HomeMy WebLinkAbout2010-0602 DRBTOWN OF YA[L
PROJECT ORIENTATION
MEMBERS PRESENT
Tom DuBois
Pete Dunning
Brian Gillette
Rollie Kjesbo
DESIGN REVIEW BOARD AGENDA
PUBLIC MEETING
June 2, 2010
Council Chambers
75 S. Frontage Road - Vail, Colorado, 81657
MEMBERS ABSENT
Libby Plante
SITE VISITS
1. Glen Lyon Residence — 1454 Greenhill Court
2. Solaris — 143 Meadow Drive
3. Futernick Residence — 930 Fairway Drive
4. Pitkin Creek Townhomes — 3850 Fall Line Drive
1:30pm
2:OOpm
PUBLIC HEARING — TOWN COUNCIL CHAMBERS
1. Allen /Castro Residence DRB100146 / 15 minutes
3:OOpm
Final review of new construction (duplex)
925 Fairway Drive /Lot 1, Vail Village Filing 10
Applicant: Berglund Architects
ACTION: Approved with condition(s)
MOTION: DuBois SECOND: Gillette VOTE: 3 -1 -0 ( Kjesbo opposed)
CONDITION(S):
1. The applicant shall not increase the height of the exterior chimney without Design Review
Board approval of a change to approved plans application.
2. Solaris Sign Program DRB100174 /15 minutes Warren /Bill
Final review of a sign program
143 East Meadow Drive /Lot P, Block 5D, Vail Village Filing 1
Applicant: Suman Architects
ACTION: Approved with condition(s)
MOTION: DuBois SECOND: Gillette VOTE: 4 -0 -0
CONDITION(S):
1. The applicant shall amend paragraph D of the sign program to remove the proposed language
encouraging bright colors, purples, and oranges for sign colors.
3. Vail T -Shirt Co DRB100157 / 10 minutes
Final review of a sign (projecting, business)
143 East Meadow Drive, Unit 101 /1-ot P, Block 5D, Vail Village Filing
Applicant: Suman Architects
ACTION: Approved
MOTION: DuBois SECOND: Kjesbo
VOTE: 4 -0 -0
Warren /Bill
Page 1
4. Futernick Residence DRB100151 / 10 minutes Rachel
Final review of a minor exterior alteration (fence)
930 Fairway Drive /Lot 7, Vail Village Filing 10
Applicant: Cohen Construction
ACTION: Tabled to June 16, 2010
MOTION: DuBois SECOND: Kjesbo VOTE: 4 -0 -0
5. Lot 1 E Glen Lyon LLC Residence DRB100178 / 15 minutes Rachel
Final review of an addition (bedroom, bathrooms, garage)
1454 Greenhill Court, Unit E /Lot 1, Glen Lyon
Applicant: Martin Manley Architects
ACTION: Approved with conditions
MOTION: DuBois SECOND: Kjesbo VOTE: 4 -0 -0
CONDITION(S):
1. The applicant shall clip the corner of the south side of the lower garage roof to create a hip
feature with the same pitch as the upper roof (7:12).
2. The applicant shall design the roof overhang to protect the gas meter below on the south side
of the building.
6. Pitkin Creek Townhomes DRB100167 / 10 minutes Rachel
Final review of a minor exterior alteration (re- paint)
3850 Fall Line Drive /Unplatted
Applicant: Kirk Hansen
ACTION: Approved
MOTION: DuBois SECOND: Kjesbo VOTE: 4 -0 -0
7. Timber Ridge Village Apartments DRB100079 / 60 minutes George
Final review of new construction (employee housing)
1280 North Frontage Road /Lots 1 -5, Block C, Lions Ridge Subdivision Filing 1
Applicant: Vail Timber Ridge, LLC
ACTION: Tabled to June 16, 2010
MOTION: DuBois SECOND: Kjesbo VOTE: 4 -0 -0
STAFF APPROVALS
Tansill Residence DRB100026
Final review of an addition (living and storage space)
63 Willow Place, Unit 8 (Bishop Park) /Lot 2, Block 6, Vail Village Filing 1
Applicant: Douglas Tansill, represented by KH Webb Architects
Brooktree Condominiums DRB100103
Final review of a minor exterior alteration (wildlife- resistant trash enclosure)
980 Vail View Drive /Lot B6, Block B, Lions Ridge Filing 1
Applicant: Christopher Carpenter
Ramshorn Lodge DRB100106
Final review of changes to approved plans (landscaping)
416 Vail Valley Drive /Lot A, Block 3, Vail Village Filing 5
Applicant: Ramshorn Lodge
Rachel
Rachel
Warren
Page 2
Vail Plaza Hotel DRB1000118
Final review of a minor exterior alteration (pool and hot tub area)
16 Vail Road /Part of Lots O & M, Block 5D, Vail Village Filing 1
Applicant: Scott Parks, Vail Plaza Hotel
Thompson Residence DRB100122
Final review of changes to approved plans (lighting, deck rails)
1814 Glacier Court, Unit B /Lot 21 -B, Lions Ridge Filing 3
Applicant: Andrew James Abraham
Field Residence DRB100124
Final review of a minor exterior alteration (landscaping)
586 Forest Road /Lot 3, Block 1, Vail Village Filing 6
Applicant: Land Designs by Ellison
Warren
Rachel
Rachel
Camelot Townhouses DRB100126 Rachel
Final review of a minor exterior alteration (retaining walls, walkway)
2801 Basingdale Boulevard /Lot 2, Block 8, Vail Intermountain
Applicant: Blueline Architects
Willard Residence DRB100127
Final review of changes to approved plans (exterior materials, chimney)
454 Beaver Dam Road /Lot 5, Block 2, Vail Village Filing 3
Applicant: Fritzlen Pierce Architects
Ford Park DRB100137
Final review of a minor exterior alteration (fence)
75 South Frontage Road /Unplatted
Applicant: Vail Recreation District
Sitzmark DRB100139
Final review of a minor exterior alteration (railing)
183 Gore Creek Drive /Lot A, Block 5B, Vail Village Filing 1
Applicant: Robert Fritch
Grasis Residence DRB100140
Final review of an addition (elevator & garage)
2807 Aspen Court /Lot 12, Block 4, Vail Village Filing 11
Applicant: August Grasis, represented by William Reslock
Heinle Residence DRB100147
Final review of changes to approved plans (window)
1285 Westhaven Circle /Lot 47, Glen Lyon Subdivision
Applicant: Allan & Diana Heinle
Town of Vail DRB100152
Final review of a minor exterior alteration (asphalt millings for path)
Gore Creek Stream Path /Tract A, Vail Village Filing 5
Applicant: Town of Vail
Aff
Aff
Rachel
Rachel
Warren
M
Page 3
Town of Vail DRB100153 Jen
Final review of a minor exterior alteration (landscaping)
Town of Vail Right -of -Way, End of Snowberry Drive
Applicant: Town of Vail
Marx Residence DRB100154 Bill
Final review of a minor exterior alteration (deck)
2627 Arosa Drive /Lot 10, Block C, Vail Ridge
Applicant: Slaugh Construction
Gunion Residence DRB100155 Rachel
Final review of a minor exterior alteration (extension request for DRB090232)
4284 Columbine Drive, Unit E /Lot 20 -1, Bighorn Subdivision, Resub lot 20
Applicant: Chris Gunion
Moulton Residence DRB100156
Final review of a minor exterior alteration (roof)
2558 Arosa Drive /Lot 6, Block C, Vail Das Schone Filing 1
Applicant: Ed Moulton
Myhren Residence DRB100158
Final review of changes to approved plans (exterior materials)
760 Potato Patch Drive /Lot 5, Block 2, Vail Potato Patch
Applicant: Suman Architects
Goldstein Residence DRB100159
Final review of changes to approved plans (eliminate office)
3145 Booth Falls Court, Unit A /Lot 2, Block 1, Vail Village Filing 12
Applicant: JP Sunderland
M
Aff
Aff
Fuzziwig's DRB100161 Warren
Final approval of a minor exterior alteration (vent)
223 East Gore Creek Drive /Part of Lot A, Block 5B, Vail Village Filing 1
Applicant: Gordon Allen
Rumaine Residence DBR100163
Final review of a minor exterior alteration (emergency repairs)
1063 Vail View Drive, Unit 1 /1-ot A5, Block A6, Lions Ridge Filing
Applicant: Paul Breitenwischer
Vail Mountain Information Center, Arrabelle DRB100173
Final review of a minor exterior alteration (outdoor seating)
675 Lionshead Place, Unit 160 /1-ot 1, Lionshead Filing 6
Applicant: Vail Resorts
Rosanne M Lobitz Trust Residence DRB100177
Final review of a minor exterior alteration (deck)
1520 Buffehr Creek Road/Valley Condos Subdivision
Applicant: David Jones
Warren
M
Warren
Page 4
Simmons Residence DRB100179
Final review of a minor exterior alteration (roof)
5157 Gore Circle /Lot 13, Block 3, Bighorn 5th Addition
Applicant: Premiere Builders
Rachel
The applications and information about the proposals are available for public inspection during regular office
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road. Please call 479 -2138 for information.
Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356,
Telephone for the Hearing Impaired, for information.
Page 5