HomeMy WebLinkAbout2008-26 Approving an Amendment to the Lionshead Redevelopment Master Plan Incorporate Glen Lyon Office Building Site into Lionshead Master PlanRESOLUTION NO. 26
Series 2008
A RESOLUTION APPROVING AN AMENDMENT TO THE LIONSHEAD REDEVELOPMENT
MASTER PLAN TO INCORPORATE THE PROPERTY KNOWN AS GLEN LYON OFFICE
BUILDING SITE INTO THE LIONSHEAD REDEVELOPMENT MASTER PLAN AREA AND
ADOPTING SITE SPECIFIC RECOMMENDATIONS FOR THE GLEN LYON OFFICE
BUILDING SITE, LOCATED AT 1000 SOUTH FRONTAGE ROAD WEST/ LOT 54, GLEN
LYON SUBDIVISION, AND SETTING FORTH DETAILS IN REGARD THERETO.
WHEREAS, on February 6, 2007 the Vail Town Council adopted the updated Lionshead
Redevelopment Master Plan; and
WHEREAS, Section 2.8 of the Lionshead Redevelopment Master Plan outlines a
procedure for amending the Plan; and
WHEREAS, on December 8, 2008 the Planning and Environmental Commission heard
and gave recommendation to the Vail Town Council of approval of Resolution No. 26, Series of
2008; and
WHEREAS, the Vail Town Council finds that the Lionshead Redevelopment Master Plan
amendments are in keeping with the goals, objectives, and policies prescribed by the Plan; and
WHEREAS, the Vail Town Council finds that the Lionshead Redevelopment Master Plan
amendments are in the best interest of the Town as they promote the coordinated and
harmonious development of the Town.
WHEREAS, the Vail Town Council finds that the addition of the Glen Lyon Office
Building site into the Lionshead Redevelopment Master Plan facilitates the orderly and
comprehensive redevelopment of the West Lionshead neighborhood.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF
VAIL, COLORADO, THAT:
Section I. Text Additions and Deletions
The Vail Town Council hereby approves the Lionshead Redevelopment Master Plan
amendments, as illustrated by text additions stated in bold italics and deletions in
StFikethr-eugh-.
Section II. Exhibits
The Council hereby approves the Lionshead Redevelopment Master Plan amendments,
as illustrated by the following maps and figures attached to this resolution as exhibits:
A. Map A - Lionshead Study Area
B. Figure 4-9 - Existing West Lionshead Development Concept
C. Figure 4-9A - Proposed West Lionshead Development Concept
D. Figure 5-25 - West Lionshead Building Mass/ Height Limitations
Resolution No. 26, Series 2008, Page 1 of 15
Section III. Chapter 2 Introduction - shall be amended to read as follows:
2.6 Master Plan Study Area
The boundaries of the Lionshead Master Plan study area (see Map A) were established
by the Town Council at the outset of the master planning process. They are defined by
the following features:
On the north by 1-70
On the east by Middle Creek (west of the Vail Valley Medical Center)
On the south by the Town of Vail boundary (south of Forest Road, not including single-
family lots)
On the west where
Tract K intersects the South Frontage Road, to the west of the Glen Lyon Office
Building site.
Section IV. Chapter 4 Master Plan recommendations — Overall Study Area shall be
amended as follows:
4.1.5 West Lionshead - Residential/ Mixed -Use Hub
, West Lionshead
includes the Vail Associates Service Yard, Holy Cross site, Vail Professional
Building site, Cascade Crossings site, Glen Lyon Office Building site, former gas
station site and the Eagle River Water and Sanitation site.
This area of Lionshead is generally under utilized and from an aesthetic standpoint is not
in keeping with what the Town would like to see Lionshead become as it redevelops in
the coming years. The Town of Vail does place a high value on maintaining the office
and retail areas in West Lionshead and any redevelopment shall reasonably increase
the square footage of existing office and have "no net loss" of retail square footage in
West Lionshead.
With their recent acquisition of additional properties in this area, Vail Resorts has the
opportunity to bring lift service to this part of Lionshead. Lift service brings with it great
potential for the re -development of this area and in doing so expand all of Lionshead to
the west with improved pedestrian connections, new retail and office activity and other
improvements. While lift access will certainly energize this area during the winter
months, attention should be given to creating a year-round attraction within this area of
Lionshead (see detailed plan recommendations in Chapter 5)
The master plan recommends that this hub become a residential/ mixed use area with
an emphasis on meeting the needs of both the local community and our guests.
Appropriate uses could include high density residential development, lodging,
community and visitor based office and retail space, employee housing and parking, bus
or transit functions and a ski lift connection to Vail Mountain. The catalyst for this mixed
use hub is ski lift access to Vail Mountain. Consideration should be given to integrating
employee housing into the redevelopment of West Lionshead in accordance with the
Town's employee housing policies and regulations. To the extent possible, development
Resolution No. 26, Series 2008, Page 2 of 15
patterns in this area should reflect north -south orientation of buildings, visual
penetrations to the mountain, and a pedestrian oriented environment. The degree of
north -south building orientation may be difficult given the relatively narrow east -west
orientation of this area. In addition, the introduction of ski lift access in this location
creates a catalyst for a structured public parking facility. All service and delivery
demands created by development in this area shall be accommodated on-site.
The site will continue to accommodate the existing and potentially expanded functions of
the Vail sanitation plant. The mountain service yard could be reduced in size, as some
functions can be moved to less central locations. It may also be possible to relocate the
entire mountain service yard to a new location in the West Lionshead area which would
allow for greater flexibility in the redevelopment of this site. However as the area
develops it is critical that new uses be connected to the primary pedestrian corridors and
that they be served by the Town of Vail in -town transit system.
4.5 Public Transportation
An efficient transit system is critical to the character and environmental quality of any
pedestrian -oriented resort. Goals identified by the master plan regarding transit include:
4.5.1 Connection to West Lionshead
West Lionshead consists of the , the
itation plant, the HGIY GFG66 let, the feFFneF gas 6tatien site, the Vail P.-.----
, Vail Associates Service Yard, Holy Cross site, Vail
Professional Building site, Cascade Crossings site, Glen Lyon Office Building site,
former gas station site and the Eagle River Water and Sanitation site.
Because it is an area of potentially significant growth, it is important that it be fully
integrated into the Town of Vail transit system. The West Lionshead properties are at the
outside edge of the acceptable walking distance to the ski yard (1200 feet). With a mixed
use development in the area which integrates a ski portal, retail space, office space and
residential development, transit service to this area and interconnections to other portals
will be critical to develop in the future. In addition, the update of the Vail Transportation
Master Plan shall provide direction on the ultimate location of a Lionshead Transit
Facility along with needed interconnections between ski portals, regional transit stops,
and other transportation modes. The addition of a ski lift in this area would make this
area more viable to redevelopment as it would be within the acceptable walking distance
of a lift (1,200 feet).
4.9 Housin
4.9.4.3 Vail AssGdates SeWiGe Yard Holy GFess Site, Vail PFOfessional Bwldwng,
West Lionshead
West Lionshead includes the Vail Associates Service Yard, Holy Cross site, Vail
Professional Building site, Cascade Crossings site, Glen Lyon Office Building site,
former gas station site and the Eagle River Water and Sanitation site.
All redevelopment in West Lionshead will need to conform to the Town's housing
policies and requirements. In order to create activity and vibrancy in West Lionshead it is
Resolution No. 26, Series 2008, Page 3 of 15
appropriate to include some dispersed employee housing opportunities for permanent
local residents in proposed developments in the area consistent with these policies.
Perhaps the most promising locations to replace the Sunbird affordable housing project
and to conform to the Town's housing policies and requirements for new employee
housing generation in Lionshead are the North Day Lot, Vail Associates service yard,
and Holy Cross site. However, housing is not the only use these three properties will
need to support.
4.9.4.6. North Day Lot
The North Day lot is considered to be the preferred location for a significant housing
project in Lionshead to replace the Sunbird affordable housing project and provide
housing for new employee generation. The North Day Lot may also need to
accommodate a transit center on the ground level of the development site. Additionally,
it may be necessary to develop a higher revenue -generating product on a portion of the
Vail Associates service yard, Holy Cross, Vail Professional Building site, and Cascade
Crossing sites in order to defray the cost of road and infrastructure improvements.
Section V. Chapter 5. Detailed Plan Recommendations shall be amended as
follows:
Resolution No. 26, Series 2008, Page 4 of 15
Ai M-
._
MYTOR
11100
MOM
Oil
MR
-MM
Mr
Resolution No. 26, Series 2008, Page 4 of 15
Resolution No. 26, Series 2008, Page 5 of 15
NOW!
"ON WIN
- -
-
-
-
-
-
M.
ONION
MIS
rTICTI.
IMW
lip
lop
Resolution No. 26, Series 2008, Page 5 of 15
- — MW arM." IMT -Mr. 0 -Y-MT
7=-e-- - I
�72
Ii.I.M.'NOW 1010"NIN
41,100 W--
5.17 West Lionshead
West Lionshead includes the Vail Associates Service Yard, Holy Cross site, Vail
Professional Building site, Cascade Crossings site, Glen Lyon Office Building site,
former gas station site and the Eagle River Water and Sanitation site.
5.17.1 South Fronta4e Road Improvements and Vehicular Access
Planning for West Lionshead must consider two different scenarios: the
realignment of South Frontage Road and its retention in the existing alignment.
While the introduction of lift service is viable in either of these Frontage Road
alternatives, site design will vary depending upon what happens to the Frontage
Road alignment. See Figures 4-9a, and 4-9b for the Frontage Road realignment
alternatives. Notwithstanding these different Frontage Road scenarios, there
should be an increase of existing office square footage and "no net loss" of retail
square footage as a result of the redevelopment of these parcels. Furthermore,
service and delivery for West Lionshead shall occur underground or be hidden
from public view. Service and delivery truck turning maneuvers should not
negatively impact traffic flow on the South Frontage Road. With a realignment of
vehicular access points, attention should be given to the location of service and
parking areas.
a. Retention of Existing Frontage Road Alignment
If the Frontage Road remains in its current location the Maintenance Yard(Holy
Cross parcels, the Vail Professional Building site, and /Cascade Crossing and the
Glen Lyon Office Building site all remain viable development sites. The most
viable site for a public parking facility would be the Maintenance Yard/Holy Cross
parcels. While other lift locations are feasible, the old gas station site is a viable
location for a base terminal. This location would require a grade separated
pedestrian crossing over the Frontage Road to the Maintenance Yard/Holy Cross
parcels. A strong east -west oriented pedestrian corridor with ground floor retail
Resolution No. 26, Series 2008, Page 6 of 15
uses would be necessary to create a strong connection between this area and the
rest of Lionshead. Under this Frontage Road scenario the Vail Professional
Building site and Cascade Crossing could be developed as a contiguous parcel.
In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the
Plan, opportunities for public transportation and vehicular circulation
improvements shall be explored in conjunction with any future redevelopment of
the sites. Possible opportunities for improvements may include, an improved
mass transit stop, relocated/reduced/shared points of entry/exiting, restricted
access points, acceleration/ deceleration lanes, greater sight distances, dedicated
turning lanes, landscaped medians and skier drop-off.
In the redevelopment of Cascade Crossing and the Glen Lyon Office Building site
under the current configuration of the Frontage Road, the bus stops in front of
said properties shall be enhanced with, for example, shelters, benches, and
landscaping. Pedestrian connections shall be improved from the bus shelters,
across the South Frontage Road and to and from the surrounding buildings to
provide safe and attractive pedestrian crossing and connections. Improvements
may include crosswalks, walkways, pedestrian crossing warning lights, medians,
and signage.
b. Frontage Road Realignment
The greatest benefit of this realignment alternative is that it results in one very
large and contiguous development parcel and in doing so integrates the
Maintenance Yard/Holy Cross site with the West Day Lot by removal of the barrier
created by the existing Frontage Road alignment. It also creates the best
pedestrian environment in creating an extension of the Lionshead Retail area in
that it provides the potential to establish a convenient and desirable pedestrian
connection to the rest of Lionshead.
With this alternative the most viable site for a public parking facility would still be
the Maintenance Yard/Holy Cross parcels. With the re -location of the Frontage
Road lift access out of the old gas station site would not require a grade
separated pedestrian crossing to the Maintenance Yard/Holy Cross parcels.
However, a grade separated crossing over the Red Sandstone Creek would be
needed to link the Holy Cross site with the Vail Professional Building site.
This alternative would also present the opportunity for enhancing Red Sandstone
Creek to make it more accessible to the community and an aesthetically pleasing
water feature. Enhancements might include; streambank stabilization/
beautification, natural stream drop structures, interactive low flow areas and
general improvements for wetlands and wildlife habitiat. Any modification or
enhancement to the creek corridor would be subject to U.S. Army Corp of
Engineers approval. A strong east -west oriented pedestrian corridor with ground
floor retail uses would be necessary to create a strong connection between this
area and the rest of Lionshead.
In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the
Plan, opportunities for public transportation and vehicular circulation
improvements shall be explored in conjunction with any future redevelopment of
the Frontage Road and interior roads within the redevelopment of the West
Resolution No. 26, Series 2008, Page 7 of 15
Lionshead sites. Possible opportunities for improvements may include improved
mass transit stops, relocated(reduced/shared points of entry/exiting, restricted
access points, acceleration/ deceleration lanes, roundabouts at major
intersections, greater sight distances, dedicated turning lanes, landscaped
medians and skier drop-off.
5.17.2 Pedestrian and Bike Access
As compared to a separate, free-standing portal, West Lionshead is considered a
part of the greater Lionshead area. In order for this area to be successful, it is
important to have a strong pedestrian connection with the rest of Lionshead.
Streetscape improvements including bike lanes or trails and sidewalks should be
incorporated in any redevelopment along West Lionshead Circle and the South
Frontage Road to improve the viability of mixed uses in West Lionshead.
Improvements to street lighting, walking surfaces, trails, seating areas and public
art that facilitate safe and attractive pedestrian and bike movement are strongly
encouraged. Said improvements may necessitate the need for access easements
through the sites. In the redevelopment of West Lionshead, pedestrian and bike
connections shall be made to integrate with the rest of Lionshead and Cascade
Village.
There is an existing recreation path that runs across the southwest corner of the
Glen Lyon Office Building site. If the site redevelops the recreation path shall be
enhanced to meet town recreational path standards and to provide a safe and
attractive pedestrian and bike experience. The improvements shall include a
public easement over the path where necessary.
5.17.3 Preservation of Existing Office and Retail Space
There shall be an increase in office space and no net loss of retail space in West
Lionshead. Opportunities for increasing the square footage of office and retail
beyond the existing conditions in West Lionshead shall be evaluated during the
development review process. Currently, West Lionshead offices and businesses
offer a variety of local services and amenities, which is important to preserve with
the redevelopment of West Lionshead. During the winter months, the proposed
ski lift in West Lionshead and the associated parking will generate significant
pedestrian traffic and activity. However, consideration should be given to how
West Lionshead can be an active and vibrant place year-round.
One way this can be accomplished is the reinforcement of a well -crafted program
of specialty retailers, offices, and restaurants that attract both tourists and local
residents. Also, quality architecture and the creation of appealing outdoor spaces
in and of itself will encourage people to visit this area. An active program of
public art, residential units that are used for "artists in residence" or a culinary
school are examples of uses that could create a catalyst for activity. In
conjunction with any application to develop a new ski lift, a market study which
analyzes the appropriate amount of office/retail square footage shall be included
in the redevelopment of West Lionshead.
5.17.4 Relationship to Red Sandstone Creek and Gore Creek
Resolution No. 26, Series 2008, Page 8 of 15
Red Sandstone Creek and Gore Creek abut the Glen Lyon Office Building site,
former gas station site, Holy Cross site and the Vail Professional Building site.
Any redevelopment of these parcels should consider how the creeks can be
enhanced and made an amenity of this redevelopment area.
A substantial stand of mature trees exists on the banks of the two creeks, with low
lying brush on the shores. Every effort shall be taken to preserve the substantial
trees and natural steep slopes along the banks of both creeks. While the natural
riparian corridor of these streams needs to remain protected and preserved, the
physical and visual relationships and references between adjacent development
and the stream tract should be strengthened. Improved public access and
utilization of Gore Creek and Red Sandstone Creek for fishing and other
recreational purposes is strongly encouraged to create a catalyst for activity and
enjoyment of the streams.
5.17.5 Architectural Improvements
The architectural design guidelines (Chapter 8) discuss several transition tools
that can be used to adapt an existing building to the new character and
architectural quality desired for Lionshead. Given the high visibility of the
buildings in West Lionshead and the extent to which they influence the quality of
the experience of passers-by, all future development of the sites should be closely
scrutinized for compliance with the applicable architectural design guidelines.
For properties that are east of Red Sandstone Creek, in West Lionshead, higher
densities and building heights may be appropriate, particularly to encourage the
development of employee housing. However, any development must meet the
overall character and visual intent of this master plan and be compatible with the
adjacent existing development of the Marriott and the Vail Spa.
Notwithstanding the height allowances of the underlying zone districts, building
height and massing shall be responsive to the Gore Creek and Red Sandstone
Creek corridors, in that buildings shall gradually "step down" at the creek sides.
Building height and massing shall also "step down" towards the Interstate, and at
the western end of Lionshead. Figure 5-25 provides a general depiction of how
building height shall gradually lower at the western end of this study area. The
intent of these height standards is that building height reduces by entire floor
levels in the locations as generally depicted on Figure 5-25.
Notwithstanding the height allowances depicted on Figure 5-25, which depicts
building height in an east(west orientation, building height and massing shall also
"step down" in a north/ south orientation. Notwithstanding the height allowances
depicted on Figure 5-25, buildings fronting directly along Gore Creek and the
western end of Lionshead shall express no more than three to four levels before
"stepping back" to taller building mass. On the Interstate side of this area,
building design shall be articulated to avoid large expanses of shear/unbroken
wall planes.
5.17.6 Redevelopment Considerations for Glen Lyon Office Buildin_-a site
Resolution No. 26, Series 2008, Page 9 of 15
Consistent with its location at the western edge of West Lionshead and with
respect to the extensive frontage along Gore Creek, it is appropriate to recognize
certain development limitations and opportunities regardless of the underlying
zone district.
5.17.6.1 Height
Building heights shall be consistent with Figure 5-25, West Lionshead Building
Massing and Height Limitations. Notwithstanding the height limitations set forth
in Figure 5-25, the maximum height for buildings on the Glen Lyon Office Building
site shall not exceed 56 feet.
5.17.6.2 Residential Land Use and Density
Existing physical improvements on the Glen Lyon Office Building site include a
three-story building with 10,829 square feet of general office space and a surface
parking lot. Because of the site's physical location along Gore Creek, it's
accessibility to Lionshead Village, and the adjacent potential redevelopment
including a ski -lift and activity center, it may be appropriate to introduce a mix of
uses on site. If residential uses are proposed, the use shall be consistent with the
Master Plan goal to increase the number of 'Live Beds' in Lionshead. Residential
density on the site should be studied and proposed in a manner that is compatible
with the character and scale of adjacent uses and Gore Creek.
Residential uses should be located on the basement or garden level and second
floor and above in buildings on-site. If residential uses are proposed on the street
level or first floor, the vitality of the pedestrian and bike experience shall be
considered along with the function and character of the adjacent uses and
structure design. The mixture of land uses on the Glen Lyon Office Building site
shall maintain a balance between residential, office/ commercial and recreational
uses to serve both the visitor and the permanent resident.
5.17.6.3 Office Land Use
Consistent with the Master Plan requirement for an increase of office space, the
existing 10,829 square feet of office space shall be replaced and increased on-site.
5.17.6.4 Employee Housin_g
All (100•/) of the employee housing requirements associated with the Glen Lyon
Office Building site, as required by the Vail Town Code, shall be met on-site.
5.17.6.5 Landscape Preservation and Relationship to Red Sandstone and Gore
Creeks
The Glen Lyon Office Building site borders on the Red Sandstone Creek along the
east property line and the Gore Creek along the south property line. The
redevelopment of the Glen Lyon Office Building site should consider how the
creeks can be enhanced and made an amenity of the area.
A substantial stand of mature trees exists on the banks of the two creeks, with low
lying brush on the shores. Every effort shall be taken to preserve the substantial
trees and natural steep slopes along the banks of both creeks. While the natural
riparian corridor of these streams needs to remain protected and preserved, the
physical and visual relationships and references between adjacent development
and the stream tract should be strengthened. Improved public access and
Resolution No. 26, Series 2008, Page 10 of 15
utilization of Gore Creek and Red Sandstone Creek for fishing and other
recreational purposes is strongly encouraged to create a catalyst for activity and
enjoyment of the streams.
INTRODUCED, READ, APPROVED AND ADOPTED his 3rd day of February, 2009.
ichard . Clevelan ayor
ATTEST:
Ja
L relei Donaldson, Town Clerk
Resolution No. 26, Series 2008, Page 11 of 15
AL .
SE
. .
EXHIBIT A
Resolution No. 26, Series 2008, Page 12 of 15
■ i i
CHAPTER 4 MASTER PLAN RECOMMENDATIONS, OVERALL STUDY AREA
PACE 4-24
Resolution No. 26, Series 2008, Page 13 of 15
0
t
1 19,j
LIONSHEAD REDEVELOPMENT MASTER PLAN
EXHIBIT C
CHAPTER 4 MASTER PLAN RECOMMENDATIONS - OVERALL STUDY AREA
LIONSHEAD REDEVELOPMENT MASTER PLAN
Resolution No. 26, Series 2008, Page 14 of 15
PAGE 4-25
EXHIBIT D
CHAPTER 5 DETAILED PLAN RECOMMENDATIONS
LIONSHEAD REDEVELOPMENT MASTER PLAN
Resolution No. 26, Series 2008, Page 15 of 15
PAGE 5-53