07 -12 -2010 Inspection Request Re orting Page 15
4:33 pm Vail, CO -City O
Requested Inspect Date: Tuesday, July 13, 2010
Assigned To: JMONDRAGON
Inspection Type: MECH
Inspection Area: JRM
Site Address: 184 BEAVER DAM RD VAIL
UNIT A
A /P /D Information
Activity: M08 -0225 Type: B -MECH Sub Type: NDUP Status: ISSUED
Const Type: Occupancy: Use: Insp Area: JRMOwner: WHITE ROCK BEAVER DAM LLC
Contractor: R & H MECHANICAL LLC Phone: (970) 328 -2699
Description: NEW DUPLEX: INSTALL BOILER FOR HEAT, BOILER FOR SNOWMELT, GENERAL VENTILATION
Requested Inspection(s)
Item:390 MECH -Final
Requestor:R & H MECHANICAL LLC
Comments:471 -5665 (luke))
Assigned To:JMONDRAGN
Action:Time Exp:
Comment:
Requested Time: 08:00 AM
Phone:
Entered By: SBELLM K
Inspection History
Item: 200 MECH - Rough "Approved
08/06/09 Inspector: cg Action: DN DENIED
Comment: 1) FIX EXHAUST DUCT WHERE SEPERATED AT OUTSIDE WALL IN UPPER LEVEL STUDY2RE -ROUTE BOILER FLUE PIPES TO ALLOW FOR R -49 CEILING INSULATION
3 RE -ROUTE A/C DUCTS TO ALLOW FOR R -49 CEILING INSULATION
08/17/09
Comment:
Item: 310 MECH -Heat
09/12/08
Comment:
09/15/08
Comment:
10/22/08
Comment:
08/03/09
Comment:
Inspector: JRM Action: AP APPROVED
CORRECTIONS APPROVED AND COMPLETED
n "" Approved ""
Inspector: JGG Action: AP APPROVED
3 gages at 100psi. In -floor tubing is OK.
Inspector: JGG Action: AP APPROVED
Remspection of tubing OK.
Inspector: JGG Action: AP APPROVED
2 gages at 100 psi on main and upper floors OK.
Inspector: shahn Action: bN DENIED
SIDE A:
CONTRACTOR NOT ON SITE FOR INSPECTION
POWDER ROOM FAN DUCT NOT CONNECTED.
WRONG FITTING AT FIRST 90.
NATED TO EXTERIOR.
CANNOT RUN DUCT IN CEILING CAVITY.
08/12/09 Inspector: shs
Comment: REINSPECT FE
Item: 315 PLMB -Gas PipingItem: 320 MECH - Exhaust goods
Item: 330 MECH - Supply Air
Item: 340 MECH -Misc.
Item: 390 MECH -Final
Action: DN DENIED
BEEN PAID. CONTRACTOR TO SCHEDULE INSPECTION.
REPT131 Run Id: 11724