Loading...
HomeMy WebLinkAboutA131A.1A2 2 3 3 4 G G H J K G.4 2.4 2.7 1 A131A.1A 2'-10" HARDIE BOARD SLAT EXTERIOR CEILING ABOVE DRAIN LEADER DOWNSPOUT LOCATION WITHIN MTL ENCLOSURE DRAIN LEADER DOWNSPOUT LOCATION WITHIN MTL ENCLOSURE FACE OF EXTERIOR WALL ABOVE VESTIBULE BELOW ELEVATOR CORE GLASS DEFINING WALK PATH (GLOW) AND TO LET LIGHT BACK DEEPER CENTERLINE OF VESTIBULE CONT. GUTTER CURB FLOW LINE GLASS CANOPY EDGE MTL PANEL FACE OF EXTERIOR WALL AT LEVEL 1 MTL PANELS OF CANOPY END @ TANGENT OF COLUMN ENCLOSURE VALET PARKING FOR 4 VEHICLES MTL PANEL CURB FLOW LINE FACE OF EXTERIOR WALL AT LEVEL 1 1.5 2'-1" 2'-1" 4'-2" 4'-2" 4'-2" 4'-2" 4'-2" 4'-2" 4'-2" 4'-2" 2'-1" 2'-1" 3'-0" 47'-8" A131A.1A 5 A004.1AA004.1A A004.1A 46 16'-0" 25'-0" 9'-8" 13'-3" 4'-6" 20'-6" 4'-6" 4'-11" 9 1/4"1'-5 3/4" 9 1/4"1'-5 3/4" 11'-11 1/32" 1 A222A.1A dup 7'-0" 14'-5 11/32" G1 A004.1A 43 45 4'-0" A004.1A 44 47 LEVEL 1 100' - 0" 2 3 CONC. BASE CORTEN STL. CONT. GUTTER STONE COLUMN ROLLED CURB @ DROP OFF AREA 2 1/2" / 1'-0" 9'-3 1/2" 4'-0" 8'-4" 4'-0" A131A.1A 4 A131A.1A 3 BITUMINOUS EXP. JT. MATERIAL A131A.1A 2 CANOPY SPAR END PLATE A131A.1A 6 14' - 0" T.O.S. 14' - 11 1/2" T.O.S. 18° STEEL CANOPY SUPPORT SPAR 7° 1'-4" 1'-4" TO B.O. CURB 5'-0" 1'-6" CLR. 7'-0" 1'-6" 13'-3 1/2" 12'-4" 7'-10 1/4" 14'-6" 3'-0" 1" / 1'-0" GUTTER 2 3 2 3 LEVEL 01 0" LEVEL 02 14' - 0" SITE -1' - 6" LEVEL 2A(1978) 10' - 6" LEVEL 3A(1978) 21' - 0" ENCLOSED SERVICE YARD FF -4' - 0" 2.9 2.4 2.7 7'-3 1/8" 6" CONC. BASE 2.7 CONCRETE COLUMN BASE 1" CHAMFER TYP. @ ALL SIDES 1" REVEAL WEATHERED METAL PANEL COLUMN COVER 1'-4" 1'-6" 4' - 0" T.O.C. EL = 2.7 WEATHERED METAL PANEL COLUMN COVER STEEL CANOPY SUPPORT SPAR. PAINT. HSS 16X8 STEEL BEAM. WELD AND GRIND SMOOTH END PLATE @ BOTH ENDS. RE: STRUCT. PAINT. METAL PANEL ASSEMBLY GLASS PANEL ASSEMBLY PREFINISHED METAL GUTTER. COLOR TO MATCH ADJACENT STEEL 1111' - 0" T.O.S. EL = METAL DRAIN LEADER DOWNSPOUT METAL FLASHING GLASS PANEL ASSEMBLY METAL PANEL ASSEMBLY METAL CANOPY SUPPORT SPAR. PAINT. 2.4 METAL PANEL ASSEMBLY 13/16" GLASS PANEL ASSEMBLY STEEL CANOPY SUPPORT SPAR. PAINT 2 1/2" 1" 2 1/2" 6" GLASS PANEL ASSEMBLY METAL PANEL ASSEMBLY STEEL KNIFE PLATE STIFFENER BELOW 000 2' 4' 8' SCALE: N This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number 1/4" = 1'-0" Heery International 555 17th Street, Suite 500 Denver, CO 80202 720.946.0276 OWNER'S PROJECT NUMBER 7/19/2015 6:04:49 PM A131A.1A Checker Author ENLARGED PLANS & SECTIONS- VESTIBULE CANOPY MAY 28, 2015 CONSTRUCTION DOCUMENTS VAIL VALLEY MEDICAL CENTER PHASE 1 - WEST WING 181 WEST MEADOW DRIVE VAIL, CO HII-1302604 INTERIOR DESIGN: Gallun Snow 1920 Market Street, Suite 240, Denver, CO 80202 720.407.6002 MECHANICAL, ELECTRICAL,PLUMBING, LOW VOLTAGE: Cator Ruma & Associates,Co. 896 Tabor Street, Lakewood, CO 80401-4700 303.232.6200 CIVIL: Martin/Martin 225 Main Street, Unit C101, Edwards, CO 81632 970.926.6007 LANDSCAPE: Lime Green Design, Inc. 900 East Louisiana Avenue, Suite 209, Denver, CO 80210 303.733.7558 STRUCTURAL: Structural Consultants Inc. 3400 East Bayaud Avenue, Suite 300, Denver, CO 80209 303.399.5154 1/4" = 1'-0" 8 ENLARGED CANOPY PLAN - ZONE A - C&S 1/4" = 1'-0" 1 CANOPY NORTH SECTION 7 CANOPY AXO 1 1/2" = 1'-0" 4 CANOPY COLUMN @ BASE 1 1/2" = 1'-0" 3 CANOPY COLUMN @ BEAM 1 1/2" = 1'-0" 2 DETAIL @ CANOPY SPAR END 1 1/2" = 1'-0" 6 STEEL BEAM @ CANOPY 1 1/2" = 1'-0" 5 PLAN DETAIL @ CANOPY SPAR END 2 ADDENDUM # 2 07.16.2015 2 6-2-2015 07.16.2015 08/11/15