HomeMy WebLinkAbout2010-0106 DRBry OVk lVfI1T
PROJECT ORIENTATION
MEMBERS PRESENT
Mike Dantas
Tom DuBois
Brian Gillette
Libby Plante
DESIGN REVIEW BOARD AGENDA
PUBLIC MEETING
January 6, 2010
Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
MEMBERS ABSENT
Pete Dunning
2:OOpm
PUBLIC HEARING — TOWN COUNCIL CHAMBERS
3:OOpm
Shirt Off My Back DRB090609 / 5 minutes Rachel
Final review of a sign
288 Bridge Street, Unit C -2 /Lot D, Block 5A, Vail Village Filing 1
Applicant: Shirt Off My Back, represented by Pat Somers
ACTION: Approved
MOTION: Plante SECOND: Gillette VOTE: 4 -0 -0
2. Joe's Deli DRB090617 / 10 minutes Rachel
Final review of changes to approved plans (sign lighting)
288 Bridge Street /Lot D, Block 5A, Vail Village Filing 1
Applicant: Joseph Joyce
ACTION: Approved with conditions
MOTION: DuBois SECOND: Plante VOTE: 4 -0 -0
CONDITION:
1. The applicant shall place the light fixture on a flat stone directly above the business
identification sign, not in the sandstone band.
3. Kirwood Residence DRB090616 / 10 minutes Bill
Final review of an addition (connect garage to house)
1464 Aspen Grove Lane /Lot 10, Block 2, Lions Ridge Filing 1
Applicant: Jeff and Brenda Kirwood, represented by Berglund Architects
ACTION: Approved
MOTION: DuBois SECOND: Gillette VOTE: 4 -0 -0
4. Ritz - Carlton Residence DRB090611 / 10 Minutes
Warren
Final review of changes to approved plans (Frontage Road design)
728 West Lionshead Circle /Lot 2, West Day Subdivision
Applicant: Vail Resorts Development Corp., represented by Mauriello Planning Group
ACTION: Approved with condition
MOTION: DuBois SECOND: Gillette VOTE: 4 -0 -0
CONDITION:
1. The applicant shall provide a construction Letter of Credit or Cash Deposit in the form of a
Developer Improvement Agreement (DIA) with the Town of Vail in the amount of 125% of
construction costs, for those portions of work not to be initially completed but are a part of the
approved plan. The DIA shall be executed prior to June 30, 2010. The DIA shall be executed
for a period of time not to exceed two (2) years from the date of the filing. At the completion of
the two (2) years, the final improvements will either need to have been constructed by the
applicant or the Town will utilize either the Letter of Credit or Cash Deposit to complete the
Page 1
work. The necessary permits to construct the remaining improvements shall be submitted a
minimum of four (4) months prior to the expiration of the DIA for review by Town Staff.
STAFF APPROVALS
Payne Residence DRB090509
Final review of a minor exterior alteration (deck)
1620 Buffehr Creek Road, Unit C -12 /Valley Condos
Applicant: Linda Payne, represented by Wayne Ward
Peters Residence DRB090603
Final review of changes to approved plans (siding, entry railings)
2955 Bellflower /Lot 6, Block 6, Vail Intermountain
Applicant: Alan Peters, represented by Jack Snow
Kestenbaum Residence DRB090607
Final review of a minor exterior alteration (lighting)
675 Lionshead Place /Lot 1, Lionshead Filing 6
Applicant: Joseph Kestenbaum, represented by John Froberg
Bridge Street Apparel DRB090610
Final review of a sign
288 Bridge Street, Unit C -4 /1-ot D, Block 5A, Vail Village Filing 1
Applicant: Bridge Street Apparel, represented by Pat Somers
Winters Residence DRB090613
Final review of a minor exterior alteration (sunroom)
4094 Lupine Drive, Unit A /Lot 5, Bighorn Subdivision
Applicant: Tom Winters, represented by Rick Craven
Espejo Residence DRB090614
Final review of an addition (living room)
600 Vail Valley Drive, Unit A9 /Unplatted
Applicant: Melita Espeio, represented by Beth Levine
Warren
Warren
Rachel
Rachel
M
Rachel
Jeannie Thoren's Women's Ski Center DRB090621 Rachel
Final review of a sign
520 East Lionshead Circle, C8 /1-ot 5, Block 1, Vail Lionshead Filing 1
Applicant: Rob Dale
Teneblatt Residence DRB090622 Bill
Final review of a minor exterior alteration (window)
767 Potato Patch Drive /Lot 34, Vail Potato Patch
Applicant: William & Anna Teneblatt, represented by Beth Levine
Zug Residence DRB090623 Bill
Final review of changes to approved plans (roof)
1548 Spring Hill Lane /Lots 1 & 2, Vail Valley Filing 2
Applicant: D. Brooks Zug, represented by Jay Nobrega
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479 -2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356,
Telephone for the Hearing Impaired, for information.
Page 2
Tt
en
00
I
O
rA
rA
'I
0
04
C)
u
03
6
C>
W
W
I I
HIS
03
0
0
U
L
C43
rA
ry
o
4 1)
al w
E
E
0
CA
> co
>1
-0 '
= co
Ln "lo 0. 2
7,
tz
15
tp
03 CIS
cl
2
m
Q
m
to a.
03
i
LU)
LL)
z
LIj
f
L
7
LLj
4
>
4.0
�
En
03
6
C>
W
W
I I
HIS
03
0
0
U
L
C43
rA
ry
o
4 1)
al w
E
E
0
CA
> co
>1
-0 '
= co
Ln "lo 0. 2
15
03 CIS
cl
m
Q
m
to a.
03
.
LU)
> 04
0
0.
cd
4.0
�
En
0
--
7E
r
W
Q
co
Q
0
co CA 0
0
r-4
C ' l
A
as
v
C'3
C'3
tn
n
rA
o I-w
0 0
e,—
Cd rA
03
6
C>
W
W
I I
HIS
03
0
0
U
L
C43
rA
ry
o
4 1)
al w
E
E
0
CA
> co
>1
-0 '
= co
Ln "lo 0. 2