HomeMy WebLinkAbout2019-04-22 PEC TO:Planning and Environmental Commission FROM:Community Development Department DATE:April 22, 2019 SUBJECT:A request for review of Minor Subdivision, pursuant to Section 13-4, Minor Subdivisions, Vail Town Code, to allow for removal of the platted building envelopes, located at 694/696 and 670 Forest Road /Lots 7 and 8, Block 1, Vail Village Filing 6, and setting forth details in regard thereto. (PEC19-0009) Applicant: LSC 27, LLC and Frances Biszantz, represented by Mauriello Planning Group Planner: Jonathan Spence I.SUMMARY The applicants,LSC 27, LLC and Frances Biszantz, represented by Mauriello Planning Group,arerequesting the review of Minor Subdivision, pursuant to Section 13-4, Minor Subdivisions, Vail Town Code, to allow for removal of the platted building envelopes, located at 694/696 and 670 Forest Road /Lots 7 and 8, Block 1, Vail Village Filing 6. Based upon staff’s review of the criteria outlined in Section VIIof this memorandum and the evidence and testimony presented, the Community Development Department recommends approvalof this application, subject to the findings in Section VIII of this memorandum. II.DESCRIPTION OF REQUEST The applicants, LSC 27, LLC and Frances Biszantz, represented by Mauriello Planning Group, are requesting the review of Minor Subdivision, pursuant to Section 13-4, Minor Subdivisions, Vail Town Code, to allow for removal of the platted building envelopes, located at 694/696 and 670 Forest Road. The graphic below showsthe existing properties with their corresponding building envelopes, established in 1997. Please see the background section for additional details on the lot configurations and building envelopes. III.BACKGROUND The subject properties were originally platted in 1964 while under Eagle County jurisdiction. The properties were annexed into the Town of Vail in 1966via Court Order resulting from the original Town of Vail election. A duplex residence was constructed on Lot 8 (694/696 Forest Road) in 1978 with a major remodel occurring in1987 and a residential addition in 1992. Asingle-family residence was constructed on Lot 7 (670 Forest Road) in 1969 with a garage being added to the residence in 1980. A major remodel of the home occurred in 1996. In the fall of 1996, an application for aminor subdivision of Lot 7 and Lot 8,which were at the time under common ownership,was receivedto adjustthe common lot lineto allow for additional GRFA for Lot 8.At the time,the planning staff felt that the inclusion of building envelopes was necessary to preserve the existing development pattern in the area. This recognized development pattern was for homes to be located near the front setback along the south side of Forest Road. The applicant’s were receptive to the placement of the building envelope on Lot 7 (eastern lot) but were not interested in the imposition of a building envelope on Lot 8. The requirement for building envelopes Town of VailPage 2 resulted in a staff recommendation of denial when the item was heard on December 16, 1996. At this meeting, the PEC members were receptive to staff’s approach, resulting in the applicant requesting a tabling to the January 13, 1997 meeting. Prior to this meeting the applicant agreed to the building envelopes and the application was subsequently th approved at the January 13meeting. The Vail Town Code (Code) did not require building envelopes at that time, nor today, to prohibit construction on steep slopes in the Primary Secondary (PS) Zone District. Although building envelopes are a legitimate tool for restricting development in sensitive areas, particularly withinnew subdivisions (Spraddle Creek), to utilize them piecemeal within an existing subdivision that creates inequities between lots appears both unnecessary and inconsistent with code. A vicinity map (Attachment A), applicants narrative (Attachment B), letter of support from adjacent neighbor( Attachment C), Proposed Final Plat (Attachment D)and the staff reports and minutes from the December 16, 1996 and January 13, 1997 PEC meetings (Attachment E) are attached for review. IV.APPLICABLE PLANNING DOCUMENTS Staff finds the following provisions of the Vail Town Code relevant to the review of this proposal: Title 12 –Zoning Regulations, Vail Town Code Chapter 6, Article D. Two Family Primary / Secondary Residential (PS) District (in part) 12-6D-1: PURPOSE: The two-family primary/secondary residential district is intended to provide sites for single-family residential uses or two-family residential uses in which one unit is a larger primary residence and the second unit is a smaller caretaker apartment, together with such public facilities as may appropriately be located in the same zone district. The two-family primary/secondary residential district is intended to ensure adequate light, air, privacy and open space for each dwelling,commensurate with single-family and two-family occupancy, and to maintain the desirable residential qualities of such sites by establishing appropriate site development standards. 12-6D-2: PERMITTED USES: The following uses shall be permitted: Employeehousing units, as further regulated by chapter 13 of this title. Single-family residential dwellings Two-family residential dwellings Town of VailPage 3 12-6D-5: LOT AREA AND SITE DIMENSIONS: The minimum lot or site area shall be fifteen thousand (15,000) square feet of buildable area, and each site shall have a minimum frontage of thirty feet (30’). Each site shall be of a size and shape capable of enclosing a square area, eight feet (80’) on each side, within its boundaries. 12-6D-6: SETBACKS: In the primary/secondary residential district, the minimum front setback shall be twenty feet (20’), the minimum side setback shall be fifteen feet (15’), and the minimum rear setback shall be fifteen feet (15’). 12-6D-8: DENSITY CONTROL: A.Dwelling Units: Not more than a total of two (2) dwelling units shall be permitted on each site with only one dwelling unit permitted on existing lots less than fourteen thousand (14,000) square feet. 1.Exception: Properties that meet all of the following three (3) conditions shall be permitteda total of two (2) dwelling units on existing lots less than fourteen thousand (14,000) square feet: a.The property was annexed into the town of Vail with two (2) existing dwelling units on a lot less than fourteen thousand (14,000) square feet. b.The property as of April 1, 2016, contained two (2) dwelling units on a lot less than fourteen thousand (14,000) square feet. c.At no time between the property’s annexation and April 1, 2016, did the property contain less than two (2) dwelling units. 2.Discontinuanceof Exception: If at any time any property as described above develops or redevelops with only one dwelling unit, this exception for the allowance of two (2) units shall no longer be valid for such property. Title 13 –Subdivision Regulations, Vail Town Code Chapter 1, General Provisions (in part) 13-1-2: PURPOSE: A.Statutory Authority: The subdivision regulations contained in this title have been prepared and enacted in accordance with Colorado Revised Statutes Town of VailPage 4 title 31, article 23, for the purpose of promoting the health, safety and welfare of the present and future inhabitants of the town. B.Goals: To these ends, these regulations are intended to protect the environment, to ensure efficient circulation, adequate improvements, sufficient open space and in general, to assist the orderly, efficient and integrated development of the town. These regulations also provide for the proper arrangement of streets and ensure proper distribution of population. The regulations also coordinate the need for public services with governmental improvement programs. Standards for design and construction of improvements are hereby set forth to ensure adequate and convenient traffic circulation, utilities, emergency access, drainage, recreation and light and air. Also intended is the improvement of land records and surveys, plans and plats and to safeguard the interests of the public and subdivider and provide consumer protection for the purchaser; and to regulate other matters as the town planning and environmental commission and town council may deem necessary in order to protect the best interests of the public. C.Specific Purposes: These regulations are further intended to serve the following specific purposes: 1.To inform each subdivider of the standards and criteria by which development proposals will be evaluated, and to provide information as to the type and extent of improvements required. 2.To provide for the subdivision of property in the future without conflict with development on adjacent land. 3.To protect and conserve the value of land throughout the municipality and the value of buildings and improvements on the land. 4.To ensure that subdivision of property is in compliance with the town’s zoning ordinance, to achieve a harmonious, convenient, workable relationship among land uses, consistent with town development objectives. 5.To guide public and private policy and action in order to provide adequate and efficient transportation, water, sewage, schools, parks, playgrounds, recreation, and other public requirements and facilities and generally to provide that public facilities will have sufficient capacity to serve the proposed subdivision. 6.To provide for accurate legal descriptions of newly subdivided land and to establish reasonable and desirable construction design standards and procedures. Town of VailPage 5 7.To prevent the pollution of air, streams and ponds, to assure adequacy of drainage facilities, to safeguard the water table and to encourage the wise use and management of natural resources throughout the town in order to preserve the integrity, stability and beauty of the community and the value of the land. 13-1-3: COMPLIANCE: A.General Prohibition: It is unlawful for any person, business, or corporation to violate any of the provisions of this chapter or to transfer, sell, lease or agree to sell or lease, any lot, tract, parcel, site, separate interest (including a leasehold interest), interest in common, condominium interest, timeshare estate, fractional fee, or timeshare license, or any other division within a subdivision within the town until such subdivision has been approved in writing by the administrator, planning and environmental commission and/or the council (whichever is applicable) and a plat thereof recorded in the office of the Eagle County clerk and recorder; provided, however, that a written agreement to sell or lease which is expressly conditioned upon full compliance by the seller with the subdivision regulations of the town within a specified period of time and which expressly recites the seller's failure to satisfy such condition within such period of time shall terminate the agreement and entitle the buyer to the prompt return of all consideration heretofore paid by the buyer under such agreement, shall not constitute a violation of this subsection. B.Prohibitive Conveyance: No lot or parcel of land, nor any interest therein, shall be transferred, conveyed, sold, subdivided or acquired either in whole or in part, so as to create a new nonconforming lot, or to avoid or circumvent or subvert any provision of this chapter. C.Responsibility: The owner, developer, buyer, or seller shall be fully responsible for all acts of agents or employees thereof that are committed in violation of the terms of this chapter. Chapter 2, Definitions (in part) SUBDIVISION OR SUBDIVIDED LAND: A.Meaning: 1.A tract of land which is divided into two (2) or more lots, tracts, parcels, sites, separate interests (including leasehold interests), interests in common, or other division for the purpose, whether immediate or future, of transfer of ownership, or for building or other development, or for street use by reference to such subdivision or recorded plat thereof; or Town of VailPage 6 2.A tract of land including land to be used for condominiums, timeshare units, or fractional fee club units; or 3.A house, condominium, apartment or other dwelling unit which is divided into two (2) or more separate interests through division of the fee or title thereto, whether by conveyance, license, lease, contract for sale or any other method of disposition. B.Exceptions:Unless the method of land disposition is adopted for the purpose of evading this definition, the term "subdivision" as defined herein shall not apply to any of the following divisions of land or interests in land: 1.The division of land by order of any courtin this state or by operation of law. 2.The division of land by a lien, mortgage, deed of trust or any other security instrument. 3.The division of land by a security or unit of interest in any investment trust regulated under the laws of this state or any other interest in an investment entity. 4.The division of land which creates an interest or interests in oil, gas or minerals which are now or hereafter severed from the surface ownership of real property. 5.The division of land by the acquisition of an interest in land in the name of a husband and wife or other persons in joint tenancy or as tenants in common and any such interest shall be deemed for purposes of this definition as only one interest; provided, however, that no agreement exists, either recorded or unrecorded, between the cotenants allowing for the use and occupancy of the property by one or more cotenants to the exclusion of one or more cotenants during any period, whether annually recurring or not if such agreement is in any way binding or effective upon any assignee or future owner of a fractional fee interest or if such agreement continues to be in any way binding or effective upon any cotenant for the sale of any interest in the property. 6.The division of land by reason of the dissolution ofa joint venture or business entity. C.Compliance:No subdivision shall be approved which includes elements not in conformance with the provisions of any applicable zoning ordinance or other ordinance of the town or law or regulations of the state. Town of VailPage 7 D.Major Subdivision:Any subdivision involving more than four (4) lots, or a subdivision proposal without all lots having frontage on a public or approved street, or with a request to extend municipal facilities in a significant manner, or a proposal which would negatively affect the natural environment as determined under section12-12-2, “Applicability”, of this code, or if the proposal would adversely affect the development of the remainder of the parcel or adjoining property. E.Minor Subdivision:Any subdivisioncontaining not more than four (4) lots fronting on an existing street, not involving any new street or road or the extension of municipal facilities and not adversely affecting the development of the remainder of the parcel or adjoining property. F.Single-FamilySubdivision:A subdivision of an existing lot, which is recognized by the town of Vail as a legally subdivided lot, and which shall contain a single-family or two-family dwelling. Each such dwelling shall be separated from any other dwelling by space on all sides. For zoning purposes, the lots created by a single-family subdivision shall be treated as one lot. Chapter 3, Section 4, Commission Review of Application; Criteria and Necessary Findings: 13-3-4:COMMISSION REVIEW OF APPLICATION; CRITERIA AND NECESSARY FINDINGS The planning and environmental commission shall conduct a public hearing on an application for a preliminary plan for subdivision. The planning and environmental commission shall consider the application, relevant additional materials, staff report and recommendations as well as any other comments or public information given at the hearing. The planning and environmental commission may discuss advisable changes to the proposed subdivision with the applicant. The burden of proof shall rest with the applicant to show that the application is in compliance with the intent and purposes of this chapter, the zoning ordinance and other pertinent regulations that the planning and environmental commission deems applicable. Due consideration shall be given to the recommendations made by public agencies, utility companies and other agencies consulted under subsection13-3-C of this chapter. A.Before recommending approval, approval with conditions or disapproval of the preliminary plan, the planning and environmental commission shall consider the following criteria with respect to the proposed subdivision: 1.The extent to which the proposed subdivision is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and Town of VailPage 8 2.The extentto which the proposed subdivision complies with all of the standards of this title, as well as, but not limited to, title 12, “Zoning Regulations", of this code, and other pertinent regulations that the planning and environmental commission deems applicable; and 3.The extentto which the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and 4.The extent of the effects on the future development of the surrounding area; and 5.The extent to which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or require duplication or premature extension of public facilities, or result in a "leapfrog" pattern of development; and 6.The extent to which the utility lines are sized to serve the planned ultimate population of the service area to avoid future land disruption to upgrade undersized lines; and 7.The extent to which the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole; and 8.The extent to which the proposed subdivision results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features; and 9.Such other factors and criteria as the commission and/or council deem applicable to the proposed subdivision. B.Necessary Findings: Before recommending and/or granting an approval of an application for a major subdivision, the planning and environmental commission shall make the following findings with respect to the proposed major subdivision: 1.That the subdivision is in compliance with the criteria listed in subsection A of this section. 2.That the subdivision is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town. Town of VailPage 9 3.That the subdivision is compatible with and suitable to adjacent uses and appropriate for the surrounding areas. 4.That thesubdivision promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. Chapter 4, Minor Subdivisions (in part) 13-4-2: PROCEDURE: The procedure for a minor subdivision shall be as follows: A.Submission Of Proposal; Waiver Of Requirements: The subdivider shall submit two (2) copies of the proposal following the requirements for a final plat in subsection13-3-6B of this title, with the provision that certain of these requirements may be waived by the administrator and/or the planning and environmental commission if determined not applicable to the project. B.PEC Public Hearing: Within thirty (30) days of receiving the complete and correct submittal for a minor subdivision, the planning and environmental commission shall hold a public hearing to consider the final plat. The administrator shall cause a copy of a notice of the time, place and general nature of the hearing and proposal to be published in a newspaper of general circulation in the town at least fifteen (15) days prior to said hearing. Also, adjacent property owners to the proposed subdivision shall be notified in writing at least seven (7) days prior to the public hearing. C.Review And Action On Plat: The planning and environmental commission shall review the plat and associated materials and shall approve, approve with modifications or disapprove the plat within twenty one (21) days of the first public hearing on the minor subdivision or the minor subdivision will be deemed approved. A longer time period for rendering a decision may be granted subject to mutual agreement between the planning and environmental commission and subdivider. The review shall be based on the criteria and necessary findings in section 13-3-4 of this title. D.Appeal: Within twenty (20) days the decision of the planning and environmental commission on the final plat shall be transmitted to the council by the staff. The council may call up the decision of the planning and environmental commission within twenty (20) days of the planning and environmental commission's action. If council appeals the planning and environmental commission decision, the council shall hear substantially the Town of VailPage 10 same presentation by the applicant as was heard at the planning and environmental commission hearing(s). The council shall have thirty (30) days to affirm, reverse, or affirm with modifications the planning and environmental commission decision, and the council shall conduct the appeal at a regularly scheduled council meeting. V.ZONING AND SITE ANALYSIS Addresses:670and 694/696 Forest Road Legal Descriptions:Vail VillageFiling 6, Block 1, Lot 7and Lot 8 Zoning:Two-Family Primary/Secondary Residential (PS) Land Use Plan Designations:Low Density Residential Current Land Uses:Single-Family/Two-FamilyResidences Geological Hazards:Steep Slopes > 40% View Corridor:None Development Allowed / ExistingProposedComplies? StandardRequired 694/696 Forest Road (Lot 8) 15,000 SF of 53,013SF53,013SF Site AreaNo Change Buildable Area Front (S): 20’*The existing structure Front:20’ Side (E): 15’conforms to the SetbacksSides:15’Building Envelopes Side (W): 15’applicable dimensional Rear: 15’ Rear (N): 15’standards. Density (DUs)Max. 22DUNo Change 670 Forest Road(Lot 7) 15,000 SF of 23,217SF23,217SF Site AreaNo Change Buildable Area Front (S): 20’*The existing structure Front –20’ Side (E): 15’conforms to the SetbacksSides –15’Building Envelopes Side (W): 15’applicable dimensional Rear –15’ Rear (N): 15’standards. Density (DUs)Max. 21 DUNo Change *Existing setback encroachments authorized through variances or provision allowing garage in front setbacks on recognized steep lots. VI.SURROUNDING LAND USES AND ZONING Existing Land Use:Zoning District: North:Low Density ResidentialTwo-Family Primary/Secondary Residential South:Ski Area (USFS)N/A (USFS) East:Low Density ResidentialTwo-Family Primary/Secondary Residential West:Low Density ResidentialTwo-Family Primary/Secondary Residential Town of VailPage 11 VII.REVIEW CRITERIA The following are review criteria for a minor subdivision, as outlined in Section 13-3-4, Commission Review of Application; Criteria and Necessary Findings, Vail Town Code: 1.The extent to which the proposed subdivision is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and Staff finds that the proposed subdivision to remove the previously established building envelopes is consistent with all applicable elements of the adopted goals, objectives, and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the town. Goal 1.3 of the Vail Land Use Plan states, “Thequality of development should be maintained and upgraded whenever possible.” If approved, the proposed subdivision willfacilitate a uniform treatment of properties in vicinity. Staff finds the proposed subdivision meets this criterion. 2.The extent to which the proposed subdivision complies with all of the standards of this title, as well as, but not limited to, title 12, “Zoning Regulations," of this code, and other pertinent regulations that the planning and environmental commission deems applicable; and Staff finds that the proposed subdivision is in compliance with all of the standards of Title 12, Zoning Regulations, Vail Town Code, and Title 13, Subdivision Regulations, Vail Town Code. As proposed, the two (2) development lots meet all development standards for the Two-Family Primary/Secondary (PS) District.The removal of the previously platted building envelopes will not effect the application of the Town’s development standards. All future development on the subject properties will be subject to allapplicable requirements of the Vail Town Code. Staff finds the proposed subdivision meets this criterion. 3.The extent to which the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and Staff finds that the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives. The removal of the previously platted building envelopes will not result in a relationship among land uses inconsistent with Town objectives. Staff finds the proposed subdivision meets this criterion. Town of VailPage 12 4.The extent of the effects on the future development of the surrounding area; and Staff finds that the proposed subdivision will have no negative impacts on the future development of the surrounding area. The removal of the previously platted building envelopes will result in a consistent regulatory framework for the Forest Road neighborhood. Staff finds the proposed subdivision meets this criterion. 5.The extentto which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or require duplication or premature extension of public facilities, or result in a "leapfrog" pattern of development; and Staff finds that the proposed subdivision will not cause any inefficiency in the delivery of public services and will not require duplication or premature extension of public services, and will not result in a leapfrog development pattern because the applicant is proposing a modification ofexisting platted lots already served by public facilities. Staff finds the proposed subdivision meets this criterion. 6.The extentto which the utility lines are sized to serve the planned ultimate population of the service area to avoid future land disruption to upgrade undersized lines; and Staff finds that the proposed subdivision is already served by appropriately sized utility lines, resulting in no future land disruptions to upgrade undersized lines. Staff finds the proposed subdivision meets this criterion. 7.The extentto which the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole; and Staff finds that the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole because there will be no negative impact to the community while facilitating the community’s goal to provide a consistent regulatory framework for alldevelopment within the Town. Staff finds the proposed subdivision meets this criterion. 8.The extent to which the proposed subdivision results in adverse or beneficial impacts on the natural environment, including, but not limited to, water Town of VailPage 13 quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features; and Staff finds that the proposed subdivision will not result in any adverse impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features.Although the removal of the building envelopes may result in future development on steep slopes, this development is not restricted within the applicable zone district. Staff finds the proposed subdivision meets this criterion. 9.Such other factors and criteria as the commission and/or council deem applicable to the proposed subdivision. VIII.STAFF RECOMMENDATION Based upon the review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented, the Community Development Department recommendsapproval of a final plat pursuant to Title 13, Chapter 4, Minor Subdivisions, Vail Town Code, to allow for removal of the platted building envelopes, located at 694/696 and 670 Forest Road /Lots 7 and 8, Block 1, Vail Village Filing 6, and setting forth details in regard thereto. (PEC19-0009). Should the Planning and Environmental Commission choose to approve this minor subdivision, the Community Development Department recommends the Planning and Environmental Commission pass the following motion: “The Planning and Environmental Commission approves the applicant’s request for a final plat, pursuant to Title 13, Chapter 4, Minor Subdivisions, Vail Town Code, to allow for removal of the platted building envelopes, located at 694/696 and670 Forest Road /Lots 7 and 8, Block 1, Vail Village Filing 6, and setting forth details in regard thereto.” Should the Planning and Environmental Commission choose to approve this minor subdivision, the Community Development Departments recommends the Planning and Environmental Commission makes the following findings: “Based upon a review of Section VII of the April 22, 2019staff memorandum to the Planning and Environmental Commission, and the evidence and testimony presented, the Planning and Environmental Commission finds: 1.That the subdivision is in compliance with the criteria listed in Section 13-3-4, Minor Subdivisions, Vail Town Code; and Town of VailPage 14 2.That the subdivision is consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town; 3.That the subdivision is compatible with and suitable to adjacent uses and appropriate for the surrounding areas; and 4.That the subdivision promotes the health, safety, morals, and general welfare of the town and promotes the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality.” IX.ATTACHMENTS A.Vicinity Map B.Applicant’s Narrative, March 2019 C.Letter of Support, Danita and Paul Ostling, April 4, 2019 D.ProposedPlatof Subdivision, prepared by Brent Biggs,Professional Land Surveyor, dated March 8, 2019 E.December 16, 1996 andJanuary 13, 1997 PEC staff reports and associated minutes Town of VailPage 15 From: Paul Ostling <paul.ostling@pauljostling.com> Sent: Thursday, April 4, 2019 2:11 PM To: Steve MacDonald <smacvail@gmail.com> Subject: Letter of Support for Our neighbors Planning and Environmental Commission Town of Vail 75 South Frontage Road Vail, Colorado 81657 Re: Subdivision Application for 696 and 670 Forest Road Dear Commissioners We are writing in support of the subdivision application for the properties located at 696 and 670 Forest Road. We are the owners of the duplex adjacent to the property; just to the west located at 706 Forest Road. We have owned 706A for more than 15 years. We love Forest Road, and just bought 706B with a plan to help the continuous evolution of the Lionshead side of Forest Road. We know our neighbors are likewise committed to this effort. We, like they, are prepared to make the investment to the future of our community. We are mutually committed to make the Town proud of our efforts. We have reviewed the application materials provided and believe that it makes sense from a fairness and equal treatment perspective that the building envelopes platted on these lots be removed and the owners be allowed to adhere to the setback requirements just as all other homes on Forest Road enjoy. Most of the homes within this subdivision have been granted setback variances at one time or another to allow a home to be easily accessed from Forest Road due to the steep slopes found on this street. We understand that is also the case here. We fully support our neighbor’s effort to remove these overly restrictive building envelopes and hope that the Commission will allow this to occur. Neighborliness is a fundamental component of developing our community. We sincerely hope you will approve of and support our efforts. Please call or email us if there are any questions. Sincerely, Danita and Paul Ostling TO:Planning and Environmental Commission FROM:Community Development Department DATE:April 22, 2019 SUBJECT:A request for the review of variances from Section 12-6D-6 Setbacks, Vail Town Code,and Section 14-10-4Architectural Projections, Decks, Balconies, Steps, Bay Windows, Etc., Vail Town Codein accordance with the provisions of Section 12-17-1, Variances, Vail Town Code, to allow for variances to the front setback and side setback to facilitate the redevelopment of both east and west units, located at 706 Forest Road Units A & B/Lot 9, Vail Village Filing 6, and setting forth details in regard thereto. (PEC19-0010) Applicant:Paul and Danita Ostling, represented by SRI Architects and Mauriello Planning Group Planner:Ashley Clark I.SUMMARY Paul and Danita Ostling, represented by SRI Architects and Mauriello Planning Group, arerequesting the review of a variance from Section 12-6D-6 Setbacks, Vail Town Code,and Section 14-10-4: Architectural Projections, Decks, Balconies, Steps, Bay Windows, Etc., Vail Town Codein accordance with the provisions of Section 12-17-1, Variances, Vail Town Code, to allow for variances to the front setback of 20 feet to facilitate the redevelopment ofboth east and west units, located at 706 Forest Road Units A & B/Lot 9, Vail Village Filing 6. Based upon staff’s review of the criteria outlined in Section VII of this memorandum, and the evidence and testimony presented, the Community Development Department recommends denialof this application, subject to the findings noticed in Section VIII of this memorandum. II.DESCRIPTION OF REQUEST The applicant is requesting the review of a variance from Section 12-6D-6: Setbacks and Section 14-10-4: Architectural Projections, Decks, Balconies, Steps, Bay Windows, Etc., Vail Town Code, in accordance with the provisions of Section 12-17-1 Variances, Vail Town Code, to allow for a variance from the front yard setback requirements at 706 Forest Road West and a variance from the front and side yard setback requirements at 706 Forest Road East. The applicant is proposing to demolishthe primary unitand rebuild a 4,189 GRFAunit, and to remodel the secondary unit with a total of 3,978 GRFA The variances requested are summarized below: Variance Request Summary* West Unit -Primary Unit(demo) Dimensional CriteriaRequiredProposed 1st Level-Entry Stairfront yard setback10'5.5' 2nd Level -Deckfront yard setback15'11.5' Rooffront yard setback16’2' East Unit -Secondary Unit(renovation) 1st Level -GRFAfront yard setback20'9.5' 1st Level –front entry front yard setback10’1’ stairway st 1Level-column front yard setback20’4.5’ features 2nd Level -GRFAfront yard setback20'9.5' 2nd Level -deckfront and side setback5’7.5' 3rd level -GRFAfront yard setback20'9.5' rooffront yard setback16’1/2' *A 20’setback required indicates a variance from 12-6D-6, any other requiredsetback indicates a variance from 1410-4 AVicinity Map(Attachment A), 1998 and 2000 Variance Record (Attachment B), Applicant’s Narrative (Attachment C), Plan Set (Attachment D) and a Letter of Support (Attachment E) are attached for review. III.BACKGROUND The parcelat 706 Forest Road was annexed into the Town of Vail by court order in August of 1966.Based on a staff report written in 1998, theexisting duplex was constructedat the north edge of thelotin 1980, at a time when the front yard setback requirement was 10’due to the steep slopes.The code subsequently changed and the duplex is therefore a legally nonconforming structure. A variance for the front yard setback was granted inJune of 1998. The variance allowed for the enclosure of an existing deck and did not extend the building footprint further into the 9’ setback.The PECplaced a condition on the grant of this variance that states, “Theapplicant shall maintain a limit of disturbance line as shown on the site plan. No building additions shall be allowed beyond this line in the future. This limit of disturbance Town of VailPage 2 and any associated variances will become obsolete if the duplex is demolished and rebuilt.” In March of 2000, another variance was granted. The new variance permitteda trash enclosure located underneath an existing deck. The side setback was decreased to 6’ from 15’. A variance was also granted foran entryway that did not extendpast the footprint of the existing building in the front yard setback. The PEC placed a condition on the grant of this variance that states, “a limit of disturbance be established at the rear of the unit and no development is to occur beyond this line in the future.” No additional variance applications have been pursued since 2000 for this property. IV.APPLICABLE PLANNING DOCUMENTS Staff finds that the following provisions of the Vail Town Code are relevant to the review of this proposal: Title 12 –Zoning Regulations, Vail Town Code Chapter 6, Article D, Two-Family Primary/Secondary Residential (PS) District (in part) 12-6D-1: PURPOSE: The two-family primary/secondary residential district is intended to provide sites for single-family residential uses or two-family residential uses in which one unit is a larger primary residence and the second unit is a smaller caretaker apartment, together with such public facilities as may appropriately be located in the same zone district. The two- family primary/secondary residential district is intended to ensure adequate light, air, privacy and open space for each dwelling, commensurate with single-family and two- family occupancy, and to maintain the desirable residential qualities of such sites by establishingappropriate site development standards. (Ord. 29(2005) §23: Ord. 30(1977) §2) 12-6D-6: SETBACKS: In the primary/secondary residential district, the minimum front setback shall be twenty feet (20'), the minimum side setback shall be fifteen feet (15'), and the minimum rear setback shall be fifteen feet (15'). (Ord. 50(1978) §2) Chapter 12-17, Variances (in part) 12-17-1: PURPOSE: A.Reasons for Seeking Variance: In order to prevent or to lessen such practical difficulties and unnecessary physical hardships inconsistent with the objectives of this title as would result from strict or literal interpretation and enforcement, variances from certain regulations may be granted. A practical difficulty or Town of VailPage 3 unnecessary physical hardship may result from the size, shape, or dimensions of a site or the location of existing structures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or from other physical limitations, street locations or conditions in the immediate vicinity.Cost or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. B.Development Standards Excepted: Variances may be granted only with respect to the development standards prescribed for each zone district, including lot area and site dimensions, setbacks, distances between buildings, height, density control, building bulk control, site coverage, usable open space, landscaping and site development, and parking and loading requirements;or with respect to the provisions of chapter 11 of this title, governing physical development on a site. C.Use Regulations Not Affected: The power to grant variances does not extend to the use regulations prescribed for each zone district because the flexibility necessary to avoid results inconsistent with the objectives of this title is provided by chapter 16, "Conditional Use Permits", and by section 12-3-7, “Amendment”, of this title. 12-17-5: PLANNING AND ENVIRONMENTAL COMMISSION ACTION: Within twenty (20) days of the closing of a public hearing on a variance application, the planning and environmental commission shall act on the application. The commission may approve the application as submitted or may approve the application subject to such modifications or conditions as it deems necessary to accomplish the purposes of this title, or the commission may deny the application. A variance may be revocable, may be granted for a limited time period, or may be granted subject to such other conditions as the commission may prescribe. 12-17-6: CRITERIA AND FINDINGS: A.Factors Enumerated: Before acting ona variance application, the planning and environmental commission shall consider the following factors with respect to the requested variance: 1.The relationship of the requested variance to other existing or potential uses and structures in the vicinity. 2.The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this title withoutgrant of special privilege. 3.The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. Town of VailPage 4 4.Such other factors and criteria as the commission deems applicable to the proposed variance. B.Necessary Findings: The planning and environmental commission shall make the following findings before granting a variance: 1.That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same zone district. 2.That the granting of the variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3.That the variance is warranted for one or more of the following reasons: a.The strict or literal interpretation and enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b.There are exceptional or extraordinary circumstances or conditions applicable to the site of the variance that do not generally apply to other properties in the same zone district. c.The strict or literal interpretation and enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same zone district. V.ZONING AND SITE ANALYSIS Address:706 Forest Road A and BLand Use Plan Designation:Low Legal Description:Vail Village Filing 6, Density Residential Current Land Use:Duplex Block 1, Lot 9 Zoning:Two-Family Primary/Secondary Geological Hazards:Steep Slopes Residential StandardAllowed / Required PSExistingProposed Site AreaMin. 14,000sq. ft.58496.7No Change Front –4’ Front –20’ Side(W) –3’See Variance Request 1 SetbacksSide –15’ Side(E) –4’Table above Rear –15’ Rear –>200’ Flat or Mansard Roof –30’ Height33’33’ Sloping Roof –33’ Density2 DUs2DUsNo change 1 Existing setbacks are a rough approximation based on the closest condition. Town of VailPage 5 8,167 sf** Max 8,167 sf GRFANA4,189 sf (primary) 4,189 sf (primary) 3,978 sf (secondary) 3,978 sf (secondary) Site Coverage20%/11,699 sf6.6%/3,866 sf7%, 4,119 sf Parking/Loading4 covered spacedNo change ,000 GRFA=3spaces LandscapingMin. 60% of site area or>60% VI.SURROUNDING LAND USES AND ZONING 706 Forest Road is situated in the middle of a Primary/Secondary Residential Zoning neighborhood.The underlying land-usefor the PS zoning district is Low-Density Residential. The map demonstrates general uniformity within this PS district. The lots on the south side of Forest Road are narrow and long. They also have steep slopes in common with one another. The properties on the north side of Forest Road are also narrow,but not as long and do not share steep slopes as a feature. The homes along both sides of the street are close to their front property lines.The homes on the south side are located towards the street due to the steep slopes toward the rear of the lots. 706 Forest Road Zoning Map Town of VailPage 6 VII. REVIEWCRITERIA The review criteria for a variance request are prescribed in Title 12, Chapter 17, Variances, Vail Town Code. 1.The relationship of the requested variance to other existing or potential uses and structures in the vicinity. While the proposed additions and projections will exacerbate existing nonconforming setbacks, relative to the overall size of the existing duplex and nonconforming nature, staff finds that the proposed additions will not have a detrimental impact to other existing or potential uses and structures in the vicinity. The direct abutter to the east at 696 Forest Road submitted a letter in support of the variance (Exhibit E). Prior to any final approval,the final design will need to receive approval from the Design Review Board. Therefore, staff findsthatthe proposed variances conformtothis criterion. 2.The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatmentamong sites in the vicinity, or to attain the objectives of this title without grant of special privilege. The proposed additions and projections will result in an exacerbationof the existing nonconforming setbacks.As discussed in Section VI, this lot is not unique among sites in the vicinity.The abutting properties share similar lot constraints, sizeand topography. Therefore, staff finds that there is not sufficient evidence or hardship unique to this lot to support that the grant of variances for redevelopment of this property. The grant of variances isnotnecessaryto achieve compatibility and uniformity of treatment among sites in the vicinity. Archived PECminutes indicate a desire to bring nonconforming decks and projections into conformance, as evidenced by conditions imposed both on the subject property,as well as propertieswithin the vicinitythat conditionconformance to the setback standards upon redevelopment. Avariance is not necessary to achieve uniform treatment among sites in the vicinity andthis proposal will result in a grant of a special privilege. Staff finds the proposed variance does not meet this criterion. 3.The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. Town of VailPage 7 The proposed variance will facilitate the redevelopment of an existing duplex and will not increase the density on the lot. Additional parking requirements will not be triggered. Therefore, the proposal is not expected toalterthepopulation; will not affect any existing transportation or traffic facilities, public facilities, or utilities; and will not affect public safety in comparison to existing conditions. Therefore, staff finds the proposed variance conformsto this criterion. 4.Such other factors and criteria as the commission deems applicable to the proposed variance. VIII.STAFF RECOMMENDATION Based upon the review of the criteria outlined in Section VIIof this memorandum and the evidence and testimony presented, the Community Development Department recommends the Planning and Environmental Commission denya variance from Section 12-6D-6 Setbacks, Vail Town Code, and Section 14-10-4 Architectural Projections, Decks, Balconies, Steps, Bay Windows, Etc., Vail Town Code in accordance with the provisions of Section 12-17-1, Variances, Vail Town Codeto allow for a variance to front-and side-yard setbacks to facilitate the redevelopment of an existing duplex, located at 706 Forest Road Units A & B/Lot 9, Vail Village Filing 6, Block 1, and setting forth details in regard thereto. Should the Planning and Environmental Commission choose to denythis variance request, the Community Development Department recommends the Commission pass the following motion: “The Planning and Environmental Commission deniesthe applicant’s request for a variance from Section 12-6D-6Setbacks, Vail Town Code, and 14-10-4Architectural Projections, Decks, Balconies, Steps, Bay Windows, Etc., Vail Town Code, in accordance with the provisions of Section 12-17-1, Variances, Vail Town Code, to allow for a variance to the required front and side setbacks as presentedto facilitate the redevelopment of atwo-family residence, located at 706 Forest Road Units A & B/Lot 9, Vail Village Filing 6, and setting forth details in regard thereto. Should the Planning and Environmental Commission choose to denythisvariance, the Community Development Department recommends the Commission make the following findings: “Based upon the review of the criteria outlined in Section VII of the staff memorandum to the Planning and Environmental Commission dated April 8, 2019, and the evidence and testimony presented, the Planning and Environmental Commission finds: Town of VailPage 8 1.The granting of this variancewillconstitute a granting of special privilege inconsistent with the limitations on other properties classified in the surrounding Primary/Secondary Residential (PS) District.; 2.The granting of these variances will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity; and 3.Thisvarianceisnot warrantedfor the following reasons: a.The strict literal interpretation or enforcement of the specified regulation will notresult in practical difficulty or unnecessary physical hardship inconsistent with the objectives of Title 12, Zoning Regulations, Vail Town Code; b.There are noexceptions or extraordinary circumstances or conditions applicable to the same site of the variancethat do not apply generally to other properties in the Primary/Secondary Residential (PS) District.”; and c.The strict or literal interpretation and enforcement of the specified regulation would notdeprive the applicant of privileges enjoyed by the owners of other properties in the Primary/Secondary Residential (PS) District.” IX.ATTACHMENTS A.Vicinity map B.1998 and 2000 Variance Record C.Applicant’s Narrative3/25/2019 D.Plan Set3/22/2019 E.Letter of Supportfrom 696 Forest Road 3/26/2019 Town of VailPage 9 DATEISSUE PROPOSED ROOF ABOVE PROPERTY LINE PROPOSED ROOF ABOVE " 6 - ' 7 DATEISSUE PROPOSED ROOF ABOVE PROPERTY LINE PROPOSED ROOF ABOVE DATEISSUE " 6 - ' 7 EDGE OF PROPOSED ROOF PROPERTY LINE DATEISSUE PROPERTY LINE DATEISSUE PROPOSED ROOF ABOVE PROPERTY LINE PROPOSED ROOF ABOVE " 6 - ' 7 DATEISSUE PROPOSED ROOF ABOVE PROPERTY LINE PROPOSED ROOF ABOVE DATEISSUE " 6 - ' 7 EDGE OF PROPOSED ROOF PROPERTY LINE DATEISSUE PROPERTY LINE TOWN OF VAIL, EAGLE COUNTY, COLORADO VAIL VILLAGE, SIXTH FILING (A PART OF) LOT 9, BLOCK 1 TOPOGRAPHIC MAP Dsjufsjb!gps!Sfwjfx;!!Wbsjbodf! Uif!dsjufsjb!gps!sfwjfx!pg!b!njops!tvcejwjtjpo!sfgfst!up!uif!dsjufsjb!qspwjefe!jo!Tfdujpo!24.4.5!Dpnnjttjpo!Sfwjfx!pg! Bqqmjdbujpo<!Dsjufsjb!boe!Ofdfttbsz!Gjoejoht/!!Uiftf!dsjufsjb!bsf!uif!tbnf!bt!uiptf!vtfe!up!sfwjfx!b!nbkps!tvcejwjtjpo-!tp! nboz!bsf!opu!bqqmjdbcmf!up!uif!qspqptfe!njops!tvcejwjtjpot/!!Uif!gpmmpxjoh!tfdujpo!qspwjeft!bo!bobmztjt!pg!uif!qspqptfe! njops!tvcejwjtjpo!xjui!uiftf!dsjufsjb;! 2/Uif!sfmbujpotijq!pg!uif!sfrvftufe!wbsjbodf!up!puifs!fyjtujoh!ps!qpufoujbm!vtft!boe!tusvduvsft!jo!uif!wjdjojuz/! Bqqmjdbou!Sftqpotf;!!! Uif!Xftu!Gpsftu!Spbe!ofjhicpsippe!jt!{pofe!Qsjnbsz0Tfdpoebsz-!xjui!bmm!mput!bmmpxfe!uxp!exfmmjoh!vojut!qmvt!b!uzqf!JJ! fnqmpzff!ipvtjoh!vjou/!!Mput!bmpoh!uif!vqijmm!tjef!pg!Xftu!Gpsftu!Spbe!hfofsbmmz!gpmmpx!b!tjnjmbs!efwfmpqnfou!qbuufso-! xjui!ipnft!mpdbufe!dmptf!up!uif!gspou!qspqfsuz!mjof/!!Uijt!jt!qsjnbsjmz!evf!up!uif!tuffq!boe!sfmbujwfmz!obsspx!mput/!!Uif! nbkpsjuz!pg!uiftf!mput!ibwf!sfdfjwfe!tpnf!efhsff!pg!tfucbdl!sfmjfg!evf!up!uijt!dpoejujpo/!!Cfdbvtf!jg!uijt-!uif!qspqptfe! wbsjbodf!jt!dpotjtufou!xjui!uif!vtft!boe!tusvduvsft-!cpui!fyjtujoh!boe!qpufoujbm-!jo!uif!wjdjojuz/!!Uif!tjuf!jt!bmtp!bekbdfou!up! Wbjm!Npvoubjo-!pxofe!cz!uif!VTGT/!!Uif!bekbdfou!qspqfsuz!jt!mpdbufe!jo!vojodpsqpsbufe!Fbhmf!Dpvouz!boe!{pofe! Sftpvsdf!Qsftfswbujpo/!!Uif!qspqptfe!gspou!tfucbdl!wbsjbodf!xjmm!ibwf!op!fggfdu!po!uif!tlj!sftpsu/!!! VTGT;!Wbjm!Npvoubjo Uif!Upxo!pg!Wbjm!\[pojoh!Nbq!joejdbuft!uibu!bmm!mput!bmpoh!Xftu!Gpsftu!Spbe!bsf!{pofe!Qsjnbsz0Tfdpoebsz/!!Uif! bekbdfou!qspqfsuz!up!uif!tpvui!jt!pxofe!cz!uif!VTGT-!{pofe!ÆSftpvsdf!QsftfswbujpoÇ!cz!Fbhmf!Dpvouz/ 3/Uif!efhsff!up!xijdi!sfmjfg!gspn!uif!tusjdu!ps!mjufsbm!joufsqsfubujpo!boe!fogpsdfnfou!pg!b!tqfdjÑfe!sfhvmbujpo!jt! ofdfttbsz!up!bdijfwf!dpnqbujcjmjuz!boe!vojgpsnjuz!pg!usfbunfou!bnpoh!tjuft!jo!uif!wjdjojuz-!ps!up!buubjo!uif! pckfdujwft!pg!uijt!ujumf!xjuipvu!hsbou!pg!tqfdjbm!qsjwjmfhf/! Bqqmjdbou!Sftqpotf;!!Ovnfspvt!wbsjbodft!ibwf!cffo!hsbout!up!ipnft!bmpoh!uif!vqijmm!tjef!pg!Xftu!Gpsftu!Spbe/!Uif! gpmmpxjoh!ubcmf!joejdbuft!fbdi!qspqfsuz!uibu!ibt!sfdfjwfe!b!wbsjbodf!boe!xibu!uif!wbsjbodf!xbt!hsboufe!gps/!!Uif! jogpsnbujpo!xbt!hbuifsfe!gspn!uif!Upxo!pg!Wbjm!HJT/!!Uif!cmvf!tubst!joejdbuf!xifsf!wbsjbodft!ibwf!cffo!hsboufe/! 8 BeesfttWbsjbodf!HsboufeEbuf 8:908:7!Gpsftu!Spbe!tjef!tfucbdl203703115 867!Gpsftu!Spbe gspou!boe!tjef!tfucbdl902302:95 827!Gpsftu!Spbe tjef!tfucbdl503602::4! 403702:9: 817!Gpsftu!Spbe!)tvckfdu!qspqfsuz*efdl!jo!tfucbdl-!gspou!tfucbdl402303111! 70802::9 7:707:5!Gpsftu!Spbe!gspou!boe!tjef!tfucbdl604202:98! 203402:89 781!Gpsftu!Spbe tjef!tfucbdl603702:91 697!Gpsftu!Spbe tjef!tfucbdl202302::3 Bt!joejdbufe!bcpwf-!nptu!pg!uif!ipnft!bmpoh!uif!vqijmm!tjef!pg!Xftu!Gpsftu!Spbe!ibwf!cffo!hsboufe!tfucbdl!wbsjbodft/!! Jo!bmm!pg!uiftf!dbtft-!uif!Qmboojoh!boe!Fowjsponfoubm!Dpnnjttjpo!gpvoe!uibu!uijt!dsjufsjb!ibe!cffo!nfu-!boe!uibu!hsboujoh! uiftf!wbsjbodft!xbt!opu!b!hsbou!pg!tqfdjbm!qsjwjmfhf!evf!up!uif!fyjtufodf!pg!tuffq!tmpqft!ps!bo!fyjtujoh!tusvduvsf!offejoh! up!cf!sfefwfmpqfe!cvu!mpdbufe!xjuijo!uif!tfucbdl/!!! 4/Uif!fggfdu!pg!uif!sfrvftufe!wbsjbodf!po!mjhiu!boe!bjs-!ejtusjcvujpo!pg!qpqvmbujpo-!usbotqpsubujpo!boe!usbgÑd! gbdjmjujft-!qvcmjd!gbdjmjujft!boe!vujmjujft-!boe!qvcmjd!tbgfuz! Bqqmjdbou!Sftqpotf;!!Evf!up!uif!obuvsf!pg!uijt!wbsjbodf-!uif!bcpwf!dsjufsjpo!jt!opu!ofdfttbsjmz!bqqmjdbcmf!up!uijt!sfrvftu/!! Uifsf!jt!op!dibohf!up!uif!bmmpxbcmf!efotjuz!pg!uif!qspqfsuz-!boe!uifsfgpsf!uifsf!jt!op!jodsfbtf!up!uif!jnqbdut!po! qpqvmbujpo-!usbotqpsubujpo-!vujmjujft-!boe!qvcmjd!tbgfuz/!!Bt!b!sftvmu-!uif!qspqptfe!wbsjbodf!dpnqmjft!xjui!uijt!dsjufsjpo/! 5/Tvdi!puifs!gbdupst!boe!dsjufsjb!bt!uif!dpnnjttjpo!effnt!bqqmjdbcmf!up!uif!qspqptfe!wbsjbodf/! Bqqmjdbou!Sftqpotf;!!Uif!bqqmjdbou!xjmm!beesftt!boz!beejujpobm!dpnnfout!bu!uif!Qmboojoh!boe!Fowjsponfoubm! Dpnnjttjpo!ifbsjoh/! 9 Bekbdfou!Qspqfsuz!Pxofst!Mjtu : Xftu!Tjef! Uif!xftu!tjef!jt!qspqptfe!up!cf!mbshfmz!jo!dpnqmjbodf!xjui!uif!tfucbdl!sfrvjsfnfout!pg!uif!Q0T!{pof!ejtusjdu/!!Uif!pomz! wbsjbodft!qspqptfe!up!uif!xftu!voju!bsf!up!bmmpx!uif!fousz!tubjsxbz!boe!tfdpoe!mfwfm!efdl!jo!uif!gspou!tfucbdl/!!Uif!fousz! tubjs!jt!qspqptfe!bu!6!gu/!gspn!uif!gspou!qspqfsuz!mjof/!!Cz!dpef!uijt!fodspbdinfou!xpvme!cf!mjnjufe!up!21!gu/!!Uif!qspqptfe! tfdpoe!mfwfm!efdl!xjmm!cf!bqqspyjnbufmz!22/6!gu!gspn!uif!qspqfsuz!mjof/!!Cz!dpef!uijt!fodspbdinfou!xpvme!cf!mjnjufe!up!b! 6!gu/!fodspbdinfou!ps!26!gu/!gspn!uif!qspqfsuz!mjof/!!Uif!dvssfou!tfdpoe!mfwfm!efdl!jt!dvssfoumz!8/9!gu/!gspn!uif!qspqfsuz! mjof-!b!hsfbufs!wbsjbodf!uibo!jt!cfjoh!tpvhiu/!!Uifsf!bsf!bmtp!bttpdjbufe!sppg!pwfsiboht!uibu!fodspbdi!joup!uif!gspou! tfucbdl/!!! Uif!qspqptfe!wbsjbodft!po!uif!xftu!tjef!bsf!up!bmmpx!gps!uif!gpmmpxjoh;! ¦Gjstu!Mfwfm;!!91!tr/!gu/!pg!gspou!fousz!tubjs!xijdi!xjmm!cf!6/6!gu/!gspn!uif!gspou!qspqfsuz!mjof<! ¦Tfdpoe!Mfwfm;!!97!tr/!gu/!pg!efdl!xijdi!xjmm!cf!22/6!gu!gspn!uif!gspou!qspqfsuz!mjof<!boe! ¦Sppg;!!sppg!pwfsiboh!xijdi!xjmm!cf!bqqspyjnbufmz!3!gu/!gspn!uif!qspqfsuz!mjof/! Bt!qbsu!pg!uif!qspqptbm!gps!uif!xftu!tjef-!uif!gpmmpxjoh!jt!sfnpwfe!gspn!uif!tfucbdl;! ¦Gjstu!Mfwfm;!!:7!tr/!gu/!pg!hbsbhf!boe!93!tr/!gu/!pg!HSGB!bsf!sfnpwfe!gspn!uif!gspou!tfucbdl<!boe! ¦Tfdpoe!Mfwfm;!!391!tr/!gu/!pg!HSGB!jt!sfnpwfe!gspn!uif!gspou!tfucbdl!boe!2:1!tr/!gu/!pg!efdl!jt!sfnpwfe!gspn!uif!gspou! boe!tjef!tfucbdl/! Po!uif!xftu!tjef-!op!HSGB!jt!qspqptfe!up!cf!mpdbufe!jo!uif!tfucbdlt!boe!uif!pomz!wbsjbodf!sfrvftufe!jt!up!bmmpx!gps!uif! fousz!tubjsxbz!boe!qpsujpot!pg!uif!tfdpoe!mfwfm!efdl-!bmpoh!xjui!bttpdjbufe!sppg!pwfsiboh!jo!uif!gspou!tfucbdl/!!! Uif!qspqptfe!fodspbdinfou!pg!uijt!efdl!jt!uif!mftt!uibo!uif!dvssfou!efdl!fodspbdinfou!uibu!fyjtut!po!uif!tusvduvsf! upebz!boe!bmmpxt!gps!b!npsf! vtfbcmf!efdl!boe!up!qspwjef!gps! bsdijufduvsbm!joufsftu!up!uif!gspou! gbdbef!pg!uif!tusvduvsf/!!Uif! qspqptfe!hbsbhf!jt!cfjoh!qvmmfe! cbdl!joup!ipnf!tp!uibu!uif! gppuqsjou!dpnqmjft!xjui!tfucbdlt-! uipvhi!uif!dpef!bmmpxt!uif! hbsbhf!up!ibwf!fodspbdi!joup!uif! tfucbdl!po!mput!xjui!tmpqft!jo! fydftt!pg!41&/!!Uif!qspqptfe! xftu!voju!ibt!mftt!fodspbdinfou! joup!uif!tfucbdlt!uibo!xibu! dvssfoumz!fyjtut!upebz!po!uif! qspqfsuz/!!Bmtp-!cfdbvtf!uif!fbtu! voju!jt!sfnbjojoh!jo!qmbdf-! qspwjejoh!b!efdl!bmpoh!uif!gspou! pg!uif!xftu!voju!ifmqt!ujf!uif!uxp! vojut!uphfuifs!boe!bqqfbs!npsf!bt! pof!bsdijufduvsbm!gpsn-!xijdi!jt! Qspqptfe!opsui!fmfwbujpo!pg!817!Gpsftu!Spbe/!!Uif!evqmfy!jt!nvdi!npsf!dpiftjwf! eftjsbcmf!gspn!b!eftjho!hvjefmjoft! uibo!uif!dvssfou!eftjho/!! qfstqfdujwf/! 5 Fbtu!Tjef! Cfdbvtf!uif!fbtu!tjef!xjmm!opu!cf!efnpmjtife!boe!sfcvjmu-!boe!jotufbe!jt!voefshpjoh!bo!beejujpo!boe!sfnpefm-!npsf!pg! uif!fyjtujoh!bqqspwfe!fodspbdinfout!xjmm!cf!nbjoubjofe/!!Uif!fbtu!dpsofs!pg!uif!voju!jt!qspqptfe!up!cf!fodmptfe!po! uisff!mfwfmt!pg!uif!cvjmejoh/!!Uijt!beejujpo!up!uif!cvjmejoh!nbjoubjot!uif!fyjtujoh-!bqqspwfe!tfucbdl!bmpoh!uif!gspou!pg!uif! tusvduvsf!boe!epft!opu!fyufoe!ibcjubcmf!bsfb!boz!gvsuifs!joup!uif!gspou!tfucbdl/!!Xijmf!uifsf!jt!beejujpobm!cvml!boe!nbtt! qspqptfe!jo!uif!gspou!tfucbdl-!uif!cvjmejoh!jt!opu!boz!dmptfs!up!uif!gspou!qspqfsuz!mjof/!!Uif!qspqptbm!jodmveft!tjhojÑdbou! vqhsbeft!up!uif!bsdijufduvsf/!!Gps!bsdijufduvsbm!rvbmjuz!qvsqptft!boe!up!jnqspwf!uif!pwfsbmm!mppl!pg!uif!cvjmejoh-!uifsf!bsf! uxp!dpmvno!gfbuvsft-!xijdi!ep!opu!dpoubjo!Òpps!bsfb-!bmtp!qspqptfe!up!fodspbdi!joup!uif!gspou!tfucbdl/! Uif!qspqptfe!wbsjbodft!po!uif!fbtu!tjef!bsf!up!bmmpx!gps!uif!gpmmpxjoh;! ¦Gjstu!Mfwfm;!!86!tr/!gu/!pg!HSGB!jo!uif!gspou!tfucbdl-!bqqspyjnbufmz!:/6!gu/!gspn!uif!gspou!qspqfsuz!mjof/!!Po!uijt!mfwfm-!uif! dvssfou!ipnf!jt!xjuijo!bqqspyjnbufmz!9!gu/!pg!uif!qspqfsuz!mjof-!uif!gspou!fousz!tubjsxbz!xijdi!xjmm!cf!2!gu/!gspn!uif!gspou! qspqfsuz!mjof-!boe!dpmvno!gfbuvsft!xijdi!xjmm!cf!5/9!gu/!gspn!uif!gspou!qspqfsuz!mjof<! ¦Tfdpoe!Mfwfm;!!86!tr/!gu/!pg!HSGB!jt!beefe!xjuijo!uif!gspou!tfucbdl-!bqqspyjnbufmz!:/6!gu/!gspn!uif!gspou!qspqfsuz!mjof/!! Po!uijt!mfwfm-!uif!dvssfou!ipnf!jt!xjuijo!bqqspyjnbufmz!9!gu/!pg!uif!qspqfsuz!mjof/!!Jo!beejujpo-!b!qpsujpo!pg!uif!efdl! fyufoet!8/6!gu/!joup!uif!gspou!boe!tjef!tfucbdl<!!! ¦Uijse!Mfwfm;!!84!tr/!gu/!pg!HSGB!jt!beefe!xjuijo!uif!gspou!tfucbdl-!bqqspyjnbufmz!:/6!gu/!gspn!uif!gspou!qspqfsuz!mjof/!!Po! uijt!mfwfm-!uif!dvssfou!ipnf!jt!xjuijo!bqqspyjnbufmz!5/6!gu/!gspn!uif!qspqfsuz!mjof<!boe!!! ¦Sppg;!!sppg!pwfsiboh!xjmm!cf!bqqspyjnbufmz!1/6!gu/!gspn!uif!gspou!qspqfsuz!mjof/! Bt!qbsu!pg!uif!qspqptbm!gps!uif!fbtu!tjef-!uif!gpmmpxjoh!jt!sfnpwfe!gspn!uif!tfucbdl;! ¦Gjstu!Mfwfm;!!Qbujp!boe!usbti!fodmptvsf!xjmm!cf!sfnpwfe!gspn!uif!gspou!tfucbdl<!boe! ¦Tfdpoe!Mfwfm;!!81!tr/!gu/!pg!HSGB!jt!sfnpwfe!gspn!uif!gspou!tfucbdl/! Uif!upubm!ofu!ofx!HSGB!qspqptfe!up!cf!mpdbufe!xjuijo!uif!gspou!tfucbdl!gps!uif!fbtu!voju!jt!bqqspyjnbufmz!88!tr/!gu/!!Jo! beejujpo-!uif!gspou!tubjsxbz!boe!dpmvnot-!bmpoh!xjui!uif!bttpdjbufe!sppg!pwfsiboh!bsf!mpdbufe!jo!uif!gspou!tfucbdl/!!! Dpotjefsbujpo!pg!uif!Foujsf!Evqmfy! Uif!\[pojoh!Sfhvmbujpot!mppl!bu!b!evqmfy!qspqfsuz!bt!b!tjohmf!foujuz!gps!uif!qvsqptf!pg!bqqmzjoh!sfhvmbujpot!)j/f-!tjuf! dpwfsbhf-!HSGB-!fud/*/!!Uif!tbnf!jt!usvf!xjui!uijt!tjuf/!!Uif!bobmztjt!bcpwf!xbt!qspwjefe!po!b!voju!cz!voju!cbtjt!cbtfe!po! uif!dpnqmjdbufe!obuvsf!pg!uif!bqqmjdbujpo/!!Dpotjefsjoh!uif!foujsf!qspqfsuz-!cfmpx!jt!uif!ofu!fggfdu!pg!bmm!pg!uif!dibohft! qspqptfe;! X!Tjef!Fyjtujoh!X!Tjef!Ofu!Dibohf!F!Tjef!Fyjtujoh!F!Tjef!Ofu!Dibohf!Upubm!Ofu!Dibohf! )tr/!gu/*)tr/!gu/*)tr/!gu/*)tr/!gu/*)tr/!gu/* Hbsbhf!Òpps!bsfb!jo!gspou! :7.:737:1.:7 tfucbdl HSGB!jo!gspou!tfucbdl 473.473:6188.396 Efdl-!qbujp-!ps!tubjs!jo!gspou!ps! 543.2:1358241.71 tjef!tfucbdl!)cfzpoe! bmmpxbcmf* Bt!joejdbufe!bcpwf-!uifsf!jt!hfofsbmmz!bo!pwfsbmm!sfevdujpo!pg!jnqbdu!xjuijo!uif!gspou!tfucbdl!boe!tjef!tfucbdl!xjui!uijt! bqqmjdbujpo-!uifsfcz!pwfsbmm!jnqspwjoh!dpnqmjbodf!xjui!uif!tfucbdl!sfrvjsfnfout/! 6 \[pojoh!Bobmztjt! Uif!{pojoh!bobmztjt!jt!qspwjefe!cfmpx!)uif!wbsjbodf!sfrvftu!jt!joejdbufe!jo!sfe*;! Mpu!:!\[pojoh!Bobmztjt Efwfmpqnfou!TuboebseFyjtujohBmmpxfeQspqptfe! Mpu!Bsfb 2/453:!bdsft!0!69-5:8!tr/!gu/Njojnvn!pg!26-111!tr/!gu/Op!dibohf Tfucbdlt 5!gu/!)gspou*!Qsjnbsz!voju!dboujmfwfs!31!gu/!gspou!5!gu/! 26!gu/!)xftu!tjef*!26!gu/!tjef!boe!sfbs26!gu/! 26/6!gu/!)fbtu!tjef*!26!gu/! ?311!gu/!)sfbs*?311!gu/ Ifjhiu 44!gu/41!gu/!)Òbu*!44!gu/ 44!gu/!)tmpqjoh* Efotjuz 3!vojut3!vojut!,!FIV3!vojut!)op!dibohf* HSGB+OB21-271!tr/!gu/!9-278!tr/!gu/! 7-1:7!!tr/!gu/!)qsjnbsz*!5-29:!tr/!gu/!)qsjnbsz*! 5-175!tr/!gu/!)tfdpoebsz*4-:89!tr/!gu/!)tfdpoebsz* Tjuf!Dpwfsbhf 7/7&!0!4-977!tr/!gu/31&!pg!tjuf!bsfb!0!22-7::!tr/!gu/8&!0!5-22:!tr/!gu/ Mboetdbqf!?71&!Njojnvn!pg!71&!0!42-918!tr/!gu/?71& Qbsljoh 5!fodmptfe-!beejujpobm!tvsgbdf!tqbdft!3!tqbdft!)=3-111!tr/!gu/*!Op!dibohf bwbjmbcmf4!tqbdft!)3-111.5-111!tr/!gu/*! 5!tqbdft!)5-111.6-611!tr/!gu/*! 6!tqbdft!)?6-611!tr/!gu/* 7 Jouspevdujpo! Uif!bqqmjdbout-!Qbvm!boe!Ebojub!Ptumjoh-!sfqsftfoufe!cz!TSJ!Bsdijufdut!boe!Nbvsjfmmp!Qmboojoh!Hspvq-!bsf!sfrvftujoh!b! wbsjbodf!bu!817!Gpsftu!Spbe!0!Mpu!:-!Cmpdl!2-!Wbjm!Wjmmbhf!Gjmjoh!7!up!bmmpx!gps!b!nbkps!sfnpefm!boe!beejujpo!up!uif!fyjtujoh! evqmfy/!!Uif!qspqptbm!jt!up!sfnpefm!uif!fbtu!ibmg!pg!uif!evqmfy-!xijmf!uif!xftu!voju!xjmm!cf!efnpmjtife!boe!sfcvjmu/!!Uif! sfrvftufe!wbsjbodft!bsf!gspn!Tfdujpo!23.7E.7;!Tfucbdlt!boe!Tfdujpo!25.21.5;!Bsdijufduvsbm!Qspkfdujpot-!Efdlt-!Cbmdpojft-! Tufqt-!Cbz!Xjoepxt-!Fud/!!! Ijtupsz!boe!Cbdlhspvoe!pg!uif!Qspqfsuz! Mpu!:!xbt!psjhjobmmz!qmbuufe!jo!2:75!voefs!Fbhmf!Dpvouz!kvsjtejdujpo-!boe!tvctfrvfoumz!boofyfe!joup!uif!Upxo!pg!Wbjm!jo! 2:77/!!Uif!evqmfy!xbt!psjhjobmmz!dpotusvdufe!jo!2:91/!!Uif!ipnf!xbt!dpotusvdufe!xjui!b!21!gu/!gspou!tfucbdl-!xijdi!xbt! bmmpxfe!voefs!uif!sfhvmbujpot!jo!fggfdu!bu!uif!ujnf!pg!dpotusvdujpo/!!Jo!uif!mbuf!2::1t-!uif!qsjnbsz!tjef!voefsxfou!b!nbkps! beejujpo-!boe!xbt!hsboufe!b!gspou!tfucbdl!wbsjbodf!cz!uif!Qmboojoh!boe!Fowjsponfoubm!Dpnnjttjpo!po!Kvof!9-!2::9/!!Jo! 3111-!uif!tfdpoebsz!tjef!voefsxfou!b!nbkps!beejujpo!xijdi!jodmvefe!gspou!boe!tjef!tfucbdl!wbsjbodft/!!Uif!evqmfy! pxofst!bu!uif!ujnf!eje!opu!hfu!bmpoh-!boe!uifsf!xfsf!nbkps!ejtbhsffnfout!cfuxffo!uif!pxofst-!xjui!zfbst!xifsf!uif! vojut!eje!opu!nbudi!boe!fbdi!bqqfbmjoh!uif!puifstÉ!bqqspwbmt/!!Uif!Ptumjoht!qvsdibtfe!uif!qsjnbsz!voju!jo!3114!boe!uif! tfdpoebsz!voju!jo!3129/!!Bt!b!sftvmu-!uif!eftjho!pg!uif!evqmfy!dbo!opx!cf!dpotjefsfe!jo!b!npsf!dpnqsfifotjwf!nboofs/!!! 3 Qspqptfe!Wbsjbodf! Cpui!vojut!pg!uif!fyjtujoh!tusvduvsf!bsf!mpdbufe!xjuijo!uif!gspou!boe!tjef!tfucbdlt/!!Uif!xftu!voju!jt!8/9!gu/!gspn!uif!gspou! qspqfsuz!mjof!boe!dvssfoumz!ibt!bqqspyjnbufmz!273!tr/!gu/!pg!HSGB!boe!bo!beejujpobm!:8!tr/!gu/!pg!hbsbhf!mpdbufe!jo!uif! gspou!tfucbdl/!!Uif!xftu!voju!bmtp!ibt!b!usbti!fodmptvsf!cfofbui!b!efdl!xijdi!jt!mpdbufe!xjuijo!uif!tjef!tfucbdl/!!Uif!fbtu! voju!jt!5/9!gu/!gspn!uif!gspou!qspqfsuz!mjof!boe!ibt!bqqspyjnbufmz!996!tr/!gu/!pg!HSGB!boe!bo!beejujpobm!451!tr/!gu/!pg!hbsbhf! mpdbufe!jo!uif!gspou!tfucbdl/!!Uif!fbtu!voju!bmtp!ibt!b!usbti!fodmptvsf!uibu!jt!mpdbufe!xjuijo!uif!gspou!boe!tjef!tfucbdl/!! Cpui!vojut!ibwf!efdlt!boe!qbujpt!uibu!fodspbdi!cfzpoe!uif!bmmpxbcmf!tfucbdlt!gps!efdlt!boe!qbujpt-!jo!beejujpo!up!sppg! pwfsiboht!uibu!fodspbdi!cfzpoe!uif!5!gu/!bmmpxfe!cz!dpef/!!Bmm!fodspbdinfout!joup!uif!tfucbdlt!ibwf!cffo!hsboufe!cz! uif!Upxo!pg!Wbjm!Qmboojoh!boe!Fowjsponfoubm!Dpnnjttjpo!uispvhi!uif!wbsjbodf!qspdftt/!!Cpui!vojut!dvssfoumz!ibwf! hbsbhft!mpdbufe!jo!uif!gspou!tfucbdl-!xijdi!jt!qfsnjuufe!cz!Tfdujpo!23.32.23;!Sftusjdujpot!jo!TqfdjÑd!\[poft!po!Fydfttjwf! Tmpqft/!!Pof!vojrvf!gfbuvsf!pg!uijt!qspqfsuz!jt!uif!ejtubodf!cfuxffo!uif!gspou!qspqfsuz!mjof!boe!uif!fehf!pg!spbexbz/!! Uifsf!jt!b!njojnvn!pg!27!gu/!cfuxffo!uif!spbe!boe!uif!qspqfsuz!mjof/!!Uijt!jt!opu!bmxbzt!uif!dbtf!jo!uif!Upxo!pg!Wbjm!boe!jo! uijt!jotubodf!ju!bttvsft!uibu!uif!evqmfy!jt!tfucbdl!b!njojnvn!pg!32!gu/!gspn!uif!fehf!pg!qbznfou/!!Voefs!uif!dvssfou! qspqptbm-!uif!fbtu!voju!xjmm!jodmvef!b!sfnpefm!boe!beejujpo-!xijmf!uif!xftu!voju!jt!cfjoh!efnpmjtife!boe!sfcvjmu/!!Uif! gpmmpxjoh!pvumjoft!uif!fyufou!pg!uif!sfrvftufe!wbsjbodft!gps!fbdi!ibmg!pg!uif!evqmfy;! Qpsujpo!pg!b!tvswfz!pg!uif!fyjtujoh!evqmfy!bu!817!Gpsftu!Spbe/!!Uif!tvswfz!joejdbuft!uif!fodspbdinfout!joup!uif!tfucbdlt-! xijdi!ibwf!cffo!bqqspwfe!uispvhi!wbsjbodft!hsboufe!cz!uif!Upxo!pg!Wbjm!Qmboojoh!boe!Fowjsponfoubm!Dpnnjttjpo/ 4 TO:Planning and Environmental Commission FROM:Community Development Department DATE:April 22, 2019 SUBJECT:A request for a recommendation to the Vail Town Council, pursuant to Section 12-3-7, Amendment, Vail Town Code, concerning an update to the Master Plan for the Public Works Department site, Unplatted, Section: 9 Township: 5 Range: 80 PCLIN N1/2NE1/4-N1/2NW1/4, located at 1309 Elkhorn Dr. and setting forth details in regard thereto. (PEC19-0006) Applicant:Town of Vail, represented by Victor Mark Donaldson Architects Planner: Chris Neubecker I.SUMMARY The applicant, Town of Vail, represented by Victor Mark Donaldson Architects, is requesting a public hearing with thePlanning and Environmental Commission(PEC) to presentthe update to the 1994 Public Works Facility Master Planthrough the adoption of the 2019 Public Works MasterPlan(Plan), and to request a recommendation to the Vail Town Council on adoption of the Plan. II.DESCRIPTION OF REQUEST The applicant, Town of Vail, represented by Victor Mark Donaldson Architects,is requesting a public hearingwith the Town of Vail PECto presentthe 2019 Public Works Master Plan, and to request a recommendation to the Vail Town Council on adoption of the Plan. The purpose of this public hearing is to accomplishthe following tasks: 1.Present the PEC with a formal review of the Plan and changes that have been made since the work session introduction of the Plan on April 25, 2019. 2.Obtain public input on the Planincluding any revisionsto the Planthat may besuggested by members of the community. 3.Determine any changes to the Plan that are recommended by the PEC for consideration by the Town Council. 4.To request a recommendation to the Vail Town Council on adoption of the Plan. III.BACKGROUND 1979 –Construction of the first Public Works Facility in the current location, basedon a programming study completed in 1976. Spring, 1993 –Town of Vail hired Morter Architects, RNL Design and Fleet Maintenance Consultants to complete a space needs analysis and master plan for the Public Works complex. January, 1994 –Completion of the Public WorksFacility Master Plan June –September, 2018: Interviews withkey stakeholders and consultants for the Public Works facility, including Public Works employees(Administration, Fleet, Streets, Facilities, Transit, Electrical, and Carpentry), residents of Buzzard Park, technical consultants(Traffic Engineers, Structural Engineers, Electrical System Engineers, and Mechanical System Engineers), Town Manager, Housing Director, IT Director, Chief of Police, Fire Chief, and the Vail Recreation District. Based on interviews with key stakeholders, Victor Mark Donaldson Architects developed a series of space needs and other functional needs to consider for the Public Works facility, which should be considered for the future of this site. The architects also documented existing conditions at the site, which includes Buzzard Parkhousing, Administration Building, Bus Garage, Fleet Maintenance, Greenhouse, Outdoor Storage areas, Snow Dump, and surrounding lands, including the hillside to the north of the existing buildings. The architects weighed the needs of the Town and the Public Works Department with opportunities and constraints of the site, including available land, topography, functionality, site access, solar orientation, zoning, Geologically Sensitive Areas (Rockfall and Debris Flow), utilities, and wildlife habitat. On March 25, 2019, during a work session, the Public Works Master Plan was introduced to the PEC. Victor Mark Donaldson Architects and Greg Hall, Public Works Director, presented the concept of the Plan, and the reasons for updatingthe Plan. IV.SUMMARY OF PLAN GOALS AND OBJECTIVES Purpose The purpose of the Public Works Master Plan is to provide a summary of the immediate needs and the long term use of the Public Works site within the Town of Vail. The Plan will provide a roadmap to guide future development of the site, while helping the Town to understand the possible costs and impacts of future development, and allowing for flexibility in implementation of the Plan. Main program elements of the Plan include: Employee Housing Public Works Administration Town of VailPage 2 Transit Fleet Maintenance Streets & Parks Facilities Maintenance Solar Energy Systems Snow Dump/Storage Site Parking Timeframe The timeframe for this Master Plan is 20 years. This duration allows for the Town to identify known needs and plan for reasonably anticipated needs for the future, within a horizon that canbe estimated or predicted at this time. Priorities forthe Plan Following are the priorities of the Public Works Master Plan: 1.Streets and Parks building expansion 2.Housing opportunities which may be available at the site 3.Solar energy opportunities to help offset Town of Vail energy consumption 4.N. Frontage Road turn-lane and improvements to support future expansion 5.Snow Dump/Storage expansion 6.Site utility upgrades V. APPLICABLE PLANNING DOCUMENTS Staff believes that the following provisions of the Town’s Comprehensive Plan are relevant to the review of this proposal. These documents identity the policy goals of the community and should be weighed against the proposed Master Plan to determine if the Plan is helping to advance the community’s priorities: VAIL TOWN COUNCIL ACTION PLAN 2018-2020 Our Mission-Grow a vibrant, diverse economy and community and preserve our surrounding natural environment, providing our citizens and guests with exceptional services and an abundance of premier recreational, cultural and educational opportunities. Community -Engage our community in honoring social, recreational,cultural, and educational values that will guide sustainablestrategies throughout our neighborhoods as the foundationof our town’s continued success. Ensure that ourcitizens are afforded the opportunity to live and thrive inour community. Housing as necessary infrastructure to our community Town of VailPage 3 Economy -Preserve our vibrant and diverse economy that keepsVail at the forefront of our resort competitors. Update long range strategic plans to enhancecompetitiveness of the Town of Vail Experience -Deliver on the promise, “Vail. Like nothing on earth”thatalso supports “preserving our natural environment”. Excellent municipal services Convenient, efficient, and safe parking andtransportation venues Sustainability -Balance our economic, environmental, and socialneedsto deliver a sustainable community. Strategic implementation of environmental programs Excellent stewardship by monitoring and maintaining our natural environment Climate action to achieve reduction of greenhouse gas emissions Reduce the environmental impact of transportation Explore and encourage sustainable building practices VAIL LAND USE PLAN CHAPTER II –LAND USE PLANGOALS / POLICIES: The goals articulated here reflect the desires of the citizenry as expressed through the series of public meetings that were held throughout the project. A set of initial goals were developed which were then substantially revised after different types of opinions were brought out in the second meeting. The goal statements were developed to reflect a general consensus once the public had had the opportunity to reflect on the concepts and ideas initially presented. The goal statements were then revised through the review process with the Task Force, the Planning and Environmental Commission and Town Council and now represent policy guidelines in the review process for new development proposals. These goal statements should be used in conjunction with the adopted Land Use Planmap, in the evaluation of any development proposal. The goal statements which are reflected in the design of the proposed Planare as follows: 1.General Growth / Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.2 The quality of the environment including air, water and other natural resources should be protected as the Town grows. Town of VailPage 4 1.3.The quality of development should be maintained and upgraded whenever possible. 1.6.Development proposals on the hillsides should be evaluated on a case by case basis. Limited development may be permitted for some low intensity uses in areas that are not highly visible from the Valley floor. New projects should be carefully controlled and developed with sensitivity to the environment. 1.10 Development of Town owned lands by the Town of Vail (other than parks and open space) may be permitted where no high hazards exist, if such development is for public use. 1.12.Vail should accommodate most of the additional growth in existing developed areas (infill areas). 5.Residential 5.1.Additional residential growth should continue to occur primarily in existing, platted areas and as appropriate in new areas where high hazards do not exist. 5.3.Affordable employee housing should be made available through private efforts, assisted by limited incentives, provided by the Town of Vail, with appropriate restrictions. 5.4.Residential growth should keep pace with the market place demands for a full range of housing types. 5.5 The existing employee housing base should be preserved and upgraded. Additional employee housing needs should be accommodated at varied sites throughout the community. 6.Community Services 6.1.Services should keep pace with increased growth. 6.2.The Town of Vail should play a role in future development through balancing growth with services. 6.3.Services should be adjusted to keep pace with the needs of peak periods. VAIL HOUSING 2027 Goal:The Town of Vail will acquire 1,000 additional resident housing unit deed restrictions by the year 2027. Town of VailPage 5 These new deed restrictions will be acquired for both existing homes as well as for homes that are newly constructed by both the Town of Vail and private sector developers. Vision:An Eye on the Future-We envision Vail as a diverse, resilient, inclusive, vibrant and sustainablemountain resort community where year-round residents are afforded the opportunity to live and thrive. We take a holistic approach to maintaining community, with continuous improvement to our social, environmental, and economic well being. We create housing solutions by recognizing and capitalizing on our unique position as North America’s premier international mountain resort community in order to provide the highest quality of service to our guests, attract citizens of excellence and foster their ability to live, work, and play in Vail throughout their lives. Our strategic solutions and actions result in the retention of existing homes, creation of new and diverse housing infrastructure, and collaboration with community partners. For Vail, no problem is insurmountable. With a consistent, community-driven purpose and an entrepreneurial spirit, Vail will lead the industry in innovative housing solutions for the 21st century. The Town is well positioned financially to undertake this significant challenge. Mission:Maintaining andSustaining Community-We create, provide, and retain high quality, affordable, and diverse housing opportunities for Vail residents to support a sustainable year round economy and build a vibrant, inclusive and resilient community. We do this through acquiring deed restrictions on homes so that our residents have a place to live in Vail Policy Statement: Resident Housing as Infrastructure -We acknowledge that the acquisition of deed restrictions on homes for Vail residents is critical to maintaining community. Therefore, we ensure an adequate supply and availability of homes for residents and recognize housing as infrastructure in the Town of Vail; a community support system not unlike roads, bridges, water and sewer systems, fire, police, and other services of the municipal government. 2009 ENVIRONMENTAL SUSTAINABILITY STRATEGIC PLAN The purpose of the Vail EnvironmentalSustainability Strategic Plan is to define a strategy that consists of measurable goals,objectives, and actions that will help the Towncoordinate efforts to achieve the environmentalvision of the community. Additionally, it willprovide a framework for the municipality,partners, businesses, full- and part-timeresidents, and guests to take action to reducethe Town of Vail’s impact on global climatechange and work toward a sustainable future. Energy Efficiency -Goal #2: Energy Efficiency: Reduce the Town of Vailmunicipal and community energy use by 20% below 2006levels by 2020, in order to effectively reduce the Town’scontribution to greenhouse gas emissions and impact onglobal climate change. Town of VailPage 6 Ecosystem Health -Goal 3: Ensure that the natural environment,specifically air and water quality, waterquantity, and use and habitat are maintainedto current or improved levels of biologicalhealth. Transportation–Goal #6 -Reduce the environmental impact oftransportationby supporting efforts within theEagle Valley to decrease total Vehicle MilesTraveled (VMT) by commuters and guests by 20%by 2020. VI.CRITERIA Amendments to the Public Works MasterPlanrequire a public hearing review process as outlined in Section 12-3-6 of the Vail Town Code. The role of the Planning and Environmental Commission is to hold a public hearing and make a recommendation to the Town Council on adoption of the Plan, or changes to the Plan that should be considered by the Town Councilbefore adoption. The Public Works Master Plan, an element of the Comprehensive Plan, will need to be adopted by the passage of a resolution by the Vail Town Council. Amendments to, or adoption of new elements of, the Comprehensive Planmust address the following review criteria: Adoption of a Master Plan The adoption of an amendment or update to a master plan needs to be in concert with the Town of Vail’s Comprehensive Plan. The adopted master plan shall support, strengthen, and further the development objectives of the town. To ensure consistency with these objectives, the following factors for consideration are applied. 1) How conditions have changed since the original plan was adopted; Staff finds that conditions have changed in the following manner since the adoption of the 1994 Public Works Facility Master Plan: Population growth in Vail and in Eagle County Increased summervisitation Increased staffing and vehicle fleet Increased and improvedtransit service Loss of spacealong roads to store snow Ever-increasing challenges with establishing workforce housing in Vail On-going redevelopment in Vail that has increased the density and intensity of use on many properties Significant declines in wildlife populations Increased energy use, including the implementation of snow melted roads and sidewalks Town of VailPage 7 Gore Creekis listed as an impaired stream by the Colorado Department of Public Health and Environment 2) How is the original Plan in error? The Public Works MasterPlan is not in error, but is 25years old. The Plan needs to be updatedto remain relevant and consistent with the changing conditions and goals of the Town and community.Many of the goals of the 1994 Plan have been implemented, and a plan for future growth is needed. 3) How the addition, deletion, or change to the plan are in concert with the master plan in general. The proposed Public Works MasterPlan willupdate an old master plan documentand set the stage for the needs of the Town over next 20 years. The new Plan addresses many of the same goals and issuesfaced by the Town in 1994, including the identification of programming needs and additional spacefor such needs, the desire to upgrade facilities, the goal of providing foradditional employee housing, andthe need to increase outdoor space for snow dumping. In addition to these goals, the proposed Plan incorporatesthe goal of planning for on-site solar energy production to offset some of the Town’s own energy use. Following are several ways in which the Plan update is in concert with the master plan, and the Town’s comprehensive plan: Land Use Adoption ofthis Plan helps to ensure that this advisoryland use document is updated and current. The Plan identifies a method and phasing plan for upgrading existing facilities and constructing new facilities. The proposed additional growth will be in an existingdeveloped area. The Plan helps to address environmental sustainability as a priority of the community. Environmental Sustainability The Plan identifies sites for future utility grade solar energy production to offset some Town’s energy use. The Plan recognizes the area to the north and east of the existing buildings as Bighorn sheep habitat, and seeks to balance the operational and functionality needs of the Town with the community’s desire to protect and enhance habitat for wildlife. Town of VailPage 8 Housing The Plan helps to advance the Town’s goal of acquiring 1,000 additional resident housing deed restrictions by the year 2027. The Plan identifies land and design options for potential new employee housing. The Plan helps the Town to provide housing to keep pace with the demands for a variety of housing types, and to upgrade the Town’s supply of employee housing. Transportation The Plan identifies space needs for maintenance of the Town’s existing and planned bus fleet toensure that residents, workers and visitors have access to an excellent public transit system. The Plan identifies infrastructure improvements, including turn lanes onN. Frontage Road and the widening of the I-70 underpass bridge at Elkhorn Drive upon the expansion of employeehousing within the Public Works site. Community Services The Plan will help the Town to improve its services including transit and streets maintenance. The additional facilities identified in the Plan will help the Town to keep pace with the needs of peak periods. Following are ways in which the Plan update is notin concert with the master plan, and the Town’s comprehensive plan: Additional housing is proposed in areas of High Severity Rockfall, which is discouraged in the Land Use Plan, Goal 5.1 VII.ENVIRONMENTAL IMPACTS The existing Public Works Department site contains a number of uses and products that have potential for negative impacts on the environment. These include fuel pumps, chemicals used for the Town’s fleet vehicles, storage of fertilizers and other landscaping chemicals, washing of vehicles, and the dumping of snow with the accompanyingsand and dirt. The residential uses at Buzzard Park and associated human activity, trash, lighting and trails have potential to impact existing wildlife in the vicinity. The Public Works Department site is within Bighorn sheep Summer Range, and is very close to, but not within, Bighorn sheep Winter Concentration area. Other wildlife species that use the area throughout the yearinclude black bear, boreal toad, elk, moose, mountain lion, mule deer, and terrestrial garter snake. There is, however, no viable alternative location within the Town to accommodate the needs of the community that are met by the Public Works Department. The current location is the only realistic location in town that can accommodate the unique public Town of VailPage 9 works service needs of the community. The location has worked well since the Town acquired this site in 1976. It is generally hidden from public view, with good access to public roads. Efforts have been made by the applicant to reduce and limit the impact on the natural environment, and to plan for new and expanded uses on portions of the site that would reduce impacts on the environment. The Master Plan calls for development in the already disturbed areas, including solar panels on slopes where vegetation has been disturbed and housing in areas with existing buildings or parking lots. More environmental studieswill be needed, and is planned, when specific development plans are submitted, including a review of impacts on wildlife. The expansion of housing on the east side of this site, closer to the Bighorn sheep Winter Concentration area, will need detailed study at the time of proposed development, and will need to balance the need for employee housing with potential environmental impacts. The proposed Master Plan also recommendsclosing of existing trails in winter, prohibiting dogs on site, and performing more detailed wildlife studies before installation of utility grade solar panels. VIII.STAFF RECOMMENDATION The Community Development Department finds that the proposed Public Works Master Plan helps to identify current space planning needs and a path for future growthof the Public Works Department, and also addresses many community goals, including the provision of employee housing and onsite solar energy production. The Plan can be improved with the following additional elements: Greater attention to utilities, includingany required improvementsto water supply lines, sewer capacity (including lift station capacity improvements) and water quality features. Identification of any changes in policiesor regulations that may be needed to achieve the goals of the Plan. This may include annexation of Town owned propertyin unincorporated Eagle County, and rezoning of the annexed property to match the General Use (GU) zoning for the remainder of the site. The Community Development Department finds that the Public Works Master Plan couldbe improved with the inclusion of additional detail. The Community Development Department requests that the Town of Vail Planning and Environmental Commission review the proposed Plan and provide feedback on any changes or additions that may be needed. Staff’s recommendation is based upon the review of the proposed amendments and the criteria outlined in Section VI of the memorandum, dated April 22, 2019 and the evidence and testimony presented throughout the public hearing process. More specifically, the staff believes the applicant has demonstrated that conditions have Town of VailPage 10 changed since the Plan was adopted and that the Public Works Master Plan, as proposed, is in concert with the adopted goals and objectives of the Comprehensive Plan in general. Should the Planning and Environmental Commission choose to forward a recommendation of approvalof the adoption of the Public Works Master Plan, staff recommends the Commission approve the following motion: “The Town of Vail Planning and Environmental Commission recommends that the Vail Town Council adopts the Public Works Master Plan(PEC19- 0006).The recommendation of approval is based upon the Commission’s review of the proposed Plan, as amended over the course of the public hearing process and the finding that the applicant has demonstrated to the satisfaction of the Commission that conditions have changed since the original adoption of the 1994 Public Works Facility Master Plan and that the requested additions, deletions, or changes to the Planare in concert with the adopted development objectives, as outlined in Section VIof the staff memorandum dated April 22, 2019.” IX.ATTACHMENTS A.Public Works Master Plan B.Appendix to Public Works Master Plan Town of VailPage 11 6.2 Town Interviews 1. Public Works Administration 2. Streets and Parks 3. Facilities Maintenance 4. Transit 5. Fleet Maintenance 6. Environmental 7. Housing 8. Information Sciences 9. Town Manager 10. Police 11. Fire 12. Recreational District 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUL 17, 2018 Public Works Administration Staff Interview Notes Interviewees: Greg Hall, Director Tom Kassmel, Town Engineer Susie Hervert, General Services Administrator Janeil Turnbull, Office Manager/Custodial Supervisor Sean Koenig, GIS Specialist By: Mark & Chris/VMDA RE: Master Plan Update Staff Interview Master Plan Update Priorities: st 1.Streets and Parks Building Expansion = 1 Priority 2.Frontage Road Turn-Lane and Improvements 3.Snow Dump Expansion and Site Utilities Upgrades Master Plan Discussion Items from Staff 1.Cold and Outdoor Yard Storage needs to be cleaned up and organized; Shop spaces are organized. 2.Inventory Control System is needed to avoid waste and expiration and for more efficiency. 3.Paper storage (old blue prints, etc.) are in the Bus Locker Room, all of which needs to stay as laser fiche (?). Is this correct? 4.John King could use storage for all the facilities (locations TBD). Please elaborate John. 5.Housing on Public Works Site - Parking is the limiting factor: a.Reconfiguration of future Housing Unit Plans needs to be more targeted and more flexible for seasonal and other types of employee profiles. b.Storage for Housing is needed. There are 54 units for Town Employees and dedicated storage is needed for Housing appliances, furniture and miscellaneous inventory, all in one place (needs to be removed from Vail Village Parking Structure), preferably on Public Works site. c.Some Housing is needed that is dog friendly, though a bit of a challenge due to Industrial Uses and wildlife there is little or no green space for dogs. d.Possible new Housing locations on Public Works Site (Note: Fire Station #1 was OK for Employee Housing - 6 units/3 Bath Rooms and Community Rooms): i.Move Administration to the back in favor of Housing ii.Some Seasonal Workers could be in the back iii.Room by myself- Community Rooms can be shared iv.Rental Price Points vary for the type and location of Housing Unit Types v.At the Administration Building (on top and behind) Housing here allows this building to be reconfigured. 6.Site Parking - Existing parking count TBD: a.On-Site parking for employees is critical. b.10 spaces are used by Golf Course when busy for Tournaments. c.Parking requirements for Employee Housing needs to be determined and designated. Each unit needs one space. d.After 5:00 pm there is lots of overflow parking. e.When Guests come to Administration Building for big meetings it consumes parking used by others on a normal basis. f.Two ADA Parking Spaces at surface lot of Buzzard Park. g.Parking in front of Administration Building is at the Property line (to back of curb); as the parking goes west, the distance from back of curb increases and may allow parking expansion south of the Bus Barn/Shops Building. h.More and more electric Vehicles charging upgrade entire electrical services for site. 7.Buzzard Park Snow Storage could be improved by eliminating some landscaping just to the East of the main large Conference room. Existing snow storage space is not adequate during larger winter storms. 8.Security cameras at intersection and at Buzzard Park Housing would be good to add. 9.Break Room at Shops Building needs expansion and improvements and to benefit entire PW Department : a.Does not function well b.Needs a Commercial Kitchen -1, 2 and 3 freestanding Ovens are used and need 3 Refrigerators, side by side and an Ice Machine. nd c.100 150 people at a time on the 2 Floor d.This is also used as Training and Seminar Rooms e.Remove large picnic tables in favor of more personal and group seating f.Need 70 lockers for 70 employees + daily check in/check-out g.Radio charging and storage is needed h.Kitchen Island should be dual purpose preparation space i.Ventilation needs complete overhaul j.Training Room, here k.Gathering place town functions l.Move John and Charlies offices away from Break Room, likely downstairs 10.Janitor Closet near Break Room and near Menoom needs to be enlarged Administration Building Comments 1.11 Staff Members in Winter and 15 Staff Members in Summer operate out of the Administration Building. rd 2.Lunch/Break Room needs to be reorganized so it can function as the 3 (overflow) Conference Room. 3.Configuration seems to work well -ptionist Traffic) 4.View from Front/Reception Desk would be nice to maintain. Too much travel occurs through the Front/Reception Desk and bothers workers; needs to be re-routed for efficient work spaces. 5.Lofted area is wasted and could go away. 6.Maintain and enhance daylight spaces. 7.Snowmelt stairs good as they are shallow. 8.Administration Conference Rooms: a.2-3 meetings per month are from non-Public Works Staff. b.The Main Conference Room is always booked but could function better with modifications (relocate base cabinets for additional seating + provide chair storage). c.The option for 2 Conference Rooms or a single Large Conference needs to remain. d.This room is good 90% of time, light board technology is important along with TV Screen, cork board, dry board, etc. e.North Conference Room has bad ventilation. f.Noise separation works between units is needed. g.Lunch Room gets used a lot (as well as occasional 3rd Conference Room. h.Could the counter in the meeting room fold up? i.Does the wipe board get used? Cork board dry erase ? TV monitors? j.An additional Rest Room is needed for larger meetings there are big meetings about 3 times a year. k.If green table is pushed out to line up with Kitchen, would create better function. 9.Administration Offices: a.PWs Offices should be on the same floor. b.The current Office Suite layout allows everyone to see one another. c.The Office Suites on the south side work well and should be maintained other than modifications noted. d.Maybe push Office Suites to south and park beneath. e.Generally Offices need space for 2 Monitors at each desk f.Tom office is bigger than he needs. g.Greg needs more Storage Space a 3-person Meeting Table within his office. h.Chad and Toddabout the right size. i.Leonard, Sean, and Molly too small: i.Leonard needs a more square office instead of narrow and long. ii.Sean needs more room for a large standing workspace. iii.Molly needs poster, banner, sculpture and miscellaneous storage on a frequent basis iv.Stand up desks needed with at least 2 Computer Monitors 10.Engineering and Interior Common Work Areas and Work Stations: a.Engineering Work Space needs improvements. b.Mail Room does not function well, needs to be more convenient and organized. c.The big table near Leonar Office is under-utilized. d.Remove wall between to Copy Room and Green Room to open up Floor Plan. e.Uniform storage, shirts need to be improved for storage and efficiency. f.Full length of copy room table is often used. g.Large table needed for opening up large plans + add workstation with computer. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 27, 2018 Public Works Staff Interviews Streets and Parks Department Interview Notes Interviewees: Charlie Turnbull, Hawkeye Flaherty, Hanna Sorenson, Blaine Palmer, Rick Gregory and Sam Sandoval By: Chris and Mark/VMDA RE: Master Plan Update Staff Interviews with Streets and Parks Department Priorities: The following are the top 3 priorities identified by Staff 1.Streets and Parks Building Expansion 2.Frontage Road Turn-Lane and Improvements 3.Snow Dump/Storage Expansion and Site Utility Upgrades Streets Staff Leaders: Charlie Turnbull, Street Superintendent Sam Sandoval Jim Hervert Hawkeye Flaherty Parks, Flowers and Mowing Staff Leaders: Rick Gregory, Mow Crew Hanna Sorenson, Flowers Blaine Palmer, Irrigation Overview of Streets and Parks Department 1.Streets reports the following general operations and needs: a. Streets manage all the Town Vehicles b.Need Flammable Cabinets + rolling equipment c.Need Pull-Through bays for larger equipment that is double and triple stacked and to avoid beating up the Walls and Shop Doors and blocks out Employee Parking d. e.Need area for torch to cut bolts and chains f.Shop needs their own dedicated welding area within their space g.Need a new home for secure Tools Cage with Room for Small Tools h.Moving Inventory back and forth causes 8 hours/Week in wasted time (need more storage) which at $40/HR x 400 Hours = $160,000/YR. 2.Parks reports the following general operations and needs: a.Overall the Parks area needs to double in size. b.Work Benches and Parts Storage areas are needed c.Need Landscape Office for 5 people with 2 computers with - 1 dedicated to Irrigation Systems d.More Tool Storage area is needed. e.Need Cabinets for Flammables and Chemicals. f.A new Hotsie is needed just inside OH Door. g.A Pull-Through Bay is needed. h.Need storage area for Valve Boxes and Tubing currently stored in Greenhouse. i.Currently have about 100 SF and will need 300-400 SF for Irrigation Parts Room. j.The Greenhouse size works for Landscape if currently shared storage is moved. k.An Asset Management Plan is needed with Input Plan for Job Work Orders. l.Staff needs to have designated work space. m.The existing Lunch Area needs expanding with more Kitchen space and needs to be -up. Also need Check-In & Check-Out Station and Lockers within this space. There are too many people in the Lunch Area for its size. n.Air Quality is very bad in the Lunch Area and gets diesel fumes leaked into the area. o.Gym Uses are requested for Transit, Administration and Housing and estimate about 200 users. Wellness Benefits will assist in Employee retention rate which is important with 305 full time employees and another 200 for seasonal workers. p.Would like to have Foosball, Pool Table, Computer Stations for work with 8-12 Cubicles q.Housing and Shops could be mutually exclusive - shining lights from Snow Dump could offend Housing in the Shops area. r.Administration needs more parking. Other General Staff Comments 1.More maintenance area with more doors is needed 2.Pieces of equipment are crowded out with too much S torage in Shops area 3.Hawkeye is -clear between Maintenance Bays 4.John King current list of all the vehicles 5.Extend the existing Employee Parking for 19 people 6.50 parking spaces are needed for Streets, Buses and Fleet Maintenance 7.Try pushing new Parking into the north hillside 8.The 3-Door Shed across from Greenhouse is used by everybody, mostly Streets 9.North Storage Bins are stuffed too deep and packed too much causing wasted time in moving inventory around 10.The 2 shorter Storage Bins are for trash bags 11.Another Storage Bin is full of Holiday lights for Rick beard 12.Two smaller Storage Bins are for Electrician 13.Need Cold Storage for Tires long items and Canopy Tents 14.Permanent spot for manure, cooked compost, topsoil, cooking compost and mulch. Compost must have access to ground and with Back-Hoe/Loader access. Cooking compost is double with a barricade of silo cinder 15.Impound lot needs to be greatly reduced into a non-strategic area and does not have to -. The (death) Jeep needs to stay in perpetuity. 16.50% more Snow Dump Area is needed to be wider and deeper for more snow cats and other machinery and to avoid Snow Dump at the power lines 17.Mini-Excavator is needed 18.Better Sweeper Clean-Out Area is needed as this is a daily event. They need water so all the debris comes out. The Clean-Out Area needs to be enclosed like the bus area . a.Bus Wash Bay works 6 hours a day b.This does not work to wash tractor trailer c.Wash daily one or two times a day 15 -20 minutes 4-6 hours a day d.How do you clean-out the collection system for this? The bus wash one is shoveled out by hand. Access clean-out with loader much like the vaults. 19.- removed. Blaine will now have a Part Room for Irrigation system parts. 20.Irrigation is about 12 x 8 Blaine 200-300 feet 21.Upstairs stuff goes to die, cannot be very safe it would be better to trash. 22.Extend snow dump to west. 23.Rick would like additional storage area of 80 SQ FT + one car which is a better way to store stuff so this should probably be increased to 120 to 140 SF. 24.Storage for mowers, weed whackers and things like that are stored for limited access to a more secure area. 25.One Irrigation Vehicle parks inside with all the other equipment around the Vehicle. Two Riding Mowers in Landscaping Double-Bay with pull through load and unload. It takes four days to mow and whip. 26.Shop Expansion will likely move Maintenance and remove items out of Greenhouse. 27.Hannah would be better off and Greenhouse could work for Winter Storage for her without rd 3 Party Storage. 28.Lighting in Shops is terrible for lumens foot candles, head lamps, etc. and needs upgrades for safety and close work. 29.Fleet Maintenance Bay Lighting is OK. 30.Also enhance Lighting in Public Works Bay. 31.Diesel Exhaust System in Shops needs to be refurbished. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 26, 2018 Public Works Staff Interviews Facilities Maintenance Department Interview Notes Interviewees: Randy Guzik, Facilities Maintenance Supervisor Adam Johnson, Electrical Supervisor Donald Gallegos, Master Carpenter By: Mark Donaldson/VMDA RE: Master Plan Update Staff Interviews with Building Maintenance Department General Maintenance Building Department Notes The Facilities Maintenance Department manages and maintains most Town of Vail properties (32+) along with snow melt maintenance with a Staff of 15-16 people. About 10 people work out of the -6 people work out of the Electrical and Carpentry Bays at Public Works. This group needs personal car parking for 12 each day as well as truck parking that could be 2 deep tandem parking on site. 1. Level 2, Southside Village Parking Structure Work Space is cramped with about 10 people and is short on actual Office area and Computer Stations. It is difficult for 10 people to work and interact efficiently in such small quarters. This Work Space also has vehicle parking within the Work Space at night due to ongoing vehicle parking shortages. With the above limitations and no expansion potential of this Work Space, some Staff will need to move to the Public Works site within a couple of years. Staff parking is also tight at Public Works. We will review the Village Parking Structure Work Space prior to finalizing this report. 2.The Public Works areas include the following and experience tight Staff parking on site: Carpentry currently occupies a full Bay with a partial mezzanine on a south bay with carpentry equipment, tools, building materials with Office Space behind the existing Landscape Bay as well as about half of another bay currently used for new outdoor furniture storage. Electrical currently occupies a full Bay with mezzanine on a north bay and has some outside storage for Street Light Poles and concrete bases. The office within the Bay is ample and organized for the on-site Staff. The balance of the Bay is also well-organized with clear and secure access to the inventory of Electrical parts, components and materials. Randy Guzik, Facilities Maintenance Supervisor 1.The Village location, though tight, allows good response time and access to Vail Village and other Town properties for maintenance and service work. However, about 3-4 years hence, Facilities Maintenance will need a new full Bay at Public Works for growth & operations. The following equipment and vehicles exist at this location: a.5 Trucks + need 1 new Truck b.Skidster c.Sweeper d.Sweeper e.Plumbing Supplies f.Drill Press g.Small Office with a single computer station used by 10 guys (more computers and less paper is needed) + need a new office for Randy/Supervisor h.Pumps, Motors, Piping, PVC and Wood Products i.Need their own Restroom within the Village Structure j.-lace to store the trailer) to deliver Sweeper to the new Parking Structure on the north frontage road due to no maintenance space being provided in the Parking Structure design. 2.Randy and about 9 other staff conduct their weekly staff meetings in the Village Parking Structure Breakroom. 2-3 of these staff members work night shifts. 3.Temporary storage and staging areas are needed frequently by various Public Works groups as they tend to poach and cross-store materials within one others areas when overflow storage and staging occurs. For example the new Lions Head Welcome Center furniture is now stored in part of the Bay next -all furniture, etc. in the Village Structure Bay. Similarly the old Greenhouse on the Public Works site has summer benches, filter barriers and other goods stored. It does seem that some The 20 year vision is there will be growth required for more buildings to maintain, more people, parking and equipment within the Department to meet those maintenance requirements. Adam Johnson, Electrical Supervisor 1.Adam and two other Staff members (Electrician and Helper) handle the current work load with 1 additional Electrical Staff member added in the foreseeable future for this north Electrical Bay at Public Works. This Bay with a partial mezzanine is deemed adequate due to organization and accessibility of parts and inventory. 2.Additional and organized Outdoor Cold Storage is needed for 60+ Light Fixture Heads, 60-80 Poles and 20-30 concrete bases, some of which currently take up valuable indoor area. The Poles should be stored horizontally on 3 outdoor storage racks with 5 racks high; the Fixture Heads should be stored on shelves and the concrete bases stored on grade along with other outside cold storage. Ideally this cold storage will be proximate to the north Electrical bay. 3.The outdoor storage bins do not work as well as a more accessible storage shed would be. 4.3 existing vehicles are stored/used on and off-site. 1 new Bucket Truck is needed to be used by Streets and for Building Maintenance to clean street light fixtures more often. Donald Gallegos, Master Carpenter 1.th side of Public Works a partial mezzanine above, all used for storage and various 10x10s, 12x12s, Plywood, boards, etc.) along with office and miscellaneous storage. 2.This work bay also houses a utility truck and seasonal vehicle stored indoors. 3.The existing ventilation within Carpentry should be maintained or enhanced for air quality. 4.Based on the need for a 2 table saws (1 for wood & 1 for aluminum), possible carpentry spray paint booth, sandblaster for signs and a new restroom it appears that 1.5 to 2 full bays may be needed to fully accommodate all operations and storage requirements. Facilities Maintenance Commentary on Public Works Wellness & Break Room 1.Common Wellness Center Needs: a.Would likely be used and hour before and/or after work shift by PW staff. b.Suggest 10-12 pieces of work out equipment including weights, treadmill, etc. c.Restroom 2.Common Break Room: a.Air Conditioning as well as improved ventilation b.Additional space for larger events (150-200 people) c.Larger more diverse Kitchen and possibly BBQ Grilles d.Serve as multi-purpose Commons Areas and Safety and other Programs, Conferences and seasonal staff meetings END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 6, 2018 Public Works Staff Interviews John A. King, Facilities Manager Interview Notes Interviewee: John King, Facilities Maintenance Manager By: Mark & Chris/VMDA RE: Master Plan Update Staff Interview 1.Master Plan Update Priorities: st a.Streets and Parks Building Expansion 1 Priority b.Frontage Road Turn Lane and Improvements c.Snow Dump/Storage Expansion and Site Utilities Upgrades 2. Interviewees: a.Facilities: 2 meetings (22 total with about 10-15 in Parking Structure) 1.John King, Facilities Manager (to be interviewed separately and last) 2.Randy Guzlik Building Maintenance Supervisor (Works in Parking Structure) 3.Adam Johnson Electrical Supervisor 4.Donald Gallegos Master Carpenter b.Streets & Parks/Flowers/Mowing: 1 Meeting (35 in winter & 55-60 in summer) A.Charlie Turnbull B.Sam Sandoval C.Hawkeye Flaherty signs this is not full time D.Hanna Sorensen - Flowers A.Rick Gregory Mow Crew B.Blaine Palmer Irrigation c.Fleet Maintenance: 1 Meeting (12 year round) A.Todd Scholl, Manager (soon to be Retired) B.Sean Heade, likely Manager successor C.Jeff Darnell, Parts, Shipping/Receiving d.Transit: 1 Meeting (50 summer 100 winter) A.Mike Rose Parking Supervisor Bus Breakroom B.Jordan Winters C.Ed Hanson Transit D.John Sheehan e.Administration (11 in winter 15 in summer) A.Greg Hall, Director Public Works B.Tom Kassmel, Town Engineer C.Susie Hervert, General Services Administrator D.Janeil Turnbull, Office Manager/Custodial Supervisor John King, Facilities Maintenance Manager Comments/Direction: 1.Second Level of Shops , Add Locker Room Upstairs keep these together. 2.Randy has himself, Adam Electrical Supervisor and Donald Master Carpenter 3.Training Room upstairs to be expanded for larger groups 4.Fleet Maintenance single Restroom with Urinal and Toilet - Streets guys use/need more 5.John manages Town of Vail facilities all over town Dobson, Golf Course, Gymnastic, Center, Park Restrooms, etc. 6.Randy manages most of the Buildings and has staff of about 10 people that operate out of the parking structure + 5-6 at Public Works. Their Staff Meetings occur in parking structure once a week 7.Donald needs more space and larger bay with planer and more room for storage of materials, etc. 8.Parking onsite at Village Parking and at Public Works is lacking how much more do you need? Parking plows outside blocks winter parking to some degree and should be alleviated in favor of protecting such Town assets indoors. 9.In theory the new space will accommodate all of street space projected needs 10.The old streets will become carpentry and landscape operations 11.John may prefer to be downstairs discuss further after all Staff Interviews 12.Could the upstairs be employee housing and relocate Break Room/Multi-Purpose area? Maybe upstairs over existing shops could be housing each of these add parking and places housing near industrial noise and light1. 13.Snow storage does not have a dual use. 14.Some of Streets is in the Bus Barn 15.Guess that Streets is 120 x 60 = 7,200 SF expanded to about 10,000 SF keep circulation at back of building. 16.Pushing back Building toward the mountain? 17.Walking lanes inside Streets could be larger for egress corridors. 18.Foot Prints behind Admin Building Solar + Employee Housing 19.Electrical or Sign Shop could go somewhere else; Streets facilities need to stay on site. 20.Fleet Break Room by themselves 21.Transit Break Room by themselves Transit Office mostly they do not work out of here. This space is mostly ok. 22.Buses go out in waves Goes 4 -6 each east to west 23.Driver, when shift is over, the driver cleans and washes it and puts is away for the night. Alternately they switch drivers with the next person. 24.100 Cars/Day drive into Public Works today. 25.About half the Buzzard Park residents work on site. 26.Target Residents for additional housing on site would be for seasonal workers Bus Drivers and Landscape. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 28, 2018 Public Works Staff Interviews Transit Department Interview Notes Interviewees: Mike Rose, Transportation Manager Jordan Winters, Bus Supervisor By: Mark/VMDA RE: Master Plan Update Staff Interviews with Transit Department General Transit Department Notes - today (2 of which are temporary). The Buses will grow by 5 or 6 Buses to become 40+ by the best estimate and includes in-town and outlying routes. The outlying Bus Routes operate with 3 Buses in 10 minute loops. Currently Electric Buses are used on the shorter in-town routes and the Diesel Buses are used for the outlying routes. Transit needs about 10 additional parking spaces for employees on this site. A current challenge within Transit area is the Streets Department storing End Dumps, Blades, Snow Removal Equipment in 3 Bays which is intended for Transit Storage of 6 Buses, which should then be sufficient for the Transit Department. 1.Bus charging overnight will be needed for 12 Buses and on up to 40+ Buses as e-Buses overtake the Diesel fuel Buses. 2.The Heating System in the Bus Bays does not provide adequate heat and should be studied along with energy conservation efforts for loss of Bus Bay heat when large overhead doors are open. See narrative directly below. 3.Possible quick-action, vinyl overhead doors with vinyl windows could be installed at Bus Bays and at Wash Bay/Service areas to keep environmental heat in the Bus Bays & Vacuum/Service areas (in front of Wash Bay). The existing sectional overhead doors would be retained for security and opened in the morning and closed at night. During the work day, the vinyl doors would operate on a electric eye to open and close rapidly when a vehicle approaches and/or departs from one of these bays. 4.The open wall areas in and around the Vacuum/Service areas before the Wash Bay should be fully enclosed to allow more efficient usage and to protect from winter elements. 5.Due to Compressed Air Braking Systems for the Buses that are slow to start in cold weather, they run the Diesel Bus engines indoors with exhaust systems piped to the exterior without tempered make-up air. This causes major heat loss from the Bus Bays as well as excess diesel fuel consumption. A large air compressor is proposed to be on a timer overnight to pre-pressurize the diesel brakes to reduce fuel consumption, reduce the indoor idle time and to reduce heat loss from Bus Bays in concert with possible quick-acting vinyl overhead doors. 6.The overall notion of Transit is to reduce their carbon footprint in as many logical ways that can demonstrate a reasonable and efficient payback period. 7.The Fueling Station at the east end of the Bus Bays is shared with Fleet Maintenance and all Public Works vehicles and including Police and Fire Departments. A DEF (Diesel Exhaust Fuel) Fueling Station is needed to operate in concert with the other fuel types. The Fueling Station needs better lighting and more efficiency to serve vehicles faster at peak hours of fueling. Either more fuel storage or more frequent fuel deliveries will be needed in the future. 8.A storage area is needed for bulk cleaning supplies. 9. down over the south-facing overhead doors causing ice formations at door thresholds as well as ongoing snow removal maintenance and ice fall hazards. This will be studied along with expansion concepts. 10.Shop Security: There are too many unauthorized personnel who have access to the valuable tools, parts, etc. within the Transit Department. Cameras are needed along with a prioritized keying system for specific areas where some personnel are working alone at night. 11. It was noted that 5-more Bus turning area from departing Buses heading out the south doors is needed which could further impact parking. To that end it was observed that a few feet could be gained on the south edge of the property in enough areas to accommodate more Bus turning as well as additional employee parking. This could include 3- walls to expand the surface areas along a lot of the south side of the property. 12.Mike offered a planning concept to build behind the length of the Bus & Fleet Maintenance Bays to allow most or all of the requisite equipment, buses and other vehicles to be covered in winter conditions while each Department functions normally with the expansion. It provides for driving lanes within the new structure as well as a one-way drive behind the new structure from west to east to complete the driving lane around the property free-flowing and efficient. This will be explored in our Master Plan Concepts. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 27, 2018 Public Works Staff Interviews Fleet Maintenance Department Interview Notes Interviewees: Jeff Darnell, Building Maintenance Supervisor Fleet Manager Todd Scholl, Building Maintenance Supervisor Fleet Manager (Retired) Sean Heade, Parts, Shipping & Receiving Purchasing & Administrative Specialist By: Mark & Chris/VMDA RE: Master Plan Update Staff Interviews with Fleet Maintenance Department General Fleet Maintenance Department Notes The Fleet Maintenance Department manages and maintains all Town of Vail Buses, vehicles and equipment with a Staff of about 12 people and need about 12 parking spaces each day along with requisite truck loading and loading for the volume of receiving from freight carriers and redistribution to other departments around Town. They manage their parts purchasing and warehousing along with managing the Shipping & Receiving for most if not all Town Departments, which may . The Parts & Shipping areas include Administration/Office for the Department which is adequate. 5:00am to 5:30pm. They no longer perform engine rebuilds (they now pull and replace engines) but do all other Mechanical Work and Maintenance as well as Body Work, which has maintains a back-log of work scheduled. These Maintenance services for the Town vehicles are expected to be quick. 1.The town-wide Shipping & Receiving has been a default operation due to convenience and needs an additional 150-200 SF so as to allow the Fleet Maintenance Parts Inventory to remain secure and available to only authorized Fleet Maintenance personnel. These shipped goods received and redistributed are town-wide and wide ranging in size and volume and include janitorial supplies along with other high volume dispensable products for the Town. According to Greg Hall consideration shou 2.The notion for expansion and inclusion of the items noted above is proposed to be by knocking out the non-bearing CMU wall between Parts & Streets and expand to the west. Removal of stairs in this area would be acceptable. 3.The Fleet Wash Bay (in front of the Vehicle Wash Bay also includes a Welding Bay. 4.Buses are brought in at night for maintenance for a quick turn-around. 5.No additional -ded by Fleet Maintenance; existing is adequate. 6.Improved lighting is needed in the existing Wash Bay; the Hotsie is still used along with Storage by Public Works. 7.Their single existing Restroom (lavatory & toilet) is overused as it currently includes use by the nd Streets guys. A 2 Unisex Restroom is needed adjacent to the existing that includes lavatory, toilet and urinal to mitigate the current overuse. Fleet Maintenance Lockers are adequate. The male/female ratio is about 10:1. Showers do not get used so are not needed for consideration. Create a new janitorial area with water to the west of locker room as part of parts room expansion to make room for new bathroom. 8.Space and accommodation for additional Bulk Oil Storage is needed beyond the existing single 250 gallon & two 125 gallon tanks. This will require plumbing of 5 new overhead hose reels per bulk tank. 9.A single new Parallelogram Lift (about $100,000 plus installation) is needed (to lift Fire Trucks) in addition to the 2 existing lifts. 10.As e-Buses are planned for arrival in about 2 years new Electric Charges will be needed in the Maintenance Bays. A new Generator (440A, 3-Phase, 100 Amps per charge) will also be needed to charge Buses when Holy Cross Electric experiences power outages and possible blackouts, from time to time. future operations, equipment, training, etc. 11.The Fleet Maintenance Break Room is independent of the larger Break Room within the facility and is in need of a new refrigerator/freezer and a bit of reorganizing for more efficient use throughout the work days. 12.Fleet Maintenance does not see the need for a Work Out/Wellness Area for their Staff. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 JUN 26, 2018 Public Works Staff Interviews Kristen Bertuglia, Environmental Sustainability Manager Interview Notes Interviewee: Kristen Bertuglia, Environmental Sustainability Manager By: Mark & Chris/VMDA RE: Master Plan Update Staff Interview General Discussion The Public Works Department along with the Town plans to include sustainability improvements and upgrades in concert with the 20 Year Master Plan Update for the Public Works Department. Kristen and her staff including Mark Hoblitzell (who wrote grant for Buses and electric battery storage locations) and Peter Wadden (storm water quality control/filters) are available to assist and consult with our Master Plan Update Team regarding community solar generated power, storm water quality control and other sustainability options for the Public Works site. This assistance includes introduction to and collaboration with energy vendors, community system designers and funding mechanisms including Holy Cross Electric Association to join the Team. Discussion of Current Sustainability Options: Kristen shared the results of the Town Event Truck that has been outfitted with a 2.5 KW (2 panels) system, which can produce 2 KW/Hour for each panel. 1.Put excess Electric Power into the Grid to reduce carbon emissions 2.Battery Bank on site (Yellowstone Park Service Buffalo Ranch is a good example of large battery bank storage in remote area.) Battery Banks can shave the peak usage loads for a 24 hour cycle, though the batteries themselves may be difficult to procure. Battery back-up banks are essential for buses particularly when power outages occur. 3.Bus Kilowatts per space needs to be developed by vendors/suppliers 4.New Flyer, Prottera, and Gillig are potential vendor options 5.1.4 miles per KW seems to be the current standard for these buses (Estimated 650 x 32 - 20,800 KW for just the buses) 6.r excess solar generated power at an agreed upon rate. Discussion of Solar Power Generated: 1.Typical Solar Panel = 4 x 8 1 KWH/Day or 30 KWH/MO/Panel 2.4 KW needs 28 SQ Meters of Roof 3.4,000 SQ/MT/Acre = 500 KW per acre 4.3,500 KW Panels System maximum x 850 KWH/YR = 2,975,000 KWH x .1 = $290,000/YR or $24,000/MO in electricity generated 5.The 20% rule does not exist for Towns cap for Terra PPA (Power Purchase Agreement) 6.Publics Works Department uses about $26,000/YR or 30,500 KWH (This does not include Storage, Admin or Buzzard Park Apartments) 7.Build Grant may include Storage Lonal Grant500,000 E-Bus Grant 8.Bus Costs 500,000 for diesel / verse $750,000.00 9.Big Horn Sheep habitat area will prevent ground mounted solar panels in some of our site areas. Roof Top panels are preferred except where we are able to make use of ground mounted solar so if possible to put on the roof, this is better than putting it on the ground. Potential Community Consultants/Providers: 1.Sunsense Solar 2.Active Energies Solar, LLC 3.Solar City (could be devolving with Tesla) 4.Holy Cross Electric Association Action Items for Environmental Sustainability Manager: In closing, the Master Plan Update Team is requesting assistance from the Environmental Sustainability group in the following aspects of support: 1.Procurement of Consultant and Community Solar Vendor to provide assessments of current and future usage for the PW site. 2.Preparation of benefit analysis for new water quality standards for waste and storm water for the PW site. 3.Procurement of Consultant to assess solar and battery storage applications compatible with the Bus products being purchased for the Town in 2020. 4.Assistance with waste diversion/recycle for the PW site. END. L0 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 AUG 2, 2018 George Ruther Interview, Director of Housing Interview Notes Interviewee: George Ruther, Director of Housing By: Chris and Mark/VMDA Re: Public Works Master Plan Update vis-à-vis Housing Needs General Housing Department Notes for Public Works Site The following site planning, project funding and housing development possibilities and strategies were discussed along with George referencing and providing a copy of the 2018 Workforce Survey Report: A.Partner with a Housing Developer that is not necessarily with the Town of Vail to build open employee housing. Funding can be from a variety of sources. The following are known housing project statistics with interesting partnerships, funding sources and ownership patterns. 1.Lions Ridge Apartments (Previously Timber Ridge Apartments) were developed on Town owned land with private developer to reduce Town risk and to get it built. They turned away from the I-70 corridor for sound attenuation. Parking for this project was an average of 1.4 vs 2 average parking spaces/unit. The cost of 114 Units all in for the 3-stories of wood frame construction with surface parking was $27MM exclusive of land cost on 5.24 acres. Low 600 to 900 SQ FT one and two bedrooms units with minimal offsite improvement costs. 2.Buzzard Park was developed by the Town on Town owned land. 3.Public/Private Partnerships can be productive with a variety of business plans based on who owns land, how long the developer manages for profit and length of time to turn back over to the Town. 4.First Chair Apartments in Lions Head was developed by VRI on their own land. Parking for this project was an average of less than 1 parking space per unit. 5.Vail Commons was built on Town owned land by private developer with commercial interests to offset infrastructure costs. 6.The Boarding House Telluride, CO has 14 to 16 Rooms with more common space and has been well-received by the seasonal resident employees. 7.6 West Project in Edwards, CO is a modular housing project set for delivery in OCT/ NOV 2018 and includes a Community Center, Commercial Kitchen, a Movie Room and Fitness Area with indoor and limited outdoor spaces, hence the amenities. 8. box: a.We do not have the option or the luxury of NOT building housing on the Public Works site, b.Increasing and optimizing density by downsizing housing units, c.Future housing cannot be for sale and must be rented for seasonal, FTE and transitional housing, d. 9.Are Sola 10. niche) with non-traditional thinking. Housing mixes and styles of living will be explored, based on Seasonal and FTE Staff housing needs. 11.Vail Health Center has lost all but 20% of their parking spaces. The remaining parking spaces are now for critical need patients. They now use shuttles to manage parking during construction for three years. Maybe it should be permanent leading to a potential reduction in parking spaces for some types of work force housing? 12.Site access is a challenge to residents without conflict with industrial operations and bus traffic in concert with long daily hours of Public Works operations. 13.Housing on the Public Works Site: How do we build and justify the housing with ongoing municipal expenses to help control long term costs of housing to the Town? 14.Public Works Master Planning Assumptions & Review of Opportunities: a.Existing Administration Building may need to either be demolished and/or moved to allow more housing at east end of site. As a 5,000 SF Administration area for limited population of staff is not the best use of the existing building footprint. b.Wvailable in the future? Who knows, maybe land values will become high enough to accommodate a below-grade parking. c.Utilize non-traditional approaches to the Public Works Master Plan Development. d.Parking can either occur beneath the restored wildlife corridor or the wildlife corridor can be displaced locally. The East Vail Parcel Critical Range goes from East Vail to the Public Works Site and may be altered over time. e.This is one the last chunks of land left so this might be the best place for housing. f.Optimize Land Use because single story structures do not work on such valuable housing sites, particularly in this situation. END. L0 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 AUG 2, 2018 Ron Braden Interview Notes Interviewee: Ron Braden, Information Services Director By: Chris and Mark/VMDA Re: Public Works Master Plan Update vis-à-vis Housing Needs General Notes for Information Technology 1.Fiber Optics (and Cellular Towers) resides at the Public Works site and it comes into the Administration Building. The Fiber was developed here around 1997-98. 2.Fiber then goes to a closet in the middle of the Bus Barn and also to the upper level of the Facilities Building. The new Fiber now goes back to the Village Transportation Center. 3.The new fiber would be in the Public Works Administration Building and come down Frontage Road and through Public Works site. 4.With Master Plan 20-Year Update, new fiber will then go back to the Municipal Complex. The Fiber currently in place is pre-2000 and is old because it wears out. We cannot do 10 Gig on the fiber as it only has 6 strands. When one strand is bad, so we are down to 5 strands. 5.A 288 count single mode fiber in Housing and Public Works upgrades. 6.State of the Art Facilities should be provided for internet/social media/etc. for Buzzard Park which is the highest usage access point in town. 7.Cabling to the Buildings is cost neutral. There is a primary fiber feed to each building. Copper has a limit of 300 feet with typically 3 drops to each jack in the building. 8.IT Fiber comes to site, cellular carrier on site Crown Castle and these cannot move along with the equipment shed at the Southwest corner. Private Fiber is going out there and Century Link Fiber goes out there, we need to know where those are at. Cellular towers use fiber from Century Link. 9.Leonard Sandoval at Public Works should have plans from 2014 for routing. 10.CDOT Fiber runs along 1 70 to the Overhead 177.4 then over the berm to Public Works 11.Century Link Fiber on site no Comcast fiber 12.Town of Vail Fiber must keep the line of sight to the Golf Course area. 13.New Data Center at West Vail Fire Station may get put into Public Works (800 SF). 14.Meet Me Center may be in Vail as well. The room at Public Works does not meet requirements of 600 SF which is a timing issue. END. L0 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 AUG 30, 2018 Greg Clifton, Town Manager Interview Notes By: Mark/VMDA Re: Public Works Master Plan Update The following major issues were discussed regarding the Town needs for the Public Works Site Re- Development capacity, project funding and most particularly housing strategies and solar energy applications. The site capacity is also intended to accommodate additional storage and some operational needs from the Vail Recreation District and Fire and Police Departments. These items are critical to address the long-term needs of the Public Works and Transportation Department and to facilitate collaborative Town efforts for ongoing Housing Development and Utility Grade Solar infrastructure. Housing Development and Utility Grade Solar Infrastructure Needs This Master Plan Update is being embraced by Council and is in the hopper to budget with the understanding that the project must have a visible strategy for significant additional housing development and long term solar energy solutions. It is critical to address and offset the Public Works site energy needs in concert with offsetting energy consumption for Town Snow-Melt Systems in order to live up to our commitment of becoming a sustainable community. 1.Discussion Points for Housing Development Needs: a.Housing is intended to be for the exclusive use of Town Employees. b.We must look way ahead and beyond our current housing needs. c.Though not ideal we need to retain the Buzzard Park Housing for the foreseeable future. d.We need to provide a variety of housing types for Town Employees with tenure. e.Bunker and Dormitory style housing works for seasonal employees and some singles; it appears we may need to provide some housing to accommodate some kids and pets. f.Live-Work Housing must be identified and included among the future housing types. g.In general the Town is losing younger employees after 2-3 years. Therefore new and creative Housing Types are needed to assist in facilitation of employee retention. h.Council is currently targeting Buy-Down Programs, Grants and Credits for entry level and seasonal employees. i. new units in 10 ye j.Due to the increased Housing, a new Transit Stop will be needed at the Public Works site. k.Town Manager and Housing Director are simpatico with the responsible reduction of cars relative to the sizes and types of housing units l.The recent Telluride, CO Public Works Housing Development project has proven to be successful though it had critics throughout the public review process for combining housing with buses and snow plows. 2.Discussion Points for Utility Grade Solar Infrastructure Needs: a.Utility Grade Solar Infrastructure is needed to provide the offset costs for Public Works site needs as well as for Town Snow-Melt Systems. This directive is intended to bring Vail into the future as a more and more sustainable community as expansions of solar applications continue through the duration of this Master Plan Update and beyond. b.The Town Snow-Melt issue and strategy will continue to be a lightning rod between the Council and Community. c.Holy Cross Energy is the target for our Utility Grade Solar Infrastructure partner and has the leadership, desire and commitment to be a strong partner. Their forward movement, diversity and expanded services toward offsetting traditional power and sustainable energy and services that improve the quality of life for our members d.We will consider solar installations at roof tops, ground and free-standing mounted structures and other solar applications as each new and/or remodeled structure evolves. The applications at Public Works Buildings will likely serve their needs directly while other installations on site over time will address Town Snow-Melt and other Town utility offsets. Each step of new and/ or remodel development of structures and site e. assisting in these evaluat f.The Town will seek collaborative partnerships (HCE), Grants and Credits in these ongoing and sequential Solar System Developments to dove-tail with the phases of development produced from the execution of this Master Plan Update. END. L0 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 SEP 10, 2018 Chief of Police Dwight Henninger Interview Notes By: Mark/VMDA Re: Public Works Master Plan Update The Vail Police Department was founded about 52 years ago and has grown to a Staff of about 27 in the 911 Regional Call Center plus about 40 with all other Vail Police Staff. Chief of Police Dwight Henninger is also the De-Facto Town Emergency Management Director. It is expected the 65 will grow to about 70 within 10 years with another 5-6 temporary Police Staff. There is one full week of Police Officer Training twice a year. All Vail Police Officers are required to live within 45 minutes to insure response time. Current Vail Police interaction with Public Works includes Fuel, Wash and Maintenance of Vail Police Vehicles along with the PW Impound Yard (which could be narrower and longer and be - Vail Police Needs at Public Works Site 1.Mobile Communica due to $100K in communications and electronic equipment being inside. This regional asset is currently stored at the West Vail Fire Station and needs to be relocated for Fire usage. 2.Temporary indoor Storage for a vehicle that needs to be impounded until a Search Warrant may be issued. This could be done in the Paint Booth if it meets the standards for security. 3.Rescue Vehicle (58,000 pounds) Storage that currently resides at the Avon Public Works Facility on a temporary basis. 4.Need secure Storage Lockers within Fleet Maintenance to secure vehicle Police Gear while being maintained and serviced. 5.Emergency Community Needs: Under emergency circumstances significant storage for drinking water, diesel and other fuels will be needed along with an Emergency Power Generator. In these times, Bus dependency for transportation could address emergency situations. The emergency power supply would allow water and fuel to be pumped without interruption. Police Staff Housing Discussion The existing Buzzard Park Apartments have only minimal sound attenuation at Party Walls and is a - operation. Vail Police Staff housing does need to include kids and pets. END. L0 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 SEP 10, 2018 Vail Fire Chief Interview Interview Notes Interviewees: Mark Novak, Fire Chief By: Mark/VMDA Re: Public Works Master Plan Update vis-à-vis Vail Fire Department Needs Discussion of Vail Fire Department Needs at Public Works The response is equally interesting and provides insight into the day-to-day activities of Fire personnel: Better and safer (new and remodel) buildings will be constructed via improved building products and technologies along with safer and more stringent Fire, Life Safety and Building Codes. Vail Fire personnel train continuously and provide an image and message of safety to the community that includes emergency medical, public awareness and continuous training as well as full response to all alarms. Surprisingly, Vail Fire personnel spend about 4% of their time each year fighting fires. Their Target Arrival Time at a scene is 4 minutes (240 seconds) and is critical to meeting community expectations. (This is due in part to the fact that when fires do occur, fire growth is more rapid, the temperature is hotter and the products of combustion are more toxic than when a fire occurs in a Employee retention at Vail Fire is a huge need. About 35% of Vail Fire personnel live in the Denver and the front-range area and commute for their work days in Vail. This long-distance living is also growing into Buena Vista, Salida, Eagle and Gypsum CO. Vail Fire feels the attraction to future staff housing needs would include a functional home with personal storage and parking for mostly young families. The following Public Works Site needs were discussed: 1.Vail Dispatch based in Vail Police Department has a Mobile Communications Unit that is West Vail Fire Station as it needs to be stored in a tempered environment due to containing about $100,000 in value of communications equipment. The storage bay needed at Public Vail Fire needs their bay that the MCU is stored in for other Fire purposes. 2.Vail Fire has thold Ford cab-over Fire Pumper Truck that is also stored outdoors at Public Works. The idea is that this vintage truck may be restored as a part of 3.3a combination of Fire Hose Testing and Extrication Training Area. Such Staff Training operations currently take place for a few days each, twice a year. This area would also need a Fire Hydrant and would be staged with 3 Fire Engines and an SUV on-site during these Staff Training Operations. An additional need could include a Staff Training for Smoke Rooms, etc. (this is not intended rstand if this need would In summary, Vail Fire feels their opportunities at the Public Works site would be beneficial and cooperative for all beyond their fuel, wash and maintenance of their vehicle assets at Public Works, as follows: 1.Better quality housing for some segments of Vail Fire personnel 2.Storage and Training opportunities beyond existing capabilities 3.Would collectively assist in employee retention. Additional input was provided regarding possible alternatives for consideration the current snow removal, trucking and snow dump/storage at Public Works, as follows: 1.Yes, increase the snow dump/storage volume by 50% while also staging a large blower to stack the snow higher and away from the electric power lines. 2.In lieu of trucking snow removal to Public Works, perhaps consider converting over time to using rotary plows that would blow the snow out of rights-of-way onto private front yards. This is a huge paradigm shift and would require community input but could, over time, free up the Snow Dump/Storage site for yet more housing, should the circumstances prevail. END. 90 BENCHMARK ROAD SUITE 207 PO BOX 5300 AVON, CO 81620 970/949-5200 FAX 949-5205 7 SEP 4, 2018 Vail Recreation District Interview Interview Notes Interviewees: By: Mark/VMDA Re: Public Works Master Plan Update vis-à-vis Vail Recreation District Storage Needs Discussion of Needs and Objectives for VRD The Ford Park area is considered the VRD Base Camp. All their Golf Carts and vehicles are serviced at Public Works. About 95% of the VRD Shipping and Receiving comes direct to the VRD Golf Clubhouse. ke) which is a relatively small portion of their overall storage in and around the Golf Course, Lower Bench of Ford Park and others described in the noted attachment. This specific storage is requested at the Public Works site. The current storage facilities for these items causes truck traffic and loading/unloading operations at the lower Bench of Ford Park, which is in conflict with the heavy pedestrian users of the Ford Park area. Additionally at the Public Works site they need vehicle storage for 5 Ford F250 Trucks and a single 4 or so VRD Sporting Events each year such as bike, whitewater and running races that occur in and around Eagle County. This will free up parking and traffic at Ford Park which is now used by VRD and works . Additionally, the storage of 2 Fairway Mowers is needed at the Public Works site in the winter. Their General Objectives are three-fold: 1.EFFICIENCY: Centralized Storage at Public Works for Sports and Athletic Field #6 Storage would allow more spacious and organized storage whereby inventory is readily available for exiting to events and returning these items directly after the events. This will cause more efficiency in critical personnel time than working out of the somewhat scattered and over- stuffed areas of current storage facilities to supply these events. h is unsafe for much of the equipment. The facility can also include overhead garage doors for direct loading and unloading as well as a mezzanine for lighter weight goods and equipment to maximize the volume and types of storage needs. 2.SECURITY: For the Storage requested at Public Works, there can be compartmentalized and secure bays in divided and lockable cages, therefore minimizing loss of equipment and sports gear. 3.SAFETY: VRD Storage areas are accessed every day of the year. By reducing vehicular and truck traffic and eliminating loading and unloading in the Ford Park area, visitor and pedestrian traffic will be safer. Many of the staff that conducts these operations are volunteers that understand less about truck maneuvers and loading/unloading than full-time staff. With the Storage Needs met at the Public Works industrial site the loading and unloading operations can be performed directly and safely with proper warehousing/storage access and design with racks and floor mounted containers. The Staff of VRD feels that these opportunities at the Public Works site can allow for better growth, more efficiency in these areas and for accessibility and safety while improving Town assets. END. Vail Recreation District 2018 Storage Content Golf MaintenancePublic Works Golf Equipment2-Trucks in Winter Snow removal equipmentTrailer in Summer Parks and Golf Shed Chemicals (Haz Mat Containers) Fertilizers Sports Storage Shop tools/small engine eqipmentLower Bench- Mechanical equipment and parts- Auto & Truck partsHomestead-All Race Equipment UniformsBikeTentsArches Mobile Irrigation equipment and suppliesRunningTablesChairs PaintsWhitewaterSignsCones Golf Course Accessories/Small Irrigation partsNordicFlagsGarbage Cans Flamable CabinetWeights for Sports FencingWater JugsRamp for Kyyaks Oils & Lubricantspodiums Potato Celler- Co-Ed Bathroom has JanitorialBaseball Equipment Tennis Nets A-Frames and Safety Barriers Old truss for Start/Finish Golf Nordic ScaffoldingRace Equipment & Fat Bike Skis Snowshoes Basketball backboards and ring (adj heights) Volleyball Tiller Summer Summer Tires#16 Golf Yard Storage Shared TractorSports fencing (PVC Material) Go-Pro uses SOS Exterior Storage Shed VSSC Winter/SummerPink Vail Golf EquipmentEC School Irrigation MaterialAerator/Slicer Parts Hand ToolsSpreader Parts Driving Range netsTrailer-winter Greens Covers Snow Fencing Tennis Administratio+G34:G86n Drainage SuppliesYouth Soccer Equipment Signage Golf/NordicUniforms BrutusAll Equipment that can not be frozen Crumb RubberElectronics and timing equipment Gatorage Concentrate Main Pump House Catch All Admin-Sports Golf EquipmentJanitorial-winter only Turf Covers Roofing Material Ford Park Sports Center Fertilization MaterialPrizes, Swag, cups (bag stuffing equipment) Umpire Closet Old Pump House Promoters Office Course AsscessoriesSafety Netting Benches, bike racksBatting screens, bases, all softball eqipment, umpire uniforms Upstairs Signageweights for goals Retaining Wall East End T-Post Taj Water Tubs2-Bay xtra deep Garage Interior and Exterior Goals (soccer/lacrosse) Turf drag conditioners Red Sandstone sweeper Basket ball, volleyball and soccer programming Winter Specific race equipment equipmentMowers x2 Volleyball nets and systems for quick setupMowing equipment Referee stand3-Utility vehicles Small Soccer goalsField Prep equipment, paint & painters Pickleball nets and accessoriesWasher Irrigation parts Eagle Vail Fields Janitorial supplies Sports Job Boxsmall employee area (microwave and Fridge) Back pack sprayers and chemicals gas and flamable cabinet Homestake Peak hand tools Designated CageSports Center-Safety and Soccer Netting Coordinate Club usage and provide storageSideline Tarps Youth Basketball, volleyball nets Futsol, small sided soccer Adult Flag Football Gypsum (Gunion Property) 2-Utility CartsTrailer Storage (Not our land and difficult to access when needed) Job Box Hand Tools Athletic Field #6 HSP Garage Corn Hole GatorsSafety Netting Misc outdoor equipmentTournament garbage cans and recycling cans hoses, painters, PVC goodsVolleyball nets and equipment Field Mower 2018Rugby posts Volleyball Tiller Utility Cart Pickleball Fertilizer and seed JanitorialLiquid Chemicals Court Maintenance EqupmentShower Area- Nets and WindscreensJanitorial closet and storage (backstock) Rugby storage(grills and tables) refridgerator Portable goals and pads (1/3 of all storage in winter) Hand tools Upper Level- box paint plus 5 gallon paint Tennis Nets and windscreens (Tennis Center and Booth Falls) Pickleball nets Exterior- Summertime x2 dumpsters (trash and recycle) sand/top dress material Rugby sleds Becomes a "catch all" for general public disposing of trash material Volleyball grill goes indoors in winter 6.3 Engineering Reports 1. Electrical 2. Mechanical 3. Structural 5. Geotechnical aec Architectural Engineering Consultants, Inc. Mechanical, Electrical, & Lighting Design Services TM TM An Office with LEEDAccredited Professionals Mr. VictorMark Donaldson& Chris Juergens August 29, 2018 Victor Mark Donaldson Architects 0090 West Benchmark Road, Ste 207 Avon, CO 81620 Reference: TOV Maintenance Administration RedevelopmentElectrical Site Observation AEC #18030 Dear Mark & Chris, We are providing the following electrical site observationto review what existing electrical systems are in place at the TOV Maintenance Administration buildings. Executive Summary This is an electrical site observation completed by Stanton Humphrieswith Architectural Engineering Consultants walking through with Adam Johnson, TOV Public Works. We are providing observations and comments for future rework, remodeling and additions to the buildings and site. The primary observations are, I.Overhead pole utility power is routed around the northand west portions of the property. The power poles and utility transformers are located up the mountainside. Services to the buildings are adequate. It would be recommended to set utility transformers closer to the buildings and provide better utility access to transformers for maintenance and replacement in case of emergency. II.Internal building electrical distribution is adequate throughout the Administration and Maintenance Buildings. Any opportunity to rework the existing incoming distribution and replace some of powerdistribution panels within the Maintenance Building should be pursued. Emergency power distribution is limited to a generator dedicated to thefleet fuel pumps. III.Interior lighting at both buildings is primarily fluorescent lights with retrofit LED lamping. At the bus barn new LED lighting with motion controlshas been installed. Lighting throughout the facilities are adequate. Lighting controls are primarily on/off switches with some motion control. IV.Exterior lighting at both buildingsis primarily wall and pole mounted fixtures with retrofit LED lamping. These fixtures are not cut off type and would not be considered Dark Sky compliant. Lighting controls are traditional photocell and timeclock controls. 40801 US Hwy 6 & 24,Suite 214,Eagle-Vail, CO 81620 Post Office Box 8489,Avon, CO 81620 phone: 970-748-8520 email: stan@aec-vail.com:www.aec-vail.com TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 2 of 7 August 29, 2018 Electrical Site Observation: Met with Adam Johnson, TOV Public Works to walk through the site on Wednesday 8/8/18. I.Utility Transformers and Incoming Services: Adam and I walked the perimeter of the property to review the existing services in place. The utility has a set ofoverheadpower polelinesrun directly north of the property, up the mountainside, and at the west end of the property turning towards the south. These power lines feed the following transformers. 1.At the northeast corner of the property, up the mountainside, the utility has two transformers, one transformer feeding the TOV Administration Building and the second transformer feeding the housing directly north and east of the Administration Building. The underground incoming service to the Administrative Building is a 200 amp120/208V 3P servicefed with 250 MCM aluminum feeders.The transformer is approximately 250’ away from the building. 2.Directly north of the Maintenance Building, up the mountainside, the utility has a pad mounted transformer fed from the utility poles. The service for the maintenance building is routed directly from this transformer down the mountainside into an electrical manhole outside of the building, then into the main electrical room. The service size is a 930 amps 277/480V 3P service fed with 3 sets of 500 MCM aluminum feeders. The transformer is approximately 275’ from the building. 3.Directly west of the AT&Tcell towera third transformer feeds the cell tower and the TOV storage shed (“3 door shed”) that is located towards the west end of the site. The service size is approximately 100 amps 120/208V 3P. The power panel set here feeds loads at the shed,exterior lighting and some block heater receptacles. nd Utility transformers at northwest corner of property. View from 2utility transformer feeding the These feed the Admin building and housing. Maintenance building. TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 3 of 7 August 29, 2018 It’s unusual to have transformers located away from commercial properties. We normally locate transformers as closeto the buildings as possible to minimize voltage drop. Utilities also have a policy to have ready access to their utility transformersincase replacement or maintenance is required. The existing utility transformer locations are not readily accessible, there’s a rough jeep trail providingaccess. II. Internal Building Electrical Distribution: The Administration Building meter and main disconnect are locatednear the center of the north side of the building. The 200 amp 120/208V 3P disconnect has a short run of wire to the interior main power panel. The main power panel distributes to two other sub panels. The service and power distribution are adequate, the power panels are in fair to good condition. AdministrationBuildingincoming Administration Building Main service CTs and Main Disconnect Power Panel. TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 4 of 7 August 29, 2018 The Maintenance Building meter and maindistribution centerare located towards the west end of the building. The main electrical room at this location has a CT cabinet with splicesfeeding two 800 ampmain distribution panels. One maindistribution panel is in the main electrical room and feeds the greenhouse, two trash compactors and one unidentified load. The second distribution panelhas three main switches,400/3barn boiler room, 400/3 Welding,400/3 Old Gutter. Maintenance Buildingincoming Maintenance Building Main Distribution service splice at CTs Panel, one of two. These maindistribution panels feed the power panels throughout the Maintenance Building. Most panels are in fair shape, some poor and in need of replacement. The panels are located as far as 500’ when you’ve run to the other end of the building where the fleet fueling station is. There would be a concern for voltage drop when running this long of a distance. TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 5 of 7 August 29, 2018 The incoming service isnot heavily loaded. During any new construction any opportunity to improve the main distribution at the incoming service, add a service at the far end of the building and replace existing panels during new constructionshould be pursued. There is one small generator set at the east end of the building to provide emergency backup power for the fuel pumps. Maintenance Building old gutterand disconnects Maintenance Buildingtypical power panel TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 6 of 7 August 29, 2018 III. Interior Lighting: Interior lighting throughout the Administration and Maintenance Buildings are primarily a variety of fluorescent fixtures that have been retrofit with LED lamps. At the Bus Barn,east part of the Maintenance Building, new LED fixtures with motion control has been installed. Lighting control is primarily on/off switcheswith some lighting controlled withmotionsensors. Lighting is adequate throughout the buildings. Maintenanceand AdminBuildingtypical Maintenance Building industrial Fluorescent fixture retrofit with LEDs Fluorescent fixture retrofit with LEDs Busstorage areaLED lighting with motion sensor control. TOV Maintenance Administration RedevelopmentElectrical Site ObservationPage 7 of 7 August 29, 2018 IV. Exterior Lighting: Exteriorlighting atthe Administration and Maintenance Buildings are pole and wall mounted area fixtures that are retrofittedwith LED lamps. These fixtures are not cut off type and would not be considered Dark Sky compliant.These lights are controlled through traditional photocell and timeclocks. Pole mounted LED fixtures at Site Wall Mounted retrofit LED Stanton O. Humphries, PE -845-7910 Fax 970-845--mail drader@raderengineering.com Town of Vail Public Works and Transportation Maintenance Facility Mechanical Site Summary ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ ¸ p p p p p p p MEMORANDUM TO: Mark Donaldson FROM: Greg Schroeder DATE: February 18, 2019 SUBJ: Vail Public Works Traffic Status INTERNAL DESIGN TEAM MEMO, NOT FOR AGENCY SUBMISSION This memorandum summarizes the status of the traffic engineering investigation to date. Traffic Counts: Turning Movement Counts (TMCs) were taken at the intersection of South Frontage Road and Vail Valley Drive/Elkhorn Drive on December 13, 2018. Counts were performed from 6:30am to 8:30am (morning) and from 3:00pm to 5:00pm (evening). A copy of the count data is included. South Frontage Road: South Frontage Road is a roadway under CDOT jurisdiction and is classified as F-R per the CDOT State Highway Access Code (SHAC). The posted speed limit is 45mph, and the Town and CDOT do have variable speed limit signs in the vicinity that do change the speed limit during events. Auxiliary Turn Lanes: Per the SHAC, auxiliary turn lanes are triggered based upon traffic volumes, safety and operational conditions. The threshold for an eastbound left turn deceleration lane at the S. Frontage Road and Elkhorn Drive intersection is 10 vehicles per hour (vph) or greater. The threshold for a westbound right turn deceleration lane is 25vph or greater. The threshold for a southbound right turn acceleration lane is 50vph or greater. Per the existing traffic counts, there were 11vph during the morning and 13vph during the evening for the eastbound left turns. Therefore, the existing volumes warrant an eastbound left turn deceleration lane based upon existing conditions. For the westbound right turn lane, there were 1vph during the morning and 2vph during the during the evening for the westbound right turns. These existing volumes do not trigger a right turn deceleration lane. For the southbound right turn lane, there were 18vph during the morning and 26vph during the during the evening for the southbound right turns. These existing volumes do not trigger a southbound right turn acceleration lane. The southbound left acceleration lane may be warranted by safety and operational concerns. Based upon the low turning movement volumes, this lane is not warranted. However, operational changes, substantial turn volume addition, and/or future accident rates may warrant this lane in the future. CDOT Access Permit: CDOT requires that an access permit be submitted when an access will be increased by 20% of its volume, if there is a change of land use, or if there are identified safety problems. The existing volume of Elkhorn Drive per the December counts is 32vph for the morning and 47vph for the evening. Based upon these volumes, an increase of greater than 6vph would trigger the 20% threshold for the submittal for an Access Permit. Page 1 of 2 Turn Lane Construction Timing: Based upon the existing volumes, an eastbound left turn deceleration lane is warranted now. However, the requirement for the timing of construction of a turn lane will be when an access permit is submitted. This could be when the 20% threshold is triggered or earlier. Additional Capacity on Site: The public works facility is proposed be replaced with a larger structure, but is not anticipated to increase traffic volumes, as the additional structure size will allow many of the onsite vehicles to be parked inside of a garage rather than in a parking lot. We understand that the overall vehicle trips will not change These operational specifics should be discussed and yard size as its metric for the determination of trip generation. Additionally, they will require an anticipated Year 2040 public works operations which are likely to increase over time. Future Phases: 4 total phases have been identified, as listed below: Approximate Traffic Volume Anticipated Improvements Phase Description Increase Needed * Construct new public Construct Eastbound Left Turn 1 No Net increase in Traffic works facility Deceleration Lane Add 12-24 new Additional 5 to 8vph for 12 units 2 None housing units Additional 9 to 14vph for 24 units Construct Southbound Right Add 40 more housing 3 Additional 13 to 20vph for 40 units Acceleration Lane or Mini units Roundabout Add 56 more housing units (80 new units, 4 Additional 18 to 27vph for 56 units None and removal of 24 units) * These anticipated improvements are for planning purposes only. A final CDOT traffic analysis is required to validate these findings. Trip Generation Rates: For the purpose of this memorandum, two different trip generation rates were utilized. Traffic turning movement counts were conducted at the Timber Ridge and Lions Ridge Apartments on December 1, 2018. A derived rate was utilized based upon the number of housing units and the traffic volumes. These rates represent the lower of the ranges shown above. th 1 National rates from the ITE Trip Generation Manual, 10 Edition were used to estimate the traffic volumes for the proposed housing units. These rates represent the higher of the ranges shown above. Next Steps: The improvements described above are considered preliminary and are subject to the completion of a final CDOT traffic analysis. McDowell Engineering can complete the phased traffic study upon a final phased plan. 1th ITE (Institute of Transportation Engineers) Trip Generation Manual, 10 Edition, 2017 Page 2 of 2 Map Vicinity 00 0 Data 000 Bicycle Hour 00 Peak 000 0 0 0 0 0 Data Pedestrian Hour 0 Peak 0 0 0 Buses) 11308 15 17 (Cars,Trucks,& Data 01 Hour 23 98 11 18 Peak Map Vicinity 00 0 Data 000 Bicycle Hour 00 Peak 000 0 0 0 0 0 Data Pedestrian Hour 0 Peak 0 1 0 Buses) 29111 127 42 (Cars,Trucks,& Data 23 Hour 45 13 102 26 Peak 5020 CountyRoad 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado GEOLOGIC HAZARDS REVIEW PROPOSED TOWN OF VAIL PUBLIC WORKS FACILITY DEVELOPMENT 1309 ELKHORN DRIVE, VAIL EAGLE COUNTY, COLORADO PROJECTNO.18-7-606 NOVEMBER 6, 2018 PREPARED FOR: VICTOR MARK DONALDSON ARCHITECTS ATTN: MARK DONALDSON P.O. BOX 5300 AVON, COLORADO 81657 markd@vmda.com TABLE OF CONTENTS Rockfall Source Zone Rockfall Paths Rockfall Runout Zone Model Input Information Model Output Information ProjectNo. 18-7-606 PURPOSE AND SCOPE OF STUDY SITE CONDITIONS ProjectNo. 18-7-606 PROJECT AREA GEOLOGY ProjectNo. 18-7-606 GEOLOGIC HAZARDS ASSESSMENT ProjectNo. 18-7-606 ProjectNo. 18-7-606 Rockfall Source Zone Rockfall Paths ProjectNo. 18-7-606 Rockfall Runout Zone ProjectNo. 18-7-606 Model Input Information Model Output Information ProjectNo. 18-7-606 ROCKFALL MITIGATION CONCEPTS ProjectNo. 18-7-606 ProjectNo. 18-7-606 RECOMMENDATIONS LIMITATIONS ProjectNo. 18-7-606 TO:PlanningandEnvironmentalCommission FROM:CommunityDevelopmentDepartment DATE:April22, 2019 SUBJECT:Arequest for a recommendation to the Vail Town Council to update Section12- 2-2,Definitions of Words and Termsand Section 14-10-4,Architectural Projections, Decks, Balconies, Steps, Bay Windows, etc., Vail Town Code pursuant to Section 12-3-7, Amendment, to amend the definition of flat roof, add a definition for sloping roof and parapet, and to create regulations for parapet height. Applicant: Town of Vail Planner: Ashley Clark I.SUMMARY The Community Development Department is proposingto update the Vail Town Code to add definitions related to roof pitches and respective maximum allowed heights and to add languageto regulateparapets. II.DESCRIPTION OF REQUEST The Community Development Department is requesting that the Planning and Environmental Commission forward a recommendation of approvalto the Vail Town Council foramendmentsto Sections 12-2-2 and 14-10-4,pursuant to Section 12-3-7, Amendment, Vail Town Code, to allow for the addition of new definitions for sloping roof and parapet, to update the existing definitionof flat roof and add regulations for parapet height. III.PROPOSED TEXT AMENDMENT LANGUAGE The Community Development Department proposes the following languageto be added to Title 12 and Title 14, respectively: The proposed amendmentsare asfollows(text to be deleted is in strikethrough,text that is to be added is bold. Sections of text that are not amended have been omitted.): 12-2-2: Definitions of Words and Terms ROOF, FLAT: A roof that is not pitched and the surface of which is generally parallel to the ground.A roof or portion of roof that has a sloping plane less than a rise of two inches (2”) over a distance of twelve inches (12”). ROOF, SLOPING: A roof or portion of roof with a pitch greater thanor equal toa rise of two inches (2”) over a distance of twelve inches (12”). PARAPET:The extension of the main walls of a building above the roof level. 14-10-4, Architectural Projections, Decks, Balconies, Steps, Bay Windows, etc. G. A parapet may exceed the allowable building height by no more than thirty inches (30”), subject to a finding of the Design Review Board that the proposal meets the criteria enumerated in Section 12-11-1. IV.ROLES OF REVIEWING BODIES Order of Review: Generally, text amendment applications willbe reviewed by the Planning and Environmental Commission and the Commission willforward arecommendation tothe Town Council.The Town Council willthen review thetext amendment applicationand make the final decision. Planning and Environmental Commission: The Planning and Environmental Commission isresponsible forthe review of a text amendment application, pursuant to Section 12-3-7, Amendment, VailTown Code, and forwarding of a recommendation to the Town Council. Design Review Board: The Design Review Board (DRB) has no review authority over a text amendment tothe Vail Town Code.The DRBheldthree separate work sessions to review the proposed text amendment. Theboardis supportive of the language submittedto the PEC for their review. Town Council: The Town Council is responsible for final approval, approval with modifications, or denial ofa textamendment application, pursuant to Section 12-3-7, Amendment, Vail Town Code. Staff: The Town Staff facilitatestheapplication review process.Staff reviews thesubmitted applicationmaterials forcompleteness andgeneral compliance withthe appropriate Town of Vail Page 2 requirements of the Town Code. Staff also provides the Planning and Environmental Commission a memorandum containing a description and background of the application; an evaluation of the application in regard tothe criteria andfindings outlinedby the Town Code; andarecommendation of approval, approval with modifications, or denial. V.APPLICABLE PLANNING DOCUMENTS Staff believes that following provisions of the Vail Town Code and Vail Land Use Plan are relevant to the review of this proposal: Title 12, Zoning Regulations, Vail Town Code CHAPTER 12-1, TITLE, PURPOSE AND APPLICABILITY (in part) Section 12-1-2: Purpose: A. General: These regulations are enacted for the purpose of promoting the health, safety, morals, and general welfare of the Town, and to promote the coordinated and harmonious development of the Town in a manner that will conserve and enhance its natural environment and its established character as a resort and residential community of high quality. B. Specific: These regulations are intended to achieve the following more specific purposes: 1. To provide for adequate light, air, sanitation, drainage, and public facilities. 2. Tosecure safety from fire, panic, flood, avalanche, accumulation of snow, and other dangerous conditions. 3. To promote safe and efficient pedestrian and vehicular traffic circulation and to lessen congestion in the streets. 4. To promote adequate and appropriately located off-street parking and loading facilities. 5. To conserve and maintain established community qualities and economic values. 6. To encourage a harmonious, convenient, workable relationship among land uses, consistent with Municipal development objectives. 7. To prevent excessive population densities and overcrowding of the land with structures. 8. To safeguard and enhance the appearance of the Town. Town of Vail Page 3 9. To conserve and protect wildlife, streams, woods, hillsides, and other desirable natural features. 10. To assure adequate open space, recreation opportunities, and other amenities and facilities conducive to desired living quarters. 11. To otherwise provide for the growth of an orderly and viable community. VI.ENVIRONMENTAL IMPACTS The proposed prescribed regulation amendment does not have any identifiable environmental impacts. VII.CRITERIA FOR REVIEW 1.The extent to which the text amendment furthers the general and specific purposes of the zoning regulations; and The general purposes of the zoning regulations are for “promoting the health, safety, morals, and general welfare of the town, and to promote the coordinated and harmonious development of the town in a manner that will conserve and enhance its natural environment and its established character as a resort and residential community of high quality”. This text amendment is intended to advance these purposes by providingclear standardsin thezoningcodeofwhat constitutes a flat versus sloping roof and to create regulations for parapets. The amendment will provide clear direction for development on calculatingthe maximum allowed height and what standards apply to parapets. 2.The extent to which the text amendment would better implement and better achieve the applicable elements of the adopted goals, objectives, and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and The proposed text amendment will providestaff,as well as anyone who references the code,clear standardsforplanning anddevelopment reviewthat can be applied consistently. The dimensional criteriafor heightcontained in thezoningcode should be defined like any other dimensional standard, such as setbacks, gross residential floor area and site coverage. Thecodification of these standards will help better implement and better achieve the adopted goals, objectives and policies inVail. 3.The text amendment demonstrates how conditions have substantially changed since the adoption of the subject regulation and how the existing regulation is no longer appropriate or is inapplicable; and Town of Vail Page 4 The legislative history forheight allowancesin Vailfrom theoriginal adoption of the Zoning Regulations and Design Regulations to today shows thatVail has adjusted its codes to accommodatedesign trends and technology. Today, roof construction practices allow for a wide range of roof pitches. Proposalsreviewed by staff often includemany differentroof pitches, with some being more flat or sloping relative to others. This text amendment seeks to update the existing code to provide aclear standard for fair and consistent review of projects in Vail. 4.The extent to which the text amendment provides a harmonious, convenient, workable relationship among land use regulations consistent with municipal development objectives; and By increasing transparency in the zoning code, the proposed text amendment would promote a harmonious, convenient and workable relationship among land use regulations consistent with municipal development objectives. The text amendment does not conflict with other existing land use documents or municipal development objectives. 5.Such other factors and criteria the Planning and Environmental Commission and/or council deem applicable to the proposed text amendments Staff will provide additional information as needed should the PEC and/or council determine other factors or criteria applicable to the proposed text amendments. VIII.STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission forward a recommendation of approval for the prescribed regulation amendment to the Vail Town Council. This recommendation is based upon the review of the criteria outlined in Section III of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to forward a recommendation of approval to the Vail Town Council for the proposed prescribed regulation amendment, the Community Development Department recommends the Commission pass the following motion: "The Planning and EnvironmentalCommission forwards a recommendation of approval to the Vail Town Council for a prescribed regulation amendment, pursuant to Section 12- 3-7, Amendment, Vail Town Code, toamendSection 12-2-2 Definitions of Words and Terms and Section 14-10-4 Architectural Projections, Decks, Balconies, Steps, Bay Windows, etc., Vail Town Code, to amend the definition of flat roof, add a definition for sloping roof and for parapet, and to create regulations for parapet height.” Town of Vail Page 5 Should the Planning and Environmental Commission choose to forward a recommendation of approval to the Vail Town Council for the proposed prescribed regulation amendment, the Community Development Department recommends the Commission makes the following findings: “Based upon a review of Section III of the April 22, 2019staff memorandum to the Planning and Environmental Commission, and the evidence and testimony presented, the Planning and Environmental Commission finds: 1. That the amendment is consistent with the applicable elements of the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the Town; and 2. That the amendment furthers the general and specific purposes of the Zoning Regulations outlined in Section 12-1-2, Purpose, Vail Town Code; and 3. That the amendment promotes the health, safety, morals, and general welfare of the Town and promotes the coordinated and harmonious development of the Town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality." Town of Vail Page 6 ORDINANCE NO. 8 Series of 2019 AN ORDINANCE AMENDING TITLE 12, ZONING REGULATIONS, VAIL TOWN CODE, PURSUANT TO SECTION 12-3-7, AMENDMENT, AMENDING THE DEFINITION OF FLAT ROOF, ADDING DEFINITIONS FOR SLOPING ROOF AND PARAPET, CREATING REGULATIONS FOR PARAPET HEIGHT: AND SETTING FORTH DETAILS IN REGARD THERETO WHEREAS, the Planning and Environmental Commission held a properly noticed public hearing on the proposed amendment on April 22, 2019 in accordance with the provisions of the Vail Town Code; WHEREAS, the PEC recommended approval of the proposed amendments at its April 22, 2019 meeting, and has submitted its recommendation to the Town Council; WHEREAS, the Council finds that the proposed amendments are consistent with the applicable elements of the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and are compatible with the development objectives of the Town; WHEREAS, the Council finds that the proposed amendments further the general and specific purposes of Title 12, Zoning Regulations, Vail Town Code; and WHEREAS, the Council finds that the proposed amendments promote the health, safety, morals, and general welfare of the Town and promote the coordinated and harmonious development of the Town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF VAIL, COLORADO, THAT: Section 1. Section 12-2-2, Definitions, Vail Town Code, is hereby amended to read as follows: PARAPET: The extension of the main walls of a building above the roof level. ROOF, FLAT: A roof that is not pitched and the surface of which is generally parallel to the ground. A roof or portion of roof that has a sloping plane less than a rise of ROOF, SLOPING: A roof or portion of roof with a pitch greater than or equal to a r Section 2. Section 14-10-4, Architectural Projections, Decks, Balconies, Steps, Bay Windows, etc., Vail Town Code, is hereby amended by the addition of Sub-Section(G) to read as follows: G. A P subject to a finding of the Design Review Board that the proposal meets the criteria enumerated in 12-11-1. Section 3. If any part, section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid, such decision shall not effect the validity of the remaining portions of this ordinance; and the Town Council hereby declares it would have passed this ordinance, and each part, section, subsection, sentence, clause or phrase thereof, regardless of the fact that any one or more parts, sections, subsections, sentences, clauses or phrases be declared invalid. Section 4. The amendment of any provision of the Town Code as provided in this ordinance shall not affect any right which has accrued, any duty imposed, any violation that occurred prior to the effective date hereof, any prosecution commenced, nor any other action or proceeding as commenced under or by virtue of the provision amended. The amendment of any provision hereby shall not revive any provision or any ordinance previously repealed or superseded unless expressly stated herein. Section 5. All bylaws, orders, resolutions and ordinances, or parts thereof, inconsistent herewith are repealed to the extent only of such inconsistency. This repealer shall not be construed to revise any bylaw, order, resolution or ordinance, or part thereof, theretofore repealed. INTRODUCED, READ ON FIRST READING, APPROVED, AND ORDERED th PUBLISHED ONCE IN FULL ON FIRST READING this 7 day of May, 2019, and a st public hearing for second reading of this Ordinance set for the 21 day of May, 2019, in the Council Chambers of the Vail Municipal Building, Vail, Colorado. _____________________________ Dave Chapin, Mayor ATTEST: ____________________________ Tammy Nagel, Town Clerk READ AND APPROVED ON SECOND READING AND ORDERED PUBLISHED this 21st day of May, 2019. _____________________________ Dave Chapin, Mayor ATTEST: ____________________________ Tammy Nagel, Town Clerk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