HomeMy WebLinkAboutB06-035608 -09 -2010 Inspection Request Reporting Page 3
7:13 am Vail, CO _ Citr Of
Requested Inspect Date: Mondayy Au ust 09, 2010AssignedTo: JMOND 2AGN
Inspection Type: BLDG
Inspection Area: CG
Site Address: 184 BEAVER DAM RD VAIL
184 BEAVER DAM ROAD
A/P /D Information
Activity: B06 -0356 Type: B -BLD Sub Type: NDUP Status: ISSUED
Const Type: 103 Occupancy: Use: V -B Insp Area: CGOwner: WHITE ROCK BEAVER DAM LLC
Architect: RESLOCK & SULLIVAN LLC Phone: 303 - 773 -9578
Contractor: WHITE ROCK Phone: (914) 260 -9070
Description: NEW CONSTRUCTION OF A NEW PRIMARY /SECONDARY RESIDENCE
Requested Inspection(s)
Item: 90 BLDG -Final Requested Time: 10:00 AM
Requestor: Phone:
Comments: 390 -7303
Assigned To: JMONDRAGON Entered By: MHAEBERLE KAction: Time Exp:Comment: Partial Cof or b side onlyComment: 1. Mech final approval. 2. Need PW approval. 3. East stairs max 7 3/4" rise and no more than 3/8"
difference between treads. 4. 2nd bedroom guard shall have max 4" openings in guardrail. 5. west stairs
max 7 3/4" rise. 6. step in garage shall have max 7 3/4" rise.Comment: repair steps to garage.
1 t
Inspection History
Item: 10 BLDG - FOOTING "Approved"
08/09/07 Inspector: JRM Action: PA PARTIAL APPROVAL
Comment:
10/05/07
APPROVED FOOTINGS, NO PADS IN PLACE PATIO LEVEL NOT READY
Inspector: shahn Action: PI PARTIAL INSPECTION
Comment:WEST SIDE "B" FOUNDATION AND 3 PADS OK FOR REBAR.
10/23/07 Inspector: shahn Action: PA PARTIAL APPROVAL
Comment:FOUNDATION REBAR AS NOTED ON PLANS.
07/11/08 Inspector: JGG Action: PA PARTIAL APPROVAL
Comment:Footings and piers ready for concrete. Steel OK per plan.
07/31/08 Inspector: JGG Action: PA PARTIAL APPROVAL
Comment:Footing steel is OK. UFER bars shown on both sides.
11/12/08 Inspector: GCD Action: DN DENIED
Comment:NO PLANS ON SITE NO ONE FROM 3J ON SITE LEFT MESSAGE WITH JEFF.
11/13/08 Inspector: GCD Action: PI PARTIAL INSPECTION
Comment:UNIT A EAST SIDE WINDOW WELLS
06/02/09 Inspector: JRM Action: AP APPROVED
Comment:APPROVED FOOTERS FOR HOT TUB /SPA AREA
Item: 20 BLDG - Foundation /Steel "" Approved ""
09/14/07 Inspector: GCD Action: DN DENIED
Comment:COMPLETE SET OF APPROVED PLANS REQD TO BE ON SITE
09/21/07 Inspector: GCD Action: PA PARTIAL APPROVAL
Comment: WEST SIDE FOUNDATION WALL AS NOTED ON PLANS
10/16/07 Inspector: JRM Action: PA PARTIAL APPROVAL
Comment: PARTIAL APPROVED AS NOTED IN YELLOW ON FILED SET OF PLANS
11/18/08 Inspector: JGG Action: AP APPROVED
Comment: Foundation walls for window wells are OK.
06/04/09 Inspector: JRM Action: AP APPROVED
REPT131 Run Id: 11812