No preview available
HomeMy WebLinkAboutAD104B.1A8 F E D C B G H 2e1978 6e1978 7E1978 9E1978 12E1978 13E1978 14E1978 17E1978 18E1978 19E1978 21E1978 De2001 Fe2001 He2001 Je2001 Ee2001 Ge2001 B.3E B.8E C.E D.E E.E C.2E A B MATCHLINE A B MATCHLINE Aa.1 F.4 GENERAL DEMOLITION NOTES: LEGEND: WALLS/ITEMS TO BE REMOVED ROOF DRAINS TO BE REMOVED, COORDINATE EXTENT OF REMOVAL AND REUSE W/ MECHANICAL DRAWINGS EQUIPMENT AND DUCTWORK TO BE REMOVED/RELOCATED COORDINATE WITH MECHANICAL DRAWINGS ROOF STEP STONES 1. DASHED LINES INDICATE ITEMS TO BE REMOVED. DEMOLITION OF WALLS INCLUDES ALL DOORS, WINDOWS AND OTHER ITEMS LOCATED WITHIN THE WALL TO BE REMOVED UNLESS NOTED OTHERWISE. RE: STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL FOR EXISTING UTILITIES 2. FADED LINES INDICATE ITEMS TO REMAIN. 3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION RELATED CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION. 4. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY SUCH SERVICES. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH OWNER. 5. ALL FURNISHINGS AND MOVABLE EQUIPMENT IN DEMOLITION/CONSTRUCTION AREA SHALL BE REMOVED/RELOCATED BY OWNER PRIOR TO START OF DEMOLITION. 6. PATCH CORRIDOR WALLS AND RAILINGS TO MATCH EXISTING ADJACENT CONSTRUCTION, PATCH ALL EXISTING WALLS, CEILINGS AND FLOOR TO REMAIN AFTER DEMOLITION IS COMPLETE. COORDINATE EXTENT OF SELECTIVE DEMOLITION WITH PROJECT SEQUENCING PLANS AND WITH OTHER TRADES. PATCH WALL BOXES AND OTHER WALL/CEILING OPENINGS WHEREVER FIXTURES/OUTLETS ARE BEING REMOVED AND WALLS ARE TO REMAIN. 7. PROVIDE METAL STUD AND GYPSUM BOARD DUST/PRIVACY ENCLOSURES FOR DEMOLITION WORK TO MAINTAIN SEPARATION OF CONSTRUCTION AND IN-USE SPACES. REFER TO SHEET G002 FOR ADDITIONAL INFORMATION. 8. REVIEW DEMOLITION AND PENETRATIONS THROUGH EXISTING STRUCTURE WITH AS-BUILT STRUCTURAL DRAWINGS WHERE POTENTIAL OF ENCOUNTERING LOADED/STRUCTURAL BEAMS/JOISTS/COLUMNS EXIST. 9. CORE-DRILL EXISTING FLOOR AND/OR ROOF AS REQUIRED FOR NEW PLUMBING OR ELECTRICAL SYSTEMS. SAWCUT FLOOR SLABS TO SLAB DEPTH ONLY, TO PREVENT DAMAGE TO UNDER SLAB UTILITIES. 10. CONTRACTOR TO COORDINATE I.C.R.A. (INFECTION CONTROL RISK ASSESSMENT) PLAN WITH OWNER PRIOR TO COMMENCEMENT OF EACH PHASE/SUB-PHASE. 11. DEMOLITION WORK SHALL NOT REDUCE INTEGRITY OF STRUCTURE TO REMAIN NOR OF FIRE- PROOFING/SEPARATION. MAINTAIN STRUCTURAL AND LIFE SAFETY INTEGRITY IN AREAS OF WORK AT ALL TIMES. 12. VERIFY ALL ELECTRICAL AND PLUMBING REQUIREMENTS PRIOR TO REMOVING ANY EQUIPMENT. 13. PROVIDE SIGNAGE FOR TEMPORARY CIRCULATION AND EGRESS PATHS DURING DEMOLITION. 14. REFER TO MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS FOR OTHER DEMOLITION WORK AND WORK TO REMAIN IN PLACE, REQUIRED FOR EACH CONSTRUCTION SEQUENCE. 15. NOTIFY OWNER AND ARCHITECT IMMEDIATELY IF HAZARDOUS MATERIALS ARE ENCOUNTERED. ASBESTOS ABATEMENT (OR REMOVAL) TO BE PROVIDED BY OWNER UNDER SEPARATE CONTRACT. COORDINATE WITH GENERAL CONTRACTOR FOR TIMING OF DEMOLITION IN RELATION TO ABATEMENT TO WORK AT EACH CONSTRUCTION SEQUENCE AREA. 16. PATCH UNDER SLAB SYSTEMS AND FLOOR SLABS TO MATCH ADJACENT CONSTRUCTION AFTER THE UNDER FLOOR PLUMBING WORK IS COMPLETED AND INSPECTED. REFER TO PLUMBING DOCUMENTS. 17. NOTE THAT SOME SYSTEMS WILL REQUIRE WORK BEYOND CONSTRUCTION SEQUENCE ZONES IN ORDER TO SUPPORT SPACES WITHIN EACH CONSTRUCTION SEQUENCE. COORDINATE THIS WORK WITH GENERAL CONTRACTOR AND OWNER PRIOR TO STARTING WORK OUTSIDE OF CONSTRUCTION SEQUENCE AREA. COORDINATE DEMOLITION/ CONSTRUCTION WORK HOURS, CONSTRUCTION SEQUENCE AND CONSTRUCTION ACCESS WITH OWNER TO MINIMIZE DISRUPTION OF NORMAL DAILY FUNCTION OF OWNER OCCUPIED AREAS. 18. NOTIFY OWNER AND ARCHITECT IF UNDER SLAB TEMPORARY DEWATERING IS REQUIRED. 19. REVIEW DEMOLITION DOCUMENTS WITH OWNER TO VERIFY ANY ITEMS TO BE SALVAGED AND TURNED OVER TO THE OWNER. 20. NOISE DURING DEMOLITION TO BE KEPT TO A MINIMUM. COORDINATE WITH OWNER 72 HOURS PRIOR TO COMMENCEMENT OF PARTICULARLY NOISY WORK SUCH AS CORE-DRILLING. 21. CONTRACTOR TO PROVIDE M.O.P. (METHOD OF PROCEDURE) PRIOR TO COMMENCEMENT OF WORK IN ANY PHASE/SUB-PHASE WHICH AFFECTS HOSPITAL OPERATION. M.O.P.'S TO BE APPROVED BY OWNER AT LEAST 72 HOURS PRIOR TO START OF WORK. WALLS /ITEMS TO REMAIN 22. REFER TO SHEET G107.1A - G110.1A FOR SEQUENCING OF WORK, INCLUDING DEMOLITION. MECH ROOF ACCESS HATCH FLUES AND VENTS TO BE REMOVED 23. SALVAGE BRICK FOR REUSE AT NEW AREAS OF BRICK AS REQUIRED BY ELEVATIONS. A B C D E 000 4' 8' 16' SCALE: N This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number 1/8" = 1'-0" Heery International 555 17th Street, Suite 500 Denver, CO 80202 720.946.0276 OWNER'S PROJECT NUMBER 5/28/2015 11:40:39 AM AD104B.1A Checker Author DEMOLITION ROOF PLAN - LEVEL FOUR - ZONE B MAY 28, 2015 CONSTRUCTION DOCUMENTS VAIL VALLEY MEDICAL CENTER PHASE 1 - WEST WING 181 WEST MEADOW DRIVE VAIL, CO HII-1302604 INTERIOR DESIGN: Gallun Snow 1920 Market Street, Suite 240, Denver, CO 80202 720.407.6002 MECHANICAL, ELECTRICAL,PLUMBING, LOW VOLTAGE: Cator Ruma & Associates,Co. 896 Tabor Street, Lakewood, CO 80401-4700 303.232.6200 CIVIL: Martin/Martin 225 Main Street, Unit C101, Edwards, CO 81632 970.926.6007 LANDSCAPE: Lime Green Design, Inc. 900 East Louisiana Avenue, Suite 209, Denver, CO 80210 303.733.7558 STRUCTURAL: Structural Consultants Inc. 3400 East Bayaud Avenue, Suite 300, Denver, CO 80209 303.399.5154 1/8" = 1'-0" 1 DEMOLITION PLAN - ROOF DEMOLITION NOTES 1 REMOVE AND SALVAGE BRICK VENEER. REMOVE BALANCE OF ASSEMBLY, INCLUDING ANCHORS, TO CONCRETE STRUCTURE OR METAL STUDS. AT METAL STUDS. REMOVE ANY BATT OR OTHER INSULATION BETWEEN STUDS. 2 REMOVE CURTAIN WALL ASSEMBLY INCLUDING ANCHORS. 3 EXISTING BRICK TO REMAIN 4 REMOVE DOOR, FRAME, AND ANCHORS 5 REMOVE BRICK AND CONCRETE BLOCK PARAPET ASSEMBLY IN ITS ENTIRETY TO THE ROOF DECK CONCRETE ON METAL 6 REMOVE ROOF ASSEMBLY IN ITS ENTIRETY TO ROOF DECK, CONCRETE ON METAL 7 REMOVE WALLS, CURB AND GATE 8 SALVAGE SIGNAGE (LETTERS) AND HAND OVER TO OWNER 9 REMOVE ALL OVER ENVELOPE CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, BRICK VENEER, SOFFITS, STOREFRONT, METAL PANELS, METAL STUDS, ANCHORS, FURRING, AND INTERIOR FINISHES TO CONCRETE COLUMNS AND CONCRETE BEAMS 10 REMOVE HANDRAIL/GUARDRAIL 11 REMOVE ALL EQUIPMENT PADS 12 REMOVE STOREFRONT AND METAL PANEL ASSEMBLY INCLUDING ANCHORS, SHEATHING, METAL STUDS, BATT INSULATION, AND INTERIOR FINISHES 13 REMOVE ALL FURRING AND FINISHES AT COLUMNS AND WALLS TO REMAIN 14 DEMOLITION OF FOUNDATIONS THIS AREA; RE: STRUCT. 15 DEMOLITION OF LOUVERS AND STRUCTURES THIS AREA; RE: MECH. 16 REMOVE METAL STAIRS 17 DEMOLISH SLAB AND WALL AS REQUIRED FOR EXISTING SEWER REPAIR AND NEW WATER ENTRY; RE: PLUMB. 18 REMOVE WALL ASSEMBLY IN ITS ENTIRETY FOR NEW STOREFRONT OPENING 19 REMOVE WALL IN ITS ENTIRETY; RE: STRUCT. 20 REMOVE PORTION OF CONCRETE BEAM BELOW; RE: STRUCT. 21 REMOVE CANOPY IN ITS ENTIRETY, EXCEPT COLUMN G4; RE: STRUCT. AND MEP 22 EXISTING TO REMAIN 23 REMOVE ALL PARTITIONS AND INTERIOR FINISHES 24 REMOVE WALL, ROOF ASSEMBLY, AND STRUCTURE 25 REMOVE BRICK AND STOREFRONT ASSEMBLIES, INCLUDING ANCHORS. EXISTING SHEATHING AND METAL STUDS TO REMAIN. 26 REMOVE PRECAST CONCRETE PLANKS OVER STAIRWELLS KEY PLAN 6-2-2015 05.28.2015 08/11/15