Loading...
HomeMy WebLinkAbout2017-0419 DRB DESIGN REVIEW BOARD AGENDA PUBLIC MEETING April 19, 2017 GRAND VIEW ROOM (Lionshead Parking Structure) 395 E. Lionshead Circle Vail, Colorado, 81657 MEMBERS PRESENTMEMBERS ABSENT Bill PierceAndy Forstl Rollie Kjesbo(Arrived at 3:05) Doug Cahill Peter Cope PROJECT ORIENTATION1:30pm SITE VISITS 1.Bailey Residence, 5155 Main Gore Drive 2.Bridge Street Land LLC, 291 Bridge Street Unit R-1(Plaza Lodge) 3.Blue Mountain Investments, 304 Bridge Street R3(Red Lion) 4.Gondola One Signage, Vail Corp 5.Vail Ski Museum, 241 East Meadow Drive 6.Gore Creek Place, 825 West Forest Road MAIN AGENDA3:00pm 1.Enzian Condominiums DRB17-0069Jonathan Final review of an exterior alteration (railings, paint, doors, walkway, stairs) 707 WestLionshead Circle/Lot 1, Block 2, Vail Lionshead Filing 3 Applicant: Enzian Condominiums, represented by 359 Design ACTION:Approve MOTION:CahillSECOND:CopeVOTE:4-0-0 2.Vail Ski MuseumDRB17-0080Jonathan Final review ofchanges to approved plans (door) 241 East Meadow Drive/Tract B & C, Vail Village Filing 1 Applicant: Town of Vail, represented by John King ACTION:Approve MOTION:CahillSECOND:KjesboVOTE:4-0-0 3.Bailey Residence DRB17-0089Jonathan Final review of an exterior alteration (windows) 5155 Main Gore Drive South/Lot 20, Vail Meadows Filing 1 Applicant: Jeffrey Bailey Revocable Trust, represented by KH Webb Architects ACTION:Approve MOTION:KjesboSECOND:CahillVOTE:4-0-0 4.Vail Corp. DRB17-0093Jonathan Final review of a sign (Operations) Tract E, Vail Village Filing 5 Applicant: Vail Corp., represented by Jeff Babb ACTION:Table to May 3, 2017 MOTION:KjesboSECOND:CahillVOTE:4-0-0 Page 1 5.Berlanti Residence DRB17-0083Chris Final review of an addition 5075 Ute Lane/Lot 29, Vail Meadows Filing 1 Applicant: Mckenna L Berlanti Trust, represented by Sipes Architects ACTION:Approve MOTION:KjesboSECOND:CahillVOTE:4-0-0 6.Marriott Residence Inn DRB16-0339Matt Final review of new construction (lodge, employee housing & parking) 1783 North Frontage Road West/Lot 9, Buffehr Creek Resubdivision Applicant: Vail Hotel Owner ESHV LLC, represented by Mauriello Planning Group ACTION:Approve MOTION:KjesboSECOND:CahillVOTE:4-0-0 7.Bridge Street Land LLC DRB17-0007Matt Final review of an addition 291 Bridge Street Unit R-1 (Bridge Street Lodge)/Lot F-K, Block 5C, Vail Village Filing 1 Applicant: Bridge Street Land LLC, represented by Pierce Architects ACTION:Approvew/ Condition(s) MOTION:CahillSECOND:CopeVOTE:2-0-2 (Kjesbo and Pierce recused) CONDITION(S): 1.Prior tothe submissionof a building permit application, the applicant shall revise the metal railing at the third floor southwest balcony structure to match the decorative wood railings located on the second floor balconies. 8.Avant-Herbst-Epstein Residence DRB17-0087Matt Final review of an exterior alteration (windows) 3094 Booth Falls Court Unit 14/Lot 1, Block 2, Vail Village Filing 12 Applicant: Deborah Avant, Timothy Herbst, Rachel Epstein, represented by Alex Cudney ACTION:Approve MOTION:KjesboSECOND:CahillVOTE:4-0-0 9.Blue Mountain Investments DRB17-0095Matt Final review of changes to approved plans (vent, condenser, louver, windows, chimney, landscaping) 304 Bridge Street R3 (Red Lion Condominiums)/Lots E-H, Block 5A, Vail Village Filing 1 Applicant: Blue Mountain Investments, represented by VAG Architects ACTION:Approve w/ Condition(s) MOTION:KjesboSECOND:CahillVOTE:4-0-0 CONDITION(S): 1.Prior to the submission of a building permitapplication, the applicant shallsubmit a landscape plan, to be reviewed by the Community Development Department staff, indicatingthat the combined height of the trees to be removed will be replaced elsewhere on site and on a foot for foot basis. 10.Gore Creek Place DRB17-0098Matt Final review of an exterior alteration (fence) 825 West Forest Road/Lot 3, West Day Subdivision Applicant: Gore Creek Place HOA, represented by Paul Datsko ACTION:Deny MOTION:KjesboSECOND:CahillVOTE:4-0-0 Page 2 11.Gore Creek Condo Building D Association DRB17-0070Matt Final review of an exterior alteration (siding/decks/walkways) 5014 Main Gore Drive Units 1-4/Lot 4, Gore Creek Meadows Filing 1 Applicant: Gore Creek Condo Building D Association, represented by Melissa Hewitt ACTION:Approve w/ Condition(s) MOTION:KjesboSECOND:CahillVOTE:4-0-0 CONDITION(S): 1.Prior to the submission ofa building permit application, the applicant shall revise the plans such that the first floor siding is the dark vertical siding, the second floor siding is the light brown horizontal siding, and the belly band is black. STAFF APPROVALS Stewart Residence B17-0077J.R. Final review of an exterior alteration (re-roof) th 5146 Gore Circle/Lot 3, Block 2, Bighorn 5Addition Applicant: Pat Stewart, represented by Master Sealers Inc. Simpson Residence B17-0079J.R. Final review of an exterior alteration (windows) 508 Lionshead Circle Unit 404/Lot 2, Block 1, Vail Lionshead Filing 1 Applicant: Nedree Simpson, represented by Rusty Spike Enterprises Inc. Bolanovich Irrevocable Trust B17-0105J.R. Final review of an exterior alteration (windows) 434 Gore Creek Drive Unit D3/Lot B, Block 3, Vail Village Filing 5 Applicant: Bolanovich Irrevocable Trust, represented by Nett Designs Construction Snowflake Trust B17-0106J.R. Final review of an exterior alteration (re-roof) 3110Booth Creek Drive Unit A/Lot 9, Block 3, Vail Village Filing 11 Applicant: Snowflake Trust, represented by TCC Roofing Savage Residence B17-0107J.R. Final review of an exterior alteration (re-roof) 3110 Booth Creek Drive Unit B/Lot 9, Block 3, Vail Village Filing 11 Applicant: Kendall Savage, represented by TCC Roofing Marx Residence DRB17-0079Matt Final review of a sign (Construction sign) 2627 Arosa Drive/Lot 10, Block C, Vail Ridge Subdivision Applicant: Lawrence Marx, represented by SRE Building Associates Potato Patch Townhomes Homeowners Association DRB17-0082Chris Final review of an exterior alteration (roof) 770 Potato Patch Drive/Lot 6, Block 2, Vail Potato Patch Filing 1 Applicant: Potato Patch Townhomes Homeowners Association, represented by Dave Laczi JMB Manning Trust DRB17-0092Chris Final review of change to approved plans (windows, deck, headers, gas meter) 2440 Chamonix Lane/Lot 2, Block B, Karins Ridge Subdivision Applicant: JMB Manning Trust, representedby Berglund Architects Page 3 North Nevada LLC DRB17-0097Chris Final review of changes to approved plans (hot tub, terrace) 2460 Bald Mountain Road/Lot 20, Block 2, Vail Village Filing 13 Applicant: North Nevada LLC, represented by Martin Manley Architects Happy Place Residence DRB17-0100Matt Final review of an addition (loft, windows) 641 West Lionshead Circle Unit 402 (Montaneros)/Lot 8, Block 1, Vail Lionshead Filing 3 Applicant: Happy Place LLC, represented by Martin Manley Architects Zvibelman Residence DRB17-0105Jonathan Final review of an exterior alteration (deck, patio) 1817 Meadow Ridge Road Unit 5(Capstone Townhouses)/Lot 21, Buffehr Creek Resubdivision Applicant: Barry Zvibleman Lublan S. A. DRB17-0106Jonathan Final review of an addition (interior conversion) 68 East Meadow Drive Unit 503 (Village Inn Plaza)/Lot O, Block 5D, Vail Village Filing 1 Applicant: Lublan S. A., represented by Eggers Architecture Lublan S. A. DRB17-0107Jonathan Final review of changes to approved plans (skylights) 68 East Meadow Drive Unit 502 (Village Inn Plaza)/Lot O, Block 5D, Vail Village Filing 1 Applicant: Lublan S. A., represented by Eggers Architecture Town of Vail DRB17-0108Chris Final review of changes to approved plans (deck) 2507 Arosa Drive/Lot 5, Block D, Vail Das Schone Filing 1 Applicant: Town of Vail, represented by John King Vail Clinic Inc. DRB17-0109Jonathan Final review of changes to approved plans (vents) 180 South Frontage Road/Lot E & F, Vail Village Filing 2 Applicant: Vail Clinic Inc., represented by Braun Associates Inc. Staley Residence DRB17-0112Jonathan Final review of an exterior alteration (deck) 1475 Lions Ridge Loop/Lot 3, Lions Ridge Filing 2 Applicant: Trenton Staley, represented by Beth Levine Architect Petrus Management Corp DRB17-0113Jonathan Final review of an exterior alteration (pavers) 64/84 Beaver Dam Road/Lots 28 & 31/Block 7, Vail Village Filing 1 Applicant: Petrus Management Corp., represented by Berglund Architects Kivland Residence DRB17-0115Jonathan Final review of an exterior alteration (vent) 1738 Golf Lane Unit 61/Area A, Sunburst at Vail Applicant: Kivland Family Trust, represented by Jeff Lutz Builders Inc. Galvin Residence DRB17-0116Jonathan Final review of a change to approved plans (addition) 303 Gore Creek Drive Unit 12/Lot 12, Block 5, Vail Village Filing 1 Applicant: Michael Galvin, represented by K.H. Webb Architects Page 4 Beaver Dam S.A. DE C.V. DRB17-0119Jonathan Final review of an exterior alteration (storage) 330 Beaver Dam Circle/Lot 6, Block 3, Vail Village Filing 13 Applicant: Beaver Dam S.A. DE C.V., represented by Nedbo Construction Morning Dew Capitol DRB17-0120Jonathan Final review of a change to approved plans (hot tub) 3030 Booth Creek Road/Lot 5, Block 3, Vail Village Filing 11 Applicant: Morning Dew Capitol, represented by Krueger Architecture Chalets at the Lodge at Vail HOA DRB17-0123Jonathan Final review of a minor exterior alteration (stairs/drain) 151 Vail Lane/Tract B, Front Door Three Dimensional Subdivision Applicant: Chalets at the Lodge at Vail HOA, represented by SRE Building Associates The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend the project orientation and the site visits that precede the public hearing in the Grand View Room of the Lionshead Parking Structure. Times and order of items are approximate, subject to change, and cannot be relied upon to determine at what time the Design Review Boardwill consider an item. Please call 970-479-2138 for additional information. Sign language interpretation available upon request with 24-hour notification, dial 711. Page 5 PROOF OF PUBLICATION STATE OF COLORADO } }SS. COUNTY OF EAGLE } I, Mark Wurzer, representative of the Vail Daily. That the same Daily newspaper printed, in whole or in part and published in the County of Eagle, State of Colorado, and has a general circulation therein; that said newspaper has been published continuously and uninterruptedly in said County of Eagle for a period of that said newspaper has published the requested legal notice and advertisement as requested. The Vail Daily is an accepted legal advertising medium, only for jurisdictions operating under Colorado’s Home Rule provision. published in the regular and entire issue of every number of said daily newspaper for the period of 1 notice was in the issue of said newspaper dated 4/14/2017 and that the last publication of said notice was dated 4/14/2017 in the issue of said newspaper. In witness whereof, I have here unto set my hand this day, 04/14/2017. _______________________________________ General Manager/Publisher/Editor Vail Daily Subscribed and sworn to before me, a notary public in and for the County of Eagle, State of Colorado this day 04/14/2017. _______________________________________ Pamela J. Schultz, Notary Public November 1, 2019