HomeMy WebLinkAbout2017-0419 DRB
DESIGN REVIEW BOARD AGENDA
PUBLIC MEETING
April 19, 2017
GRAND VIEW ROOM (Lionshead Parking Structure)
395 E. Lionshead Circle
Vail, Colorado, 81657
MEMBERS PRESENTMEMBERS ABSENT
Bill PierceAndy Forstl
Rollie Kjesbo(Arrived at 3:05)
Doug Cahill
Peter Cope
PROJECT ORIENTATION1:30pm
SITE VISITS
1.Bailey Residence, 5155 Main Gore Drive
2.Bridge Street Land LLC, 291 Bridge Street Unit R-1(Plaza Lodge)
3.Blue Mountain Investments, 304 Bridge Street R3(Red Lion)
4.Gondola One Signage, Vail Corp
5.Vail Ski Museum, 241 East Meadow Drive
6.Gore Creek Place, 825 West Forest Road
MAIN AGENDA3:00pm
1.Enzian Condominiums DRB17-0069Jonathan
Final review of an exterior alteration (railings, paint, doors, walkway, stairs)
707 WestLionshead Circle/Lot 1, Block 2, Vail Lionshead Filing 3
Applicant: Enzian Condominiums, represented by 359 Design
ACTION:Approve
MOTION:CahillSECOND:CopeVOTE:4-0-0
2.Vail Ski MuseumDRB17-0080Jonathan
Final review ofchanges to approved plans (door)
241 East Meadow Drive/Tract B & C, Vail Village Filing 1
Applicant: Town of Vail, represented by John King
ACTION:Approve
MOTION:CahillSECOND:KjesboVOTE:4-0-0
3.Bailey Residence DRB17-0089Jonathan
Final review of an exterior alteration (windows)
5155 Main Gore Drive South/Lot 20, Vail Meadows Filing 1
Applicant: Jeffrey Bailey Revocable Trust, represented by KH Webb Architects
ACTION:Approve
MOTION:KjesboSECOND:CahillVOTE:4-0-0
4.Vail Corp. DRB17-0093Jonathan
Final review of a sign (Operations)
Tract E, Vail Village Filing 5
Applicant: Vail Corp., represented by Jeff Babb
ACTION:Table to May 3, 2017
MOTION:KjesboSECOND:CahillVOTE:4-0-0
Page 1
5.Berlanti Residence DRB17-0083Chris
Final review of an addition
5075 Ute Lane/Lot 29, Vail Meadows Filing 1
Applicant: Mckenna L Berlanti Trust, represented by Sipes Architects
ACTION:Approve
MOTION:KjesboSECOND:CahillVOTE:4-0-0
6.Marriott Residence Inn DRB16-0339Matt
Final review of new construction (lodge, employee housing & parking)
1783 North Frontage Road West/Lot 9, Buffehr Creek Resubdivision
Applicant: Vail Hotel Owner ESHV LLC, represented by Mauriello Planning Group
ACTION:Approve
MOTION:KjesboSECOND:CahillVOTE:4-0-0
7.Bridge Street Land LLC DRB17-0007Matt
Final review of an addition
291 Bridge Street Unit R-1 (Bridge Street Lodge)/Lot F-K, Block 5C, Vail Village Filing 1
Applicant: Bridge Street Land LLC, represented by Pierce Architects
ACTION:Approvew/ Condition(s)
MOTION:CahillSECOND:CopeVOTE:2-0-2 (Kjesbo and
Pierce recused)
CONDITION(S):
1.Prior tothe submissionof a building permit application, the applicant shall revise the metal
railing at the third floor southwest balcony structure to match the decorative wood railings
located on the second floor balconies.
8.Avant-Herbst-Epstein Residence DRB17-0087Matt
Final review of an exterior alteration (windows)
3094 Booth Falls Court Unit 14/Lot 1, Block 2, Vail Village Filing 12
Applicant: Deborah Avant, Timothy Herbst, Rachel Epstein, represented by Alex Cudney
ACTION:Approve
MOTION:KjesboSECOND:CahillVOTE:4-0-0
9.Blue Mountain Investments DRB17-0095Matt
Final review of changes to approved plans (vent, condenser, louver, windows, chimney, landscaping)
304 Bridge Street R3 (Red Lion Condominiums)/Lots E-H, Block 5A, Vail Village Filing 1
Applicant: Blue Mountain Investments, represented by VAG Architects
ACTION:Approve w/ Condition(s)
MOTION:KjesboSECOND:CahillVOTE:4-0-0
CONDITION(S):
1.Prior to the submission of a building permitapplication, the applicant shallsubmit a
landscape plan, to be reviewed by the Community Development Department staff,
indicatingthat the combined height of the trees to be removed will be replaced elsewhere
on site and on a foot for foot basis.
10.Gore Creek Place DRB17-0098Matt
Final review of an exterior alteration (fence)
825 West Forest Road/Lot 3, West Day Subdivision
Applicant: Gore Creek Place HOA, represented by Paul Datsko
ACTION:Deny
MOTION:KjesboSECOND:CahillVOTE:4-0-0
Page 2
11.Gore Creek Condo Building D Association DRB17-0070Matt
Final review of an exterior alteration (siding/decks/walkways)
5014 Main Gore Drive Units 1-4/Lot 4, Gore Creek Meadows Filing 1
Applicant: Gore Creek Condo Building D Association, represented by Melissa Hewitt
ACTION:Approve w/ Condition(s)
MOTION:KjesboSECOND:CahillVOTE:4-0-0
CONDITION(S):
1.Prior to the submission ofa building permit application, the applicant shall revise the plans
such that the first floor siding is the dark vertical siding, the second floor siding is the light
brown horizontal siding, and the belly band is black.
STAFF APPROVALS
Stewart Residence B17-0077J.R.
Final review of an exterior alteration (re-roof)
th
5146 Gore Circle/Lot 3, Block 2, Bighorn 5Addition
Applicant: Pat Stewart, represented by Master Sealers Inc.
Simpson Residence B17-0079J.R.
Final review of an exterior alteration (windows)
508 Lionshead Circle Unit 404/Lot 2, Block 1, Vail Lionshead Filing 1
Applicant: Nedree Simpson, represented by Rusty Spike Enterprises Inc.
Bolanovich Irrevocable Trust B17-0105J.R.
Final review of an exterior alteration (windows)
434 Gore Creek Drive Unit D3/Lot B, Block 3, Vail Village Filing 5
Applicant: Bolanovich Irrevocable Trust, represented by Nett Designs Construction
Snowflake Trust B17-0106J.R.
Final review of an exterior alteration (re-roof)
3110Booth Creek Drive Unit A/Lot 9, Block 3, Vail Village Filing 11
Applicant: Snowflake Trust, represented by TCC Roofing
Savage Residence B17-0107J.R.
Final review of an exterior alteration (re-roof)
3110 Booth Creek Drive Unit B/Lot 9, Block 3, Vail Village Filing 11
Applicant: Kendall Savage, represented by TCC Roofing
Marx Residence DRB17-0079Matt
Final review of a sign (Construction sign)
2627 Arosa Drive/Lot 10, Block C, Vail Ridge Subdivision
Applicant: Lawrence Marx, represented by SRE Building Associates
Potato Patch Townhomes Homeowners Association DRB17-0082Chris
Final review of an exterior alteration (roof)
770 Potato Patch Drive/Lot 6, Block 2, Vail Potato Patch Filing 1
Applicant: Potato Patch Townhomes Homeowners Association, represented by Dave Laczi
JMB Manning Trust DRB17-0092Chris
Final review of change to approved plans (windows, deck, headers, gas meter)
2440 Chamonix Lane/Lot 2, Block B, Karins Ridge Subdivision
Applicant: JMB Manning Trust, representedby Berglund Architects
Page 3
North Nevada LLC DRB17-0097Chris
Final review of changes to approved plans (hot tub, terrace)
2460 Bald Mountain Road/Lot 20, Block 2, Vail Village Filing 13
Applicant: North Nevada LLC, represented by Martin Manley Architects
Happy Place Residence DRB17-0100Matt
Final review of an addition (loft, windows)
641 West Lionshead Circle Unit 402 (Montaneros)/Lot 8, Block 1, Vail Lionshead Filing 3
Applicant: Happy Place LLC, represented by Martin Manley Architects
Zvibelman Residence DRB17-0105Jonathan
Final review of an exterior alteration (deck, patio)
1817 Meadow Ridge Road Unit 5(Capstone Townhouses)/Lot 21, Buffehr Creek Resubdivision
Applicant: Barry Zvibleman
Lublan S. A. DRB17-0106Jonathan
Final review of an addition (interior conversion)
68 East Meadow Drive Unit 503 (Village Inn Plaza)/Lot O, Block 5D, Vail Village Filing 1
Applicant: Lublan S. A., represented by Eggers Architecture
Lublan S. A. DRB17-0107Jonathan
Final review of changes to approved plans (skylights)
68 East Meadow Drive Unit 502 (Village Inn Plaza)/Lot O, Block 5D, Vail Village Filing 1
Applicant: Lublan S. A., represented by Eggers Architecture
Town of Vail DRB17-0108Chris
Final review of changes to approved plans (deck)
2507 Arosa Drive/Lot 5, Block D, Vail Das Schone Filing 1
Applicant: Town of Vail, represented by John King
Vail Clinic Inc. DRB17-0109Jonathan
Final review of changes to approved plans (vents)
180 South Frontage Road/Lot E & F, Vail Village Filing 2
Applicant: Vail Clinic Inc., represented by Braun Associates Inc.
Staley Residence DRB17-0112Jonathan
Final review of an exterior alteration (deck)
1475 Lions Ridge Loop/Lot 3, Lions Ridge Filing 2
Applicant: Trenton Staley, represented by Beth Levine Architect
Petrus Management Corp DRB17-0113Jonathan
Final review of an exterior alteration (pavers)
64/84 Beaver Dam Road/Lots 28 & 31/Block 7, Vail Village Filing 1
Applicant: Petrus Management Corp., represented by Berglund Architects
Kivland Residence DRB17-0115Jonathan
Final review of an exterior alteration (vent)
1738 Golf Lane Unit 61/Area A, Sunburst at Vail
Applicant: Kivland Family Trust, represented by Jeff Lutz Builders Inc.
Galvin Residence DRB17-0116Jonathan
Final review of a change to approved plans (addition)
303 Gore Creek Drive Unit 12/Lot 12, Block 5, Vail Village Filing 1
Applicant: Michael Galvin, represented by K.H. Webb Architects
Page 4
Beaver Dam S.A. DE C.V. DRB17-0119Jonathan
Final review of an exterior alteration (storage)
330 Beaver Dam Circle/Lot 6, Block 3, Vail Village Filing 13
Applicant: Beaver Dam S.A. DE C.V., represented by Nedbo Construction
Morning Dew Capitol DRB17-0120Jonathan
Final review of a change to approved plans (hot tub)
3030 Booth Creek Road/Lot 5, Block 3, Vail Village Filing 11
Applicant: Morning Dew Capitol, represented by Krueger Architecture
Chalets at the Lodge at Vail HOA DRB17-0123Jonathan
Final review of a minor exterior alteration (stairs/drain)
151 Vail Lane/Tract B, Front Door Three Dimensional Subdivision
Applicant: Chalets at the Lodge at Vail HOA, represented by SRE Building Associates
The applications and information about the proposals are available for public inspection during regular office
hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is
invited to attend the project orientation and the site visits that precede the public hearing in the Grand View
Room of the Lionshead Parking Structure. Times and order of items are approximate, subject to change, and
cannot be relied upon to determine at what time the Design Review Boardwill consider an item. Please call
970-479-2138 for additional information. Sign language interpretation available upon request with 24-hour
notification, dial 711.
Page 5
PROOF OF PUBLICATION
STATE OF COLORADO }
}SS.
COUNTY OF EAGLE }
I, Mark Wurzer,
representative of the Vail Daily. That the same Daily newspaper
printed, in whole or in part and published in the County
of Eagle, State of Colorado, and has a general circulation
therein; that said newspaper has been published continuously
and uninterruptedly in said County of Eagle for a period of
that said newspaper has published the requested legal notice
and advertisement as requested.
The Vail Daily is an accepted legal advertising medium,
only for jurisdictions operating under Colorado’s Home
Rule provision.
published in the regular and entire issue of every
number of said daily newspaper for the period of 1
notice was in the issue of said newspaper dated 4/14/2017 and
that the last publication of said notice was dated 4/14/2017 in
the issue of said newspaper.
In witness whereof, I have here unto set my hand this day,
04/14/2017.
_______________________________________
General Manager/Publisher/Editor
Vail Daily
Subscribed and sworn to before me, a notary public in and for
the County of Eagle, State of Colorado this day 04/14/2017.
_______________________________________
Pamela J. Schultz, Notary Public
November 1, 2019