Loading...
HomeMy WebLinkAboutB09-024508 -02 -2010 Inspection Request Reporting Page 8 5:02 pm Vail, CO - City Of Requested Inspect Date: Tuesdayy August 03, 2010AssignedTo: CGUNIOV Inspection Type: BLDG Site Address: 4254 COLUMBINE WY VAIL A /P /D Information Activity: B09 -0245 Type: A -BUILD Sub Type: ADUP Status: ISSUED Const Type: Occupancy: Use: VB Insp Area: Owner: CHERYL L. POST FAMILY Contractor: PREFERRED HOME REPAIR AND Phone: 303 - 841 -6603 CONSTRUCTION LLC Description: Remove wood siding, replace 1 window, 2 doors, add 39 sq. ft addition. Add stucco low level of building. Add shower /bath, add new kitchen and office. Requested Inspection(s) Item: 90 BLDG -Final Requested Time: 10:30 AM Requestor: PREFERRED HOME REPAIR AND Phone: 303 - 841 -6603 CONSTRUCTION LLC Comments: 303 -522 -7 88 Assigned To: CGUNIO Entered By: JMONDRAGON K Action: Time Exp: Comment: smoke a g in bedrooms ex eno crnot completeComment: 1) PROVI POSITIVE DRAINAGE AWAY FROM FOUNDATION ON NORTH AND EAST SIDES OF ADDITION ND AT GUTTER DOWNSPOUT BY DECK PER IRC log Inspection History Item: 10 BLDG - FOOTING "Approved" 10/14/09 Inspector: c1 Action: CR CORRECTION REQUIRED Comment:1 CLEAN OUT LOOSE DIRT FROM BOTTOM OF FOOTING23NEED3" CLEAR FROM REBAR TO DIRT 3 SECURE REBAR HOOPS PER PLANS 10/14/09 in cg Action: AP APPROVED Comment:10' SONOTUBE PER PLANS 11/19/09 Inspector: BW Action: DN DENIED Comment:cancelled by contractor Item: 30 BLDG - Framing ** Approved ** 10/19/09 Inspector: cg Action: PI PARTIAL INSPECTION Comment:UNDERFLOOR FRAMING ONLY 11/24/09 Inspector: BW Action: AP APPROVED Comment: Item: 50 BLDG - Insulation 10/19/09 Inspector: cg Action: PI PARTIAL INSPECTION Comment:UNDERFLOOR INSULATION ONLY Item: 60 BLDG - Sheetrock Nail ** Approved ** 12/08/09 Inspector: cg Action: AP APPROVED Comment: Item: 70 BLDG -Misc.Approved ** 11/11/09 Inspector: c Action: AP APPROVED Comment:STUCCO LATH Item: 90 BLDG -Final 02/04/10 Inspector: JRM Action: NO NOTIFIED Comment:smoke alarms req.d in bedrooms exterior work not complete 06/16/10 Inspector: CG Action: CR CORRECTION REQUIRED Comment:1) PROVIDE POSITIVE DRAINAGE AWAY FROM FOUNDATION ON NORTH AND EAST SIDES OF ADDITION AND AT GUTTER DOWNSPOUT BY DECK PER IRC Item: 534 PLAN - FINAL C/O ** Approved ** 02/08/10 Inspector: RLF Action: CR CORRECTION REQUIRED Comment:1. The applicant shall paint all exterior, skirtboards, outlet boxes and fix paint on underside of REPT131 Run Id: 11789