Loading...
HomeMy WebLinkAbout2008-0507 DRBDESIGN REVIEW BOARD AGENDA PUBLIC MEETING ' May 7, 2008 0 � a Council Chambers 75 S. Frontage Road - Vail, Colorado, 81657 PROJECT ORIENTATION MEMBERS PRESENT MEMBERS ABSENT SITE VISITS 1. First Bank of Vail, 555 East Lionshead Circle 2. Pepi's Restaurant, 231 East Gore Creek Drive 3. Osaki's Restaurant, 100 East Meadow Drive Driver: Bill PUBLIC HEARING — TOWN COUNCIL CHAMBERS First Bank of Vail DRB080096 / 10 minutes Final review for minor alterations (paint, lighting, signage) 555 East Lionshead Circle/ Lot 3, Block 1, Vail Lionshead Filing 1 Applicant: First Bank of Vail, represented by Mitchell Plus Associates ACTION: MOTION: SECOND: VOTE: CONDITION(S): 2. Pepi's Restaurant DRB080101 / 10 minutes Final Review for minor alterations (upgrade patio woodwork) 231 East Gore Creek Drive/ Lot E,F,G,H,I, Block 5B, Vail Village Filing 1 Applicant: Pepi Gramshammer, represented by Kenneth Cameron ACTION: MOTION: SECOND: VOTE: CONDITION(S): 3. Osaki's Restaurant DRB080116 / 15 minutes Conceptual review for an addition /renovation 100 East Meadow Drive, Unit 14/ Lot O, Block 5D, Vail Village Filing 1 Applicant: Takeshi & Kazue Osaki, represented by KH Webb Architects ACTION: MOTION: SECOND: VOTE: CONDITION(S): Page 1 1:OOpm 2:OOpm 3:OOpm Mo M- Mo 4. Versman Residence DRB080048 / 15 minutes Nicole Final review of an addition (garage) 4230 Spruce Way /Lot 1, Block 7, Bighorn 3rd Addition Applicant: Ken & Linda Versman, represented by VAg, Inc. ACTION: MOTION: SECOND: VOTE: CONDITION(S): 5. Town of Vail DRB080132 / 15 minutes Nicole Final review for new construction (kiosks) Vail Village and Lionshead Applicant: Town of Vail, represented by Todd Oppenheimer ACTION: MOTION: SECOND: VOTE: CONDITION(S): 6. Red Lion DRB080134 / 10 minutes Nicole Final review for exterior changes (windows) 204 Bridge St /Lots G /H, Block 5A, Vail Village Filing 1 Applicant: Phil Long ACTION: MOTION: SECOND: VOTE: CONDITION(S): 7. Peters Residence DRB080123 / 15 minutes Nicole Final review for an addition of GRFA (garage) 2995 Bellflower Lane /Lot 6, Block 6, Vail Intermountain Applicant: Francine and Alan Peters, represented by Carl Mueller ACTION: MOTION: SECOND: VOTE: CONDITION(S): 8. Vail Plaza Hotel & Club DRB080092 / 15 minutes Nicole Final review for new signage (sign program) 16 Vail Road/ Lots M and O, Block 5D, Vail Village Filing 1 Applicant: Vail Plaza Hotel & Club, represented by Zehren & Associates, Inc. ACTION: MOTION: SECOND: VOTE: CONDITION(S): STAFF APPROVALS Antlers at Vail DRB080100 Rachel Final Review for minor alterations (courtyard stairway) 680 West Lionshead Place/ Lot 3, Block 1, Vail Lionshead Filing 3 Applicant: Antlers at Vail, represented by Tom Schlader Page 2 Golfstream Realty Residence DRB080102 Rachel Final review for a minor alteration (lighting) 1386 Buffehr Creek Road/ Lot G5, Residences at Briar Patch Condos Applicant: Golfstream Realty, Inc, represented by Zehren and Associates, Inc. Miller Residence DRB080103 Rachel Final review for a minor alteration (windows, door) 508 East Lionshead Circle/ Lot 2, Block 1, Vail Lionshead Filing 1 Applicant: Dan and Jen Miller, represented by KW Woodworks, Inc. Harrington Residence DRB080093 Warren Final review for changes to approved plans (windows) 600 Vail Valley Drive/ Lot F1, Pinos Del Norte Applicant: Faversham Corporation, represented by Nedbo Construction Manor Vail DRB080098 Final review for changes (firewall) 595 East Vail Valley Drive/ Lot A, B, C, Vail Village Filing 7 Applicant Manor Vail represented by Zehren & Associates, Inc. Warren White Residence DRB080105 Rachel Final review for a minor alteration (mechanical vents) 103 Willow Place/ Lot 4, Block 6, Vail Village Filing 1 Applicant: Greg and Mindy White, represented by Nedbo Construction Francoise Residence DRB080106 Rachel Final review for a minor alteration (windows) 2834 Snowberry Dr /Lot 18A, Block 9, Vail Intermountain Applicant: Reginald and Susan Francoise, represented by Sawatch Land Co. Timber Falls Condos DRB080109 Rachel Final review for a minor alteration (deck replacement) 4576 Meadow Drive, Units 807 & 810/ Unplatted Applicants: Richard Quetsch and Stephan Livingston, represented by Jim Bowen Castro Residence DRB080111 Rachel Final review for a minor alteration (roof) 2430 Chamonix Rd/ Lot 12, Block B, Vail Das Schone Filing 1 Applicant: Maria Icela Gomez Garcia, represented by Master Sealers Helbing Residence DRB08 -0090 Final review for an addition (master bedroom) 4946 Juniper Lane, Unit B/ Lot 7, Block 5, Bighorn 5t" Addition Applicant: Schelro Ltd, represented by TAB Associates Theriault Residence DRB080095 Bill Final review for changes to approved plans (windows, chimney) 2585 Bald Mountain Road/ Lot 13, Block 1, Vail Village Filing 13 Applicant: Ali Theriault and Kathy Renman, represented by Studio Spinnato Page 3 Schink Residence DRB080099 Final Review for minor alterations (patio) 5027 Main Gore Drive /Lot 1A, Block 1, Bighorn 5th Addition Applicant: James H Schink, represented by Atlas Construction Nicole Front Door DRB080114 Rachel Final review for minor alterations (sign color) 174 Gore Creek Drive/ Lots A, B, C, Block 5C, Vail Village Filing 1 Applicant: The Chalets at the Lodge at Vail Snowstorm LLC Residence DRB080115 Rachel Final review for minor alterations (skylights) 2009 Sunburst Drive /Lot 15, Vail Valley Filing 3 Applicant: Snowstorm LLC, represented by Nedbo Construction Ricci Residence DRB08 -0117 Final review for minor alterations (roof) 2576 Davos Trail /Lot 5, Block E, Vail Das Schone Filing 1 Rachel Vail Mountain School DRB080094 Nicole Final review for a minor alteration (weather antenna) 3000 Boothfalls Road/ Lot 12, Block 2, Vail Village Filing 12 Applicant: Vail Mountain School, represented by Peter Abusi, Headmaster, and Jordan Mesch, Student Vail Valley Medical Center DRB080082 Bill Final review for a minor alteration (waiting room) 181 West Meadow Drive /Lot E & F, Vail Village Filing 2 Applicant: Vail Valley Medical Center Ruder Residence DRB080112 Nicole Final review for minor alteration (landscaping) 2415 Bald Mountain Rd/ Lot 22, Block 1, Vail Village Filing 13 Applicant: Trent Ruder Saipe Residence DRB070605 Nicole Final review for minor alteration (deck stair addition) 1890 Lions Ridge Loop /Chateau Tremonte Unit 5 Applicant: Harvey Saipe, represented by Bill Vernon - McNeill Property Management Gateway Building DRB080129 Rachel Final review for minor alteration (roof) 12 Vail Rd/ Lot N, Block 5D, Vail Village Filing 1 Applicant: Vail Gateway Plaza, represented by KH Webb Architects Vest Residence DRB080135 Rachel Final review for change to approved (roof) 975 Fairway Drive/ Lot 3, Vail Village Filing 10 Applicant: Vest Holdings, represented by Saundra Spaeh Page 4 Manor Vail DRB080073 Warren Final review for changes to approved plans (chimney, fireplace) 595 Vail Valley Drive, Unit 454/ Lots A, B, C, Vail Village Filing 7 Applicant: Judson and Joyce Green, represented by Zehren and Associates Manor Vail DRB080097 Final review for changes (fireplace & chimney) 595 East Vail Valley Drive/ Lot A, B, C, Vail Village Filing 7 Applicant: Manor Vail, represented by Zehren & Associates Warren Resnick Residence DRB080075 Warren Final review for changes to approved plans (landscape) 493 Beaver Dam Road/ Lot 1, Block 2, Vail Village Filing 6 Applicant: Eric and Sara Resnick, represented by Fieldscape, Inc Boehland Residence DRB080130 Rachel Final review for a sign (construction) 3966 Lupine Drive /Lot 3 -B, Block 2, Bighorn 1St Addition Applicant: Thomas and Kim Boehland, represented by Nedbo Construction Tobin Residence DRB080127 Rachel Final review for a minor alteration (hot tub) 400 E Meadow Drive #1 Nail Village Filing 1 Applicant: Herb Tobin, represented by DJensen Electric Town of Vail DRB080122 Warren Final review for a change to approved plans (landscaping) Tract C, Block 1, Vail Lionshead Filing 1 Applicant: Town of Vail The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office, located at the Town of Vail Community Development Department, 75 South Frontage Road. Please call 479 -2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356, Telephone for the Hearing Impaired, for information. Page 5 (tell), ftil PROJECT ORIENTATION MEMBERS PRESENT Tom DuBois Pete Dunning Brian Gillette Libby Plante DESIGN REVIEW BOARD AGENDA PUBLIC MEETING May 7, 2008 Council Chambers 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS ABSENT Mike Dantas SITE VISITS 1. Peters Residence — 2995 Bellflower Lane 2. Pepi's Restaurant, 231 East Gore Creek Drive 3. Osaki's Restaurant, 100 East Meadow Drive PUBLIC HEARING — TOWN COUNCIL CHAMBERS 1. First Bank of Vail DRB080096 / 5 minutes Final review for minor alterations (paint, lighting, signage) 555 East Lionshead Circle/ Lot 3, Block 1, Vail Lionshead Filing 1 Applicant: First Bank of Vail, represented by Mitchell Plus Associates ACTION: Approved MOTION: Gillette SECOND: Plante VOTE: 4 -0 -0 2. Pepi's Restaurant DRB080101 / 5 minutes Final review for minor alterations (upgrade patio woodwork) 231 East Gore Creek Drive/ Lot E,F,G,H,I, Block 5B, Vail Village Filing 1 Applicant: Pepi Gramshammer, represented by Kenneth Cameron ACTION: Approved MOTION: Gillette SECOND: Plante VOTE: 4 -0 -0 3. Osaki's Restaurant DRB080116 / 5 minutes Conceptual review for an addition /renovation 100 East Meadow Drive, Unit 14/ Lot O, Block 5D, Vail Village Filing 1 Applicant: Takeshi & Kazue Osaki, represented by KH Webb Architects ACTION: Withdrawn 4. Versman Residence DRB080048 / 10 minutes Final review of an addition (garage) 4230 Spruce Way /Lot 1, Block 7, Bighorn 3rd Addition Applicant: Ken & Linda Versman, represented by VAg, Inc. ACTION: Approved with condition(s) MOTION: DuBois SECOND: Plante VOTE: 4 -0 -0 CONDITION(S): Page 1 1:OOpm 2:OOpm 3:OOpm Ao M- Nicole 1. Approval of design per elevation plan sheets A3.1 and A3.2, submitted on May 7, 2008, at the public hearing. 5. Town of Vail DRB080132 / 10 minutes Nicole Final review for new construction (kiosks) Vail Village and Lionshead Applicant: Town of Vail, represented by Todd Oppenheimer ACTION: Denied MOTION: Gillette SECOND: DuBois VOTE: 4 -0 -0 Finding: The imitation roof material does not meet the four findings of section 14- 10 -5A, Building Materials and Design, Vail Town Code. 6. Red Lion DRB080134 / 5 minutes Nicole Final review for exterior changes (windows) 204 Bridge St/Lots G /H, Block 5A, Vail Village Filing 1 Applicant: Phil Long ACTION: Approved MOTION: Gillette SECOND: Plante VOTE: 4 -0 -0 7. Peters Residence DRB080123 / 15 minutes Nicole Final review for an addition of GRFA (garage) 2995 Bellflower Lane /Lot 6, Block 6, Vail Intermountain Applicant: Francine and Alan Peters, represented by Carl Mueller ACTION: Tabled to May 21, 2008 MOTION: DuBois SECOND: Dunning VOTE: 4 -0 -0 8. Vail Plaza Hotel & Club DRB080092 / 5 minutes Nicole Final review for new signage (sign program) 16 Vail Road/ Lots M and O, Block 5D, Vail Village Filing 1 Applicant: Vail Plaza Hotel & Club, represented by Zehren & Associates, Inc. ACTION: Approved with condition(s) MOTION: DuBois SECOND: Gillette VOTE: 4 -0 -0 CONDITION(S): 1. The sign colors (yellow and blue) to be utilized on the new sign shall match the colors found on the temporary signs, found on the Plaza Hotel and Club building on May 7, 2008. STAFF APPROVALS Antlers at Vail DRB080100 Rachel Final Review for minor alterations (courtyard stairway) 680 West Lionshead Place/ Lot 3, Block 1, Vail Lionshead Filing 3 Applicant: Antlers at Vail, represented by Tom Schlader Golfstream Realty Residence DRB080102 Rachel Final review for a minor alteration (lighting) 1386 Buffehr Creek Road/ Lot G5, Residences at Briar Patch Condos Applicant: Golfstream Realty, Inc, represented by Zehren and Associates, Inc. Page 2 Miller Residence DRB080103 Rachel Final review for a minor alteration (windows, door) 508 East Lionshead Circle/ Lot 2, Block 1, Vail Lionshead Filing 1 Applicant: Dan and Jen Miller, represented by KW Woodworks, Inc. Harrington Residence DRB080093 Warren Final review for changes to approved plans (windows) 600 Vail Valley Drive/ Lot F1, Pinos Del Norte Applicant: Faversham Corporation, represented by Nedbo Construction Manor Vail DRB080098 Final review for changes (firewall) 595 East Vail Valley Drive/ Lot A, B, C, Vail Village Filing 7 Applicant Manor Vail represented by Zehren & Associates, Inc. Warren White Residence DRB080105 Rachel Final review for a minor alteration (mechanical vents) 103 Willow Place/ Lot 4, Block 6, Vail Village Filing 1 Applicant: Greg and Mindy White, represented by Nedbo Construction Francoise Residence DRB080106 Rachel Final review for a minor alteration (windows) 2834 Snowberry Dr /Lot 18A, Block 9, Vail Intermountain Applicant: Reginald and Susan Francoise, represented by Sawatch Land Co. Timber Falls Condos DRB080109 Rachel Final review for a minor alteration (deck replacement) 4576 Meadow Drive, Units 807 & 810/ Unplatted Applicants: Richard Quetsch and Stephan Livingston, represented by Jim Bowen Castro Residence DRB080111 Rachel Final review for a minor alteration (roof) 2430 Chamonix Rd/ Lot 12, Block B, Vail Das Schone Filing 1 Applicant: Maria Icela Gomez Garcia, represented by Master Sealers Helbing Residence DRB08 -0090 Final review for an addition (master bedroom) 4946 Juniper Lane, Unit B/ Lot 7, Block 5, Bighorn 5th Addition Applicant: Schelro Ltd, represented by TAB Associates M- Theriault Residence DRB080095 Bill Final review for changes to approved plans (windows, chimney) 2585 Bald Mountain Road/ Lot 13, Block 1, Vail Village Filing 13 Applicant: Ali Theriault and Kathy Renman, represented by Studio Spinnato Schink Residence DRB080099 Nicole Final Review for minor alterations (patio) 5027 Main Gore Drive /Lot 1A, Block 1, Bighorn 5th Addition Applicant: James H Schink, represented by Atlas Construction Page 3 Front Door DRB080114 Rachel Final review for minor alterations (sign color) 174 Gore Creek Drive/ Lots A, B, C, Block 5C, Vail Village Filing 1 Applicant: The Chalets at the Lodge at Vail Snowstorm LLC Residence DRB080115 Rachel Final review for minor alterations (skylights) 2009 Sunburst Drive /Lot 15, Vail Valley Filing 3 Applicant: Snowstorm LLC, represented by Nedbo Construction Ricci Residence DRB08 -0117 Final review for minor alterations (roof) 2576 Davos Trail /Lot 5, Block E, Vail Das Schone Filing 1 Rachel Vail Mountain School DRB080094 Nicole Final review for a minor alteration (weather antenna) 3000 Boothfalls Road/ Lot 12, Block 2, Vail Village Filing 12 Applicant: Vail Mountain School, represented by Peter Abusi, Headmaster, and Jordan Mesch, Student Vail Valley Medical Center DRB080082 Bill Final review for a minor alteration (waiting room) 181 West Meadow Drive /Lot E & F, Vail Village Filing 2 Applicant: Vail Valley Medical Center Ruder Residence DRB080112 Nicole Final review for minor alteration (landscaping) 2415 Bald Mountain Rd/ Lot 22, Block 1, Vail Village Filing 13 Applicant: Trent Ruder Saipe Residence DRB070605 Nicole Final review for minor alteration (deck stair addition) 1890 Lions Ridge Loop /Chateau Tremonte Unit 5 Applicant: Harvey Saipe, represented by Bill Vernon - McNeill Property Management Gateway Building DRB080129 Rachel Final review for minor alteration (roof) 12 Vail Rd/ Lot N, Block 5D, Vail Village Filing 1 Applicant: Vail Gateway Plaza, represented by KH Webb Architects Vest Residence DRB080135 Final review for change to approved (roof) 975 Fairway Drive/ Lot 3, Vail Village Filing 10 Applicant: Vest Holdings, represented by Saundra Spaeh Rachel Manor Vail DRB080073 Warren Final review for changes to approved plans (chimney, fireplace) 595 Vail Valley Drive, Unit 454/ Lots A, B, C, Vail Village Filing 7 Applicant: Judson and Joyce Green, represented by Zehren and Associates Page 4 Manor Vail DRB080097 Final review for changes (fireplace & chimney) 595 East Vail Valley Drive/ Lot A, B, C, Vail Village Filing 7 Applicant: Manor Vail, represented by Zehren & Associates Warren Resnick Residence DRB080075 Warren Final review for changes to approved plans (landscape) 493 Beaver Dam Road/ Lot 1, Block 2, Vail Village Filing 6 Applicant: Eric and Sara Resnick, represented by Fieldscape, Inc Boehland Residence DRB080130 Rachel Final review for a sign (construction) 3966 Lupine Drive /Lot 3 -B, Block 2, Bighorn 1St Addition Applicant: Thomas and Kim Boehland, represented by Nedbo Construction Tobin Residence DRB080127 Rachel Final review for a minor alteration (hot tub) 400 E Meadow Drive #1 Nail Village Filing 1 Applicant: Herb Tobin, represented by DJensen Electric Town of Vail DRB080122 Warren Final review for a change to approved plans (landscaping) Tract C, Block 1, Vail Lionshead Filing 1 Applicant: Town of Vail The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office, located at the Town of Vail Community Development Department, 75 South Frontage Road. Please call 479 -2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356, Telephone for the Hearing Impaired, for information. Page 5 0 C, N N 0 0 N N V7 b 00 0 0 N 0 b 00 N co N O 4-4 O En 3 U) (1) M v° Cd 0 0 U 0 Cd W O 0 U 110, •v a Cd r. ca H N O 3 r. Id v ° U C/] Z 006, v'`•� b � O < : O ® � 0, U � U cd F � 0 z r-I O N 14 z Cl) N r. p rn rn O U I r o 4 O b U d ° � � Cd � +� Hv°� ° �- O Cd o Cd U p V o Q o 4 '5 p � 0 0 Cd p cn p b 4- ai cd u TJ o O ® 4.4 O O yy a ° o u o co 0 Pa 0 o 0. OH Cd W H O at A U N O O �n U cn U O + ai } O cd Cd d 1 ,7 O N N O oCa�03 o p. O . 4- O rd ca RJ N O y p a 3 b :, .N c d ,D U N +-' ' cn cn C-) 0 � H .� H � � End -; c0i W d 0 0 N N V7 b 00 0 0 N 0 b 00 N co N O 4-4 O En 3 U) (1) M v° Cd 0 0 U 0 Cd W O 0 U 110, •v a Cd r. ca H N O 3 r. Id v ° U C/] Z 006, v'`•� b � O < : O ® � 0, U � U cd F � 0 z r-I O N 14 z Cl) N r. p rn rn O U I r