Loading...
HomeMy WebLinkAboutReview Fourth Plan Comments fourth review Linhart Peterson Powers AssociatesMessage: Norm: OFFIr 1. Enclosed please find attached 2 stamped copi `q LOP11'r unstamped copy for your record only) of sheets requested in the above referenced final review comments (also attached): • A021 • A101 • A102 • A111C • A132 • A133 • A134 2. Also enclosed are unstamped sheets, for your record only that may be missing from your record set (reference your comment no. 1) o A004 o A031 o A488 Note the other sheets you list in your comment no. 1 are covered above (A101, A102, A111C, A132, A133, A134) Hope this is all clear and will allow you to release all stamped drawings under this review back to Charlie Davis. Please feel free to call with any questions, thanks! PS. I think we are still looking for final resolution on plan review 2050114.005 4240 Architecture Inc. chicago denver 1621 Eighteenth Street Suite 200 Denver, Colorado 80202 1 3 0 3 2 9 2 33 1 `3 0 3 2 9 2 3 W 424oarchitecture.com Fla. AC # o954656 � r \ ail. (.:(,I iIa(I�,� Uillnn, C(�Inr;ul�r Monroe & Newell Fllg'il wcl �. Inc'. December 28, 2005 4240 Architecture 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Attn: Mr. Steve Roberts, AIA Re: The ArraBelle at Vail Square LP2A Review comments dated 12/22/05 M &N Project Number 6250 Gentlemen: The following is the response to the structural comments: S I : The precast cores were redesigned only to the extent that the lowest five (5) feet of the walls (from footing elevation to twelve (12) inches above slab on grade elevation) were changed to cast -in -place concrete for timing purposes. The precast cores were designed as bearing on the footings so the detailing simply matched the rebar quantity and concrete strength of the precast. No further calculations are required since we are matching the required reinforcing of the original precast core wall design and the precast calculations in the possession of LP2A. The following is the response to the architectural comments: 4. There are no Addendum 14 revisions to Sheet SC 1. 5. There are no Addendum 14 revisions to Sheet SC2. 200 IVl:uinum .tih„nwr I he ( oloradn ( hapter (,I 1cria:111 In <titutc ul Architect, ��c���.ntunrur nr�\c�ll.cnm 1'il l t\ � nhn�!I) �trc(I • Suilr ?uu • D(•,Oeer. C()1Ur:Id,) 8 )2O2 ;tli) ri'3 0) 3 - • 1 A\ t 30 02.� -6002 . email: III(),, ni'��'rlI ('nni Second comment: The structural calculations for the podium design elements were submitted with the spa supplemental calculations on pages 280 -397 per the table of contents. If you have any questions or comments, please call. Very truly yours, MONROE & NEWELL EXfr;VEERS, INC. C'fa' r ,arrV, E. V 'Vv ```o> > f��r, Princi al CCisd l zt Vail C- ,iorado -- — Denccr, � olurar'r� Dillon, Coluru,lu iN l()ntc >' l.n,,l nu, •r. Inc. December 5, 2005 4240 Architecture 1621 F,ightecnth tit.. Ste 200 Colorado 80202 Attn: Mi . Steve Roberts 1�C: Arrabelle at ail Square M &\ 6250) Dear Steve: The following is the r ponse to the structural items I n the plan review dated Hocember 1, 2005 by I l'.A. ! 1a. The double tees in the upper garage span roughly 62 fcct as shown on sheet S 110.20 and S l 10.LD. The tees are single span but previously only spanned 30 feet in the original permit drawings. what we meant to imply is that the revised tees span twice as far as the original tees. 2a. The revised base plate schedule is shown on sheet S2.1. The calculations are on pages 398 -440 per the table ol'conternts. 2b. lli, (Yrand stair is detailed on the streetscape sheets SC l and SC2. �c. Llevator 17 is located near Grid t').2 and between grids N & 1' in area H. The training is shown on sheet S 1 1 l I� and the calculations are part of the lei el 1 Spa beams on pages 1 -35 per the table of contents. 1 b. The precast supplier provided stamped calculations t all of their ._-- products as part of their submittals. If (tZLtuired the General Contractor can provide copies of the precast calculations. *ti #� #�� Nat'anun spon. "'I 7hr coimailu c lu ra.r , i The Ant CIiCJII In.t i I I : 0 \1, I w w. it onrnc -ntv cII. cc) in 1 Wy Sti 00 • Denver, Colorado 80202 /.I.: ,O1 . FeY (.i Z\ 0 c n1 J, The revised Spa framing calculatUmb are hagcs l -1 l 3 of the supplemental calculations per the table ofcontenls. ld. The revised beam framing; for the pools is part of the Level 1 Spa beams on pagc� 1 -35 per the table of content:,. A The beam depth revisions were simply a direct suhstitution to the original permit sct beam with section properties greater than the original beam. A. The roof dormer revisions were simply plate height revisions and minor locations of relocated dormers. the dormers relocated are the small 8'x10' dormers and the beams N ere designed in the original submitted calculations. If you have any questions or comment~, please call. N ury truly yours. MO'< ;,01 & N I A'ELL F �<UI [ A ,R S. INC. ' (aig (_aP .L. Princip4 +l 1 Cdr Ope ,:�),' 4 / l'H p�o�S "S . December 1, 2005 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 / 292 -3113 Email: sroberts @4240arch.com Re: Plan Review: ArraBelle at Vail Square - Revisions Address: 75 South Frontage Road Dear Mr. Roberts: TOWN OF VAIL SECOND REVIEW LP Job No.: 2050114.004 Linhart Petersen Powers Associates (LP has completed a second review of the following documents on behalf of the Town of Vail: Plans: Two (2) copies of sheets A004 through W405 (120 sheets) dated ( "issue 023 ") July 29, 2005 by 4240 Architecture, Inc.; sheets W600 through W604 (4 sheets) dated ( "issue 023 ") July 29, 2005 by Liss Engineering; sheets FAIO1C and FP101C dated ( "issue 023 ") July 29, 2005 by Rolf- Jensen & Associates, Inc. For reference: One (1) copy of approved plans for reference: Volume One (cover sheet through WP8), Volume Two (cover sheet through W604), Volume Three (cover sheet through T600.4), Volume Four (cover sheet through ID86201). 2. Sketches Revised sketches Drawing Number ASK0073 through ASK0081, dated November 4, 2005, by 4240 Architects. 3. Structural Calculations: Two (2) copies of Supplemental Structural Engineering Calculations, dated November 22, 2005, by Monroe & Newell engineers, Inc. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our re -check comments follow on the attached list. Please submit an itemized response letter and three (3) sets of complete and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Talat Abbasi, PE Norman Hong ICBOACC /IRC Plans Examiner Architect Supervising Plan Review Engineer Senior Plans Examiner Senior Associate TAA/NH /WY (Bin 118) Enclosures Copy: Mr. Charlie Davis, Chief Building Official, Town of Vail: Fax: 970 / 479 -2452 The following comments, numbered per the original list, require further response and revision. Note that the format includes a restatement of the original comment followed by the new or clarifying recheck comment in a separate ArraBelle at Vail Square - Revisions Second Review - Vail, Colorado 75 South Frontage had LP2A Job No.: 2050114.004 December 1, 2005 Page I bolded and italicized paragraph. I Re: Occupancy Groups: Type of Construction: Stories: IB R -1, R -2, S -1, S -2, A -2, A -3, B, M Seven and two garage levels Sprinklers: Yes Building Area (sq. ft.): 539,663 GENERAL COMMENTS: A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). ARCHITECTURAL COMMENTS; 4. Sheet SC I: Please indicate whether there were any Addendum 14 revisions on this sheet. 5. Sheet SC2: Please indicate whether there are any Addendum 14 revisions on this sheet. For the above podium design elements shown on Sheets SCI and SC2, please provide structural calculations for the design. STRUCTURAL COMMENTS: Please provide the following information regarding structural revisions to the plans and calculations: SL First item: a. It indicates that at the upper Garage the double T -beams will span two bays instead of one bay. Where is it shown on plan? ArraBelle at Vail Square - Revisions 'Second Review - Vail, Colorado 75 South Frontage Road ` LP2A Job No.: 2050114.004 December 1, 2005 Page 2 b. This item indicates that the pre -cast concrete cores were redesigned, provide the calculations for the same. Indicate the page number on which such calculations could be found, if the calculations are part of submitted package. C. Also the spa was redesigned, where are the calculations and details for the same. d. Spa pools were also relocated, resulting in framing modifications; clarify where the revised framing could be found. Second item: a. According to this item, steel base plate schedule was expanded; indicate the detail and sheet number on which this revised schedule could be found. Also provide calculations for various bearing situations. b. Indicate the sheet number on which Grand Stair was detailed. Indicate the sheet number on which the revised framing around elevator 17 was included. Indicate also the sheet number on which revised detailing could be found. Also provide calculations to check the adequacy of the details. Third item: a. The item indicates that structural framing was further developed resulting in various beam depth revisions, clarify where these revised beams could be found. Indicate the sheet number and provide calculations for the same. b. Also the roof beams have been revised, please indicate where these beams could be found, indicate the sheet number and provide calculations for the revised beams. Dewaterinz Revisions: a. Please clarify if the note was added on the plans. If you have any questions regarding the above comments, please contact Talat Abbasi (x222) for structural questions or Norm Hong (x224) for general questions at 925 / 226 -1320 between 8:00 A.M. to 5:00 P.M., M -F. [END OF COMMENTS] "Steve Roberts" <sroberts @4240arch.com> 12/08/2005 09:48 AM Norman: To Norman Hong /U SANER ITAS @VERITAS cc <cdavis @ci.vail.co.us >, <dfeeney@va i [resorts. com> bcc Subject 2050114.004 Vail ArraBelle Revisions AND ADDITIONAL DRAWINGS FOR REVIEW Please find attached a response letter to the 2nd round of structural review comments (also attached) for the above referenced project. There are no drawings being resubmitted — the responses are clarifications on where to find information in the structural package that was submitted. ALSO, tomorrow you'll receive two full -size stamped copies (on green paper) of plumbing revisions for the same project. The revisions are titled ASI (Architect's Supplemental Instructions) No. 30, dated 10.20.05. We'd like to have LP2A's review comments on the plumbing revisions incorporated into this review. Following is a brief narrative of changes to anticipate on those drawings. We'll include this narrative on the transmittal that comes with the drawings tomorrow. 1. Changes to Condo levels include, moved plumbing fixtures, move fireplaces, pipe chase changes effecting plumbing stacks. Changed plans, details, Water risers and waste /vent isometrics. Gas piping changed as a result of fireplaces being moved. 2. Finalized the Spa area plumbing design and coordination with HVAC. 3. Water rooms changed requiring changes to plans, details and schematics. 4. Plaza Fire Place /pits were added. Made changes to gas piping. 5. Coordination with Contractors required adjustments to plans and associated details. 6. Finalized Elevator pit sump pump design. 7. Removed trench drain piping from drain at entry ramp on sheet M310.OH. 8. Rerouted piping at Garage entry to accommodate warm spaces so as to avoid freezing. 9. Re- evaluated all systems and made adjustments accordingly Please let me know if you have any questions. I'll be out of the office through Monday, but you can still reach me on my cell at 303.514.9504. Thanks! Steve Roberts, AIA Associate 4240 Architecture Inc. 1621 Eighteenth Street Suite 200 Denver Colorado 80202 p. 303.292.3388 f. 303.292.3113 Vail cell p. 303.514.9504 Vail - 'llorado 0111011, co :'JI —1,: l l' +,,comber 5, 2005 4240 Architecture 1621 Eightc,:nth tit. Ste 200 1acn, Colorado '60202 Attn: lvl; . Steve Roberts I:, \rrabelle at \. ail Square M& `, 6250) Dear ` The following is the response to the structural items in the plan review dated I ),,cember 1. 2005 by i 'P,A 1a. Th.; double tees in the upner garage span roughly 62 fi_•_;t as shown on sheet ti 1 10.2! " and S l 10.2D. The tees are sin span but previously only spanned 30 feet in the original permit drawings. W hat we meant to imply is that the revised tees span twice as far as the original tees. 2a. The revised bast- plat; schedule is shoe -n on sheet 52.1. The calculations are on pa 398 -440 per the table ol'contents. 2b. ! 11, grand stair is detailed on the streetscape sheets `1 I and SC2. 2c. L1(vator 17 is located near Grid 13? and between orids `. & I' in area 1;. The lruining is shown on sheet S 1 1 l I' and the calculations are part of the lev ;I I Spa beams on pages 1 - 3 5 per the table of contents. Ib. The precast supplier provided stamped calculations for all of their products as part of their submittals. It' rcCluired the General Contractor can provide copies of the precast calculations. PkI II1l11 `1171 11'01' - I hr .11ncr16:111 Imtiu:w 1.( \.:1....:I" v, \% %v.Il )nroc -ne% II.coill 1 7 (�I \Ci} SII k - `.uitr 200 • r7CnVeI Colorado 80202 0 7 FAV n lc. The revised Spa framing calculations are pagcs I - l 13 of the supplemental calculations per the table oCconternts. Id. The revised beam framing for the pools is part ofthe Level 1 Spa beams on pages 1 -35 per the table of contents. 3a. The beam depth revisions were simply a direct substitution to the original permit set beam with section properties greater than the original beam. 3b. The roofdormer revisions were simply plate height revisions and minor locations of relocated dormers. l lie dormers relocated are the small 8'x10' dormers and the beams were designed in the original submitted calculations. If you have any questions or comments, please call. Vcr\ truly yours. MOXRul :sec \IA'I 1'\" C'. C aig C uroll. '.0 Princi , 1 N1un1tif" 0 a I September 29, 2005 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 / 292 -3113 Email: sroberts @4240arch.com Re: Plan Review: ArraBelle at Vail Square - Revisions Address: 75 South Frontage Road Dear Mr. Roberts: TOWN OF VAIL — FIRST REVIEW LP Job No.: 2050114.004 Linhart Petersen Powers Associates (LP has completed a first review of the following documents on behalf of the Town of Vail: Plans: Two (2) copies of sheets A004 through W405 (120 sheets) dated ( "issue 023 ") July 29, 2005 by 4240 Architecture, Inc.; sheets W600 through W604 (4 sheets) dated ( "issue 023 ") July 29, 2005 by Liss Engineering; sheets FA101C and FP101C dated ( "issue 023 ") July 29, 2005 by Rolf- Jensen & Associates, Inc. For reference: One (1) copy of approved plans for reference: Volume One (cover sheet through WP8), Volume Two (cover sheet through W604), Volume Three (cover sheet through T600.4), Volume Four (cover sheet through ID86201). The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our comments follow on the attached list. Please submit an itemized response letter and three (3) sets of complete and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Talat Abbasi, PE ICBO /ICC /IRC Plans Examiner Supervising Plan Review Engineer Senior Associate TAA/NH /WY Norman Hong Architect Senior Plans Examiner (Bin 118) Enclosures ArraBelle at Vail Square - Revisions First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 Page I Re: Occupancy Groups: Type of Construction: Stories: Sprinklers: Building Area (sq. ft.): GENERAL COMMENTS: R -1, R -2, S -1, S -2, A -2, A -3, B, M IB Seven and two garage levels Yes 539,663 A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). ARCHITECTURAL COMMENTS; ' Sheet A021, Code Summary — Level 1: Amend plan to specify minimum 2 -hour separation at Air Intake P142. Response, 11.07.05. Please see corrected sheet.-1021 sketch ASK 0073. Sheet A101, First Level Floor Plan: `I( Near building lines 9.5/E.2, amend note regarding ramp slope. Response, 11.07.05. Please see iucorr note deleted,mitt SheetAlllC.cketch ASK 0074 (also deleted /turn Sheet A 101 but not included here). _0 At Service Hall P145.33, review slope of ramp. Sheet A134 specifies that ramp is 1:20; Sheet A101 specifies that ramp has 1:12 slope. Response, 1/.07.05. Please see corrected sheet AIIC sketch ASK 0075 for 1:12 rump .slope (also corrected on Sheets A101 and A 134 but not included here). ArraBelle at Vail Square - Revisions First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 Page 2 * For ramps with slopes greater than 1:20, amend plans to specify handrails at both sides. Response, 11.07.05. Please see corrected sheet AIIIC sketch ASK 0075 for handrail detail references: 3/A058 for handrail heil ht and la5jwut requirements, and 51A715 fbr handrail section and dimensions. Sheet A134, Spa Plan; At Linen Room (Bldg. Lines F /2) please confirm whether there is linen shaft in the room. If laundry chute is provided, amend drawings to show laundry chute requirement in IBC 707.13 and fire sprinkler requirements in IBC 903. Response, 11.07.05. Please note the room is a unitor closet and was mislabeled on that sheet. The feature noted in the room is a floor sink. Please .see corrected Sheet ,4134 sketch ASK 0076. 4. Sheet SCI: Please indicate whether there were any Addendum 14 revisions on this sheet. Response. I1.OZ05. Please trots sheets SCI and SC2 tire new sheets adder( to the drawing set in Addendum 14. Sheet SCI is a reference plan for most of the .structural details oil Sheet SC2. The details are for building plena elements such as 1i,-ht poles, sculpture, and water features. Other details oil Sheet .SC2 are for features in the villa e strectscape' which are heYond the .scope of this buiddin, permit. 5. Sheet SC2: Please indicate whether thee are any Addendum 14 revisions on this sheet. Response, l 1.07.05. Please see response to item no. 4 alcove. DISABLED ACCESS COMMENTS _ .._... ; Sheet A 101: At Spa Retail P145, amend plans to show accessible height at counter. Counters for sales or distribution of goods and services are required to have a portion of the counter 36 inches long minimum by 36 inches high maximum above the floor or ground. ANSI 904.3. Response, 11.07.05. Please see corrected sheet A133 sketch ASK 0077 for regrtired accessible coturter in fnrnurtiorr. e.' Sheet A132: At ADA Suite P145.16 (Women's Locker Area) provide dimensions and details to show that shower and shower access area meets handicap requirements in ANSI 608. Response, 11.07.05. Please see corrected sheet ,1132 sketch ASK 0078 for transfer -type shower detail reference 3/A059. Also note mirrinrnnt required clear dimensions noted at shower stall and stall ntaneavertrtg space. R At Couples Treatment P145.27 provide dimensions and details to show that shower and shower access area meets handicap requirements in ANSI 608. ArraBelle at Vail Square - Revisions 'First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 Page 3 Response, 11.07.05. Please see corrected sheet : sketch ASK 0079 for standard roll- in -t)/re shower detail reference 21'A059. r Elevator 17 revisions: On Sheet A101, where Elevator 17 has been relocated, please review what appears to be an opening from the mechanical shaft into Stair Enclosure 8. Openings into exit enclosures are limited to those necessary for exit access to the enclosure from normally occupied spaces per IBC 1019.1.1. Responsc, 11.07.05. Please see corrected sheet , -1 /0l sketch ASK 00N0 fiir deletion of opening (it exit enclosure. On Revised Sheet A101, please review the building lines Y1 through Y5 to agree with drawing on Sheet A102. Response, 11.07.05. Please note both Addendum 14 Sheets ,A101'and :1102. - ;, lhow the same column ,rid, which was modified fYoar the Februarp 15 issue. C Please provide revised Second Level Floor Plan, Sheet A102 to show the new location of Elevator 17 at the second level. Response, 11.07.05. Please see corrected .sheet A 102 sketch .ASK 0051 showinb new elevator location. l Sheets SCI and SC2: Please indicate on these drawings the items which were revised by Addendum 14. Provide a narrative indicating changes and a copy of the previously approved drawings for our comparison of revised drawing. Response, 11.(17.05. Please see response to item no. 4 ahove. MECHANICAL. PLUMBING, ELECTRICAL COMMENTS: Mechanical: No comments. `robing: Tio lumbing comments. Electrical _ The condo panel schedules indicate only one small_ appliance circuit. Article 210.11(c)(1) requires a ��� minimum of two small appliance circulates, please correct the plans. Response, 11.07.05. Please note a second small appliance circuit is identified on load center schedules as "re iig" The condo reference plans still indicate load centers located within clothes closets in violation of Article 240.24(d). Show the locations of the load centers on the enlarged condo plans for ease of review. ArraBelle at Vail Square - Revisions 'First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 Page 4 Response, 11.07.05. Please note rill load centers were relocated outside of clothes closets for plait review response dated 041'07105. These revisions were made on the electrical reference plans, E101- 1;106. k2. Provide a note on the plans that the service Ground Fault Protection shall be performance tested per Article r 230.95(c). Response 0 , 11.'115, Please see note added to one -line dia; rants (E600.1, E600.2, F600.3),for plan review response dated 04 107105, and included on thr , Addendum 14 drawings. FIRE SYSTSEMS: V . , Sheets FA101 C (Area C — First Floor Fire Alarm Plan) and FP I O1C (First Floor Fire Protection Plan): Both the fire alarm and fire sprinkler systems presented on these two sheets are conceptual incomplete design. Please provide completed plans for our review. Response, 11.07.05, Please note that both fire alarm acrd fire protection final desi documents are to be provider( as deferrer/ submittal shop drawiugs hi the trade subcontractors. Deferred submittal revicir procedures shall fiillow the requireineii s of 113CS', ction 106.3.4.2 as noted ou Sheet 1004 in Code Summary puratiraph AIL ENERGY COMMENTS: ,&o energy comments. STRUCTURAL COMMENTS: Structural calculations for the revised structural design have not yet been submitted. The architect and engineer have been notified and the calculations will be forwarded. The structural review will be completed and structural comments will be provided when the calculations are available. Response. 11. 017.05. Please note 2 copies of the structural calculations were submitted Sept 29. If you have any questions regarding the above comments, please contact Talat Abbasi (x222) for structural questions or Norm Hong (x224) for general questions at 925 / 226 -1320 between 8:00 A.M. to 5:00 P.M., M -F. [END OF COMMENTS] ArraBelle at Vail Square - Revisions 'First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 Page 5 "Steve Roberts" <sroberts @4240arch.com> 11/09/2005 06:28 AM Norman: To Norman Hong /USA/VERITAS @VERITAS cc <dfeeney @vailresorts.com >, <wfink @rjagroup.com> bcc Subject ArraBelle at Vail Square - Revisions - LP2A Job No.: 2050114.004 Please find attached our responses to first review comments from eS . 29 for the above referenced project. Also attached are 8.5x11 correction sketches with clouded revisions in response to the comments (please note the files are labeled with sketch numbers that are referenced in the itemized response). We respectfully ask that the sketches first be reviewed to resolve outstanding_ comments. Once all comments have been satisfactorily addressed, we will print the revW&d sheets on full size green paper with the wet stamp and signature for your record and for is r utidn"to tfie'Town of Vail. I'll call you to follow up and verify that everything is in order to help expedite your review. Thanks! A111CASI 0040ASK0075. pdf A102AS1 0040ASK0081.pdf AS[ 0040ASK0080.pdf A132AS1 0040ASK0079.pdf Jk5 OY5 aY5 JYS A132AS10040ASK0078.pdf 13 AS 10040 ASK0077.pdf A1344�10040ASK0076.pdf ,A111CAS10040ASK0074.pdf JYS Y5 A021 AS1 0040 ASK0073.pdf Revsi0nRes15osnes051107.doc STAIR 5 NO EGRESS REQUIRED THIS LEVEL: REQ. DOORWAY WIDTH AT .15 " /OCC. = 15.75" < 33.5" ACTUAL REQ. STAIRWAY WIDTH AT .20 " /OCC. = 21' < 44" ACTUAL ASI 40 L AIR INTAKE P142 IR 12 4 00 e ArraBelle The RETAIL CORE SHELL USE: FUTURE RETAIL TE OCCUPANCY: M AREA SUBTOTAL: 309 S OCCUPANCY LOAD FACT 30 SF /PERSON OCCUPANT LOAD: 11 REFERENCE: A SI RETAIL —CORE SHELL USE: FUTURE RETAIL TE OCCUPANCY: M AREA SUBTOTAL: 830 S OCCUPANCY LOAD FACT 30 SF /PERSON OCCUPA LOAD: 28 — AUTOMATIC SPRINKLER PROTECTIOt PROVIDED AT THE CEILING ABOVE NORTH STAIR EXIT O e ArraBelle The No: ASK007 Architect of Record Vail Squ are DRAWING REFERENCE: A SI 424 Owner / Develo er h ISSUE: ASI 0040 Vail Resorts DATE: 1 1 /04/05 Denver, Colorado Development Company p p y SCALE: 1/16 " =1' -0" DRAWN BY: med Avon, Colorado C.8 10 The ArraBelle ASK00 Architect of Record DRAWING No: at Vail Square REFERENCE: A111C 4240 Owner / Developer ISSUE: ASI 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado Development Company SCALE: DRAWN BY: 1/8"=l'—O" MCD Avon, Colorado The ArraBelle ASK007� Architect of Record at Vail Square DRAWING No: 4240 REFERENCE: A11-1C Owner / Develop P ISSUE: ASI 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado an Development Company [� 1 y SCALE: 1 /8" =1' -0" DRAWN BY: MCD Avon, Colorado A¢hitea of Record The ArraBelle oRAwwC No: ASK00 " 4240 a O Developer t Vail Square Owner / Develo REFERENCE: A P ISSUE: ASI 0040 Vail Resorts DATE: 11/04/2005 Development Company SCALE: 1/4"=V-0" Denver, Colorado p 1' Y DRAWN BY: MCD Avon, Colorado J -------- -- - -- -�� 11' -5y2" 8128' - 0" n AS I 40 �—� PROVI E 36" MIN. WIDTH X P145.B 36" M X. HT. COUNTER — FULL DEPTH OF COUNTER. SPA RETAIL P145 SPA P 145.07 II 1 145.03. I I I I I I I I I I I I I I i� I N OI I COATS LO � P 145.02 J Architect of Record The ArraBelle DRAWING No: ASK00'�7 4240 a Owner / Develop t Vail Square REFERENCE: A133 P ISSUE: ASI 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado Develop Comp SCALE: 1 /4 " =1' -0" P DRAWN BY: MCD Avon, Colorado 7 STAFF E TOILET P 145.36 11M / 145.14 145.14 W.C. P145.15 145.15 :D 1 �L T01 ET P143.0 - ----1 I - - -� 143.01 F P t 0 r� 0 I 1' -6%8" c n AS I 40 v 6' -0" 11 5' -2" 8 i O i i `i/ — 0 1 0 i n i 2' -8Y2" � 4' —C Co AREA —At�A4 145.16. 1 P1 45.58 / SUITE I \ P � 3 ' I ' A059 SHOWER SHOWER P 145.12 1 P 145.13 3' -0" 3' -0" MIN. MIN. 3- 1034 3'- 10/8" T he ArraBelle T v ArehitecroERecord DRAWING No: ASK0078 Vail Square REFERENCE: 132 4240 at Owner / Developer l ISSUE: ASI 0040 Vail Resorts DATE: 11/94/P5 Company SCALE: 1/4 " =1' -0 Denver, Colorado ° I � P Y DRAWN BY: MCD Avon, Colorado y � 145.32 145.32. I C.8 A 0 7 P TYP. COUPLES 45.27. TREATMENT P145.27 7'— 11 r� I i � A / AS I 40 SAUN o The ArraBelle No: ASK00"79`i -''� Architect of Record at Vail Square DRAWING 4240 Owner / Develo er REFERENCE: 1,32' P ISSI A 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado ari Y Development Company P p SCALE: 1/4 " =1' -0" DRAWN BY: MCD Avon, Colorado C I / 5'_4 °'� 2 6.25 P A059 r , I ROOF LINEN P145. STORAGE 1 0 1 145.3. P 145.34 1 I I \ SERVICE 145.36. STAFF E L STA TOILET P145.33 PREP P145.36 [ F. F. P 145.35 81 27 -0 ------ - - - - -- �M [ The ArraBelle No: ASK00"79`i -''� Architect of Record at Vail Square DRAWING 4240 Owner / Develo er REFERENCE: 1,32' h ISSI A 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado ari Y Development Company P p SCALE: 1/4 " =1' -0" DRAWN BY: MCD Avon, Colorado Architect of Record The ArraBelle DRAWING No: ASK0081 4240 at Owner Square wner / Developer REFERENCE: 1 FSI ASI ISSUE: 0040 Vail Resorts DATE: 11/04/05 Denver, Colorado Development Company DRAWNABY: MC/D6 " =1' -0" Avon, Colorado The ArraBelle Architect of Record DRAWING N0: AS 4240 at Vail Square � If Owner /Developer REFERENCE: (A10Y ISSUE: y{5i�0040 Vail Resorts DATE: 1 04105 Denver, Corrado Development Company SCALE: 1 16" = 1' -0" Avon, Colorado DRAWN BY: CD September 29, 2005 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 / 292 -3113 Email: sroberts @4240arch.com Re: Plan Review: ArraBelle at Vail Square - Revisions Address: 75 South Frontage Road Dear Mr. Roberts: TOWN OF VAIL — FIRST REVIEW LP Job No.: 2050114.004 Linhart Petersen Powers Associates (LP has completed a first review of the following documents on behalf of the Town of Vail: Plans: Two (2) copies of sheets A004 through W405 (120 sheets) dated ( "issue 023 ") July 29, 2005 by 4240 Architecture, Inc.; sheets W600 through W604 (4 sheets) dated ( "issue 023 ") July 29, 2005 by Liss Engineering; sheets FA101C and FP101C dated ( "issue 023 ") July 29, 2005 by Rolf- Jensen & Associates, Inc. For reference: One (1) copy of approved plans for reference: Volume One (cover sheet through WP8), Volume Two (cover sheet through W604), Volume Three (cover sheet through T600.4), Volume Four (cover sheet through ID86201). The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our comments follow on the attached list. Please submit an itemized response letter and three (3) sets of complete and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Talat Abbasi, PE ICBO /ICC /IRC Plans Examiner Supervising Plan Review Engineer Senior Associate TAA/NH /WY Norman Hong Architect Senior Plans Examiner pAVail2005 \2050114.004- pc1.doc (Bin 118) Enclosures ArraBelle at Vail Square - Revisions '75 South Frontage Road September 29, 2005 Re: Occupancy Groups: R -1, R -2, S -1, S -2, A -2, A -3, B, M Type of Construction: IB Stories: Seven and two garage levels Sprinklers: Yes Building Area (sq. ft.): 539,663 GENERAL COMMENTS: First Review - Vail, Colorado LP2A Job No.: 2050114.004 Page 2 A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). ARCHITECTURAL COMMENTS; 1. Sheet A021, Code Summary — Level 1: Amend plan to specify minimum 2 -hour separation at Air Intake P142. 2. Sheet A101, First Level Floor Plan: A. Near building lines 9.5/E.2, amend note regarding ramp slope. B. At Service Hall P145.33, review slope of ramp. a. Sheet A134 specifies that ramp is 1:20; Sheet A101 specifies that ramp has 1:12 slope. b. For ramps with slopes greater than 1:20, amend plans to specify handrails at both sides. 3. Sheet A134, Spa Plan; At Linen Room (Bldg. Lines F /2) please confirm whether there is linen shaft in the room. If laundry chute is provided, amend drawings to show laundry chute requirement in IBC 707.13 and fire sprinkler requirements in IBC 903. 4. Sheet SC1: ArraBelle at Vail Square - Revisions X 75 South Frontage Road September 29, 2005 , First Review - Vail, Colorado LP2A Job No.: 2050114.004 Page 3 Please indicate whether there were any Addendum 14 revisions on this sheet. 5. Sheet SC2: Please indicate whether there are any Addendum 14 revisions on this sheet. DISABLED ACCESS COMMENTS 6. Sheet A101: At Spa Retail P145, amend plans to show accessible height at counter. Counters for sales or distribution of goods and services are required to have a portion of the counter 36 inches long minimum by 36 inches high maximum above the floor or ground. ANSI 904.3. 7. Sheet All 32: A. At ADA Suite P145.16 (Women's Locker Area) provide dimensions and details to show that shower and shower access area meets handicap requirements in ANSI 608. B. At Couples Treatment P145.27 provide dimensions and details to show that shower and shower access area meets handicap requirements in ANSI 608. 8. Elevator 17 revisions: A. On Sheet A101, where Elevator 17 has been relocated, please review what appears to be an opening from the mechanical shaft into Stair Enclosure 8. Openings into exit enclosures are limited to those necessary for exit access to the enclosure from normally occupied spaces per IBC 1019.1.1. B. On Revised Sheet A101, please review the building lines Y1 through Y5 to agree with drawing on Sheet A102. C. Please provide revised Second Level Floor Plan, Sheet A102 to show the new location of Elevator 17 at the second level. 9. Sheets SC1 and SC2: Please indicate on these drawings the items which were revised by Addendum 14. Provide a narrative indicating changes and a copy of the previously approved drawings for our comparison of revised drawing. MECHANICAL, PLUMBING, ELECTRICAL COMMENTS: Mechanical: No mechanical comments. Plumbing: No plumbing comments. Electrical: ArraBelle at Vail Square - Revisions First Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 September 29, 2005 . Page 4 10. The condo panel schedules indicate only one small appliance circuit. Article 210.11(c)(1) requires a minimum of two small appliance circulates, please correct the plans. 11. The condo reference plans still indicate load centers located within clothes closets in violation of Article 240.24(d). Show the locations of the load centers on the enlarged condo plans for ease of review. 12. Provide a note on the plans that the service Ground Fault Protection shall be performance tested per Article 230.95(c). FIRE SYSTSEMS: 13. Sheets FA101 C (Area C — First Floor Fire Alarm Plan) and FP 101 C (First Floor Fire Protection Plan): Both the fire alarm and fire sprinkler systems presented on these two sheets are conceptual incomplete design. Please provide completed plans for our review. ENERGY COMMENTS: No energy comments. STRUCTURAL COMMENTS: Structural calculations for the revised structural design have not yet been submitted. The architect and engineer have been notified and the calculations will be forwarded. The structural review will be completed and structural comments will be provided when the calculations are available. If you have any questions regarding the above comments, please contact Talat Abbasi (x222) for structural questions or Norm Hong (x224) for general questions at 925 / 226 -1320 between 8:00 A.M. to 5:00 P.M., M -F. [END OF COMMENTS] December 1, 2005 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 / 292 -3113 Email: sroberts @4240arch.com Re: Plan Review: Arral3elle at Vail Square - Revisions Address: 75 South Frontage Road Dear Mr. Roberts: TOWN OF VAIL SECOND REVIEW LP Job No.: 2050114.004 Linhart Petersen Powers Associates (LP has completed a second review of the following documents on behalf of the Town of Vail: Plans: Two (2) copies of sheets A004 through W405 (120 sheets) dated ( "issue 023 ") July 29, 2005 by 4240 Architecture, Inc.; sheets W600 through W604 (4 sheets) dated ( "issue 023 ") July 29, 2005 by Liss Engineering; sheets FA101 C and FP101 C dated ( "issue 023 ") July 29, 2005 by Rolf- Jensen & Associates, Inc. For reference: One (1) copy of approved plans for reference: Volume One (cover sheet through WP8), Volume Two (cover sheet through W604), Volume Three (cover sheet through T600.4), Volume Four (cover sheet through ID86201). 2. Sketches Revised sketches Drawing Number ASK0073 through ASK0081, dated November 4, 2005, by 4240 Architects. Structural Calculations: Two (2) copies of Supplemental Structural Engineering Calculations, dated November 22, 2005, by Monroe & Newell engineers, Inc. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our re -check comments follow on the attached list. Please submit an itemized response letter and three (3) sets of complete and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Talat Abbasi, PE Norman Hong ICBO /ICC /IRC Plans Examiner Architect Supervising Plan Review Engineer Senior Plans Examiner Senior Associate TAA/NH/WY p: \Vail2005 \2050114.004- pc2.doc (Bin 118) Enclosures Copy: Mr. Charlie Davis, Chief Building Official, Town of Vail: Fax: 970 / 479 -2452 ArraBelle at Vail Square - Revisions 75 South Frontage Road December 1, 2005 . Second Review - Vail, Colorado LP2A Job No.: 2050114.004 Page 2 The following comments, numbered per the original list, require further response and revision. Note that the format includes a restatement of the original comment followed by the new or clarifying recheck comment in a separate bolded and italicized paragraph. Re: Occupancy Groups: R -1, R -2, S -1, S -2, A -2, A -3, B, M Type of Construction: IB Stories: Seven and two garage levels Sprinklers: Yes Building Area (sq. ft.): 539,663 GENERAL COMMENTS: A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). ARCHITECTURAL COMMENTS: 4. Sheet SC1: Please indicate whether there were any Addendum 14 revisions on this sheet. 5. Sheet SC2: Please indicate whether there are any Addendum 14 revisions on this sheet. For the above - podium design elements shown on Sheets SC1 and SC2, please provide structural calculations for the design. STRUCTURAL COMMENTS: Please provide the following information regarding structural revisions to the plans and calculations: S1. First item: ArraBelle at Vail Square - Revisions Second Review - Vail, Colorado 75 South Frontage Road LP2A Job No.: 2050114.004 December 1, 2005 , Page 3 a. It indicates that at the upper Garage the double T -beams will span two bays instead of one bay. Where is it shown on plan? b. This item indicates that the pre -cast concrete cores were redesigned; provide the calculations for the same. Indicate the page number on which such calculations could be found, if the calculations are part of submitted package. C. Also the spa was redesigned, where are the calculations and details for the same. d. Spa pools were also relocated, resulting in framing modifications; clarify where the revised framing could be found. Second item: a. According to this item, steel base plate schedule was expanded; indicate the detail and sheet number on which this revised schedule could be found. Also provide calculations for various bearing situations. b. Indicate the sheet number on which Grand Stair was detailed. C. Indicate the sheet number on which the revised framing around elevator 17 was included. Indicate also the sheet number on which revised detailing could be found. Also provide calculations to check the adequacy of the details. Third item: a. The item indicates that structural framing was further developed resulting in various beam depth revisions, clarify where these revised beams could be found. Indicate the sheet number and provide calculations for the same. b. Also the roof beams have been revised, please indicate where these beams could be found, indicate the sheet number and provide calculations for the revised beams. Dewatering Revisions: a. Please clarify if the note was added on the plans. If you have any questions regarding the above comments, please contact Talat Abbasi (x222) for structural questions or Norm Hong (x224) for general questions at 925 / 226 -1320 between 8:00 A.M. to 5:00 P.M., M -F. [END OF COMMENTS] December 22, 20Q5 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 1292-3113 Email: sroberts @4240arch.com TOWN OF VAIL FIRST REVIEW LP Job No.: 2050114.005 Re: Plan Review: ArraBelle at Vail Square —ASI 30 Mechanical and Plumbing Revisions Address: 75 South Frontage Road Dear Mr. Roberts: Linhart Petersen Powers Associates (LP has completed a first review of the following documents on behalf of the Town of Vail: 1. Plans: Two (2) copies of revised plumbing and mechanical drawings ASI 30 dated October 20, 2005. Volume 2A: sheets A002.2A, M002.7 and M003. Volume 26: sheets A002.213, M310.OA through M310.)H, M310.1A through M310.21D, M31 1.A through M318.D, M400.2 through M400.5, M600.4 through M800.17. By 4240 Architects and Cator, Ruma and Associates. 2. Letter: One (1) copy letter outlining revisions, dated December 8, 2005, by 4240 Architects The 2003 International Building Code, 2003 International Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our comments follow on the attached list. Please submit an itemized response letter and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Jess Villar, P.E. Norman Hong ICBO /ICC /IRC Plans Examiner Architect Senior Plan Check Engineer Senior Plans Examiner JV /NH p: \Vail2005 \2050114.005pc1doc (Bin 118) Enclosures Copy: Mr. Charlie Davis, Chief Building Official, Town of Vail: Fax: 970 / 479 -2452 ArraBelle - F Vail Square - Revisions 75 Sout` ontage Road Decen. 2, 2005 , Re: Occupancy Groups: Type of Construction: Stories: Sprinklers: Building Area (sq. ft.): GENERAL COMMENTS: R -1, R -2, S -1, S -2, A -2, A -3, B, M IB Seven and two garage levels Yes 539,663 First Review - Vail, Colorado LP2A Job No.: 2050114.005 Page 2 A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). PLUMBING COMMENT; Gas piping system schematics had been changed. Please provide documentation to show that the 12" main gas piping is adequate in size for the loading provided. Include total loading and distance of the most remote outlet. Sheet M600.4, IFGC402.3. [END OF COMMENTS] December 22, 2005 Steve Roberts 4240 Architecture, Inc. 1621 Eighteenth Street, Suite 200 Denver, CO 80202 Fax: 303 / 292 -3113 Email: sroberts @4240arch.com Re: Plan Review: ArraBelle at Vail Square - Revisions Address: 75 South Frontage Road Dear Mr. Roberts: TOWN OF VAIL THIRD REVIEW LP Job No.: 2050114.004 Linhart Petersen Powers Associates (LP has completed a third review of the following documents on behalf of the Town of Vail: Plans: Two (2) copies of sheets A004 through W405 (120 sheets) dated ( "issue 023 ") July 29, 2005 by 4240 Architecture, Inc.; sheets W600 through W604 (4 sheets) dated ( "issue 023 ") July 29, 2005 by Liss Engineering; sheets FA101 C and FP101 C dated ( "issue 023 ") July 29, 2005 by Rolf- Jensen & Associates, Inc. For reference: One (1) copy of approved plans for reference: Volume One (cover sheet through WP8), Volume Two (cover sheet through W604), Volume Three (cover sheet through T600.4), Volume Four (cover sheet through ID86201). 2. Sketches Revised sketches Drawing Number ASK0073 through ASK0081, dated November 4, 2005, by 4240 Architects. Structural Calculations: Two (2) copies of Supplemental Structural Engineering Calculations, dated November 22, 2005, by Monroe & Newell engineers, Inc. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. Our re -check comments follow on the attached list. Please submit an itemized response letter and three (3) sets of complete and revised documents with all revisions clouded, directly to LP Sincerely, LINHART PETERSEN POWERS ASSOCIATES Talat Abbasi, PE ICBO /ICC /IRC Plans Examiner Supervising Plan Review Engineer Senior Associate Norman Hong Architect Senior Plans Examiner TAA/NH /WY p: \Vail2005 \2050114.004- pc3.doc (Bin 118) Enclosures Copy: Mr. Charlie Davis, Chief Building Official, Town of Vail: Fax: 970 / 479 -2452 4rraBelle at Vail Square - Revisions 75 South Frontage Road December 22, 2005 , - Third Review - Vail, Colorado LP2A Job No.: 2050114.004 Page 2 The following comments, numbered per the original list, require further response and revision. Note that the format includes a restatement of the original comments followed by the new or clarifying recheck comment in a separate bolded and italicized paragraph. Re: Occupancy Groups: R -1, R -2, S -1, S -2, A -2, A -3, B, M Type of Construction: IB Stories: Seven and two garage levels Sprinklers: Yes Building Area (sq. ft.): 539,663 GENERAL COMMENTS: A. The 2003 International Building Code, 2003 international Mechanical Code, 2003 International Plumbing Code, 2002 National Electrical Code, 2003 International Fire Code, 2003 International Energy Conservation Code and 2003 International Fuel Gas Piping Code were used as the basis of the review. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Further, amendments to plans shall be identified by "clouding" and "delta symbol ". Your complete and clear responses will expedite the re -check process and eventual approval of this project. Thank you for your assistance. C. For the final set of drawings, please be sure to have designer's "wet" stamp and signature on all sheets of plans and on covers of specifications and calculations. D. The following code comments reflect a review of building plans only. If site - related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Fire Department, Health, etc.). ARCHITECTURAL COMMENTS: 4. Sheet SC1: Please indicate whether there were any Addendum 14 revisions on this sheet. 5. Sheet SC2: Please indicate whether there are any Addendum 14 revisions on this sheet. Second Comment For the above - podium design elements shown on Sheets SC1 and SC2, please provide structural calculations for the design. Third Comment This plan check item was not addressed in the plan check response letter. Please provide response to this plan check comment. ArraBelle at Vail Square - Revisions 75 South Frontage Road December 22, 2005. STRUCTURAL COMMENTS: Third Review - Vail, Colorado LP2A Job No.: 2050114.004 Page 3 Please provide the following information regarding structural revisions to the plans and calculations: S1. First item: b. This item indicates that the pre -cast concrete cores were redesigned; provide the calculations for the same. Indicate the page number on which such calculations could be found, if the calculations are part of submitted package. Third Comment Plan check response stated that the "precast supplier provide stamped calculations for all of their products as part of their submittals. If required the General Contractor can provide copies of the precast calculations." Please provide the pre- cast calculations for our review. Also provide Engineer of Record's approval stamp on the submittals. If you have any questions regarding the above comments, please contact Talat Abbasi (x222) for structural questions or Norm Hong (x224) for general questions at 925 / 226 -1320 between 8:00 A.M. to 5:00 P.M., M -F. [END OF COMMENTS] Dater 14 September 2005 UPDATED Dec 22 2005 with ASl narrative To: Mr. Charlie Davis Mr. Norman Hong Chief Building Official Architect Building Safety.& Linhart Peterson Powers Inspection Services Associates�sict p� 8 v Town of Vail 6088 Sunol Blvd. 75 South Frontage Road Pleasanton, CA 94566 Vail, CO 81657 DEC 2 8 2005 CC: Dan Feeney T PETERSEN POWER °t ASSOCIATES F rom: Taal Resorts Steve Roberts via email ,u P File Subject: Revisions to documents since final permit review responses. Project ArraBelle at Vail Square Page, 1�Q,2 , r 4.24.0 Memorandum The following is a brief description of modifications to the documents which have occurred since permit review. As noted below, these changes fall into three broad categories: 1.) value engineering, 2.) further detailed structural, mechanical and electrical coordination, and 3.) programmatic changes to the spa. Structural Revisions: • The precast level framing at the upper garage was value engineered to allow the double tees to span 2 bays instead of the original 1 bay. The lower level basement walls at the south end of the project were value engineered to 8" thickness. The precast concrete cores were redesigned to provide cast in place concrete at the base for value engineering purposes. The spa was redesigned resulting in column relocations in that area and associated framing revisions for the floor above the spa. The spa pools were relocated resulting in framing modifications. • The steel base plate schedule was expanded to include all of the various bearing situations. The grand stair was further detailed. Further streetscape items were identified and detailed, which may or may not fall under this particular review. In response to value engineering, elevator 17 was relocated resulting in revised framing and detailing. Mechanical coordination with the structural framing was further developed resulting in various beam depth revisions and additional floor penetrations. Various roof dormers were revised or relocated on the roof framing plan resulting in detail framing revisions. Architectural Revisions: • The spa program was revised: 4 treatment rooms were deleted, resulting in a larger ski club locker area and revisions to the toilet room layouts. Spa locker rooms and the fitness center were 4240 Architecture Inc. chicago denver 1621 Eighteenth Street Suite 200 Denver, Colorado 80202 t 303 292 3388 f303 292 3113 w 4240architecture.com relocated, resulting in changes to the layout of various spa functions and adjoining retail spaces. Fixture counts remain the same except for one less sink in the men's spa locker room. A public vestibule east of elevator 10 was relocated to the west of the elevator. • Minor occupant load changes resulting from the spa program revision have been enumerated on the code summary sheet. Accessibility and egress diagrams for the building quadrant and the plaza have been revised. There is no gain or loss in gross building area, but minor changes to net areas have resulted. Dewatering Revisions: • Through value engineering, the elevations of piping in many areas were raised. Pipe routing was consolidated and simplified as a result. Dewatering along the garage access ramp and along the south side of the building was added. Mechanical, Electrical, Interiors, Fire Alarm, Fire Protection and Water Feature Revisions: Revisions on all sheets for these disciplines are in response to the spa plan revisions, Including: o Duct layouts, mechanical equipment and piping. o Plumbing plans and riser diagrams. o Power and lighting plans, and panel schedules. o Interior finish plans, elevations, and reflected ceiling plans. o Fire alarm devise locations and sprinkler layout. o Spa pool piping plans, sections, equipment and electrical diagrams. ASI 30 Plumbing revisions: 1. Changes to Condo levels include, moved plumbing fixtures, move fireplaces, pipe chase changes effecting plumbing stacks. Changed plans, details, Water risers and waste /vent isometrics. Gas piping changed as a result of fireplaces being moved. 2. Finalized the Spa area plumbing design and coordination with HVAC. 3. Water rooms changed requiring changes to plans, details and schematics. 4. Plaza Fire Place /pits were added. Made changes to gas piping. 5. Coordination with Contractors required adjustments to plans and associated details. 6. Finalized Elevator pit sump pump design. 7. Removed trench drain piping from drain at entry ramp on sheet M31O.OH. 8. Rerouted piping at Garage entry to accommodate warm spaces so as to avoid freezing. 9. Re- evaluated all systems and made adjustments accordingly RECEIVED DEC 2 8 2005 IJNHART PETERSEN POWERS ASSOCIATES 4240 Architecture Inc. chicago denver 1621 Eighteenth Street Suite 200 Denver, Colorado 90202 t 303 388 4820 17303 292 3113 w 4240architecture.com