HomeMy WebLinkAboutB05-0016 Conditions CONDITIONS FOR ARRABELLE AT VAIL SQUARE TEMPORAY CERTIFICATE OF OCCUPANCY— EXPIRATION DATE 5-1-2009 PERMIT#B05-0016 1. A Final Certificate of Occupancy (CO) is required to be obtained for Building Permit #B05-0016 by May 1, 2009. 2. Any violation of the terms of the Temporary Certificate of Occupancy (TCO)will result in revocation of occupancy per IBC 110.4. 3. TCO includes the following areas: See attached letter from Shaw Construction G1 Level excluding construction staging areas G2 Level excluding construction staging areas Loading dock excluding Gondola Tunnel Plaza Level including Ice Rink Lobby level including Centre V, Porte Cochre and supporting areas Hotel Rooms at B2, B3, C2, & C3 Level B2 Great Room and Balcony Building B and C Second floor units: 201,205,217,219,229,241,243 Building B and C Third Floor units: 301,305,309,329,341,343 Building B and C Fourth Floor units: 408,412,414,422,426,430,436, 438/444,441/443 Building B and C Fifth Floor units: 508,512,514,522,526,529,530,536 Building D -1 Skate Rental and Zamboni Garage Building D — 3 Units 352, 358,359,360,361,363 Building A-1 Ski Valet Building A-2 Units, 274,275,276,278,282,284,285,287 Building A-3 Units 374,375,376,378,382,384,385,387 Building D-3 Units 353, 355 (with corrections), 364,368,372 Building B-6 Units 608,612,614,617,619 Building C-6 Units 622,630,636 Building C-4 Unit 429 (with corrections) Building C-6 Units 626,629 (with corrections), 642 (with corrections), 643 (with corrections) Building A-4 Units 476 (with corrections), 478,482,487 (with corrections) Building D-4 Units 452 (with corrections), 455 (with corrections),460,461,462,463,464,468 (with corrections) Building A-5 Units 572,578 Building D-5 Units 552,555 (with corrections), 560,561,562,563,564,568 Building D-5 Units 576,582,587 Building A-6 Units 670,672,682 Building D-6 Units 655,660,661,663,668 Building A-2 Units 270,272 Building C-3 Unit 330 Building D-2 Units 255,259,261 Building D-7 Unit 755 Building D-4 Unit 472 Building C-5 Units 543-544 Lerner Corrections Listed Below 4. Fix door latches, closers in corridors in many locations of the Hotel corridors at communication rooms etc... \\VWS-Storage\Desktops$\cgodfrey\Desktop\B05-0016 Conditions.doc 5. Provide plan and schedule as to how and when the Rise and Run items discovered at the atrium first level of stairs are to be addressed and repaired. 6. All stairwell floor identification signage needs to also indicate the story of and direction (up or down) of exit discharge on the sign per IBC 1019.1.7. 7. Install signage at exit stairways indicating location of accessible means of egress at elevators per IBC 1007.7. 8. Provide signage with International Symbol of Accessibility at men's' and women's locker room accessible bathrooms. 9. Panic hardware required on Centre V exit doors. 10. Panic hardware required on all other A occupancy exit doors where missing. 11. Remove all remaining construction fencing and dumpsters at plaza level entries. 12. Install approved barriers at escalator locations. 13. Complete the plumbing work for public bathrooms located near the ice rink. Call for final re-inspection ASAP. 14. All Town of Vail Public Works, Vail Fire and Emergency Services and Planning Department corrections must be completed for final CO. 15. Any construction activity shall not negatively impact areas approved for occupancy. 16. Provide accessible hardware per IBC section 3109 Swimming Pool Enclosures and Safety Devices. 17. The Conditions of the Development Agreement are to be complied with prior to a certificate of occupancy. \\VWS-Storage\Desktops$\cgodfrey\Desktop\B05-0016 Conditions.doc