No preview available
HomeMy WebLinkAboutAD102A.1ADN DN UP UPUP DN F.E.C. (E) F.V.C. (E) F.V.C. (E) F.V.C. (E) F.E. (E) UP 1 2 3 4 5 6 7 8 F E D C B G H J K A B A B MATCHLINE MATCHLINE A 2 20 2 1 18 1 9 9 9 9 12'-5" 1.5 F.4 2'-4 1/2" G1 12 37 36 G.5 39 39 218 219 38 39 37 G.7 3'-1 1/4" 3'-0 1/4" 1'-5 1/2" 27 A612.1A 20 43 26 MODIFY, REPLACE, REPAIR TO TIE IN EXISTING CEILING GRID AND TILE, MATCH EXISTING 39 PREP OPENING FOR NEW DOOR 39 44 33 GENERAL DEMOLITION NOTES: LEGEND: = EXISITING TO REMAIN = TO BE REMOVED 1. DASHED LINES INDICATE ITEMS TO BE REMOVED. DEMOLITION OF WALLS INCLUDES ALL DOORS, WINDOWS AND OTHER ITEMS LOCATED WITHIN THE WALL TO BE REMOVED UNLESS NOTED OTHERWISE. RE: STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL FOR EXISTING UTILITIES 2. FADED LINES INDICATE ITEMS TO REMAIN. 3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION RELATED CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION. 4. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY SUCH SERVICES. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH OWNER. 5. ALL FURNISHINGS AND MOVABLE EQUIPMENT IN DEMOLITION/CONSTRUCTION AREA SHALL BE REMOVED/RELOCATED BY OWNER PRIOR TO START OF DEMOLITION. 6. PATCH CORRIDOR WALLS AND RAILINGS TO MATCH EXISTING ADJACENT CONSTRUCTION, PATCH ALL EXISTING WALLS, CEILINGS AND FLOOR TO REMAIN AFTER DEMOLITION IS COMPLETE. COORDINATE EXTENT OF SELECTIVE DEMOLITION WITH PROJECT SEQUENCING PLANS AND WITH OTHER TRADES. PATCH WALL BOXES AND OTHER WALL/CEILING OPENINGS WHEREVER FIXTURES/OUTLETS ARE BEING REMOVED AND WALLS ARE TO REMAIN. 7. PROVIDE METAL STUD AND GYPSUM BOARD DUST/PRIVACY ENCLOSURES FOR DEMOLITION WORK TO MAINTAIN SEPARATION OF CONSTRUCTION AND IN-USE SPACES. 8. REVIEW DEMOLITION AND PENETRATIONS THROUGH EXISTING STRUCTURE WITH ORIGINAL DESIGN STRUCTURAL DRAWINGS WHERE POTENTIAL OF ENCOUNTERING LOADED/STRUCTURAL BEAMS/JOISTS/COLUMNS EXIST. 9. CORE-DRILL EXISTING FLOOR AND/OR ROOF AS REQUIRED FOR NEW PLUMBING OR ELECTRICAL SYSTEMS. SAWCUT FLOOR SLABS TO SLAB DEPTH ONLY, TO PREVENT DAMAGE TO UNDER SLAB UTILITIES. COORDINATE WITH STRUCTURAL. 10. CONTRACTOR TO COORDINATE I.C.R.A. (INFECTION CONTROL RISK ASSESSMENT) PLAN WITH OWNER PRIOR TO COMMENCEMENT OF EACH PHASE/SUB-PHASE. 11. DEMOLITION WORK SHALL NOT REDUCE INTEGRITY OF STRUCTURE TO REMAIN NOR OF FIRE-PROOFING/SEPARATION. MAINTAIN STRUCTURAL AND LIFE SAFETY INTEGRITY IN AREAS OF WORK AT ALL TIMES. PER EACH PHASE/ SUBPHASE. 12. VERIFY ALL ELECTRICAL AND PLUMBING REQUIREMENTS PRIOR TO REMOVING ANY EQUIPMENT. 13. PROVIDE SIGNAGE FOR TEMPORARY CIRCULATION AND EGRESS PATHS DURING DEMOLITION AND CONSTRUCTION. 14. REFER TO MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS FOR OTHER DEMOLITION WORK AND WORK TO REMAIN IN PLACE, REQUIRED FOR EACH CONSTRUCTION SEQUENCE. 15. NOTIFY OWNER AND ARCHITECT IMMEDIATELY IF HAZARDOUS MATERIALS ARE ENCOUNTERED. ASBESTOS ABATEMENT (OR REMOVAL) TO BE PROVIDED BY OWNER UNDER SEPARATE CONTRACT. COORDINATE WITH GENERAL CONTRACTOR FOR TIMING OF DEMOLITION IN RELATION TO ABATEMENT WORK AT EACH CONSTRUCTION SEQUENCE AREA. 16. PATCH UNDER SLAB SYSTEMS AND FLOOR SLABS TO MATCH ADJACENT CONSTRUCTION AFTER THE UNDER FLOOR PLUMBING WORK IS COMPLETED AND INSPECTED. REFER TO PLUMBING DOCUMENTS. 17. NOTE THAT SOME SYSTEMS WILL REQUIRE WORK BEYOND CONSTRUCTION SEQUENCE ZONES IN ORDER TO SUPPORT SPACES WITHIN EACH CONSTRUCTION SEQUENCE. COORDINATE THIS WORK WITH GENERAL CONTRACTOR AND OWNER PRIOR TO STARTING WORK OUTSIDE OF CONSTRUCTION SEQUENCE AREA. COORDINATE DEMOLITION/ CONSTRUCTION WORK HOURS, CONSTRUCTION SEQUENCE AND CONSTRUCTION ACCESS WITH OWNER TO MINIMIZE DISRUPTION OF NORMAL DAILY FUNCTION OF OWNER OCCUPIED AREAS. 18. NOTIFY OWNER AND ARCHITECT IF UNDER SLAB TEMPORARY DEWATERING IS REQUIRED. 19. REVIEW DEMOLITION DOCUMENTS WITH OWNER TO VERIFY ANY ITEMS TO BE SALVAGED AND TURNED OVER TO THE OWNER. 20. NOISE DURING DEMOLITION TO BE KEPT TO A MINIMUM. COORDINATE WITH OWNER 72 HOURS PRIOR TO COMMENCEMENT OF PARTICULARLY NOISY WORK SUCH AS CORE-DRILLING. 21. CONTRACTOR TO PROVIDE M.O.P. (METHOD OF PROCEDURE) PRIOR TO COMMENCE- MENT OF WORK IN ANY PHASE/SUB-PHASE WHICH AFFECTS HOSPITAL OPERATIONS. M.O.P.'S TO BE APPROVED BY OWNER AT LEAST 72 HOURS PRIOR TO START OF WORK. 22. REFER TO SHEET G120.1A - G125.1A FOR SEQUENCING OF WORK, INCLUDING DEMOLITION. 23. REFERENCE STRUCTURAL FOR ALL STRUCTURAL ELEMENTS DEMOLITION INCLUDING BUT NOT LIMITED TO FOUNDATIONS, BEAMS, COLUMNS, AND FLOOR PENETRATIONS. 24. REFERENCE MEP FOR ALL MEP DEMOLITION. 25. REMOVE AND SALVAGE BRICK FOR REUSE AS REQUIRED FOR NEW WORK. 26. CONTRACTERS AND SUB-CONTRACTORS MUST VISIT THE SITE & BUILDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTING BIDS. 27. REMOVE PORTIONS OF WALLS, FLOORS, AND CEILINGS AS REQUIRED FOR INSTALLATION OF MEP & IT SYSTEMS TO LEVEL ABOVE 28. REFERENCE REFLECTED CEILING PLANS FOR EXISTING CEILINGS TO REMAIN. EXCEPTION IS NOTE 27. 29. REMOVE PORTIONS OF EXISTING FLOOR, BASE, AND CEILING, AND PREP AS REQUIRED TO PREPARE FOR NEW SCOPE OF WORK AS DESCRIBED IN RCP, FINSIH PLANS AND FINISH SCHEDULE A B C D E 000 4' 8' 16' SCALE: N This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number 1/8" = 1'-0" Heery International 555 17th Street, Suite 500 Denver, CO 80202 720.946.0276 OWNER'S PROJECT NUMBER TOV: C&S PRJ14-0157 B15-0185 (ADD#5) TI PRJ14-0157 B15-0461 E15-0043 (ADD#6) DFPC: C&S 9667 (ADD#5) TI TBD 5/24/2016 3:43:31 PM AD102A.1A Checker Author DEMOLITION FLOOR PLAN - LEVEL TWO - ZONE A 02/06/2016 CONSTRUCTION DOCUMENTS VAIL VALLEY MEDICAL CENTER PHASE 1 - WEST WING 181 WEST MEADOW DRIVE VAIL, CO HII-1302604 INTERIOR DESIGN: Gallun Snow 1920 Market Street, Suite 240, Denver, CO 80202 720.407.6002 MECHANICAL, ELECTRICAL,PLUMBING, LOW VOLTAGE: Cator Ruma & Associates,Co. 896 Tabor Street, Lakewood, CO 80401-4700 303.232.6200 CIVIL: Martin/Martin 225 Main Street, Unit C101, Edwards, CO 81632 970.926.6007 LANDSCAPE: Lime Green Design, Inc. 900 East Louisiana Avenue, Suite 209, Denver, CO 80210 303.733.7558 STRUCTURAL: Structural Consultants Inc. 3400 East Bayaud Avenue, Suite 300, Denver, CO 80209 303.399.5154 1/8" = 1'-0" 1 DEMOLITION PLAN - LEVEL TWO - ZONE A N.T.S KEY PLAN DEMOLITION NOTES 1 REMOVE AND SALVAGE BRICK VENEER FOR REUSE .REFERENCE EXTERIOR ELEVATIONS FOR EXTENT OF SALVAGED BRICK TO BE USED. REMOVE BALANCE OF ASSEMBLY, INCLUDING ANCHORS, TO CONCRETE STRUCTURE OR METAL STUDS. AT METAL STUDS. REMOVE ANY BATT OR OTHER INSULATION BETWEEN STUDS. 2 REMOVE CURTAIN WALL ASSEMBLY INCLUDING ANCHORS. 3 EXISTING BRICK TO REMAIN 4 REMOVE DOOR, FRAME, AND ANCHORS 5 REMOVE BRICK AND CONCRETE BLOCK PARAPET ASSEMBLY IN ITS ENTIRETY TO THE ROOF DECK, CONCRETE OR METAL 6 REMOVE ROOF ASSEMBLY IN ITS ENTIRETY TO ROOF DECK, CONCRETE OR METAL 7 REMOVE CONCRETE WALLS, CURB AND GATE 8 SALVAGE SIGNAGE (LETTERS) AND HAND OVER TO OWNER 9 REMOVE ALL OF ENVELOPE CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, BRICK VENEER, SOFFITS, STOREFRONT SYSTEM, METAL PANELS, METAL STUDS, ANCHORS, FURRING, AND INTERIOR FINISHES TO CONCRETE COLUMNS AND CONCRETE BEAMS 10 REMOVE HANDRAIL/GUARDRAIL 11 REMOVE ALL EQUIPMENT PADS; RE: MECH 12 REMOVE STOREFRONT SYSTEM AND METAL PANEL ASSEMBLY INCLUDING ANCHORS, SHEATHING, METAL STUDS, BATT INSULATION, AND INTERIOR FINISHES 13 REMOVE ALL FURRING AND FINISHES AT COLUMNS AND WALLS TO REMAIN, TYPICAL CONCRETE 14 DEMOLITION OF FOUNDATIONS THIS AREA; RE: STRUCT. 15 DEMOLITION OF LOUVERS AND SHUTTERS THIS AREA; RE: MECH. 16 REMOVE STAIRS AND LANDING 17 DEMOLISH SLAB AND WALL AS REQUIRED FOR EXISTING SEWER REPAIR AND NEW WATER ENTRY; RE: PLUMB. 18 REMOVE WALL ASSEMBLY IN ITS ENTIRETY FOR NEW STOREFRONT OPENING 19 REMOVE WALL IN ITS ENTIRETY; RE: STRUCT. 20 REMOVE PORTION OF CONCRETE BEAM BELOW; RE: STRUCT. 21 REMOVE CANOPY IN ITS ENTIRETY, EXCEPT COLUMN G4 (V.I.F.); RE: STRUCT. AND MEP 22 EXISTING TO REMAIN 23 REMOVE ALL PARTITIONS AND INTERIOR FINISHES 24 REMOVE WALL AND ROOF ASSEMBLIES, AND STRUCTURE; RE: STRUCT. 25 REMOVE BRICK AND STOREFRONT ASSEMBLIES, INCLUDING ANCHORS. EXISTING SHEATHING AND METAL STUDS TO REMAIN. 26 REMOVE PRECAST CONCRETE PLANKS OVER STAIRWELLS. 27 REMOVE WALL AS REQUIRED FOR NEW OPENING. 28 REMOVE EXISTING ELEVATOR PENTHOUSE. 29 REMOVE ROOF HATCH. 30 REMOVE CONCRETE WALL TO LOWER LEVEL AS REQUIRED FOR NEW DOOR AND FRAME. MAINTAIN 3'- 4" ROUGH OPENING 31 REMOVE AND SALVAGE AUTOMATIC ENTRANCE DOORS. HAND OVER TO OWNER TO RELOCATE (AS PART OF THE TEMPORARY ENTERANCE PROJECT). 32 REMOVE CYRO QUENCH VENT 33 REMOVE LANDSCAPING 34 REMOVE CONCRETE WALL APPROX 4'-0" AS REQUIRED BELOW EXISTING OPENING FOR NEW DOOR AT BASEMENT FLOOR LEVEL 35 REMOVE EDGE OF ROOF SLAB AND PORTION ALL LANDINGS AS REQUIRED FOR NEW STAIR 36 REMOVE AND RELOCATE SINK AND ACCESSORIES AS REQUIRED FOR SISTER COLUMN INSTALLATION 37 REMOVE PARTITION AND/OR FINISHED WALL TO ALLOW FOR NEW STRUCTURAL INSTALL. 38 REMOVE BORROWED LITE. 39 REMOVE DOORS, FRAME, AND HARDWARE, BULKHEAD EXISTING TO REMAIN, PATCH & REPAIR WALL AS REQUIRED. 41 EXISTING CASEWORK TO REMAIN 42 REMOVE PORTION OF EXISTING CMU WALL AS REQUIRED TO ALLOW FOR COIL PULL SPACE AT AIR HANDLING UNIT. VERIFY EXACT SIZE AND LOCATION WITH AIR HANDLING UNIT MANUFACTURER. PROVIDE STEEL ANGLE LINTEL AS REQUIRED AT HEAD OF OPENING. 43 VERIFY CURTAIN TRACK TO MATCH NEW LAYOUT. 44 REMOVE UPPER PORTION OF WALL DOWN TO SILL HEIGHT (MATCH ADJACENT SILL HEIGHT) PATCH AND REPAIR REMAINING WALL TO ALLOW FOR INSTALLATION OF SOLID SURFACE SILL. 2 ADD #2 07.16.2015 5 ADD #5 TOV, DFPC 10.20.2015 6 ADD #6 TOV, DFPC 11.16.2015 26 ASI #19 02.26.2016 33 ASI #24 05.20.2016 33 01/04/17