Loading...
HomeMy WebLinkAbout15-6565 - West Wing Foundation Summary 160203 February 3rd, 2016 Subject: Summary of Materials Testing Services -Special Inspection Services – West Wing Addition Foundation, Vail Valley Medical Center – Phase 1, Vail, Colorado Ground Engineering Job Number: 15-6565 Mr. Chris Knight Project One Integrated Services, LLC 88 Inverness Drive East, Building G, Suite 101 Englewood, CO 80112 Attn: Mr. Knight, This letter summarizes the special inspection and materials testing services GROUND Engineering Consultants, Inc. (GROUND) performed during construction of the foundation elements for the West Wing Addition for the Vail Valley Medical Center – Phase 1. The special inspection and materials testing services were performed at times scheduled by the Contractor and/or Subcontractors between September 29th, 2015 and December 31st, 2015. During construction, representatives of our office were present on a part time basis to periodically observe the open-hole excavations and structural fills placed to date for foundation elements. Representatives of our office periodically observed reinforcing steel placement, drilled and epoxied reinforcing steel and performed periodic testing on the structural concrete placed for the foundation, foundation walls and other structural elements. Samples of the structural concrete were periodically tested to determine physical properties and compressive strength. Based on the field observations to date, RFI’s received and/or project documentation received from the design team, it is our opinion that the materials observed for the structural soils and reinforced concrete were in general accordance with project plans, specifications, and/or applicable RFI’s at the time of observation and/or testing. The observations and materials testing as indicated above were performed periodically to provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the materials and/or work with the contract documents at the times of our observation and testing. We did not supervise, direct nor have any control over any of the Contractor’s or Subcontractor’s work. We were not responsible for the Contractor’s or Subcontractor’s scheduling of our services, means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or completed the work in accordance with the contract documents or construction industry standards. If you have any questions concerning this letter, please contact our office. Sincerely, GROUND Engineering Consultants, Inc. Chris Hutto, C.E.T. Reviewed by Carl Henderson, P.E.