Loading...
HomeMy WebLinkAbout2010-0519 DRBi TOWNOFVAIL PROJECT ORIENTATION MEMBERS PRESENT Tom DuBois Pete Dunning Brian Gillette Rollie Kjesbo Libby Plante DESIGN REVIEW BOARD AGENDA PUBLIC MEETING May 19, 2010 Council Chambers 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS ABSENT SITE VISITS 1. Wren — 500 South Frontage Road 2. Forest International — 45 Forest Road 3. Taplin Residence— 115 Forest Road 1:OOpm 2:OOpm PUBLIC HEARING — TOWN COUNCIL CHAMBERS 1. Bernstein Residence DRB100120 / 5 minutes Final review of an addition (bathroom, laundry, office & exterior renovation) 2606 Davos Trail /Lot 2, Block E, Vail Das Schone Filing 1 Applicant: Lois Bernstein, represented by Ron Kirkham ACTION: Approved MOTION: Gillette SECOND: DuBois VOTE: 5 -0 -0 2. Wren Condominiums DRB100142 /5 minutes Conceptual review of minor exterior alteration (paint, siding) 500 South Frontage Road /Unplatted Applicant: KH Webb ACTION: Conceptual, no vote ( Kjesbo recused) 3. Wilkes Residence DRB100138 / 5 minutes Final review of changes to approved plans 520 East Lionshead Circle, Unit 201 /1-ot 7, Block 1, Vail Lionshead Filing 1 Applicant: Snowdon /Hopkins ACTION: Approved MOTION: Gillette SECOND: Kjesbo VOTE: 5 -0 -0 4. Taplin Residence DRB100148 / 10 minutes Conceptual review of a new single family residence 115 Forest Road /Lot 30, Block 7, Vail Village Filing 1 Applicant: KH Webb Architects ACTION: Conceptual, no vote 3:OOpm Rachel Rachel M Page 1 5. Forest International LLC DRB100141 / 10 minutes Bill Conceptual review of an addition (family room, garage) 45 Forest Road /Lot 33, Block 7, Vail Village Filing 1 Applicant: Mark Donaldson ACTION: Conceptual, no vote 6. Lionshead Parking Structure DRB100123 / 10 minutes Warren Final review of new construction (new building for bus stop, modify parking structure) 395 South Frontage Road West /Lot 1, Block 2, Vail Lionshead First Filing, Lot 3, A Resubdivision of Lot 1, Block 1, Vail Lionshead Second Filing, and part of the South Frontage Road West and East Lionshead Circle rights -of -way Applicant: Town of Vail ACTION: Approved MOTION: Gillette SECOND: Plante VOTE: 5 -0 -0 CONDITIONS: 1) The applicant shall use wood benches in place of the proposed poured in place concrete benches. 2) The applicant shall use the "Winter Blend" pavers with a rough surface adjacent to the stone on the building and a smooth finish on the field area. 3) The applicant shall use Telluride Gold stone on the structure. 4) The use of solar technologies on the structure is acceptable on the south facing fagade and roof. 7. Timber Ridge Village Apartments DRB100079 / 60 minutes George Final review of new construction (employee housing development) 1280 North Frontage Road /Lots 1 -5, Block C, Lions Ridge Subdivision Filing 1 Applicant: Vail Timber Ridge, LLC ACTION: Tabled to June 2, 2010 MOTION: DuBois SECOND: Kjesbo VOTE: 5 -0 -0 STAFF APPROVALS Boymer Residence DRB100083 Rachel Final review of an addition (kitchen, bedroom) 1817 Meadow Ridge Road, Unit 6 (Capstone Townhomes) /Lot 21, Buffehr Creek Applicant: Bob Boymer Pinker Residence DRB100102 Final review of an addition (bedroom, study) 3964 Bighorn Road, East Unit /Lot 5, Block 1, Bighorn Subdivision 1 st Addition Applicant: Scale Production Architecture Peters Residence DRB100109 Final review of changes to approved plans (entry, exterior materials) 2955 Bellflower Drive /Lot 6, Block 6, Vail Intermountain Applicant: Carl Mueller Wiepking Residence DRB100114 Final review of changes to approved plans (driveway) 332 Beaver Dam Circle, Unit B /Lot 6, Block 3, Vail Village Filing 3 Applicant: KH Webb Architects Aff Warren M Page 2 Mary K Hartwig Trust Residence DRB100121 Final review of a minor exterior alteration (solarium, roof) 1460 Ridge Lane, Unit 5H /Lot 5H, Ridge at Vail Applicant: John Hartwig, represented by Intention Architecture Rachel Four Seasons Hotel DRB100125 Warren Final review of changes to approved plans (chimney's, entry, flags) 1 Vail Road /Lots B & C, Vail Village Filing 2 Applicant: TJ Brink Clark Residence DRB100128 Final review of change to approved plans (windows) 4887 Juniper Lane /Lot 7B, Block 4, Bighorn 5 Addition Applicant: Stephen Clark Warren Angelo Residence DRB100130 Bill Final review of changes to approved plans (windows, roof material) 352 East Meadow Drive /Tract B, Block 5, Vail Village Filing 1 Applicant: John Angelo, represented by Mauriello Planning Group Costa Residence DRB100131 Final review of a minor exterior alteration (windows, siding) 1460 Ridge Lane /Lot 5F, Ridge at Vail Applicant: Piero Giorgio Costa, represented by Karl Fauland Aff Lopez Residence DRB100133 Bill Final review of changes to approved plans (front entrance) 1350 Sandstone Road, Unit 8 (Eiger Chalets) /Lot G2, Lions Ridge Filing 2 Applicant: Ivan Lopez, represented by Michael Hazard Nisonoff Residence DRB100134 Warren Final review of changes to approved plans (landscaping) 1418 Moraine Drive /Lot 8, Block 2, Dauphinais- Moseley Subdivision Applicant: Hollywood Services Lodge at Vail DRB100135 Final review of a minor exterior alteration (air conditioning unit) 174 Gore Creek Drive /Lot A,B,C, Block 5C, Vail Village Filing 1 Applicant: Tolin Mechanical Town of Vail DRB100136 Final review of a minor exterior alteration (landscaping) 413 Gore Creek Drive /Tract I, Block 5E, Vail Village Filing 1 Applicant: Town of Vail Mountain Plaza DRB100144 Final review of a minor exterior alteration (landscaping) 280 Vail Lane /Front Door Three Dimensional Subdivision, Tract A Applicant: Jeff Babb, Vail Resorts Warren Warren George Page 3 The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office, located at the Town of Vail Community Development Department, 75 South Frontage Road. Please call 479 -2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356, Telephone for the Hearing Impaired, for information. Page 4