HomeMy WebLinkAbout1984-15 Approving a Contract Modification Order for Certain Changes to the Main Vail Interchange and Increasing the Cost of the ProjectRESOLUTION NO. 15
Series of 1954
A RESOLUTION APPROVING A CONTRACT MODIFICATION
ORDER DATED JULY 18, 1.9$4, WHICH ORDER MODIFIES
A CERTAIN CONTRACT BETWEEN B&B EXCAVATING, INC.
AND THE STATE HiGIiWAY DEPARTMENT, PROVIDING FOR
CERTAIN C~iANGES TO THE MAIN VAIL INTERCHANGE AND
INCREASING THE COST OF THE PROJECT TO MODIFY THE
MAIN VAIL INTERCHANGE BY $52,666.45.
j'VHEREAS, the Town of Vail, Eagle County and the Colorado Depart-
meat of ~iighways jointly retained Centennial Engineering to conduct
a study to determine feasible alternatives to modify the main Vail
interchange of 1-70; and
WHEREAS, the study has been completed and reviewed by all
parties and it is the recommendation of the study to install a
system of interconnected traffic signals at the interchange; and
J
WHEREAS, the cost of installing the signals is estimated to
be approximately $200,000.00 and an additional X52,666.45 is required
to widen the Vail road portion of the interchange and install conduit
to accommodate an effective traffic light system; and
WHEREAS, in order to provide for the widening of the main Vail
interchange and related work, it is necessary to approve the attached
Contract Modification Order.
NOW, THEREFORE, be it resolved by the Town Council of the Town
of Vail, Colorado, that:
1. The attached Contract Modification Order is hereby approved.
2. The Town Manager is hereby directed to take all steps
necessary to effectuate said Contract Modification Order.
APPROVED AND ADOPTED THIS 7th DAY OF August , 1984.
Rodney E. Slifer, I~ybr
4
Pamela A. Brandmeyer, own Clerk