HomeMy WebLinkAbout2015-1026 PEC". PLANNING AND ENVIRONMENTAL COMMISSION
TOWN 13F October 26, 2015, 1:00 PM
Vail Town Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
Call to Order
Members Present: Brian Gillette, Henry Pratt, Dick Cleveland, Kirk Hansen Webb Martin, John
Ryan Lockman
Members Absent: John Rediker
2. A request for a recommendation to the Vail Town Council for an amendment to the Lionshead
Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the
Master Plan, Lionshead Redevelopment Master Plan, to amend the Detailed Plan
Recommendations for the Evergreen Lodge at Vail, located at 250 South Frontage Road
West/Lot 2W, Block 1, Vail Lionshead Filing 2, and setting forth details in regard thereto.
(PEC140044)
Applicant: Evergreen Lodge at Vail, represented by Mauriello Planning Group
Planner: George Ruther
Action: Recommendation of Approval with Conditions
Motion: Martin Second: Hansen Vote: 6-0-0
Conditions:
1. This recommendation of approval shall be contingent upon the land exchange
occurring and being recorded with the Eagle County Clerk & Recorder.
2. This recommendation of approval shall include clarification of Figure #3 including
the 10 foot wide setback adjacent to Lot 10.
3. This recommendation shall include the striking of language (second sentence) in
Section 5.19.8 concerning contemporary architecture.
Director Ruther introduced the topic and recapped the stopping point of the previous meeting.
Ruther stated that the applicant will be requesting a final action on this item today. That action
will be a recommendation to the Town Council.
Commissioner Hansen requested clarification concerning the trigger mechanism.
Ruther clarified the recommended trigger related to the land exchange.
Commissioner Cleveland asked how this affected the Council's decision.
Ruther clarified the Council's role and timing.
Dominic Mauriello, representing the applicant Evergreen Lodge, walked the commission
through the work that has occurred since the last hearing. Many of these changes were the
result of a request from the commission to remove some of the specificity in the plan. He
presented the proposed land exchange and the items that the commission have found
acceptable at previous meetings. Dominic discussed the new materials including revised
graphics and additional language for clarification purposes. Items addressed include the
pedestrian link between the frontage road and Meadow Drive, the possibilities of shared
parking/refuse management, setbacks, the effect of the land exchange on the site, as well as
architectural considerations.
Mauriello concluded with the benefits of both the land exchange and the changes to the
Lionshead master plan.
Lockman requested clarification on Figure 3.
Cleveland asked if this drawing is to scale.
Mauriello clarified the graphic and its purpose to illustrate the proposed step downs in the
building as it approaches Meadow Drive.
Martin asked if additional language would be helpful.
Ruther anticipated additional refinements to the figures.
Pratt requested that the figure illustrate the south setback.
Hansen asked about the net loss of parking anticipated.
Mauriello clarified that the new development would need to meet the parking requirement of
the Town Code.
Hansen asked for clarification on the setback requirement.
Ruther clarified the setback requirement and the proposed language
Hansen asked about whether the roundabout is contingent upon the Evergreen
redevelopment.
Ruther clarified the moving parts in relation to this item.
Cleveland and Ruther briefly discussed the inclusion of the language related to setbacks and
setback encroachments.
Gillette requested clarification on Section 5.19.8 concerning architecture and the purpose of
the language.
Mauriello provided a response to answer Gillette's question.
Gillette feels that the reference to the existing structures is a departure from the overall
purpose of the master plan. He feels that the language adds confusion to the architectural
intent.
Pratt feels that the language referenced by Gillette is unnecessary, redundant and potentially
confusing.
Ruther spoke to the reasons for the inclusion of the language and Staff's support for the
language.
Cleveland suggested alterations to the language that would make it more acceptable to the
commission.
Gillette spoke to his continued confusion on why the language on existing structures is
included.
Ruther spoke to the language being reinforcing, and not deviating from the architectural
guidelines.
Pratt opened up the meeting for public comment
Jim Lamont, representing the Vail Homeowners Association, spoke to his support for the
covering of Vail Valley Medical Center (WMC) parking and how that might present itself to
surrounding properties/roadways. Jim asked if similar language related to building stepbacks
was included in the Ever Vail plan.
Pratt closed public comment and asked for comments from fellow commissioners.
Lockman asked that the document being presented in its final form prior commission action but
that it would not prevent his vote. Supports process and discussion that has occurred. Overall
he supports the document and will support.
Hansen spoke to his support for the plan and the process and discussion that has occurred.
Hansen spoke to areas of support including parking, lighting, refuse management and the
approach to Mill Creek.
Cleveland generally agrees with his fellow commissioners and asked for clarification related to
mitigation from the roundabout construction and how it relates to Lot 10.
Ruther clarified how the roundabout and Lot 10 discussions might occur related to right-of-way
acquisition.
Martin spoke to his support to Cleveland's requested language change and spoke to his
concerns about how the roundabout might function.
Gillette spoke to his general support for the document and his support for Cleveland's
amendment but asked for an additional sentence to also be removed. This refers to Section
5.19.8.
Cleveland responded with his support for only removing one sentence.
Pratt supports Cleveland's proposed language change. Pratt feels that some of the language is
redundant. Expressed his concern for the live bed policy and the proposed replacement plan
for the accommodation units (AUs). Would like to see an increase in the number of AUs in
tandem with the proposed reduction in AU square footage. May vote in opposition to bring the
Council's attention to this matter.
Cleveland spoke to his role with the WMC and his impartiality. Cleveland spoke to his
uncertainty the role private covenants might have in respect to the plan.
3. A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail Town
Code, to allow for the future development of Employee Housing Units on the Chamonix parcel
located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D, Vail Das Schone Filing 1,
and setting forth details in regard thereto. (PEC150019)
Applicant: Town of Vail Community Development Department
Planner: George Ruther
Action: Table to November 9, 2015
Motion: Cleveland Second: Lockman Vote: 5-0
Director George Ruther introduced the topic. Staff has shared the Commission's concerns on
the parking requirements for this development. Parking has been increased to two spaces per
unit regardless of unit type. About parking 58 spaces will fit on the site of the multiple family
buildings (i.e. 28 units), unless the development program is altered. There may be room to add
up to 6 more parking spaces (i.e. 3 units). Intended goal for this project is to address employee
housing that does not exist in significant quantity in town. These units are intended for families.
This development is intended as a phased plan. We are requesting approval of a development
plan that includes the density, a range of floor areas, landscape areas, site coverage, parking
and development standards. After this first phase, the applicant will return with more details on
the vertical construction.
Hansen asked for a clarification on the phasing.
Ruther explained that the first phase is site improvements only (site access, infrastructure, and
utilities). The Town is also talking with developers to learn more about development
approaches and construction methods. It is also unlikely that a developer would build all the
units at the same time without some pre -sales or a demonstration of the market absorption
rates. We welcome your comments so they can be incorporated into the development plan.
Pratt asked "Given that the client (Town Council) is expected to change in the next several
weeks (due to elections), is it too late to go back?
Ruther indicated that but for a change in the density, the infrastructure can accommodate a
number of configurations and some change in density. There has already been much
community debate on this project, and we are not anticipating significant changes from the
client. He discussed the development plan contents and development standards. If there are
changes to the phases, we may need modifications to the phasing plan as well.
Will Hentschel, 359 Design — Multifamily buildings have shifted slightly to accommodate the 2
parking spaces per unit. Project Guidelines and Goals were reviewed. West end of the site is
mostly undevelopable due to steep slopes. He reviewed the landscaping plan, access plan and
lighting for the site. There are 1.15 acres of open space proposed in plan. During access and
infrastructure construction, over lot grading would prepare the sites for development.
Gillette asked about removing asphalt between the multifamily and the townhomes. He
discussed options to add walking paths to the Northside Grab and Go.
Ruther indicated that removing asphalt would likely require taking access through the Fire
Department site.
Cleveland stated people need to be able to get to the bus stops easily. Both red and green
route busses stop near the fire station, and another stop at the intersection to east of this site.
Ruther indicated that a 6 foot sidewalk is proposed along Chamonix Road.
Pratt indicated we need to address walking paths to the bus stop at the southwest near fire
station.
Hentschel explained the mix of unit sizes
Cleveland stated 3,000 sq. ft. is a large 4 bedroom unit. We might be shooting too high on
size. Also, driveways will require retaining walls. Bridges may be better than retaining walls
and steep driveways. Changes to the plan could allow for a 6t" duplex.
Hentschel responded that there is potential for 3,000 sq. ft. units, but we are aiming for 2,400
sq. ft. (1,200 sq. ft. per level). Garage area is not included in these number ranges. All
duplexes have 2 spaces in a garage and space for another car in front. Most of the townhomes
have 2 spaces in a garage and some have 1 space in front of the garage. Multifamily parking is
provided under the multifamily buildings. Plus 13 guest parking spaces are proposed.
Development standards were reviewed.
Ruther stated we have heard from potential owners that there should be some private outdoor
space on the site, but generally they are OK with some shared space.
Gillette asked why were outdoor patios removed from allowed uses?
Ruther responded that outdoor patios as a land use are referring to dining patios at
restaurants, not private patios on residential units. Private residential patios will be allowed.
Hentschel stated multifamily could be 2-3 levels above podium parking, up to 48' tall. Some
additional design drivers include Pride of Ownership, Connection to Nature, Parking and
Storage, Everyday Conveniences.
Hansen asked how is the approach on energy and design?
Hentschel responded that strong emphasis to help future owners pay lower bills in future. We
look at the insulation closely. We have looked at how this design would compare to LEED as
far as insulation, connectivity, overall sustainability.
Lockman stated Habitat for Humanity does projects with LEED silver or above, with solar
panels too. I would love LEED to be called out in this project. Could the western part of site be
used for Solar photovoltaic (PV) panels?
Hentschel responded that we do not have enough space on buildings to accommodate solar
panels that would provide full offset to electric use.
Gillette encourages the applicant to look at the most cost effective way to be energy efficient.
Solar may not be the best in this project. Smart roof design and insulation can give us more
bang for the buck.
Hentschel stated we will use LEED as a metric for comparison. We will try to use best design
practices and consider issues like snow shedding, and try to avoid the need for heat tape.
Hansen inquired if there are spaces available for kids play areas?
Hentschel responded that the site is steep and not many spaces, but we will consider play
areas.
Public Comment — None
Final Comments
Lockman indicated that I may be a potential future owner in this development. Everything I
have seen is right on. I like the connections to bus stops, but this project needs to be above
and beyond to meet Vail's standards.
Cleveland stated that his concern is with the multifamily. If these will be condominiums, what is
our fallback position is statewide condo laws are not addressed? This is a huge component of
this development.
Ruther responded that the Town Attorney is researching the issues with condominiums. The
Town, as the developer, should not take on any additional liabilities. This is an issue that we
need to figure out. There are a handful of ways that some communities are addressing these
issues and we should wait for a legal response from the Attorney's office.
Cleveland stated that we should be open to expanding parking to areas outside the building
footprint. Maybe under the open space. It's not cheap. You could put a park over the top of the
parking. I'm not a big proponent of heated driveways. There are other ways to do it. People in
our real estate community can tell us what people want in these units.
Gillette stated that the parking improvements are good. We are on the right track
Ruther indicated that we have heard from realtors and prospective buyers that the interiors
need to have better finishes than what we have traditionally seen in employee housing. Brass
door knobs, hollow core doors and cheap counter tops may not be what are best for this
product.
Cleveland stated that this need to be a different product than we have previously built. We
want people and families to move back into Vail. The large 3 bedroom units in employee
housing are the most stable and turn over the least in existing employee housing
developments.
Ruther indicated that people don't want to buy a unit that they know they will soon be leaving.
We have heard from the Town Council that this development should be designed for families.
These people have options for housing product that meet their needs down valley, but not here
in Vail.
Pratt stated that you have a diverse range of products here. In the final presentation, I would
like to see some site sections, with roof forms. Not just blocks. I'm in favor of the guest parking,
but I wonder where the snow storage will be on this plan. Worried that guest parking can
disappear in winter due to snow storage. That eastern multifamily building could go away and
become townhomes.
Cleveland stated that one of the concerns with the multifamily is that the units do not have two
sides (windows). How will accessibility be handled? Will you need elevators?
Hentschel responded that we may need elevators in one of the buildings. It will depend on
construction type and building codes.
Lockman asked that we please show bus stops on the plans.
4. Approval of Minutes
October 12, 2015 PEC Meeting Results
Motion: Cleveland Second: Hansen Vote: 5-0
5. Informational Update: Alan Nazzaro, Housing Manager —There is a court case on the Front
Range that recently discussed this issue of condominiums. Declarations in a condo development
(Villagio) were created by the developer that required arbitration prior to filing a construction defects
lawsuit. The declarations were modified by the HOA without informing the developer, but the court
upheld this arbitration requirement.
6. Adjournment
Motion: Hansen Second: Cleveland Vote: 5-0
Kirk Hansen indicated that he will miss the November 9, 2015 meeting.
Henry Pratt informed us that he will not be able to attend the November 23, 2015 meeting.
The applications and information about the proposals are available for public inspection
during regular office hours at the Town of Vail Community Development Department, 75
South Frontage Road. The public is invited to attend the project orientation and the site
visits that precede the public hearing in the Town of Vail Community Development
Department. Times and order of items are approximate, subject to change, and cannot be
relied upon to determine at what time the Planning and Environmental Commission will
consider an item. Please call (970) 479-2138 for additional information. Sign language
interpretation is available upon request with 48-hour
notification. Please call (970) 479-2356, Telecommunication Device for the Deaf
(TDD), for information.
Community Development Department
01),
PLANNING AND ENVIRONMENTAL COMMISSION
T%V�J OF Vii October 26, 2015, 1:00 PM
Vail Town Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
Call to Order
2. A request for a recommendation to the Vail Town Council for an amendment to the 45 min.
Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and
Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to amend the
Detailed Plan Recommendations for the Evergreen Lodge at Vail, located at 250 South
Frontage Road West/Lot 2W, Block 1, Vail Lionshead Filing 2, and setting forth details in
regard thereto. (PEC140044)
Applicant: Evergreen Lodge at Vail, represented by Mauriello Planning Group
Planner: George Ruther
3. A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail Town 45 min.
Code, to allow for the future development of Employee Housing Units on the Chamonix
parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D, Vail Das
Schone Filing 1, and setting forth details in regard thereto. (PEC150019)
Applicant: Town of Vail Community Development Department
Planner: George Ruther
4. Approval of Minutes
October 12, 2015 PEC Meeting Results
5. Informational Update
6. Adjournment
The applications and information about the proposals are available for public inspection during regular office
hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to
attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community
Development Department. Times and order of items are approximate, subject to change, and cannot be relied
upon to determine at what time the Planning and Environmental Commission will consider an item. Please call
(970) 479-2138 for additional information. Sign language interpretation is available upon request with 48-hour
notification. Please call (970) 479-2356, Telecommunication Device for the Deaf (TDD), for information.
Community Development Department
Published in the Vail Daily October 23, 2015
TO6' d OF V It `
VAIL TOWN PLANNING AND ENVIRONMENTAL AGENDA MEMO
MEETING DATE: October 26, 2015
ITEM/TOPIC: A request for a recommendation to the Vail Town Council for an amendment to the
Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption and Amendment of the
Master Plan, Lionshead Redevelopment Master Plan, to amend the Detailed Plan
Recommendations for the Evergreen Lodge at Vail, located at 250 South Frontage Road West/Lot
2W, Block 1, Vail Lionshead Filing 2, and setting forth details in regard thereto. (PEC140044)
ATTACHMENTS:
ame: Description:
PEC140044 Evergreen Lodge LRMP Text Amendment Memo 102615.pdf Staff Memorandum
D Vail Homeowners Association Written Response 102615.pdf VHA Written Responses
D Evergreen Lodge Master Plan Figures.pdf Master Plan Figures
0
TOWN OF VAIL
Memorandum
TO: Planning and Environmental Commission
FROM: Community Development Department
DATE: October 26, 2015
SUBJECT: A request for a recommendation to the Vail Town Council for an amendment to
the Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption
and Amendment of the Master Plan, Lionshead Redevelopment Master Plan, to
amend the Detailed Plan Recommendations for the Evergreen Lodge at Vail,
located at 250 South Frontage Road West/Lot 2W, Block 1, Vail Lionshead Filing
2, and setting forth details in regard thereto. (PEC140044)
Applicant: Evergreen Lodge at Vail, represented by Mauriello Planning Group
Planner: George Ruther
SUMMARY
The applicant, Evergreen Lodge at Vail, represented by the Mauriello Planning Group,
is requesting a public hearing with the Planning and Environmental Commission
(Commission) to present proposed amendments to the Lionshead Redevelopment
Master Plan (LRMP). The applicant will seek approval of these amendments when the
land exchange between the Vail Valley Medical Center (VVMC) and the Evergreen
Lodge (EL) is finalized. At this time, it is likely the land exchange will occur as
conversations are ongoing and efforts are being made by all parties to execute a final
agreement. This public hearing is the culmination of many worksession meetings held
on this topic that were intended to have a dialogue with the Commission and engage
the community to identify the desired redevelopment outcomes of the Evergreen Lodge
site should a land exchange occur.
II. DESCRIPTION OF REQUEST
The applicant, Evergreen Lodge at Vail, represented by the Mauriello Planning Group,
is requesting a public hearing with the Town of Vail Planning and Environmental
Commission to present proposed amendments Chapter 5, Detailed Plan
Recommendations, subsection 5.19, Evergreen Lodge at Vail, of the Lionshead
Redevelopment Master Plan. The four purposes of the amendments are to:
1. Clearly identify and articulate the desired outcomes of a future redevelopment
of the Evergreen Lodge at Vail property,
2. Remove language from the Master Plan which is no longer relevant or
applicable,
3. Respond to changes in conditions as a result of the land exchange with Vail
Valley Medical Center, and
4. Establish predictability within the review process by providing detailed site
specific recommendations for redevelopment of the Evergreen Lodge at Vail site.
The purpose of this public hearing is to accomplish the following tasks:
1. Present the proposed amendments, as amended, based upon input received
from the Commission and public at the worksession meetings previously held on
this application.
2. Request that the Commission forwards its final recommendation on the
proposed amendment to the Vail Town Council, pursuant to the master plan
amendment review procedures prescribed in the Vail Town Code.
III. PROPOSED AMENDMENTS
The amendments proposed by the applicant have been drafted and will be presented
assuming the proposed land exchange has occurred. Town staff is recommending that
any motion by the Commission recommending approval, or approval with modifications,
of the requested master plan amendment contains a condition that said amendments
are effective upon the date that the land exchange subdivision amendment is recorded
at the Office of the Clerk and Recorder of Eagle County.
Text to be added to the LRMP is shown in bold italics and text to be deleted is shown
in c+rikethre, inh
5.19 Evergreen Lodge at Vail
The Evergreen Lodge at Vail is located directly east of the Middle Creek Stream
Tract and is bordered to the north by the South Frontage Road and to the
east by the Vail Valley Medical Center.,, and-te the -east bythe West StaF RaAt
The lot area is 136,807 114337- square feet or 3.14 acres.
Since the original inclusion in the Lionshead Redevelopment Master Plan, a
portion of the Evergreen Lodge parcel, adjacent to the existing VVMC
parking garage, was sold in 2014 to the Vail Valley Medical Center (VVMC).
Additionally, in 2015, the Evergreen Lodge and the Vail Valley Medical
Center, entered into an agreement to exchange land that resulted in the
Evergreen Lodge acquiring approximately 12,500 sq. ft. of the VVMC
property south of the Evergreen Lodge and VVMC acquiring approximately
9,970 sq. ft. of Evergreen Lodge land east of the Lodge. (See figure ???)
The agreement was reached based on the conclusion of a two-day
Town of Vail Page 2
charrette between VVMC, Town of Vail, and the Evergreen Lodge
representatives, which was conducted in December of 2014 where the
parties developed an overall conceptual redevelopment scheme benefiting
all parties. The resulting land area for the Evergreen Lodge is
approximately 2.68 acres after the land trade. Physical improvements that
currently exist on the site are a nine-story tall hotel/condominium structure
containing 19 dwelling units and 128 accommodation units with an adjoining
two-story tall hotel amenities wing containing a restaurant, cocktail lounge
and bar, meeting rooms and conference facilities, #gone below-grade
structured parking garage containing 52 parking spaces, and paved surface
parking comprised of 85 parking spaces. The nine-story tall structure has a
predominant east-west orientation along the southerly edge of the site while the
facilities wing has a north-south orientation along the westerly edge of the site.
Vehicle access to the site is provided by two existing curb cuts along the
South Frontage Road. No dedicated loading and delivery berths currently
exist on the site. Delivery vehicles often are required to maneuver onto the
site by backing in from the South Frontage Road. The eastern parking
garage is utolozed by the Voil \/olloY M Enol Gent rer fetete Tmreye e parkiRg and is
onnoccorl from the Se ith Frontage Read thre gh o shored omni/ovit w0th the
West Star Ronk effino building. Opportunities for future improvements and
upgrades include:
• Elimination of surface parking and creation of more underground parking;
• Enclosed Loading and Delivery;
• Architectural enhancements consistent with the Lionshead Architectural
Design Guidelines;
• Improved exterior lighting;
• Coordinated vehicular access and implementation of the Vail Streetscape
Master Plan recommendations;
• Creek improvements to improve health and access by the public;
• Improved streetscape and landscaping along the South Frontage Road;
• Improved pedestrian circulation along the South Frontage Road and
connection to West Meadow Drive, and
• Upgraded and expanded hotel accommodations and amenities.
5.19.1 Pedestrian Access
Pedestrian access should be upgraded to provide a safe and attractive
pedestrian connection from the South Frontage Road, through the Evergreen
Lodge development site and/or the adjacent tracts of land owned by the
Town of Vail and the Eagle River Water and Sanitation District, to West
Meadow Drive and with a continuous pedestrian/bicycle path along the South
Frontage Road, as depir.ted GR Map T heroin consistent with the Town's
proposed plans for a roundabout along the frontage of the Evergreen
Lodge property (see figure?) A gravel path connecting the South Frontage
Road to the paved pedestrian path located on the east side of the Dobson Ice
Arena presently exists along the south side of the property. This path, while
Town of Vail Page 3
functional, receives little, if any, regular maintenance and includes a railroad tie
set of stairs that is unsafe and in disrepair. There are currently no pedestrian
improvements located along the South Frontage Road along the Evergreen
Lodge frontage. Though no improvements exist, a fair number of pedestrians
use the southerly edge of the South Frontage Road when entering or exiting the
site or while traveling past the property. In order to improve pedestrian access
and safety, it is recommended that future redevelopment of the site includes the
construction of a continuous pedestrian/bicycle path along the South Frontage
Road and that the existing gravel path along the southerly edge of the site be
improved and regularly maintained. Said iMPFE) eMeRtc may ReGeSSitoto the
inrGGGI feF PP_C_J(_QC_;trian aGGGGG e��(_QAt1._q t#PA-'61g„ the site. Based on the results of
the two-day charrette, the land trade provides an opportunity to create a
pedestrian walkway from the South Frontage Road to West Meadow Drive
along the new shared property line between the structures on both
properties (see figure??). Conceptually, the new walkway could benefit
users of both the WMC and the Evergreen Lodge properties while also
allowing for access by the public. It may be necessary to utilize the Town
owned Lot 10 to accomplish the desired pedestrian connection from South
Frontage Road to West Meadow Drive, a desired public improvement.
5.19.2 South Frontage Road Improvements and Vehicular Access
The site is currently accessed by vehicles from the South Frontage Road #rem
with two, full movement-, tw-G� access points. The current location of these
access points relative to the existing access points for the `"'�aT US Bank
Building, Vail Valley Medical Center parking structure, Town of Vail Municipal
Buildings, and potential future access points to the Vail Valley Medical Center
and Vail International Building results in undesirable traffic flow and turning
movements creating traffic safety, and capacity, and level of service concerns.
In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the
Plan, opportunities for public transportation and vehicular circulation
improvements should be explored in conjunction with any future redevelopment
of the site. Possible opportunities for improvements may include, an improved
mass transit stop, relocated/reduced/shared points of entry/exiting, restricted
access points, acceleration/ deceleration lanes, greater sight distances,
dedicated turning lanes and landscaped medians, and the evaluation and
possible implementation of an intersection solution, such as a roundabout. If
constructed, a full, two lane roundabout could be located along the
frontage of the Evergreen and Town of Vail Municipal site that takes into
account the additional through -traffic needs of the community but also the
future redevelopment of the Town's municipal site, VVMC, and the
Evergreen Lodge properties. Additional study of the roundabout design is
necessary. As envisioned, the roundabout and roadway improvements
would allow for a primary right in, right out vehicular access and a separate
right in, right out service vehicle access to the Evergreen Lodge property.
The proposed roundabout as envisioned encroaches into the Evergreen
Town of Vail Page 4
Lodge property and the Town's municipal site which impacts the future
development of the properties.
In an effort to improve the pedestrian environment along West Meadow
Drive and further reduce the total number of vehicle trips on West Meadow
Drive, vehicular access to the Evergreen Lodge from West Meadow Drive
shall be prohibited.
5.19.3 Preservation of Existing Accommodation Units
The Evergreen Lodge presently contains 128 s"n,mr accommodation units. In
addition, the Evergreen Lodge also contains a restaurant, cocktail lounge and
bar and meeting rooms incidental to the operation of the Lodge. Originally built
in 1974, the existing accommodation units and hotel amenities are old and
outdated. The Lodge was developed to the standards desired more than
four decades ago and likely no longer provides guests with
accommodations meeting more modern standards and expectations. Given
the importance and need for short-term accommodations to the vitality and
success of the community, any future redevelopment of the site shall ensure the
preservation or replacement of the number of short-term accommodation units
on the site, in keeping with the live bed policy in Section 4.13. T49
presepiatinn of shnrF term onnnmmG)datinnc chnI-I'd fnn..c nn mointoining the
Gn �Qite oc �eiell oc reg..iring the presepiatien of 122-
I
` 2- onnnmmniJotinn
�c-ate--veer.-aTrec�umrr���-r�.�reaer-Pcrcrvi-r-vi--rz� crvi-r
..� %Nith this in mini)0 nthe g..olity of the evicting onnMMG)datinUnit nit rnnm
nn..liJ he upgraded and
the}�rnnmc rennnfig..reiJ to e
grets _rnn
m..ltim c..itec A
iRstaRGee, heweyer,,-she- ;ld th(-Q o—urMG61rnr f grnccrTeSidiential fIA_AvrrArea -Qeyeted-to
While the development trend in Vail since
the late 1990's has been to focus on high-end, luxury accommodation units
utilizing more floor area per unit, an opportunity exists to create high
quality accommodation units that are smaller in size and likely to be more
affordable, yet achieve the goals of preserving the existing number of
accommodation units, maintaining live beds on the site, and increasing the
revenues and vitality of the Town. In�Opportunities for increasing the
number of accommodation units beyond the existing 128 units already on-site
should be evaluated during the development review process. For example, the
construction of "attached accommodation units", as dGfineid in the Inning
l7eg6.lotinn6 or the provision of a rental management program, could
significantly increase the availability of short-term rental opportunities°iit"(Q
b6i+Id+Rg. through redevelopment.
5.19.4 Impacts on Middle Creek Stream Tract
The Middle Creek Stream Tract lies to the west of the Evergreen Lodge. The
Tract is owned by the Town of Vail and the Eagle River Water and Sanitation
District. The tracts ares heavily vegetated with several suhctantiol deciduous
trees, a significant lower layer of riparian underbrush and also includes a
Town of Vail Page 5
pedestrian path and a pedestrian bridge. Given the importance of water
quality, it is imperative that any future development on the Evergreen
Lodge site does not negatively impact or encroach upon the existing
riparian corridor of Middle Creek and that it comply with any stream health
initiatives adopted by the Town. Although the site borders the Middle. wool,
StFeam T-FaG+ these tracts, there is no significant amount of quality vegetation
on the site and the parcel lies out of the 100 -year flood plain. As currently
configured, opportunities exist to better recognize the benefits of creek side
development and to improve and enhance the riparian corridor. While
the riparian corridor of Middle Creek should neo remain protected
and preserved, the physical and visual relationships and references between
adjacent development and the stream tracts should be strengthened. Careful
consideration should be taken when approving any application for
development adjacent to the Creek. An opportunity exists to create a
significant connection between the Evergreen Lodge and Middle Creek. Any use
of Middle Creek for aesthetic or recreational purposes, however, should be
subordinate to the preservation of the natural riparian corridor and its inherent
natural character. The Middle Greek Stream Trar_t These stream tracts 4�ay
provide an opportunity for the construction of a recreational path connecting the
South Frontage Road and uses on the Evergreen Lodge property to the
existing pedestrian paths at the Dobson Ice Arena providing a strong
pedestrian connection to West Meadow Drive.
5.19.5 Relationship to the Vail Valley Medical Center and the proposed
Cpntpr Owned Lot 10
Perhaps the most critical functional relationship is the need to coordinate any
future development on the Evergreen Lodge site with the Vail Valley Medical
Center. For example, odor„ offer+ chef ild be to Lon +e once ire. that fut.- it 1
dey pme.c cTr E��e�eeR e site �'c-dees RetpreE ... 'v�aiI Va
MGdmGal Ce.pter from ronenfig trine tho design of the morlinol non+or +e eliminoto
FreRtage °dam i nal opportunities for coordination may include, shared
service and delivery facilities, grading and site improvements, shared parking,
and pedestrian pathway connections. onrl lonrl ovnhaRges Both parties have
taken steps to ensure the properties can be redeveloped in a more
coordinated manner by executing the land exchange. The land exchange
provides better access length, frontage, and redevelopment opportunities
to the Vail Valley Medical Center by securing additional South Frontage
Road access and providing a location for a possible future emergency
helipad providing direct access to medical facilities on -campus. The
exchange of land affords the Evergreen Lodge and VVMC an opportunity to
construct an important pedestrian connection from the South Frontage
Road to West Meadow Drive, thereby strengthening the pedestrian
connection into Lionshead and Vail Village. The land exchange also allows
for improved vehicular access by providing a reasonable location for a
roundabout located in front of and on the Evergreen Lodge property
Town of Vail Page 6
improving access to both properties. This pedestrian connection could
potentially utilize a one-story deck that could cover surface parking on the
VVMC campus. While a deck provides covered parking screened from
public view, it also introduces a landscape element and plaza benefiting the
views and use by patrons from Evergreen Lodge, and-VVMC, and the
community at large. In order for a connection and landscape enhancement
to be successful, i*�be it may require that it to be developed with
reduced or zero setbacks between the properties and may require stairs
and elevator access on or adjacent to Lot 10.
The Town of Vail owns Lot 10. Lot 10 is located at the southwest corner of
the existing VVMC campus and at the southern end of the land included in
the land trade to the Evergreen Lodge (see figure ??). The southerly
portion of Lot 10 is used for right of way developed as West Meadow Drive
street and sidewalk improvements and the northerly portion is a surface
parking lot currently used jointly by WMC and the Town's library
personnel. A potential development alternative would be to allow a portion
of Lot 10 to be used by the Evergreen Lodge to provide a stronger
connection to West Meadow Drive or as potential mitigation for roundabout
impacts to the Evergreen property. Any private use of Lot 10 not required
to offset roundabout impacts on Evergreen Lodge, including use by VVMC
and the Evergreen Lodge shall provide a public benefit to the
community a44d with interest, vitality, and interaction with pedestrians
along West Meadow Drive, such as public art or a public park and provide
for pedestrian access of Evergreen Lodge patrons. Lot 10 could be utilized
to complete the pedestrian connection to West Meadow Drive.
Opportunities may exist for the shared parking and loading between the
Evergreen Lodge and VVMC, subject to agreements between the two
parties. Such shared uses, however, are not mandated.
Since it is unlikely that the redevelopment of the Evergreen Lodge and
VVMC will occur within the same timeframe, any redevelopment of the
Evergreen Lodge property or VVMC property will need to provide
appropriate interim development solutions that allow the properties to be
developed in a functional and aesthetic fashion. Guarantees and/or
temporary improvements such as landscape buffers and pedestrian paths
may be required of any redevelopment proposals in the interim.
5.19.6 Service and Delivery
Service and delivery functions for the hotel are currently accommodated on
grade from the westerly entrance to the property. Service and delivery for the
redeveloped Evergreen Lodge shall occur within the structures or
otherwise be hod dtQ radequately screened from public view. Service and
delivery truck turning maneuvering shall not negatively impact traffic flow on the
South Frontage Road and a separate loading and service entrywW maybe
allowed in conjunction with the construction of a potential new roundabout
Town of Vail Page 7
5.19.7 Setbacks 499 the South Creentage Read
Special consideration should be given to the setback of buildings from the South
Frontage Road. Pursuant to the Lionshead Mixed Use -1 zone district setback
standards, a minimum 10 -foot (10') setback is required. Given the relationship of
the development site to the South Frontage Road, the need for adequate area for
vehicular traffic circulation, the importance of a landscape area to visually screen
the massing of the building, and the existence of a 30 -foot wide utility easement
along the southerly edge of the South Frontage Road, the minimum required
front setback for the Evergreen Lodge development site shall be thirty feet (30').
This increased setback requirement shall supersede the 10 -foot setback
requirement prescribed in Section 12-7H-10, Setbacks, Vail Town Code.
Based upon the coordinated efforts between the Evergreen Lodge and the
Vail Valley Medical Center, opportunities exist for a covered parking deck
and pedestrian access landscape plaza to be developed between the
properties with the goal of screening surface parking and enhancing the
visual quality of the area. If appropriately designed, a reduced or zero set
back in these areas may be proposed for review during the development
review process. Additionally, below grade improvements, including but not
limited to, parking and vehicular circulation improvements may be
developed within the required setbacks, if found to be consistent with the
Town's development objectives.
5.19.8 Architectural Improvements and Building Heights
The architectural design guidelines (Chapter 8) discuss several transition tools
that can be used to adapt an existing building to the new character and
architectural quality desired for Lionshead. Given the high visibility of the
buildings on this site and the extent to which they influence the quality of the
experience of passers-by, all future development on the site should be closely
scrutinized for compliance with the applicable architectural design guidelines.
That said, the Evergreen Lodge is located in a transitional area with VVMC,
the Library, and Dobson Arena, which tend to have more modern or
institutional architecture. It may be appropriate to allow the Evergreen
Lodge to be redeveloped with a contemporary expression of alpine
architecture to address this transitional location provided it is found to be
consistent with the Town's development objectives and adopted design
guidelines. The building will need to have a relationship to adjacent
buildings and pedestrian corridors. With the addition of the land acquired
Town of Vail Page 8
from the Vail Valley Medical Center, the Evergreen Lodge has the
opportunity to step building mass down towards West Meadow Drive in a
north/south orientation. Building mass should step down from the South
Frontage Road to the south boundary of the Evergreen Lodge property.
The building on the exchange parcel should step down to a maximum of
four or five stories with complementary roof forms to achieve a more
pedestrian scale building, consistent with the west wing of the medical
center (see figure ??), and subject to design review. The final building
massing, scale and form shall be determined during the development
review process.
5.19.9 Public Transit Stop
A public transit stop is presently located east of the `"'�aT US Bank Building,
across the street from the Town Municipal offices. Through the future
redevelopment of the Evergreen Lodge and the Vail Valley Medical Center, an
opportunity exists to potentially relocate the transit stop to a more optimal
location.
V. BACKGROUND
The Evergreen Lodge was previously zoned Special Development District No. 14 with
an underlying zoning of High Density Multiple -Family. The Special Development District
(SDD) was established via Ordinance No. 5, Series of 1986. The SDD permitted 128
accommodation units, 19 dwelling units, a restaurant, lounge, spa, and meeting
room/conference facility space.
On December 20, 2005, Resolution No. 23, Series of 2005, was approved by the Vail
Town Council amending the Lionshead Redevelopment Master Plan to include detailed
plan recommendations for the Evergreen Lodge site and amend the boundaries of the
Lionshead Study Area. Additionally, Ordinance No. 30, Series of 2005, was adopted
establishing Lionshead Mixed Use 1 District zoning for the Evergreen Lodge parcel.
On August 10, 2015, the Planning and Environmental Commission held a worksession
to begin discussion regarding the proposed master plan amendment application. As a
result of the worksession and public comment, a number of questions and issues were
raised.
On September 14, 2015, the Planning and Environmental Commission held a
worksession to continue discussions regarding the proposed master plan amendments.
As an outcome of the worksession, the Commission voted unanimously to continue the
public hearing.
On September 28, 2015, the Planning and Environmental Commission held a
worksession to continue discussions regarding the proposed master plan amendments.
In sum, the Commission recommended a number of changes be made to the
Town of Vail Page 9
amendments to provide less specificity with regard to certain plan recommendations.
The Commission's preference was to have document more general in nature while still
proposing possible or potential options and solutions.
VI. APPLICABLE PLANNING DOCUMENTS
Staff believes that the following provisions of the Vail Town Code are relevant to the
review of this proposal:
TITLE 12: ZONING REGULATIONS
Article 12-7H Lionshead Mixed Use 1 (LMU-1) District (in part)
12-7H-1: PURPOSE:
The Lionshead mixed use 1 district is intended to provide sites for a mixture of multiple -
family dwellings, lodges, hotels, fractional fee clubs, timeshares, lodge dwelling units,
restaurants, offices, skier services, and commercial establishments in a clustered,
unified development. Lionshead mixed use 1 district, in accordance with the Lionshead
redevelopment master plan, is intended to ensure adequate light, air, open space and
other amenities appropriate to the permitted types of buildings and uses and to maintain
the desirable qualities of the zone district by establishing appropriate site development
standards. This zone district is meant to encourage and provide incentives for
redevelopment in accordance with the Lionshead redevelopment master plan.
This zone district was specifically developed to provide incentives for properties to
redevelop. The ultimate goal of these incentives is to create an economically vibrant
lodging, housing, and commercial core area. The incentives in this zone district include
increases in allowable gross residential floor area, building height, and density over the
previously established zoning in the Lionshead redevelopment master plan study area.
The primary goal of the incentives is to create economic conditions favorable to
inducing private redevelopment consistent with the Lionshead redevelopment master
plan. Additionally, the incentives are created to help finance public off site
improvements adjacent to redevelopment projects. With any
development/redevelopment proposal taking advantage of the incentives created
herein, the following amenities will be evaluated. streetscape improvements,
pedestrian/bicycle access, public plaza redevelopment, public art, roadway
improvements, and similar improvements.
LIONSHEAD REDEVELOMENT MASTER PLAN
2.3 Policy Objectives
The Town Council adopted six policy objectives on November 4, 1996 to outline the
important issues to be addressed in the master plan and to provide a policy framework
for the master planning process.
Town of Vail Page 10
2.3.1 Renewal and Redevelopment
Lionshead can and should be renewed and redeveloped to become a warmer,
more vibrant environment for guests and residents. Lionshead needs an
appealing and coherent identity, a sense of place, a personality, a purpose, and
an improved aesthetic character.
2.3.2 Vitality and Amenities
We must seize the opportunity to enhance guest experience and community
interaction through expanded and additional activities and amenities such as
performing arts venues, conference facilities, ice rinks, streetscape, parks and
other recreational improvements.
2.3.3 Stronger Economic Base Through Increased Live Beds
In order to enhance the vitality and viability of Vail, renewal and redevelopment in
Lionshead must promote improved occupancy rates and the creation of
additional bed base ("live beds" or "warm beds') through new lodging products.
Live beds and warm beds are best described as residential or lodging rooms or
units that are designed for occupancy by visitors, guests, individuals, or families
on a short term rental basis. In order to improve occupancy rates and create
additional bed base in Lionshead, applications for new development and
redevelopment projects which include a residential component shall provide live
beds in the form of accommodation units, fractional fee club units, lodge dwelling
units, timeshare units, attached accommodation units (i.e, lock -off units), or
dwelling units which are included in a voluntary rental management program and
available for short term rental. Further, it is the expressed goal of this Plan that
in addition to creating additional bed base through new lodging products, there
shall be no net loss of existing live beds within the Lionshead Redevelopment
Master Plan study area.
2.3.4 Improved Access and Circulation
The flow of pedestrian, vehicular, bicycle and mass transit traffic must be
improved within and through Lionshead.
2.3.5 Improved Infrastructure
The infrastructure of Lionshead (streets, walkways, transportation systems,
parking, utilities, loading and delivery systems, snow removal and storage
capacity) and its public and private services must be upgraded to support
redevelopment and revitalization efforts and to meet the service expectations of
our guests and residents.
4.13 Live Beds
The maintenance, preservation, and enhancement of the live bed base are critical
to the future success of Lionshead and as such, special emphasis should be
placed on increasing the number of live beds in Lionshead as the area undergoes
redevelopment. The Lionshead area currently contains a large percentage of the
Town's overall lodging bed base. The bed base in Lionshead's consists of a
variety of residential and lodging products including hotels, condominiums,
timeshares and hybrids of all three. The vast majority of live beds in Lionshead
Town of Vail Page 11
are not accommodation units in hotels, but instead, in dwelling units in residential
condominiums such as the Vail 21, Treetops, Antlers Lodge, Lion Square Lodge,
Lifthouse Lodge, Landmark Tower and Townhomes, Lionshead Arcade, and
Montaneros, all of which have some form of rental/property management program
that encourages short term rental of dwelling units when the owners are not in
residence. It has been the experience in Lionshead that condominium projects
which include a voluntary rental management program have occupancy rates
which exceed the occupancy rate of hotel products, and therefore tend to provide
more live beds and produce more lodging tax revenues to the Town. Applications
for new development or redevelopment which maintain, preserve, and enhance
the live bed base in Lionshead have a significantly greater chance of approval in
the development review process than those which do not.
4.13.1 Live Bed Definition
Pursuant to Policy Objective 2.3.3, live beds (and warm beds) are defined
as residential or lodging rooms or units that are designed for occupancy
by visitors, guests, individuals, or families, on a short term rental basis. A
live bed may include the following residential products. accommodation
units, fractional fee club units, lodge dwelling units, timeshare units,
attached accommodation units (i.e., lock -off units), and dwelling units
which are included in a voluntary rental management program and
available for short term rental.
4.13.2 Location of Live Beds
Live beds should be located in Lionshead pursuant to the Lionshead
Mixed Use 1 and 2 zone districts. All properties within Lionshead, when
developing or redeveloping and providing new residential or lodging
products, should provide live beds as defined herein.
4.13.3 Hotel -types of Services and Amenities
To aid in the furtherance of Policy Objective 2.3.3 of the Plan, the creation
of additional live beds should include hotel -types of services and
amenities. Such services and amenities may include, but not be limited
to, the operation of a front desk, registration/reservation capabilities,
recreational amenities, guest drop-off, on-site management, etc. These
types of services and amenities in multiple family residential dwellings will
increase the likelihood that the dwelling units will be made available for
short term occupancy and help to promote improved occupancy rates.
4.13.4 Review of New Development and Redevelopment Projects
The Planning and Environmental Commission shall consider the policies
and direction given by this Plan with respect to live beds when reviewing
new development and redevelopment projects in Lionshead. Applications
for new development or redevelopment shall maintain the live bed base in
Lionshead. Applications for new development and redevelopment which
enhance the live bed base have a significantly greater chance of approval
in the development review process than those which do not. A proposal's
Town of Vail Page 12
adherence to the policies contained in the adopted master plan will be one
of the factors analyzed by staff, the Planning and Environmental
Commission (PEC), the Design Review Board (DRB), and the Town
Council (as applicable) in determining whether to approve or disapprove
the specific proposal.
VAIL LAND USE PLAN
CHAPTER 11— LAND USE PLAN GOALS / POLICIES.-
The
OLICIES.The goals articulated here reflect the desires of the citizenry as expressed through the
series of public meetings that were held throughout the project. A set of initial goals
were developed which were then substantially revised after different types of opinions
were brought out in the second meeting. The goal statements were developed to reflect
a general consensus once the public had had the opportunity to reflect on the concepts
and ideas initially presented. The goal statements were then revised through the review
process with the Task Force, the Planning and Environmental Commission and Town
Council and now represent policy guidelines in the review process for new development
proposals. These goal statements should be used in conjunction with the adopted Land
Use Plan map, in the evaluation of any development proposal.
The goal statements which are reflected in the design of the proposed Plan are as
follows.
1. General Growth/ Development
1.1 Vail should continue to grow in a controlled environment, maintaining a balance
between residential, commercial and recreational uses to serve both the visitor and
the permanent resident.
1.2 The quality of the environment including air, water and other natural resources
should be protected as the Town grows.
1.3 The quality of development should be maintained and upgraded whenever
possible.
1.13 Vail recognizes its stream tract as being a desirable land feature as well as its
potential for public use.
3. Commercial
3.1 The hotel bed base should be preserved and use more efficiently.
3.2 The Village and Lionshead areas the best location for hotels to serve the future
needs of destination skiers.
3.3 Hotels are important to the continued success of the Town of Vail, therefore
conversion to condominiums should be discouraged.
Town of Vail Page 13
3.4 Commercial growth should be concentrated in existing commercial areas to
accommodate both local and visitor needs.
4. Village Core/ Lionshead
4.1 Future commercial development should continue to occur primarily in existing
commercial areas. Future commercial development in the Core areas needs to be
carefully controlled to facilitate access and delivery.
4.2 Increased density in the Core areas is acceptable so long as the existing
character of each area is preserved through implementation of the Urban Design
Guide Plan and the Vail Village Master Plan.
4.4 The connection between the Village Core and Lionshead should be enhanced
through.-
a.
hrough:a. Installation of a new type of people mover.
b. Improving the pedestrian system with a creatively designed connection,
oriented toward a nature walk, alpine garden, and/or sculpture plaza.
c. New development should be controlled to limit commercial uses.
5. Residential
5.1 Additional residential growth should continue to occur primarily in existing,
platted areas and as appropriate in new areas where high hazards do not exist.
5.2 Quality time share units should be accommodated to help keep occupancy rates
up.
5.3 Affordable employee housing should be made available through private efforts,
assisted by limited incentives, provided by the Town of Vail, with appropriate
restrictions.
5.4 Residential growth should keep pace with the market place demands for a full
range of housing types.
5.5 The existing employee housing base should be preserved and upgraded.
Additional employee housing needs should be accommodated at varied sites
throughout the community.
VII. CRITERIA
Amendments to the Lionshead Redevelopment Master Plan require a public hearing
review process as outlined in Section 12-3-6 of the Town Code. If approved,
amendments are adopted by the passage of a resolution by the Vail Town Council.
According to the Lionshead Redevelopment Master Plan, amendments to the Master
Plan must address the following review criteria:
Town of Vail Page 14
How have conditions changed since the plan was adopted?
The Lionshead Redevelopment Plan was first adopted in 1998. Since its original
adoption, the Plan has been amended several times. To date, the Plan has served the
community well as more than twenty redevelopment projects have been completed
within the Lionshead Study Area since 1998. As a result of these redevelopment
projects, the community and property owners within Lionshead have been progressing
incrementally towards achieving the six development objectives prescribed within the
Plan. Undoubtedly, the Plan has been a success.
A number of conditions affecting the community and those properties governed by the
Lionshead Redevelopment Master Plan have changed since the Plan's adoption in
1998. Those conditions include:
• A dramatic rise in real estate value has occurred.
• The local, regional, national and global economies were impacted by the Great
Recession.
• The Vail community experienced a more than $2.513 town -wide redevelopment
and renaissance.
• The Vail Valley Medical Center adopted a master facilities plan and is currently
underway with a +/- $125M redevelopment project.
• A land exchange affecting the boundary lines and site area configurations of the
Vail Valley Medical Center and Evergreen Lodge has been initiated.
• A need to complete South Frontage Road traffic circulation improvements in the
immediate vicinity of the Evergreen Lodge, Vail Valley Medical Center Campus
and the Town of Vail Municipal site has been identified.
• The effectiveness and relevancy of the economic incentives identified nearly
twenty years ago and subsequently adopted in the 1998 Lionshead
Redevelopment Master Plan have changed (i.e. grfa/dwelling unit per acre ratio)
• Vail's annual summer and winter guest visitation has grown to more than 1.2M
guests in the summer and 1.7M skier visits in the winter, respectively.
• Real estate buyer preferences and expectations have evolved and changed
since 1998.
• The advent of VRBO and AirBnB along with other aspects of the new and
evolving sharing economy has altered the face of the short-term
accommodations market.
How is the plan in error?
The plan, as adopted, and as it governs the redevelopment of the Evergreen Lodge, is
not in error. The demonstration of plan error, however, is not a requirement of a master
plan amendment review and approval process. Instead, it is but one of three possible
reasons for approving a master plan amendment.
Town of Vail Page 15
How would an addition, deletion, or change to the plan be in concert with the plan
in general?
The 1998 Lionshead Redevelopment Master Plan identifies six fundamental design or
development objectives. Each of the objectives is aimed at addressing and responding
positively to certain shortcomings of the existing conditions of the physical and built
environment within the Lionshead area. Upon adoption of the master plan, procedures
were put in place to allow for future amendments to occur to the Plan throughout its
useful lifetime. To date, a number of amendments have been approved and adopted.
In each instance, the amendments did not fundamentally change or alter the six
development objectives originally adopted with the Plan. Instead, the amendments
served to further ensure that each of the objectives would be achieved.
The additions, deletions, and changes proposed to the Chapter 5, Detailed Plan
Recommendations, of the Lionshead Redevelopment Master Plan for the Evergreen
Lodge are in concert with the Plan and its development objectives. For instance, the
following list of detailed plan recommendations demonstrates the how the Plan remains
in concert with the development objectives:
• 128 accommodation units are being preserved on the Evergreen Lodge site.
• Improvements are recommended for South Frontage Road traffic circulation.
• On site loading and delivery is being provided within the future structure and off
site delivery truck maneuvering will be eliminated.
• A north/south pedestrian connection between West Meadow Drive and the
South Frontage Road will be accommodated.
• Improvements and enhancements to the Middle Creek stream corridor and
riparian areas are being preserved.
• The redevelopment of the existing Evergreen Lodge shall comply with the
adopted development standards and design guidelines established for
Lionshead.
VIII. STAFF RECOMMENDATION
The Community Development Department recommends that the Town of Vail Planning
and Environmental Commission forwards a recommendation of approval of the
proposed amendment to the Lionshead Redevelopment Master Plan, pursuant to
Section 2.8, Adoption and Amendment of the Master Plan, Lionshead Redevelopment
Master Plan, to amend the Detailed Plan Recommendations for the Evergreen Lodge at
Vail, located at 250 South Frontage Road West/Lot 2W, Block 1, Vail Lionshead Filing
2, and setting forth details in regard thereto. Staff's recommendation of approval is
based upon the review of the proposed amendments and the criteria outlined in Section
VII of the memorandum, dated October 26, 2015 and the evidence and testimony
presented throughout the public hearing process. More specifically, the staff believes
the applicant has demonstrated that conditions have changed since the plan was
adopted and that the amendment, as proposed, is in concert with the adopted goals and
objectives of the plan in general.
Town of Vail Page 16
Should the Planning and Environmental Commission choose to forward a
recommendation of approval of the proposed master plan amendment to the Lionshead
Redevelopment Master Plan, staff recommends the Commission approves the following
motion:
"The Town of Vail Planning and Environmental Commission recommends
the Vail Town Council approves the requested amendment to the
Lionshead Redevelopment Master Plan, pursuant to Section 2.8, Adoption
and Amendment of the Master Plan, Lionshead Redevelopment Master
Plan, to amend the Detailed Plan Recommendations for the Evergreen
Lodge at Vail, located at 250 South Frontage Road West/Lot 2W, Block 1,
Vail Lionshead Filing 2. The recommendation of approval is based upon
the Commission's review of the proposed amendments, as amended over
the course of the public hearing process and the finding that the applicant
has demonstrated to the satisfaction of the Commission that conditions
within the Lionshead Study Area have changed since the original adoption
of the master plan and that the requested additions, deletions, or changes
to the plan are in concert with the adopted development objectives,
outlined in Section Vll of the memorandum dated October 26, 2015."
IX. ATTACHMENTS
Attachment A - Written response to the letter from the Vail Homeowners
Association Inc., dated September 14, 2015.
Attachment B - Evergreen Lodge Master Plan Figures
Town of Vail Page 17
Vail Homeowners Association. Inc.
P.O. Box 238
Vail, Colorado 81658
vha@vail.net
October 15, 2015
Dear Mr. Jim Lamont,
The purpose of my letter is to provide you with a written response to the questions you raised on behalf
of the Vail Homeowners Association, Inc. with regard to the review of the proposed Lionshead
Redevelopment Master Plan amendment for the Evergreen Lodge. The responses are highlighted in
italic text below:
Will the Evergreen master plan amendment provide the same level of design detail as that provided
by the VVMC (master plan), if not, why not?
The master plan amendment is proposed to include an appropriate amount of design level detail to be
consistent with the intended purpose of Chapter 5, Detailed Plan Recommendations as outlined in the
Lionshead Redevelopment Master Plan. According to Chapter 5,
"The intent of this Chapter ... and the Master Plan as a whole... is to identify important
functional relationships and visual objectives within the District and to propose a
framework for the long-term redevelopment of Lionshead. The document does not
intend to limit or eliminate ideas relating to specific parcels; any proposals consistent
with this framework should be considered even if they are not anticipated in this
document."
For consistency purposes, and to ensure the overall success of the master plan document, the Town staff
will continue to recommend that the proposed amendment contains the appropriate amount of design
level detail. This approach has proven to be successfully in the redevelopment of nearly twenty
properties throughout the District during the past 10 —12 years.
What is the bulk, mass and height profile as the Evergreen stair steps from the South Frontage Road
to the West Meadow Drive? What is the grade and relationship to West Meadow Drive of the plaza
proposed to cover the VVMC surface Parking lot, shown in the Evergreen graphic presented to the
PEC?
A diagrammatic profile is currently being created to illustrate the conceptualized bulk, mass and building
height of development on the site. The profile will be incorporated into the final master plan
amendment. As presently proposed, the height of any future structure on the site shall be consistent
with the bulk, mass and height limitations prescribed within the Lionshead Mixed Use —1 zone district
(82.5 feet maximum/71 feet maximum average). It is recommended that the building height, bulk and
mass steps down to 4 to 5 stories maximum as it approaches Lot 10 and West Meadow Drive. This
height is consistent with the height of the Vail Valley Medical Center on the adjoin parcel. The final
proposed bulk, mass and building height is subject to design review at the time of development plan
approval.
As currently conceptualized, the pedestrian and landscaped plaza covering the surface parking lot at
VVMC is indicated to be approximately 14 feet to 16 feet in height. The final height determination, if
proposed and built, has yet to be determined. Similar to many other aspects of any future
redevelopment proposal, the plaza is subject to design review at the time of development plan approval.
If the Evergreen was to assume control of the Town owned Lot 10, what would be the intended use?
The speculative nature of the question makes is difficult to answer. Any answer to the question would
itself be nothing more than speculation as the owner of the Evergreen has not expressed an interest or
desire to assume control of the Town owned Lot 10. The Town has indicated, in very general terms, that
any future use of Lot 10 would need to be a public/quasi-public use and demonstrate a public benefit to
the community.
What is the treatment of Middle Creek including the width of the existing and proposed stream
setbacks and any required restoration?
Middle Creek is an identified tributary of Gore Creek. As such, the existing watercourse setbacks for
development are 30 feet from the centerline of the water way. Further, development is prohibited within
the delineated 100 -year floodplain. No changes to the water course setbacks are proposed in the master
plan amendment.
A development application for future redevelopment of the Evergreen site has not been submitted for
review. As such, it is difficult to determine what, if any, direct impacts of development require mitigation
at this time. At a minimum, however, the town staff is recommending that additional language be
added to the master plan obligating the Evergreen owner to comply with any stream health initiatives,
policies, and/or regulations that are adopted town -wide as the community moves forward on improving
and further enhancing water quality within Gore Creek.
Is it a prudent decision to place a hotel structure immediately adjacent to the proposed VVMC
heliport?
Yes. The Town of Vail, the Vail Valley Medical Center and the Evergreen Lodge have cooperatively
analyzed and study the feasibility of siting an emergency helipad on the VVMC campus. The analysis and
study was completed by independent, qualified emergency helicopter consultants as part of an extended
public hearing process. Modifications and accommodations were made to the 2015 VVMC Master Plan
recommendations and are similarly being proposed and recommended in the Evergreen Master Plan
Amendment. Additional review and analysis will be required prior to the adoption of any development
plan approval for the VVMC campus and/or the Evergreen Lodge.
Does the proposed Evergreen amendment preclude an enclosed sky bridge link between the
Evergreen and Town of Vail Municipal sites?
No, the Evergreen Master Plan Amendment does not preclude an enclosed sky bridge link between the
Evergreen and the Town of Vail Municipal sites.
Does the Evergreen amendment foreclose the redevelopment opportunities for the Town of Vail Civic
Center Site, as has been made public in Town Council deliberations?
No, the Evergreen Master Plan Amendment does not foreclose the redevelopment opportunities for the
"Town of Vail Civic Center Site" as the area conceptualized for Civic Center improvements does not
include any privately owned parcels of land such as the Evergreen Lodge property.
Has the applicant and the Town made contact with the Vail International Building Condominium
Association and other adjacent property owners with respect to the proposed master plan
amendments?
Public notice of the proposed master plan amendment has been provided subject to the Vail Town Code
coo
o
r
r U,
•a X F .. .� f 7 r" ,
N O LL 1' i
mQC'J :ir7 i
F I:J !
y f r
_
w
LU
LLJco
I r-
LU
!
z r r
+4 j,-cor
I
co
Lu
_
w
LUN
N
Q � 00
Q
5W
'F—
v+
W
C)
O
J
E
co
1
co
Un
TO6' d OF V It `
VAIL TOWN PLANNING AND ENVIRONMENTAL AGENDA MEMO
MEETING DATE: October 26, 2015
ITEM/TOPIC: A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail
Town Code, to allow for the future development of Employee Housing Units on the Chamonix
parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D, Vail Das Schone Filing
1, and setting forth details in regard thereto. (PEC150019)
ATTACHMENTS:
Name: Description:
d PEC150019 Chamonix Development Plan 102615.pdf Staff Memorandum
D Chamonix PEC MEETING 10-26-15 Fina101-13.pdf Chamonix Presentation Pages 1-13
D Chamonix PEC MEETING 10-26-15 Fina114-19.pdf Chamonix Presentation Pages 14-19
rowN of vain
Memorandum
TO: Planning and Environmental Commission
FROM: Community Development Department
DATE: October 26, 2015
SUBJECT: A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail
Town Code, to allow for the future development of Employee Housing Units on the
Chamonix Parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D,
Vail Das Schone Filing 1, and setting forth details in regard thereto (PEC150019)
Applicant: Town of Vail, represented by Will Hentschel, 359 Design
Planner: George Ruther
I. SUMMARY
The Town of Vail acquired the Chamonix Parcel in West Vail for the expressed purpose of
constructing a new West Vail Fire Station and an affordable housing development on the
combined area of the site. Since the acquisition, the Town of Vail, in participation with the West
Vail neighborhood and the Chamonix Advisory Committee, completed and adopted a master
plan for the future development of the site.
The Chamonix Master Plan was first adopted by the Vail Town Council in 2005, and the plan
was subsequently amended in 2009. The most significant change resulting from the
amendment approval was the ability to gain vehicular access to the duplex units from Chamonix
Lane. In the end, the "Neighborhood Block Scheme" was selected by the community as the
preferred alternative for future development on the site.
Developing affordable housing on the Chamonix Parcel is a development objective of the Town
of Vail. Determining the potential viability for affordable housing to be built on the Chamonix
Parcel and completing a first phase of development on the property has been identified as a key
initiative of the Vail Town Council. In the end, this action helps achieve the Town Council's
adopted goal of "growing a thriving and balanced community'.
DESCRIPTION OF REQUEST
The applicant, the Town of Vail, is requesting approval of a development plan to allow for the
future development of deed restricted employee housing units on the Town -owned Chamonix
Parcel, located at 2310 Chamonix Road. A development plan approval is required, pursuant to
Section 12-61-11, Development Plan Required, of the Vail Town Code to guide and direct
development within the Housing District. Once adopted, an approved development plan, along
with any applicable land use regulations contained in the Town's Zoning Regulations, becomes
the principal governing document for land use and dimensional requirements and limitations on
the property. The development plan shall remain in effect for the life of the development, and
may be amended from time to time, as deemed appropriate, as part of an established
development review process.
A copy of the proposed Approved Development Plan has been attached for reference
(Attachment A)
The purpose of this worksession is to present the proposed development standards for the
Chamonix development and receive feedback from the Town of Vail Planning and
Environmental Commission on the standards proposed. The proposed development standards
are prescribed in Approved Development Plan which has been attached for reference.
III. BACKGROUND
The Town of Vail has been exploring options for developing the community's newest residential
neighborhood on the Town owned Chamonix parcel located in West Vail. This action helps
achieve the Town Council's adopted goal of "growing a thriving and balanced community'. The
Town Council affirmed a number of goals for the project. The goals include:
• Optimize the use of the site for workforce for -sale housing (15 - 25 du's per acre)
• Design a context sensitive design solution (design review guidelines)
• Ability to be phased over time (min. two phases)
• Deliver desirable, marketable and diverse types of housing products (duplexes; one, two
& three bedroom flats; townhomes, etc.)
• Maximize the town's limited supply of financial resources
• Build responsibly given the existing site configuration, topography and natural features of
the site
• Develop a diversified cost/sales structure to respond to a wider range of buyers (i.e.
pricing structure based upon income)
Project Approach
Development on the Chamonix site requires two distinct steps:
1) site access and infrastructure improvements, and
2) vertical building construction.
For obvious reasons site access and infrastructure work must be completed before vertical
building construction. Town staff recommends breaking the project entitlement process down
into two steps as well. Due to the presence of the Housing District on the site, this approach can
be easily accommodated and is particularly advantageous.
Step One - The Housing District provides flexibility in the application of the development
standards. According to the Town's Zoning Regulations, the development standards for
the District are prescribed by the applicant and reviewed for approval by the PEC. With
that in mind, staff recommends that the Town prepares a development plan generally
prescribing the applicable development standards (i.e. density, GRFA, setbacks, building
locations, site coverage, landscape area, building height, etc.) and seek a development
plan approval from the Planning & Environmental Commission. Once a development
plan approval prescribing this general development standards are in place, the site
access and infrastructure designs can be completed, contracted and permitted (late
2
summer 2015). Approximately $1.5M has been appropriated in the 2015 Budget for this
work. Prior to submitting an application to the Planning & Environmental Commission for
review and approval of the site access and infrastructure improvements the town staff
will return to the Town Council with a detailed probable cost estimate for the work.
Step Two - While the site access and infrastructure improvements are being installed
and completed, the Town can simultaneously make progress on meeting with
prospective home buyers and work towards the design review approvals needed for the
vertical building construction. The first phase of vertical building construction could
begin as early as spring 2016. The advantage of this approach is it optimizes time,
reduces risk, saves cost, creates predictability and allows for phased construction of the
housing development.
IV. APPLICABLE PLANNING DOCUMENTS
2009 Chamonix Master Plan
Title 12, Zoning Regulations, Vail Town Code (in part)
V. ZONING ANALYSIS
Address:
Legal Description:
Lot Area:
Buildable Area:
Zoning:
Land Use Designation
2310 Chamonix Road
Parcel B, Resubdivision of Tract D,
3.21 acres/ (139,828 sq. ft.)
???? acres/(??? sq. ft.)
Housing District
Medium Density Residential
VI. SURROUNDING LAND USES AND ZONING
Vail Das Schone Filing No. 1
VII. REVIEW CRITERIA
According to Section 12-61-13, Development Standards/Criteria for Evaluation, of the Zoning
Regulations of the Town of Vail, the following criteria shall be used as the principal means for
evaluating a proposed development plan. It shall be the burden of the applicant to demonstrate
that the proposed development plan complies with all applicable design criteria.
A. Building design with respect to architecture, character, scale, massing and orientation is
compatible with the site, adjacent properties and the surrounding neighborhood.
3
Land Use
Zoning
North:
Residential
Two -Family Primary/Secondary Residential (P/S)
South:
Commercial
Heavy Service District
East:
Commercial
Heavy Service District/Commercial Core III
West:
Residential
Two -Family Primary/Secondary Residential (P/S)
VII. REVIEW CRITERIA
According to Section 12-61-13, Development Standards/Criteria for Evaluation, of the Zoning
Regulations of the Town of Vail, the following criteria shall be used as the principal means for
evaluating a proposed development plan. It shall be the burden of the applicant to demonstrate
that the proposed development plan complies with all applicable design criteria.
A. Building design with respect to architecture, character, scale, massing and orientation is
compatible with the site, adjacent properties and the surrounding neighborhood.
3
B. Buildings, improvements, uses and activities are designed and located to produce a
functional development plan responsive to the site, the surrounding neighborhood and uses,
and the community as a whole.
C. Open space and landscaping are both functional and aesthetic, are designed to preserve and
enhance the natural features of the site, maximize opportunities for access and use by the
public, provide adequate buffering between the proposed uses and surrounding properties,
and, when possible, are integrated with existing open space and recreation areas.
D. A pedestrian and vehicular circulation system is designed to provide safe, efficient and
aesthetically pleasing circulation to the site and throughout the development.
E. Environmental impacts resulting from the proposal have been identified in the project's
environmental impact report, if not waived, and all necessary mitigating measures are
implemented as a part of the proposed development plan.
F. Compliance with the Vail comprehensive plan and other applicable plans.
VIII. STAFF RECOMMENDATION
As this is a worksession, the Community Development Department will not be forwarding a
recommendation at this time. A formal recommendation will be provided at the time of the final
public hearing on this application.
IX. ATTACHMENTS
0
Chamonix Parcel
Approved Development Plan
"Vail's Newest Residential Development for Families"
Adopted
???, 2015
Resolution No. ??, Series of 2015
Table of Contents
I.
Statement of Intent
II.
Development Plan Contents
III.
General Information
IV.
Definitions
V.
Development Standards
a. Permitted Uses
b. Conditional Uses
c. Accessory Uses
d. Setbacks
e. Site Coverage
f. Landscaping and Site Development
g. Parking and Loading
h. Location of Business Activity
i. Additional Development Standards
VI.
Supplemental Regulations
VII.
Open Space/Recreation
VIII.
Phased Development
IX.
Amendment Procedures
X.
Exhibits
5
Statement of Intent
The purpose of the Chamonix Parcel Approved Development Plan is to facilitate the completion
of Vail's newest residential development for families on the town -owned property located at
2310 Chamonix Road/ Parcel B, Resubdivision of Tract D, Vail Das Schone Filing No. 1, in Vail,
Colorado. It shall be the intent of this Approved Development Plan to develop, over a period of
time, for -sale, deed -restricted, employee housing units in a mix of dwelling unit product types
consistent with the recommendations of the 2011 Chamonix Master Plan. The Master Plan
recommendations locate the highest densities of units on the south and east sides of the
development site. The northern portion of the site is set aside for lesser densities to maintain
the greatest compatibility with existing and adjacent neighborhoods. The western most portion
of the site is unbuildable due to the presence of steep slopes. The undeveloped areas in and
around the buildings and internal driveway system provides landscape areas and recreational
opportunities for the residents living in the homes on the site.
Development on the parcel is intended to achieve and further the seven (7) goals affirmed by
the Vail Town Council in the adopted 2011 Chamonix Site Master Plan. The seven (7) goals of
the plan are as follows:
Chamonix Master Plan Goals
o Optimize the use of the site for workforce, for -sale housing (15 - 25 du's per
buildable acre)
o Design a context sensitive design solution (design review guidelines)
o Ability to be phased over time (min. two phases)
o Deliver desirable, marketable and diverse types of housing products (duplexes;
one, two & three bedroom flats; townhomes, etc.)
o Maximize the town's limited supply of financial resources
o Build responsibly given the existing site configuration and topography of the site
o Develop a diversified cost/sales structure to respond to a wider range of buyers
(e.g. pricing structure based upon income)
The approved development plan shall remain in effect for the life of the development,
and may be amended from time to time, as deemed appropriate, as part of an
established development review process.
Approved Development Plan Contents
To ensure unified development, protection of the natural environment, compatibility with
the surrounding area and that development on the Chamonix Parcel meets the intent of
the 2011 Chamonix Master Plan and development objectives of the Town of Vail, an
approved development plan shall be required. The Chamonix Approved Development
Plan shall include the following contents and materials:
1. Topographic Survey
2. Development Area Plan
3. Site and Grading Plan
4. Landscape Plan
5. Architectural Elevations
6. Architectural Floor Plans
7. Outdoor Lighting Plan
A
8. On Site Vehicle and Pedestrian
Circulation Plan
9. Phased Development Plan
10. Approved Development
Standards Matrix
11. Land Use Summary Matrix
12. Project Design Guidelines
13. Open Space and Recreation Plan
III. General Information
The Chamonix Parcel is to be developed to meet the growing demand for for -sale, deed
restricted employee housing in Vail. To that end, a mix of housing product types that are
both desirable in the eyes of prospective buyers and marketable to persons and families
choosing to make Vail, Colorado their place of primary residency is the intended
outcome of the Chamonix Parcel development.
Once adopted, an approved development plan, along with any applicable land use
regulations contained in the Town's Zoning Regulations, becomes the principal
governing document for land use and dimensional requirements and limitations on the
property. The development plan shall remain in effect for the life of the development,
and may be amended from time to time, as deemed appropriate, as part of an
established development review process. The Town of Vail Zoning Regulations, in
effect at the time, shall prevail in the event that the Approved Development Plan is silent
on a particular issue or is otherwise in conflict with a particular development standard or
guideline.
The total gross land area of the Chamonix Parcel is 3.21 acres/ 139,828 square feet.
The buildable area is ??? acres/???square feet. The use of the land area shall be as
stated on the Land Use Summary Matrix.
A total density of 15 - 25 dwelling units per buildable acre is approved for the site. The
mix of dwelling unit types should be broken down as follows and further illustrated on the
Development Area Plan:
• Duplex — five buildings (10 units)
• Townhomes — 3 to 4 buildings (9 — 12 units)
• Multiple Family — 3 to 4 buildings (24 -34 units)
IV. Definitions
Approved Development Plan: The set of development plans approved by the Town of
Vail Planning and Environmental Commission on ????, 2015 entitling development on
the Chamonix Parcel.
Chamonix Parcel: The parcel of land legally described as Parcel B, Resubdivision of
Tract D, Vail Das Schone Filing , Town of Vail, County of Eagle, State of Colorado.
Zoning Regulations: Title 12 of the Municipal Code of the Town of Vail
V. Development Standards
According to the Official Zoning Map of the Town of Vail, the Chamonix Parcel is zoned
Housing (H) District. Development on the Chamonix Parcel shall be governed by the
following development standards:
7
A. PERMITTED USES:
The following uses shall be permitted in the H dis+ri`++ on the Chamonix Parcel
Bicycle and pedestrian paths.
Employee housing units, as further regulated by chapter 13 of +ham the Zoning
Regulations.
Passive outdoor recreation areas, and open space.
B. CONDITIONAL USES:
The following conditional uses shall be permitted in +he H dis+ri`++ on the Chamonix
Parcel, subject to issuance of a conditional use permit in accordance with the provisions
of chapter 16 of +him the Zoning Regulations:
Oho needs of the residents of the rleVelnpmen4 and developed in nnnii motion With
emple\/ee hei 16!Rg OR Whinh nesse the fellGW!Rg uses may be alleweld si iNent to a
rnnrlitinnel i ice permit•
4i itnmeterl teller menhinec (AT -Ms) evterinr to a hi 1ildinn
R;;nLs ;;Ad finenniel institi itinns
##f --
n
Di 1blin and pFiyatecn�.r
Public buildings, grounds and facilities.
Public parks and recreational facilities.
Public utilities installations including underground transmission lines and appurtenant
equipment.
C. ACCESSORY USES:
The following accessory uses shall be permitted iN the u dis+ri.+ on the Chamonix
Parcel:
Home occupations, subject to issuance of a home occupation permit in accordance with
the provisions of section 12-14-12 of this;tot'the Zoning Regulations.
Private greenhouses, toolsheds, playhouses, or attached garages GF Garperts,
Peels er ronreatinN fanili4ioc customarily incidental to permitted residential uses.
Other uses customarily incidental and accessory to permitted or conditional uses, and
necessary for the operation thereof.
D. SETBACKS:
The setbacks iN this dostri`++ on the Chamonix Parcel shall be twenty feet (20') from the
perimeter of the z^No distri..+ parcel boundary. The distance separation between
buildings on the interior of the site shall comply with the requirements of the
International Building Code and Uniform Fire Code, as may be amended. M thp
appliGa Rt GE)MpliaNno V.Aith Oho Fr,llr,Wi Rg nrite Fig•
9
• :T�SA/1:S1tiTTSs(�l�LrSS7P.Cm� PmI■MNAP.W- 1MIT=.,` - MWe
"Mr-rZT:
IBM
E. SITE COVERAGE:
Site coverage shall not exceed fifty seventy five percent (575%) of the total site area of
the Chamonix Parcel. o++ho diGG-Feting of+he planning and onWirnnmo431 nnmmis;
Site GE)Verage may be provided more than seventy five percent (75%) of
the required parking spaces are underground or enclosed, thus reducing the impacts of
surface paving provided within a development, and that the minimum landscape area
requirement is met.
F. LANDSCAPING AND SITE DEVELOPMENT:
At least thirty percent (30%) of the total site area of the Chamonix Parcel shall be
landscaped. The minimum width and length of any area qualifying as landscaping shall
be fifteen feet (15') with a minimum area not less than three hundred (300) square feet.
G. PARKING AND LOADING:
10
The parking requirement for the Chamonix Parcel shall be as follows:
Duplex Units — two (2) enclosed spaces and one (1) surface space per unit.
Townhome Units —two (2) enclosed spaces and one (1) surface space per
unit.
Multiple Family Units —two (2) enclosed spaces per unit
Unassigned Guest/Visitor Parking — A minimum of 9 surface spaces total
All enclosed and surface parking spaces and areas shall be constructed in
accordance with design standards and dimensional requirements contained in
chapter 10 of the Zoning Regulations.
.T.s��rrnri�-�r��rari-z-s.T.ir►����•�
Me =—.=. e, i WN e
I. ADDITIONAL DEVELOPMENT STANDARDS:
The following additional development standards shall be approved for the
Chamonix Parcel:
1. Lot area and site dimensions.
There shall be no minimum lot area or site dimensions requirements. Any
subsequent resubdivision of the Chamonix Parcel such as duplex plats,
townhomes plat or condominium maps and plats shall adhere to the procedures
of the Title 13, Subdivision Regulations of the Vail Town Code.
2. Building height.
The maximum allowable building height with the Chamonix Parcel shall be as
follows:
11
Duplex Units — For a flat or mansard roof the height of buildings shall not exceed
thirty feet (30'). For a sloping roof the height of buildings shall not exceed thirty-
three (33').
Townhome Units - For a flat roof or mansard roof, the height of buildings shall not
exceed thirty five feet (35'). For a sloping roof, the height of buildings shall not
exceed thirty eight feet (38').
Multiple Family Units - For a flat roof or mansard roof, the height of buildings shall
not exceed forty five feet (45'). For a sloping roof, the height of buildings shall not
exceed forty eight feet (48').
3. Density Control
Dwelling Units per Acre - A total density of 15 - 25 dwelling units per acre of buildable
area is approved for the Project.
Gross Residential Floor Area
A total of 67,900 — 84,300 square of Gross Residential Floor Area (GRFA) is approved
for the Project. GRFA should generally be allocated as follows:
Duplex Units — 32,000 to 40,600
Townhomes Units — 20,200 to 24,600
Multiple Family Units — 26,700 to 52,500
68,900 — ??? square feet total
VI. Supplemental Regulations
(See Title 14, Development Standards)
VII. Open Space/Recreation
Passive outdoor recreation areas and open spaces are permitted uses within the project.
Each of these uses are an important element of the project and critical to ensuring the
creation of a desirable neighborhood for families. The open space area provide
opportunities to protect the more steeply sloping hillside on the westerly end of the
project and creates areas to plant landscape buffers between the project and the
adjacent commercial uses. It is, however, important to make the outdoor areas within
the project more than just open/green space. The outdoor areas between the buildings
provide opportunities for semi -private outdoor spaces for the owners and the larger
outdoor area running through the center portion of the project is to be used as a shared,
passive outdoor recreation area. The open space and recreation areas shall developed
consistent with the improvements shown on the Landscape Plan and Open Space and
Recreation Plan.
12
VIII. Phased Development
Development of the Chamonix Parcel will be completed overtime and in a series of
development phases. According to findings of the Market Analysis — Chamonix For -Sale
Employee Housing, dated March 30, 2014, completed by Rees Consulting, Inc.,
phasing of the development from a marketability stand point will likely not be necessary.
However, pre -sales conditions, mortgage availability, pricing and sales structure,
construction financing options, development approach, market risk tolerance, down
valley competition, and absorptions rates, for example, all weigh heavily on the Town's
ability to complete the development in a single phase. A phased development approach
reduces risk, provides flexibility, is more responsive to a changing market, and allows
the development to better target certain segments of the buyer's market in an effort to
meet the affordable housing needs of the community.
IX. Amendment Procedures
Upon adoption, it is recognized that the Approved Development Plan may need to be
amended from time to time. As such, amendment procedures are hereby adopted as an
element of the Approved Development Plan. Amendments to the Approved
Development Plan will be considered in accordance with the provisions of section 12-9A-
10 of #tee -the Zoning Regulations.
X. Exhibits
1. Topographic Survey, dated...
2. Development Area Plan, dated..., 2015
3. Site and Grading Plan, dated..., 2015
4. Landscape Plan, dated..., 2015
5. Architectural Elevations, dated..., 2015
6. Architectural Floor Plans, dated..., 2015
7. Outdoor Lighting Plan, dated..., 2015
8. On Site Vehicle and Pedestrian Circulation Plan, dated..., 2015
9. Phased Development Plan, dated..., 2015
10. Approved Development Standards Matrix, dated..., 2015
11. Land Use Summary Matrix, dated..., 2015
12. Project Design Guidelines, dated..., 2015
13. Open Space and Recreation Plan, dated..., 2015
13
Z
C7
N
W
0
C*
Lr)
M
m
M
W
a
a
W
a
r
O
N
N
cr
W
m
0
U
O
a
O
cm
a
W
Z
W
cm
LUV
O
CL
E
u
U
�
O
/i
O
W
L
r
C
o
O
O
41
O
V
E
Q
i
0
_3
�+
>.bA
C
L
a..+
N
•_
Ri
C6
�
E
r
cu
�..�
•N
a--+
o
i
O
N
a--+
w
i
N
N
—
E
+-+
Q
O
++
C6
cn
o
N
ro
c-
O
>—
0
N
C6
j
0
s
a
I�
•—
•�
cc
R
C:)
O
y
M
C
C
o
a
M
E
i
0
cu \
L
o
CM
O
-o
E2
`o
C
o
U
r0
4—
C:)
O
^
W►.�
� n
/1
l,i'
ro
� V
O
M
/'
r V
bn
W
O
Z
C7
.
U
0
w
T
ro
M
C6
O
O
i
4-jro
i
Q
cu
�
O
U
O
41
i
ate-+
U
'N
3
bn
�+
.c
N
N
a--+
N
O
�
U
a--'
�
o
o
N
�
o
R
v
a
ca
R
_�
�
•LC
•_
3
41
c
d
Cal
a
'0
o
a
d
•
•
3
CD
0
U
d
r
rd
0
0
4w
rdMalw
�r
wa
o
W o
W
rd
0
0
0
02
In
r
0
fa
Ord
*+ ar
a�
Q o. .o1 Im
o b 0.4 01
mom
raag
a
Q 0 o aaw
a�
ANNo0
,r
p
0rdO
a
L
CL
O
i
V
7
0
3
P-
0
v
F7Z
I I 1
C)
71 CD
\ 1 4 ok
}� \ 1 1 61 Q V
i —�7 >> �� ..,�\ 1 1� 1
00 0
X
LU
\ Z>°
Q`
to_ -
a
✓ � � 1 � 1 1 I I A ���`
111 ��Illill�lr i i.�i�ll ` � i i I I 11 II �� \
�Ilq�iigl _ i A�1�1 t A
A11 11 Q
�i
plir
-
»S�
00,
�oi�
x
VA
AI
—
�����—
I II
\\
O
i
V
7
O
C
3
P-
0
0
0
N
lG
N
d
0
Z
O
0
0
R
v
O.
CL
Q
ca
C
d
c
E
0.
0
CD
G
U
d
(1)(
P O;o z M
CC!
a--� N M
D Q Ir W o
a
cl�
i c c Q) U
Eo
a c
In _ o
>
0
t
v -0 c
o c
i\
Copvv�ttvvv v * \ v t�A (� Q > o
\\�
\\,
co
o al M
VA�v�Av �` v A \ � k`
�o�v4tAt�v� v' �A� �v Iv vv �v ctt
�
w
CDo
111111(/1 I � � tv�t l\
�����- � ' ' 1 � \�• �, � vv � tv� tit �� V � � � — —
v I
t \\q1
/PGG" i/� \.� tt t• �. \ \ \ \ � ew
1
lit l \ 1 � \ • � jl � \' � / i� /
vp 1`� `W
\
V\tAv
�Ns\,�
X �
� lei � I /
Ir 1 II LO
CD
CV
O
CV
R
0.
0.
ca
0.
LLI
IL
` U
_ 1
z
J
C -D
z
C -D
J
O
E
i
V
7
0
3
9
0
LO
0
N
l0
N
N
m
O
0
O
c
0
R
v
n
d
Q
C
R
IL
C
E
d
O
N
CD
N
0
U
d
y
9
LO
O
N
l0
N
N
a
0
O
c
0
R
v
n
d
Q
C
R
d
C
N
E
d
O
N
N
0
U
d
*w■■■■■iv,04r.
U)
U)
(1)
U
U
Q
VJ
9
cvi
0
M
0
E2
U
0
0
z
CD
0
LO
N
N
N
a
0
0
0
R
CL
a
ca
R
d
c
CD0.0
CD
CD0
U
d
1
i t 1 i
� � c
� � C
l � I I � 111 ii � �` � • � V 1 . � a
I
V\0
�
\I 1� 1
N
I ,
I ,
I 0
' U
II '
I I 1
II 11 C
I I ,
1 1 1
CL
1
O
CD
1 =
1
1 h
1
CD
CO)
O
CL
O
1 L
l CL
�I
•l � � 1 1 � � I I
I .1
�--
�11 cm
y
�1
��` �9"\ ��•��� � \Y � ilii � �
x�� v--
���
���� �a�� �� ��� e•� Ii 1
0
CD
0 Q Q Q /\\ \\\`\\ \ \\�\\\ \\\�
D H - - -
m m m m m \ . \'� O
Ow
LO
O
CVN
d
a
v
O
c
0
R
v
O.
CL
Q
IL
C
d
C.
O
CDN
C3
U
d
w
CD
o
0
0
0
N
s
O
0
Q
M
r
N
N
N
r
m
O
O
O
M
T
O
O
O
O
O
N
�
N
r
N
CO
CT
r
a
a
a
O
0
0
0
0
0
0
o
M
O
O
N
M
O
O
p
O
O
O
CO
ON
O�
W
p
O
I`
C7
N
N
V
N
V
CT
Cr
f0
C/n
o
w
O
O�
Q
m
In
N
Q
mr
CJ
A
F --
CD
O
O
w
J
Z
Z
D��
FC -D
w
w
w
a
m
m
m
m
m
m
Z
CO
CO
CO
CO
CO
m
O
N
I ,
I ,
I 0
' U
II '
I I 1
II 11 C
I I ,
1 1 1
CL
1
O
CD
1 =
1
1 h
1
CD
CO)
O
CL
O
1 L
l CL
�I
•l � � 1 1 � � I I
I .1
�--
�11 cm
y
�1
��` �9"\ ��•��� � \Y � ilii � �
x�� v--
���
���� �a�� �� ��� e•� Ii 1
0
CD
0 Q Q Q /\\ \\\`\\ \ \\�\\\ \\\�
D H - - -
m m m m m \ . \'� O
Ow
LO
O
CVN
d
a
v
O
c
0
R
v
O.
CL
Q
IL
C
d
C.
O
CDN
C3
U
d
W c a) a) a) a) a) _ A
0 '3 a, v
v o
o
D
O C:U)
Q v ao +� p 0
c v'F-
-0C)
>
O E v O c
gg T�
(O -O a1 a1
i
x -0c v �
m
Q a1 a1
\ ` azs 0 O
O +� 3
���� 1 •\ , O +, O v
O 0 0= N
p
+� ai o Q -0 m > 3
LOU �_ � — ao x
I �j111 ii�� I 1 F9 .1VA� A ( Q f0 X p of
-03 a,
N
X +
Z 0 u n a) Q o
uUlti 11 �A a o a) > '- -00
•'��� ����, v 0 v 0 o
t •N O O f0 C O
• C
OU E U 7 Q
i
r I
too
AI
/ V 14
I
-41
AN v
♦ . 1�� ��
Ow
LO
0
N
N
d
a
O
c
0
R
v
d
d
Q
C
R
IL
c
d
E
.
0
CD
a�
0
U
d
^ M
7
O �/�/��.
VJ W
O
0
u
CL
Y L
\ OA
o
1 Q o c o
—0 o
N CD00 C
u 0 r1l CL i
Q O `O Q c
v \ v t �v � •�� ��� b..0 v� N ate+ D
OA pCro v
OAN (U Q- Y Q O O -O
U C i v� 1 — O
Q � 7 Q OA E
V",\
2 _- OCDv Q Q rEv vA co OA O o
E a) OA N N (o0- U
v Z$ ob.0 Ln u Q v
Q OA O
N d (3) � l7 Ln l0
I��IIIIA U 1CL -O
LU CD
O
N o�
w
LU C M
II
ilk
ii
4)4
to04
/ v Liv/
/
lv
\
T
\X(.. /
v v 1�� �.J�`
A
CD
CV
CL
O
c
U
/ r d
_ 1
I
Nr
O C
M
0
O
�
II N
W
T Q
M
O
M
0
J g O �
U
O CO O
o
`o
U
0
O
A
O
\rte,
1
I
Nr
O C
M
0
O
�
II N
W
T Q
M
O
M
7
U
i
o
`o
U
0
O
A
O
P—
I O
M
ICD
0
z
M
N
l0
N
m
O
0
R
CLv
n
Q
C
R
IL
C
E
d
O
N
CD
N
0
U
d
t
3 £
LL O W
N Q Q
L QL Q
in
XIM
LU
J 6
W
c0
M
Q O
0
0
U
0
0
0
M
CD
w
0
L2
N
N
N
a
'2
c C,
O
E
R
cc
a
V
L R
IL
E
.—L1
0
CDcCD
3 0
U
d
a�
�
CK5
(5-0
U
CK5
'�
�
c
(a)} Q
C7
CD
(a)
O
c
O
O
o
0
Q
co
O
o Lo
o
ID
q
2
b
0
co
co
co
N
co
r
Q
LU
cc
Q
c/)w
0-z
LU
LU
ct)
Z
H
Q
U
ZD
—
5�2wN
NO
WC.3(3Z
>w<LU
zN
Ww=OCA
JN
pJ
w
m
Y
ff
U
LU
zw¢
w
XIM
LU
J 6
W
c0
M
Q O
0
0
U
0
0
0
M
CD
w
0
L2
N
N
N
a
'2
c C,
O
E
R
cc
a
V
L R
IL
E
.—L1
0
CDcCD
3 0
U
d
\
it
U
�
M
W
CC
O
V
W
z
CD
O
Z
�� A •�
v I • v 'v �
I
_
O
z
\ 1
1
c
I
1
co
O
cn
1 1•
/ \
��LLU/�
0 � Q
E2V) O
C7
N
i m 0 O
O
O O
O
it
U
�
M
W
CC
O
V
W
z
CD
O
Z
I I I
I
_
O
z
O
c
O
co
O
cn
Q
UD
E
��LLU/�
E2V) O
C7
N
O
O O
O
f
f E E
J
Q
-
\
s c
}
s
$�
r
0
Q
+�
o
LU
cc
Z
(7
w
U
M
LO
s
N
N
N
m
C,
a�
O
c/)w
0-z
LU
LU
ct)
Z
Q
U
ZD
—
5�2wN
H
NO
E
WC.3(3Z
>w<LU
W -a
o
G
CD
zN
c
3
d
0
LU
LU
C)
J
N
cr
C0
�UpJw
�
��
mY
z
0-ZD�
w¢
LU
it
w
M
W
CC
O
V
W
T
Z
I I I
I
z
z
M
O
O
��LLU/�
E2V) O
CD
f
f E E
J
Q
o
s c
U
s
$�
m
0
+�
o
Z
(7
w
U
M
LO
s
N
N
N
m
C,
O
R
cc
V
a
R
IL
E
W -a
o
G
CD
c
3
d
0
U
d
(/)
0
ryQ
0
z
Q
v )
z
W
Cl -
OO
W
LLJ
0
U
�
C
�
�
C
�
C
O
CD
ro
Cl)
a
O
U
Cl)
o ro
C
o
_
o
\ I
o
OD
Lc7 O
o
,N
O—
OCV
\ `
,
LL
y
Cl)CD
§
N
1 /
Q
/
LU
cc
a�
� � oco
cn
0-z
Q
ZD
C)ZH
5
LU
CO
– N
LL � M M
•\`
(/)
0
ryQ
0
z
Q
v )
z
W
Cl -
OO
W
LLJ
0
E E
O
O
E-
0
o
m 0 w
m
E E
O C O O
m
c0
T LL O
J
T C
^ O
v J A
O
ZD
T �
'$ z
g o
� o
g ZD
C- o
LL �
z
0
U
z
c�
C/)
0
jly
T
R II
00
T
ZD
N
z
g O
Q
cr
ZD
C -D
LL
z
O
U
s
N
N
d
a
� O
O
E
R
cc
V ¢
ca
R
IL
CDE
W—d
00
_ N
N
3 0
U
IL
U
�
C
�
�
C
�
C
O
CD
ro
Cl)
a
O
U
Cl)
o ro
C
o
_
o
Cl)
U
o
OD
Lc7 O
o
,N
O—
OCV
Q
LL
Cl)CD
§
N
Q
LU
cc
a�
c/)w
LU
cn
0-z
Q
ZD
C)ZH
5
LU
CO
U-
>wQw
0
m
zN
Lu
�UpJw
�
��m
Y
LU
zw
LU
E E
O
O
E-
0
o
m 0 w
m
E E
O C O O
m
c0
T LL O
J
T C
^ O
v J A
O
ZD
T �
'$ z
g o
� o
g ZD
C- o
LL �
z
0
U
z
c�
C/)
0
jly
T
R II
00
T
ZD
N
z
g O
Q
cr
ZD
C -D
LL
z
O
U
s
N
N
d
a
� O
O
E
R
cc
V ¢
ca
R
IL
CDE
W—d
00
_ N
N
3 0
U
IL
u—
O ro -
a O d�
u
�O av
Z(L) o
3R
O
uv
LL. 0 m
F 0
Oa,�=
LU X
pwv
N p R
a N O 3
N
a v v
s
0 0s w
O
5 7 w u v u O O UJ
�I Iros��v
� v
inn v Qj Q vj
Q ros.o— rn�
Z t
O 6w Qj
rnaa o a
Hi0 Q�oU E au aE
O v
R 'O '^ R o)
Ln 0- C p
ro v
w UJ W d +O+ w in = E>
Oo >� 3�
U a Y c a v
L R u
'A 'A O .�
D Q R V
LU
O
�v
J
Uu
Z �
w
w s �
LU H ,�
> a
z�s
Oma*
U=
00-0)
5p�
O
LU
a
W +O
C�
J
w
m
P—
v
M
0
0
0
0
0
CD
CV
co
N
N
a
O
0
O
c
0
R
v
n
d
Q
C
R
IL
C
E
d
O
N
N
0
U
d
1
1
u—
O ro -
a O d�
u
�O av
Z(L) o
3R
O
uv
LL. 0 m
F 0
Oa,�=
LU X
pwv
N p R
a N O 3
N
a v v
s
0 0s w
O
5 7 w u v u O O UJ
�I Iros��v
� v
inn v Qj Q vj
Q ros.o— rn�
Z t
O 6w Qj
rnaa o a
Hi0 Q�oU E au aE
O v
R 'O '^ R o)
Ln 0- C p
ro v
w UJ W d +O+ w in = E>
Oo >� 3�
U a Y c a v
L R u
'A 'A O .�
D Q R V
LU
O
�v
J
Uu
Z �
w
w s �
LU H ,�
> a
z�s
Oma*
U=
00-0)
5p�
O
LU
a
W +O
C�
J
w
m
P—
v
M
0
0
0
0
0
CD
CV
co
N
N
a
O
0
O
c
0
R
v
n
d
Q
C
R
IL
C
E
d
O
N
N
0
U
d
L
A
Ln
LU
CJ
L
Q
LL
W
J
0
Z
Ln
L
Ow
0
0
0 A
`o
J �
Q1 �
U
c�
i o
�
o
M
U
Z
C7
w
D
M
L2
O
N
lG
N
N
m
0
0-. 0
O
0
E o
R
ca
C'
V d
1 ca
R
IL
7 E
W-0.
0 0
N
C y
3 0
U
d
TO6' d OF V It `
VAIL TOWN PLANNING AND ENVIRONMENTAL AGENDA MEMO
MEETING DATE:
ITEM/TOPIC:
October 12, 2015 PEC Meeting Results
ATTACHMENTS:
Name
Description:
D PEC Results 101215.pdf October 12, 2015 PEC Meeting Results
Ad Name: 11632949A
Customer: TOWN OF VAIL/PLAN DEPT/COMM
Your account number is- 1 OP2P33
Vail Daily
PROOF OF PUBLICATION
STATE OF COLORADO }
}SS.
COUNTY OF EAGLE }
I, Don Rogers, do solemnly swear that I am a qualified
representative ofthe Vail Daily. That the same Daily newspaper
printed, in whole or in part and published in the County
of Eagle, State of Colorado, and has a general circulation
therein; that said newspaper has been published continuously
and uninterruptedly in said County of Eagle for a period of
more than fifty-two consecutive weeks next prior to the first
publication of the annexed legal notice or advertisement and
that said newspaper has published the requested legal notice
and advertisement as requested.
The Vail Daily is an accepted legal advertising medium,
only for jurisdictions operating under Colorado's Home
Rule provision.
That the annexed legal notice or advertisement was
published in the regular and entire issue of every
number of said daily newspaper for the period of 1
consecutive insertions; and that the first publication of said
notice was in the issue of said newspaper dated 10/23/2015 and
that the last publication of said notice was dated 10/23/2015
in the issue of said newspaper.
In witness whereof, I have here unto set my hand this day,
12/02/2015.
General Man ager/Publisher/Editor
Vail Daily
Subscribed and sworn to before me, a notary public in and for
the County of Eagle, State of Colorado this day 12/02/2015.
� 2M 4, & 9. -V-�
Pamela J. Schultz, Notary Public
My Commission expires: November 1, 2019
PLANNING AND ENVIRONMENTAL COMMIS-
SION October 26, 2015, 1:00 PM
Vail Town Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
1. Call to Order
2. A request for a recommendation to the Vail
Town Council for an amendment to the Lionshead
Redevelopment Master Plan, pursuant to Section
2.8, Adoption and Amendment of the Master Plan,
Lionshead Redevelopment Master Plan, to amend
the Detailed Plan Recommendations for the Ever-
green Lodge at Vail, located at 250 South Front-
age Road West/Lot 2W, Block 1, Vail Lionshead
Filing 2, and setting forth details in regard thereto.
(PEC140044)
Applicant: Evergreen Lodge at Vail, represented by
Mauriello Planning Group
Planner: George Ruther
3. A request for final review of a Development
Plan, pursuant to Section 12-61-11, Vail Town
Code, to allow for the future development of Em-
ployee Housing Units on the Chamonix parcel lo-
cated at 2310 Chamonix Road, Parcel B, Resubdi-
vision of Tract D, Vail Das Schone Filing 1, and
setting forth details in regard thereto. (PEC150019)
Applicant: Town of Vail Community Development
Department
Planner: George Ruther
4. Approval of Minutes
October 12, 2015 PEC Meeting Results
5. Informational Update
6. Adjournment
45 min.
The applications and information about the propos-
als are available for public inspection during regu-
lar office hours at the Town of Vail Community De-
velopment Department, 75 South Frontage Road.
The public is invited to attend the project orienta-
tion and the site visits that precede the public
hearing in the Town of Vail Community Develop-
ment Department. Times and order of items are
approximate, subject to change, and cannot be re-
lied upon to determine at what time the Planning
and Environmental Commission will consider an
item. Please call (970) 479-2138 for additional in-
formation. Sign language interpretation is available
upon request with 48-hour
notification. Please call (970) 479-2356, Telecom-
munication Device for the Deaf (TDD), for informa-
tion.
Community Development Department
Published in the Vail Daily October 23, 2015
Ad Name: 11600284A
Customer: TOWN OF VAIL/PLAN DEPT/COMM
Your account number is- 1 OP2P 33
Vail Daily
PROOF OF PUBLICATION
STATE OF COLORADO }
}SS.
COUNTY OF EAGLE }
I, Don Rogers, do solemnly swear that I am a qualified
representative ofthe Vail Daily. That the same Daily newspaper
printed, in whole or in part and published in the County
of Eagle, State of Colorado, and has a general circulation
therein; that said newspaper has been published continuously
and uninterruptedly in said County of Eagle for a period of
more than fifty-two consecutive weeks next prior to the first
publication of the annexed legal notice or advertisement and
that said newspaper has published the requested legal notice
and advertisement as requested.
The Vail Daily is an accepted legal advertising medium,
only for jurisdictions operating under Colorado's Home
Rule provision.
That the annexed legal notice or advertisement was
published in the regular and entire issue of every
number of said daily newspaper for the period of 1
consecutive insertions; and that the first publication of said
notice was in the issue of said newspaper dated 10/9/2015 and
that the last publication of said notice was dated 10/9/2015 in
the issue of said newspaper.
In witness whereof, I have here unto set my hand this day,
11/24/2015.
General Man ager/Publisher/Editor
Vail Daily
Subscribed and sworn to before me, a notary public in and for
the County of Eagle, State of Colorado this day 11/24/2015.
� 2M.&& 9. -V-�
Pamela J. Schultz, Notary Public
My Commission expires: November 1, 2019
Nx �
THIS ITEM MAY AFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Planning and
Environmental Commission of the Town of Vail will
hold a public hearing in accordance with section
12-3-6, Vail Town Code, on October 26, 2015 at
1:00 pm in the Town of Vail Municipal Building.
No new items have been submitted for this meet-
ing.
The applications and information about the propos-
als are available for public inspection during office
hours at the Town of Vail Community Develop-
ment Department, 75 South Frontage Road. The
public is invited to attend site visits. Please call
970-479-2138 for additional information.
Sign language interpretation is available upon re-
quest, with 24-hour notification. Please call
970-479-2356, Telephone for the Hearing Im-
paired, for information.
Published October 9, 2015 in the Vail Daily.
(11600284