A. GENERAL
I. NOTIFY ARCHITECT IMMEDIATELY OF ANY
CONFLICTS BETWEEN ANY CONTRACT DOCUMENTS
PRIOR TO THE START OF WORK.
:2. IN THE EVENT OF ANY CONFLICTS BETWEEN THE
DOCUMENTS, THE ITEM OF MOST OR GREATEST
EXTENT OF WORK AS DETERMINED BY THE
ARCHITECT SHALL APPLY AND BE PERFORMED 5
THE CONTRACTOR AT NO ADDITIONAL COST.
5. ALL TRADES SHALL PERFORM THEIR WORK
WITHIN THE RECOGNIZED STANDARDS OF THE
APPLICABLE INDUSTRY.
4. ANY DEVIATION OR CHANGE IN THE WORK FRoi
THE CONTRACT DOCUMENTS WITHOUT PERMISSION
OF THE ARCHITECT PLACES ALL RESPONSIBILITY
FOR THE DEVIATION OR CHANGE ON THE
CONTRACTOR.
5. THESE DOCUMENTS WERE PREPARED NITHOUT
REGARD FOR THE DIVISION OF WORK AMONG
TRADES. GENERAL CONTRACTOR 15 To
COORDINATE AND PROVIDE ALL YsIORK 5HOPSIN OI
THESE DOCUMENTS WITH ALL TRADES REC7ARDLEE
OF WHICH DRAWING WORK 15 5HONN ON.
6. TH15 PROJECT IS GOVERNED BY THE 2005
INTERNATIONAL BUILDING CODE AS ADOPTED BY
THE TOWN of VAIL, COLORADO. THE DRANIN65 Z%
NOT ALLOW WORK THAT DOES NOT COMPLY WITH
THESE COVE5. GENERAL CONTRACTOR AND H15
5U15-CONTRACTOR5 ARE RESPONSIBLE FOR
COMPLYING WITH ALL APPLICABLE CODES,
ORDIANCE-5, RULES RE6ULATION5, ETC., BY ALL
AUTHORITIES HAVING JURISDICTION. GENERAL
CONTRACTOR 15 RESPONSIBLE FOR OBTAINING AI
PAYING FOR ALL REQUIRED PERMITS.
7. ALTHOUGH TrD architects HAS PERFORMEND IT�
SERVICE WITH DUE DILIGENCE AND CARE, IT DOES
NOT GUARANTEE PERFECTION. EVERY EFFORT 15
MADE TO PROVIDE A COMPLETE AND CLEAR SET
OF CONSTRUCTION DOCUMENTS, HOWEVER,
DISCREPANCIES OR OMISSIONS MAY OCCUR,
RELEASE OF THESE DOCUMENTS ANTICIPATIE5
COOPERATION BETWEEN THE CONTRACTOR, ONNEF
AND ARCHITECT TO PROVIDE THE BEST P05515LE
PROJECT. THESE DRAWINGS HAVE BEEN PREPARE-i
FOR THE USE OF A OUALIFIEv CONTRACTOR
EXPERIENCED IN THE CONSTRUCTION TECHNIOUE-5
AND SYSTEMS SHOWN.
5. GENERAL CONTRACTOR AND H15
5U5-CONTACTORS ARE TO FIELD VERIFY ALL
DIMENSIONS, EXISTING CONDITIONS, UTILITY
LOCATIONS, ETC., PRIOR To aE(91NNIN6 ANY WORK
OR ORDERING ANY MATERIALS. NOTIFY ARCHiTEC'
OF DISCREPANCIES OR INCONSISTENCIES IN THESE
DRAWING IMMEDIATELY.
B. SCOPE of WORK
I. THE INTENT OF THE CONTRACT DOCUMENTS 15
THAT EACH CONTRACTOR SHALL PERFORM ALL
ACTIONS NECESSARY AND REQUIRED TO PROVIDE
ALL LABOR, MATERIALS, SUPPLIES, EQUIPMENT,
TRANSPORTATION, FACILITIES AND
APPURTENANCES NHICK ARE INDICATED
OR
RZA50NABL'r' IMPLIED ar EACH DRAWING AND
SPECIFICATION SECTION, ALL OF WHICH 15
COLLECTIVELY NECESSARY AND REQUIRED FOR
THE EXECUTION OF THE WORK AS 5HOAN ON THE
CONTRACT DOCUMENTS.
:2. WRITTEN DIMENSIONS ON DRAWINGS GOVERN. VC
NOT SCALE VRANIN65. DETAILS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWINGS.
DRANIN65 AND SPECIFICATIONS ARE INTENDED T4
AGREE. GENERALLY, SPECIFICATIONS WILL TAKE
PRECEDENCE OVER DRAWINGS. SHOULD ANY
DISCREPANCIES OCCUR, CONTRACTOR SHALL NOT
PERFORM ANY WORK UNTIL RESOLVED BY THE
ARCHITECT. WORK SHOWN ON PRANIN65 BUT NOT It
SPECIFICATION OR SHOWN IN SPECIFICATIONS BUT
NOT ON THE DRAWINGS SHALL BE PROVIDED AS IF
SHOWN ON BOTH. NO DEVIATIONS, CHANGES,
5U55TITUTION5, ETC, IN THE DOCUMENTS SHALL BE
MADE WITHOUT WRITTEN APPROVAL FROM THE
ARCHITECT. IN THE CASE OF CONFLICTS BETWEEN
OR WITHIN THE DRAWINGS AND SPECIFICATIONS.,
THE GREATER QUANTITY, HIGHER QUALITY, ETC
WORK SHALL BE PROVIDED AT NO ADDITIONAL
COST.
C. PROJECT COORDINATION
I. ALL CONTRACTORS AND SUBCONTRACTORS
RESPONSIBLE FOR FOR WORK 5HOINN IN THE
SPECIFICATIONS AND ON THE PRAKN65 SHALL
,JOINTLY AND SEPARATELY COORDINATE THEIR
WORK WITH REGARD TO 50HEDULIN6, IN5TALLATIOi
PROCEDURES, SHOP DRANINC75 AND INSTALLATION
OF ALL RELATED MATERIALS.
2. PRIOR TO THE START OF ANY WORK, THE
CONTRACTOR AND 5UE30ONTRACTOR5
RESPONSIBLE FOR THE WORK SHOWN IN THESE
DOCUMENTS SHALL INSPECT AND APPROVE ALL
PREFATORY WORK THAT HAS BEEN COMPLETED To
RECEIVE HIS WORK. HE IS TO ENSURE THAT H15
WORK AND ADJACENT WORK WILL FINISH To
PROPER CONTOURS, PLANES AND LEVELS.
PROMPTLY NOTIFY GENERAL CONTRACTOR OF ANY
DEFECTS IN THE PREP WORK THAT WILL
ADVERSELY AFFECT OR PREVENT THE
5AT15FACTORY COMPLETION OF H15 WORK.
FAILURE TO NOTIFY GENERAL CONTRACTOR SHALL
INDICATE ACCEPTANCE OF THE PREP WORK AND
ANY SUBSEQUENT CLAIMS OF DEFECTS SHALL NOT
BE RECO&NIZED,
5. No WORK SHALL BE PERFORMED UNTIL ALL
PREP WORK HAS BEEN COMPLETED, CURED, DRIED,
ETC AND READY TO RECEIVE THE YqORK. GENERAL
CONTRACTOR 15 RESPONSIBLE FOR THE TIMELY
COORDINATION AND INSTALLATION OF ALL
MATERIALS.