HomeMy WebLinkAboutB04-0186TOWN OF VAIL DEPARTMENTOF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALTCOMMBUILDPERMT Permit #: 804-0186
COMrRACTOR VMIr, IrIrC
352 E. Meadow DriveVail, Colorado
816s7
License:782-9
APPtICANI VMIJ IrI-,C
285 BRIDGE ST
VAIL,,
Status...: ISSUED
Applied. . : 07/222004
Issued...: 08104/2004
Expires. . .: 01/31/2005
07/22/2004 Phonez 476-O7OO
o7/22/2oo4 Phone:
eo 81657
License:
owNER \n\4r-, LLC 07 /22/2004 Phone:
285 BRIDGE ST
VAII.,
co 816s7
L,icense;
Desciption:
ADDING SOUND WALL TO LOWER SPA ROOM
Occupancy:
Type Construction: lI FR Type II Fire Resistive
Type Occupancy: ??
Valuation: $3.500.00 Add Sq Ft: 0
Fireplace lnformation: Restricted: # ofcas Appliances: 0 # ofcas togs: Q # of Wood Pellet: 0
.'}+,}.,}|1t:|:t+++'+||l|l+tt||*tlit+*+ttt|llt|l+.tt||l|t|+t1**+t*|t|l||i*FEEsUMMARY.t.t.l||*'tl.|,'t|.l*'.||}ll*1***.|.i
Building-> g9?.25 Restuarant Plan Reyiew-> $o.Oo Total Calculated Fees-> 9163.46
Plan Check-> 563.21 DRB Fee----> 50.00 Addiaional Fe€s----.--> $0 .00
lnvestigation-> gO.0O Recrcation Fee-> $0.00 Tolal Permit Fee---> $153-45
will call--> $3 . OO clean.up D€posit-> $0. 00 Payments----------> 5163 . {5
TOTAL FEES---> S1G3 .46 BALANCE DUE---> $0, 00
Approvals:Item: 05L00 BUILDING DEPARTMENT
o8/o4/2oo4 eeD Action: AP
Item: 05400 PLAIiINING DEPARTI{ENI
Item: 056O0 FIRE DEPARTMEIf,I
Item: 05500 PIIBIIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
Job Address: 352 E MEADOW DR VAIL
Location.......: 352 E. MEADOW DRIVE
ParcelNo....: 210108255001
ProjectNo.: frla(_ovrt
DECLARATIONS
I hereby acknowledge that I have rpad ttris application, filled out in full the information required, completed an accurate plot plan,
and sate that all tre informcion as requirod is conect. I agree to comply with the information and plot plan, to comply with all
Town ordinances and stete laws, and to buiH this sfuoture mording to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and otrer ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOI'RS IN ADVA}.TCE BY 47S2149 OR AT OUR OFFICE FROM 8:00 AM . 4 PM.
SIGNATI,'REOF FORHIIUSELF AND OWNEF
PAGE2
**'|'|t'}'}'}*,}'},t**!t|*.t+*|{tt***,}'}****:}**|lt*'}*'|'|t*t|'t**'}**'}{t'|*{t'|'}{t**,$**{.'t{t!}|:}********
CONDITIONS OF APPROVAL
Permit #: 804-0186 as of 08-04-2004 Status: ISSUED
*!t'****|'|'}*'t*'}'}**,ht'|**t'}'|*'|**'}'|.***'tt'}****'t'|****'t*'|**'||***t,|t}+***'t|*'**,|t*'t**'i,}t.***,|f'}*|}l.*|}**
Permit Type: ADD/ALT COMM BUILD PERMT
Applicant VML LLC
Job Address: 352 E MEADOW DR VAIL
Location: 352 E. MEADOW DRM
Parcel No: 210108255001
Description:
ADDING SOUND WALL TO LOWER SPA ROOM
Conditions:
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCANBE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLIRED TO CIIECK FOR CODE
COMPLIANCE,
Applied: 07/2U20M
Issued: 08104120M
To Expire: OlRllzOOs
+** + 'i + * * * * * * * + 't + + * + * '|! * * * ** | * +* ** * * * t'i t * I tt'tt * | t {' t'}* | * tt*l * * * * + * + + *** * * {. + * * * * 't * + * + i**+ +** +* +*
TOWN OF VAIL, COLORADO Statement
l. * * * + * + + * + * * * * * * * * * !t + + + t*'lr:l* * * * * * * * ** i t * + * * * i + * + ** * + * + * * * * * * * * * * t * * i * * t * * * * +* ** * t * * * * + **:t* * *
Statement Nunber: R04000634? Amount: $163,46 08/04/2OO4t0:23 AJII
Palment Method: Check Init: DDG
Notsat.ion I Chad Ziegler
9577
Permit No: 804-0186 fype: ADD/AL,T COMM BUILD PERMT
Parcel No: 2101082 55 0 01
Site Addregs: 352 E MEADOW DR VAILI
I,ocation: 352 E. MEADOW DRIVE
Total Fees: $163.46
This Paynent: $153.46 Total ALL Pmtg: $153.46Balance: $0.00
**** * * * * * * + +* + * t + * * *t 't * + * {'*** * ***** * l*** f * ** * **a ***'l * * ** ** * * l* * * * ++ * * * * r* * * * *+ +** +* * * * ** * * * *
ACCOIJNT ITEM LIST:
Account Code DescriDtion Current Pmts
BP OO1OOOO31111OO BUILDING PERMIT FEES 97.25
PF 00100003112300 PLAN CHECK FEES 63.2r
hrc 00100003112800 wtLL CALL INSPECTIoN FEE 3.00
tl
ApplrcAnoN wtLr Nor BE AccEprED rF rNcoMpLErF"i"l,r#r'"Hel a.t - raz (
Build Permit #:
PL|CATION RECEIVECI
its ale required g, mechanical, eru[ I g ?fi{]q
75 S. Frontage Rd.
Vail, Colorado 81657 AAeB fultnt^o-r*
CONTRACTOR INFORMATION
:l\ia - ck'
Emaif address: Cil(
COMPLETE VALUATIONS FOR BUILDING PERMIT (LAbOr & MAIETiAIS
BUILDING: $ ?.OO 01'ELECTRIcAL:$ {00-9 OTHER:$
PLUMBING:$MECHANICAL:$rorAl:s P3,5oo
For Parcel # Contact Assessors Office at 970-328-8640 or visit
kl ol 7sLf flo
Job Addrcss:
J f.tooName:|,/ru',/ /4on"hi fa,//i/ f 5fA
owners nane: l//l L LL C
frin/l/>.
WorkClasf New() Additionl.{ Remodel ( ) Repair( ) Demo( ) Other( )
Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior QQ Exterior ( ) Both ( )
Type of Bldg.: Single{amily ( ) Two-family ( ) Multi-family ( ) Commercial 0Q Reslaurant ( ) Other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
No/Tvoe of Fireolaces Existinq: Gas GasLoqs( ) Wood/Pellet( ) WoodBurn
Gas Loqs ( ) WoodiPellet ( ) Wood Burning (NOT ALLOWED
a Fire Sprinkler System Exist: YesDoes a Fire Alarm Exist: Yes
**l*****************:rt************s*FOR OFFICE USE ONLf*****r.**4********#rri*r.*r.*'H.*:**
Other Fees:
DRB Fees: ,': )t: .:, :.'
Puhlic Wav Permit Fee:Received: A7-!1'O
07n6r2002\WAiI\dAtA\CdEV\FORMS\PERMITS\BLDGPERM, DOC
ll
-,r^,ffi
Questions? Call the Building Team at 479-2325
Department of Community Deyelopment
Project Name:
Project Address:
This Checklist murt be ompleted before a Building Permit aooliation is
All pages of application is complete
U&tr Has DRB approval obtained (if required) Provide a copy of approval form
o Condominium Association letter of approval attached if project is a Multi-Family complex
Nko ComPlete site Plan submitted
Itlbo Public Way Permit application included if applicable (refer to Public Works checklist)
Nilro Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaoe
allowed on roadwavs and shoulders without written approval
Nko Asbestos test and results submitted if demolition is occurring
pKb ,Architect stamp and signature (All Commercial and Multi family)
tf futt floor plans including building sections and elevations(S sets of plans for MulU-Family and
Commercial Buildings)
ill,b window and door schedule
1lO Full structural plans, including design criteria (i.e.loads)
illsa Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
f\Jlto soils Report must be submitted prior to footing inspection
{fi, " resistive assemblies specifi ed and penetrations ind icated
tlt<a
llr
Smoke detectors shown on plans
Types and quantity of fireplaces shorun
Applicant,s Signature:
Date of submittal:
\\VaiMatabdev\FORMS\PERM ITS\BLDGPERM.DOC
Received By:
duh|
ut02r2003
MWNOF
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Depaftment, the estimated time for a total review will take as long as three (3)
week.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name:
Date:
F: everyone/forms/bldperm3
HOW DID WE RATE WITH YOU?
Town of VailSurvey
Community Development Departnent Russell Fonest, Director,
(970)479-213s
Check allthat applies.
1. Which Deparfinent(s) did you conhct?
Building _ Environrcnhl_ Housing_ AdminPlanning DRB _ PEC _
2. Was your initid contacl wilh our staff immediate
no one available
lf you were required to wait, how long was it bebre you were
helped?
4.Was your project revieiled on a timely basis? Yes / No
lf no, why no?,
Was fiis your first lime to fle a DRB app_ PEC app
Bldg Permit_ l,l/A
Please rate the performance of he sffiperson who assisted you:54321Name:
(knowledge; responsiveness, availability)
Overall efiectiveness of he Front Service Counter. 5 4 3 2
What is the best time of day for you to use fie Front Service
Counter?
9. Any comments you have which would allow us to beter serve you
nexttime?
Thank you for taking the lime to complete this survey. We are
commited b improving our seMce.
slow or
-f
e
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE REAB AND CHECK OFF EACH OF THE FOLLOMNG QUESTIONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT":
\\o Is this a new residence? YES_ NO_N_
o Does demolition work being performed require thqf\e of the Right-of-Way, easements or
public propefi? YES_ NO / \
v.,o Is any utility work needed? YES_ NO__-NL
o Is the driveway being repaved? YES- NO,N-\^o Is a different access needed to the site other than the existing driveway? YES- NO.IN-
o Is any drainage wq\being done that affects the Right-of-Way, easements, or public property?Is any drainage wq\YES NO \J
LJ
o
Is a "Revocable Right-of-Way Permit" required?YES NOA-
Is the Right
YES
-of-Way.pgsements or public property to be used for staging, parking or fencing?
NO___N_
If answer is NO, is a parking, staging or fencing plan required by Public Works?
YES
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUEfiONS.
Job or Project Name:
Date Signed:
'oJ+
Contract6r Signature
F :/everyone/forms/bldperm4
Company Name
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT
PW*IT T'I I T N
Parcer#:I f I I - I n [ - X I - n I !
1s- Btds.Permit#:E In'I I f, I
1.Job Namo Street Address n n n-[-l (tlunknowncallt-J Lr t-r Lr 479.213€ exl.o)2.Excavating Conlraclor Nams Maillng Addrss TOV Contraclor's Licgnse Numb6r REOUIREO
()
zipCity Phone #
3.
4.
Stan Date
Work is for (circle one)
Compl€tlon Date
Water Sewer Gas Electric
(Psmit Explration Dat€)
Telephone CATV Landscaping Temp. Site Access
Other
c.Trench-width
(min.4)
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces undernealh the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphaft.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
TotalSF $
ToralLF $
Permit Fee Total Permit Fee $
Public Service Natural Gas Group (1-800-922-19871
Public Service Company (1
U.S. West (1-800-922-1 987)
9.
10.
11.
12.
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970.476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970'479-2198)
THERE wlLL BE No rorAL STREET cLosuREsl A construction traffic control plan must be approved by the
Public Works Department prior to issuance ol the permit.
All excavation must be done by hand within 18" of utilities - (Senate Bill 172).
Permittee must contact Public Works Department et 479-2198 24 hours prior to commencino of work. Failure to notify
the Town will result in forfeiture of bond money. Scheduled inspections which are not reafly may result in the Town
ctiargiig the contractor a reinspection fee.
I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities hav€ been notified as required.
Contrac,tor's Signature ol Agreement
ATTACH PLAN OF WORK, INCLUDING CONSTBUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT'
Prlnt name clearly Date of signatire
Whil€ - Public Works
Y€llow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Apolication.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being peformed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the tralfic control plan or a site plan for the job.
Submit completed application to the Public Workt office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
) NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.17=
Signatwe/
F:/et/eryone/forms/bldperm5
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
tr The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Depaftment will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Depaftment for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Depaftment will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occuoancv issuance.
Agreed to by:
Print Name
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
Signature
MATERIAL STORAGE AND CONSTRUCTION PARKING
PIease read and check off each of the atems below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
D Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocK, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
tr Notice; Abatement: The Director of Public Works may notiff and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works, In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Work, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-l AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord, 28(1981) 5 1)
I have read and wif f comply with the above codeprov iri"*t CA0il--U:9-h!.-
Position or Relationship to Project:
F:/evervone/forms/bldoernrT
Vail 2004
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and Lionshead Village are invaluable assets to the communig. Thousands of people
come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has t6 otfer.
The community and merchants rely upon our guest to generate revenue. Our summer/vyinter guests
expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on ourguest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the the Merchants, to not
actively participate to minimize the impact of
New for 2004-2006 will be the Vail Village
)lillage areas.
utility related improvements,
All Construction projects and/or Scott
Bluhm Town of Vail Streetscape
Givens
The following givens are intended to construction
in the Villages:
The public's health, safety and
Adequate pedestrian, load
be maintained.
the Vail
, refer to
The hours of Outside Construction Activity shall be as follows:
- April 15-June 18 &SeptemberT-November19,7a.m. until 7 p.m., seven daysaweek.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 15, 2005 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 1 1:30 a.m. on Gore Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge Street.
- Special Construction delivery permits must be requested in advance, from Public Woks in
conJunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 19 and
September 5.
all
3418 for
- No outside construction activity shall occur on the following dates:
Saturday, February 14, Sunday, February 15, and Monday, February 16.
(President's Weekend)
Saturday, May 22, Sunday, May 23 and Monday, May 24 (|V|em9!!4lDgyl
Friday, June 25, Saturday, June 26 and Sunday, June 27. (Vail Arts Festival)
Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July 5.(llCessblse jsl
Saturday, September 4 , Sunday, September 5 , and Monday, September 6.
{Labor Dav Weekend).
Friday, September 10, Saturday, September 1'1, Sunday, September 12 in (Lionshead)
Saturday, September 18 and Sunday, September 19. at (Vail Viltaqe) - (October Fest)
1 9.
'to
'''.'...(:ir,,
to obtain bh Approved Construction-Staqinq Plan from the
Village
Step 2. (Wriften warning),
resolvgd);
r Full and complete cooperation and understanding from all parties involved in the construction activity
in regards to this plan.
. Strict adherence and compliance with the requirements outlined in the construction plan.
o Resoect and consideration for the affected interests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction Inspector) or the Vail Police Department (Code Enforcement Officer)
970479-2198 970-476-7603
TOWN OFVAIL
Vail 2004 Staging / Parking Plan Information
The Stasine / Parkine Plan Philosophy- Is a very important step in the building
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build,
The General Contractor is responsible for all subcontractors and all construction
activitv relatins to the buildine proiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a surnmer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. NSteJ!9I9j!_U9_A!
street parking in the winter season and all materials. equipment. etc must be l0' off the
edse ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written wamings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Department issue tickets and tows or public works writes second
written waming to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Tas will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction lnspector at
970-479-2198
Requirements for an Acceptable Staging Plan
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and i or vegetation is required to be protected, then show how this will be
done.
(f) If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
O) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Trafhc Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
@) Traffic Control Devices (warning, signs, cones, flaggers, etc,)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout.
rl
.$
lq
fi
[iI..
t
EXTERIOR
}MAD
BASE
INTERIOR
FLOOR/CEILING OR
ROOF/CEILING ASSEMBLY
SEALANTTY?ICAL
STEEL STUD.ALLOW FOR DEFLECTION
TOPRUNNER
5/S"TYPEXGWBt.
f
i
il
Ii.
I' TYPE S SCREW @ 8" O.C. - PANEL EDGES
1" TYPE S SCREW @ 12'O.C. - PANEL FIELD
BATIINSULATION
22 GAUGE METAL STUDS @ 24" O.C. TilIDTH VARTES
REFERENCEPLAN
2-U2" WIDE - 22 GAUGE METAL STUDS @ 24'O.C.iO'-O'MAXIMUM HEIGHT
5/8" TYPE X GIffBl" TYpE S SCREW @ 8'O.C. -pAltEL EDGES
l" TyPE S SCRETy@ t2'O.C. -PANELruTD
%" AIRSPACE
RESTLTENT CHANNEL @ 24" O.C. ATTACHED
TO EACH STUD WI Y2" S-12 STEEL SCREWS
BOTIOMRI]NNER
SEALAJ.IT TYPICAI
FLOOROR
FLOOR/CEILING ASSEMBLY
NEW OR EXISTING METAL STUD WALL
PLAN
I HOURRATING
u.L. DES U4l9 0R451
sTc 56+
NOTE: SUBSTITUTE TWE X
GLASS MAT }VATER RESISTA}.IT
BACKING BOARD AT SHOWER
AND TUB TILE LOCATIONS
NOTE: SIJBSTITUTE TYTEX
WATER RESISTANT BACKING
BOARD AT ALL OTTIERTILE
LOCATIONS
PROJECT NAME:
VAIL MOUNTAIN LODGE
VAIL, COLORADO
DRAVING TITLE:
INTERIOR WALL ASSEMBLY P6
PROTECTNOT 20(nl50l.OO DRA}VN BY: DDR
CHECKTD BYr Tr
tsslrE: E
SHEET:1 .n(
b?ts r
7:
^. .:' ,i,';i
5 E€fiEtr-t{;ttt.=a r .rlrll!:tclrrr-t,aa v
"!!
1
"1,1,, I Ie- -d l-;-
tii
ll t
M\lc-,f-
l'l IG- -l+ - L-|!"j'iiiiltili;llile- -f--_+l_ _,_/ilill lr, l@-l---F:--=-T-
?E
>:^
A(J
r-ll<lrl
7,Zl
< ,P I
(JI
frr IEr
Xr
Fli
U
zz,<DlhrR IF.i qt I
-{J -d- -ITI I
al___ _n_
T
I
3O
.rTl--.H
rr-l
c.)
l]l
-l
Dl
---1.l_
r_ _QI
qtvffv
)
lhavnt
,tg<€-
-e+5-+ 41/
T-FgE
dt(3
F$
ffinFge*l ' j:,
tr-E(s g
d
;giEE}EE;dEbe;.HE+qsg;B::- R ::.i;+iHE:!:
R;tsi;4rE;EEAo_ __l_
I
I
i/<l-
I
I
1
rErDlaFd--ic)
,Fo' t-tzI rFt<xI rr'l-
I c.lllI<
I
I
I--_-+
I
I
I--s-
-r
I
Ij
I-i--{- it-- | ___t
I: l:l
I
i-*;l<trltr
i