Loading...
HomeMy WebLinkAboutArrabelle at Vail Square Final Certificate of Occupancy RequirementsI ` Vit=� Ljosmek f Iwo ORIi4, -�— — -�_ MEMORANDUM 00 A T0: __ Vail Town Council ) "From: ; Community Development Department Date: October 7, 2008 Subject: Arrabelle at Vail Square Final Certificate of Occupancy Requirements The following list of items must be completed, accepted and approved by the Town of Vail prior to the issuance of a certificate of occupancy for the Arrabelle at Vail Square project. X Completion of day skier drop -off improvements for a minimum of nine drop off spaces on the North Day Lot. Adoption of two new view corridors and one amended view corridor within Lionshead consistent with the recommendations of the Lionshead Redevelopment Master Plan. Completion of exterior improvements to the Eagle Bahn Gondola, including but not limited to, the replacement of the river rock stone veneer with a new veneer consistent with that existing on the Arrabelle at Vail Square project and the removal of the temporary loading and delivery improvements located on the south side of the Eagle Bahn Gondola building. Installation of exterior storefront awnings as depicted on the approved Arrabelle at Vail Square building elevations. Completion of all exterior building elevations consistent with the improvements depicted on the Approved Plans. Completion of the approved public art components (ie, glockenspiel, may pole, water wall, exterior faqade stenciling, etc.) totaling $1 million. Completion of streetscape improvements consistent with the Approved Plans. x Final resolution to the operation or removal of the newspaper stand kiosk consistent with the Approved Plans and /or Agreements. X Written verification of compliance with the Off - street Parking Requirements as established by the existing uses and Approved Plans. Final resolution to the provision of a minimum of 120 beds of deed restricted employee housing consistent with the requirements of the Lionshead Redevelopment Master Plan, Town of Vail Zoning Regulations and the Approved Plans /Agreements. X Permanent installation of all outdoor dining deck railings and enclosures consistent with the Approved Plans. Provide written documentation verifying compliance with the Rental Program Provisions outlined in the September 27, 2204 and January 24, 2005 Planning and Environmental Commission conditions of approval. U A61- 5F TAuA C -- OV L ii ou-5ke 4co Ph4 C Mtervao. i own or vaii community Development Department October 7, 2008 (Attachment A) Planning & Environmental Commission Amended Conditions of Approval Arrabelle at Vail Square Major Exterior Alteration January 24, 2005 (Additions are shown in BOLD, Deletions are shown in ) Amended Conditions of Approval: The Developer shall address the following conditions of approval prior to final review of the development applications by the Town of Vail Design Review Board: 1) That the Developer identifies a new location for publicly accessible restrooms on or near the development site. The new location shall be identified on a revised set of floor plans which shall be submitted by the applicant to the Town of Vail Community Development Department for review and approval. 2) That the Developer submits a complete Design Review Board application to the Town of Vail Community Development Department. The Developer shall address the following conditions of approval prior to applying for a building permit for the improvements from the Town of Vail Community Development Department: (note: A grading plan shall constitute a building permit.) 1) That the Developer addresses the red -lined corrections on the proposed grading and drainage plans and submits a revised final grading and drainage plan for final review and approval by the Town of Vail Public Works Department. 2) That the Developer submits a complete set of civil engineered drawings of the Approved Development Plans including the required off site improvements, to the Town of Vail Community Development Department for review and approval of the drawings. It is acknowledged that final DRB approval of streetscape improvements is not required prior to VR making application for building permit. It shall be noted that the review of the civil engineered drawing may take up to six months to review and approve. 3) That the Developer submits written letters of approval from all adjacent and /or affected property owners whose property is being physically impacted or altered (ie, Montauk, Lionshead Arcade, Antler's, Lions Square Lodge, Landmark, etc.) as a result of the construction of the Lionshead Core Site Hotel, as depicted on the Approved Development Plan, to the Town of Vail Community Development Department for review and approval. 4) 2 Town of Vail Community Development Department October 7, 2008 S Hotel developmeRt appliGat*ORs, The approved Development Agreement between the Town of Vail and VR has approved in concept the conveyance of Town -owned land to VR and stipulates that the conveyance of this land shall occur concurrent with the issuance of a building permit. VR shall submit a major subdivision application as necessary to create the parcels to be conveyed. prior to making application for building permit and such major subdivision application shall be reviewed and approved by the Town prior to issuance of a building permit. 5) That the Developer receives final approval from the Vail Town Council for how the ownership, maintenance and other aspects of improvements proposed within the Lionshead Place public right -of -way will be handled. Said approvals may involve the conveyance of the public right of way existing beneath Lionshead Place or in some other manner as approved by the Town Council. Should the Developer be unable to secure a final approval from the Town Council, the Developer may submit a revised major exterior alteration application to the Town of Vail Community Development Department for review and approval by the Town of Vail Planning and Environmental Commission. 6) That the Developer submits revised plans to the Town of Vail Community Development Department for final review and approval of the Town of Vail Public Works Department addressing each of the comments summarized in the letter from Greg Hall, Public Works Director, to George Ruther, Chief of Planning, dated September 23, 2004. A copy of the letter has been attached for reference. 7) That the Developer submits a complete application for a variance from the adopted public streets design standards outlined in Title 13, Subdivision Regulations, Vail Town Code, to allow for the construction of a new street which deviates from the minimum design standards, for review and approval by the Town of Vail Planning and Environmental Commission. The Developer shall address the following conditions of approval prior to the issuance of a building permit by the Town of Vail Community Development Department: (note: A grading permit shall constitute a building permit.) 1) That the Developer finalizes the Rental Program Proposal and then enters ,4ri� into a written agreement with the Town of Vail that is recorded with the Eagle O a c. County Clerk & Recorder's Office, which requires that the Rental Program �P Proposal is implemented and fully adhered to by the applicant and its ca" assigned and successors for a period of not less then 20 years from the date �21 of the issuance of a temporary certificate of occupancy. The final Rental Program Proposal shall be reviewed and approved by the Vail Town Council following a recommendation on the proposal from the Town of Vail Planning and Environmental Commission. 2) That the Developer submits a Construction Staging Plan to the Town of Vail Community Development Department for the review and approval of the proposed staging plan by the Town of Vail Public Works Department. 3 Town of Vail Community Development Department October 7, 2008 3) That the Developer prepares a Lionshead Core Site Hotel Art in Public Places Plan, for review and comment by the Town of Vail Art in Public Places Board. Said Plan shall include the funding for a minimum of $1,000,000 in public art improvements to be developed in conjunction with Lionshead Core Site Hotel. The implementation of the Plan shall be completed within two years of the date of the issuance of a temporary certificate of occupancy for the Lionshead Core Site Hotel improvements. 4) That the Developer shall be assessed a transportation impact fee in the amount of $5,000 per increased vehicle trip in the peak hour generated (61 trips), or $305,000, as a result of the Lionshead Core Site Hotel improvements. The fee shall be paid by the Developer. At the sole discretion of the Town of Vail Public Works Director, said fee may be waived in full, or part, based upon the completion of certain off -site improvements. 5) That the Developer prepares a Developer Improvement Agreement for Off - Site Improvements, as depicted on the Approved Development Plan, for review and approval by the Vail Town Council. Upon approval of the Agreement, the Developer and the Town of Vail shall legally execute the Agreement. 6) That the Developer receives final approval of the major subdivision application and records the final plat with the Eagle County Clerk & Recorder's Office as contemplated above. The Developer shall address the following conditions of approval prior to the issuance of a temporary certificate of occupancy (TCO) for any of the Lionshead Core Site Hotel improvements: 1) That the Developer provides deed - restricted employee housing that complies with the Town of Vail Employee Housing requirements (Chapter 12 -13) for a minimum of 35 20 employees, and that said restrictions shall be made available for occupancy. In addition, the deed - restrictions shall be legally executed by the Developer and duly recorded with the Eagle County Clerk & Recorder's Office. 2) That the Developer submits an application for the establishment of View Corridors #4 and #5 as contemplated by the Lionshead Redevelopment Master Plan to the Town of Vail Community Development Department for review and approval by the Vail Town Council. The Developer shall address the following conditions of approval prior to the issuance of a final certificate of occupancy (CO) for any of the Lionshead Core Site Hotel improvements: 1) That the Developer prepares easement agreements for the review and approval of the Town of Vail for all necessary easements (ie, utilities, pedestrian access, ingress /egress, drainage, maintenance, emergency vehicle access, fire lane, signage, etc.) in and around the development site as generally depicted on the Approved Development Plans and major subdivision plat. The easement agreements shall be legally executed by the Developer and duly recorded with the Eagle County Clerk & Recorder's Office. 4 Town of Vail Community Development Department October 7, 2008 I^ ✓ 2) That the Developer executes a Memorandum of Understanding for the Operation, Maintenance, and Management of the Lionshead Core Loading and Delivery Facility, to be located on the development site beneath the Lionshead Core Site Hotel. The Memorandum shall be reviewed and approved by the Vail Town Council following a recommendation on the proposal from the Town of Vail Planning and Environmental Commission. 3) That the Developer agrees to design and construct all required streetscape improvements within the defined area of work, as generally depicted on the Off Site Improvements Plan. The Developer acknowledges that the final design of the improvements has not yet been approved by the Town of Vail Design Review Board and that the proposed plan may be subject to change. The following condition of approval shall be placed upon the operation of the Private Skier Club in the Lionshead Core Site Hotel: 1) That the maximum number of Private Skier Club members shall not exceed 100 full members and 16 partial members and the maximum number of private parking spaces dedicated to the full members use shall not exceed 100 spaces. A full member shall be defined as a ski club member entitled to full parking, spa, and members club services. A partial member shall be defined as a ski club member entitled to full spa and members club services with no rights to on -site parking. Town of Vail Community Development Department 5 October 7, 2008