4„ H'. y cm d z 0 a LU J LU LUH N w O a O cL cL a� m N o U 0 = C m O o C a= d1 w E N u jn o a -s 1 0 = ao R •• �.. z N c� R - N LU � w y o U � H ¢ U N z z- z° W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ �b b ffia o° b, I I I I I I I I I I I I I I I I I I I o---- I I -4 4- I I I I --------- I I I I I I I I I I -� I I I - - I I I -I I - -�- I - - -I -- I I I 1 o---- -4 -k -- - - -4 -1— I — — — -- - - - - -- -- - - -1 -- - -- — -'. - -.— -- - - -I--- —.— - - - -- T[ I I I I 1 1 1 1 i i I I I I I 1 i I I I 1 I I I I I I I I I I I I I I I a I .az.E p.E �E QE E LE LE z 0 a LU J LU LUH N w O a O cL cL a� m N o U 0 = C m O o C a= d1 w E N u jn o a -s 1 0 = ao R •• �.. z N c� R - N LU � w y o U � H ¢ U N z z- z° W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ o- LJ - -- o- — ❑ �� ❑ � 1 V I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 i I I I 1 I 1 i I I I 1 I I I I I I I I I I I I I I I 1 I 1 I 1 1 17F ol ' E 'E vE z 0 w w LU LU 0 W U) 0 a 0 a a� m N o U j � o �+ N V) hq y C E • � C a< O = ye R N� R •• � z N � t/1 - Q� W � o U H Q w S U N zFz- z W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ �b b ffia o° b, I I I I I I I I I I o---- I I -4 4- ---- I I I I I I I 1----- I I I I I I I I I I -� - I I I - -I - I -�- I - - -I -- I I 1 -- 1 o---- -4 -k -- - - -4 -1— I — — — -- - - - - -- -- - - -1 -- J o- LJ - -- o- — ❑ �� ❑ � 1 V I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 i I I I 1 I 1 i I I I 1 I I I I I I I I I I I I I I I 1 I 1 I 1 1 17F ol ' E 'E vE z 0 w w LU LU 0 W U) 0 a 0 a a� m N o U j � o �+ N V) hq y C E • � C a< O = ye R N� R •• � z N � t/1 - Q� W � o U H Q w S U N zFz- z W' t° U .^ W w- U ;a ¢ _a vs = a o �- o_ ^z r) r) LLJ CD 0 m 2 s� rn a' sad s C O TN co O ate._ dry o e Ey x O cL G r a'E U y 0 z_ U) X Lli o � TIICI` ® ICI o OIL o- - - -!I —Ir I I I � I I I lull I -T z 0 F- Q W J W H Q W C7 z x W o i•�� N III �I� ® ME C) 'LLJ v ) 0 c- C) T T I I II- T 7_ z 0 Q W J W H N Q W w 0 a 0 CL a� m N o U �+ N C E V] u @ v� r� O ' ? r y o _R w N R � z t/1 � W U H Q W 2 U U z z- z ¢tl w �= a� �.m W w- U ;a _a vs = a o �- o_ CD o 0- CD CL O LLJ N F- M 0 L L-L-j 7" 0 Ld _j Ld _j o- -r F- 0 LU (n 0 n- o CD 0 CCD L 1:9 0. t6 E Ld M L) Lu zF C, S H O Z 2 O w W w cl w CO O a O Of a 2 H d' O Z O W w U z W X W m N CL 0 a M O N d d O. d y� U O = - o0 yr iv CL N a' ILo o� L M = 1 R Z C7 M (� W M Q U — Q% ~ W 2 U N C7 z z- zn J = W .m cc = ¢ _m N =- 0.= d O O LLJ O CD x LLJ O O C0 2 0 iz) LU C() 0 0— 0 cr 0— D 0 0 C() X LLJ 0 CL 2 CL O C-4 O. U) o CL Na o IL > (Y) I CZD 4-0 — V) LLJ Q) cn L) W < LLJ L) (0 LD O O O LLJ D 0 O CD x LLJ O Ad Name: 9524360A Customer: TOWN OF VAIL /PLAN DEPT /COMM Your account number is- 1 OP2P 33 Vail Daily PROOF OF PUBLICATION STATE OF COLORADO } }SS. COUNTY OF EAGLE } I, Don Rogers, do solemnly swear that I am a qualified representative ofthe Vail Daily. That the same Daily newspaper printed, in whole or in part and published in the County of Eagle, State of Colorado, and has a general circulation therein; that said newspaper has been published continuously and uninterruptedly in said County of Eagle for a period of more than fifty -two consecutive weeks next prior to the first publication of the annexed legal notice or advertisement and that said newspaper has published the requested legal notice and advertisement as requested. The Vail Daily is an accepted legal advertising medium, only for jurisdictions operating under Colorado's Home Rule provision. That the annexed legal notice or advertisement was published in the regular and entire issue of every number of said daily newspaper for the period of 1 consecutive insertions; and that the first publication of said notice was in the issue of said newspaper dated 9/6/2013 and that the last publication of said notice was dated 9/6/2013 in the issue of said newspaper. In witness whereof, I have here unto set my hand this day, 09/23/2013. General Man ager/Publisher/Editor Vail Daily Subscribed and sworn to before me, a notary public in and for the County of Eagle, State of Colorado this day 09/23/2013. � 2M 4,& 9. -V-� Pamela J. Schultz, Notary Public My Commission expires: November 1, 2015 �pRY PUe/ ' PAMELA J. SCHULTZ 9�� COt -ARP$ My Commismn Expires 11/0112015 THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with section 12 -3 -6, Vail Town Code, on September 23, 2013 at 1:00 pm in the Town of Vail Municipal Building. A request for the review of a variance from Section 12- 14 -17, Setback from Watercourse, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for the construction of gross residential floor area within the prescribed setback, located at 1975 Placid Drive Unit 33 /Lot 33, Vail Village West Filing 2, and setting forth details in re- gard thereto (PEC130025). Applicant: Rosslyn May Valentine Residence Trust, represented by Richard Bolduc Planner: Joe Batcheller The applications and information about the propos- als are available for public inspection during office hours at the Town of Vail Community Develop- ment Department, 75 South Frontage Road. The public is invited to attend site visits. Please call 970 - 479 -2138 for additional information. Sign language interpretation is available upon re- quest, with 24 -hour notification. Please call 970 - 479 -2356, Telephone for the Hearing Im- paired, for information. Published September 6, 2013 in the Vail Daily. (9524360) Ad Name: 9560326A Customer: TOWN OF VAIL /PLAN DEPT /COMM Your account number is- 1 OP2P 33 Vail Daily PROOF OF PUBLICATION STATE OF COLORADO } }SS. COUNTY OF EAGLE } I, Don Rogers, do solemnly swear that I am a qualified representative ofthe Vail Daily. That the same Daily newspaper printed, in whole or in part and published in the County of Eagle, State of Colorado, and has a general circulation therein; that said newspaper has been published continuously and uninterruptedly in said County of Eagle for a period of more than fifty -two consecutive weeks next prior to the first publication of the annexed legal notice or advertisement and that said newspaper has published the requested legal notice and advertisement as requested. The Vail Daily is an accepted legal advertising medium, only for jurisdictions operating under Colorado's Home Rule provision. That the annexed legal notice or advertisement was published in the regular and entire issue of every number of said daily newspaper for the period of 1 consecutive insertions; and that the first publication of said notice was in the issue of said newspaper dated 9/20/2013 and that the last publication of said notice was dated 9/20/2013 in the issue of said newspaper. In witness whereof, I have here unto set my hand this day, 09/27/2013. General Man ager/Publisher/Editor Vail Daily Subscribed and sworn to before me, a notary public in and for the County of Eagle, State of Colorado this day 09/27/2013. � 2M 4,& 9. -V-� Pamela J. Schultz, Notary Public My Commission expires: November 1, 2015 �pRY PUe/ ' PAMELA J. SCHULTZ 9�� COt -ARP$ My Commismn Expires 1110112015 PLANNING AND ENVIRONMENTAL COMMISSION September 23, 2013 at 1:00pm TOWN COUNCIL CHAMBERS / PUBLIC WELCOME 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS PRESENT MEMBERS ABSENT 60 minutes 1. Gore Creek Water Quality Update - Kristen Ber- tuglia 45 minutes 2. A request for a recommendation to the Vail Town Council on a major amendment to Special Development District No. 6, Vail Village Inn, pursu- ant to Section 12- 9A -10, Amendment Procedures, Vail Town Code, to allow for an addition to an ex- isting dwelling unit, located at 16 Vail Road, (The Sebastian) /Part of Lots M, N, and O, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC130021) Applicant: AMPH, LLC, represented by Mauriello Planning Group Planner: Warren Campbell ACTION: MOTION: SECOND:VOTE: CONDITION(S): 3. A request for a recommendation to the Vail Town Council on the adoption of the 2013 Gerald R. Ford Park Master Plan, an assemblage of the 1985 Ford Park Master Plan, the 1997 Ford Park Management Plan, and the 2012 Ford Park Man- agement Plan Amendment, located at 530, 540, and 580 South Frontage Road East/Unplatted, and setting forth details in regard thereto. (PEC130012) Applicant: Town of Vail Planner: George Ruther ACTION: Table to October 14, 2013 MOTION: SECOND:VOTE: 4.A request for the review of a variance from Sec- tion 12- 14 -17, Setback from Watercourse, Vail Town Code, pursuant to Chapter 12 -17, Variances, Vail Town Code, to allow for the construction of gross residential floor area within the prescribed setback, located at 1975 Placid Drive Unit 33 /Lot 33, Vail Village West Filing 2, and setting forth de- tails in regard thereto (PEC130025). Applicant: Rosslyn May Valentine Residence Trust, represented by Richard Bolduc Planner: Joe Batcheller ACTION: Table to October 14, 2013 MOTION: SECOND:VOTE: 5.Approval of September 9, 2012 minutes MOTION: SECOND: VOTE: 6.Information Update 7.Adjournment MOTION: SECOND: VOTE: The applications and information about the propos- als are available for public inspection during regu- lar office hours at the Town of Vail Community De- velopment Department, 75 South Frontage Road. The public is invited to attend the project orienta- tion and the site visits that precede the public hearing in the Town of Vail Community Develop- ment Department. Times and order of items are approximate, subject to change, and cannot be re- lied upon to determine at what time the Planning and Environmental Commission will consider an item. Please call (970) 479 -2138 for additional in- formation. Sign language interpretation is available upon request with 24 -hour notification. Please call (970) 479 -2356, Telephone for the Hearing Im- paired, for information. Community Development Department Published September 20, 2013 in the Vail Daily (9560326)