No preview available
HomeMy WebLinkAboutS201FOUNDATION DETAILS S201 10/22/2015 This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number Heery International 555 17th Street, Suite 500 Denver, CO 80202 720.946.0276 CDT APC OCTOBER 12, MAY 28, 2015 CONSTRUCTION DOCUMENTS VAIL VALLEY MEDICAL CENTER Phase 1 West Wing 181 WEST MEADOW DRIVE VAIL, CO HII-1302604 STRUCTURAL: Structural Consultants Inc. 3400 East Bayaud Avenue, Suite 300, Denver, CO 80209 303.399.5154 MECHANICAL, ELECTRICAL, PLUMBING, LOW VOLTAGE: Cator Ruma & Associates, Co. 896 Tabor Street, Lakewood, CO 80401-4700 303.232.6200 CIVIL: Martin/Martin 225 Main Street, Unit C101, LANDSCAPE: Lime Green Design, Inc. 900 East Louisiana Avenue, Suite 209, 303.733.7558 Edwards, CO 81632 Denver, CO 80210 10/22/2015 14-011-05 10.20.2015 3 ADDENDUM #5 TOV: B15-0185 DFPC ID: 9667 3 2 09.21.2015 ADDENDUM #4 TOV: B15-0185 DFPC ID: 9667 2 2 1 ADDENDUM NO. 3 8-12-2015 1 09/13/2016 01/04/17