Loading...
HomeMy WebLinkAboutB06-0085TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE: (rrr DEPARTMENT OF COMMUNI4EVELOPMENT THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES�'�` "� ADD /ALT COMM BUILD PERMT Permit # B06 -0085 Project # fe- -(j ( (- (U Job Address: 321 BRIDGE ST VAIL Location.......: BRIDGE STREET LODGE UNIT 104 Parcel No....: 210108269007 OWNER RILEY -BSL LLC 228 BRIDGE ST VAIL CO 81657 APPLICANT R.A. NELSON & ASSOCIATES, PO DRAWER 5400 AVON Colorado 81620 License: 170 -A CONTRACTOR SILICH CONSTRUCTION, INC. 304 -S. GALENA ST. STE B ASPEN COLORADO 81611 License: 335 -A Desciption: BRIDGE ST. LODGE UNIT 104 -VAIL SUREFOOT RENOVATION. Occupancy: M Type Construction: II -A Valuation: $79,700.00 Revision Valuation: ?? Add Sq Ft: 0 ************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ***************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Building ------ > $853.75 Restuarant Plan Review - -> $0.00 Total Calculated Fees - -> $1,411.69 Plan Check --- > $554.94 Recreation Fee--------- - - - - -> $0.00 Additional Fees ---------- > $125.00 Investigation - > $0.00 TOTAL FEES ------------- > $1,411.69 Total Permit Fee --------- > $1,536.69 Will Call - - - - -> $3.00 Payments ------------------- > $1,536.69 BALANCE DUE --------- > $0.00 ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approvals: Item: 05100 BUILDING DEPARTMENT 05/09/2006 cgunion Action: CR 07/03/2006 cgunion Action: AP approved corrected drawings Item: 05400 PLANNING DEPARTMENT 04/24/2006 ee Action: COND NO exterior changes to result from this construction Item: 05600 FIRE DEPARTMENT 04/26/2006 mlv Action: APCR see comments section Item: 05500 PUBLIC WORKS ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** See the Conditions section of this Document for any conditions that may apply to this permit. Status ...: ISSUED Applied ...: 04/17/2006 Issued ...: 07/13/2006 Expires.....: 01/09/2007 04/19/2006 IN04/19/2006 Phone: 970 - 949 -5152 06/30/2006 Phone: (970) 926 -4465 K DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS KIV ANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. 9� � Sly -1 st . SIGN URE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF C 4 CONDITIONS OF APPROVAL Permit #: B06 -0085 as of 07 -13 -2006 Status: ISSUED Permit Type: ADD /ALT COMM BUILD PERMT Applied: 04/17/2006 Applicant: R.A. NELSON & ASSOCIATES, INC Issued: 07/13/2006 970 - 949 -5152 To Expire: 01/09/2007 Job Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Parcel No: 210108269007 Description: BRIDGE ST. LODGE UNIT 104 -VAIL SUREFOOT RENOVATION. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 13 (BLDG.): VENTILATION IS REQUIRED AS PER SECTION 1203 OF THE 2003 IBC AND SECTION 403 OF THE 2003 IMC.. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: CON0008235 EXISTING 1 HOUR FIRE RESISTIVE ASSSEMBLIES AND FIRESTOPPING TO REMAIN IN PLACE. ANY AREAS DISTURBED SHALL BE REPAIRED BY CONTRACTOR. 0 TOWN OF VAIL, COLORADO Statement Statement Number: R060000987 Amount: $1,536.69 07/13/200601:07 PM Payment Method: Check Init: LC Notation: #10118 /Silich Construction Permit No: B06 -0085 Type: ADD /ALT COMM BUILD PERMT Parcel No: 2101 - 082 - 6900 -7 Site Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Total Fees: $1,536.69 This Payment: $1,536.69 Total ALL Pmts: $1,536.69 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - BP 00100003111100 - -- ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 853.75 CL 00100003123000 CONTRACTOR LICENSES 125.00 PF 00100003112300 PLAN CHECK FEES 554.94 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATIOMILL NOT BE ACCEPTED IF INCOMPLE fE OR UNSIG� Project #: Q ` U v Building Permit #: 970,- 479 -2149 (Inspections) TOM OFVE TOWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! 75 S. Frontage Rd. ' / f! V� �� Vail, Colorado 8165 f c c4r; ^ Jc (t (.-4 CONTRACTOR INFORMATION ga General Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s: Email address: _)-_ e -9- PA+ ELS onr coK. Fax #: 9;0 9 _ 31 C ntr ctor, ,ign tur COMPLFTF VAI I IATIONS POP RI 111 11 1M(; PP PRAIT 11 - k, st_ BUILDING: $ 32,500 ELECTRICAL: $ 8, O THER: $ �I �S 3.5 ono PLUMBING: $ 0 MECHANICAL: $ g,ecx> TOTAL: $ For Parcel # Contart Farrle Cnlinty d ccnccnrc r)fftrn of Q7n_77R_RRAn ­1­4 Parcel# ,Zlolo'$z�yoo Job Name: ^ C L. C� lA � OET �o ✓�, on ( 1 - C — apJ Job Address: ,Z76 I-Af4$pi' R,4, "" Qp. - VAIu E l-o -- C,- Jb0 V O Legal Description. �Qt: ' Block: F Filing: Subdivision: Ov,!ryd Name :tee ° _ Address: Iy�'O K ry �n ® o �� Phone: A'v'. G� C r rc ch�itecE esigner.� ;4v4b- % -e Address: ZS 7 kla. 't�onf t)v -\Va 45 Phone: 31 401-o5 Engineer: N/ - QRckqac�r of Address: F0 I--X - 7zs Phone: 97o ✓o c-o 6 I t. 20 � 569 - 31 Detailed description of work: ImImlev- -- r4if4o VU_LA0J.1T oA11 114 ' 6 T_'"L- A Cr MEW PLeT,4,,L `JAWORK /L(,t$G. DR YWA1.1. F IGArII ONE AeCNP'�11t / , rLEG�I.P�'tGu.t� -t. 0(1X W ck iVCW LI45h"Fiv4 f 4.11 O QIL /L� F workclass: New () Addition( ) Remodel (101 Repair ( ) Demo ( ) Other ( ) Work Type: Interior ( Exterior ( ) Both( ) Does an EHU exist at this location: Yes( ) No( ) Type of Bldg.: Single ) Two ) Multi ) Commercial( ) Restaurant( ) Other( (LG L_ No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building No/T pe of Fireplaces Existing: Gas Appliances O Gas Los o Wood /Pellet o Wood Burnin o No/T e of Fireplaces Proposed: G Appliances o Gas Logs o Wood /Pellet o Wood Burning NOT ALLOWED Does a Fire Alarm Exist: Yes ( No ( ) Does a Fire Sprinkler System Exist: Yes( ) No( ) FOR OFFICE USE ONLY*********"' Type of Construction. Date Received: J.i � Occupancy Group: _ - Accepted By: jJ APR 1 7 2006 L9 ti l L TOW N OF VAIL F: \cdev \FORMS \Permits \Building \but Ingpermit.DOC Page 1 of 16 APR 17 2006 TOWN OF VAIL 02/09/2005 JUN -29 -2006 16:48 SUREFOOT, L.C. 435 649 0663 P.02iO4 June 29, 2006 Town of Vail Dept of Community Development Building Safety and Inspection Services Attn: Chris Gunion, Building Plans Examiner 75 South Frontage Road Vail, CO 81657 Via facsimile: 970 -479 -2452 Dear Chris Gunion, Please transfer the Permit # B06 -0085 for Surefoot L.C. (321 Bridge Street, Vail, CO) from RA Nelson to Silich Construction (contact info below). Silich Construction Attn: Hendrik Venter 210 Edwards Village Blvd, Suite A204 Edwards, CO 81621 If you have any questions, please contact me at 888655 - 8110. Thank you, Robert J. Shay President Surefoot L.C. 1500 Kearns Boulevard SUIte A•100 Park City, Utan 84060 Ph. 14351 655 -8110 Fx. 14351 649 -0663 www.surefoot.com JAN z 9 2006 lj� TOWN OF VAIL Serefom. DiiWP�W.'[L LNLJNLLPLO IJOi Ni'M Questions? Call the Building Feam at 479 -2325 O TOIVA Building Permit Submittal Checklist Department of Community Development Project Name: ` )L SuRZ;�!?� T2EUoyatcA Project Address: 2.78 44A vs ,,,❑ P—& , .CAA Qb . • ✓AIL ✓ This Checklist must be completed before a Building Permit application is / accepted. All pages of application is complete ❑ Has DRB approval obtained (if required) Provide a copy of approval formic ❑ Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee #(A- schedule) ❑ Complete site plan submitted A /'A ❑ Public Way Permit application included if applicable (refer to Public Works checklist) ❑ Staging plan included (refer to Public Works checklist) No dumpster,parking or material storage �vp allowed on roadways and shoulders without written approval ' Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) ❑ Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR and Duplex, 5 sets of plans for Multi - Family and Commercial Buildings) )V /A ❑ Window and door schedule NIA ❑ Full structural plans, including design criteria (i.e.loads) A///A ❑ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) /V /A� - ❑ Soils Report must be submitted prior to footing inspection i✓I ❑ Fire resistive assemblies specified and penetrations indicated ❑ Smoke detectors shown on plans ❑ Types and quantity of fireplaces shown ^! /A Applicant's Signature: Date of submittal: Received By: F: \cdev \FORMS\ Permits \Building \building —permit.DOC Page 2 of 16 02/09/2005 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG{ Project #: —. Q - Q f Q 0 Building Permit #: 970 2 nspections) 7O AOVAL TOWN OF VAIL BUILDING PERMIT APPLICATION 75 S. Frontage Rd. Separate Permits are required for electrical, plumbing, mechanical, etc.! Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: Town of Vail Reg. No.: ][ ftact Person and Phone #'s: • A • IJ el ,o 4 oc t r. S, t o c , Q — Q ,1 5 g '`WTH C ) 4 'I - Big I Email address: .�su,T cv PAA)EL vv c Fax #: CQntra /- COMPLETE VALUATIONS FOR BUILDING PERMIT La & Materials j BUI L D ING: $32,5pp ELECTRICAL: $ 8, OTHER: $ r_lp-L(pF -t35,0(no L PLUMBING: $ M E C H A NICAL: $ 3 � 3 ap - TOTAL: $ — 79 For Parcel # Contact Eagle County Assessors Office at 970 - 328 -8640 or visit www. /e - count .com Parcel# ,Z1f)10sZra9om7 J�l - I I [ Job Name: L epi bcw_ ob Address: 278 � 1 PA'N ,� P—p, _ 1JAt u Q l l^ cSuQ.E Fob �j�to%ATt o�-( G+h1D t O [ Legal Descri Block: Filing: Subdivision: O d Address: Phone: ` a we Gt lltr o tR n Architect/ esigner:AAAaotj Address: z%'J t}a+u o 5R.1ve 45 Phone: 310 4oi -o5 JftN1� , A , ,\, I Engineer: N - Apc e,e Address: Po -rzs Phone: 97Q vp t4, c-o 6 i t. 2n Detailed description of work: /nr1wt11oR REtao %ont M,tiLOr� vet �04,'�0�� i t Nk ��L Ca'SCwot7�c oa,L. DRyu A�.l A"D IF( G One s J �O-TNC colQ 1 Cautsc N !� �' � � 4c ' D`�.�- u' � , 'mow uG�/�f7' t ^'4 f t.! 11; c . Work Class: New () Addition ( ) Remodel ( Repair( ) Demo ( ) Other ( ) Work Type: Interior ( Exterior ( -)Both ( ) Does an EHU exist at this location: Yes( ) No( } Type of Bldg.: t Single- family ( ) Two - family ( ) MUlti- family ( ) Commercial ( ) Restaurant ( ) Other N foo Existing Dwelling Units in this building: No. of Accommodation Units in this building: e of Fireplaces Existing: Gas Appliances ( 0) Gas Logs (o) Wood /Pellet (o) Wood Burnin (o ) No /Type of Fireplaces Proposed: G A liances a Gas Lo 2s o Wood /Pellet o Wood Burning NO ALLOWED Does a Fire Alarm Exist: Yes ( No( ) Does a Fire Sprinkler System Exist: Yes ( ) No ( ) OFFICE USE ONLY***** l`J [E ******** C stffec n Date Received: I I O U in G u . - : Accepted B Accepy 17 2006 APR fi l APR 1 7 2006 � ' 1A7 IV' Y� l, TOWN OF V AIL L I � p � � TO WN OF VAII. v F: \r_dev \FORMS \Permits \Building \bui ingpermit.DOC Page 1 of 16 �, 0_, 09/2005 otp ERR H E RRO N O Enterprises USA, Inc. `�b/ished� Hazardous Materials "Mold *Asbestos *Lead Paint Environmental Services *Industrial HVgienists April 14, 2006 R.A. Nelson and Associates, Inc. /Mr. John Smith Phone (303) 763 9639 Fax (303) 763 9686 E -Mail Lennie.Herron @comcast.net Website www.HERRON- Enterprises.com 726 W. Hampden Ave., Lakewood, Colorado 80227 -5305 HERRONO Project No.: 0407067 Job No.: Verbal Location: `Commercial Property', Surefoot, 278 Hanson Ranch Road, Vail, CO 81657 Date(s) of Service: April 11 -13, 2006 Services Requested: Environmental Consultation/Limited Asbestos Building Inspection Scope of Work Per your request, and under the guidelines defined, HERRONO Enterprises USA, Inc. (HERRONO) has concluded the Environmental Consultation/Limited Asbestos Building Inspection at the aforementioned property. Local, state and/or federal regulations, including but not limited to the Air Quality Control Division (AQCC) Regulation 8, OSHA 1926.1101, and EPA (NESHAP) 40 CFR Part 61 may require a comprehensive asbestos inspection prior to a renovation or demolition. This inspection requires an AHERA and State certified asbestos building inspector identifying and sampling any friable and non - friable asbestos containing materials which could be affected by the activity. HERRONO was contracted by the Client, to perform: a Environmental Consultation/Asbestos Services, Limited Asbestos Building Inspection, specifically tailored to Friable and Non - Friable Suspect Asbestos Containing Materials (ACM), associated with the aforementioned property, specifically; Client directed Limited Asbestos Building Inspection prior to a renovation of `Commercial Property', Surefoot, 278 Hanson Ranch Road, Vail, CO 81657 as follows: Yellow Fiberglass Insulation in Back Room Light Blue Textured Drywall/Joint Compound Walls in Front Room Multi Colored Smooth Drywall/Joint Compound Walls in Front Room Black Cove Base /Adbesive in Front Room Non - destructive bulk sampling; Rush Turnaround PLM Analyses. HERRONO was subsequently contracted by the Client, to perform: None requested. Conclusion Based on the information generated by this report, we conclude that the aforementioned property does not Contain Regulated Asbestos Containing Material(s) (RACM), however, may have Regulated Asbestos Containing Material(s) in other locations in accordance with local, state, and/or federal regulations for purposes of a renovation or demolition (when conducted in accordance with local, state and/or federal regulations). HERRON' Project No.0407067, Limited Page No. - 1 April 14, 2006 Asbestos Building Inspection EW ERRS H E RRO N CI p Phone (303 303) 763 9639 Enterprises USA, Inc. Fax 763 9686 E -Mail Lennie.Herron @comcast.net al /ShBd� Hazardous Materials`Mold'Asbestos`Lead Paint Website www.HERRON- Enterprises.com Environmental Services'Industrial Hygienists 7261 W. Hampden Ave. Lakewood Colorado 80227 -5305 Materials that contain < =1.0% Asbestos are not considered Asbestos Containing Materials by NESHAPS or EPA but may still be covered by OSHA. OSHA regulations may apply during potential disturbance activities. Although a material may have been determined to contain < =1.0% Asbestos, or during a demolition, if the composition of drywall/joint compound (when the joint compound does not cover the entire surface) has been determined to contain < =1.0% Asbestos, this document serves as a Hazard Communication and should be followed during an activity such as a renovation or demolition, to ensure that an exposure does not occur. The Maximum Allowable Asbestos Level (MARL) may not be exceeded at `any' time in accordance with local, state, and/or federal regulations, including but not limited to AQCC Regulation 8 (State), 29 CFR 1926.1101 (OSHA), 40 CFR Part 61 EPA (NESHAP), and 40 CFR 763 EPA ( AHERA). Suspect materials which were sampled and determined to contain < =1.0% Asbestos (refer to Attachments), by PLM and/or PLM Point Count analysis are: Yellow Fiberglass Insulation, Miscellaneous Material (M), <160 SF, Friable, Good Condition (Current condition), throughout Back Room, 1 Sample(s), (Confirmation) 041106 -1A, Back Room, SE Corner at Ceiling Light Blue Textured Drywall/Joint Compound Walls, Surfacing Material (S), <1,000 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, Partition Wall, 3 Sample(s), 041106 -2A, 2.5' from ground, 3' from W Wall, on S Wall 041106 -2B, 3' from ground, 7' from E Wall, on S Wall 041106 -2C, 2.5' from ground, 3' from E Wall on S Wall Multi Colored Smooth Drywall/Joint Compound Walls, Surfacing Material (S), <1,000 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, 3 Sample(s), 041106 -3A, 1' from S Wall, on E Wall, 2' from ground 041106 -3B, 6' from E Wall, 4' from W Wall on Soffit 041106 -3C, N Wall, 4' from ground, on W Wall Black Cove Base /Adhesive, Miscellaneous Material (M), <160 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, 1 Sample(s), 0411064A, .25' from floor, 1' from S Wall, on E Wall Suspect materials which were not within the Scope of Work at the time of the inspection were: 1. `All' EPA suspect Materials not requested. 2. `Any' confirmed or suspect ACM which may have been concealed at the time of the inspection. 3. During a normal inspection, and more specifically when non - destructive sampling techniques are employed, it is not within the scope of the inspection to remove surface materials to inspect the structures and/or materials which may be under the surface, i.e., within or under concealed areas such as under carpet, under sub - floors, within chases, walls, crawlspaces, tunnels, etc., to remove suspect Asbestos Containing Material(s), to move and/or sample electrical wiring which has not been 'locked out', etc. All said areas are to be assumed as containing >1.0% Asbestos, until such a time that these areas are made accessible, and/or rendered safe so that sampling can be performed. 4. HERRONO recommends extreme caution during a renovation or demolition of these areas in the event that an area which was not suspect, visible, accessible and/or specified during the inspection, is discovered to contain or is suspected of containing an Asbestos Containing Material (ACM). Under local, state and/or federal regulations, should such an event occur, the Client and or Contractor is required to cease operations which may effect this (these) material(s) until an inspection is concluded and a determination is made by an AHERA and State Certified Asbestos Building Inspector. HERRON* Project No.0407067, Limited Page No. - 2 April 14, 2006 Asbestos Building Inspection I � G 0 0 Phone E R R O N° Phone (303) 763 9639 c� Enterprises USA, Inc. Fax (303) 763 9686 E -Mail Lennie.Herron @comcast.net Mished�` Hazardous Materials *Mold *Asbestos *Lead Paint Website www.HERRON- Enterprises.com Environmental Services1ndustrial Hygienists 7261 W. Hampden Ave. Lakewood Colorado 80227 -5305 5. It is expressly advised that although this is a Limited Asbestos Building Inspection, it is a limited inspection which is designed to indicate the presence of Asbestos Containing Materials in the Building(s), and under normal the guidelines defined, specific samples and locations have been instructed and authorized by the Client. Although some materials may indicate that Asbestos is not present in this report, and under the protocol of limited sampling whereas not `all' suspect materials were sampled, under local, state and/or federal regulations, including but not limited to AQCC Regulation 8 and OSHA 29 CFR 1926.110 1, a certain protocol for sampling, number of samples obtained, and assessment is required. 6. Disturbance of these areas could create a potential health hazard. Suspect materials which were visually inspected and determined to be Non -ACM materials at the time of the inspection were: Not applicable. Inspection Methodology: HERRONO selected sample locations and frequency of sampling based on observations, Client requirements and /or the assumption that like materials in the same area are homogeneous in accordance with EPA Publication EPA 560 / 5 -85 - 030a `Asbestos in Buildings: Simplified Sampling Scheme'. Recommendations As Regulated Asbestos Containing Materials were not discovered during this inspection, further action is not required. Should a renovation or demolition occur which would affect materials that were not homogeneous to the materials which were inspected and determined negative for Asbestos, HERRONO would recommend as a minim Plan of Action: 1. Comprehensive Asbestos Building Inspection: a continuous process in areas which may not have been accessible, or for materials which may have been concealed in previous inspections, may be required, i.e., review and usage of previous Asbestos Inspection(s), identification of suspect materials, friable and non - friable, approximate quantities (ACM), discovery sampling in areas which will be affected by the renovation/demolition in order to determine the presence of Asbestos Containing Materials (ACM), etc. Assumptions, and Limitations This Environmental Consultation is applicable in whole, not in part, to the entire contents of the document, and the assumptions, and limitations of current published Terms of Services. HERRON* Project No.0407067, Limited Page No. - 3 April 14, 2006 Asbestos Building Inspection f '0 R Phone 303 763 9639 E'" O H E RRON Enterprises USA, Inc. Fax (303) 763 9686 E -Mail Lennie.Herron @comcast.net 00 1 Hazardous Materials *Mold *Asbestos *Lead Paint Website www.HERRON- Enterprises.com Environmental Services *Industrial Hygienists 7261 W. Hampden Ave. Lakewood Colorado 80227 -5305 Closure Information and data which has been generated as a results of this Environmental Consultation will remain confidential and will not be released to any party without authorization from Client(s). Thank you for the opportunity to be of service. Should you have any questions or comments regarding this report, please do not hesitate to call HERRON® Enterprises USA, Inc. Sincerely, (7 1 i* - Jamie L. Herron Johnson Supervisor HERRON® Enterprises USA, Inc. Certified Asbestos Building Inspector(s): Sherri K. Herron HERRON' Project No.0407067, Limited Page No. - 4 April 14, 2006 Asbestos Building Inspection G ERRS fRP " /fished HERRON Enterprises USA, Inc. Hazardous Materials *Mold *Asbestos *Lead Paint Environmental Services *Industrial Hyqienists 1A 2A 2C 3A 3B 3C 2B 4A Limited Asbestos Building Inspection Attachments Phone (303) 763 9639 Fax (303) 763 9686 E -Mail Lennie. Herron @comcast.net Website www.HERRON- Enterprises.com 7261 W. Hampden Ave., Lakewood, Colorado 80227 -5305 .. i Page 1 of 2 2059 Bryant St. Denver, CO 80211 (303) 964 -1986 Fax(303)477-4275 Toll Free (866) RES I-ENV April 13, 2006 Laboratory Code: RES Subcontract Number: NA Laboratory Report: RES 126138 -1 Project Description: 0407067 None Given Lennie Herron Herron Enterprises, USA, Inc. 7261 W. Hampden Ave. Lakewood CO 80227 Dear Customer, Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code # 101896 and the American Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate #480. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively. Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office. RES 126138 -1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Reservoirs Environmental, Inc. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303 - 964 -1986. Sincerely, Jeanne Spencer Orr President Analyst(s): f Paul D. LoScalzo Paul F. Knappe Michael Scales Wenlong Liu Rich Wegrzyn w m (T (a a U Z J Q Z w 2 Z N O I.L. Z w af w U) w of co m Lo M O q O co O O cc 0 O � J Co U J d N U C U N Q U a J > o z (n N N C Q W 0 0 LO o 0 0 0 0 o LO J 0 0 O o °�� 0 m LO o 0 co rn o m 00 0 z 0 0 0 O c� O Q U) O N +• U O w a. C7 r- Z ( " D = o 0 0 01 C 0 N N w LS U N C r M r r r o fC o m _ U) i o .L - Lo . w a W a) o 0. J In CL 2 0 z Q d M Q uS J Q 0 z Q d o 7C3 Y L — 0 m U U J a U U a) Q Q) z a) Q) QQ >, a >, O O M L L w -) a a U) (j) a Q J CO > , (D U) E Q a) m o o W O c (o H L UUUDQF -6 (n n^ ° 0 0 LO o 0 0 0 0 o LO Ln o 0 0 000 o °�� 0 m LO o 0 co rn o (b 00 0 co') 0 0 0 o 0 iL a E 0 U c o) U) (n^ o C o 00 ti LOO) 00 N 00 0 L r LO CD r 00 r 000 a fl O U) a Q E 0 @0 00 00 0o 0o 00 00 00 000 N Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z > a d + E N 0 w U N 0 y 0 Q Z3 c r- Ln LO o o LO LO LO CD 0 CD CD (p UJ a m m N ti M CO (D LO M d7 M r M C C6 a Q) C O . U Q (6 3 a Q m a CB a _ (6 a a ) 3 3 >, 3 io 3 3 3 3 U) E CO io m m m 0 m m w 0 m 0 L in Z) 3 (n in 3 3 Z5 3 3 �5 cn ) a) c� o ?!, c� T � T � a s 2: T c a T o> ns 70 a Qa a s -o a Q-0 a E a) w a) o a) Q) (D a) o L L L L L LL L LL (6 >t >> > >L > > L m J Q} W Q m Q m Q m Q m Q CO Q m Q m Q co U co CY) CD N C` ) V' LC) (.O CD !— h rl- � � r— a) co (D co (9 (D CO CO (D -0 L(') LO LC) UC) U) LO LO LC) N N N C (D (D C D ro co CO CD Z J W W W W W W W W Q M N N N Cl) Cl) " a 0 0 0 0 0 Cl 0 0 E E r r r r r r r r Fu cn Z o 0 0 0 0 0 0 0 N O U Q N O E H u E E LU �o q v o Z Z F a 0 i t I ti- 3 ! O— ff d � - E 3 j d z: id 'x7l 1 sL vvayi I l.r , A ..�.._:. €:- waz . � _ a ifi tc sm ry ''t k u'Jfi 1+ 9'j ti'k[�J 593.9. i 1 • > �__ a 'R In g- $ t: o ig. 70 1. L2 t CS __aa f r - L z CERTIFICATE OF COMPLETION THIS CERTIFIES THAT SHERRI HER R.ON HAS COMPLETED THE U.S. EPA/. STATE OF COLORADO /APCD ACCREDITED A.H.E.R.A. ASBESTOS INSPECTOR /MANAGEMENT PLANNER RECERTIFICATION TRAINING Approved under EPA section 206 of the Toxic Control Act (TSCA) and meets the requirements of Colorado regulation No 8 07/26/2005 COURSE DATE AUTHORIZE S GNATURE ZTIMPR8728 4 07/26/2006 CERTIFICATION # EXPIRES -W MQ; A'0 Tli rm 11891 east 33 Ave Unit C Aurora Colorado, 80010 303 - 340 -5781 fx 303 -340 -5782 14 "► • STATE OF COLORADO as met th( and T-h Air P of Jution Ont W ffiff 7� C ... ....... A... ?al t -M ora 04! Issued: 10/15/2005- Expires on: 10115/2006 gem-ek Authorized APCD Representative This certificate is valid only with the possession of a current Division-approved training course certification in the discipline specified above. O ViEi TRW OF WHEN A °PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT ": o Is this a new residence? YES NO o Does demolition work being performed require the us the Right -of -Way, easements or public property? YES NO o Is any utility work needed? YES NO o Are there any improvements being done to the driveway? YES NO o Is a different access needed to the site other than the existing driveway? YES NO I/ o Is any drainage work being done that affects the Right -of -Way, easements, or public properly? YES NO — V o Is a "Revocable Right -of -Way Permit" required? YES NO o Is the Right -of -Way, easements or public property to be used for staging, parking or fencing? YES NO t/ If answer it NO, is a parki 6, staging or fencing plan required by Public Works? YES NO ti If you have answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Works office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 970 - 479 -2198. I H READ AND ANSWER ALL THE ABOVE QUESTIONS. 72., S 14 S Contractor S gnature Company Name Job or Project Name: VH /L 5 Yam kN o,,l Date Signed: PRJ #:__ -____ F: \cdev \FORMS\ Permits \Building \building _permit.DOC Page 7 of 16 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 20_ 1. Job Name Street Address (If unknown call 2. 479 -2139) Excavating Contractor Name Mail Address TOV Contractor License Number - REQUIRED City 3. Start Date State Zip Completion Date Phone (Permit Expiration Date) 4. Work is for (circle one) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Other 5. Trench -width (min. 4') Bond Amount $ Length Depth Total SF Permit Fee $ 1 otal LP Total Permit Fee $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. 7. Rubber out - riggers are required on excavating equipment when working on asphalt. Asphalt surfaces underneath the bucket and lugs shall be protected at all times. 8. A signature below indicates a review of the area and utility locations and approval. Once all utility company signatures are obtained, permittee has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Energy/ Public Service Company (1- 800 - 922 -1987) Xcel Energy High Pressure (1- 800 - 922 -1987) Quest (1- 800 - 922 -1987) Comcast Cable (1- 800 - 922 -1987) Eagle River Water & Sanitation District (970 -476 -7480, ext. 114) Holy Cross Electric Company (1- 800 - 922 -1987) Town of Vail Electricians (970 -479 -2158) Town of Vail Irrigation (970 -479 -2158) THERE WILL BE NO TOTAL STREET CLOSURES! A construction traffic control plan must be submitted and approved by the Public Works Department prior to issuance of the permit. 9. All excavation must be done by hand within 18" of utilities — (Senate Bill 172). 10. Permittee must contact the Public Works Department at 476 -2198 24 hours prior to commencing* of work Failure to Notify the Town will result in forfeiture of bond money. Scheduled inspections that are not ready may result in the Town charging the contractor a reinspection fee. 11. 1 certify that I have read all chapters of Title 8 — Public Ways and Property, of the Vail Municipal Code and all utility Company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signature of Agreement Print name clearly Date of signature ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN White — Public Works Show street with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Yellow - Contractor PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS F:\ 1!IL�0 a] \building -permit.DOC Page 8 of 16 02/0912005 PW #: - - - - - -- Parcel #:_ __- ___- _ - - - -- Bldg. Permit #: B- - - - - -- How it relates to Building Permits: Fill out the attached check list with the Building Permit Application If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign -offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control /staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1s` and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Works office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. The Public Works Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with the "Building Permit ". NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15 A new Public Way Permit is required each year if work is not complete. Re- application each November 15 does not mean an automatic renewal. I hav ad and understand the above. Si ature Date Signed TOR OF V F: \cdev \FORMS \Permits \Building \building_permit.DOC Page 9 of 16 02/09/2005 ICI DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 970 - 479 -2198 to request an inspection from the Public Works Department. Allow minimum of 24 hour notice. Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: I Fes( SMrp+ Project Na Date Signed: 4�/�� F: \cdev \FORMS\ Permits \Building \building _permit.DOC Page 10 of 16 02/09/2005 TO U OF oViAl L MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5 -2 -10: DEPOSITS ON PUBLIC WAYS PROHIBITED :V Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. �( Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1 -4 -1 of this code. Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1 -4 -1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7 -3A -1 AND 7 -3A -3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) § 1) Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42 -4 -1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1) I have read and will comply with the above code provisi _JV Lt v Si T7-f Pr4Trtiame Signature Position or Relationship to Project: tcG Date Signed: 3 O F: /everyone/forms/bldperm7 F: \cdev\ FORMS \Permits \Building \building _perm it. DOC Page 11 of 16 02/09/2005 Vail 2006 Vail Village and LionsHead Village Construction Hours Information Handout Problem Statement The Vail Village and LionsHead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guests to generate revenue. Our summer /winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and LionsHead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the construction contractors and the merchants, to not actively participate to minimize the impact of construction in the Vail and LionsHead Village areas. The Vail Village Streetscape Project will continue through 2006. Improvements scheduled for 2006 will be concentrated along Gore Creek Drive west of the Children's Fountain, Gore Creek Promenade and around the frontage of the Mill Creek Court Building. Additional streetscape improvements are scheduled to begin along East Meadow Drive. All construction projects and /or remodels within the Vail Village Core Area should contact Scott Bluhm, Town of Vail Streetscape Coordinator, at 970 - 477 -3418 for further information. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the villages: • The public's health, safety and welfare shall be honored at all times.. • Adequate pedestrian, loading /delivery, vehicle, and emergency vehicle access and circulation shall be maintained. • Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. • All construction deliveries, equipment, tools and materials entering the Vail Village and pedestrian areas must go through CheckPoint Charlie. All LionsHead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking; refer to approved staging plan or make other arrangements for parking. • The hours of outside construction activity shall be as follows: - April 15 — June 23 & September 5 - November 17, 7:00 a.m. until 7:00 p.m., seven days a week. June 30 thru September 1, work must end by 4:00 p.m. on Fridays. November 13 — April 15, 2007 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a.m. on Gore Creek Drive and 7:00 a.m. to 8:30 a.m. on Bridge Street. F: \cdev\ FORMS\ Permits \Building \building _permit.DOC Page 12 of 16 02/09/2005 TOWN 011L ASBESTOS TESTING REQUIREMENTS THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED. AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT. A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION . I have includ�d the asbestos test and report with my building permit application signature 3 . I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during plan review, and will delay your project if found to be inaccurate) applicant signature !' date • The building was constructed after October 12, 1988. The date of construction was applicant signature date original construction date F: \cdev \FORMS \Permits \Building \building _permit.DOC Page 4 of 16 02/09/2005 0 1V�Ailll TOIN OF BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi - family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: J014tk �M Print name. �,� Signature Project Name: A��- QEFoor �vo %71an Date: -4 &(K F: \cdev \FORMS \Permits \Building \building _permit.DOC Page 5 of 16 02/09/2005 G' ° O HERRON Phone (303) 763 9639 c� Enterprises USA, Inc. Fax (303) 763 9686 E -Mail Lennie. Herron @comcast.net b18h9d Hazardous Materials *Mold *Asbestos *Lead Paint Website www.HERRON- Enterprises.com Environmental Services *Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227 -5305 April 14, 2006 R.A. Nelson and Associates, Inc. /Mr. John Smith HERRONO Project No.: 0407067 Job No.: Verbal Location: `Commercial Property', Surefoot, 278 Hanson Ranch Road, Vail, CO 81657 Date(s) of Service: April 11 -13, 2006 Services Requested: Environmental Consultation /Limited Asbestos Building Inspection Scope of Work Per your request, and under the guidelines defined, HERRONO Enterprises USA, Inc. (HERRONO) has concluded the Environmental Consultation/Limited Asbestos Building Inspection at the aforementioned property. Local, state and/or federal regulations, including but not limited to the Air Quality Control Division (AQCC) Regulation 8, OSHA 1926.1101, and EPA (NESHAP) 40 CFR Part 61 may require a comprehensive asbestos inspection prior to a renovation or demolition. This inspection requires an AHERA and State certified asbestos building inspector identifying and sampling any friable and non - friable asbestos containing materials which could be affected by the activity. HERRONO was contracted by the Client, to perform: a Environmental Consultation/Asbestos Services, Limited Asbestos Building Inspection, specifically tailored to Friable and Non - Friable Suspect Asbestos Containing Materials (ACM), associated with the aforementioned property, specifically; Client directed Limited Asbestos Building Inspection prior to a renovation of `Commercial Property', Surefoot, 278 Hanson Ranch Road, Vail, CO 81657 as follows: Yellow Fiberglass Insulation in Back Room Light Blue Textured Drywall/Joint Compound Walls in Front Room Multi Colored Smooth Drywall/Joint Compound Walls in Front Room Black Cove Base /Adhesive in Front Room Non - destructive bulk sampling; Rush Turnaround PLM Analyses. HERRONO was subsequently contracted by the Client, to perform: None requested. Conclusion Based on the information generated by this report, we conclude that the aforementioned property does not Contain Regulated Asbestos Containing Material(s) (RACM), however, may have Regulated Asbestos Containing Material(s) in other locations in accordance with local, state, and /or federal regulations for purposes of a renovation or demolition (when conducted in accordance with local, state and/or federal regulations). 14ERRON" Project No.0407067, Limited Page No. - 1 April 14, 2006 Asbestos Building Inspection F ERRO O Phone (303) 763 9639 f � .0 H E RRO N ' Enterprises USA. Inc. Fax (303) 763 9686 c� E -Mail Lennie,Herron @comcast.net `�bliShed�` Hazardous Materials* Mold *Asbestos *Lead Paint Website www.HERRON- Enterprises.com Environmental Services *Industrial Hygienists 7261 W Hampden Ave. Lakewood Colorado 80227 -5305 Materials that contain < =1.0% Asbestos are not considered Asbestos Containing Materials by NESHAPS or EPA but may still be covered by OSHA. OSHA regulations may apply during potential disturbance activities. Although a material may have been determined to contain < =1.0% Asbestos, or during a demolition, if the composition of drywall/joint compound (when the joint compound does not cover the entire surface) has been determined to contain < =1.0% Asbestos, this document serves as a Hazard Communication and should be followed during an activity such as a renovation or demolition, to ensure that an exposure does not occur. The Maximum Allowable Asbestos Level (MARL) may not be exceeded at `any' time in accordance with local, state, and/or federal regulations, including but not limited to AQCC Regulation 8 (State), 29 CFR 1926.1101 (OSHA), 40 CFR Part 61 EPA ( NESHAP), and 40 CFR 763 EPA ( AHERA). Suspect materials which were sampled and determined to contain < =1.0% Asbestos (refer to Attachments), by PLM and/or PLM Point Count analysis are: Yellow Fiberglass Insulation, Miscellaneous Material (M), <160 SF, Friable, Good Condition (Current condition), throughout Back Room, 1 Sample(s), (Confirmation) 0411064A, Back Room, SE Comer at Ceiling Light Blue Textured Drywall/Joint Compound Walls, Surfacing Material (S), <1,000 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, Partition Wall, 3 Sample(s), 041106 -2A, 2.5' from ground, 3' from W Wall, on S Wall 041106 -2B, 3' from ground, 7' from E Wall, on S Wall 041106 -2C, 2.5' from ground, 3' from E Wall on S Wall Multi Colored Smooth Drywall/Joint Compound Walls, Surfacing Material (S), <1,000 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, 3 Sample(s), 041106 -3A, 1' from S Wall, on E Wall, 2' from ground 041106 -313, 6' from E Wall, 4' from W Wall on Soffit 041106 -3C, N Wall, 4' from ground, on W Wall Black Cove Base /Adhesive, Miscellaneous Material (M), <160 SF, Non - Friable, Good Condition (Current condition), throughout Front Room, 1 Sample(s), 0411064A,.25' from floor, 1' from S Wall, on E Wall Suspect materials which were not within the Scope of Work at the time of the inspection were: 1. `All' EPA suspect Materials not requested. 2. `Any' confirmed or suspect ACM which may have been concealed at the time of the inspection. 3. During a normal inspection, and more specifically when non - destructive sampling techniques are employed, it is not within the scope of the inspection to remove surface materials to inspect the structures and/or materials which may be under the surface, i.e., within or under concealed areas such as under carpet, under sub - floors, within chases, walls, crawlspaces, tunnels, etc., to remove suspect Asbestos Containing Material(s), to move and/or sample electrical wiring which has not been 'locked out', etc. All said areas are to be assumed as containing >1.0% Asbestos, until such a time that these areas are made accessible, and/or rendered safe so that sampling can be performed. 4. HERRONO recommends extreme caution during a renovation or demolition of these areas in the event that an area which was not suspect, visible, accessible and/or specified during the inspection, is discovered to contain or is suspected of containing an Asbestos Containing Material (ACM). Under local, state and/or federal regulations, should such an event occur, the Client and or Contractor is required to cease operations which may effect this (these) material(s) until an inspection is concluded and a determination is made by an AHERA and State Certified Asbestos Building Inspector. HERRON* Project No.0407067, Limited Page No. - 2 April 14, 2006 Asbestos Building Inspection FPP ws •00 G Phone (303) 763 9639 0 H E R R O N .n Enterprises USA, Inc. Fax (303) 763 9686 t E -Mail Lennie.Herron @cbmcast.net `dblished� Hazardous Materials* Mold *Asbestos'Lead Paint Website www.HERRON- Enterprises.com Environmental Services *Industrial Hygienists 7261 W. Hampden Ave., Lakewood Colorado 80227 -5305 5. It is expressly advised that although this is a Limited Asbestos Building Inspection, it is a limited inspection which is designed to indicate the presence of Asbestos Containing Materials in the Building(s), and under normal the guidelines defined, specific samples and locations have been instructed and authorized by the Client. Although some materials may indicate that Asbestos is not present in this report, and under the protocol of limited sampling whereas not `all' suspect materials were sampled, under local, state and/or federal regulations, including but not limited to AQCC Regulation 8 and OSHA 29 CFR 1926.110 1, a certain protocol for sampling, number of samples obtained, and assessment is required. 6. Disturbance of these areas could create a potential health hazard. Suspect materials which were visually inspected and determined to be Non -ACM materials at the time of the inspection were: Not applicable. Inspection Methodology: HERRON® selected sample locations and frequency of sampling based on observations, Client requirements and/or the assumption that like materials in the same area are homogeneous in accordance with EPA Publication EPA 560 / 5 -85 - 030a `Asbestos in Buildings: Simplified Sampling Scheme'. Recommendations As Regulated Asbestos Containing Materials were not discovered during this inspection, further action is not required. Should a renovation or demolition occur which would affect materials that were not homogeneous to the materials which were inspected and determined negative for Asbestos, HERRONO would recommend as a minimum Plan of Action: 1. Comprehensive Asbestos Building Inspection: a continuous process in areas which may not have been accessible, or for materials which may have been concealed in previous inspections, may be required, i.e., review and usage of previous Asbestos Inspection(s), identification of suspect materials, friable and non - friable, approximate quantities (ACM), discovery sampling in areas which will be affected by the renovation/demolition in order to determine the presence of Asbestos Containing Materials (ACM), etc. Assumptions, and Limitations This Environmental Consultation is applicable in whole, not in part, to the entire contents of the document, and the assumptions, and limitations of current published Terms of Services. HERRON* Project No.0407067, Limited Page No. - 3 April 14, 2006 Asbestos Building Inspection FE Edo H E R RO N° p ' Phone (303) 763 9639 Enter rises USA, Inc. Fax 303 763 9686 E -Mail Lennie.Herron @comcast.net 1 Hazardous Materials *Mold *Asbestos *Lead Paint Website www.HERRON- Enterprises.com Environmental Services *Industrial Hygienists 7261 W. Hampden Ave. Lakewood Colorado 80227 -5305 Closure Information and data which has been generated as a results of this Environmental Consultation will remain confidential and will not be released to any party without authorization from Client(s). Thank you for the opportunity to be of service. Should you have any questions or comments regarding this report, please do not hesitate to call HERRON® Enterprises USA, Inc. Sincerely, Jamie L. Herron Johnson Supervisor HERRON® Enterprises USA, Inc. Certified Asbestos Building Inspector(s): Sherri K. Herron HERRON Project No.0407067, Limited Page No. - 4 April 14, 2006 Asbestos Building Inspection ew G ERRO a ;sn�a�`' H E R RO N Enterprises USA, Inc. Hazardous Materials *Mold *Asbestos *Lead Paint Environmental Services *Industrial Hvctienists lA 2A 2C 3A in 3C 2B 4A Limited Asbestos Building Inspection Attachments Phone (303) 763 9639 Fax (303) 763 9686 E -Mail Lennie, Herron @comcast.net Website www.HERRON- Enterprises.com 7261 W. Hampden Ave., Lakewood, Colorado 80227 -5305 ti. r,/ Page 1 of 2 2059 Bryant St. Denver, CO 80211 (303) 964 -1986 Fax(303)477-4275 Toll Free (866) RES I -ENV April 13, 2006 Lennie Herron Herron Enterprises, USA, Inc. 7261 W. Hampden Ave. Lakewood CO 80227 Dear Customer, Laboratory Code: Subcontract Number: Laboratory Report: Project Description: RES NA RES 126138 -1 0407067 None Given Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program ( NVLAP), Lab Code # 101896 and the American Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate #480. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively. Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office. RES 126138 -1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Reservoirs Environmental, Inc. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303 - 964 -1986. Sincerely, Jeanne Spencer Orr President ti Analyst(s): Paul D. LoScalzo Paul F. Knappe Michael Scales Wenlong Liu Rich Wegrzyn w I a) 0) n3 a U Z J Q F— Z W M z N O 6L. z W U) I.L O W W x co m � 0 0 t r) co O O @ d J a co O J a N N U C U � Q U_ d J F- z m c Q W CD CD ono 00 0 0 CD LO J 00 O o : co CD Cl) cno (D 00 rno m CO z o00 O J � O Q d D - c O ar U ` fA O W c Q 0 CL O a) O o a O O 0 Z M C N N O W LV U ~ M 04 c ccC�. —cn O O - cam fn i C C '� ❑ 'i ll.l CL � 2 o Z Q d M Q uS r J Q 0 Z Q a C O 0 D E U z 0 E J U U CD Q o J 0Q m Q cn a) a) (D ! c W c m F- 0�- UUU Q 0 U) ^ CD CD ono 00 0 0 CD LO cn o 00 00 0 o : co CD Cl) cno (D 00 rno CD CO CD 0') o00 0 0 r t- - c o a E O U c U> U) o O -O Q) C o CD CD r- u 00 00 o�n .- cno 00 000 a) LL L O U) Q Q E O m ❑❑ ❑❑ CIO ❑❑ CIO cc ❑❑ ❑❑❑ D N � z z Z Z Z z Z Z Z Z Z Z z Z Z z z _ > C0 E � N O W U O N N Q Fa m _C 1 Lc) Lc) o O LD Ln Ln o 0 0 o CO cn a ° M O) N ti M cl) (0 LC) O 0) = O) . O c Q a) � O . U Q Q d > Q a) a) a) O L L) L (O CQ i L L O 7 _ 0 (1) 3 Z >, c0 _m _� ?: _ co 3 3 3 3 3 a) a Q n Q -o - o n - o -o Q. Q. -o Q E a) a) () a) a) a) a) 0 a) a) 0 a) a) a) Y !E = L' F L 7 ! L L L L L (� > > > 3 > L > >- > > L > > > > > > m Q} WQ� Q m Q m Q c0 Q c0 Q m Q co Q c0 Q m U E N N N N N N N N co co co co cfl co co co Z J 2i 2i 2E W W W W W W W W Q m N N N M M i � a) t0 CO CO CO CD cD CO CD O O O O O d E E r r r r r r r r cn Z O O O O O O O O � a a> 0 c U Q O E H u E N H E . a > U c a Q V C U zL H II �I Z F ay r i, P cr n %z O to xgjlen — LiL . ..... . _ qq 6. EL ih zlylah ul 'Asoo log ff fia i o J�QfSYI Yt^rd tu 0:cX+„ j.�aut7S7 C3.iJ� "ilanlyiclla'; g a ` F �` : ° z too € 7 63 � RE : Zr cc y ffi .AF ( ba •G[_ c S � f � i _ , 3 g,t1 ',? S �� v' cs ` I f r c , CERTIFICATE OF COMPLETION THIS CERTIFIES THAT SHERRI HERRON HAS COMPLETED THE U.S. EPA/. STATE OF COLORADO /APCD ACCREDITED A.H.E.R.A. ASBESTOS INSPECTOR /MANAGEMENT PLANNER RECERTIFICATION TRAINING Approved under EPA section 206 of the Toxic Control Act (TSCA) and meets the requirements of Colorado regulation No 8 07/26/2005 COURSE DATE AUTHORIZE S GNATURE ZTEWPM728 CERTIFICATION # 07/26/2006 ` _ EXTIRES _ F ,_.. ��_ -.:' t7 r ilY`;n hT::i'f'i::�:: ' C 11'891 east 33` Ave Unit Aurora Colorado, 80010 303 - 340 -5781 fx 303 - 340 -5782 0 STATE OF COLORADO 'IA inspector M _ ..._ nagem: t Pl p u Mt Issued: 10 /15 /20l ": Expires on: 10/15/2006 ified by fi3 Authorized APCD Representative * This certificate is valid only with the possession of a current Division- approved training course certification in the discipline specified above. in MO NW A Department of Community Development Building Safety and Inspection Services 75 South Frontage Road Vail, Colorado 81657 970 - 479 - 2136 FAX 970 - 479 -2452 www. vallgov. com BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS: TO: Contractor /Applicant RA Nelson John Smith FAX /Email #: jsmith @ranelson.com Architect Schalon Freyinger LLC proj# 01- 002 -CO claus.freyinger @gmail.com NUMBER OF PAGES: FROM: DATE: BUILDING PERMIT #: OWNERS NAME: SITE ADDRESS: OCCUPANCY GROUP: TYPE OF CONSTRUCTION: NUMBER OF STORIES: BUILDING AREA: 2 Chris Gunion, Building Plans Examiner 05/09/2006 B06 -0085 Riley BSC LLC 321 Bridge Street M? II -A The documents submitted for this project have been reviewed for compliance with the 2003 International Building Code, 2003 International Residential Code, 2003 International Mechanical Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International Energy Conservation Code and 2002 National Electrical Code as modified and adopted by the Town of Vail. The following comments will need to be addressed prior to issuance of a building permit; For processing: • Please submit four complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. • Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet, detail, specification, or calculation shows the requested information. Please send revisions to the attention of the plans examiner with the building permit application number noted. • Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp, signature, registration number and date on the cover page of any structural calculations, all structural details and structural sheets of the plans. For commercial or multi - family projects all sheets of the plans must be stamped. A plan review could not be completed with the limited information on the plans provided. Additional comments will most likely be necessary once a complete set of plans is received. Please resubmit complete plans and address all comments below. Architectural Comments: 2 Revise plans to specify building construction type and occupancy type per 2003 IBC. 3 Clearly show existing construction versus proposed new construction on the plans. Show non- combustible construction as required for type II buildings. IBC ch. 6 D Show all existing fire resistive assemblies and occupancy separations on the plans. Also show any proposed modification to fire resistive walls, floor /ceiling, columns and beams. C&%i I <'b�' '5- Show locations of exits on the plans. Provide a means of egress plan. IBC ch. 10 �. Amend plans to show accessible route, accessible entrance, maneuvering clearances at doors, accessible service counters, and dressing rooms per ANSI 117.1 1998 and IBC Ch. 11. Show proposed use of rooms or spaces on the plans. "�9, Provide a key or schedule for all undefined notes on the plans such as P -2, WD -1. "9\ Include a complete list of all proposed interior finish materials and corresponding flame spread index. Show compliance with IBC ch. 8 and table 803.5 10 Show location of thhe r bathroom and plumbing fixtures serving this tenant space. IBC ch. 29. 'X A Town of Vail Design Review Board application is required for any exterior work including vents, doors, windows etc. Structural Comments: 1- Include structural drawings if any structural work is proposed. It is unclear from the architectural ans provided. Mechanical Comments: Complete electrical drawings prepared by a Colorado State Licensed Engineer showing proposed work are required for commercial projects. A building permit cannot be issued without the drawings. Electrical Comments: 1 Complete electrical drawings prepared by a Colorado State Licensed Engineer showing proposed work are required for commercial projects. A building permit cannot be issued without the drawings. Fire Protection Comments: Y5 Include fire alarm and fire sprinkler modification plan for Vail Fire and Emergency Service review. Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in issuance of a permit, please check all requested information is included with the resubmitted plans. Please submit revised plans as a complete set. Partial plan resubmittals will not be reviewed. F: \cdev \CH RISTERMIT. COMM ENTS \B06 - 0085 \BO6 -0085. DOC OCT -27 -2006 14:12 RADER ENGINEERING E m %IRA ENGINEERING • COMFORT SYSTEMSIMI PO BOX 8610 - AVON, CO 81620 • Telephone 970 -845 -7910 Fax 970. 845.7522 - E•mall drader@raderenglneedng,com 10/27/06 Mr. Greg Denckla Vail Community Development 75 South Frontage Road Vail, CO 81657 VIA FACSIMILE 479 -2452 Re: Swefoot Vail Village REI Job No; 6065.00 Dear Greg, 970 845 7522 P.01i01 1 have inspected the installation of the ducting system for the Surefoot retail space on 10/27/06. The owner requested that the ductwork into the showroom be minimized and changed from the engineered plans. With the reduced ducting the system will provide adequate heating for the space. I am also aware that the fan coil unit has been installed upside down to provide access to the unit. It is my understanding that the blower motor has been reinstalled since orientation of this motor is critical for proper long term operation. 1 am unaware of any other reasons which would preclude proper operation of the fan coil in the current orientation; however the manufacture should approve t his installation. S Ti tom. J. f-Q L v i 10, C43 De (2 e — i l , - t STV9zL M A4 4 W Please call if you have any questions. 1pE Best regards, ` , J. Drew Rader P.E. en Cc: Phil Koski 926 -4469 TOTAL P.01 E Town of Vail Vail, Co. 81657 to �?- 0 z7t ( I October 27, 2006 104 -6 LLC 228 Bridge Street Vail, Co 81657 This letter is to verify that Surefoot has access to and can use the downstairs bathrooms in the Bridge Street Lodge. Michael D. Staughton Ron Riley Landlord 104 -6 LLC TOWN OF VAIL ( EPARTMENT OF COMMUNITY DEVOOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E06 -0128 Job Address: 321 BRIDGE ST VAIL Status ...: ISSUED Location.....: BRIDGE STREET LODGE UNIT 104 Applied. 08/02/2006 Parcel No...: 210108269007 Issued . .. 09/14/2006 Project No Expires . .: 03/13/2007 OWNER RILEY -BSL LLC 08/02/2006 228 BRIDGE ST VAIL CO 81657 APPLICANT WAGNER ELECTRIC, INC. 08/02/2006 Phone: 970 - 949 -6161 P.O. BOX 1620 AVON CO 81620 License: 223 -E CONTRACTOR WAGNER ELECTRIC, INC. 08/02/2006 Phone: 970 - 949 -6161 P.O. BOX 1620 AVON CO 81620 License: 223 -E Desciption: SUREFOOT- COMPLETE ELECTRICAL Valuation: $10,000.00 Square feet: 0 ************************************ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ***************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Electrical --------- > $ 218.50 Total Calculated Fees - -> $ 221.50 DRB Fee --------- > $0.00 Additional Fees ---------- > $0.00 Investigation ---- > $0.00 Total Permit Fee--- - - - - -> $ 221.50 Will Call --------- > $3.00 Payments ------------------ > $ 221.50 TOTAL FEES - -> $ 221.50 BALANCE DUE--- - - - - -> $0.00 ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approvals: Item: 06000 ELECTRICAL DEPARTMENT 08/07/2006 shahn Action: COND Provide lighting switching requirements pe IECC. Provide egress lighting per 2003 IBC. Item: 05600 FIRE DEPARTMENT CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0008331 Provide lighting switching as required per 2003 IECC. Provide egress lighting. ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADRNTY -FOUR HOURS IN ADVANCE BY TELEPHOIVE 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. OWNER 09 CONTRACTOR FOR HIMSELF AND OWNEF Q 0 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R060001452 Amount: $221.50 09/14/200612:13 PM Payment Method: Check Init: LC Notation: #27426 /Wagner Elect ----------------------------------------------------------------------------- Permit No: E06 -0128 Type: ELECTRICAL PERMIT Parcel No: 2101 - 082 - 6900 -7 Site Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Total Fees: $221.50 This Payment: $221.50 Total ALL Pmts: $221.50 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- EP 00100003111100 ELECTRICAL PERMIT FEES 218.50 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG zr Project #: Building Permit #: �Z Electrical Permit #; c� 9 70- 479 -2149 (Inspac:Uonz) MWNOFPAa TOWN OF VAIL ELECTRICAL PERMIT APPLICATION 75 S. Froutage Rai. Vall, Colorado 81657 � C � o - ntact Eagle County dory Office at 970- os visit rt'r "vw caate C0jjn V Com for .f at 4e YiY PC1111.L - a Prvvl aDOVe) )Gb (tiar71E: c� Job Add r's5: J `� C Legal Description i' Lot. F OCK: Filing: Subdivision: � l Owne Address: Phone: 2 Engineer: a Address: Phone: Detailee description cr .v r : r C' I Work Class: New ( } Addition,( Repair ( ; Temp Power ( ) Ctner ( } Work Type: Interior %_ ' Exterior ( } Both ( ) DCes an EHU exist at this lu�:auon: Yes ( ) No Type of Bldg,: Single family Duplex ( ) htulti farniiy ( ) ComrrerCia ) Restaurant ( ) Omer ( I N ng Dwelling Unite in tnis building: R No. of Accommodation Units in this building: Is this rrrit fcr a ? tUC: Y r No Does a Fire Alarm Ex:r*: Yeas ( ) t,lo ( Y i noes a Fire Sprinkler System Exist: yes( ) No ( } E A� y COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials) L AMOUN r OF SQ FT N STPWIL - TURF: I � ELECTRICAL VALUATION_ CONTRACTOR INFORMATION aeQr,Cal Contractor;I Town of Vail Rec No.: 1 Contact and Phone #`s; 1 Contractor Signatur 6 t e: n _ �n _ '*l. rtz' z* reA"l., YdRn= ?x�M.ais,zYi #RAelicAf�tx OFFICE USE ONLY _ r t %C- - i everyan a/ form e; ec per m er7res. C� As^ Zl N II�I�U v IS v AUG 0 12006 TOWN OF VAIL 2'd OEEE 1 '3CNASH� dH WHEb =8 9002 TO �nl� TOWN OF VAIL TEPARTMENT OF COMMUNITY DEVEMPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M06 -0206 > $253.00 Plan Check --- > $50.00 TOTAL FEES--------- - - - - -> Job Address: 321 BRIDGE ST VAIL Status ...: ISSUED Location.....: SUREFOOT -278 HANSON RANCH ROAD Applied ..: 08/02/2006 Parcel No...: 210108269007 Issued . .: 08/10/2006 Legal Description: \ Sb� _�, j �� d Expires . .: 02/06/2007 Project No : > $0.00 OWNER RILEY -BSL LLC 228 BRIDGE ST VAIL cgunion Action: AP CO 81657 APPLICANT C & C PLUMBING & MECHANICAL,08 /02/2006 Phone: 827 -9443 PO BOX 7314 AVON COLORADO 81620 License: 328 -M CONTRACTOR C & C PLUMBING & MECHANICAL,08 /02/2006 Phone: 827 -9443 PO BOX 7314 AVON COLORADO 81620 License: 328 -M Desciption: SUREFOOT REMODEL - INSTALL HVAC SYSTEM Valuation: $9,575.00 Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 ********************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY Mechanical --- > $200.00 Restuarant Plan Review - -> $0.00 Total Calculated Fees --- > $253.00 Plan Check --- > $50.00 TOTAL FEES--------- - - - - -> $253.00 Additional Fees------ - - - - -> $0.00 Investigation - > $0.00 Total Permit Fee ---------- > $253.00 Will Call - - - - -> $3.00 Payments ------------------- > $253.00 BALANCE DUE --------- > $0.00 Item: 05100 BUILDING DEPARTMENT 08/08/2006 cgunion Action: AP Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC.. Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structu according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and�other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS W ADJPANCEY T LEPHONE 4I�} OR AT OUR OFFICE FROM 8:00 AM - 4 PM. l �f // OR CONTRACTOR FOR HIMSELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: R060001200 Amount: $253.00 08/10/200603:15 PM Payment Method: Check Init: DDG Notation: C & C P & H 7888 ----------------------------------------------------------------------------- Permit No: M06 -0206 Type: MECHANICAL PERMIT Parcel No: 2101 - 082 - 6900 -7 Site Address: 321 BRIDGE ST VAIL Location: SUREFOOT -278 HANSON RANCH ROAD Total Fees: $253.00 This Payment: $253.00 Total ALL Pmts: $253.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - MP 00100003111100 - -- ------------------------ - - - - -- ------ MECHANICAL PERMIT FEES - - - - -- 200.00 PF 00100003112300 PLAN CHECK FEES 50.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATIO NOT BE ACCEPTED IF IN — OR UNSI 3 Q (,` 633 Project #: C) Building Permit t Mechanical Permit #: _ Za A 970 -479 -2149 (Inspections) TOWN OF �a TOWN OF VAIL MECHANICAL PERMIT APPLICATION 75 S. Frontage Rd. Permit will not be accepted without the following: Vail, Colorado 81657 Provide Mechanical Room Layout drawn to scale to include: • Mechanical Room Dimensions • Combustion Air Duct Size and Location • Flue, Vent and Gas Line Size and Location • Heat Loss Calcs. • Equipment Cut /Spec Sheets CONTRACTOR INFORMATION Mechanical Contractor: Town of Vail Reg. No.: Contact and Phone #'s: 9 0+ 59 00 C � C PLUHBI�& s MEC N ICAL 32 8 - M I CURT WEI - 3' 827• ` 4 E -Mail Address: W@l lS e CA Yid C f'►'t • Gp M Contractor Signature: COMPLETE VALUATION FOR MECHANICAL PERMIT Labor & Materials MECHANICAL: $ S`7 S , Contact Eaale Countv Assessors Office at 970- 328 -8640 or visit www.eaale- cnunfv_cnm for Parcel # Parcel # F bN,rrie: SU RE Fa OT I V A� L >✓ I lrL_f�(� �- Job Address: 2-7 8 1+ W SI ,� RJR NC Legal Description EE� Filing: Subdivision: VA IL. AK A I F Owners Name: SQIZE Address: lsoo v eNq.tJs 13 (-vo A -1%0 Phone: 0C3' PRRk cra, 0404c> Engineer: Address: Phone: Detailed description of work: I HV 51/5TF_t -\ Work Class: New( ) Addition { ) Alteration (JK4 Repair ( ) Other ( ) Boiler Location: Interior ( ) Exterior ( ) Other ( ) Does an EHU exist at this location: Yes ( ) No Type of Bldg: Single family ( ) Duplex ( ) Multi family ( } Commercial ($)_ Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: No /T pe of Fireplaces Existing: Gas Appliances Gas Los Wood /Pellet Wood Burnin No /Type of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) Wood /Pellet ( } Wood Burning (NOT ALLOWED) Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( } No( ) FOR OFFICE USE ONLY* * * * * * ****'`'* *** * * * * * * **** Other Fe' "t Planner Si no� Accepted By r T 60 Fseg: X Date Race _ \\ Vail\ data\ cdev\FORMS\PERMITS\MECHPERM.DOC: — I' p 1 tu�io 'J ,_, VAIL 07/24/2002 • 08 -23 -2006 Inspection Request Re Page 15 4:19 pm -- -. -- Va GO, Of - - - -- Requested Inspect Date: Thursday, August 24, 2006 Inspection Area: CG Site Address: 321 BRIDGE ST VAIL SUREFOOT -278 HANSON RANCH ROAD A/P /D Information Activity: M06 -0206 Type: B -MECH Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: CG Owner: RILEY -BSL LLC Applicant: C & C PLUMBING & MECHANICAL, INC. Phone: 827 -9443 Contractor: C & C PLUMBING & MECHANICAL, INC. Phone: 827 -9443 Description: SUREFOOT REMODEL - INSTALL HVAC SYSTEM Requested Inspection(s) Item: 200 MECH-Rough Requested Time: 03:00 PM Requestor: C & C PLUMBING & MECHANICAL, INC. Phone: 827 -9443 Comments: will call Ken 904 -1014 Assigned To: JM QNDR AGON Entered By: DGOLDEN K Action: V Time Exp: ) Comment: Comment: 1.PROVIDE APPROVED MECH AND BUILD PLANS ON SITE. 2.PROVIDE INSTRUCTIONS FOR DUCT HEATER. 3.EQUIPMENT INSTALLED UPSIDE DOWN. 4.DUCT NOT COMPLETELY SEALED. I 1 I r--C� v ZA'e �,AA - , b"- V"4 Ih -j"' om C_ 6e� L Inspection History Item: 200 MECH -Rough 08/21/06 Inspector: GCD Action: DN DENIED Comment: NO ACCESS 08/22/06 Inspector: GCD Action: CR CORRECTION REQUIRED Comment: 1.P APPROVED MECH AND BUILD PLANS ON SITE. 2.PROVIDE INSTRUCTIONS FOR DUCT HEATER. 1EQUIPMENT INSTALLED UPSIDE DOWN. 4.DUCT NOT COMPLETELY SEALED. Item: 310 MECH- Heating Item: 315 PLMB -Gas Pipinq Item: 320 MECH - Exhaust Hoods Item: 330 MECH - Supply Air Item: 340 MECH -Misc. Item: 390 MECH -Final REPT131 Run Id: 5614 RAYWA LL-- F4 tJ LOI L_ — SV RE T=o'19 MFH OPERATION & MAINTENANCE DESCRIPTION An MFH terminal may be used as a horizontal (ONLY) furnace or blower heater. When used with a remote primary air damper, the discharge of the MFH unit is inserted into the low pressure duct work down stream of the primary air damper. INSPECTION AND HANDLING Immediately inspect each unit for damage upon receipt. File damage claims with the freight carrier and advise the shipper. Store in a clean dry location and do not stack units or cartons more than four high. Do not lift units by the collars. INSTALLATION A. Before installation, remove packing and all foreign material from unit B. Suspend unit from building structure in a horizontal plane with access panels on the sides. Do not obstruct access panels with support channels, straps or T -bar supports. C. Check blower wheel for free rotation. D. Slip flexible or hard duct over inlet collar. Fasten and seal connections to prevent leakage. Close coupling of the inlet to main supply duct is not recommended. For optimum control, allow at least 1 1/2 duct diameters up stream of the inlet to be straight and unrestricted. E. Connect outlet end of the assembly using low pressure insulated duct. Fasten and seal all joints to prevent leakage. F. Filters must be installed where required. ( Highly recommended on units with hot water coils). G. Thermostat must be calibrated and in control at desired setting. H. Duct work and duct connections must be tight and free from leaks. 1. All foreign materials must be removed from duct system. Maintenance Filters - Disposable filters should be changed and washable filters should be cleaned a minimum of twice per heating season to avoid excessive restriction of air flow. If excessive accumulation is noted due to dusty environment, change filters more frequently. Blower and Motor- Fan terminals are supplied with PSC motor. Inspect motor assembly at least twice a year. Motors are permanently lubricated for normal lifetime use However if lubrication is required oil motor with two drops of 3 -in -1 oil or 10 weight oil. Clean as necessary. Motors and blowers are mounted on a motor plate assembly located behind access panel. Motor has built in thermal overload which automatically resets after a short time. CAUTION Electrical requirement A. Provide a safety disconnect per NEC 424 -19, 20 & 21. B. Disconnect incoming power before wiring or servicing unit. C. All field wiring must be in accordance with NEC and local requirements. All units with electric heat should have copper wire sized at least 125% of nameplate amperage. D. Observe wiring diagram and instructions mounted on the unit. 208/480/3 Phase wire units require a 4th wire (NEUTRAL) wire in addition to the full sized ground wire. All units must be grounded as required by NEC 424 -14 and article 250. • • MAINTENANCE CONTINUED Trouble shooting Problem Possible solution A. Fan motor does not run. Fan disconnect circuit breaker is open - energize circuit • Thermostat is not calling for heat -raise temperature setting and or reca/ibrate. • Fan P.E. switch is open - verify switch setting verify switch action (open or close on pressure rise) • Verify supply voltage and wiring diagram. ' Bearing or motor wheel jammed - free wheel * Fan motor damaged - rep motor. B. Unit blows insufficient air. Check for dirty filters, or other restrictions clean or replace dirty filters (if applicable) clean hot water coil (if applicable) ` re- adjust fan speed control (scr) for additional (CFM ). C. Unit blows cold air only Verify operation of all heating equipment. No Heat For hydronic systems verify hot water supply temperature. Vent all system piping. ' Disconnect, fuses, or circuit breaker may be open Energize circuit and verify fan operation ' Air flow switch may not prove air flow. Verify air flow, check sensing probe and tube for obstruction. * Thermal cutouts are tripped. Reset or replace cut -out, check for air flow obstruction. ' Low voltage. Verity supply voltage against nameplate data. ` Heating element or contactor defective. Replace with original factory replacement parts. * Broken wire in control circuit or control circuit improperly wired. Check wiring diagram in unit. • • REPAIRS PARTS LIST Description Part # 1/15 HP -277v motor 29141017 1/6 HP -277v motor 29141008 1/4 HP -277v motor 29141009 1/3 HP -277v motor 29141010 112 HP -277v motor 29141011 3/4 HP -277v motor 29141012 1/15 HP -115v motor 29421001 1/6 HP -115v motor 29141002 1/4 HP -115v motor 29141003 1/3 HP -115v motor 29141005 1/2 HP -115v motor 29141005 3/4 HP -115v motor 29141012 1/6 HP Capacitor 4.0 OF 29152004 1/4 HP Capacitor 5.0 OF 29152005 1/3 HP Capacitor 10.0 OF 61903018 1/2 HP Capacitor 10.0 O F 61903018 3/4 HP Capacitor 20.0 OF 29052003 Motorspeed controller 277/5 29144027 Motorspeed controller 277/10 29144026 Motor speed controller 208/277/5 29144029 Motor speed controller 208/277/10 29144028 Motorspeed controller 115/5 29144025 Motorspeed controller 115/10 29144021 2 Pole control terminal block 40525001 3 Pole control terminal block 40525002 4 Pole control terminal block 40525003 6 Pole control terminal block 40525004 Contactor 1 Pole 30 A. 24v coil 58027061 Contactor 2 Pole 30 A. 24v coil 58027001 Contactor 2 Pole 30 A. 115v coil 58027002 Contactor 2 Pole 30 A. 240v coil 58027003 Contactor 2 Pole 30 A. 277v coil 58027004 Fuse Link 103 deg. 29157004 Auto Reset High Limit 130 deg. 29176002 Manual Reset High Limit 175 deg. 58248001 Su RE r 0 RFH ;., IEES FAN COIL UNIT Applications: Perimeter Heating; Lobby Heating; Plenum Heating; Kitchen Make -up Air: The fan pac offers the advantages of eliminating large and unsightly roof -top package equipment, and through the roof duct systems which require costly installations with greater horsepower requirements. Commercial or Industrial Unit Heaters: Since the fan pac incorporates a centrifugal blower designed to operate at static pressures of up to .70 inches w g., it isideally suited for hanging in unused overhead spaces and forcing the warm air to occupied Floor areas. Ductwork can also be utilized to circulate the heated or ventilated air overlarge areas that may not be in the vicinity of the fan pac. Construction: All units FTI I isted as a total package with electric heat or hot water mils Options: Certified sound data by an independent testing laboratory • Factory wired disconnect switch. Single point pneumatic pipe connections. • Throw away fitter • Each fan package is factory tested prior to shipment. • Permanent filter. Fan package, electric heat and optional disconnect switch are factory wired as a package Electric heat or hot water coils. • 20 gauge galvanized cabinet acoustically insulated 1" fiberglass • Sealed access panels 1" 4 lb. density core insulation is U.L Listed and meets NFPA 90A standards • 120 or 277 PSC motors. Motors are single speed PSC with thermal over load protections, solid -state speed controller, and are . Dust tight electric panel permanently lubricated. • Acoustically lined discharge plenum or Access panels to the blower and motor are placed on both sides of the cabinet return air boot Fan and motor assembly is mounted on a special 16 gauge pad and completely isolated from the casing with rubber vibration mounts. Features: The fan pac is a basic, and very simple orVoff operation for an application that requires a fan coil unit with electric or hot water heat and a static pressure duct system of up to .70 inches w.g. The unit can be energized by electric controls (line voltage or low voltage) or by PE. switches in conjunction with a pneumatic system SCR motor speed controller for continuous adjustable fan speed from minimum to maximum RPM. Built -in line voltage thermostats are available for unit heater type applications. Built-in control circuit transformers are available in 24V or 120V. Hot water coils are one row 112" O.D., two row 5f8' O.D. copper tubes. Numinum fins are standard with 10 FPI spacing. Transformers for fan motors are NOT available Specifications: The fan packages shall be factoryassembled complete with electric heat/hot water coils. Factory mounted control panel shall provide all internal control and fan power wiring for a single point field connection. An optional factory mounted disconnect switch shall be furnished and prewired so as to disconnect all electrical components in the fan package A single point field connection will be made at the disconnect switch. Fan package must be labeled and listed by a nationally recognized and locally accepted testing laboratory, such as ITS Intertek testing services. Fan packages must be tested for safety and in accordance with the latest National Electric Code Casing shall be a minimum of 20 gauge galvanized steel and acoustically insulated with 1" fiberglass The rasing shall be U l L isted and meet NF PA and NBFU 90A requirements. Blower casing shall be cunstructed of heavy yduye steel and baked endmel finish. Fan wheel andil be forward curved centrifugal type, dynamically balanced and be driven by direct drive, single speed permanent split capacitor motors Motors shall be single phase, 1050 RPM. An electronic motor speed control shall be provided to allow continuously adjustable fan speed from minimum to maximum and shall incorporate a minimum voltage stop to insure motor cannot operate in stall mode. Fan assembly shall be nlouri On d 16 gauge steel sub -base, but shall be internally isolated with rubber -in -shear isolators to prevent vibration transfer to t e si,b -base Mntors shall also he isolated with nibber- in•shesr isolators between the motor mounting legs and the blower rasing Fan motor assembly shall be accessible through access panels from hoth sides arid rear of cabinet (tx)ttorn and fry> arrv%% rrnrwl% arc not ru:r:rrCaNpt Anf:v % Panel% %h, o tu• naskeipn to rkr -ve=nt leakage and vibration transmission An electric heater (hot water optional) shall be part of the total listed package and shall be controlled by pneumatic, electric controls enclosed in a NEMA -1 enclosure on the side of the cabinet T he panel shall be gasket sealed to prevent air leakage. Heater shall be the requested available voltage and phase. Each fan package will be factuly tested priur to El liprifent and c;ftified as s r.11 Eacll fan sirdff haw an oV4ior!;Al fhruw - away of NerFnaF 'erd filter, = -r! .= v' optional arnustirally lined disrhamr• pfpni rim nr return air hmt Sample Model Number: Electric Heat: —RFH —E -- 500 -5KW Disconnect Switch— Washable Fi ?ter 1 ! 1 ! 1 SE �lES NIT Sll F C PICITY OP i NS Hot Water Heat: — RFH W — 500 — 12.6 MBH — Inlet Attenuator — Totally Enclosed Motor biAWIRW CAW* Kill 5 7 B 10 11 13 U 15 17'� m 18 ne 211 1 21 1 23 1 24 1 26 ?.7 28.5 30 GAd X00 500 1 600 1 700 1 800 900 1000 j 1100 1280 1 1300 1 1400 j 1500 j 1 600 1 1700 1 180 15.0 2000 3100 RFH - E Shown • RFH -E & RFH -Dr SERIES FAN COIL UNIT RFH PERFORMANCE DATA Dimensions (Inches) Model A B L Discharge W H 300 12 14 28 14 8 500 14 18 36 18 8 750 18 18 36 18 10 1500 18 22 36 22 10 1800 18 26 36 26 10 2000 j 18 26 36 26 10 3000 18 44 36 44 10 4000 18 52 36 52 10 RFH PERFORMANCE DATA RFH -E ELECTRIC HEAT MODEL MO P. AMPS MOTOR FULL AMPS MOTOR SPEED CONTR. EXTERNAL STATIC PRESSURE (in. H,0) 1 CFM .2 CFM .3 CFM .4 CFM .5 CFM .6 CFM .7 CFM 115V 277V 300 1 @ 1/15 2.90 1.00 MAX 270 245 225 180 Below 50CFM MIN 95 85 80 7Q 500 1 @ 1/6 3,60 1.10 MAX 740 700 640 590 530 490 450 MIN 290 275 250 230 210 200 190 750 1 @ 1/4 5.30 1.70 MAX 1390 1370 1350 1270 1230 1130 1040 MIN 450 440 430 420 410 405 400 1500 1 @1/2 8.30 2.50 MAX 1825 1790 1740 1660 1570 1450 1340 MIN 820 790 760 675 590 515 440 1800 1 @ 112 9.70 3.10 MAX 2120 2080 2040 1940 1850 1750 1670 MIN 850 840 820 810 790 740 630 2000 1 @ 3/4 11.00 4 30 MAX 2230 2160 2100 2040 1960 1860 1760 MIN 1200 1120 1040 950 860 750 640 3000 2 @ 1/2 19.40 6.30 MAX 3160 3040 2920 2790 2600 2440 2240 MIN 1840 1800 1760 1720 1640 1560 1 1460 4000 2 @ 3/4 22.00 8.60 MAX 4150 4050 3950 3830 3650 3250 3000 MIN 2200 2180 2160 2130 2080 2000 1900 'See minimum CFM chart for all electric coil selections. 208V and 240V units use 277V rated motors -FL A on ZW and 240V units same as 277V. For fan curve data consultfactory /NR'-� \ INLET DISCHARGE (;RILLS o`N w Mode Dimensions (Inches) A B L H 5n0 14 18 36 9, 75 750 18 18 36 11.75 1500 18 22 36 11.75 18W 18 26 36 11.75 2000 18 26 36 1175 3000 18 44 36 11.75 4000 18 52 36 11.75 Basic Weight (no options) Model lbs. 300 95 500 115 750 138 1500 160 1800 175 2000 198 3000 275 4000 315 RFH PERFORMANCE DATA RFH -DG ELECTRIC HEAT DISCHARGE GRILL MODEL M� P R MOTOR AMPS FULL AMPS MOTOR SPEED CONTR. EXTERNAL STATIC PRESSURE (in. H 1 CFM .2 CFM .3 CFM .4 CFM .5 CFM .6 CFM .7 CFM 115V 277V 300 1 @ 1 /15 2.90 1.00 MAX 220 195 175 1130 Below 50 CFM MIN 95 85 80 70 500 1 @ 1/6 3.60 1,10 MAX 640 600 540 490 430 390 350 MIN 290 275 250 230 210 200 190 750 1 @ 1/4 5.30 1.70 MAX 1290 1270 1250 1170 1130 1030 940 MIN 450 440 430 420 410 405 400 1500 1 @112 8.30 2 50 MAX 1725 1690 1640 1560 1470 1350 1240 MIN 820 790 1 760 675 590 1 515 440 1800 1 @ 1/2 9.70 3.10 MAX 2020 1930 1 1940 1840 1750 1650 1570 MIN 850 840 820 810 790 740 630 2000 1 @ 314 11.00 4.30 MAX 2130 2060 2000 1940 1860 1760 1660 Ml 1200 1120 1040 950 860 750 640 3000 2 @ 1/2 19.40 22,00 6.30 MAX 3060 2940 2820 2960 2500 2340 2140 MIN 1 8_40 1800 3950 1 1 1640 1560 1460 4000 2 0_ 3/4 g.60 MAX 4050 3850 3730 3550 3150 2900 MIN 2200 2180 2160 2130 2080 1 2000 1 1900 'See minimum CFM chart for al I elect c coil selections. 208V and241YV units, use 277V rated motors - FL A. on 208V and 240V units same as 277V. Forfan cline data consuttfactrry RFH -W �,�,;IES FAN COIL UNIT HOT WATER REHEAT CAPACITY SIZE COIL ROWS GPM HI REHEAT CAPACITY MBH CFM PRIMARYCFM HEATING 3000 100 150 200 250 Q Q CO) 1 S.P. 0.5 DROP .01 .02 .04 .06 09 4.0 4.8 5.5 59 1.0 .30 497 5.7 6.3 7.0 t5 .50 50 6.0 6.7 7.4 2.0 1.0 5.1 6.2 7.0 37.0 10 2.0 5.2 6.3 72 8.0 4.0 3.0 5.3 6.4 '.3 8.2 5.0 5.0 5.3 69 7 8.3 2 42.5 43.4 .0 W .08 .12 0.5 02 64 7.8 8.7 93 190 09 7A 9.2 10.8 11.7 1.5 15 7.8 9.8 11.2 12.5 2.0 30 8.0 10.3 12.0 13.3 3.0 .60 8.1 10.7 12.4 13.9 4.0 1.0 8.2 10.9 12.8 14.5 5.0 1.5 8.3 1 161 13.1 14.8 HOT WATER REHEAT CAPACITY SIZE R GPM H(; REHEAT CAPACITY MBH CFM PRIMARYCFM HEATING 81.6 300 350 400 450 79.0 1 S.P. DROP 0.016 0.021 0.026 0.033 0.5 0.2 9.8 10.3 10.7 11.1 1.0 0.6 11.8 12.6 13.3 13.9 t5 1.3 12.7 13.6 14.4 15.2 2.0 2.1 13,2 14.2 11.1 1 1. 2. 13.8 14.9 15.8 16. 44.3 7.1 14.1 15.2 16.2 17.1 2.5 1064 14.3 15.4 16.5 1764 O Q 2 S.P. DROP 0.032 M042 0.053 0.065 0.5 091 1462 14.9 15.6 1661 1.0 0.2 18.2 19.6 20.7 21.7 1. � 0.5 20.1 21.7 23.2 24.5 2.0 0.8 21.1 23.0 24.7 26.2 390 1.7 22.3 24.6 26.4 28.1 4.0 2.8 23,0 25.3 27.3 29.2 560 4.1 23.4 25.8 27.9 29.9 HOT WATER REHEATC ACITY SIZE R GPM Hi�h)O H A CAPACITY MBHICAfF 12.4 PRIMARY CFM (d HEATING 85.9 1 500 600 700 890 O 1 S.P. 0.5 DROP 0.2 0.025 127 0.034 13.3 0.045 13.8 0.057_ 142 1.0 0.8 16.2 17.3 18.2 19.0 1.5 1.7 17.9 19.2 20.3 21.3 2.0 2.8 18.8 20.3 21.6 2297 3.0 5.6 19.8 21.5 23.0 24.3 4.0 9.3 20.4 22. 23.8 252 5.0 137 2098 22.6 1 24.3 25.7 2 S. 50.8 .040 _068 .000 .114 0.5 0.1 17.8 18.6 19.2 19.7 1.0 0.2 2.7 26.5 .9 29.1 1.5 0.5 28.2 30.5 32.5 34.2 2.0 0.8 30.3 310 35.4 37.4 3.0 1.7 327 36.9 38.8 41.3 0 2.8 34.0 37.6 40.7 43.5 5.0 4.1 1 34.9 38.7 42.0 45.0 59.7 HOT WATER REHEAT CAPACITY StZE COIL ROWS GPM 1420 PD REHEAT CAPACITY MBH "CFM PR RAARY CFM HEATING 1208 1300 1400 1500 1600 0 Q 1 3.0 R OP . 7799,. 01991 • 16 1 U.5 0.3 18.6 16.9 17.1 1L2 17.4 1.0 1.0 23.5 24.0 24.5 24.9 25.3 1.5 1.9 27.1 27.8 28.4 29.0 29.8 ^.0 3.2 29.3 30.1 30.8 31.5 32.3 3.0 95 31.8 32.8 3397 34.5 35.3 6.0 10.8 33:2 34.3 35.3 36.2 37.1 5.0 1890 3492 3593 38.4 37.4 18.3 LO 2 8. R 0.159 0.183 0.209 91263 0.265 1.0 0.1 3408 3504 36.0 36.5 37 D 1. 0.6 4^.4 43.4 44.4 45.2 48.0 2.0 1.0 47.4 48.8 50.0 51.1 512 4A 3.2 57.4 594 01.3 83.0 84.7 6.0 6.5 61.8 63.9 66.2 68.2 70.2 8_0 10.8 64.0 66.5 68.9 71.2 73.1 �10.0� 16.0 65.5 88.1 70.7 73.1 75.1 Altitude Correction Factors Ft. H ea t Factor 0 1.00 N BPD 94 0.90 3000 4000 0.87 5000 0.84 6000 0.81 7000 0.78 HOT WATER REHEAT CAPACITY SIZE ROWS GPM N BPD REHEAT CAPACITY MBH FM PRIMARY CFM HEATING 1500 1600 1700 1800 1900 Q 1 S.P. DROP 0.006 9,096 0.107 0.118 0,130 1.0 1.5 1.1 1 . , 28.7 27.2 27.6 27.9 28.3 31A 32.0 32.6 33.1 33.6 2.0 3.7 31.3 35.0 35.7 36.4 37.0 2.5 5.4 36.3 37.1 37.9 38.6 39.3 3.0 7.5 37.7 38.8 39.5 40.3 41.0 4.0 12.4 39.7 40.7 41.6 42.5 43.4 5.0 18.3 41.0 42.0 43.1 44.0 44.9 co r 2 B.P. DROP #MITI ImI92 1 0.214 0.237 1 0.261 1.0 0.3 38.4 38.9 1 39.3 39.7 40.1 1.5 0.7 48.0 48.8 49.8 50.7 51.0 2.0 1.1 54.5 55.7 56.7 57.7 58.6 4.0 3.7 67.8 88.7 71.4 77.0 74.8 6.0 7.5 3.3 7 .8 77.9 79.9 81.8 8.0 12.4 76.9 79.3 81.6 83.8 85.9 10.0 18.3 79.0 31.6 84.0 86.3 88.5 HOT WATER REHEAT CAPACITY SIZE ROWS GPM HP CAPACITY MBH CFM ARYCFM HEATING 1900 2000 2100 Q Q Q N _ 1 S.P. DROP A38.6 0.130 0.143 0.156 1.0 1.1 28.3 28.6 28.9 1. 2. 33.6 34.1 34.5 20 3.7 37.0 37.6 38.1 2.5 5.4 39.9 40.0 40.6 s. 3 41.0 41.8 424 4.0 12.4 42.5 43.4 44.2 45.0 5.0 18.3 44.0 44.9 45.8 46.7 2 S.P. DROP 0.237 0.281 0.286 0.312 1.0 0.3 39.7 40.1 40.4 40.8 1. 0.3 1.0 51.6 522 2.0 1.1 57.7 58.6 59.5 60.3 76.0 -- 4 6.0 7.5 79.9 81.8 83.5 85.3 8.0 12.4 83.8 85.9 1 87.8 89.7 10.0 18.3 86.3 88.5 90.6 1 92.7 OTWATER HEATCAP.ACITY SRE C OIL ROWS GPM (TL) REHEATCAPACITY MBH FM PRIMARY CFM 1 HEATING 1000 2000 2200 2400 1 2600 3000 Q Q Q 4"3 S. . DROP OAS 0.06 0.07 0.09 0.11 1.0 0.3 32.6 33.1 33.9 3491 35.1 1.5 U.5 40.2 41.3 42.0 4391 44.1 15 1.5 45.5 46.8 48.0 49.2 50.8 48.2 50.3 51.8 53.2 54.9 3.0 2.0 52.0 53.8 55.5 57.2 59.1 4.0 3.0 551 57.9 59.1 60.9 63.1 5.0 I 4.5 58.5 60.8 62.9 64.8 68.0 2 S.P. DROP 0.10 0.12 1 0.14 0.16 0. 1.0 0 2 44.0 44.5 45.8 46.2 47.1 1.5 0.3 53.9 56.1 56.9 59.7 61.2 2.0 0.5 63.8 67.6 68.5 72.4 75.7 4.0 1.2 91.6 94.1 974 101.2 104.2 .0 3.0 102.4 107.2 110.1 114.6 12t3 8.0 7.0 108.6 113.9 118.7 122.8 130.4 10.0 10.0 112.2 118.6 123.1 128.0 136.0 NOT WATER REHEAT CAPACITY SIZE ROWS GPM H I R) REHGATCAP PM PRwRYC GATING 2500 2900 3106 3500 1 3900 0 40 1 S.P. D 01 0.06 0,075 0.01 011 0.1 t.0 03 35.5 36.6 36.9 37.6 38.0 1.5 0.8 45.1 46.8 47.4 48.2 49.0 2.0 1.0 52.0 54.0 54.8 56.1 57.8 3.0 2.0 80.4 632 64.4 66.8 68.3 4.0 3.4 84.7 68.1 691 72.2 74.2 5.0 5.0 69.1 72.9 74.4 76.0 80.2 TO 9.0 74.0 78.0 1 80.0 82.0 87.0 Q 2 OP 4 ms I mos • 0.265 1.0 0.2 46.2 46.8 47.2 48.1 49.0 3.0 1.5 93.5 96.8 100.0 103.2 105.8 5.0 3.2 113.9 115.0 12.1 128.0 1233 8.0 4.5 120.0 123.0 131.6 137.1 143.0 8.0 7.5 129.1 130.0 141.8 1481 155.0 10.0 12.0 135.0 139.0 147.6 156.2 163.8 12.0 18.5 138.2 143.0 154.1 1811 170.2 Di oni Model I A A B W 300 12 14 28 _ 51111 14 18 36 750 18_ IR 36 N2218 1500 18 _ 12 - _- 36 1800 18 6 36 0 18 26 36 3 1 44 36 38 6_ 18 Tt� I A W P4F • 10 -26 -2006 4:23 qm A/P /D Information Activity: Const Type: Owner: Applicant: Contractor: Description: C " Comment: Comment: B06 -0085 RILEY -BSL LLC R.A. NELSON & SILICH CONSTF Inspection Request Reporting -- . Vail- CQ_- _City_0f - -- Requested Inspect Date: Friday, October 27, 2006 Inspection Area: CG Site Address: 321 BRIDGE ST VAIL BRIDGE STREET LODGE UNIT 104 Type: A -COMM Occupancy: DCIATES, INC Sub Type: ACOM Use: II -A Phone: 970 - 949 -5152 Phone: (970) 926 -4465 Comment: Comment: Comment: Comment: Comment: Comment: Comment: Comment: Comment: Comment: Page 19 Status: ISSUED Insp Area: CG MENT FOR USE OFF- ROUTED TO PLAN RACK A -5 FIRE AND ELISABETH REED. - JSUTHER CONTRACTOR REGISTRATIdN RENEWAL FEE INCLUDED IN ERMIT FEE. CONTRACTOR ACCOUNT UPDATED. - LCAMPBELL plan does not show horn strobe current location or proposed location. - MVAUGHAN plan does not reflect changes needed to sprinkler locations listed in description. clarify - MVAUGHAN approved by planningq• no DRB application on file, so condition made that no exterior changes will result from this approval. - EECK�L REVISIONS ADDRESSING COMMENTS SUBMITTED AND ROUTED TO CHRIS GUNION, ELISABETH REED, FIRE AND PUBLIC WORKS - JSUTHER EXISTING 1 HOUR FIRE RESISTIVE ASSSEMBLIES AND FIRESTOPPING TO REMAIN IN PLACE. ANY AREAS DISTURBED SHALL BE REPAIRED BY CONTRACTOR. - CGUNION SIGNAGE SHALL BE PROVIDED TO BATHROOM FACILITIES FROM THE TENANT SPACE IBC CH. 29 - CGUNION NO ENTRY WAS EVER MADE FOR PUBLIC WORKS. CONTRACTOR TO CONTACT TOV PUBLIC WORKS FOR ANY STAGING. - CGUNION CALLED CONTRACTOR TO PICK -UP PERMIT. LEFT MESSAGE - CGUNION LETTER RECEIVED REQUESTING CHANGE OF CONTRACTOR FROM RA NELSON TO SILICH CONSTRUCTION. LETTER PLACED IN FILE. - CGUNION addendum for Steelgguard FM intumescent paint for 1 hour beam and column approved. see binder. SPECIAL INSPECTION REPORT REQUIRED FOR FIREPROOFING PAINT APPLICATION - CGUNION J Requested Inspection(s) I wp Item: 530 BLDG -Temp C/O RRequested Time: 08:30 AM Requestor: SILICH CONSTRUCTION, INC. Phone: 390 -6237 Comments: will call 390 -6237 � Assigned To: JMONDRAGON Entered Bv: DGOLDFN K Action: Time Exp: �1Z 1 "Sip C (Z "V-) n P ..._. CT /��'9'rTz_ / Inspection History Item: 10 BLDG - Footings /Steel Item: 20 BLDG - Foundation /Steel Item: 30 BLDG - Framing " Appro d " 08/09/06 Inspector: NSC Action: AP APPROVED Comment: west wall frame cover existing outlet. Item: 50 BLDG - Insulation Item: 60 BLDG- Sheetrock Nail "' Approved " 10/16/06 Inspector: SHAHN Action: AP APPROVED Comment: 10/24/06 Inspector: shahn Action: AP APPROVED Comment: SCREWS APPROVED. Item: 70 BLDG -Misc. 10/20/06 Inspector: cdavis Action: NO NOTIFIED Comment: Cort. inspection re �R ardin oc y- Elec. final 1 rin;jredd r -_ � UC,AFCAG$-I Aachanical fina ni l rn iirorl —_� Special Inspection reports required forIaLuMecent pain All Life /safety items completed Exits signs a c. R emove al L construr�n related materi t LSpdy forF isnes ace msut be rea s operatio ZlDaSe agreement or atnr� oom us�rec: r �- r -01'AZ Item: 90 BLDG -Final �Jh AN l � S I Ifi1t�+� heater installati rc �Y f W 5� -UA.1 REPT131 Run Id: 5852 11 -02 -2006 Inspection Request Reporting Page 12 5:00 pm _ Vail, CO - City Of Requested Inspect Date: Friday, November 03, 2006 Inspection Area: CG Site Address: 321 BRIDGE ST VAIL BRIDGE STREET LODGE UNIT 104 A/P /D Information Activity: B06 -0085 Type: A -COMM Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: II -A Insp Area: CG Owner: RILEY -BSL LLC Applicant: R.A. NELSON & ASSOCIATES, INC Phone: 970 - 949 -5152 Contractor: SILICH CONSTRUCTION INC. Phone: (970) 926 -4465 Description: BRIDGE ST. LODGE UNIt 104 -VAIL SUREFOOT RENOVATION. Notice: APPLICANT TO PROVIDE LEASE AGREEMENT OR OTHER WRITTEN AGREEMENT FOR USE OF COMMON BATHROOMS FOR THIS TENANT SPACE. - CGUNION Comment: RECEIVED SIGNED BATHROOM AGREEMENT FOR FILE. - SHAHN Comment: ROUTED TO PLAN RACK A -5 FIRE AND ELISABETH REED. - JSUTHER Comment: CONTRACTOR REGISTRATI6N RENEWAL FEE INCLUDED IN ERMIT FEE. CONTRACTOR ACCOUNT UPDATED. - LCAMPBELL Comment: plan does not show horn strobe current location or proposed location. - MVAUGHAN Comment: plan does not reflect changes needed to sprinkler locations listed in description. clarify - MVAUGHAN Comment: approved by planningg no DRB application on file, so condition made that no exterior changes will result from this approval. - EECK�L Comment: REVISIONS ADDRESSING COMMENTS SUBMITTED AND ROUTED TO CHRIS GUNION, ELISABETH REED, FIRE AND PUBLIC WORKS - JSUTHER Comment: EXISTING 1 HOUR FIRE RESISTIVE ASSSEMBLIES AND FIRESTOPPING TO REMAIN IN PLACE. ANY AREAS DISTURBED SHALL BE REPAIRED BY CONTRACTOR. - CGUNION Comment: SIGNAGE SHALL BE PROVIDED TO BATHROOM FACILITIES FROM THE TENANT SPACE IBC CH. 29 - CGUNION Comment: NO ENTRY WAS EVER MADE FOR PUBLIC WORKS. CONTRACTOR TO CONTACT TOV PUBLIC WORKS FOR ANY STAGING. - CGUNION Comment: CALLED CONTRACTOR TO PICK -UP PERMIT. LEFT MESSAGE - CGUNION Comment: LETTER RECEIVED REQUESTING CHANGE OF CONTRACTOR FROM RA NELSON TO SILICH CONSTRUCTION. LETTER PLACED IN FILE. - CGUNION Comment: addendum for Steelgguard FM intumescent paint for 1 hour beam and column approved. see binder. SPECIAL INSPECTrON REPORT REQUIRED FOR FIREPROOFING PAINT APPLICATION - CGUNION Requested Inspection(s) Item: 90 BLDG -Final Requestor: SILICH CONSTRUCTION, INC. / ERIC Requested Time: 01:30 PM Phone: 390 -6237 Comments: SURE FOOT; REQUESTED REINSPECT MECH & FINAL 30 BLDG - Framing Assigned To: G NCKL 08/09/06 Inspector: Entered By: LCAMPBELL K Action: V u Time Exp: Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Approved wL O• 10/16/06 Inspector: SHAHN Action: AP APPROVED Comment: 10/24/06 Inspector: Inspection History Comment: SCREWS APPROVED. Item: Item: 10 BLDG - Footings /Steel Item: 20 BLDG - Foundation /Steel Item: 30 BLDG - Framing " Approved *` 08/09/06 Inspector: NSC Action: AP APPROVED Comment: west wall frame cover existing outlet. Item: 50 BLDG - Insulation Item: 60 BLDG - Sheetrock Nail Approved 10/16/06 Inspector: SHAHN Action: AP APPROVED Comment: 10/24/06 Inspector: shahn Action: AP APPROVED Comment: SCREWS APPROVED. Item: 70 BLDG -Misc. 10/20/06 Inspector: cdavis Action: NO NOTIFIED Comment: Cort. inspection regarding occupacny requirements discussed Elec. final required Mechanical final required sprinkler final required Alarm final required Special Inspection reports required for Intumecent paint and Duct heater installation All Life /safety items completed Exits signs etc.. Remove all construction related materials REPT131 Run Id: 5944 tibx,� •�S • 10 -26 -2006 Inspection Request Reporting Page 35 4:23 pm Vail, CO - CitV Of Requested Inspect Date: Friday, October 27, 2006 Inspection Area: SH Site Address: 321 BRIDGE ST VAIL BRIDGE STREET LODGE UNIT 104 A/P /D Information Activity: E06 -0128 Type: B -ELEC Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: SH Owner: RILEY -BSL LLC Applicant: WAGNER ELECTRIC, INC. Phone: 970 - 949 -6161 Contractor: WAGNER ELECTRIC INC. Phone: 970 - 949 -6161 Descri ption: SUREFOOT - COMPLETE ELECTRICAL Comment: Engineer /architect to submit lighting calcs and switchingq requirements per 2003 IECC. Engineer to show locations of egre lighten as requied by review comments. - SHAHN Comment: Received comchec light compleance ss reportrom Wagner electric on 8/5/06. - SHAHN Reauested Insoection(s Item: 190 ELEC -Final Requestor: WAGNER ELECTRIC, INC. Comments: reinspect final Assigned To: GDENCKLA Action: Time Exp: Inspection History Item: 110 ELEC- Service Item: 120 ELEC -Rough Item: 130 ELEC - Conduit Item: 140 ELEC -Misc. Item: 190 ELEC -Final � D e-,- K Requested Time: 08:00 AM Phone: 970 - 949 -6161 Entered By: DGOLDEN K k-�4� o0d REPT131 Run Id: 5852 11 -02 -2006 Inspection Request Reporting Page 24 5:00 pm — - Val_I,_G0_-_Git Qf - -- - - Requested Inspect Date: Friday, November 03, 2006 Inspection Area: CG Site Address: 321 BRIDGE ST VAIL SUREFOOT -278 HANSON RANCH ROAD A/P /D Information Activity: M06 -0206 Type: B -MECH Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: Insp Area: CG Owner: RILEY -BSL LLC Applicant: C & C PLUMBING & MECHANICAL, INC. Phone: 827 -9443 Contractor: C & C PLUMBING & MECHANICAL, INC. Phone: 827 -9443 Description: SUREFOOT REMODEL - INSTALL HVAC SYSTEM Requested Inspection(s) Item: 390 MECH -Final Requested Time: 02:30 PM Requestor: ERIC Phone: 390 -6237 Comments: SURE FOOT; REQUESTED REINSPECT MECH & FINAL Assigned To: G NC Pe Entered By: LCAMPBELL K Action: , Time Exp• )-- v Comment: FG NOT RECEIVED TO Comment: PENDING RECEIPT OF MGF LETTER STATING EQUIPMENT CAN BE MONTED UPSIDE DOWN. Comment: Mechaincal contractor of record is reinstalling duct heater to conform to manufacturer installation requirements Re- inspection required Inspection Histo Item: 200 MECH -Rough " Approved "' 08/21/06 Inspector: GCD Action: DN DENIED Comment: NO ACCESS 08/22/06 Inspector: GCD Action: CR CORRECTION REQUIRED Comment: 1.PROVIDE APPROVED MECH AND BUILD PLANS ON SITE. 2.PROVIDE INSTRUCTIONS FOR DUCT HEATER. 3.EQUIPMENT INSTALLED UPSIDE DOWN. 4.DUCT NOT COMPLETELY SEALED. 08/24/06 Inspector: JEC Action: AP APPROVED Comment: Items 1,2,& 4 approved. Will provide letter on equipment installed upsidedown b final. Contractor & his Sub both made aware that equipment is not approved without Mfg. letter. Installaiton instructions in file regarding duct heater. Item: 310 MECH- Heating Item: 315 PLMB -Gas Piping Item: 320 MECH - Exhaust Hoods Item: 330 MECH - Supply Air Item: 340 MECH -Misc. Item: 390 MECH -Final Approved *' 10/26/06 Inspector: SHA'HN Action: COND APPROVED /CONDITIONS Comment: PENDING RECEIPT OF MGF LETTER STATING EQUIPMENT CAN BE MONTED UPSIDE DOWN. 10/27/06 Inspector: SHAHN Action: DN DENIED Comment: LETTER FROM MFG NOT RECEIVED TO DATE. 10/27/06 Inspector: cdavis Action: NO NOTIFIED Comment: Mechaincal contractor of record is reinstalling duct heater to conform to manufacturer installation requirements Re- inspection required REPT131 Run Id: 5944 ?/? ?? `? ?_ 1 TOWN OF VAIL DEPARTMENT OF COMMUNITY I [LOPMEN 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Job Address: 321 BRIDGE ST VAIL Location.......: BRIDGE STREET LODGE UNIT 104 Parcel No....: 210108269007 OWNER RILEY-BSL LLC 228 BRIDGE ST VAIL CO 81657 APPLICANT R.A. NELSON & ASSOCIATES, PO DRAWER 5400 AVON Colorado 81620 License: 170-A CONTRACTOR SILICH CONSTRUCTION, INC. 304-S. GALENA ST. STE B ASPEN COLORADO 81611 License: 335-A 04/19/2006 Permit # B06-0085 Project # Md (0- Q 1 Status ...: FINAL Applied...: 04/17/2006 Issued ...: 07/13/2006 Expires.....: 11/03/2006 IN 04/19/2006 Phone: 970-949-5152 06/30/2006 Phone: (970) 926-4465 Desciption: BRIDGE ST. LODGE UNIT 104-VAIL SUREFOOT RENOVATION. Occupancy: M Type Construction: II-A Valuation: $79,700.00 Revision Valuation: ?? Total Sy Ft Added: 0 ******************************************************************** FEE SUMMARY ************************************************************ Building ------ > $853.75 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $1,411.69 Plan Check ---> $554.94 Recreation Fee--------------> $0.00 Additional Fees ---------- > $125.00 Investigation-> $0.00 TOTAL FEES ------------- > $1,411.69 Total Permit Fee--------- > $1,536.69 Will Call-----> $3.00 Payments ------------------- > $1,536.69 BALANCE DUE--------- > $0.00 ************************************************************************************************************************************************* Approvals: Item: 05100 BUILDING DEPARTMENT 05/09/2006 cgunion Action: CR 07/03/2006 drawings Item: 05400 PLAN 04/24/2006 changes to Item: 05600 FIRE cgunion Action: AP approved corrected VING DEPARTMENT ee Action: COND NO exterior result from this construction DEPARTMENT 04/26/2006 mlv Action: APCR see comments section Item: 05500 PUBLIC WORKS See the Conditions section of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ******************************************************************************************************** CONDITIONS OF APPROVAL Permit #: B06-0085 as of 01-22-2009 Status: FINAL ******************************************************************************************************** Permit Type: ADD/ALT COMM BUILD PERMT Applicant: R.A. NELSON & ASSOCIATES, INC 07/13/2006 970-949-5152 Job Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Parcel No: 210108269007 Description: BRIDGE ST. LODGE UNIT 104-VAIL SUREFOOT RENOVATION. Applied: 04/17/2006 Issued: To Expire: 11/03/2006 **********************************************Conditions:************************************************ Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 13 (BLDG.): VENTILATION IS REQUIRED AS PER SECTION 1203 OF THE 2003 IBC AND SECTION 403 OF THE 2003 IMC.. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: CON0008235 EXISTING 1 HOUR FIRE RESISTIVE ASSSEMBLIES AND FIRESTOPPING TO REMAIN IN PLACE. ANY AREAS DISTURBED SHALL BE REPAIRED BY CONTRACTOR. Entry: 11/03/2006 By: cdavis Action: AP TOWN OF VAIL, COLORADOCopy Reprinted on 01-22-2009 at 09:51:06 01/22/2009 Statement Statement Number: R060000987 Amount: $1,536.69 07/13/200601:07 PM Payment Method: Check Init: LC Notation: #10118/Silich Construction ---------------------- ------------------- Permit No: ------------------------------------ B06-0085 Type: ADD/ALT COMM BUILD PERMT Parcel No: 2101-082-6900-7 Site Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Total Fees: $1,536.69 This Payment: $1,536.69 Total ALL Pmts: $1,536.69 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts ---- ------------ ----------------- BP 00100003111100 --- -------------------------- BUILDING PERMIT FEES 853.75 CL 00100003123000 CONTRACTOR LICENSES 125.00 PF 00100003112300 PLAN CHECK FEES 554.94 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Job Address: 321 BRIDGE ST VAIL Location.....: BRIDGE STREET LODGE UNIT 104 Parcel No...: 210108269007 Legal Description: Project No OWNER RILEY-BSL LLC 228 BRIDGE ST VAIL CO 81657 APPLICANT WAGNER ELECTRIC, P.O. BOX 1620 AVON CO 81620 License: 223-E CONTRACTOR WAGNER ELECTRIC, P.O. BOX 1620 AVON CO 81620 License: 223-E 08/02/2006 Permit #: E06-0128 Status ... . Applied .. Issued . . Expires. .: FINAL 08/02/2006 09/14/2006 10/27/2006 INC. 08/02/2006 Phone: 970-949-6161 INC. 08/02/2006 Phone: 970-949-6161 Desciption: SUREFOOT-COMPLETE ELECTRICAL Valuation: $10,000.00 Square feet: 0 ******************************************************************* FEE SUMMARY ************************************************************ Electrical --------- > $218.50 Total Calculated Fees--> $221.50 Investigation ---- > $0.00 Additional Fees ---------- > $0.00 Will Call --------- > $ 3 . 0 0 Total Permit Fee--------> $221.50 TOTAL FEES--> $221.50 Payments ------------------ > $221.50 BALANCE DUE--------> $0.00 Approvals: Item: 06000 ELECTRICAL DEPARTMENT 08/07/2006 shahn Action: COND Provide lighting switching requirements pe: IECC. Provide egress lighting per 2003 IBC. Item: 05600 FIRE DEPARTMENT CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER TOWN OF VAIL, COLORADOCopy Reprinted on 01-22-2009 at 09:49:31 01/22/2009 Statement Statement Number: R060001452 Amount: $221.50 09/14/200612:13 PM Payment Method: Check Init: LC Notation: #27426/Wagner Elect ----------------------------------------------------------------------------- Permit No: E06-0128 Type: ELECTRICAL PERMIT Parcel No: 2101-082-6900-7 Site Address: 321 BRIDGE ST VAIL Location: BRIDGE STREET LODGE UNIT 104 Total Fees: $221.50 This Payment: $221.50 Total ALL Pmts: $221.50 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ EP 00100003111100 ELECTRICAL PERMIT FEES 218.50 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 Hug 15 2006 3:20PM HP LRSERJET 3330 P•1 P O BOX 1620 Avow, CO 81620 970-949-6161 970-949-4339 (FAX) Fax WAGNER ELECTRIC, INC. To:? r ! /aY? N From: Fax:7% Pa9ess???- Phones Date: ?Iyevl Res CC: ? Urgent ? For Review ? Please Comment O Please Reply ? Please Recycle • Comments: GdjvM?-? Aug 15 2006 3:20PH HP LASERJET 3330 0? Wagner Electric, Inc. P.O. Box 1620 Avon, Colorado 61620 (970) 949-6161 (970)949-4339 fax August 10, 2006 S J iZ t F,,, + Mr. Stan Hahn Town -of Vail Community Development 75 South Frontage Road Vail, Colorado 81657 Re: Surefoot Electrical Stan, Thanks for making us aware of the !EEC energy saving code that the town has adopted. Unfortunately, the electrical plans that I enlisted Rader Engineering to develop based on the requirements of the project designer do no comply with this code. To come into compliance, the designer has elected to install eight (8) two lamp fluorescent fixtures and sixteen (16) 70 watt metal halide fixtures in lieu of the quantities of fixtures originally shown on the plan. As the lighting track the fixtures are installed on will remain the two circuit type,the lighting will be capable of two level switching. In reviewing the code, I am unsure if automatic shutoff control if necessary. We could install a occupancy sensor if required. Please advise. I have attached the executed IECC Lighting Compliance Certificate for your review and use. Please call with any questions or if you need any additional information. Regards, V{ob Wag President Wagner Electric, Inc. p.2 Aug 15 2006 3:20PM HP LASERJET 3330 p.3 Permit # Permit Date 1 ?J COMcheck Software. Version 3.2.1 Lighting Compliance Certificate 2001 IECC Report Date: 08115108 Data filename: C:1Progrem FlleslCheck\COMcheck?Surefoot.=A Section 1: Project Information Project Title: Surefoot Construction Site: 278 Hansen Ranch Road Vail, CO 81657 Owner/Agent: Russal and Robert Shay Suratcot L.C. 1600 Keams Blvd. SuitsAA00 Paris City, UT 84060 Section 2: General Information Building Use Description by: Activity Type Project Type: Now Construction Acitvkv Tvnofsl Fioor Ores Retail Sales, Wholesale Showroom 1092 Section 3: Requirements Checklist Interior Lighting: Uf1. Total actual waits must be less than or equal to total allowed watts- Allowed Watts Actual Watts Complies 2293 1968 YES Designer/Contractor: Claus Benjamin Freyinger Schalon_.Paus] Froyinger, LLC 257 Hampton Drive #5 Venice, CA 90291 310-401-0556 claus.freyingerogmail.oorn Exterior Lighting: ? 2. Efficacy greater than 45 lumens/W. ?? Exceptions: Specialized lighting highlighting features of historlo bulldings; slgnage; safety or security lighting; low-voltage landscape lighting. ?Controls, Switching, and Wiring: laT3. Independent controls for each space (switch/occupancy sensor). Exceptions. Areas designated as security or emergency areas that must be continuously Illuminated. Lighting in stairways or corridors that are elements of the means of egress. ? 4 Master switch at entry to hotellmotel guest room. Each space provided with a manual control to provide uniform light reduction capability. Exceptions: Only one lumineire in space; An occupant-sensing device controls the area: The area Is a corridor, storeroom, rostroom, public lobby or gueel room; Page 1 or 3 Aug 15 2006 3:21PM HP LASERJET 3330 p-4 Areas greater than 250 sq.ft, ? B. Automslic fighting shutoff control in spaces greater than 260 aq.fl In buildings larger than 6,000 sq.ft. ? /7. Photocell/astronomical dme switch on exterlor lights. /V Q' Exceptions: Lighting intended for 24 hour use. O S. Tandem wired one-lamp and three-lamp ballasted luminalres (No single-lamp ballasts). Exceptions: Electronic highdrequency ballasts; Luminaires not on same switch. Section 4: Compliance Statement Complia?xe Statement: The proposed lighting design represented In this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to most the 2001 IECC, Chapter 8, requirements in COMcheck Version 3.2.1 and to comply with the mandatory requirements In they Requirements CheckllsL Pnnapel Ughting Dealgner-Name SI pe(e Page 2 of 3 Aug 15 2006 3:21PM HP LRSERJET 3330 lo,5 Permit # Permit Date I ?J COMcheck Software Version 3.2.1 Lighting Application Worksheet 2001 IECC Report Date: Data filaname: Q\Progrsm Fl1eslChec14COMcheck\Sure1oot.ook Section 1: Allowed Lighting Power Calculation A B Area Category Floor Area Retail Sales. Wholesale Showroom (ml 1082 Section 2: Actual Lighting Power Calculation A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Linear Fluorescent 2: 98" TS ES 60W f Electronic HID 1: Metal Halide 70W /Electronic Section 3: Compliance Calculation C D Allowed Allowed Watts Watts 1 R2 (B x C) 2.1 2293 Total Allowed Watts = 2293 B C D E Lampe/ # of Flxh" (C X D) Fixture Fixtures Wad. 2 8 108 848 1 16 70 1120 Total Actual Watt = 1968 if the Total Allowed Walls minus the Total Actual Watts Is greater than or equal to zero. the building complies. Total Allowed Watts - 7293 Total Actual Watts = 1968 Project Compliance = 325 Page 3 (7 3 TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2135 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES SPRINKLER PERMIT Job Address: 321 BRIDGE ST VAIL Location.....: BRIDGE ST LODGE Parcel No...: 210108245012 Project No : F" G GP _-0 ( Luo OWNER SURE FOOT 06/05/2006 1500 KEARNS BLVD A-100 PARK CITY UT 84060 APPLICANT CENTRAL FIRE PROTECTION 06/05/2006 10775 E. 51ST AVENUE DENVER CO 80216 License: 447-S CONTRACTOR CENTRAL FIRE PROTECTION 06/05/2006 10775 E. 51ST AVENUE DENVER CO 80216 License: 447-S Permit #: F06-0035 Status ...: ISSUED Applied ..: 06/05/2006 Issued. .. 06/19/2006 Expires . .. Phone: 303-576-8157 Phone: 303-576-8157 Desciption: ADD/REMOVE/RELOCATE FIRE SPRINKLERS FOR TENANT IMPROVEMENT PER NFPA #13 Valuation: $5,500.00 ******************************************************************* FEE SUMMARY ******x*************************************** Mechanical --- > $0.00 Restuarant Plan Review--> $0.00 Total Calculated Fees --- > $583.75 Plan Check ---> $350.00 DRB Fee --------------------- > $0.00 Additional Fees----------- > $0.00 Investigation-> $0.00 TOTAL FEES--------------> $583.75 Total Permit Fee ---------- > $583.75 Will Call-----> $0.00 Payments ------------------- > $583.75 BALANCE DUE--------- > $0.00 Item: 05100 BUILDING DEPARTMENT Item: 05600 FIRE DEPARTMENT 06/07/2006 mcgee Action: AP CONDITION OF ArrxOVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2135 FROM 8:00 AM - 5 PM. SIGN'ATUIWOF OW? OR ONTRACTOR FOR HIMSELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: R060000824 Amount: $583.75 06/19/200610:08 AM Payment Method: Check Init: DDG Notation: 14260Central Fire Protection ----------------------------------------------------------------------------- Permit No: F06-0035 Type: SPRINKLER PERMIT Parcel No: 2101-082-4501-2 Site Address: 321 BRIDGE ST VAIL Location: BRIDGE ST LODGE Total Fees: $583.75 This Payment: $583.75 Total ALL Pmts: $583.75 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 SPRINKLER PERMIT FEES 233.75 PF 00100003112300 PLAN CHECK FEES 350.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Building Permit Sprinkler Permit #: 7VAIR 970-479-2135 (Inspections) TOWN TOWN OF VAIL FIRE SPRINKLER PERMIT APPLICATION Fire Sprinkler shop drawings are required at time of permit submittal and 75 S. Frontage Rd. must include the following, Permit application will not be accepted Vail, Colorado 81657 without this information: A Colorado Registered Engineer's stamp or N.I.C.E.T. Level III (min) stamp. Equipment cut sheets of materials. Hydraulic calculations. A State of Colorado Plan Registration form. Plans must be submitted by a Registered Fire Protection Contractor. Contact Eagle County Assessors Office at 970-328-8640 or visit www. ea4/e-county. com for Parcel # Parcel # (Required if no bldg. Permit # is provided above) Zl d 1 a a (f Std / • Job Name: Job Address: 116 R4NS9P •94WGtl kDA10 AL. 0) Legal Description if Lot: II Block: II Filing: II Subdivision: Owners Name: S,ope Fovr LL[ I) Address: i!?C>DkF#kW 600*4?10D Pcall AI Phone: ?? 6SS SIl J Engineer: I4 Address: II Phone: Detailed Location of work: (i.e., floor, unit #, bldg. #) Detailed description of work: fUt) ov „t?F??c iF rT d?e,u c.Eof rof- ' Umtit 1rn&_0a.FmrAAr /Tx_ We#0 /3 Work Class: New () Addition( ) Remodel (y,) Repair ( ) Retro-fit ( } Other ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial (A) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: Does a Fire Alarm Exist: Yes. QQ) No( Does a Fire Sprinkler System Exist: Yes X) No( ) COMPLETE VALUATIONS FOR ALARM PERMIT (Labor & Materials) Fire Sprinkler: $ 5 ! p 0 G ? - i I? CONTRACTOR INFORMATION Fire Sprinkler Contractor: Town 4f 1 Reg., No.- Contact and Phone #'s: -- Contractor Signature: *..::*::*** ? Y ?k f r? x? r Y-....****::FOR OFFICE USE ONLY******-,. ..- *:.:......** .:: *** s x ......*** / I Other Fees: Date Received: Public Way Permit Fee: ! Accepted By: I Occupancy Group: L R/everyone/forms/sprkperm ******************************************************************************************** TOWN OF VAIL, COLORADOCopy Reprinted on 01-22-2009 at 09:51:33 01/22/2009 Statement Statement Number: R060001200 Amount: $253.00 08/10/200603:15 PM Payment Method: Check Init: DDG Notation: C & C P & H 7888 Permit No. M06-0206 Type: MECHANICAL PERMIT Parcel No: 2101-082-6900-7 Site Address: 321 BRIDGE ST VAIL Location: SUREFOOT-278 HANSON RANCH ROAD Total Fees: $253.00 This Payment: $253.00 Total ALL Pmts: $253.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ MP 00100003111100 MECHANICAL PERMIT FEES 200.00 PF 00100003112300 PLAN CHECK FEES 50.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Job Address: Location.....: Parcel No...: Legal Description: Project No : 321 BRIDGE ST VAIL SUREFOOT-278 HANSON RANCH ROAD 210108269007 OWNER RILEY-BSL LLC 228 BRIDGE ST VAIL CO 81657 APPLICANT C & C PLUMBING & MECHANICAL, PO BOX 7314 AVON COLORADO 81620 License: 328-M CONTRACTOR C & C PLUMBING & MECHANICAL, PO BOX 7314 AVON COLORADO 81620 License: 328-M Permit #: M06-0206 Status ... Applied. . Issued . . Expires. .: FINAL 08/02/2006 08/10/2006 11/03/2006 08/02/2006 Phone: 827-9443 08/02/2006 Phone: 827-9443 Desciption: SUREFOOT REMODEL-INSTALL HVAC SYSTEM Valuation: $9,575.00 Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 ******************************************************************** FEE SUMMARY ************************************************************ Mechanical ---> $200.00 Restuarant Plan Review--> $0.00 Total Calculated Fees ---> $253.00 Plan Check ---> $50.00 TOTAL FEES--------------> $253 . 00 Additional Fees-----------> $0.00 Investigation-> $0.00 Total Permit Fee ---------- > $253.00 Will Call-----> $3 .0 0 Payments ------------------- > $253.00 BALANCE DUE--------- > $0.00 ************************************************************************************************************************************************* Item: 05100 BUILDING DEPARTMENT 08/08/2006 cgunion Action: AP Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC. Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER B06 -0085: Entries for Item:90 - BLDG -Final 16:09 02/07/2013 Action Comments By Date Unique_ Key AP mech final was good. all other inpections were NSC 11/03/2006 A000095 checked of 265 Total Rows: 1 Page 1 E06 -0128: Entries for Item: 190 - ELEC -Final 16:10 02/07/2013 Action Comments By Date Unique_ Key DN not ready eg 10/26/2006 A000094 931 AP PROVIDE LOCKING DEVICE FOR FCU SHAHN 10/27/2006 A000094 CIRCUIT BREAKER AS BREAKER IS NOT N 976 LINE OF SIGHT. Total Rows: 2 Page 1