HomeMy WebLinkAboutB08-0013TOWN OF VAIL
75 S. FRONTAGE RI�AD
VAIL, CO 81657
970-479-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT COMM BUILD PERMT
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.......: SAFEWAY STORE
Parcel No....: 2103 ] 1415011
OWNER SAFEWAY STORES 46 INC Ol/29/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
Permit # B08-0013
Project # � ��SU � � �- C�� � �
Status . . . : ISSUED
Applied .. . : O1/29/2008
Issued . . . : 04/14/2008
Expires.....: 10/11 /2008
APPLICANT PIONEER GENERAL CONTRACTORS O1/29/2008 Phone: 806-622-3100
P.O. BOX 7968 / 3850 MACK ROAD
AMARILLO
TX 79114
License: 268-A
CONTRACTOR PIONEER GENERAL CONTRACTORS Ol/29/2008 Phone: 806-622-3100
P.O. BOX 7968 / 3850 MACK ROAD
AMARILLO
TX 79114
License: 268-A
Desciption:
SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE
Occupancy: M
Type Construction: IIIB
V aluation: 2,405,000.00
Revision Valuation: $0.00 Total Sq Ft Added: 1903
1,Lc � 3
. 1��
V�`� �—
********�*�****�*+�**a*e**►r*sa**��**+r�r►r*r*►*�****�*+�**�***x*s�� FEE SUMMARY *t*►**�*�****�************�+**�******t*►e�*****s+��xa**�►+*t
Building------> $10, 737. 00 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $67, 633 .OS
Plan Check---> ' $1, 903 . 00 Additional Fees---------->
$ 6, 9 7 9. 0 5 Recreation Fee--------------> $ 71, 6 4 8. 4 9
Investigation-> $0.00 TOTAL FEES-------------> $67, 633 . OS Total Permit Fee---------> 139, 281. 54
W ill Call-----> $ 4. 0 0 Payments-------------------> 13 9, 2 81 . 5 4
BALANCE DUE---------> $0. 00
■*r**+**��****+***�*r*�*+***�++**�+«**�►*+���***►*�r»*�***.+*�►*ax�***«**r**�►rs+s�:s*s**�•*:r*�**r*�*+rr+*►a**+.***+***�**+«++�*�*+►r�s*�*+*+a*+�
Approvals:
Item: 05100 BUILDING DEPARTMENT
02/13/2008 cgunion Action: CR
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0013\B08-0013.DOC
03/31/2008 cgunion Action: AP APPROVED
REVISED/CORRECTED PLANS WITH REVISION DATE OF 3/7/08
07/31/2008 cgunion Action: AP APPROVED REVISED
STRUCTURAL AND REVISED MECHANICAL SHEETS
Item: 05400 PLANNING DEPARTMENT
02/21/2008 rlf Action: CR
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0013\B08-0013 Planning
commertU.�doc
04/11/2008 RLF Action: AP DRB CONDITIONS
FROM 12/4/07 MET.
08/26/2008 Warren Action: AP The revisions to
add accent lighting has been approved. I reviewed this
application in Rachel's absence. I had a conversation
with Michael Bolton about the lighting and its low
intensity.
Item: 05600 FIRE DEPARTMENT
02/13/2008 cgunion Action: CR per email from
Mike Vaughan
04/10/2008 mvaughan Action: COND l. No fire
protection engineer is shown
2. Shop fire alarm and sprinkler drawings (engineer
stamped) required.
3. Janitors closet shown with shelving for haz mat
storage. Cabinets required.
4. Gas fireplace shutoff shall be minimum 6 ft from
appliance.
5. E.M. lighting appears inadequate at front
of store .
6. No licensed fire protection contractors are listed.
05/09/2008 jgulick Action: AP l., 2. and 6. are
corrected with resubmittal.
Item: 05500 PUBLIC WORKS
01/30/2008 TEK Action: NA No PW issues
Item: 05700 ENVIRONMENTAL HEALTH
04/09/2008 cgunion Action: AP APPROVED PER EMAIL
FROM BILL CARLSON
Item: 05101 BUILDING DEPT REVISION
08/29/2008 Martin Action: CR
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0013\B08-0013 Revision
1.DOC
09/12/2008 mh Action: AP
*.**.*.��*...*�.�+��*.++��.**�*.+,*�*«....�.*.:...*+*.*.*,�*.�:�*.*.*�.***.�*«*.*.***.*.���.*.+.**�.+.....«*...��.*+..*�.*+..:....+....+�.*..�*�*.
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
1 hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FO�t-I�QURS IN AI�A� TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM
4 PM. �' � � i ! �_.
R OR CONTRACTOR FOR HIMSELF AND OWNER
**#**********#�##�T#*#***#*********#*********#*****************************************#*******#********
CONDITIONS OF APPROVAL
Permit #: B08-0013 as of 09-12-2008 Status: ISSUED
********************************************************************************************************
Permit Type: ADD/ALT COMM BUILD PERMT Applied: Ol/29/2008
Applicant: PIONEER GENERAL CONTRACTORS INC
Issued: 04/14/2008
806-622-3100 To Expire: 10/11/2008
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Parcel No: 210311415011
Description:
SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE
***********************************************Condltions:************************************************
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD iNSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 34
(BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE
A FOOTING INSPECTION WILL BE CALLED FOR.
Cond: CON0009845
SPECIAL INSPECTIONS REQUIRED PER IBC CH 17. ALL REPORTS TO
BE SUBMITTED TO BUILDING DEPT. FOR REVIEW SEE STATEMENT OF
SPECIAL INSPECTION
Cond: CON0009878
Stamped engineered fire protection plans for sprinkler and
alarm are required.
*******************************************++**+++*********************++***************++**
TOWN OF VAIL, COLORADO Statement
*****************�*********�***********+*+*********************�****************************
Statement Number: R080001638 Amount: $128.25 09/12/200803:21 PM
Payment Method: Check Init: SAB
Notation: 2282 PIONEER
GENERAL
Permit No: B08-0013 Type: ADD/ALT COMM BUILD PERMT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: 139,281.54
This Payment: $128.25 Total ALL Pmts: 139,281.54
Balance: $0.00
***********************+****************************************************************+***
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 18.25
PF 00100003112300 PLAN CHECK FEES 110.00
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-213 8
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT COMM BUILD PERMT
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.......: SAFEWAY STORE
Parcel No....: 210311415011
OWNER SAFEWAY STORES 46 INC O1/29/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT PIONEER GENERAL CONTRACTORS Ol/29/2008
P.O. BOX 7968 / 3850 MACK ROAD
AMARILLO
TX 79114
License: 268-A
CONTRACTOR PIONEER GENERAL CONTR.ACTORS O1/29/2008
P.O. BOX 7968 / 3850 MACK ROAD
AMARILLO
TX 79114
License: 268-A
Permit # B08-0013
Project # —1�> 1'� C�`� �' ,"; `� �
Status . . . : ISSUED
Applied .. . : O1/29/2008
Issued . . . : 04/14/2008
Expires.....: 10/ 11 /2008
Phone: 806-622-3100
Phone: 806-622-3100
Desciption:
SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE
Occupancy: M
Type Construction: IIIB
Valuation: 2,400,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 1903
*+*r+r*r*************+**+*�sr+*�*�s*********��***�►**s►s�rrr»e�*s**♦ FEE SUMMARY ****ers*x�rsr***�a*+s**e**st�****+**t*t****+*s►s*rr*a**r***r
Building------> $10, �18. 75 Restuarant Plan Review--> $o. 00 Total Calculated Fees--> $19, 592. 94
Plan Check---> $ 6, 96 7. 19 Recreation Fee--------------> $1, 9 0 3. 0 0 Additional Fees----------> 119 , 5 6 0. 3 5
[nvestigation-> $ o. o o TOTAL FEES-------------> $19 , 5 92 . 94 Total Permit Fee---------> 13 9, 153 . 2 9
W ill Call-----> $ 4. 0 0 Payments-------------------> 13 9, 15 3. 2 9
BALANCE DUE---------> $ 0. 0 0
«*******r***r*rr►*�a+»+**�*+*�*r►+�**�*�►�*�t***���*****+****�sa**.*+:►.*****r**»**��+***+*+�***■+�.*rs*�****r**►+►+***s*******rrr■**r►*�:+��t*��
Approvals:
Item: 05100 BUILDING DEPARTMENT
02/13/2008 cgunion Action: CR
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0013\B08-0013.DOC
03/31/2008 cgunion Action: AP APPROVED
REVISED/CORRECTED PLANS WITH REVISION DATE OF 3/7/08
Item: 05400 PLANNING DEPARTMENT
02/21/2008 rlf Action: CR
F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0013\B08-0013 Planning
comments.doc
04/11/2008 RLF Action: AP DRB CONDITIONS
FROM 12/4/07 MET.
Item: 05600 FIRE DEPARTMENT
02/13/2008 cgunion Action: CR per email from
Mike Vaughan
04/10/2008 mvaughan Action: COND l. No fire
protection engineer is shown
2. Shop fire alarm and sprinkler drawings (engineer
stamped) required.
3. Janitors closet shown with shelving for haz mat
storage. Cabinets required.
4. Gas fireplace shutoff shall be minimum 6 ft from
appliance.
5. E.M. lighting appears inadequate at front
of store .
6. No licensed fire protection contractors are listed.
Item: 05500 PUBLIC WORKS
O1/30/2008 TEK Action: NA No PW issues
Item: 05700 ENVIRONMENTAL HEALTH
04/09/2008 cgunion Action: AP APPROVED PER EMAIL
FROM BILL CARLSON
*.*�.���*.*.*.*«*.*,*�*,.,.,.*.�**.+�*.*...*..*+..***.+...*.*..**....+.s****.**�*.....*+���.****.**s*.,��*..*.*.�*.***s*..++..*..*+***�.�++*.*.�*
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinance,� of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOURjL9�Si� A�A1�l�J'� BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM •
4PM. / � �� //
ATIIRE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
**++*********************+*****************�+***********************************************
TOWN OF VAIL, COLORADO Statement
**************************************+*************+++***+*********************************
Statement Number: R080000437 Amount: $12,625.7504/14/200810:36 AM
Payment Method: Check Init: DDG
Notation: Safeway 050-
0003083
-----------------------------------------------------------------------------
Permit No: B08-0013 Type: ADD/ALT COMM BUILD PERMT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: 139,153.29
This Payment: $12,625.75 Total ALL Pmts: 139,153.29
Balance: $0.00
***********�********************************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 10,718.75
RF 11100003112700 RECREATION FEES 1,903.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
,'
�rowr�oFV� �
ASBESTOS TESTING REQUIREMENTS
�
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS
TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT
APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR
REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER
OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
• I have included the asbestos test and report with my building permit application
applicant signature
OR
date
�
• I certify my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature
OR
date
• The building was constructed after October 12, 1988. The date of construction was
applicant signature
date
original construction date
http://www.vailgov.com/docs/dl_forms/building�ermit_4-17-2007.DOC Page 5 of 7 04/17/2007
********************************************************************************************
TOWN OF VAIL, COLORADO Statement
********************************************************************+***********************
Statement Number: R080000116 Amount: $6,967.19 O1/29/200803:39 PM
Payment Method: Check Init: JS
Notation: 2179/PIONEER
GENERAL CONTRACTORS
-----------------------------------------------------------------------------
Permit No: B08-0013 Type: ADD/ALT COMM BUILD PERMT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $17,689.94
This Payment: $6,967.19 Total ALL Pmts: $6,967.19
Balance: $10,722.75
********�***********************************************************************�x***********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 6,967.19
�/
_ �'
�� �� ��,� �
75 S. Frontage Rd.
Vail Colorado 81657
�
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS�� �� � S� �
Project #: ,,_,
� � � Building Perm�t #: ��
� � 970,-47�'-�,1.49. ��ns�e,c.,tions)
� TOWN OF VAIL BUILDING PERMIT APPLICAT
Separate Permits are required for electrical, plumbing, mecF
CONTRACTOR INFORMATION
General Contractor: Town of Vail Reg. No.: Pearre Chase
Pioneer General Contractors, Inc. ��-� 806-622-3100
Email address: Pearre.chase@pioneergc.com Fax #: 806-622-3803
Contractor Signature:
���.. I�C._.�
���� lV/ �
et�QIV
�
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor 8� Materials)
BUILDING: $ 1,915,000.00 ELECTRICAL: $ 300,000.00 OTHER: $ N/A
PLUMBING: $ 100,000.00 Mechanical:$ 85,000.00 Total:$ 2,400,000.00
For Parcel # Contact
�=�w.�� a'�„ �.;`'F,�'1�31.1415011r
Job Name: Safeway #631
Legal Description I Lot: 3
Owners Name: Safeway, Inc.
Peterson-Staggs Architects
Engineer: EHM Engineers
description
Assessors Office at 970-328-8640 or visit
Job Address: 2131 North Frontage Road
West Vail, CO 81657
Block: 0247 I Filing: 3
� Address: 6900 South Yosemite
Englewood, CO 80112
Address: 3200 West State Street
Boise, ID 83703
� Address: 3501 West Elder Street
Boise, ID 83703
Grocery
Subdivision: Vaildas-Shone
e:
Work Class: New ( ) Addition ( ) Remodel (X ) Repair ( ) Demo ( ) Other ( )
Work Type: Interior () Exterior () Both (X ) Does an EHU exist at this location: Yes () No ( X)
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial ( X ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: N/A No. of Accommodation Units in this building: N/A
No/Type of Fireplaces Existing� Gas Appliances () Gas Logs () Wood/Pellet () Wood Burning () N/A
No/Type of Fireplaces Proposed: Gas Appliances (X ) Gas Logs ( X) Wood/Pellet () Wood Burning (NOT
ALLOWED)
Does a Fire Alarm Exist: Yes ( X) No () Does a Fire Spnnkler System Exist: Yes (X ) No ()
*********************************************FOR OFFICE USE ONLY*****************************************************
Date Received:
http://www.vailgov.com/doa/dl_forms/building�ermit_4-17-2007.D0� Page 1 of 7 04/17/2007
SEP,25,2008 3:13PM � KUMAR & ASSOCIATES INC
� •G�'�' �a,�_ V' iA� � l.
Kamar �, Ass�ciabess Inc-
�—�— Gentechnical and Materials Engirreers
and Environm�ental Scientists
N0. 860 P. 1
2390 S. Lipan St. Denver, CO 80223
Phone:303-742-9700 Fax:303-742-9666
www.kumarusa.com
Fax Transxnit�al
Loe9tions: Denver, �'ort Collans, Colorado Springs, Pueblo and Winter ParlJFraser, Colorado
To: (h �,�� ('�u�-c w�z From: C.a,x�� �DU� 5
Of:
FaX: i- q�(� - 32$ - 1�g �
Phone:
Date: September 25, 2008
No. o£ Pages (including cove�) Z
Project Number:
Subject: �grEwe,� VAz� ��xY p���vA�-�.,�
The contents of this transmittial are solely for che individual to whom this transmiL�al is direeted.
This information fs ro be considcred CONFTDENTIAL.
COTI1ri1f21CS:
GEOTECHNICAL ENGCN�ERING:
• Found�tion Studics
• Geotechnical D�sign of Slopes and
Slope Retendon Systems
• Geotcchnicallnswmcntation
• �orettisic Studies
• psveroent Thiekne3s Design and
Pavement Rehabili�ation
• Landslide Idenufication and�
MiLig3tioD Studies
• Nondes�ructive Pavement Suvctural
Evaluation Using FWD
ENVtRONMENTAL 5CIENCFS:
• .ASTM 7rsnsacdon Scrans
� Phase I snd il Environmental Site
Assessmencs
• Soil and Groundwacer Remedietion
Dcsi;n, ConQacting, Ove�sight and
Repordng
• Asbestos and Lead-Based Paint
Sur�cys
• Undesground Euel Storage Tank
Removal snd Site Characceriration
• Discharge Permitting
• Asbesws Air Monitoring
• Mold Znvestigations
• Property Condirion Asscssmtncs
;� �
� � � p �,; `� t �
', b �' + , F'.
�'
MATERIALS TESTING,
CoNSTRUCTION ���RVATION
AND INSPECTION:
• �arthwork
� Foundation ConSflrucrion
� COntre[e
� Reinforcing Sucl
• Masonry
• StructuYal Steel
• Fireproofino
• Asphalt
• Geotechnical Specialry Construction
-� 6
ENGIN�ertnvG GEOLA�Y:
� Expansivc Soils
• Unstable Slopes
� Rockfall
• Debris Flows
• Subsidcnc� Over Undcrgound
Cavitics
LABORA7'oR7 SERYICFs:
• Soils
• Aggregaics
• Concrece
• Asphalt
• Chcmically Stabilizcd Soils and
Sases
• Asphal; Concrete and Chemical
Stabilization Mix Desigi Scrvices
��� . 239U 5ou1h Lipon Sveel
Kumar& Associates, Inc. Dem�e[,coson�
phone:307-742-9700
Geotechnlcaland Matena[sEnglneers fx:c:303•7d2-95fi6
a�d Envtronmental Scientists unail= kadem�r�@kumarus�com
wtivw.ku marus�oom
� OLhu OClice Loca�iuns: Colofado Springs, Pori Collins, I'ueblo, and
Winter Packl�raser, Color.�do
� REfNFORCI{�G STEEL OBSERVAiION_REPORT
Brian Han�ig PROJECi NO. 08-1-261
� Safeway, Inc. DAILY REPORT t�0. 4
� 8900 S. Yosemiie Streei Safeway StorE tt611
o Englewaod, CO 60112
� Vail, CO
Structure: Footing Elevation: 3'BG
Location: Southwest corner and southeast corner af b�tilding
�
z
w
�
Q
U
O
c�
cr�
Q
azs
d
Q
�
�
�C
�
�
�-,
,�
0
0
.
�;
�
�
��
.��
Structura4 Plan 8 Sheet No. See Atlachments
Architectura� Plan & Sheet No.
Grade: 60
Size: YES � NO ❑
Length: YES 0 NO ❑
Loeation: YES❑� NO❑
REFERENCE
Shop Drawing Sheet lVo.
Other:
REINFORCING STE�L COMPLIANCE
Quantity: YES ❑� NO ❑ NIA ❑
N1q ❑ Spacing: YES ❑� NO ❑ NIA ❑
N!A ❑ Clearance: YES � NO ❑ fVlA ❑
NIA❑ Cleanlioess: YES� NO❑ NlA❑
NON-COMPLIANCE I�iFORIUTAiION
Support:
Splice:
Dowels:
Qih er:
YES ❑�
YES ❑
YES ❑�
YES �
Date: 9I24/2008
SHEET 'f OF 1
�O ❑
NO ❑
NO❑
NO ❑
N�A ❑
N1A ❑f
PlIA ❑
N/A ❑
�rogress Report: Drilled and epoxied bars. One Simpson set 22 epoxy.
❑ FULL-TIME OBSERVATIdN � PAR�-T�ME OBSERVATION
Field Observer: David Bofioms
Cc: book, file, Pioneer Genera)
CONTRACTOR ADVISED: ❑� YES ❑ NO IH CENERAL COMPLfANCE: �YES ❑ IVO
Reviewed By: ScctEt B. Hougard, Project Supervisor
���� 2390 South Lipan Street
Kumar & Associates, Inc. Denver, co sozzs
phone:303-742-9700
Geotechnical and Materiais Engineers fax: 303-742-9666
� � email: kadenver@kumarusa.com
.�--�,.`,�,, and Enviro�mentai Scientists www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Fraser. Colorado
CONCRETE TEST RESULTS
(ASTM C39)
Brian Hannig
Safeway, I nc.
6900 S. Yosemite Street
Englewood, CO 80112
PROJECT N0. OS-1-261
Safeway Store #611
Vail, CO
Sample Location Foundation wall F.3-H/7-6
Date Sampled 6/26/2008
No. of Specimens 4
Supplier B&B
Truck Number 6042
Mix Design 36042474
Slump 3 in.
Air Temperature 73
Water Added
Time Sampled 10:35 AM
Curing Method Lab
Ticket Number 32123466
Date Received in Lab 6/27/2008
Air Content 4 %
Concrete Temperature 74
Sampled By AW
Batch Size 10 CY
Batch Time 9:28 AM
Unit Weight 144.4 pcf
STRENGTH TEST DATA
Average Specimen Diameter 4 in. Area 12.57 sq. in. Design Strength 4000 psi
Percent Type of
Specimen Test Date Age (days) Load (Ibs) Strength (psi) of Design Fracture
C9504-1 7/3/2008 7 46820 3730 93 A
Reported By
Scott B. Hougard, Project Supervisor
cc: book, file, B&B
Pioneer General
These test results only apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written
approval of Kumar and Associates, Inc. Testing performed in accordance with ASTM C31, C39, C138, C143, C231, and C1231.
�,�.� Kumar 8� Associates IIIC. 2390 South Lipan Street
� Denver, CO 80223
phone:303-742-9700
���, Geotechnicai and Materials Engineers fax: 303-742-9666
��
��and Environmental Scientists ema� : a enverc kumarusa.com
� www. kumarusa. com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Fraser. Colorado
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Engiewood, CO 80112
PROJECT NO. 08-1-261
Safeway Store #611
Vail, CO
Sample Location Stem wall A.9-C.7
Date Sampled 6/25/2008
No. of Specimens 4
Supplier B&B
Truck Number 6003
Mix Design 36042474
Slump 3.0 in.
Air Temperature 80
Water Added
CONCRETE TEST RESULTS
(ASTM C39)
Time Sampled 2:18 PM
Curing Method Lab
Ticket Number 32123417
Date Received in Lab 6/26/2008
Air Content 4.9 %
Concrete Temperature 74
Sampled By BH
Batch Size 10 CY
Batch Time 1:06 PM
Unit Weight 143.3 pcf
STRENGTH TEST DATA
Average Specimen Diameter 4 in. Area 12.57 sq. in. Design Strength 3000 psi
Percent Type of
Specimen Test Date Age (days) Load (Ibs) Strength (psi) of Design Fracture
C9391-1 7/2/2008 7 39680 3160 105 A
Reported By
Scott B. Hougard, Project Supervisor
cc: book, file, B&B
Pioneer General
These test results only apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written
approval of Kumar and Associates, Inc. Testing performed in accordance with ASTM C31, C39, C138, C143, C231, and C1231.
���� 2390 South Lipan Street
Kumar & Associates, Inc. Denver, co sozz3
phone:303-742-9700
y..�� Geotechnical and Materials Engineers fax: 303-742-9666
� emaiL kadenver@kwnarusa.com
..��� and Environmental Scientists www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser. Colorado
CONCRETE TEST RESULTS
(ASTM C39)
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
PROJECT NO. 08-1-261
Safeway Store #611
Vail, CO
Sample Location Pilasters on south side of building
Date Sampled 7/7/2008
No. of Specimens 4
Supplier B&B
Truck Number 6092
Mix Design 36042474
Slump 4 in.
Air Temperature 65
Water Added 5 gals
Time Sampled 2:00 PM
Curing Method Lab
Ticket Number 32123897
Date Received in Lab 7/8/2008
Air Content 5.0 %
Concrete Temperature 68
Sampled By DB
Batch Size 10 CY
Batch Time 1:15 PM
Unit Weight 142.4 pcf
STRENGTH TEST DATA
Average Specimen Diameter 4 in. Area 12.57 sq. in. Design Strength 4000 psi
Percent Type of
Specimen Test Date Age (days) Load (Ibs) Strength (psi) of Design Fracture
C9532-1 7/14/2008 7 39080 3110 78 A
Reported By
cott B. Hougard, Project Supervisor
cc: book, file, B&B
Pioneer General
These test results only apply to the samples which were tested. The testing report shall not be reproduced, except in ful�, without the written
approval of Kumar and Associates, Inc. Testing performed in accordance with ASTM C31, C39, C138, C143, C231, and C1231.
����
-..�...,�.1'
..—e.�...,�..'^
��
Kumar � Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
2390 South Lipan Street
Denver, CO 50223
phone:30S-742-9700
fax:303-742-96ti6
emaiC kadenver@kwnarusa.com
www.kumarusa.com
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
WEATHER CONDITIONS: (AM) Clear, 45°
CONTRACTORS EQUIPMENT:
Other Office Locations: Colorado Springs, Port Collins, Pueblo, and
Winter Park/Fraser, Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261 Date: 4/28/2008
DAILY REPORT NO. 1 SHEET 1 OF 1
Safeway Store #611
Vail, CO
(PM)
CONSTRUCTION OBSERVATION AND COMMUNICATION: When we arrived on site the contractor was excavating a smail area outside of
the proposed footing line. The hole was excavated to a depth of 6'. The top 3' was fill and the bottom 3' was a very damp siity clay. We asked
the contractor is he could get in the area of the footing. A smali section of sidewalk was removed and a hole was excavated to a depth of 6'. The
top 3' to 3 1/2' appeared to be road base (sand and gravel) and the remaining material was the silty clay. The contractor informed us that he
would excavate down 2' below the bottom of the footing and use structural fill in the bottom 2'.
Fieid Observer: Darrell C. Huss
Cc: book, file, Pioneer General
Reviewed By: Scott B. Hougard, Project Supervisor
����
��
Kumar & Associates, �nc.
Geotechnical and Materials Engineers
and Environmental Scientists
Brian Hannig
Safeway, I nc.
6900 S. Yosemite Street
Englewood, CO 80112
WEATHER CONDITIONS: (AM) Clear, 62°
CONTRACTORS EQUIPMENT:
2390 Sou[h Lipan Street
Denver, CO SC223
phone: 303 J42-9700
fax:303-742-9666
email: kadenver@kumarusacom
www.kumarusa com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser, Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 2
Safeway Store #611
Vail, CO
(PM)
Date: 5/5/2008
SHEET 1 OF 1
CONSTRUCTION OBSERVATION AND COMMUNICATION: A test pit was excavated at the southeast corner of the existing building. The top
6' of material was silty damp black clay. Under the clay was red sand, gravel and large rocks. We informed the contractor that this native
material was suitable for footing to bear on. We also informed him that this material should be compacted prior to placement of any fill and/or
concrete.
Field Observer: Darrell C. Huss
Cc: book, file, Pioneer General
Reviewed By: Scott B. Hougard, Project Supervisor
� 2390 South Lipan Street
"�"" Kumar & Associates, inc. Denver,CO80223
phone:303-742-9700
r�,��, Geotechnical and Materials Engineers fax: 303-742-9666
and Environmental Scientists
...•--� email: kadenver@kumarusa.com
www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Fraser_ Colorado
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Engiewood, CO 80112
Structure: Stem walls
Location: A.9-C.7, H.1-F.3
Structural Plan & Sheet No. S1.1, S2.1
Architectural Plan & Sheet No.
Grade: 60
Size: YES 0 NO ❑
Length: YES ❑� NO ❑
Location: YES � NO ❑
REINFORCING STEEL OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 1
Safeway Store #611
REFERENCE
Vail, CO
Elevation: 96' to 100'
Shop Drawing Sheet No.
Other:
REINFORCING STEEL COMPLIANCE
Quantity: YES � NO ❑ N/A ❑
N/A ❑ Spacing: YES � NO ❑ N/A ❑
N/A ❑ Clearance: YES � NO ❑ N/A ❑
N/A ❑ Cleanliness: YES � NO ❑ N/A ❑
NON-COMPLIANCE INFORMATION
Support:
Splice:
Dowels:
Other:
YES �✓
YES ❑�
YES 0
YES ❑
Date: 6/25/2008
SHEET 1 OF 1
NO ❑
NO ❑
NO ❑
NO ❑
N/A ❑
N/A ❑
N/A ❑
N/A ❑
rrogress Report:
❑ FULL-TIME OBSERVATION ❑`� PART-TIME OBSERVATION
Field Observer: Brad Henderson
Cc: book, file, Pioneer General
CONTRACTOR ADVISED: ❑� YES ❑ NO IN GENERAL COMPLIANCE: � YES ❑ NO
Reviewed By: Scott B. Hougard, Project Supervisor
�� 2390 South Lfpan Street
Kumar & Assoeiates, If1C. Denver, co so2��
�� phone:303-742-9700
�� Geotechnical and Materials Engineers fax: 303-742-9666
dnd EnVlronmental SClentist5 email: kadenver@kumarusa.com
www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser, Colorado
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
PIER OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 2
Safeway Store #611
Vail, CO
Date: 6/19/2008
DEPTH VARIATION
N
IN IN �= C7= pZ
OVER- BED- TOTAL ELEV. ELEV. OVER UNDER CONDITION �~ Z� a
PIER PIER BURDEN ROCK HOLE GROUND TOP OF BOTTOM OF � w Q w O � WATER SUPPORTING
NO. DIAM. DEPTH ELEV. PIER OF PIER WALLS 1 �� v o m v 3 STRATUM
7/A.9 36" 6'6" 96' 96' 89'6" -- -- NA -- -- Dry NA
8/B.1 48" 6'6" 96' 96' 89'6" -- -- NA -- -- Dry NA
7/B.9 48" 6' 96' 96' 90' -- -- NA -- -- Dry NA
8/C.6 48" 6' 96' 96' 90' -- -- NA -- -- Dry NA
7/C.7 48" 8'6" 99'6" 96' 91' -- -- NA -- -- Dry NA
� i� in oeanng sirawm. �[7 ueptn to top oi swrry. (3) uepth ot water in bottom of hole.
PROGRESS REPORT: Pier 7lD.7 at existing doorway.
Cc: book, file, Pioneer General Field Observer: Dana Cotter Reviewed By: Scott B. Hougard, Project Supervisor
Page: � End of Daily Report 2
This report is intended for the client and distribution as indicated. The report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.
�
x ,i�
r
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
Brian Hannig
Safeway, I nc.
6900 S. Yosemite Street
Englewood, CO 80112
2390 South Lipan Street
Denver, CO 80223
phone:303-742-9700
fax:303-742-9666
emaiC kadenver@kumarusa.com
www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Fraser, Culorado
PIER OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 3
Safeway Store #611
Vail, CO
Date: 6/20/2008
DEPTH VARIATION
IN IN �2 ?= OZ
OVER- BED- TOTAL ELEV. ELEV. OVER UNDER CONDITION �~ �' � Q
PIER PIER BURDEN ROCK HOLE GROUND T.OP OF BOTTOM OF � w Q w O � WATER SUPPORTING
NO. DIAM. DEPTH ELEV. PIER OF PIER WALLS 1 N O v o m v 3 STRATUM
7/E.7 9�6�� 99�6�� g6� 90' -- -- NA -- -- Dry NA
7/F.7 9'6" 99'6" 96' 90' -- -- NA -- -- Dry NA
8/G.3 9' 99'6" 96' 90'6" -- -- NA -- -- Dry NA
7/G.5 9'6" 99'6" 96' 90' -- -- NA -- -- Dry NA
7/H.1 9'6" 99'6" 96' 90' -- -- NA -- -- Dry NA
8/H.3 8'6" 99'6" 96' 91' -- -- NA -- -- Dry NA
� � � n � ueanng s�ra�um. <<� uep[n to top or siurry. �3) uepth ot water in bottom of hole.
PROGRESS REPORT: Pier 7/D.7 at existing doorway.
Cc: book, file, Pioneer General
Field Observer: Dana Cotter Reviewed By: Scott B. Hougard, Project Supervisor
Page: 1 End of Daily Report 3
This report is intended for the client and distribution as indicated. The report shall not be reproduced, except in full, without the written approval of Kumar and Associates, Inc.
����
��
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
2390 Sou[h Lipan Stree[
Denver, CO 80223
phone:303-742-9700
fax:303-742-9666
email: kadenver@kumarusa.com
www.kumarusa.com
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Engiewood, CO 80112
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser, Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 1
Safeway Store #611
Vaii, CO
Date: 6/4/2008
SHEET 1 OF 1
Cc: book, file, Pioneer General
����
���
.�.,�..�
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
2390 South Lipan Stree[
Denver, CO 80223
phone:303-742-9700
fax:303-742-9666
email: kadenver a kumarusa.com
www.kumarusa.com
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
Other Office Loca[ions: Colorado Springs, Fort Collins, Puebio, and
W inter Park/Fraser, Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261 Date: 6/18/2008
DAILY REPORT NO. 1 SHEET 1 OF 1
Safeway Store #611
Vail, CO
C;c: booK, tile, Nioneer General
1�-��
�'�*�rw.,..�,./'
�-�+.."��'"�.�..�
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
2390 South Lipan Street
Denver, CO 80223
phone:303-742-9700
fax:303-742-9666
email: kadenver(c�kumarusa.com
www.kumarusacom
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
Other Office Loca[ions: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser_ Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 2
Safeway Store #611
Vail, CO
Date: 6/16/2008
SHfET 1 OF 1
Cc: book, file, Pioneer General
�I��� Z390 South Lipan Street
Kumar 8� Associates, �IIC. Denver, CO 80223
phone:303-742-9700
.�.� Geotechnical and Materials Engineers fax: 303-742-9666
��.J' email: kadenver cr kumarusa.com
,. � and Environmental Scientists
www. kumarusa. com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser, Colorado
WELDING INSPECTiON REPORT
Brian Hannig
Safeway, inc.
6900 S. Yosemite Street
Englewood, CO 80112
SHOP OR FIELD WELDING: Field
WEATHER CONDITIONS: Clear, 60°
VT � MT ❑ UT ❑ Electrodes: E-70XX
LOCATION AND DESCRIPTION OF WORK:
1. We visited the project site in Vail as requested.
PROJECT NO. 08-1-261
DAILY REPORT NO. 2
Safeway Store #611
Vail, CO
STANDARD OR CODE: AWS D1.1
Date: 6/16/2008
SHEET 1 OF 1
Type of Welds: Various Weld Size: Various
2. Requested welder certification. No certification available. Specifications require welders to be certified to
AWS D1.1. All welds shall be removed and rewelded by a certified welder.
3. Bolts too short at column F.3.
4. Existing welding is of very poor quality and shall be rejected for insu�cient size, incomplete fusion,
incomplete penetration. Please see OD list.
�
REMARKS: See OD List
Welds in the above described items were determined to be in general accordance with project specifications, standards and code, unless
otherwise noted.
Field Observer: Michael Shearer, CWI
Cc: book, file, Pioneer General
Reviewed By: Scott B. Hougard, Project Supervisor
Kurt�r & Associates, tnc. 2390 South Lipan Street
—�— Geotechnical and Materiais Engineers Denver, CO 80223
and Environmental 5cientists Phone: (303) 742-9700
Fax: (303) 742-9666
�_� Email: kadenver@kumarusa.com
www.kumarusa.com
Office Locations: Denver, Colorado Springs, Fort Collins, Colorado
Branch Office: Pueblo, Colorado
LIST OF OUTSTANDING DISCREPANCIES
PROJECT:SAFEWAY VAIL, CO
INSPECTOR:
PROJECT N0.:08-1-261
DATE: 6-16-08
ITEM LOCATION AND DESCRIPTION DATE
NUMBER ACCEPTED
OQ1 WELDER HAS NO CERTIFICATION
SPECIFICATIONS REQUIRE ALL WELDERS CERTIFIED TO AWS
D1.1
Q()2 BOLTS TO SHORT AT COLUMN F.3
OQ3 EXISTING WELDING 1S OF VERY POOR QUALITY,
INSUFFICIENT SIZE, 1NCOMPLETE FUS10N, INCOMPLETE
PENETRATION.
����
��
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental 5cientists
2390 South Lipan Street
Denver, CO 80223
phone:303-742-9700
fax:303-742-9666
emait kadenver@kumarusa.com
www.kumarusa.com
CONSTRUCTION OBSERVATION REPORT
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
WEATHER CONDITIONS: (AM) Cloudy, Light Snow, 46°
CONTRACTORS EQUIPMENT: (Masonry)
Other Of6ce Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Praser, Colorado
PROJECT NO. 08-1-261
DAILY REPORT NO. 1
Safeway Store #611
Vail, CO
(PM)
Date: 6/11 /2008
SHEET 1 OF 1
CONSTRUCTION OBSERVATION AND COMMUNICATION: 7/8" diameter holes, 6 1/2" deep were drilled into the column pad at grid line G3
and Hilti HY150 epoxy was injected into each hole. Ten inch long, 3/4" diameter, Hilti bolts were set in each hole. All holes were cleaned with
forced air prior to epoxy.
3/4" diameter holes, 6 1/2" deep were drilled into the existing foundation wall at grid line C2, C6 and E6. The holes were cleaned and 5/8"
diameter Hilti anchor bolts were set in HY150 epoxy.
Field Observer: Darrell C. Huss
Cc: book, file, Pioneer General
Reviewed By: Scott B. Hougard, Project Supervisor
����
-�`r" ��
Kumar & Associates, Inc.
Geotechnical and Materials Engineers
and Environmental Scientists
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Englewood, CO 80112
2390 South Lipan Street
Denver, CO 80223
phone:303-742-9700
fax: 303-742-9666
email: kadenver@kumarusa.com
www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
Winter Park/Fraser, Colorado
CONSTRUCTION OBSERVATION REPORT
PROJECT NO. 08-1-261
DAILY REPORT NO. 2
Safeway Store #611
Vail, CO
Date: 6/10/2008
SHEET 1 OF 1
Cc: book, file, Pioneer General
���� Kumar 8� Associates �fiC. 2390 South Lipan Street
� Denver, CO 80223
phone:303-742-9700
l,,,, Geotechnical and Materiais Engineers fax: 303-742-9666
,r.,. �`�,..� emaiL kadenver@kumarusa.com
r�� and Environmental Scientists www.kuman�sa.com
Other Office Locations' Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser. Colorado
CONCRETE TEST RESULTS
(ASTM C39)
Brian Hannig
Safeway, Inc.
6900 S. Yosemite Street
Engiewood, CO 80112
PROJECT NO. 08-1-261
Safeway Store #611
Vail, CO
Sample Location Piers 7/E.7, 7/F.7, 8/G.3
Date Sampled 6/20/2008
No. of Specimens 4
Supplier B&B
Truck Number 6042
Mix Design 36042474
Slump 6 in.
Air Temperature 75
Water Added 5 gals
Time Sampled 10:10 AM
Curing Method Lab
Ticket Number 32123150
Date Received in Lab 6/23/2008
Air Content
Concrete Temperature 73
Sampled By DC
Batch Size 10 CY
Batch Time 9:08 AM
Unit Weight
STRENGTH TEST DATA
Average Specimen Diameter 4 in. Area 12.57 sq. in. Design Strength 3000 psi
Percent Type of
Specimen Test Date Age (days) Load (Ibs) Strength (psi) of Design Fracture
C9343-1 6/27/2008 7 29410 2340 78 A
r
Reported By
Scott B. Hougard, Project Supervisor
cc: book, file, B&B
Pioneer General
These test results only apply to the samples which were tested. The testing report shall not be reproduced, except in full, without the written
approval of Kumar and Associates, Inc. Testing performed in accordance with ASTM C31, C39, C138, C143, C231, and C1231.
1��� Kumar 8� Associates Inc. z390 so�cn L�Pa� sc�eet
� Demer, CO 30223
phone:303-742-9700
�„�l�, Geotechnical and Materials Engineers fax: 303-742-9666
email: kadenver@kumarusa.com
�'**�� and Environmental Scientists
'"�~"���„�.�.�' www. kumanisa. com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo, and
W inter Park/Fraser, Colorado
CONCRETE TEST RESULTS
(ASTM C39)
Brian Hannig
Safeway, I nc.
6900 S. Yosemite Street
Englewood, CO 80112
PROJECT NO. 08-1-261
Safeway Store #611
Vail, CO
Sampie Location Pier 7/A.9, 8/B.1, 7/B.9
Date Sampled 6/19/2008
No. of Specimens 4
Supplier B&B
Truck Number 6091
Mix Design 36042474
Slump 5 in.
Air Temperature 80
Water Added 10 gals
Time Sampled 2:30 PM
Curing Method Lab
Ticket Number 32123125
Date Received in Lab 6/20/2008
Air Content
Concrete Temperature 72
Sampled By DC
Batch Size 10 CY
Batch Time 1:09 PM
Unit Weight
STRENGTH TEST DATA
Average Specimen Diameter 4 in. Area 12.57 sq. in. Design Strength 3000 psi
Percent Type of
Specimen Test Date Age (days) Load (Ibs) Strength (psi) of Design Fracture
C9344-1 6/26/2008 7 34130 2720 91 A
Reported By
Scott B. Hougard, Project Supervisor
cc: book, file, S&B
Pioneer General
These test results only apply to the samples which were tested. The testing repoR shall not be reproduced, except in full, without the written
approval of Kumar and Associates, Inc. Testing performed in accordance with ASTM C31, C39, C138, C143, C231, and C1231.
� Kumar & Associaies, Inc.
Geolechnical and Matenals Engineers
and Environmenlal Scientisls
June 4, 2008
Mr. Brian Hannig
Safeway, Inc.
6900 South Yosemite Street
Centennial, Colorado 80112-1412
r.----�..
ACEC
MEMBER
2390 South Lipan Street
Denver, CO 80223
phone:(303)742-9700
fax:(303)742-9666
e-mail: kadenver@kumanisa.com
www.kt�marusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo
and Winter Park/Fraser, Colorado
Subject: Preliminary Results of Geotechnical Engineering Study, Proposed Additions
to Safeway No. 0631, 2131 North Frontage Road, Vail, Colorado
Project No. 08-1-320
Dear Mr. Hannig:
This report presents preliminary results of a geotechnical engineering study for the proposed
addition to Safeway No. 0631 located at the subject address.
Proposed Construction: We understand the proposed construction consists of addition of
canopy in front (south) of the Safeway store and construction of decorative planters and
support columns. We understand the proposed column loads vary between 40 to 89 kips.
Existinq Conditions: At the time of our study, the construction of the various parts of the
addition were underway. An earlier report prepared by Geotek, Inc. under their Project No.
15474 dated October 7, 1976 was being utilized for information on geotechnical conditions
for this addition. Four borings were drilled for that geotechnical report along the west
expansion during that time. The geotechnical report recommended overexcavation of
existing fill and replacement by compacted structural filt with expansion to be founded on
spread footing foundation system designed for an allowable soil bearing pressure of 4,000
psf.
Earlier attempt to install steel helical piers were not successful because enough torque could
not be imparted on the helical piers to ensure the adequate bearing capacity.
Subsurtace Conditions: Three exploratory borings were drilled near the proposed foundation
areas as determined by Mr. Michael Bolton of Pioneer General Contractors. The
approximate locations of the exploratory borings are shown on Fig. 1. Logs of exploratory
borings are presented on Fig. 2 and legend and notes on Fig. 3. The laboratory tests on
selected samples obtained from the exploratory borings is currently underway. The final
report will include the results of laboratory testing.
The borings encountered 8 to 10 feet of man-placed fill consisting of sandy clay with fine to
medium grained gravel with non-plastic to low-plasticity, with blow counts between 8 to 34 in
the fill. The higher blow counts in the fill were probably due to large size gravel or cobble
within the fill material. Below the fill, the borings encountered poorly graded gravel with sand
and clay with cobbles which are to coarse grained and dense to very dense based on blow
counts between 54 for 8 inches to 54 for 11 inches of sample penetration. Ground water
was not encountered in the borings.
Foundation Recommendations: Based on the subsurface conditions encountered in the
exploratory borings and the proposed nature of the construction, we recommend the
foundation for the proposed addition consist of spread footings. The existing fill does not
Safeway, Inc.
June 4, 2008
Page 2
appear to be piaced in controlled and compacted conditions. Footings placed on the existing
fill will be subject to future settlement and distress. Therefore, we recommend the existing fili
be overexcavated on footing placed below the fill. The footings should be founded either on
the natural poorly graded gravel with sand and clay below the fill or on compacted structural
fill.
Footings placed on the gravel layer below the fill and with long-stem walls may be designed
for allowable end bearing pressure of 5,000 psf. The excavated material may be used as
backfill around the stem wall and compacted to at least 95% of standard Proctor density as
determined by ASTM D 698 at moisture content of ±2 percent of the optimum moisture
content.
Alternately, the existing fill should be excavated below the footings and in a footprint area
defined by 1.5 horizontal to 1 vertical. The excavated material may be placed back in 1-foot
thicknesses and compacted to at least 98% of the standard Proctor density at the moisture
content of ±2 percent of the optimum. The footings placed on the structural fill should be
designed for an allowable soil bearing pressure of 4,000 psf.
Exterior footings should be provided with adequate cover above their bearing elevations for
frost protection. Continuous foundation walls should be reinforced top and bottom to span
an unsupported length of at least 10 feet. Areas of loose or soft material encountered at the
foundation bearing level within excavation should be removed and the footings extended
down to adequate natural bearing material. Other good construction techniques which are
applicable should also be followed.
The existing fill materials classify as Type C soil requiring 1.5 horizontal to 1 vertical slope for
unbraced construction. Alternately, the excavation should be braced or protected by trench
shield for safe construction procedures. All safety requirements by OSHA on other
government agencies should be followed for excavations at the site.
Other foundation types including, rammed geopiers, drilled piers or steel helical piers with
considerably higher torque, may also be considered for support of the foundations loads. We
can provide recommendations for these alternates, if requested.
If you have questions or need additional information, please call.
Sincerely,
KUMAR & ASSOCIATES, INC.
Narender (Ned) Kumar, P.E.
OQ`PDO ER G/s�
�o : ���ao k��Fo
1707� � ;
- . �. � �- v-�
�� ••a...o.
NK/mj F'��'l�N���� �/� �a �
cc: book, file
cc: Petersen Staggs Architects, Attn: Todd Poirier (email)
Core Engineering, Attn: Michael K. Brown (email)
Pioneer General Contractors, Attn: Pearre Chase (email)
0&1 �2011r k
Kumar & Associates, Inc.
LEGEND
�FILL: SANDY CLAY WITH FINE TO MEDIUM GRAINED GRAVEL, NON PLASTIC TO LOW PLASTICITY,
SLIGHTLY MOIST, BROWN AND RED.
b' :
��� POORLY GRADED GRAVEL WITH SAND AND CLAY (GP—GC), WITH COBB�ES, FINE TO COARSE
��.o GRAINED, DENSE TO VERY DENSE, SLIGHTLY MOIST, BROWN AND REDDISH BROWN.
� DRIVE SAMPLE, 2—INCH I.D. CALIFORNIA LINER SAMPLE.
� DRIVE SAMPLE, 1 3/8—I.D. SPLIT SPOON SAMPLE, STANDARD PENETRATION TEST.
� ��� 2 DRIVE SAMPLE BLOW COUNT. INDICATES THAT 10 BLOWS OF A 140—POUND HAMMER
FALLING 30 INCHES WERE REQUIRED TO DRIVE THE SAMPLER 12 INCHES.
NOTES
1. THE EXPLORATORY BORINGS WERE DRILLED ON MAY 30, 2008 WITH A 4—INCH DIAMETER
CONTINUOUS FLIGHT POWER AUGER.
2. THE EXPLORATORY BORINGS WERE LOCATED.BY PIONEER GENERAL CONTRACTORS.
3. THE ELEVATIONS OF THE EXPLORATORY BORINGS WERE NOT MEASURED AND THE LOGS OF THE
EXPLORATORY BORINGS ARE PLOTTED TO DEPTH.
4. THE EXPLORATORY BORING LOCATIONS SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE
IMPLIED BY THE METHOD USED.
5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY BORING LOGS REPRESENT THE
APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL.
6. GROUND WATER WAS NOT ENCOUNTERED IN THE BORINGS AT THE TIME OF DRILLING.
7. LABORATORY TEST RESULTS:
WC = WATER CONTENT (%) (ASTM D 2216);
DD = DRY DENSITY (pcf) (ASTM D 2216);
+4 = PERCENTAGE RETAINED ON N0. 4 SIEVE ASTM D 422);
—200 = PERCENTAGE PASSING N0. 200 SIEVE ASTM D 1140);
LL = LIQUID LIMIT (ASTM D 4318);
PI = PLASTICITY INDEX (ASTM D 4318);
NP = NON—PLASTIC (ASTM D 4318).
��
o�
,�
m%
�a 08-1-320 Kumar & Associates LEGEND AND NOTES Fig. 3
;>
f
� Kumar & Associates, Inc.
Geotechnical and Matenals Engineers
and Environmental Scientists
June 19, 2008
Mr. Brian Hannig
Safeway, Inc.
6900 South Yosemite Street
Centennial, Colorado 80112-1412
��
ACEC
MEMBER
2390 South Lipan Street
Denver, CO 80223
phone:(303)742-9700
fax:(303)742-9666
e-mail: kadenver@kumarusa.com
www.kumarusa.com
Other Office Locations: Colorado Springs, Fort Collins, Pueblo
and Winter Park/Fraser, Colorado
Subject: Geotechnical Engineering Study, Proposed Additions to Safeway No. 0631,
2131 North Frontage Road, Vail, Colorado
Project No. 08-1-320
Dear Mr. Hannig:
This report presents results of a geotechnical engineering study for the proposed addition to
Safeway No. 0631 located at the subject address. Preliminary results of the study were
p�esented by us in a letter prepared under our subject project number dated June 4, 2008.
Proposed Construction: We understand the proposed construction consists of addition of
canopy in front (south) of the Safeway store and construction of decorative planters and
support columns. We understand the proposed column loads vary between 40 to 89 kips.
Existina Conditions: At the time of our study, the construction of the various parts of the
addition were underway. An earlier report prepared by Geotek, Inc. under their Project No.
15474 dated October 7, 1976 was being utilized for information on geotechnical conditions
for this addition. Four borings were drilled for that geotechnical report along the west
expansion during that time. The geotechnical report recommended overexcavation of
existing fill and replacement by compacted structural fill with expansion to be founded on
spread footing foundation system designed for an allowable soil bearing pressure of 4,000
psf.
Earlier attempt to install steel helical piers were not successful because enough torque could
not be imparted on the helical piers to ensure the adequate bearing capacity.
Subsurface Conditions: Three exploratory borings were drilled near the proposed foundation
areas as determined by Mr. Michael Bolton of Pioneer General Contractors. The
approximate locations of the exploratory borings are shown on Fig. 1. Logs of exploratory
borings are presented on Fig. 2 and legend and notes on Fig. 3.
The borings encountered 8 to 10 feet of man-placed fill consisting of sandy clay with fine to
medium grained gravel with low-plasticity, with blow counts beiween 8 to 34 in the fill. The
higher blow counts in the fill were probably due to large size gravel or cobble within the fill
material. Below the fill, the borings encountered poorly graded gravel to sand with silt and
cobbles which are to coarse grained and dense to very dense based on blow counts
between 54 for 8 inches to 54 for 11 inches of sample penetration. Ground water was not
encountered in the borings.
The laboratory tests on selected samples consisted of swell-consolidation and classification
test on a sample of fill material indicated no swell potential upon loading and wetting. The
gradation tests indicate the coarse grained soils are fine to coarse-grained. The results of
laboratory testing are graphically plotted on Figs. 4 and 5 and summarized in Table I.
Safeway, inc.
June 19, 2008
Page 2
Foundation Recommendations: Based on the subsurFace conditions encountered in the
exploratory borings and the proposed nature of the construction, we recommend the
foundation for the proposed addition consist of spread footings. The existing fill does not
appear to be placed in controtled and compacted conditions. Footings placed on the existing
fill will be subject to future settlement and may cause distress to the structure. Therefore, we
recommend the existing fill be overexcavated and footing placed below the fill. The footings
should be founded either on the natural gravel to sand with silt and cobbles below the fill or
on compacted structural fill.
Footings placed on the gravel to sand layer below the fill and with long-stem walls may be
designed for allowable end bearing pressure of 5,000 psf. The excavated material may be
used as backfill around the stem wall and compacted to at least 95% of standard Proctor
density as determined by ASTM D 698 at moisture content of ±2 percent of the optimum
moisture content.
Alternately, the existing fill should be excavated below the footings and in a footprint area
defined by 0.5 horizontal to 1 vertical. The excavated� material may be placed back in 1-foot
thicknesses and compacted to at least 98°/a of the standard Proctor density at the moisture
content of ±2 percent of the optimum. The footings placed on the structural fill should be
designed for an allowable soil bearing pressure of 4,000 psf.
Exterior footings should be provided with adequate cover above their bearing elevations for
frost protection. Continuous foundation walls should be reinforced top and bottom to span
an unsupported length of at least 10 feet. Areas of loose or soft material encountered at the
foundation bearing level within excavation should be removed and the footings extended
down to adequate natural bearing material. Other good construction, techniques which are
applicable should also be followed.
The existing fill materials classify as Type C soil requiring 1.5 horizontal to 1 vertical slope for
unbraced construction. Alternately, the excavation should be braced or protected by trench
shield for safe construction procedures. All safety requirements by OSHA on other
govemment agencies should be followed for excavations at the site.
Other foundation types including, rammed geopiers, drilled piers or steel helical piers with
considerably higher torque, may also be considered for support of the foundations Ivads. We
can provide recommendations for these alternates, if requested.
If you have questions or need additional information, please call.
Sincerely,
KUMAR & ASSOCIATES, INC.
Narender (Ned) Kumar, P.E.
O�p,p 0 RE�js�
G��.•q'r�,��ER /fC%',��r^
2�' o
— _ � � s�e`77� �:
NK/mj " �" ��'c'r�.• �ao�°�"�� /, � / / �
Attachments ` � ;`�`���A� ��` b � J �
cc: Petersen Staggs Architects, Attn: Tod` � dirier (email)
Core Engineering, Attn: Michael K. Brown (email)
Pioneer General Contractors, Attn: Pearre Chase (email)
Book, file
n&1•32(Itlr/21 nk
Kumar & Associates, Inc.
LEGEND
�FIL�: SANDY CLAY WITH FINE TO MEDIUM GRAINED GRAVEL, NON PLASTIC TO LOW PLASTICITY,
SLIGHTLY MOIST, BROWN AND RED.
�POORLY GRADED GRAVEL TO SAND WITH 51LT (GM-5M), WITH COBBLES, FINE TO COARSE
o GRAINED, DENSE TO VERY DENSE, SLIGHTLY MOIST', BROWN AND REDDISH BROWN.
� DRIVE SAMPLE, 2—INCH I.D. CALIFORNIA LINER SAMPLE.
� DRIVE SAMPLE, 1 3/8—I.D. SPLIT SPOON SAMPLE, STANDARD PENETRATION TEST.
10/12 DRIVE SAMPLE BLOW COUNT. INDICATES THAT 10 BLOWS OF A 140—POUND HAMMER
FALLING 30 INCHES WERE REQUIRED TO DRIVE THE SAMPLER 12 INCHES.
NOTES
1. THE EXPLORATORY BORINGS WERE DRILLED ON MAY 30, 2008 WITH A 4—INCH D�AMETER
CONTINUOUS FLIGHT POWER AUGER.
2. THE EXPLORATORY BORINGS WERE LOCATED BY PIONEER GENERAL CONTRACTORS.
3. THE ELEVATIONS OF THE EXPLORATORY BORINGS WERE NOT MEASURED AND THE LOGS OF THE
EXPLORATORY BORINGS ARE PLOTTED TO DEPTH.
4. THE EXPLORATORY BORING LOCATIONS SHOULD BE CONSIDERED ACCURATE aNLY TO THE DEGREE
IMPLIED BY THE METHOD USED.
5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY BORING LOGS REPRESENT THE
APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITI�NS MAY BE GRADUAL.
6. GROUND WATER WAS NOT ENCOUNTERED IN THE BORINGS AT THE TIME OF DRILLING.
7. LABORATORY TEST RESULTS:
WC = WATER CONTENT (%) (ASTM D 2216);
DD = DRY DEN5ITY (pcf) (,asrM � 2z� s);
+4 = PERCENTAGE RETAINED ON N0. 4 SIEVE ASTM D 422);
—200 = PERCENTAGE PASSING N0. 200 SIEVE �ASTM D 1140);
LL = LIQUID LIMIT (ASTM D 4318).
�o
m%
°� 08-1-320 Kumar & Associates LEGEND AND NOTES Fig. 3
;> -
,-.
\
.. p
J
J
W
� —�
N
�
O —2
�-
a
0
J
� —3
N
z
0
U
—4
—5
SAMPLE OF: Fill: Sandy Lean Clay
FROM: Boring 2 � 4.5'
WC = 19.6%, DD = 107.5 pcf
—200 = 70%, LL = 28, PI = 10
ADDITIONAL COMPRESSION
UNDER CONSTANT PRESSURE
DUE TO WETTING
The�e lM resulta oppy only W the
somplu lealed, fie le�tlnq rtpoA
shall nat W �eprvtlueel, ¢MCepl h
IWI, wiUwut the wrilten opprovol of
Kumor md Nsocbtes, Me. Sxdl .
ComolfdaUon leslin9 p ��� M
xcordoixe wiU� �ISIM D-4556.
.t 1.0 APPLIED PRESSURE — KSF 10 100
E�
°i
om
o%
�o
a
Y „
O —
°`�° 08-1-320
��
»
Kumar & Associates � SWELL—CONSOLIDATION TEST RESULT � Fig. 4
PROJECT NO.:
PROJECT NAME:
DATE SAMPLED:
DATE RECEIVED
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
08-1-320
Safeway No. 631, Vaii
5-30-08
6-2-08
SAMPLE LOCATION NATURAL NATURAL GRADA'fION PERCENT ATTERBERG LIMITS
DEPTH DATE MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTICITY SOIL OR BEDROCK TYPE
BORING TESTED CONTENT DENSITY N0.200 LIMIT INOEX
(feet) (%) (P� �%� ��0� SIEVE "k %
1 5 6-2-08 21.7 103.6 61 27 7 Fill: Sandy Silty Clay
2 4.5 6-2-08 19.6 107.5 70 28 10 Fill: Sandy Lean Ciay
2 9 6-2-08 39 43 18 Gravelly Sand with Silt
3 14.5 6-2-08 52 37 11 Sandy Gravel with Silt
' �.
J
MICHAEL K. BROWN
Registered Professional Structural Engineer
In Partners With
C�Inr7J11�r�1_l� Engineers Inc.
ENGINEERS/SURVEYORS/PLANNERS
STRUCTURAL DESIGN CALCULATIONS
FOR
SAFEWAY STORE #0631
2131 NORTH FRONTAGE ROAD
VAIL, COLORADO
EHM JOB # B07-540
DESIGN INFORMATION:
USED 2003 IBC, ALLOWABLE STRESS DESIGN
ROOF DEAD LOAD:
ROOF SNOW LOAD:
WIND SPEED:
EXPOSURE TYPE:
SEISMIC PARAMETERS:
SITE CLASS:
SEISMIC USE GROUP:
SEISMIC DESIGN CATEGORY:
ALLOWABLE SOIL BEARING PRESSURE:
20 PSF
100 PSF
90 MPH
C
SS = 28.5%
S1= 6.8%
D
II
C
4,000 PSF
PER GEOTECHNICAL REPORT WRITTEN BY: GEOTEK, INC. CONSTULTING
AND MATERIALS ENGINEERS, PROJECT #15474, DATED: 10/7/1976
3501 W. Elder, Suite 100 • Boise, Idaho 83705 •(208) 386-9170 • FAX (208) 386-9076
0
0
, Conterminous 48 States
- 2003 NEHRP Seismic Design Provisions
Zip Code = 81657
Spectral Response Accelerations Ss and S1
Ss and S1 = Mapped Spectral Acceleration Values
Site Ciass B- Fa = 1.0 ,Fv = 1.0
Data are based on a 0.05 deg grid spacing
Period Centroid Sa
(sec) (g)
0.2 0.285 (Ss, Site Class B)
1.0 0.068 (S1, Site Class B}
Period Maximum Sa
(sec) (g)
0.2 0.306 (Ss, Site Class B)
1.0 0.071 (S1, Site Class B)
Period Minimum Sa
(sec) (g)
0.2 0.274 (Ss, Site Class B)
I
i
Safewav, Vail
WIND LOAD - IBC 2000 (ASCE7-981,
90 mph, Exposure C, 1=1.00, Mean Roof Height = 30.00 ft
IEzt at Base = 1
Kd = 0.85 , Roof Slope 22.62 degrees (5:12)
Enclosed Building, GCpi = 0.18
Main Wind Force Resisfina Svstem with Gable Roof
Building Width = 80.0 ft; Building Breadth = 40.0 ft; Rid�e Parallel to Width
Build'ing Frequency Normal to Width = 2.0 Nz ; Build'ing Frequency Nortnal to Breadth = 2.0 Hz
Gust Factor for Wind Normal to Width (80.0 ft Dim'n) G=0.85
Gust Faetor for Wind Normal to Breadth (40.0 R Dim'n) G=0.85
q(h) =17.31 psf ; K(h) =0.98 ; q(h)"GCpi =3.12 psf
Wind Pressures (ps� by Zone
Zone 1 - Windward Wall
Height Wind Normal to �dth Wind Normal to B�eadth
(ft) Kz qz (ps� Cp Max Min Max Min
0- 15 0.85 14.96 0.80 13.3 7.1 13.3 7.1
20 0.90 15.90 13.9 7.7 13.9 7.7
25 0.95 16.66 14.4 8.2 14.4 8.2
2b - 30 0.98 17.31 14.9 8.7 14.9 8.7
Zone 2- Stoped Windward Roof
Wind Normal to Width
Zones 2- Windward Roof at Flat Portion Parallel to Ridge
Wind Normal to Breadth
Distance to 100
Windward Edge Cp Max Min
< h/2 -0.90 -10.1 -16.4
< h -0.90 -10.1 -16.4
< 2h -0.50 -4.2 -10.5
> 2h -0.30 -1.3 -7.5
Zone
3 - Leeward Roof
4 - Leeward Wall
5 & 6 - Sidewalls
Max/Min Cp
Max 0.05
Min -0.47
Tributary Area
200
Cp Max Min
-0.90 -10.1 -16.4
-0.90 -10.1 -16.4
-0.50 -42 -10.5
-0.30 -1.3 -7.5
Wind Nomtal to Max/Min
Width Max
Min
Width Max
Min
Breadth Max
Min
Width
Breadth
Zone 7- Bottom Face of UnenGosed
Overhangs at Roof Elevation
SEISMIC LOADS IBC 2000, Site Glasa D
p (Psfl
3.9
-10.1
1000
Cp Max Min
-0.90 -10.1 -16.4
-0.90 -10.1 -16.4
-0.50 -4.2 -10.5
-0.30 -1.3 -7.5
CP P iPgfl
-0.60 -5.7
-11.9
-0.50 -4.2
-10.5
-�.30 -1.3
-7.5
Max -0.70
Min
Max -0.70
Min
Wind Normal to Cp
Width 0.8
Sreadth 0.8
-7.2
-13.4
-7.2
-13.4
P (Ps�
11.8
11.8
�
y
Short period spectral acceleration, Ss = 0.29
LATERAL FORCE RESISTING SYSTEM - STRENGTH/LRFD LEVEL FORCES
1-Second spectral acceleratio�, S1 = 0.07, Building Height, Hr = 30 ft
Seismic Use Group 1, Seismic Design Category - B, I= 1.0
SDs � 0.30, SD1 s 0.11, Fa = 1.57, Fv = 2.40
Bearing Wall Systems
K. Light frame walls with shear panels-wood structurai panels/sheet steel panels
R= 6, Omega o= 3, Cd = 4, Ct = 0.02, PERIOD per Eqn 16-39 T= 0.256 Seco�ds
Eq 16-35 Cs=Sds"le/R = 0.05
Eq 16-36 Cs=Sd1'le/(R''n = 0.071
Eq 16-37 Cs=0.044*Sds*le = 0.013
Cs = 0.0498
�
Safewav. Vail
SEISMIC LOADS IBC 2000. Site Class D
Short period spectral acceleratian, Ss = 0.29
LATERAL FORCE RESISTING SYSTEM - STREN6TH/LRFD LEVEL FORCES
1-Second spectral acceleration, S1 = 0.07, Buiiding Height, Hr = 30 ft
Seismic Use Group I, _ Seismic Design Cate�ory - B, I= 1.0
SDs = 0.30, SD1 = 0.11, Fa = 1.57, Fv = 2.40
Bearing Wall Systems
G. tntermediate reinforced masonry shear walls
R= 3.5, Omega o= 2.5, Cd = 2.25, Ct = 0.02, PERIOD per Eqn 16-39 T= 0.256 Seconds
Eq 16-35 Cs=Sds'le/R = 0.085
Eg '16-36 Cs=Sd1*le%(R"T) = 0.121
Eq 16-37 Cs=0.044•Sds*le = 0.013
Cs = 0.0853
L�
C
-�E HM� EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 63301 208/734-4888 FAX 2D8/7346049
2404 Bank Drive, Suite 100 Boise, Idaho 837D5 208/366-9170 FAX 208/386-9076
JOB NAME ��C D` �' (il%�.�i� �/ GC r(� JOB N0. `-� � r�� G''
BY ��S DATE t�/��/� 7 SHEET OF
1� ��
— ,�(.Q � : o :1"' �Yi�_;, C � �j, �
..� y
�Q/�!ti � '�� �� '�` � �l��l����
� �, � ,
.�L _ �i,' . Id'` - _, (�,� .;�/'�: _ _ _ _ _.
, ; ;�.7; ,J�'` - °�.;��;�„',/�=,
_ ;
:;-:: .
�', , �i
_ , � _
�� ' _ wz ��� t�r '� � � 6 3� k �- `1-- � �� c/�r�%� l�v� � `'") _
— �—
— Ea.✓� �r'✓i : �N� � ) � � v��' 1 � � S � �%' � :�>` �'?'../' �'
� L = ?�(� ' ( �' = 31�19p/ � _ _ _
�L � l�y'u-J,ZS-�s= )��;s�!� _ _
� �_ � �cu�t u s'� � ���.� �`� ,' � ;� �'�� w�,�
_
, ,t ,
' '����� �. =��� - . �� � ��, �� �, � �' �m�l���v�
�_____---
�� - �d j,a L Zep� �
L �- - ���y . ►. 2� -I,p - = ��z.S,,r '� -
,Vj�m� � _ � g '� �' � _ � y,,.� �� < �, l- � � � _ _ _ _ _
.
�-�,,�,K ` , � ��� ` ) �� � �' �
/yl � -� �� , ' ��z1���3
M wy cc�, f �/� - 4,� `� �•v"' n�v/.; -� �
� ,� SDkzZ �' ►'�+(�,'�`�
� � e � Z� o = ?,� -s y > �� s �t� ,� id �< << �v,� �� ��� 5 �.� �-� �
_ �� � J� ,,� r
��,.y y , r� �,� _ �� �
�
�` � � f . ^ . . ... .. . ... . . . .. .. . . . . . . . . .. . . .. .. .. . .
. . l pl + . . � .. . . . . .. . ... . . .
LC ! ! y��l� �=
��May� _ ��Iq n�` ��� `— l, �.��
6�� � = , »« �,;,��� 3, oo a�`i
�� � ��S � �Z_ 5� 6 +� ,,l � �R
�� ' ,�r �, �
I�y ~
� �, ..
�.- �-
.� _ �, 7 .-,a �
��,�,�,���� , �. ���.,��� . �„�,T.,��� .� �
EHM Engineers, lnc Title :
3501 W. Elder, Ste. 100 Dsgnr:
6escription :
_ Boise, Id 83705
Scope:
Rev: 580004
User:KW-0605725e�e�5.a.o,,-0�2�3 ___ General Timber Beam
Description Glulam Ridge Beam, grid C 8� G.8
Job #
Date: 2:16PM, 9 JAN 08
Page 1
I General information Code Refi 1997l2001 NDS, 2000/2003 IBC, 2003 NFPA 5000. Base allowables are user defined �
Section Name 6.75x27 Center Span 18.00 ft.....Lu 0.00 ft
Beam Width 6.750 in Left Cantilever 10.00ft .....lu 0.00 ft
Beam Depth 27.000 in Right Cantifever 5.00ft .....Lu O.QO ft
Member Type GluLam Douglas Fir, 24F - V4
Bm Wt. Added to Loads Fb Base Allow 2,400.0 psi
Load Dur. Factor 1.150 Fv Allow 240.0 psi
Beam End Fixity Pin-Pin Fc Atlow 650.0 psi
Wood Density 31.00Opcf E 1,800.0 ksi
Full Length Uniform Loads �
Center DL 360.00 �/ft LL 1,800.00 #fft
Left Cantilever DL 360.00 #/ft LL 1,800.00 #lft
Right Cantilever DL 360.00 #!it LL 1,800.00 #/ft
Beam Design OK
Span= 18.00ft, Left Cant= 10.00ft, Right Cant= 5.00ft, Beam Width = 6.750in x Depth = 27.in, Ends are Pin-Pin
Max Stress Ratio o��o : 1
Maximum Moment -»o.o x-n Maximum Shear • 1.5
Allowable ���•$ k-ft Allowabie
Max. Positive Moment 76.75 k-ft at 9.328 ft Shear: @ Left
Max. Negative Moment -19.96 k-ft at 0.000 ft @ Right
Max (d,� left Support -109.96 k-ft Camber: (a'� Left
Max � Right Support -27.49 k-ft � Center
Max. M allow 171.84 @ Right
Reactions...
fb 1,608.95 psi fv 170.47 psi Left DL 8.42 k Max
Fb 2,514.34 psi Fv 276.00 psi Right DL 4.76 k Max
Deflections
31.1 k
50.3 k
25.62 k
20.21 k
0.112 in
0.007 in
0.000 in
47.62 k
31.21 k
Center Span... a L ad Tatal Load Left Carnilever... Dead load To4al Load
Deflection -0.005 in -0.217 in Deflection -0.075 in -0.791 in
...Location 11.562 ft 9.197 ft ...Length/Defl 3,200.3 303.6
...length/Defl 44,955.9 995.95 Right Carrtllever...
Camber ( using 1.5 * D.L. Defl )... Deflection 0.000 in 0.183 in
� Center 0.007 in ...Length/Defl 2095,575.5 654.5
@ Left 0.112 in
@ Right 0.000 in
L $treSS Calcs �
Bending Analyais
Ck 20.711 Le 0.000 R S�oc 820.125 in3 Area 182.250 in2
Cv 0.911 Rb 0.000 CI 0.000
� Center
(� Left Support
� Right Support
Shear Analysis
6esign Shear
Area Required
Fv: Allowable
Bearing Q Supports
Max. Left Reaction
Max. Ffight Fteaction
Mex M6m�nt
76.75 k-ft
109.96 k-ft
27.49 k-ft
� Left Support
31.67 k
112.569 in2
276.00 psi
47.62 k
31.�1 k
Ssac R�a'd
366.29 in3
524.81 in3
131.20 in3
@ Right Support
22.95 k
83.148 in2
276.00 psi
Bearing Length Req'd
8earing Length i�eq'd
Rllowable fb
2,514.34 psi
2,514.34 psi
2,514.34 psi
10.853 in
�.1'f 3 in
�
EHM Engineers, Inc Titie : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 2:16PM, 9 JAN 08
- Boise, Id 83705 6escription :
Scope :
' Rev: 580004
User:KW-0605725,�e�5.6.o,,-oe�-zoo3 General Timber Beam Page 2
Description Glulam Ridge Beam, grid C 8� G.8
Query Values ---�
M, V, & D� Specified Locations Moment Shear Deflectlon
� Center Span Location = 0.00 ft -109.96 k-ft 24.37 k 0.0000 in
@ Right Cant. Location = 0.00 ft =109.96 k=ft 24.37 k 0.0000 in
@ Left Cant. Location = 0.00 ft -109.96 k-ft 24.37 k 0.0000 in
�
EHM Engineers, Inc Titie :
3501 W. Elder, Ste. 100 Dsgnr:
- Boise, Id 83705 6escription :
Scope:
Rev: 580004
User. KW-0605725, Ver 5.8.0, 1-Dea2003
,_„�e, ���, �.,�o,.�, ,. �__.____.__ ��...___ General Timber Beam
Description Glulam Eave Beam
Job �
Date: 2:15PM, 9 JAN OS
Page 1
� General Information Code Ref: 1997/200i NDS, 2000/2003 IBC, 2003 NFPA 5000. Base allowabies are user defined
�
Sect(on Name 6.75x27 Center Span 18.00 ft.....Lu 0.00 ft
Beam Width 6.750 in Left Cantilever 10.00ft .....Lu 0.00 ft
Beam Depth 27.000 irt Right Cantilever 5.00ft .....Lu 0.00 ft
Member Type GluLam Douglas Fir, 24F - V4
Bm Wt. Added to Loads Fb Base Allow 2,400.0 psi
Load Dur. Factor 1.150 Fv Allow Z40.0 psi
Beam End Fixity Pin-Pin Fc Aflow 650.0 psi
WoodDensity 31.00Opcf E 1,800.Oksi
Full Length Uniform Loads --�
�
Center DL 300.00 #Ht LL 1,875.00 #Ht
Left Cantilever DL 300.00 #/ft LL 1,875.00 #!ft
Right Cantilever DL 300.00 #/ft LL 1,875.00 #!ft
Beam Design OK
Span= 18.00ft, Left Cant= 10.00ft, Right Canh 5.00ft, Beam Width = 6.750in x Depth = 27.in, Ends are Pin-Pin
Max Stress Ratio o•� : 1
Maximum Moment -i�o.� k-ft Maximum Shear * 1.5
Allowable 171.8 k-ft Allowable
Max. Positive Moment 79.19 k-ft at 9.328 ft Shear. � Left
Max. Negative Moment -16.96 k-ft at 0.000 ft � Right
Max (a� Left Support -11 d.71 k-ft Camber. � Left
Max @ Right Support -27.68 k-ft � Center
Max. M ailow 171.84 � Right
Reactions...
fb 1,619.92 psi fv 172.00 psi Left DL 7.15 k Max
Fb 2,514.34 psi Fv 276.00 psi Right DL 4.04 k Max
Deflections
31.3 k
50.3 k
25.84 k
20.52 k
0.096 irt
0.006 in
0.000 in
47.99 k
31.59 k
Center Span... Dead Load Tatal Load Left Carrtilever... Dead Load T I Load
Deflection -0.004 in -0.225 in Deflection -0.064 in -0.807 in
...Lacation 11.562 ft 9.D66 ft ...Length/Defl 3,766.4 297.6
...l.engthlDefl 52,907.2 959.07 Right Carrtilever...
Camber ( using 1.5 * �.L. Defl )... Deflection 0.000 i� 0.194 in
(� Center 0.006 in ...Length/Defl 2466,217.6 617.1
� Left 0.096 in
� Right 0.000 in
1 Stress Calcs �
Bending Analysls
Ck 20.711 Le 0.000 ft S�oc 820.125 in3 Area 182.250 in2
Cv 0.911 Rb 0.000 CI 0.000
� Center
(� Left Support
� Riqht Support
Shear Analysis
Design Shear
Area Required
Fv: Altowable
Bearing � Supports
Max. Left Reaction
Max. f�ight C�eaction
Masc M6tsi�nt
79.19 k-ft
110.71 k-ft
27.68 k-ft
@ Left Support
31.35 k
113.573 in2
276.00 psi
47.99 k
3i.�S k
Sxsc R�a'd
377.93 in3
528.38 in3
132.10 in3
@ Right Support
23.37 k
84.662 in2
276.00 psi
Bearing Length Req'd
Bearing Length !'�eq'd
Allowable fb
2,514.34 psi
2,514.34 psi
2,514.34 pst
10.937 in
7.g61 in
��
EHM Engineers, Inc Title : ,lob #
3501 W. Elder, Ste. 100 Dsgnr: Date: 2:15PM, 9 JAN 08
- Boise, Id 83705 6escripEion :
Scope:
Rev: 580004 Pa e 2
use�°icw-osos�zS�Ver5.8.0, 1-Dec-2003 General Timber Beam 9
Description Glulam Eave Beam
Query Values �
M, V, & D� Specified Locatioes Moment Shesr Deflaetion
� Center Span Location = 0.00 ft -110.71 k-ft 24.54 k 0.0000 in
� Right Cant. Location = 0.00 ft =110.71 k=ft 24.54 k 0.0000 in
Q Left Cant. Location = 0.00 ft -110.71 k-ft 24.54 k 0.0000 in
I
. E� H M� EHM Engineers, Inc.
6 2 1 N o rt h C o l l e g e R o a d, S u i t e 1 0 0 T w i n F a l i s, I d a h o 8 3 3 0 1 2 0 8/ 7 3 4- 4 8 8 8 FAX 208/7346049
� 3501 Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 2p8/386-9076
JOB NAME JOB N0.
BY DATE SHEET OF
- ,�� '` /�c:� � _
6 �✓- s
.__�___------
��, �,, � � 1 ' ��� = Zg� �l/� �t ���
� - s�ad �� � _
G L = d`�o o,�. �= _
��, � rE �� �,�� �� LlX Gd �'��
� _ Gy� (rv► ' �'1 � �'� � �� ` )�' � 1 � �' _
� �
_G'� Y t; .
�L— 3��n� � � �'•�x ;�;, g�
�(. � ._�1 `l U �l � '3 �;,� � 'Y� _ _ _
��� ���� � �ZNx�S✓��l� _ ..
, �
� ��� = zz �, ,� ��`�o � Z�' _ _ ,
_ _
aG` S��n�'"� _ _ _ _ _ _
�c = Z����� � :
r
�'`' �1 ��y`u�r:C ��. �% �' S �.-�',�
- r, --,----------- �-�- _
,
- c�,�, = 13 ,,,,,a,r �,,,f v ' �� ` _
.DG = Z3',�r �
�,�i�� r.�:'
� �
� � i .,�'+�� �r ��:;� �,% �� �F�� Z`1 k �$ �; �'
;' ,
l
��' ��t� ��' ;,✓� G� � � �,
_ ��� �Z� � � v �L,��
b� � ZrS�9;o/ �
1�L � !� Z�� j;� �
yri �/✓n �vY� P/�'' �`!l �.(�� �'�%Zy x �� ,./�%, %i.
r'�'I S� ,
Ib
�
Description
EHM Engineers, Inc Titie :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 6escription :
Scope :
5.8.0, 1-Dec-2003 Steel Beam Design
C Enaineerina Software
Typ Beam, line 7
General Information
Stee{ Section : W24X55
Job #
Date: 1:52PM, 16 JAN 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Pinned-Pinned Load Duration Factor 1.00
Center Span 32.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL 8 ST Act Together
Right Cant 0.00 ft
Lu : Urtbraced Length 0.00 ft
� Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.200 k/ft
LL 1.250 Wft
ST �c/{�,
Start Location ft
End Location ft
Using: W24X55 section, Span = 32.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Adua1 Allowabie
Moment 192.643 k-ft 316.250 k-ft
fb : Bending Stress 20.102 ksi 33.000 ksi
fb / Fb 4.609 : 1
Shear
fv : Shear Stress
fv / Fv
24.080 k 186.203 k
2.588 ksi �6.066 ksi
0.129 : 1
Beam OK
Sfafic Loac� Case Goveriis Sfress
Max. DeflecYion -0.907 in
Lertgth/DL Defl 2,498.7 : 1
Length/(DL+�L Defl) 423.4 : 1
Force 8� Stress Summary
<<- Thase columns are Dead + Live Load piaced as noted -»
DL LL LL+ST LL LL+ST
Maximum Onlv enter Center Cants Cants
Max. M+ 182.64 k-R 32.64 182.64 k-ft
Max. M -
Max: M Q �eft
Max. M � Right
Shear (� Left 24.08 k
Shear � Right 24.08 k
Center Defl. -0.907 in
Left Cant Defl �.bObin
Right Cant Defl 0.000 in
.,.Query Defl � 0.000 ft
Reaction � left 24.08
Reaction @ Rt 24.08
4.08 24.08
4.08 24.08
-0.154 -0.907
0.000 b.Ob�
0.000 O.OQO
0.000 0.000
4.08 24.08
4.08 24.08
Fa calc'd per Eq. E2-1, K'Ur < Cc
I Beam Passes Table 65.1, Fb per Eq, F1-1, Fb = 0.66 Fy
k-fi
k-ft
k-ft
k
k
-0.907 0.000 0.000 in
b.0�b 0.000 0.000 in
0.000 0.000 0.000 in
0.000 0.000 0.000 in
24.08 k
24.08 k
�
EHM Engineers, Inc Title : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 1:52PM, 16 JAN OS
. 8oise, Id 83705
6escription :
Scope :
- Rev: 580007 -
User: KW-0605725, Ver5.8.0, 1-Dec-2003 Steel Beam Design Page 2
c 1983-2003 ENERCALC Enaineerina Soflware enerca�c e�w•Calculatiom
Description Typ Beam, line 7
Section Properties W24X55
Depth 23.570 in Weight 55.03 #/ft
WebThick 0.395in i�oc 1,350.00Oin4
Width 7.005 in �yy 29.100 in4
Fiange Thick 0.505 in S�oc 115.000 in3
Rrea 16.20 irt2 Syy 8.300 irt3
Rt 1.680 in R-�a 9.130 in
Values for LRFD Design.... R-ri 1.340 in
J 1.180 in4 Zx 135.000 in3
G1iv 3,870.00 in6 ZY 13.400 in3
K 1.110 in
��
� � �� EHM Engineers, Inc.
621 North College Road, 5uite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
3501 West Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB NAME JOB N0.
� BY DATE SHEET OF
� L ��/{/� �, �% �M 5 . `,'�y►1 � , : � 19�s �^� SU�'1 Q �i+� �r/
S,�av� � Z'7� �C� `� �� ` 7.�p/ �
�L = �� ZSo�i �'
� l�'Y1 � �G��G �s 2 1'v` � 1 � c/ �/ V' _
�,�rr� " Z `� �
�c9v►'1 � �'^u�'� +�,5e- � �1 �X � 5 c./�0�
_ 5�o�vn � Z � _
�i� � e��l� us e�� 6k� ��i�G�
�1�3
ENGINEERS / PL1aNNERS / SIJRVEYORS
Rev: 580007
' User KW-0605725,
c 1983-2003 ENER
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
1-Dec-2003 Steei Beam Design
heerin9 Sottware
Typ Beam, line 7
Generai Information
Steel Section : W21 X44
Job #
Date: 4:18PM, 5 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Pinned-Pinned Load Duration Fador 1.00
Center Span 27.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL 8� ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 0.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.200 �
LL 1.250 �
ST ��
Start Location {�
End Location �{
Using: W21X44 section, Span = 27.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Aduai Allowable
Moment 136.155 k-ft 224.400 k-ft
fb : Bending Stress 20.023 ksi 33.000 ksi
fb I �b 6.60T : 1
Shear
fv : Shear Stress
fv / Fv
20.171 k 144.620 k
�.�96 ksi �O.b00 ksi
0.139 : 1
Beam OK
Sfafic Load Case Govern§ Sfre§s
Max. Deflection -0.731 in
Length/DL Defi 2,713.2 : 1
Length/(DL+LL Defl) 443.4 : 1
Force 8� Stress Summary
«- These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL IL+ST
Maximum Onlv Center Center ant Cents
AAax. fil� + 136.15 k-ft 22.25 136.15 k-i�
Max. M -
Max: M � �eft
Max. M � Right
Shear (a� Left
Shear � Right
Center Defl.
Le� �ant 6efl
Right Cant Defl
,,,Query Defl �
20.17 k 3.30 20.17
20.17 k 3.30 20.17
-0.731 in -0.119 -0.731 -0.731
0.000 in 0.000 0.000 0.000
0.000 in 0.000 0.000 0.000
0.000 ft 0.000 0.000 0:000
Reaction @ Left 20.17 3.30 20.17
Reaction � Rt 20.17 3.30 20.17
Fa calc'd per Eq. E2-1, K`L/r < Cc
I Beam Passes Table 65.1, Fb per Eq. F1-1, Fb = 0.66 Fy
20.17
20.17
k-ft
k-ft
k-ft
k
k
0.000 0.000 i�
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
I�
0
nev: oauuu�
User: KW-0605725,
c 1983-2003 ENER
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
5.8.0, 7-Deo-2003 Steel Beam Design
C Engineering Software
Typ Beam, line 7
Section Properties W21X44
Deptfi 24.660 in Weight 44.16 #fft
Web Thick 0.350 in I�oc 843.000 in4
Width 6.500 in lyy 20.700 in4
Flange Thick 0.450 in S�oc 81.600 in3
Area 13.00 irt2 Syy 6.370 in3
Rt 1.570 in R-�oc 8.060 in
Values for LRFD Design.... R-yy 1.260 in
J 0.770 in4 Zx 95.400 in3
G1iv 2,110.00 in6 ZY 1Q.20Q in3
K 0.950 in
Job #
Date: 4:18PM, 5 MAR 08
Page 2
l5
• Rev: 580007
User. KW-0605725,
(c)1983-2003 ENER
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 DescripEion :
Scope :
�e�5.8.0, 1-Dec-2�03 Steel Beam Design
r.ai r. F.,�c�RP���� s��a�A
Typ Beam, line 7
Job #
Date: 4:19PM, 5 MAR 08
Page 1
Generai Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Stee{ Section : W18X35 Fy so.00tcsi
Pinned-Pinned Load Duration Factor 1.00
Center Span 24.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 0.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 i!5 #6 #7
DL 0.200 k/ft
LL 1.250 k/ft
ST WR
Start Location ft
End Location ft
Using: W18X35 section, Span = 24.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Actual
Moment 106.919 k-ft
fb : Bending Stress 22.275 ksi
fb / Fb 6.675 :1
Shear 17.820 k
fv : Shear Stress 3.3�fi ksi
tv / Fv 0.168 : 1
Force 8� Stress Sum
DL
Maximum Onlv
tJVax. NI + 106.92 k-ft 16.92
Max. M -
Max: M @ 6eft
Mex. M � Right
Shear � Left 17.82 k 2.82
Shea� � Right 17.82 k 2.82
Center Defl. -0.749 �� -0.119
Lefit Cant �e#! O.00Oin 0.000
Right Cant Defl 0.000 in 0.000
,.,Query Defl � 0.000 ft 0.000
Reaction @ Left 17.82 2.82
Reaction @ Rt 17.82 2.82
Fa calc'd per Eq. E2-1, K'Ur < Cc
I Beam Passes Table 85.1, Fb per Eq. F1-1, Fb = 0.66 Fy
Beam OK
Sfatic Load Case Governs Sfres§
Allowable
158.400 k-ft Max. Deflection
33.000 ksi LertgthlDL Defl
Length/(DL+LL Defl)
106.200 k
26.006 ksi
-�.749 in
2,428.3 : 1
384.3 : 1
«_ These columns are Dead + Live Load placed as noted -»
LL LL+ST LL LL+ST
Center Center ants Cants
106.92 k-fi
k-ft
k-ft
k-ft
17.82 k
17.82 k
-0.749 -0.749 0.000 0.000 in
- -- - --- - -- - --
0.000 0.000 0.000 0.000 in
0.000 0.000 0.000 0.000 in
0.000 0.000 0.000 0.000 in
17.82 17.82 k
17.82 17.82 k
�I ✓
�b
. �e�: ss000�
User: KW-06�5725,
�1983-2003 ENER
Description
EHM Engineers, inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 6escription :
Ver 5.8.0, 1-Dec-2003
CALC Enaineeri�a Software
Typ Beam, line 7
Scope :
Steel Beam Desiqn
Section Properties W18X35
Depth 17.744 in Weight 34.99 #/fl
Web Thick 0.300 in i�oc 510.000 in4
Width 6.000 in lyy 15.300 in4
Flange Thick 0.425 in S�oc 57.600 in3
area 10.30 irt2 Syy S.12Q irt3
Rt 1.490 in R-�a 7.040 in
Values for LRFD Design.... R-yy 1.220 in
J 0.510 in4 Zx 66.500 in3
Gtiv 1,140.00 in6 ZY 8.060 in3
K 0.827 in
Job #
Date: 4:19PM, 5 MAR 08
Page 2
!�
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
6escnption :
. Boise, !d 83705
Scope :
� Rev: 580007
User: KW-0605725, Ver5.8.0, 1-Dec-2003 Steei Beam Design
!cl'19H3-2003 ENERCALC Enoineerina S�ftware
Description Typ Beam, line 7
General Information
Stee{ Section : W16X31
Job #
Date: 4:21 PM, 5 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 20031BC, 2003 NFPA 5000
Pinned-Pinned Load Duration Factor 1.OD
Center Span 21.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Urtbraced Length 0.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#a #2 #s #a #5 #s #�
DL 0.200 k/it
LL 1.250 k/ft
ST k/St
Start Location ft
End Location ft
Using: W16X31 section, Span = 21.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pin�ed, Lu = O.00ft, LDF = 1.000
Actuai Allowable
Moment 81.639 k-ft 129.800 k-ft
fb : Bending Stress 20.756 ksi 33.000 ksi
fb / Fb 4.629 : 1
Shear
fv : Shear Stress
Tv/Fv
15.550 k 87.340 k
3.56'1 ksi 26.000 ksi
0.178 : 1
Beam OK
Sfa�c Load Case GoVern§ Sfres§
Max. Deflection -0.596 in
LengthlDL Defl 2,711.5 : f
Length/(DI+LL Defl) 422.9 : 7
Force 8� Stress Summary
«_ These columns are Dead + Live Load placed as noted -»
DL LL LI+ST LL LL+ST
Maximum Onlv (c� Center Center Cants Cants
Max. M+ 61.64 k-ft 12.73 81.64 k-ft
Max. M -
Max: M � �eft
Max. M (d� Right
Shear @ Left 15.55 k
Sheac � Right 15.55 k
Center Defl. -0.596 �n
Le�t �ant De�l 0.000 in
Right Cant Defl 0.000 in
,.,Query Defl (r� 0.000 f�
Reaction � Left 15.55
Reaction � Rt 15.55
k-R
k-ft
k-ft
2.43 15.55 k
2.43 15.55 k
-0.093 -0.596 -0.596 0.000 0.000 in
0.000 0.000 0.000 0.000 0.000 in
0.000 0.000 0.000 0.000 0.000 in
0.000 0.000 0:000 0.000 0.000 in
2.43 15.55 15.55 k
2.43 15.55 15.55 k
Fa calc'd per Eq. E2-1, K'Ur < Cc
I Beam Passes Table B5.1, Fb per Eq. F1-1, Fb = 0.66 Fy
;� �
i EHM Engineers, Inc TiUe : �ob #
3501 W. Elde�, Ste. 100 Dsgnr: Date: 4:21 PM, 5 MAR 08
- 6escnption :
. Boise, Id 83705
Scope :
Steel Beam Design
Description Typ Beam, line 7
Page 2
Section Properties W16X31 �
Depth 15.880 in Weight 3d.98 #/ft
Web Thick 0.275 in I�oc 375.000 in4
Width 5.525 in lyy 12.400 in4
Flange Thick 0.440 in S�oc 47.200 in3
Area 9.12 in2 Syy 4.490 irt3
Rt 1.390 in R-�oc fi.410 in
Values fo� LRFD Design.... R-YY 1.170 in
J 0.460 in4 Zx 54.000 in3
Cw 739.00 in6 ZY 7.03Q in3
K 0.842 in
� `�
� Ll L�'�
JOB NAME
BY
EHM En ineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
3501 West Elder St., Suite 100 8oise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB N0.
_ DATE SHEET OF �I
— ��,� � ��s d
r�. 6 �-o C. ? . �� � = � b , ��� z zy'
_ _ _ __
DC ` Zt9' Zy� �� 8.4 PI f �- 8y1� +� � g' ��� els n��(�e
�CY ►�;�, Zy � �,y�p�f { �9,��
�� 4� �c�Cr u�se � Zy� SS _ ✓��f2 _ ''
- �. z fn c. 6 : �,��;� � o ` t��� = ? �'
PL <. �. Z� r_: c� p� �
�- L` I 8'� � Z 1�' = Z, �/%0 �/ P�
�� � ��r� �� � 'r-�/ I �x�a ��fe
_ � 6�� P, � ��,�y� Z �„:��Z�-
pG= S�iU�I�
u = Z, f �r� �
�� � �✓'co�t �C �c �^✓ � y x Z Z c/'�r2
- D�l ��.9 �' ��c�� Z�' -lr-`!�' z�° w/'7 �c�i����e�.
,
t� � ` S �P/ � _
;� l -- -, ;��;,�� � �(
_ �,.
;-;,� -�r,� -�,�n �,��� �� �.�. �,� ,1 zy X.� s ,��
ENGINEERS / PI ANNFRS / SLJRVFY(lRR
d�
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
,- Boise, Id 83705 Description :
Scope :
� Rev:580007
User: KW0605725, Ver 5.8.0, 1-Deo-2003 Steel Beam Design
(cM983-2003 FNFRCCI C. Fnainwarine Snfhuara
Description 6.6 to C.2
General Information
Job #
Date: 3:58PM, 6 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W24X55 . Fy 5o.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 16.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 6.00 ft
DISt�ibUt@d L08dS Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.480 k/ft
LL 2.400 k/ft
ST
Start Location
End Location
Point Loads
#�
Dead Load 8.400
Live Load 39.200
Short Term
Location 8.000
Using: W24X55 section, Span = 16.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
Actual
Moment 284.321 k-ft
fb : Bending Stress 29.668 ksi
fb / Fb 0.989 : 1
Shear 47.280 k
fv : Shear Stress 5.078 ksi
fv / Fv 0.254 : 1
Wft
ft
ft
Note! Short Term Loads Are WIND Loads.
#4 #5 #6 #7
k
k
k
ft
Beam OK
Static Load Case Governs Stress
Allowable
287.500 k-ft
30.000 ksi
186.203 k
20.000 ksi
Max. Deflection -0.290 in
Length/DL Defl 3,707.4 : 1
Length/(DL+LL Defl) 662.5 : 1
Force 8 Stress Summary
«- These columns are Dead + Live Load placed as noted --»
DL LL LL+ST LL LL+ST
Maximum Onlv � Center Center Cants Cants
Max. M+ 284.32 k-ft 50.72 284.32 k-ft
Max. M - k-ft
Max. M @ Left k-ft
Max. M @ Right k-ft
Shear @ Left 47.28 k 8.48 47.28 k
Shear @ Right 47.28 k 8.48 47.28 k
Center Defl. -0.290 �� -0.052 -0.290
Left Cant Defl 0.000 in 0.000 0.000
Right Cant Defl 0.000 in 0.000 0.000
...Query Defl � 0.000 ft 0.000 0.000
Reaction @ Left 47.28 8.48 47.28
Reaction @ Rt 47.28 8.48 47.28
Fa calc'd per Eq. E2-2, K*Ur> Cc
I Beam, Maior Axis, LIrT <(102,000 ` Cb / Fy)^,5, Fb = 0.6 Fy (F3)
-0.290
0.000
0.000
0.000
47.28
47.28
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
k
k
C�/6
EHM Engineers, Inc Title : �ob #
3501 W. Elder, Ste. 100 Dsgnr: Date: 3:58PM, 6 MAR 08
Description :
. Boise, Id 83705
Scope :
' ReV:580007
User: KW-0605725, ver s.s.o. ��oec•zooa Steel Beam Design Page 2
(c11983-2003 ENERCALC Englneering Software enercalc.ecw:Calculatlon
Description B.6 to C.2
Section Properties W24X55
Depth 23.570 in Weight 55.03 #/ft
Web Thick 0.395 in I�oc 1,350.000 in4
Width 7.005 in lyy 29.100 in4
Flange Thick 0.505 in Sxx 115.000 in3
Area 16.20 in2 Syy � 8.300 in3
Rt 1.680 in R-�oc 9.130 in
Values for LRFD Design.... R-yy 1.340 in
J 1.180 in4 Zx 135.000 in3
Cw 3,870.00 in6 ZY 13.400 in3
K 1.110 in
Z.�L
�
User: KW-0605725, Ver
(c)1983•2003 ENERCALC
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope:
1-Dec•2003 Steel Beam Design
iaarinn SnfMiaro
C.2 to C.6
Job #
Date: 3:58PM, 6 MAR 08
Page 1
General Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W14X22 Fy 5o.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 10.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft �
Lu : Unbraced Length 6.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.520 k/ft
LL 2.600 k/ft
ST k/ft
Start Location ft
End Location ft
ummary
Using: W14X22 section, Span = 10.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
Actual Allowable
Moment 39.276 k-ft 67.454 k-ft
fb : Bending Stress 16.252 ksi 27.912 ksi
fb / Fb 0.582 : 1
Shear
fv : Shear Stress
fv / Fv
15.710 k 63.204 k
4.971 ksi 20.000 ksi
0.249 : 1
Beam OK
Static Load Case Governs Stress
Max. Deflection -0.122 in
Length/DL Defl 5,678.4 : 1
Length/(DL+LL Defl) 979.6 : 1
Force & Stress Summary
«_ These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Onlv Center Center Cants Cants
Max. M+ 39.28 k-ft 6.78 39.28 k-ft
Max. M -
Max. M @ Left
Max. M @ Right
Shear @ Left 15.71 k
Shear @ Right 15.71 k
Center Defl. -0.122 ��
Left Cant Defl 0.000 in
Right Cant Defl 0.000 in
...Query Defl @ 0.000 ft
Reaction @ Left 15.71
Reaction @ Rt 15.71
2.71 15.71
2.71 15.71
-0.021 -0.122
0.000 0.000
0.000 0.000
0.000 0.000
2.71 15.71
2.71 15.71
k-ft
k-ft
k-ft
k
k
-0.122 0.000 0.000 in
0.000 0.000 0.000 in
0.000 0.000 0.000 in
0.000 0.000 0.000 in
15.71 k
15.71 k
Fa calc'd per Ep, E2-2, K'Ur > Cc
I Beam, Malor Axis, (102,000' Cb / Fy)^.5 <= UrT <_ (510,000 * Cb / Fy)".5 , Fb per Eq. F1-6
z LiD
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
Rev: 580007
User: KW0605725, Ver 5.8.0, 1•Dec•2003 Steel Beam Design
lc)1983-2003 ENERCALC Englneering Software
Description C.2 to C.6
Section Properties W14X22
Depth 13.740 in Weight 22.04 #/ft
Web Thick 0.230 in I�oc 199.000 in4
Width 5.000 in lyy 7.000 in4
Flange Thick 0.335 in S�oc 29.000 in3
Area 6.49 in2 Syy 2.800 in3
Rt 1.250 in R-�oc 5.540 in
Values for LRFD Design.... R-yy 1.040 in
J 0.210 in4 Zx 33.200 in3
Cw 314.00 in6 ZY 4.390 in3
K 0.735 in
Job #
Date: 3:58PM, 6 MAR 08
Page 2
�V �
• Rev: 580007
User: KW-0605725
lc)1983-2003 ENER
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
i, 1•Dec•2003 Steel Beam Design
Ineerina Software
C.6 to D.1
General Information
Steel Section : W14X22
Job #
Date: 3:58PM, 6 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Fy 50.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 12.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 6.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.520 k/g
LL 2.600 k/ft
ST k/ff
Start Location g
End Location ft
Using: W14X22 section, Span = 12.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
Actual Allowable
Moment 56.557 k-ft 67.454 k-ft
fb : Bending Stress 23.403 ksi 27.912 ksi
fb / Fb 0.838 : 1
Shear
fv : Shear Stress
fv / Fv
18.852 k 63.204 k
5.966 ksi 20.000 ksi
0.298 : 1
Beam OK
Static Load Case Governs Stress
Max. Deflection -0.254 in
Length/DL Defl 3,286.1 : 1
Length/(DL+LL Defl) 566.9 : 1
Force 8� Stress Summary
«_ These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Only Center Center Cants Cants
Max. M+ 56.56 k-ft 9.76 56.56 k-ft
Max. M - k-ft
Max. M @ Left k_n
Max. M � Right k-ft
Shear @ Left 18.85 k 3.25 18.85 k
Shear � Right 18.85 k 3.25 18.85 k
Center Defl. -0.254 in -0.044
Left Cant Defl 0.000 in 0.000
Right Cant Defl 0.000 in 0.000
...Query Defl @ 0.000 ft 0.000
-0.254 -0.254
0.000 0.000
0.000 0.000
0.000 0.000
Reaction @ Left 18.85 3.25 18.85 18.85
Reaction @ Rt 18.85 3.25 18.85 18.85
Fa calc'd per Eq. E2-2, K*Ur > Cc
I Beam, Malor Axis, (102,000 " Cb / Fy)^.5 <= LIrT <_ (510,000 * Cb / Fy)".5 , Fb per Eq. F1-6
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
k
k
��F
� EHM Engineers, Inc Title : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 3:58PM, 6 MAR 08
. Boise, Id 83705 Description :
Scope :
, Rev:580007
User: KW0605725, Ver5.8.0, 1-Dec•2003 Steel Beam Design Page 2
lc)1983-2003 ENERCALC Engineering Software enercalc.ecw:Calcutatlon
Description C.6 to D.1
Section Properties W14X22
Depth 13.740 in Weight 22.04 #/ft
Web Thick 0.230 in I�oc 199.000 in4
Width 5.000 in lyy 7.000 in4
Flange Thick 0.335 in S�oc 29.000 in3
Area 6.49 in2 Syy 2.800 in3
Rt 1.250 in R-�oc 5.540 in
Values for LRFD Design.... R-YY 1.040 in
J 0.210 in4 Zx 33.200 in3
Cw 314.00 in6 ZY 4.390 in3
K 0.735 in
L.t.J�
�
ver
(c)1983-2003 ENEF
�
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope:
'I•Det•2003 Steel Beam Design
iaarina SnfTwara
D.1 to D.9
Job #
Date: 3:58PM, 6 MAR OS
Page 1
General Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W24X55 Fy eo.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 22.00 ft Bm Wt. Added to l,oads Elastic Modulus 29,000.0 ksi
Left Cant. 7.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 6.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.520 k/ft
LL 2.600 k/ft
ST k/ft
Start Location ft
End Location ft
Using: W24X55 section, Span = 22.00ft, Fy = 50.Oksi, Left Cant. = 7.00ft, Right Cant. = O.00ft
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
Actual Allowable
Moment 185.108 k-ft 287.500 k-ft
fb : Bending Stress 19.316 ksi 30.000 ksi
fb / Fb 0.644 : 1
Shear
fv : Shear Stress
fv / Fv
35.566 k 186.203 k
3.820 ksi 20.000 ksi
0.191 : 1
Beam OK
Static Load Case Governs Stress
Max. Deflection -0.409 in
Length/DL Defl 4,276.4 : 1
Length/(DL+LL Defl) 421.8 : 1
Force 8� Stress Summary
«_ These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Onlv Center Center Cants Cants
Max. M+ 185.11 k-ft 28.10 185.11 6.77 k-ft
Max. M - -14.09 -14.09 -77.79 k-ft
Max. M @ Left -14.09 -14.09 -77.79 k-ft
Max. M � Right k-ft
Shear @ Left 35.57 k 6.97 35.57 21.85 k
Shear @ Right 34.28 k 5.68 34.28 2.79 k
Center Defl. -0.409 �� -0.059 -0.409
Left Cant Defl 0.398 in 0.039 0.398
Right Cant Defl 0.000 in 0.000 0.000
...Query Defl @ 0.000 ft 0.000 0.000
Reaction @ Left 60.69 10.99 39.59
Reaction � Rt 34.28 5.68 34.28
Fa caic'd per Eq. E2-2, K*Ur > Cc
I Beam, Malor Axis, L/rT <(102,000' Cb / Fy)",5, Fb = 0,6 FV (F3)
-0.409 0.036 0.036 in
0.398 -0.139 -0.139 in
0.000 0.000 0.000 in
0.000 0.000 0.000 in
39.59 32.09 32.09 k
34.28 2.79 2.79 k
W�
� EHM Engineers, Inc Title : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 3:58PM, 6 MAR 08
, Boise, Id 83705 Description :
Scope :
- Rev: ss000� Pa e 2
User: KW0605725, Ver 5.8.0, 1-Dec2003 Steel Beam Design 9
lc)1983-2003 ENERCALC Enalneerina Software enerealc_ecw�Caleularinn
Description D.1 to D.9
Section Properties W24X55
Depth 23.570 in Weight 55.03 #/ft
Web Thick 0.395 in I�oc 1,350.000 in4
Width 7.005 in lyy 29.100 in4
Flange Thick 0.505 in S�oc 115.000 in3
Area 16.20 in2 Syy 8.300 in3
Rt 1.680 in R-�oc 9.130 in
Values for LRFD Design.... R-yy 1.340 in
J 1.180 in4 Zx 135.000 in3
Cw 3,870.00 in6 ZY 13.400 in3
K 1.110 in
�x
�� �� EHM En ineers, Inc.
L5 621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
, 3501 West Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076 ',
JOB NAME JOB N0. II
� BY DATE SHEET OF '
- �,�,� 6� ��s _�,�.
�
- � �-� �_6 f � � Y ��� r�, I
__ _ _ I
� � � �'v1�% � ' '
� r_ � Z�pP�`� '
�/`l�'1 � �t/'G�� �l �.� (�� � W` c.'' ( �'' �i° �!/��^�
� _ _ _ _ _ I
'' � � ` 1 , !� ' I
�, 1� �� � S��w, � 1 �� Z- Z r� �i� l�,r� �
pc� 5��� _ _ _ '
r� � � � +� �;` _ . _
� ,,
� �- 3/�
, �r �✓► i �,n �iY'e�'�c �s � W ZyX (�� c/�E�
- G. 3 � �, % � >,��wr � Zy'. � ,, _
�
��= �� �8' t �0-6' � v�p�,� t�il� � J � �
� � � ��- i�' � �S. � � � � ys�,�� F �q � �
,
� r�w� � v,��l� �t s � �1 Z y k � � ✓��k
�'
ENGINEERS/ PLANNERS/ SURVEYORS
- Rev:
user:
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705
Description :
Scope :
1•Dec•2003 Steel Beam Design
ieerina Software
Description (E) W21x44
General Information
Job #
Date: 4:OOPM, 6 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W21X44 Fy 50.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 16.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 0.00 ft
Distrlbuted Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.520 k/ff
LL 2.600 k/ft
ST k/ft
Start Location ft
End Location ft
Using: W21X44 section, Span = 16.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Actual
Moment 101.253 k-ft
fb : Bending Stress 14.890 ksi
fb / Fb 0.451 : 1
Shear 25.313 k
fv : Shear Stress 3.501 ksi
fv / Fv 0.175 : 1
Force 8 Stress Summa
DL
Maximum Onlv
Max. M+ 101.25 k-ft 18.05
Max. M -
Max. M @ Left
Max. M � Right
Shear� Left 25.31 k 4.51
Shear � Right 25.31 k 4.51
Center Defl. -0.191 �� -0.034
Left Cant Defl 0.000 in 0.000
Right Cant Defl 0.000 in 0.000
...Query Defl @ 0.000 ft 0.000
Reaction � Left 25.31 4.51
Reaction � Rt 25.31 4.51
Fa calc'd per Eq. E2-1, K*L/r < Cc
I Beam Passes Table B5.1, Fb per Eq. F1-1, Fb = 0.66 Fy
Allowable
224.400 k-ft
33.000 ksi
144.620 k
20.000 ksi
Beam OK
Static Load Case Governs Stress
Max. Deflection -0.191 in
Length/DL Defl 5,642.6 : 1
Length/(DL+LL Defl) 1,006.0 : 1
«_ These columns are Dead + Live Load placed as noted -»
LL LL+ST LL LL+ST
Center Center Cants Cants
101.25 k-ft
k-ft
k-ft
k-ft
25.31 k
25.31 k
-0.191 -0.191
0.000 0.000
0.000 0.000
0.000 0.000
25.31 25.31
25.31 25.31
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
k
k
�
0
�
• Rev:580007
User: KW-0605725
1c11983•2003 ENEF
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
003 Steel Beam Design
cnfrw�rn
(E) W21x44
Section Properties W21X44
Depth 20.660 in Weight 44.16 #/ft
Web Thick 0.350 in i�oc 843.000 in4
Width 6.500 in lyy 20.700 in4
Flange Thick 0.450 in S�oc 81.600 in3
Area 13.00 in2 Syy 6.370 in3
Rt 1.570 in R-�oc 8.060 in
Values for LRFD Design.... R-yy 1.260 in
J 0.770 in4 Zx 95.400 in3
Cw 2,110.00 in6 ZY 10.200 in3
K 0.950 in
Job #
Date: 4:OOPM, 6 MAR 08
Page 2
Z�L
• Rev:580007
User: KW0605725, Ver
lc)9983-2003 ENERCALC
���
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
. Description :
Boise, Id 83705
Scope :
1-Dec-2003 Steel Beam Design
iaerinn Cnffuiaro
F.1 to G.3
Job #
Date: 4:OOPM, 6 MAR 08
Page 1
General Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W24X68 Fy 5o.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 31.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 2.20 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 6.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.520 k/ft
LL 2.600 k/ft
ST k/ft
Start Location ft
End Location ft
Using: W24X68 section, Span = 31.00ft, Fy = 50.Oksi, Left Cant. = 2.20ft, Right Cant. = O.00ft
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
� Actual Allowable
Moment 382.279 k-ft 423.500 k-ft
fb : Bending Stress 29.788 ksi 33.000 ksi
fb / Fb 0.903 : 1
Shear
fv : Shear Stress
fv / Fv
49.464 k 196.959 k
5.023 ksi 20.000 ksi
0.251 : 1
Beam OK
Static Load Case Governs Stress
Max. Deflection -1.246 in
Length/DL Defl 1,033.9 : 1
Length/(DL+LL Defl) 187.1 : 1
Force 8� Stress Summary
«- These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Oniv Center Center Cants Cants
Max. M+ 382.28 k-ft 69.96 382.28 66.86 k-ft
Max. M - -1.42 -1.42 -7.72 k-ft
Max. M � LeR -1.42 -1.42 -7.72 k-ft
Max. M (� Right k-ft
Shear @ Left 49.46 k 9.16 49.46 9.37 k
Shear @ Right 49.37 k 9.07 49.37 8.87 k
Center Defl.
Left Cant Defl
Right Cant Defl
...Query Defl @
Reaction @ Left
Reaction @ Rt
-1.246 in .0.228
0.282 in 0.051
0.000 in 0.000
0.000 ft 0.000
56.68 10.46
49.37 9.07
Fa calc'd per Eq, E2-1, K*Llr < Cc
I Beam Passes Table 65,1, Fb per Eq, F1-1, Fb = 0.66 Fv
-1.246 -1.246
0.282 0.282
0.000 0.000
0.000 0.000
50.76 50.76
49.37 49.37
-0.215 -0.215 in
0.046 0.046 in
0.000 0.000 in
0.000 0.000 in
16.38 16.38 k
8.87 8.87 k
Z�iM
, Rev:580007
User: KW0605725
Ic)1983-2003 ENER
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
F.1 to G.3
Steel Beam Design
Section Properties W24X68
Depth 23.730 in Weight 68.27 #/ft
Web Thick 0.415 in I�oc 1,830.000 in4
Width 8.965 in lyy 70.400 in4
Flange Thick 0.585 in S�oc 154.000 in3
Area 20.10 in2 Syy 15.700 in3
Rt 2.260 in R-�oc 9.550 in
Values for LRFD Design.... R-yy 1.870 in
J 1.870 in4 Zx 177.000 in3
Cw 9,430.00 in6 ZY 24.500 in3
K 1.090 in
Job #
Date: 4:OOPM, 6 MAR OS
Page 2
� ��
Rev: 580007
• User: KW0605725
1C11983-2003 ENEF
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
s��,�,a�p Steel Beam Design
G.3 to G.9
General Information
Job !�
Date: 3:59PM, 6 MAR 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section : W24X68 Fy 50.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 24.50 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant. 0.00 ft LL 8 ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 6.00 ft
Distributed Loads Note! Short Term Loads Are WIND Loads.
#1 #2 #3 #4 #5 #6 #7
DL 0.420 k/ft
LL 1.950 k/ft
ST k/ft
Start Location ft
End Location ft
Point Loads
#1 #2 #3
Dead Load 8.400
Live Load 39.200
Short Term
Location 7.000
Using: W24X68 section, Span = 24.50ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = 6.00ft, LDF = 1.000
Actual Allowable
Moment 387.295 k-ft 423.500 k-ft
fb : Bending Stress 30.179 ksi 33.000 ksi
fb / Fb 0.915 : 1
Shear 63.869 k 196.959 k
fir : Shear Stress 6.485 ksi 20.000 ksi
fv / Fv 0.324 : 1
Note! Short Term Loads Are WIND Loads.
#7
k
k
k
ft
Beam OK
Static Load Case Governs Stress
Max. Deflection -0.738 in
Length/DL Defl 2,115.2 : 1
Length/(DL+LL Defl) 398.6 : 1
Force 8 Stress Summary
«- These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Oniv Center Cm Center Cants Cants
Max. M+ 387.30 k-ft 71.93 387.30 k-ft
Max. M - k-ft
Max. M @ Left k_n
Max. M @ Right k_n
Shear @ Left 63.87 k 11.98 63.87 k
Shear � Right 43.47 k 8.38 43.47 k
Center Defl. -0.738 in -0.139
Left Cant Defl 0.000 in 0.000
Right Cant Defl 0.000 in 0.000
...Query Defl @ 0.000 ft 0.000
-0.738
0.000
0.000
0.000
Reaction � Left 63.87 11.98 63.87
Reaction @ Rt 43.47 8.38 43.47
Fa calc'd per Eq. E2-1, K*Ur < Cc
I Beam Passes Table 65.1, Fb per Ep. F1-1, Fb = 0.66 Fy
-0.738
0.000
0.000
0.000
63.87
43.47
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
0.000 0.000 in
k
k
�-�D
� EHM Engineers, Inc Title : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 3:59PM, 6 MAR 08
, Boise, Id 83705 Description :
Scope :
• aev: sa000� Pa e 2
User: KW0605725, Ver 5.6.0, 1•Dec-2003 Steel Beam Design 9
(e1�983•2003 ENERCALC Englneering Soflware enercalc.ecw:Calculatlon
Description G.3 to G.9
Section Properties W24X68
Depth 23.730 in Weight 68.27 #/ft
Web Thick 0.415 in I�oc 1,830.000 in4
Width 8.965 in lyy 70.400 in4
Flange Thick 0.585 in Sxx 154.000 in3
Area 20.10 in2 Syy 15.700 in3
Rt 2.260 in R-�a 9.550 in
Values for LRFD Design.... R-Y�' 1.870 in
J 1.870 in4 Zx 177.000 in3
Cw 9,430.00 in6 ZY 24.500 in3
K 1.090 in
7�.�P
� LE�H M� EHM Engineers, Inc
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
� 3501 Elder St., Suite 100 Boise, Idaha 83705 208/3B6-9170 FAX 208/386-9076
JOB NAME JOB N0.
� BY DATE SHEET OF
� � `���/� �� ��� � c��c.� � _�y��= � 6 ' _
T� -�-�'' �a� �= � ,��� �
` �: ! !�('���i, !�'7/u"1
GG � Z(, �t /�
_ / _
�r'..-�r� �-�i�, �.�r.�!(� u,� �Z � (� �� k� �' '� � � � t'�,� _ v� , � ��'�
- P,�c(��,,� ti m �.- �'�� c� �f _; �►,�� �: Z.�' ���, � z��
_
�L = � � � z � ti � (� �e � .�, h�►9 � $ ll �, u k� s �. �, ; �,�„�,,
LL = ��� `�$� = ��r,p � � �
_ � +�51�ce� a+� cd1, �� l�
�+'�t� � ��� k.� �' ��i'k�'� ���' _ _
_ _ _ __ _ _ _
_ _ __
_ _ _ _ _ _ I
��,�,�,���� , �. ....,�.... . �. ,�.,�,��� �L.� I
EHM Engineers, inc Title :
3501 W. Eider, Ste. 100 Dsgnr:
. Boise, Id 83705 6escription :
Scope:
I�Se�:'°"-°6°5'Z5,"e�5.e.°,,-°�Z°°3 General Timber Beam
!cl'19A3-9(l03 FNFRCGI C Fnninnnrin.. s..ln..�.e
Description Entry Tnass Bottom Chord
Job #
Date: 2:17PM, 9 JAN 08
Page 1
General Information Code Ref: 1997/2001 NDS, 2000/2003 IBC, 2003 NFPA 5000. Base allowables are user defined
Sectlon Name 6.75x27 Center Span 36.00 ft.....Lu 18.00 ft
Beam Width 13.500 in Left Cantilever ft.....Lu 0.00 ft
Beam Depth 27.000 in Right Cantilever ft.....Lu 0.00 ft
Member Type GluLam Douglas Fir, 24F - V4
Fb Base Allow 2,400.0 psi
Load Dur. Factor 1.150 Fv Aliow 240.0 psi
Beam End Fixity Pin-Pin Fc Allow 650.0 psi
E 1,800.0 ksi
Point Loads
Live Load 26,450.0 Ibs Ibs Ibs Ibs fbs Ibs Ibs
...distance 18.000 ft 0.000 ft 0.000 ft 0.000 ft 0.000 ft 0.000 ft 0.000 ft
Span= 36.00ft, Beam Width = 13.500in x Depth = 27.in, Ends are Pin-Pin
Max Stress Ratio o.ss7 : �
Maximum Moment 2sa.7 k-st Maximum Shear'� 1.5
Ailowabie 303.8 k-ft Allowabie
Max. Pa�ifiv� Mbliier�f 284.65 li-ft af 18.000 ft Sfiear (�,D Leff
Max. Negative Moment 0.00 k-ft at 36.000 ft � Right
Max � Left Support 0.00 k-ft Camber. Q Left
Max � Right Support 0.00 k-R � Center
Max. M allow 303.82 � Right
Raactians.,.
fb 2,082.50 psi iv 65.08 psi left DL 2.59 k Max
Fb 2,222.77 psi Fv 276.00 psi Right DL 2.59 k Max
Deflections
Beam Design OK
�3.7 k
100.6 k
15.81 li
15.81 k
0.000 in
0.3271n
0.000 in
15.81 k
15.81 k
Center Span::: Dead Load To I oad Laft Ca�lavar... Dea Load Total Load
Deflection -0.218 in -1.333 in Deflection 0.000 in 0.000 in
.:.Location 18.000 ft 18.000 ft ...Length/Defl 0.0 0.0
...Length/Defl 1,979.9 324.13 RtghtCantltavar...
Camber ( using 1.5 * D.L. Defl )... Deflection 0.000 in 0.000 in
!� Center 0.327 in ...Length/Defl 0.0 0.0
� Left 0.000 in
(fa Right 0.000 in
y Stress Cafcs �
Bending Analysis
Ck 20.711 Le 35.896 ft S�oc 1,640.250 in3 Area 364.500 in2
Cv 0.811 Rb 7.990 CI 0.993
(a� Center
@ LeR Support
(d� Right 5upport
Shear Analysis
Design Shear
Area Required
Fv: Allowable
Bearing � Supports
Max. Left Reaction
Max. Right Reaction
Max Moment
284.65 k-ft
0.00 k-ft
O.OU k-ft
(�D Left Support
23.72 k
85.946 in2
276.00 psi
15.81 k
15.81 k
�oc 'd
1,536.74 in3
0.00 in3
0.00 in3
@ Right Support
23.72 k
85.946 in2
276.00 psi
Bearing Length Req'd
Bearing Length Req'd
Al�ewable fb
2,222.77 psi
2,239.29 psi
2,239.29 psi
1.802 in
1.802 in
L �
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
• Boise, Id 83705 6escripfion :
_ Scope:
Description
-Dec-2003
General Timber Beam
Entry Truss Bottom Chord
Jo6 #
Date: 2:17PM, 9 JAN 08
Query Values
NI, V, 8 D� Specified Locations Momant Stwar Daflaction
(� Center Span Location = 0.00 ft 0.00 k-ft 15.81 k 0.0000 in
@ Right Cant. Location = 0.00 ft 0.00 k=ft 0.00 k 0.0000 in
� Left Cant. Location = 0.00 ft 0.00 k-ft 0.00 k 0.0000 in
Page 2
�, `�
�>
EHM Engineers, Inc Titie :
3501 W. Elder, Ste. 100 Dsgnr:
' Boise, Id 83705 6escription :
_ Scope:
User: KW-0605725, Ver5.8.0, 1-Dac-2003 Steel Beam Design
(c)1983-2003 ENERCALC Enaineerin Software
Description Pick up beam for (E) column
General Information
Job #
Date: 10:39AM, 22 JAN 08
Page 1
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Stee{ Section : W24X55 Fy 50.00ksi
Pinned-Pinned Load Duration Factor 1.00
Center Span 23.00 ft Bm Wt. Added to Loads Elastic Modulus 29,000.0 ksi
Left Cant 0.00 ft LL & ST Act Together
Right Cant 0.00 ft
Lu : Unbraced Length 0.00 ft
DISt�IbUted L08dS Note! Short Term Loads Are WIND l.oads.
#1 #2 #3 #4 #5 #6 #7
DL 0.476 �{
LL 2.800 wg
ST �
StaR Location {�
End Location �
Using: W24X55 section, Span = 23.00ft, Fy = 50.Oksi
End Fixity = Pinned-Pinned, Lu = O.00ft, LDF = 1.000
Actual Allowable
Moment 220.264 k-ft 316.250 k-R
fb : Bending Stress 22.984 ksi 33.000 ksi
fb ! Fb 0.696 : 1
Shear 38.307 k 186.203 k
fv : Shear Stress 4.115 ksi 2d.b66 ksi
iv / Fv 0.206 : 7
Beam OK
Sfa�c Load Case Governs Sfress
Max. Deflection -0.536 in
Lertgth/DL Defl 3,231.8 : 1
Length/(DL+LL Deft) 515.2 : 1
Force � Stress Summary
«- These columns are Dead + Live Load placed as noted -»
DL LL LL+ST LL LL+ST
Maximum Onlv en r Center Can ants
Max. M+ 220.26 k-R 35.11 220.26 k_p�
Max. M -
Max: M (a� 6eft
Max. M � Rlght
Shear (� Left
Shear (dl Right
Center Defl.
Left Cant befl
Right Cant Defl
...Query Defl �
k-ft
k-ft
k-R
38.31 k 6.11 38.31 k
38.31 k 6.11 38.31 k
-0.536 �n -0.085 -0.536 -0.536 0.000 0.000 in
b.Obb in 6.000 O.ObO b.000 0.000 0.000 in
0.000 in 0.000 0.000 0.000 0.000 0.000 in
0.000 ft 0.000 0.000 0.000 0.000 0.000 in
Reaction � Left 38.31 6.11 38.31
Reaction � Rt 38.31 6.11 38.31
Fa calc'd per Eq. E2-1, K'Ur < Cc
t Beam Passes Tabte B5.1, Fb per Eq. F1-1, Fb = 0,66 Fy
38.31
38.31
� �
�
EHM Engineers, inc Title :
3501 W. Elder, Ste. 100 Osgnr:
BOise, Id 83705 6escripfion :
Scope:
User: KW-0605725, Ver5.8.0, i-Dec-2003 Steel Beam Des
{c)1983-2003 ENERCALC En9ineerina Software
Description Pick up beam for (E) column
Section Properties W24X55
Depth 23.57d in Weight 55.03 #!ft
Web Thick 0.395 in boc 1,350.000 in4
Width 7.005 in lyy 29.100 in4
Flange Thick 0.505 in 5bc 115.000 in3
Rrea 16,20 in2 Syy 5.300 irt3
� 1.680 in R-�ac 9.130 in
Values for LRFD Design.... R-YY 1.340 in
J 1.180 in4 Zx 135.000 in3
Cw 3,870.00 in6 ZY 13.400 in3
K 1.110 in
Job #
Date: 10:39AM, 22 JAN 08
Page 2
~ J
. LE�H'
_ JOB NAME
f
BY
5� � � ,�
EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falis, Idaho 83301 208j734-4888 FAX 208/734-6049
3501 West Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB N0.
DATE
SHEET OF
��t dv�/ �✓�r` T 7' Cl�1 �C K b �'g ` ���ps �
i r lO�
1,�� �o L�, - �so �� „�Ps��;��
��� p�E ���
_ +"1 � ` S'- 6 r ' ��y ` _ Gl'`, Z' .
C� ` cz � �v G � �1 � - Z �- '� ��
�� y��,�` l(,( G`' _�b
j r s,� _;
►'1 � �,,;3 = 3 - L� = f s� � �g -` f.���r �
��
�c± = S�- 6�� '��Y ' `l� Z��: _ _ 16Jb' _ _
� -- z', �,� _
L"
z
� � y �'`� �` l �l �
5 5 �
�� �L .� �,�� �G nss= �a�/
�� �
I o,�.1 %a ocl � � �
,��fs �S U�" `s-� (� '� rJ�. % „�� 3 7 � �� j,JuM
�
�.S � � �, 3� ' �_�^_
_.______----.
5��= ' � ��- �- /z,q5,i5r�3,s',��'
`�,'`� � i �, '7 � � � 5 � 4�w 7 n e�✓ � �
Sn 8w � 3,S' ' 7D�s �'��' w %, l�l - 3,s, /(�,� � 9ZZ�c� � � ��
��
0
0 o S%16�w %� d���`�2� ha�. � e e�'I. s u�� cr evi �/� a1�s�,�, �,�
��� c�,,,,� ,wru� a�� s�4:� � �✓,� P.w aya,� l- �,G;�
ENGINEEAS / PLANNERS / SURVEYORS
_ b
L
.
CE�H M�
JOB NAME
BY
- �l (.�1(� S 4
r
_ T �, �, � �
,_�.—'- •
�Lrnw `�
EHM Engineers, Inc.
621 Narth College Road, Suite 100 Twin Falis, Idaho 83301 208/734-4888 FAX 2D8/734•6�49
3501 Elder St., Suite 100 Boise, Idaho 83705 208/386•9170 FAX 208/386-9076
JOB N0,
_DATE SHEET _ _ _ OF
r
�� ZZ- �'` n; ����� r.r,�,�:'�l,,�.
�G`° �•�i<
X �Z a 3q, f � _ _ _
__ _ ___
�� �v�, �err�, � Vr,� c_ T s �j�r ��` �> �j � �� i�
� /�'
__ _ _
T��a� � c� = �- q k� z� %�C � � CD�s �< :
��� �.�x �- i �, �.L - �ZS;�
_ _
�`�Lw1 Giv► eNCA �l +�'( � �. ; =� %9 r!' / �i' S�/ �j ' I/l,p � _
�- 1 �, �,W�� � _ _ _ _
__
TL �,a� --�. p� _ �. � _ _ _ .
� __
�L -' �Ic�. z� _ _ _
_
; _ _
�''� �rn,rw�r1C ��e �� �r�� `�y (/�c9� �y��`�'� _ _
,,
- � ���r C�, C�„�,, �, , t� = �5, �� � _ 3 s�8 _ ��
,�
n�= y.yl�
L� = Z � ,5,�'
� � �►-,� �., ��� !.� � � � �►� � f'/w g ! 6l���'c�� �
h = i�'
;
� L= ��n� l� t► �I . Z I( ` � g, I:
bL� i�K
L��' �SK
�/'� � �'/��C �� l`� (��'G�' ���
��r,�,���� ,�, �.,.,�.,� ,..,,,.,,...,,.....
� �I�
� EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
. • BoiSe, id 83705 6escriptfon :
• IRev: 560010
User. KW-0605725, Ver 5.8.0, 1-Deu2003
Description Steel Column, @ high canopy
3cope :
Steel Column
Job #
Date: 2:12PM, 9 JAN 08
Page 1
� General Information Code Ref. AISC 9th ASD, 1997 UBC, 200316C, 2003 NFPA 5000 �
Steel Section TS6X6X5l16 Fy 46.00 ksi X-X Sidesway : Restrained
Duration Factor 1.000 Y-Y Sidesway : Restrained
CblUmn Height 25.OQ0 ff @lastic Modulus 29,000.00 ksi
End Fixity Pin-Pin X-X Unbraced 22.500 ft K�oc 1.000
Live & Short Term Loads Combined Y-Y Unbraced ��:500 ft Kyy 1.000
Loads r
��
Axtal l.oad...
Dead load 8.30 k Ecc. for X-X Axis Moments 1.000 in
Live Load 39.10 k E�. fo� Y-Y Aici§ M3ti5enf§ 0.000 in
Short TeRn Load k
""1f°'y ■ Cofumn Design OK
Section : TS6X6X5/16, Height = 25.00ft, Axiai Loads: DL = 8.30, LL = 39.10, ST = O.00k, Ecc. = 1.00Oin
Unbraced Lengths: X-X = 22.50ft, Y-Y = 22.50R
Combined 5tress Ratios Dead Live DL + LL DL + ST +(LL if Chosen)
AISC Formuta N1 - 1 0.6605 0.8510 0.8510
AISC Formuta H1 - 2 0.3129 �.3794 0.3794
AI5C Fortnula H1 - 3 f�.134�
XX Axis : Pa caic'd per Eq. E2-2, K*Llr > Cc
YY Axis � Fa r_air'd ner Ea_ E2-2_ K*Llr > Cr_
Stresses
Allowable 8� Actual Stresses
Fa : A41a++abk
fa : Actual
Fb:�oc : Atlow [F1-6]
Fb:�oc : Allow [F1-7j & [F1-8]
tb : bc Actual
Fb:yy : Allow [Fi-G]
Fb:yy : Allow [F1-� & (F1-8]
Dead
10.84 ksi
1.21 ksi
30.36 ksi
30.36 ksi
0.69 ksi
38.3� ksi
30.36 ksi
Live Dl + LL DL + Short
10.84 ksi 14.84 Vcai 10.84 Vcai
5.70 ksi 6.91 ksi 6.91 ksi
30.36 ksi
30.36 ksi
3.23 ksi
3�.3G ksi
30.36 ksi
30.36 ksi
30.36 ksi
3.92 ksi
3b.3� ksi
30.36 ksi
30.36 ksi
30.36 ksi
3.92 ksi
36.36 ksi
30.36 ksi
ib : yy Actual 0.00 ksi 0.00 ksi 0.00 4csi 0.00 ksi
Analysis Values
F'ex : DL+LL 10,839 psi Cm:x DL+LL 0.60 Cb:x DL+LL 1.00
F'ey : DL+LL 10,839 psi Cm:y DL+LL 0.60 Cb:y DL+LL 1.00
F'ex : DL+LL+ST 10,839 psi Cm:x DL+LL+ST 0.60 Cb:x DL+LL+ST 1.00
F'ey : DL+LL+ST 10,839 psi Cm:y DL+LL+ST 0.60 Cb:y DL+LL+ST 1.00
Max X-X Axis Deflection -0.260 in at 14.500 ft Max Y-Y Axis Deflection 0.000 in at 0.000 ft
(..� �
Rev: 560010
User: KV1l-0605725,
c 1963-2003 ENER
Description
EHM Engineers, Inc
3501 W. Elder, Ste. 100
Boise, Id 83705
1-Dec-2003
ineerinA Software
Steel Column, @ high canopy
TiNe :
Dsgnr:
6escripfion :
Scope :
Steel Column
Job #
Date: 2:12PM, 9 JAN OS
Page 2
Section Properties TS6X6X5/16 �
Depth 6.00o in Weight z3.3o #!ft Values for LRFD Design....
Thickness 0.313 in I�oc 36.300 in4 J 58.900 j�4
Width 6.000 in tyy 36.300 in4 0.00
S�oc 12.100 in3 Zx 14.400 in3
Area 6.86 in2 Syy 12.10o in3 Zy 14.a00 in3
Rt 3.000 in Rxac 2.300 in 0.000
Ryy 2.300 in
Section Type = TS-Square
� G 1>
• Rev: 580010
User: KW-0605725,
c 1983-2003 ENER
Description
EHM Engineers, Inc
3501 W. Elder, Ste. 100
Boise, Id 83705
Ver 5.8.0, 1
TS Column
Titte :
Dsgnr:
Description :
Scope :
Steel Column
Job �
Date: 1:19PM, 6 MAR 08
Page 9
Generai information Code Ref: AISC 9th ASD, 'l997 UBC, 2003 iBC, 20D3 NFPA 5000
Steel Section TS6X6X5/16 Fy 46.00 ksi X-X Sidesway : Restrained
Duration Factor 1.330 Y-Y Sidesway : Restrained
Column Heighf 18.000 ff �lastic Mtidulus 29,000.00 ksi
End Fixity Pin-Pi� X-X Unbraced 18.000 it lUa 1.000
Live & Short Term Loads Combined Y-Y Unbraced 15:000 ft Kyy 1.000
Loads
Axial Load...
Dead Load 10.50 k Ex. for X-X Axis Moments 1.000 in
Live Load 52.50 k EcC, tor Y-Y Aiti§ Moi►ierifs 0.000 in
Short Term Load k
a111°' y � Cotumn Design OK
Section : TS6X6X5/16, Height = 18.00ft, Axial Loads: DL = 10.50, LL = 52.50, ST = O.00k, Ecc. = 1.00Oin
Unbraced Lengths: X-X = 18.00R, Y-Y = 18.00ft
Combined Stress Ratios Dead Live DL + LL DL + ST + fLL if Chosen)
AtSC Forcnuta H1 - 1 0.6636 0.8371 0.5872
AISC Fortnula H1 - 2 0.4345 0.5214 0.3920
AI5� Formula Hi - 3 0.1297
XX Axis : Fa caic'd pei Eq. E2-1. K*Llr < Cc
YY Axis � F'a cair.'d ner �n_ F2-9 _ K*i_fr < Cr_
Stresses
Allowable � Actual Stresses
Fa : Aftowable
fa : Actual
Fb:�oc : Allow [F1-6]
Fb:�oc : Allow [F1-7] 8� [F1-8]
Po : bc Actual
�b:yy : Allow (�'1-fi]
Fb:yy : Allow [F1-7] 8� [F1-8]
Dead
15.57 ks's
1.53 ksi
27.60 ksi
27.60 ksi
0.87 ksi
2�`.60 ksi
27.60 ksi
Live DL + LL DL + Short
15.57 k�i 15.57 ksi 20.71 kai
7.65 ksi 9.18 ksi 9.18 ksi
27.60 ksi
27.60 ksi
4.34 ksi
27.�0 ksi
27.60 ksi
27.60 ksi
27.60 ksi
5.21 ksi
��.�0 ksi
27.60 ksi
36.71 ksi
36.71 ksi
5:2i ksi
36.71 ksi
36.71 ksi
th : yy Actua4 0.00 ksi 0.00 ksi 0.00 ksi 0.00 ksi
I Analysis Values
F'ex : DL+LL 16,937 psi Cm:x DL+LL 0.60 Cb:x DL+�L 1.00
F'ey : DL+LL 16,937 psi �m:y DL+LL 0.60 Gb.y 91�+L6 1:00
F'ex : D�+LL+ST 22,526 psi Cm:x DL+LL+ST 0.60 Cb:x DL+LL+ST 1.00
F'ey : DL+LL+ST 22,526 psi Cm:y DL+LL+ST 0.60 Cb:y DL+LL+ST 1.00
Max X-X Axis Deflection -0.179 in at 10.440 ft Max Y-Y Axis Deflection 0.000 in at 0.000 ft
��
EHM Engineers, Inc
3501 W. Elder, Ste. 100
Boise, Id 83705
User: KUV-0605725, Ver 5.6.0, 1-Dao-2003
jc11983-2003 ENERCALC Enaineerina Softwere
Description TS Column
TiUe :
Dsgnr:
Description :
Scope :
Steei Column
Job #
Date: 1:19PM, 6 MAR 08
Page 2
rSection Properties TS6X6X5/16
Depth s.�00 in Weight 23.30 #/ft Values for LRFD Design....
Thickness 0.313 in I�oc 36.300 in4 J 58.900 in4
Width 6.�00 in lyy 36.30o in4 0.00
S�oc 12.100 in3 Zx 14.400 in3
Area s.86 in2 Syy 12.100 in3 Zy 1a.a0o in3
Rt 3.000 in Rxx�cc 2.300 in 0.000
Ryy 2.300 in
Section Type = TS-Square
Z�
. Rev:580010
User: KW-0605725
Ic11983-2003 ENEF
Description
EHM Engineers, Inc
3501 W. Elder, Ste. 100
Boise, Id 83705
TS Column
Title :
Dsgnr:
Description :
Scope :
Steei Column
Job #
Date: 1:44PM, 9 JAN 08
Page 1
General Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section TS6X6X1/4 Fy 46.00 ksi X-X Sidesway : Restrained
Duration Factor 1.000 Y-Y Sidesway : Restrained
Column Height 11.000 ft Elastic Modulus 29,000.00 ksi
End Fixity Pin-Pin X-X Unbraced 11,000 ft K�a 1.000
Live & Short Term Loads Combined 1'-Y Unbraced 11.000 ft Kyy 1.000
Loads
Axfal Load...
Dead Load 9.10 k Ecc. for X-X Axis Moments 1.000 in
Live Load 40.20 k Ecc. for Y-Y Axis Moments 0.000 in
Short Term Load k
""""°'r ■ Column Design OK
Section : TS6X6X1/4, Height = 11.00ft, Axial Loads: DL = 9.10, LL = 40.20, ST = O.00k, Ecc. = 1.00Oin
Unbraced Lengths: X-X = 11.00ft, Y-Y = 11.00ft
Combined Stress Ratios Dead Live DL + LL DL + ST +(LL if Chosen)
AISC Formula H1 - 1 0.4328 0.5363 0.5363
AISC Formula H1 - 2 0.4048 0.4964 0.4964
AISC Formula H1 - 3 0.1075
XX Axis : Fa calc'd per Eq. E2•1, K*Ur < Cc
YY Axis : Fa calc'd oer Ea. E2-1. K*Ur < Cc
Stresses
Allowable 8 Actual Stresses
Fa : Allowable
fa : Actual
Fb:�oc : Allow [F1-6]
Fb:�oc : Allow [F1-7] & [F1-8]
fb : �oc Actual
Dead
21.76 ksi
1.63 ksi
27,60 ksi
27.60 ksi
0.90 ksi
Live DL + LL
21.76 ksi 21.76 ksi
7.19 ksi 8.82 ksi
27.60 ksi 27.60 ksi
27.60 ksi 27.60 ksi
3.98 ksi 4.88 ksi
DL + Short
21.76 ksi
8.82 ksi
27.60 ksi
27.60 ksi
4.88 ksi
Fb:yy : Allow [F1-6] 27.60 ksi 27.60 ksi 27.60 ksi 27.60 ksi
Fb:yy : Allow [F1-7J &[F1-8] 27.60 ksi 27.60 ksi 27.60 ksi 27.60 ksi
fb : yy Actual 0.00 ksi 0.00 ksi 0.00 ksi 0.00 ksi
Analysis Values
F'ex : DL+�L 46,455 psi Cm:x DL+LL 0.60 Cb:x DL+LL 1.00
F'ey : DL+LL 46,455 psi Cm:y DL+LL 0.60 Cb:y DL+LL 1.00
F'ex : DL+LL+ST 46,455 psi Cm:x DL+LL+ST 0.60 Cb:x DL+LL+ST 1.00
F'ey : DL+LL+ST 46,455 psi Cm:y DL+LL+ST 0.60 Cb:y DL+LL+ST 1.00
Max X-X Axis Deflection -0.063 in at 6.380 ft Max Y-Y Axis Deflection 0.000 in at 0.000 ft
ti �
J
�
. Rev:580010
User: KW-0605725
lc)1983•2003 ENER
Description
EHM Engineers, Inc
3501 W. Elder, Ste. 100
Boise, Id 83705
TS Column
Title :
Dsgnr:
Description :
Scope :
Steel Column
Job #
Date: 1:44PM, 9 JAN 08
Page 2
Section Properties TS6X6X1/4
Depth 6.000 in Weight 18.99 #/ft Values for LRFD Design....
Thickness 0.250 in Ixx 30.300 in4 J 48.50o in4
Width 6.000 in lyy 30.300 in4 0.00
S�oc 10.10o in3 Zx 11.900 in3
Area 5.59 in2 Syy 10.100 in3 Zy 11.900 in3
Rt 3.000 in Raoc 2.330 in 0.000
Ryy 2.330 in
Section Type = TS-Square
�V
• �e�: se000s
(User: KW-0605725,
(c)1983-2003 ENER
Description
EHM Engineers, Inc Tit1e :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 bescription :
Scope :
�a�5.e.o, 1-Dec-2003 Timber Column Design
CALC Enaineerina Software
Canopy Column
General Information
Redangular Column
Golumn Depth
Width
GluLam
Job #
Date: 11:03AM, 22 JAN 08
Page 1
�de Ref: 1997/2001 NDS, 2000/20031BC, 2003 NFPA 5000. Base allowables are user defined
���•
d�,,usad
(along y-y a�s) �
(along x-x axis)
Load Duration Fador 1.15
9.25in Fc 1,650.00 psi
9.25 in Fb 2,400.00 psi
E- Elastic Modulus 1,800 ksi
Douglas Fir, 24F - V4
Unbraced length for "y-y" axis sideways defiection 23.00 ft
Unbraced length for "x-x" axis sideways deflection 23.00 ft
Lu XX for Bending 23.00 ft
Loads
6ead Load Live Load Short �erm Load
Axiat Load 2,200.00 Ibs 13,750.00 Ibs 0.00 Ibs
Eccentricity O.00Oin
Column OK
Using : 8.75x9, Width= 9.25in, Depth= 925in, Total Column Ht= 23.00ft
DL+LL DL+LL+ST DL+3T
fc : Compression 186.41 psi 186.41 psi 25.71 psi
Fc : Allowable 762.95 psi 778.72 psi 778.72 psi
fbx : Flexural 0.00 psi
F'bx : A!(owable 2,146.24 psi
0.00 psi
2.4�1.28 psi
0.00 psi
�,4fi'1.�8 psi
I Interaction Value 0.2443 0.2394 0.0330 �
Stress Details
Fc : X-X 762.95 psi For Bending Str�s Calcs...
Fc : Y-Y 762.95 psi Max k'Lu / d 50.00
F'c : Alloweble 762.95 psi Le : Bending 42.32 ft
F'c:Allow' Load Dur Factor 778.72 psi (tu-xx `NDS Table 3.3.3 factor)
PtsX 2,140.24 psi Rb :(Le d/ b^2) ^.5 7.410
F'bx' Load Duration Factor 2,461.28 psi Min. Allow k'Lu / d 11.00
Cv:Bending 0.8�2
For Axial Stress Calcs...
Cf : Axial 0.892
Axial X-X k Lu / d 29.64
Axial Y-Y k Lu / d 29.84
�
�
�
Description
EHM Engineers, Inc Title : Job �
3501 W. Elder, Ste. 100 Dsgnr: Date: 1:32PM, & MAR 08
Description :
Boise, Id 83705
TS column
Scope :
Steel Column
Page 1
General information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000 �
��� �� �
Steel Seotion TS6X6X1I2 Fy 46.00 ksi X-X Sidesway : Restrained
Duration Factor 1.330 Y-Y Sidesway : Restrained
Column Heighf 18.OQO ff �lastia lCAodulus 29,OOQ.00 ksi
End Fixity Pin-Pin X-X Unbraced 1$.000 ft IGoc 1.000
Live 8� Sho�t Term Loads Gombined Y-Y Unbraced 18:000 ft lEyq 1.000
Loads
Axiat Load...
Dead Load 13.00 k Ecc. for X-X Axis Moments 1.500 in
Live Load 65.00 k Ecc. fo� Y-Y Azis Momenf§ O.00d in
Short TeRn Load k
"""'°' y � Cofumn Deaign OK
Section : TS6X6X1/2, Height = 18.00ft, Axial Loads: DL = 13.00, LL = 65.00, ST = O.00k, Ecc. = 1.500in
Unbraced Lengths: X-X = 18.00ft, Y-Y = 18.00ft
Combined Stress Ratios Dead Live DL + LL DL + ST +(LL if Chosenl
AISC Forcnuta H1 - 1 0.6340 0.8002 0.5603
AISC Fortnula H7 - 2 0.4367 0.5241 0.3940
AISC Formula Hi - � i3.12�7
XX Axis : Fa ca{c`d per Eq. E2-1, K*L!r < Cc
YY Axis � F� caic`d ner Ea. E2-1. K*Lfr < Cc
Stresses
Allowable 8� Actual Stresses
Fa : ABowable
fa : Actual
Fb:�oc : Allow [F1-6]
Fb:�oc : Allow [F1-7] & [F1-8j
fb : �oc Adual
Fb:yy : Allow (F1�]
Fb:yy : Allow [F1-7] & [F7-S]
Dead
14.78 ksi
1.25 ksi
27.60 ksi
27.60 ksi
1.16 ksi
2�.66 ksi
27.60 ksi
Live DL + LL DL + Short
14.78 ksi 14.76 ksi 19.65 kai
6.25 ksi 7.50 ksi 7.50 ksi
27.60 ksi
27.60 ksi
5.80 ksi
2�.60 ksi
27.60 ksi
27.60 ksi
27.60 ksi
6.96 ksi
27.�0 ksi
27.60 ksi
36.71 ksi
36.71 ksi
6.96 ksi
36.71 ksi
36.71 ksi
tb : yy Retuat 0.00 ksi 0.00 ksi 0.00 ksi 0.00 ksi
� Analysis Values
F'ex : DL+LL 15,542 psi Cm:x DL+LL 0.60 Cb:x DL+LL 1.00
F'ey : DL+�L 15,542 psi Cm:.y DL+�6 0:60 Cb.y 96+6� 1:00
F'ex : OI+LL+ST 20,671 psi Cm:x DL+LL+ST 0.60 Cb:x DL+LL+ST 1.OQ
F'ey : DL+LL+ST 20,671 psi Cm:y DL+LL+ST 0.60 Cb:y DL+LL+ST 1.00
Max X-X Axis Deflection -0.239 in at 7 0.440 ft Max Y-Y Axis Deflection 0.000 in at 0.000 ft
�j �a
�
• Rev: 580010
Description
EHM Engineers, !nc
3501 W. Elder, Ste. 100
Boise, ld 83705
1-Dec-2003
inaerina Software
TS column
TitFe :
Dsgnr:
Description :
Scope:
Steel Column
Job #
Date: 1:32PM, 6 MAR 08
Page 2
Section Properties TS6X6X1i2
Depth 6.00o in Weight 35.33 #/ft Values for LRFD Qesign....
Thickness 0.500 in I�a 50.500 in4 J 85.600 in4
Width 6.000 in lyy 50.500 in4 0.00
S�oc 16.800 in3 Zx 20.900 in3
Area 10.40 in2 Syy 16.800 in3 Zy 20.904 in3
Rt 3.000 in R�c�c 2.210 in 0.000
Ryy 2210 in
Section Type = TS-Square
�Z�
-�E H M� _ EHM Engineers, Inc.
621 North College Foad, 5uite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
3501 West Elder St., Suite 100 Boise, Idaho 83705 200/386-9170 FAX 208/386-9076
JOB NAME JOB N0.
BY DATE SHEET OF
'
T`� G��,�,,,,.� �� l� - 1� S`
�
r�� y�k+ y�-`iK � y3.5K TG= ���.9:��
_ _ Tp� = z�,sK .
T�� : � i �, y i�
�� � �r/'�u�i _ ��'� � �`� Gk (yk 9�6 �� �
F�If;IAIFFGC / PI AAIAIFGC / CI IGVFVfIGC
�Z�
�
� Rev: 560010
User. KW-0605725, Ver 5.8.0, 1
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, id 83705 �escription :
Description TS column
Scope :
Steel Column
Job i�
Date: 2:03PM, 6 MAR OS
Page 1
General Information Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section TS6X6X9116 Fy 46.Ofl ksi X-X Sidesway : Restrained
Duration Factor 1.330 Y-Y Sidesway : Restrained
Column Heigfif 15.QQ0 ff Etastic Modulus 29,0OO.OQ ksi
End Fixity Pin-Pin X-X Unbraced 15.000 ft IGoc 1.00d
Live 8� Short Term Loads Combined Y-Y Unbraced 15:000 f� IEyy 1.000
Loads
Axial Load...
Dead Load 23.50 k Ecc. for X-X Axis Moments 0.750 in
Live Load 117.40 k Ecc. fo� Y-Y Aici§ Momenf§ 0.000 in
Short Term Load k
"""/Q'y ■ Column Design OK
Section : TS6X6X9/16, Height = 15.00ft, Axial Loads: DL = 23.50, LL = 117.40, ST = O.00k, Ecc. = 0.750in
Unbraced Lengths: X-X = 15.00ft, Y-Y = 15.00ft
Combined Stress Ratios Dead Live DL + LL DL + ST +(LL if Chosen)
AtSC Focmula H1 - 1 0.7851 0.9946 0.6940
AISC Formula H1 - 2 0.5504 0.6605 0.4966
AISC Formula Hi - 3 0.152d
XX Aacis : Fa caic"d per Eq. E2-1, K*L!r < Cc
YY Axis : Fa caic'd per Eq. E2-1, K�`Llr < Cc
Stresses
Allowable � Actual Stresses
Fa : A{lowab{e
fa : Actuai
Fb:�oc : Aliow [F1-6J
Fb:�oc : Allow [F1-� 8� [F1-8]
fb : bc Actuai
Fb:yy : Allow [F1-6j
Fb:yy : Allow [F1-7] 8� [F1-8)
Dead
17.63 ksi
2.06 ksi
27.60 ksi
27.60 ksi
0.98 ksi
�7.6b ksi
27.60 ksi
Live DL + LL
17.63 ksi 17.63 ksi
10.30 ksi 12.36 ksi
27.60 ksi 27.60 ksi
27.60 ksi 27.60 ksi
4.89 ksi 5.87 ksi
2�.t6 ksi �7.�6 ksi
27.60 ksi 27.60 ksi
DL + Short
23.45 ksi
12.36 ksi
36.71 ksi
36.71 ksi
5.B7 ksi
3B.71 ksi
36.71 ksi
fb : yy Aetuai 0.00 ksi 0.00 ksi 0.00 ksi 0.00 ksi
Analysis Values
F'ex: DL+LL 21,873 psi Cm:x DL+LL 0.60 Cb:x DL+LL 1.00
F'ey : DL+LL 21,873 psi Gm:y DL+LL 0.60 6b,y 9L+LL 1:00
F'ex : DL+LL+ST 29,090 psi Cm:x DL+LL+ST 0.60 Cb:x DL+LL+ST 1.00
F'ey : DL+LL+ST 29,090 psi Cm:y DL+LL+ST 0.60 Cb:y DL+LL+ST 1.00
Max X-X Axis Deflection -0.140 in at 8.700 ft Max Y-Y Axis Deflection 0.000 in at 0.000 ft
� �D
�
Description
EHM Engineers, inc
3501 W. Elder, Ste. 100
Boise, Id 83705
1-Deo-2003
ineerina Software
�
TS column
Title .
Dsgnr:
Description :
Scope:
Steel Column
Job #
Date: 2:03PM, 6 MAR 08
Page 2
Section Properties TS6X6X9/16
Depth s.000 in Weight 38.72 #/ft Values for LRFD Design....
Thickness 0.563 in I�oc 54.100 in4 J 92.900 in4
Width 6.00o j� �yy 5a.100 in4 0.00
S�oc 18.000 in3 Zx 22.700 in3
Area 11.40 in2 Syy 18.000 in3 Zy 22.700 in3
Rt 3.000 in Rx�c 2.180 in 0.000
Ryy 2.180 in
Section Type = TS-Square
�
���
�E H M�
'- JOB NAME
EHM En ineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 20B/734-4888 FAX 208/734-6049
3501 Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB N0.
BY DATE SHEET OF
� �-,"h� s % _
— ��,,�(� �, � , l :
! __�
I�L� .Z ��6 y 3, z J< z3,Z , _
LG = � , z5 �G' - Z�y /� �� `_....- _ �•� ► _
�I�D
� s 2 Z`- b xt'�j�k � L i� �i C� �,� ,,�/ .(� ��� Y�,�,,, �,,��,�
�`.z. IZ` 4 Z-yk _
��� i�Z5�1Z' = 1 �� ��'� -Z,� r
�
y, o
�l 4 � �,r d ��X ��,� �' X 1 l �� � �
�l1� +� �� �Lv. +1�� � _
_ _ ��t� � �,� �' � -
r �� 8 � �'
� �� _ _
rL � ti 7.� k✓'e Fry✓ �. b+�v� y,� ►
,- _
���L6�����,� X � t ,� � � � �-/�.� � S � ��,� _
T� � z�� k�- i�Z 1 k� t zZ��' ,�z s _
� �� � 5.6+,
_ y
6,a�
+� � e ��,6 ��x � � x � �;�4 �, �= �� ��r �1�j ) � � e� , �� �
T�` i�.�� �� � � �l Ik si,i _ � ��
`
- r� ��o ,
,
� 5 e � x � � k f Z �� r�t.'�i l �� ��� �w�. f �� > �1 � �, � �•'��:-,�
��y ��, :
,----
D L = `�- �l l< e �; � ��,� ', 3 �, q �. N, � ,
��= z�,si< �� S
� � e S X s I� � Z � �'l fl �� -� � : c•''' � �' '�°' ;/�=��
2: F�. �-►� ��.C�
GAIf_In�CCOC i ni n ninicnc i c� in��ninnc• �� ��
� EHM Engineers, lnc Title :
3501 W. Elder, Ste. 100 Dsgnr:
6escription :
Boise, ld 83705
Scope :
' Re 58 QOOv 0
• �User. KW-0605725, Ver5.8.0, t-Dea2003 Square FootinA Desiqr
r..��naz_�rviz cuoorn� r c....:..m.;.... e..sw..�.�
Description Pad Footing
Joh #
Date: 2:23PM, 6 MAR 08
Page 1
Generai information Code Ref: ACI 31&02, t997 UBC, 2003 {BC, 2d03 NFPA 5000
Dead Load 23.500 k Footing Dimension 6.��0 R
Live Load 117.400 k Thickness 16.00 in
Short TeRn Load 0.000 � # of Bars 10
Seismic Zone 2 �ar Size 5
Overbdrden Weigh4 9:098 psf Rebar Cover 3.000
Conc�ete Weight p,pp p� fc 2,500.0 psi
LL & ST Loads Combine Fy 60,000.0 psi
Load Duration Factor 1.000
Column Dimension 12.00 in Allowable Soil Bearing 4,000.00 psf
Note: Load factoriag suppotts 2003 lBC and 2003 NFPA 5000 by virtue of their references to ACl 31&02 for coacrete design.
Factoring of entered toads to uftimate ioads within this program is according to AC1318-02 C.2
Reinforcing
Rebar Requirement
Actual Re6ar "d" depth used 12.688 in As to USE per foot of Width 0.487 in2
200/Fy 0.0033 Total As Req'd 2.920 in2
As Req'd by Anelysis O.OU24 in2 Min Allow % Reinf 0.0014
Min. Reinf % to Req'd 0.0032 °�6
6.00ft square x 16.Oin thick with 10- #5 bars
Max. Static Soil Pressure 3,913.89 psf
Atlow Static Soi1 Pressure 4,000.00 psf
Max. 5hort 7erm Soil Fressure
Allow Short Term Soit Pressure
Mu : Actual
Mn' Phi : Capacity
3,913.89 psf
4,000.00 psf
20.18 k-B / R
28.08 k-ft / ft
Vu : Actual One-Way
Vn'Phi : Allow One-Way
Vu : Actual Two-Way
Vn•Phi : Allow TwaWay
,4lfemate I�ebar Selections...
15 # 4's 10 # 5's
5 # 7's 4 # 8's
Footing OK
61.19 psi
85.00 psi
163.74 psi
170.00 psi
7 # 6's
3 # 9's 3 # 10's
��
C�H M�
C�
JOB NAME
BY
�,�� � { '
EHM Engineers, Inc.
621 North College Aoad, Suite 100 Twin Falls, Idaho 83301 208/734�888 FAX 208/734-6049
3501 Eider St., Suite 100 Boise, Idaho 83705 2�8/386-9170 FAX 208/386-9076
DATE
�,� /� ���
�
SHEET OF
- ���= �5���� �s'= zZ���,�
_
�cs� � 6,,krZ Y �1� �� � r��� .� �� v��� _.
__ _ _ ____
- <<v ) /� � �., (� � c�u { �� �
(�� s� �, C b�� ��� �� = �, ���o � � �-� � ����� # ����� �� kp f �� �
_~� F��:�,� C. _G�� �p( '�f� �!/' 19' f
ch�/¢ , _ �� �r�u�t �/[y/� 9 � z, �u �� Y
r���ts
,�� S ;� e °'� '' S'x5' _ _
z.;'� __
TL � i ��.� � ) ,� t- ?',o,� �' � �' � �. � : �/�y/� t� 7 Z �� �w �,�' �d �u�s �
r � �i 1�/ Zs//9 9�J '�� �rc.� �l u�,�
�,7a= �S'��.� ��'�
_
I �; ����� )• 35.5- Z6,Zs � �.3� �6�� � �:r Z1���z
_ y�..� �-�a
�� = y. G ' �--j � S � s � s' �= _ �,�r���
C�/) l�-�.c,��' he $ h�g- �,� t;-�� .�, ��� � s ,�i 5, � �__ � �
� � - � p� �� �
o� �G�� " ��.) �r� � �a(,� w� � �1�►� � ��.wt� ;, i,�,, � ���,-°,� �r �%°
V ( � rG`�'i �il. �, �'�'' � ✓� �9 � / /�✓` nt J� � �„� � � � n
� � � � � � +� �� ���
�
rit�l !�f � %; � � 1�� e .SCyy� c� `�; �,�7 � � � �� ; / �, �;
��(/'� � ��� � � k p�
.. y�.� K �c.
�jr`� �yv� C-� 1/i
,�� .P G- 31���,/�
L� - ► � u,,�'6
I"Y` �'V4 j Wvt �Viv'I�GC- ��C +°� �",� � ��,,, ��`r : t ��� ( � � '� !t '✓ �'tr � �"�i `'.!� ��,�" v�"lC;��
'�'�f �z''k��,� ��� ,p�
F�N;I�IFFGC i PI ��I�IGOC / CI 10\/[VllOc
��
�
� EHM Engineers, Inc Title : Job #
3501 W. Elder, Ste. 100 Dsgnr: Date: 1:43PM, 9 JAN 08
Description :
, Boise, Id 83705
.
�
Scope :
� Rev:580000
User: KW0605725, Ver 5.8.0, 1-Dec•2003 Masonry Flush Wall Pilaster/Column
1c11983-2003 ENERCALC Engineering Software
Description Bearing on CMU
Page 1
General Information coae Ref: aci 530-02
Wall Height 18.000 ft Block Type Medium Wt fm 1,500.0 psi
Thickness 12 in Bearing Plate Width 12.000 in Fs 20,000.0 psi
Rebar Size 6 Column Width 48.000 in Em = fm " 900.0
Rebar Spacing 48.000 in Special Inspection
Rebar Location Center Column Width used 48.000 in Grout @ Rebar Only
E 1350,000.0 psi
Seismic Factor 0.240 Load Duration Factor 1.000 n 21.481
Seismic Zone 2 Wall Wt Multiplier 1.000
Applied Loads
Uniform Loads Girder Load
Dead Load 360.00 #/ft Dead Load 7,000.00 Ibs
Live Load 1,800.00 #!ft Live Load 40,800.00 Ibs
...eccentricity 0.000 in ...eccentricity 0.500 in
...load Type Roof ...load Type Roof
Wind Load 17.00 psf
Design Values
Allow Brg. Stress 390.00 psi Rebar Area 0.440 in2
Allow Axial Stress 330.46 psi Rebar Depth 5.750 in
Reduction Factor 0.84 Wall Weight 75.000 psf
Allow Masonry Bending 495.00 psi np 0.0342 k 0.2297
j 0.9234 2/kj 9.4292
Max. Allow Moment w/o Axial Load 3,893.82 ft-# Radius of Gyration 3.859 in
Max. Axial Load w/o Moment 103,104.93 Ibs Moment of Inertia 1161.640 in4
Load Combinations 8� Stress Details
Top of Wall
DL + LL
Btwn. Base & Top of Wall
DL + LL + Wind
DL + LL + Seismic
Required Bearing Area
Moment
ft-#
1,991.67
2,899.83
3,061.83
122.56 in2
Axial
Ibs Steel Masonrv Axial Stress
56,440.0 10,229.89 142.00 180.90
11,140.0 14,894.54 206.75 35.71
11,140.0 15,726.64 218.30 35.71
Req'd Bearing Length 10.21 in
�-----' Pilaster Design OK
18.00ft high, 12.00in thick w/ #6 @ 48.00in o.c. at center, Special Inspection, Grout @ Rebar Only
Max. Bending + Axial Comp. Stress . . . . . . . . .
Allowable . . . . . . . . . . . . . . . . . . . .
Max. Axial Only Compressive Stress . . . . . . . . .
Allowable . . . . . . . . . .
Max Steel Bending Stress . . . . . . . . . . . . . .
Allowable . . . . . . . . . .
of Loads 8� Moments
Girder + Uniform Dead Load
Girder + Uniform Live Loads
Wall Weight � mid-height
flL Moments @ mid-height
LL Moments @ mid-height
48,000.00 Ibs
2,700.00 Ibs
0.00 ft-#
0.00 ft-#
322.90 psi
495.00 OK
180.90 psi
330.46 OK
15,726.64 psi
20,000.00 OK
Girder DL Moments
Girder LL Moments
Wind Moment @ Mid-Ht
Seismic Moment @ Mid-Ht
fOW � Mid-Ht
291.7 145.8 ft-#
1,700.0 850.0 ft-#
2,754.00 ft-#
2,916.00 ft�
�.,`' ;�
�',�'
� E H M�
�
�r
� JOB NAME
� BY
_T�� ��
EHM Engineers, inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734�888 FAX 208/734-6049
3501 Eider St., Suite 1 �0 Boise, Idaho 83705 208/386-9170 FAX 208/38fi-9076
TE
JOB N0,
SHEET OF
y�" +�,� e. r��u.�; � -�+ `� 1c i- � �� �l� � y'� �,3� � s, �>k'�
S (�. �a�� k
-�--.., .�
yk�F
_ ��, y�r x
g�, �� '�� � �� � s �i"�� t�'�. ` � �_gY tn�,:��f e k )Z�� �� a`G' (�"'
_
_ L"'� (z � � � �� ,.�"i �;� `' � � _
1�•Il' � g, �(�j' l�,t�j�'��VI !�'�l,ru _ _ _
c�., _.
�, � ! � _ : _ _
_ TL '
_
�'1� �Y� e � a,5 � �'�(c G� : ����d = y �� • 1, �i `� ' ' '
� G` L _ _
_ _C��� � 1� �� �,�, �-� __ _.
L� L,�,��-d = i�'.. 6_`` TL =��, 6� r�_� 0 5(�,.u�u �z' c�� y��'
z�.� u i� ��.. 1 k� � 7�or �,�,,�,,P- ���, ��
Z. 1$�L�
_ �' �_ ,�y�� ✓����
— --- �z � .
_ _ _
--�- -------� � �y1 �? I� e d_ �v-r�.� S
l0 � (�'� 'I
�
�
_ , ��_ _ ° _
'I
' �� � � �� I
__ __--- � --__�.�_ i : _ 1 � �t � '� S
y1C�� -�' 6,�8 i<GF
, ,,
����' ?��rZ �CG �
�.-y � � � ��
.
� � �I/'� �' �-��es
� •.� u�� � .s k � x I
,
, sK ��
, �, �
�
39•�ik' ' IS ►1
M
� u� , � � �a
� ►� �x 3 � , y --� ,/�( z I 1l ° > � � —�
ul/�� �` � . (� � t'I,c� �:�,,;�; � ' Ncc !�Q
(,� !� �iI � i_ � 11 � �` � / n t I� 1 � (( (i� /! /r N' � Gfi1 c ,{..7 �" 357 {<, !�.0/ �" .�+ �� �4`a.f
J � C
�y G�a/l+�g # �✓:�� '� E� �#S i��v,s t� �Z,l �. Ce ,�'►'I�d � i �� ✓�t9h.
,�,
�r,������ , .,, �...,��.. , �. ,.,,,...�..�
���
<� �
' r
.`
.
�w�
JOB NAME
BY
EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falis, Idaho 83301 208/734-4888 FAX 208/734-fi049
3501 West Elder 5t., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB N0.
DATE
SHEET OF
.��� �� �� ���� ��o
�h � � : fl ` =� _��. � K �
LL = ��-�tK
� , _,f :
-
(F ) ���i�Ce � Yn = � �, �L�� � , � �� (� . '✓����' ",!" (�� �" � J ►�,-� '� �ap �
�� � ) � 4 "' �.► �( _ _
` r P �Z•1k
I �`� � , ` '� w 1 I , $' ,�e��� � �,,,1� ,� �, i
�• �� iKsf '
�1�2 IZ`
_ � ' � � �- � � i' I'
��1,, � 6 �.R ,�' s,�z K� f '
3!•NS K '
,
' I
/"I�� �- Qyx � }_ ���J✓1
_ �+'�� � I Z`` �I�P�v►tI w�ct (/
� �' 8 ��
= ) � ��e
) t�iVi � 1 Z " � (�? � � � �j �1 �� � � '
GZ�qI�
6-� � ��y� ��� ��,
I�b��y � 1 � � , , � �-
�i�l� �'1 r�11�' �•G�K��
�1.ys
.--�---�`'.
M ►�viax � �1 �' �,' > ���i �
� ,
' ° �� '� �'�� ig /� �e � e�u.vr car�, ��'r �� �� �e a` �
sc������ �:F(,:�'t�i �+9�`�a ��r��9v�� w�mr.� � ��J�i �,�'��'�
ENGINEERS/ PIANNEAS/ SURVEYORS
b
. �
� �E H M� EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
' ,r 3501 West Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 20B/386-9076
� JOB NAME JOB N0.
.
BY DATE SHEET OF
_ �� � �s o ��aX ` z , G,, ��� ��, � _ _
7�Lw, �.r ` Z I �l �/�' � �c ���� prl�:�,� _
iz , z � �� = � � � � � e,v, �" _ _ _
�cs� 8'`n�" sc�����, o� ��f� � �� �r,nb� �a-�fs�
[�^�'t ��✓'G�iC (�1.�ie_ �r��l� w�l� +��/ 3 =c9`' m�� �v�r,��lr�i�
. _ _ __ _ _
�6�
ENGINEERS/ PLANNERS/ SURVEYORS
.
. �
�
• �v: se0002
u�� icw-0sos�zs,
� (c11983-2003 ENER
Description
EHM Engineers, inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, ld 83705 Description :
Ver 5.8.0, 1-Dec-2003
CALC Enaineerina Softwara
Planter Wail
General Information
Allow Passive
Max Passive
Load duration fador
Pole is Rectangular
Width
No 5usfacz Restsaint
AllomenEs � �ueface.__
Point load
[Sistributed load
Withau� Sufiace Restrain�...
Required Depth
Press � 1/3 Embed...
Actual
Allowa6le
Scope :
Pole Embedment in Soil
Job #
Date: 3:03PM, 6 MAR 08
Page 1
Code Ref: 1997 UBC 1806.8.2.1, 2003 iBC 1805.7.2, 2003 NFPA 5000 36.4.3
250.Q0 pcf ,4pplied Loads...
1,500.00 Psf Poirrt Load 143.00 Ibs
1.000 distance from base 2.500 ft
B.00D in Distributed Load 0.00 #/ft
d'+stance to top 0.000 R
dista�ce to bottom 0.000 ft
357.50 ft-#
if.00
3.000 #t
239.31 psf
140.84 psf
Total Moment
total Laterai
357.50 ft-#
1.43.00 Ibs
36p
r
. �
,�
EHM Engineers, Inc.
5�� ��-���Ji 621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734•6049
3501 Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 20B/386-9076
JOB NAME JOB N0.
BY
� 1�P�v'a i �l'v�Utys�S �
v��� ��_ �p��
, Z$�e LL = zSps �
i�v►.� = � � n� �'
�e�`�m��= . f�yq� ' �'✓
; , d�S3 ' W
DATE
SHEET
OF
�. _ _ _
1¢��► E _ �� � �/ � �v �� �•� /s
'° �-�tc�l w��l�'c ��
�— — — — -- _�._ --_. ..� _. _ (
� �t., � _ _ _ _ i
_ _ � _ - _ _ _ __ _ ,
� �
_
i �z � � �
�� � ' i
_ . � 8 �- �. _;- -- � `- — �-_.
— — -�— .
N _
�" .:._ � i�� � ��o' �
�F� c� �1 � h � ��L�- � L� e� k ; �.�s �
�r�,� `z-2 � _ __
�_ _ :�1 w � w� � :`%�.�^�� _ _
_
w����� i�,,s�, (�}s`>.�6�'� 3s,�� _ _
5�,���,,'�° •�$53'�1G3�Z�S'CZ��zS%� ���'`�Z�oq`'��� ' l�fZ,ZK
- s G�� ,� <<� �. ti = l �'' L � 5 0 ' �ZS � .� Zs�_�
� � 3�k � �q��l ,�
�
= ��Z/<� ��,G� ��✓��s _
Z"' � "' y � (7 ` � �/ �� '`h Z �' , �/ �'
��, � ��,� ,� � , y� ,�, z � �,d,�� � ,,��
�� � �i/► �,v�, ,`��`�
� ��v- � 1 :
���v,� � i'��� � � � � `� � 18 �' � = 3�,`� k
Se,yw,,Y,�� .(�I�1�� _zH'� i'�s'• (?�r9� �s�'� Z'iS�� 1��. �5�-�� �= ZF��
liv� `_ �'�d �r�•v ev�► s ' 3 �j � % I<
FNf:INFFFIC / PI n�I�IFl7C / CI I�l/LVnOc
i�
� ��
. r
. ,�,
~�
i Rev:580004
User: KW-0605725
Ic)1983-2003 ENEF
Description
EHM Engineers, Inc Title :
3501 W. Elder, Ste. 100 Dsgnr:
Boise, Id 83705 Description :
Scope :
Ver 5.8.0, 1-Dec-2003 Masonry Pier Analysis & Design
.ALC Engineering Software
Existing CMU shear pier
Job #
Date: 1:42PM, 9 JAN 08
Page 1
� General Information Code Ref: ACI 530-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000 �
Total Lateral Force 68.60 k Moduli: Em = Pm * 900.00
Seismic Zone 2 Moduli: Ev = Em ` 0.40
Load Duration Factor 1.33
Shear Pier Data
Pier #1 Pier #2
Pier Height 18.00ft 18.00 ft
Pier Length 25.00 ft 25.00 ft
Wall Thickness 12 in 12 in
"j" : Depth Mult. 0.90 0.90
Pier Fixity Fix-Fix Fix-Fix
fm 1,500psi 1,500psi
Fs 24,000 psi 24,000 psi
Sp Insp No No
Grout Spacing 48 in 48 in
HeighULength
(H/L)^3
Rel. Defl
Sum Rigidity
Rigidity = .001/Defl
% Force to Pier
Shear to Pier
Relative Defl * 10^5
M ! (V"Depth)
Em
Ev
Shear Reinforcing...
fv=V/(12*est'jd)
Fv: w/o Reinf.
Fv: w/ Reinf.
Horiz. Shear Av Req'd
Bending Reinforcing...
Moment � End
"d" to tension As
Bending As Req'd
Pier #1
0.7200
0.3732
0.1564
12,789.90
6,394.952
0.50
34.300 k
0.00 in
0.400
1350,000.0
540,000.0
0.7200
0.3732
0.1564
6, 394.952
0.50
34.300 k
0.00 in
0.400
1350,000.0
540,000.0
Pler #1 Pler #2
19.54 psi 19.54 psi
30.91 psi 30.91 psi
46.36 psi 46.36 psi
Not Req'd in^2/ft Not Req'd in^2/ft
308.70 k-ft 308.70 k-ft
22.50 ft 22.50 ft
0.43 in2 0.43 in2
psi
psi
s.,y ��.'+9
i`� V
.
. ; CE�H M� —
� �
� JOB NAME
s
BY
� j�,� �- Z .
EHM Engineers, Inc.
621 North Callege Road, Suite 100 Twin Falls, Idaha 83301 208/734-4888 FAX 208/734-6049
3501 Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 208/386-9076
JOB N0.
_ DATE SHEET OF
__
�v+.� ` � �ny � � LZ�1 �, � Z� � ` �8y' 6� _ _ _
�'�'t��M;tj` ��i'�`�`��/i�':,�i�lr' Z7�� �(��Z� /� �'� /.' 7i�/����s�3 r ISi��/�
YC° G, aLik ���,�
�-L = 15-y �t � _ . _
- I/ I< s�e � M. ti g c�•t/ �i•v� s
_
_ _ t ��t
: �e�� � ��.. � � � 5 � � l, a,�
_ _ __ _ _ _ _. ,__ __ __ __ _
-
_ � ��`,,,�K,� � ; _ _ _ _
- � 1-r � . _
--._._.. �
V'��„ ux = �1�,'� K _ _ _ _
_ . �--L = ��.� k � sZt�� ��Z � s.3�� _ �,����� ��� U= ���� ,�
_
� G„ � � ` � s G,�`'`�� � �'' s _ _ _
� ��
/ J� ' u � �, 1
.. '/ . � .
j p f�]�� y� . U � , T/ � ,.S�`�
�/l,l`%4. � :.r'''•I 1.��� '�I'� ,.r,-(���� l, i 1G .��+�� �'...-�..� �_ /{��/��R... V�t9� � ..... . � .
�r
i�= 3�. �- ���:��'l� � Z. �5,� �- E�, _ v,_ �Sq�i �
(� g�' �`� S D i F'� F Q,,�/'� -
�(� ��i 5G! �'`� , �0 sw�au-�, ��\•"�Z� p�rYe�►�� �v� l��it/,,�,,,,-''s 3S�,>/ � �
TC = �G-�- Sy�d' �lz ' �.�{K � `�/� U_ jy�p�,�. _
� � g �, � � � �u� �Wk
� y � ��� ��i��� � �� ���'�s, 3" ��z��a�r`� ✓r�k T�,fd'a,,,�� ' bi�PO t �
- ���v Z�� �.. � (/'.��,uk � 11, v k
7� � 1�,�-�� - 5,�� �.� �Z� V- � �Z �r�, � �
o���� �
�s���8`�vP 5�►�'g �-$5�� y1;�Z"
�u�-� :��� i ��/l�.a.� �- ) `�S �o� � . - %L�:-�ssc,�' � ''15�,�; �
3q'
ENGINEERS / PI ANNFRG / Sl1RVFY�RR
r
., �_
• �
�
s
�E H M�
JOB NAME
BY
EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 2D6/734-6049
2404 Bank Drive, Suite 100 Boise, klaho 83705 208/386-917❑ FAX 208/386-9076
JOB N0.
I�L���
_SHEET OF _
!Ce % �t� �f �r��� ``'� = e�`'�� _
U,�ak� I ��s�� �Z`- 3'�%_� 3���� L= ll' �` ` 3y3,o� �
_ �i �e 5� �� <�:; h �� r � .� s �,�us, �``: �Z `` �� � ��� . �`��/�'`�r = 3 `! � �/ �
- I��� � �jy✓��,ay (�u�o � l� ^�,� �iu� �a%1 ri�`i� � f� ' _
- , �'
'l`r,�t�,� � i f �� ;� ' 9 �' y� � � ' i� y �/ � _
T�` �3yy'�� -' `���Z � �= 3y� L�� 1u��, � .
„
�� SIa r�sz�s��� ,� a���.� c 6�.rz`'�Q��� �,��_ �j ,��.
�`��t �6vi ��/ y � � �r-rn- �q%� � � � ✓' � `f,�S '1� . � l�, 5 �j/���-�
��,�- = 73yy� ��lZ � 3��z� �- �` U�- s? S p� �_
, ,
(� �e �Y nc G s �� �,pri r���%1 ,�:% �
V.�,uK= 3 G� Z� L= �8� (/' `�`r/�l � �g��� g� ���', � G�3 c�l�,
v( � C �y/Je ��� S(il P,� w°a//�r9� I. `r!`( �1M/ ` 3� S�O �'�'
, �_
U�� = � � �, s f � Gg � � � i � , y k � 3 � ��s � � � � �'. � �.,��� �-,
T� = i�. y �'/L = s• z �� � = ��` U = ?� � �r �
I� S �- 5 �I �U+' ��if ,���C � f.: � I" Lr� �%,r� _ �� ,� �/ �
ENGINEERS / PLANNERS / SURVEYORS
,
��
,i
r
`�
�
�
►
CE�H M�
JOB NAME
BY
EHM Engineers, Inc.
621 North College Road, Suite 100 Twin Falls, Idaho 83301 208/734-4888 FAX 208/734-6049
3501 Elder St., Suite 100 Boise, Idaho 83705 208/386-9170 FAX 2p8/386-9076
JOB N0,
DATE
SHEET OF
— i�V �' ,��,.� f'vt � ; _
....�
TL= s��< � ��,:r��� Q,st �'S .
�I�r � � �� 3 k' „ �r / . _ _
"�rrs - f3 � � � �� !` ' � > ` l� (9S5 �� :
(d,;� ��`� � � �i', �� � .�' _
_ _ _ __ _
_ ,,,,�_ r�
11� �. _ � . �� � � �� � �.. �} t� l y „/r';� � '���,� �' s �-S '�" __
T� `� d1�� c�' g r�� (�,S ___
����- � G �, > K � :
_ _.
'v�,��� = L�s � C�� � �� . '►%3 = � 65 ��� _ _ _ _
u.� �-�t � � � y d y # . _ _ _ _
�c � s ��.,,, �.� ��1� r�ty ��� % �° �:���;�, � � `? �s �� _
.
� %�L� Z ��SiL �: .�,��"L(� �� l�� � _�
✓'iJr ` L31, �s 1� � Z�
Ni,�� ' /3 � � � s- � j � ' � L�
�,�,�0 �� ��= �, z y S,�- _
:,r.�
� �. '�!��� .s� s� � G� 8' c/f �o�( T Lq/�� ' ?,3 zs �
-b�'�; ', 1��� �
.___---�
,`
11�►�x �� I 7,,= � , � z �. �� = �l 1y �
B � il'
�1 � e. � ,v�►°� � � �� S/�t'l � 7" Z 7 r/�(: % , ��al�%'w,� `� �,. `��' ,���-...
��
s�� a�� �/ M 5 � 7 Z �./ 'l�► k � �/�, �-; �.�� � � �''�. �, �� �o
�NGINEERS j PLANNERS / SURVEYORS
'� U
�/
MICHAEL K. BROWN
Registered Professional Structural Engineer
In Partners With
� rrl�� Engineers Inc.
ENGINEERS/SIJRVEYORS/PLANNERS
March 18, 2008
Todd J. Poirier
PETERSEN-STAGGS ARCHITECTS
5200 W. State Street
Boise, ID 83703
P: (208) 345-1462
F: (208) 345-1532
RE: Safeway Building Remodel/Addition
Special Inspections Letter
EHM Job #607-540
Dear Todd,
This letter lists the required special inspections for the above-referenced project.
Special Inspection:
1. Special Inspector shall be a qualified person who shall show competence to the satisfaction
of the building official, owner, architect, and engineer for the particular operation.
2. Continuous Speeial Inspection shall be provided during structural welding including welding
of reinforcing steel.
a. The special inspector does not need to be continuously present during the
welding of the following items, provided that the materials, welding procedures,
and welder qualifications are verified prior to the start of any work; periodic
inspections are made during the work in progress; and a visual inspection is
made prior to completion or shipment of the work:
i. Single pass fillet welds not exeeeding 5/16" in size.
ii. Floor and roof deck welding.
iii. Welded sheet steel for cold formed steel framing member�.
3. Special Inspection shall be provided for the installation of expansion bolts and epoxy anchors,
as required by the manufacture's ICC report.
4. Periodic Special Inspection shall be provided during the installation of high strength bolts, in
accordance with AISC specifications.
a. High strength bolts shall be "snug tight" in accordance with AISC specifications.
5. Special Inspection shall be provided for the following in the concrete constructiona
a. Periodic Special Inspection shall be provided for the placement of reinforcing
steel in concrete.
3501 W. Elder St., Sulte 100 • Boise, Idaho 83705 •(208) 386-9170 • FAX (208) 386-9076
.
MICHAEL K. BROWN
Registered Professional Strudural Engineer
In Partners With
� N���� Engineers Inc.
ENGINEERS/SURVEYORS/PLANNERS
b. Continuous Special Inspection shall be provided for placement of anchor bolts
installed in concrete prior to and during concrete placement.
c. Periodic Special Inspection shall be provided for maintenance of specified curing
temperatures and techniques.
d. Periodic Special Inspection shall be provided for formwork shape, location, and
dimensions of the concrete being formed.
e. Concrete Specimens and Tests shall be provided as follows:
i. Samples for strength tests of each class of concrete placed each day
shall be taken at least once a day, once for every 150 cubic yards, and
once for every 5,000 square feet of surface area for slabs or walls.
ii. If the total volume of concrete for a given class of concrete would
provide for less than five strength tests, tests shall be made from at least
five randomly selected batches or from each batch if fewer than five
batches are used.
iii. Strength tests shall be the average of the strengths of two cylinders
made from the same sample of concrete tested at 28 days, or at the test
age designated for the determination of f' c. Every average of any three
consecutive strength tests shall equal or exceed f' c. No individual
strength test shall fall below f� c by more than 500 PSI.
iv. One Slump test shall be provided for each set of compressive strength
specimens.
6. Special Inspection shall be provided for the following in Soils and Earthwork:
a. Periodic Special Inspection shall be provided to verify the materials below
footings are adequate to achieve the design bearing pressure.
b. Periodic Special Inspection shall be provided to verify that excavations are
extended to the proper depth and have reached proper material.
c. Periodic Special Inspection shall be provided to classify and test controlled fill
materials.
d. Continuous Special Inspection shall be provided to verify the use of proper
materials, densities, and lift thicknesses during the placement and compaction of
controlled fill.
e. Periodic Special Inspection shall be provided to observe sub-grade and verify the
site has been properly prepared for the placement of controlled fill.
3501 W. Elder St.� Suite 100 • Boise, Ideho 83705 •(208) 386-9170 • FAX (208) 386-9076
MICHAEL K. BROWN
Registered Professional Structural Engineer
In Partners With
� H�r�� Engineers Inc.
ENGINEERS/SURVEYORS/PLANNERS
7. Special Inspections shall be provided by Kumar and Associates, Inc. Scott Hougard will be
the individual performing the special inspections, located in their Denver office. Contact
information is as foilows: 2390 South Lipan St.; Denver, CO 80223; 303-742-9700.
If you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
�����'� ���7/"
���
David Sansotta, E.I.T. ichael K. Brown, P.E., S.E.
EHM Engineers, Inc. EHM Engineers, Inc.
3501 W. Elder St., Suite 100 • Boise, Idaho 637A5 •(208) 386-9170 • FAX (208) 386�g076
B & B Balancin Inc.
g�
CERTIFIED AIR TEST, ADJUST AND BALANCE REPORT
SEPTEMBER 29, 2008
Project: Safeway #0631
Address: 2131 North Frontage Road — Vail, Colorado
General Contractor: Pioneer Construction
Mechanical Contractor: Westech Mechanical, Inc.
Mechanical Engineer: D.C. Engineering
Prepared By:
B & B Balancing, Inc.
8672 E. 148�' Lane
Thornton, CO 80602
(303) 655-7643 - Phone
(303) 655-7981 — Fax
NEBB Certification # 3255
% r w� ``
� � ��
LARiiY G. SAR7LEY
cE�s,�-�r�
�
, � �a�o ,
i w"r-
.i
� s
■
� �
J1
� _ f;1
PROJECT: SAFEWAY #0631
2131 NORTH FRONTAGE ROAD
VAIL, COLORADO
Certification
THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS
AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH
THE CURRENT EDITION OF THE NEBB PROCEDIIRAL STANDARDS FOR TESTING,
ADJ�ISTING, AND BALAIVCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM
DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE
TEST-ADNST-BALANCE REPORT PROJECT SUMMARY.
SUBMITTED & CERTIFIED BY:
NEBB TAB FIRM:
B & B BALANCING, INC.
8672 E. 148� LANE
THORNTON, CO 80602
(303) 655-7643 - PHONE
(303) 655-7981 - FAX
TAB SUPERVISOR: LARRY G. BARTLEY
REG. NO. 3255
DATE: 9/29/2008
SIGNATURE:
.,
r
CERTIFiCA7'ION
3255
Exp. 3�31�to
,i -.._
� s
■
� �
�
— �
Project:
Address:
Safeway #0631
B & B Balancing, Inc.
Certified Test, Adjust and Balance Report
September 29, 2008
2131 North Frontage Road — Vail, Colorado
Instruments Used:
Alnor EBT-721 Capture Hood w/Digital Manometer, Velocity Matrix,
Airfoil, and Humidity & Temperature Probes
Serial # 90801001; Certification Date: 1/7/2008
Fluke 337 Digital Clampmeter
Serial # 83707731; Certification Date: 11/13/2007
Omega Pocket Photo/Digital Tachometer
Serial # 1822060; Certification Date: 3/4/2008
Prepared By:
B & B Balancing, Inc.
8672 E. 148�' Lane
Thornton, CO 80602-5800
(303) 655-7643 - Phone
(303) 655-7981 — Fax
/ 0 �` ' �
4� � �, '
� �,
� � ��
LARRY G.BARTLEY
CERiIF6CAT10N
3255
Exp.3l31/10 ,
nic
..� �& �B �a�I�n.ci�.�r, In�c.
Roof Top Unit Report
PROJECT: Safeway #0631 DATE: 9/29/2008
LOCATION: Vail, CO CONTACT: Larry Bartley
SYSTEM/UN/T: HV-1 Tested By: Eric Bowhay
AREA: Test Date: September 29, 2008
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Unit Fiker Quantity
Unit Filter Size
Reznor
HRP6300
Not Legible
Vertical/Down
1/1
45x20x1/45x30x1
Total CFM Design 4000 CFM
Total CFM Actual 4119 CFM
Outside Air CFM Design 4000 CFM
Outside Air CFM Actual 4119 CFM
Return Air CFM Design N/Appl. CFM
Retum Air CFM Actual N/Appi. CFM
Suoolv Fan
Fan RPM Design 1240 RPM
Fan RPM Actual 7241 RPM
Motor Volts 1 206 Volts
Motor Amps 1 5.70 Amps
Motor Amps 2 5.40 Amps
Motor Amps 3 5.50 Amps
HV-1 Supp/y Out/ef
��t� �
OuUet-01 SG-1 i
OuGet-02 SG-1 i
OuUet-03 SG-1 i
OuUet-04 SG11
Outlet-08 � SG-1
Motor Manufacturer
Motor Ftame
Motor HP
Motor RPM
Motor Rated Voks
Motor Phase
Motor FL Amps
Motor Service Factor
Magnatek
M56
2 HP
1725 RPM
208 Volts
3
7.0 Amps
1.0
Motor Sheave Make Browning
Motor 5heave Model 1 VL44x5/8
Fan Sheave Make Browning
Fan Sheave Model AK56x1
Number of Belts 1
Belt Size A37
Sheave Center Line 12 in.
Fan SP In Actual 0.48 in. wc
Euternal SP In Actual 0.33 i�. wc
Extemal SP Out Actuai 0.25 in. wc
Total SP 0.73 in, wc
Filter Pressure Drop 0.13 in. wc.
Cooling Coil Pressure DropN/Appl. in. wc.
30 x 10 93 101 500 467
30 x 10 95 103 500 475
30 x 10 90 98 500 451
30 x 10 101 109 500 503
30 x 10 92 100 500 461
30 x 10 95 104 500 475
30 x 10 99 108 500 497
30 x 10 94 102 500 472
514
488
545
499
519
510
8& B Ba/ancing, Inc Page 1 of 3
Roof Top Unit Repo�t
� � .�3 �c�rlc�t�.cin�r, .��.+�.
Roof Top Unit Report
PROJECT: Safeway #0631 DA7E: 9/29/2008
LOCATION: Vail, CO CONTACT: Larry Bartley
SYSTEM/UN/T: HVAC-2
AREA:
Unit Manufacturer
Unit Model Number
Unit Serial Number
Unit Discharge
Unit Filter Quantity
Unit Fiker Size
Total CFM Design
Total CFM Actuai
Outside Air CFM Design
Outside Air CFM Actual
Retum Air CFM Design
Return Air CFM Actual
Fan RPM Design
Fan RPM Actual
Motor Volts 1
Motor Amps 1
Motor Amps 2
Motor Amps 3
TRANE
YHC043A3RHA08BP
830101817L
Horizontal
2
20x30x1
1990 CFM
2020 CFM
525 CFM
525 CFM
1465 CFM
1495 CFM
1168 RPM
1165 RPM
209 Volts
3.30 Amps
3.10 Amps
2.90 Amps
HVAC-2 Supp/y Outlet Summary
Tested By: Eric Bowhay
Test Date: Septembe� 26, 2008
Motor Manufacturer
Motor Frame
Motor HP
Motor RPM
Motor Rated Volts
Motor Phase
Motor FL Amps
Motor Service Factor
Motor Sheave Make
Motor Sheave Model
Fan Sheave Make
Fan Sheave Model
Number of Belts
Belt Size
Sheave Center Line
General Electric
56
1 HP
1725 RPM
200 Volts
3
4,0 Amps
1.5
Browning
1 VL34x5/8
PRP
AK39x3/4
1
AX26
9 1/4 in.
Fan SP In Actual 0.49 in. wc
Extemal SP In Actual 0.22 in, wc
External SP Out Actual 0.31 in. wc
Total SP 0.80 in. wc
Filter Pressure Drop 0.01 in. wc.
CooUng Coii Presaure Drop0.25 in. wc.
8& B Balancing, lnc. Page 2 of 3
Roof Top Unit Report
.B' � � .�3ar��rn�ing►� ��t�.
Roof Top Unit Report
PROJECT: Safeway #0631
LOCATION: Vail, CO
SYSTEMNN/T: HVAC-2 (Cont.)
AREA:
HVAC-2 Retum inlet Summary
DATE: 9/29/2008
CONTACT: Larry Bartley
Tested By: Eric Bowhay
Test Date: September 26, 2008
* Notes
B& B Balancing, lnc. Page 3 of 3
Roof Top Unit Repoit
� � B .��Ia�r�c�r�.�r, Ir�.�c�
Fan Unit Report
PROJECT: Safeway #0631 DATE: 9/29/2008
LOCATION: Vaii, CO CONTAGT: Larry Bartley
SYSTEM/UNlT: EF-8
AREA:
�,�....::
. _ ,.
Fan Manufacturer Loren Cook
Fan Model Number 90 ACEH
Fan Serial Number 007SC1 2 1 97-0 110 00 070
Motor Volts 1
Motor Amps 1
Total CFM Design
Total CFM Actual
SP Out Actual
Fan RPM Design
Fan RPM Actual
SP In Actual
Motor Amps 2
Motor Amps 3
120 Volts
1.00 Amps
360 CFM
377 CFM
N/Appl. in. wc
N/Appl. RPM
N/Access. RPM
Q.21 in. wc
NlAppl. Amps
N/Appl. Amps
Tested By: Eric Bowhay
Test Date: September 26, 2008
Motor Rated Voks
Motor FL Amps
Motor Phase
Motor RPM
Motor HP
Motor Manufacturer
Motor Frame
Motor Service Factor
Motor Sheave Make
Motor Sheave Modei
Fan Sheave Make
Fan Sheave Model
Number of Belts
Belt 5ize
Sheave Center Line
115 Volts
1.7 Amps
1
1600 RPM
1/8 HP
Queace
48Y
1.0
Direct Drive
Direct Drive
Direct Drive
Direct Drive
Direct Drive
Direct Drive in.
Direct Drive in.
* Notes
B& B Ba/ancing, /nc Page 1 of 2
Fan Unit Report
� � .B �3c�tc�n.�in.gr, Irt+�.
Fan Unit Report
PROJECT: Safeway #0631 DATE: 9/29/2008
LOCATION: Vail, CO CONTACT: Larry Bartley
SYSTEM/UNIT: EF-9
AREA:
U� �t
Fan Manufacturer Loren Cook
Fan Model Number 150VCRH
Fan Seriai Number 007SC1 2 1 97-01 /0002001
Motor Volts 1
Motor Amps 1
Total CFM Design
Total CFM Actual
SP Out Actual
Fan RPM Design
Fan RPM Actual
SP In Actual
Motor Amps 2
Motor Amps 3
120 Volts
4.50 Amps
700 CFM
71 S CFM
N/Appl. in. wc
1254 RPM
1250 RPM
N/Appl. in. wC
N/Appl. Amps
N/Appl. Amps
Tested By: Eric Bowhay
Test Date: September 23, 2008
Motor Rated Voks
Motor FL Amps
Motor Phase
Motor RPM
Motor HP
Motor Manufacturer
Motor Frame
Motor Servfce Factor
Motor Sheave Make
Motor Sheave Model
Fan Sheave Make
Fan Sheave Model
Number of Balts
Belt Size
Sheave Center Line
* Notes EF-9 23-Sep-08 Grease trap not installed
115 Volts
5.5 Amps
1
1725 RPM
1!3 HP
Marathon
48Y
1.35
Browning
1VL34x1/2
Maska
AK39x3/4
1
4L210 in.
5 3/8 in.
B& B Ba/ancing, /nc. Page 2 of 2
Fan Unit Report
� ' �� �.
3 . . �a,..,� I I � ! � !�!�Y , � _ . � , � �
�y ��d � ��p �F�IIm � � � .^lJJY .^l�%_. . �3Ct wn I � m
11� x �; � i a � zyoo-ooC-�£F.7S0'ON1�3P0?Jd � I �
aCJ• A� =p• ON/Y9�N/O 3 �� i I iM 1 I 1 III ! �� IW I� C) �
i �i ��ii�� � II� I �Ilf�l �t� � ._u �ac r_c:.s. :.r v � �t � r j �� �' 4�
ar r� � r� - - � � � s oce��d�o� "Ilv�i� +V � � � � j
e � I� ;� s ;� �..�''.;.1�? � ��ra ii ;.C'' _ ;�� � �� t; .£�.�'i� =�:'� } S 1.t1M��t/S ,'� � ' G,�"'.r—.,
� ��
�� A g , �_____
�� R � •� R� I I a � $ ,.
" I� � �e �� � ���}pa �� � � � � � � � ��� �� �? x$�� ��� � � i '
� � 7 � �� � �FR �� �� � I � � � � ���� ����3� ����3�#@ l� ; y � �
t 3
a' � R € � � � a �s � G � ay'� 4s 4� s e � w�� x � ¢��b I � �! � f � s � � � ° �
� f � �6 ■ ! � � 3� Y h- � � � � � �-� �2��! � - : 1' y � IY � � 6 � `R � $ � � � 7 � � '•
� B� � �R e �$�� g � � � ' �.�����'�s���r3��� ' '���� � � 3��$��s������;�� `i
� � �� �e� � � � � � � � � � � £K � � �
� � � � �-� ��� � � � � � � ���� �� �� _���¢ r - ---- �
g � F � � � $< 5���� � �� . -F� � �
� g �j y y?q� �E �p i R °= e s II E II� s 8.. e a a� s e s��.'
� � � � ��1����R��@A ��S�dF A��I � �� �� �� � � ��j ���� ������ ��.����` I ;� I�4;s a 8 �T g ,
� /�� � � 6 3� �€ ���� 4���<� �����`�aB � � ^ I I 1 I; i; I
��� � a a a�= ac se a es� F' s� s a a s e s e � s a (�} f. i ^� :^ i
. � ' ' . �:���� _.I- � '�Ilnilli�f:(1 OQGmfl��a;[r.,
(-1 ��vr �. �) �i�il im� � — � �
i { �
i � � ,� � n„ m ��'li� J
� � � g j � ,,.�
� �!�
i j' ^ '.� ''c . ;
I o � � �,
E � � I �,�—_ -_ � 8 li �
�
1
�
�
(�1-
��'t—
I`LL �
lLL:r _—
� n'i— --
� a . . "' _`. _ _��_� '1 i
� m�---I ------- , - � +�`�_ .
- I � I
� � !
i II --- �, ��1�' _
i I � ��
�f I� � �?I I�
I �'�� ,� _"�J , i�
I I � _ --
I I "-= ;
I I '
; � `-
;�!---I--- -F---- — _ _ _ _ ___. _
� I
I I
j i
l
1-- --
-._ _�i:
II
-- -i-- ---- - -tii
_ ia �
_.— _ _.________.��;
_—.__ __—.—.—_—_���,,
�� �.
� -- -- —J��r
�.
�, -------;�.,
I'
I' -----�--%�l
�r
fi--- -----(;�:
_i- -- - -- -r:`' �
, �, �
�
4 "�
j
�
— -- — ---- --�'��
�
— -- -- �,u.,
—Ij— --
I
I I
,,
— —�!---- — ---- -i.ri;
I
,=.
--II--------(U �
ff�±---- ---�)
,- -------- (;�jl
�
1 ,
�
- _._._.._.—.�N
lI"—__'_'—___—/,�;
I� _.�6'
��
1HVqC SCHEDULES
�, w,, , �.,,. �. �..E�. E.���. µo �.�E, �w..,� �„� � � �o a, .�F... ,� �=,LL�ro .. ,� ���,��� roMR<r�.
w. ���.�w s�.. ��,�
�N �<NRER �fu Al
uaoEt 1 a�m rt.
SCUD l�.1-N� 19i0
:�«��� �
M�.�o �. �t� ° --� -- ----
�.� �i� a.a: - �� ��dd �
��..._ 9�LCxE Yu
�m.• ,un su�'� —�- p urw xanr �
/ ��P ` 4
ypfy�i�y�'�ps � — . .lF AX dlCt fN]1g1LWE � �
— ..�._ _—_ rorz
�`�
ra �ranwe�
.=q' yw. oF�� n
eauxr c[a�c � xprtv+e�s�im£
__ .._""""'""' _"_'_"""_—�.1
E' W S1AMl[55 SIER IPW �-+
a.sn m.emc c�uw — �- �m a rnax
— . ..—_ — .__-_ .__ .
�._—..__— '— --._—
•//�/ HEARTH QVEN EXHAUST FAN cr
( nE'SUI.t 9"
`•'VIRIV (�i.f�1G.�1_JlN1LiN4i . -.. __.__ .—..
�'�� ��OESCftiFiICN �p�� W/.115uV5 YMWIR[uaMi
xEl EAELL1MCm m/�/ �- p�t[fl WM BWLT-w MfPN�I 0�[RLOW: WiERNAL t-Si�t
N N]3-1R
--'— �CTd1V SAIPt[ 9ai ppNN SvS�EN M�lNii i5 OKR I.OW LFU. — _� _ .. .. , —
•• PRONOE f
' ORO�NAIE INSiKL�MN N�iN f..C_�_..__."".—... _ ..... _.
�1 aK WiM� 011 �NS MYMMS .�� —.�— - . �"
rt R� �
p �� OIY�YNy ryp „E�n�/COO�IM T�fR405�Ai BY <M1P0.5 CM1P�CiIXi. NA GUUtM. BEIT OI1rvE EVnPOA�iq1 f4N, fACiaR� WSi4lE0 uifAOVPWL550R COMrapS TMFU IHE 8�9E E�E<1MCN
3) 10.2 �t CMNECIi0N5. PRMi BM�xEW. W15M)[ �M M000. �ND ii0 �Mi COH�EWOICE W11Fi (tiELO POV.fREO). VRONpE CUPB AO�PIER.
- - __ - - -
?'M �z, zo.zo �� �a� � �.• ��a .� � � �E a��,� ,� s«„ �n � � � ���,�,. m
.._... � _,�-�4 —
3 LF�FT ENTRY HVAC SECTION
� �,,
� ��, .'�
,..- �; — —_
�:. ' � �I
:� � � �K
=-T a;ahR�' .w
�
. i y�
xx -
, �HI'�1 i
,., n, � �.k.
,. �E �ts _'__
/. 1_
�
�
LEFT ENTRY HVAC SECTION
PESY�.1
m
I.�C YIMK� M1NG M[ 11M91 93E .�C[SSdbEf
m-� �e �aw u+�-w a a'� s��aw i�xaisw xm . .
s�i �nn nui u�x-u m- rt•� oiai aut. nvm n�rcs i�x' .
u •a w�un . a oEarc[ omrtnox. r ur-w a' us�a uwwt. n�awrcn.
Iq-� ATX 154 �Y .M 6t-YMI[ 9 SRLt QM1IG iliu➢ M�O[5 /YUv
xw a cxwn �vw�e� oc.. o xa¢ ovuxnol. fbi -M P AMK[ uaw rs x[pwm.
[4 nM riR ' ''�w 1Ql UMIL vm BL�CE9 � l.
NY x. tlf iF �5 ] il �
ry 9WiMF QlHM1I 9�OIM OC.. 0 MQtt OfRCCMN. f__ 9MML uOLMi. AS P(WIREO..—_ .
��
SAFEWAY
�e,��
iarons�ru�eun.aM
� ocai
V
2
\
�'
� ����
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
:
�owxo�v�, �
Town of Vail, Community Development, 75 South Frontage Road, Vaii, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149
ELECTRICAL PERMIT Permit #: E08-0066
ACOM
Project #:
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
OWNER SAFEWAY STORES 46 INC 04/28/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT PAGETT ELECTRIC COMPANY
8081 E. ORCHARD RD. #190
GREENWOOD VILLAGE
COLORADO 80111
License: 415-E
CONTRACTOR PAGETT ELECTRIC COMPANY
8081 E. ORCHARD RD. #190
GREENWOOD VILLAGE
COLORADO 80111
License: 415-E
04/28/2008 Phone: (303) 706-9260
04/28/2008 Phone: (303) 706-9260
Desciption: SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE-
ELECTRICAL PERMIT
Valuation: $274,000.00 Square feet: 44711
Status . . . :
Applied . . :
Issued . . .
Expires . .:
PRJ07-0598
ISSUED
04/28/2008
05/01 /2008
10/28/2008
„�,,,�..,�,,,.......*...�.*.**.,,*«*****.***«*.,*****«**«.***.,*.,*«*****.*. „*.**.**.,,...*..,,.,.,..,.*„*...,,..*.�*...�.,.,<*,.�„*.,,.,.,,..,,.*.,.*..*.�*.«*.
Electrical Permit Fee--------->
Investigation Fee-------------->
Will Call Fee-------------------->
FEE SUMMARY
$5,729.30 Total Calculated Fees--> $5,733.30
$0.00 Additional Fees----------> $0.00
$4.00
Use Tax Fee-------------------> $0.00 TOTAL PERMIT FEE---> $5,733.30
Total Calculated Fees-------> $5,733.30 Payments-----------------> $5,733.30
BALANCE DUE----------> $0.00
.**..***««.««.«„«„*.,*.,..,«.*.*.***«*....*....*.....,.,,.......*.,..*,,.,*,,,,.....�..*.*„*****.,.*.«.«***.**.*..*...,*...,*...,*..*.,,.**...*..«.**..****.....*.*.*.,,*.«.,,..,
APPROVALS
Item: 06000 ELECTRICAL DEPARTMENT
05/01/2008 shahn Action: AP per approved plans
Item: 05600 FIRE DEPARTMENT
Item: 05101 BUILDING DEPT REVISION
08/29/2008 Martin Action: DN F:\cdev\CHRIS\PERMIT.COMMENTS\608-0013\608-0013
Revision 1.DOC
09/15/2008 SHAHN Action: AP
.,,,.,,.,*..,**x,,....,..*,,.,.,,.,...,,,,,.,.,�.�.,.,.,,.,.,,,,,..,..,..,�„�„�.«,.,,*».*«...,.,*.,«.,***,,..*.,�..,,.,,.,�*,.,.*�.�„�*.,«*«�„«..,«.,««�«�.**«.,«„****„*.,,,«.,**.*«,.,,,.*„**,.«**.,.,.*�*,.*�**
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
************R*************************************************�k********MW********k*rt****iF*f**********************************************************************'k
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate ptot plan, and state that
all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and
Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR
OFFICE FROM 8:00 AM - 4 PM.
elec_prm_041908
t� o Owner or Contractor
Print Name
elec_prm_041908
Date
*****+***************************************************�+***+***********+*****************
TOWN OF VAIL, COLORADO Statement
*****++********++*******************************+*+****�******+****�*******++*******�*******
Statement Number: R080001665 Amount: $207.00 09/17/200809:30 AM
Payment Method: Check Init: DDG
Notation: PGC 2283
-----------------------------------------------------------------------------
Permit No: E08-0066 Type: ELECTRICAL PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $5,733.30
This Payment: $207.00 Total ALL Pmts: $5,733.30
Balance: $0.00
*********************************+++*****************�*****************************+********
ACCOUNT ITEM LIST:
Account Code
--------------------
EP 00100003111100
Description Current Pmts
------------------------------ ------------
ELECTRICAL PERMIT FEES 207.00
-----------------------------------------------------------------------------
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
TOWNOFYAII„ '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149� �. 6� t3
ELECTRICAL PERMIT
ACOM
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
OWNER SAFEWAY STORES 46 INC 04/28/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT PAGETT ELECTRIC COMPANY
8081 E. ORCHARD RD. #190
GREENWOOD VILLAGE
COLORADO 80111
License: 415-E
CONTRACTOR PAGETT ELECTRIC COMPANY
8081 E. ORCHARD RD. #190
GREENWOOD VILLAGE
COLORADO 80111
License: 415-E
04/28/2008 Phone: (303) 706-9260
Permit #:
Project #:
04/28/2008 Phone: (303) 706-9260
Desciption: SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE-
ELECTRICAL PERMIT
Valuation: $264,000.00 Square feet: 44711
Status . . . :
Applied . . :
Issued . . .
Expires . .:
E08-0066
PRJ07-0598
ISSUED
04/28/2008
05/07 /2008
10/28/2008
.,,****,,.,,,,..�,��,.�«,,.,,*...,,,,,,,,�.,.��«.***.,,,,..,..�����.*«*«*.**,,,.,,..,. FEE SUMMARY „�„*«*«*„*.»�..�.,,,,�„�*�****.,,.�,,..,,.,,«„*«**„****.*.,.,,�..,.�...�«�„�«„�«*,,.
Electrical Permit Fee--------->
Investigation Fee-------------->
Will Call Fee-------------------->
$5,522.30 Total Calculated Fees--> $5,526.30
$0.00 Additional Fees----------> $0.00
$4.00
Use Tax Fee-------------------> $0.00 TOTAL PERMIT FEE---> $5,526.30
Total Calculated Fees-------> $5,526.30 Payments-----------------> $5,526.30
BALANCE DUE----------> $0.00
„«*�*�«*.,*..,..,.,.,.�.,�„�«**..,,.�.�.,..*«„*****.,,.�,,..,��„�„«„****„**,,,�,,,..,.��.,,*«,«„**„*.,*.�,.�.�,..,,.,.**«*«*„***,,.,...«.�.��„*«*«.,*.*.**.,*�.�,..�.�„*,,.,.�*«**,.,.*.,«..,.
APPROVALS
Item: 06000 ELECTRICAL DEPARTMENT
05/01/2008 shahn Action: AP per approved plans
Item: 05600 FIRE DEPARTMENT
�.,,,..>...,,,.<,,,.,.��.,..,�„«�.,,.,,.,.,.,,�,,.,,.,,�...�.,,.,,,,.�,.,.�,,.,,,,«�«*..*.,�.,..,,,,.,,��.*..��*�«**„*„��...�„*„**„***„��..,,,,�.*,,.«**.****�.,..�.,.�.,****.,.«*****„*,....,,�.�„
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
���**.«,.,,.*.,.,,,,�.��.,�.�*,,,.«,..�,,.,,.,,.�.*«�««*«*.**.�,,,..,.�„�„�,,,�„***.*.,«.,**,.��...,,..�..�«.«***..*.,��„�„�,.**..*.*.,�.,,.,,�«�«�«*. ***,,«.,,�.,,,,�.,�«,,,,�„�.,�*.:..*.*.�.,�,,.,,.,,,�
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that
all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state
laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and
Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR
OFFICE FROM 8:00 AM - 4 PM.
�� Signature of Owner or Contractor
elec_prm_041908
/ . ' ��:
�. -
****************************************************+************************************+**
TOWN OF VAIL, COLORADO Statement
****+*****************************+************+********************************************
Statement Number: R080000599 Amount: $5,526.30 05/O1/200803:40 PM
Payment Method: Check Init: DDG
Notation: Pagett Electric
13794
-----------------------------------------------------------------------------
Permit No: E08-0066 Type: ELECTRICAL PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $5,526.30
This Payment: $5,526.30 Total ALL Pmts: $5,526.30
Balance: $0.00
*************************+**+**********************************************�****************
ACCOLINT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
EP 00100003111100 ELECTRICAL PERMIT FEES 5,522.30
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS GNED �
Project #:
Building Permit #: 1 �
. �' Electrical Permit #: • 6
���ry�+ �,� rt � 970-479-2149 (Inspect�ons)
lH" NZ
75 S. Frontage Rd.
Vail, Colorado 81657
TOWN OF VAIL ELECTRICAL PERMIT APPLICATION
CONTRACTOR INFORMATION
COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials)
AMOUNT OF SQ FT IN STRUCTURE: ��J, '7
Contact Eag/e County �
Parcel# ���3,(e
]oh Name: �'a1�,_ �
t�e.w�
Legal Description Lot:
�
Block: Filing:
� Address: ►�? i �
Engineer: kuRT t LEGNT�NQ�uStfr, P�
Detailed description of work:
� � e-t�Y� �� �
ELECTRICAL VALUATION: $
visit
c7
fo� Parce/ #
Job Address: 2 �� � N F�n►'r{' c�2 (Zr:�
►.,�_.► �� .�
5 ORCN �KtO �,;,�
Subdivision: '
o Phone:
� Phone:C�oB) 3 �'
Work Class: New () Addition (� Remodel h( ) Repair () Temp Power () Other ()
Work Type: Interior O Exterior O Both (� D�es n EHU exist at this location: Yes O No O
Type of Bldg.: Single-family () Duplex () Multi-family (x) ommercial . Restaurant () Other ()
No. of Existing Dwelling Units in this building: � No. of Accommodation Units in this building:
Is this rmit for a hot tub: Yes No
Does a Fire Alarm Exist: Yes ('�(') No () Does a Fire Sprinkler System Exist: Yes �•) No ()
��� ,, � � �
D �� ,�� �� � =
_ � �,,
*******************
i d1N`N �i� \i�;�.
�,�****��****FOR OFFICE USE ONLY�**�*�**��********,�*****�******�**,�**
ier Fees•
B Fees� �
nner Siqn-off:
ceived�
a s,r:
F:\cdev\FORMS\Permits\Building\electical�ermit_i1-23-2005.DOC Page 1 of 2 11/23/2005
t
.
"�i4fi�QFY�, '
Amendment to the 2002 N.E.C. Town of Vail Ordinance 4, Series of 2005
❑ Overhead services are not allowed in the Town of Vail.
❑ Underground services sha// be in conduit (PVC) from the uti/ity transformer to the electric meter, main
disconnect switch, and to the first electrical distribution circuit breaker panel.
❑ The main disconnect switch shall be readi/yaccessib/e, and located next to the meter on the exterior wall of
the structure. All underground conduits are required to be inspected before back-filling the trench.
❑ In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common
walls and spaces are exempt,
o NM Cable (Romex) can be used on/y in sing/e and mu/ti-fami/y dwe//ings not exceeding 3 st�v�ies
Type NM cannot be used in any bui/ding mixed with Type A,B,E,F,H,I,M &S occupancies
❑ A/uminum conductorssmaller than size #8 are not permitted.
TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES
o All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form attached (if applicable).
❑ If this permit is for installation of an eacterior hot tub or spa on a new elevated platf�rrei or deck o��er
30" above grade, you must also obtain a building permit.
o If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform,
a structural engineer must review the existing condition and verify that it will support the added
concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing
with this application.
❑ If this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
o If this permit is for a commercial space, two (2) sets of stamped drawings are required. E/ect�ica/
one-/ine and pane/ schedu/es are �equired if /oad is addeal o� dist�ibution is a/ter�ed,
I have read and understand the above.
� Zoo�
Signature Date Signed
If you have any questions regarding the above information or have additional questions,
please contact the Town of Vail Electrical Inspector at 970-479-2147. The inspector can be
reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also
leave a voice mail and the inspector will call you back.
F:\cdev\FORMS\Permits\Building\electical_permit 11-23-2005.DOC Page 2 of 2 11/23/2005
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2135
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES �� _,J��
SPRINKLER PERMIT
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
Project No :
OWNER SAFEWAY STORES 46 INC
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT PRECISION FIRE PROTECTION, I
5135 W. 58TH AVENUE , UNIT 7
ARVADA
COLORADO 80002
License: 813-5
CONTRACTOR PRECISION FIRE PROTECTION, I
5135 W. 58TH AVENUE , UNIT 7
ARVADA
COLORADO 80002
License: 813-5
05/09/2008
Permit #
Status . . . :
Applied . . :
Issued . . .
Expires . .:
F08-0027
ISSUED
OS/09/2008
06/10/2008
05/09/2008 Phone: (303) 432-8181
05/09/2008 Phone: (303) 432-8181
Desciption: SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE-
FIRE SPRINKLERS
Valuation: $19,400.00
*+�r***��*��*r*r�rr**+r**+�*******�+*��*►���***�*►*�*�***v*****�**++ FEE SUMMARY *+r�***r�******�****r*►**r*�*+***ar+++****s#*+�***�***w**r*r
Mechanical---> $ 0. 0 0 Restuarant Plan Review--> $ 0. 0 o Total Calculated Fees---> $1, 1 � 4. 5 0
Plan Check---> $350. 00 DRB Fee---------------------> $0. 00 Additional Fees-----------> $368. o0
Investigation-> $0. 00 TOTAL FEES--------------> $1, 174. 50 Total Permit Fee----------> $1, 542. 50
W il) Call-----> $ o. 0 o Payments-------------------> $1, 5 4 2. 5 0
BALANCE DUE---------> $ o. 0 0
**r�*�*r»****<*t***►rr****+**r*.+*.*.:*.**..*.s►*****«***t*�**t***t*t*►**t*t+�*�*»***s***s*«***r«a:**►r*r.+�x*****a*�****r*r******:r►+**�****s****
Item: 05100 BUILDING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
05/13/2008 McGee Action: DN l. PRV required per ERWSD requirements.
2. Provide hydraulic calculations.
3. High temp heads required in proximity to kitchen hoods.
4. Pipe for new work not specified.
5. No flow data provided.
6. Material cut sheets not provided.
7. Permit application form incomplete.
I b c= 3 �
Resubmit required.
06/09/2008 McGee Action: AP See Conditions:
2nd submittal reviewed.
Duscussed minor issues with Rick Jefferies.
Visual inspection ot cross mains required. Flushing or replacement may be requirec
by Fire Dept is required.
Verification of existing pipe schedule is required.
Provide data on existing pipe to support hydraulic calculations.
Conduct flow test to confirm results. Fire Dept must witness test to be valid.
200 lb hydro test ot entire system and tunctional tests ot all control and alarm ,
required.
12/05/2008 mvaughan Action: AP revision submittal for antifreeze system.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0010065
Verification of Existing Conditions is required.
See Conditions:
2nd submittal reviewed.
Duscussed minor issues with Rick Jefferies.
Visual inspection of cross mains required. Flushing or replacement may be
required. Witness by Fire Dept is required.
Verification of existing pipe schedule is required.
Provide data on existing pipe to support hydraulic calculations.
Conduct flow test to confirm results. Fire Dept must witness test to be
valid.
200 lb hydro test of entire system and functional tests of all control and
alarm valves is required.
«*,*�****«******�*.*�****.*.**�***.****»***«*.*.*.*.*.*.**�.*.*.�.*�.*..���.***«,:.*«*.*.*.��***.*******.******.*»*�.*.�*.,:.***�***.*****�****�**�
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS IN ADVANCE BY TELEPHONE AT 970-479-2252
FROM 8:00 AM - 5 PM.
�� � J �� �
3 �� � �"�
************+*******************************************************************************
TOWN OF VAIL, COLORADO Statement
****************************�***************************************************************
Statement Number: R080002350 Amount: $58.00 12/11/200801:56 PM
Payment Method: Check Init: DDG
Notation: Precision Fire
Protection 8910
-----------------------------------------------------------------------------
Permit No: F08-0027 Type: SPRINKLER PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $1,542.50
This Payment: $58.00 Total ALL Pmts: $1,542.50
Balance: $0.00
*********************�****************+*******+****************+*******************�********
ACCOUNT ITEM LIST:
Account Code
PF 00100003112300
Description Current Pmts
------------------------------ ------------
PLAN CHECK FEES 58.00
-----------------------------------------------------------------------------
�
Transmittal Form
Revision Submittals:
1. "Field SeY' of approved plans MUST accompany revisions
2. No further inspections will be performed until the revisions are approved & the permit is re-issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to
��J C�� -05� �'
�'" � � � O (� �- �-
Attention:
�j � � t
Project Address: �
� _ _ �
drP i�l(n��
Contact Information
Company: "� r< <. i 5 S vr. }- � r e
Company Ph: 3 03 �{ 3 Z g I'� Fax: 30`� 'i-3 Z'� 1��
Contact Nam��r..�� ��, e S
Z S� ^
Contact Ph: Cell: 3D3 � ���j
E-Mai�v—C L:Sinn �: r-c.". N c(`�� /�. C7_L'
Tow f Vail Contractor Registration No:
\
X �
Si atUl'G (required)
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation) ��' �
�����:
Building $
Plumbing $
Electrical $
Mechanical $
Fire Sprinkler/Alarm $
Total $
L� c�00 �°l
�:;;��;
( ) Revisions
( ) Response to Correction Letter
attached copy of correction letter
( ) Deferred Submittal
( ) Other
Description / List of Changes:
�e.�� se -�c r- ,4 n�� : �'� ��Z�
1� ;" .
! �„'".i . �,
'r : �
r:�1 �
.
_ �, �f �` fi,;;: ' ; ; t � �.
, M .
Z� -
��s ���
(Use additional sheet if necessary) ,
Date Received:
`l D�
� �
i
� l;.
� �� J �I�� .. .�
i
I�� ,,:, � � ,� ��='
�
���L�:��,� ���: �g'��l�,
� ' f
;,F
;; �;�;�
, s
i;
�'1�
TOWN OF VAIL FIRE DEPARTMENT
75 S. FROi�TAGE ROAD
VAIL, CO 81657
970-479-2135
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
SPRINKLER PERMIT
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
Project No :
OWNER SAFEWAY STORES 46 INC 05/09/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT PRECISION FIRE PROTECTION, I 05/09/2008
5135 W. 58TH AVENUE , UNIT 7
ARVADA
COLORADO 80002
License: 813-5
CONTRACTOR PRECISION FIRE PROTECTION, I 05/09/2008
5135 W. 58TH AVENUE , UNIT 7
ARVADA
COLORADO 80002
License: 813-S
Permit #
Status . . . :
Applied . . :
Issued . . .
Expires . .;
F08-0027 ( �-� � �'�' «
"�' i�, � U � - � �� 1 �
ISSUED
05/09/2008
06/10/2008
Phone: (303) 432-8181
Phone: (303) 432-8181
Desciption: SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE-
FIRE SPRINKLERS
Valuation: $9,400.00
ar***�*r�r�+r*�r�*r**a*r*r*+*r*r*+*+++s**�rr***►+�*�**►++*a***��ra** FEE SUMMARY *�******�r*�r+*+�****�s�*��*a►**r***a*+***�*+*�r**rr*�*r*�*■
Mechanical---> $0.0o RestuarantPlanReview--> $0.00 'I'otalCalculatedFees---> $�49.50
Plan Check---> $350. 00 DRB Fee---------------------> $0. 00 Additionai Fees-----------> $310. 00
Investigation-> $ o. 0 0 TOTAL FEES--------------> $ 74 9. 5 o Total Permit Fee----------> $ i, 0 5 9. 5 0
W i I I Cal 1-----> $ o. 0 o Payments-------------------> $1 , 0 5 9. 5 0
BALANCE DUE---------> $ o . 00
��►«**+***.***�a�**s�.r*****r+�******rrr*tr►*r**►*t*t****.vrs***.rsr*+**r**f*�s*.�r*a**�r*****��**r*�r�*****�*******►*►**+*t*�t**ss*��*��**s*r.�•
Item: 05100 BUILDING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
05/13/2008 McGee Action: DN 1. PRV required per ERWSD requirements.
2. Provide hydraulic calculations.
3. High temp heads required in proximity to kitchen hoods.
4. Pipe for new work not specified.
5. No flow data provided.
6. Material cut sheets not provided.
7. Permit application form incomplete.
- ReQubmit required.
06/09/2008 McGee
2nd submittal reviewed.
Action: AP See Conditions:
Duscussed minor issues with Rick Jefferies.
Visual inspection ot cross mains required. Flushing or replacement may be require�
by Fire Dept is required.
Verification of existing pipe schedule is required.
Provide data on existing pipe to support hydraulic calculations.
Conduct flow test to confirm results. Fire Dept must witness test to be valid.
200 lb hydro test ot entire system and tunctional tests ot all control and alarm �
required.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0010065
Verification of Existing Conditions is required.
See Conditions:
2nd submittal reviewed.
Duscussed minor issues with Rick Jefferies.
Visual inspection of cross mains required. Flushing or replacement may be
required. Witness by Fire Dept is required.
Verification of existing pipe schedule is required.
Provide data on existing pipe to support hydraulic calculations.
Conduct flow test to confirm results. Fire Dept must witness test to be
valid.
200 lb hydro test of entire system and functional tests of all control and
alarm valves is required.
*��.*«**.*.**�.*.*.*.�*�».****.**...,.:...*......�.*.**.*,�....*,:*,:.*,�.�*��*�*.�..�*«+***,*�**********.*....,..,...�.*.....�..,�.�.*.*.+......**.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-
FROM 8:00 AM - 5 PM.
BY TELEPHONE AT 970-479-2252
r • �
*****************************************�**************************************************
TOWN OF VAIL, COLORADO Statement
*************++********+******+*+**********************************+************************
Statement Number: R080000918 Amount: $1,059.50 06/10/200809:18 AM
Payment Method: Check Init: DDG
Notation: Precision Fire
Protection 8350
-----------------------------------------------------------------------------
Permit No: F08-0027 Type: SPRINKLER PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $1,059.50
This Payment: $1,059.50 Total ALL Pmts: $1,059.50
Balance: $0.00
*******************************************************�******�+*********++*****************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 SPRINKLER PERMIT FEES 709.50
PF 00100003112300 PLAN CHECK FEES 350.00
-----------------------------------------------------------------------------
NOTE: TH/S PERMIT MUST BE POSTED ON JOBS/TE AT
:
TOWNOFVAII, '
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f. 970.479.2452 inspections. 970.4792149
MECHANICAL PERMIT
ACOM
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
OWNER SAFEWAY STORES 46 INC
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT HUSSMANN CORPORATION
11929 E 51ST AVE
DENVER
CO 80239
License: 390-M
CONTRACTOR HUSSMANN CORPORATIOP
11929 E 51ST AVE
DENVER
CO 80239
License: 390-M
05/09/2008
05/09/2008 Phone:303-371-5447
05/09/2008 Phone:303-371-5447
Desciption: SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE
Valuation: $90,854.00
ALL TIMES
Permit #: M08-0101
Project #: PRJ07-0598
Status . . . : ISSUED
Applied . . : 05/09/2008
Issued . . . 05/12/2008
Expires . .: 11/08/2008
....,,....,«..,,...........���...,�,..�..�* ................���....�....��.�.......*„FEE SUMMARY.....���.�#...,.......�....�....�.�....�.,..#..,.�...............�.....��.............��
Mechanical Permit Fee---> $1,820.00 Will Call------------> $4.00 Total Calculated Fees---> $2,279.00
Plan Check-------------------> $455.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $2,279.00
Total Calculated Fees--> $2,279.00 Payments-----------------> $2,279.00
BALANCE DUE---------> $0.00
>......�.:...��.., ....................,.............�..:.............�...�........�....**.«....*....+....................«..,,,.*..........+._.............,..�..,.�..,........................
APPROVALS
Item: 05100 BUILDING DEPARTMENT
05/09/2008 RLF Action: AP
Item: 05600 FIRE DEPARTMENT
......._,...........:..«�..�.......»...:.::.......��..,��.......«.,........�.:.:.,........�..,..*....�*.........: .............�..��*......*................�..,.....::.:.....:......��,....�...
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
m ech ca n ica I_perm it_041908
YY*#**w*##*�f#YRfYw*fw#lwwwwww*�##wY#ww�*wwwY#ww*i*w*#fw#w##***#****if#ii*******iii#t****�*******#*#�i*************#*##ii***f#R****f*******x*****R***�**�*���**#�ww**#***#*##**�#i�*}****
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4 PM. � �
of Owner or
��
mechcanical_perm it_041908
s--�z-�
Date
**********************************************************************++********************
TOWN OF VAIL, COLORADO Statement
**++++*+***+*******+**+*+*****+**********************************************************+**
Statement Number: R080000665 Amount: $2,279.00 05/12/200802:29 PM
Payment Method: Check Init: DDG
Notation: Hussmann Corp
000452
-----------------------------------------------------------------------------
Permit No: M08-0101 Type: MECHANICAL PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $2,279.00
This Payment: $2,279.00 Total ALL Pmts: $2,279.00
Balance: $0.00
**************************************+****+*+**+*******************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 1,820.00
PF 00100003112300 PLAN CHECK FEES 455.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
APpLICATlQN WILL NOT �E ACC�PTED �F INCQMPLE'E'� OR UNSIGNED
�rav p,��� #: Pf LJ b'{- • 05q �
Building Permit #: " O
. –
����A,� j ��a�s ��4 (Y �ec.#tions) 0 (
l � l T01NN OF VAIL MECWA�1tICAL PERMI7" APp!„ICATI4N
�5 S, Frontaga Rd� Permit wil[ not be acc�pted withou� t�e following:
Vail, Colorado 816�?
Provide Mechanical Room Layput drawn t�o scale to include:
o Mechanical Room Dimensions
o Combustion Air Duct �ze ar�d Loqtion
a Flue, Vent and Gas I�irfe Size and Lo�ation
❑ Heat Loss Cala.
n Equipm�nt CutJSpec She�ts
. .__.._...w. ......�..,�.r... . �
HUSSMANN CORPORATION
E-Mai{ Address: � arry_1 oss@i rco. com
Gontractor S�gnature:
�
����
COMPLETE VALUATIt
MECMANICAL: $ 90,854.
# 210311415011
Job Name:
SAFEWAY #631
Legal Descrip�ion �� Biock:
Owners Name: SqFEIUIY STORES 46 i n Ac
�ngineer: Ac
Qetailed description o€ work:
Town
_�
�R
Filing:
aR�#.TIUN'
. Cont�ct person and Phone �
LARRY LOSS 303-371-5447
FaX#; 303-371-5995
IGA� P�I�MIT' Cl.�bor & Mate
40 or �risi#' w►�vw.eaa/e-countv.c
Jab Address:
2171 N FRONTAGE RD, WEST VAIL
� Subdivision:
Q_BLVD 200 Phone;
�tnnry� 1MPROVEMENTS/EXPANSION OF EXISTING STORE
Work Class: New ( ) Add�tion { ) Aiteration ( ) Repair ( ) Ot�er ( )
Boifer Locatfon: Interior () Ext�rior () Other () Does an EMU exist at this iocation: Yes () No ()
Type of Bidg: Singl�'Family ( } buplex ( ) Multi-familY ( ) Comrnercia! ( ) Rey�taurant ( ) 4ther ( )
No. of Existing Dwe(ling Un�s in this building: No. of Accommodat�on Units in this building:
No/"fype of �ireplaces-Propoc.�ed: Gas Appliarroes () Gas Logs () Wood/Pelf�t () Wood Burning (NOT ALLOWED)
�s this a�ersion fcom a wood burning fireplace to an �PA Ph�se II device? Yes () No ()
��;***���***x��***x�**�**�x*FOR O��CE
�:jcdev\FORM5IPERMITS�BUiEding\methaniCa�permit ,i1-23-2005.DOC
�ONL"Y*�x****��x***
� Z2�1
6d WdZZ:iO 80aZ 80 'hpW BI0Z9Lb0Z6 :'ON Xd�
�c�������� —
MAY 0 9 1008
TQV'��` �'�iL
�N I —�Jd : W0�1�
NOTE: TH/S PERMIT MUST BE POSTED
:
TOWNOFVAII, '
ON JOBSITE AT ALL TIMES
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970-479-2139 f.970.479.2452 inspections. 970.479.2149
MECHANICAL PERMIT Permit #: M08-0252����- ��'���
ACOM
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
OWNER SAFEWAY STORES 46 INC 10/02/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
APPLICANT WESTECH MECHANICAL, INC.
4755 FOX STREET
DENVER
COLORADO 80216
License: 407-M
CONTRACTOR WESTECH MECHANICAL, INC
4755 FOX STREET
DENVER
COLORADO 80216
License: 407-M
Desciption: HVAC FOR REMODEL
Valuation: $36,258.84
10/02/2008 Phone: (303) 986-0366
10/02/2008 Phone: (303) 986-0366
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
PRJ07-0598
ISSUED
10/02/2008
10/03/2008
04/01 /2009
...,����..��..,..<.����......�..�..*��*�..**��<.�.....<...�,t,�.,��.�..�......�..�..FEE SUMMARY>.x�.........���*..#.*..*..�......>.....��..�,��.....����*..«.�<.**..*...**,.�,.�.�......
Mechanical Permit Fee---> $740.00 Will Call------------> $4.00 Total Calculated Fees---> $929.00
Plan Check-------------------> $185.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $929.00
Total Calculated Fees--> $929.00 Payments-----------------> $929.00
BALANCE DUE---------> $0.00
*..�.,...»�..«.....,..,..<...,....���...�.,.��..,..,w„«,��............�.,.�.�.,,.»............,��.���...��...�,.,.�...�.�+ .................�.����.......���.��....,...�......�......,....��,�...,
APPROVALS
Item: 05100 BUILDING DEPARTMENT
10/02/2008 JLE Action: AP
�......��.��<....«....���....�,�.....*�..��.......,....�....,.,:�����..*....�t...�««.<.......�....�,�:����..*�..,�.»..«...........,�....,��.�.��.�..����,..�..,�....«�.........«>....,<......,
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
,....�,,...,,.,,......,t�,�...,�...,�.,....,�.,.....�..��.���,,.,.�.....»,...>...«...>...�.....���*...�����+,..�..�......,.«.�,�<....��....�,..��:��.�,....�..�......,.�...,�.�,:.........,.�..,......��....
DECLARATIONS
mechcan ica I_permit_041908
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. 1 agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
4P
FOR INSPECTION SHALL BE MADE,�IE�-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
��jnG�:�;'�" �.... ( G�� � —v �
G
of Owner or Contractor Date
.cil_�-i� tr � I w
Print Name
mech ca n ica I_pe rm it_041908
091.30I2008 19:33 303-762-1767 WESTECH MECH PAGE 02/12
The ioilowina i�ams MUST be �ched to di� nerml! aeol' gtion
AAechanical Roam l,.awu! dravm �o scale ta include•
_. MechanN:al Ro�n plmensions ��
,_ Combustion AI� Duct Size and Locatlan
_ Flue, Vent and Gas Une Sin� and LoCation
_ Heat Loss Catculations
„ �quipment Cut / Spec Sheeta
,..... . ......, . ...... .._.......___..... ..___..... ....
• .._....... �....._. .., . .. _.
Projecl Addresa vZ �-I + N � W �� . .. ...
: P��� �G� - C�,�1�
, C�
" �` �
._.... ...___._— ........ ......_.__.._._......_ ......._._.--•----...._.......__..��__..:..,.�.,.._._---'1 BuHOing Permiti�:
� Contrar,tar Inlom,ation , -
Company:�t?��%lL1�� ���, %��, ,
/� ,��` �
Company,�dd�ess: �7�7 f�/�- ,�j]`�
� Gity: !/'��'�!'�-� State- W Zq�• � Z l F'1
' Contatt Name: (�L. ,d/ / � �
, Contack Ph�: 303 -��6 �o36k ce,,: ��3- �7 z-os I o
; E-Mail• ..�a� � � u���eGhn��,lna ni cA. I, �a �►
Town of Vaii Conqa r � don No: ���% �� I � I
Mecharii�al Rermit � �¢7 `P � �'� 02-
.. ---•a---._...... . . .._...._.____... .. ._....._ :.. .... . . ...... ... _.�. .
W
Descripflon of MYork :
�UA'C� ��DOCLr
�OD/ �D� S
;(Use adtlitional sheet r� necesd ny)
._._ _....,�....,...__�.._........___.__ ...... . ..__---. ... ....._..___
� Complebe Vsluation for Med�ar �a1 Rermi�
, y : c/
� A g I Mechenical $ �� � � � . � /
� CoM.Ta�ctor Sig�na �r�quined►
____.. . .._.__.....
.___...._.. _._..._._.._..... ....__.....
Properb� Ilrpformatlon ..
P��� �:� _� i � � i � �+ � �c� i 1
....__�:..___ ........ .. ... __.__.. _.. ,
: Work Clp�s:
; Lega1 Description; Lot � g� �
' Subdivisiwn:
' 5,�.��►r�y..�4fo 31
JoD Name:
' Owner Name: �i�'�l�� �f��•r •
! Mailing Addae6s;(v"I�%� 'S� rD�yr /%��r, �(,�hl�Y �
:(For Paroel � Con� Ea810 Counqr essessors Offioe a 970328�8640 or •-
www.eaglcraounty.uB/paliej Q„ � � Z.
-�---._.. �.---_... ......_.__........ .._..__._._._.. . ..._.__.__._... G��.__..
� Ar+chibacx ��' Dasigoet j � Enginser ( )
Name: �� ���'j 1�7 1 %{�%
Pbone: J(� � z-
� Fax:
� �-Men: _.
������
v �� �
����1
C✓�'i nlD�lc.n�t
; .t�w ( j AddlUon Remodel�yy Repeir ( ) Qther ( )
. , .,._:;: ; ,. �.._:-:::. Y�±,,, . .�........ .
; Boiler Lbcation: . ... .
� I�Merior ( ) Exterior ( ) Olhe� ( ) �
, .._._...._�w .,,..__.-._.._....,..,. _,_...,_.... ...._..�_._.. .. ..�.___.
� Nol'1'j�e; F.xletl�g Firsplaces:
; Gas,4ppGanoe�! 1 �g �-o9g ( ) WoodlPel�et ( ) �
. ._,,._ ......... . ... .._ ....... . . .
; NMypa' Propoeed Flrepl�s �..
� Gas Applienc�s( ) Gas Logs () Wood/PelQet ( j :
�-_....,.... ,_...._.�.___...._.... ....._____ ... . ..._..__�_.... . ..._....._....
euild'mg:7j�p�e: .
; Singte-FAmily () Two-Famiry � j Muld,Family () ;
.: Commercial(� Townhome ( ) Othe� ( ) .
Date ReaeNed,
����-o��� i ► �
�
**+***+**********************+++******************************************+++*++************
TOWN OF VAIL, COLORADO Statement
***********************************************************************+***++++***+*********
Statement Number: R080001821 Amount: $929.00 10/02/200809:58 AM
Payment Method:Credit Crd Init: JLE
Notation: ERIC NELSON
-----------------------------------------------------------------------------
Permit No: M08-0252 Type: MECHANICAL PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $929.00
This Payment: $929.00 Total ALL Pmts: $929.00
Balance: $0.00
********************************************+***++******************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 740.00
PF 00100003112300 PLAN CHECK FEES 185.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
�ow�o�vnn. �
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149 � J�-(� O��
PLUMBING PERMIT
ACOM
Job Address: 2171 N FRONTAGE RD WEST VAIL
Location.....: SAFEWAY STORE
Parcel No...: 210311415011
OWNER SAFEWAY STORES 46 INC 05/02/2008
1371 OAKLAND BLVD 200
WALNUT CREEK
CA 94596-4349
CONTRACTOR H20 PLUMBING AND HEATING, IN 05/02/2008 Phone: 720-344-1354
147 SCOTCH PINE CIRCLE
PARKER
CO 80138
License: 382-P
APPLICANT PETERSON STAGGS ARCHITECTS 05/02/2008 Phone: 208-345-1462
TODD POIRER
5200 W. STATE ST.
BOISE
ID 83703
Desciption:
Valuation:
SAFEWAY TENANT IMPROVEMENTS/EXPANSION OF EXISTING STORE
$149,000.00
Permit #:
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires . .:
P08-0034
PRJ07-0598
ISSUED
05/02/2008
05/07I2008
11 /03/2008
...�..�.........�.......*,......,. ....................*........�...�.....,..*...... FEE SUMMARY .,.....�........».....................�..*.�......�.....*.....�.........*....�.....
Plumbing Permit Fee---> $2,235.00 Will Call------------------> $4.00 Total Calculated Fees---> $2,797.75
Plan Check----------------> $558.75 Use Tax Fee------------> $0.00 Additional Fees------------> $75.00
Investigation--------------> $0.00 TOTAL PERMIT FEES--> $2,872.75
Total Calculated Fees--> $2,797.75 Payments-------------------> $2,872.75
BALANCE DUE-----------> $0.00
.......................,..............,....*.......,...................�......................,.......................«...............:....,.+................«.,,........................
APPROVALS
Item: 05100 BUILDING DEPARTMENT
05/06/2008 JRM Action: AP
Item: 05600 FIRE DEPARTMENT
.,.,...,, .....................................................,.,....,..=.=x.,,,.............,..._..,..._.,,.,................,..___,�..,,.....,.,,......,.__..........,.,,..._..._,.......,
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
� ................�....�......,....«...»...........................,.......+.....�.........................�.««..�.....................�.,......:.........»........��......�.....�..........
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto. /
REQ� UE_S�S F�f� INSP,.�¢TION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
/ / / /
�t re o�ner or ontractor
����� � � ��
Print Name
plmbpermt1_041908
�� � �
Date
********************************************************************************************
TOWN OF VAIL, COLORADO Statement
**********************************************************************+++*******************
Statement Number: R080000637 Amount: $2,239.00 05/07/200802:48 PM
Payment Method: Check Init: DDG
Notation: Pioneer General
Contractors 2195
-----------------------------------------------------------------------------
Permit No: P08-0034 Type: PLUMBING PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $2,872.75
This Payment: $2,239.00 Total ALL Pmts: $2,872.75
Balance: $0.00
***************+****************************************+***********************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PP 00100003111100 PLUMBING PERMIT FEES 2,235.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
� 08'-•9013
APPLICATION WILL NOT BE ACCEPTED IF INCOMPP E�O�R�UNSIGNEDn�� �-� _� 5��
I IJ
Building Permit #: '�' � og-oo�3
i� Plumbing Permit #: P�'C •G2'�?�..,.�}
���t���� • 970-479-2149 (Inspections)
�
75 S. Frontage Rd.
Vail, Colorado 81E
�2 �-6�'�5
�,
)NTRACTOR INFORMATION
"own of Vail Reg. No.: Conta
� �2' � V i
� . ,._.. . _ . �?"'c„�, Fax #:
and
��
��
COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materiais)
PLUMBING: $ ���pQQ o 9
3
�I�M����s �l�.�s �t o� ��-I-�
*�**�***�**�*****�**�**�***�*�******�**FOR OFFICE USE ONLY*�********�,��**�*****���*******�*��**
Other Fees: Date Received:
ACce B •
� � � I�I� �' i
MAY 0 � 2008
F:\cdev\FORMS\PERMITS\Building�plumbing_permit_11-23-2005.doc Page 1 of 1 I" " il/23/2
TOWN OF VAIL
0
�k�k�k#**#######****#*#**####****�k+k�k�k####***�k*##**#*�k***�k�k*****+k##�k�k######*#***$*##******�k#�k�k**
TOWN OF VAIL, COLORADO Statement
********************************************************************************************
Statement Number: R080000602 Amount: $558.75 05/02/200812:04 PM
Payment Method: Check Init: RLF
Notation: 2769 H20
PLUMBING AND HEATING
-----------------------------------------------------------------------------
Permit No: P08-0034 Type: PLUMBING PERMIT
Parcel No: 2103-114-1501-1
Site Address: 2171 N FRONTAGE RD WEST VAIL
Location: SAFEWAY STORE
Total Fees: $2,797.75
This Payment: $558.75 Total ALL Pmts: $558.75
Balance: $2,239.00
*********�**********************************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
PF 00100003112300 PLAN CHECK FEES 558.75
-----------------------------------------------------------------------------
02:19-2009 Inspection Request Reporting ( P
Requested Inspect Date: Friday, February 20, 2009
Inspection Area: CG
Site Address: 2171 N FRONTAGE RD WEST VAIL
SAFEWAY STORE
A/P/D Information
Activity: 608-0013 Type: A-COMM
Const Type: Occupancy:
Owner: SAFEWAY STORES 46 INC
Contractor: PIONEER GENERAL CONTRACTORS INC
Description:
BLDG-Final C/O
NEER GENERAL CONTRACTO S INC
C mments: WC 303-472-5802
Ass qned To: JMONDRAGON
Inspection History
Item: 10
Item: 20
Time
Sub Type: ACOM
Use: IIIB
Phone: 806-622-3100
ION OF EXISTING STORE
Status: ISSUED
Insp Area: CG
Requested Time: 01:00 PM
Phone: 806-622-3100
��
�
Entered By
,�n
�
���� �
N K � �
BLDG-FOOTING `" Approved "*
07/17/OS Inspector: GCD Action: CR CORRECTION RE IRED
Comment: AS BUILT FOUNDATION WALL DOES NOT MEET APPROVED PLANS. RPOVIDE ENG
SATMPED PLANS FOR REVIEW AND APPROVAL. DO NOT POUR UNTIL REVISIONS ARE
APPROVED.
08/01/08 Inspector: JGG Action: PA PARTIAL APPROVAL
Comment: Partial approval for foundation wall and planter walls. OK to pour.
08/27/08 Inspector: GCD Action: PA PARTIAL APPROVAL
Comment: GRADE BEAM
09/03/08 Ins� pector: GCD Action: PA PARTIAL APPROVAL
Comment: INTEROPR SLAB AND THICKENED FOOTINGS. 5/8" ALL THREAD BEING TIED IN TO
FOOTING FOR HOLD DOWNS.
09/08/08 Ins ector: GCD Action: PA PARTIAL APPROVAL
Comment: EA�T ENTRY SLAB WITH THICKENED EDGE
09/10/08 Ins ector: GCD Action: NO NOTIFIED
Comment: NO� A REQD INSPECTION
09/18/08 Inspector: JGG Action: AP APPROVED
Comment: Footin for thickened slab had #5 rebar overla and 6x6 mesh. OK
09/23/08 In�sp ec�or: SHAHN Action: N� NOTIFIED
Comment: PM FOOTING INSPECTION CANCELED AT 2:15.
BLDG-Foundation/Steel `" Approved ""
08/08/08 Inspector:. JGG Action: PA PARTIAL APPROVAL
Comment: 3#4 bars in footing under shear wall. 6" concrete slab.
08/25/08 Insp ector: GCD Action: DN DENIED
Comment: VISITED JOB 3 TIMES 11:45/1:15/ AND 325 CAISSON POURED WITHOUT INSPECTION BY
TOWN OF VAIL.
08/27/08 Inspector: GCD Action: AP APPROVED
Comment: GRADE BEAM
09/25/08 Inspector: mgsafe Action: PA PARTIAL APPROVAL
Comment: three pedestals J,I,A lines @ 6 line. #5 rebar 16in. oc 42 inches deep. sheet s1.1 #1 cut s2.1-
14.
partial approval. special ins ection approval required for dowels drill and expoxy per plans, sheet
s1.1 note numbers 3 and 6�
10/07/08 Inspe�ctor: GCD Action: AP APPROVED
Comment: FOUNDATION WALL ON EAST SIDE OF BUILDING ON GRIDS J.1 TO 3.2 FOR
WATERPROOFING DETAIL.
REPT131 Run Id: 9242
E08-0066: Entries for Item:190 - ELEC-Final 08:34 01/31/2013
Action Comments By Date Unique_
Ke
PA ALL WALKABLE AREAS OK INCLUDING shahn 10/03/2008 A000118
REAR AND DELI, BAKERY, REST ROOMS, 353
CAHSIER, FRONT SEATING.
DETERMINED NO SHOW WINDOW
RECEPT REQUIRED.
AP shahn 10/21/2008 A000119
014
Total Rows: 2
Page 1
M08-0101: Entries for Item:390 - MECH-Final 08:34 01/31/2013
Action Comments By Date Unique_
Ke
PA OK FOR TCO GCD 10/01/2008 A000118
PROVIDE ORIGINAL BALANCE REPORT 252
FOR NEW HVAC EQUIPMENT AND
SUPPLY/RETURN ONLY.
PROVIDE ACCESS AT SLOPED ROOF TO
WEST EQUIPMENT PER IFGC.
WESTECH IS WORKING UNDER HUSSMAN
PERMIT. SHOULD HAVE THIER OWN
AP GCD 10/07/2008 A000118
456
Total Rows: 2
Page 1
M08-0252: Entries for Item:390 - MECH-Final 08:34 01/31/2013
Action Comments By Date Unique_
Ke
PA PRELIMINARY BALANCE REPORT GCD 10/07/2008 A000118
RECEIVED. 458
OK FOR TCO
Total Rows: 1
Page 1
P08-0034: Entries for Item:290 - PLMB-Final 08:34 01/31/2013
Action Comments By Date Unique_
Ke
CR 1.EEMAX IS TO SERVE A SINGLE FAUCET GCD 09/26/2008 A000118
ONLY. PROVIDE AREATOR AS NOTED IN 082
INSTRUCTIONS.
2.PROVIDE AAV IN BAKERY
NO CANCELED BY CONTRACTOR GCD 09/30/2008 A000118
185
AP EEMAX WATER HEATER HAS BEEN GCD 10/01/2008 A000118
REPLACE WITH MULTI SINK TYPE. 253
AREATORS HAVE BEEN INSTALLED.
AAV IN BAKERY INSTALLED
ROOF TOP GAS PIPE SUPPORT BEING
CHANGE TO APPROVED TYPE.
Total Rows: 3
Page 1