Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1991 DRB Agendas & Minutes plus sign variances (Jan to Oct)
+ ~ *n DESIGN REVIEW BOARD AGENDA JANUARY 2, 199,1 3:00 p.m. SITE VISITS 1:45 p.m. 1. Spraddle Creek -- Development plan, design KP issues. 100 N. Frontage Road/Parcel B (Conceptual) MOTION: SECOND: VOTE: Conceptual. 1 2. Vail. Pointe - Regrading/revegetation plan for KP excavated site. 1881 Lions Ridge Loop/Lot 1, Block 3, Part of Lions Ridge Filing #2 MOTION: SECOND: VOTE: Staff approved. 3. Trope - New Single Family Residence SM ~o~ 4 Homestake Cir/Lot 5, Block 1, Vail Village 8th MOTION: George Lamb SECOND: Sherry Darward VOTE: 4-0 Approved. 4. Sink - 250 Addition SM 781 Potato Patch Drive/Lot 21, Block 1, Vail Potato Patch. MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. • '~ i A 5. Red Lion - Temporary site development sign SM 304 Bridge Street/Lot G,=~'Block SA, Vail Village 1st MOTION: "~ George Lamb SECOND: Pat Herrington VOTE : 4 -0 Consent approved. ** b. Bridge Street Charlie's - Co1ar change and BR window lighting. 304 Bridge Street/Red Lion Bldg. MOTION: SECOND: VOTE; TABLED TO JANUARY 16, MEETING. 5 8. Schofield - New Garage AK 1448 Vail Valley Dr/Lot 18, Block 3, Vail Valley 1st MOTION:` `F SECOND: VOTE: TABLED indefinitely. 3 9. Byrne - New Primary/Secondary Residence AK/MM 126 Forest Rd./Lot 5, Block '7, Vail Village 1st MOTION: George Lamb SECDND: Sherry Dorward VOTE: 3-0 Approved with conditions that (1) Town Engineer approve driveway slope and (2) the applicant identify the elevations of the top and bottom of ail retaining walls. 10. Montaneros Condominiums ` Loft expansion JK 641 Liorishead Circle Unit #421/Part of Lot 8, Block 1, Vail Lionshead MOTION: Sherry Dorward SECOND: George Lamb VOTE: 2-0 Approved subject to following conditions: 1). Window shall be installed at same elevation as existing, adjacent windows. 2). Window to be installed to match existing window which is to lie removed. -.,x... ~ -., 2 11. Selby - New Single Family Residence AK (Conceptual Only) 1467 _Aspen Grove Lane/Lot 8, Block 2, Lians Ridge 4th MOTION: SECOND: VOTE: Conceptual no formal action taken. ** 12. Iberra - Exterior Lighting AK 343 Beaver Dam Road/Lot ~., Block 3, Vail Village 3rd MOTION: SECDND: VOTE: Withdrawn. ** 13. Lund - Exterior Lighting AK 443 Beaver Dam Road/Lot 4, Block 4, Vail Village 3rd MOTION: SECOND: VOTE: TABLED indefinately. 4 14. Vail Gateway _ Parking Signs AK 12 S. Frontage Rd/Lot N, Block 5D, Vail Village 1st MOTION: Sherry Dorward SECOND: George Lamb VOTE: 2-0 Approved, sings may be set up far a 3 week temporary period. ** If you have the opportunity, please stop by these locations during evening hours to look at lighting. Thank you. MEMBERS PRESENT: Pat Herrington Ned Gwathmey Sherry Dorward George Lamb *No PEC member elected STAFF APPROVALS: NONE MEMBERS ABSENT: ~~ ^ • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on January 2, 199 at 3:00 P.M. in the Town of Vail Municipal Building. ~- Selby - New Single Family Residence (Conceptual Review) AK 14b7 Aspen Grove Lane/Lot 8, Black 2, Lionsridge 4th Byrne - New Primary/Secondary Residence AK/MM 126 Forest Road/Lot 5, Block 7, Vail Village 1st Schofield - New Garage AK 1448 Vail Valley Drive/Lot 18, Block 3, Vail Valley 1st Montaneros Condominiums - 130 sq. ft. extension to existing loft. 641 Lionshead Circle Unit #421/Part of Lot 8, Block 1, Vail Village 3rd ' Bridge Street Charlie's -- Color change and window BR lighting. 304 Bridge Street/Red Lion Building 770 Potato Patch - Dumpster enclosure BR Part of Lot 6, Block 2, Vail Potato Patch Spraddle Creek - Development plan, design issues KP 100 N. Frontage Road/Parcel B (conceptual) Vail Pointe - Regrading/revegitation plan for excavated site area. 1881 Lions Ridge Loop/Lot 1, Block 3, Part of Lion's Ridge Filing #2 KP Trope - New Single Family Residence SM 1044 Homestake Circle/Lat 5, Block 1, Vail Village 8th Sink - 250 Addition SM 781 Potato Patch Drive/Lot 21, Block 1, Vail Potato Patch a Project Application Project Name: ~` y i ~: Project Description: ~~~ Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: ; ~~ Date ^~~ Block Filin ~IQ~' ~ l ~~~~ Zone ~~ Legal Descripti~on~~: Lot q'~ G~' f~ ~~ Qg Comments: _? A~IG~~_ t~Y ~ i~ l1 ~u`'~"o ~ --~ r ~~ !v Design Review Board Date Motion by: Seconded by: APPROVAL Summary: '~.~ ~~~ -~ l~ ~t-~ ~~ ~~~ ~ ~ ~~6 Town Planner. Date: ~ ~ ~ ~ ~~~~ ~~ P~ld~ ,~ ~. ~af7`~S DfSAPPROVAL r° hl ~C ~_ _ U ~ Staff Approval Project Application r/~l~tl Date ~ Project Name: ~~-~ ~ ~'~ ~ ~~ ' 5 ~ Project Description: ~~~ ~~ ~IV ~~ P~ ~~~' Contact Person and Phone ` ~ ~ ~~~ ,_, v'` `'' t ~ , Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot ,Block Comments: Piling ,Zone `-i'~CWI n ~' ~ i~ ~ ~ Design Review Board Motion by: Seconded by: APPROVAL ~~~ ~~ Summary: ~~ 1" ti~ Town Planner Date D15APPROVAL ^ Staff Approval Date: Project Application Project Name: r Project Description: n Contact Person and Phone ~~~ Date ~.~f ~~ -` ~r' ~5 i ~ C ~- `'7` ~7~ - ~~~~ Owner, Address and Phone: '~-~ ~~ ~ ~~' ~. ~~ ~'r~ ~~~ c1 V Architect, Address and Phone: - Legal Description, Lot •~ ,Block ~ Filing ~~~~~~~`'~ «- /~~ ,Zone ~`~ Comments: Design Review Board Date ~ _ ~ .~ ~~ Motion by: ~'~ Seconded by: ~~~ ~~ APPROVAL DISAPPROVAL ,~~ Summary: _~~~2./~iM~d L,cf'7~>r"/it Cp}z.o~~~'1 sY{!.S Y /~~-~ u~ { S. Town Planner Y ~ ^ Staff Approval Date: ~ r r -~ ~, >,~ Lea Project Application Date f ~~ ~~ Project Name: ~~f/Ji?r~-~ ~Ol~C~dll~/17~G~ms' -_Gfr'I/~ ~~~ /rlrJ/%1 Co~dorrlii~/G~~J Project Description: ~X/~d~/~~rc~ d-~ ~i'~J -P/Xl~~~ ~~~ ~~1~"~ ~-f/~~ ?~~ Contact Person and Phone ~~~~~°~ ~~~ ~f-~~C~ ~i~0. ,~r1X ~~rv~ / ~e~~• ~~~oJ~~ P~a~ ~~~~ `~1S~ ~ ~ Owner, Address and Phone: ~~~~ ~i?d ~aC'~/~ /r~~f7 / ~ t~6lQKeI- L~rIY~hJ Architect, Address and Phone: ~~~ ~~~~~~'' Legal Description: Lot Comments: • Motion by: sh~~'~ ~rl~I~/U Seconded by: ~~ ~~~ clock ~,~ Filing ~~`~/~fa~"`""~~~~©, ZoneG~ Design Review Board j/OT~ ,~-O APPROVAL l~lip~/ it/!7~ ~//~~t//ice Go~~i~!'t~-1~ ~J Date ~'~ ~ ~~ DISAPPROVAL ~1 dUir~oH! ~ 6~e ..ash//~ ~ r~~~i ...a~rs~i%~ st.~r,~ou~ ~vhidi ,rs ~ .f e. ~.rrlov~d 2~,r~ ~r~oz~~/ ~ ~h~~z1/e~ ,~f ~sa>~ . e~~rm~ a.s rzdpce~>L ~r/rr~i~ls' Summary: ~J ~a y, . . / Town Planner lt..~l ~. /~~/ ^ S#a#f Approval Project Application Date ~ 2 "2-/~` ~~l ,, r r- ro}ect Name: +~'' """~`~ ~.~~a~r_ 1c3~~ft ~ G~-1I ~°- c-~ ~ sir S ~71' ~¢. Q~i. arC-lz.~ 4:~ Project bescription: ~+ ~ ~ Contact Person and Phone ,~~ ~- ~ `\"eic! ~ ~~ ~~ ~ ~ ~} ~ llllll CJ Phone: t--•~ ~~°~`~^'~ ~ 7 ~ 3 / ~.~5 /!/ i `- Owner, Address and s~,~ ,~ ~ ~- ~ ~ 3d~. Architect, Address and Phone: Legal Description: Lot /~ ,Block ~~ *~-' ,Filing ~~ ~1 ~1 ,~~~ ,Zone s~ ~~ V Comments: // r J~ ~ r / f C :'s~.v[j /C~[,QVI l~c~..' f /c--d7-~ 7~"~'~ ~-~~L~ (1~ • f ~G/~ ~CYO~~ _ U ~ v Design Review Board Date ~ ._... z~ ~~ Motion by: .~~~ Seconded by: L:•~'t'r'~'~ APPROVAL DISAPPROVAL ~~~ ~/ ~~ Summary: ~ ~ ~ ~~i ~~ ~. _~ ~_.~ C ~.~ /lie.-~ ~ '~ d~,Q" / / f ~ ~` ~ j _ ~ Town Planner ^ Staff Approval Date: ,/ ~~ ~~ Project Application ~roject Name: ~ ~ _ _ y Project Description: ~~~~ ~~ Contact Person and Phone Owner, Address and Phone: P.,. ~~zl~~ i Architect, Address and Phone: ~~~1~~~. F ~~~~~ ~ ` "" ' Legai Description: Lot Comments: ~~" logs ~~~ ~j ~~~~~~ / > ~ ,Zone 'T ~~~ E31ock ~ Filing ~ _L - F ~ f r fir".E. r ~ ~ Design Review Board Motion by: r I'e~~ Seconded by: ~ . ~. - r AP VAL Su mo~m ?ar~~ypp: ~~] ''] r~ C~T~ T I"1 ~ ~ 6 V ~ ~ ~#n ~. ~ ~ ~~ ~ ~ ~ ~~ Town Planner -Date: ~ ~ +~ Date DESAPPROVAL >n~~ ~~ ~~ ^ Staf# Approval ~ ~ ~ .•:k~ r ~. DESIGN REVIEW BOARD AGENDA JANUARY 16, 1991 3:00 P.M. REVISED 1/15/91 SITE VISITS 1:00 P.M. i 1 1. Spraddle Creek Subdivision - Design KP Guidelines. 100 N. Frontage Road/Parcel B MOTION: George Lamb SECOND: Sherry Durward VOTE: 5-0 TABLED TO FEBRUARY Fi MEETING. ~-- 5 2. Vail Activities/The Adventure Company BR Storefront. 675 Lionshead Place/Sunbird Lodge MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 It was determined that the business fronted on only one major pedestrian way. 7 4. Stevenson - 250 Addition SM 275 Beaver Dam Rd/Lot 40, Block 7, Vaal Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE; 5-0 Consent. 2 5. Aasland Residence - Addition & Color Change SM 2527 Arosa Drive/Lot 3, Black D, Vail Das Schane ~l MOTION: SECOND: VOTE: TABLED TO FEBRUARY MEETING. Lag store front with blue on door and window tram. 6 3. Breeze Ski Rentals Frontages BR 684 W. Lionshead Cir./Montaneros Building MOTION: George Lamb - Denial of 2 frontages. SECOND: Jim Shearer VOTE: 5-0 6. H'erdrich - New Primary/Secondary Residence SM 2008 Sunburst Drive/Lot 18, Vail Village 3rd MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved. 4 7. Stephen's Park - Review of proposed park AK design to be constructed in summer of 1991. 2500 Block of South Frontage Road West. MOTION: SECOND: VOTE: TABLED TO JANUARY 30TH MEETING. 3 8. Adler - Addition JK ~-~ 2602 Cortina Ln. (West Half)/Lot 1, Block B, Vail Ridge. MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent. Approval subject to GRFA check. 9. Rimski Residence - Demo/rebuild with two 250 JK additions. 394 Beaver Dam Road/Lot 7, Block 2, Vail . Village 3rd. MOTION: George Lamb SECOND: Jim Shearer VOTE: 4-0 Ned Gwathmey represented the applicant on this item and therefore abstained from voting. Motion to approve subject to the following conditions: 1. Applicant must use great care and sensitivity in redeveloping the site to insure the survival of the two large evergreens which flank the driveway near the residence. The DRB suggests the applicant consult with a landscape architect/nursery person/tree expert for suggestions on haw this can be accomplished. 2. Applicant give consideration to minimizing the impact redevelopment of the site will have on the existing willows and aspens located along the western edge of the site. 3. Any plant material removed during construction should be transplanted wherever possible or replaced. 4. Any walkways to be installed located more then 4'-0" from the face of the structure must be approved by the DRB. 10. Charlie's T-Shirt - Lighting BR 641 W. Lionshead Circle/Montaneros Building MOTION: George Lamb SECOND: Jim Shearer VOTE: 5-0 3 florescent lights under awning to be directed downward - not to light awning, 2 spot liter, eliminate wall liter. MEMBERS PRESENT: Sherry Darward Ned Gwathmey George Lamb Pat Herrington Jim Shearer (PEC) STAFF APPROVALS: Vail Point Grading, Lot 27. 1894 Lions Ridge Loop MEMBERS ABSENT: 770 Potato Patch trash dumpster enclosure. Construct dumpster and enclose, transplant 2 aspen, remove third trash container. Vaii Gateway Plaza - Modification of flue cap screens, see drawings dated 12/28/90 by Arnold, Gwathmey, Pratt. Lot N, Block 5-D, Vail Village 1st Vail Gateway Plaza - Site modifications. Lot N, Block 5-D, Vail Village 1st • Project Application p Date 1 '~ rD / L Project Name: ~a ~ ~' ~ U (~' l,C~+~ ~e~ / ~ ~~ ~J Project Description: ~ ~ ~'~ ~~'~"` ~ h'~ ~ ~ Contact Person and Phone ~~ ~~- ~ h ~~ ~' l ~~ ~ ~ ~ ~- a~ ~ s .~ ~ s~~z v 3 Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot s Block ` Filing I Comments: ~1~-~ --..~~'1 ~ ~U S ~~ C' ! ~7 ~ ~$ ~d ~ N' +~ik--G~ ltl ~ z'L W A ~ r 4Jx- ~-C ~~ l yli'7 r ~ Design Review Board Motion by: SecondEd by: Summary: ~~ U A,Pr~PROVAL "` V Town Planner Date: ~ II ~~~l ~ l Date DISAPPROVAL ^ Staff Approval Zone Project Application Date J /~ ~°/~~ i Project Name: ~ Y~~- ~"~~ ~~. t Project Description: ~~ ~ `~ ~~ ~ x "~~ ~ ~ ~ ~~ ~ ~ ~ " ' G~-- SAO Contact Person and Phone Owner, Address and Phone: Architect. Address and Phone: Legal Description: Lot Block Filing ,Zone ~- / r. b C~ c~~..e~t~ ~-, 6 Gr Comments: ` ~~`-`~ ~t-•-e- U ~~ ~ 4 Design Review Board Date Motion by: ~'" " Seconded by: ` ~ L ~ t.~-- APPROVAL DISAPPROVAL ~~`-- o ~ ~ Summary: ~ ~..~~ ~~~ / ~, / ~ , 1 ~' d ~ ~, - ~ Gc.~-tx - s~ Town Planner Date: ` ~r a ^ Staff Approval 1 Project Application Project AEame: ~l ~~~~~~~ w_ - ~~O Project Description. _~ Contact Person and Phone Owner, Address and Phone: Date Architect, Address and Phone: ~~~~~ ~ !` Jr Legal Description: Lot Block ~ Filing ~ ~ ~, ~ ,zone Comments: ~~ ~ ~~~o ~ r>n~ c~nr~ ~ r~,l~. ~--- I~r~-~ (~~ Sl wC~- Lro~ ~Y ~ ~~~~ ~. Design Review Board Motion by: Seconded by: APPROVAL ~~~ Date DISAPPROVAL Summary: ~O ~` ~'"_~ -~ ~ ~ 4N~~ ~n ~~ ~ ~ ~ u Town Pfann Date: ~ ~ ~ "` ~~ 1YJ Staff Approval Projec# Application Date Project Name: ~~ ~ ! ^' ` ~-Q`?j~~~~~ ~ Project Description: ,~ n /~~~r ~~ Contact Person and Phone ~(~.~'~ ~'~"'Yc`~'~ ~- Owner, Address and Phone: Architec#, Address and Phone: ~.~Af~ 1 ~ `~ ~ ~'~i~~ ~ ~ r ~P~'a" ~ "Y~le~ 1 U ~ v ~~ ~~~ . Legal Description: Lot ~ ~ Block `~ Filing ~~~~ ,Zone Comments: ~J t>l ~y ~ ~ ~ ~ ~~ 1 ~ 19-lL.r i ~ -"T~~ ~, 7 S ~~ C:o~1 2~~ f ~ rye. (~ v e~a~. 3~0~, ~ ~~I~.e. ~ 'r iU'r%l.LalWl~ `~ NN~.tQ `T~~,~ Design Review Board Motion by: ~ ~ ~ T v ~" -~ Seconded by: ~,k t !"`~P ~` APPROVAL Summary: ~~~ ~ ~ ~~''` '' ~ ~~~,~ ~ ~ Town Planner Date: ~ ~ VJ ~ ~ ` x Date DfSAPPROVAL ^ Staff Approval Project Name: ~1 G L /~ j,, Project Description: f ~u Contact Person and Phone Owner, Address and Phone: Pro;~ect Application Date ~ ~ ~~ll I ~1. ~ ~ I' 1~ ~ ~ I f 1 ~'Y~ ~ ! t ~L/ Architect, Address and Phone: ~,"u ' "~ Legal bescription: Lot - Block ,Filing ~ ` ~~~~~JI~tJV\3"'~ ,zone Comments: Design Review Board Motion by: Seconded by: Date APPROVAL DISAPPROVAL Summary: ____ ~~ ~~~ Town lanner~ ff Approval Date: ~ ~~ 1 ~ r PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on January 16, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Stevenson - 250 Addition SM 275 Beaver Dam Rd/Lot 40, Block 7, Vail Village 1st Aasland Residence - Addition & Color Change SM 2527 Arosa Drive/Lot 3, Block D, Vail Das Schone ~1 Herdrich - New Primary/Secondary Residence SM 2008 Sunburst Drive/Lot 18, Vail Village 3rd Rimski Residence - Demo/rebuild with two 250 additions• JK 394 Beaver Dam Road/Lot 7, Block 2, Vail Village 3rd Adler - Addition JK 2602 Cortina Lane (West Half}/Lot 1, Block B, Vail Ridge Lund Residence - Changes to approved plan. AK 443 Beaver Dam Rd/Lot 4, Block 4, Vail Village 3rd Stephen's Park - Review of proposed park design to be constructed in summer of 1991. 2500 Block of South Frontage Road West. AK Spraddle Creek Subdivision - Design Guidelines KP 100 North Frontage Road/Parcel B Vail Activities / The Adventure Company Awning BR 675 Lionshead Place/Sunbird Lodge And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OE VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on January 11, 1991. Project Application yZ©yL 7~rn-~s ,- ,~ ~ ~~~~ Date l' f {° (~~ ~y ~ , Project Name: `"` ~ a-~ I ~ ~ i~ ~ ~~ ` E Y- ~-~ / ~ ~ Project Description: ~ 1 ~ ~ ~~ ~~ ~.n'l t.~G ~ ~.J Contact Person and Phone // '• / Owner, Address and Phone: C~ ~ `'~ 7 ~ ~ ~ 2~ ~ Architect, Address and Phone: t.egal Description: Lot ,Block Filing Comments: ~~ ~~ ^~'~ ~"~-- -3 ~ r U C Design Review Board Date Motion by: - Seconded by: °~.-~~ APPROVAL DISAPPROVAL Zone Summary: _ C;~/_-:/t~sCL C_..~fi ~L-i~~ q~(G ~~'~~/ ! ~ -~-~'i 3 iF' (` 9~. ~ffi4-~.~ ~ G~~'~-C.l~' ~ .~tIY( C.%~~[.. `3 r C.+~-~[/~ vri. U C'~ ~2 ~ ~ /,~ C Cg d'I ~ ' ~~a .~-LCrr7 O J' ~c-#' ~-~ ~~~~~~_ S Tow/n~Planner ^ Staff Approval Data: rt ~/ 7 / `~ ~ / DESIGN REVIEW AGENDA JANUARY 30, 1991 3:00 P.M. SITE VISITS 1:15 P.M. 2 1. Hymers - New Primary/Secondary Residence JK 1459 Greenhill Caurt/Lot 6, Glen Lyan Subdivision MOTION: SECOND: VOTE: Conceptual. 4 2. Treetops - Deck enclosure MM 450 E. Lionshead Cir/Lot 6, Block 1, Lionshead 1st MOTION: SECOND: VOTE: TABLED TO FEBRUARY 6TH MEETING. 3. Vail Ski Activities/The Adventure Company BR Storefront. 675 Lionshead Place/Sunbird Lodge MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 7 4. Gasthof Gramshammer - New ski storage below AK dining deck. 231 E. Gore Creek Dr/Lots E,F,G, H & I, Block 58,.Vai1 Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 5. Orrison -- New detached garage AK 1464 Aspen Grave Ln/Lot 10, Block 4, Lionsridge 4th MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. r 6. Stephen's Park - Review of proposed park AK . design to be constructed in summer of 1991. 2500 block of South Frontage Road West. MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 5 7. Larrea Remodel - Combine 2 Units SM Vail Village Inn Plaza/Suite 310, (unit 404 & 410) MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Cansent approved. 6 8. Rojas - Dormer Addition SM Vail Village Inn Plaza, Suite #331 MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent. 1 9. Aasland Residence - Addition SM . 2527 Arosa Drive/Lot 3, Block D, Vail Das Schone #1 MOTION: SECOND: VOTE: TABLED TO FEBRUARY 6TH MEETING. 3 10. Glen Lyon Office Building - Addition SM 1000 S. Frontage Road/Lot 45, Block K, Glen Lyon Subdivision. SDD 4 MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 11. Alpine Standard - Dumpster JK 28 Vail Road/Lot A, Vail Village 2nd Filing MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 To approve new dumpster enclosure location at north end of west planting bed. As proposed dumpster enclosure doors will open to the north. Approval is subject to the following conditions: 2 .7 1. Applicant must submit to the Community Development Department a letter from Holiday Inn which states the hotel approves of the new dumpster location. The Community Development Department must be in receipt of such a letter prior to relocation of the dumpster enclosure. 2. Applicant will work with Holiday Inn and Colorado Department of Highways (CDOH} if necessary, to provide additional landscaping on Holiday Inn owned property which is located north of the dumpster enclosure and south of the South Frontage Road. Landscaping to be installed must be approved by the C~.~u,~unity Development Department staff prior to relocation of the dumpster enclosure. * Appointment of DRB member to Art in Public Places Board. • MEMBERS PRESENT: MEMBERS ABSENT: Ned Gwathmey Jim Shearer (PEC) Pat Herrington Sherry Dorward George Lamb STAFF APPROVALS: Lot 9, Glen Lyon - Change to approved plans. Whittemyer Residence - Change to the inside of the north covered entry, from a square opening to a radius curve. Bighorn Rentals Sign - Replace existing non- conforming sign. Lot 6, Bighorn 4th EW Oakes Trust - Interior addition to ~7d4. Lot 3, Block 3, Lionshead 3rd/Antlers Building 3 ~J Project Application Project Name: ~ ~ ~ ° ~ 2~~ ~-' ~ ~r r Project Description: ~~ .~I1~311~C~ ~'~~ ~~v~~p~ Contact Person and Phone ~~~~ ~ ~L~~ ~~~ r ~ ~ G~L`l~ (~~ 7~~ ~~~ C~ Qwner, Address and Phone: p~~'`" ~ L-~ ~ ~?'1~S~s~}~YYt-~ Architect, Address and Phone: Legal Description: Lot Comments: E~ J Date E ~ ~a~Z.~ C P~O~ Ste! (',CJ ~1 l~ s 7~ g?~- 7~ q Block 5 ice' ,Filing ~~l ~/ ~~Ux.~~ ~= ~~r ,Zone ~~ Motion by: Seconded by: ~l~rl! D Jc~iL~ 1 ~ N APPROVAL Summary: Gate: Design Review Board ~~ ~ ~~ ~. Town Planner ~ ~/~I Rate ~f adU DESAPPROVAL ^ Staff Approval Project Application • bate /'~~~ ~ 9~ Project Name: /~,i~~fS6~ ~~~~ / ..~ / Project Descrip#ion: %T-r~-.~ ~(~--rl®~~dc.v ~;~, `~ ref y-~ r Contact Person and Phone r ~-d.~`t`~"7 Q~.[.r~ %r ~ (/ Owner, Address and Phone: ~7' ~P~ ' ~~''~ ~n ~C~Y-C. ~ ~ / ~ - 7 ~d I Archi#ect, Address and Phone: Legal Description: Lot ~~ Bock ___/iR ~ Filing ~~~~ ~ ZoneS° Comments: Design Review Board Date Motion by: ~'`~~~ Seconded by: ~1~~~~i[~r ~ v ~, APPROVAL DISAPPROVAL Summary: ~ c.~r"~` %7 d~ ~ ~r~1 ~ ( / ~- r ~~ s~ // ~ 0 ~~~ town Pia net ^ Staff Approval ba#e: ~~ ~V ~~ Project Application y pate ~~ ~_ ~1 ~ ~~ Project Name: ~~~"` "`~ ~ ~ ~~ ~i ~_ Project Description: -~~° ~"`-~~ ~ ~~ ~~ C.~dY~ ~~-- Contact Person and Phone f ~~~ i~-,'L ~--~rrvi ~--~ k ~ 2f ~' Owner, Address and Phone: ~ ~ v Architect, Address and Phone: ~~~ Legal pescription: Lot ,Block Filing Comments: Design Review Board Motion by: ~ -P Seconded by: ~`/~~ 1Lt,Y ~~ /'~ APPROVAL [.~ Summary: ~~E~~ ~-~ T Town Planner ~~ Date: ~ C~ zone Date /- .~~ ~l DISAPPROVAL ^ Staff Approval Project Application Date Project Name: ~~~ ~ r ~~~ ~~~ ~ ~ ~~ " ~~ i ~~ ~ ` l} l Project Description: ~~~~ ~~~ - ~ ~~ ' `~ [~'~ ~~~ l 1 ll Contact Person and Phone Owner, Address and Phone: pl~~~ Architect, Address and Phone: ~~~~.~~ i ` k~'~C~ ~ ~~/r ~ f~{,'~!~-r~~~ ~~~~ ~~- 1 Legal Description: Lot Block Filing Zone ~-+J~.LL~ Comments: . Design Review Board Motion by: ~~ _ nJ~ Seconded by: `r t~ ~~~~4 APPROVAL i 5~ammary~ ~~ ~~ rfil N CN Y ~ ~~~~ Date DISAPPROVAL ,~-~~ /~( i ~"1` inn ~ ~ /J~ D~ ~P~ - ~ ire S ~,~.f;~ ~~~ Tow Planner Date: ^ Staff Approval Project iVame: ~ ~~ ._.-- ~~~~/- J Project Description: ~~i J Contact Person and Phone Owner, Address and Phone: Project Application Date ~ ~~~ t ~ ~ :~ ~~~ ~~~ ~,~~~ / Architect, Address and Phone; ~~'~~ ~~~ r' ~~~1~ ] ~~ ~~- } ~S `"~ ~ Legal Description: Lot Block Filing ~~V -~ ~~~ ~ - ~-~1--Zone ~ ~~ _ Comments: . Design Review Board Mption by: ~i ~ v Seconded by: ~ ~~ APPROVAL ~ ~ ~~ ~ Summary: ~~~ ~~ ~IP~~ P~. ~~~Q~~ ~ S ~~ Towri Planne~ ~t: ~~ ~ ae 1 Date DISAPPROVAL ~ ef~a9,e ra l~.v~-~i ( ~n ~~ ~(.e_ ^ Staff Approval Project Name: ~~ Q/fn ]'~ Project Description: ~r / Contact Person and Phone Owner, Address and Phone: Project Application Date ,r'af, ,~111~`~~~~J~' ~ ~ i/~~~ Architect, Address and Phone: ~~~~~~ 1~ Legal Description: Lot. ,Block Filing~~.U`~~"- ~ ~ ~~ ,Zone ~~~ ~~ Comments: Design Review Board Motion by: ~~~ [ U,}~-~ ` Seconded by: ~r NI ~y~~y A~P;''"ROVAL -~~41I V V V Summary: ~ ~ ~ ~1_Q_,~ ~tr-- Town Planner Date: I ~ ~~ ~~ f i~~ ~~ ~~~r~ Date DISAPPROVAL ^ Staff Approval Project Application Date ~'~ " ~~ ~roject iVame: A~d//ZUh'~G~GZ~"~/"1//~c~Tu~~~h/ 'o~C~'t~. ~tiiii7'~2~i /~"• ~v~~ Project Description: ~in~~ ~~"~/~~'~ i Contact Person and Phone ! fps ~h~~~~ "L~J ~~'~~~~~~°~~~• ~~G' j SG©~ s• ~u~~.,~ ~~~ ~a 7,~ . ~r~1e~r~G . ~~. 80~~~ ~vr~e = lam) 2 z a -232 ~, srzlN ~2e~v'<~ C37DD,/~IQrJ ~~ ~r~ ~iif~i~ #3, du~re~/BPD Owner, Address and Phone:'~~ ~/~CQ~ U D1~i1/~~1r,E',~lcS'. ~102/~ /~~'i~ae t9i3J~3~--Soo aa~D,~%~i/~~ -DAB /nr~~~'. ~a ~ /~~o E/~sa~ TX• 799~~ Phm~e. (y/5~'Ss~~ Zz 5~~, ~4~' ~r~ rti/grry/,~ ~i-z°~sd~~F- Architect, Address and Phone: x //~ legal Descripti Lot 13fock Filing Zone Comments: Design Review Board Date r~~'9~ Motion by: t.7E4/?~Q~ L~/Ylfl - ~ El,O.G~/a~irL° /'#//TTY CD/I~,~147',L.f' Seconded by: ~¢ ~~'r/ U APPROVAL D15APPROVAI 70 ~,~atne ~uJ p'un~er P~/~~ la~,m~ ~,~ ha~~ end ~' dv~f p/a~rrg f ea :.~' pry/ -- ~,, ~~ rid j duh?,r~ e?rel~u~ er'adra~' ~ui!/ ~•~ ~ !fie ~er~ .,~iad~t-C .ci' ~ru~,~- ~ ~e ~!/ru~ir~' r~a~~r~~ Summary: r~/~LiCe?il~r fi~tG~rSll~7G~7D~e Car~mrrr~~~-°/a.~~•~~,~a~: a/~~'-~.rJ,~a//n~7 ~u~i/!~ S~i~f 7~e ~0~/l.~f~/DGt°rP~'119~ /!Bu>~ur~z~Pit~~~.{7~t? . ~° ~•j? ~[2°/dArir~n~ ~. /r1[ds~.~ /rI ~e~i, yak ~'~~. a./~.~t.l,pnm ~ t~/cra~ra~ ~e crur?~,astw ~arur~ . .~/c~ri~ mill 6r/c~re .w//1 g~~ /hn CLriO'~'o • ~~9~ ~G'4Dr~) . v„C/,~~!,tQ~'y, 7O~rd ~~~ G/~n~-mina A7r ~/a/.~a~.1~a ~ur.~d~r r.~h~h .rs' /~~d nazi ~~1 e c~!~~~, Pix~as gra~dau~ ~ S. F~rl~!~G~i~S~Ji' ~ ~` 6[.i%~~z~/~'mr.GS,~' .fie. a~D ~rr~~-' ~ P (~~.mrlr~,~j ' ,~~'~.~~ ,~~. ~~h~' ~h~l 7n .tee/a~eil fit' ~ d~f zs-~ e~C~.ftir ~~ Town Planner ^ Staff Approval Date: ! ~-~ " ~~ PUBLIC NOTICE ~~. NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on January 30, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Forbes - Combine 2 units (Conceptual) MM Lat 4, Vail Village 4th; Units 4B & 5B, Texas Townhomes Treetops - Deck enclosure MM 450 E. Lionshead Circle/Lot 6, Block 1, Lionshead 1st Larrea Remodel - Combine 2 Units SM Vail Village Inn Plaza/Suite 310, (unit 404 & 410) Rojas - Dormer Addition SM Vail Village Inn Plaza, Suite #33i Aasland Residence - Addition SM 2527 Arosa Drive/Lot 3, Block D, Vail Das Schone #1 Gasthof Gramshammer - New ski storage below dinning deck AK 231 E. Gore Creek Dr/Lots E,F,G,H, & I, Block 5B, Vail Village 1st Orrison - New detached garage AK 14b4 Aspen Grove Lane/Lot 10, Block 4, Lionsridge 4th Stephen's Park - Review of proposed park design AK to be constructed in summer of 199T.. 2500 block of South Frontage Road West. Hymers - New Primary/Secondary Residence JK 1459 Greenhill Court/Lot 6, Glen Lyon Subdivision Vail Ski Activities/The Adventure Company Storefront BR 675 Lionshead Place/Sunbird Lodge *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on January 25, 1991, DESIGN REVIEW BOARD AGENDA FEBRUARY 6, 1991 3:04 P.M. SITE VISITS 1:45 P.M. 5 ~.. Forbes - Combine 2 Units AK Lot 4, Vail Village 4th/Texas Townhomes MOTION: SECOND: VOTE: Conceptual review. 2. Treetops - Deck enclosure MM 450 E. Lionshead Cir/Lot 6, Block 1, Lionshead 1st MOTION: SECOND: VOTE: TABLED TNDEFINITLY. 2 3. Stempler - 250 Addition SM 1044 Homestake Cir/Lot 4, Block 6, Vail Village 7th MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. Ned Gwathmey abstained. 1 4. Wiegers - New Single Family Residence SM 785 Potato Patch/Lot 22, Block 1, Potato Patch MOTION: SECOND: VOTE: TABLED TO FEBRUARY 20TH MEETING. 3 5. Breeze Ski Rentals - Sign Variance/Montaneros JK Commercial Condominium Unit #100. 641 West Lionshead Circle/Part of Lot 8, Block 1, Vail Village 3rd MOTION: SECOND: VOTE: TABLED TO FEBRUARY 20TH MEETING. • 6. Gateway - Signs AK 12 Vail Road/Lot N, Block 5D, Vail Village 1st MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 Approved. Ned Gwathmey abstained. 4 7. Worksession on Neon/Gas filled lighting SM/LE (Site visit to Crossroads & Vail Village Center) MOTION: SECOND: VOTE: The DRB requested that site visits at night be conducted to further the DRB's understanding of the proposal. 8. Hymers - New Duplex on Primary/Secondary Lot JK 1459 Greenhill Court/Lot 6, Glen Lyon MOTION: George Lamb SECOND: Jim Shearer VOTE: 3-0 Ned Gwathmey abstained from voting as he represented the applicant. Motion to approve subject to the following conditions: 1. Prior to Town issuance of a building permit, development plans be modified to conform to 1992 revised GRFA and site coverage guidelines. 2. Prior to Town issuance of a building permit, applicant must obtain approval from applicable utility companies to encroach into the utility easement adjacent to Lot 7. MEMBERS PRESENT: Ned Gwathmey Jim Shearer {PEC) Pat Herrington George Lamb Sherry Dorward STAFF APPROVALS: Pool Residence - Revised grading plan. Lot 6, Block 1, Lionsridge #4 MEMBERS ABSENT: Dunn Residence - Add deck to west side of unit #15. 931 Red Sandstone Road/Aspen Tree Condominiums Project Application Date ~~~/9~ ,~/ ~/ , `,roject Name: ~~/~r"-s ~p~ ~ ~"-"~" /~S9 ~i~enh~%l C~ur~ /Lob / Cam, LuonJ ff,, ~ u Project Description: /Ye~ ~~X ~ ~rn~~ ~~ L b~ ~J Contact Person and Phone ~~ Q~~ Owner, Address and Phone: /~LG~ f~ym~~ /~~ ~X ~~~/YQ~~' r~a ~~~°58 Phi : ~~~ -~03.~ Architect, Address and Phone: ~~2~ ~~~/~~ ~~~~~~ ~u'~~~y~/ ~Q~ ~_~ /' C" ~~ i~a ~s: fr"~~ ~Pc~! , l~~l, Co - 8/~~7 f~~' X710 //S~~ v / Legal Description: Lot cQ Block ,Filing ~~~ L~~ ,Zone ~/~ c/ Comments: Design Review Board // / Date a'(p" ~~ Motion by: C7e.°~• Z~'~lC?. TD Qdf~Ia!/t° --~GLI~/P~"' ,~1~ G~/l~~l'~7'~y Seconded by: C~%m ~~~~ V 1/0~ 3~ o APPROVAL DISAPPROVAL /1/Pd ~li;~~,~''~~~s.~nir,~d~~rrr ~o~~~ as /ie .~' she ~~~~' ~, - Summary: ~D~~v ~ a,~iar~ ~f;~ ~ ~ie,_~~14u~l~z~ G~Dl1O~i ~ ; ~~~ fn 7`~z ~.ssua~c.~ ~~. 6ui%~r1arlr~i~ c~ev~/darne.~~ ,d/mss ~- ~ L X99/ ~e~ .~ /r~GY~s~~ ~ eo~_ rm ~a q ~i~.d Q /J!~ a/7~ G~~ r~42 c put Cis//7rFl' ~riov~ ~~ ~.ss-u~~ ~' a ~u%~ir7.~~.~rrr~i~~ ~vrCQr~~ ~i-~u..s~ ~ 6~z~ u,br~r~v~2/ -~oirj aad/~~~~ ~i~i/rev cbn'-- ~ ~~a ~C~Dar.! ire ~ ire u~i~~ ea~~n~r~l~ a faceh~ ~ ~o~ 7 ~ ~' Town Planner ^ Staff Approval Date: °~'~'9 Project Apptica#ion • Date ~~CS1 ~ •~ ,__ Project Name: ~~' _~ ~r ~^ ~~ ~~~_ Project Description: ~ ~ 5 i ~ S ~Y' U~ Contact Person and Phone ,.~`~ ~~ ,~~ `-'"` ~~~g ~' ~~ ~- Owner, Address and Phone: ~--~"~ ~Q ~:a~.~r ~ ~ ~r ~ ~ ~r~ ~ ~/`~ ~- ~ c~ ~r~ ~ /ate S . ~.,.~.~~ ~/ Architect, Address and Phone: ~~ ~ l~~-s~~ ~ ~~ ' ~ C'.e~ ~C ~Cr~ .~`'~ s . rho! Legal Description: Lot c~ i m Z e ~~, Q 1 ~.- /l/ ~~r~ f!'ir~ia~ I~7~~~. ~ ~~' CF'/~-~ e4 ~ t C~ dllS t11~ t~~ ~ 3~f, /110 ~33~-C~ t~/C yT~nt C~ /S ~{2Lc~~'-~J. • Motion by: Seconded by Design Review Board l,a Ili s ~ l APPROVA~ .~ ~~ ~t1'r'Tl~ ~c~eP C~..~ sc Date ~~-~/r Q DISAPPROVAL ~~ ~tl~ ~~1 ~~~~ ~~ .~ Summary: ~- f IVC."~ I N~ ~„(~,1~ ~C_l J~ 31? ~9f1~?71I71~ G 1~ ~t-1.e1~.~ ~~~ 3~ ~cl ~(I ~ rtl~C ~ il.~. ~~ /.,.71 L L At r Qom- S ,A~ ~f" r~~ ~ ~,Ir° ~z" ~~ ~~5 ~'F ~.e]/ll~ 1~~ ~fLI.CS I ~~ ~^J~~ 1 ~. v Town Planner ~ ^ Staff Approval Date: ~~ l ~ ~ ~/` • Project Application i '' Date ~ ~ ~" ~ I Project Name: ` ~ /-~- ~' ~ 1 ~ S - [ ~~c.~Gtr~ '~ ~f~l~f ~ 7"a~i~r~~+ ^~ ~p- v .~[ ff - /~~~ Project Description: -3 S1 ,r S .0~-~`%~? ~ 4~ ~/ Contact Person and Pi~ane !~eu4~ S ~~~- ~` '~ y~ ~~ ~/nr „~~ X "~iT 7 ,.. Owner, Address and Phone: _.. c ~'~ ~"~ ~~~ / ~~JS /t ~d~- ~~`~' ~' ~C C~ 8a ~~ ~` Architect, Address and Phone: ~• r~~ ~ ~-~Qdr~- 1 - ~ Lega! Description: Lot /~ Block ~y Filing _~~', ~~f (emu. ;! I t.~~ ..~- V J ~ / Design Review Soard Motion by: ~ ~~°*~'~~~ Seconded by: ~, APPROVAL L~ _ D > Zone ~~~-/ Daie ~r ~ ~` D15APPROVAL ~~~ / I Summary: ~~1~ -ra-~ -.Lc~ .iCncf~.~/~ ~~7 ,~/~!i~-~ ,~-- ~` ~ ~ ~~ Tov`ii Planner Date: ~ ~ T~~ ^ Staff Approval PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on February 6, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Breeze Ski Rentals - Sign Variance/Montaneros JK Commercial Condominium Unit #100 641 W. Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Stempler - 250 Addition SM 1044 Homestake Circle/Lot 4, Block 6, Vail Village 7th Wiegers - New Single Family Residence SM 785 Potato Patch/Lot 22, Block 1, Potato Patch Forbes - Combine 2 Units MM Lot 4, Vail Village 4th/Texas Townhomes Worksession on Neon/Gas filled lighting SM/LE Gateway - Signs AK 12 Vail Road/Lot N, Block 5D, Vail Village First Treetops - Deck enclosure MM 450 E. Lionshead Cir/Lot 6, Block 1, Lionshead 1st *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. Published in the Vail Trail on February 1, 1991. DESIGN REVIEW BOARD AGENDA FEBRUARY 20, 1991 . 3:00 P.M. SITE VISITS 1:15 P.M. 1. Wiegers - New Single Family Residence SM 785 Potato Patch/Lot 22, Block 1, Potato Patch MOTION: George Lamb SECOND: Sherry Dorward VOTE: 5-0 Approved. 5 2. Tobin -- Satellite Dish Antenna SM Vail Village Inn Plaza, located at 100 Vail Road/Lot O, Block 5D, Vail Village 1st Filing. MOTION: SECOND: VOTE: Conceptual. review. 3 3. Aasland Residence - Changes to approved plans SM 2527 Arosa Drive/Lot 3, Block D, Vail Das Schane ~1 MOTION: Pat Herrington SECOND: George Lamb VOTE: 5-0 Approved with conditions. 4 4. Blockbuster Video - New Sign BR 1031 S. Frontage Road/Cascade Crossing MOTION: SECOND: VOTE: TABLED TO MARCH 6TH MEETING. 2 5. McGill Residence - New Single Family AK 1453 Buffehr Creek Drive/Lot 4, Cliffside MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with.5 conditions. Prior to issuance of a building permit, applicant shall: 1. Meet Fire Dept. standards for providing access to house without violating Public Works requirements. 2. Redesign all boulder retainage exceeding a 1:1.5 slope with terraces or clumps of landscaping. 3. Design an irrigation system for all trees. 4. Reduce all retaining walls to a maximum of 6 feet (for those located outside front setback) . 5. Insure that the metal roof has a matte finish. 1 6. Buffehr Creek Partners - New Single Family AK 1726 Buffehr Creek Dr/Lot 11, Phase VI - The Valley MOTION: George Lamb SECOND; Pat Herrington VOTE: 5-0 Approved with two conditions: 1. The DRB strongly recommends that the Town approve a variance to road width requirements. 2. The applicant must comply with all PEC conditions of approval prior to issuance of a building permit. 6 7. Locktan Residence - New Single Family AK (Conceptual Review) 3994 Bighorn Road/Lot 2, Gore Creek Park MOTION: SECOND: VOTE: Conceptual Review. MEMBERS PRESENT: Ned Gwathmey Jim Shearer (PEC) Pat Herrington George Lamb Sherry Dorward STAFF APPROVALS: MEMBERS ABSENT: Collier 250 Addition -- convert existing storage to GRFA. Vail Golf Course Townhouses, Unit #M-45 Perot Residence - Addition of two windows, per attached drawings. Lot 31, Block 7, Vail Village 1st • • Project Application roject Name: ~~ ~~~--= Project Description: ~ ~~ Contact Person and Phone Owner, Address and Phone: Architec#, Address and Phone: !~~ aV~#d~ ~ ~i~ Block ~ Filin ~~ ~~ ~ ~~ Zone ~~~~ Legal Description: Lot ~-~,/~_ ~"~ s~ 9 Comments: ~ 2~.Y ~ ~ ~i~' l / ~ ~)~ ~ ~ ~~' ~~`~ ~~-~ (`fir . `_ ~~a~ ,~'i~ ~ ~i--~ C.~r~ ~ ~ ~ ~ Design Review Board ~' ~~ Motion by: ` ~ ~~~ ~~ w(!1!T U{ Seconded by: AP OVAL i~ Date Date DISAPPROVAL IJ Summary: mn~fk- ~~~ ~ hits `d~;-~ ~ ~~~ ~~ _- ~? '~l~ Town Planner Date: ~ ' • ~ « ~ y hard. Cn~ ~41P.VI~~ ~flf~/ `~A~ -~---~ ^ Staff Approval i Project Application /~ ~ ~~ I ~Praject Name: `,~ ~-'r`~ K 'e~ ~ C~ Project Description; ~~ ~~~ Contact Person and Phone ~~~~ ~~ Owner, Address and Phone: ~~ °. ~~ /rt ``'+~ ~~ Date ~ ~ -~/ Q`7C •- 2~c~ l Architect, Address and Phone: ~~~ ~~! Sk~~G-,~ ~ r ~ Sj~"~ ~-~~` °"~r ~'~, Legal Description: Lot [ ,Block ___. Fiiing ~ ~~ r! ~S ~ ~ ,Zone "- Comments: Design Review Board Date ~'~ Motion by; Seconded by: APPROVAL ~•- ~ DISAPPROVAL Gf /ham . ~OL~ vu .~.~i.~ f D`~. Q 2/.L L i~ C ~c._D"` ~ a.G_Y Summary: / / 1 11~t P~~/ ~~~C, ~-P~4~ „$~Kfrs~~"d~ ~ ,°~•- ~ ~ C~~l~ ~ua~e.d~ ~ ~ ff'' ~ ~ . ~~dlY~.~- .,~r: ~ i~~.~ ~nr ~~r;G~ ~ ~a~rc.ei~s'cd,D~ K ~ S ~ ~ ~ -~ 1 ~-ad -q/ Date: To n Planner ^ S ff Approval d ~ fJ~~t-e ~ ~ vzv ~ ~acc~fi~dl d~-~~S.i~~, ~+~vziT" S~p~~~,~ ~- ,~ • • Project Application Date ZT ZC7 ~`~~ Project Name: G ~ ~ ~l , .~ ' ~"~ V G~~`.'' `r-~" `~"~.'4~" ~ ~, Project Description: ~'~'"~ ~~ Contact Person and Phone ~~ ~~~ ~r~~ ~ 2 ~~ ~~~ Owner. Address and Phone: ~~ ~~~~~~`~ ~~ 167,r v ~'' / ~ ~~~5 r Architect, Address and Phone: ~ ~ ~~ ~~~~ "'~ ~~ ~~ ~ ~~~ ~~ Legal Description: Lot ~~ Biock r ,Filing ~ (/ ,^~*` done ~~ 1 Comments: Design Review Board Date ~ ~~ ®~ Motion by, ~"'' "~ Seconded by: ~'d~.'-=r -~~ " "' " DISAPPROVAL APPROVAL ~ /5 ~I (/ N /'ir 7J'11/12 5 ' v ~ Summary: ~ ~ ~,/'-,~~~'YC ~t -J~-l~d~cp d!I T~1rriA c~J.~Y i'i ~ + ~t-~ •4 ~~ ~~ar~~ a ~If ~ r /" ~ C ~° ~~ iI ~ I/Jr~,-~0 nom; y,~- 17~' / / // U ~" Town Planner ~ ^ Staff Approval bate: ~ ~ ~ ~~ PUBLIC NOTICE NOTICE TS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on February 20, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. McGill Residence - New Single Family 1453 Buffehr Creek Drive/Lot 4, Cliffside Buffehr Creek Partners - New Single Family 1726 Buffehr Creek Drive/Lot 11, Phase VI Blockbuster Video - New Sign 1,031 S. Frontage Road/Cascade~Crossing AK AK MM/BR Aasland Residence - Changes to approved plans 5M 2527 Arosa Drive/Lot 3, Block D, Vail Das Schone #1 Lockton Residence - New Single Family AK (Conceptual Review) 3994 Bighorn Road/Lot 2, Gore Creek Park Wiegers - New Single Family Residence SM 785 Potato Patch/Lot 22, Block 1, Potato Patch Tobin - Satellite Dish Antenna SM Vail Village Inn Plaza, located at 100 Vail Road/Lot O, Block 5D, Vail Village 1st Filing. *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail. on February 15, 1991. - The Valley • 1 11 1. Gramm - Repaint BR 303 Gore Creek Drive, Vail Rowhouses MOTION: George Lamb SECOND: Sherry Dorward VOTE: 3-0-1 Denial. Ned Gwathmey abstained. 2 2. Vail Run - New awning & sign BR 1000 Lionsridge Loop/Lat 10 & 11, Block C, Lionsridge Subdivision. MOTION: SECOND: VOTE: Applicant did not appear, 5 3. Blockbuster Video - New sign BR 3031 S. Frontage Road/Cascade Crossing MOTION: SECOND: VOTE: TABLED TO MARCH 20TH MEETING. 4 4. Stott Residence - Deck Addition BR 2339 Chamonix Ln/Lot 11, BIk A, Vail Das Schone #1 MOTION: SECOND: VOTE: TABLED TO MARCH 20TH MEETING. 5. Review of Banners BR MOTION: SECOND: VOTE: Direction was given to the staff to decide an allowable amount of signage and then to allow 25~ of that signage for sponsors names. DESIGN REVIEW BOARD AGENDA MARCH 6, 1991 3:OA P.M. REVISED 3/6/91 SITE VISITS 12:15 P.M. 6 6. Breeze Ski Rentals - Sign Variance JK Montaneros Commercial Condominium Unit #100. 641 W. Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd. MOTION: SECOND: VOTE: TABLED TO APRIL 17TH MEETING. 12 7. Christiana Remodel. JK 356 Hanson Ranch Rd/Lot D, Block 2, Vail village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Motion to approve with the following conditions: 1. When ownership of parking across the street from north is resolved, applicant will pave and landscape. Landscape plan for this lot to be submitted to staff for approval. 2. Aspens to be installed on Christiania Lodge owned property shall be 2 1/2" to 3" caliper. The board also recommended the spruce to be installed on Christiania Lodge owned property be 10 feet to 12 feet in height. 15 8. Stanley - Addition JK 1816 Sunburst Drive/Lot 1, Vail Valley 3rd MOTION: George Lamb SECOND: Pat Herrington VOTE: ~4-0 Motion to approve subject to the following conditions: 1. Resolution o€ site coverage interpretation issue by C...,..,~unity Development Department staff. 2. new stone work match existing or existing stone work be removed and all new stone be installed. If new stone is to be installed, material must be presented to DRB for review and approval. ~` 1 9. Red Sandstone Elementary School - New facade JK and minor changes to site. (Conceptual Review) MOTION: SECOND: VOTE: Conceptual Review. 9 14. Ski Museum - Plaza Development Review SM Vail Village Transportation Center MOTION: SECOND: VOTE: Conceptual Review. 14 11. Vail Trails East SM 433 Gore Crk Dr./Lot 7-15, Block 4, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO MARCH 20TH MEETING. 8 12. Josey - Addition SM 97 Forest Road/Lot 3, Block 7, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO MARCH 20TH MEETING. 3 13. Buffehr Creek Townhomes - 5 Units on SM existing portion of Lionsridge, Tract B. (Conceptual Review) MOTION: SECOND: VOTE: Conceptual Review. 14. Review of neon/gas-filled signs SM MOTION: SECOND: VOTE: DRB directed staff to prepare a proposal which will prohibit neon signage in Town. Will be reviewed at March 20th meeting. ,. • ' 15. Schofield - New Garage AK 1448 Vail Valley Dr/Lot 18, Block 3, Vail Valley 1st MOTION: George Lamb SECOND; Pat Herrington VOTE : 4-~0 Approved with the condition that prior to issuance of building permit, applicant shall obtain a right- of--way revocable permit farm the Town of Vail or redesign the proposal. 16 16. Lockton - New Single Family Residence AK 3994 Bighorn Road/Lot 2, Gore Creek Park MOTION: George Lamb SECOND: Sherry Dorward VOTE: 3-1-0 Approved with 6 conditions prior to issuance of building permit, applicant shall: 1. Provide approval from Army Corps of Engineers to alter wetland condition. 2. Show grading that matches neighbor's driveway and meets Town of Vail Engineer's approval. 3, Enlarge drainpipe specs to 10". 4. Insure bay window encroachment meets code or is pulled back. 5. Meet Town of Vail Fire Department requirements. 6. Applicant is ~ranaly encouraged to use materials other that glass block. 7 17. Peterson/Bossow - Conceptual Review of 250 AK addition & remodel. 332 Beaver Dam Road/Lot 5, Block 3, Vail Village 3rd. MOTION: SECOND: VOTE: Conceptual Review. 4 N 17 18, Graubart - New Addition AK 4394 Streamside Circle/Lot 9, Bighorn 4th MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved with the 4 conditions that prior to issuance of building permit, applicant shall: 1. Provide topographic survey, showing 100 year flood plain, referencing to FIRM. This approval becomes void if new information shows project violates section 18.69 Town of Vail Zoning Code. 2. Show proposed drainage plan. 3. Secure right-af-way revocable permit for all encroachments. 4. Provide signature from owner with 1/2 interest in Lot 5. 13 19. Manor Vail - Addition AK 595 East Vail Valley Drive/Lots A, 8, C, 81ock 1, Vail Village 7th MOTION: SECOND: VOTE: .] Conceptual Review. 10 20. Coldwell Banker Display Box AK 286 Bridge Street/Lots A & B, Block 5A, Vail Village 1st MOTION: SECOND: VOTE: TABLED AFTER DISCUSSION. MEMBERS PRESENT: MEMBERS ABSENT: Pat Herrington Ned Gwathmey George Lamb Sherry Durward Jim Shearer (PEC) .. • F STAFF APPROVALS: Potato Patch Townhomes - Change in approved plan. Lot 6, Black 2, Potato Patch Gottieb Addition - B2 sq. ft. addition. Bedroom expansion on north side of building. Lot 15, Block 1, Vail Village 13th s ~ PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on March 6, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for a sign variance for Breeze Ski Rentals. Project location - Montaneros Commercial Condominium Unit #100/68 Lionshead Place/Part of Lot 8, Block 1, Vail Village 3rd. Applicant: Lewis Sapiro The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on February 15, 1991. Project Application Pro~ect Name: ` _w' ~~ 1 Project Description: ~r'e ~~ ./1 Contact Person and Phone ~/~ u • ~t~ol h ~~ ~, D,a~te J OwneY, Address and Phone: /~ i Architect, Address and Phone: ~ ~~~~ Legal Description: Lot ~ ,Block ~ Filing f/ `~ ~ C r L S Comments: Design Review Board Date Motion by: Seconded by: ~~~~hL~ ~re~ APPROVAL ,Zone DfSAPPROVAL S u m m ry: ~`~° ~'r I '~~ ~%'~-~t/~ O .~ ~ Lir-~7ti /~ S ~~~~ ' Town Planner Date: ~ / 6 ~ ( / ^ 5taff Approval ~/ ~/~' / Project Application J~ Date , ~~ /~~ Project Name: ~~ ~'~ ~~~(~ /roc-z~ .~t .t_./-~q~ Project Description: ~-*/1~ ~ C_ GL,/' ~"Crr/~t~.a,~ ~~J/ ~~f~~~~~j Contact Person and Phone ~.1~sit_+~ SC.iLhV'7~ ~ ~ ~~3--~v,/C~' ~/' - ~ Owner, Address and Phone: ~~~ ~~~ ~ i~-C( d Architect, Address end Phone: "- ~~ ~ ~ ~f Legai Description: Lot ~~ ,Block ~ ,Filing v~•~ ~~~~~ / /r~ ,Zone ~~r~~ Comments: ~(!-'~ f ~,cp.~ /Lj~ ~~:~ ~~ 7frt ~'!'d ~~.~. OJ 1 ~~f1 ~ ~!~~~~ a~iArn-~ ~,~~ Ste` w~ ~ ~~ Z31` -- i Design Review Board Date ~~~ ~~/ Motion by: lira ,~~ ' 5ecanded by: < ~{(~ ~PPROVA~ ~ ~ DISAPPROVAL f S .~U /z..1 s •P_ .-~ I )d ~., (~ ~c ~ ,L~2-~liLf iT , cz /~.~~ l / /~ t/ 1,,1/ ~ o / Summary: ~• G[ ~ ~7ifC/".2,1~ ~ r~` &'/ - ~ Lc~~-~ _~/'GI.)~~1~E ~ ~fr~i.`/`- 1 ~ / (/~ ~~~ ~ ~ Town Planner / r ^ Staff Approval Date: ~/~ ~`~[! r Project Application roject Name: ~ - n L Project Description: ~'~_~ Contact Person and Phone ~r't- 1~ E~ 1 ~~~v~~: I yt s f~ J~~•vrii I l ~. R~~ V • Date `~/ I i r.U~~~i vt Owner, Address and Phone: ~_~~-~~ `~ G~ v °' ` ~ ~ ~' "~~ ~~~ ~ ~ ~~-~ ~ ~ U.~ Architect, Address and Phone: d~Q "'~~~k~~-- ~r~ ~ ~IS~ ~l~~P Legal Description: Lot Z Block T,. Filing ~~ ~ L-~~ ~~~ ,Zone ~cl,.~~ Comments: • Motion by: ~~ Design Review Board Date ~ ~4' /g Seconded by: / J~~-~~~ APPROVAL ~ f, ~'~ / C~ Gtlr77~~ to l'~2f !1/77.F~rIS -~ ~~ P~6U~~~- .~a-~~a~~r DISAPPROVAL Summary: ~~~~ ~-~~) ~ ~I~~cs ~~/~/r~~~~ _~G/r.,sS~(-G~~1~7t1~ i7/1~ Lfi~r m2 ,[~ ~uGr -EYJ ~~`l-c/L. _~~ ~'Vr' ~-~ i TAU ~f/~~ ~~%• ~~u/~~ --.~~~~ APL iCI~7l i s S~~dXI/,~'~ ~C arc-/~~?~ ~ ~5~ ~•4~°_t,~s { ~ `fin! C ~-~S L./ Towrn Plan'~ner ~~~~ ^ Staff Approval ~~~~a` Date: ~ /~ ` ` '~ ~ / 3~ ~UL,~C,:~ n~~ix1 ~i~ SPA `~ `i I~ /O `~, {~~ 1,U.5u/~~ ~'f tJJh1~ Project Applica#ion Project Name: `? .,r ,~~~1-~, ~~~!! r~~/ Project Description: -~' ~~~ ~~ Contact Person and Phone ~ (~C.9.RS.e Nl n ° r" Date ~,~/~ ! ~ ~ ~ ~~~ ~~ ~~ ~ Owner, Address and Phone: ~/~ ~~~ ~ ,~~ ~~~~ S~~-~ ~~ ~S'~~~ s-~v ,dam ~ `7 7v d 2 Architect, Address and Phone: ~ ~~,~~i~ Legal Description: Lot ~ Block '~ ,Filing ~7 ~ ~~~-~ ~" ,Zone ~~~/~ / . Comments: Design Review Board Date ~/~~~~ Motion by: ~~~ Seconded by: ~ ~~/~` APPROVAL ~` ~ DISAPPROVAL r` 'r /yf1/VC~ Gr-~~~ ~ l! ~~ ~~ lJ,f'~~ ~ 1 ~S G~~ 'e _/5 K ~L.~/~a . ~, rte,. _~ _ ~~ ~ // /~~, Summary: ~~vT~.C ~~ 1~~af`~. CurY`r-~., S ~'~~k ~/3"~ r ~'~ /~.''t ~ _ ` / ~ / / ~ /' t ~ / / ~ ( rr i f ~t~~ i~c fI211~fJCC. ~~1 S`~'~ ~~~°~f ~/!lJ[CL9'~ ~~.1C GPG~ I S~. ~ 9 i71v ~~ i ~~~ ~~ s ~t.n,s- /~rr~~~~ ~r-z~..n~ > Ja ~~ , ~ 1 ,SP c-u~e r wa -W ~ eJ~-~ ~--~.. ~~ ,~~ fir- ~~ ~Gr ~-~. ~ ~-~.-~.~.~......0~ , 4~ ~ r~ wn Planner ^ Sta(f Approval Date: ~ ~ X17?-~~~4 ~ ~~~~~~ Y Project Application Date ~f/` ~ ~ ~ ~ r ~oject Name: //7rtl ~O/~~d7i` ~ ~ ~ ~ /'~~~~1 ~~~~/lx:~J ~Od~ ~D/~° !fit/ Project Description: ~~~ ~ ~~~7f~~/~P_Gl~~~/0471 ' G%~l~ ~~~'~~~~ CI~~h`'a-~`~ Contact Person and Phone ~r~~~~ • rn~~~'•-~ ~"~~ ~~~~ ~~~ ~~c~ ~~~~d~ c,Z,r z ~~+.. ~/~/ Co. ~llo~ f'1a~= 9~9~ 43'7 Owner, Address and Phone: ~~'? ~~~~' ~'2~~0 ~ ~`'~ ~toa,~r~~ . l{l/ S3Do~` ~ O g~~/ `~ !. rl Architect, Address and Phone: C"i~ _ ~~~~ ~/`~' Design Review Board ~ , ~ . 9~ r' Date Ta ~b``r~~t~r~ 7 rnee/Sf` ,~s~ /era,/ ~ s £. ~'orner~ W Goi~. Cr~.eK. Circle, ~/~vr~i Legal Description: Lot Block ~~ Fiiing ~ • .~~ ~ ,Zone ~\ C1 Comments: Motion by: ~r ~ ""rr~~D~J Seconded by: ~~ '~~~ ~~~~ APPROVAL ~~~-~ 2~iC~on~ . .. Summary: Town Planner ate: ~ ~ ~~ ~~y~) 78 5~ ~~"aa DISAPPROVAL ~. ~ . 9/ 0 Staff Approval '~ ~~~ PUBLIC NOTICE ~~ NOTICE IS HEREBY GIVEN that the Design .Review Board of the Town of Vail will hold a public hearing on March 6, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Ski Museum - Plaza Development Review SM Vail Village Transportation Center Vail Trails East SM 433 Gore Creek Drive/Lot 7-15, Block 4, Vail Village 1st Josey - Addition ~ SM 97 Forest Road/Lot 3, Block 7, Vail Village 1st Buffehr Creek Townhomes - 5 Units on existing portion SM of Lionsridge, Tract B. {Conceptual Review) Breeze Ski Rentals - Sign Variance/Montaneros JK Commercial Condominium Unit #100. 641 W. Lionshead Circle/Part of Lot 8, Block 1, Vaii Lionshead 3rd. Christiana Remodel JK 356 Hanson Ranch Road/Lot D, Block 2, Vail Village 1st .Stanley - Addition JK 1816 Sunburst Drive/Lot 1, Vail Valley 3rd Red Sandstone Elementary School - New facade and JK minor changes to site {Conceptual Review) Schofield - New Garage AK 1448 Vail Valley Drive/Lot 18, Block 3, Vail Valley 1st Lockton - New Single Family Residence AK 3994 Bighorn Road/Lot 2, Gore Creek Park Manor Vail - Addition AK 595 East Vail Valley Drive/Lots A,B,C, Block 1, Vail Village 7th Graubart - New Addition AK 4394 Streamside Circle/Lot 9, Bighorn 4th Peterson/Bossow- Conceptual Review of 250 Addition AK and remodel. 332 Beaver Dam Circle, Lot 6, Block 3, Vail Village 3rd Gramm - Repaint BR 303 Gore Creek Drive, Vail Rowhouses ~ DESIGN REVIEW BOARD AGENDA MARCH 20, 1993 3:00 P.M. REVISED 3/20/91 SITE VISITS 1:00 P.M. 1 1. Red Sandstone Elementary - Remodel BR 551 N Frontage Road/Portions of Lot 8, Block 2, Vail Potato Patch MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 , Approved of "SC59 Seagull Grey" all wood, "Herald Green" trim, plaster to be Devoe "Mimosa". 8 ~2. Stott Residence - Deck BR 2339 Chamonix Ln/Lot 11, Block A, Vail Das Schone ~1 MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 Approved with color change -- trim to be "Ironwood". 10 3. Vail National Bank - Deck enclosure MM Part of Lot D, Block 2, Vail Village 2nd Filing. 108 S. Frontage Road West, SDD 23 MOTION: George Lamb SECOND: Jim Shearer VOTE: ~-0 Consent approved. 6 ~4. Lindsey/Nilsson - New Single Family Residence AK with Caretaker Unit. Phase VI, The Valley MOTION: SECOND: VOTE: TABLED TO APRIL 3RD MEETING. • 7. Peterson/Bossow - 250 request p,K 332 Beaver Dam Cir/Lot 6, Block 3, Vail Village 3rd MOTION: Sherry Dorward SECOND: Jim Shearer VOTE: 3-0-1 Approved with the condition that prior to issuance of a building permit, applicant sha11 provide a topographic survey to establish benchmark for measuring height. Height may nat exceed 33 feet. Ned Gwathmey abstained. 8.' Manor Vail - Addition AK 595 East Vail Valley Drive/Lots A, B, C, Black 1, Vail Village 7th MOTION: SECOND; VOTE: Conceptual Review. 9 ~ 9. Hunter - Addition SM 5074 Main Gore Dr/Lot 5, Vail Meadows #1. MOTION: George Lamb SECOND: Jim Shearer VOTE: 4-0 Consent approved. 5 10. Lot 24, Dauphanais-Moseley SDD 22 - Single 5M Family Residence. 1403 Moraine Drive/Lot 24, Dauphanais-Moseley Subdivision ~ ~ MOTION; Jim Shearer SECOND: Sherry DorWard ~, VOTE: 3-p ~~ DRB made strong recommendations to add a dormer to the east facing roof. Staff will review at building permit, Ned Gwathmey abstained. 1Z, Wildflower Inn -- New Sign 5M 174 East Gore Creek Drive/Lodge at Vail MOTION: Gearge Lamb SECOND: Jim Shearer VOTE: 4-0 Consent. DRB ruled that flowers associated with sign were not pert of the overall signage. Vail Run - New awning & sign BR 1000 Lionsridge Loop/Lot l0 & 11, Slock C, Lionsridge Subd. Blockbuster Video - New Sign 8R 1031 S. Frontage Road/Cascade Crossing Stott Residence - Deck Addition BR 2339 Chamonix Lane/Lot 11, Block A, Vail Das Schone #1 Review of neon/gas-filled signs SM Review of Banners BR *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on March i, 1991. • ~~ i4 } 4 12. Cohen - New Single Family Residence JK '786 Potato Patch Dr/Lot 14, Block 1, Vail Potato Patch Gea ~q~~ cf1ih7 S~ e4~/" MOTION: r SECOND: .~'laca.i.,~ LV'il~ui VOTE: 3-0 R, Approved as submitted. ~ !~ - 1~ ~ `~~~ ~~~-~ 7 13. Brinkman - New Single Family Residence JK 2543 Cortina Lane/Lat 4, Block A, Vail Ridge MOTION: Jim Shearer SECOND: Sherry Dorward VOTE: 3-0 Approved. ~~~~ ~ ~~~j~, C --..~ ~\~, \~~~ 3 ''14. Frein - New Single Family Residence SM 798 Potato Patch Dr/Lot 8, Block 1, Vail Potato Patch MOTION: SECOND: VOTE: TABLED TO APRIL 3RD MEETING. • F15. Vail Trails East SM 433 Gore Creek Drive/Lots 7-15, Block 4, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO APRIL 3RD MEETING. •15. Josey - New Residence SM 97 Forest Road/Lot 3, Black 7, Vail Village 1st MOTION: SECOND: VOTE: Conceptual Review. k^ .. MEMBERS PRESENT: Ned Gwathmey Jim Shearer (PEC) Sherry Dorward George Lamb STAFF APPROVALS; MEMBERS ABSENT; Pat Herrington Vail Gateway - Chimney and power exhaust for pizza oven at Michaels Restaurant. 12 Vail Road. Grubbs Residence - Changes to approved Primary/Secondary. Lot 6, Black 1, Vaii Village 6th. Gonzales -~ Dormer Addition. 600 Vail Valley Drive. Northwoods Unit 10-B. r • r PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Tawas of Vail will hold a public hearing on March 20, 3.991 at 3x00 P.M. in the Town o~ Vail Municipal Building. Alpine Townhomes East - New Single Family Residence AK 767 Potato Patch Drive/Lot 34, Block 1, Potato Patch Alpine Townhomes West - New Single Family Residence AK 767 Potato Patch Drive/Lot 34, Block 1, Potato Patch Lindsey/Nilsson - New Single Family Residence with AK Caretaker Unit. Phase Vi, The Valley Peterson/Bossow - 250 request AK 332 Beaver Dam Circle/Lot 6, Block 3, Vail Village 3rd Armstrong - Exterior changes BR 2450 Chamonix Lane/Lot 7, Block B, Vail Das Schone #1 Pitkin Creek Park - Remodel BR Unit 7C - Commercial Space Red Sandstone Elementary - Remodel BR 551 N. Frontage Road/Portions of Lot 8, Block 2, Vail Potato Patch Northwoods Condos - Enclose Decks, Building C BR 600 Vail Valley Drive Tiampo - 250 Request BR 122 East Meadow Drive/Lot 5E, Vail Village 1st Vail Run Awning -Awnings and logo BR 1000 Lionsridge Loop, Lot 10 & 11, Block C, Lionsridge Subd. Stott Residence - Deck BR 2339 Chamonix Lane/Lot 11, Block A, Vail Das Schone #1 Hunter - Addition SM 5074 Main Gore Drive/Lot 5, Vail Meadows #1 Lot 24 Dauphanais-Moseley SDD 22 - Single Family Resid. SM 1403 Moraine Drive/Lot 24, Dauphanais-Moseley Subdivision Frein - New Single Family Residence SM 798 Potato Patch Drive/Lot 8, Block 1, Vail Potato Patch Wildflower Tnn - New Sign SM 374 East Gore Creek Drive/Cadge at Vail Vail Trails East SM 433 Gore Creek Drive/Lots 7-15, Block 4, Vail Village 1st Josey Residence - Addition 97 Forest Road/Lot 3, Block 7, Vail Village 1st SM Cohen - New Single Family Residence JK 786 Potato Patch Drive/Lot 14, Block 1, Vail Potato Patch BrinkMann - New Single Family Residence JK 2.643 Cortina Lane/Lot 4, Block A, Vail Ridge Vail National Bank - Deck enclosure ~ Part of Lot D, Block 2, Vail Village 2nd Filing. 108 S. Frontage Road West, SDD 23 Coldwell Banker Display Box AK 286 Bridge Street/Lot A-C, Block 5-A, Vail Village 1st *And all tabled items from previous meetings, The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on March 15, 1991. • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on March 20, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for an internal addition of 82 square feet to Unit 12-D, Village Center {Vail pre) Condominiums located at 122 East Meadow Drive. Applicant: Mary Jo Tiampo The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on March 1, 1991. PUBL2C NOTICE NOTICE YS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on March 20, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration af: 1, A request for an additional 250 square feet of Gross Residential Floor Area for the Peterson/Bossow Residence located at 332 Beaver Dam Circle. Lot 6, Block 2, Vail Village 3rd Filing. Applicant: Jay Peterson The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on February 20, 1991. *Please notice the meeting date has been changed from March 6th to March 20, 1991. r~ L J Project Application ~~J~, Date ~roject Name: Project Description: ~ ~" r Contact Person and Phone Owner, Address and Phone: Architect, Address and .Phone: Legal Description: Lot Comments: • Motion by: Seconded by: -? ~~~ V APPROVAL ~ ~-- ~ Date DISAPPROVAL Summary: . ~'i u-C~ ~f`e--~j ~ ~ 5 9 O bt n ~ .°.~it.V~ ~~~/'~~1 ` / ,ion yl J / ~ f~"i ~}/] ~ ~ . d / 1 t 1~ D 10.... ~ ln- ~a.~ ~_ ~ C~ ~ Town Planner ~` pate: ~ /~ / ~~ E3lock Filing Design Review Board ^ Staff Approval Zone Project Application Date 3/20/91 Project Name: ~TnTT RF.MC}T1F.T. i Project Description: DECK EXTENSION; STAIRWAY, RAILING AND COLOR CHANGE TIM HASSE, COLO HOME IMPROVEMENTS, INC. Contact Person and Phone Owner, Address and Phone: HUGH STOTT 2339 CHAMONIx LANE VATL Architect, Address and Phone: Legal Description: Lot 11 Block A Filing VAIL DAS SCHONE ~~1 ,Zone Comments: T1F~K RATT,TNf; T(1 MATf'H T+.XTSTTNf; WAS [:~Ep TC} SQ,T,TTI $ATT,TNf: (1N RAT ~Tn~:_ ~FX'TF:NT1F11 'Pn~TS WF,RF' RF.Mnt7FT1_ ~j,()RR Tn RF. pATNTF.TI WTT,T. RF._~ nT vmrnrr„~,ep~ r m mnrNr mn ~zF rnnu~innn Design Review Board Date 3/20/91 Motion by: LAMB Seconded by: DORWARD APPROVAL DISAPPROVAL t~_n Summary: '3rSiS3t Fc`.3~4I.!4C Town Planner ^ Staff Approval Date: 3/ 20/ 91 Projec# Application R, ,~ ~ Date ~ ' ~~' ~ ~ Project Name: ~ ~~ f?~~ ~•~ ~ ' Project Descrip#ion: ~~~ ~~ Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: ~~ ~ ~ ~'7/ ~ {~-G.c*~ew ~~U~ Legal Des ri~n~Lot ~ Block ~ Filing !I• v ~ o ~- -' ,Zone Comments: ~~ ~ • ~ ~~ - • ~ Design Review Board Date Motion by: L~~" Seconded by: ,? -~ PPROVAL DISAPPROVAL ~~ Summary: ~~1r~.2,.~ 141.~•„•~ ~- .~-~ /. .~, S 0 Town Planner Date: "~ ~ 2 0 • °1 ~ ^ Staff Approval ,. ~,. ,..... .~ ., -~-~.. ~..•~ fi`r' ~ .- ._:~ P r • Project Application Date ~I-~ ..Project Name: ~"~ ~ ~ ~ $ Project Description: ~ - l Contact Person and Phone ~~"~ ~ 'Y `- ~~~ r Owner, Address and Phone: ~ f ~~ ~--~-~~' C~~'~ Architect, Address and Phone: ~`~ ~" ~1 ~~ x ~~~ Legal Description: Lot ~ 61ock ~ Filing ~~~[ ~l a ~ ] ~ ,Zone `~ /~ V ~ Comments: Design Review Board Date ~ /~/~~ nn -~ ! r r Motion by: ~ l,~'1rkT~~ Seconded by: ~~~ APPROVAL DISAPPROVAL ~~~ ~/ l 4~~' Summary: v To PI n ^ Staff Approval Date: ~/~/~~ Project Application {~~`~~ /~ ~ ~ /~ Date Project Name: ~~ ~~°~.~~ ~° w ~_ Project Description: ~_ ~ ` _. _ ~ J li Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: ~~,~M ~ ~/~ [_Klu ~S c~r~ ~ ~~~ ~~ ~n ~.~ Legal Description: Lot ~'' ) Comments: ~~~~ • Design Review Board Date Motion by; Seconded by: n APPROVAL ~~` t-~~ Summary: ~ ~~~_ ~- Block Filing ~~~~~ ~~~~~~`~ C~~~~r to ~~~ •~ ~ ~~ - ~ ~~~ . ~ ~~ Z _~ ~~ ) Town Planner Date: ~ yy~~ DISAPPROVAL ^ Staff Approval Zone ~A~~ Project Application ~J,~ Date`s ~ "" ~ ,~{ Project Name: ~_ ~ ~~ ~. ~~- UVT L~ ~ ~ ~ (~~2 ~,~ Project Description: c Contact Person and Phone ~~.,~ -! ?~~_~ ~'~ ~~ ~ ~ _ a Owner, Address and Phone: Architect, Address and Phone: /) i Legal Description: Lot ~ ,Block ,Filing D~ ! ,Zone ~ ~~ i Comments: L~ Design Review Board Motion by: ±~ i ` v !P ~~r Seconded by: ~u ~ ~ APPROVAL r Summary: ~~ Date DISAPPROVAL Y~~~,~vomPnn~a-ht~n ~ add i1..brrn.v~ N ~G~P.1 JIPt 1~'pi9e~- . ~ I ll ~ ~ ~~ Town Planner Date: ^ Staff Approval Project Application Date ~ ~ ~~+~ ~ ~~t~v1 ~'V l lV Projec# Name. _ _ Project Description: ~~ 1~1~ ~! ~~ l ~, ~~ !~~~ ~~ Contact Person and Phone ~/~~~ ~ - Owner, Address and Phone: Architect, Address and Phone: Legal Descriptio~/n}: Lot BIOCk '_y,Filing f ,Zone Comments: .~` t ~~ ~Q~~ ~ U I `-H~ ~ ~ a ~Jlj~' U (~ (~} . Design Review Board ~/~ r+ Date Motion by: Seconded by: APPROVAL D15APPROVAL Summary: psi ~~" ~a - ~~ ~- ~. ~' ~~n.r-tom ~`~ ~ `-{~n i,n~~~a a ~r ~~ ~M~n~' Sic ~. Y~ ~~'} ~C 4~ ~ -- ~~ ~1 Can ~U\. ~''-~ _ ~,~ ~~~~ Town Planner ^ Staff Approval Date: ~' ~fi' ~` i Project Application Date r ~arGfi 2~ /99/ Project Name: ~~~ /~D~~'v P~ ~~ ~~- ~ ~~•~~~ Project [Description: ~~ ~/~~ ~r~~ ~~~~~~~ Contact Person and Phone ~• ~ ~t//a.~'~.~ 1~rUl/~c~ ~t.°Q /~ 9~/~ /i ~/'~ C~/~~~~ ~ ~" ~ ~ US'25 Owner, Address and Phone: ~cl-~ ~ ~~~ ~`D~i~ ~ /~~ ~~~~-~~~r ~~. _ ~~1.~//~ %DO l~~Gt~ ~~~~ Architect, Address and Phone: ~~~ ~J~i~f_~ ~~~~~ }~ Legal Description: Lot /-T Block ` Filing /~ r~~ ~~~ ,Zone /,/`~ or/r:~u~ Comments:•~rJ~/~ir~~ ad~ ~o~r1n..~~airecr- a~~~ o~/a~n,= 6/ads: ~~ ~~ Design Review Board Date ~ 3/2v/~/ Motion by: '~', ~ w !"~~. ~~fJ ~C~f7'7fj Seconded by: ti, ~~~ ~ '% `-' APPROVAL t)ISAPPROVAL I~ps~e : ~ 4 ~ rvr~, ~~irU Summary: /~~/1°f~/1~ .lI'I~ ~C~ Q/~2~ /d~{~ ~ /~,~~R.~ ~~~i+C/i~J ~ ~ v / ~ .,,~ir~ a~ ~o ,~s~~ ~iv~~ ~zr~~ ~ririr ~ , ~fil/ _~. ~,~ ~ ,~/f Town Plapnner Date: ~Y~ ,3. 20 ~/ 9~ ^ Staif Approval Project Application Date ~'2~' 9/ Project Name: ~'/rl+~i/.L?iYcJ~G°~JG~P~~P~ ~ 2~5~.3 C'Or~n~) ~rto~ Project Description: ~-r,.7 ~ ~ ~~/6~/~~~rt~~~°~ f± ~ Contact Person and Phone , ~-~l'~ ,~~/"~rg - ~°. O. ~r 2/2~ ~ !/f.~/~, C~J. Belo `~ v ~~~~ -s~~~-533 Owner, Address and Phone: ~r' ~''~/k°~ Br'//?f'1 ~ 4U //~i~ I/G~~~2C1 ~? ~, ~ ~`~07 v ,°~~ = ~7~0 ~~B~ Architect, Address and Phone: ~~ %d77~YdC~~°pf1~a~? °~~ Legal bescription: Lot `~` ,Block ~ Filing Yd/ ~ `- /~~~ ,Zone P/s Comments: ~/7~~~/?f iYl~•~ G'U777~'~Cr 'r CXI~GL/~~'ff' /~~°-~/i`7//"1¢J' W~~![~ 2~ ~~~Dr~tJ~ ~ , • ~ ~ ~~~ .~r~~/ic~~rz~ ~t/~~./ ir~.s~'%/ r~/a~~ ~~~i/cam ,~r/ ,~1e., ~lCl_.!/_ %r i Design Review Board Date ~ ~ ~U' ~~ Motion by:~~P~~ L'~m~ Seconded by: C/~`/~~ ~r APPROVAL DISAPPROVAL v u1/I Cd/~• _~~i~.~~ ~rrri~ ~~ G'~r~xi2~v .~/Ie ~/ .dvslf ~e , d/coin Summary: S/~ ~ and9r~~~~ ° ~GZ/f~ /~ -~rDr~f c~~ m~ r~of".~G'~PCf t3`-~„ /rI ~t~v h~~ ~ /!.l a'r~ ~/~~ a~' ~~~.~ ~~a~~~ ~~~~~ ~ =-d'' ~~z hev~1~ . ~1ila~xirnurr~ ~ ~~~~ o,r 6rdA ~"~.y /'P, ire v q/~ .!' Town Planner ^ Staff Approval Date: Project Application ~o~ /~ Date Project Name: ~~rC `Y"' J ~~~ /''~~ ~~ /1 Project Description: ;~/~~~~ r~~~ i~ '~ ~GLG~7 Contact Person and Phone Owner, Address and Phone: 'rte Architect, Address and Phone: ~~ ~ ~~-`P~ ~~,., ~ ~~ ~~ folk ~~~c- / ~G .~ Legal Description: Lot ~~ Biock f Filing ~~~ ~~~"S Comments: ~ ~~~~ ~ ~'~~~ Zone "`~ Design Review Board Date ~~ZD' ~! Motion by: "` ~ Seconded by: ~G~~~ APPROVAL DISAPPROVAL Ud,4 4-O Gf ~J>'t-~ ~-"~` ~'_. a 1r-.~` .`rte Summary: //~ ~7 ~~ T wn Planner ^ Staff Approval Date: ~ \ ~~~~/ ~-~ / ~ r V DESIGN REVIEW BOARD AGENDA APRIL 3, 1991 3:00 P.M. REVISED 4/2/91 SITE VISITS 12:15 P.M. 1.` Spraddle Creek Subdivision KP 100 Narth Frontage Road/Parcel B MOTION: SECOND; VOTE: TABLED TO APRIL 17TH MEETING. 2. Vail Medical Center Parking Structure - ~ KP Revision to landscaping plan. MOTION: George Lamb SECOND: Pat Herrington VOTE : 5-0 Approved as submitted. 3 3, Mindlin - Addition (Conceptual) JK 800 Potato Patch Dr/Lot 7, Block 1, Vail Potato Patch MOTION: SECOND: VOTE: Applicant & staff are working on resolving GRFA interpretation issues. DRB had no objections or concerns with proposed designs of addition. 6 4. Lifthouse Lodge - Addition (Conceptual} JK 555 E Lionshead Cir/Lot 3, Block ]., Vail Lionshead 1st Filing MOTION: SECOND: VOTE: DRB requested the applicant further study the entrance to the Pedal Fower/Nail Ski Tech commercial space and the entrance to the Banner Sports commercial space, With regard to the Banner Sports entrance, the Board was specifically concerned with the high blank west facing wall. In selecting construction materials, the Board stressed the importance of having the addition and existing structure be compatible. • 4 5. Singleton -New Two Family Residence MM 2476 Garmish Dr/Lot 28, Block A, Vail Das Schone 1st Filing. (Conceptual) MOTION: SECOND: VOTE: Ta be considered as a final application an April 17th meeting. 5 6. Spector/Kalish - Addition SM 1467 Greenhill Court/Lot 10, Glen Lyon Subdivision MOTION: SECOND: VOTE: TABLED TO APRIL 17TH MEETING. 11 ~~7y Vail Trails East SM 433 Gore Creek Dr/Lots 7-15, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE : 5-- 0 Consent Approved. ~: `~,$1. Leary - Renewal of DRB approval SM 5075 Ute Lane/Lot 29, Vail Meadows Filing #1 MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. GRFA and site coverage revised to meet 1991 ordinance. Fireplaces to be all gas. 10 9. Village Parking Structure - Lighting BR 241. South Frontage Road MOTION: George Lamb SECOND: Pat Herrington VOTE: Consent Approval. f • ~4 2 1Q. Frein -- New Single Family Residence SM 798 Potato Patch Dr/Lot 8, Block 1, Vail Potato Patch MOTION: George Lamb SECOND: Jim Shearer VOTE: 5-0 Approved with conditions; engineer must sign off GRFA to be confirmed. I/ 8 11. Biederman Addition - 250 request & garage SM addition. 254' Beaver Dam Road/Lot 23, Block 7, Vail Lionshead MOTION: George Lamb SECOND: Jim Shearer VOTE: 5-4 Approved; garage addition may shift to west in order to save large pine tree. 12 12. Fraser - 254 Addition AK ~ ].468-B Vail Valley Dr/Lot 1'7 B, Block 3, Vail Valley 1st MOTION: SECOND: VOTE: Conceptual consent. 7 13. Sheppard Duplex - 254 request AK 596 Forest Rd/Lot 4, Block 1, Vail Village 6th ~' MOTION: SECOND: VOTE: TABLED TO APRIL 17TH MEETING. 14 ~4; Vail Mountain School AK 3164 Frontage Road East/Lot 12, Block 2, Vail Village 12th MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent Approved. .~ • .w 15 15. May Residence - Additions to house AK " 5188 Gore Circle/Lot 7, Block 3, Vail Village 1st i MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent Approved, 9 16. Willow Bridge - Replacement of existing MM structure. Located on willow Bridge Road, between the Village Center Condominiums and the Sitamark Lodge. MOTION: SECOND: VOTE: Conceptual Only (No vote taken). 17. Frontage Road Street Plan - Conceptual Review MM Public Works, Greg Hall MOTION; SECOND: VOTE: TABLED TO APRIL ].7TH MEETING. 13 18. Molyneax - Addition AK 152$ Vail Valley Dr/Lot lA, Warren Pulis Subdivision MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with the condition that prior to issuance of building permit, applicant shall document compliance with GRFA standards (or make modifications). (Specifically check the 5' head height). 19. Lindsey/Nilsson - New Single Family Residence AK with Caretaker Unit. Phase VI, The Valley MOTION: SECOND: VOTE: TABLED TO APRIL 17TH MEETING. • v^ 1 20. Lauterbach West - New Single Family Residence AK Parcel A, West half of Lot 34, Vail Potato Patch MOTION: SECOND: VOTE: TABLED TO APRIL 17TH MEETING. MEMBERS PRESENT: Pat Herrington Sherry Dorward Ned Gwathmey George Lamb Jim Shearer (FEC) STAFF APPROVALS: MEMBERS ABSENT: Lot 9, Glen Lyon - Change to approved plans. Perot Residence - 2 new windows on South elevation, 2 new windows on West elevation, and expanded entry vestibule (per approved PEC variance on 3/11/91). Lot 3~., Block 7, Vail Village 1st Solar Vail - Add rain gutter. Lot 8, Block 2, Vail Potato Patch Vail Point, Unit #13 middle, Bldg. #3 - decreased ridge by cutting it back 1 ft. 10" 1/2". Max. ridge height 8143.75 ft. Base elevation 8105.75 ft. fi • _ PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on April 3, 1992 at 3;00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area for the Biederman residence located at Lot 23, Block 7, Vail Village lst Applicant: Mr. C.L. Biederman The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VATL COMMUNITY DEVELOPMENT Published in the Vail Trail on March 15, 1991. • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on April 3, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area for the Fraser residence located at 2468-B Vail Valley Drive. Lot 17B, Block 3, Vail Valley 1st Applicant: Ann Justine Fraser 2. A request for an additional 250 square feet of Gross Residential Floor Area for the Sheppard residence located at 596 Forest Road. Lot 4, Block 1, Vail Village 6th Filing. Applicant: Mr. William Shepperd The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on March 8, 1991. • Project Application ' V~~~t~ ~~~ ~~ - -•--::.roject Name: Project Description:.~~ ~~~~~~ ~ ` ~'!~n' Contact Person and Phone Owner, Address and Phone: • o.. ~3~~ ~~ ~,,~ Architect, Address and Phone: ~~~^ ~~i~ ~~~" `f` 4~ ",~- ri lion: Lot ~ ~ ~~ Block filing ~ ~„~~ ~~ ~ ~ ,Zone Legal Desc p Comments: i+ Motion by: ~ ~ ~ Seconded by: ~ ~~ APPROVAL Design Review Board lJ'~} Summary: (R_r~ •~_~ ~ ~~ ' ~ ? ~~,~~ C°~ne~vn n ~~l ~~ I~ ~ 1~~~ ~~~ ~~ To n Planner Da#e: ~~~~h ~~ _ Date DISAPPROVAL ^ Staff Approval Project fVame: ~_ Project Description: ~'P~n ~~ Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Legal description: Lot Project Application Date 1~~~ ~~,~ ~ ~n Block ~ ,Filing y 1,~ y , ~ ,Zone ~t~ Comments: ~~ ~A i ~ '~~i~ ~~ ~ ~ ~ ~ ,r~~ t Design Review Board n~ ~ ~, Date Motion by: ~~ - ~~~' +~ ~ Seconded by: ~ ~ ' APPROVAL DISAPPROVAL Summary: ~' Town Planner © Staff Approval Date: ~ ~~ Project Application Project Name: ~. ~ ~ ~h ~~~ Project Description: Contact Person and Phone ~p Date !~~ ~ Wf(GVY+f~~~ ~~_ ~ l~~l_ ~(~UAA9lvU,l Owner, Address and Phone: ~~,~ Architect, Address and Phone: ~~ ~"~'~ `f~ Legal Description: Lot Comments: i• Motion by: ~~~ --~ ~~ Seconded by: ~~ M~ ~~ APPRO L r- r~ Summary: i• Date ,~~ Town Planner 131ock Filing " v ~~-'' Design Review Board Date DISAPPROVAL ^ Staff Approval Zone Project Application Date Project Name: ~~ ~ ~ ~ h ~"~ ~ t ~ r ~ Pro'ect Description: ~ t °7 l~ ~ /~ ~ ~i ~ G~ J ~/,, s Contact Person and Phone ~ ~.,"~ ~~ °~~ Owner, Address and Phone: Architect, Address and Phone: ~0. ~[C ~.q Legal Description: Lot Black Filing ,Zone Comments: ~n~~~~~--~ r ~L ~~ ~ ~ ~ ~ f . Design Review Board Motion by: Seconded by: ~ ~ ~f'i° ~` r /~ APPROVAL "~7 1~ Date DISAPPROVAL Summary: ~r~ ,/ _Town Planner / T Date: `~' ~~ / ~/ l / ^ Staff Approval Project Application .Project Name: ~ °ft Project Description: ' `"v~- Contact Person and Phone Owner, Address and Phone: Slna~lu fia,u~,i k~ Date Architect, Address and Phone: ~ t fi~ ~N1 ~~~ (~.~T UI ~ ~~D[~~('k'CS Legal Description: Lot ~ Block ~ ,Filing l ~ ~ ~ ~~ ~~„1~ Zone ~'~ ,_ Comments: Design Review Board .,~ p~ ~ /'~ ,,,~ ~ ~ Date Motion by: ~ ~ `~-j~ ~ Y ~' ~~ Seconded by: ~ ~ ~~_~ ~ ~1r APPROVAL DfSAPPROVAL •-~y~ ~~ n.~Q.d..s ~~~ ~r~ ~~~ Town Planner ^ Staff Approval Date: ~ ~ Project Application ~ t ~ n Date "~~ Project Name: ~ ~ ~'~` ~~v" v Project Description: _ _ ~' ~ ~ ~ f~l v \ ~~~ '~ ~ ~~V ~ -"- , Contact Person and Phone rNry w~ ~ f/~M Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot ~~ Comments: ~~~ ~~~ ~~~ ~n ~~I ~ l~-2.~i~ v~vrv +R°.~,o , U Design Review Board Motion by: Seconded by ~~ Block ~ Filing ~Wt ! ~~~, f7 ~~~, Zone ~~~ ~- ~ L~ S (',V~e.ax~Pn~' APPROVAL ~~ Summary: f@.I~ ~ ~P~ ~~J ~ ~"h ~ 1 ,~~~ ~ ~ own Planner Date: ~ ~ ~ r _ l ~~i Date DISAPPROVAL ~ ~" ~°~ 4~~s ^ Staft Approval i • Project Application Date ~ ~~ ~/ Project Name: ~~~ r ~ / f -~PI~-~-1 fr7~,~i[- ~~C Project Description: /~.~~* ~ ~rn~-~'~ 2~ `~ ~~111~ Contact Person and Phone ~~~ ~~~~'~--~ X - ~ ~~-? Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot Block Filing ,Zone Comments: Design Review Board Date ~y+~ C.~ . Motion by: Seconded by: ~~~~~~~~~?- ~~ APPROVAL ~--3 DISAPPROVAL / ,~~/1 f ,~.. i Summary: i, Town PI ner ^ Staff Approval Date: "~'"~~~~/ // ~ . Project Application Project Name: ~fii ~, Project Lescription: Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot Comments: Motion by: ~~ ~~ Seconded by: ~~~~4~~~~ APPROVA~ Summary: / ~-~ i ,,~~ //t~ ~7rlf/~ ." /U~/`•P~~ ////,d~r f i bate ~ ~~ Block ~ Filing ~!~</ V . Design Review Board mo=o ~ 1 ~ .~ .r ' ""'~ To4u Planner 1 /~ Date: ~/~~i / e~ f i bate Zone ~!~ 9/3/~r D15APPROVAL ^ Staff Approval Project Application ~roject Name: Project Description: Contact Person and Phone Owner, Address and Phone ~~~ ~~u~ ,~~f Architect, Address and Phone: Legal Description: Lot Comments: n„ ~ ~:~.~ ~~~'~'( .~elxi~~i~ Hate ~~31 ~i ,~ . ~ ri .~-r~ ~.r~. rt r J - ~~~- 7x74 ..~~ ~V ~~1-~H pct ~C 2 ~/l 2~ " ~a 1~ Block ~ Filing ~~-~'eYt P~ ll~~ Zone `'P'~% Design Review Board g Date ~~ ~~ r / Motion by: ~-"' ~ ~ . Seconded by: \'°~~~~~~~ ~~ APPROVAL DISAPPROVAL Summary: t,~/ ~ ~~~~~~ ~A~ T 1L/ ~~ S r~f~ /- I A~ '^~ Y ,1 ~/ ~'- ~I:YYC.~ ~~ Ge.,~~7 ! .~ r n.~..w~ l ,~ ~ ~` ~ I i ~~ ~'' To/Gun Planner ^ Staff Approval Date: ! 1 ~ ~ ~~ PUBLIC NOTICE NOTICE TS HEREBY LIVEN that the Design Review Berard of the Town of Vail will hold a public hearing on April 3, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Fraser - 250 Addition AK 1468-B Vail Valley Dr/Lot 37B, Block 3, Vai3 Valley 1st Sheppard Duplex - 250 request AK 596 Forest Rd/Lot 4, Block 1, Vail Village 6th Vail Mountain School AK 3160 Frontage Road East/Lat 12, Block 2, Vail Village ~2th May Residence - Additions to house AK 5188 Gore Circle/Lot 7, Black 3, Vail Village 1st Mohyneax - Addition AK 1528 Vail Valley Drive/Lot lA, Warren Pulis Subdivision Lindsey/Nilsson - new Single Family Residence AK with Caretaker Unit. Phase VI, The Valley Lauterbach West - New Single Family Residence AK Parcel A, West half of Lot 34, Vail Potato Patch Biederman Addition - 250 request & garage addition SM 254 Beaver Dam Road/Lot 23, Block 7, Vail Lionshead Spector/Kalish - Addition SM 1467 Greenhill CourtfLot 10, Glen Lyon Subdivision Leary - Renewal of DRB approval SM 5075 Ute Lane/Lvt 29, Vail Meadows Filing #1 Frein - New Single Family Residence SM 798 Potato Patch Dr/Lot 8, Black 1, Vail Potato Vail Trails East SM 433 Gore Creek Drive/Lots 7-15, Vail Village 1st Village Parking Structure - Lighting BR 241 South Frontage Road Spraddle Creek Subdivision KP 100 North Frontage Road/Parcel B Mindlin - Addition JK 800 Potato Patch Dr/Lot 7, Block 1, Vail Potato Patch Lifthouse Lodge - Addition (Conceptual} JK 555 E Lionshead Cir/Lot 3, Block 1, Vail Lionshead 1st Filing Singleton - New Two Family Residence JK 2476 Garmish Dr/Lot 28, Block A, Vail Das Schone 1st Filing (Conceptual) Willow Bridge - Replacement of existing structure MM Located on Willow Bridge Road, between the Village Center Condominiums and the Sitzmark Lodge. Frontage Road Street Plan - Conceptual Review MM , Public Works, Greg Hall *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on March 29, 1991. • f J _~ r~ SITE VISITS 1:30 P.M. 4 1. 2. 3. 4. DESIGN REVIEW BOARD AGENDA APRIL 17, 1991 s:ao P.M. 5praddle Creek Subdivision KP 100 North Frontage Road/Parcel B MOTION: SECOND: VOTE: Project Landscaping/Ret. Walls - MOTION: George Lamb, SECOND:. Jim Shearer, VOTE: 5-0 Approved. Arch./Landscape Guidelines - MOTION: George Lamb, SECOND: Sherry Dorward, VOTE: 5-0 Approved. Street Lighting - MOTION: George Lamb, SECOND: Pat Herrington, VOTE: 5-0 Approved. Signage - MOTION: George Lamb, SECOND: Pat Herrington, VOTE: 5-0 Approved. Frontage Road Street Plan -- Conceptual Review MM Public Works MOTION: SECOND: VOTE: Conceptual Only - No Vote. Lilienthal - Reconstruct east unit SM 184 Beaver Dam Rd/Lot 24, Block 7, Vail Village ist MOTION: SECOND: VOTE: TABLED TO MAY 1ST MEETING. Josey - Addition SM 97 Forest Road/Lot 3, Block 7, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO MAY 1ST MEETING. f • r 6 5. Bridgewater - Remodel AK Lot 11, Block 5, Vail Village ~.st MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 3 6. Sheppard Duplex - X50 Addition AK 596 Forest Road/Lot 4, Block 1, Vail Village fith MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with the conditions that prior to issuance of building permits, applicant sha11: 1. Modify landscape plan on removing spruce on North West Corner & replacing it with low junipers. 2. Add 2 or 3 $-10' spruce on South East Corner. 3. Insure that proposal meets zoning standards (chimney/laundry room). • 6.5 Consideration of a modification to approved building envelope location in The Valley, Phase VI building envelope 12, The Valley, Phase VI. MOTION: SECOND: VOTE: Conceptual Review. 7. Lindsey/Nilsson - New Single Family Residence AK with caretaker unit. Phase VZ, The Valley MOTIDN: SECOND: VOTE: Conceptual Review. 8 8. Riverbend - Restain Building BR 4$00 East Meadow Drive MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. • } . .~ 9 9. Spruce Park -- Revisions to approved plan BR Unit D. Lot 7 part of 6, Block 1, Bighorn 3rd MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 10. Fraser - 250 Addition AK 1468-B Vail Valley Drive/Lot 17B, Block 3, Vail Valley 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. NOTE: mitigation plans must be finalized prior to issuance of building permit. 7 11. Groff - 250 request AK 1468-A, Vail Valley Drive/Lot 17A, Block 3, Vail Valley 1st MOTION: SECOND: VOTE: TABLED AFTER DISCUSSION. ~"" 2 12. Breeze Ski Rental -- Sian Variance-~~ JK Montaneros Commercial Condominium, Unit 100. 641 West Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Filing. MOTION: SECOND: VOTE: TABLED TO MAY 1ST MEETING. 1 13. Singleton - New Primary/Secondary JK 2476 Garmish Drive/Lot 28, Block A, Vail Das Schone #1 MOTION: SECOND: VOTE: TABLED TO MAY 1ST MEETING. C7 14. Lifthouse Lodge - Addition ~ JK 555 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead 1st Filing MOTION: SECOND: VOTE: Approved with following condition: Applicant will modify plan to include clerestory north of Banner Sports Entrance for staff approval. Clerestory will be presented to DRB on May 1, 1991. 15. Vail Interfaith Chapel - Addition SM 19 Vail Road/Tract J, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 16. Daly - Changes to approved plan SM '782 Potato Patch Drive/Lot 16, Block 1, Vail. Potato Patch MOTION: George Lamb SECOND: Fat Herrington VOTE: 4--~-~1 Consent approved. Ned Gwathmey abstained. 17. Lancelot - Lighting SM 201 Gore Creek Drive/Bell Tower Building MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent with provision that staff review intensity of lighting. MEMBERS PRESENT: MEMBERS ABSENT: George Lamb Ned Gwathmey Pat Herrington Sherry Dorward Jim Shearer (PEC) i • • ~_ STAFF APPROVALS: Peterson/Bossow - 250 remodel to existing Primary/Secondary. Lot 6, Block 3, Vail Village 1st Schrager Residence - Changes to approved plan.. Lat 8, Bighorn Estates Furey Residence - Change existing windows on north elevation, middle floor, to "French" double doors. Close existing kitchen door and close west facing window in master bath. Lot 6, Vail Village West Filing #2 f • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on April 17, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area for the Groff residence located at Lot 17, Block 3, Vail Valley 1st Filing. 1468-A Vail~Valley Drive. Applicant: Mr. Neal Groff 2. A request for an interior addition to Unit 7, Tyrolean Condominiums at 400 East Meadow Drive on part of Tract B, Block 5, Vail Village 1st Filing. Applicant: Bluegrove Properties The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on March 29, 1991. PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on April 17, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Breeze Ski Rental - Sign Variance JK Montaneros Commercial Condominium, Unit 140. 641 West Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Filing. Singleton - New Primary/Secondary JK 2476 Garmish Drive/Lot 28, Block A, Vail Das Schone #1 Lifthouse Lodge - Addition JK 555 East Lionshead Circle/Lot 3, Block 1, Vail Lionshead 1st Filing. Riverbend - Restain 4800 East Meadow Drive BR Groff - 250 Addition AK 1468-A Vail Valley Drive/Lot 17, Block 3, Vail Valley 1st Sheppard Duplex - 250 Addition AK 596 Forest Road/Lot 4, Block 1, Vail Village 6th LindseylNilsson - New Single Family Residence AK with caretaker unit. Phase VI, The Valley Frontage Road Street Plan - Conceptual Review MM/GH Public Works Lilientual - Reconstruct east unit SM 184 Beaver Dam Road/Lot 24, Block 7, Vail Village 1st Josey ~- Addition SM 97 Forest Road/Lat 3, Block 7, Vail Village 1st Spraddle Creek Subdivision KP 100 North Frontage Road/Parcel B Bridgewater -- Remodel AK Lot 11, Block 5, Vail Village 1st Fraser - 250 request AK 1468--B, Vail Valley Drive/Lot 17B, Block 3, Vail Valley 1st *And all tabled items from previous meetings. The application and information about the proposals are available in the zoning administrator' s office during regular office hours ~. for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT Published in the Vail Trail on April 12, 1991. • ;A L~ r'' TO: Design Review Board MEMORANDUM FROM: Community Development Department DATE: April 17, 1991 SUBJECT: A sign variance request for Breeze Ski Rentals, Montaneros Commercial Condominium, Unit 1(}01 641 W. Lionshead Circle/ Part of Lot $, Block 1, Vail Lionshead Third Filing. Applicant: Louis Sapiro I. THE VARIANCE REQUEST Breeze Ski Rentals is located at the western end of the Lionshead Mall, in the Montaneros Building. The applicant has indicated the traffic to leis store comes from three directions: north, south, and east. On Tanuary 16, 1991, the DRB determined the business faces onto one major pedestrian way. Therefore, the business is allowed one sign, projecting or hanging, in addition to the window signs as discussed later in this memo. An existing 2.25 square foot projecting sign is visible from both the north and south, but not from the east. The applicant believes only a sign facing directly east toward the Mall would be visible from that direction. Further, the applicant believes, due to the distance the business is located from the main part of the Mall, and the location of a raised planter containing a number of trees in front of his store, a new 12.6 square foot window sign is the minimum size sign that would be visible from the Mall area to the east. {Please see attached applicant's rationale for the variance.) The applicant is requesting approval of the following variances: 1. A variance to exceed the maximum allowable "incidental" window sign of 1.5 square feet by 11.1 square feet. This variance is necessary in order to incorporate the name of the business "BREEZE SKI RENTALS" in the sign. Under Sections 16.04.330 and 16.20.220 of the sign code, a separate sign sha11 be allowed to display hours of operation, credit card information and the Warne of the business, which shall not exceed 1.5 sq. ft.; and i 2. A variance to exceed the maximum allowable window sign area of 10 square feet. Under Section 16.20.220(A) of the sign code, incorporating the name of the business into a window sign is prohibited. However, even if the business identif cation was not incorporated into the window sign, the proposed window sign would exceed the allowable window sign area of 10 sq. ft. by 2.b sq. ft, II. SIGNAGE COMPARISON A. EXISTING SIGNAGE The business' existing signage consists of: a 2.25 square foot projecting sign, which reads "BREEZE SKI RENTALS"; and Two window signs. One of these signs is 5.8 square feet and reads "SKI RENTALS." The other window sign, which reads "BREEZE SKI RENTALS" is located above the entrance to the store and is 8 square feet in size. The combined area of these two signs is 13.8 square feet. The existing "BREEZE SKI RENTALS" sign is illegal, because a window sign which incorporates the name of the business cannot exceed 1.5 sq. ft. in size. B. ALLOWED SIGNAGE Breeze Ski Rentals, as an individual business within a multi-tenant building, with a lineal frontage of 30.3 feet, is allowed: One projecting sign or one wall mounted sign with a maximum area of 6 square feet; and Two window signs, the purpose of which is to identify particular types of services, products or events, with a maximum area of 10 square feet; and 3 square feet for the display of incidental signs (name of business, hours of operation, credit card information etc.). Of this 3 square feet, a maximum of 1.5 squaze feet shall be allowed for the display of the name of the business. C. PROPOSED SIGNAGE Under this sign variance request, the applicant is proposing to install a window sign reading "BREEZE SKi RENTALS." The sign would he painted on the inside of the window over the entrance door. The letters would be white and the background would • 2 be blue. Colors will match the colors of existing signs. The dimensions of the sign • would be not more than 5'-5" x 2'-4", or a total of 12.6 square feet. Half of the proposed sign area (6.3 square feet) would read "BREEZE," and the other half of the sign area (6.3 square feet) would read "SKI RENTALS." All other existing window signs would be removed. III. BACKGROUND The existing projecting sign is legal and would remain. The applicant is requesting a sign variance for the total sign area and sign text for a business located within Commercial Core II. The sections of the code which relate to the variance request are listed below: 16.20.220 -Window Signs A. Purpose, to identify particular types of services, products or events. Note; Window signs may not be used to identify a business. In other words, the name of the business may not be incorporated into a window sign. B. 1. Size, any sign or signs attached or applied to the inside surface of any exterior window will be limited to a coverage of 15% of the total window space. Further, no sign or signs shall cover more than 10 • square feet of any window space. 2. A window space is considered to be the total area of any single window pane or series of window panes separated by mullions of 12 inches or less; D. 3. Number. Each window frontage may contain sign or signs within the prescribed size limits far each frontage on street or major pedestrian way with a maximum of two signs; I. Special provisions shall be as follow: 3. Three square feet shall be allowed for the display of the name of a business or organization (not to exceed 1.5 square feet), the display of the hours of operation, credit card informadon, and similar information items. This area will not be included in total allowable window coverage calculations. IV. FINDINGS AND STAFF RECOMMENDATIONS Before the Board acts on a variance application, the applicant must prove phvsical hardship, and the Board must find that: 3 A. There are special circumstances ar conditions applying to the land, buildings, . topography, vegetation. sign structures or other matters on adiacent lots or within the adiacent right-of-way which would substanrially restrict the effecriveness of the sign in question: provided. however. that such special circumstances or conditions are unique to a particular business or ento~~,,:se to which the applicant desires to_ draw attention and do pat generally apples to all businesses or enterprises. Staff Response: Staff does pat believe the location of the business, at the western end of Lionshead Mall, or the existence of a raised planter with trees in it, is a physical hardship sufficient to warrant allowing the installation of a window sign greater than 10 square feet in size which incorporates the name of the business into the text of the sign. The applicant may be able to increase the visibility of this business by increasing the size of the existing projecting sign from 2.25 square- feet to 6 square feet or through the installation of an awning sign. B. That special circumstances were not created by the applicant or anyone privy to the applicant. Staff Response: Special circumstances were not created by the applicant. C. That the granting of the variance will be in general harmanv with the purpose, of this ritle and will pat be materially detrimental to the persons residing or working in the vicinity. to adiacent vropertv. to the neighborhood. or to the public welfare in general. Staff Response: The proposed window sign location, design, materials and colors would be compatible with the appearance of surrounding business facades and signage. However, the excessive allowable signage size (configuration) would not be harmonious with the scale of the Town. (Section 16.16.010 of the Town of Vail Municipal Code.) In addition, the proposed signage would be incompatible with the scale of signage in Lionshead Mall. • .. ~ w • D. The variance atsnlied does not depart t.,~~~~ the urovisions of this title anv more than is required to identifv the applicant's business or use., Staff Resvonse: The applicant is proposing to incorporate the business identification into the window sign text. In doing so, the sign will exceed the allowable "incidental" signage size maximum of 1.5 square feet by 11.1 square feet. The applicant is further proposing to exceed the maximum window signage size of 10 feet by 2.6 square feet. Staff believes a 10 square foot sign reading "SKI RENTAL" will be sufficient to identify the business and its services. a III. STAFF RECOMMENDATION Staff does not support the Breeze Ski Rental window sign size or text variance requests. Staff does not believe the location of the business at the western end of Lionshead Mall is a physical hardship. The existence of a planter near the business' eastern facade does somewhat obscure the visibility of the business. However, if the location of landscaping in front of a store front and the location of a business at the western end of Lionshead Mall were considered hardships, conceivably almost any business along the Mall, west of the Lifthouse Building, could request sign variances. Staff believes the business can be adequately identified through the installation of the following allowable signage: 1. One, 10 square foot window sign which reads "SKI RENTALS." 2. increasing the size of the existing projecting sign from 2.25 square feet to 6 square feet. 3. Installing 3 squaze feet of incidental signage, i.5 square feet of which can identify the business. c:ldrblmemaslsapiro.417 Project Appiication ~f ~" Date ~_ ._ / / ~~ f Project Name: +~~~' ~ ~'~ '° ~~/ Project Description: ~~~ l-~~.te ~? ~ ~~~ ~-"~"'~' ~r~k~` ~~ Contact Person and Phone ~~~~ ~-~v ~'~~~ ~ ~ ~` Owner, Address and Phone: -~~~ Architect, Address and' Phone: Lega! Description: Lot ~~' ~ t~ _~~~~' `" - Filing Comments: Zone Design Review Board Date ~ ~ ~~ Mo#ion by: i Seconded by: ~~ ~r• APPROVAL} DISAPPROVAL /! -~ rya,[ ~ ~ _ - I r~ Summary: ~L~1~-~_ ~ L- ~~~1~~ C ~" ` "C ~i . ` 'rr~zs ~'G~~tG+l~'rp ~ ~f ~j ~~,~ ~l sew. ~~ ~ ~~~ ~ ~~,e.. ~~ .~,~..~ ~~ „~~ - - T V wn Planner taff Approval Date: ~--- ~'~~-- ~ / / r / Project Application f Date ~~ " ~! ~/ ~~ ~~ ~ ~ ~~/~ I Project Name: Project Description: ~ ~~~J~•~ ~ --~ / ''""" S ` "`''' ~-rem- 7--- V Contact Person and Phone ~-~~~~'~~ J Owner, Address and Phone; - ~" ~ ~~ ~ ~a~~~ ~~ ~~ Architect, Address and Phone Legal Description: Lot T er ~i~~r-S Comments: • Motion by: ~~ Seconded by: ,~_~: If V ~ APPROVAL ~S~ 2 ` ~~ 2 /'~ &iv z ~ ~G~ 2 / n~E ~'°i/ ~~ ~ ~~ 7 Block / Filin /~ ~ / / ~~ done /~ ~ ~`~- r r /~ V Design Review Board ~~ Date -~~~~ DISAPPROVAL ~ ,_.1 Summary: f 5~~<~ d/ ~i..ca ~2.6' ~0`. ,~oc~ ~ L~ r /~. ~ ~ r // r __ 1 - , - / ~~ E GL ..T ~.~t-1'~ V G~ /J.~FS Cc. p ~l't : ~ c ~rc-~r`G~ ~ U~ ~ ~ ~~ ~~~~~ own Planner ~ ^ Staff Approval Date: Project Application Date t Project Name: ~ f ~ ~Y ~ chY '~ ~ ~ t Project Description: ~~- c` h''~ "~ U ~~~...Y~ ~± Yl /~-c7~1 ~ Contact Person and Phone .esr ~ Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot Comments: Block Filing Design Review Board Motion by: ~~ Seconded by: h APPROVAL ~~ Summary: ,~ ~ L G`e'm /c-c] L ~' ~~ Date DISAPPROVAL Zone ~ rte.-~~..~ ~ ~,~ .~ ~° ~ s Town Planner ~~~ ~~ ^ Staff Approval ~Jr ~ ~ ~% ~~ ~9°- I ~l'© Date: Project Application Project Name: 1~ ~ Project Description: /~-~~ Contact Person and Phone ~~ ~ D Owner, Address and Phone: ~~~~'~"` Architect, Address and Phone: Legal Description: .Lot Comments: • Motion by: •'~1 Seconded by: ~ , ~{ APPROVAL (.-~) S Summary: ~-- Town Planner Date: l t/f ~ C~ ~ I Block Filing Design Review Board Dale ~ / ~ / ,/ i Zone Date DISAPPROVAL ^ Staff Approval • Project Application ~- ~-7 Project Name: ~ ~~ ~~`/- ~` ~~ r Projec# Description: ~__ ±~~"~"~'~~ ~"'~~ Contact Person and Phone ~ vv ~~~ f ~ ~~ ~/ Owner, Address and Phone Archi#ect, Address and Phone ~~ ~ ~~ ~~~ ~~ ~r i bate ~~ /~ ~/ ~~i liic~ r ~ i(.l~~a~ Lega! Description: Lot { ~ 81ock ~ ,Filing ~~~~ ~"`N""~'~...._..~~~Zone ~/ Comments: /Ud3~[ ~ ~'liL.~ 7~r5 ~fJ~~ ;~~i~r.~' ~2u~Y~ l~~C ~2t.~~ ~ ~ ~ ~,. . / ' Design Review Board Motion by: 4f~~ Seconded by: ~~-/'lti k-~ [,~"~ APPROVAL ~ a Summary: ~ ~ T~irn Plannerr7 Da#e: ~~l /~` Date ~ ( ~~ ~/ DISAPPROVAL ^ 5ta## Approval Project Application Date Project Name. ~ ~Y ~1~~ ,, n /} Pro~ect Descri lion: r ~ ~~ ~ ~~~ ~ v f~ ~Y t 1 P j Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Legal Description~~r ~ Block ~ 1~ ~-1 l ~.J l 1~ }~ ,Zone Filing Comments: Design Review Board Motion by: ~ ~~ i~ ~~ Seconded by: APPROVAL ~~~ `..~ Date DISAPPROVAL Summary: ~ ~~~~ ~ ~s~ h ~ ~ ~~~. -~ Town P nner Date: ~ ~ ~ ~ f r~{,a~,u~ed, ^ Staff Approval Project Appiication ~n~ Date ~-.IL D 1 Project Name: Project Description: ~A~~{~ x`-'~ ' ~ "''~ ' r t ~'~~, Contact Person and Phone i~~i Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot ~~ ~~~~~ Block ~ Filing ~~ v~ ~o~ Comments: Design Review Board Motion by: ~~~, [-' Seconded by: ~ APPROVAL ~~~ f~1E C~~r~1P~ Summary: • ~ ~~~ Town Planner bate: ~ ~ ~~ Date DISAPPROVAL ^ Staf( Approval zone ~r Project Application Date t roject Name: _ ~ ~~ ~~ ~~ r Project Description: ~~~ ~fT f QG Contact Person and Phone Owner, Address and Phone: _~~ ~~ ~ Architect, Address and Phone: Legal Description: Lot Comments. • Block r Filing Design Review Board date Motion by: Seconded by: APPROVAL ~~ .~ ~''~ tf 1 Summary: '~ ~ I~C?, ~ ~ l~ 7U "' s ~~~ ~~o~ DISAPPROVAL i~ ~~ Zone 5~1 mJ2 ~ lie - ~~u nPt7Y1 } y~ ~IY1~ "~11 ~nP In 4~f ~ . r I own P n r f s flats: r f. ©5taft Approval ~~ DESIGN REVIEW BOARD AGENDA MAY ~. , 199 ~. 3:00 P.M. SITE VISITS 12:45 P.M. ~. Phase II - The Valley 2 Lindsey/Nilsson - Phase VI, The Valley 3 Barnes - 2851 Basingdale 4 Spector/Kalish - 4S7 Greenhill Court 5 Findell - 1210 Westhaven Circle 6 Bailey - 193 Beaver Dam Road 7 Byrne - 254 Beaver Dam Road 8 Huss~uan - 327 Rockledge Road 9 Karats -- 122 East Meadow Drive 10 Robertson - Northwoods Condos. 1I Ford Park - 530 E. Frontage Road 12 Lamb - 4879 Meadow Drive * Ibarra - 343 Beaver Dam Road * Kravis - 424 Forest Road • * There are two items on this agenda. which are exterior landscape lighting proposals. Please make site visits to these properties Tuesday night, April 30th starting with the Ibazra residence. The lights will be turned on between 8:00 and 9:00 p.m. ::>- }. AGENDA 1. Lilienthal - Construct East Unit SM 184 Beaver Dam Road/Lot 24, Block 7, Vail Village 1st MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 Approved. 2. Spector/Kalish - 250 Addition 467 Greenhill Court/Lot 10, Glen Lyon Subdivision MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 SM Approved. 3. Mikell - Bath Addition SM 74-A Sandy Lane/Lot 4, Black 2, Vail Potato Patch 2nd MOTION: SECOND: VOTE; TABLED TO JUNE 5TH MEETING. 4. Findell - New Single Family Residence 5M 125.0 Westhaven Lane/Lot 41, Glen Lyon Subdivision MOTION: George Lamb SECOND: Pat Herrington VOTE : 3-0 Approved with conditions. Sherry Dorward abstained. 5. Bailey Residence - Demo/rebuild JK separation for garage. 193 Beaver Dam Road/Lot 38, Block 7, Vail Village 1st MOTION: Sherry Dorward SECOND: Pat Herrington VOTE: 4-0 Approved. 6. Singleton - New Primary/Secondary JK . 2476 Garmish Drive/Lot 28, Block A, Vail Das Schone #1 MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved with condition Public Works sign o£f on plans. 7. Breeze Ski Rentals - Sign Variance JK Montaneros Commercial Condominium, Unit 1a0. 641 West Lionshead Circle/Part o~ Lot 8, Block 1, Vail Lionshead 3rd Filing. MOTION: SECOND: VOTE: TABLED TO MAY 15TH MEETING. 8. Barnes - New Primary/Secondary JK 2851. Basingdale/Lot 4, Vail Intermountain MOTION: SECOND: VOTE: Conceptual. 7 9. Groff - 250 request ~ AK 1468-A Vail Valley Drive/Lot 17-A, Block 3, Vail Valley 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved as submitted. * 10. Kravis - Outdoor lighting AK 424 Forest Road/Lot 4, Block 1, Vail Village 3rd MOTION: George Lamb SECOND: pat Herrington VOTE : 4-Q TABLED TO JUNE 5TH MEETING. * 11. Ibarra - Lighting Plan AK 343 Beaver Dam Road/Lot 1, Black 3, Vail Village 3rd MOTION: George Lamb SECOND: Par Herrington VOTE: 4-0 DENIED. 12. Vail Trails Chalet - #12 renovation BR 421 Gore Creek Drive/Lots 1-6, Block 4, Vail Village 1st MOTION: SECOND: VOTE: STAFF APPROVED 13. Ford Park - Transplant two trees AK 530 Frontage Road East MOTION: George Lamb SECOND: Fat Herrington VOTE: 4-0 TABLED TO MAY 15TH MEETING. 14. Timberfalls Unit #402 - Deck Enclosure AK 4496 East Meadow Drive MOTION: SECOND: VOTE: TABLED TO MAY 15TH MEETING. 15. Phase TI - The Valley -- Building 5 units on AK existing foundations. Parcel A, Lion's Ridge Filing #2 MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved with conditions. 1G. Lindsey/Nilsson -- New Single Family Residence AK with caretaker unit. Phase VT, The Valley MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved with 3 conditions: Prior to issuance of building permit, applicant shall revise landscaping plan so that: 1. 50a of aspens are 3" caliper, 50o are 2" caliper. 2. 1/3 of coniferous trees are 6', $' and 10'. 3. Change contrasting stucco colors so they are more compatible. 17. Consideration of modification to approved AK building envelope location in The Valley, Phase VI. Building envelope 12, The Valley, Phase VI. MOTION: George Lamb SECOND: Pat Herrington VOTE: /~-0 Approved. 18. Robertson - Combine units 101 & 103 BR Northwoads Condominiums MOTION: George Lamb SECOND: Pat Herrington VOTE: 3-0 °- Consent approval. Ned Gwathmey abstained. 19. Lifthouse -- Concrete walkway BR 555 East Lionshead/Lot 3, Block 1, Vail Lionshead 1st MOTION: SECOND: VQTE: WITHDRAWN • 20. Village Parking Structure - Signage BR 241 South Frontage Raad East MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved as presented. 21. Karats -- Bay window BR 222 East Meadow Drive, Part of Tract C, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE : 4-0 Consent approved. 22. Hussman - Deck BR 327 Rockledge Road/Lot A, Block 7, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 23. Lamb - Addition SM 4$79 Meadow Drive/Lot 15, Block 5, Bighorn 5th MOTION: George Lamb SECOND: Pat Herrington VOTE : 2-0--2 Consent approved. George Lamb and Ned Gwathmey abstained. 24. Byrne - 250 request SM 254 Beaver Dam Road/Lot 23, Block 7, Vail Village 1st MOTION: George Lamb SECOND: Sherry Durward VOTE: 3-0 Conditions: Lighting plan to be submitted with in 6 weeks. Ned Gwathmey abstained. 25. Biederman Addition - 250 request & garage addition SM 254 Beaver Dam Road/Lot 23, Block 7, Vail Village 1st MOTION: George Lamb SECOND: Sherry Durward VOTE: 3-0 Conditions: Lighting plan to be submitted with in 3 weeks. Ned Gwathmey abstained. 2~. Josey ~- Addition SM 97 Forest Road/Lot 3, Black 7, Vail Village lst MOTION: George Lamb SECOND: Sherry Dorward VOTE: 3-0 Approved. 27. Lifthouse Lodge _ Banner Sports clerestory JK 555 E. Lionshead Cir/Lot 3, Block 1, Vail Lionshead 1st MOTION: George Lamb SECOND: Pat Herrington VOTE ; 4-0 Consent approved. 28. Manor Vail - Lobby Expansion AK 595 Vail Valley Drive MOTION: SECOND: VOTE: TABLED TO MAY 15TH MEETING. MEMBERS PRESENT: Ned Gwathmey Pat Herrington Sherry Dorward George Lamb STAFF APPROVALS: Beedie - New windows Westwind Unit #404 Nystrom Residence - Stained redwood on house. Lot 7, Block 3, Vail Village 11th MEMBERS ABSENT: Jim Shearer (PEC) Ford Park - Fence replacement at Ford Park soft ball Melds. Precourt Residence - Change to driveway. Lot 4, Block 1, Vail Village 1st wiegers Residence - Changes to approved plan. Lot 22, Block 1, Vail Potato Patch Vaal Gateway Plaza - Add guardrail to 3rd floor around south and east deck areas and add exterior door to master bedroom, to Unit #3 (per revised drawings dated 4/10/91). Lot N, Block 5D, Vail Village 1st ti • • ~J Scheller - Renovation of unit, minor exterior Vail Village Inn Plaza American Ski Exchange - New windows & entry Wall Street Building LJ • PUBLIC NOTICE NOTICE TS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on May 1, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area for the Spector/Kalish residence located at 467 Greenhill Court. Lot 10, Glen Lyon Subdivision. Applicant: Mr. Gerald Spector 2. A request for an additional 250 square feet of Gross Residential Floor Area for the Lamb residence located at 4879 Meadow Drive. Lot 15, Block 5, Bighorn 5th. Applicant: Mr. Lamb 3. A request far an additional 250 square feet of Gross Residential Floor Area for the Byrne residence located at 254 . Beaver Dam Road. Lot 23, Block 7, Vail Village 1st. Applicant: Mr. Ron Byrne 4. A request for an additional 250 square feet of Gross Residential Floor Area for the Kirby residence located at 227 Rockledge Road. Lot 13, Block 7, Vail Village 1st Filing. Applicant: Mr. Steve Kirby 5. A request for an additional 250 square feet of Gross Residential Floor Area for the Glatzle residence located at 2317 Garmish Drive. Lot 20, Block H, Vail Das Schone 2nd Filing. Applicant: Mr. Ernst Glatzle 6. A request for an additional 250 square feet of Gross Residential Floor Area for the Biederman residence located at 259 Beaver Dam Road. Lot 23, Block 7, Vail Village 1st. Applicant: Mr. C.L. Biederman • The applications and information about the proposals are available in the zoning administrators office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on April 12, 1991. *PLF.ASE NOTICE THE FETING DATE HAS SEEN CHANGED FROM APRIL 17TH TO MAY 1. 1991. • C7 Project Application r/~ Project Name: ~- ~}`~ V ~`--~~_~ i{~~.~is,%L`,f~'_ Project Description: ~ ~~.'!/t~ Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: ~";~ ~f~, ~)~is ~~1 ~ ~~l ~~ ~l-`A~-'~ ~~~ ~1~~- ~f '- G Legal Description: Lot /~ Block Comments: Date \` . ~~'+~ 1 `!11 { ( ~_ - ~ ' , Filing i ~ ~_~~ ~ ~ ~ r l~ ~,(r ~,i` } ~ ,Zone ~ ~y J l ~ ~:~~, ,~ - - Design Review Board Motion by: ~-~E Y ~~"~' J Seconded by: ~ ~~~ ~ l~~"~ 1J APPROVAL ~ /~ ~~ ( 1 f Summary: Vf , ~'" Town PEanner ~~ ~ _ Date: ~G~ ~~l .r ~(~ I t:\~,~ ~\:~°'~~',~' `:\ 1~~~;•` \ ~~\\ _.~` '• ~ ~ Date DISAPPROVAL ^ Staff Approval Project Application - ~ ~~ Date ~`, "~ Project Name: ~( ~~~~~~~~ -- Project Description: ~~ ~ ~~~~ ~~~ ~_M ~~ Contact Person and Phone ~~ ~~1 ~ ~ ~~~-~'~~~ Owner, Address and Phone: Architect, Address and Phone: _ ; -~'~ ~~ i~ ~/~ ~~-'+~~~~ '~~~ Legal Description: Lot ~~ ,Block r Filina ~~~~ v -~~ ~a ~, ~~~~ ,Zone ~ 1--~ Comments: • Design Review Board Date Seconded by: ~~ /' '~ ~ ~'~a_~~~~~~~" APP VAL DISAPPROVAL Summary: ~ 11~~ l~i~. ~~ ~~~ ~~~ ~11~'~ ~ ~~/~.~ ..~ Town Planner Date: ~-° i ~1 /t_l~l~ i r I ^ Staff Ap{~roval Project Application . Date .Project Name. ~-~~. , ~ ~ Gam, Project Description: x ~n ~''~7` Oontact Person and Phone ~" `~"~ • ~~"~~ f ~~`~ ~ Q~~ ~jC~ Owner, Address and Phone: Architect, Address and Phone: /~~~ 1~~'D~~s ~- 6~-~~ - "~/ tr Q J, U ` / `~i Legal Description: Lot ,Block Filing ,Zone /f~' /~ .; Comments: C.-G``~2 / ~ ~7 ~l ~G ~ t C. J' ~ ~"l ~6 ~G ~~..~_ GC ~~1, ~ ~ e r I ., ~ C-~~(t `~' ~ 1 fU ~ CI/1~-P~-~ (((.l,a C ~ ~-2 f ~ ~-~ /~rz~.dr....rp . ~ Pi/ r / I i'l Gt" f iJ C [k' C~ ~ -~7) G ?~t_~ ~c.~) ~ / d ! { L- /7 Cr ! < d (~C ~' J' . / ~ . Design Review Board Date Motion by: ~~/'~~~ Seconded by: ~~ ~~ / fZ ~' ~~~} APP~R/OVAL DISAPPROVAL 7" ~.. /s Summary: Town Planner ^ 5taft Approval ,! ~ ~~ Date: d project Application Date -~i ~ %/ ~'roject Name: ~YJ/ lC~r'' ~f• ~7(~'~iC`!'~ ~~~ l'1Cl'L~f'~.,~ •~~/J7/~~/• /~`~/~i%r l (iCfifr%i.l J1 `.~(/Ji%r'i~/i- ~f 1 Project Description: .1 ~~>/'i~1>//~7I 1 /,!~ /r~//i"T~l`~, J~'~f7~r.~ /Ir~~U' f~S /'/;_9%//C•ill (`.}~~C~~~r`~,. i~~c/i~(~/ J ./ _ Contact Person and Phone Owner, Address and Phone: ~ /~r'1/JfIC"". /'"/~ f~~~`i~C:l/ A `/~~f~ ~~[~~lyc'lr'"--~r./Jt~ ~',r/jrl, ~'l`. ~`~i/~~,,~,' J Architect, Address and Phone: ~~i/~~~"'/" ~f"%1C~N"~Y%iJ s~ ///"Y,f~,L~j"~("l '/ %%y' ~/r/r"ijii;i/~ 1 iii r~~> .~lJ`/~i~r'~~ _~ "7~1.~ ~`~~ %~/i"z~~~~ , /~~~~~r~ ~e.~-. ~.~/l l1 ~/ ~ /. Legal Description: Lot --~<~' ,Block ` ,Filing ~ ~ /~ ~/~ji7~k- ' /~/ ,Zone f r" Gornments: ,~~'.~~/l-.5>`Z~f~i~/~ri~,~ «-~/.~%iJ~1'Cl~~///l~r~~'.~i1C~/lr.%~~l~ /'~~li'/~/.~~%1/!!r //~:'l',.'(~(r /~lL'( ~r"~ ~c= t~/''Jl Sjzc.;%'~C rl l!!IC lc `1~~ //7' .,fit"fC'c:;~ 1 ~ ," ~//r~~~r C'~il5~lc"!~~/r; ' t'-~ ,:"/1!'1.(Y" •c ~L~ ~IC'%['/J11~'~ l~''I7ri~ t'JY~IJi'ljl~/~//ii_i r^ ^ _l'iK/.S'//t7 of /YrS/l(.%J/t' ~~ - ~~ Design Review Board ~- ~ ~.. Date - ~ ~ /~ Motion by: `~~~i'%~~ ~~lZr,''/r`P</ 4. Seconded by: APPROVAL DISAPPROVAL 1 ~^Cc?l~rv ~7c`.ri'il~ ~('i i~~~/`~./<S-' ~ ~'' l/r~> ~ /!Jill ~i f ~r`~ `J -J Summary: ~!f/<~i>/r'~Gk~~/ - .->/~i'~~~/CI~Ji/ ~ ~~x~' C":t~l/,..5~/l1'%//~S L~'~% c .~//~/Jc~ ~~/ /rl'~- . ~;3;i5~%zri ~~IItC~-~l/IC~ f77c(..~i! ~C.. f~lii7~~~7%~ _./ . ...5'> i /_~(' . ~ t-3>~/~ ~ ~ ..- f/>i ~>,/~Gc s'F°G ~ /'~ ~ J~1~!fr %ir%. ,?. ~~ C~ r~~ -~ .r>~/i ~;~~ir~~~~ %i/ r`f r . /S- . j~~% J~III"~"~/~~- t'om'/1 /~G`(' ~~~%~~lG~~=//i/ -~~G°/iL cat'%.~Y%(/_~" l<"1%~~di~~ i`~~/~li//,~i/C~;r'l:_.- " ,} ,+~JG11.(f/.''C'tl''C.:' //7 S~l' 17C`//.)~% ~/1'~'r1 (~[//c~>l~J' CIt" /`lC'~ /.~/C%l•r` i<. %C~f"~~~: l/ C'~C.-_5_.4 ,~~ ~Gl 5 f /lE~ Cam'/r 2G'C'/ /`, ~ c~~ u / ~C'Ct'c~_ ~` / t C7,/ r - ~. .(` (~ ~ T X1.11 Z=% ~~~'~ C''1? J .~ ~ ~ Town Planner ^ 5tatt Approval ,...Date: ; 1 . ,/.. ~>r~ Project Application Da#e ~~~ ,Project Name: --a`''~9~G7`~~J~ /fff~lC~~r'y~ /TPG~ /~''~ Grl/./'f'C'~lr~'~~ r~ffGr07'1~~-y U/7~ Project iescription; /1/~/.~i~ ~/~ . Ld~ ~~ ~~, lD~ _ ~ ~v ~ a'. 5PL°or~ClQ/1 y GC/7/~ lI~~J/G~~ Contact Person and Phone ~ Owner, Address and Phone: C ~~~'~ ~/~~~~""°' _~ P. ~ ~~` 8D7 / 1/~f.~/, c~ ~l~ ~ 7 Architect, Address and Phone: <~~//~ iL/G7i%~J, ~Q 3~~r/ (/G~f f, ~. ~~~i.~rq 92f -'~ 7~ D `~5~ 9 r 5L/r2/ ~Gr/orlc- 1 - r Legal Description: Lot ,Block ~ ,Filing ~~~ ~ `~'~~~~ ,Zone ~~-~ Comments: Motion by: ~ ~• ~~~ Seconded by: ~ APPROVAL Design Review Board Date /~/~~J ~ ~ ~~ /~ ~ } OISAPPF~OVAL J~',~lov~° GcJ/~ G"~rt:"~r~iu h.~ ~~/G GC~r~r~~S' c~i~ °~~ °~'-~ ,O~2a-- ~ . S,J - r Summary: ~1/~~..f.S`/~ f.~71~ ~7 ~12[Y/~ ~lL2r~~ ,~iJt~~~`j`~~~~ L1~ ~}/t`G~~ .,G~cZC~ ..1~~ /y.~C~F/ .~ Q s'/>Ylli.~'t/~~.~:. ~~il/t.L~ ~/~i!? r/7/J2y T/'!-~~ ~~~~ ~ ~~~~~~ ~:~~r~.. ~~ ~ ~rr~.~~~ end a~r~lrip~' -h..J ~itrsr~r ~airr-r.. ~r,~~~_ ..e%i~~-r~~.~ ~l~iic/ Gr~m~ /~' t~~ ~u~~/ ,~~~A1 f Town Planner ^ Staff Approval Date: s~l~l9 //~ ~99~ V Project Application Date .~° ~ n r'7 ~roject Name: =~~~ ~' `~ .~ ~ l~ Project Description: ~ r~~f~ ~•r'r~ `f~ ~r~~ f""~~r~''`~"'` ~V1 ~~~ t;r ~~l/ V Contact Person and Phone , <~ ~ Owner, Address and Phone: -~ - `~ Architect, Address and Phone: ~ ~~` ~ ~ `~r-~ ~~~" Legal Description: Lot ~ ~ Block ~ ,Filing 7 Comments: Zone ~~C'-,/2 4c•~- • Design Review Board ~r~_~~~ Date Motion by: ~~~~q(~-r Seconded by: ~ ~~r~~~~~` ~~t_ /~ -` ~ t APPROVAL ~ /~ DISAPPROVAL f/ ~ ~ V Summary: / r..:_.~_ ~:~_~;`_- r ~i ~~J ~a-vvu. -~.~f~, ~I Town Planner ~ ^ Staff Approval Date: ~~ ~ ~~ ~~ Project Application ~roject Name: ~l~L~~~. ~l ~ l~ ~~1 r~~ ` ~ f~ Pro~ect Descri tion: = '~- ~~~ ~i ~~ i7_;~rvv-r~-1 i~ 1 P ~ ~~ ' Contact Person and Phone ~~ f f'•+ -~~ L' 11,'sr~~` Owner, Address and Phone Architect, Address and Phone: Lagal Description: I~ot Comments: Date ~ ~ ~~~ rJ f ~t _" ~ _.. Block , Fi#ing lei/ << ~~ ~~~ Zone Design Review Board 5 _ 1- r Date Motion by: ~ ~'~"~-~ Seconded by: 1 ~ ~~ ~~ ~ - - APPROVAL ~ DISAPPROVAL --~ Summary: t ~,~ ~ ~ ~-~ ~~ Town Planner ` ^ Staff Approval Date: ~ ~ ~~ ~ Project Application ~~::,.c~,?/~ ;~~TJ~> ri]jF_i~'.-~ -'1 Date L/ _ ~ 1. ' c~ Project Name: ~~F.=~~ - .~~,~T-17ui~7-/~"-f ~i~1~ ~`~ /C}1~~~ / ~~/~ ~ rf/I/~C ~' ,~ %~~'~ (~. ~ ti r ~ ~'"~ . Project Description: ~1~~'~~+~-~T7T`~y~:~7`~'r~j ~i~~~ ~~~11~.r~i~lt1 G `. ~~~t~S ~ f~'~'/? ~/}r'~~ 4~;~Tf"~~~~~ Contact Person and Phone ~ if ~J } ~ 4`~-~ ~i`+~~ ~ ?~~'4n F~~''a ~ ~ ` l ` ~~ ~`~~~~ Owner, Address and Phone: ~ '~7 ~' f -/~, Architect, Address and Phone: ~"~o~`;~sS`~c's~~'~~ ~~ `~t7f',~~~ '~ fU~~ `7'o~~°t~ ' ~~~~'~ ~'r _ ~C' ~ x- ~l~ I Legal Description: Lot Block Filing ,Zone Comments: ya ~ ~ - ~~ ~ /I l~1`~~,{7 ~.,, ';7~. ~ ~1.~-~~c ~ ld- I ~-t~ ~ 1 ~{ ( ~~ I n!r?.LIJ I-r?1 Ifu.1~ = ~~ ~ ~ / ~j[l% ~j ~~3 _ I / i `T ~ f b (C~ ~ l ~1~.<"1 [~ ~'~ r~ ~ t: J ~i'`r- c' ~:J i ~~ ~~. 7 ~ ~ zj r't t. l ~~ / , ~ Design Review Board Date Motion by: Seconded by: APPROVAL DfSAPPROVAL Summary: • Town Planner ^ Statf Approval Date: ~, "~ Project AppNication Date ~~ - ~~ ~~~ 1 !` ~r ~ / Pro}ectName: ~e"fir" f.fC(~If.C'F.- ~~- ~~"~/'1,~:?-~' ~ ~-L~•i~irr'r~ s>'~.r•.~I i ~'~~'t~Il,.~~71~.~•F'~ f { ~ .- Project Description: 6?lf rf~'~ ~}l ~ ~i1,~ ~r'~1 ~. ~•,~`, ~ r .,ter ."I-5 f~'r/ -~=%,k/ -S;.l ~~1, f~~rtl.-,.<,~; ~~;;~~,_~ Contact Person and Phone ~ ~/-%'/~ ~"~%~_c~t~` ff'~~~r, ~ ~7~ ^~ ~~ ~~ ~. , (~ r ~ / / ~ J Qwner, Address and Phone: t ~l-~~~ `t.~~ ~,f~"c;/( ~ ~ ~ El'I,~•~-•1 ! t i~ <<, ji, i'~~1 `;~%C~ J ~ C,; J~`r- '1 Architect, Address and Phone: ~- ~~~~~ • ~ ~ '~`~~ Legal Description: Lot ~l !~-F r ,~~c.~~~lbf~k ~ 1 ~`)f"ff~ ~" Filing ,Zane fl)~ Comments: • L ~~~ ~ ~rY I,t~ U~ a ~~. - ._, APPROVAL `~ `--~' C_~ Design Review Board Date f ~ (~~ Motion by: Seconded by DISAPPROVAL Summary: /:f~~1~~~1'~JCl-( C-t~~ / G'~ ~~~~C C'l cl}-'(~'~, I) r.1~'~~"~ ~)! ~nr ~ /~^ / Jf~ / ~ 1~ / ~ l ! ~ ~> ~s.i1,,L.;I,L /r -z; / ~ ~ Z ~"~- ~'1 C C J ~~ l_°I/~ f'~ C(I /~ r i.1 /C ~f { ~ `1 I ~ r /G~..L (~9 f_ ~a~° 1 ~2`1 ~ 4<~ S /'l r:/1-~~~ ,.:~~`j 1/f"l(' r.!~: ~s.'~~ .~lll/ s ~ /I ./l . (./ 4 J + I t 1 r / r f? ~~ ~- i/ ~ `" ~7own planner ^ Staff Approval ~~,/~~ Date: ~ i ! 5~L<rc.~ilr.. ~~ f C ~?/ ~~/J C. ~,, ,,,~. CONDITION5 OF APPROVAL FOR "THE VALLEY, PHASE II" • Prior to issuance of a building permit, the applicant shall: 1. Provide documentation that the parking lot design approved by the Design Review Board on May 1 is acceptable to the Tawn of Vail Fire and Public Works Departments and both owners of the property; OR Provide documentation that eleven parking spaces in the parking garage are available and that the proposed development has the right to use them; 2. Provide documentation, with signatures from both owners, showing the total amount of available GRFA, the amount of GRFA already used, the amount to be used in the proposed plans approved by the DRB on May 1, and the remaining amount to be used in future development. All calculations are to be made using the 1991 codes. 3. Provide documentation that the applicant has the right to use Grousse Glen property for drainage purposes; • 4. Provide hazard studies for the rockfall and debris flaw hazards; 5. Show that the development complies with all zoning standards, specifically height and site coverage. • Project Application / Date ~ ~/ r ~roject Name: -~ ~~C't,) 1~ t, ~-S t~fin~c C~f$"f`~ ~- ~ -, i•v r;l~.c.~..~ ~~ ~ S~ c;v~ r -° ~ 1 f Project Description: .~ Contact Person and Phone ~~~c' ~,~~~~` /~-' Owner, Address and Phone: ~.1 ~-`~.af ~l~/~fA~L~~ Architect, Address and Phone: `, ~(~~ ~1~~`L t(~~'~=• / 7 ..~ ~~~t ~ (~ ~~ Legal Description: Lot ( ~~ Block ,Filing i <~ L ~- ~ ` ,Zone ~ ~- ;, Comments: Design Review Board f Dale ~ Motion by: /-~`CL"~"v Seconded by: ~`tJ1rlc~•.Z:- ~%~ ~PPROVAL~ DfSAPPROVAL ~_~~~ ' .~ I / r- - .~ -~~r:.f ?.11~:'.:~t ~c~ ~ ~ f .c~(c"'C i~ "J ~.'f~'- i ~ ! ~ 1 ~V /, S' ti ~ r ~i .l, " ~-. ~ f 1 Sr~mmary: %;~ !~.<-~~~'L ~2-~~ ~1.~~ <~•_. ,, ~" Wiz. : ~i2 f~` ~-~ .-. r. / ~ ~ « . (~ ~ - {~ ~.~ ... ~ r / ~ ~i / ~ / 1 ~ / /, ~/ / ~.: r/ (fit . `~ ~!L •if ~~~ ! ~ ~~! f [~'})/ t~.. ILL C. 1 ~"~ c' t [( i~•~.. f] ~~r~ ~.,-t !I ~` ~ j/' ~~-,.~_l.f '~"~~ (~ C'~~~i~C`.C ~(?)"1~/l~~.l~~~.-•' ~V'~l+tr'~ r'~'~-~ay ~ -/ Town Planner f '~r ~ /~~~ Staff Apprpv~l~~l~ f~f ~ Project Application /- ~/ / / / ~ hate ~roject Name: ~ tea z` (.c%}~~-~:. /C~ c~ 7) ~( /,i.f[~ ~f ~ (1'c << ~ ,,v(.. Project Description: ~ ~ ~ ~ ~ 64F GOc~.L `°~ 0~ ~~i2Y ~~ Contact Person and Phone ~%~rJ ~~~~" `=~ Owner, Address and Phone: ~. ,(~ Ian `~ ~ { S_S`M Architect, Address and Phone: / ~I 7 /f Legal Description: Lot (~ Block .___- ,Filing ,` ``{ ~~Jc ~` r ! ~~~ ,Zone ~ Comments: • Design Review Board c, Date ~ /~ Motion by: ~'~e~'Yl~~(.r Seconded by: l;-t-l,. ~'~"~ `! ~~ APPROVAL ~ DISAPPROVAL Summary: • ~~ Town Planner ^ Staff Approval Date: Ci ~ l '~ ~~f t Project Name: ~~ Project Description: -~~ Contact Person and Phone Owner, Address and Phone: Project Application _ ~j / Hate -~ /r / J ~v G' ~ d Gj ~ U c} c. ~ ~ ~ ~~ f Architect, Address and Phone: f ~ `~"~ ~~~"~'~- ~~~~~ `~ / ' • Motion by: Seconded by: v~~-i~ i~ Zone 1 ~~ ~-~"" ~~ }tit-L°"a Design Review Board ~~~_.~?~ APPROVAL ~~ ~~`~, Summary: --~ S G~~ Town Planner Date: ~ ! ~ I ~! e Legal Description: Lot Block Filing i ,~1t: ~c `~ f ~~ 5 Comments: ~i f . ~ f:"1 / y c:'?!v2'/~ ~c't) 7'v'~-~ c~-f.vtic..e-~-~ ~ ~~ ~. Date DISAPPROVAL ^ Staff Approval Project Application Date ~ / / / ///, ~ %° i~~c-'r'U ircr/,zip.: ~t, .c//7•%! ,:~r,~-~i~'~'lc % ; .;.Tl.. l// / ~D G/ l l Ci,'~ 1(~..i ~J ~..~~ ~ f!- ~;' )/l f ~~C i/ C "i/ 'C'/t ~ ,Project Name: , _/ ~ "~ Project Description: ~~~c(/"c`;S1f%'fF~ ~j1;~'' jJi~~/JG1~~~(~ f~•~ /~i/'~ .~~ /'~,///{~ f flr /,~> ('~" ~f %~`~••Y c . / Contact Person and Phone ~ =~! Owner, Address and Phone: ~~ ~'~•~`~ ~ /~ri1 ~`"~ ~f%` ~/l t" ~ ~ ~ l'Y~= ~-.J~'7~ ~- O~~r~; ~~~ f~'7~ -~.~«-i~' Architect, Address and Phone: /~/%//~I ~ ~~~~~:5~~/`JC ~ ~ ~~~%X -_~r~~=-? . l~l~(~ ~~'~. ~c.,~~~„r ,~c.~ Legal Description' Lot ~~ -~ Block ~ Filing ~ ~f~l/~'il<J~f'; ~ / `S f ,Zone ~~ 'f/ Comments: ~/~ ~»"%/ ~~~f~ /~>r~'//: aj 4 ~'~"~;~f~ ~~~/ ~~ll~<<.~~ 5~ ~j,~~~'1,~~/,.'Z'.' ~ /, ~~'r"`-,-1. i! ~C~ C~:i1~~/l/'i`: yf~~', r.%l~%/,~iG~(. ~ r~ l<-- t'~~I'C.'..57~~'~/ :/lJ ~' ~j'~~C~~ ~!jC'~Sf~lJl/,~~ GJ~~ c: io/I' /il l'f'i~/Cf/J(" 4 • ~d?t .~ G(%~~. ~`/fit . ~>"`fiiiJc: ' , ~~~~1'~1 .'i11, C / ' ../ . ~~~C'l~//lfff i'./~i' l' ,-~~/'/~~ ~~'(~~I`%~/cal ? .~ t ~/~ ~/lc',/JC'' C C Design Review Board Date '~'~~ ~~~ '-, Motion by: C-7~c'. ll~'~ J Seconded by: ~~%T ! ~~~' ~"// E%~~~,~~_~ _% APPROVAL Summary: " i' ~ /~ Town Planner ~°~ %/ Date: / D15APPROVAL ^ Staff Approval Pro'ect 1Vame: ~` ~ ~~~ f Project Description: ~"" Contact Person and Phone Owner, Address and Phone: Project Application ,~_ j Date `~ ~ /` / ~/ ~ /) ~ ~ ~ ~ i,~ ' l~ l h r1L {' } f~J Architect, Address and Phone: ~~' G~ ~ C~ "` `" ~~'~ ~ ~ r /~ f Legal pescription: Lot 81ock ,Filing Comments: Design Review Board Motion by: Seconded by: ~~L~~'~ APPROVAL ~~ Summary: ~ ~ Town Planner /r~~r Bate: ~~ Date DISAPPROVAL ^ 5tafi Approval ,Zone Project Application Date Project Name: ~~"'~-~-"~~7~-r~-`~`~ ~-~2 {~_ C.:/~ •.S~ L ~~ Project Description: `~~ ~ /"-~C--"-~ "~~~ , ~"`-' t.~--c~ Contact Person and Phone ~~ Owner, Address and Phone: ~' ~CF. ' I ~~~ ~~ IrL-G~~ Architect, Address and Phone: i ~ , ~~ ~. ~Y'C~,~- Legal Description: Lo Block Filing ~~ ~ ~~ r~ Comments: ~~~~ ~ (~~_. C~-~?~~-c',--~-~e:~z... Y1 i +~C~~-- to .mac----. . Design Review Board ~~ ~ I ~ ~~~ ~~~~ /~ ~G .~ l ~ ~~ 7 ~.-~~ f -~ ~ ~~ ~ ~ r ~ ,,Zone /~~ faate Motion by: ~ ~ "" ~~~ Seconded by: ~~'~-~ ~ ~1n APPROVAL DISAPPROVAL Summary: ~~ ~ ~~ y-- Town Planner ^ Staff Approval Date: ~ / ~ ' ~' r Project Application Project Name: u ~^~' ~ ~~~~~~~ `~ "w~" (~ qc i Project Description: E ~ ~'~ll ~~~~ ~~~~ Contact Person and Phone Owner, Address and Phone: ` ~~~~ Architect, Address and Phone: ~~~~ Legal Description: Lot ~ ` -~ Comments: Date ~-~n~~ ~ Block "tea Fiiing ~r Motion by: ~ ~ ~ ` Seconded by: ~ T APPROVAL f ~ ~ ]I/~.. Summary: ~>,~ ~ -.,,' ~ ~ ~ "_ ~ S ! 3 ~ l f ~1P1+~~ Town Planner Date: ~~ Design Review Board Date r ~~ ,Zone ~!(~ DISAPPROVAL ^ Staff Approval Project Application ~~ Project Name: Project Description: ~~~ Contact Persan and Phone !~r ~~Y ?St 1 V ~-- ~V Owner, Address and Phone: ~~ F '~' ' i !. Architect, Address and Phone: ~'~~ %~~~!n « ~~~~/~ Legal Description: Lat ~~ 81ack ~ ,Filing ~~~A~ Comments: ©esign Review Board Motion by: ~~~~ ~ ~ ~ ~~> ~ . ~ Seconded by: APPROVAL. ~ ~~f°rJi Summary: 1~~L~ r~~ r~.e ._ ~ ;~~ ~,,,. G~ b. ~=1 I ~_1,11~ _ ~~~ ,Zone ~~~ Date DISAPPROVAL ~ ~ ~ ~.~~ . ~1./ i r ~~ . ~~~~ c (~-} ~iTown ~' anner ~~ ~~ ~ ~~ ^ Staff Approval Date: ~ Project Application Date "J Project Name: ~ ~ ~~~~ Project Description: ~~~ Contract Person and Phone ~_~~~~ ~ ~~- ,- ~'~ ~~~~ a~~' y ~'~22, 2_ Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot ~~ .Block ~ Filing ~~~~ l ~~ r ~ ~ ,Zone ~~~~ Comments: Design Review Board r~ ~ Date Motion by: Seconded by: ~~~~~...JJJ;~ ~~.I/~ ~ s U APPROVAL DISAPPROVAL Summary: ~'~~ ~~ L r ~ ~ V ~ ~ Town Planner 3 ^ Staif Approval Date: *Revised 5/15/91 SITE VISITS 12:40 P.M. DESIGN REVIEW BOARD AGENDA MAY 15 , 19 91 3:44 P,M. 1 Wertheim - 774 Potato Patch Drive 2 Waeckerle - 773 Lionsridge Loop 3 Days Inn - 2211 N Frontage Road 4 Kloser - 2466 Garmish Drive 5 Kimball - 1915 West Gore Creek Drive 6 Lionshead Merchants - East & West Lionshead Entries 7 Concert Hall Plaza - 616 West Lionshead Mall 8 Shannon - 245 Forest Road 9 Vail Village Transportation Center - 241 Frontage Rd W. 14 Teuscher - 925 Fairway Drive 11 Town of Vail Snow Dump - 1289 Vail Valley Drive 12 Bernardo - 4718 Meadaw Drive AGENDA 1. Wertheim -- Satellite Dish BR 774 Potato Patch Drive/Lot 11, Block 2, resubdivision of Lot 7, Vail Potato Patch. MOTION: George Lamb SECOND: Gena Whitten VOTE: 5-0 Approved with conditions: 1. Plant eight 8' aspen 2" caliper minimum and two evergreen 8' minimum height. 2. Dish color to blend with tie wall behind dish. 2. Lionshead Merchants Banners & Awning BR Located at east & west Lionshead entries and on existing canopy. MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with conditions: 1. The Town of Vail will not be responsible for maintenance of the banner or awning. 2. Lion logo to be modified. 3. Kimball - New Primary/Secondary Residence AK 1915 West Gore Creek Drive/Lot 28, Vail Village West 2nd MOTION: George Lamb SECOND: Sherry Dorward VOTE: 5-0 Approved: Design Review Board recommends that the applicant cluster landscaping in front yard with edging. 9. Waeckerle - New Single Family Residence AK 773 Lionsridge Loop/Lat 1, Lionsridge Filing #2 MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with conditions. 5. Conceptual Review of Town of Vail Snow Dump AK 12$9 Vail Valley Drive MOTION: SECOND: VOTE: Conceptual, no vote taken. 6. Timberfalls Unit #402 - Deck Enclosure AK 4496 East Meadow Drive, East Vail MOTION: SECOND: VOTE: WITHDRAWN 7. Manor Vail - Lobby expansion AK 595 East Vail Valley Drive/Lot A, Vail Village 1st MOTION: George Lamb SECOND: Sherry Dorward VOTE: 5-0 Approved. 8. Himelfarb - 250 request JK 4269 East Nugget Lane/Lot 9A, Bighorn Estates Resub. of Lots 10 & 11. MOTION: SECOND: VOTE: TABLED TO JUNE 5TH MEETING • • -~, 9. Rothbart - New Primary/Secondary Residence JK 2349 Chamonix Lane/Lot 12, Block A, Vail Das Schone 1st MOTION: SECOND: VOTE: Conceptual, no vote taken. 10. Days Inn - (Conceptual) Addition to existing JK shoppette and Motel Buildings and construction of new employee housing building. 2211 N Frontage Road/Lot 1, Block A, Vail Das Schone 3rd Filing, a resubdivision of Vail Das Schone 1st Filing. MOTION: SECOND: VOTE: Proposed modifications to shoppette and motel building dropped from proposal. 11. Breeze Ski Rental - Sign Variance JK Montaneros Commercial Condominium, Unit 100. 641 West Lionshead Circle/Part of Lot $, Block 1, Vaii Lionshead 3rd Filing. MOTION: SECOND: VOTE: • TABLED INDEFINITELY 12. Lifthouse Lodge -- Roof color change JK 555 East Lionshead Cir/Lot 3, Block 1, Vail Lionshead 1st MOTION: SECOND: VOTE: TABLED TD JUNE 5TH MEETING 13. Kloser - New Primary/Secondary Residence SM 2466 Garmish Drive/Lot 2, Block G, Vail Das Schone #2 MOTION: SECOND: VOTE: Conceptual. 19. Shannon - Addition to Primary Unit {CONCEPTUAL) SM 245 Forest Road/Lot 22, Block 7, Vail Village 1st MOTION: SECOND: VOTE: Conceptual. 15. Schrager Residence - Change to approved plan SM 4299 Nugget bane/Lat 8, Bighorn Estates MOTION: George Lamb SECOND: Pat Herrington VOTE : 5~-0 Consent approved. 15. Concert Hall Plaza SM 615 West Lionshead/Lot 1, Lionshead 9th Filing MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 17. Teuscher - Addition to east unit SM 925 Fairway Drive/Lot 1, Vail Village 10th Filing MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-Q Consent approved. 18. Bernardo -- Addition MM 4718 Meadow Drive/Bighorn Townhomes, Unit #4, Tract B MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with conditions. 19. Willow Bridge - Replacement of existing AK structure. Located on Willow Bridge Road, between the Village Center Condominiums and the Sitzmark Lodge. MOTION: SECOND: VOTE: Conceptual, no vote taken. x .i • • 20. Vail Village Transportation Center - Landscape plan revisions. 241 Frontage Road West. Todd Oppenheimer . from Public Works Dept. MOTION: SECOND: VOTE: Conceptual, no vote taken. 21. Ford Park - Removal and relocation of trees MM 530 Frontage Road East MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with conditions: If transplanted tree dies, VRD must resubmit a plan to staff for review showing an adequate number of new trees to serve the same aesthetic purpose. r1 u MEMBERS PRESENT: George Lamb Ned Gwathmey Pat Herrington Sherry Dorward Gina Whitten (PEC) STAFF APPROVALS: MEMBERS ABSENT: Molyneux Remodel -- Reduce size of proposed remodel. Lat 1, Warren Pulis Subdivision Accardo - Add hat tub and deck. Mountain Meadows Unit #32 May Palace - Add flower boxes to outside deck. Creek Side Building/223 East Gore Creek Drive Kjesbo Landscaping - Add topsoil to yard, re-seed with native grasses. Lot 31, Block 2, Vail Village 13th; resub. of Lot 27, Block 2, Vail Village 13th Cerisola Residence - Minor modification to retaining wall at south side of driveway. Lot 29, Block 1, Vail Potato Patch McGill Residence - Revise window locations, modify exterior materials, and add 13 sq. ft. of GRFA as per sheet with list of changes dated 4/29/91.. • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail. wall hold a public hearing on May 15, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Consideration of: 1. A request for a Satellite dish antenna at 774 Potato Patch Drive. Lot 11, Block 2, a resubdivision of Lot 7, Vail Potato Patch. Applicant: Dr. Herbert A. & Nicole J. Wertheim The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on April 26, 1991. • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail wi11 hold a public hearing on May 15, 1991 at 3:aQ p.m, in the Tawn of Vail Municipal Building. Consideration of: 1. A request for an additional 25a square feet of Gross Residential Floor Area for the Hilmelfarb residence located at 4269 East Nugget Lane. Lot 4A Resubdivision of 10 & 11, Bighorn Estates. Applicant: Mr. & Mrs. Alan & Brenda Himelfarb The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VATL COMMUNITY DEVELOPMENT Published in the Vail Trail on April 19, 1991. Project Application ~~ ~ S-/~/ Date roject Name: '~_ Project Description: 1 J Contact Person and Phone ~_ 1 L d'~i R ["~'~~~-lr`f f 's. < < r f L. I / 1 ,- Owner, Address and Phone: ~~" L'fe'~-J b~ ~t L ~r~- 1.~(f C'-Y~~ '~ t ~` Architect, Address and Phone: Legal Description: Lot ~ ~ Block ~ ,Filing ,Zone Comments: Design Review Board Date Motion by: ~~~~' ~ - --~- C~/~, i I ~ -e.- ~1 Seconded by: APPROVAL DISAPPROVAL (~ ~~~ t ' f ~ 4~,~ Summary: ~'j ~J / ~i- ~. ~-.~-Gds C '~ f c~3 of va ....~' ~~ `t%~ p f G'~ `ts?~G-i r ` t Town Planner ^ 5iatf Approval Date: Y .-y/l `S` / Grl i / C.~ j~~ ~i~~P~~ Project Application ; .~ _ _ f ~ ~ C~ ~C f S ;~ l t1j ~ ~~~'~ ~ G Date 'S ~~S ~`! ~~ roject Name: C.._ ! ~~7r~-~ /~~ ~ L~~ Gj ~? ~~_yl -~ S f ~J G~ t`~G~ ~ ~ t S r__l~ 6, <'_ayt"~ Project Description: ~ E~ ~ ~ ~ ~^ ~ '~ ~ ~ ~~ Contact Person and Phone ~'~' (>' ~` G~ ~ ~ ~ ~ ~ `~ ~ ~! ~ ~' '_ 3 0~ lD Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot Block Filing Zone Comments: Design Review Board Date Motion by: ~Q ~ Seconded by: ~A?PPROVAL DISAPPROVAL ~~ ~ V (/ ~~ Summary: ~ : ~`"-y"_ _~'(.~-e c~ /rl ~ ~.Ge~L. ~: ~lZ- ~?~ _ ~ i ~ ~h ! ! D/`~ ..,J ; ~t7 Ltd }'? L'c,~ i l f'~ ~ ~ {~ ~ a '~ G~-~2~~~Y~-~.J /tom-~ c Y! .S" r h ( / C• /~ '~~~~ S Town Planner Date: ~~~ S / / / ^ Staff Approval • Projec# Application Project Name: ~ ~?~! ~~~ ~~~ Project Description: 6L~~~~ ~e'~ Contact Person and Phone s~~-~-~^_' ~~~ sn/~ ~ /~~ f Owner, Address and Phone: ~° ~ ~~<~~A x~y~~ r - Architect, Address and Phone: ~~r r~ ~ - .~ t_egal Description: Lot ~- ,Block Comments: • Motion by: Seconded by ~-.~~ _ APPROVAL _3 - ~', Date ~ ~~S / ~` DISAPPROVAL Summary: ~ ~~Y-~ G~ ~~ .~ ~..r'rnh~ a~~ -~.._~t~Z _ / 1 ~ Y !~_~ -V V c.`..~--. T _.. ~~ f To n Planner ^ Stmt Approval Date: ~ /~ S ~~~ .~ ~ r ~ ( /s~~, r ~ u Date ~--/~~ /~/ f -. ~.. Filing ~~'~~~ ~~, ~~G~/<r`a ~~~~/.~~____~~ one ~/] :J '~ Design Review Board Projec# Application l _~ ...._ Project Name: 9 ~- ~ ~~: ~~.~. F~ ~ ~ ~.~j~la - = - - -- Project Description: ~'•~ S i ~~ " ~~ ~~~'d'~-'~ Contact Person and Phone ~~~-~ ~I ,?rt %~ _'~ Owner, Address and Phone: t/id~~' C-~-~-r~~'~ Architect, Address and Phone: ~~•~ ~+`~~-~~ ~t~~ `~~ ~ -~ r Date '~~~~! r r - Legal Descriptian: Lot ~ ,Block ~~` ,Filing I ~[~Zi,a~~i'~i"~%~~-~ !l- ~ ,Zone ~``~%, J ' Comments: . Design Review Board Date Motion by: ~ ~~~~ Seconded by: _~.~~1 _..'~-. APPRO~ DISAPPROVAL ~,~° Summary: /,~'1'1J12%~ Gr3 (~ ~ G~ G-G~ ~ l~j/! S ~ 1 ,iii' /~s'.Sdd~~ ~.~ c~ c~~- / / ~ ~J j ~ L~ fl~'l` ' ~- G~ii`~~t. ~ ,v ~~~t.71~ ~'~~ ~/ /, --- }T ~~~-- /~C d~,~.. r-~ f ~ C-~~~ e,~; -...., .,;~a" f~ r,s,,,r o,! ~c c;~ j' ~~.E _.r~u.ir e_>rr- Ili- / i r __ V r ~ -~ - ~ - -.r'°~ Town Planner/ ~ ^ Staff Approval Date: ~-~~~ ! ~~~ f ~ Project Name: Project Description: Contact Person and Phone Owner, Address and Phone: • Project Application `~ / Date v / ~_ ~_` ~ r Architect, Address and Phone: 1 Legal Description: Lot ~ _~ t31c~~~ Comments: r1 u Filing Design Review Board Zone Date `-, ~ r ~ ~I Motion by: ~~ ~'~ Seconded by: ~~'~'Y 1 ^"~ APPROVAL DISAPPROVAL Summary: J ~_~ F~ ~'y t ~-.?~..~ ~ ---~~~-f ~'c. ~~ 1 ,ice ~. ~ ~- ~ ~:..~a i~ f X11 l`~...P ~' 1 1 -~. - ~"'~~ Town P anner ~ ^ S1aif Approval n ~ O Dafe: ? /~ Project Application ~~ ~ Project Name: ~Y ~' ± ~ ~~~ Project Description: { ~ ~'~~~~ ~~~ ~~~ t~ ~ ~`~~~ Date Cs, ~1. Contact Person and Phone F Owner, Address and Phone: ~ ~~ Architect, Address and Phone: '~ ~~~"~ Legal Description: tot ~ ,Block Filing Zone ~~~-F=-~~ Comments: ~_ ~~ ~ Design Review Board f~ Date Motion by: ~--~~~ ~f x Seconded by: ~~ APPROVAL =~ i?ISAPPROVAL Summary: ~f-~ ~~! ~~~n~ ~ > Y 9 ~ ,,,~. ~_~<<~ T~ Planner ^ Staff Approval Date: ~~~ ~ ~ ` , t r • Project Application ~.~, Date Pro~ect Name: ~ ~>~~~~~ ~ ~~~~ + r ~_.~ r Project Description: ~~~~f~' Contact Person and Phone ~~~ ~~~ ~ `'~> > t% I~~ ~~~~~~ ~ Y L~`h~^ ~ Y 4 ~~ l; ~~ ~t,~~ ~f~~~ J Qwner, Address and Phone: Architect, Address and Phone: ~~ 1 ~`v l~`-'~-~ Legal Description: Lot ~ ,Block ~~ Ffling~~~ ~ ,~ ~~ ~~~ ~ ~ Zone ~~ Comments: . Design Review Board Motion by: ~~~~ _- ~~' + ~' ` l .J Seconded by: ~~ ~~!~'~ }r ~ ~ ~' ~+'~ ~~,~ n APPROVAL /~ Date DISAPPROVAL Summary: ~~~-.-f~)`~~~ ~~~ .f1 ~ ~~ ~~ ~`V l ~~~ -{f~VC . `~ ~ ,~ - .~ ~ ~ ~~~r~ ~ ~~,~ ~ ~ ~ ~ v ~ ~~ 7own~er ^ Staff Approval Date: ~ ~ Project Name: ~~ p~.y...~t~i!' Project Description: ~ ~`7 Contact Person and Phone Owner. Address and Phone: Project Application a~ ~~~~~ [late ~ ° I ' °>/ ~ ~2..~~Li~LC-fives. iC, rS` ./.rte-~!~ ~ '-7' , Architect, Address and Phone: ~-{~ Legal Description:-e~t- , ~ ~~~..I, Comments: ~~' ~ '9 ~~~~~ -fig Design Review Board Motion by: ~ ~m~` Seconded by: f f -P~~-~ j~~ J PPROVAL~ ~?~-" C~ ~,~- ~~/l . ~ ~~ ~~ ~~ nit ~( L.r / C1~P ~..-(~..t.C.L~.-ry~_ /,~~,~ ,tea ~ . Date .Zone -L~~'JF` C]ISAPPROVAL ~ M ,~ .~~-f"prr~~er.n _~~._r~-e~ .I~.~~_~,~~ few-,~,~Gvn~ ,/i~~ ~P ! ,a" ~,G12rfGe-rrv~ iC-O' ~/ ~ ...~~LO ~.~~I-Y ~-~P_ .,22_ ~~t~t` /~-~.-o~, p. ~ p I ~ /,~irrLrl'rt' _~P~ -1~.v-~L_,...__ ~'a!i~-C ~7.G-rr~-l~t,rG1. /t!>4~'_ GC ~ ~i.. ~ (~Ce _ l ~ // I (/~~ '7 a ,~ ' !_- `Town Planner ^ Stafi Approval Date: ~ ~ ~~' ~ ~ ~ Project Application ~-- _ Date `~ r ~ T ~~_~ ~,~• 1 roject Name: ~1'r~~ ~..[ v ~ st,~. n~fs~~f~ ~"=. ~ ~: Project Description: .f~:?f~' y^r°~ r~'~4~> ~~f~?i~'i~ /I rte. .`~ ~~vti1,!L~1~'~.~r( ~ ,tiyt.rtl~~' Contact Person and Phone ~-~~~~ ~~ ~-~~" ~" i Owner, Address and Phone: ~~~~ Architect, Address and Phone: Legak Description: Lot ~~ ~Bl~~c ~ Filing Comments: Mo#ian by: Seconded by: /~~+ (1~ # ~. APPROVAL Design Review Board Date Zone ~~~~~ / .~ DISAPPROVAL ,~~ ~~-- ,f own Planner _ _ Date: r ~~ ~~ Summary: ~;~ j ~ . ~- _f _ ~ VVV ~ ~ 1. Aii'l ^ Staff Approval PUBLIC NOTICE . NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on May 15, 1991 at 3 : 00 P .M. in the Tawas of Vail Municipal Building. Himelfarb - 250 request JK 4269 East Nugget Lane/Lot 4A, Bighorn Estates Resub. of lots 10 & 11 Rothbart - New Primary/Secondary Residence JK 2349 Chamonix Lane/Lot 12, Block A, Vail Das Schone 1st Days Inn - Addition to existing shoppette and Motel JK Buildings and construction of new employee housing building 221]. N Frontage Road/Lot 1, Block A, Vail Das Schone 3rd Filing, a resubdivision of Vail Das Schone 1st Filing. (Conceptual) Breeze Ski Rental - Sign Variance JK Montaneros Commercial Condominium, Unit 100. 641 W. Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Filing. Bernardo - Addition MM 4718 Meadow Drive/Bighorn Townhomes, Unit #4, Tract B Kimball - New Primary/Secondary Residence AK 1915 West Gore Creek Dr/Lot 28, Vail Village West 2nd Waeckerle - New Single Family Residence AK 773 Lionsridge Loop/Lot 1, Lionsridge Filing #2 Conceptual Review of Town of Vail Snow Dump AK 1289 Vail Vailelf' Drive Timberfalls Unit #402 - Deck Enclosure AK 4496 East Meadow Drive Wertheim - Satellite Dish BR 774 Potato Patch Drive/Lot 11, Block 2, resubdivision of Lot 7, Vail Potato Patch Lionshead Merchants Banners & Awning BR Located at east & west Lionshead entries and on existing canopy Kloser - New Primary/Secondary Residence SM 2466 Garmish/Lot 2, Block G, Vail Das Schone #2 Teuscher - Addition 925 Fairway/Lot 1, Vail Village 10th SM • PUBLIC NOTICE NOTICE IS HEREBX GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on May 15, 1991 at 3:00 P.M. in the Town of Vail Municipal Building. Himelfarb - 250 request JK 4269 East Nugget Lane/Lot 9A, Bighorn Estates Resub. of lots 10 & 11 Rothbart - New Primary/Secondary Residence JK 2349 Chamonix Lane/Lot 12, Block A, Vail Das Schone 1st Days Inn - Addition to existing shoppette and Motel JK Buildings and construction of new employee housing building 2211 N Frontage Road/Lot 1, Block A, Vail Das Schone 3rd Filing, a resubdivision of Vail Das Schone 1st Filing. (Conceptual} Breeze Ski Rental - Sign Variance JK Montaneros Commercial Condominium, Unit 100. 641 W. Lionshead Circle/Part of Lot $, Block 1, Vail Lionshead 3rd Filing. Bernardo - Addition MM 4718 Meadow Drive/Bighorn Townhomes, Unit #4, Tract B Kimball - New Primary/Secondary Residence AK 1915 West Gore Creek Dr/Lot 28, Vail Village West 2nd waeckerle - New Single Family Residence AK 773 Lionsridge Loap/Lot 1, Lionsridge Filing #2 Conceptual Review of Town of Vail Snow Dump AK 1289 Vail Valle~f' Drive Timberfalls Unit #402 - Deck Enclosure AK 4496 East Meadow Drive Wertheim - Satellite Dish BR 774 Potato Patch Drive/Lot 11, Block 2, resubdivision of Lot 7, Vail Potato Patch Lionshead Merchants Banners & Awning BR Located at east & west Lionshead entries and an existing canopy Kloser - New Primary/Secondary Residence SM 2456 Garmish/Lot 2, Black G, Vail Das Schone #2 Teuscher -- Addition 925 Fairway/Lot 1, Vail Village 10th SM • DESIGN REVIEW SHARD AGENDA JUNE 5, 1931 3:0© P.M. ~~ REVISED JUNE 5, 1991 SITE VISITS 11:00 A.M. 1 Vail Village Parking Structure, 241 Frontage Road 2 Sonnenalp _ 20 Vail Road 3 Mikell - 74A Sandy Lane 4 Sadler Real Estate - 2077 N Frontage Road W 5 Lindsey/Nilsson - Lot~~ ~E3.,, Phase VT, The Valley 5 Barton - 2019 Chamonix Drive 7 Rothbart - 2349 Chamonix Lane $ Kloser - 2465 Garmish Drive 9 Glatzle - 2317 Garmish Drive 10 walker/Doumas - 25$6 Davos Trail 11 Rose - 2617 Arosa Drive 12 Atkins Residence - 2972 Bellflower 13 Herzog - 1652 Matterhorn Circle 1g Stevenson -- 1230 Westhaven Circle 15 V.A. Maintenance Yards - 862 S Frontage Road 15 McClain/Kaiser - Sunbird Lodge, Suite #3 17 Miniature Golf Course - Base of Born Free Express l8 Rumford - 675 Forest Road 19 True North - 100 E Meadaw Drive 20 Cashmere Vail -- 154 Gore Creek 21 McInerney/McVey Real Estate ~- 232 Bridge Street 22 Golden Peak House 23 Pritzker - Vail Rojir Houses 24 Mill Creek Court Building - 302 Gore Creek Drive 25 Christiania Lodge 2~i Garden of the Gods - 365 Gore Lreek Drive ~G~N~~ ~, Vail tiiilage Parking Str°a~ture - Lan~s~ape Plar, RP 241 ~rontag~ R~aG Easy ~10~IGN: Nei G~;at~?mev SE~~JN~: Pat ii2x'ring~.c I~p~. ©ved ~ ~ th cont~iti~rss . • 2. Sonnenalp (Bavaria House) - Addition & remodel AK . 20 Vail Road/Part of Lot K & L, Block 5E, Vail Village 1st {Conceptual Review) ~~ MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Conceptual approval. 3. Christiania Lodge - Lobby expansion JK 356 Hanson Ranch Road/Lot D, Vail Village 1st MOTION: George Lamb SECOND: Sherry Dorward voTE: 5-0 Approved. 4. Himelfarb - 250 Addition JK 4269 East Nugget Lane/Lot 4A, Resub. of Lots 10 & 11 Bighorn Estates MOTION: SECOND: VOTE: TABLED TO JUNE 19TH MEETING. 5. Lifthouse Lodge - Band color change JK 555 E Lionshead Circle/Lot 3, Block 1, Vail Lionshead 1st MOTION: George Lamb SECOND; Gena Whitten voTE: 5-0 Approved. 6. Byrne Residence - Site plan & modified elevation JK 16 Forest Road/Lot 1, Block ~, Vai1 Village 1st MOTION: George Lamb SECOND:. Sherry Dorward VOTE: 9-© Approved with condition: Subject to Town Engineer sign off on new site plan. Gwathmey removed himself from meeting and did not participate in discussion or vote. 7. Herzog - Addition ,~{/~ 1652 Matterhorn Circle/Lot 23, Matterhorn Village MOTION: Fat Herrington SECOND: George Lamb VOTE : 5--0 Approved. • ~. 2-Si.11 Creek Ceur~ Building - reiecate an pxistirg BR evergreQn tree. 3~"% Gore Greek Dra~ve,Lot 1, 3lock 5A, Vail Village 5th >~;CTIC~7: George Laub SEvDND: Sherry Durward VOTE : 5-~ ~,pprcved, 9, Garden Oi the GedS III - sit? de~~elopme:~t sign BR ~ifi5 Gore ~ureek DrivelLot ~, Ble^k 3, Vail Village 5th MO?'It~N; George Lar~;~ SECOND: Pat Herrington VOTE: 5-~ Consent approved. 1 ~ . Sad~.er Real Estate - Iae;a sign BR 2~~?~7 N F rcntage Road tj~, Lc~~, 39, Buffeter Creek (Erandess Bldg) P{1CmI0T~; George La:~b S~'COND: Pat Herrington VOTE. 5-C Censent approved. ~ 1 . 'i~rue North - 1*7e~.a Signi awning BR "l~Q E. I~~eade~~= Dri=Tel~Tai l Village Inn Plaza I~SOTTCN: Ge~urge Lamb SECOI~;D : Pat Herringten VOTE: 5-0 L,~n ~el:'~. approved. l2. Golder Peak S?euSQ - Ne."~ aUanir.g and sign B'~ 22 ; 8 Hans¢n P~anCh Read/Let B, Rlo.ck ~, ~~Tai ! ~,Til l.age First 2~10'~'IGN: Geerge Lamb SEC~J`~D: Pat Herrington iTGTE : 5-0 Concert approved. 13. Ford A.'rip~'?it~:eat~~' -- iaevr Banners ~ Sign BR 53~ montage Read East MOTIOla: SECOND: ,TOTE TABLED TO :lL~~_- 1~TS~: MEETING. ~~ ~ J ~.4. V.A. Maintenance Xards _ Addition to existing shop AK ~.' building. 862 S Frontage Road MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 15. Pritzker - Remodel AK Vail Rowhauses, Units 5A & 5B/Lot 5, Block 5, Vail Village 5th MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 16. Molyneux - 250 Expansion AK 1628 Vail Valley Drive/Lot 1, Warren Pulis Subdivision MOTION: SECOND: VOfiE TABLED 17. Atkins Residence - Conceptual review of AK new Single Family. 2972 Bellflower/Lot 19, Black 6, Vail Intermountain MOTION: SECOND: VOTE: Conceptual Review. 18. McInerney/McVey Real Estate - Display box BR 232 Bridge Street/Lot E, Block 5, Vail Village 7.st (Gorsuch Building) . MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 19. Cashmere Vail - New Sign/awning BR 16~ Gore Creek/Lodge at Vail MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. - ~;~ . tiikell - 250 Addition sRIS~~ 7~-A Sandy LaneILot ~, Block 2, ~~,a.l Potato Pat~.h 2nd P~I~?TIC~T: Pat Herrington SECOP.D: George Lama `;ATE: 5-i~ ApprO'ved Wl' t~"1 r~:TlC~lti{3nS , 21, Mc~:lainJKaiser -Exterior finish BR/S~'. 075 Lionshead Place%Lot 2, Block 1, 'nail Lionshead 3rd Sunbird Lodge, Suite #~ I~1~TI~rT: George Lamb SECuivD: Fat Herrington ~iJTF: 5-~ Consent a~p_ro~ed ~;=~.th condition that appli~.a~~t clean existing a~v7ir.g. 22. Alexande:° - ~~lin.~ature Golf" LoUrse tC'orceptual; AK Base of Born Free ExpreSSiFarLel C ~ D, vai' Lio:1SY'°a'' y ~ 1~~.U 1~~. MOTTC~i : SELC~ND VCTE: C~ Cor~cept~;a? re~~iew. 23, Lindsey/Ni Wssor - ~e~v Single Family= Residence AK Lo'~~_ -u Phaat~ VI, 't'he ~7a1 i ey ^~1C _ I Odd ; George La~r~b SEC~~~~L ; Gera ~~~:~it t en ~7f1T~' : 5-'~ Apprc~aec? 4.1t~ C+JnClitlflil;j , 24. GlatLle -- 25G fiddit.ion AK 2317 Gax';Tlisil Dxive%Lot 2~i, Bloc.: H, ~%a~i.l Das Schone ~? Ty~OTI.CN ; George Lamb SEC~7NPi ; Pat Herrington V~JTE : ~~-~l Appro~2d. • 25. Kravis - Outdoor lighting AK 924 Forest Road/Lot 9, Block 1, Vail Village 3rd MOTION: George Lamb SECOND: Pat Herrington VOTE; 5-0 TABLED 26. Rothbart - New Primary/Secondary Residence JK 239 Chamonix Lane/Lot 12, Block A, Vail Das Schone #1 MOTION: George Lamb SECOND: Pat Herrington VOTE; 5-0 Approved with conditions prior to issuance of building permit applicant must: 1) Owner needs to obtain a written agreement from adjoining property owner to encroach with retaining wall excavation. 2) Owner needs to obtain a written agreement from all utility companies allowing owner to build retaining walls within the utility easement if the utility easement exist. Owner will need to provide to the Town of Vail engineering dept. 3) A 4 foot wide concrete drainage plan is required at the beginning of the driveway. This is to prevent drainage from driveway from entering onto the roadway. 9). All owners of property must sign necessary documentation permanently restricting secondary unit per Section 18.13.080 (B) of the Municipal Code. This document must be filed with the Eagle County Recorder and will run with the land. 27. Stevenson - New Duplex JK 1230 Westhaven Circle/Lot 32, Glen Lyon MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with recommendations. • 28. Barton - Addition JK 20~~ Lha?P,C:11X I~riV~iL~t ~~, r~-'`l:i~e17I' Cr~F?~C ~LiOC~l~T1S10t"1 FiOT T ON : SEOOt~iL` ~r07'E TABLED TO DUNE 1~, 1~~i 2 ~ . T,~alker/Doumas -Replace retaining Walls and decks JKi SNs 2685 Da.ros Trail,'Lot 5, B1.OCk G, ;Tail Ridge £~IOT10N; Sherry Dor~,Tard SECOI~7I3: Ge::a Whitten MOTE : 5-[7 Approved with conditions. 3G . Rose -- Neu Single Family Residence JK,'5~~~ 261 Aresa Dri~:e/Lot lam, 51ock ~', Vail Das Schone ~1 P~]OT.~ON : George Larr:b SECOND : Genes G~'hitten VO''~; ~--~-1 Ned G~~athmey abstained, as re ~=as architect} Approved 31. Rumford -Addition ~Cr.~noeptual; A-~~SZ~' 675 Fcresn RoadiLCt ~, B'cck 2, Vail Vilwage 6th NOTION: SEC0~1D: VO ~' E . Concept~:al review . 32. Shunncn -Addition tc Primary Unit AK/Sp., 2~5 Forest R~]ad,lLt~t 22, Block 7, Tail Village 1st MO`~'~G~~: George La_rr,b 5EC0?~ID: r_e;3a Whitten ~,i0`~'"~: ~-~-1 i?VeQ G;~7athmey abstalrled~ Approved. 33. Stempler -- Addition of second unit tc existing AKISN; residence. 1[J04 Hcrr~estake iircleiLct ~, Block: 5; . nail VillaSe 'th N1OT1.i;N : George Lamb SECJP~D : Cena Whitten VOTE : 3--0-? ;Ned Gwathmey abstained; ~,pprcved . • f 34. Kloser - New Primary/Secondary Residence AK/SM ~- 2466 Garmish Drive/Lot 2, Black G, Vail Das Schone #2 MQTTON: George Lamb SECQND: Pat Herrington VOTE: 4-0 Approved with conditions. MEMBERS PRESENT: MEMBERS ABSENT; Ned Gwathmey Sherry Dorward Pat Herrington George Lamb Gena Whitten STAFF APPROVALS: Chambers Re-roof -- Lot 10, resub of Lot 7, Vail Potato Patch Russell's Awning - 22$ Bridge Street Meyer Skylight - Lot 17, Block 1, Vail Village 1st Carol Dick -- znterior remodel, change 1 window . 4708 Meadow Drive Hutson/Cummings - Landscape plan Lot 6, Vail Village 9th Oelbaum - New Window Riverbend #13/4800 East Meadow Drive Trope Resid. - Changes to approved plan. . Lot 5, Block 1, Vail Village 8th Morris Residence - Modifications to landscape plan. Lot 9, Vail Va11ey 3rd Lot 4, Dauphanais-Moseley - Move building to north by 9' Lot 4, Dauphanais-Moseley Subdivision Pedal Power - Mural on construction fence. Lot 9, Dauphanais-Moseley - Changes to GRFA Lot 4, Dauphanais-Moseley Subdivision ~1 ~J PUELIC NOTICE IvCTICE IS HEREBY G?~'EN that the ;resign Re~Tiew Board of the Town of Vail will hold a public hearing on June 5, 1991 at 3:40 p.M, in the Town of Vail Municipal Building. Cc~nsderatic~n of 1. A request for a second unit on a primaryJSecondary zoned lot which is less then 15,000 square feet, located at 1004 Homestake Circle. Let ~, Block b, Nail Village 7t:~. applicant; Mr. and Mrs. Svempler ~. A request for a second unit on a primary~,0econdary zoned lot which is less then 15, 404 square yeet, 1L~cated at 266 Garmish Drive. Lot %, Block ~G, VaiL Das Schone Filing #2. ~pp?icant: Mike and Emily Kloser 3. ~ request for a second unit on a PrimaryJSecondary zoned lot which is less then 15,000 square feet, Located at 234 ~.hamcnix Lane, pct 12, Block A, Fail Das Uchone Filing #l. ~ppliLart: Gary Rothbart 9. ~ request for an additional. 25~~ square feet of Gross RAvidential floor ~irea fcr the Molynea~ Residence located at 15L8 Vail ~,7alley Drive. Lot l~'i, Warren Pulis Subdi~~ision, ?applicant: Mr. and Mrs. Molyneax Tre applications and information about the proposals are available in the zoning administrator's office during regular office hours fcr public inspection, 'T©V`yI~I ~F VAIL COi~Ii~:TJNITY DEVEL~JEMENT P;lblished ir. the Vail Trail on May 1?, 191. • PUBLIC iyGTICE N()iTCE IS TIEREBY GIVEN that the resign Re~iec~ Ecai~ Lf the Town of Vail will hold a pu~?ic h°aring on, June 5, ?397. at ~;~~ p.m. in the lvwn cf Vail IuiurziLipal Building. Consideration of= ~.. ~ request fo,. an additional ~5~ square feet cf Cross Residential Floor Area for the h~ike,ll residence 1~cated a 7~~-~ Sa~:~~y Lane. Lot ~, Plock 2, Fail Potato Patch 2nd. Applicant: i~likell Holdings Company the applications and information about t}7~ prop0$a?S are a~raila~le in the zflning ddm-nistrator~s off~.ce during re,ular Gffice hours for public inspection, '.'Ob~~Pd flF VAIL CGI~1~~1[.~NITY DEVELGPr~lENT P~a;o~.ished in the Vail. Trail on may i~, 7.91. • .J • • ~echous - Land regrading ar:d reseet~ing Vucich 1~,dditi on Lot 3, Block ~, Bighorn 5th Va:~~. Trails `hest #1~ _ :~dindosr, =door changes =aTail Tra;~.ls ~;eLt Condo, Lodge at Vail - 5ide~Talk_ ?4 Vail Road Vail Resort ?~Lsociation - ~,yninr~ Vail Village Inn Pfa~a, Bhase V Geno's - Sign Chamonix Corners Bui .l.dirigl22 ~ I Narth Frontage Road V~1est Scots Residence -- Perimeter L;rain and re~:~o~~e deck Lot 2y, Vail Mead3~,~s Lionshead Cen±~er B;~iiding - add four skylights to Unit ~~10 520 WeU'~ Licr.sr~ead i~4ai 1 G~~iff i th' s nec:~ - Rertozre greenhouse enclosure Lot ~, Gore Greek Meado~rs~50,~~ Main Gore i~rive Park Meadovrs - Roof extension osier s~air5~ays Lifthci~se~y~~estvrind - .~7alk~uav, ~' riride concrete Uaalk north or Lifthouse. Graubert ~ddi Dion - rnodif i catio:~ to aprro=yed FRB plan. Lot ~, Bichorn nth • ~r~pe~t ~~~~lication II /}~y }} ff. kk ©ate ~~ f:4: ~~ ~l~l~ / ~C~k+,~'~. r ~'~ ( !~'~' ~' ~r J .i~'~~ ~~1~.~.~i _ ~~'^~ ~~'-I ~(~!~~~1:'~?r-~r, Nroject PJarne: ~~4~~~1`~,'~~ j? ar ~1 J!'~.. ~'1 k ,-l,l . i,~~: ~).~)Y75i ~ ~`I U ~ ' ~~ ~: Pr~;ect Descr'pti~n: ; -,i t Person and ~hcre .J?f~`'~ ~1•(1~/~:.~nf1 ~~r^,iS( `;`•~ 1 ~ i "~ ~ 1 C~nfac ~' .k ~ Owner, ;address and Pt~ane: i ~.reh°tect, address and Phone: Le~ai Description: Lat Car~rr~ents: r1 11i~4~ ~ 1~ ~ ~ ~ fl{j~( ~~( ^~ Seconaeci t3y: (~ r"-tPPi~QVr~L Fii',•n~ Design F~~~i~w ~~a~d Z~r;e Datc ~~ Ilti' ~._ ~ C!SP.PPRvU%tii~ ~~. } ~ ~ f,/ y 1` ~ i ) ,~ } ~. ! }: „ ` ! l I( S rP ~ ~ n 4' ~~y, .:. f 1 ~ r~ 1~ ail'' '{ i i 1~1~i i~ f ~: r~:.:5~1- 3 h~Y~ ~~'. _ I ~JII~C~..~, ~i ~ ~ i \ ~ ~.~1 I ~.., f1~: S!f ~ ~ ~ . ~ ~1~) S d`~ ~ ~7 if ~ l~ 1.:.~1[) ~~ ~ ~ r S.iiT`~nic~.rw`: i ~} • I •~~ `o~wr Fi~nre~r y /-~ © Staf~ A~,;rovai at e : ~ k ~ t~ ~{~@~ !f 7 E3icck Project i\arri~: _ "~~ ~~' 1 .1 ~~.`~i t ~ ~~F Proj4ct Descri~iion: ~~tJ r l ~aniact Person and Phone ~rGye~~ ~pplicat~o~ Date _ ~~ ~rrner, address anc~ Phone: ~`'a..~~-~ l~ , rC 1 G~f ~ ~~t~is~~ - -- - - ~: Arehit?ct, kddress c:nd ; r~ore ~~ ~ ~~ ~# ~~ ~•-~j~~ ~~J/_tt~y/_/~' ~~~ --- ~- S .. ~/ _ ~ l .' Legal Desc~iption: Lot ~ Biork `~~ ,Filing _ ~1,~~~~~_~~' U~._ _ Zor:e . - iornrrents: • ( ~l~- Seconded by: ~~~~;9 ~ APP~~ :lAL ~~s~gn i~evi~r~ ~~ard Sumr~ar;,: .. ..T, ~ ~' ~~ ~ !1 ~ ~ n Pf nner ~ ~1~, Laie __- DISk?PROVAiw ~~-- a d ~ i. ~~ © Stiff Rpprov~~i ~~a~~c~ ~a~3REic~~ia~ ~' 6 ~~y j7 9 '~~ ~wrojecf s~ta~e. .. ,~~` rF~• ~~~~~~~~~~ ~~l `~°R ?ro;ect Q2scrotiCn: ,_ ~ t ~ s~ _- ... ~orfar_t Perscn ar.d Phor'e ~~r~er, Address and Phone :architect, Address end Phone: ~ ~~~ ;r ~~ ~.agal Qescr~t!an: Lct ~ ~ > Blcck ~,am rnents: Qate 5 t' , a. .~,/}~~~~~.~ deg/-_ ~~~~~~~`~-_' ~ ~..~ l~+~hg1 "~~ 4R'f.. --__..--- PPP ~~~ r F La ~ {{ y~ //~~ /~ ~. ' ~~~~c~r~ ~~~~e~~ ~aarC~ [~~.~~d ~ G~tP Seconded b~•~ •~,,~ ~~-lr F.,~~ ~ ~i;- ~r V APP~Q!fr~L ~•,SAPPf~OVAi_ ~Liijlril2.r~: r4r r..~ ~i~r:~ ". ~ t~~i i t'~' f a ~~~~. ~~~ ~ll1,,, ~,'~'.~ ~1 ?_~ < < ~ , ~11 ~ ~~~ ~ ~~ ~ ' ~4'~'i ~ PIn:Sr ~3" Qate: +„~~' ;~ J d ---~.¢--~...._f_~ - - _.-------s--- ~J Stzff A.~proval 1~ ~ ~ ~ Project f~ar~e: Project Descri~tian: Contact Persarf and Prone GE~ner, ,address arc, Phase: ~rcnitec', Addr?ss and Pi~ana: uegak ~escri~ticn~ i-ot ^a~nments: l f~latian b,~: !1 f / ~,. Sscanced by: ~~~-f~~ ~`C 1'~_ :.~ / l3 ~ -- _ `,~ .., ~- ~_M-~;,---~ . __._ ZcE~e _-.. ~Ct~ ~ -.____. ...-~. LESAPPRCV~! SiJf"lf?laC'y: ~ff,)'~~~ f l L__C,2 ~~.~~ . .:~~~• _ ... ~ ----------- ---- _-..------ , /,, ,.l ~ 'd ~ .. h t - ~ -- ~„~~ , ~ , L, r~ ~. fit,. < - -- ~~ i / -(~ ~ (' l ~ L _ .~~- ~ ~ ~..-. c ~,:- ~ f. <'r /~~~,;a,.:l..~l(c;(~'-:~) `~' (...1 i ( / ,'~ c.~. ~ilt r~-f . l~f..~~ ~~~~.__ ~ ~'! f fiCG!..:~.•'~;: j•_zL"-' ~_c 4~_: )U ~r... Y~ { / + ! / ~' jr~ x`, j' Lip r-~...t `-~ l.t. ~-~'i_~ - f. C .c t~ i o•s~r Plainer C Staff A~prcva! _ (; ~ ~° J ~atr ~' / ' /c~ / _. ~( G i ~ iJ -~ _ j / / i _ l _,4_,7.aw--.! C. - ~:-:t.; ~ . ~I.. (~) ~ t_ ~. ~~~ t.4 mot.-t c. t c ~' ~ ~ ~.-- ~__- ~ - > ~ y Fs Block Filing r , ~~sig~ ~E~~ae~~ ~~~~€~ \ ~ 5 T, f ~~~~ I. ~i~ ~ 1 1 `~' ~ ~. ~~~ ~i-~~:~f~ ~. : ~ ~ -r~~~ Y l C ~j ~ C ~~~" (~ ~ / r •~ / ~/ ~ / oiec, i~~ar~e: Date '~ ~ --~ ~~ 1 ~ > ,. ~ ~..~ c ~ ~ ~~ /~c ~ '~ -7 C 1 i Protect Descript~cn: , C'_ - . . ~, • ~, /,7..s , jl . ~ Contact Person ar~d Pho:~e Gv~ner, ,4ddrzss and Phone: 4rchitec~, Address and ahcne: I egal uescriNtion; Lot ,dock Flir.g Cornrnents: _ / ~? ~~ Cr~E:. G'i ,:;j C~ f'7 ~'.. iu'.°IL l~c.,_= Ld:.:J.C.~7 7 Cl/• ~-~~ ~:.a (f / ~ ., ~/j ~ 77~ 6 1'd~._L=___-=~ `( `('7 s) , (..f ~ ~ ~'l~j ~.F ~ i 4., c~ P): ~~ C._ ~ t~ ~~~_: [ Z.) .~r". rl' L--i ~, ~}ESi~~ l~evievv B~~rd ~.-,l+rr~~gr ~~~ ~ Date i~.~iCtiaCt bv: ~~ sPPPG~'FP DISAPP?GVAL _,~/! --. C i c`) vL~ ~ L~ ~~~~ 1 ~~ ~_._ ~ 1 Surnma.~~: `oEV~~ Pla~,~er ~ Sta`f Repro'/al / f~'' ~.atz: [:~. d .~.... zone r ., ~~~f/ ~ ~.. ~ ~,.- J ~~a Date .. ~ --- Pr~3ect r\~il'18: -~. - _ 6~ --- -- -- / ` Praje^t Qescr€ption: ~'`.-~ t fj ~..~ ~.~... __r ..._.~~ ~ ~ ; . _ 1 f / C,~-~...L ~'?f~ ~ r,4.. i-~; `~_.. , ;. ~ ' ~)c~ ~ _ :,orstact Fersan and Ph:or-,e __ ~ - ~EJner, Acdress ar.c.' ?none: ---- --- - -_- Architect. R~uress and Phone: - . -- --- - --- -- ~. ~ ~ Legal Qeseription: Lot D'ack F€ling __-` -..._ -_ done __-- Comments: .1`~~ lt-, ~~~~: ~ -~ .-~, i . t ~ f~ r,' D~~t~ _ --.. - - -- Motion by: ~ ~ ` F/J ~' I.. y -~ Seconded by. / ~ J°- ; ~ . APPf~OVAL DlSAPPROVA~ ./~. . ' +, 1 Sur~rrary: i Cate: ` To:,~~ Plan--~er ^ Staff A;~prc~va! f ,j ~ ) ,_~ /i ~r~~~~~ r~-~~~~~u~E~i'~ c /.~_ ~,~ Project dame: ~ } Project Description: r°:;C.-!c~/L'~_~:-L~ C`?~~_ ~~ f~C_ ~ a~, --- --.____~. ~ _..__. -._._.- ® ~ %ontact Person ar-~d Ph~r-~e ~ `~-L..~~__r.~~~.'jrr_..t'%GL.f h. Ovt~ner..~ddress and Phone: architect, ~daress and ?hon2: ~~~ ~~ r i_egai Description: ` at C BEoc'.: F~, ng ____~ .__._~ ~. _ ,, ~~ _ .__. _ .~.-_ Zore ... ~ ~ ~_. _~- ~ ~c: ,_~ ~~ ~ - ~ ~- G a ~/ ~~~~Z:.~ )rc.._z'_i... l ~ `~ "7 ~ ~es~i~E,~ ~€ev~e~ ~c~a~d ~~- ~.~Qta~ ~Ff: ~~L ~'~ ~ -vL ~ .. . ~ .,, -- Seconced ~ , ( -'f~.~~----- ~PPROVRL C J • T6u~r'~ P!cnr..~ ~~te _----.-- --- .. - -- -- L~iSf~PPROVF;~_ Li Staff Hpprcv f ©ate ~~ - ~ t ~~ ~r ~ - ~r~~~c~ ~~~~~~~~E®~ f Date ~ S_ / ~~ f -- .- Project ~Earne: ~ '~~. --- s r Project DescriFtian: ~Cntact Person arc Phone ~ 1 t `~- '~- ~/ ~ti~~ner, ~ddr?ss ar-d ?ri:;ne: ~~~ .__ __. ---.--- - - - architect, t~ddress and Phor:e: __~_ ... _ ---- Legal Descriutirn: Lot f,~} ~ ~ Mock Film __ .-.__ -..- ,Zone __-._ g ----. -- CornrT~°nts: ~~~a~rs R~~~~k~~ ~~~~r~ D2t2 ~- ----. _ ivlotion E~y~: Seconded ~y,: .,~~_:~,~~.~,-v~.~~_-/ ~`~l ~- --- APPF~VAL f~ESAPPRCVAI_ ~_c~ -- - S~n-!mary: `~-~( , To.tn =lar-per p' ~/ ~ p Date: ~~ f ,~ ll ~ f ~; Staff Rpproval • ~rt~jeef ~-~iaiiea~i~n Cate ~:. ~ ._ ! ~ ------ f ~",r I project idarne: ~~~ ~I Gi'~.? I'.f rj~r.~~ C ~'., ,. )lst ~c P'! ~r< <~.~ ~~ /j ,.o/~ ~ _ r ` ~ rrajeef Description: ~.1~1"~f( ~~ r~ ~ ~ r'r f~il. l-l/~l ~~t} dI fY !9~'~, %cntact Person and Phe~e ~~~ ~°Xr~'~~~Pr~ ~1~. ,°~~,,~~... _._..-- ,~--- ~_ F Of,ner. address artd F~ane: ~~ Arcnrteet, address end Pher:e: ~ ~~~'. ~I(tiCCc~i ~ ~Cf - ~~~~ /~ _._..--- +~1 ~ ~+'/ _egaf Gescripticr: Lat ~ ~~~ ` ~ ~~`t,iack F:iir.~ Zor;e C~rr~,:Eents i• ~e~ig~ ~e~rie-~ ~aar~i ~BGGnCiP,CI t3 ;r: ~F PR~`si~L ::, gate ~~ j .~._ -._~._ I ~' TOV~n °I~r:nEr ~ i ~r Cate - CiJAP?RCU.^,l_ ^ Staff ~,pprovsl ~J ~r~~e~~ ~~~i~~at~c~~ i Pr±~~ect C'BSCi I~tlOn: ~"~t r' ' i S / ~ (t ~' i ( ~ ~ ~ - ` I t i f 7 i ~! ~:, ~ ~. ( ~ J~ S /r ~ cry o ~' -~, r. :: ,, f'~; > ~~. y ! ., ,}~ a •~ ~~% ,' f' vOlit2Ct r~8i50n and OI?.. C~~~~rer, Rddreas and Phone: Archiiect, Rccress and phone Leoal Qesc.iLtian: Lot % (~ :-1 ,} `; 3ioc, r~_. Filing il' `~' ~ {'r ~ f+, ~~ ~, ,Zone ..~'' f ~~~ ~ .~- ORI[~~i~t5: ~~ 'i~ dd' ~? 1 1 i y J f i' /L9 Seconded by.. I fr f Y 1 ,, .:~ ;`,.;,, i ~ R~PFtGVRL ~' ,~ Summary: _. _ _-~...--.__..._._ _ .. - Gd[E €~e~igrf ~ie~~e~r Board CISi-~F'i'RC;VA~_ TCLJrI ^lar:ner _ r` ;r Stott ~'tpprOVAI ~raj~c~ ,~~~~~~~#~Q~ ~~t~ eS,., // ~ / `` 7 t i / l Project description: ' ? ~ k°~ ' ~- '1 ~: ~ 1 I J - i tF ~+'f G 0 GantG~t Person and Pone a~ ~ G , ~. _ E _ ' ~ . ' ~ ~~.~ ~ ... ~ S 7-f ~ JJ ~ ~`~--- O~~ner, address and Pnonc~: ~ ~/ ~~)6° ...~' (J ~~_ !~p i ~reryitect, ~cdress arrr Pho!~e: E / J Legal Descri-~;tian: Lat ~'Icc~c riling ~q ,Zone G~rr:rnQnts: f ~~ l l n ._. _ r .- --- i• ~es~gn R~r~ie~ Board -1,_ ~- ; ~'- h~ o:ian ~y Seconded t3,~: vl'~~~`'/d..~~_~.k ~ ,~~ 1 RPPROt•~~L S~rnrnar~t: Q3i~ -c•.vr P'.snr.e~ cute ~ ~ ~ ~~ ~ DlS,4FPf3~VA`- ^ 5tat` Approval p ej~ci .~ppli~atit~~ Qate ~~ `~// ~..-~ t7-~~ l`1~t~ ~L.t: _ ~' 4~ ~'~I (.~1= ~ t., ~F. 9 l ¢.r- ~. - j,~ . j Z~_ r ~~'(~ 1, r C . ~ ~!` r (~ ~ ~: ~rcject ~larF~e: /' - / /~ j~ / d ~ ~ ~ C. ~~ CC l.t/~l {~_% ~ t~> ~~._' I C- f ~~,F'_ ~ C Cz ~. .~! ~~- '1'A_ ~~ ~ t_` Yb~ Z~ -~-f I{ tiL~ Project Qeseripticr:: ~ ! , i Contact Person and phone r ' r1 / j c- G-~vr:er, r?d~ress and Prone: ~ c;°_..-~~'~`_L,- ~J t C.., ~ ~-~_.. 1.~ f:~k`,L ~, ~ ~. -i ~-- ~.~. J ~s Legal Qescription: ~c- B~.vk Fil~rg ,Zane C~om mer,ts: i• ~e~i~n Review ~Qa~d t / `~' / Gate triotion b~: Secanead by: c ~;~ ~PPRCVAL Summar Tc~r.~rt F"annex a- A ~~~ ~~te: ~ ~y r CESP,='PFi~JVP. G 5taft l~.pprova! ~~~~e~~ ~~, Ii~a~iQr~ rajeet C<Jarne: ~~ ~ E ~y~ . ,,~ ,_ ~, Project Description: ~-.~'`)~ ~ ~~': „~.~~.~~~~ 1 Gontaot Parson ar:d Phone Gwner, Address ar.c Phone: ~~~~r?+~t ~ ~~•~' 1 Fl, ~`-' ~ 1.~_~~~Uj./t~ ~~ Architect, Anc'ress anc Phone: s Dail ~i~ r^- , ~ C~ ~~ ° { /~ [-fit ~~- ~" f LegGl Qescr•.ptian: E of Bloc€~ ~ ' piling ~ 1~ 11,~i~ ~i ~~ti~ ~In ~- ,Zone ~ `:.7 ~ORlfr,entS: . ~e~~gr~ ~evie~ Board ,~ ~p,, > Date ~~ Se4anded ~y: ~ ~~s~~i/ U~ ~f fiPPRGVAL L,iS~RPPRG`~J`tL Su ~ mary~: __ ... ~ • 1 ~r-~~ I ~.) ~~ •°~ ' ~ ~-~~ T ~ ^ etati ^ pp. ovai oi~r, F,zrr:e~ A ~r ~ra~ec~ ~~plicatiQn --- ~~ . ~ ~ J Date ~' /~~ ~~~ \ T~ rroject Name: ~ r. ff ,{ Proje:;t description. ~"! , I Contact Person and Phase / ~ OEnne~. f~ddress anc4 f h4nG: Arc~~itec:, ACdress and Phone: r ~ ~ 1 Lego' ~escriefian: Lot 81ocK Fling :~~. -~.,~7 '~\..; C~.C..-.C.1 i`.~G't Gt.'~zC,r` ~7 Ef~- c:'.,z~, ~(.~F=• Com~~r~ents: i• ~~sigr~ F3~v€evv Board r;, Secaneeci f R°FRC?`vr~L ~ ~_ ~ / ~ i~ J ,, ~ f ,;. 3 Tc°r.:n Plarr;er ~~ mate: ~ ~ ~ / date ~15APFPC`L~~.L Zany i;l 4 r ~' ~.._ __r C' ~.~~ ~f. ~J Staff Approva' • • ~r~~e~~ ~-p~l~~a~~on ~3 r FY6le~t , € ~ ~; ~ f/ -i, r. ; f r ~ !i -~ ~,'~ .~n_ ,~ . f^ • r --- ---.._- . t\a'7iB: Ih Prefect Ceserinti~n; l'~ t'%%~ - ~ ~ ~ ,~~ ~ ier~tact Fers~n anc~ Phone ~, ~'~~~ r %,r ~ ~.f`;, .~'''~: .~•`' - ~.~~ ~ f,; r , t G;rtlnar, Acdess and Phone: .-i ~ ~ a ` , architect, l~d~ress and P~~r:e: '~~; ~ +~ ! .1 s -. ~ •-~ ~ ~', Legg! :~2sRri~tian. Lat %~ ~ t3lr~ci< Filing •,- ~ ~ t _ ~ - ~ Zone ~ - ~`Of7lnSentS: . ~~Si~~'1 R~V~~~f Baarc~ DGe ----.._~ ~~._ `~., -- r~kotian fir: : i ~ .3eCC~i CIV~~ ~31r: < , ~ / ~ r'" i l~f ~r f_ ~ 1 ~ E;PPF~C~~fAI lvilSA?P;~OVAL ~ } ~ ~'~ / ~ ~ ~ ~ ~r'~ ~ ~ ~ r i/ ! i !/ r ~ .~Uf`1171ar~: S; . / r ~ i j~ ! / , _ ~ -i 0.:_ ~ _{~~~~ ~ 1.;~c-LL I r.- -_ _.- - ~ ~ -._ ._... _._ ,. ~~..~r 3 iE ~ r ! J :• 1'. ? '.. ~-t i iii r _ r r e I '~ • ~ .' . .~i r ~., _' _ Er r'1~~~- r _~.- r . -I ----. ~- 1 ~--'---- .._ 1 ~ f u~ , i ~ ~~,} '~~ .'~ ~/ .. __._y_ 1 ., f ~~ , f '--'fit :_~ l•:~ - f _ '' ~ l !•I ., i `~~[ ~ .. __.__.... / r ~ i "~'-~lr ~ .~~ ~_- _~~` ~~~ r-~ ~I~ ,~r~ ~~t r1. .1,~~lf ~ " /.~'~/?~' ~~ (-'~/~. ~?f ,~f .. F`~ ~-~~ ~'./~F' ~/~ ~l'- I• ~~ ~~ 1 r !'~ / j I / r t ~ / !' A F ~ .~ 6~ r ~ ~ ~ ~ ~ I " -- - -! ..-~ ` ; -, . ~ ~ r/ r _ ~ Toavr. Plar rer ~ 5tatf R~:,~ro~~al _ r i .r~~ ~ ~ .~~ f G~a[e: ~~ ~f ~r~j~~~ ~~~i~~t~~€~ ~rc~ject Na~r2: Project Qesc~iptECn: ~~~)Jl~~{J~ 11~.~ ~~~~%~~ ~i,~~~.~~-~ 11U1~~~f~~ Contact Person and Phone ~~ ~ t''~~.1; ~~~~ ~ 1~1~1~..~'1 ft~r~ G~+~?ner, Rc;dress a.nd Phans: ' AreE: feet, Adrtr2ss and Pf~one: /? Qn±~ ~:~ r Leal ~escrip`ion: Lot } PE:~cl. F~'in•y , (~ Corr~rnents: ~• ~ r ~ ~~ l~ ' (~~f'~`l ~~! ~ ~-~~.~li ~ 1~ t=~f1~`~~,~1~f aGt i~'•~Ol ~,it/li~~..fi ~_~(~1 ~~sign F~~~~e~r E~~~rd PE~1Gt;on may: ~~~~1~~' V A, ~x~ Seconded ~y: ~~~,~1,'11~ i1~J~f~' --, APF'P,01%AL ~~- ~. Qate G~> . ~~ ]j.~( " 1 ~ J ZGne f ~~, ,~ ~~ ~ f~ DE~,rtFPROVAL s• ~~r' ,~ ~ , ~ '- a ~:~f~ ' C~~ cg ~. ~`1. - r ~ I ~ ~ . ~ ~ ~ ~, ~. _ ~ Tor, P a~f,ar -~ ~~ ,~ - - _ ~- ~. ~~~ry~~ ' f r °d~~ ~ ., R- _ ~ Al ~ ~ ---___- _ y j __ M1 f -- ---.._._. F,-- ~-- 5taif AF ~~Ot~E r i ~~~~~~~ ~~~i~~~t~~~, date __ _ ,,~• i Pr'3feFt ~~~~ / ,. f 4 rl: _ ~ - f ~1 I} Frc~jact t;es.cription• . , `;~` ,~i ~ - ~,~• Z, ,'' ~... ~ ; ;" ' ;' Corf:act Person ane~ Fhone ~ - C~~rer, Rddress and Phone: - -- ---~ -- -- ~rehitect, Rdr~ress and Phane: '-" - ii;. ~ , . Legal f~esaripilan: La , `' ~iaCk ~--- Fi'inr f ~ . f ~~~~~~~ ~ _ ,Zone _ --_ Go~rr.ents: ~zs~c~r~ ~~~ierr~ Eaarc~ ^ mate _._~c- 1~._ ------ Motion ~f,. ~n..tF.-r,.~ ~ :~PPR~VAL\~• CiSAPPR.GVltiL C~ _ __ - --- ~ ~ - -- 5urnmary: - _.----- --- .. ~ ~~r f r 7~trt,n Plsr~ner ^ Staff Rpprovai ~- ` ,:~- Date: ' ~ ° ~r~jec~ ~-.~~ii~~~~~~ Date /~'' ~ `) "L1~ -- -- ~PrcjEC` fVar,~e: `~~'yi~~~`[J ~i'S/:>;'~ ;"'~, r .i'~ 71 C ," . f , /'. r ~l NtC ~ ~% %/%/f~~'~, :f7`r. ,f ~ ' . J ~ ~ ~ ~'f _, ^ ' ~ 4i 4l i'-C,~ ~~-/~ T ~•'~ ~£~' -., PrDl~~t De~Ci~~CIC3 ~: 1 G r_ 11 L~r l.( f / +L ~/f. (.. /i ifff ~•/ ' ~ r ~ ( (. Contact Persen a~7d Pf,cne ~/: ~~ ~.~ ~ ;ui.l /plc. ~~ ! ~ /C%'/ ' ,'~~/r l' ~ %~; /r~ r/~~// ,~/ t /~~~(i `~ ,~,~ ~ ; ~1(~r ~l •~t ~ ' rl~l ~G-~1. l ~:-, fit' /~~.,~~' ~,~ J~ >~'t'. _ £~r~'~ >'' C ~" / ~ t ~tiuner, Adc'ress crrd Phene: ~:~~`%~•J /7 r~"~l!}'~!'.~ ~ i J•'', /F'C'~li~~/ f~ ~ ~/,!/~~ ~~~ ~Ff°~"f'I' ~PC.'~(`' l ~ ,,'c ( ~ t. }C~~C ~ , j )~I ` / j / ~` 'l~l,: ( C 't// /, /•. : / ,. - ,l , architect. ~.GGress and Phone: ,::?C.(' c G%1,~:r°%r"I _--- _____ _ _.. 1 a r ~ , ; - LBr~ai Ces%ri .tics: Lot ~ rr~ BIocK ~ ~I Fi!i~n ~ ~= r'~.'~~i~.f-_SrI',,/+~'~l c_ ~i~/i~, Zore ~~ j Cc~r~ments: design Re~rie~ ~c~arc~ ' • 5 ' `%f CGte _Lr'- ... [~1~tiOn .hy: ~ll'~(°'. ~tcEJl~r Seconded by: ~-`~~i: ~l`i , :., ~/ . 1 ,y . ~ ,~PPPGv`aL DiSFEPPROVAL ~~~; fl~~./c";~~:: _ : - , if. L , / . ,.~ ~~ i ,,, ., ,. .. L~1.,11 ~L{/'9 )L' )r ~JLJC C ~ILC; // ~ __j__.__ ....-/-._._.__,__ -_~...._ ___.. _.__ l / ll.`{ .l l% ~~~iLll~`i.K'( C'7_/ !.l(l/.~f/.,Ci:j ~Ij ./('i~I'~~ /~ ~'lL[ ~i. ~~/!,.li~.Y_L~_r'f /./l~ 1 '/S _ Ir'/(. ~~°., f l ~ ~' ~r~`~-'/~r~ f.. ~i:'%%/~~, t G~;r r. C ~1,+C .'/~--fi r. ~1 f CSC., ~: i ,(r ~e,~f~: / + r , ~_ e~iCjei i ~~! / ', ;r -._.. ~ ~ ,T ~ ,•r r' ~ Sur?nlary: f~l../fYi~ !'(~°~T/!/,~'ii~j ir''lt!E : ('.,~'C%%'GCCiff.~~f' ~'- ,.~ij~,:rrr/~~~t-~~-- - - - - ~..- (.~ ~ ~'~l~~~~i+f i~. Clre'~~fi/~~(~/t`.~'!%1./."~'~(` i~f ~`/.~C'~_,~/ /.~-.~, li~~;~~ 7_rr //'~,i~~ /, ,~~i. r., J r~,- /.. ~~ :. ..'~% ~ {{ ~~ / ~ ~ ~ F'1.c:1~~ /C''~''/f~'(.':r(h ti 'l~:~ff, ./L-'///.l! S`~L( ~ ('„ij )}Q: G I ~ /~~/t."/~" ./-[i.1i J/r /..~ .. , ._~_ _ .,. - - ---...._ T 1 ;~~. ;"+~r' /'r"'(.'~~Gt.. :~/~ I ,~ +/ ~. ~,f~~,r„ !,. L. ~:Jf~%~:r.il.,~„ ~;:' ;L f.:' ~~,, I:,; r, t.•'r~ ~+! ~. %' 6I v /,~. /1/r /( 7<'~ J/£ ~ ,•,1~ ,-~f L!//I„/G~ d u ,yli c %s Y11.1. fr ~ c r' ( C /~'~!, r f/ / i // ~~~, %1// /lR~f4'Ci /~~ ~!, rrQ..'1 -1 1111'r.1f 1[i_-r')i- ~7/c,t"c + !..~/ // £ I,;~. ',.~(~; / jam,, ~Jr' ~ I .. / r~, 1 .. r ~ I ..~ ~ r' S/ :[ i'• Jt.~r i',- ,:.r"r,....~ ~.CL /Lr ( ~~: ! `,i ¢~; ,_ ~~r!' , ~ r•r. / f~' } i,! ~//~~, ~L/ r 'r r i ,try L / f ~.'~ c1 .l `- ~ ~ (>f/ 'r'~ •/6:b ~ L /C' 'L/ '/ ri ;r+ lJl. (/~ JI I~/ ~ . /,r r"(/ /,~ r.l1r/ i' %,:, £ t ,:~ t~/t ~' ~ .</ jfS /-I ~ /~' e.'(. ~I. C'.~") / ~)+d !' (~!l `~~ r. ~ ,C ~ F. '//~ /CL/~ /i 1: Y /c ~':'C~ - rtvr~ ?lar•ner ~ S[a,f A~;prcval f I Care: .' lc' , ,) ' f ~~o~~~~ ~.~~~~~~~i~~ ~t ~~ / / p p . \. 1 f~.~ / -~•~ ,~`(~'(( ' l ~f~ JCS ~f. ~l,)f~r'.~(Y /l ~ // C' ro~ect Name: ,~~~~-~.•lq?S%:1. ~=-1-~~;~~_.:' / P~oiect Descr',~iii~n: /~~~~f ' ~~% %i,~~'r.,%j ~.` /=-~%<''<'ll~~~, :'~ ~ ~"i.%'~~~' Contact Person and Phone .~~~!/..t`.~"~' /:`~'a: 2 •' ~ ~';~"-~' .. ]:5 1(~ l!c'G;," L:?. ,5~/(~-.-~1 ( 1~ > > / qq Addr@55 and Phone: f/•/"~ie r ~J~~GY~'91r~/~~~~~ ~~r(~ ! ' ~' (fi'!Ilr',i~ /)/~/~. , /l~/'-r,`/Ic['~f~i.~/ ~ . virJner: ~ '' - // // S 7 l r~ i 11 / r~e'r ~ fr'r~7%-;<'~ ~irl~cr~ ~c~~~1Z•'t Arc~itact, Address a.nd Phone: Legal r~esCriPtion: Lot .j 1. Bloc's moiling ~•~'r %> i:r_/c~%r Zone ///' Com rnen ~s: • Qe~igr~ ~~vi~-n+ E~Qars~ NEaticn hy; (:ic' c."i. CCU/.'/~ ~~ 5econced btr: J ~ APPP.CiVAL Late _~~~ `~ (~,/ C':SAPPROVAL Sumi:~ary. --._~:'~.,~/~'l s''1f''~'(/cJ ~~c%% x'.:%4`1 ~fiFl~~l ~¢ /'.~ ff ` ~~~'%/7/~ .. ~ ~~~~~' `/ i'~''~~~~~~`j 1~~~_7 ~ J ~:~ T~ia'n ~I~nrer c mate: Sta`f A;.,rc~~al ia~r4j~~E ~~~lic~i~iQ€e Project iS~arr~° ~: . i~ ~ Project CPscript€on: - f ;' ~ ~ ' ~ =i• J ' ~ I f , ~~ I :,aretact ?ersgri and Ptione r ;~, •; ~ ,,• ,.,; : , r ; 1 j , .. ~ , ~ G+~vner, Address anci Phcne: -- - ---- - --- Architect, Address and Phc:,e: ~ ~ % ' ~~, % ~i . ~ ~ ~ ' /~ ` Leg~.E Cescr?pt€on: Lot Bl:;ck Fii,~;;-~ V . -~ _ , - ,Zone . - -- i 1 i~orrrrer€ts: ~EtS1~1'T i~elfi~'~~ ~C~~G'C~ r i S .~ Cate -~ _.. _-- - .; i r _~ APPR~`~'AL C_ISAPPRCV~tii_ °- - ~. - ,/ .-. . : •- ~ _: ;. summary: ' :. € • - - -- ~ -- -------- - - ~ -.. -.. ~ ~, ~, ,, ~ t ; ~;, f, - ~ ;a ~ , ~ ; Tarv~ Plainer ~ ~ Sta`f Approval Date: ~ /~, ~~ ~'~ ~~ ~j~~~ ~ipp~E~~tic~~ !., Date ~ - , { Prp~eet dame: ~d~ .' ~~ `~ ~ ' ~-- ,j ,. - Project Desc~iptipn: i"~, ^~ s r ) ~ ~.. -- ,~ _ ~ / ;`~ i ~ ,' / ~~ni8ct perSOn 3r1~ F=hGn° ' 1 { t f ,' -7 ~ i~ ~,°,t --1,:~ C,;r~ner, ~?ddress and Pr,a~c: .~,~~ _ r f• ',.~ . ~ ,_~~'•~ f r _ -- r architect, ~'.ddress ar~d i`'~ane: . ~,% Legal uescri~tipn: Lot Cprrr~ents: i• iviption h~. Seconded E~y: Surnmar~r: Qate 81pck 1 Filincd ~ ~ - ~ ~ ~ ~ r. Zpre design B~~~e~ Beard r ,. ~ ~~ ~PPRv``~!L `, ~, :~~ f. C SR~'PROVl~,L **REVISED 6/19~9I** DESIGN REVIEW BOARD AGENDA JUNE 19, 1991 3:00 P.M. y7JRKSES$ION: 10:04 A.M. SITE VISITS: 1:00 P.M, PUBT~IC HEARING: 3:00 D,M. WORKSESSIO'~ - lU;~i`i A.?'-~.: iot.:'~ of 'Mail Streetscape P lar~ - Balking tou*~ cf Lionshead to East ;Tillage, over~~ie~~a of project and revie.s7 of materials. Addresses the general area from E, Lionshead Cir. to Ford Park, and inLludes =~+ . ~readow ur . , F: , !Meade=~ Lr . , ~~Ti llow Bridge Rd., Gore Greek Dr., Vail Valley Dr., Brid;~e St., and Hansen Rand Road, SITE VISyTS - 1 ; ~'0 P.P~.:, 1 ABC School - i.29 Mountain Be31 Road 2 King Resid. - 14$1 Aspen Grove Vane 3 Chamonix SDD - 2211 N Frontage Road 4 Timber Creek - 2883 Kinnickinnick Road 5 Hernreich -2694 Larkspur Court 5 Breeze Ski Rentals - 641 W Lionshead Circle i Lionshead Mini Golf - Base of Born Free Express 8 Curtin/Hill - 244 Wall Street 9 Hubcab Brewery - 143 E Meadow Drive 1~ Gastoff Gramshammer - 231 Bridge Street 11 Bridge Street Charlie's -- 344 Bridge Street 12 Himelfarla/Helmering - 4269 E Nugget Lana AGENDA - ~ ; 0 0 P . NI . , 1 . Chamonix SDD ,JK~ Kr 2211 ~~ . Frontage Road/Let 1, Bi oc~ A, Vail Das Schone 3rd i ding, a resabdi;~i5ion or Vail Das Schvne 1st ~'i ling ?~~0't'IOt~: George Lam=b SL~^~~]B: Pat Herr?ngton VOTE; ~1-0 Approved ~ai~h conditions. • 2. Gateway Plaza - Vail Road sidewalk modifications to approved plans. Block 5D, Vail Village 1St MOTION: George Lamb SECOND: VOTE: 9-0 TABLED TO JULY 3RD MEETING. (east side), MM 12 Vail RoadlLot N, Pat Herrington 3. Ford Amphitheater - Signage/Banners BR 530 Frontage Road East MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 4. Kravis - Outdoor lighting AK 424 Forest RoadlLot 4, Block 1, Vail Village 3rd MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 TABLED TO JULY 17TH MEETING. 5. Castoff Gramshammer _ Tree replacement AK 231 Bridge StlLots H & T, Block 5B, Vail Village 1st MOTION: George Lamb SECOND: Ludwig Kurz VOTE: 3-0 Three of the six existing trees will be cut down. Applicant wi11 plant three other trees in place of the three existing trees. Species and size to be determined by July 17, 1991. 6. Breeze Ski Rentals - Determination regarding JK/MM number of pedestrian frontages adjacent to the business. Montaneros Commercial Condominium Unit #100, 691 V+T. Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Filing MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Number of frontages is one. Applicant in currently entitled to one sign. Recommend that the applicant proceed thought the variance procedure. • • n '7, King Resicter.ce - Landscape re~yisicn BR 141 Asper. Grove Ln.ILct 1, Flock 2, L~c:~sridge Fi_lir:g #~ I~li.'"IO'Pd : George iamb SECONJ : Pat Her. r~ngtcn L~O~'.E ; ~-0 Consent approved. 8. Curtin; Hill -Exterior ~inishas Bx Cne ;fail Place. 244 ~~7ai1 Street/Lot C2 ~ C3; Block 5C, v'ail Vi1J.age let '?(~':7CrTTC~]: j~ George i:ari:b ~ECCTvB: Pat Her}-is.gt on V ~~L 'Y'~ Consent approved, ~. ~~1111 L-t S.+l - ~~~lU~+r-a~~•J 1~ V~ ~al ~ti~-'L+ +-'+' 269 Larkspur C~1.irt/Lets 1 ~ 2, Block 1, Irterm•ous tail: ~~IOi IGI~ ; Gecr~~e Lamb SL'CO'_:;~, : Lud,L=i~ Rurz tIOmE : 3-0 Approved. 10. 3~'idge Street Charlie's --- Exterio~' Color Chan;e BFt 3G4 Bridge Sreet I~~OTT0~1 : SECC•s~~~ : ~.~0•T TABLEB TO yi]L~ 3R1 i~lEETI~<~, 1? . Li'~thcuse Lodge - ~~ended application, roof and v~ki'BR tri;n color chances. 555 E. Lions~icad Cizcle MO•~ T~~1 ; Georg° La~+.b SECC~TB : Pao Herr ir;gt un Vu~TE : 4-G Consent approval. ~ri?~ colors .5-l? be presented a~~ a later time. 12. Hubcap -- Exterior Linisn A~ 143 E , s~eadcw7 ~ri:~e,%Cressrcads Mall T:OTTO~d : George Lamb SECC~7J : LudS~Ji ~ K-arz " ~IGTE : 3-0 Approved proposal tc hang six rub~~aps vr: exterior of Crossroads Building. 13. Lionshead Miniature Golf - New Miniature Golf AK Course, base of Born Free Express/Parcel C & D, Vail Lionshead 1st MOTION: Ludwig Kurz SECOND: George Lamb VOTE: 3-0 Approved. 19. Atkins Residence -New Single Family Residence AK 2972 Bellflower/Lot 14, Block 6, Intermountain MOTION; George Lamb SECOND: Ludwig Kurz VOTE: 3-0 Approved. 15. ABC School - BermiRelandscaping SM 129 Mountain Bell RoadCUnplatted MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 16. Rumford - Addition SM 675 Forest Road/Lot A, Block 2, Vail Village 6th • MOTION: George Lamb SECOND: Ludwig Kurz VOTE: 3-0 Approved with condition. 17. Barton - Addition JK/SM 2019 Chamonix Drive/Lot 29, Buffeter Creek Subdivision MOTION: George Lamb SECOND: Ludwig Kurz VOTE: 3-0 Approved with conditions: 1. Must pave driveway according to Town of Vail standards. 2. If existing spruce dies at least 2 new spruces with the combined height of the existing tree must be installed. * DRB recommends that the utility lines be undergrounded. However, This is not a condition of the approval. • l 18 . 'r?ircal farb,'s-Ieimering -~ 2~~ ?addition 425 fast Ivucget Lane/Lot ~A, Resub and il, Psighorn Estates Iv1~J1^~~I~: SECO?~~D c~;'SM cf Lots ~ 0 v~^~: 1~. T'irt~ber Creek _ .~dditior~ cif Garage 1283 ~in.~ickinnick Rcad,'Lct 8; Block ~, Scrim and Tennis M~TZ~~T; S~coN~: TSB: ED m~ ~3UL~' 3R3 THEE ~''1~ . ~ J MEMBERS PRESwNT: ti ~F 1~ v~~~. I~EP~BERS ~B :ENT : Ned Gwathm-cy S:"~erry DGr:~~ard George Larr~:~a Pa`U He crir:gton Ludwig Kurz {PEC) STAF^ APPRCV~=,S: Lot 9 -- :~~ulhearn uro~ap - Changes rc apprc;je pia:-:. LOt ~, ~leri L., Gn S~~ndial, Parcel ~~ - Co_or Chaa;ge. Parcel f~, Sundsal. Phase ,- `I'h~: Val' era I? Mitigation Design - Create debris fio~a bermldito~ . The ~1~alley, phase II Letven 250 reguest -- t~cve 1 ^ s . ~ . from: diir~ room to entrs> . rat 2, Tai 1 Village 3rd Ballestexcs Dormer - add dormer tc Unit #E-310. Nart:~~~,*oocs Uon;~e . SimbaRlir] `°' .:~?:ClO~Llre Oi ~rF'.eZeTrla~% «nd C42:~TB~51.Onv~ SU~rag~ Sp %e into a conferenve;r.~eeti~~?g room of approx. 106 sg, ft. Lots ~ - i0, B1ock C, Lions Ridge Subdi~risic._~ Village cn Bighorn - PrpdifiC~tiJI7s to Lni~_ #~~, expanded dining rGOrn and ; raster bedroom, deck addition ~ =,~aindoc~~ changes . Lot. 1, Bicc'~c ~, Bighorn 3rd ~rt~~~c~ ~-p~licaiian :r--- / ~ ~~1 ~ ~ ~ ~~-~?~_~-~ ? 4 ~%~~r~' 1. ~. ~~ ~re,ject Name: /~ Project Descr ption: ~~~ f 3 yU`-~ =:~ ~,. ~ E~ -tic. ~ ~`~_ ~ "~ ~~_> ~~ ~r ,~ ,. ,~'~~e.~,~~.~ C c_ ~~~'~''- `L~ t'7~e~ ~~. ~,i~(l~., ~ ~ LL~~> `} ~-~ ~ f_,': t~r~ e~ ~ C ~F3'I Gar~tact Person any Phone 3 J J hrC'llteCt, AC.'areSS ~ilG P'I~ne: P `f t_egal D?scr!pt~on~ i_ot / Beck Filing Zore Garnrnents: i• ~e~ign review Board a t e ---- _. ;~~.~ //I e. -~~ ., f J.L! 1~16t1f3i, G;~': ~~ l:J ~j ~ecor5dee b d ~'~ ~ ~--L'64-~ r~L~ti pl ~, ~ ~~ ~PPROV~:L DiSRPPRvVA'~. j!J r5-t Citi2 ry: _ ~.. ~ ~ ~ i ,~ ` .~ ~ ~f Town Pl~r~rer ^ St~:fr AnnrcVai Date: ~~ ~f ~~ ~/ ~ ~ ~r~ec~ ~,~~~ieati~s~ Gate 1 ` ~r~ect dame: ~< ~`~ ~ ~~~ !2 ,rJ l ~~ ~ C~t~. ,~ ~1(,'i. y~-;t l:~tr~-!:-' / .; Project CescriPtion: !~ t~~dt'~/~r"i7!<'. ~E'~v~-~'~ t`c fe:~) lt~,e,r ~l .;~ s fi`t' r. ~~ _~f ~ ~' ~~ Ga^tact Person arG Prcone - ~ ~ts,~, fr_< (~ b ` fs.,r,~ez - t ~x _ Lit r~~ z: <. _r Owrner, Address and Phone: Arc~itec!, Address and P€~one: Leya: GescripEion: ~ of C'/! / rfi?1 ! Cem menu: F -~ ~-- -~~-- m. ,~ / ~f Fl. r r't=tCl~ i' l~ t'f c'~"fi f, !. i[ ~, t _ I f k ~ ~ ~l f.:~; ~ff, ~-ii.~i! Zany: ~~` ~ Bloc .f~ .Lai Fi' r~ 'ja'i. /`c , (f . Bei~r~ Rer~ier~v Board Gate _ ~ ~ ~ ` . ~~ Se:.onded b~~_ (.f~o~~~~1- ~~~fir_1` `~~~- - ~-~_ A P:~OVA~ ^`~~ ~ ~ DISAPrRO'JAL R !J ~~ ) ~f?rdJ f-F--~~~/ =~:I~ ~ ~J.'y°.vl ?~~ [ ~~~~ ~ ~lpri C'~'~ --' /__+ f` __r ''C~:.f. lY !4/- .. ~~i ~~%~-.~ s . {~~ _.e °.~ ~'~ !~ _4 ~~_6~~4 .r~ Y !' l~9 _j~~ a _ -~i,~~ _ ~ /Gr'.:.~ /P C f ~`fr~ ~ . ~. ~ ~Unlmar~: !ff ~- ( %i _ ~ 7 a~_~..~(~ !' ,Cr-.~~ ! Sai i /~ /.~~ (1.±(.'!-'( ~ '/) ~~e' r 7 jC .r ~~_ at't ! ~`.,,r l,(""/;.F'- /i'~'r."I ~7~ 'r ~f.! ~~~ / IF i °d://` ~~~-'' ~ '/ "`.,r-j'`-- _~l ~ r~ a~ - ~e.-1','° !/ ! ~_c rf ~ t,("r"'~ t1)?il _ ~'~ J-f~ r cif/~ )! ii.: i_ r 11/l. _._ 1 r~~ T f_ . <{ ~, 6 /d f `,' l~c~.vn alar~rer ~ ^ ctaf~ Apl~rov«I cit... ~°f ~~~~~ ~~~'Ji~e C7~QV:t ~roject i~amz: _~~/r C~~~ e) _~ ~•a /\ . i~~.~'~: = CfM Pr[FjEC°. DeSGriptlan: _. '1 ~~/3r"mF~i,.,~a~~.fP•.,-s ilf~!-7~r-~u~ ~~f? /jl,lln ''L=. i~~( 2~S~YiL~~Gr,?rc_- ~ '`z=`~°s~~i Contact P2rsan anti Pone Ca51ner, ~cdrass and Phore: 1 i~' ~~ `\:,` ~\t .14. `~.'.~ . '~_~ '~ ' ,~ ~ ` ~ i ~, ' 1 ~. ~ . ' ~,~ l ~ , . ~rcl~citact, r~edr2ss ar.C Phone: i_egal D6scriptlon: Lot ~icck FI' ng ,Zang Comments: t~"'`'~~ ~J1I, .~,~~w~f +~.~~~ ~c..~1'.~~C~ ~ ~C~ ~lc,. /Q(1 ~'';/~/~m('•~~:,~.. ~~sig~i ~e~ie~ hoard ~~_~ ~~~l`1~ `)l ~locicn b;r: Sl~mr-na~41: r~ .~ ~~~ - ~~~.Ptt~cr~~'~ APPROL~r~L CiSF~PPRCsJR- . ~, / ~ `2 ~w~_..T: v.~l~F'L/w~l /f .~ l"I /2 ~/~.L: ~G~..n ..'i~ ~ ~+l F.'1 ~_ ~~~ ~ _ ,,~ 0111 , ti _. ftTi1.."'c~~ P~ ~ _~`~ : /,~""~ y L,~liL~L _'R- ~ /i' / ~~ ~~ o /~~j ,~ ~J . T;~,vr~ F~~r~i~~r _. ?~ L 5tat` !?ppraval Cr~ty ~~~~~~: ~i{~~~i%~~i~Cl ~: r / ~ l date _-_~ Praiect Barrie: ~ -- Froje~t Description: -. ---- Q~ntact Parson an~+ Prone \~~ ~ - --~-L~2 .7~' t ~a ~` ~~`jI~( __~ _ _ _T C?~•sner, G,d~ress and Phone: ~.rehitec`, Redress and Phone: ..... ----- --- --- egai GescriptiarE: L~. Block Fi'~irg __.-- -_. .- -- ,Zone ~~~'_ Fx~ „~. _.,~;~ ~. . ~~s€g~ F~~~i~~~ ~~ard ~ Date __ _ __ ~~ ib9otion by: `z. Gam;%J~-~ Seconded dy: ~``-.~-~'. '~ ~. ~ ~~~ ~,,~~,'1 ~~ ~ ~PPP,Q~fr~z. DISAPPF?C~VRL / . ~.~ a - -~ ~ - C ~' ~-~ C' V l` Summary: ~~ -~ ~ _ ~..---- -- l ~ ..~ .? ~ ~ --- - ~.~ Vie.-,~ ~ ~ ~ ~v `~ ~ Te4nn Planner ^ 51aff .`,;,prov~:l ~f mate: ~r®e~t ~~~i~~at~~~ ~. ~ ~ i ~raject Name: `- ~ ` //, Pr©ject ~~eser;pttor~: ~4. -~! (~tf= _~~ '""'~Z.) ~~ ~- -~ - / '~ i.--- ff dontact Person and F'har~e __ ~~~`~~`=-~ °' ~'`-:~~`~~ ' dv4fner, F;adress and P?~one: Arcriteet, F~ddrass and ?hane. Legg! Descrinti~n: got ,Buck ~ilino Zone ~.~--~~: ~ ~ ~_.; ~~ ;~ ~ .~..~.- ~ ~. ~, -.,ter ,~-~..~~.~. F~ ~ ~ ~~ <~-~~~~f~ -~t, I/~ . ~~sign F~e~iew ward :ic;tian b~.: ~. Cate _ ._ CiSAF'PR~J~JA'- Secanr'.ed b° ~FPRdVF;°_ _,. Sum:~r~arr: . "~ +(. /~ -,.~ r .~ ~/~! '• Tct~•n Planer Date: ~ / / ~ 0 ~' ~ r ~ Scarf l~ppraval ~~ ~ra~~~~ ~~iicatia~ ~~ ou~e ~' ~ ~ / ~ ~ ~ Fr~;ject DBSCriFtiCfl: ~ /`mil:'` +:';~ ,./<.~~'`--_~:t~~i/~ -z-.~_.d°' r°f ~ ~ J _ Contact Fers~r~ anti ~E1one ~.' //~.~,-.~f~-'L~ ~~' ;)-°~~C~~'Z~-7/ ~~,: ~ j~_ ~^ Z ~~, ,!/ C?vvner. ncdrsss and Phone: Arc'~tect, Address and PFor~e: Legal C}escripticn: ! of @IDCk Fiii~~ ZDne ~. iDrr,mer~tG: ~j~~ ~~:~ :I"-t`' fy_µ ~- ~ I i~ ~C' ~ C' c? ~ ~ <_' -~ ~ T ~ / l r.~ ~ ~: -t 1 ~ ~ 1~! L . -C:_e". f~ / / ~ ,s i ~3e~ig~ Bev~ev~ Bawd ,1 ~ L~'GiE i:44gtier i7,~: L- G~~ Seconded ~~~; C`~~..f/~ ;_.`) ~!t- APPR~.,4f6,'_ t~ SA~PROVAL `~ ~~ -- - 5urnrnar}: ~. ~ To..•n ~I~r.~er Sfaf ANpro~r.l gate: ~ o ~.s.~ f ~:~~~ec# ~~a~EECatia~ ,_ < ~` fi ~~ Da.e ri ,~1` _ ,.~ ~ - ; ~ I _ ~t'Cl2Ct Na'ii6: [~,~ a % f~ !1 '~~..~~~i'.21 F°_-/.% >` ~ ` _ ~ t~-f;J~ ~.__ _. Project Qese~iptian: ~,r'~i~ ~ ~ - - _: ' r Contact ?erscn and Prcne ~~t'~'`f_::~t_ (_. ~ a ~i~~~ ~ l ).i ~ 111 +~ 1:~.+ ,.~ ~\ ~~\ \' ` , Cvfrer; Ad~Jress arC Pone: Arc~ritect, Acaress and Phone: t ~ 1 ~~~r. ~12GIE L ;%~-,~.~~ ! ~" - -i Filing Zcne . o Lagal Qeseription: ~GrTlt!ler!tS: ~e~ign F~ev~e-n~ ~ca+r`ci / , // J[/ `°"-~/ ~ / G~ / rare ! _. ,/ ~.. ~-u.~e~~d ~i ~hotion ~f: ~ecanded oy: _ . ....~ r - ~,~._ . , ,: - ~Pp~d~fAL ~ .,__~ :'15APFP0'JAt.. -._ - ~. - _ _ _ j - _ k'~ ~ ~ ~ `~ ~ ~, ~~ t ~ ' ,y-Jp ~ S c> :J &'i 3~~S+l.f~ 'P L ~ ,//,,,r -'i' ~"~, t_ ~-.F- jJ ~ f E'~~° c~ ( ~,~!' 6: / ~ -J/ /~ l~'{ i ~f~~f_ ! ~r r / ,!; : S f.~~ -'1. c'-7~'~r .r7, ~ L~ -__ 1~ ~UiTI !iI CF ~ . I. _7. ~ ~ ' 6 ~ ' 1; ~~//~ ~ 1 ~ - ,% 'w ~/ ~{., / y% I ~ ~ .. ~ sr e ~ ; ; ,~ 71 f{_ ~. ~ ~ P ,~~L f~ 1 l' ,~. c i , ~ °- • ., t~r..:.-r : ~ - /y F.. ~ L Jf <<' : J qq~ r '`~ / Toti:n °lar;rr~r ~ Staf A pproval ~, y~ !,f ~ ~` ~E - r ~ o' irate: ~ „ i -- • j ~ / Y ~raject i:!ame: /1~~ -~'.;l'~~La P~~,~" l~r, ~A fr'r+'/:?~!~ ~ i f~ ~~/ a I/7~.~~.''s.. z'`.;i"(../ f` fI~[.;~l,~'C` /. •~ 4~ ~'~l-t' ~I/ ..~~c'~'~i l~ - i.[ ~- Prajeci ~escri~ticn: ~ ~ / e ~ _ _._ Contact Person and Phon? ~~'?.%• < !a E' ~ ,ill <~-~~'~i~r ~~C.,- `re C3vrrer, F~ddress ar~d Phone: (~ ~ _ [~ ~ ~`EAri r .., V ~ V~ Arci~~:eet, address and Phone: ~,~ 4. ~'~ ~ ~ ~.. 'F.• ~III"1 .~ ~ ,tee Legal ©escript;or~: Lot ~ .,ck ~ Gar~rner~ts: I• ®~~i~n ~~~i~~ B~card J~~~lr aate -- ~~ ~~ Ma _ i.~tation h ~ / ,-~ Seconded b~;~: ~"~1/d2 _ -__ ., ,~~FtPPPOVAL r 5iimrnar,E: ~• ` ~°~ ~/ Tc°.+v°n lar:ner irate: r C `71SAPP'iC'~/F.L ^ 5i~iff Apprcva! ~r~~e~~ ~~~~"€cati~;'~ r/ P Ct rJate ~~' !J~ ~raject dame: ~-~',~,~" ~ !,r ~, ~~1~d-'t~ ~1 / .~~ j~ / ~'~ i'raject Des~ripfian: ,:~~?..3 ~1 ~vZ~' ~~ d ,~`!~~''l°"(._~? ~~~i: ~~Lr', i•r _-.^ P , _ j ,J C tact Person and Phone ~•~~~?~ ~~,~ff' ~ ,.~- "~ ~/~ ~~ , C:~fner, address and Pnone: ~~~1` ~C7r~~i~t S' ~° ~'Jt c~ (S/ ,~rchiteci, Address and P~~~ne: Legaf GescriNtion: Lot CoElln~tr*1t5: i• 1~lotion i/;': Seconded ~`.': ~~~JY~~ ....._~` ~PPRGtI.AL -~ Su~-nrr~ar.~: 1 - ` /" ~ ~ ~ ~~ E3iock ~ F~lir~ . /J~i .~f .,'",~7i'.:/"s r'~Gv(o-S~ ~~?~ ~~~~~~ F~~~i~~r BGarci ,~ ~- ~7 _~~~~~ l i9~. /~ ~ ~rV f Date ~~.~~~~~ d [;ate ~ r(1 % b'~ f~~~. L ~ISi~FFFiOVP,L Q Staff A.~provr' Rrc~j~~~ ~~~i4~~i~~ Cate .____.. ,~ r ,. ~'~ ~,~~ ~_r ~~~, ~'1 ~~ ; ~?~~r'/`' ~ .~ ~ ~~ nit. ~~~~ ~t (~,i ;j~ ~~.. Project game: " - ,, . ~., r. , i l ~ 1. ~ ,,~ ! - ¢j( Ir /~1 //~~ Pr©ject sescri~tion: ,~ r1I1y~~„ ~! /,.~,~'I ~ t , I,~j~ .` ~Y ----- k~ ~ .}I Go~.tact PErsc~r and Phone r. ~~ ,~ Cvrner, P-.ddress a,~c Phone: ~, , ~ i 1. - - _~_ _..~__ lei rl,~ ;.,1 -~- ~~~,t,/i, i~rc"iiOCt. AeiGr2ss aid ?bore: _egai Descri,~tien: I_et ~ ~ . - ~loc'< Fiii,ig _ -- Comments: {.•~ 1 /ii . Zone f._ Y,! ~_.. ~ . ~ _ y ti ,,I -~ ~ t ~~~bgn ~er~i~~,r ~oar~ ,, Crate _.. -- -- - ---.. - - iJ ,;-.. , ~ ~.. I'~iotion by: ~- ji~:i~"1Y ~~~~ ~" c Secandec~` las: `j' ~, li ~0. ~. I' -- AFPPO`JR.~ }-. DIS~tPPROVRI_ ` r / ,,~ ~/ ~~ ,. , ~.t~ ~ r. A, ~ 1` 1 f ~ ~ 1v 1~4 ~~ ~~ ~l L ~~ l ~~~.~1_1~ c..` j~~ ~ ~~1~. ~%~ t _~~-_., ~ ~`_ "~~~1'f i/\•'"Y~~`~ - ~-- ~1-~~~-_ ,. ~ .~ -~ i ~ .. ~ r 4 .~ I J i e~ ~ / / { 0 ' p d ". r 1 fRF rl / ~ s II i V L ,~ ~~/i.. r ~, i .~ -1 r- __~--r~,l. ti 4 t`~~ (` /! ~ f / f~•~I `i~i~ ,~ l~ ~.`/t~! ~. 4,i(~S~I~~i_'vl ~~~\'•.::~1- t1 ~;~ ~- ~ i' 1 ,_ f 1 i I rot~~n °ianner`' ^ St~:tt A?;~ruv~: Hate: ~ ~! ~ ~~~~~~~ ~~ ,~ ~R ~~~~~~~ ~~~:E~~~~~~ ~roject 'Name: ~~ U~~1~,, ~~~ ~' (i~ ~~=f.~3 ~~~~JJt~ (~~ K ~ n1JI Project Description: r,c-~l~~t ~ l ~~.~ l ~i ~~=c~'~~r ~rl ~'~i~~ G~"fz, ~ ~ ~~t.~~~-tom Contact Parson arc! ?hcne " Owner, A~~+r~ss and °hane: F,renitec:, Ac~Uress and Pnone: Lec~a~ Description: Lot ~ >, ,#7 ~? ~ ~~- ~ ~ 1 1 Da'e r i ~ ~ .~r Bic:.k ' ~~ Film ~ iI,'1,~1 ~ ~J I 1 ~ ~j ~1r l C„~4~ , Zone ~r ~~ J I} 4 C'~~.f (,'~ ~ ~.(.' , ~._~ ~f ~~ ( % ~" C~4.(-irk - ~ ~ -'~) ~ ~ `.' , l f' ~esi~n ~~vi~w ~aa~d ,:~~ " _ t1 ~:"cat€cn wy: ` ~ ` ,~~~~~~ ~~ ~. FF i} l fr~ I 1 I ~ ~~ S°CQ~CtBCt 'Q`.' J ~ Il 4 ! /'~ 4r ~1 ~ APPROVAL • ~~ ~ ~ ~~" ~i ~~~~. 7; l~~ . 1~~ 1 ~~,1 ~I,~I/~. ~ ~ I ~J l~/~ I~ ~f 'Il 4:(/l~J~ tl~L~ ~ - ~- , / ~ J~ Sr~mmary: ~~~lr r~.)~ ~~ ~~?~ ~~ f /1 J\ ~"' ~._i Date ~15APPROV:~L _ _, ~ j - ~~ `l X71 ~ C! ~"~ '%l r,'t ~%~~~ f',, c° ~~ !. i'('.i' i 1 ~~. ~- ~ t~ r_~n t, J ~ -~ . ~il ~ _ r, ' ~ jt1,( ' ~ i ~ , (: l~ -,{'~1 Yr~~f-~~ ,~ ~~--~°l%1 r~'~;~ ~ `'~}l:~i, - l ^ ~~ ~ l.l~"~~;;`1, 4~ " ,- ~ .l:~~~'_~,'` ~ 'y' '~ f` I I ` ~- ~ ~~ ~,_ ~ 1,4~,~;ice ~ , l_~?_:~ ~,~,-_ f/ Tcv~r ?la^rer ^ Staff Au•arcva~ i ~~ _u r` ~r~~~~~ ~i,~r~l€G~I~i~~€ D3*U ~ ` roleCf PVvrFl e: ~ ..°~~'~ ~~~ ~ J ~I.: ~4 ~~~~~ ~. .~~ - \ I,~:~ill7~~ l~l~~~'~r,~' f[.( ~k.:'i~l`~~ _-_.. ' 1 ~ ~ 1 II ~ / 'f Pra}ect Description: ~,~ ~ ~ ~, ^,Gnt3ct Per-scn ai~c Phone ~ ~ ~ ~~ K. ~~ ~~ ~~'s~~~~' ~ ~_. ~~Nne', Address anti PE~ane: ~~~1 ~~~~~~-~1~?~ Architect, Address and Phone: )~,l.~~E~f ~~ ~'~~~ ~ ~`,~ ~e~al Qascript:on: Lct ~~~rr:rr;ents: flloticn ~~;r: ~ecanded by `~ ~~./ ~1DCk r~,.l.i['Ca.~ ~~ ! ~~~~~~~ ~ - Zone } 1 ~~; e~~. ~. ~~~'~i~ i ' fi ~. ~~ APPRQlI.~;L' .~ ~, QiQ~ic~~ ~~~fi~`w ~Qa~d ~ (~.(1 ~' Case - (,JV 4 ,~ ~`'1_ ~ ~ __ D!SA~PRO~IAL -_ _ _ - -- ( ( 5 1~~ 1 ~,1 L Sun~mart,~~~° ~~{~~tl`t~`~.~ t~,~'4~('~;~arlf'~ ('~~• ~Jf1 ., V:1lf~~~ a~~'~~~Tl ,. __- _ -__ _ 4 ~ . ~ ~f ~? X11 {~~~'~ ~1~^^,~~:~1(Tf~~i~ ~~s .,~1'~.~ ~.,~r~.~~ ~~~~~~~, - ._ - ~_ ___ ~a. ~~ ~~ §"$1 ~i'~~r~~,~~i!'~r3 /'~~C~~L`~; •~~:i ~tf~ ~ ~~1~~'~~ • ~'~"~'r~_- ~~s'~- ••-~~~"~~1~ `[~~~~f C~_ _ .__ ~_~~~~~~>>.t I~~l~~ ~~t~. ~~~~YY1~ r~~. ~~ ~~ . ~ !tl~,~. ~~~~~~~`~~1~J'v~~~'a'~3~~,~It~CP:.!' .~~~ '~~~Ff~Y ~. ~ f _ ~ ~ t~ • ~wr Pl~nre [~ Siuff r;~;~rovai ~~ ~L,tJL.~~ .. te: Da FUBLTC NOTICE ?dOTICE IS HEREBY GIVEN that the Design, Revie~? Board of the ToERan of Vail will held a public hearing an ::.ane 19, 1981 at 3:00 B.P~1, in the Tcwii oaf Vail ~;unicipal Building. '~iuhcap - Exterior finish 143 E. F~eadow Dr:~~e~Crossroacis 3~~]all ABC Lionshead Niniatuze Gclf -New I~4iniature Golf Course hK Base cf Born Free Express,%Parcel C & B, `wail Lianshead 1.st Atkins Residence - ~leca Single Family Residence AK Family. 2972 Bellflower; Lct 14; Block ~, Ircterrtountain Kravis - Outdccr lighting A~: 424 Forest Road!Lct 4, Block 1, mail Village 3rd Gate~•ray Playa -- Vail Road sideE~alk (east side) r r~~M madi~icatians to approaed plans. 12 Vaii Road/Lot ~:~ Block ~~, Vail Pillage 1st Streetscape - (E-dORKSESSION) Over~~ie.~° of project and M~afSM reviev~F cf materials. Addresses the r~eneral area fraa~, E. Lianshead Cir, to Ford Park, and includes srd . ty]eadcs~a Fir . , E . Meadow L~r. t T~7illow Bridge Ra., Gore Creek Lr., Vail VaileY Dr ., Bridge St., ar~d Hanson Ranch Rd. Stork - Seecnd Unit Addatic_r: MM ZEDS Day=os Trail~Lot 23, Block B, ~~ail Ridge Kang Residence - Landscape _re~,-isic=l BR X481 As~e:~ Grope Lane/Lot 1, Ba:eck 2~ I,icnsridge Filrta ~4 Curti~~E call ~- Exterior finishes BR bne nail Blace. 244 in~all Street~Lot C2 ~ C?, Block 5CE Vail Village 1st Ford `hI"i~phi theater --• Signage~Ban::ers ~3Q Frontage F.ead East BR Hernreich - Separation €~ garage BR 294 Larkspur CaurtCLats 1 & 2~ Block 1, intermaantain ABC Schc~cl - Berm; RetandGeaping 129 Mountain Bell Rcadf=u::piatted SM Timmer %reek - Additiori of Garage SM 288? Kinnickinnick Rcad~ ?~u•t ~ ~ Black 4, ~ntern~auntai n S.•.~i m and Tennis • Freeze ,~ki Rentals -- S~~n Var~.ance Jfi .°~ontaneros Cflm:~ercial ~on~iominium Unit #1GG, 641 W. Lionsl~ead Circle/Part of Lot ~, Block 1, Vail Lionshead 3rd F~ilir?g Barton -- Addition JK 2Ji~ Chamo::ix nris~e%Lot 2~, Baf-e~ir Tureen ~t~bd~.vision CYaamonix ~Dn JK 2271 ~. Frontage RoadlLot i, Block ~, Vail Das ~oriona 3rd Fi?irg, a res3.~bdivisa.on of Vail Das Schone 1s4 Filing Hir~elfar'.~1=-~elmer s n~ - L5~ Ar3dition ;~Fi 4269 East l1'ugg~t LanelLot 4A, Res~:b_ or Lott 10 & ii, ~ i ~r1orl'; Estat Ps *And all gabled -items from previous Meatin~rs, The app' ication and ~.nforrr~ation abo-}'~ t~~e r~ropos3ls are; available in the zoning administrator's office during regu~.ar office hours fox public inspection. TO?n~N OF V~TL COMMUNITY DESIELODNiENT DEPARm1~1E~Ii Published in the V_~il Trail o:~ ~~un2 ;~4, 191 , ~J DESIGN REVIEW BOARD AGENDA JOLY 3, 1991 REVISED 7J3I91 3:flfl P.M. SITE VISITS l:flfl P.M. 1 Mindlin - 80fl Potata Patoh Drive 2 Hillside Condo. - 1819-1839 Meadow Ridge Road 3 Stork - 25flS Davos Tram 4 Mammoth Video - 1fl29 S Frontage Rd./Casoade Crossing 5 Vail Glo Lodge - 7fl1 West L~.onshead Circle 6 Gateway Plaza - 12 Vail Road 7 Vail Raad Sidewalk - S. Frontage Road to Meadow Drive $ Widow Bridge - Lacated an Willow Bridge Road, between the Village Center Condominiums and the Sitzmark Lodge 9 Snow Dump, Tawn of Vail - 1289 Vai:. Valley Drive 1~J Kaiser/Ha~.l - 4915 Juniper Lane li ~3eima:~ Resid. - 5134 Grouse Lane • ..}:~. ~:-$ 23G 1-' ~~1 D 11 1 , Store - ?~dditiol: o?~ secondary unit carer the ~xistin~ MM ~~.rage . L6~5 Davos ~:rail~Lct 2 5, Block B, t~ai1 Riu,~e MGTIt~N : Geese Lamb SEC~?t~TD : ?gat Herrir~gt on - ~rCTE : ~---~ Consent ~pprcj: a~ . 2. ~ille~r Bridge - Replacement of e~-stinn str~acLure. MM Located cn Willo.~ Brid~'e Road, between ts~e ~.'illage Center Cc~ndcminiams and the Sitzmark Lodge. r~C~rDN: Geflrge Lamb SLC'CND: Fat Herringtoza 4DTE; 5_~ TABLED TtJ JIILY 17TH MEETING '~ . Gateway plaza - ;Jail. Road sidewalk mod?fications to approved plans. Block 5D, =Jail Y,Tillage '.st MC`~'ICN: George Lamb SEt;OND: ~J^TE . 5-0 ~pproY~ted. with ccnd:~ bons , {east side), MM 12 Nail Rcad;'Lot ~., ?at Herrington • 4. Vail Road Sidewalk, west side from South Frontage Road to Meadow Drive MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved with conditions. Change 5. Snow Dump - Town of Vail ~{ 1289 Vail Valley Drive. IInplatted parcel generally located west of the Town of Vail Public Works Shops MOTION: George Lamb SECOND: Chuck Crist VOTE : 4-0-1 Approved. Sherry Dorward abstained. 5. Super Star Studios - Appeal of a staff interpretation BR concerning the use of a display box. 253 East Gore Creek Drive/Lots C, D, E, Block 5, Vail Village 1st Filing MOTION: George Lamb SECOND: Pat Herrington VOTE: 2-3 :7 Motion was to uphold staff decision. Vote failed. Therefore, Super Star is permitted to have a display box . Design Review Board defined the content of the display • box as follows: Name can be 1/2 sq. ft., remainder of sign for current music available. 7. Bridge Street Charlie~s - Exterior Color 304 Bridge Street/Red Lion Building MOTION: Pat Herrington SECOND: Sherry VOTE: 5-0 Approved $. Breeze Ski Rentals - Sign Variance Montaneros Commercial Condominium Unit Lionshead Circle/Part of Lot 8, Block 1, 3rd Filing MOTION: SECOND: TABLED Dorward AK BR JK #100, 691 West Vail Lionshead VOTE: • 3. L3.~nd - Landscape Plan ~K ~~3 Beaver Dam RoadiLot 4, Block 9, 'trail Village 3rd i~Or~'ION : SECOND ; ~TGTE TABLED '~0. Hi llside Ccr~do. - rteplaoe R,etainirl~ Wa~.~. AK 1$19-?839 Meadow Ride Road,LOts 1?-14, Buffeter CreeX Subdivision MOTTCN: ~=eorge Larib SEv~F~D: Pat F?erringten '~7OTE ; 5-0 ~ppro:>e~i =Nith conditions , L~ 11. Oberloi:.x - Sercndary unit or, a lot less than 15,000 SM s~. it. 2656 Davos Trail;~Lot 3, Block 3, ~,~ail Ridge M~~T I ON ; 7ECGFID : VOTE TABLED TO JULY 17TH MEETING. 12. Fub~:ap -- ?~7ew Sign SM 1~3 Meadow Drive%Crossroads Mall i~OTaC~ : SECfl?~'D : MOTE, TABLED TO JULY 17TH MEETING, 13. Kaiser/Hall - Changes to approved plan ,~~i ~] 916 ,~uniper LanelLOt 3, Block 5, ?3ighorn Subdivision 5t1~ .Addition l!7CT1oN : ~eox~e Lamb ~ECOYJD : Pat Berri ngtor ~7OTE : 5_f C~?iser~} ?~pFroved. 1~. ~'imber Creek -Addition of Garage 2883 Kirnickinnick Road.;'L; t ~, Block ~, Swiri'~ and T£',nz~i s M0~'1-fl~~r ; SECt~i~D TABLED S IYI Interzrc~untai:? VOTE ; ~~ U 15. Montaneros Condominiums, Unit #911 - 250 request BR `~ 641 West Lionshead Circle MOTION; George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent Approved 16. Mammoth Video - New Sign gR 1029 South Frontage Road/Cascade Crossing MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-D Consent Approved 17. Heiman Residence - Addition JK 5139 Grouse Lane/Lot 9, Black 1, Gore Creek Subdivision MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved 18. Himelfarb/Helmering - 250 Addition JK 4269 East Nugget Lane/Lot 4A, Resub. of Lots 10 & 11, Bighorn Estates MOTION: SECOND: VOTE: TABLED TNDEF~NITELY 19. Mindlin - 250 Request JK 800 Potato Patch Drive/Lot 7, Block ~., Vail Potato Patch MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved 20. Kimball Residence - Secondary unit on a lot less AK than ].5,000 sq. ft. 1915 West Gore Creek Drive/Lot 26, Vail Village West Filing #2 MOTION: SECOND: VOTE: TABLED • a a 21. Vail Gl:; bodge -~ Bollards BR 701 ~~est Lionsheau Circle/Let 1, Block 2, Nail Lionshead 3rd Fi lnt7 MCTICN: George Lamb SEC~t~TD: Sherry Durward ~%flTE : ~-C~ TABLED TO JULY 17TH MEETING ME~~]BERS PRESENT : :~4E~IBERS ABSENT ~Ied Gwathmev Sherry Durward Pat Herrington George Lamb CP1_:Ck Crist {PEC) STAFF APPRCvALS: {~7ax:~er - Trash er.c3osure. Lot 4, Sunburst To~~:~ of Dail - Reconstractior~ of pathways soutri of Pedestrian overpass, replace exisving Loncr?te idith asphalt. The Valley, Phrase VI - Expand kitc~ien, relocate fireplace, change caindot~s, Lot 11, The Valley, Phase vTl {~) . Groff 250 -Add two bay windows to south elevation, Lot 1 ~--A, Block 3, ~1ai.~. Talley ? $t Borne Duplex - Changes to approved plan. Lot 22, ;rail r~eadows Sreppard Duplex - Add 2 stair towers and 2 garages and remodel, Lot ~, Block 1, Vail Vi?rage at~i G.aulkins kesidence - Crianges to approved plan. Lot ~, Block 3, Vail Village ~lth Hornesta~{e Cando . - Exterior trim paint . 1081 & 1136 Sandstone wive F_rltzlen, Pierce, t'3?"lner - 1']eW SiyI1. Nail RUn Bullding Lord Latigo Sign - formerly Island Sorts. 285 Gore Creex Drive ~eacow Vail Place - NeT~* skylights in pent house. 4A ;vest ~~eado.•~ Drive FUBLTC N~~'TC~ N~TrCE r5 HEREBY v~VEN tC<at the Desicn Re~ieu~r Board ~;f the J'~'.oY;r: of Va:41 swill ho~.d a pti~li c hearing cn Ju1v ~, ? 991 at 3: ~~FM ir: the 'oh:~ cf Vail `~~ur:ie~ pa? Bu=Tuzng Consideration cf: 1 . A rc--west for a secor_d unit on a FrimarY/Sect Nary z~cned lot =A:hich is ,, ess tear: 15, OC~O s~. ft . , located on Lot 28; Vail V' 11 age ^?est Filing '_`~o . 2/115 ;~feSt Core Cr2e~ Sri;;e, ~~ppli cant: be~bi e iCirn~cll The applications ana wnfor~:ation a-ocut t:~e proposa- are a~,rai lade ~_n the zon_ng aol~inistrator's office duris~g ~-ecular office nouns far p~.blic inspection, `1' l~W Nom.' " ~i ~ T L C;OMM~iI~TTTY ~E'?EL'~PT~IE~~1T D-,Pr'~RT'_~Et,~T Published in the Vail Ira-~. an J~?ne 2:~, "W~9i. • • PU~T~I~ NO~'1CE N0~'ICE IS EEREBX uTVEN7 that the P~esi~sn R2~~i env Board of the `Z'oy,n of Vail. sa7i l1 hold a public hearir_c cn duly 3, 1991 at 3:00 p.rn, in the Town of Vail. Municipal L~:ilding. COn~1de'~"~a%-0~1 Of 1 ~. reaues t fcr } o add 64 square feet tUSirig the 250 ordir_ance j to a 'oft in ~7nit X411 in the ?~~cntar_eros ~ondoi~iniums, ? orated at 541 ~?est Li~r.shea~ C'_rc'_e on Lot 8; ~Tai~. ~i ,nshead 3rci F-~.iSlg 71pp1.ica^'~. Mr. Michael ~. F1o~~eV & I~r, ?~~aichael Bush rr'he applwcaticns any informat~.on about the proposals are avai'~a~^1e ~.zi the zoni~:g administrator's office during regalar ~~fwice hours for p~:blic inspection. J. OWN ~: ' ~T~ T L COMMC7NZ'Z'Y ~E Vl?,LOPN.~N'I` Pu~~l ~ shed ir. the ;L7ail 1':~a y.~ on June i 4 . "~ S 91 .] ~J NQT7.CL IS HP;R~BY_ GzVE~, that tl~e ~es_gn Re~~i2~1 BoG.rd o the To=gym of Vail wail held a public hear;~ng c~~ ~TU~y '~, 1~~1 at 3:00 p.r~. in t1_`ie Town of Vail i~Iunicipal Bu-idin~. PUBI:TC rdOT'IC'L Consideraticn of; 1. I~ recuest for a seco :dart' ,~,r;it addition over tree garage oL a Prir~aryJSecondary zoned sot, wiiicr~s less then 15, 000 square .~eet in size. Located at 2505 Bavos TraiWlLot 23, Block B, Vail Ridge. App1i :ant : Mr. Gt~..o Sto:~~ The applications and i ~~cr~naticr. about t~~~e proposals ~:ra a,~a_lable iri the zoning acirlinistratcr's office during regular office hours for pablie inspect~.cn- TOTi~=~T C~~ VAIN, CQMMUNITY ~EV~LCPNLN Published in the ;Tail T'ra'~.l on JunU r, 19°1, • C .~ ,~ L ~ L<~ _r_ ~ R~€~je~t ~~~ii~afi~rr ~. a,.,,,t f~tarne: _~~~ ~ , ~~ ~- Pr~ject Descr;~;iivn~ ~~ f c'y ~ ,~ ~ r '~ `-°~~ ~ ` `~ .~ ~ ~ _ ~~~ .=1 (._~ ~- ~c~.!-J .~ ~=-~/ ~"~ Gontae[ Pers~r and Phone i~ ` , ~c~~ cc Est ~; .~~_~~,-~ ,, ~~~ ~ ~~ ~~l :, ~~ ~ r Caw°ner, address and °i~cne: Afvh'tect, fiddress and Pi^or~e: Legai GQscripticn: _ot ~I;~cK Filing ,Zone . f! ~y/ ( t.~.._. Comments ~'i1- It ~~ ! ~.'.~ _-t'U ~~..c-~ .~~ - ~, <.~7 f c'1 ft /?~-~~~C/ f'c:~-~= G/ r~ ~ ~ ~ ~ ~ ~~r ~~ ~ l~ ~-tv~_~c~_,~~' • f]e~i~n Review Board J PP~;OVF~L ~ ~~..... ~~? ~2 -~-~' -sr~ ~~ Summary°: ~' /~' ~~ ~. To.t~r, °lar~r:.~/r Qate. f~ ~°' ~ ~/. ~isa~G~~vr.L ~ Staff R~prov~:~ ~ro~ece ~~~fi~atio~ ~~ate `~ ` ~ ' ~~ ~ ¢~-` r ~roEEet i~ar;~e: ._-'.~,~;rw ~. ~~~,ar.,~~a-v d~~~ Project C}escripfion: ~~~a~.r:.~',trd (~ f~-~c..k~°l~ . ,~°fi:-a.r'..' .I~'~='~ ..~~~P ~~~-L~i~~-..ct.~; _i'' yr f Cent~ct Person and P^ene ~ ~ ., C}~n~ner, Address and Phc~r•,.e: ~,~,ti~, - ~a~~~~.. Architect, Ad~ress an,d P'~rone. ~~~-~°~~~ ~~ c:~~,~.-~.-~ /7 {~ egal Qescripiion: i_o+. ~ ~ E?lack ~ Fiiing ~4•?~L-'` ~ -~~ ~ ,Zone l~ • Seconded t;~~~: f I.~/ZJ~-~,~_~'e--~ ~~ PP~C~~r~ design F~e~iew hoard ~~~~ ~ ~'~ Su€n:n~arv: e!.~v~.~~_~a--~ f~ •~je•'~z.•c-v~~~ ~0 Tcar•r~ Pla~~r~r Qaie: DiSAP?ROVItiL L ~ Siatf Ac;°oval pr~~~~t ~pplic~t~~~ . ~ ~ . -, Cate _.___c ~ ,. _~~ / `~ ( ° ~~ rl -- ~ _ rv^~v°Ct game: r ( ~ %~"r !"'~~ !1 'r L [7 ~- ~ =~ - r~t r"., , _~ ~ ~~ r ~ r ~% .. , ~ ~ ~ i ~ ~ „' \! ~ ~/~ ~ . . , - , ~rriect Cescriptian: .. ,. !/ ~ :7 ~~i; ; ~ i/ , ~ . ~ {, t n . ~~ . ~ ,, . , ~;i~, J ~ ` . , Contac` Ferran and Pf~are /. ,. % .. ~ - - ;..' ~~ f` ~ ~ Gn~neY, Address anc~ Pi~or:e: , . '~ / ` /fit .i' ` f ''%J 1 ..~i ~ . Rr; nitecF, ~~~I p~JR ancE ?h:one. ti / i~ r r, t, LecGl DescrPpt:on: Lat B' cF: Fill;-~~ done _. Gcmrnents: • ~l~s~gn ~evievv ~~ard . , 'date ~__.__ _-._ _.. <";~ :~: f ~vlotian b;f: ' L_ ;: . SECOnGed `iJj: •,.i = r) ~ y. ~%fF~ ': ~-_ . AP~R~G'AL} ; ~is~?F~~vr~~ , ~ -- - _ , a - / // r!, 7 i .: , ! 7 !!i-,fir "f r` ~~ ~~/i ~ it /7 C' 1 ~~ ~ / r \ - , ; , , . . [/ __ Summar., .. -_.... ! `.. / ~_ . F /' ~ // ~1 / . ' ~ f _ c,~•r- Fiar~r~°,~ ~,o 3 ^ Start Approval Dace: ~ .. , 1 ;~~~ Praje~# ~~~li~a#~a~ ) Date -- - . ! ..) ~~~ - ~," ~•, ~roject ~E•an~e; e /.~ f. t 1r7.. ,r~ ft~ ,,:.,f~ _- ----- _.. -- 1 1 / .l i `/ Project Deseri~,iion; e .;'~;< 1 f~1' ,`Ire/ .~y:t~>l,r' lff.r' . ar_rr r: r• .I ~' , ~/ ~ .,1; ~} /,~ . , ~ ~ ~-r --- ~ i ~,or,tact Person and Phone ~~` 1.~~ ~, Crr', ~' I~~ ~ ; {~ ~,~y.~c '3 Qwrer. address and Ptrcne: ~ / !'?t-)/~ ~~_!? c,_r~ ~~ E:. ,.-= U ~1rc~itect, Ac'dress a~~~ Phone: ~~ ~:f ~"-"L tom` rj~.-I ~~' ~_ 5 . ~, ~~ ~ ~ ~lr.~i).~_~ i• I, ~ /1 ~ fJ f / Leval Descrlptian Let ~ Sieck Pil`na ,Zone Gcrnrr~ents: i• C3e~igr~ Ree-~ew ward Date ~ ~ S `~~ seconded ~},; ~~.~=f1~-S ~~ __ ~ ~ ~/ i :/4 l_ / ~; ~ i 3 "' ~ n•.vr P;anr~ ^ Stafi Rppraval .~ ~ ~a .. / 1. ~ ~:~ e, h ~~' , <<l ~r~je~~ ~g~~ic~t~c~r~ _ 7 ', ~ j -~ Gate ~ , reject iVan'ie: _ - Project C~escriptian: /i-P-/f ° ~r//I ~t -`-t t2 J r r Contact Person and Phone C_-.. r rat ~ l( Gj ~ ~~ ~"1 <0) ~~ __ ~ y~ Ci O~rner, t~ddress s.nd Phone: Rrc='~itect, ~,u~dress ar~d Pi^one: ,7 -~ -` f Legal GescripietF~: Lot f3.eek / [or.e . Fi`ny •'7j'`~_~(C ~ 1 C_~ ..a-~ G d. ' l ~, i ~ ~ / ./ ~~ ~_ [. l ~ G ~~ ~~~ t I `# c~ U ~_~ r Gamme~ts: i• ;~ Seconded b~. ,~~~~~~_r!~ C~':~c A~f'POb't;L .`~ '- C ~ ~~~~c~n Ft~;~iew Board Ca'.e _ i-~ f-t.. .l i~~-~..: /F. t'_ 1) r~ ~ 1, (.i _ r ~ `_ ~ J _ _ r II> i bYVr f'I&rir:~Y Gave: L Staf` f~pproval ~€~o~e~t ~~~iicatia~ .. _ - `,' ~ , '~ Dare - ~rQ~BCL Name. fry°r/ '.- . ~/f.', . ,~ .' , °" /~' r a ° ~ ., ~' f ? r % `~ r ' ~'~ ~ Project ~escrption: ~ . ,,._ r •. -;) i.:~ ' , - ~ontac; Person and Phone__. ~, .~ , i ~ :, _._- --. __ , } i Gv~ne~, ~icdress and Phone: Architect, ~c~ar-e~s am Phone: ;~ Leda Description: Let`, ``~ fl'/, B1~7c~k _ p; ; `~ F';~rg ~ ;~; r " r ,Zane Cemmerrrs. ' ,, ; ~~ f - ~ /~ "(. y 1 ~ , - y.i ,J/ -~ lr`i /~ 'i ,1 i r:~ r~~ ~ r ~ if, _ ,. -~ ~-_- i ~ - ~ r i~ l ~1 f ~. ~.. f ~, i ~e~~gr~ ~e~rie~ F~c~a~d Sara ., _ -. / ~ '~,i y.. .i Seconder ray`: i ;i , r,PPRQtIP,L' ~ ---- -- - CISR,PPRGVhL -.- Surnmar~,: ,~ ~ _ ~ __..y. f _. _ - , :> •~ ~ .f i _. ~ ~'i'F f~ ~ i - - ,, r:: r ' r ~. ~ .- , ~ , Tear F;an r.e ~ Staft R.pprava Date: -~ ~ 5 ~c ~ f~ ~ ~~ ~ ~~ ~ F~rrrajeet ~~}~Eic~fian ..,°~/~Cjt2 ~ Date ._ ~ - , E -- } ~` C _ ~ ~ PrGjeet Description: Contact Person aril Phone C~~vner, Address and Fhcre: _ - l" ( / ~ s Rrcnitect::~Cdress and Ph n°: ~~ ~ C' iC~ ~I ~'~ / r ~c?.u-,c+~, ~}: ~ f~ll ° ~; Vic' l ~„~! L._ {-~ C.c ~- ~_.l ~_- Lega:i Descriptian~ Lat ~_ dock ,Filing ,Zane Con~rr~ents: • ~e~igr~ Review ~©~rd ~i, ~.totion b;r: ~-~iJ~.~ ' ry 1~~ 0.l S~n~r:lary: ` `.~. ~ ~ ~L' ri ~i2f':~uf 7 `C'f i ~~~!/ l r D~t~~ DISAPPRCV/{.L Staf Approval ~~~~e~t ~~~~E~~~iQ°~ ` ar ~ C ------ Date -~ '-~ ~~ .rc~;ect SJar~P: fT~%Ca'7G,%e%1 ~~L~J~~~~ Praj2ct Description: ~ ~-a~~,~''~l t~'/f~/T1/~)'1 ~~~~ ~'~'%~~1~°;f_~.~.._ ~.~~~~JI.J/U~.~~D7l~l'c~° ~-,~~~,~~ ~,,~`:, _j, Cortac' Lesson and Aho~~~ ~~ ~~ 4_~ - ll// Owr;er, Address anc~ P7one: ~~~/~ s'~~-.~'~>~~t_s~ ~~-~ <' G_L.-r cs~'fJ/~ ~=~ -a e if ~(~~ ~ yJ /~ ~~1 ! Architec., Ad~:rRss and Ph:•^ne: ~~ Legal Descr~p?ior: Lo: Cor~rrents: • dock ~ Filing ~ s~~~~~.~"~2~` ,Zone ~'lG=~/y~/f ~'-r~~~~~ ~~~i~l~t 5i'!OtiOn v~. ~ »i!'^//'1L~~~~ ~~ f ~~~ Seeoneed by: 4.._~~ :~PPPC}~lA~ Sur'lmar.,~ ~-~~~~ ~~ w Viii !'2f1nEr ~e~~gr~ r~e~Eer~r ~r~rd !a ~~ ;date .~ r/~iSRPPf?~`JA~~ ^ 5taf` Approval ~rc~~e~~ ,~~~Ei~a~i~~ Cate ' ~ro~ect ~~ame: // , ;~'~~ ~1 ~G~ "7!4 ~ lei. G ~ 7 I ~ _~ ~/ //.llG/ Prcject Cescrip:ien~ ~~ , • ' clfJiC - contact Person and Phone ~~d!~i" ~.l'1r...1,7, S ~ . ~• !~ i~ ~~j~o - i ~s~,rner, address and Pn~ne: ! } r y ~ J ~~ ei l Aret~itec?, i~ds~•ess and f'hene: ~~~'~~' ~~ i. j ~CL~ ~ ~ ~~~~~~ ~1oc~ Lee~ai Ceserip:i~n: Lot Fi.,ng /`f+~"~/-' ~f~r~ ~ Zone ~ ~ ' r.-, ~ .~~~l.T~~IL~~'?.cj l'//~f~ ~rY3'?.,~ 1.~~~t)i;r%fjC,E'- (~~;~~ Con;rrfents: ~/1e~~Ja~/~. C~z~~~j Gy7J,c5~li/t'7 ~5 l°~~~~./c~3 S~i~f ., ~~ ~ ', t' ~ 7 ~~ " y~~ P~i~r:~:' cr Gr;f7s>L ~~~;3!: G/~'.~~dt~~~~. ~.'~'~;~~ .~5 a3~; i1 ~/ , ~~,i:~~f ~~1~1~ lf~~'I ~ ~~f ry ~ ~* ,~ }} Vii! ~=/-~ /~c 2 J~'rj ~ ` C!/"~/ ~ /E~ -~~~-r.Gu: ~' ` ~eti'~~ ~ s .~G.~-~~ '~ ~ L~'~e'~ ~-~ (..S~uzc~/`~~~~ Cdl~ i LJ ~~~ .s 1f/i~;; ;_~ G' ~ ~l' i 1, /7i/i~7f~rr" ~~ ~' ~ / ~'~~ ~y7 t !~ ,.~ ~ ;~ `~ rIl~"' t GIl1 ~i7~~f ...c~xL~ PG~ /ltGZj~. ;.o ~lt3/7t/G~~c'~fl/?/~ a ~'~c~rl /C~/yJ ~J~ :r/4~.~1~5'r-~:/~G1~~~( ~~ ~~~` ~~~- ~fr?z~r~,~% _.~.~~°~~r'`~~" E3'esign F~~vie~nr hoard f / l~ ~ Cate - /~ - r ~~r ~;°~oticn 'ay: >aCJ~i, s:~1G~~J'J_) /~~ ~~,f>s23L'~~ Seconded by: ~l~-~ ~f'~,~'~/ ~~fJ~ ~c."~/~- aPPP.GV~L ,~iSAPPROiIaL Ge.'c~~rJ'- f 9m. Gt ~~ ~~" "~ C~lv~/~ ~~ d G~ J /i~S" 3l~ if~ ~ .' ~ ~~I~Ir"r" ~ _ ~L C% % L`%.1 ~_. t 69 ~ ~$ ~GJ°/~/L'a! ~~? 1~7~. f~~rzs~f'~`t'~" fY f' ,, .~J~~~' ~~r~ ~{s>~~ ~ ' f ~~__ z~` i ~ ca 1 s~ , ~.'U i~'~~~/~~~2L'~j ~~/7l ~ 1_'~E~~S~~I ~1.~` L~ ~-~ `~J~ ~ (.~~~~~.I. _ I~ %I7G 1..~~ ~,..''`G'C!!~f =_Li %~/ 47``lfG. f ~Ii7/' ., . ~ . f ~'~ ~~#. ~~'Srr"~ • . ~mmar _ skid ~•' -{..~_ ,.~-J7° ,~Y/'~~7~`?c'lrt>c~ ..~ ^ St~:if Approval ~~ T~vdn ?tanner "~,. Cate: tTi1F3LTG NGTLGu NGTICE 1S EEREB" Gi~~Fr~ that the Design Review Heard c~ the '~,'oc~7n o~ ,rail Ttri 11 ho' d a pubyic hear i :?g ar July '~, "_~cii at 2 : GG P .i=1. in the Town o?= Mail Municipal Building. HeirE,an Residence -- ?~.dditior, JK 51.34 Grouse Lane,ELo4 9F S1ock 1, Gore Creek Sumdivision Hirnelrarb~<'elme~-ing _ 25G Addis°ion .7K 429 Fast Nugget Lane/Lot 4A, ReSUh. of Lots 1G & 11, Bighorn Estates r<iindli:t - 2?G Request JK 8GG Potato Patch Lr<lLot 7, Block 1, Mail Pctata Pa-`ch C~~erlorir - ~sdditi on SM 255 Davos 'T`rail/:mot :~, Block ~~ .Tail Ridce Kramer ~- Deck expansion. SM a33 Red Sar:dstone CirclelCottontr~;;od Park Unit #~3 Hu~:ca~ - I<ew Sign 143 Mead<~~r ^rivefCrossruads Mall SM • Kaiser~'Ha'1 - Granges tc approved plan SM 4916 Uun~per LaneF`L~?t 3F H,Wock 5, Bighorn Subd. 5th Addition Timer Creek = Addition. of Garage SM 2883 TCirnickir~r.~ick RoadlLot 8, Hlcck 4; Interz<<ounta.:_n S~K~i.a ar5d Tennis Bridge Street Cha_iie° s -- Exter-ar Coyor Ch~.nge BIB 3G4 Psridce StreetfRed Lien Fsuilding i-?on..ar:eros ~'.onclC~.illrLlurr:s, i~Tn=mot X411 -- 25G Request BIZ X41 ~~est Lionshead Circle ~'tamnoth video - o=re=~ uign BR 1G29 South Frontage Read./Cascade CLcssing Hillside Co:tdo - Replace Retainyng tIaAl AK 1819-8?9 Meadorz Zidge PcadfLo;~s 11-14, Huf~'ehr Creek Subd~ Land - Landscape Plan AK 443 Beaver Dare Road~fLo'~ 4, Block 4, Vail i~illage 3xd Filing Sno~r Dump - Toc;n c~: Mail AK 1289 i,Fail Talley Drip=s. ~Tnplatted. parcel generally ~.ocated west o~ the Tcxr:t of `Fail Pu~~.ic ~rForks SY~ops . PI~:B~,IC ?vCTICE NCTICE IS HEREBY GIVE~~ teat ti:e Design Reviety Board Gf the To:~7I~ of Vail wi 11 hold a public hearir:g on July 3, ~.~91 at 2:'00 P .M. in the Town of Vall Ni~ani;.ipal Building. Heiman Hesider_:.e -- Addi'~icn JK 5134 Grouse Lanel`~ct ~, Block 1, Cora Creek Subdivision ~iim,elfarb~Halrner:~ng - 250 A.'a.Lditi ~I`, JK 4259 East N-agget `,arxe/Lot 4A; Resub, of Lets 10 & 11; Bighorn r~states i~iindlin - 250 Re guest JK 800 Potato Pater Dr . ILot ; , B-ock J., Vail. Potat~~ Patch Obewlohr - Add~ti;,n SP-i 2550 Daxros Txa=1ILGt 3, B1GCk 3, ~,~ail Ridge K~~aiz:er - DecK expansion Si"= 133 Red Sandstone C~.rcieiCottor.wood Park snit ##? Hubcap -New S~gn 1.43 i~eado~T D~:i~~2/CrGSSrcads s{ia11 S ~, KaiserlHall - Changes to apprG«ed plar_ 3S"? 4116 Juniper Lan.-^_.!Lvt 3, Black 5, B?.gL'iGrrs S'ubd> 5th AdditzOr: Ti_<<b2r Creek -` :~ddi`.ion Gf Garage Si< 2883 Kinnickinr_ick ReadJLct 8, Block 4, Intermountain Sc~~-m and T°rnis Bridge Street Crar~ie's - Exterior Color Change B~- 309 Bridge S:reet,'Red h,ion Building ~~c:~tanerns CGndomi r:iu~rs, r~nit X411 - 250 Reques~.. BR nc1 ti~lest LiGr~sread Circle i~~Iamnoth ~iidt3o - Ade;r~ Sign Bic 1029 Louth Frontage Rcad%Cascade Crosswng Hillside Condo - Reprace Retaining ~rlall AK 18i~-i8?9 Meado;~~ Ridge RGadiL~ats 11-'4. Buffehr Creek Subd. L,;~nd - Landscape Plan AK r43 Bea<~er Darr. Roauil:ct 4, Blocx 4; Vawl Vi1.%age 3rd Fi link Sr.ow Dump - Town of Fail AK 128 9 Vai 1 Valle:' Dri~~e , Unplatted parLel generally located nest Gf the Town. cf Vai=~ i~ublic Works Shuns. • REVISED 7/17J91 SITE VISITS 1:30 p. m,. DESIGN REVIEW BOARD AGENDA .7UL~ 17, 1991 3;04 P.M, 1 Abraham - 874 Spruce Court 2 Oberlohr - 2655 Davos Trail 3 Bailey - 193 Beaver Dam Road 4 Rimski - 394 Beaver Dam Road 7 Lodge Tov~er - 200 Vail Road 8 Sonnenalp - 20 Vail Road 9 Gasthof Gramshammer -- 231 Gore Creek Drive 10 Hubcap - 7.43 Meador Dra.ve 11 Super Star Studios - 253 East Gore Greek Drive 12 Schofield - 1448 Vail Valley Drive 13 Moore Residence - 4214 Columbine Way 14 Windstream Condos. - 4295 Columbine Drive 15 Fried - 5124 Grouse Lane AGENDA 1. Sonnen~lp - r:a~cr Renovation to Hotel AR ~~~ ~~a.1 keadlPart of Lets K & :~, deck ~-E, Vail Village .!. cJ 4 MOTI0T~7: George ~,amb SECOND; Sherry L~orward ?'reliminary apprrvai gi~.'er. to the structure with conditions, Landscapir.3 will be presented later fox' final. approval. 2. 4~'i11ow Bridge Rep~.acemer~t of existing structure Mi~I r,C%ated on ~7illow Bridge Road, between the Village Center Cende~riiniums and the Sitzmark Ledge. MC'T`IisN: George Ls.znb SECOND; Sherry Dcrward V S~'~'E ; ~-fl Approved as modified. 3. Kra=.ris - Outdoor Lighting Plan AK 4~4 Fcrest RoadiLot ~, Block 1, Vail ~7illage 3rd r~70TI~.?N ; SECOND : VOTE TABLED TO AUGUST 7TH MEETING. • 4. Gasthof Gramshammer - Landscape Plan AK 231 Gore Creek Drive/Lot H & I, Block 5-B, Vail Village ]. s t MOTION: SECOND: VOTE: TABLED TO AIIGIIST 7TH MEETING. 5. Breeze Ski Rentals - Sign Variance JK Montaneras Commercial Condominium Unit #100, 691 west Lionshead Circle/Part of Lot 8, Block 1, Vail Lionshead 3rd Filing. MOTION: Chuck Crist SECOND: George Lamb VOTE: 3-1 Sherry Dorward cast dissenting vote for the following reasons: 1. Signage needs in Lionshead are different from signage needs in the Village. 2. Signage can be an amenity and should not be consider a negative. Signage need not necessarily be minimized. 6 . Super Star Studios - Sign ~V ~ ` ~C~~'~ BR 263 E Gore Creek Drive/Cats C, D, E, Block 5, Vail vi.1 l age 1 st MOTION: George Lamb SECOND: Chuck Crist VOTE: 4-0 Consent approved. 7. Fried '- Request to separate garage & residence SM 5124 Grouse Lane/Lot 7, Block 1, Gore Creek Subdiva.sion MOTION: George Lamb SECOND: Chuck Crist VOTE: 3-0 Conceptual review of garage. Separation of units approved. Sherry~Dorward abstained. $. Oberlohr - Addition SM 2656 Davos Trail/Lot 3, Block 3, Vail Ridge MOTION: SECOND: VOTE: TABLED TO AIIGUST 7TH MEETING, • • ~ . ;?uboap - rdew Sigrs SNi 1~3 Meadow Driy;e;Cressroads Mall M~`'T`~I~l . SECv:VIJ : ~`i~CTE . TABLED T4 AUGUST 7TH MEETING. 1~ . ~ratia~r~ - Entry Addi4icn ~K 3~9 Spruce ieurt,Let 11, Vail Village 9th MO'T'ION : George Lamb SECODID : Chuck Crist VOTE: ~-0 Consent approved. 11. Kir;lbail Residence - Secondary unit on a lot less ~n }han 15,Q~~ sg, tt. 1915 Trsest Gcre Creek Drive/Lot 28, Vail Village West Filinq_ #~ MOTI'JI~T : ,reorge Lamb SECOND : Starry Dcrward :~dTE : 4-G ~ppreved. 1~, chorield - iarage xaddititJIl AK 1~~8 Vail Vallee Drive.lLet 18, Block 3, Vail Valles3 ist MOTION: George Lomb SECOr.D: S'~erry Lorward VO?'E : ~-0 Approved. Railing cn garage r~~:~st comply, with the Urzifcrm Banding Cede . 13 . Ford ?~mphitY:eater i~ic sk JK 5Y~ South Frontage Road MOTTCN ; SECOr~TD : VOTE : Staff ~=Ppr3,Ted. 1~. Bailey -- I~ew Residence LK s~3 Beaver Dam Read; Lot 38, Bleak `], Vail Village 1st r-i~~z~~~ • sEcor.TP : ti'OTE : Conceptual re ~~ie~a . • 15. Rimski Remodel - Modification to aggroved site plan JK to allow construction of a hot tub in the side setback. 394 Beaver Dam Road/Lot 7, Block 2, Vail Village 3rd Filing. MOTION: George Lamb SECOND: Chuck Crist VOTE: 3-0-1 Consent approved. Ned Gwathmey abstained.' 16. Lodge Tower - Repaint windows, doors and balcony BR railings. 200 Vail Road/Lat A, Black 5-C, Vail Village 1st MOTION: SECOND: VOTE: TRp*~~D TO AUGUST 7TH MEETING. 17. Windstream Condos. - Replace Roof BR 4295 Columbine Drive/Windstream Condominiums MOTION: SECOND: VOTE: TABLED TO AUGUST 7TH MEETING. 18. Moore Residence - Reroof BR 4214 Columbine Way/Lot 5, Bighorn Terrace MOTION: George Lamb SECOND: Chuck Crist . VOTE: 4-0 Consent approved. 19. Vail G1o Lodge - Bollards BR 701 West Lionshead Circle/Lot 1, Block 2, Vail Lionshead 3rd MOTION: SECOND; VOTE: TABLED TO AUGUST 7TH MEETING. 20. Timber Creek - Addition of Garage SM 2$$3 Kinnickinnick Road/Lot 8, Black 4, Intermountain MOTION: SECOND: VOTE: TABLED TO AUGUST 7T[i MEETING. • 2:~. Trope :residence - Modification to approved site plan JK to allow changes to driveway and adjacent landscaping. 1~.:~5 Hornsilver Circle/Lot ~, Block 1, Vail Village nth MG'TION: SECGND; vOTE: TABLED TG AIIGUST '7TH MEETING. 22 , Ti~'~ - Air Ccnditior,ing System JK ~i~ LionsYiead Place!Sunbird Lodge T~CTICI~ : Ce3rge Lamb SECO~y7D : Chuck Crist Co sent approved. i~1Ei~?BE.,RS PRE'SLN?' : MEMBERS ABSENT Ned Cwathr~ey Chuck Grist (PECt Sherry D~~rward George Larch STAFF ArPR©VALS: tfeyer/Byrne Residence - Changes tc approved plan. Lot 23, Block ?, ;'ail Tillage ].st Pat Herrington iiutchir?son PrimaryiSecondary Residence - Revise interior spaces of secondary unit . Revise window ors north elevation. .Lot 1,.Tail ~.;il:~age 1,st Cc"~vhelf'siMy Jeweller - ~Iew ari=n'_ng wi*~h signage on existing frame. East Core Creek Dri~-e~Lc~dge Promenade Kramer !zesidence - NeTa Deck on :;nit #3 933 r ed Sandstone Read,,s'Cottonwood Park Conde. IU:'=platter. Booth Creek Roadri7ay - Retaining walls located on Bald Mtn, Road and ~atsos Ranch Road. • • • ~~~~~~i ~~"i~i~~c`~1ilOiG Da`e ' ~- IE r I ~ - ~r~ertfJal~e: tp..~='~._r.ll!"1tfL,'I,i'~' ,~ll~`);;~~'f'i^F r.'( ~~',~'}l~li';_ +i11'sl (Z ,•I('f.i~ '~ i,/,a 11 „ '~. ~' ~.__ ' il~~ , ,__ ~'' 't: S'}1 f }?~. . r ,~.. ~ , _, ~. l~ ~y,} .iOl~~ Z j li' ~ ~ ~ r r ~ 1 , i r) r' ! r~i r / ~ r Ff r.% `, ; PrOIeG[ CJSSCrit?~iorl . Contact Person ar~d Pt~~ne ~:1 .. , . ,'~~~'`-' ~~1 ?i',__1~ ~ '! ~ ' ~f ~ a~l; E !: , 1~~,'~?~ ',-;i.. 1 .~'~ ~'~ ' I ,~ ;.~~ ~ J ~ ~~J ).j !. i' t 7 l- r'; %.~ 71 .~f. j r .-i t~~i I C l i.~~ f1 I l 1 ~ AA I ~i l~~~~ q f.~{ ~ ~ l 1 i . ~ ~`' ~ ~ a 'i 3 ~ 1 `~ ~ °,~ ~{ ~ € 1 r ? i t j C~wrer; t~ddress and ~f~ona: l '~ ~!i' 'i r~:~ fi.'. ii ;~°il "~ li -., ~-~~.'~ ij('.t>'f.7~~ [ ..fit/'r 7 1' Ff) ( t~~%: 'lS~r~' c ~[ ~ [ f~ t, i~.' ~ . ' ~ . ., : 'r2s5 and PY'en f~reh tact, Adu e: ( ' ' ~ ~. ~`` ' r. 7f ~'( ic. ~~ ?.. ~ r' ~ ; ~ , r~ ~ t ,~' : ~ r' ~ ~, j Legai DesCri~tian: Lot : `'t .i ~ ~ r~; f ~ ~I~ck ~ ~ f. moiling f,~'~';i ~ . { rt ! 11 , ~ 1 ~cn.. Gcmments: _ J'~' jt'I'. `Jl' I' .',r.f,~i/!if't ~ '; .%1 ~V; i.,'i ~~ li -1~~n `~ •- ~}esEg~ ~tevie~ Bard r ` ["1 f ~~'~ ~~ t!Aoticr E;y: secartded 12y: Su!nmar~~: t _ ~~~~,~ ~': 1 ~. ~~ RIVAL ,~1 ! t;'SAPPROV^~L ~,i .r j / i f ' . ; _ , ~ ~ ~ ~ i ~ ~ ~~ ~ r~~ ~ ~ . ~. t !~ . ' Inf!. t / ~r~ . .~i , ' is r, ~ ,` / ."~'f r ~:' . r I 1, l , l e -°-.- . C r _ ' ,~~ ~ ; ~ 1 I3 i~zn j`'~ilE rli 1.'~" ~ ~ i~ '~~ 5, Fl .1~ .rl ~ f '~ i.1 ~ ! li ~.~ /r ~ !, ~ ' / "~^ _ : . ~~` !:__ -),fE /,,iTna, F~rE +~~a ll+ar~r}.!'(" ^ 5t~;ff ~~JrrOVci ,Aft '< l ) ~ l , 'i i .,Ira ~, f ti { ~ i ,E CJate: ~ ~_...__y Td RrQject ~p~licat~o~ ~_~_ G~~~r~1Ci~ ~° ~ ~~p/ project Na~~e: ~~~~`'~~ C~'+~/~~ l1~C/~J~~~' Fr~ject Description: C~/9i`~ Y~/"%f/'JJL'~~ C_~ Co~itact Person anry Phone ~~r'~'~~~/, r--S~~~~ j-~ _ , c~sf~%~ ~!~~eriY~e-C~ C Date ~ , ~~ _ ~ ~JCZ I '/ ~u E'C'=M °~ / J.~ / - /. r~ (~~~~//j7 ,, O:~nEr, ~;dd!'ess and Phon4 J~'-~ G~,~~Gk", ••~-~i`7`If~P~.~ rrch?teet, address ar:d Phone ~/~ ~e~al Des ription~Lci « B!r~ck F: ir~ U.~! acne /; 1- ~ ' / I~Z~rz Comprents: !/GLi7/~/J'~~fe ~~I E'"~~'j~~L~~i~Gl/~~ ~Z) //7(_~L~~~~! ~~~. `_/ /~~~ra~~' I cZLI®ccJ~~~~ ~I~r>~~',, ~Iir~C~r~~ ~,/~~~~~~~~ _Sjgf~a~~ ~ ~j ;, i f.~ c/ CJ C~eSE~n R~vieuv Bard ~,~y ~'~~.LCt" ~i"~f~S~'~ 6/a%1,rJc /N /i/JU~t. aF"il./~;~ir)r~T.~t,2/ /~'~ ,Ur~I~'_. fUotion b;~: cJ e ~ f Ca~fJ, l~dl7f% /U~~'/ ~7rr~~~y~~~~ ~~, ~.)~ltf'~ Secor:ded btr. ~G'f~. ~.Z/~,/J ~'1~rS7.._ l~I~~ ~S~~~r~~ j~~Gc%!?) Gd~~S;7'~ ~l~~J~~t/%/~/G %0~~~ ~'~ !,~/C- f~~!_C. n~/~f11-~ /2L: `~~tS ~~/U. _~ - , ~/~ ~~~dl ~~_ mar] ~rrlP~)iy/ ~.ij`]C~/"~~C'~~~f' /7e(~'~:S~'C1/'//~ /`n..~t~/J/~~EfC~c~_ © / „ z~ ~,-v(r~'_1Cir7~~ `~']~t~'~i~F-~ ~~ C>l' ~)o~ /~c~~orrli"r/y ~`/e~f~ >~- ~-~, e~-~r~]i~s~i'c~rl' a c/ c1 ~urr?mar;: `ati~:r~ Planner Crate: ~'~~ ° ~f Sta#f R~:E,roval ~~~~~~~ ~~~lic~~[t~~ Date ~~` ~ `~' ~ f ._ / .. ~rojec*•. ~~Jarne: Pf~~Ps~"~i~z•.~" 1 ~~'.~,f-~e~.~~' ~, ~' Project Gese=i; Lion: ~'-~.~ c.,r..cY~-a-..:~ ~' ,L!~~1~t•,-=. ~d~~e-c=~~!~..-C~ ~ _ ~~ Contaci Person and PhQ~e ~~"~~~ ~`~~'~~~`~-~':_~ ~~~~'~.; ~~~~~~~ Ciw~ner, address and phone: ,,~r'~r~ ~'l t~~t,~-~.~_~ ~° / ~ r Archt2ct, address and Phone: [-e'~t~.C"a-f~j R---~ ~' ~'~ ~r[~...~- 1.~~~-rn~-~'t. _ ~ c'~ ray--r LecGi Des~ri~ticn: ' ~t Gon-n~er~ts: 6~ock Fil',ng ~~sign Rz~ie~ hoard , Z,ne Date ~•~' ~ ~ • `~ ~~Qtion ~;1: seconded nF, ,F--~ ctl„-~qr~~ ~~ ,~'r,(,~ c 2- 6~l PR~Vr~:L ~ _..°..~ .~~ - ~~ '~iSAaPR~VA!= ..~1.~?.~Z.-e"7~'"~e~~ rAfZ orb i~~(~FJvr r ~1 ~i~f~ ~~[ i.+f~~-P`.r,~t~C:~sa ieZE3~2 ~~r f_ ~'E' ~~ C?,~t~f.~ ~~ rdrL7~(.r;-tiL-v---.~ _....- _ __. ~rE:~~sx<!~rat~:~~~ d~.i,F~.~ MC''LL/ :f~-.--, . 7fG`~t..vvi?n FC3r4,I_%L-L..s,~ (:-`~"~J'f'~.__ [/l/'~ _ .!I_1.1~~f.~%;Zi:..(_C~'(r,? ~ -l f f [°.A t~7.:~C.:i` ~'1°21~ - E'-L7r~( t".r/)LC•f~'•~~ A!7~r''_~'~-~a'~~ a_:~'~Y.r/,1..°rt!?~:-~i~_ j ~ ~ / _ aa~i c.~ r ~ s ~~r ~ s~ • .~~ ~r~ r 3_: cwr P,an:~e; L~ Staff G;Pe~~o~l:zl Dail f; ~ ~l ~re~ject ~pplica#i~€~ 7 /~ J ~. Cate -- r l ~ ! f `%- _--- ~ .__, ~ f ~ r ~ rofect P~a~e: --~"' ~ - -~) ~j (~~--e?.ti . ~ ` I zt G f ~ "_~ ~~ `C:(. ~~ ~~'r , ~ 'J G Project ©escri~~ti~n: Gor~tact Person and Phone l! {~ GEh~n~r, ;address anti Phore: ~rchitact• address anC PnonE: ~ ~; Logal Qescription: i_Ot B:cck Pi€ir~g ~.._ ---.- Z^ne C~rnr~en`s" --- r ~ ~5 l~f a ~ ~ . ~, fi~ft r ~- !' -~~? P.notion by: ~~~". ~ ~, JF... Seeanccd bj: ~PPROVr"~L .__ r, ,~-. C1 ~7~ ~ J ~' ~~ ~~ °.~€rr€rnary: _ ~es6c~r~ r~e~rie-~• Board ~~_. C15,4P?RCVF~L .~ /.~ ~o+.i~n F'an~~°r l ^ staff Rp~rnvra! i • ~r~jecf ~~~licafiQn e ' .Projeot Blame: _ ~ ~` ~ l~f / ~ ~,'Y_~.(_~~i 7) ~r~;f, ~~~ ~.~i!--aa ~,1 r_..t r r ~ , r- Pro~ect Description: ~'Ont~Ct '2fSQn and Phone %~`1 ~ ®I~LS}°f~-Gta''~.~- Qwner, Address ar~d P~~one: . ~ z-v;~r .~'.._, ' Y Are~~itect, Address and Ft;one: ®~~` r ~' FZ~`""1 ~ 1 rl-~.-~.,, __ - LegGi Gesrr~ptio,n: mot ~.~ ,Meek ~~ ~il'n~ ~~~ ~~~~,/!~~`= .: ~~I~ done I .~ ~I.%~~.•. ComnEents: Design Ftevie-~r ~©ard _ Da`.e 1 / f _ ~/ Seconded by: p ~r.~i'-~U'!~!`TI~ °~~~ APPPQVAL ~ DISAPPRGVAL SUITiTi2r~. ~1~~ '/'-S7°s~T~ r,.$~_, F~~e:' F`~ !!~~ ~I '/~~r~l i/il :%' ~~f`~~~~ t~i~~ d~% -. ~ t/ ~d ~~ ~`.i'fi4~if'~ /~±/J,"~~~' ~ i'ce' ~'/~ t ' ~ ~ r ~`~ ~~ ~ ,~ / T~vm Qi~r~ier ~ ~ta`f App ; o~fnl a Date: _ / ~.~.._. ~~ Prajeet 'dame: Project C~escrirticn: Cprtact F~ersor, and Phone CJi~~nar-, address and ~hon2: ~~ejec- ~~plieatiCn r 1 ~ f f -- ,~/f 2 ~ Areh tcct, address and Phone: ~ ,--'~ ~/`~+.~-~ `° f f i - egal C~escri~*.icr~: L^? +~ ,Block .~. Comments ~• "~ ~esi~n Review Baarci Seconded oy: ~J05~~fs1'`~`~~~~ APPRCJV~IL ~~''"~ A SE€rnrnar~-. ~/ ~~}~ ~~~;,~ ~,~Fr ~.~::' ~ 6 Svc-~ `~ ~ Tct~~n ?lanr.er f ~ ~r-.ate' "_" s ~ ~ ~~~ ~a:' - I -0 7- ~ o Staf' ~„-r€jrovai ~ • ~r~~ee~ ~~pii~a~ia~ .~ . // /, ~~~ ~ Project P~a;rie: ..~ C~ Gr~.r~, i~t~`Z ~~ ~°' ~~_~'~ ~.--- ~ 1 ~~ -- r reject Descri~tian: ~`%-r~r-~ ~~ ~K-'t~.~ ~, ~7!-~ ~~ ` ,,,_, .rc E~, r~~~z E. {I ~ t,~ ( ~ ._. ~ ~ "' / / n Contact Person and Phc~r,e ~.~G~iP`'. 'ri ri_ /" ~~- f.c / _-C ~ I-~ :.,~', f ~ .~t ~:r c; r ~r., r~ ~~t ~ c~~ ~~ '[ '.f ( II J / G,n.~ner, Adc4r~ss and Phor;e: ~ 1~r`L-~n = ~ c` 1~ 4,. ,~i c" ~l! architect, Address and Fhone: Lego! ~sscri~ti~n: Let f~9 "' Plcuk ~ Filing ~~~-_ ~ ~'`.~,~'~~-r / j}~~ ~~ ,Zane ~~ fi-'"~-~ Comments. design Revievr Bawd ~~~~ lotion hv: Seconder b~~. ~G°YL~rl,~-r ~~ ~,.~ ~~.. AP?RGt~AL1Y ~:~ISA?PRG`Ja'~ SL;rr,ri73r~': £~,,/ [`f ., rlY~ :1 ~~l r'j ,~f^d /1/~,e'-a-'~-'~ • :l~a~.;~_~ ~ -~%{~.~~t~.~(~ . ~ ~~-~~ -~--t~- ! _. ~a~~n Pla~~r:2, o ~ ~ta`f Rr;^ro~~al 'Date: 0 ~~ ~ ~..._ ~ / ~r~ee~ ~~~iicati©~ Date ~~~~ ~~ ~! !~ Sroject rJame: / /dI7~'~1~~1 ~~~>~fl~t`~'~"' ~~YII~~~~'/J~ ~O ~/~~~1/fL~~'l/~f f~~~~rJ(/2°~~~~Lf/ - / ~ /~i~ t Fraject Qesc~iptior~: /f~ /`3`C~~ ~i Jai/ ~ ~~~-~ ~X~ //1/~~~I/~ C~~~ >~Tf=~'~~d~ Cankact Ferson and Phone !~/C~~ ~~~~~/J.f~`12//I ~~~~ ~~~~j `l/'d/ale ~1~~ ~~~3'// Ov~~ner, address and Rhone: ~~~~ ~~lGlGl ~r~'I/?F'~~ Architect, Address and Rhine. Legs? Description: Lat Gomrnents: 31acF ~' ~ilinr~ ~ U'//~~~YJ~~xf~~%l//1-1'j Zene . ~/S~ lr// ~ --J %~ / P~lotic~n b;~: +~'~ ~~~rt Seconded oy: ~~~(l'~j ~i"/,~'~~' :~RPFC3~`=° L // Sr~rnrr~ary: ~,C _~ ~ ~yJ~iYyLQ.~.~/U ^~ , 7o<vn Planner Date: ~//r/`~~, ~e~ign Re~rie~nr ward rJ~r~/ f /~'~/ Date _.%~' :. -~ - _..__.. QiSAF?R0~1AL ^ Sta'f ~,~,°ovai ~rr~~e~~ ~~~i~c~t~~r~ _ ~.. ~~ ~ ~ ,~ r'oFeet Name: ~l1 ~ ~` ~...._.- ~~_'~'_ i~f ~~ `f ~ O~r~tact P2rscn and Ph!~ne ~! -~ ~°~~ ~~~%~ ~`~~l O ci /~-~ <~ 1 C~ ~__. <' j ~ ~~ ~ ~~1 /% Owner, Address aid Phone: ~ l 1'1- ~f" ~ ~~~~i ~~ ~_ ~-<'. ~ •~_ J (st~_ ec~~ 1~,G ~? (f~ C~~ ~< t 5 r ~ .S I ~t -~ l~ I Architect, Address anc Phone: gal ~escrr~:ion: ~o Cornrnents: BfoGk R~4ation / ~._ Seconded ~,~: C--~''l S' :% APr~ROV:~~ r'~ ~~ ~- cY~ 8~_immarv: ~~ f~~ _ ~~ ~~~> ~ C? ~ ~ ~ f l Tc~1~n °~Fannefr Date: / / f ~ / ~?/ filing ~e~igr~ R~~ie~ ~c~~rd a~tP C€SAF?RC ~lAI 5tai~ Approva' ~C~lx ~r~~e~~ ~p~~~c~Ei~~ ~ ~ / /= , ~rojec' (tame: ~'l~e~' `° ~`/1l" I~O,Y~I~l,7'~/P~fJ~//' < ~r~'~~ Project aescripti©r7 .d'f// ~G's'~1%1~fJ:~/~~i c~~~c_ 1, / v ~-~ // onEact Person and FhorE ~~ ~~~~~~~ {gyp p s / / / u ~~ ?tom ~<J ~J 1~~, ~.d~ , f~/U~ ~~~ /rJ7~/-t2C~• ~ t ~~> ~ J ~ ~ / ~`~~~~7 r~ } f O~rtner, ~~idress and f~hons: 1~./~~~~--~D~C1~~.1 ~~~~~ ~/`~ - /~/~.c~~~il~~l<J c~t'i''v/~'_~:,~`~l ~=. ~ " --_ architect, ~~d~ess and Phone: /~~ r f ' / ~ C1 -''~''U . Legal Descrirtin_n: Lot ~' ~IQCi< ~ Filing V~~ ~„~l'~?~5~1~G[.: ~.~ ___ ,zone C._'~:.//_ ~/ l/1"ly Com~:,er;ts: ~ ~e~igr~ ~e~riew ~~a~ cf ~~ot~on her: C~i~f1 ~~'d-r~~ s ~ / ~:~ /.. ~PPROEiAL Sr~r~mary: pp U" ~/ ~~~p1~ ~~ , ~ Ijyyll~~i-G~E_.~ 1 To~~~ Pl~~ne~r Date: ~r~/~ ~~ /~9/ Ll ~ DISAPP~u~~ AL Star` Apprcv ~I 1.0 : Des qn Revi eT.F 1-~oard FRC}M: Community De~~elop~~~ent Department IjA`TE: Jul; 17, 1~~1 SUB~~I/CT: t? sign va.ciarfce request for Super Star Studios at 263 J'ast Gore Creek ~JriVe, Tots C, D, and F; B~.ock ~, `/ai1 F~~_llage First Film, (Gorsuch Eui ldirq) Applicant : I~Ir , Paul ~ . Golden Planner: >3etsy Rosolack I. THE REQUEST fir . GQlder'i is the o~•rner cf the Super Star St~:dios located in the basement level oz the Go?~~such Building at 263 Last Gore Creek DY-i :~e ~ Mr~ . Golden iV rec~ues Virg a variance to have a prori:cited Sign in the form of a disg~aC~r box that is not affixed permanently ~ Tiis display box 4aould bR in the .~=orrn of a sandvaich board A display box must re per:~~anenvly a~ta :hecz to the build-ng or railing or may be freestanding (attacY~ed to the grcurd} Mr. Golr~=en is requesting a variance to allow nis display :.ox to be unattached to the built-ng, the railings or tree ground. IIe ~ s requesting a var~.ance to Section 7.6.26 Prohibited Signs. Section 16.26 PYohibited Signs, Section G. states: "S.gna net permanently affixed or attached to the ground or to any structure except fcr wir:do~~: signs ar_d temporary barziers utilized for e:~~ergency purposes, ~' Z Z~ BACKGP.C~UND AND ?~ T S i O~Zy I?ecaase Super Star Studios is a basement level business, it i permuted cne 3-square foot sign. Tr_ addition to the permitted sir_, t~~.e applicant felt t-fat h.e should be allowed a display boX because his b:;.siness eras considered "eritertdin;r~ent`. ~'he s~aff deterrlWned vrra~ Super Star SLiac~ios was not 'Fentertainrlent" F and thus should not be perr:~i tLcd to have a display box Mr. Calden appealed this staff decision to the Desicr: Review Board or: July 3, 7.~~7.. 1'he Design Review. Board, by a vote of 2-3, over~~.~rnRd she staff decision, perm.ittir:c~ SL.pe_r Star Studios tc have a di:~play box ir1 add,,-t=cn to the 3-square foot sign= J III s FINL7II~1~S t1Iv~ STAFF P~ESI?G~SES before the hoard acts on a Y.%ariance auplication, the applicant must prove priflsical hards~ryip and the hoard rr~us~ rind: `='i1Ore ire S~::ee`ial CircL7~15~anc2S C)r Condlti G;1S ap~l`.Ii nCS to, the land, buildings. topography, veaecation, sign structures or other matters on adjacent lots or ;atl~in. the ad-iacent right--cf-way Et7l,ich wou~~ substantially, rest~.-ict tl_e eTfect i ~%eness of the sign in question, provided, l~o~~e~,~er, that such special circumstances or conditions aLe Llni aue to the parti ct"' ar bti:s} Hess or. enter~r^e to ~~~rhic~. the applicant desires to draw, attention ar~d do not apr~ly generally to all bu5i nesses o.r. 'Enter"~r1SeS . Staff F~esvonsE. Though the use of a rnoveab.:~e display box wc-~:ld a1~ow the app? iCai',t tQ place 11is s=gn closer to file ~~eCie~trian environ:nentf the staff cannot find any special circumstances cn tl_is prcper~y which is nc~ generally found on ad~acer~t properties in t"_-ris zone d~str.ict; and ~ahi~~h s,.,o;~ld~reguire 4hE display box ~vo be moveable _ B. That sped ~.l circur~lstances were :-got created by thc, applicant or anyone in 1:3riv°~ tc tare applicant . Staff Resuonse: The staff uan find no special circumstances on this property teat indicate tyre reed for a display bo.~ that is rsGt perrcanently fastened tc a b-ai 1.ding or. raring. C. That the grant~.nc~ of the variance ,,~7i1~ be ir: general harmony ~,Tith the cu:rpasE of Mhis title and will r_.or_ be materi all€,~ detrirrental to the persons residing c~~ worming in the v~cinity, to ad~µcer~ ~ropert'v, to thn neiahbarhond, or tc the pub-ic ~~e~.=are .in aenera.i . Staff Res~arrse to grant a variance to allow an ur.*ixed displa-t> box in this area T~rould riot be in general harFr~or_~~ wish the purpose of tie TG•Trr sign code . It is the stafr' s opinion that unfixed display boxes wc~ald only acid- unw<~zntcd cltrtter to the Tillage core area, F~urthermcre, in the area proposed far the disp~.ay box, congestion could result due to ~,Te~.icular an;: ped_cstrian traffic Gnd tlie: proximity cf the entry tc the road;aay. s • T~. The ~Tariance a~x~lied fGr does ~Iot de~a.rt from t.le ~ro~risions ~f t:ris title any more than is Ve~uired tG identif~r the a~~licant` s l~t?sines5 or use . iCit+~~i I"`~e SACS ~iS° The staff belicses that a permanently.- zasrened display bow ar_d a ~ square foot ranging sign are more than adequate tc identify the app}licar~t' .s business . IV. ~;'f'7~FF t~E~..GI~1F~]END~TZC~A! The staff reeGrnmends denial Gi this sign ~arianuE reques~. We cannot find special circumstances unique to tie particular bllSi~leSS thc3t dQ nGt ap~i~_37 generally= ~~G Of.11~~ GUSH "?~'SSeS lI1 the zone distri{~t . Ta allow the display bow tG k~eccme ~=: sandwich beard world be a giant of :special pr~.vilece. To allow a prGhibited sign ,vculd Set a precedence the staff fa~nds undesirable, f I DESIGN REVIEW BOARD AGENDA AUGIIST 7, x.991 3:00 P.M. R.'G'VISED 7/6/91 - 5.00 p.m. SITE VISITS :L,15 P.M. 1 Eik Creek T.,,...homes - 767 Potato Patch Dr, East Side 2 Elk Creek Townhomes - '~67 Potato Patch Dr, West Side 3 Wertheim Gazebo -- 774 Potato Patch Drive 4 Daly Residence - 7$2 Potato Patch Dive 5 Tupy Residence - 19fl1 Chamonix Lane 6 flberlohr Addition - 2556 Davos Tram. 7 McDonalds - 2172 N. Frontage Road 8 Hernreich Garage - 26$A Larkspur Court 9 Vail. Glo Bollards - 701 West Lionshead Circle 1Q Sundial Plaza Landscape Improvement Plan - Lic~nshead 1l. Lifthouse Lodge - 555 E. Lionshead Circle 12 Lodge Tower - 20~J Vaii Road 13 Daily Grind Menu Board -- 288 Bridge Street 14 Trope Residence - 1115 Hornsilve~: Circle 15 Arthuy Residence - 3956 Lupine Drive 16 Streamside Duplex - 4551 Streamside Circle ...... ...... ............: ........ .........:....::..:..... ............. .::::ux. ~::~ rrvvn.:n .:~ ~.r r.r', -x::::{:.vC:..;..--.....:-r ~...: fS.YiFl1.!..~ k+:f F~ :4'J.::y~C: i~ .... ...............:..:.:......... •v :.~::::... '.::: '~:':: ....::::.: ~........... .............. ...... r...:::..... :.... r::r: .ii~i~:.....,::,..,,.N ............ ...........:................. .... .....:.::.. .:,,..,..... .. r. r. A .7~iN Da~ 1 Gasthof Gramsham~er - Landscape ~1an ~-~ . 231 Gore Cree'.~ DrivelZot H & I, ~1o•sk .5-B, Vail. Viil.age yst Pf~CTIfl~I: George Lamb SECt~ND; Pat I-±e: rinQtcn VO ~ .~., : 5- ~ Ccnsent apprt~~~ed. 2. Kra~7S _ t~utdoor Lighting Flan ~~ A24 Foresu Read/Lot A, Block ~., Va" Village 3rd biflT1ON; Gorge Lamb SECOND; Pat Herrin ton V~DTE" ; ~-G~i Denied 3 . T~.~gv -- New= ~rir~a,ryi Secondary Residence AK i~i~1 Chamonix LaneiLct 33, gu~~ehr Creek SubdiVisien ?~IOTI~7N : SECOND : VOTE T~18LED TO AIIGUST 2IST MEETING ~4. Vail Recreation District -- New Signage SM 292 West Meadow Drive MOTION: SECOND: VOTE: TABLED TO AIIGIIST 21ST MEETING 5. Lodge Tawer Sign Variance SM 200 Vail Road/Lot A, Block 5-C, Vail Village lst MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 TABLED - Board directed applicant to resubmit smaller sign within 25 feet of grade. 6. Vail Glo Lodge - Bollards BR 701 West Lionshead Circle/Lot 1, Block 2, Vail Lionshead 3rd Filing MOTION: George,Lamb SECOND: Pat Herrington VOTE: 4-1 Approved with suggestion that the hill to the east of the new walls be seeded with wild flower mix. Sherry Dorward felt the landscaping was inadequate and the bollards were too large. 7. Landscape Improvement Plan - Sundial Plaza, Lionshead JK MOTION: SECOND: VOTE: Conceptual Review: - 8. Hernreich Residence -- Garage Addition BR 2684 Larkspur Gourt/Lots 1 & 2, Block 1, Intermountain MOTION: George Lamb SECOND: Pat Herrington VQTE: 5-Q Approved with condition that PEC approve extension of wall and all zoning requirements are met. 9. Wertheim - Gazebo BR 774 Potato Patch Drive/Lot 11, Block 2, Vail Potato Patch a resubdivision of Lot 7, Block 2, Vail Potato Patch MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. • 1 ~ . vr'indstream Condos , - keplace Roof BR X295 Ce?umbine Drive~Windstream Condominiums MCTI©N: George Lamb SECOND: Pay. Herringten VvTE: 5-~ Approved the charcoal color roofing. Every effort must he made to have the roof non reflective. 11. Dai~.v Grind Menu Board BR 28~ Bridge Street/A & D Building MGTION: George Lame SECOND; ?at Herrington VOTE : 5-C~ Appro~;cd temporary location: with chain ~Tith condition that the applicant submit an application for a permane:;t locat_on ir_ two wee'.~s , ~.2. Lodge Tower - Rvpair_t windows, doers & balcony BR 2flfl Vail Road; Lot A, Llock 5-C, 4'ail Village 1st ~~OT10N: George Lamb Sr~COND: Pat Herringten VOTE: 5-~ Ccr~sent approved c~~ith the understandir~e~ that the paint color is flat not a gloss as sample appears and railing . gill be uhe dare color, 13. flberlt~hr - Addition SM 2655 Davey Trail~Lo~: 3, Block 3, Fail Ridge i%flT7flN: George Lamb SE'CflND: Pat Herrington ~,70TE : 5-~ Gonent approved, providing all goring issues are met. i4. Hubcap - Ne=~~ Sign SM ~3 i~e3dow D,rive;'Crossroads Mall MOTION: SECOND; VOTE: T1~iBL~D 15 , Strea:nside Duplex - Color Change S£~i 455` Strea~r=side CirclelLct :~~, Bighorn: Sub. 5th Addition i~i~JTrON: Pat ~ierrirgton SECO?vL~; Sherry Dor~~ard VOTE: 9-~ Approved. Stair. #~~~~' 2B N~oorwt~od (Deep Red) East house to remain existing color. George Lamb abstained. 15. Daly Residence - Landscape Plan SM 7$2 Potato Patch Drive/Lot 16, Block 1, Vail Potato Patch MOTION: George Lamb SECOND: Sherry Dorward VOTE: 4-0 Screen parking with 3 6-12'conifers; blanket steep banks; 12 Aspen min 2" some 3-9" in front and 6 Aspen min 2" some 3-4' in front of parking; Recommendation to improve shrubs. 17. Fried - Request to separate garage & residence SM 5129 Grouse Lane/Lot 7, Block 1, Gore Creek Subdivision MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Approved landscape to be submitted to staff. 18. Trope Residence - Modification to approved site plan JK to allow changes to driveway and adjacent landscaping. 1115 Hornsilver Circle/Lot 7, Block 1, Vail Village 1st MOTION: George Lamb SECOND; Chuck Crist VOTE : 4-~0 Fallowing discussion this item was TABLED to a date convent for the applicant. 19. Lifthouse Lodge - Roof design changes over Pedal JK Fower and Lifthouse Lodge Condominium entrances; roof material and color changes; band material changes; West elevation change to allow for emergency secondary access as required by the building code. 555 E. Lionshead Circle/Lot 3, Block 1, Vail Lionshead 1st Filing. MOTION: George Lamb SECOND: Chuck Crist VOTE: 4-0 Other changes approved: 1. Facade Changes 2. Window changes 20. Elk Creek Townhomes/76'7 Potato Patch--east side of AK Parcel A, siding changes. Lot 39, Block 1, Vail Potato Patch MOTION: Sherry Dorward SECOND: Chuck Crist VOTE: 4-0 Approved • 21. Elk Crepx Tawnt~urr~esi'?6~ Potato Patch--west side of AE Parcel ~, Ne•,a Residence. Lot 34, Block 1, Vail Pctatu Patch MOm=JN : George Lamb SEG~JNL~ : Sherry Durward VG'~'F ; _~-~ ~pprcved with conditions. 22. Arthur - t3et~ Duplex ?~Y. .~~55 Lupine Ar~.ve;Lct 4, Block 2, Bighorn 1st MOTION: Geflrge L3~.b BEGONE: Sherry Aurward VOTE: ~-C ~pprcved with conditions. 23. Biffehr Creek Tuwnhumes -Temporary Deve?cpment Sign 2~D 171G Buffehr ~;reek,'Lct 2, Resin.. of phase ~'I, The galley Sr:bdivisiun t1CTIflN: George Lamb SECCND: Pat Herrington ~iO'.CE : 5-~ Gcnsent apprOz.;ed, 29. McDonalds -Dolor change fur roof trim T?D 2172 N. Frontage Roadi Lot 2, Vail Das Schone ;rci ~' i ling MOaION: George Larric SEGO7'3~; ?~3t Herrington Consent approved, 25. Lauterbach - raew P*~~mary!ecandary Residence JK 14:,5 Greenhill Ccirt~Lut 21, Glen Lyon 5ubdivisicr~ MOTION: BEGONE: VOTE: TABLED TD AUGUST 21ST MEETING ~'IEMBERS PRESET*IT MEMBEES ~B,SEN'I' Ned Gwathrt~ey ~herr~~ DcxttiTard Pat Herrington Geora~e Lamb Chuck Grist ~FEC) • i STAFF APPROVALS: Byrne/Meyer - Changes to approved plans. Lot 23, Block 7, Vail Village 1st One Vail Place -- Becher/Smead, remodel/new window. One Vail Place Condo. Red Lion Building - Redesign of balcony planter boxes. 304 Bridge Street Sheppard Duplex - Revise roof of east side garage. Lot 3, Black 1, Vail Village 6th Bighorn Townhomes - Trash enclosure for existing dumpster. 4718 Meadow Drive/Bighorn Townhouses Subdivision May Place - Repair and repaint menu board, new paint will match existing color of trim on Creekside Building. 223 Gore creek Drive/Creekside Building Canto Colorado Enterprises, Inc. - Modifications to previously approved DRB application. 5198 Gore Circle/Lot 8, Block 5, Bighorn 5th Timber Fa11s Condominium Association - Trash Dumpster, relocation for building #8 & #9. 4516 & 4524 East Meadow Drive. Timber Falls Condominium Association - Installation of 2 windows above 2 existing slider doors, building #9. 4529 East Meadow Drive. Bridgewater Residence - Window changes, add 2 windows. Vail Rowhouses #11/Lot 1, Black 6, Vail Village 1st Phillips Residence - Retaining Wa11s. 2G96 Davos Trail/Lot 6, Block C, Vail Ridge P~JBL~C ~7UT?'CE I~~TTCE IS HFR~'3Y GI~~'EN that the pesign ReLTie~~ Lnard of the Town of Val 1 w x.11 hold a p~~blio hearing on August 7, 191 at ~ : O~J p,m. ir, the T'oT~rn cf Vai1 ~'~JI'iiC ± pal B;~i lding , Consideraticn of. 1. A request for a sign varianoe for ~c4ge Tower Condo~r~ir~iur:? Association Lccateu at ~C~? z,ai 1 '?oad, Lot A, Blocs ~-C, ~'a~.l Village First Filing. App1_icar?t : Al.ioe Snavely; President The applicavions and information about the proposals are available i~~ the Zoni _~~; ad~inist: a~..o:~' s office dur ng re~ulaw office hours far pub" is i:~speotior_. TOr~;\ flF ~IATL C~bIP~U~TTY DES~~T~JPI~1E•2vT Published in the Vail Trail on July lam, 'i..~l, ~~ U ~ro~ec# Appfica#ion Date ---- ,~~( ~ /`~ ~ -- ~// ~ _ f=roject t~Jame: _ '~3 mil' ~ ~, f ~ ~-l"G%~J ~~~ ~ ~,2... ~ ~ ~ l.r _~.. - _---- Project ~escripii~n: --.--- Contact Person prd ?hone ~Y~e'r7 Gr, Aid CUSS ~ClC ~'E"1 `J rie: ~~chitect, f~ddress and Phone: Legal DesCrigtien: mot DEoc~ Filing _ __~-- ~onc _ :;omrr~erts: r-, /] rrJJ !/ ~ f - - --- - t~~l_ L` t ~ ~~-l~Ji c.-. _ rri !/f f -~C. i_. ~ L ~~~ `~ 1 _ .-~, ~~~ ~.. ~ -- ~e~ign Rerrie~nr Board Gate -_ ~. Seconded by: APPRC~1~,! DISP,PPROVP•.!, ~~~- ~` ~ - -- f / ~'~.r GL f °f ~"-L ~ ~ /' -tx.~~ ~7 ~'l C; b- LU -ct-`'~._ _ (~}- ~~ f ~'~: ~~ - - - -- - - --- ------ ~ <, T E _._--- - - _ -..-._. r I .-~, ~ l E~~ 1'1~ <<-'_,-~~ ~r- ~,; =_i;-,~ -.`~ lit-=~= -~~---/~~--Gf 7 ~~~ c- l Town ~-€3r~ner Date: ~~ ~' ,/ ^ Staff Pa.pprov~,i ~~oj~et 4ppiicatio~t Date tJLl~Y I., ~R~7_..... -- Protect dame: KP~.~VI S EXTEkIO~? ILLUI`•1I'11~T ~ rN Protect Cescriptien: OBTAIN DRB A4PRG`rfL ON EXIaTLNG LA:~IDS%APE ILLtiN3II~IAIIGN. Contact Persan and Prune PTLL RESLOCK 4?6--44~ FTEF.CE, SEGERBER~3, SPACH 1t~Ofl S.. FRONTAGE Rv^AE Fr1EST ~~ATL, COLOR~rO 8I557 Owner, ,~ddress and Phone: RENR~F KP.AFdTS - GHIEy E:iECUTTG~E OFFICER THE TaEATHERSTO\?~ pEVELOP. CORP. , ~ t'd. 57TH STREET, SUITE 4~23Q NETT YORK. NY ].Gt~I~; F~rcF~itect, A~'drass and Fhane: I egai Descrirrticn Let `~ Buck ~ Fiing vATI, ~~iLT:-`'GE 3P~} ,Zane Camr~ents: T~BLLD AT ?IAY 1ST fiO ,i~~IE 5T'F-~ ~;'OTED Q~ 6%5/~l TO TABuE, 4'QTE ~_fl VOTED Oi~? ~% I9 ! 91 Tfl TABLE TO 3ULY 1 i`TH, 1~,a1 C~fl!iGE NIO'~ION, ~'A'1' ~Ni?, VO'T'E 4-fl ON JULY i?T~-~, STAFF TABLED ITEri L'~LTE Tv A. FnI~ILY Et7ERGE~d^Y. ~~sigt~ ~~r~ie~ ~oarc~ k<lation hy: Sewn; ed ~~~'. GEORGE L Ar1B PAT HERRII~:GTON 4-fl-~ ;~` ~~ISA?PROV.AL ' 0~ AL~GUS'F . TH, DRB VOTETi 4-~-- ~ , DIS~PPROVIIvG ThE EXISTING L,IG?~TI?`7G Surat}gar}f: (CHUCK. CPETST AnSTt~.TN~Tiv'Gj SEE P30TES TIC FIT_.E FOR BASIS QE 1!LCISIO:~I. <<. ~... ~ _ O . ,- ~~ Tcv~n ?lar r2r Cate: AUGUST 7 , i 9 ~ i ^ Staff A:,erovu! ~r~j~Ct ~~plica#iar~ ~~~, date r Pro ect i~arne: ~ 4!~ t.. ~ .~~~~-~~-_"~~~ .~ C~~~~~ t .~.-:t?C~ %~~~~~- ~~'~_... _ - e ~ •~~ Frolect Descri~t~cn: ~-~°2"~--w- '~,`"~~1~ ~ ~'oc_ ~.~1-' f F..-'- ~ o a:" J /J Contact Person and Pr~cna ~'.:.~~' t -"~ ~'-`z~~`.• ~~ Qv~msr, Address and Phone: ~:rchitect. F;ddress and Phone: Legal Gescriptior: Lo ~`ommer~ts: s `~i!)C~ i ifln~l ~~sign F~~view Baarc~ Zone Date _ _ ~-- f~letion by: ~~~~~ ~'~~ ;~FF'RQ1`R? [~'~SNPFRC?Vr"~,L 5ummary~:: ~~~ s•1 ~ l! j ~y ..T s~~ s ..eC~-~:~r~~% ~ ~i~.... '`~•~-'~-~.`_) Cv-_C~_-~=~f~ U~~ r ~ ~ ~ ~~•C'/ .~o-~-~~L~'~g'~G• ~I~ ~~ ~ ..~:1~ ~(_ % i ~ ~ -~~~ ~{ -~~~~ ~ t, ~.u..~, r:=;Z.. ~'~ r dom.. . / ~_ J ~ r of A !I - lf/ ~- ~1 f...t? _a:~ ~' ~ (~ ~/t.r _. [.fit.-~1.~ ~~~~ ..~~ f ~ ~~~~~ ~~~ ~_ T'1 t'J:"1 F:Bfi?lel" ~ ~E ~ f Qate: /` 1 J l l © 5taf~ Nr7prcvaf ~ra~~e~t ~r,p~~ica~~arrl date __ _`~' / / ~) 1 ,~. - r ~ r PrClece F~ar,e: ~`I ~~~~~ ~ ~_~ ! C... ~~ ~~~~~=C . Ur! ` ~ ~. c< <-~ r{ ~r '/~ ti.3/'• Projeci r~escriptio~t: // ~ t Contact Person and °nor:.e r' ~- ~ .S C~hner, address and Phone: , ~rcf".irect: address and Phone ~ I .% ~ Legai l~esc ipfian: Lo ~ ' ~.. Bloe~c / ;ling . _ _ ._ Cerrrraents: • i~e~~g~ Rewier~w Bard :ate -_-- _. __ /,/~ f~ J/ ~~CtIOR fJj/' 1 . /cI~J 6~ ~ / Seconded by: ;~PRi=1C`JAL D,SAPPR'JV;~L ~J o ..-, .._._ ~~lr: G I / ~G.L~- ,~( +- ~~ rC~t; ~ti 4~.,-!'` ~'~~~ ( _. ~ .J: ~. f~j z._c_ C ` ,c ~c ';,_ -..°i ~~T~'`I -- ~- ~ 1 ~,_ . i c~<*'n Pla,nr~r I / /. Cate: /~ / ~ / ~! / ~ l!! ~ Staff Aai~r~v~ i=rc~~ect ~~pf icatior~ i '~' - - Project ~an~E: ~ ~ `' ! i l_ ~ fj~ '/ ~ C~- `s _. V (/ E-'r~jSCt ©eSGrl~tl~~ri: Confact Person arcs Phone ~1 ,- Oms~:ner. Fddross and f'~I~?ne: ~ ~ ~ ? (; ~ ~ RrGntteGt, ACdress anc °hon8: -~ E ~, ~ Legal ~escrir~tior: Lai ~ r ~Eock F~lir.c~ , Gcrr:r~~ents: - I i 1 i. ~~~~~~ c F:Aatior E?,~: ~~-C/Z ~~ f ~ ~7 seconded may: APPRQ!/.~,L Summar•;: ~e~i~~ review Board _ r_ ~_ i7V'", PIa'1~"5~! -7 ~>1 Gage ~/~/,rl f~ a':e 1~15F~.PP;sCVRL C ~taf` Rp~roval Praieet t'~lar~e: Project De~cription~ ~uont~ct Person anc Phone Q~°ner, Address end Phone: t~ra~ect ~ppiic~tian ~' L J ~ ~! ~~~lz ~-- -"r ,~ c~. Buie '~ ~ ~~ / 4r I --~J-------- ,~, ~ ~, ~" ~ z. Archifect, Address arcf Phone: ;> C~ . ~ f ~ Leal Des^riptien: Loi ~- BEeck Filing Ccmrr~ents: ~ d~ ~~( f" ~_ ~} ~~~ ~• G~sEgn F;c-i;ie~ Board ~.•tation by. , eccnded by: r~, -e _. Lone APPF~OVAL GiSA.FPFi~VAL ---- ... --_.~~' - ~. 7 ,~..,.. ;., ~ .fir -r.> 1. t .. f ~' ~ ~. ~ ... /`/~ ~~ C~... Tr,~s~r Flar~rer ~` ~"~ ~ ''j' ~ Gate: c Stat Approval Project CJarne: PCQjewt i/?SC!I~tEGtn; Gor,taet Perar~n arEe~ Phone ~vvner, address and Phone: F.rchEteet, ,4ddrpss and Phone: Le~~l ~eseri~tion: Fot Camr~ents: l~ro~eet ~p~licatiorti ~, ./7 ~%/ _ ,, gate ---.. _ ,~ .} ~~ _. C_ ~ I ' f~ , 8iock Filn ~ / ~~ ~ .~ Zone ~• Design Re~rie-r~ Board Qate ___ _.. ___ Seconded ~~y: ~`~~ ".L 'a -~'~ •_ l /E) ~ _ ( f APPFf01;',4L CESRPPRC3Vr,E_ r~ ~~ I / Surr:rr~arw: ~ _ _ _._ __ / 'o~r ~~ P!a ~.~er L Stan Ap{~ra~ial date. 4,. / "/ ~ C~• r Project flame: ~ E ~~~ ~~ Projec`; Descri~tion:.~~~~Jh~~ Contact Person ar~d Phane ~rc~ject ~,ppEicet~c~r~ Date (,~~~~_ it f--~~~'~ .L--- 9 Ovr~ner, R.dcress aid Phony: ~~'~ ~~-~ ~~ ~~~f~~~~~~~ ~ , r ~ - - r~rcl~itect, Address and Pnone: ~-/~;~,~`~-~ ~~1`~ ~~~ V-~ r' ~ I-~lJ~ ~-'lJ ~ 1 Leal Description: Lot ~'eck ~/ Fi~inc ~.:~`~i'Y' ~~~ ~~ ~i ~~~,~~~ Zene .. ~~% -- Comments: ``~~ ! ,~ 4 } ~/ ~ f r~~~ ~~ ~ 1 ~~~ ~L_ V \ ~,1j~ ~ Vl . ~~~ !.'rl~~f^ (~~~ ~ 1 Jl ~7;> l/i.1~ /_? '7~ ~~ ~~ #~ a ~es~g~ Review Ba~~d d / i Dare _ _ .~ ...__. `vice*;on b,,. ~ --~t ~ 6~ ~, ~ 1~~' f~ ~, ~ ~ /+ Seconaed h ~ ~~~~ ~,~~_ ~"~ ~ '~~ ' C, ,.~/ Af'FRE)~:`AL ~_... ;~15APPPJV.~L I l A ~ L yy ~~ I a Sur.`€r*~ar~: L~S~1~/t~ ~r li ,~.~ . r~. ~~>~ ~/~I ~ 1'~~~~1~ _--~------- i r ~ ~ y l r b i °~! 1 3 v o~•vp ~IarrY~ ~ f Sta`f ,4:;~rcva,l Pi`E~J~G# ~l~7r~3E1C~tiQ~l Date -_-. / }~..~ ~`FrojeC? f•darne: ~' F~~!~ ~~ ~ ~-J`- ?reject Uescri~tion: ~~ ~~~i1 ~ `t~~~' °~~~ Gontaet Person and Pane Gamer, add: ess and ?iiane: ~:~ehEteat, Fddress ar~d Prune: Le~ai Description: L~^= r~~ dock - %' Fi!;ne ~1,1~/~ ,~ P ~ornmen_s: ~ ~~ ~._ .. ~.~C~/~ ~ ,Zone design Review B©alra ~l~atlQi ~, IvV: ~,.A .. y`1 y-.f d ~! ~-~ t_~ . .~PPPG~~AL 7 ~~I~` } l 5unin~arF: ~~ f ,~ r` ...~ 1~~~ ~ t~l ~,, ~ .. owe P€~t"1nG. A ~ `~1 ~~ Qate: I~a2 ~_ (~(~ I~':SAFF'FvV ^~L L! 5taif Rppro~~al ~r~je~t ~~piie~tior~ ~ ~ Qete ---- -- Project fVarrme: ~+I tr ~~./~./t~ j~ 7i o1~~~. ~_,~. y~ . {! ~. ~__._._ -- _- ..~ ~ '~ PrajeC~ Qescription: ~~j`~f_:t-1~ [ ~.~~n~~ _ _~- _~-_ ~~ Contact Person a.nd Phone _- - - -- Gv~rner, F~ddrass and Phor~;: %rchiteat: address and Phone: !J?~~1r'i/~ tk' ~ ~'d ~~ ~1~~~ ~:_. r f Legal Description Lat ~ ~~• ,Black ~- -~ Filing i.~~/~ R:'~~I i~ ~]1~,~(~ ILA `1~~on~ ~~ Gom~~ents: :~e~i~n ~?e~ier~v ~Qerd [~ Qate ~ ---.. _~ """' iJ /~ i ,~PPtiO~'. ~ QISaPPRCVF;t.. Sumr~~ary: , ' t ,, ~ ,l ~,~I, r' ~~~--~ ~ ~J~1,fL./~ ~ ~ ~'~~' ~ UU tin ~~%r Vii(. ~ ~ ~(? ~~ ..._ ~~~ ~ ~~,1~ # ,? - --- -- ~c~,r. Pi~nr,~r Li Stat` approval ~ ~'~_ - ~.~ ~`~ 1 Date: ~~ ~r~~ect ~p~~E~a~i~~ P~C)e^t ~ia~~.7E: ~ 5~.~~~ !`--~ 1`JaS.s3~~_,J~-_-`~ .~__ 1~ 1 /~ ~ Project L`3escript+on: ~ -~' ~~~~~~~~ ~,~ ~~ !~~~-''~~~ ;,j Cor:tact Person and Phone Oin~rer, address sra' Phone: ~r~'llt°Ct, r~G{(]r@SS and rh~!~c Legal Deser ~tion: Lot ~ l~ Commen,s: i ' Block ~~ Filing L"~^t ,n i- ~e~ign Re~r~e~ Board P~lotior• i;,r: Seconded E?},: ~~~~'~.-f~/~~~,/~' ~,.1 J ;~PPn' AL Surn.-~ary, ~ ~~ ~~~ ~A.I~~ 11~~ ~~ i~~~~ ~~~ ', ~'~~~~ ~. `='~ ' ~ nn • l~~%~~~~.~~r .- ~_ ~ y~~^"°' ~~ f f L ~~{/ ~~~ v Tc~•n Planr~r Date: ~~ dr~^ ~ ~' ~ ~~ ~q/I rite ,~ 1 irate _. _ __ .T rl5^,PPRC••d~••.L (e ~ 1~~~._ _~ Ll~ _----- - .StEl~T r'.t%}.r~Vc'1~ ~rm~ect ~p~iiGat~ar~ i Project i`Jame: ~.-~%~~DL/_~~Lc~' ~G `s.~5 .~ G/D~I.~`l?~~ G'/l'~~P~ / c/ / ~~ i ?rojeci f~escription: ~/7~2i? ~>i~'~''~.5' f~~/ /~i~ ~-/~~1~/~~07'~ ~ P/2°~//~I~lc~ Q~I~iIJ~/~' /-~1C117.S' i v U Contact Person one Phone /L°~ ~165'~~~7~ ~/~~/~~7"~ / . ~ ~~ ,3~~, ~~/~i ~Q. i s~/a~ie X27-~~~s - ~,/ ~~ Gvvner, address and Phone: rE C~l%~~ >~ ~~«` ~ ~ l/Q~%~ ~G~Cj~ f .~~ 77r~rls~~7 ,i ~/ f~U ~~~ //rya/, ~. ~~~s~ ~ ~7~ - s~/~ ~,rci~itect kddress ar,d P`~OnE ~-~ ~'~~a-c~/! ~~~~ Leal ©escr:ption: ~ of ~ ,Block ! Filing Y~//~/~~5~`~-~ ~~~ done . ~~~ ~~' C~mrner*.s: ~e~~grf Review Beard Cat: ~. ~/~/~/ _ f. ~~ Seconded t~v: ~f~~~°`?~~ ~f'/~~/~f~U `_~ ;~PPROt~rr~L ']ISP.?PROVFIL ~~~~~°~d cGi~.es: ~G~~r~ ~rca~~~a/. ~/ri/~ ~~~c~'_~i~~ f~~~~~v~u~~-~ ~o~t~e~r~c~r ' </ ~G'o%s~ doss rrv~ y~efi ,r3~er1 d~~rrnr~~rf _ _ -_ ~~P rari~/ ~-ra~tse ~~ Gar>~o~/r1r~i~~I~'C~~/7l_~Z - ~lfP~ ~/7/7~f" ~S'~Di/-~~SLi~ .~r,~ y%~ ~~ ~o~~~.tJ ~_ ~2~~~ ~~~r.~r- ~ ~d~ ~~~-~r~rvz<s~ cr~~r~~~°~`__r_~7~f~Ya/ ___ sup, ~~,,: • ~~ ~~~~~ ~~~/~k~~~~ ~~rn~r.-~.!~1~. C~~~?i'~r~~ ~=fr~c~ ~ld~,yc% ~~~/fi~j Y ~~~~~?~r~ C2~°~ ~~~~ s ~o~~ Gt! f~zC of .~T~. i~fa ~rr~~ ~~is ~s r~' ~~ ~~Perr~ar•~ ~~ ~a~e ~~~ -~-r ~~'~.~~~~ ,Q.~`~-~~e ~~e>Cc~~rr~~r~ ,~~~'~r- i~~/~~~ .~lJ~ Sr2lC~ . ,car-~li-~ .6~.~r_Y~~-~ ~i.Jh~r~ ~.~~ c~r~~'~~cs- {a r-~n~zsi~ a7r .~ilr~~ -S,f'~.~~- ~-'vita ~d /~~~'~ ~ ors / .~.~-e ~ei~va~ ~ ~/_~~~tr° ~ ~Ca~:° .ts C!~r/ia ~/~~~~~~es~t>°r fbruJ~i~27` ~Z ~j~~v ~J i~-r~J ~ ~~. ~~rr~'n-nUrr~ e~~~~f~ ~ ~ ~ ~~~~e ~ ' ~~s~~~ a ~~~~~f/y c~~f~~ri~c~'/' ~~~h~ ~D~ ~~'/o.~ ~~ ~~~ ~ G`o~//~.f" ,~16r~C!j ~a~s' deerz r'~'~ ~~a ~Q~ ~ycC~' ~~lii~rec7`/~1?,~' ~ ~ e%i~~~?~~~,~a~-? ~iP~Y~~~y; 2~~ ~r~~S°s~a~~e ~~i~rl~~a,~'-~~ a,~~`--~rrC~ ~ ,~~ p ~ % ~ ~~ 2~i'c~..~3rfs' e~~7C~1-~1. c~~~~" ~'-T`~~~='-~r~ en/ ~'racir~ ~~f/ ~G .~~ ~~/.J'f'~C~in~ ~D ~e~ C~/l/l~P~ ~~,L",Giz.~res 5=r~~ ~T~ .'~~7~/~ 4i?Cf Town Plan~ier sn~!e~~~• ~sj ~ ~l~l~~~~/~. `LJ Staf= ~.pprcval / . /r, ChQirl r~ boa av~ L.~`~L~~ ~~~ ~~~~~ GF/~c~'~ ir~a`1 2t~~n~~~ ~iv~ /ic~r~~ /~ Gravy ~s • ~r~je~t ~~~ficatiQr~ Project i''Jame: Prejeet Gesc~i€~tion ~f ~J , ~% % , ~/ ?.C -.n-.~r 1~ ~~ Coniact Pers/are and Phone/ ! ~/~c2-.-cc~ fJ~~/~.~~ - ~ /~ ±~~ner. Adcress and Phone Architect, Address and Phone: ~. ~~~ ~ ~µ ,i ~ u ~~~ ~ ~ ~ ,~`~ Et J-- Ley21 Lescr!ption ~ c•t~ ~~~ Piaci~ ~ Filin~ !•~ !` ~z.dy~~ ~/ ~ B ~~ ~e~ign Review Board C~FiOt'OTl ~Y: Seconded ey: c EJ It"f r113 r~ • Gate ~rt~l'f~Jr.'~4 >~ l't, a 1 ~l o t.` P ~. ~ ~q i //~ __ T ~----- r Late -~~t'rt .Zone / x' c~SAPP~ov,a~ ~ ,/ ~'~f~~lrf7,'1dC /~4~ i-% ~ i r~~i~ : ~~rif p' , "~ „'lrf~ ' ~..__ _ ~ -- - ~- /s /. ~j~ ~ii?i~.~ J' /.'Q,..~. ~. . C~ :r F~f /f G:?./_ t ~"'f.s ~~ i~~ ~1~~ .,~ ~ " .. i' C i c-=-~. ~/~ ~ _-~~/7~!'~ :lr ~ , - f , , - ,J ! , e ~ n ~ ~'.'t i~ ~ PI J .~ 7c ~~ l~ ~. ~„' GE° f',[_-f .. ~ I~~[. %~ .E / }..(' ``l C 'l ~~~'f` ~C' ~,,. (,l ~ I I '~ ~ 4, ~ / / /i~ '- "~.rv:~~=~ri~~~-r~,2~~t. 1J ~ / ! /' ,}1'`'~ l~~t ~ ~ L S(a~i Approval ~ ~ ~/-~'cT f~'-- _ '~ ~ - l ~, ~~ ~4 ~' ~ ~ ri ,1 ~ra~~ct ~,~pli~~t€on Project r~`arre: ~J1~~~~~~- ~~~~.~- tC~l.~s.-..~~-~~~~ Project L)escriptic;~ ..~E ~~-.~l1=JC-.1'~~~?:-~" "~i~'L~/r;~ C~!'~f--~~~:~-~"'~ ~~L'_:I~__~ e~rtzCt Person sr,d ?hone f - ~~~ ~- ~?x-~t'7t.~] '~°""7EF~-- ~l Z..'L~ p41 rer, address anci Phone: ~ _~ ~-.`~~r--]C7t.~ ~~L;~,C -~ ~7 ~ u~'I~„~1~t2~~ ~ _U. ~,j Cn ~~~'- architect, address ?nd Phone: Le~ai Descri;~tion: Lot ~~~~~ t3ieck Filing f ~~ ~~t~~.~ Zor.e ~ .( Gor~~r~ents: ~~Sl~;i~ ~E'Vi~1F1t B08CE~i Cate ~~4C2. _ (} I "~`~ l __ r~~ c t i a n b~ ~" ~.~' ~~-zi.~ i ~ ~ ~t seconded h~`: ~~1.~~1~_1~, ~_~'~rJs7c~LF~n~-~ ~ ~~ Sur;~rttar~~_ -- -- ' i ~~~.nr Fianr~~r gate. .~\t._~L.~ • ~~ t l~G 1 ~?ISnPP~~CVF~L ~~tnff A ;~rO~rFi F r~~ec~ a-~p~i~ateQn Project Marne: `~ I Projec' ~escripiior: P~,~~ '~-/"""~'~~= ~~~~---~~ -Fr-"1 ~ r'71.~,I -. .._ _- Gortact Person and °hcn2 ~~~ I/!i6•~ ~~/ .t-~T-fE 4 t~~"TY ~l~ ~._ f~ ~ ~~j~ _. _ --- dvr~er, Rc?dress anc? phone: ~--~'t--!l•~~~ ~.-~.._b-~r-'~IE~`f~ ~ (~, 3~r~~.] ~/~It"•, ~~~~ ?~ ~Co~~~~ ~;rcnitect, address and Phone: Legal GescriPtio~: Loy aie,c ~emrnents: E~esE~n ~?ev~ew B~arc~ Fate ~i~.~L•7 . G~ . ~~°~ I __~ Secorcted ov: i~~fit~l/ (J~.. ~ ~-""i~._i~i~~ lt~~-.~ RPFRd`~.fRL ~ISAPPROV~~ T.~+r.r, i'la~~~2r Date: ~~} ~ , ~ ~~ St:,fi ,4ppraval ~ i ~~c~~ec ~ ~~pliCafio.t • ~ ~ "' '~ ~.~'e _ ~ ---- / / A~! -f ~' -~ ~ /~< / 1' [ ~ ,~/ ~ Y ~ ~ Proia~t Name: ~ - -- Frojec*. Rescriptian: i~ ~'G~ ~ ~ i~-t~~-~~_ ~Fc ,n~a ,f,..; ~~ AYii`~.' i ~~ ~ Ca~~tact Person and Ph one ~~~.-' . f~.~: , ', ~ ~ ~: . ;' %• . `,'!~ ~ ..` " vv4•ner, F~dcress and Phone: ,~ 1 - r t - - -- , 1' S ~ ~r~htec, ACdress and }} Phone: ?- '` ' " ''~ r~,~ ~~ ' ~ ~ ~i~i{ Fili ~j,, ~~r: ~~/ :~~ Zone Legal Descript:en: ? of E!o ~ - ck ng ~ f , Comments: %l~r~~: ~~ .. . JJJ ~ , ,, ~ ,. .. d, ~ JJ /J i ~ '~1 r , rf . r / ~ i ff 1 i •••~ i3e~ig~ Review Baard late ~ / ~ -- ~~ '~___ ~ ~`~14ttiOn b~: ~' ~'~~r7 - r/-~ j Seconded b~~: - -" _ _~` • ~ h~PRO`v`,41 ~ t~iSA?PR~Vl~:~ 5urnr~ary: ~a'e. C - ' -- ! l` ~` ~ --- --- - • '` ~' % r~ f ', , i ` 1 ~ ~ 1• l<. ` - ---- ~ ---- -- -- !OS'a ~1 TF~~-7 "1 F,r ~ Sia`t F~: CIrOVa~ ~~ //_ • • C Pr~je~t ~p~li~a~ir,~ r~ ~ J~ ~f~ ? C~ ~~ie Project ~~an~e: ~~~/~~-/ -' `~- -•~ ~~ ~ C ~~ J 'J .l de Project Description: C. ~~~ ~ cf~ ~~ ~ /~.,.f _ ~Y (~ Conta^i Persor~ and Phone Q~.~nsr, Address and Phone: arc=~itecz, RcdF•ess and Phone: Legal Descri{~tian: Lot ~ ~ Biock ~ !=ilir•g I~G~~f f/:~ J •~ ~' % ' ,Zone ~~ .~ Go~rr~ents: ~.~-,~r -r-.~ ~~~ 1 i ~esigr~ L~~wie~ B©ara -~ ~r~, , Date __ '~ ; / ~~ - ~r1Gt C ~ /, Seconced by: ~'~ ~~ _,- _ ~- ~ ,.N~PPRQVE;L ~ D15AF!'PGVAL /_ ~ i 1 ~;l24 ~i)/ ~~> ~ ~~ A~~D~~ l: t ~/~~~,~r~~. ~.r ~~ ~f _ '~ 2 :'1 ~ C1!' r~~-Y'l -. Srimmar~: y _ ~ (_ ~' ~l - 71 ~r i ~ ff - -7 / ~ov:r F1a,ijier C Btaf` Approv_tl Date: a"~~ ~~~ ~ra~e~# ~-~~ii~atia~ f y~ Date ~_._ ~r~~ect iJame: -i ~~ ~ 1 ~~~J l'. 1 r i ((~~ _ F'rc~ject Descripti~l,; ` 1 ~ ~ ~_ (~ (`;~ (-~'X, \ ~ ~ L ~/' ~,,, CentaCt Per3Gn acid Phone 7 I[ .J~ Y ~ n, ~:~~~ ~ _ ~_ ~ - Owner, Address an`y Prone: r~rcf?itect, ~idcfress and Fhor!p: Legal Cescriptior: Lu ~.- Carnments: i• design Revietr~ Board ~dte _ Motion bv`: Secencea Lw: APPROVAL Surrrrnary: ..~. ~ (, t ~ I ov4•r Planner Cate: ~`o~k ~ FiiirC~: UL~~1 ~ ~ ~~ l'~~,t, ~'_~L! :? Z~na, _ `l~ '~3~ U l ~-~~ C`SApPF?~3VA'~ J © 5tatf P.pnrcvni • ~r~j~ct ~ppl[~afiQn ~~ ~, Dae ~ ~ ~~ ~~ 1 project FJarne: °` t ~ 1 ~~. fi~ ~+ '~ ~#"~ ~~. f~a~'t~A.nr-v~ PrcjecE Gescripticn: ~~1~,~.'p ^~/.~;~~a~l r.:~~,~~ ~ c. c:€_.f~:~'t r ~~- r' ~ ~ p~ t 7.~ rf .tax l' ~ 5' E~ _-r/fiC.-sz~;-;f- ~csntact Person and °hore -. 231 e gore ereelz c~ri.=e vai1, eal~rado 81557 Owner, Address artd Phone. l:rchitect, Address anu ?hpne: LegaE Des~~~ipf+cn: Lit ,Block Fi!in Zone Camrnents: _ ~~si n ~~vi~v~~ ~ Be~~rd ~ ~ ~~~~~ Cate _ ~ ~ -- e~ _ ~/,, ~ ~~ ecanded uy: _ r x~PROI'AL^J^_Y ~ ` ` r 'JiSRFPR.CiVE:L -_ ~ ~~. - -~ ~J _- ~l: rn rnary~. Q .~ ~r`!i~/.~r(~!~!~'! d• ~ ~ Y b'~ ~~! •~-6.. .. `J ~- I n?/! f'_~~. i`J~~~ .._~ EL'_f~~!/S' !. < ~~;~[~~ r'~~~~t~~r[_~ f `-` 7. _ _. i II I w it.~ E`•~~~ ~'~1 f0 ~~-t' ..:-r, fi't~Zf~ ~r~l r °.~~ .T ~i~ /li~L f'~i'i !-~ - _~1 ~l~r - . _ ter;(/<~~ <~f~'>' _. -~bl~".-C{.r-~~f)'f~ i`:'7 i %~~ ~1 f' ~.~'_C~ r~l ~ ~ `( / ._. ~~/L5, /~JS~Gi .~__~~:'~~5~1 C~/~-' . /,a 5 ~ II ~ d.~t"~f~' c`~ ~~t !1 j~._ ~Ls1 L2. r -~ ~ r.____ ~~` ~Y 6=L~rR /~Cf ! r~ ~~~_~' `~ `~---._ /C~ - 4..i". ~-c~a~f... ~~~ "--<~-`P~'f .:] / f (may C' ....~ l/ ~~- own Pinnne ~ Staff A.P~roval Cate: _ (rv ~~ l ~~~ ~ ,.,~ .~-- ~ r DESIGN REVIEW BOARD AGENDA AUGUST 21, 1991 3.40 P_M. REVISED 8/2p/91 5:Op P.M, SITE VISITS 1;15 p.m. 1 Shanley - 864 Spruce Court 2 Tupy Residence - 1901 Chamonix Lane 3 Chalets at Buffeter Creek - The Valley, Phase VI 4 Vlaar -- 2953 Bellflower Drive 5 Stone Residence - 1241 Westha^cren Drive ~ T-Lazne - Crossroads Mall 7 Daily Grind - 288 Bridge Street 8 Village Popcorn Wagfln - Founder's Plaza; Top of Wa11. Street 9 East Vail Bike Path - Bighorn Road right--off-way in the 460p-5100 block. ~1G~EN~~D:M1 1. Lauterbauh _ NeS~~ Prirnary~SeUendarv Residence ~K Iu~B Green sill Court; L;,t 21, Olen Lion Subdivysi on ~~IOT IO~T : UECUND : VO'?'E : TABLED 2 . ~~ 11age Popcorn ~7agor. - Sign ~y~arianc~ ar:d ~:dni na BR pounder' s ~'laza, Top o~ ~ilall Street C~1fl i ICT~ : SECOND ' ~~D~TE TABLED TO SEPTEMBER 4TH MEETING. 3. ~:halets at Bu~~ehr Creek - Develor3rlent Sign BR The ~.7alley Phase VI MCT ION : SECOND : ~lCTE TABLED TO SEI~TEMBER 4TFi MEETING. r ~ ~J 4. T-Lame - New Sign gR ~ 143 East Meadow Drive/Crossraads Mall MOTION: Gearge Lamb SECOND: Pat Herrington VOTE : 9--0 Consent approved. 5. Daily Grind - Menu Board location BR 288 Bridge Street/Otta Stark Building MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. 6. Stone - New Primary/Secondary Residence SM 1241 Westhaven Drive/Lot 44, Glen Lyon Subdivision MOTION: George Lamb SECOND: Chuck Crist VOTE: 3-0 Conceptual approval. 7. Vlaar - New Dormer SM 2963 Bellflower Drive/Lot 7, Block 6, Intermountain MOTION: George Lamb SECOND: Pat Herrington • voTE: 4-0 Conceptual consent approved. 8. Lodge Tower Sign Variance SM 200 Vail Road/Lot A, Block 5-C, Vail Village 1st MOTION: SECOND: VOTE: TABLED 9. Herdich - Revision to landscape plan SM 2008 Sunburst Drive/Lot 18, Vail Village 3rd MOTION: SECOND: VOTE: STAFF APPRQVED. 10. Vail Recreation District _ New signage SM ` 292 West Meadow Drive MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 1. Soccer Field 10 sq. ft. total. 2. Ford Park signs to be resubmitted. 3. Add white to directional signs to make readable. 11 , Alen -- Storage Shed ~K 29~~-8 Bellflower Drivei'Lot ~., Block ~, Resub. of Lot 1C~, Intermountain , MOTION; SECOND: VOTE: FABLED 12 , Tupy - COi~ICEPTUAL New Prirr~arylSecondarv P.esi deuce ~K 1~~i Chamcnix La.:le%Lot .:,3, Buffeter Creek Subdivision NiCTIC~~: SECOND : T~C'I'E Conceptual review. • 13. Shanley - Garage and Addition A?~ 864 Stiruce CourtlLot 1~, Vail Tillage nth riOTlOivl . George Lar1b SBC'O~~D , C«uck Crist VO1,E : 4-'J Approved wit:~~ the conditions tri.:.t prior tc issuance of building per~rsits, applicant shall modify tree p1Gns so that: 1. The suppv.rts under the deck are 1="' x 12", 2 , Ider:tif~~ a reprised ier~ce location which i.s acceptable to staff, 19. Bast Vail Bike Path - Retaining ~rlall AK Bighorn Road ria_:t-of-way irs the 46J0-510 Block MC`I'IG~] : Pat Herr ington SECOND : Chuck Cri st VOTJ: 4-~~ I'he constr,~ction, described below, was approved by DRB or augr:st ~l, 1y°i. 1. ~7a11s to be constructed out of boulders. 2 . s^aai~.s s~.~a11 not exceed 6 feet . 3. Construction area will be reseeded =with :nydwoseedlpoppy seed mix. 4. Curb ~ gutter gill be cor~structecl. at base of boulder walls. r~ 15. Vail Gateway Flaza - Sidewalk along the east side AK of Vail Road; from the southwest carner~of the Gateway ~ site, south to the intersection of'.Vail Road and East Meadow Drive. Applicant: Leo Palmer MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Approved with the conditions that the applicant 1. Relocate existing WI lights, maintaining the same number o£ lights; and 2. Use pavers to construct the Sidewalk that are consistent with the streetscape plan. 16. Ski Heritage Center - New Sign MD 291. E. Meadow Drive/Nail Village Transportation Center MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Consent approved. MEMBERS PRESENT: Ned Gwathmey Pat Herrington George Lamb Chuck Crist (PEC) MEMBERS ABSENT: Sherry Dorward f • • STAFF APPROVALS: Butts Residence - Sky Light Holiday House Unit #43 Kurtz - ReRoof Lot 9, Black A, Vail Das Schone #2 Eilert/Welsh Exterior Repaint Lot 7, Block 9, Bighorn Subdivision 5th Lia Zneimer Subdivision Lot 3 - Increase height of structure to 32'6". Lot 3, Lia Zneimer Subdivision Biederman Resid. - Railings on root, Lot 7, Black 33, Vail Village 1st Bag & Pack Shap - Move Sign Village Center Building Station ve~'bier, Inc , - T~Iew PLVning Vail ~,~a llage Inn Plaza NIcCi11 ReGider~ce - Change retaining wails fx;~m Timbers to Boulders. Lots ~ & ~, Cliffside ~:ia Zneimer Lot 3 - raise building, iravrease height . Lot 3, Zia Zneimer Subdivisioal Kellar ReRoof - Replacerent of roof shingles with fiberglassi asphalt. Zot 11, Nail Nleadosr~s #i Miller/S~oweinsbera - I3ri~,3esaay/grading walls. Lot 7, B1oCic 1, Vail Intermour~t aiz7 Renner Exterior paint, ~'rintery Buildinc. Tract A, Bloc's ~, Lionsridge ~~ Vail Heights -~ '~4aintenar~ce to decks Vail Interfaith Chape:. - Bench. Tract J, Vail Tillage 1st The Roos - awning on =.~vest sidC of brilding, Lots 9, 1G, 11,":~2, Resub, Bufzehr Creek Lund Residence Landscaping -Add landscaping, remise plan from building permit. Lot ~, Blo,;,'.~ ~:, Tail Village 3rd Filing Alpine I'ownr~lomes tiTZI - ~^~indow and decx modification's to previously approved plans. Lot 34, Block 1, Vail Potato Patch Wittemyer Residence - ~~ew dcor ar:d window, west elevation of garage. Ti"gb~r stairs, Plexiglas bubble oiler gondola terminal. Lot ' , Bloc;c 1, Mail Vil' age Ord Precourt Residence - Charges to approved p:~an. Lot 9, Block 1, Vail +Iillaae ? st Lowe Residence - Repair=t. Lot :~, Bighorn nth Station Verbier - Replace operable ~r~ndows ~.jfiixed windows. Vail ~'.? lage Inn Plaza Ggndos Resta~:rant - ~'erc-ng to define out dcor dining area, Lot 4, Bock ", tra~l Lionshead 1st Pock ~ec:k Extension -- ground ' e y=el . Timberfalls Unit ~1~[~l C~ 1 The Eagle's Nest - Changes to previously approved plans, per ~ submittal. Lot 4, Block 3, Bighorn 3rd Ford Park Tree Removal/Replacement. 530 Frontage Road East Peter Rudy Deck Replacement - Replace existing deck with identical deck. Grouse Glen Unit #4B PUBLIC NOTICE NOTICE iS HEREB`l IVEN t'r~at t'~:e Design Revs evv Board of the Town of Vail will hold a public hearing ors August 21, 1991 at 3:00 p.m. in the Town of Vail l~~unicipal Building. Village Popcorn wagon -- Sig~~ Varianoe and Awning BR Founder's ?laza, I'cp of ~~~all Street Chalets at Buffehr Creek - development Sign BR The Va11ey Phase VI i-Larne - ~Iev. Sign 143 East 1~Seadow DriveiCros~roads Mall Daily Grin:; - If.ena Board location 288 B:cidge Streetl0tto Stork Building Stone - New Primary~Secondarv Residence 1.241. [~Iest~?aven 7ri u=e/Lot 44, Glen Lyon Subd. V1aar - New Dormer 2963 Be' 1lc~rer/Lot i, Bloc}; J, Irxtermountain Lodge Tor,~zer Sign Variance 280 nail Road~Lot A, Block 5-C, Vail ~Jillage lst A11en - Storage Shed 2992-B Bellflo;•ler Dr~'Lct 1, Block n, =~esu'~ of Lot 1i?, lnterrnountai n Tupy -- New Priir:aryJSecordary Residence 1901. Char~ioni x Lang/Lot 33, Buffeter Cree'_~ Subdivision Shanley - uarage ar,d Addition 8~4 Spruce Court,iLot 12, LTail Village 9th East Mail Bike Pate -- ;2etaining wall Bigho:cn Road righ~~ of way in she 4000-5100 blccl~ BP. BR S A'( SM S T~1 AEC AK A~', ATE Vail Gateway Plaza - sidewalk along the east side cf AK Vail Road, from the souths~7est corne?^ of tree r'at:~way site, south to the intersection of Va? 1 Road and East Meadow Dri~.~e . Applicant; Leo Palmer Lauterbach - I~IeT,v Prir;aryi'Secor?~ary Residence JK i458 Greenhill Court/Lot 23., Glen Lyon Subdivision *An~i all tab'ed ivems =rort prEVious mee~ings. The application. and infcr~;ation about the proposals are aTrailable in t_~e zoning administrator's office during regular office hours for p~:blic inspection, ~LBI,rC ?~raTICE NCTIC~ i S HERBY G1L'EN that t=ze DesigrE keS~iaw Board of the Tos~~n of Va i 1 ;gill no'~d a publrL hearing on August ~1; 19~I at .s : ~,~, p .m. in the Towr: of Vail P~unici~al Building, Cor,s~.~eration off: 1. A request for a sign ~larianc2 for the A,lillage ropcoxn Wagon ~.ocat2d in . cundPrs' Sgizare at the top of ~~a1 Street, adjacent to Christy Sports and the Hong ~o~:g Cafe in Vail Vi llag2 First Vii' ~.ng. ~pplivant ~ Jan ~r3enir~g The applications and inrorma'~ion about the proposals are a~~ailable in the zoning adre'ir.istrator's offic? during .r2a~:lar office t,o~urs for public inspection. 1 O VL7L~' ~~ ti t~ 1 a . COMN1~;~?~lY DE~TEi;Cps~1E~,'T ~ubi.i shed in t~,e ~a~.l Tr it cn. ~~~gust ~, 1~~1. • To . Desa.gn ~e~ ~.ew Board FROM: Community revelo~~tient DCpartllle_~t BATE: August 21, 1~~1 SUBJECT : .~ request for sign variances for the Vail Village Popcorn T~7agcn lf~cated ~-n Founders' Square at the top of T~Tall Street, Vail ~~illage lst Filinn Applicant: Jan Wenir~g Staff : Betsy Rosolac;~ I , -~iE REpULST ^he applicant is the o~=ner of the ~~illage ~'opcorr T~agor . T:~e Village Popccn T^~agon is loCa~ed on To~~=n of Fail land, The owner of the ;~agon leases the property under the °~ragon from the Tcwr of Vail . r~s _ ~ruenirg i5 requesting three sign variances. The first ~~•arian::e is to Section i~,2C.10 ;~), ~°L-~pose, to cello=,a the r,~~ords, ;`Bes~erages Sandwiches Pastx:ies" or: an existing awning, The sec~~r.d req=pest ws for a vari.rnce to tre total amount of sign area permitted, Section 16,20.17.0.(B)= Siz9. The third request concerns the nsmber of ez~terior signs permitted, Section 16.2~~.110 rr), Number. (?lease note the ~=ariances are highligrlted in b~;ld pr~.rt. i Section 1.6.20,110 P_ojecti::g and Hanging Signs--Single Business Use; sA? Puxpase: A. "Purpose, to id2ntif~ a business or organization beiri tie sole business occupant withi n a bliluing - The idcrtifwcatior sign. or signs for a business or organization mad= include t~~e nar~ie of the business cr organization and the general nature of the bus`s r.es.s conducted =~=i thin cr upon the premises . zn no instance, however, shall the total uortion cf the sicn descrzba.n~ t'r~e general nature of the business exceed ~0 raer cent of the total area of each sign permitted for this ~ur~ose. The deSCr.i~tio~ of file General riattire Cf the h~..iS1I1eSU sha~.l be incorporated into the liars or signs identifying the nar~.e of t7'ie business and should not exist as a seoarate s i ~rr~ . " The following signs require a ~rariance to the requirement that the cl,escrip4ion of the general nature flf the business should not exist as a separate extea~zor sign, and that warding other than the na.•ne of the establishment not exceed 40 percent cf the total area of the sign The si.grs are: i 1. A sign on the awning stating 'Beverages Sandwiches Pastries", ~. A metal. "Fresh Hot Popcorn" sign 3. Tw© m.etal "Wagon Papcarn" signs ~. A meta. sign which states, "Exclusively Recreated for Popcorn Wagon Franchise, l:nc," The applicant feels that a popcorn ~•.agon connotes ~nGir.ly popcorn, and s~"ie z•.ishes to ir:dicate tYiat ether ite:tt~ are for sale, as t~;ell ~s pcpcorri. Section 1.5.2J.~1© r,~all Signs-~ir:gle Business Jse, ~B, ~iZe. B. "Sipe shall not exceed one square foot rcr each five wont lineal. feet of thy b:~ilding. _ ..': The staff has determined that one 'esigth anµ two short sides of the wagon .nay be counted as pedestri n frontage, for a teta'_ length of J.$ feet . T!~~erefore, a total. of .~ . ~ sguare feet of exterior sign area and a :~axi~:um of two exterior signs a~-e permitted. The S7illage popcorn wagon has four existing exterior meta' signs tn7.'lich are attached vo the wagon. ~'he ? anger sign ecntai ns ~ . 5 sguare feet nd states, "Fresh Hot Pcpuorn" : The sma' ler sign comair:s 1 , ~ square feet and states, "Ex=~lusit~ely Recreated for ?opcorn ~~agc:s Franchise, lnc." These tUro signs total. ? . 1 square reet . In addition, two metal signs of . ~ square feet each, whi Li] state "r~a~fl;~ PCpCO~'a " are attached rear the top of the ~,Tagon on tre fr;,^st and one- side . The staff determined twat ail ~ of the metal signs ~:ount as exterior signs; anu the fetal area of these siCT'iS 1~ ~ ..~ square feet , '"he applicant wishes to ?~iave ~ square feet of si,r~ area eti the existing awni~~~, in ad i ticn to the four :petal iligns of 8 , 3 s~r~:are feet, ma:~ing fi~,re exterior signs totaling 12 , ~ sguare feev, This woui.d require a variance of $.'~ square feet to the 3.6 square feet of total sign area allowed. Sect~.on ? x.20.110: ProJ~evting and Hanging Signs: {B) ~1=amber: D . "I~?umber, Brie sign per veh i Lular street ;~r major pedestrian way ~;hich the business abaft, with a maximum o f two signs a determined by the adrninistrator; s~:bject tc review by tha Resign review Beard,=' • Ty~~o exterior signs are allowed, and there are four existing mewl signs attac:zed to the wagon. The applicant is req~estir.~ a variance t~ allc~ a f~.fth exterior sigrs, or ~hree more than is per:itted iz: the sign ~s~de. The applicant feels the metal signs af~rixed to t,~e ~~agorl s:~ould be considered part of the design of the popcorn wagon; and thus not counted as sign area, T1. FIilDI~TGS r~ND S'r'AF~ R~SP~I~S~S ~~1 ~J Before the Board a;,ts on a variancy applicat~.on, the app? icarst must prove physical harc.ship c.nd the Bca~•d must fine that, A~ !here are special circur~starices or cor~da.tions appls:~~.na to the land, bui ldinas, topo~4~.phv, ~3caeta~i~~r, sian structures cx otr-er matters on ad~as~ent lots o?- ,ai~~i-:in the ad-jacert rigrt-of--way .~rhich would substantially reStrlGt tilE3 effe~tlveness of t:7e Sl~n iri ~lleStlon; ~arovided, ho~;~e-,Ter, That such special czrcu~nstances or conditions are unique to the particular business or enterprise to T.vhich the appl.i.cant desires to draw attention and do not apply ~enerall~,~ to all busi r_esses or enterprises. Staff Response: ~ Var~anc2 to Acceptable infcr~ation on Sa.an ~s7hile it ws t?~ue that people associate popcorn ~~a.go:~s wivh popcorn; generally, peop~.e are also aware that popcUrr. wagons sell more than ;ust popcorn. The popcorn wagon is permitted a menu board of 5 square feet arc two wi dow signs totalling 5.a squarre feet to Qxplain the Various menu ;~ptioT7s ;total wiiido~~ area is 3~ _ LJ square feet) . In addition, the popcorn. s~agon is permitted to have t~7c exterior signs stating the name of the business. The staff feelw that the wording on the awning is not necessary, giver. the allowable sigr.age . 2 , ~rariance to Ai;:punt of Sian ?area Permitted and ~1`arianc° to Number: of Mans Permitted The popcorn wagon is permitted tT~o exterior signs with an area totalling 3.~ square feet, However, the popcorn wagon ~r~as designed with Tour exterior signs wits a total sign. area of ~,3 square feel, or ~.7 square feet of exterior sign area over the allo:ti=ed 3 . 5 s~aare feet , ?'hose suns ;sere part of the original ~~7agor~ design, ar~d were first placed rs Tos~~n of vail ' ar~d in 19 ; ~ . Trse staff feels that this t~usiness 1GLatiOP_ does not have special circu~nLtances re~suiri ng additional suns or sign area. ~~~e believe the popcorn =,~agon's desir~n calls attention to itself3 and. thus does not rewire ar additional szgn nar a si.~n area ;renter than trat which is allowad under the code i33~ s~Lare feet j . B. That s-oecial circumstances were riot created by trio avplicart or ar.vone i.n nrizrv to the a~~l cant . Staff Res~~onse. ~, Variance tc ~cca~table lnformaticn =erTCiitted cn, Sian St~.ff foals no special circumstances have 'Dean created, 2. '~Tariance to A.~~:curt of Siari area P©rm~.tted and ~Tariance to Nu~rber of Sictns permitted Staff feels no special circumstances have been created. C. That the arantirz~ of the variance wil? be in aenerai harmony, Lri th t'~a ~ur~ose of tha.s title and ~r~ill not be materially detrimental to the persons residing or wort.inr ;n the vicinity, to adjacent property. to the neiahborhocd> or to tale public welfare in ~reneral__ staff Response: variance to ?~Lce~tar~le rr_forrYatiort Per~t~itted on Sign The staff feels that the granting of the =rariaiEce ~,>ould set a precedent that v~ouid not ire in general harmony *,~ith the purpose of the sign code. • ~J ~. Variance to Amount of Sian Area Permitted and, VarlanCf'. to Number {?~ ~3.Gn~ Permuted Because of tha ur~ig3ae design any smal~. size of the popccrr. ;~agor~, the staff feels the signage shoo' d be brought into contor~rance with the sign cede. The staff feels that the Granting of these variances will not be in general harmony with the purpose of this title. D, Tk:e variance applied for does not depart from the nro~~isior~s o` t~is title ana more than is rec~aired to identify the a~~licant's ~?usiness or use. Staff Res~ons2: 1.. 'Lra.riai,c2 to ~ccentable Information Perm :.teed on SiGn Althoucrh the applicant feels that the popcorn wagon implies the sale of only popcorn, the staff feels '~ha~. vhe twc vrindo~;~ signs and the mina ~oard are adequate to inform the pedestrian t'rat ~norv than j~:st pcpcorn is sold at the ~:agon, ~. Variance ~o ~~ount of 5igr~ Area Permitted and i7arianee to NUr?be~ of Suns Per~iitted The staff feels that the unique design of tree popcorn Aragon, the two exterior sign;, the t7aro wi.ndc~ti~ signs, and the ~rsentz board are ~no~:e. than adequate to i der~tify tree applir_ant' s business . vie belie~~e the business is iIl a eery visib~l2 location in the center of a major pedestrian plaza of the Village . For these reasor.•s, we think tz.e variances depart more than necessary from the Towrs of Vail Sign ~cde. ZI?~ . S'T'AFF ~~;c~~~~r~,~~~Tr~l~s The staff recommends denial of the req,~ested vax~.anves. True can find. no physical hardship, ~e find that the req;zested variances do riot r,!eet the criteria necessary to justify a Var1aS?Ce . J 1 . ~axiance to Acce~tuble rllfflrmati ~J:1 permitted On Sins The staff reriom~~ends denial of the re:~uested variance t ; al1_o:a additional ~vording which does nit inc? udo t~-e name ~f the busi~~ess , 'i'he applicant' request t~ use an extera.or sign to name or~l~, products whioh are available, and net limit this wflrd.i.ng t~ the aceeptab~.e ~0 ~, would set a precedent that the Staff finds insupportable. 2, zariance to ~,ount of ~i~n .Area Permitted and, A~ariance to 2~umber of ~i~xrs Permitted The staff recomriiends der_ial of ;.he requested ~,~ariances to the number of s-gns, and to the amount of sign area permitted for the popcarn wagon. X72 feel that the design and location of the p~~pcor.~ wagon draws _xttention to the X7USin~SS, y',ie also feel that it is 1Tlpflrtal"iC to ZlalT3t~1s? tree unique design of the w~.gon, and feel that a aditivnal sig~TS and sign area on such a small -tructure would net be in harmony with tiie purpose of the sign. Mode. • • • • ~ ' .'L'a -t,~~~ C ~E ~~ee~ ~p~i~^at~v~ ~~ ., Date -- - - --- roject ~~zme: ~ ~r -.- ~ - ~._-- -- Project description: CJntacr Person and Phone ~~ ~"~~ ~E~~ '~~`~~ Owner, redress and Phc~n~: Prchitect. Address and f'~rar~e: / 5 Leydl ~escriptiorr: Lot Elpc~ Fi!€rg Zi;ne _. ~- n `7 { ~ ~~ ~. uG~F7'.I7!cntS: (/L.~.<:' ~ ~~.~ .: -"'2-~~.-aLL--a ~5,~~ /~~d~L-~ ~' C.c..~„~/Y'~ G ,~ ~ ~+~ C~esig~ Reviev~ ~Qard ~~ i7ate - -- u"'iGiQ?i may: y_'Id~~~-~. Seconder' i,y ~`7~-~"'2-,~..'T~-~~L'~ </ ;~PPF?~VAL (~.SAPPR~VA~ To/w~n Planner © Staff Approval irate: ~Z ^~ ~ ~~ ~r~~~~~ ~iapii~a~i~~ ~rQject Nar~F: 1~!`;~/~-~ tf.~~~ Project Description: ~~j~~~na Gantact Person and Phone ~;nmer, Add: ess ancf Phone: Archi'.ect, ~:ddrels and Phone: ~~ ~;~~r~ ~ ~~ "j`f.~ ~ - APP^nC1V:~L ~~ t.~1~ ~~'~f_~,~i,~,~~. C~ Legal QescriplI*.ian: Lo jj {~~,ij S~-;?r ~~"a t y j~ Block t.{ ~i' J°~1,~ ~ ~~~~,f.~~i ~ F~€ing ~~)~~:~' 4~J~~ ~~~`~,~~~.`~~~ ,Zane I"lf ~/j~ ~I/l1~ ~ ~1~~~ f'~,.. . Ca~rrren s: 1/k /~ ~ t ~ ~ 1~ C7 ~Aotion hy: 52eanded €~~: 5u~mmar,-: Dare Date CiSAPPFiOVA~ ti 1 - - . ~'~ { t ~~ ~`i~ :3v`r~c"~ ~ n.f i f °f/1:~ ~~~ ~ ~~~ '~1~~(j,try~"V i `:~ t L~ ~~- ~' `~} f~~ - ~~,. °' f.. 1 ,. v - _~ :c.~.~ ~'kanne~ Date: ~~ ~ 7~J1 ~ `~~~ ~ ~~sign ~e'~i~v~ ~oa~d 0 5t~f- Approva' R~aj~~E ~~~ii~~~ic~r~ ~ ~ ~~ i ~ ~~' l 1 ~. l ~'~ f~' ~ 1~_ ~~ ~~r:? ~~~11_ G~ I~~ c;~ X I ~C~ r ~_: %~ i C~? ~'/ Project Blame: a ~ _~ Project f~ascription: ~` ~vA L ~ ~" L .. Contact i~ers~n and °hone °~- ~~ .~"'a `~` rr~ ~'~- ~ C_~t_-c~. C •, ~{-:_'~i~ ~~,~t_L.~ - GNrner, Address and Phare: ~-~~,~ .,,~°"~C3lr~- Arcr:itect, ~iddress and Phone: ,-~ ~~ Legal Vaseri~tior,: Lot ,dock F~iiry Zane ~ / Gorrments: - Cf ~) ~4~ ~ `~..~~~~--[ ~_ <~'t1c~ j`-' I ~ / L: ~ + ~ C~'f~ t~1.~„~~'/ ~C~~ ~~ ,m°°~;-~C-~_.~c f~ ~„~,~:~ ,~ ~C. `~ °_-_ ' f '~' ! "£[. ~6L'~J C~! c_ L } , 1-~ L Gt, E~esign Ftevier~ ward f1~"j f7ate -__---- --- ~iaticr~ ~f. ...~ Seconded ~• : / " ~'.~e~-~ ~-~.. ~i/~ ~~ ~ R°f~f~,~LfhL DISF:PPR~VA.i_ 5urr mare: ~~ ~ ~ i ,-~ ~~~~ ~/ ~ ~fi T04,'n ~ian~~r ^ Staff R~~;~~ova_I date: ~~ ~~ ~ ~ J 1 f L ~rt~jee~ ~p~l~catio~ ro)ect ~la~~e e_-~ ~ r.'c! ~-~'. _ ~~,-y~g~ /, c'- ~ t' , c.. ,.~ ~~ d r' ~ ~1 Project GeSCri~tiG`n: d~ '. ~ ~Ar~s'.~r`j f~!°0 f ~`~;°:~i ~r~Jt` ~'; -. ~~ ~ '~, .~ Contact Persar~ and Phone `r ,~~ ~ -~%„~ _'~~ .{ C?~,'ner, Address and Phar.e: Architect, Adc~rass ar.c Pone: Legal Deacri~ticn: L;~t Com;~,ents. ~J ivv1otic,~~ by: 8ee~nded tr;•~: Sur:imary .~ Gatc ~ o ~~ -_ i.rl / ,,~ rFZ. / ._. / ~ ~J~7f ~ ,~ l J / ~ / /_,- Glcck ,Filing ~` r~ -~2'•-s~~ ~: •.~ 1 `~ ~' -~ APPFiQV.A Ge iPj r°Y ~~ Zc~nc cti'~~,F-~ Jr!`~ D15AP?RC'11A~ c ~j ~ e ~`/" ~ ~ /f/ Bt"Yif~~:"Allr`Y.'el r'..'~A ~'r >[{ ~~~:" ;. :sd/7..~?/e /1 f`j~,<1_ i..-~[' }..__ ,~..~-~t~/l i~i_._._-.___-. l!' f/" 1~ P ! al -r.. r_~~ Jar' , Z ~~. ~.fl is ~ ~ f,•_ `~.~, , .. , ~ k ~~ ! ~,-~ ,/ / , J ~i .~" 6 J• .¢'i_e....~. /`1~ ~f "~~: 'tr'y .; ! .°./~ r' z ~ :. , - (' ~r, .rl. s ~ - .lf .,...L,. ~ ~ ~ / :. er~ !IA . f_ ~{ ! .7 z': ~ a ~~~C7 ,:~::9- /1' /( i' f~f.). - -~~ r~~ ~, ,~' Gate. ''I'!~~x".-~~ ~~~•~~r~~d"rrj, €~es~gn ~e'rriew ward ~, f ,~ L StafF A~Prov11 P~°a~~a~ ~p~lica~~ar~ Project PJarne: F.•ti a rroj.,ct bescri~tien; __ ,~ Contact Person, and Pi~C~}e "w-' °~;L.= V c'3t~' - -> r ~~ ~f .~~. ,~. f7 f f C. ,f..-i :Wt -- ` _~ r~ ~ ~ r ~- ,.. -- / ~~ i Ot~~ner. Address and Phone: ~ /~f/ ~°' (~! ~~ ~~ "+ C~;` ` ~~~ ~j j ~~ r ,~ -~ l ~~ ~. A~ A Arch[Tect, Address and Phone: R ~ ~;' LegaE i~escri~tion: Lat E~ock Filing ~ Z~.re ComrrEents: ~~sign Beviev~r Board ~ I`.- l~~~ds ~. ~~ ~R~ C a:e ~ ~ ~ T ! --- ~~~~~ :' V'~ 1 ~,~r~ ~ ' r ~,~ ~= ~ ; ~ Se:,cr,ded btr: •;r S APPF~G~,'~L ~~' ~IS~,PP~OVAL f 7,. ,. C ~r 1 r.~ 1:i_li~Bs~,! :i1 ;!v~~ ! ~ %~~ ~ f__r~/1~_° ~ /I C~. .~.; ~; 1 I. (F'!~-_ _ _ : . .a _ F ~ummar~~~ ~ ._ .- l,~f~.~~~ 4.7`~ ~a.a~ (.!l.r..~! :~h'~., i ~t'.:%f .art /~~ i~'~t ~:~~j~•' S --- ,~. f ... ~_ ~;~~,' S's'b`. ' s• ~.~~ _ If^'df lrl , ~! ~~.~~ :?, _j' t" ~r .. t--!~i f,f ~". (_- f / a,] ~~~;`~1"~t .,~ t;fs`i 3~ {~'Z°'-~r-fir-j , . , :'l :~'j!-~~, ~_ ~_ _ -- ~~` f ~ /~ ~f'`~ ~ ` '`~~ ~~ ~ , ° / -..F. ~ f l - !t . ry ~ ~, .. ~c~+~r p,anre :• ~~ Sta;i '1;~Nroval ~ ~al~.: ~._~- ~ , ~~?~~ect ~~plieas~~~? ~t !>4 ~' ~ ~ ~ _ ~~./ Ll a :P.'. -._..._ . ~~ - __-- .•O P' " r /- `~ - - - -- Fr6ject C~escriptie~n: p.- e.,,++_.1~~s r_~'.."/R .~~" .~.. F~~ ... fi ~,~~'~ ~'~~.,~~„~,{_..__ ;~,},:~_~.. ,, Gcntact Person and ?hanE ~/'Y ~ ~~ r r~,-'. -. .. ,:~ _ r,i' ~ -, ~ . ~` ~.~I•.~~~ ,-/. ~.., t / /.•. l j //.,! ° 6 Architect, address anc Phar~e: >~.. ~ ~ . ,~~ ~~ ~~ ; .l' Le~~l DescriptiQr. mot ,Block ~ Fili 7g Ccrr~rrEnts: • ~e~~gn ~ev~eVlr B~a~d Zone date ~l,~GtiOrf by: Secor:der cy /• ~ ,~~ c.~ t. %: _ ~ e', ~f~ s' ,' ~ ~,. APPRQV~;L~ G'`APPFiGV~.~ ~ " ~ :~ ~ ~. - r .~, p;> ~; >.,.r r~_. ~- '~:.~, > /'r ~ ' __ ~~1___ ~~~-~ ~_' ,~i /~_- ,'v „ . , ! ~ Su rn rnary. ~ ~ / ff t~/'d ~ k ''~ri ;1 rJ r' (-1-i._ : 2• ~ `fi{- ~ / ~-~! r ~ ~ ! i ~ ~~ ~ - /~ - r~' ` I ~ ~: r~a_1 :_ ~.`.1 /~rr`r-1~~ ,.r'+ C ~'~ -~.<~~~>~r r.~ l ~~ ~ t -`1 ~~=---_f.`: i~ r __ '3" ~ ,. _. ' ~ j . ,s` /~,, f .-117 ~_ ~1.'~ ~~1 ~ ~:' ~ Staf~ A~ royal r . r~' ~ ~~~ Data: ~ ~ ~~ s' P~~~jee~ ~~~16eaEEe~ Gate ~L~[_~. ~ 1..~ lGi~l I _ ~f/roect tJame: I ~~-"f"-,~-~t'~/S~L~t~ ~__--~r~.l~ ~r~r~.. Froiect C~eseription: ~~4~ ~i~~ Gontaet person and Phone --°' •-~ 3 - Qtn~ner address and phone: ( ~~~1^-~.'i-..~~_~"~1i ~~~==f (-~~=>i~'~ ~l:l~f.:.;j~~~ ~.t~: i--~°k~:fY-' ,. ~~ i - - as'.-~<"7'a ~ 'J:J ~=~ ~~~"C`<1~---~ L ~°-"'~ - Sri. ~f ~.:/' ~£- ~~ r ~ If ~ ~'/ -: ~~<'.~ ..'~~~' `> r Rrehitect, ~,c!dress and Phone: Legal ~escriptiar,: Lot Biock '~/~ ~> F;ing ~'f-~lr. :-!~,(l~!_~'I•:)~-~..., ~_.~ ,Zone Gon~~mertts: @r~~ign Revie-n~ B~ar*d . ! -~ Seconded by: ~~T- 1T-4~~~'~...1.~°rc~l. ~yPPRQVaL 4~rrjr7ary°: .~ To4ti~n Fla.r~~er j ~~] ~iSaPPFiQi/FFL ^ Staff Appro•da' ~~~~e~~ ~t~~il~~~t~c~~ ~~{~ _ - - `°~ ? Pra;ect 6~~?T'iB: Project ~escriptla~~: t;ofitacf Persan ana Phase _ ~~~ ~ !''l 1 '~f ~ ~D .5 ~~ ~~ ©~+?ner, Address and Pnane: Rrel~itect, Rdc!ress and °hare: I ega! Gescriptic,n: gat Bfoci: moiling ,Zone ~.~ : ~ Garrmee-~ts: "~)'".~ £.. ..~ f`Cr.~i~-.~r-~ ! .~ ~'- ~ ~~""U ~j~'~ !~~'_~ (.~' -~ ~~ ~e~ic~~ Revierrv Br~rd M1~tot±a~ b:~: secgnaecs by: RPPPGV.~,L ~ISRPFRO~JRr. S!!n~marr: 0' `~ __ db'111=i' •7 - I r / ~ ~ ./ .. .. . . ~ff ~~fl... !_ ~_ ~~,r- ri _'~~ C ~ r~ ~-r: 12 /_ 1 Le.. _~~~1 G!_~-' r? c.~ f_( ,~'~._..:, ~~ ~G/ ~ .:~ c.'.~ ~~~1~7 -~' ~j..~ ~ ~~~L C7 f~l ~ ~ ~~-~~.+~e'.~ (~~ ~ l 5 L< __n. ~(= ~ Z t--eb'L- ~J~r,,Tr~ P~a~--~er '~si~tt Approve! /3 / T ~ " ~ ' G .~~ J// /~ Gate: ~_~/~ i -' • DESIGN REVIEW BG~iRD AGEND~i SEPTENIDER 4, 1991 3:C0 F,M. SITE VISITS 1:00 P.M. 1 Tupy - 1901 ChaAeonix Large 2 TES West/Ceiiul.ar - 953 S Frontage Road 3 Mr.chael's Restaurant - 12 Vail Road ~ Va~.~, Village Ina - ? 00 East Mead©~ Drive 5 3uffard - 1130 East Meadow F3rive 6 McInerney/McVey - 232 Bridge Street 7 Lancelot -- 201 East Gore Cxeek Drive S Hong Kong Ca~'e - 227 Wall Stree: 9 Red Lion - 304 Bridge Street 10 Samuels - 22£ Forest Road 11 The Wren _ 500 S. Frontage Road 12 Vail Valley Cons©lidated Water Dist. -Vail Go.if Lourse 13 Vail Mountain School - 310 Frontage Road East 14 AiLk -- 4708 Meadow Drive • ':%f:: ..F .... ii ....... ........., :.:?yt.: ........~....n......x... Fnv.... a..... r... rv.r, r.. r: f. AMEND 1. Vail Village Inn -- RedevLlopment o~ rhas~ IV~A I~a~i 10~ East Meado~7 DrivelLot ~, B1G~:ic 5-D, tra~.l village 1st Ni.^,TICN : George Lamb SECOND : Pat :I2rrir?gton VO'i F : 5-~ Conceptual appro~~al only. Applicant to =vane back and address the issues of landscaping and parking ;at the F~;od and De:,.~. lot) and landscaping ;along the S ~ Fsortage Road) . 2 , Samuels -• Lcevis .ons to site plan MD 22& Forest Road;'Lot 11--3, Block ?, Vail Vl.wlags 1st ~~IDTION: George Larrib SECOND: Pad Herrington VCI'E : 5-C Appro~red as presented. 3. Lan~:elot -- R3of ~;ei-!t 2 D 1 East Gore Creek MOTIO?7: George La:ctb NOTE : 5--fl DrivelBell Tc;~Ar B?3i.lding SECC~NL~ : Pat Herrirgi~on TABLED TC SEPTEMBER y8TH MEETING. MD • 4. Tupy - New Primary/Secondary Residence AK 19x1 Chamonix Lane/Lot 33, Buffehr Creek Subdivision MOTION: George Lamb SECOND: Chuck Crist\ VOTE: 4-0 Approved with conditions. 5. Sonnenalp - Temp. mockup addition AK 20 Vail Road/Part of Lots K & L, Black S-E, Vail Village 1st MOTION: Pat Herrington SECOND: George Lamb VOTE: 5-0 Approved with conditions. 6. Vail Mountain School - New Lights in parking lot AK 3160 Frontage Road E./Lot 12, Black 2, Vail Village 12th MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-Q-1 Approved as submitted. Ned Gwathmey abstained. 7. Hong Kong Cafe/Louie's Restaurant - New Sign/Awning SM and Remodel. 227 Wall Street MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-Q Consent approved. 8. Huffard - Addition/Remodel ~ SM 100 East Meadow Drive/Nail Village Inn Plaza Unit #405 MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0-1 Consent approved. Ned Gwathmey abstained. 9. Red Lion - Change to approved plans SM 304 Bridge St/Lot E,F,G,H, Block 5-A, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0-1 Consent approved. Ned Gwathmey abstained. • 1~ , ~,odge 'dower Sign Variance SM 2C0 Vail Road~I~ot ~, Block ~--C, Vail ~~illage 1st I~TOTIOr.: SECCPdD ; ~~CyTE TAB7~El3 INDEX' ~ NI TE ~'Z 11. Mail valley Lor~solidated i~7ater Distric~ -~ CO~dCBF^L'~iL tiny New ThTell He~use. Mail Calf Course ~dC`I'ION ; ECpND ; VpTE ; OOI~7CEF ~'U~z., 12. Stone -~ New ?rimarv/Secondary Residexz~e SM 121 bvesthaven Dx'ive~Lot 4~, illen 'Lys.~r Subdi~r.s~.or ?10I' ION . Sr:~Ci~,L . t?p'7'E . TABLED TO SEPTEMBER ~.$T3 MEETING. 13. ?~i'_en - Storage Shed ~:,E 2992-B Bel :.flower Drive/Lot 1; F31eck ~; Resub, cf Let iC, Inter;?iountain "fiOTION ; SECfl~~D : ~'~;TF TAHLET~ Tti SEPTEMBER ~8TB MEETING. 14. M;cnael's Restaurant -Awning aR 12 Nail RoadlLot N~ veil ~~i llage 1st TABLED TO SEPTEMBER ISTR MEETIi3G, 15. Dick -- Enclose existing deck JK X708 ~~eado=~ Drivelvrsit ;~2A, Fighorn Towrnomes ~:~Ip/v~TIfl~7: ~7eorge liarrab SBCOL~D ° Fat Herrington V11 J.L ; ~~V approved sun~ect ~~ loran of °y~.il rece.pt of ~.etter stating applicant and applicants neighbor BernardU have reaohed an underst~.nding regarding sharing the cost o~ constructing a du:npster enclosure. Recor~znerded app' icant return to PEC to o~~ert3.~r_~ paging t?f load_rg area requirement ar~d wore tors:ards establis~~ing an escroT,a account ftJr paying costs associated c~=~.th pa~r~.rsg commons dri.~~e:~a~=. 16. McInerney/McVey - New Sign HR . 232 Bridge StreetlClock Tower Building MOTION: Gearge Lamb SECOND: Pat Herrington VOTE: 4-0 Approval of portion of awning to be extended out from door. Retractable awnings are not to be included in approval. 17. ~US West/Cellular - New Sign BR 953 South Frontage Road/Nail Professional Building MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 1$. Village Popcorn Wagon - Sign Variance & Awning BR Founder's Plaza, Top of Wall Street MOTION: George Lamb SECOND: Pat Herrington VOTE: 4-0 Recommend to council denial o£ sign variance to section 26.20.110 purpose which restricts the amount of signage which describes the general nature of business. Approval of awning. Signs part of wagon - design not signage. 19. The Wren -New Sign HR 500 S. Frontage Road/Nail Village Inn Plaza MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. 20. Trope Residence - Modification to approved site plan JK to allow changes to driveway, site walls, and adjacent landscaping. 1115 Hornsilver Circle/Lot 7, Block 1, Vail Village 1st MOTION: Gearge Lamb SECOND: Pat Herrington VOTE: 4-0 Approved: Subject to following conditions: 1. Plant material be warranted for 1 year from date of installation. 2. Applicant notify neighbors to North (Duddy's) when plant material is to be installed and transplanted. 3. Town Engineer sign off on revised plans. Lj]~,i~]BERS PRESEI~TT Neal Gwathmey Pat Herrington Sherry Do~-ward George Lamm Chuck Grist {PEG) S3'A''E ~PPR~VAL•S ; HIEl`~IBERS ABSENT Ledge at Lir~nshead Phase ? - i~ew ~~~a1k~;ay/Pedestrian Uteps . Lot 7, BIoG't 1, Licnshead Est Ryerson Deck Additi o.3 - ? st story deck addti~,n3 Lot 1 ~, BIoG'~ 5, Bighor:7 Stn :-addition filer. Lyon Cf*ice Building - New windc~as on z4est elevaticr~. Low ~5, Block K, Glen Leon Sul;divisior: ABC School - Revision to landscape plan. 1.29 H1c~untain Bell Road Caul:~in5 - Front porch T;=odi ficat ions . ~~;t ~, rjl {j~]; 1}~ iTail ~Illlage litii Odishehdze Remodel. -Install 2 fixed glass windows and ~ skylights . Lot ~., Block 1, Vail ~~~i.llage 13th ~P7ritzker-7 Repaint . Va1~ RC43 11fl~ses t7ickers - Deck expaal5a.c?~, 2033 Ki.ilriCkinr'AiGk/meadow Creek Condos. Pk~ase TT1, Unit E-2 Holiday Rouse - Flue er:Glflsure with new moiler 8yste~i, 13 Wiest '~eado=t~ Brive,Ihot B, ;Tail Village 2nd Blsae Cow Chute - SideY+~Talk on west side. j7i page narking Stricture S.~eppard Duple Lot ~, Block 1, Vail 4Tillage 6th VaillLicnshead Center Conde _ Rep:,aGe existing fAnoe adjacent (around; pool. I;ct ~, Block 1, ~J'ail ~~.onsnead l.st Fraser Sun Room -Add sun root; to ad~ition approved, Lot 1,7, Block 3, VVail Valley 1st • Sylvester Residence - Install 20~ flag pole. Lot 28, Block 2, Vail Village 13th Lauterbach Residence - Rearrange windows/move deck. Lot 34, Block 1, Vaii Potato Patch, Parcel Six Schneider - Changes to approved plans. Lot 2, Block 3, Bighorn 5th Glen Lyon Office Building - Landscaping. 1000 South Frontage Road West Gorsuch Residence - Site Wall. Lat 4, Block 2, Vail Valley 1st Molyneux/Briones - Modify master bedroom area/change window. Lot lA, Warren Pulls Subdivision • U ~~~~e~,E ~p~a~cafio~ //r Il ~ `~ ~r6jFCt ~`3at732: ~,~(~-~ ~1- ll .f.M1'~~.£'~ <<;~'~ \~/S'\i.- Project Descriptior: i\ cs.,~c~•,r,•t.:~/.~_.~~~~.-`~ ~~ r. ~~ft-~<a 1 L- l.~ Gantact Person ane+ F'!~one C?wner, F~ddress and Pl~ona ~r;~~ritect, ~Cdress anQ Pf;cne: Legai Desc~igtion: Lat ~~~ Comr,iei~s ~t l Blocs •f-' .I.7 ,~ riling f,r ~~ ~~~.: ~,' ~ -.. Zone /~ r ~esrg~ ~eviev~ E~oa~d (;, ~. ~~~ Data __ - s s~ ~~... !s ~1~Vt~0n 4E~. - il.'YY-'' 6~ Seccndeci i^~v: ! 'f _C' r. ~:L:: ~t, ~rv._- " O ~,gPi~a `~L J `r _}. ... (_1 C SF,PPROVAL (f ~~ . ((// . J r ~ ~ ~ ~ • ~ [ /.-ri/L~_ (il./~.%~'~-.; "~f`. .f.)"-[.' ~1 )~ tit.i.~ vf~r 'Yl~l If-L- f l=/ .. {. ts~ ..-L,/!! 1!/\ ~ _._ -_ _ - _ _ l I (f \1 ..._ ji t / ' If G ~../t,~ ~ .411 / % ~'~N~~1 ('f.. ~~j C-C .••~ ~ :fYV) it -i _ff~) "i ~It :! :'C=i. F i. 'If'L. /1 </-i.- ' /Y- ~i r.-- y ,. :, . /7 ~ ., '':iY f./^ f ~ /^~f`l j ~.'l!l ~'r ~•.. L~ ~i~~~.r i_i. f~,: ti'_+~ ~~5'~ f~/~ I( l/: ~, l ~~( 1_ ,7 ~ .4-, i. ~ A .. ... ... .. f~ ~ / , A P~% i T^wn '~I~ro~er ~ St s'f A~; ~rCVa! Qate ~r~j~~# r~~~ii~atio~ Date `----- I ~ I - ! ~ L' -~--~-~ ~,. JJ roj2Gt tt,~3171E: ~~~i-~`r~ ii -, I?_. + - ! 'f' f' t .-vyr !-.`~. .~ ~ y ~~~ l 4._ -~~r`J,._!. r ~;~ ~ /-~4"' 3" .~ ...~( ! ~j,~~- ; ~ f~-,~.ti _> /`+l ~ ,l 'rJa/~' I ~ _I; ~ (~ l Project Description: t , _ r _, ~`~ f`'. i I ~~~-. ~. ;~`--..<' 1~. _ I G~ ... ti ~~ ~ lf- .~"~ ~.-- Contact Person any Pt,one ~ ~~' 1 ~.i °°~ t"_ ~~ r~~ r O~rr-rer, Address and Phore: i , ~ ~~t F7. `>`. ~ ji'{._ y.-' t. li' _t ~ i ~ `• ~~',i ~ 1~ I ~ ~ '~ ~ ~.~.~ ~~ ___- ..,~ fit. " ~_. ~ i ~ ~ i .1 _ ~ ., ~_ ~~_ ~~- ,,. I:I .. 1 ~ ° . _~ ii r, ~ . - ~ i _ S ~ ~ architect, F~ddress ancf Gnane r : Yf~ l`-,: l l ~ ~~ ~ ...-,~~.,~` tt-_ 1 i. _~.I._ i f°•~ .s,` ' y ~_ `_~, -~ _,-+ _~ f j /~~l k .-~ l ~. 4 ! -~.. ~~ .~ '.. - - r. 1 -a ~ ~ ~` ~ j ;~ Legal DESCriotian: Lct ~ ~ ~`9' BlacE~ ~ Fil'n~ `-~~ :sl . `~/I. ~ i'•~` i` 1 ~ ~ ,Zane _ - Comm=ents: design R~vi~rn~r B€~ard D~te•_~- ~: '" t ~ ..: mil` 1' i i - SECOnued by: ' d~~. 1 - 1~=~- L~ -fir.... d.:';~.:-I i'~e-- ~PF'I~.`~3vA'~ ', SG;rmart • t TGVJr~ Fii3'ifi°" D_SAr~PROVR.:- ^ Staff Apprcv ~_ ~Cj~C~ ~i~,3~3~€Ca~la~ rJ J/ Cate /_ ` ! `~ ~ ~I--- / / I Project ;~!a~~e: I f...f is-~.. I ~ /) ~,.~.,,.:r"; ~'..-. /~ ~ Project Cescription: .` i i~.i-..i %~,- .~ ._ f ~rl ~ «,~ f~~ Contact PerG~n and P~•one ' ~' OE~vner, r~dcir~~s and Prone: _, ~ / Arch'~te~,t, Adc:ress and PI"•ane: ~ p Lut ~- ~ -~~ Glick "" F''in:,. ,~~.)r ~"('~~~-~/ ~ /}_. ~ ,<~ }~': ,~/Zone ~ ,'~1 Le ai f~zescri tic~n: f CGrn~nents. design Rer~iev-~ ward i Cate - . ;'-' `S~~`/ -- --- . ,, a ~ cRcanocd by: t .~. ~ ~, ~ ~.I.. . _,,1 ~ / I~ISr'~PPRCVAL PPR01fAL ~ c_,,.. ~ ~.1 -- -- ~_ _ ~ ~ ~~ /.- '~ :'; if .~ ~.`_. /'t .T.. -r': ~ J /~C : x. /.`1~ f_~C~~( ii~ 1 ~~ L ! _,.~" ~~~~ ~ ~~~ ~ ~ '~f .r ~/ ~ . f ``~ , // ~. ., j ~~ ; ~ ./ ' `, O' J~ /L f / i s`/f r ~°[ 1 /5 ~~/ ~ )T:;~-gin/('via rer ^ Staff Apprcv~;i Ida±e `! ~ ~~~/ r/ ~~aaec~ ,r~~pii~atic~r~ Tupy ~eszderi^e reject ~~arr~e: New ri ilfta~v; Secondary Project Description E _ J . ~'Ieade Ccrtac: Person and Phone ~, ;,. Daze ~ ,~ ' , t,zon ar.d .Tu3v `~u~ey Qwvner, Address and Pi~ore: 13sC~ Timber'ane, BczuJ~der, ~G, gQ?u~+ t;. 1. i~`~eade Prehitect, ~`;ddr2ss arc Phone: Legal Description: Lo ~3 Block Fiiing BaffeY~r reek Sub. Ccmre~~ts: f.loYian dy: Seconded hy: j l1 rE'~ rTl ~ r}~ Date , ~or;e r/B ~esi~;~ F~~vieuv Baard rapt. ~., ~~~i Dare _ ----- - - -- ---- atnb CrisL APPRQV~.L Vcte° 4'-0 DI~RPF~CVAL lppro~.Ted with the cGnd~tienu that the a~,plieant: 1-- Tkie.a.ify_~t_he roof plan by extending the front: portiori cf the y n n ~ rear ..- +~p~R ~ r,,, .; a y-~r r~.i, ; t rt„ t "^<~r n m a F t f h E? -r r~ n ~~ Q ~ the -~ - -_ _ prir,.ary unit; nd awd crickets in t'r~e tocf to ia:pro~ie arainage, 7-- ~ro TZ~~~~--ui~..~~acu:~3 ~ ~~:~ .~~~_^_~':~lr'.~ to th~~n~-~S-~~j;~.S-.StELt~~T d1Irl.n~ the ~}~~ *_neeti~?g OT Q,~-~~ _ ~-- ~esubiriit the c~_ors rcr the rRvie~_ and a rcval of th° DRB PPA at the Saptemhe~' I~, t~~L rteetirig. / < ~` TG'/d.i F`ar r~er ` ~ '' I,, 5tatf App~ov:,l ~roj~o~ ~~~lioatio~ -~=raject Name: 50~iNE]VALP-~J-TEI`TrOR<?RY EL'ZLLt_~~C Project Description: ~~-`TSTRUCT TE'PTPORARY UT.;ILDIi~~ Contact Person and PE1one KEid {i, ERYAi~ 4?6-443:: 7a=e SE1 TEMEER_ ~ , 1991 Q~;%ner, Adc'ress and Phone: JDH2,.NNES ~'~E~bLEL~c SE?N~~EI1r1LF PP.OPERTIES Architect, Address anc Phone: KEI~1 0`BRYAi. 1000 S rRG:~TAGE ROAD ~~`EuT Si1ITF 3010 VAIL , [;G 816 ti S Leal Descript,or~: Let SD~TPdENALP{ B~~A NOUSE F,'in~ Cornrner:`s: • ?ane Date 5F1'TEI~ILER 4, 1_991 F~•lotior: hv: PAT HERRTI~]GTO~i 5econaed by: GEORUE S:A~IFS - ---~,.- ,APi'RCjVAL ~ DISAPP~~V/`_L 1 i - -~~- THE THREE Ct)NDTTIun15 OF APPRt~VAL TzTHii:H THE DRS I:~Cu"7DEI~ Tr3 T:iEIR APPRO~"-,4L DT3 5EP1Ei:BFR 4, 1991. ARE AS F'0LL01v`S: ~,. PRIt~F. T[~ ISSTJA~~GE OF ~UILDIIVG PERI~TTT. T1iE APPLICA~~T SHALT.: - ---._... ._ -__- Sun-~r,'~ary': 1. PROVIDE A REVISED FARK_ING FLAK. 5~TC7ivTi~~ TIT~iT `~11~ ~t:?~?Ft2 1~'_P~R~TT~ ; ~P1~CE5- DISPLACED Bz THE TErTP0P~4RY STRUCTUP.E ~.A~d BL RELOCATED AS 7ALrT SPACED. ~. PP,OVIDE A SITE ?LAST 530ikII~G THAT I'IP~,E TRU`CI~ AQCESSES ARE t~_~.A~TAII~ED 'FHR©UGH ~ru~. t~~urz-r~~Trt r.n~r n~v~~~.r~m ~r.r. c>;TuarK ~'~iD,~~~---~:~E ~fF ~ ----- - --_. B. AidY UTILITY LII~]uS TO BE INSTALLED Tn 5ERv7I~;~; THE MOCK-UP UNIT SHI3LL DE L0C'111ED ~Jid])ERGROUTdD. . TcTIS T~10GK-UP l1~vIT SF)~1I,i: EE REI=fiIVE1~ IUD LATEI? 'FHAIV ~~~['EMBER 1 S 1_992. - ,~ 1 /~~``~,~tf.~~~`~.,~, Andr~w~Knudtsen Yc,~,n Fianner~ ~L`T Sta,T Appruval SEPTE~:DE'R 4, 199I Date: ir3esig~ Revie~tsr Board i • ~~aje~t ~,p~iica~io~ r7ate _..... `~J.. ~ _•`I ~ Project Name: ~~~'°~ ~+~;i.~r~~~~~;t.,~~i ~. ( l~~f.~f ii~~ ~ ~, ~,r ~.. .; ,~ ~~ ,~ ~~ -~ j, .~ , ~ ~ Protect C~escriPticr: t E~ F~~ ~Hf 1 '~, f n ,~ ~ ; (., ,~~ ~, 1. `,~ ~ t ~, 1~ __ ' Cor:tac: Person and P~•orre 1 i~ , I .,.:i ~ ~: r ~ ~ ., ! ~, ~~-~ r f ,,~.T 1 ~ { ; i•, , c • ,'~. r ~ ~. . ~ : ~_,,~ /; r / I ~ °~ , ~ ' r ,. I ,, . 3/, r I ~ ,.., •......~ i Gwnar, address and Phc~Re: , _ ~ __ _ 1 ~rcnitecL r^.ddress and P~~r7e f Js, /~~j[ A' )) FFYi / tr Legal 7escri~~ien: Lot ,Black F ing Comments i~ ~~, ~ 4 Ftiic~ti~n ~"~~: C~ 1-~~ i.^ ` ~`~`~ Seccr~dec+ txy: ~~6/f! r.~a:r i~ F.PPRC~Vf~L~ `~. Siammarf: i• [~latE~ ~e~i~r~ F~~-~ie~ni ~Qa~d Zone . f I F ' r Cu.e _- ji CiSAPPf?v~JF~ _ i - - - - --- - ~ :~ f .;' ' ~` - ~ ~ - r ~ { /~ b` alai P~;^l,~C/Y.I ~~G~@G~ ~~i~iiGc"~fi03'1 } date __ ~ 1. ~~, reject Marne: i F ~ I ~. ;, ~ ~_`_ i (i 'r ~ i P,~c~ject Ge c~ipt~on: _ • `~ ~ - ` , Contact Person and Phone 1 Cmvr:er, ~'ddress and Phone: ~! ~~ ~ ~~-. 1-~.. ~I~_ ~ ~~~~` ~~ ~, ,4;chitect, F,ddress and Phone: ~~1~1'1,~~{.,~ ~`~~`~~if~~~~,~1'~~i'~~Jt/ 7 ~~4'~~1~~ ~ .~ - Leeal descri~-iQr: L::. e :~ ~~ - Commar*.s: ~~sign ~~vie~i Boa~~ t=:t~tien hy: ~ .~~~#~~~ ~eccnded by: ~Y"9~1~5 ~~ ~}~'' ~a~f ~ APPRO`t~AL ~~ ~~,!~ I.~~.,C%/d~~~ ~~ ~~~f~ ~~ J ~~ ~ ~ ~ ~~ ,~ / J Summar,°: , F L I~ 1 - - ~~ ~,. .(~~ ~ I~ ~ ~~R ~~~ ~. _ - TOirn?lar~..ner Late: Zar~c . Date ~.-- -- - - D15P.PP~C`V~ L ~V- _ ,~, ~- ^ staff Appro~a ~~'il I~ ~- t ~ ~~ I i C~ .~ ~5 (~ Pr~~e~~ ,~~~~~cat~Q~ c ~.i / ~ 'I \ ~ bas ____ ~/ !_7 ! r ~~~ _ - ~rc3j2Ct ~!arrle: < (~ - j Projec~ Description: ~ C-. /l.•'~~C. y ,C r~~~-~- c_~ _ /L.+- - `j c.c_f'_,'_ ( Contact Person and Phone ~~ r" f c '` C~lner, Ac'.dress and Phone: Architect, Address and Phone: r i i ~ ~ {' ' / ~~~!_~' C ~--~~ ;~C~ f'~'~ l~~ ~J L ~ r f r.'~C' t- ~~ - ~~ 1-C CI .~ t- ~, ~ .: ~ Lagal Dasc~~ipticn: _at ~ ,•~ ~ P .,ck Fi!~n~ _ ,Zane ,, r Gomrnents. -Gf,~! l vv~~- G ~ r 17 ~ ( ~~ ll~-~ ~ r ~,f C~ ~i ~-} f~ '~ I7~.P L..IC-ii~. C7 .1~,.`i ~ _ CEr-1.`~ ~.f%( /~w ~ f J ~- ~~~ ~- ~' ee`.--~ ~ l I ~~-~ i Qes~~r~ Review B©ard ~L~otien ~•,~: ~ ~ -~ -/- [! Seconded hy: ~,~ P.PPR(~5J:4L QISAPFPO`JAL '~ ~! W .~ -- -- ~. - -- - --' -- , Surnnrar~: ~ - ~- } I l) ~~ ,~-~ Ca ~ (_ u ~i ~; ~.'~1 ['~I;'-~1 C %' J1 , J ~~' ~t ~ _.__~~`Z ('_ I-/i , l ~.- C~ t,,; j ~.(~ c `, )- - / i ,r .~ ~ , _~-~..~C%U,~ ~•~~-~7~c cz.J f,- ~•~~ ~~c c~~~t c~~, ~`~ij ~~--` ~`t x;11 l~ ~ s~' /r C%(. ~~ ti ] -C'v ._~. /7 f~~.. Zi ~f-c ~~li ~ .~G'~-L AJ~t~ ~1 f ~C. Ci LL~'GL L Vic. I.l 3(-~S r/J I ~l C ~C ..L !C t-''{' ` ~ 7 i o(v~i Planner ^ St~:ff Elpprava! L'?ate: r / ~ ~ r ~ (~ /`~' ~ ~~ `t a tj' ~' ~ -j~ 1 i ( 1 1 Rr~j~~~ ~~~€ica~iar~ D~.te ~ -. - ~rnject tJame: ~- ~~- ~ J~~~'!/~. l Protect Description. n a ~ ~/ L%~~ ~~-• ~, ~~-'~ %.- ' ~~ Contact Pers:.n a.nd l~h~ne Gtivner. Address and Fhar?e: __ ~__.__ _. Architect, Address anc~ ?hone: ~~~ ~ ~ ~~-~.~~ `~~~~~~,,~,~1~Q ~ ~.,'; _/(~~~~~ ~ t k ~ ~~ ~ .~ f .~~ ( ~ ~ 3 L~gai ;ascription: Lot a~-~~~~ ,~ ~~~' Block ~~.~ ~"~' ~ifing _'~.,~~,~/i ~~ ~t~(..~~~1~~ ~-- ~ Zo~2 ~.. ~_. 4 .~ {` `~ Garr~n~ents: • C~esi~n Revi~v-r Board Date _ _ ~I f .~/I /j ! ~/N--r Seconced dy: ~, _~ __ PPRa~~~L a~sA~PROVA._ Sumrr~ar+,: .~_ ~~ 1'~ ~ ~.~z ~'~ ~.~ l ~ A~"~ ~ ~,,~ ~,~.~~~~ ~,,.` ~ . (~,fi-_;-elf ~ ~t c~ ~~(~ ~~ r - -- ~ _ ~"~q~rr Pig;ir~~r ^ Statf F;pprov:~l Date: ~i~c~~ec~ ~~~licati~n ~rolEGi f~Jame: ~ ~ 1 C 1 ifI r~~ c~ .c~.^-- - ~lVt ~'. I/~ftt - f ~ 1 Project Description: (' drn .~ ~ f.t e'f l~LcrLL r~l~~~. ~ et ~'~f~n ~:f G C •u f C(,~ ~~~ 3 ~'~.Li . l c'~ ~"1 `/J% r R {nf 1 !f ~~~ ~ ~~r !/fir S ~.~,~ ~~ !-i.l' `.~ ~ ~' f~ ! (~~,(,9 <~ :7 Cents..t Person snd hcnE rr //~1~] ~ r / ~ ~ )` i l i ~~'"l ~~ ~~7 r''`I ] c"... ~ ~ P (~~~ ~ ,_~ ~ jc c •Z i~j ~'~7. f ~e~~ ~ , c~~~' >, Q~~rner, Address and PhanE: 1 Arcritect, Rddress anc Phone: Legal Description: Lo` Blocs ;=ilino Zone //, G'''C L~ ' t /\ ~L 1 ~~ c~ 1 ~`_ C3~ 1• ti. t/_ ~' J , l ~ ~f ~ ~ ~.. ~ , C ~: . , ~ ' ) (' c. ` ~ .t ~ s ,` ~ , 'x L~.U ~`~ ~ --~-v r k'_ C~~? ~'~ i.~ ~~ ~~~ I d' (~-- ~i~)-~ t ~i Y"l~' i i ~~~~~'~C ~~"t ' 1 t ?~Ji~ '- ~ ( C'~! j j ~ I ! ~esig~ RevEE~ Bca~d Date b t~~ SecondEu ~ ~~ ~~M (~af~.~ ~¢PPCV`AL ~, ~ . (~ i315APPB^`vAL ,~ / ~' 1 • ~'~ ~ ~ _~ I SL~rr!mar , ~ (^-e- l ~} ~f~- . .[.C ;`IY-~d. r 1-f=i. /""~~T. r [~: i amt r- ,.: ;,..1 -'T ~C __.. Tc..r; Fiant}er ^ ~fafr A:~prcv3l Date: cj~ ~~/ %~ i ~fJ~ ~ ~rc~~e~6 ~~p~i~a~i~~ C C I ~~, .. i` G G to 1~/j o~ect FJarne: Project Descri~tior,; / Car€act Persa~n and Phone Qwner, r;ddress and Phone: ~',rehitec*, ~cdress and Phone: ~'~~ J C~ .,.~ /~-y Gil' ~~7~ ~Jc-- Legai description. Lit Bloc`s >iling Zane ~-- ~, Cemmen*.s: is rf - i ~~sigr~ R~v~~-,~ ~c~ard ~=-~~~1 ~"atic~n ~~~~ 4J , APPR~`J.~,L ~ e / ~ Dat~•: i ca=•r: FIB nnvr `~ ~~ gate ___. _.. __ ~15F~PF'F?~~dF~L ^ ~~?tT E'. E'i 710V ai ~~c~~e~~ ~~~ii~:a~i~r~ ~~ `~~ %~ DC[e -...... - / l J / rc ect i'~arr~e: ~G~lr~Crc~~!GC`C` •~ ~.~f.~ ~! - f'' /l ~.'J~1c,~C. O~c-I • ~iL ~rl~" • . ~..J Pr©ject Descrpti~n: ~~C/' - /1~J ~~ ~`JL!/1J,~ c~/<'cfll.')Z~,1 ~ ~! Ci%~1~Y.f/'i1.1!%J~- C:'~ .1.'iY/._Sfi/lr~ CC1/il_J/r'c ,.. t / / / ~ '/ ! {I Ccntac.t Person and Phore <~~~~~(/CfdLZCf, C):vne~- Address and Pdane: R 5~!)~Gj l~~r~~'~) ~C~ ~c`'j~ ~c~1 ~/, ~/GC.'t_{",~ C f~., c~l~~; r~`~ J i ~ i ~-1,~~~~ ~-~l~ - Cuff % ~~~'~ `~~7~ - ~/~~.~ ~ ~r~/~ f~rr-~itect, Address anc' Phi"n~: E-~/%/! //~G'F'lc~~ ~•' } J"~l ~f-f[ Bw3~ fff ~ el/)'f C•!_.~' z ~~? ~J- /~/t`C1C%G'G~ r~~ ~~~~ c (;~ Vic: ` o~~~ :.~'% r'r'%e~/L~% ~~ 1~ _ _,~%C> .1 J, Legai Description: Lot BIec4 riling f/~~L~~ ~i/~CF=.%lL [~=f~ ,Zane Gomrnents: /"° %~J -."s~' l..•~1+SlC(it °` ,6/GCr'L/°~'=~t'. t?/' c~%~'.r ` J ~ u ~~'°/L`~C ~//~41~~/~! G~~L -L~~IIC~GL GBJ C~~l'"~~ '. ". ~l~ ~.~f/Il[/ /J-6c:Ccf ~E'. ~~Li~~F'/J1E'C~ GIJ°. ,r f ;fiI1~~ ~11~C~GL''~~lJ ~~~~ l_?Cit.'.!!/~~S' ~~' /f.i<~~rl~~, c~b/~ C~ft"coil ~ ~/~ /S >r1c~OC cr/iCL~ <yLf ~~` ~3~[~~~ ~ ~~~/~~~1 /r~~GG'~~~ /%7L'I/CItC.~ 5cn/~ /~%i1FClrlf-~7r~rrc /S ~'F'~ufilrC~f . ~ ~~i~esigr~ Review Board c ~~%~ Gaie -~~ / _ _ Pt1ot on ~,~: Seconded b)~: ? ~~ ~PPF~O1tAL ~.i``it~ ~~ ~rs t~se*/IG"Cc ~~~'/rf1 4 DiSAPPFiO'I!',~_ ~~~~E'G~iSC ~~5i,4I ~~/]G31/ ~IU(fC//7t! N'iC3= ~~,L/'/~Tje~CJ] ~'_fJ[G, c'~Fle•~/i"L(' %(~~Ei Gf`~l~>/J /7C"C~~~_`~:'/ • Gif7%L~Gtr}~J'L7r/.Sf~ti... . /~~~ rF i~l~~r~~~f:S f1J~~[`L'!e~~) `.. j~J~sc.'."lJ~~G' >G-~/~l~fi{~J!/fbG["ilfr~ /"~~izCr•.fj~!! G~~G:'~~j} f~~~..~ ~~~Gl/~f/lLjrl>c/0!i/L ".SCE/~.l~i~ S~~ii~el! _ ~ -- / ~- ~ ~d! 'J/JEC'i !sue f/ ~, ~ j )~ <. , ~/" ~/!"~', L~/~~ /~~'i~'Lfr' cf iZ~I.~vG it`c t'_{_'_~~ ji/S/~/~.~[c~c'~~lCZ"?~ ~~*ii~r/%ii/~r:i~' _ ` y ~ ~; i lli ii~1 ~`2 C.. i J('C//~ 7.: C'el. r ~ -_ Surrin~ar~'. ~~jlil~St"t:t r,'fJCf/il ./~.~:~g~~1C11:, fJc:~ Cc/~%L"'G'l'•Cf./~ ~~:'%~ c.~Cl_C~c~~,~~- ~~~'~=~T' Ci~~.i<'/Li1•,<_, -~'~1F'<_<:.1~ G)`F.~'.%dJti1 Lz~`~G`LurLC~%/1 ~~~~' ~c~tr:'%1._ ~. C~Cd~f /iJ C'G'j~t~~i'.~iGl ~.' ~~i'l/~_~T`f~•~Cl tI.~J~_.:~ ~ tf ° ~ ~ l %~ Y • -.. _.~~' C'P ~ r~%'~_'l' !i' L~-~ ~f.~` CL, ~ ,f~'%ia!r' ~~ C 4~%7~1~'f.IGO~Gti ~'"i<1C'` (`_ .. ,~ o ~~~i/ ~:S>'-~l'~SLFa~~ /x?.,w~rir>r~ ors ~Gtl,° ~~ ~idil'Gi/<~~f~i°ffr!r~~rz%~~~4~~~~1~c/f~IN~G'~. ~~~r fi._:s-~I .~ f/~v/~ fi-,~vz`'~,sc%~1~~~~~~`i~ .r~~~~lGcc7%Gi~~~'f.~/r1L'P~ ~~ ~'r~1e~~ fi~%°/~ ,c~X~'~i~/ ~ /ow Ct~~~~,~ - •S%c/FS~~ Tr~rr~3'c . R ~~- • ~ ..._. 1 T~'4ti'r ni~nner ^ jtaff Apprcvr:~! DGte: ~ ~~ ~~~ ~Prcject fame ~ Syr 1~.; Protect Geser'pt•~an ~~ id' `!',/ Contact Person and Phore Cw.ne;-, ~ct~!ress anti Rhone: ~r~je~t i~~,~ticafi~n ^ate _~ ~ • _' ~ j Ir Arehstec., Admires; and Ph;.•ne: , , ~' ri~t~ i ~l' c,~:~•';~~:`~~~ r~`,) ~,/l. . f~; :; Leal Descri~tian: Lot Rlcck Fi!in~ ,Zane Comments: ` ~~ ~ ~~ ~~sign B~~i~vv Beard Date _-._ _~-~-._ - .. [~,lotia,n a}~: Sueanded ~v: .~PPRC}~lAL C'.SAPPRCVAL ~umrnar~~: ~_ -- - - --- - ~~ ~ ~ 1 ~ ~i -ev.~n Pian~~: '~~. Stan A~,7roval gate: ~ ~~ ~ 4 I ti ~rc~~e~~ ~~~alic~~i~r~ ~rr~jeCt carne: ~f~ ~r?c~r`412 ~/~7~f/~r '~C./~ ~~i~~4r3 ~~P~l~Dcc~' ~r~/f,~~ ~`i~~T ~,~ Project i~esc`rlptlQir. o:~iaGt Person sn~ PY-~cne i~GUi?~`,3!/~' / 7/ Q~n~izer, ,4dc3ress and Phone: ~/l~i~` ~~/~ /~~ ~~~ ~1` ; ~~/~ ~~ ~~~'Sr°~ ~rchite~t. ~.ciaress ~n~ Phone; ,bra, /a~rrl ~ c ~s?fo~7~~ /au> d~~~ LeSa' L~eserirtion: Lot ,Block Fi'.=i, ~~ ~~/~?~~ /`--~~ ,Zone ~u-f~~">/~ ~~rr»!, {/ Corr;.n-rents: ~rG~°'1~ c3'~~'~j f,~iY~ ~'P/.~i~~ ~~,~/~r~~v.~ ~r~ffi°C/~~f f"~G' ~°D~~ ~/ i i~e~ign Re~ie~ ~€~a~e~ , / ` rate ~ `7`' /~/ ~..-._~ i~~ v ti c n ti y: ~~'~ ~iJ?J T~ G~/J~7YD i/~ ~GG.~ f P~ ~ /~~J'Z~J Seconded ay: ~.~ 77'~'~~~"/f ~~ 5'~© ~~~rDi~ ~'~PPRO~fr?L B~SRrPf30'J?,L I.~~2~ r~~~rn.~ra~n~Pc~ ~a~lrea~~ ~~:r~r-~1~~ ~ -PEC ~ 6fr~°~"`~u~r~..~~v`irt~ ~' /oat/~rl ~~~~~ ~,~~ ~~~~ C~~s ~S~'octa~~ lvlt~ ~Q-r/ri2a Gadr?rrr~a~~~~r°~~ ~racd Pamir>>°~>~~, S u ~ ~ : n~ a r ~; : c.~G€ ~,%~~ TU GOB`/~%I12~ `( ~~.~i"~~d` .~ ~uJ~i /S~'G~.~?C~~~ 6Gle~di~ ~ o~'~~~ oaJr7 v - -- --- - ~us~ ~ ~~~Ev~ /~`. ~v~ ~,~~1/rC~~ ~~ ~/./rlo.~r:,,~5~ /.~~r~~rs 5r-;e f~~"rz~r-~'os ~~ ~~~~~.s~r~ ~~~~~~ ~ ~~reemzrrc ~~~~~~ .~~ ~~ ~~f ~ssocrc7~~'~' , ;.~ ,-~~„ :~~ ~~i `'r G~~.~s,~r~~~ ~- ~~~~r~s/er ~`~~ur~z . ~ ~/ ~.? ~ _ ~a -~-~ -/a sr~'z . ~~nclsc~~ ~` ~~,~ re rl;2~t1 ar?d ~ra~ mac-! ---.. ~~JG.1'J ii ~/~~r3 ~"7 ~ i F r ^ Staf;' Atrprcval DESIGN REVIEW BOARD AGENDA SEPTEMBER 18, 1991 3,00 P.M, REV'~"SF.D 9/1.8/91 - 11:30 A,M. SITE VISITS 1.;30 P.M. 1 Bxoaktrae Condor. - 980 Vail Viers Drive 2 Ship and Cash - 1031 S, Frontage Road 3 Chicago Pizza - 1031 S. Frontage Road ~ U.S. West Cellular - 953 S. Frontage Road S Sto:~zer Residence ~- 338 Rockledge Road 6 I{aisex/$all -' 110'14 Bighorn Road .....: r:-.,,-.. ni ' ':... ..............:TiY.i .~-.-tL::t:ri ~Fr "F:'F.~ :FF.:I .'F:::C,:........- ::..~ :::.}:'r ': "r.fvf. .:+:'~-.. . ...:Yr=:;i{.::i.:?{4~;r,~i.::Y.i7'r.'FF..:f!{.,:.r{~i:.:r:: r: a::.~ :•:: s.• ..:..... lllfr.. ..:::: :.............:: r. ~:::.v.• r-.ll....., ~~- --- .......................4..., r . Fi'v}: i::i"-<~:i": " 4 1-$:::~. ' ..:Y v ^3 .............:: ::.. r t .:.. :::.::. ~ ::...: :.. ~:~:::: ~ ~:: _: ~::: ~: ~ ~:::::: -: ~r: rc::::::::::............ ..:,......... .:::: x•:.:::::::-:~.s.:4; •.~•: I.>. r :..r...:::.. .. .: ---... .::~vS:...: 1:riY+ :. .................~.:..:...:..................................... ...... ......... ....:::................ ....... :.....F.Y. ri:i: vrv:::... ;. w•.::.::. :..a..:::.: ...................... .............:. _::::....:...... n............r: ~-::. uf.:..;•;.: ,...'-r:~i: Si}: i':::.i"-: i"-ii:v.-: . ~: :.l:f.:rf•::.::.* -T:~::::t.i: ~~i::v. ~::: ::.:~ r .:::.::::::::::..:.:. ...............::.ter:. rr-..::...:-: r -r:..~.: ....:rrir:•:•Y.. . ................. .::::: :.:::;!. ~..::. ~:. ~::: v::: nom::: w: ~~-~-~~ ::::.r...:'n:::::~:::::::: ~:::::: fi:^._..... r::::.r ... • ~.~,..{_: .... -k::::~.....:::.:.ii.;`ry::~ L.: v ..I .. i.. f.... ~. :.::: ~ -:r :1 ~ r i:1': ~ . ..::.:......... :i: is is ~:.v: ~.:/.::: ii:.:::. ~ ::::.:..: :.::::::.:.:.: ~:::v....; ,.. r::. t:.'r...':-i: ii4:.::...r ..... . ........ .... ...... .. :~•:: y4: "f' ......... {iti.Y.: ......~.....A:..i.AVn'! .....: .: n:l .. ::::w:.r::'fiifl!"lllfi~ri.iii::Civ::'_::._:_ ::::::::::: s }n::: i'.:::... :::• .:::..:.:....:.x:~ .. .'l. .':..:. _:; ': '~"+ :. .x:.:.::{.:CVx......v ............:.:... ~~:4:i.::4 ~G~~IU?~ J.. Gre2n Residence - Neva Dri ~a~*ay i~lD 41.05 Columbine Drive, Lot ~.~, 3='s.ahorn S~~di~ision ~IflT?~©N : SECfl~iD : ~i~'?'E 2. Me~:iories ~~ Va-I ~ Roof ~Ient MD ~Ol East Gore Creek Dris~e;'Dell ToV;er Building MGTIC~N: George Laan~ SBCUND: %ruck Crist ~IGT:~ : A-0 ~pprav?d. 3 . Town of ~aiw - nir Condi~icr:in~ iJni t ~cx~ Computer JK Room, 75 S. Frontage Roadi~iuricipal Building Nit~TIG'N : SECGrID ; ~'.~.T~ TABLED STAFF APPROVAL 4 . Genun~ - X50 ~lddit; ryn, ~L'il~a Co:~twna. #3"~ SM 22 ~7est t~~eadew Dri~~Ai Block H, ~73i1 ~illa~e znd ~G T zfl~ ; ~EC~r-~D : j~~~E STAFF APPFcO`,TAL • ~;: ~ - 5. Lytle - New Hot Tub 430].--B Columbine Drive MOTION: SECOND: Staff Approved. SM VOTE: G. Stone - New Primary/Secondary Residence SM 1241 Westhaven Drive/Lot 44, Glen Lyon Subdivision MOTION: George Lamb SECOND: Chuck Crist VOTE: 4-0 Approved with conditions. 7 . Kaiser/Hall - Color Change "~~1`~ ~'t~~~~~ ~'n ~ SM "-4-87-4 Eiyl~~rna :cad; pct s Dighe-~r~----S~h- iv~s-ion ~. MOTION: George La ~ SECOND: C~~~k Crist VOTE : 4-0 ~,.<~ ; ~ ' ~~ ~~~~ ~ , '~~ ~ ~~ , Approved with conditions. 8. Stolzer Residence - Modifications to previously MM/AK approved plans. 338 Rockledge Road/Lot ]., Block 1, Vail Village 3rd MOTION: Sherry Dorward SECOND: George Lamb VOTE: 4-0 Approved with conditions. - - 9. Spruce Creek, Phase SIS -~ New Single Family Residence AK 1750 S. Frontage Road West/Spruce Creek Townhomes #5, Phase III MOTION: SECOND: VOTE: TABLED TO OCTOBER 2ND 1~ETING 10. Michael's Restaurant - Awning 12 Vail Road/Lot N, Vaal Village 1st MOTION: SECOND: TABLED TO OCTOBER 2ND FETING VOTE: AK • • i1 . Tupy "' :~e4Y Frimar~~! Se ;ordary Residence 190. uhamcnix LanelL4t 3:;, B~l~fehr Greek S~bdi~i~~on MflTIflI~: George Lam SECOND: Chuck Grist VGTE: 4-0 Approved with ccrditicns. ~.2 . Chicago Pizza -~ i~?e~~ Sigr BFI 103? ~ montage RcadlCascade Crossing NOTION: George Lames SELGP~%: Ch31ck Grist VOTE : ~-~ Consent approved. 13 . J . S , v?est Cellu' ar - ~IeLti= sign Bft 953 S Frontage Rcad :~iestlVai.I Fx-o~essic~~al Bu~.lui~'ig '~flTsfl~I: George Lamb SECO'~ID: Chuck Lrist ~1'OTE : ~-~ Consent appwe~.~ed. s.4 , Nail Prfl essicnal B?l"ding - Si;n Pragram r~ Ne=~ Sign BR 953 S Frontage Rcad Westl~,Taii Professional Building 1~1fl`~TO?V : George Larry SECOi~I~ ; Chuck wrist ~, Consent app_ro=.=ed. 15 . Broo'.:tree Ccrdc , - xeRoaf BR 980 ~~ail ~Iiesrr Drive ilOT1O:~1: George Larlb SEvflI`JD: C7'i~~z:~. ~:,~i~t MOTE : ~-~ Consent aa~roved. i ~ . Ship and Cash - Ney-a Sig~'i BP. 1031 S Frontage Road~'Ca,scade Cressi rig ~D ~~flTION : George La:r~b SECflivTD ~ Chuck. Grist SIflTE : ~-0 Consent approved. 17 ~ W©rksassion - i~isvussion of proposed amendments Lo BR to the sign code reiatirsg to display beards. ~~ MEMBERS PRESENT: MEMBERS ABSENT: Chuck Crist (PEC) Pat Herrington George Lamb Sherry Darward Ned Gwathmey • STAFF APPROVALS: Timber Falls Unit 603 - New bay window. 4503 East Meadow Drive Evans Exterior Changes - Reconstruction/Remodel of Deck. Lot 4, Block 3, Vail Valley 1st Langley - Addition of skylight in Unit #10. Villa Valhalla/Lot J, Block 3, Vail Village 5th Mi11 Creek Court Building - Tnstallatian of 2 sets of windows in Unit #403. Lot T, Block 5--A, Vail Village 5th Perot Residence - Landscape/entry walkway revision. Lot 31, Block 7, Vail Village 1st Kaplan Residence - Raise roof in existing sunroom to align with existing raof line. Lot 5, Block 3, Vail Village 11th Village Center Condominium Building -- New lobby where trash room currently exists. Lot K, A Part of Tract C, Block 5-E, Vail Village 1st Zin Residence - 250 addition, add window, re-grade and landscape rear area. Vail Galf Course Townhomes Unit #N-49 • Beck Residence - Exterior repaint. Lots 2 & 3, black 6, Vail Tntermountain Trope Residence - Add bay window to approved plan. Lot 5, Block 1, Vail Village 8th Hormel Residence - Replacement of retaining wall. Lot 10, Vail Valley 1st • PUBLIC I~D~zcJ rIOTICE IS HEREBY GIjJE~v that the Design R_evie~~ Board cf tk?e Town of vail e;7ill hold a pusalic hea_rin~~ cn ~epte~be~ 1$, x.991 at 3: c~{~ p.m. iT1 the To=ran of Nail Municipal Building. Consideration of; 1. ~~ request for ari additional 2~CJ square feet of Gr~;ss Residential Floor Area for the Genung Residence l~;uated at ~Tilla Cortina Unit #~5~. ~2 ~~7est I~~eadow Drive. Iy~p~.Wcant: John A. Genung 2 _ A request for an additional 25th square feet cr Grc.;s P.Gsidential floor area r"o~~ the Browning Residence located at the t9ontaneres Unit ~~18. ~~4 ~~est Li:~nshead =~ircle. Applicant: Pr_scil.la E. Bro~,nina `t'he app.Licaticns and informa~ion about the proposals are a~railaY?le in the zoning ad:ninistra.tor's offiUe d~~ring regular effice hours for public inspection. TOC^32~ OF ~,T1~ZT~ CDtfA!UNImX DFi,'F~:C~P~IBr:T Published i n the ~~%ai l ^rail on August 28, 19J1. ~1 ~J ~rc~ec6 ~~~iicaQic~~ D~ttP, k Project Qescr pt a~~: -l~,~t ..-a i -' %~,~'- ~~~~i~~~ ~~-r~.__~ ~~~ f r1 Contact Person and Phone ~~-._1C i.-_~l=°_c~?'t "7 ~~ ~?~,!~ _~`-<~ _~ i f r> '> j > r-~ _ ~ _ _ Q~h°ner, ~ddrass and Pl~one: -- -- - r"-Ereh[iect; Address ar:d Pone: Legal GESCriPtion got F~.."~'1+~~1 Flock .7r~ Fi,InY ~~ l Zo!~o C;cn-!ments: C7 design Re~rier~ Board Cate ~F~~ ~ ~ ~~_, # ~ ~ ~~~~~~~_~ _` ,__ ivletion bk`: C - . ~~_:(~_'--L~~~ ~~r'~s-=f~-'~7 ~P~RO+;~.L~~ _. S:~rr.rnary: To~'~"1 F'IS^rrer Date: ~_.:-~~' ~ . `~ ~~~ . ~ ~~°1 DISAFPF?CVAL 5taf Approval ~r~j~~~ ~~~li~atiQn ,; ~ ~roi~ct i~amE: Praiect ~Jescri tiara: ~~~~~r~ ~~ ~i~/ l.t:'~~•' v~~ ~ p Gentact Person and °hcne /~, f f /~ `, ~` ~ ~ e l ,~,~ ~ ~ ~. ~~ G~rr.er, l~daress arFC~ Phone: ~~ ~li !(~ '~ G'! ~~~t ~ •~~'/~~l1 ~ ~~ ~~G'+J~ 1~~ „} } _ ~Jr^ architect, address and Pnane: -c ~~ X L~~,f ~ ~~ ©~( ~-~~ fE/! 1~•~~ :~ (f' "~ r ~e~al ~esoriptior:: Lat ~-~ ~';o4k F'`~ F lir:g ~~ ~~ E ~.~1~ /tir J ~ -j~ __ Zane _ Gamrr~ents: ~~sig~ Review Beard date .- ~I a~~~~~ it ~ `. l ~ c= WL~n flAptlpn i~}~: 1 / ~eGOr'Ced b~`: ~/V `/11~ ~~`~ i~~... i ~~11 V ~;1 I :~PPRO=,~a, i ISaFPRCVAL Surnrnary: )' . ~~~ ~ - t ~ ~ - )i ~ ~ ~< ' ~. l~ //f-`µ ~ ``o~ r~Pia,'~~z~ ~ Staff Apprcva! date: ~, ~ ~~ ~•. t i ~r~~~~~ ~~~~i~~~~~~ `J~• ~`? `7 ~ `~ ante roject ~vamz: .. _ ~ --- F'rcject Goscr;ption: ~L-r..•,~-9~ /' ~~~~ '~~,~~s~.~--e~~ / ~ . 1 ~T~-r~ ~.,::;, ~..~ .~la -~ti:..v.~._ ~ [ ,~~~ .~i~~t~s~~.~,, r ~ / Contact Person and P !~cne ~~1ner ~`dd~ess anp Pore: ~,rchiiect. address and PForfe Leal ~escrPticn: Lot CQ~nrnerts: • f'CJ ~~~ ~~~~ ~~'~~ Block Zane ~F~6tIQn X71`: Seconded t;~`: ~':~r'y • ~4` ~ 1~7~--.lf .. (.=EYPPR~V~L ~ ~ ~ ~-~~ ~~~~g~ 6~~r~i~w ~aairc~ C!SFEPPRC~VAL ..~~lJ/2~~~~1_._~ r{~) /jl.~.A-./trl.?~ t?..., • ~r ~/,~i 4~~i'-, f~+?^__T=ri. r._~~.. ~ 7 / ~ ~ n.~ .dr' 4r~ f I,~~;it~t"AOr- ~~.~ C f." ~ I ! d C_ ~')--C~. C ,'~ ~~[, i~ _ ~~.~_ ~1 r_, v: ~ - cve,~i .~~.~~:~~ef~~%. ~,~-e.* --i~ ,r-r-r~-~.,~-~2- ~tr' /~.~~~c,.~a,~.(~~C~' ~i't/.~~~'E:~ .1~~ ; ~ ---- 1\ _1~,/CC.ES.C M1~~~ ~ ~~~ ~~~-"C P_'~~iF~_ ; la~ - ~-1 .'~~ ~1~'.:?~--lrf ~'~ ~= i .{i ~. L ~ ~ .a _: ~ ~r ~ _._~_. --- -- ---- _ ~~ e ~1~~- ivwr Fianr~er L Staff Approv~;l Cate: ~~'~5~€~~ ~~~~~~t~4~ ~rcject ~'an~e: ~~- ~ l (~ C~ ~ d ~ r / ,, /G Project Cescri~tion: __ ~~t_ ~~ .._ (. .~I~ ~ ~(i -~Cf~., (i~-. t"-~--^~a- J Gantact Perscsn and Pnane '/ ~ /!c li r f 1, C]u:me€', r~ddrass anri Phone: P.rchiteat, Ftddress and Phone: "v ~~~ ~ (~= ~ f r1~ Da'e __ ----- c--~, ~~ % (j i ~ .~ i i / _ -- Legal Description: Lot Elac~: ,Filing ,Zane -- Gorr~n~ents: / ~/ ~/ r' .,. I ~ ~~ i €~~sign F~e~-ier-~ 3oard ~' ~eca~nde~d h;r: Date -_.... r~PPFiC~V~L L`S~FPROVA~ ~__ ~ CJ:? _. - ~ _ L ~ r f rt -- - - _ ----- - - - l~/ S~;rr~marv: -' ,~ L ~Cl..~a`/ ~JE'( t.c'_~~'C..., ~f_!1-l~, _~)` i~4i.t.• ~~"/ -_--` ~~~~-C. CL 'C i ~; = Lt~' (. 1 ~~ ~ ~ .~ ,• ', ~ev~,n Pian~?~r/ irate: ~~ ~~ <~ / ~/ ~ ~ Siatf 1;;~}~rov:al 7 ~ -7 ~rajeat ~~~iic~ltias~ ' 'I / ~ _..~ ~~~ ~ ~ / ` Cute ~ ~ , ~ f ~ ~ -._. _.. -. ~rcicct far-~e: " '. ~ . ~~V .~~ / C. -~-~~f' `C l rte' ~' l -- ~~1 ~` ./~/ _ _ r raject Cescripti~n: Contact Person and Phon e / ~/feR ~i //~ `-- CC ~ ' -<-7?~f ~' ~~i'i_: c.rz ~ ,~ ~ C?U . ~ / /J (~ (-z~, (i ''~ C.~~ne:, Acidness anc Phon _ - e: -` ;~rchltect, address and Rh one: ~ . ~_S ~_s S ~i~ c; .~. ~ ,z f G~ ~ ~`, Leg21 CescriPton: L~~t B[cek filing _.~-. ,zone Gcsmments: j ~ c/ ~ ~ ties€~~ ~evie~ ~Qard ~~6~',Orl 3,r, ~~i f.' a ~~~ 2- ~ 5ecandec bye: SE i m mar~,r. 0 ~ L ~~ 1 a~.n PiarSr~er c~ / f~ ~~ ~ Cato: / . Je'1te f~ISAPPR ~VF.L ^ Staff Ro~ro~lal ~r~~~ct ~-~~1i~atic~~ (C ~>, ~~ ~ ~ ,~ Date L T - ~ ~ .- - ~/~ C_ ~~ tom? ( G2~c ~~ ~~~~ '~ / - ~ ~' ii Pr~~jec? frlame: -- ~ -~~ - - -- Project De~.cripti~rt: Contact Person anc~ PE~or~e Gv~ner, Adc`ress and PhcnL: Architect, Address a.nd Phone: Lay~i Qescript,on: Lit ~ ock Fi~n~ //may/,//: -- - Zcne Cc!nmeris: ~ / f ( / /` / ~, ~ ~ ~ ~ ~~sign ~~vie~-v hoard seconded tit; ~ ~" f .~ ~`~ APB°O!'R~ `.:ISAPP~~3V.AL E) _ - -t ~! ~~ ~?. C °-h 7F ---- --~ ----- . . Summar~r: -- - -- - 7 • / ~--- TJ~,,i p; n'~cr ^ ~taTi Approval ` i L-}ate: ~/ / ~ ~ ~~/ `/ / ~~®Je~~ ~~pli~~tEQ~ y `~ ~- ~ ~~~ ~/ y, r.. Cate _. ~~ -- - ---- fr 1~~' Cam. l1r`_ ~~~ ~_ ~ -..~ ~~~J~ '1 reject ~Jarne: - ~,~ -.... --- -:-- ti r _ r~ , // z. i / t~ Project Gese'iption: /.. fit`) d~[t c ~ L ` > !!- f ~.~C) Cc.k~ ~' (.t -F, .'~_ -S x1~ .!t~ii,~c . S' (f !*/~ C.. _. 1 / / / 0_ / /' _„ C~untact Person a~~d Phone ~~/ ~J-~~ !'] °~IC-'` ~aGl.. ~ ~C_- -- /~~J ~/. ~ ~ 1 ~ / ~c"> e.7 ~1 i !~ f 1 --- ~%~' / sI 1~~~ f/ ~ _ / ~ ~) n~~ r:er, ~;ddress anc Phone: ! `-i L! r %~ ~• ~ `l' CG-/~~~ x- r-:Y ~--7 ~~~ [!, - ~-:) / `5 -- () architect, Rddress and Phone: - , f - c j~rC~ Legal rCesCriptiort: Lot / Clod Filing zcr~^ ~e~€gn f~e~ie~ gr~a~d mate ~. ~ -~ - FvtotiQr, by: _ - ~~-~~ ~{ ti aPP~OVaL L~iSaPPR~VF;L /,~ Surr!rrar~~: -- -- - i T~~.~n Plar,rer ^ Stafi .4~nrov~! irate: ~ ~~~~~~~ ~~,~5~~~~ti~~ I _ ._. Date .. ! ~{ t~/~~ r/- ~rcjeet f~larr~e: ~i~' ~.~ ~' a~~ /2 ( ~~ ~ C`~ ~l-~ ~.~" ~ L~~'. ~ ~ --5~ ! ~ ~ ': - 'f '.~ ~ ~ l P~r,2ct Qescr~pt!cn: ~ii-~J (_~_~.i!~~ ~~~~'_.",L~.C~:> >'~ f %' ~~ I {' C~ ~ t ~t~.1,.. ,~ f~f~ .~ CiOrita~t Fersa~. and Phase CJ.~ ~:! ~ ~~ ~.~ C:ll:_r'~.._ %(~ (, ---- ~;...5-_~._y' C)w~r;er, address and Pi-gone: F~rchitect, AC~tress anu Phone: Legai Descf~i~3tinn: _~t Biccl: ,Filing ,Zane Corr~t~en:a. l ~- ~ ~~~Eg~t F~~u@~~ ~~a~c~ ~~ /' / pare -.~__ ---- L~etion b~y: l~-C~Yiz ~, li'`!~ Seconded try: ,~PPYC}~IAL D15P.PPr~C:Vl.L t ,.., ~~~::~ 12-.'~C~ r~_- S~~r~rnary: _-_~ --- . _, ~'~ °o~.n P.Unr.~ ~ StaTT ~,f7p;"oV:+l ~~ ~! ~ /` ~js ~ Date: DESIGN REVIEW OCTOBER x:00 REVISED 1dJ2J93. 12:A5 SITE VISITS 1:OC P.M. BOARD AGENDA ~, 1991 P,M. 1 Banner Sports - 555 East Lionshead Circle ~ Spruce Creak, Phase III - 1750 S Frontage Road West 3 Discussion of possible sign variance for the West Vail 65 service stata~on. 1-7d & West Va3.~. Exit 4 Lot 23 -- Dauphanais-Moseyay --- 145E Lionsridge Loop 5 Riva South - 11~ Wa.~.1~as~r Road 6 Vista Rahn Ski Renta'!s - 27$ Hanson Ranch Road '~ Crossroads - 1~1 East Meadowr Drive 8 Manox Vail - 595 Vail Va1.].eg Drive 9 Trope ~- 1111 Sornsi.lver Circle 1~ Green Residence - X156 Columbine Drive 11 Sutph~.n - 4882 Meadow Lane 12 Paulson -- 5128 Grouse Lane •...: ... .:v..:. . ::l.:! x~t r!- ''~T~. - .:........... ...: sue.<4:;.<.:;:::. ...,...~. .~ ... n~::: :~`c n~r'S ~~~ ..rf:::':c. . ?.. ...............................:................ ..............:.::: w.~:.v ::r..:i~~:-:i ~:s::,-:::::.r i~';r~: ~::: ~r ~: -:_•..-r~•.: ....::... r,r.n:•,.~?........ ..v~..f. 4: ' .. .F.'r' .:. ~::::. ~ ::: .......::.. : ....................... u.:::.?....:. r.-r.r:.min:r:::-.:J-::....:;~.;...;;;.::..v...r4:::u~.t-.: :.u...a:..:. r:.v..n-..tiv.Y .O'. ..Ti.l err. :.wN:-.:. f.RAK.~. r~GENDA 1. Vail Village Irn - Rsdeveluz~me~t of Phase ~.V-A i~~ '.00 East P~ieadoT~~JrivelLot ~ Blcek ~D, ~~ail ~~i~.lage ist NOTION: George Lamb SEvQND: Pat Herringter~ VCTE: 5-0 ~'ipjJY'flzTed ~~ preSented. 2. Banne~c Sports - Alew Sic~r~ 3R Lifthouse Ledge%~~5 East Lianshead i:irele MOTION: Gee_,e T~ar~b SECOND: Pat Hexrirgton VOTE : .~,~-~~ `.'c :curt appro~'ed. 3. Discussion oL possible sign varier;ce for t~~e West BR Val' 65 ser;rice station to alloy used autn sales signs . -7~ and Wes#~ tai ~. Exit vi scussien 3?~1~. ', - - - 4. Vista Bahn Ski Rentals - exterior trim paint MD 278 Hanson Ranch Road/Golden Peak House MOTION: SECOND: VOTE: TABLED TO OCTOBER 1fiTR MEETING. 5. Green Residence - New Driveway MD 4166 Columbine Drive/Lot 18, Bighorn Subdivision MOTION: SECOND: VOTE: TABLED TO OCTOBER 1fiTH MEETING. 6. Crossroads -- New Elevator and ventilator JK 141 East Meadow Drive/Lot P, Black 5-D, Vail Village 1st MOTION: George Lamb SECOND: Pat Herrington VOTE : 5--0 Consent approved. 7. Trope Residence - exterior lighting JK 1111 Hornsilver Circle/Lot 7, Block 1, Vail Village 8th . MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-D Consent approved: 8. Spruce Creek, Phase III - New Single Family AK Residence #S, 1750 S. Frontage Road West/Spruce Creek Townhomes, Fhase III MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-Q Approval with the conditions that prior to issuance of building permit, applicant fulfill Town of Vail Engineering and Fire Dept, requirements and fulfill PEC conditions of approval. In addition, applicant shall plant 11 spruce and 22 aspen prior to final CO for the 1st unit, as shown on the approved DRB plan. The applicant shall also return to DRB on 10/16/91 to present final color selection for house. • • ~ . Mic~~ael' w kesta;~rant -Awning AK 12 Vail RoadJLot N, ~~ai1 G'iilage st MOT IGi~T : SECGr~D ; VO'C'E : FABLED TO t)CTflBER 15TH 1+SEET3NG ~.~ . ~ aL~.~.SOI1 - Addi t.1oT"i AK 5128 Crouse Lane~Lot $, Black i, Core Creek sabdir-~i a.c~r~ l1GTIGN: ^eorce iamb sECGr~D: Pat Herzington Vt~1E. 5-~ Consent approved. ~3ed C7~ath~ney abstaznvd. 11. r~?anor Nail -- Color CY~arge 595 Vail Valle1 Drive~Vail ~,'illage ?th Filing MOTTGN: SECGi~D: VJTE: ~'AI3I~D Ta OCTOHER 15TH MEETING. ~1 ~J i 2 , stxtphin ~ r~ec~ Fence ~8~2 Meadov~ Lane/Lot 1+~, Block ~, Bighorn 5t~i MOTIGN: George Lamb SECGND: Pat Eerringtoz~ VOTE: 5-0 App.ro~~ed i3. Lot 23 - Dauphianais-Moseley ?~5~ Lionsridge Loop. Lot 23, Dauphanais~MOseley Subdivision NIGTIOi+T: George Lamb sECGND: C:~~inie Enigr t V~3TE : ~ -~ ~x S°~ Approval ~onditiorial aeon apprLval of corrective amendments to 5DD #2,2. The ^own Engineer rust approve pri or to b~z.lding_ permits _ ~.~ . Hubcap - I~Te~zT Sign ? ~3 East Meadow Drive; Crossroads Dials MGI'IflN: George Lamb UECGrdD: Connie i?nig?~*_ VGTE: 5-~ approved. Dimerisiorls to be sab~ritted. SM n 15. Riva South - New Roof 114 Willow Road/Lot 7, Block 6, Vail Village 1st MgTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. MEMBERS PRESENT: MEMBERS ABSENT: Connie Knight (PEC) George Lamb Sherry Dorward Pat Herrington Ned Gwathmey STAFF .APPROVALS Avila Addition/Modifications. 3050 Booth Creek Drive/Lot 6, Block 3, Vail Village 11th Kosloff Windows replacement Lot 11, Block 4, Vail Village 1st Municipal Building - Cooling fans for computer air conditioner 75 South Frontage Road Vlaar - Color change. Lot 7, Block fi, Intermountain Milner - Revised landscape plan. Lot 25, Vail Village west Bighorn Townhouses - Repaint. Bighorn Townhouses, Tracts A & B McLaine - Deck Addition. Lat 19B, Black 9, Intermountain McDonald/Hoffer Decks. Lot 2, Block 5, Intermountain/Flussheim Condos. Lot 9 -- Change to landscape plan. Lot 9, Glen Lyan Subdivision Primack - Window change, enlarge 2 windows. Lot 3, Block 2, Vail,Village 11th Genung Remodel - 250 addition, interior. Villa Cortina Unit #350 SM C7 • r ~raha~r~ Remodel -Add entry=gay to home . Lot 11, 'n'ail brillaaQ nth Lapin/Shwaydar -Berm and landscape tc screen Meadcw Lrive. Lct 7, ~J'ail ~T~.llage end ~~ ~7illage on Bighcrn Cree'.~ - Additicn cf unheated stcra~e area tc Buildincr ~~ . Let -, B=o~.k 7, Bi~hcxr 3rd Brcwnir_g - Loft expansion. Tract ~, Mail LiC3ils~'ead 7th Lytle Resid. -Portable hct tub i_~stal~.aMicno Tot 1, Blcck 7, Bi~horr~ 3rd ya7iegers - Re~~ised. landscape p~.an . Lct 22, BloLk ~., pail Potato Patch ~J ~~ajec~ ~rp~;lic~ticzr~ ~ ~ ~ ~ ,°~ ~ioj@i;t Pv3mE: ~~{.'a.•Z--f ~..yG-~~t=ti~T ~~~•~-..-.-~q. r 7 Project Desc:°i~#ior:: ) ~C~?ef~~~,,-~-t-~~,~~~.~.~ P~ ~ ~E~.~-~z -~! fr;~ ._ Y ~antact Person and Phcne Q~~ner, Address and °hore: `~` G'~?-~' ~ ~.-'Lrr.~~.-, ~, ~~, z d ;-~ hrcl~itect, address artd Pnone: ~ )r•C.-~~ f~...{~-c.~c,.,~a Legal Bescri~tton. Lct (° ~icck ~`=a _~ Cummer#s i• Fi'ng ~ ~ ~: - Zor:e _ ~2~sig~ ~tevi2-~~ ~oa~d / ~ ' ~ ~/, . Bate r/ - ~- ~oticn ~v: C~ ~ ~F. `r::a .-, ~i9f ~ ~ . SeCOiiQB~ qv: ~ s- _. FiPPRQt`r^L ~ t~°.,._~.-J BISA?PFiOVAL °~,-... ,jp~ [y _: ~ 9 J ' ,~ -~7 Ny J. / C~s 'n /- (' : 7 ~'fd ~ ~ ) ~ ' I dZ.°•b° t:.....1 C i /': [~ i .- e. _ .'~~ Y- ay- ~rd`f~.~~ w l ~~? ~ .~ .. .n ~~ vr~ . ~ ~ .., 5urnr,9ry: -1 c;~r.~~.~•~~ ,~~.~'`.~ lr.?.C-fail--_ ~/~rJ.~~~~~- --~~ ~ i_ / ~ ~ T Wiz. ----- ~ al~t-~~ ;-€~~ . ~~ a ~ . -l c ~ ~~~r ~ 1~,Ii6~.~~~ oi.~~, Panner Bale: S#~~;i Apr;roval ~rc~je~f ~;~~~~~a~€o~ /r~ . ~ <. ~rojeet PJamv: ~ ~~~ : ~G1/GCn'1~J/" -- ~f'~J~'S'f~~~t.~t~'C~J ~~~-~ /~/ ~-.-/t!c'Gl~lii~ri-" t~i}~-'. ~~ ~,~ ., ?rciec- Cescripti~n: ~~~! ~ ~~ ~~°-'~G~f%~G~ ~ ~y~~~'~t~~ ...i /!!G!f/~ ~!!''l~~i 7/_'~>_~)C'!"VICt. /,!7/~' .~ ~ ~~ ontcct son and hone G~:~~ner, Rddress and Phone: ~~~/~~!"~ / :y ~f~//c~'.~/./c~(l Li/, `~~r7 L.G~~~C~ /~~~ /~Gf/~ ~'../,;. ~U v architect, Address ar•d Phone: ~~~~~~ ~- ~i`?GG~ ~~_'-V _,_ ~-U, r- - Leda! Gescr;pt~on: Fct ~~acl< Fig n~ _-__ _..__. ,Zane f.OmmQr's• ~.f'~' ~~17`JG/ ~r~~ r~F'7~G;~/ 7 ~ ._.5~`fi~`/.S/t~-f~.i~U~`~?~~iY-l/lil//J c }~I~'L`/lr"~ ~~s~c~~ Ret~i~te~ ward ~~ mate "/~ ~-~ ,diction b;E: Seconc+eci bv: RP?RG`4r`r~,{- Sumrrery-: ~~ __~ To~t~n Fiariner Gate: ~~'/`~/~ ~,' ~~~ / e .~flc,t%~OZrJ._._ __~_ t. i~15A?P~^VAL ^ St~Ff` Approval ~raF~~t ~~~iFcatlar~ / Cate ~~'~1J ' ~~~---- iroject dame: ~/'D`:~~ !f ~Tt~i~~ ~/~~ f-ff~f•:.~~f/Li'~:i(~ ~./6''1.~~~ _----~-~ ------------ ---- r, Project Qescri~tien: ~"X~~d'/~dJ ~/~'i,~fJl%iZ~ ~ ~~iY7C~s~~l['f/1?/ G1'.111/r~l'~~~~~ .%~7 U`y~F~} -_- Contact Person and ~!IOri@ ~~eIG1 /~~~'~~1~F2.~ /i`'li~f)~r~ir! /,l~i'G~~ ,e~//`lC'-l' ~~f'~Gy~/~~L",;~-- ~DD~J ~/«7'~S~/~/~"~ ~ U e~r~ ~~ ~~~ !/./~ ~ ~D. CY-~l SCY j°1-1~~~ll' ll%~c - ~._?~/:~ G~;ne~~, ~;ddress ar~d P~~one: r. ~U/"%~~'~~ ~'~/1~fCc~ ./i'°'1~~~ ~~~ ~~• (•C~G~~j1f7f~,' J !-U.S~7~%F'.~.:f' t <- ~ ., ' ~ architect, Adv+ress and Fn^~e:. ~~~-f~: ~U/>~/~G/~ ~- ~i Leal QescriptiQr: Lct e 8 :~ck / Fi~iny ._.V1r?/~ l//~fl~ f~ CY.-__ --- _ ,zone ~/~~ Gorr,~:ents: ~ ~'G~'l~~/7~ G~j/Jidl/~~.~ ~`~ ~f~U ~CL~~' c~D>~~~ /~T~ ~'~ll'~ c}%~!t'Ji ~ f~j '.. J~r~.~ . ~/~~J.~~" -~ ~C~1C~~~Q,f~"/f zc Gtr / ~~c".'~ L./ < ~ / ~ -- ~Y~~P~ . ~ ~f~~_~~ fG~ l~il/ old ~~. r/~F~ ~~~~~'D~~-~ ~~~~~~C~~.~~ -- - .s-,~h;1, rrz~4r~, ~ 4 -~ ~rr~/?.~~_~rt.~~ Cap' //~~`7~~ Gr~l~/ ~-~ ~'~ ~i221~~J. , Y ~~ rl~rJr~`oc:1~ c~~f=ice Gr//1~ ~ ~~'~si~n RerriE-n~ ~o~ard Case ~~~'r~J~ s ~4otion by' Seco,ndec E;~~•: AFFPGVA_ / DI~AFPRCV~^E!~ Summary: ~; ~/ Town Planner Caie: ~~ - l7 Sta`f Apr~roval ~~ Ei~~~~ ,~~~~l~3[IE)~ ~7ate - ~~' r ~~•~ ---- ~rofect carne: ,~ ~-`~f t'- ~ f ~ ,~~] Project C~escrip*.icn: ~ rr,.~ ref? rt r' cr! ,)~ s ~~ u~ r t r ~'r - ~" Cantaet Person ar~d Phone ~ ~~' -lit. pi y ~ /] f ~. f .- ~ ~t' (. fc~' /' f ~ // /~`-~J_.._. _._..-.____ ---- - `~ ~ ~ ~ ~ , . G~~ner, Address and Phone: ~ .' (i, ~~ `" l - ---_._.______ f '`f?!tc'" %° ~ t~/~ ~.] ("' f~ c. ~j~, llf()~ r '' / rS f ~; ~~r {0` ~~/~ _.._~ `~ c ' f' , Rrchitect, Address anr' Pt,^n a J ~, e: , ~~, / ~ ~ ,f- ~/,. - Legal C~escriptior: Lo: ~~~ , Biock ` Fiing C dic'1 `__._{_.~'•` K.! - ,Zone -- Cornrr~ents: ~ ~~~~~~ ~~~~~~ ~6Q~~ ,~ ~ ~;~ Date ' ~ -._._._ __ [lotion o} : al -~`1a.~r Secanaed i;~ ~ ~ ~ r~,`~~ hy: d/~` . ` ~ ,•-APP~?C}1rAL 1 'J15AFPRvVA!_ - - a ~ - ~ - ,~ _ .. .-j ~_. Summary: __ . ° r ' , ~' 1 ., ! s ~ , /~ ` / " ~ 7~~t•~n ~"!anner ~ Stat Aoprov~~i mate: r_~ ' P~ ~ ,'_,. " ~ ( ~~, • ~~Ei~~~ ~ ~.Es~'s0i~~1`iOF~ Dale - ... ":~! - ` /1 ~I " / ' ~ { 7 ' /i C rojeet r~Eame: i f..f. ` •; ~ ~ . T, 1 l Project Descriotlcr: ~",~r,.e. .'i ~{~r,tr'I !/C:<~ i r~ ~ ~, 1.~ , .,f ~~ ~: _-"...':f,rY (~ r-. r' ~_...___ ~cr?tact Person ar~r~ Phane r _/ ~^ ~ ~ ; ~~f' ~7, ~ ~~ r ;~~ i~.-~'i ..~(. F (( // / G:urer, F~d~~ress and f hG'lE' ~"_ . ~ - ~a~~ _.r~,.r,~f (~~ ,~-~ ~'~ :' ~ ~ 1! ,; ,.. - , j J ~" ~ , i~YChItPCt, ~,G'~reSS afZG' ~CIOnE: LeUai DeJc€"17tIG!l: LOt ~~"~ ~Ic Ck ~ FII'n~ /'~`~ x'!'.f~1~'~ ~ -------- ~prEC' ".,~ / s ~Qfl;fTiE'1t5: design Rerriew Rc~ard ' ~// RR {~ 3 f SeconcEG b4f: ~.~ .rY t~r•. f r~/~~ APPRQGf~'~~ ~ 1 -- (., DIS?~~Pi3DV~.L ( ---- ~ , ~urr:mar ~ ! !~', .~ f%fC'' f , 5 ; ~`~~ .~~~ "f t..~ . ~'l s ~' . 17~.C_ c 1~`F' ='L n/ ~r _< <' ~~.C-~- w ` ~ / /1 ! Y~ ~w ~ i /f7 A-~.> `, ~; ~;.,` t~ f ,[ ~ if- ;-t r- f i CJ r: ! 1 ~~ C "~ d [ ~! S - ~ ~ .__ i. ` ~ ~ `~.., ' ^ staff A~~o~cdal TCSrn ~/n~ner ,~, Date: ~_ a ~~ ~d ~r~~~ct ~~li~~~ic~ i I~ ,, i f !-'~ ~`1 ~ :}~ 1%~tP _._..._._ .. J I _.- ,~ J --~ 1r\ ~N ,{~ 'err ~ ~r~~ ~'! 1 ;~f ~ ~~ ~:'~_ .1,.~ { ~+` ,~ 7` f,'r~ ~ ~ ~ ,f'~ ~,~ ~ ~ ! ~roject Marne: , ; , :< < , ~ i ,,~ ~,ti i ;~ ~ . fir, 1 .rr , PrQie~t Jescr~~tion: i' ~~~ ,' \~ ~~ i - drntact Person and Ph~,ne dtih~ner, Address and Phone: i ~i '- ! Arr,"_iteCt, Address and PhonR: }~~~ ~ i:'~~E. ~t ~~ i ~~ 1!(~'. 1 ~~ 7 i' j~'..!' { '~ ~ ~~; C~~l ~ ~ ,i }i' ~r .;r ; ~.i ~ '~ r'! ~ ~..~. -r. ~ ~'! __ ~ J ! LeC;ci i_1PSCription: Lot f ~ '' Blow. ~ Fiiing Gene CaYn mer'.s: ~esigr~ Review Raard Late _ , ~Jiotion by { .i /a [- I . ; %,I I . ~°C©nded Ur: ~~ ,r ~= . r~: ~,~~'~ ~~' r' .~ 'I, j r° .~~ ,- ; Af'PRd~`AL DSF;?PROVAL I ~, .. Su;t~mraryf: 1 1 I .- I `: ~~ `! ~/ it '.~ ~` ,~,~ f/ i ; 1 i' i~ f4 r~ ~ i' ~ i r.~' ~.~ li ~ Li l ~,' /; ! ~ ~ SE ~'~ 44 r~~i ~,~^ 1 lr 1r~ ~ti 1 ~ } ~ ~_ ~ ~ ( ~k 1. ~ ~ti, 1 1~ ~ ! it ,~ ~'~~ 1 f~t.~ \.( .1 ~r'l~i: F,4 .'i'~/ 1 E~ ~ 1. 1... 1 A _ r ...... ,} (-~ i. - ~, 1,-, ~ I ' r` - - - -- -- --- !'~! ? 11' ~I ~ ' t ~ 4 ~ ~ `ova F anr~~r ~ ~tatf A~, ro+Jal r -1 ~ I~ `'~' ~ 3f r .:j i ~a*.e: ~ ~..~ i 1 1 r ~ '. ~rr~j~~t ~-€~~ii~a~i~a~l Bate ~. ---.._... - ~~",r~~#~~~! f~j ~1~ l~~ i~~ 1.'t_ .~i~ i ~,~i _ r~ ~ ~~ ,t' ~ jl'~ i ~~3 j ~; ~' ~1 ~ ~~t 1~ ~~~1 Project Desc~iptiar:: E ~ ~ - - ~~ i' Gorltact Person and Phone C]v~,rner. ~?ddress and Phone: \c architect, ~dcress ar~d Phone: ~ ~''f` ~~ .~~ ~~ ~~ -..,i . f 1 1 Legal DescrPtion: Lot ~ _f Plock Gamrnents: • i q ~ ! i~ 1 ~~~~ I ~' ~ t ~ ;~~~~ r; ~~ ' t • ^~, 1 ~,~ Filing j. ~. ~~ ~ , ~ ~ I`i ~; ~ Zona ~ ~ ~~ ~.. 1 ~esi~~ ~~~ie~ Bc~~rd Date __~ __..- __ 1 Fw~Eation 5v: ~ J ; .~ f s i , ~ , l _~ .~ ~ ti.~ i ~?PROVAL DIS,fiPPF~CVAL Surntnary: ~__ - ---- ~r I _~,• r , `1 i i ~ ~~ r ~ `~~. '; ~ 1. f t ~ ~ . ~ ~ ~~ ' ~ ~ ` ` ~ - --- _ .. - - ,_. - - ~ ~,, '~, i ~ , ~ i ~ ~. ~ (~ ,~ ~~rJ~ P!af~ne ' ~ Statf i1,proval Gate F~r~jee~ ~~~~i~ativn ~'raject iJame: ~ HCI~~1 /(/~2~ f ~/~ ~~~~~' ! ~C~~9 ~ ~j~dldr~o77/ _. f/.~'. -_ .~ project Descrirtiai~: -°7-~'e/1~~~ ~ ~C/~/~CIiYJC~ /~l1~~ ~~.'-~/~'l~~S,TIi'~ ~G1~~.7/~~ - ---- Cor`.act Persar, are Phone ~]b.~f`J ~fQ~~eu~' ~~?~ ~+~. ~/~~~'~~~/C/~-~C-/. ~'~~e~ ~ , ~ . ~ol~D plan e. '~ 9'7 - I/~// C~vner, Ad~r2ss anct Phone: ~~ff' //n/ ~ . ' ~~f ~i7 ~~4/~7~'7JlC~, .~f"~ ~- ~/O r~ ~~ ~I~tliYl.E!;~/i'Jr~f ~n-~'°ri~ec--t, Acaress and i'F-~ene: ~SP~ ~~~7"' ~./~Uf1/hJ /~')r'c ~fY~iP.G!/`S' l /~..~G'~'~J ~PGZIQ_~ ~!-~~.f~ ~.J ~ t3L~ b ~ tS: i'a..~e~i~ , ~i?r/~~, c!'.a ~ 8623'7_ (3~) `7 I.~ ~ //~ o ~- Lego; ~escrip.ion: Lc~t ( ~ Eslock Fiisny ~/ _ Zo~rc ~~' ~onirnents: • ~as~gn Revi~~ Board ~~te _ ~ ~r9~ ~/ .,. Seconded b;-: ~Lf~Gt/lCf /7 Ll~"~y ~J v r:`PP°C3l~`.~L ~SA~'PFiCVA I .. -- __--~_ - --- ----- l `~ ~~~ri~CC~d7~ /~`~~f~'~ ~~1Cr~r~~~/~'l -z~ ~/l ~l~f~~_ ~2 c~~ ~ ~ ~ i~7~r~orr~Ci~ sEar~,-,:~r,.: /~ .~ ~ , .p.r~ ~l'E'~.!'J ,~v .fie f~e.~/a~PG7~ cJr~-'~ _2 or~~ rr~~o,~'c ~~~r''~'~r ~.~'.- -t - ~~~ s~s~z. ~~~/ hers h~ ----, /~x.~r~ rte:/~ rr'~ar~:~gd~~~czf GG~1 /~lc°d~ ~~ U6'JC/~`-c'y~~ ~1~-1'~'l~ __ . -><~~ ' // fot.' i planner Gate: filr'~ l /~ /? ~/ ~ Siaff /?pprcva! ~z ~J <~ F ~ ?~ ~~. ';`~~L} ~ ~3_s`,,~ P~sLI~ NC3TICE ~ NQTICE XS HEREBY GZG'E:~ that the uesigr. Re~riew Board of the Town cf ~~~ wail will ~:oid a public hearing on October 2, 1991 at 3:07 p.m. in ~ the Town of Vail Municipal Building. Ski `~ech - *de~a ;Sign ar~d awning BR Lifthoase Lodge/555 East L•ienshead Circle Fanner Sp^rts -New Sign BR Lifthouse Lodge; 555 East Licnshead Circle Lct 23 - Ba~aphanais--MoseleY~ SM 1~5~ LiQnsridge LccpiLct 23. Black 2, ~auphanais~-Moseley Suh. HiF.ra Sout~~ -New Ralf SM 114 Willo•~ RcadiL=.t 7E B1ock 5~ ,Tail Village ist Holy Crass Electrzc -~ Landscaping of switch g4ar S~~ Li.onsridge Loop ar=d Fail ~Iieta I~r~.~.~e Faul;,cn - ~c:dYt~.cn 77~~VV t]lt 5128 Grouse Lane~Lot fi, Block 1€ Gore Creek Subdivision Manor Grail - Color Change AK 595 t~a.i1 Valle= Sri E~eEVail ~i 11age 7th Filing @.ltpil~rt '- ~1v~GLT F erlce ~iK 4842 Mead:~w ~anefLot 10; B1Vck 7, Bzghorr~ 5th Crossroads - New E~leYrator 1~7. East rieadow ~rire JK Biscussi ora cf p~:ssibie sign ~rariance for the Nest Vail ~6 BR $er~.yice station to a'low used auto sales signs. 1-7J ~ hest Vail. Exit ~`~nd all tabled items frern prey ions 5r~ee rings . The application and infor~taticn about the proposals are atiailable iri tine coning administrator°s office during regular officce hours .for public inspection. TQG+Ii~ QF VAIL GQMM~N= ~ ~' ~EVELC~Pi~IE_~ T CEP p,.RTME~lI` Published _~n the Vail Tra=1 on September 2 ' 991 . C Spruce Creek, Phase ITT - New Single Family Residence #5, AK 1750 S. Frontage Road West/Spruce Creek Townhomes, Phase III . Michael's Restaurant - Awning AF( 12 Vail Road/Lot N, Vail Village 1st Vi11a Valhala Unit #10-- Skylight MD 350 Gore Creek Drive Vista Bahn Ski Rentals ~ 278 Hanson Ranch Road/Golden Peak House Green Residence - New Driveway MD 4266 Columbine Drive/Lot 1$, Bighorn Subdivision Hubcap - New Sign SM 143 East Meadow Drive/Crossroads Mall Anderson Residence - Lighting plan SM 1175 Sandstone Drive/Lot 1 & 2, Lionsridge #4 • PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning Staff will be reviewing a Design Review Board application on October 7, X991 in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area, specifically for the addition of a bedroom and bath within the existing building confines, for the MacLean Residence location at 1881 Lionsridge Loop, Unit ~4, Vail Point Condominium. Applicant: Mr. John MacLean The applications and information about the proposals are available in the zoning administrator' s office during regular office hours for public inspection. TOWN OF VATL COMMUNITY DEVELOPMENT Published in the Vail Trail on September 20, 1991. • DESIGN REVIEW BOARD AGENDA OCTOBER 16, 1991 3;00 P.M. SITE VISITS 1:30 p.m. 1 Red Sandstone Elementary - 551 N. Frontage Road West 2 Gateway Plaza awnings - 12 Vail Road 3 Crossroads, new vent - 141 East Meadow Drive 4 Shogun Restaurant ~- 292 East Meadow Drive 5 Crazy Shirts Retail, Wall Street Bldg - 250 Bridge St. 6 Red Lion - 304 Bridge Street 7 Precourt - 328 Mill Creek Circle 8 Hutchinson -- 2049 Sunburst Drive 9 Sipf - 3876 Lupine Drive 10 Kaiser/Hall - 4876 Juniper Lane AGENDA 1. Red Lion - Landscape plan SM 304 Bridge Street/Lots E,F,G & H, Block 5-A, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO NOVEMBER 6TH MEETING 2. Precourt - Revision to landscape plan ~ SM 328 Mill Creek Cir/Lot 4, Block 1, Vail Village 1st MOTION: SECOND: VOTE: TABLED TO NOVEMBER 6TH MEETING 3. Garden ofi the Gods - Revised landscape plan SM 365 Vail Valley Drive/Lot K, Block 5-A, Vail Village 5th MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-0 Consent approved. 9. Kaiser/Hall - 250 Addition SM 4876 Juniper Lane/Lot 3, Block 3, Bighorn 5th Addition MOTION: SECOND: VOTE: TABLED TO NOVEMBER 6TH MEETING 5. Hutchinson - Landscaping and entry gate AK 2049 Sunburst Drive/Lot 1, Vail Valley 4th Filing . MOTION: SECOND: VOTE: TABLED TO NOVEMBER 6TH MEETING 6. Sipf Residence - Addition AK 3876 Lupine Drive/Lot 14-A, Block 1, Bighorn 2nd MOTION: Pat Herrington SECOND: Connie Knight VOTE: 4-0 Approved. 7. The Ledges -~ Utility Meter relocation AK 389 Bighorn Road/Parcels B, C, & D, The Ledges MOTION: SECOND: VOTE: WITHDRAWN 8. Crossroads - New vent on top of an existing elevator JK 141 East Meadow Drive/Lot P, Block 5-D, Vail Village 1st MOTION: SECOND: VOTE: Stai'f approved. 9. Crazy Shirts Retail Space - New entrance and Facade JK on Wall Street. 250 Bridge Street/Lot D, Block 5-B, Vail Village 1st Filing, Bridge Street Building. MOTION: Connie Knight SECOND: Pat Herrington VOTE: 4-0 Approved. 10. Red Sandstone Elementary - Addition of a modular AK telephone "cell" site. 551 N. Frontage Raad West/Lot 8, Vail Potato Patch MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-0 Consent approved. • 11. Vail Gateway Plaza - Awnings ~ 12 Vail Raad/Lot N, Vail Village 1st MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-0 Consent approved. 12. Manor Vail -- Color Change AK 595 Vail Valley Drive/Nail Village 7th Filing MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-0 Consent approved. 13. Spruce Creek, Phase III - Color selection for new AK single family residence. 1750 S. Frontage Road West/Spruce Creek Townhomes, Phase III MOTION: SECOND: VOTE: TABLED TO NOVEMBER 5TH MEETING 14. Vista Bahn Ski Rentals -- Exterior trim paint MD 27$ Hanson Ranch Road/Golden Peak House MOTION: Connie Knight SECOND: Pat Herrington . VOTE: 4-0 Approved. 15. Shogun Restaurant - New sign and menu board BR 292 East Meadow Drive/Mountain Haus MOTION: Pat Herrington SECOND: Sherry Dorward VOTE: 4-0 Approved. MEMBERS PRESENT: MEMBERS ABSENT: Pat Herrington George Lamb Sherry Dorward Ned Gwathmey Connie Knight (PEC} STAFF APPROVALS: Stolzer Residence -- Landscape plan modifications. Lot 1, Block 1, Vail Village 3rd • Hymers Duplex - Exterior stone color change. Lot 6, Glen Lyon Subdivision Maclean Residence - Internal 250 & extension to existing deck. Lot 1, Block 3, Lionsridge #3 Treetops Condo. - Modifications to existing "window wall" bridge between Phase I and Ahase II. 451 East Lionshead Circle Sheppard Duplex - Remove stone on eastern wall of garage. Lot 9, Block 1, Vail Village 6th Schmidt Addition - Add stairway on main level, add bedrooms on lowest level. Lot 12, Black B, Vail Das Schone #1 Wittemyer Residence - Wooden enclosure for upper gondola terminal controls. Lot 1, Block 1, Vail Village 3rd Mclaughin Residence - Replace existing skylight with 3 flat velux skylights. Lot D, Block 1, Vail Village 2nd Village on Bighorn Creek - Deck expansion to Unit #3. Lot 1, Block 7, Bighorn 3rd Vestlandet - Exterior repaint. Lot 1 & 2, Vail Village West 1st Fried Garage - New exterior stairs. Lot 7, Block 1, Gore Creek Subdivision Vail Valley Medical Center - Relocation & replacement of incinerator. 381 East Meadow Drive Lifthouse Lodge (Banner Sports Addition) - exterior paint color change. 555 East Lionshead Circle Rotary Landscaping. Located east of the Vail Post Office, south of Timber Ridge and north of I-70. Noble - Deck Expansion. Potato Patch Club Unit #25 Lionshead Center - Skylights and fan Unit #312. Gordan - Repaint. Woodridge Townhomes #5, 6, & 7. • • PuBLxc NOTICE NOTICE ZS HEREBY GIVEN that the Planning Staff will be reviewing a Design Review Board application on October 16, 1991 in the Town of Vail Municipal Building. Consideration of: 1. A request for an additional 250 square feet of Gross Residential Floor Area for the Kaiser/Hall Residence located at 9913 Juniper Lane. Lot 3, Block 5, Bighorn 5th Addition. Applicant: Ursula Kaiser and Rob Hall The applications and information about the proposals are available in the zoning administrator's office during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on September 2'7, 1991. • Project Application ~~ ~ ~ ~ s Date ~roject Name: ~} ~ , ~~`~" " ~- r ' " `-'` v ~ c Project Description: ~r~~ ~ ~ ~ ~ ~ ' J '~~ ~ ~ ~ ~ ' "~ !~-7n~/)J~ V ~ / Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: ~'1T f ~ ~ ~ ~' ~ ~ < ~ _ ~~- ~~ ~ L,1 J{S~~ 11 Legal Description: Lot ~ Block ~ ^ ~ 1=ding ~~ - ~~ ~ u i a~,(~ ,Zone _ ~~~ U Comments: Design Review Board ~`~' Date Motion by: ~~ ~! , Seconded by: ~~~~ APPROVAL DISAPPROVAL C9~~nwr~r 4-v Sum~y: ~~~ ~_ ~ ~~ ~ ~ ~ ~~ ~ Town Planner Date: ~ ]]] ~ ~ j ~ ~ ~ ~ f ^ Staff Approval ~roject Name: Project Description Projec# Application Date w / { r ~f'~ V ~~ Contact Person and Phone Owner, Address and Phone: Archi#ect, Address and Phone: Lega! Description: Lot ~~ Comments: r tic ~ Sus~,,.4 ~i A v ~f 7~vC` S . ~RP-/~ ~.'r ~ ~, rc ~.e ~ ~'~ ~ .!s~.~ rl l'rl d`~/~d .~l'lir~tl~c fa :P~ ~'~ Q~ `3 2.3 ~ ~~n P / Gr 1 cS'l~ S?l Block ~ i=fling ~~K ~~ ,Zone Design Review Board Motion by: ~ 1~!`t Lf1 Seconded by: ~-~ r APPROVAL .~~-~ Date /y,/lt~Q~ DISAPPROVAL Summar ~~~ ~ `~ ~-'~ Y J ~! !~ Town Planner ~ Date: ~~/~~~ ~ t ^ 5taff Approval ~ ' !.i I°Proje t Application / / p ~! ~G'~ L ~A/h/)7~/~Qx ~ q q~ ~roject Name: G/'(}~L/ r~~/!i'J'~ .4 ~~l~L.~ , ~D/~p - ~/~i~ /Vo ~` . ~rf04.2X~7~?~ ,~u/l4~/ixj . 2c~P.CJ Project Description; ~X~r/~n A/~ff~2.J - G'it'R7~+or7 ~ ~>°~ .~C~r/o~ e:~~~~•~ho~ ~Q~~ `-~- '/~~~ ~ ~ .. Contact Person and Phone ~~ ~~~ f /DSO ~~~~~. ~/~, ~`~"""~' ~3d3.~ T~Ca -~~2 g Owner, Address and Phone: ~e /n~a~ ~~~~~~ ~ /~~• ~~9~~ -'T"` ~~~u'~-/ / ' ~s~i•~, ~/-i1°. ~21~~'~ ~Ir~~ X32 ~5~'~3 ~•s~cr~ ~1a~~ • Architect, Address and Phone: ~un,t°r~v~" ~~~~ ~r~i~~~~ t ~~~ ~~~~~ ~k/~; C',4 ~~l D9 ~~a~ ~2~~/~D2 Legal Description: Lot ~ Block ~~ ,Filing ~~ l~//Q~ ~~rFi~~ ~ Zone +~C/ Comments: ~~G' Q~~/~d~ ~ ~I'/Ol C'fj/f/1~To7J G~7 ~1L % /~9/ rl'Gl.6iPG~ ~ ~1/~ZVTiizq . , L ~./' i~an~ ° ~ ~~ ~~izee.~ ~' Trul?~ L~.~c~.~z~i~c~ aararr~t~u.Q~a.~.~,ijaf c~i~~~~ ~/~ ~~~ ~ ~~ /ss~rc~~ ~ .dur%~i ~9 ,~~ir~~ ~ar~„ ~~~rzee,,~~'' 7rz~ri ~ir~.f~. ". , •f~°c~ ~. -hri2~ ~~u~nc~Q~r~ ~~/~ ~irurn .itace~~ ~ ~z. /~er/rder~ Design Review Board Date ~~ `~ ~~~/ Motion by: ~O/7/I/~/ J~/I/~j~ ~4~ 7'~ n /v~~ ~ Seconded by: `~ /~~~" -"'"' ~P~~~ v APPROVAL DISAPPROVAL ~..arld~nze~~zu~rr~..,~~~~_( s~~rzo ,,~ s~'ac.~a~~~ f7l~S l'~r//ecu~'c~ mv~~/'~~~ /~._ ~i ,~1/iris' ~r~Q~ ~ 7o"zrr~ ~ssu~ce~ ~ fur%C~~i~ ~~'~~' ['s`J•~,o/r~~~ ..r~,~s~// .2 ~sa~r ` ~ ~/ ~s ..r.~, ~ie..~~l~n~ r,~.~iicfi ~ /aUZ~ ~ ~ ~~~l ~'~~/ .//af' ~e ~eUrr ~~ ~•,-,r~/or~ Summary: ~i~ .C..~'!/j'IL.~.~~~~ ri`r"~'~ ~}~CC~U. ~j9;~~"-~/.70J~7 /7~Gf~Q/l~C~ ~l~S~/?Gi ~/~Y~-9~ ..uv fir' ~a.~~. c~dia~/ ~ ~ she. ~~i~'~,ca_~ spa ~-e~ ~r _ _ , /fir Town Planner~ Date: cO1,~~~(aj l~l/ ^ Staff Approval Project Application Date ~d ~~ " ~/ roject Name: Project Description: C-c~~ C~dL~,~ ~~~~~5,~~ ~ ~J~""'~""-.-- Contact Person and Phone ~~ ~ " `~ ~ ~"~ ~ ~~ ~ ~ ~ ~~ a~a ~! ~C ~ Zvi ~ d l,`~~o7~t ( ~ •-- Owner, Address and Phone: Architect, Address and Phone: ~~3.~ Legal Description: Lot ,Block .Filing ,Zone Comments: • Motion by: /~_ r Seconded by: ~`~ APPROVAL Design Review Board ~~7~~ Summary: i - ~ Town Planner Date: ~~/~l /'~'~ l Date ~~~~ ~~ DISAPPROVAL ^ Staff Approval .,-~~~s roject Name: J ~- Prpject Description: ~!'~,} ,-P Contact Person and Phone ~/ Project Application `/ Date ~~,~ ~ ~~~ / f ~. Owner. Address and Phone: ~-~} ~~~~ Architect, Address and Phone: /~Ll ~~ ~~~~~~ ~ ~~~~~~ ` '~ " "" " ~' `~~~ /vis tr~-~. l2 G~~.~/ ~(, c~71 s7 Legal Description: Lot Comments: Filing ~~~~~f~/~~ ~~r ,zone Design Review Board Date -/ ~ ~r ~~~1 Motion by: ~1~ Seconded by: ~~~d`T~ APPRO ~~ Summary: ~/-~ ~ !~ b 6~ ~r~ ~ ~~IT~ 1T-own Planner Dato: ~u//l-~~~ /V Block ~~~ ~.fF#7 ~r~I~'L~ DISAPPROVAL ^ Staff Approval Project Application ~roject Name: ~~ ~~~ r Project Description: ~ ~~ ~ ~ Contact Person and Phone ~~~~ ~~ Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot ~~ Comments: Date /~ ~/~ ~~~ ~,n,.-,rte fi'/~.~ 7 ~d. ',//a ~ ~ ,Zone BEock ~ Filing ~~`L u Design Review Board Motion by: /~7~~1ti% ~~°"~ c~G1r$iJ-s[rr~~ Seconded by: APPROVAL ~~ ~1 Summary: Date ~~/~~~f DISAPPROVAL .~ r Town t/anner ^ Staff Approval Date: ~~~~-/ ~~ ~ r Project Application Date ~ ! ~ =~~ l ! ~ ~~.~ 1 roject Name: -,-~~ Y~ ~~~-~ r""r~ -+ l1~~~ Project Description:~~~'--' ` ~j ~ ~• ~` ~ ~~~~~~---~ i Contact Person and Phone t_ ~~^~~ ~~ S ~~ ~ ~ ~ ~~~- Owner, Address and Phone: ~ ~~+-~-1~ `j ~ ~-J~~ ~~ ~~ ~~- ~~~~ Architect, Address and Phone: Legal Description: Lo# ~~~~ Comments: Block ~-- Filing v. `~ ' ~ ~~ Design Re~lew Board zone Date ~~ `~ ~~ ~ Motion by: _~~"~--~ +~! ~' ~j---~ 1~~.~~ Seconded by: ~.~JT-' i~ ~--Q--~ ~--~r'"f (~ =~ cRPPROVAL Sum a ~~~ w`l 1--~Laa C'~ `_~i-1- 3 ~~~.~kC•~, Town Planner DISAPPROVAL ~ f- ~~~~. ~J. ~7r~ ~~_1~L~ . ~C,,,-ltit~~ ^ Staff Approval Date: ~7F}~', 1 ~ , ~ ~ ~') YY~ ~~ ~ ~ ~ ~~ ~.- Project Application Date r ~ ~r 6 / ~'~ ' t Name: ~ ~~ GI CL ~j /~~~. ~l G H / ~ Prolec ~/~~ ~ ~ / Project Description: ~' ~ `-~'''t- f-~- ~~ ~ ~ ~ '~ ~ ~ ~ ~? ~ ~'f C1'c.~~~L C~t~d/ ~ J Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot Block ,Filing ~ / Z1one Comments: _ ~'`--fit ~.O ~C ~- f ~ ~ ~- ~ S t ~ c ~ T~'i l7 Q_~!n/1rt r ~1`'~.- V'~.-dr/~ ~+ ~[ ~ ~ ~/P~ / ( s~ `r I 1. / ^-~ ...,~' ,~[ f~/ ~ f'^r ~i c l ~- G'~--~~/t-~ 'I ~ ~ ~-~-~ rr /r~,~ O Gt ~ ~/L~~ ~ t~ f { ~ Gv ~ / / s fib- '~~ Cr ~ ~ t7 ~ rr ~-, ~~- ~ J Date Motion by: Seconded by: Summary: APPrrR~~OVAL "~ V ~ ~~s~~ Design Review Board DISAPPROVAL Town PlanneQr ^ Staff Approval Date: ~ ~ ~ ~ (° / ` s/ t GG3pff4 PIIBI,IC NOTICE • NOTICE IS HEREBY GIVEN that the Design Review Board of the Town of Vail will hold a public hearing on October lfi, 1991 at 3:00 p.m. in the Town of Vail Municipal Building. Kasier/Hall - 250 addition SM 4876 Juniper Lane/Lat 3, Block 5, Bighorn 5th Addition Precourt - revision to landscape plan SM 328 Mill Creek/Lot 4, Block 1, Vail Village 1st Red Lion -- Landscape plan SM 304 Bridge Street/Lots E,F,G & H, Black 5-A, Vail Village 1st Schmidt - Addition AK 2430 Chamonix Lane/Lot 12, Block B, Resub. of Vail Das Schone 1st Red Sandstone Elementary -Addition of a modular AK telephone cell site. 551 N. Frontage Road West/Lot 8, Vail Potato Patch Sipf Residence - Addition AK 3876 Lupine Drive/Lot 14-A, Block 1, Bighorn 2nd The Ledges - Meter relocation 389 Bighorn Road/Getty Oil Site AK Hutchinson - Landscaping and entry gate AK 2049 Sunburst Drive/Lot 1, Vail Valley 4th Filing Michael's Restaurant - Awning 12 Vail Road/Lot N, Vail Village lst AK Manor Vail - Color Change ~ 595 Vail Valley Drive/Vail Village 7th Filing Noble - Deck expansion BR 950 Red Sandstone Road Shogun Restaurant - New sign BR 292 East Meadow Drive/Mountain Haus Crossroads - New vent JK Lot P, Block 5-D, Vail Village 1st Crazy Shirts Retail Space - New entrance and facade on JK Wall Street. 250 Bridge Street/Lot D, Black 5-B, Vail Village 1st Filing, Bridge Street Building. •