Loading...
HomeMy WebLinkAbout1982-21 Initiating a Special and Local Improvement Project for the Vail Lionshead Mall and Adjacent Area1 ~~ RESOLUTION #21 SERIES OF 1.982) rITEMNq('~" G DATE: /~ 'S' ~°Z A RESOLUTION INITIATING A SPECIAL AND LOCAL IMPROVEMENT PROJECT FOR THE VAIL LIONSHEAD MALL AND ADJACENT AREA; DIRECTING THE TOWN MANAGER TO HOLD ADMINISTRATIVE HEARINGS AND OTHER PROCEDURES FOR THE IItiPLEMENTATION THEREOF; RATIFYING AND APPROVING WORK PREVIOUSLY DONE BY THE ADMINISTRATION ON SAID SPECIAL AND LOCAL IMPROVEMENT PROJECT; AND SETTING FORTH DETAILS IN RELATION THERETO. WHEREAS, it is the opinion of the Town Council that certain improvements should be made to the Vail Lionshead Mall and surrounding areas; and WHEREAS, said improvements are necessary to protect and preserve public areas and ways within the Town; and WHEREAS, said project is necessary for the full and complete use and enjoyment of the private property in the Lionshead area; an d WHEREAS, it is the belief of the Town Council. that said improvements will confer special benefits of a local nature on the private property inthe Vail Lionshead area; and BE IT RESOLVED AND ORDERED BY THE TOWN COUNCIL OF THE TOWN OF VAIL, COLORADO, THAT: J~. There is hereby initiated by this Resolution a special and local improvement project to construct and instill certain improve- ments to the Vail Lionshead Mall and surrounding areas, including, but not limited to, replacing paving in major areas of the mall, re- locating planting areas, providing new focal points of interest, unifying and upgrading utility systems, providing emergency access to all areas of the mall, instilling a cascading fountain, a sculpture plaza, a new lighting system, benches, kiosks, planters, bicycle racks, drinking fountains, anti other amenities, and generally improving the aesthetic quality of the mall and its surrounding area. 2. The Town Manager or his authorized agents are hereby directed to proceed with the project by holding such adminis~tra~ive hearings and investigations as they may deem necessary or appropra_ate l ~ I. to inform affected property owners about the project and the assessments proposed and to obtain their reactions thereto, to implement the project, and to recommend to the Town Council for its consideration and adoption the manner of construction and installation of the project, the extent of the project, the portion, if any, of the cost of the project to be paid by the Town, the method of assessing all or a portion of the cost of the project against the properties in the vicinity thereof specially benefited thereby, the portion of the cost of the project to be paid by special. assessments, and any further recommendations that the Town Manager may deem appropriate. 3. The Town Council hereby ratifies and approves any hearings, work, or proceedings previously carried out by the Town Manager or his authorized agents in relation to the project. 4. This Resolution shall take effect immediately upon its adoption. INTRODUCED, PASSED, ADOPTED, A~~TD APPROVED THIS 5th day of October, 3982. TOWN OF VAIL, COLORADO Ro ne E. Slifer Ma ~'r 'Y ~ Y ATTEST: j~, Colleen M. Kline, own Clerk 2- Cauncil Member ~. ter. ~ ~ ~~C___~ seconded the motion, and the question being upon the passage and adoption of the Resolution, the roll was called with the following result: Council Members Voting "Yes": Rod Slifer Chuck Anderson Paul Johnson Herman Stauffer Ronald Todd Gail Wahrlich Bill Wi1to Council Members Voting "No": A majority of the Council Members present having voted in favor of the passage and adoption of the Resolution, the Mayor thereupon declared the Resolution duly passed and adopted. Thereupon, after consideration of other business to come before the Council, the meeting was adjourned. r .~~~ . ~. TOWN) Mayor / - - ~ SEAL} Attest: 1 ~ TOW (/ f/( ' 6- STATE OF COLORADO ) COUNTY OF EAGLE ) ss. TOWN OF VAIL } I, Colleen M. Kline, the Town Clerk of the Town of Vail, Colorado, do hereby certify that the attached copy of Resolution No. ~l , Series 1982, is a true and correct copy; that said Resolution was passed and adopted by the Town Council at a regular meeting thereof held at the Vail Municipal Building, the regular meeting place of the Town Council in the Town, on~.. Tuesday, the 5th day of October, 1982; and that true copies of - said Resolution have been duly executed and authenticated by the signatures of the Mayor of the Town of Vail and myself, as Town '_ I Clerk of the Town, sealed with the seal of the Town, and numbered and recorded in the official records of the Town kept for that purpose in my office. I further certify that the foregoing pages 1 through 6, inclusive, constitute a true and correct copy of the record of the proceedings of the Town Council at its meeting of October 5, 1982, insofar as said proceedings relate to said Resolution; that said proceedings were duly had and taken; that the meeting was duly held; and that the persons were present at said meeting as therein shown. IN WITNESS WHEREOF, I have hereunto set my hand and the seal of the Town of Vail, Colorado, this ~r day of `L11~, 1982. s TOWN} Town Clerk tSEAL} Town of Vail, Colorado 7-- GAGE DAVISASSOCIATES GAGE DAVIS ASSOCIATES. INC. 910 TWEI•~TY EIGHTH STREET PL.Mih'~X3 AtvD LANDSC1iPE ARC}-IITECTURE MOUL DER. COLORADO 80303 isn'sl ~t•t7 1168 September 27, 1982 VAIL LIONSHEAD CONSTRUCTION BUDGET I, Construction of Mall Areas 1,800,000 Overall Construction Costs Q00,000 a 2,00,000 II. Assessment District 1,000,000 General Obligation Bond 1,600,000 2,-1~00,000 a~b~~~90p COSTS FOR ALL NEW PLAZA AREAS IN LIONSHEAD LionsHead Center Mali Clock Tower Square LionsHead Court LionsPride Court Gondol a P,l aza Landmark Mail Southwest Mall Entry test Mall Entry East Mali Entry (to complete) . Auxiliary Area Costs TOTAL:1,800;000 OVERALL COSTS FOR LIONSHEAD MALL DEVELOPMENT Utilities 190,~~17 Mohi 1 i zati on 95,3.08 Stockpiling ~57,x, Master Electr•3cal System g8,gs5 Survey 28,532 Design & Engineering Fees 19D,212 Bond and Asszssment txnenses 150,000 TOTAL:800,000 i GAGE DAViSASSOCfATES GAGE dAV1S ASSOCIATES, INC. 910 TWENTY EIGIiTH STREET L = ^.-_--.- ~ _.,r~~,,,,,,~;60ULdER. COLORAdO $0303 PLANN~tdG A;d[i :.AfvD:iCAYr AFICNiTECTUflE 303- 449-1168 ' VAIL LIONSHEAD PLRZA: TOTAL ITEMIZED COST Page 1 Cost per Total Cost ~"_~,. Task Units Quantity Uni t of Item ,.~:=±~ DEMOLITION 6" canc. slab SF 71,793_6.00 $420,758 Bomanite & standard slab) 6" conc. curb LF 2,685 5.00 ].3,_425 around planters) canc. stairs SF 3,172 5.00 15,860 Demolition Subtotal 460,043 I ~ -. _ . -sir EARTHWORK Rough grading SF 7 Trenching of planter LF wall s Excavation for new SF steps Grading for fountain Lump Sum includes fill and regrading} COh:CRETE WORK ivetiv cone, stairs ~ SF Planter walls Face 1.5 average height} Foct Retaining walls Face Foat 2,727 0.84 G1,090 3,851 2.40 9,242 1,146 4.50 5,157 6440.00 6,440 arthwork Subtotal 81,929 2,630 25.00 65,750 4,239 31.00 131,437 1,573 18.OC?28,314 GAGE DAV9SASSOCIATES GAGE DAVIS ASSOCIATES. INC. q50 TWENTY EIGHTH STREET rrr.w..ar:.rr~~ .o.t...~~='+-=~•--=•~---«•- •~~ PLAi+iiAtJG Af~D i_AfvDSC.,F'E ARGiiTEG7URE 000LDER. GOLORADO 80303 1303) 44S•5568 VAIL LIONSHEAD PLAZA: TOTAL ITEh;IZED COST Page 2 Cost per Total Cast. r~~ Task Jni is Ruanti t.y 1lni t of Item -. Conc. flat work SF 996 15.00 _14,940. ~' Concrete tidork Subtotal 240,441 PAVING & SURFACING 6" sub base {for existing SF 17,438 0.74 12,904 planters being removed} Patching existing SF 8,649 2.00 17,298 conc. llnistone pavers SF 70,583 5.37 ~~379,568 utilizing existing sub base} Paving and Surfacing. Subtotal ~ - $4J9,770 LANDSCAPING 2"Aspen ea.80 220.00 17,600 5'Blue Spruce ea.33 225,00 7,425 7'Blue Spruce ea.24 315.00 7,560 5`Lodgepole ea.24 175.00 4,200 7'l;adgepol a ea .25 245.00 6,125 9'Lodgepole ea.10 267.00 2,670 i a h GAGE DAVISASSQCIATES PLANNING AND LANDSCAPE gF~CMiTECTURE GAGE DAVISASSOCIATES. iNC. 9t0 TWENTY EIGHTH STREET 80LiLbER, COLORADO 80303 303) 449-1188 PAIL LIDNSHEAD PLAZA: TOTAL ITEMIZED COST Page ' 3 Cost per Total Cost Task ~llni is Quanti t.y lJni t ~of Item Specimen ea.lg 400.00 7,600 ' Specimen ea.6 500.00 3,000 Shrubs: 5 gallon ea.470 30.00 14,1OD Ground Caver SF 9;055 1.75 15,846 Soil prep.Lump Sum 3,598 tine Grading Lump Sum l~ggg Irrigation SF 23,132 0.60 13,879 „ Landscaping Subtotal 105,952 MISCELLANEOUS Gondola Plaza fountain Lump Sum 151,250 Lighting ea.30 ~2,000.00 60,000 Speciality lighting ea.50 2DD.D0 10,000 Benches ea.40 425.00 B,OOD Drinking fountains ea.0~1,600.OD 0_ Trash containers ea,7 400.00 Z,'80D Signage Lump Sum 9 800 Kiosk ea.2 13,000.00 26,000 Bicycle Racks ea.2 500.00 1,000 Movable planters ea.0_1,OOD.OD 0-- Hand rails (for steps)LF L2~4D.00 9,36D Tree grates ea.4-600.00 0- Flag poles ea.8 1,000.00 8,000 t y r ^~~~,u, o ~„~'.,:oi.a ~~. _, :.;°,~,._ d .,, i,,, C;hGE DAVIS ASSOCIATES, 1NC. GAGEDAViSASSOCIAT~S Se10 TWENTY EIGHTH STREF7 1zi."-__t. .. •..~,.-..~ ~ tDULDER, COLORADO 80343 PLAlJNi^ki AND IANUSCAPE AACNITECTURE u)'S! 419 1166 VAIL LIONSHEAD PLAZA: TOTAL ITEMIZED CAST Page 4 Toi:al Cost Task Units Quantity Cost aer unit of Item Gondola Plaza Lump Sum $40,000.00 $40,000 sculpture Bus shelter ea. 2 32,000.00 64,000 Miscellaneous Subtotal: $400,210 Auxiliary Areas $101,655 Grand Total $1,$00,000