2. A request for review of a Conditional Use Permit pursuant to Section 12-813-3
Conditional Uses, Vail Town Code, in accordance with the provisions of Section 12-
16 Conditional Uses, Vail Town Code, to allow for the installation of parking in the
Chalet Road right -of- way and the conversion of the existing tennis courts to pickle
ball courts, located at 461 Vail Valley Drive, Tract F2, Vail Village Filing 5, and setting
forth details in regard thereto. (PEC150037)
Applicant: Town of Vail, represented by Todd Oppenheimer
Planner: Chris Neubecker
Planner Neubecker walked the commission through the proposal.
Todd Oppenheimer, representing the applicant, elaborated on Chris's introduction and
referenced active pickleball members in the audience. Todd provided details on the
proposed reconstruction of the existing courts for pickleball including materials,
orientation, parking and landscaping.
Commissioner Gillette asked why this use is being proposed if there is a potential
noise issue and why this isn't being proposed at Ford Park?
Scott O'Connell from Vail Recreation District (VRD) spoke to the clay courts at Ford
Park and to the noise generated by the pickle ball being within the town's limits. Scott
also spoke to the site visit by the Town Council.
Mr. Oppenheimer elaborated more on the noise generated by the activity.
Commissioner Gillette asked about the surface conditions at Ford Park.
Mr. O'Connell spoke to all of the courts being resurfaced recently.
Commissioner Rediker asked about noise complaints.
Oppenheimer answered that no complaints have been received.
Commissioner Hansen asked for clarification on hours of operation and times of year
of use.
O'Connell spoke to the courts not being cleared for snow in the winter, and the courts
needing to be vacated for maintenance in October. Hours would be dawn to dusk.
Commissioner Pratt asked about parking management.
Oppenheimer responded that there was no management proposed.
Commissioner Rediker asked if these parking spots are going to be reserved or
managed.
Oppenheimer thought that with the Town's parking garages free in summer, that no
demand is apparent from non-pickleball users for this space.
Public Comment:
Courtney Kline, manager at the Ram's Horn, spoke to concerns about the noise and
Town Council's directive to work with the neighbors and wondered why we would wait
for complaints to institute remedies.
Dan Reynolds, Attorney representing All Seasons, Vail Trails Chalet, Vail Trails East,
and Texas Townhomes, expressed concern with more noise, parking and use and its
lack of compatibility with the residential properties. Dan spoke to the parking taking
away area for potential landscaping. He questioned what would happen if the noise
mitigation was ineffectual. Dan also spoke to alternatives in location, design and
management. Recommended conditions of approval including sound baffling on
fences and a landscape plan, both which should be evaluated by private consultants.
Gillette asked for clarification regarding the proposed conditions of approval from Dan
Reynolds.
Rediker asked Dan if the change to pickleball from tennis exacerbates the issues he
mentioned.
Reynolds responded that the increase in participation increases the odds.
Rediker further asked how additional people in the neighborhood destroy the
character of the neighborhood.
Reynolds feels that it is the noise being generated by the paddle and the additional
people impact the character.
Charlie Penwill, former Parks and Recreation Director in the 1970's, spoke to his
support for pickleball and the historic use of the area which has included recreational
activities. Charlie also spoke to the concerns expressed by Dan Reynolds.
Commissioner Hansen asked about court layout and if it should be altered.
Charlie spoke to the need of proper orientation of the courts.
Rick Sackbauer spoke to his desire for the inclusion of a drinking fountain, a bike rack
and elevated benches for viewing pickleball matches.
Commissioner Rediker asked about the social aspect of the game and how the player
turnover occurred.
Sackbauer explained the game and the pace and how games are shortened when
others are waiting.
Gillette asked about the courts at Red Sandstone.
Sackbauer spoke to the temporary conversion of the basketball court at Red
Sandstone for pickleball use. The pickleball courts are used in the evenings and on
weekends.
Jerry Stevens, pickleball coordinator, spoke to the drop-in nature of the sport here in
Vail and other characteristics of the sport.
Rediker asked about operational characteristics of the current facility at Red
Sandstone.
Stevens spoke to how the courts were set up and how people coordinated to wait for
the next match.
Rediker asked if there are better ways to program the space from what is being
shown.
Penwill spoke to how the space is planned including the planned waiting area not
within the court and how the waiting area interacts with casual bystanders.
Jim Lamont, representing Vail Home Owners Association, raised issues including
waterbody and stream setbacks that he feels has been ignored, restroom facilities
that are needed (a given) with the creation of a park, and a proper streetscape.
Recommends conditions of approval related to things that may change in the short
term including the streamtract issue and soundproofing. He recommended a possible
reduction in number of courts from 6 to 4 to make room for other improvements.
Jeff Babb, Vail Resorts, spoke to the restroom facilities in the Golden Peak building
across the street, of which there are two (upper and lower floors). The restrooms on
the second the floor are open sometimes during the summer but generally the
building is locked in the summer. The parking lot is by permit only which is managed
more in the winter than the summer. Some special events use the lot in the summer.
There have been discussions with the Vail Recreation District but not into specifics.
Larkspur restaurant has planned changes to their business model and no longer
operates a restaurant on a daily basis in the summer.
Commissioner Ryan requested clarification on the fencing and noise proofing
proposed.
Oppenheimer spoke to the fence height being flexible and a typo in the memo.
Ryan spoke to his general support for the proposal.
Commissioner Hansen feels this will be a good pocket park for the neighborhood.
Feels there has been ample time for the public to weigh in and will support this
project.
Rediker is not certain if an 8' fence will be adequate. Feels that noise will increase but
does not know if it will be at a problematic level. Inquired about Mill Creek.
Oppenheimer spoke to Mill Creek in this area and generally how drainage works in
the vicinity.
Rediker - 8 ft. fence vs. 10 ft fence — sound barrier needed. West and north side
needs more noise barrier but not on south side. South side concrete paving area
should be rethought. More room for queueing. Increase vegetation beneficial to
stream tract so more vegetation should go in. A formalized agreement with Vail
Resorts for restroom use should be looked at. Supports project but only voting in favor
with redesign with more vegetation and restrooms access.
Commissioner Webb — Wanted to confirm what the percentage of landscape to
hardscape area is. Generally in favor of project. OK with parking layout. Concurs with
Commissioner Rediker about need for restrooms. Recommends better signage.
Commissioner Gillette — Concurs with Commissioner Webb's comments.
Oppenheimer spoke to restroom use, and that the requested use of restrooms at
Golden Peak has been declined by Vail Resorts.
Gillette — concrete patio is not large enough for queueing. Opportunity on east side of
courts to make more riparian area. Look at Manor Vail and see if they'll allow Town of
Vail to restore the stream. Wait on opaque barrier and hold off until more data justifies
it. Wait a season before installing barrier. Drainage should be looked at (from courts
to north) and see if water runoff can be held on site rather than let run across adjacent
parking lot to north.
Oppenheimer spoke to the drainage and says it follows historical drainage pattern and
is treated better by allowing to drain as is.
Gillette- Water quality vault should be a part of this project.
Rediker — inquired of any written testimony received by town or Town Council that
PEC has not seen.
Neubecker: No other material submitted to Town Council that is not part of record of
this hearing is available today. Notice was published in accordance with Town
ordinances. Issue was before Council in November 2015.
Greg Hall spoke to Council's hearing of tennis vs pickleball.
Gillette: How does water work on site?
Oppenheimer spoke to current water situation — no drinking facilities available.
Chairman Pratt: generally in favor of the application but with conditions. Some
reconciliation with Vail Resorts about restrooms at Golden Peak should be arranged.
Mill Creek is severely degraded and Town should take the lead to enhance the
riparian zone on east side of courts. Plant more native species along banks. Sound
barrier should be installed from the start and fences should be ten feet tall rather than
8; East side too to absorb the sound of the game. Parking is biggest issue and
parking should perhaps be reduced to provide more green space along west side of
courts. Parking should be signed for exclusive use of the courts.
Oppenheimer requested to table the application to bring some plan changes back to
PEC. Staff confirmed that's a fair direction.
Chairman Pratt looking for show of hands for water quality vault as condition of
approval and no Commissioners were in favor of that. Water quality important but not
fair to tie water quality vault to this project.
Pratt spoke to need of restrooms and favors an agreement with Vail Resorts to
provide public restrooms but would not make that a condition of approval. Would like
to see more landscaping particularly on the north and west.
Hansen reiterated his desire to see a larger concrete patio on south side.
Oppenheimer spoke to size as designed at 500 sq. ft. in accordance with the site
constraints. Stated that there is additional space to the north of the courts. There is a
parking easement along the north property line used by Texas Townhomes for use
that could be revoked by the Town if the space is needed for public use.
Pratt reiterated he'd like to see the parking reduced so it doesn't become formalized
parking. Bike rack and more landscaping should be installed in lieu of parking.
Rediker would like to see an alternate arrangement for parking.
Oppenheimer stated that head -in parking allows drivers to turn around, as currently
designed. Parallel parking would not be possible. Todd stated landscaping does not
provide an adequate sound barrier.
Table to February 8, 2016
Motion — Rediker Second — Lockman Vote: 6-0-0
3. A request for a recommendation to the Vail Town Council on an application for an
encroachment into an existing view corridor, pursuant to Section 12-22-6,
Encroachments Into Existing View Corridors, Vail Town Code, to allow for the
encroachment of an addition to the Villa Valhalla Building into View Corridor #5,
located at 384 Gore Creek Drive, Unit 10/Lot J, Block 5A, Vail Village Filing 5, and
setting forth details in regard thereto. (PEC150036)
Table to February 8, 2016
Applicant: Jose Pedro Valenzuela Rionda, represented by Pierce Architects
Planner: Jonathan Spence
Table to February 8, 2016
Motion — Rediker Second —Lockman
Vote: 6-0-0
4. A request for a final recommendation to the Vail Town Council of a major
amendment to Special Development District No. 4, Cascade Village, pursuant to
Section 12-9A-10, Amendment Procedures, Vail Town Code, to allow for the
redevelopment of the former Cascade Village Theater and Colorado Mountain
College property to include 14 dwelling units, one (1) onsite Employee Housing Unit
and the preservation 4,087 square feet of existing commercial, retail and office
space, located at 1310 Westhaven Drive/Cascade Village, and setting forth details
in regard thereto. This project was previously approved most recently in 2007 and
expired on June 1, 2015. (PEC150014)
Table to February 8, 2016
Applicant: Ultimate Cascade LLC, represented by Mauriello Planning Group
Planner: Jonathan Spence
Table to February 8, 2016
Motion — Rediker Second — Lockman Vote: 6-0-0
5. A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail
Town Code, to allow for the future development of Employee Housing Units on the
Chamonix parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract
D, Vail Das Schone Filing 1, and setting forth details in regard thereto. (PEC150019)
Table to March 14, 2016
Applicant: Town of Vail Community Development Department
Planner: George Ruther
Table to March 14, 2016
Motion — Rediker Second — Lockman Vote: 6-0-0
6. Approval of Minutes
January 11, 2016 PEC Meeting Results
Approve
Motion — Rediker Second — Gillete Vote: 5-0-1 (Lockman Abstained)
Commissioner Rediker - Top of page 6 of the minutes, statutory provision. Did not
feel there was an inadequate explanation but rather that there is room for further
examination at this possibility for regulating pesticide use.
7. Informational Update
Information update by George Ruther: On February 3, 2016 the Town of Vail will host
Chamonix Affordable Housing Open House.
8. Adjournment
01),
PLANNING AND ENVIRONMENTAL COMMISSION
T%V�J OF Vii January 25, 2016, 1:00 PM
Vail Town Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
Call to Order
2. A request for review of a Conditional Use Permit pursuant to Section 12-813-3 Conditional
Uses, Vail Town Code, in accordance with the provisions of Section 12-16 Conditional
Uses, Vail Town Code, to allow for the installation of parking in the Chalet Road right-of-
way and the conversion of the existing tennis courts to pickle ball courts, located at 461
Vail Valley Drive, Tract F2, Vail Village Filing 5, and setting forth details in regard thereto.
(PEC150037) - 15 Min.
Applicant: Town of Vail, represented by Todd Oppenheimer
Planner: Chris Neubecker
3. A request for a recommendation to the Vail Town Council on an application for an
encroachment into an existing view corridor, pursuant to Section 12-22-6, Encroachments
Into Existing View Corridors, Vail Town Code, to allow for the encroachment of an
addition to the Villa Valhalla Building into View Corridor #5, located at 384 Gore Creek
Drive, Unit 10/1-ot J, Block 5A, Vail Village Filing 5, and setting forth details in regard
thereto. (PEC150036) - 5 Min.
Table to February 8, 2016
Applicant: Jose Pedro Valenzuela Rionda, represented by Pierce Architects
Planner: Jonathan Spence
4. A request for a final recommendation to the Vail Town Council of a major amendment to
Special Development District No. 4, Cascade Village, pursuant to Section 12-9A-10,
Amendment Procedures, Vail Town Code, to allow for the redevelopment of the former
Cascade Village Theater and Colorado Mountain College property to include 14 dwelling
units, one (1) onsite Employee Housing Unit and the preservation 4,087 square feet of
existing commercial, retail and office space, located at 1310 Westhaven Drive/Cascade
Village, and setting forth details in regard thereto. This project was previously approved
most recently in 2007 and expired on June 1, 2015. (PEC150014) - 5 Min.
Table to February 8, 2016
Applicant: Ultimate Cascade LLC, represented by Mauriello Planning Group
Planner: Jonathan Spence
5. A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail Town
Code, to allow for the future development of Employee Housing Units on the Chamonix
parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D, Vail Das
Schone Filing 1, and setting forth details in regard thereto. (PEC150019) - 5 Min.
Table to March 14, 2016
Applicant: Town of Vail Community Development Department
Planner: George Ruther
6. Approval of Minutes
January 11, 2016 PEC Meeting Results
7. Informational Update
8. Adjournment
The applications and information about the proposals are available for public inspection during regular office
hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to
attend the project orientation and the site visits that precede the public hearing in the Town of Vail Community
Development Department. Times and order of items are approximate, subject to change, and cannot be relied
upon to determine at what time the Planning and Environmental Commission will consider an item. Please call
(970) 479-2138 for additional information. Sign language interpretation is available upon request with 48-hour
notification. Please call (970) 479-2356, Telecommunication Device for the Deaf (TDD), for information.
Community Development Department
Published in the Vail Daily January 22, 2016
TO6' d OF V It `
VAIL TOWN PLANNING AND ENVIRONMENTAL AGENDA MEMO
MEETING DATE: January 25, 2016
ITEM/TOPIC: A request for review of a Conditional Use Permit pursuant to Section 12-813-3
Conditional Uses, Vail Town Code, in accordance with the provisions of Section 12-16 Conditional
Uses, Vail Town Code, to allow for the installation of parking in the Chalet Road right-of-way and
the conversion of the existing tennis courts to pickle ball courts, located at 461 Vail Valley Drive,
Tract F2, Vail Village Filing 5, and setting forth details in regard thereto. (PEC150037) - 15 Min.
ATTACHMENTS:
ame: Description:
PEC150037 Staff Memorandum Golden Peak Pickleball and Parking CUP.pdf PEC150037 Pickleball Staff Memo
D PEC150037 Application Memo Pickleball.pdf PEC150037 Pickleball Applicant Narrative
❑ PEC150037 Exhibit Golden Peak Pickleball and Parking CUP.pdf PEC150037 Pickleball Site Plan
❑ PEC150037 Golden Peak Pickleball Landscape Rendering color R.pdf PEC150037 Pickleball Color Site Plan
❑ PEC150037 Pickleball Google Maps.pdf PEC150037 Pickleball Google Map
TOWN OF VAIL
►,- ,C� 1Z- Z I : MI",
TO: Planning and Environmental Commission
FROM: Community Development Department
DATE: January 25, 2016
SUBJECT: A request for review of a conditional use permit, pursuant to Section 12-813-3,
Conditional Uses, Vail Town Code, to allow for the expansion of public parks and
active public outdoor recreation areas and uses, excluding buildings (parking lot),
located at 461 Vail Valley Drive, Vail Village Filing 5, Tract F2, and setting forth
details in regard thereto. (PEC150037)
Applicant: Town of Vail, represented by Todd Oppenheimer
Planner: Chris Neubecker
I. SUMMARY
The applicant, Town of Vail, represented by Todd Oppenheimer, is requesting the
review of a conditional use permit, pursuant to Section 12-813-3, Conditional Uses, Vail
Town Code, to allow for the expansion of public parks and active public outdoor
recreation areas and uses, excluding buildings (parking lot), located at 461 Vail Valley
Drive. Parking will be added along the west side of the courts on Chalet Road, and the
tennis courts will be reduced in size to accommodate six pickleball courts. The existing
pickleball courts will be turned 90 degrees to a north -south orientation.
Based upon Staff's review of the criteria outlined in Section VII of this memorandum and
the evidence and testimony presented, the Community Development Department
recommends approval of this application subject to the findings noted in Section VIII of
this memorandum.
II. DESCRIPTION OF REQUEST
The applicant, Town of Vail, is requesting review of a conditional use permit application
to allow for the installation of 12 surface parking spaces at the existing tennis / pickleball
courts at 461 Vail Valley Drive. The new parking will result in an increase in the size of
the existing use by 764 square feet (149 square feet are on Tract F2), which requires a
conditional use permit. In addition, the one existing tennis court and four pickleball
courts will be realigned into six pickleball courts. The realignment to a north -south
orientation is important to avoid a low sun angle during morning and evening play on the
cou rts.
According to the applicant's proposal, 12 parking spaces will be added along Chalet
Road to the west of the pickleball courts. A small portion of the parking will be on Tract
F2, and the remainder of the parking will be within the Chalet Road right-of-way. On
street parking is permitted for public parking.
14-5-2 B. On Street Parking. On street parking is not permitted for private
developments. All public on street parking provided in the right of way shall meet the
standards included in this chapter (table 5).
According to the Official Zoning Map of the Town of Vail, the subject site is zoned
Outdoor Recreation and public parks and active public outdoor recreation areas and
uses, excluding buildings are allowed conditional uses in this district, subject to the
issuance of a conditional use permit.
A copy of the applicant's request has been attached for reference (Attachment A).
III. BACKGROUND
Ownership of Vail Village Filing 5, Tract F2 was transferred to the Town of Vail from Vail
Associates in 1985 via Quit Claim Deed. The conditions of the transfer of land included
the following two items:
a. That the property be used solely as public open space, parking or for public
recreation facilities, parks or playground uses;
b. That no permanent above -ground buildings or structures other than those
used for recreational purposes shall be constructed, located or maintained on
any portion of the property.
The use of the site as an active public outdoor recreation area was in place prior to
October 1985 when the property was conveyed to the Town. At that time, active public
outdoor recreation areas were permitted uses on this site, which was zoned Agriculture
and Open Space district. The tennis courts were lawfully established when constructed.
In 1995 the property was rezoned to Outdoor Recreation (Ordinance 19, Series 1995),
and active public outdoor recreation uses were listed as conditional uses. The existing
use was lawfully established and no additional permits were required if the use
remained active public outdoor recreation area and was not expanded, including no
additional parking. The existing use is legal nonconforming by the fact that it does not
have a Conditional Use Permit. Since parking is proposed, this is considered an
enlargement of the use.
Approximately three years ago, one of the tennis courts was converted to four pickleball
cou rts.
IV. APPLICABLE PLANNING DOCUMENTS
CHAPTER 12-16: CONDITIONAL USE PERMITS (in part)
Town of Vail Page 2
V.
VI.
SECTION 12-16-1. PURPOSE, LIMITATIONS:
In order to provide the flexibility necessary to achieve the objectives of this title,
specified uses are permitted in certain districts subject to the granting of a
conditional use permit. Because of their unusual or special characteristics,
conditional uses require review so that they may be located properly with respect
to the purposes of this title and with respect to their effects on surrounding
properties. The review process prescribed in this chapter is intended to assure
compatibility and harmonious development between conditional uses and
surrounding properties in the Town at large Uses listed as conditional uses in
the various districts may be permitted subject to such conditions and limitations
as the Town may prescribe to insure that the location and operation of the
conditional uses will be in accordance with the development objectives of the
Town and will not be detrimental to other uses or properties. Where conditions
cannot be devised, to achieve these objectives, applications for conditional use
permits shall be denied.
SITE ANALYSIS
Existing Zoning: Outdoor Recreation
Existing Land Use Designation: Village Master Plan
Mapped Geological Hazards: None
SURROUNDING LAND USES AND ZONING
Existing Use
North:
Medium Density Residential
East:
High Density Residential
South:
Ski Base
West:
High Density Residential
VII. REVIEW CRITERIA
Zoning District
Vail Village Townhouses
High Density Multiple Family
Ski Base Recreation
High Density Multiple Family
Before acting on a conditional use permit application, the Planning and Environmental
Commission shall consider the following factors with respect to the proposed use:
1. Relationship and impact of the use on the development objectives of the Town.
Staff finds the conditional use permit request is consistent with the development
objectives of the Town of Vail. Specifically, the conditional use permit addresses a goal
identified in the Vail Comprehensive Plan to maintain and improve the recreation
facilities. Changing to pickleball also helps to meet the goal of evaluating current
recreational programming, facilities and amenities and ensure they meet the needs of
all users on a year-round basis.
The proposed parking will also help to ensure adequate parking for the users of the
pickleball courts and thus reduce impacts on adjacent properties. In doing so, this
increase in parking supply will not negatively impact the availability or use of other
Town of Vail
Page 3
public parking structures or spaces intended to meet the needs of our visiting guests
and year round residents.
Goals for Parks and Recreation in the Vail Comprehensive Plan:
Goal #I. Evaluate current recreational programming, facilities and amenities and
ensure they meet the needs of all users on a year-round basis.
Goal #3. Conduct necessary capital improvements of Vail's current recreational
facilities and amenities to meet high standard of quality for users.
Staff finds that the proposed conditional use permit request to provide parking and
reduce the size of the pickleball courts:
• meets the intended purpose of the conditional use permit,
• is harmonious with the surrounding uses and ensures adequate light, air, and
open space,
• is compatible and harmonious with the surrounding properties and the Town at
large,
• furthers the development objectives of the Town.
Staff finds this criterion to be met.
2. The effect of the use on light and air, distribution of population, transportation
facilities, utilities, schools, parks and recreation facilities, and other public
facilities needs.
The proposed conditional use permit will have a positive effect upon transportation
facilities and other public needs in the Town. Approval of the site for vehicle parking
ensures that at a minimum of 12 public parking spaces located elsewhere in Town
remain available for their intended purpose and meet the parking needs for uses of this
recreation facility.
Staff finds this criterion to be met.
3. Effect upon traffic with particular reference to congestion, automotive and
pedestrian safety and convenience, traffic flow and control, access,
maneuverability, and removal of snow from the street and parking areas.
Staff finds the proposed conditional use permit will have a positive effect on the existing
traffic circulation pattern. Access to the parking spaces will be through existing curb
cuts on Vail Valley Drive. Chalet Road will remain available for snow storage in the
winter when the pickleball courts are not in use.
Staff finds this criterion to be met.
Town of Vail Page 4
4. Effect upon the character of the area in which the proposed use is to be
located, including the scale and bulk of the proposed use in relation to
surrounding uses.
Staff finds the proposed conditional use permit will have no significant impact on the
character of surrounding area. Chalet Road is currently used informally as parking in
the summer. The character of the area will remain, and the height of the fence is
proposed to be reduced from 10' to 8' tall. The design of the fence will be reviewed by
the Design Review Board.
Staff finds this criterion to be met.
VIII. RECOMMENDATION
The Community Development Department recommends the Planning and
Environmental Commission approves the conditional use permit. This recommendation
is based upon the review of the criteria outlined in Section VII of this memorandum and
the evidence and testimony presented.
Should the Planning and Environmental Commission choose to approve this conditional
use permit request, the Community Development Department recommends the
Commission passes the following motion:
"The Planning and Environmental Commission approves, with conditions, this
request for review of a conditional use permit, pursuant to Section 12-8B-3,
Conditional Uses, Vail Town Code, to allow for the expansion of public parks and
active public outdoor recreation areas and uses, excluding buildings, located at
461 Vail Valley Drive, Vail Village Filing 5, Tract F2, and setting forth details in
regard thereto." (PEC150037)
Conditions:
The parking area approved by this conditional use permit is a seasonal use
which shall be made available annually for snow storage between December 1
and April 1 of the following year.
Should the Planning and Environmental Commission choose to approve this conditional
use permit request, the Community Development Department recommends the
Commission makes the following findings:
"Based upon the review of the criteria outlined in Section Vll of the Staff
memorandum to the Planning and Environmental Commission dated January 25,
2016 and the evidence and testimony presented, the Planning and
Environmental Commission finds.-
Town
inds.
Town of Vail Page 5
1. The proposed conditional use permit is in accordance with the purposes of the
Zoning Regulations and the Outdoor Recreation District.
2. The proposed location of the use and the conditions under which it will be
operated or maintained are not detrimental to the public health, safety, or welfare
or materially injurious to properties or improvements in the vicinity.
3. The proposed conditional use permit complies with each of the applicable
provisions of Chapter 12-16, Conditional Use Permit, Vail Town Code."
IX. ATTACHMENTS
A. Applicant's Request
B. Site Plan
C. Google Map of Existing Conditions
Town of Vail Page 6
TOWN OF VAIL t
Memorandum
To: Planning and Environmental Commission
From: Todd Oppenheimer
Date: January 18, 2016
Subject: PEC Conditional Use Application for redevelopment of Tract F-2, Vail Village 51" Filing
from Tennis Courts to Pickleball Courts.
INTRODUCTION
The Town of Vail has submitted an application for a Conditional Use Permit for the existing
lawfully established, nonconforming use of Tract F-2, Vail Village 51" Filing. The town desires to
remove and reconstruct the existing 2 tennis courts as 6 pickleball courts and to include 12
public parking spaces on the Chalet Road right-of-way and Tract F-2 with accompanying
aesthetic and functional improvements.
II. BACKGROUND
Tract F-2, Vail Village 51" Filing was conveyed to the Town in October 1985 as developed active
recreation tennis courts. At that time the property was zone Agriculture and Open Space in
which district active recreation is a permitted use. In 1995 the property was rezoned to Outdoor
Recreation in which district active recreation is a conditional use. The rezoning created the
condition of a legally established nonconforming use on the property.
The property is owned by the Town of Vail and operated and managed by the Vail Recreation
District. The existing tennis courts are currently being utilized as 1 tennis court and 4
substandard pickleball courts. The existing court surface is in poor condition with numerous
cracks and safety issues. The community has requested additional, correctly constructed
pickleball courts and the Town Council have appropriated funds in the 2016 Real Estate
Transfer Tax Capital Budget to reconstruct the facility.
Tract F-2 is immediately adjacent to the Chalet Road right-of-way which is used for informal
facility parking in the summer and snow storage for the Golden Peak area in the winter. Chalet
Road is seldom used for through traffic as the Gore Creek Drive right-of-way to the north was
vacated to the Texas Townhomes Association in 1986. An emergency vehicle and fire
easement was retained by the town to provide emergency vehicle access to Vail Valley Drive
and the remaining Gore Creek Drive right-of-way. No change to the existing vehicular access
configuration is planned.
The proposed pickleball facility, as is the existing tennis facility, is a summer recreation activity
only. The facility will be closed in the winter and the parking area will be utilized for snow
storage for the Golden Peak area rights-of-way.
III. PROJECT DESCRIPTION
The removal of the existing tennis courts and reconstruction as pickleball courts on Tract F-2
includes the following general elements.
A. Removal of the existing 13,304 SF asphalt court surface, nets, posts and10' chainlink
fence.
B. Construction of proposed 13,030 SF post -tensioned concrete pickleball court surface
with acrylic coating, nets, posts and 8' black vinyl -coated chainlink fence.
C. Installation of Acoustifence Sound reduction material on the south and west fences to
reduce sound impacts to adjacent properties if necessitated by noise related complaints.
Material will be green in color and printed with an Art in Public Places approved design.
D. Reconfiguring of the existing Chalet Road asphalt pavement by removing portions of the
asphalt, regrading, and replacing asphalt to accommodate 12 parking spaces including 1
accessible parking space. There is a net increase of 764 SF of asphalt pavement. The
combined site configuration requires 149.22 SF of the proposed parking to be located on
Tract F-2. The National Recreation and Park Association (NRPA) publication,
Recreation, Park and Open Space Standards and Guidelines, 1983, references a
parking standard for recreation facilities of 1 space per 4 patrons. The 6 pickleball
courts proposed can accommodate a total of 24 players at a time. This would generate
a parking requirement of 6 spaces. Pickleball is a social sport where groups of players
gather and rotate in and out of play possibly increasing the parking demand. The
proposed 12 parking spaces, including 1 accessible space, provides 80% more parking
than would be required using the NRPA Standards. Additional, overflow parking is
available in the Village Parking Structure on most days in the summer and is less than
0.2 miles distance from the site.
E. Other improvements included in the project include the following items.
a. Accessible concrete walkways.
b. Drainage improvements.
c. Landscaped boulder retaining walls.
d. Landscaping and irrigation.
e. All existing trees on the site are to be retained and protected.
F. The provisions of public restrooms for the facility have been negotiated by the Vail
Recreation District at the Golden Peak Ski Base area with Vail Resorts.
Town of Vail Page 2
r�Xle.+'rnrnrv,
3sn ivoEn ONIA2JWNOO NON Ol NOLVOUIGOIN
f
NOI VAONI'd idnoD i'dOdS )1V]d N10109
I
- o
111Vn 80NVH
I
A oro
r
U
Lam- a 0
El
Z mLl i
7 /
1
101„„
d
I
� / a
s% oia, awowt
OVOJ 131VH0
0
I
I,g
OX
wy _
10
OO ( ✓l
l
�g l
--
b
C6 t
U
I
S
i
�/ g � I a ° • wLswu I �
F+ I
f l
/ ppp g I
ygF
cor I I
�
I
I
.71
'
l' 1
/ /
/
i
Q4
S � �j lI I • — /
Y s
I —
ie 1 3� y L--JIf
.wfil!er.�mmm
�;€b eotb
lnokv-1 ldnoo -i-lveEnAoid
eseta ao nennen
°°'""°`°"
,X.
ne � ow,uau,ueaaa
NOIiVAONId -LdnOD 1O'ddS NVId N3a1O9
J
of
r —
1000
S
? T
T
+ + a:
L.
✓ ✓.ISS
S
III
a
I
I I
I' I
I
I
I
it
I,
II
---------- -----------------
----------
N030 -- I
--------- 11
_� A030 _ I
o I I
461 Vail Valley Dr - Google Maps
Go gle Maps 461 Vail Valley Dr
Page 1 of 1
Map data 02016 Google 20 ft
461 Vail Valley Dr
Vail, CO 81657
https://www.google.com/maps/place/461+Vail+Valley+Dr,+Vail,+CO+81657/@39.6397... 01/12/2016
ruwN oFvaiL
Memorandum
TO: Planning and Environmental Commission
FROM: Community Development Department
DATE: November 9, 2015
SUBJECT: A request for final review of a Development Plan, pursuant to Section 12-61-11, Vail
Town Code, to allow for the future development of Employee Housing Units on the
Chamonix Parcel located at 2310 Chamonix Road, Parcel B, Resubdivision of Tract D,
Vail Das Schone Filing 1, and setting forth details in regard thereto (PEC150019)
Applicant: Town of Vail, represented by Will Hentschel, 359 Design
Planner: George Ruther
Request to Table this item to November 23, 2015
Ad Name: 11856031 A
Customer: TOWN OF VAIL/PLAN DEPT/COMM
Your account number is- 1 OP2P 33
Vail Daily
PROOF OF PUBLICATION
STATE OF COLORADO }
}SS.
COUNTY OF EAGLE }
I, Don Rogers, do solemnly swear that I am a qualified
representative ofthe Vail Daily. That the same Daily newspaper
printed, in whole or in part and published in the County
of Eagle, State of Colorado, and has a general circulation
therein; that said newspaper has been published continuously
and uninterruptedly in said County of Eagle for a period of
more than fifty-two consecutive weeks next prior to the first
publication of the annexed legal notice or advertisement and
that said newspaper has published the requested legal notice
and advertisement as requested.
The Vail Daily is an accepted legal advertising medium,
only for jurisdictions operating under Colorado's Home
Rule provision.
That the annexed legal notice or advertisement was
published in the regular and entire issue of every
number of said daily newspaper for the period of 1
consecutive insertions; and that the first publication of said
notice was in the issue of said newspaper dated 1/22/2016 and
that the last publication of said notice was dated 1/22/2016 in
the issue of said newspaper.
In witness whereof, I have here unto set my hand this day,
01/22/2016.
General Man ager/Publisher/Editor
Vail Daily
Subscribed and sworn to before me, a notary public in and for
the County of Eagle, State of Colorado this day 01/22/2016.
� 2M 4, & 9. -'—
Pamela J. Schultz, Notary Public
My Commission expires: November 1, 2019
PLANNING AND ENVIRONMENTAL
COMMISSION January 25, 2016, 1:00 PM
Vail Town Council Chambers
75 S. Frontage Road - Vail, Colorado 81657
1. Call to Order
2. A request for review of a Conditional Use Permit
pursuant to Section 12-813-3 Conditional Uses, Vail
Town Code, in accordance with the provisions of
Section 12-16 Conditional Uses, Vail Town Code,
to allow for the installation of parking in the Chalet
Road right -of- way and the conversion of the exist-
ing tennis courts to pickle ball courts, located at
461 Vail Valley Drive, Tract F2, Vail Village Filing 5,
and setting forth details in regard thereto.
(PEC150037) - 15 Min.
Applicant: Town of Vail, represented by Todd Op-
penheimer
Planner: Chris Neubecker
3. A request for a recommendation to the Vail
Town Council on an application for an encroach-
ment into an existing view corridor, pursuant to
Section 12-22-6, Encroachments Into Existing View
Corridors, Vail Town Code, to allow for the en-
croachment of an addition to the Villa Valhalla
Building into View Corridor #5, located at 384 Gore
CreekDrive, Unit 10/Lot J, Block 5A, Vail Village
Filing 5, and setting forth details in regard thereto.
(PEC 150036) - 5 Min.
Table to February 8, 2016
Applicant: Jose Pedro Valenzuela Rionda, repre-
sented by Pierce Architects
Planner: Jonathan Spence
4. A request for a final recommendation to the Vail
Town Council of a major amendment to Special
Development District No. 4, Cascade Village, pur-
suant to Section 12-9A-10, Amendment Proce-
dures, Vail Town Code, to allow for the redevelop-
ment of the former Cascade Village Theater and
Colorado Mountain College property to include 14
dwelling units, one (1) onsite Employee Housing
Unit and the preservation 4,087 square feet of ex-
isting commercial, retail and office space, located
at 1310 Westhaven Drive/Cascade Village, and
setting forth details in regard thereto. This project
was previously approved most recently in 2007 and
expired on June 1, 2015. (PEC150014) - 5 Min.
Table to February 8, 2016
Applicant: Ultimate Cascade LLC, represented by
Mauriello Planning Group
Planner: Jonathan Spence
5. A request for final review of a Development Plan,
pursuant to Section 12-61-11, Vail Town Code, to
allow for the future development of Employee
Housing Units on the Chamonix parcel located at
2310 Chamonix Road, Parcel B, Resubdivision of
Tract D'Vail Das Schone Filing 1, and setting forth
details in regard thereto. (PEC150019) - 5 Min.
Table to March 14, 2016
Applicant: Town of Vail Community Development
Department
Planner: George Ruther
6. Approval of Minutes
January 11, 2016 PEC Meeting Results
7. Informational Update
8. Adjournment
The applications and information about the
proposals are available for public inspection
during regular office hours at the Town of Vail
Community Development Department, 75 South
Frontage Road. The public is invited to attend the
project orientation and the site visits that precede
the public hearing in the Town of Vail Community
Development Department. Times and order of
items are approximate, subject to change, and
cannot be relied upon to determine at what time
the Planning and Environmental Commission will
consider an item. Please call (970) 479-2138 for
additional information. Sign language
interpretation is available upon request with
48-hour
notification. Please call (970) 479-2356,
Telecommunication Device for the Deaf (TDD), for
information.
Community Development Department
Published in the Vail Daily January 22, 2016
(11856031)
Ad Name: 11823065A
Customer: TOWN OF VAIL/PLAN DEPT/COMM
Your account number is- 1 OP2P 33
Vail Daily
PROOF OF PUBLICATION
STATE OF COLORADO }
}SS.
COUNTY OF EAGLE }
I, Don Rogers, do solemnly swear that I am a qualified
representative ofthe Vail Daily. That the same Daily newspaper
printed, in whole or in part and published in the County
of Eagle, State of Colorado, and has a general circulation
therein; that said newspaper has been published continuously
and uninterruptedly in said County of Eagle for a period of
more than fifty-two consecutive weeks next prior to the first
publication of the annexed legal notice or advertisement and
that said newspaper has published the requested legal notice
and advertisement as requested.
The Vail Daily is an accepted legal advertising medium,
only for jurisdictions operating under Colorado's Home
Rule provision.
That the annexed legal notice or advertisement was
published in the regular and entire issue of every
number of said daily newspaper for the period of 1
consecutive insertions; and that the first publication of said
notice was in the issue of said newspaper dated 1/8/2016 and
that the last publication of said notice was dated 1/8/2016 in
the issue of said newspaper.
In witness whereof, I have here unto set my hand this day,
01/12/2016.
General Man ager/Publisher/Editor
Vail Daily
Subscribed and sworn to before me, a notary public in and for
the County of Eagle, State of Colorado this day 01/12/2016.
� 2M 4, & 9. -V-�
Pamela J. Schultz, Notary Public
My Commission expires: November 1, 2019
Nx �
THIS ITEM MAY AFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Planning and
Environmental Commission of the Town of Vail will
hold a public hearing in accordance with section
12-3-6, Vail Town Code, on January 25, 2016 at
1:00 pm in the Town of Vail Municipal Building.
A request for review of a Conditional Use Permit
pursuant to Section 12-813-3 Conditional Uses, Vail
Town Code, in accordance with the provisions of
Section 12-16 Conditional Uses, Vail Town Code to
allow for "Public parks and active public outdoor
recreation areas and uses, excluding buildings" lo-
cated at 461 Vail Valley Drive, Tract F2, Vail Vil-
lage Filing 5, and setting forth details in regard
thereto. Specifically, this project includes the in-
stallation of parking in the Chalet Road right-of-
way and the conversion of the existing tennis
courts to pickle ballcourts. (PEC150037)
Applicant: Town of Vail, represented by Todd Op-
penheimer
Planner: Chris Neubecker
The applications and information about the propos-
als are available for public inspection during office
hours at the Town of Vail Community Develop-
ment Department, 75 South Frontage Road. The
public is invited to attend site visits. Please call
970-479-2138 for additional information.
Sign language interpretation is available upon re-
quest, with 24-hour notification. Please call
970-479-2356, Telephone for the Hearing Im-
paired, for information.
Published January 8, 2016 in the Vail Daily.
(11823065)