Loading...
HomeMy WebLinkAboutB08-0280NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ TOMOFVAII਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149਍ഀ ADD/ALT MF BUILD PERMIT Permit B08-0280਍ഀ Project PRJ08-0399਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location......: GOLDEN PEAK UNIT ONE਍ഀ Parcel No....: 210108109005਍ഀ OWNER VAIL CORP 08/15/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT GEORGE SHAEFFER CONSTRUCTION 08/15/2008 Phone: 845-5656਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ CONTRACTOR GEORGE SHAEFFER CONSTRUCTION 08/15/2008 Phone: 845-5656਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ ARCHITECT K.H. WEBB ARCHITECTS PC 08/15/2008 Phone: 970-477-2990਍ഀ 710 WEST LIONSHEAD CIR, UNIT A਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 0000001627਍ഀ Description:਍ഀ INTERIOR FINISH REMODEL, WINDOW AND PATIO DOOR REMODEL, AND਍ഀ EXTERIOR HOT TUB REPLACEMENT਍ഀ Occupancy: R2਍ഀ Type Construction:IIA਍ഀ Status :਍ഀ ISSUED਍ഀ Applied . . :਍ഀ 08/15/2008਍ഀ Issued...:਍ഀ 09/04/2008਍ഀ Expires਍ഀ 03/03/2009਍ഀ Valuation: $500,000.00਍ഀ Total Sq Ft Added: 0਍ഀ .<................x...,..,.,,,...,.......~........... FEE SUMMARY਍ഀ Building Permit Fee------ >਍ഀ $3,233.75਍ഀ Will Cal Fee--------------------- >਍ഀ $4.00਍ഀ Total Calculated Fees >਍ഀ $15,139.69਍ഀ Plan Check-------------------->਍ഀ $2,101.94਍ഀ Use Tax Fee >਍ഀ $9,800.00਍ഀ Additional Fees----------------------->਍ഀ $0.00਍ഀ Add'I Plan Check Hours->਍ഀ $0.00਍ഀ Restuarant Plan Review----->਍ഀ $0.00਍ഀ TOTAL PERMIT FEES-------------->਍ഀ $15,139.69਍ഀ Investigation----------------->਍ഀ $0.00਍ഀ Recreation Fee----------------->਍ഀ $0.00਍ഀ Payments >਍ഀ $15,139.69਍ഀ Total Calculated Fees-------->਍ഀ $15,139.69਍ഀ BALANCE DUE------------------------ >਍ഀ $0.00਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM਍ഀ 8:00 AM - 4:00 PM.਍ഀ Sig Pure of Owner or Contractor Da fle਍ഀ ਍ഀ Print Name਍ഀ b I d_a It_co n st ru ct i o n_p a rm it_041908਍ഀ APPROVALS਍ഀ Permit B08-0280 as of 09-04-2008 Status: ISSUED਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 09/03/2008 cgunion Action: AP਍ഀ Item: 05600 FIRE DEPARTMENT਍ഀ 08/21/2008 drhoades Action: COND Approved with਍ഀ conditions.਍ഀ See the Conditions section of this Document for any that may apply.਍ഀ bld_aIt_construction_perm it_041908਍ഀ CONDITIONS OF APPROVAL਍ഀ Permit B08-0280 as of 09-04-2008 Status: ISSUED਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE਍ഀ COMPLIANCE.਍ഀ Cond: 14਍ഀ (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO਍ഀ BE SEALED WITH AN APPROVED FIRE MATERIAL.਍ഀ Cond: 1਍ഀ (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY਍ഀ WORK CAN BE STARTED.਍ഀ Cond: 40਍ഀ (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72.਍ഀ Cond: CON0010258਍ഀ Separate permits required for Fire Alarm system and for਍ഀ Fire Sprinkler System. Detectors shall not be bagged or਍ഀ covered. Contact the building's alarm contractor to have਍ഀ smoke detectors changed to heat detectors prior to any work਍ഀ occurring.਍ഀ Cond: CON0010288਍ഀ MAINTAIN ALL EXISTING FIRE RESISTIVE ASSEMBLIES PER IBC਍ഀ bld_aIt-co nstruction_perm it_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ ਍ഀ Statement Number: R080001541 Amount: $13,139.6909/04/200809:12 AM਍ഀ Payment Method: Check Init: SAB਍ഀ Notation: 094358 GEORGE਍ഀ SHAEFFER਍ഀ ਍ഀ Permit No: B08-0280 Type: ADD/ALT MF BUILD PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $15,139.69਍ഀ This Payment: $13,139.69 Total ALL Pmts: $15,139.69਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code਍ഀ Description਍ഀ Current Pmts਍ഀ -਍ഀ ਍ഀ BP਍ഀ ਍ഀ 00100003111100਍ഀ ਍ഀ BUILDING PERMIT FEES਍ഀ ਍ഀ 3,233.75਍ഀ PF਍ഀ 00100003112300਍ഀ PLAN CHECK FEES਍ഀ 101.94਍ഀ UT਍ഀ 11000003106000਍ഀ USE TAX 4%਍ഀ 9,800.00਍ഀ WC਍ഀ 00100003112800਍ഀ WILL CALL INSPECTION FEE਍ഀ 4.00਍ഀ 0਍ഀ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGbLE਍ഀ TOW, Ot Vail Project P 0S - 034਍ഀ Building Permit਍ഀ OVAR C()Dy 970-479-2148 ~jnspections)਍ഀ 7E 'b਍ഀ F ~਍ഀ 5 S. Frontage Rd. O •O j;0਍ഀ Vail, Colorado 81657਍ഀ TOWN OF VAIL BUILDING PERMIT APPLICATI਍ഀ Separate Permits are required for electrical, plumbing, mechanical, etc.!਍ഀ CONTRACTOR INFORMATION਍ഀ General Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s:਍ഀ George Shaeffer Construction Jon Stevenson- 970-390-6141਍ഀ Company਍ഀ Email address: ions0asconco.com Fax 970-845-7013਍ഀ Contractor Signature:਍ഀ COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials਍ഀ BUILDING: $ N/A਍ഀ 11 ELECTRICAL: $ 5,000਍ഀ OTHER: $਍ഀ N/A਍ഀ PLUMBING: $ 5,000਍ഀ 11 MECHANICAL: $ 5,000਍ഀ TOTAL: $਍ഀ 500,000਍ഀ For Parcel # Contact Eagle County Assessors Office at 970-328-8640 or visit www.eagle-countv.com਍ഀ cel 210108 71001.਍ഀ Job Name: Golden Peak Unit One Remodel਍ഀ 11 Job Address: 458 Vail Valley Drive Unit One਍ഀ Vail, CO 81658਍ഀ Legal Description Lot: Block: Filing: Subdivision: Golden Peak਍ഀ Condominiums਍ഀ Owners Name: Charles & Helen Address: 188 Fair Oaks Lane਍ഀ Schwab Atherton, CA 94027 11਍ഀ Phone:਍ഀ Architect/Designer: KH Webb Address: 710 West Lionshead Circle Suite A਍ഀ Architects P.C. Vail, CO 81657਍ഀ Phone: 970-477-2990਍ഀ Engineer: Architectural Engineering Address: PO Box 8489਍ഀ Consultants 11 Avon, CO 81620 1਍ഀ Phone: 970-748-8520਍ഀ 1 1਍ഀ Detailed description of work: Interior finish remodel, window & patio door remodel, and exterior hot tub replacement.਍ഀ Work Class: New ( ) Addition ( ) Remodel (X) Repair ( ) Demo ( ) Other ( )਍ഀ Work Type: Interior ( ) Exterior ( ) Both (X) Does an EHU exist at this location: Yes( ) No (X )਍ഀ Type of Bldg.: Single-family ( X ) Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )਍ഀ No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building:਍ഀ No/Type of Fireplaces Existin : Gas Appliances 1 Gas Los 1 Wood/Pellet Wood Burning਍ഀ No/Type of Fireplaces Proposed: Gas Appliances Gas Los 1 Wood/Pellet Wood Burning NOT ALLOWED਍ഀ Does a Fire Alarm Exist: Yes (X) No ( 11 Does a Fire Sprinkler System Exist: Yes (X) No( )਍ഀ FOR OFFICE USE ONL਍ഀ Date Received:਍ഀ Received By:਍ഀ AUG 15 2008਍ഀ C:\Documents and Settings\JonS\Desktop\GP\building_permit 4-17-2007.DOC TAWAW OF VA I- .w _17/2007਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ MEOU਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149਍ഀ ADD/ALT MF BUILD PERMIT Permit B08-0280਍ഀ Project਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location......: GOLDEN PEAK UNIT ONE਍ഀ Parcel No....: 210108109005਍ഀ OWNER VAIL CORP 08/15/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT GEORGE SHAEFFER CONSTRUCTION 08/15/2008਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ CONTRACTOR GEORGE SHAEFFER CONSTRUCTION 08/15/200਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ ARCHITECT K.H. WEBB ARCHITECTS PC 08/15/2008 Phone:਍ഀ 710 WEST LIONSHEAD CIR, UNIT A਍ഀ VAIL਍ഀ CO 81657਍ഀ License: C000001627਍ഀ Phone: 845-5656਍ഀ Phone: 845-5656਍ഀ 970-477-2990਍ഀ Description:਍ഀ INTERIOR FINISH REMODEL, WINDOW AND PATIO DOOR REMODEL, AND਍ഀ EXTERIOR HOT TUB REPLACEMENT਍ഀ Status :਍ഀ Applied਍ഀ Issued਍ഀ Expires਍ഀ PRJ08-0399਍ഀ ISSUED਍ഀ 08/15/2008਍ഀ 09/04/2008਍ഀ 03/03/2009਍ഀ Occupancy: R2਍ഀ Valuation: $500,000.00਍ഀ Type Construction: I IA਍ഀ Total Sq Ft Added: 0਍ഀ ਍ഀ xx .....,.x...਍ഀ x..........................਍ഀ FEE SUMMARY਍ഀ Building Permit Fee------ >਍ഀ $3,233.75਍ഀ Will Cal Fee----------------਍ഀ > $4.00਍ഀ Total Calculated Fees >਍ഀ $15,359.69਍ഀ Plan Check-------------------->਍ഀ $2,101.94਍ഀ Use Tax Fee > $9,800.00਍ഀ Additional Fees----------------------->਍ഀ $0.00਍ഀ Add'I Plan Check Hours->਍ഀ $220.00਍ഀ Restuarant Plan Review਍ഀ $0.00਍ഀ TOTAL PERMIT FEES-------------->਍ഀ $15,359.69਍ഀ Investigation----------------->਍ഀ $0.00਍ഀ Recreation Fee-----------------> $0.00਍ഀ Payments >਍ഀ $15,359.69਍ഀ Total Calculated Fees--------> $15,359.69਍ഀ BALANCE DUE >਍ഀ $0.00਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ REQUESTS FOR INSPE N SH L BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM਍ഀ 8:00 AM - 4:00 PM. -਍ഀ -21r,਍ഀ Si loci of wner or Contractor Date਍ഀ a v. GV~C v~ s ov.਍ഀ Print Name਍ഀ bld_a It_co n stru ction_perm it_041908਍ഀ APPROVALS਍ഀ Permit B08-0280 as of 02-19-2009 Status: ISSUED਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 09/03/2008 cgunion Action: AP਍ഀ 11/14/2008 cgunion Action: AP APPROVED਍ഀ STRUCTURAL REVISION AND UPDATED FLOOR PLAN FOR BUNK ROOM਍ഀ 02/12/2009 cg Action: AP APPROVED਍ഀ ADDITIONAL PLAN SHEET FOR FIRESTOPPING AND REVISED਍ഀ MECHANICAL SHEETS਍ഀ 02/19/2009 cg Action: AP APPROVED TOP OF਍ഀ WALL FIRESTOPPING REVISION DETAIL਍ഀ Item: 05600 FIRE DEPARTMENT਍ഀ 08/21/2008 drhoades Action: COND Approved with਍ഀ conditions.਍ഀ See the Conditions section of this Document for any that may apply.਍ഀ bld_alt_construction_perm it_041908਍ഀ CONDITIONS OF APPROVAL਍ഀ Permit B08-0280 as of 02-19-2009 Status: ISSUED਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE਍ഀ COMPLIANCE.਍ഀ Cond: 14਍ഀ (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO਍ഀ BE SEALED WITH AN APPROVED FIRE MATERIAL.਍ഀ Cond: 1਍ഀ (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY਍ഀ WORK CAN BE STARTED.਍ഀ Cond: 40਍ഀ (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72.਍ഀ Cond: CON0010258਍ഀ Separate permits required for Fire Alarm system and for਍ഀ Fire Sprinkler System. Detectors shall not be bagged or਍ഀ covered. Contact the building's alarm contractor to have਍ഀ smoke detectors changed to heat detectors prior to any work਍ഀ occurring.਍ഀ Cond: CON0010288਍ഀ MAINTAIN ALL EXISTING FIRE RESISTIVE ASSEMBLIES PER IBC਍ഀ bld_a It_construction_perm it_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R090000167 Amount: $110.00 02/19/200911:55 AM਍ഀ Payment Method: Check Init: SAD਍ഀ Notation: 096322 GEORGE਍ഀ SHAEFFER਍ഀ ਍ഀ Permit No: B08-0280 Type: ADD/ALT MF BUILD PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $15,359.69਍ഀ This Payment: $110.00 Total ALL Pmts: $15,359.69਍ഀ Balance: $0.00਍ഀ ਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ PF 00100003112300 PLAN CHECK FEES 110.00਍ഀ Transmittal Form਍ഀ Revision Submittals:਍ഀ 1. "Field Set"of approved plans MUST accompany revisions਍ഀ 2. No further inspections will be performed until the revisions are approved & the permit is re-issued.਍ഀ 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.਍ഀ O Revisions਍ഀ Permit #(s) information applies to: Attention: Response to Correction Letter਍ഀ -attached copy of correction letter਍ഀ &OT---r~~~/~ l p~-y~_ Deferred Submittal਍ഀ Other਍ഀ Project Address: Description /List of Changes:਍ഀ n਍ഀ Contact Information਍ഀ Com਍ഀ Company Ph: -1 -IV਍ഀ Contact N਍ഀ Contact Ph: Cell:਍ഀ &SC਍ഀ E-Mail:਍ഀ Town of Til Contractor Registration No:਍ഀ Sigd4ture (required)਍ഀ Revised ADDITIONAL Valuations (Labor & Materials)਍ഀ (DO NOT include original valuation)਍ഀ Building $਍ഀ Plumbing $਍ഀ Electrical $਍ഀ Mechanical $਍ഀ Fire Sprinkler/Alarm $਍ഀ Total $਍ഀ (Use additional sheet it necessary)਍ഀ Date਍ഀ FEB 18 2009਍ഀ TOWN OF VAIL਍ഀ System No. HW-D-0184਍ഀ Assembly Rating -1 and 2 Hr (See Item 2)਍ഀ Nominal Joint Width - 314 In.਍ഀ Class II Movement Capabilities -17% Compression or Extension਍ഀ FEB 15਍ഀ TqW qF VAIL਍ഀ 1. Floor Assembly - The fire-rated fluted steel floor unit/concrete floor assembly shall be constructed of the materials and in the manner਍ഀ described in the individual D700 or D900 Series Floor-Ceiling Design in the UL Fire Resistance Directory and shall include the following਍ഀ construction features:਍ഀ A. Steel Floor and Form Units* - Max 3 in. (76 mm) deep galv steel fluted units.਍ഀ B. Concrete - Min 2-1/2 in. (57 mm) thick reinforced concrete, as measured from the top plane of the floor units.਍ഀ C. Spray-Applied Fire Resistive Materials (Optional) - (Not Shown) - Prior to the installation of the ceiling runner and Fill, Void or਍ഀ Cavity Materials (Items 2A and 3), the steel floor units may be sprayed with a min 5/16 in. (8 mm) thickness to a max 11/16 in. (17 mm)਍ഀ thickness of fire resistive material.਍ഀ W R GRACE & CO - CONN Type MK-6/HY਍ഀ le਍ഀ co਍ഀ 0਍ഀ 0਍ഀ x਍ഀ o. ~ F/਍ഀ Reproduced by HILTI, Inc. Courtesy of SS Vv ~O਍ഀ U਍ഀ Underwriters Laboratories, Inc.਍ഀ Hilti Firestop Systems C 0 ~ US Page: 1 of 3਍ഀ System No. HW-D-0184਍ഀ Assembly Rating -1 and 2 Hr (See Item 2)਍ഀ Nominal Joint Width - 314 In.਍ഀ Class II Movement Capabilities -17% Compression or Extension਍ഀ 1A. Roof Assembly - (Not Shown) - As an alternate to the floor assembly, a fire rated fluted steel deck roof assembly may be used. The਍ഀ roof assembly shall be constructed of the materials and in the manner described in the individual P900 Series Roof-Ceiling Design in the UL਍ഀ Fire Resistance Directory. The hourly rating of the roof assembly shall be equal to or greater than the hourly rating of the wall assembly. The਍ഀ roof assembly shall include the following construction features:਍ഀ A. Steel Roof Deck - Max 3 in. (76 mm) deep galv steel fluted roof deck.਍ഀ B. Roof Insulation - Min 2-114 in. (57 mm) thick poured insulating concrete, as measured from the top plane of the floor units.਍ഀ 1 B. Roof Assembly - As an alternate to Items 1 and 1A, a fire rated protected fluted steel deck roof assembly may be used. The roof਍ഀ assembly shall be constructed of the materials and in the manner described in the individual P700 Series Roof-Ceiling Design in the UL Fire਍ഀ Resistance Directory. The hourly rating of the roof assembly shall be equal to or greater than the hourly rating of the wall assembly. The roof਍ഀ assembly shall include the following construction features:਍ഀ A. Steel Roof Deck - Max 3 in. (76 mm) deep galv steel fluted roof deck.਍ഀ B. Spray-Applied Fire Resistive Materials* - (Not Shown)-Prior to the installation of the steel ceiling runners, Forming Material and਍ഀ Fill, Void or Cavity Material (Items 2A, 3A, 3B), the roof assembly shall be sprayed with the type and thickness of fire resistive material਍ഀ indicated in the individual P700 Series design.਍ഀ 2. Wall Assembly - The 1 or 2 hr fire rated gypsum board/steel stud wall assembly shall be constructed of the materials and in the manner਍ഀ described in the individual U400 or V400 Series Wall and Partition Design in the UL Fire Resistance Directory and shall include the following਍ഀ construction features:਍ഀ A. Steel Floor and Ceiling Runners - Floor and ceiling runners of wall assembly shall consist of min No. 25 gauge galv steel channels਍ഀ sized to accommodate steel studs (Item 26). Ceiling runner to be provided with 1-1/4 in. (32 mm) flanges. Ceiling runner installed਍ഀ parallel to direction of fluted steel deck, centered beneath valley, and secured with steel masonry anchors or by welds spaced max 12 in.਍ഀ (305 mm) OC. When optional spray-applied fire resistive material is used on the steel deck, ceiling runner secured through਍ഀ spray-applied material to valley of steel deck with min 3/16 in (5 mm) diam steel masonry anchors spaced max 12 in. (305 mm) OC.਍ഀ Al. Light Gauge Framing* - Slotted Ceiling Runner - As an alternate to the ceiling runner in (Item 2A), slotted ceiling runner to consist਍ഀ of galv steel channel with slotted flanges sized to accommodate steel studs (Item 2B). Ceiling runner installed parallel to direction of਍ഀ fluted steel deck, centered beneath valley, and secured with steel masonry anchors or by welds spaced max 12 in. (305 mm) OC. When਍ഀ optional spray applied fire resistive material is used on the steel deck, slotted ceiling runner secured through spray-applied material to਍ഀ valley of steel deck with min 3116 in. (5 mm) diam steel masonry anchors spaced max 12 in. (305 mm) OC.਍ഀ CALIFORNIA EXPANDED METAL PRODUCTS਍ഀ COMPANY - CST਍ഀ SCAFCO STEEL STUD MANUFACTURING CO਍ഀ SLIPTRACK SYSTEMS INC - SLP-TRK਍ഀ 'qr਍ഀ 00਍ഀ T਍ഀ x਍ഀ SS/F/਍ഀ Reproduced by HILTI, Inc. Courtesy of V~ Fa਍ഀ Underwriters Laboratories, Inc.਍ഀ Hilti Firestop Systems C US Page:2of3਍ഀ System No. HW-D-0184਍ഀ Assembly Rating -1 and 2 Hr (See Item 2)਍ഀ Nominal Joint Width - 314 In.਍ഀ Class II Movement Capabilities -17% Compression or Extension਍ഀ A2. Light Gauge Framing* - Vertical Deflection Ceiling Runner - As an alternate to the ceiling runners in Items 2A and 2A1, vertical਍ഀ deflection ceiling runner to consist of galv steel channel with slotted vertical deflection clips mechanically fastened with runner. Slotted਍ഀ clip provided with step bushings for permanent fastening of steel studs. Flanges sized to accommodate steel studs (Item 213). Vertical਍ഀ deflection ceiling runner installed parallel to direction of fluted steel deck, centered beneath valley, and secured with steel masonry਍ഀ anchors spaced max 24. in. (610 mm) OC. When optional spray-applied fire resistive material is used on the steel deck, vertical਍ഀ deflection ceiling runner installed parallel to direction of fluted steel deck, centered beneath valley, and secured through spray-applied਍ഀ material to valley of steel deck with min 3/16 in. (5 mm) diam steel masonry anchors spaced max 12 in. (305 mm) OC.਍ഀ THE STEEL NETWORK INC - VertiTrack VTD250, -362, -400, -600, -800਍ഀ A3. Light Gauge Framing*- Notched Ceiling Runner - As an alternate to the ceiling runners in Items 2A through 2A2, notched ceiling਍ഀ runners to consist of C-shaped galv steel channel with notched return flanges sized to accommodate steel studs (Item 2B). Notched਍ഀ ceiling runner installed parallel to direction of fluted steel deck, centered beneath valley, and secured with steel masonry anchors਍ഀ spaced max 24 in. (610 mm) OC. When optional spray-applied fire resistive material is used on the steel deck, notched ceiling runner਍ഀ secured through spray-applied material to valley of steel deck with min 3/16 in. diam steel masonry anchors spaced max 12 in. (305਍ഀ mm) OC.਍ഀ DENMAR STEEL INC - Type SCR਍ഀ B. Studs - Steel studs to be min 3-518 in. (92 mm) wide. Studs cut 1/2 to 3/4 in. (13 to 19 mm) less in length than assembly height with਍ഀ bottom nesting in and resting on floor runner and with top nesting in ceiling runner without attachment. When slotted ceiling runner (Item਍ഀ 2A1) is used, steel studs secured to slotted ceiling runner with No. 8 by 1/2 in. (13 mm) long wafer head steel screws at midheight of slot਍ഀ on each side of wall. When vertical deflection ceiling runner (Item 2A2) is used, steel studs secured to slotted vertical deflection clips,਍ഀ through bushings, with steel screws at midheight of each slot. Stud spacing not to exceed 24 in. (610 mm) OC.਍ഀ C. Gypsum Board* - For 1 hr assembly, one layer of 518 in. (16 mm) thick gypsum board is required in the individual Wall and Partition਍ഀ Design. For 2 hr assembly, two layers of 5/8 in. (16 mm) thick gypsum board is required in the individual Wall and Partition Design. For਍ഀ both hourly ratings, a nominal 3/4 in. (19 mm) gap shall be maintained between the top of the gypsum board and the bottom surface of਍ഀ the steel deck and the top row of screws shall be installed into the studs 3 in. (76 mm) below the valleys of the steel floor units.਍ഀ 3. Fill, Void or Cavity Material* - Sealant - Max separation between bottom of floor or roof and top of wall is 3/4 in. (19 mm). The joint system਍ഀ is designed to accommodate a max 17 percent compression or extension from its installed width. Min 518 in. (16 mm) thickness of fill material਍ഀ installed on each side of the wall between the top of the gypsum board and the bottom of the steel deck, flush with each surface of wall.਍ഀ HILTI CONSTRUCTION CHEMICALS, DIV OF਍ഀ H ILTI INC - CP 601 S Elastomeric Firestop Sealant or CP 606 Flexible Firestop Sealant.਍ഀ *Bearing the UL Classification Mark਍ഀ I:t਍ഀ 00਍ഀ 0਍ഀ 0਍ഀ x਍ഀ ~ SS 1 Fi਍ഀ Reproduced by HILTI, Inc. Courtesy of V~ Fa਍ഀ Underwriters Laboratories, Inc.਍ഀ Hilt! Firestop Systems C ®L US Page: 3 of 3਍ഀ Development Review Coordinator਍ഀ 75 South Frontage Road਍ഀ Vail, CO 81657਍ഀ Phone: 970-479-2128਍ഀ rax: 970.479-2172਍ഀ Inspections: 9 70-479-2149°਍ഀ Transmittal Form਍ഀ Revision Submittals:਍ഀ 1. "Field Set" of approved plans MUST accompany revisions਍ഀ 2. No further inspections will be performed until the revisions are approved & the permit is re-issued.਍ഀ 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.਍ഀ Permit #(s) information applies to:਍ഀ L2 A਍ഀ (J਍ഀ Attention:਍ഀ Project Address:਍ഀ ~~S$ U6:1 volt,) Dr1V-(0 %P,਍ഀ Contact Information਍ഀ Company:6eovq2%ka A e • CoM64.vei ..0 ~o►a1~਍ഀ Company Ph: 5,iSte--SGs(o Fax: 844-'70 ( 3਍ഀ Contact Name: J o4. sA a ye H so਍ഀ Contact Ph: n Cell: oil mv- 6011111਍ഀ E-Mail: ~1oV15 ~wgSGOltiCo.~ON`਍ഀ Town of Vail Contractor Registration No:਍ഀ Sign dire (required)਍ഀ Revised ADDITIONAL Valuations (Labor & Materials)਍ഀ (DO NOT include original valuation)਍ഀ Building $਍ഀ Plumbing $਍ഀ Electrical $਍ഀ Mechanical $਍ഀ Fire Sprinkler/Alarm $਍ഀ Total $਍ഀ Revisions਍ഀ Response to Correction Letter਍ഀ -attached copy of correction letter਍ഀ Deferred Submittal਍ഀ Other਍ഀ Description / List of Changes:਍ഀ 'Re sw 1 k S o-C e15 hosier S਍ഀ (Use additional sheet if necessary)਍ഀ Date Receive਍ഀ FE਍ഀ G 2 2009਍ഀ N OF VAIL਍ഀ A & D Asbestos Testing and Consulting਍ഀ John R. Peterman਍ഀ P.O. Box 1230 Clifton, CO. 81520-1230਍ഀ Cell 970-270-3689 Home Phone 970-464-5265਍ഀ INSPECTION REPORT PREPARED FOR:਍ഀ George Shaeffer Construction Company਍ഀ P.O. Box 373਍ഀ Vail, CO. 81658਍ഀ LOCATION:਍ഀ Golden Peak Lodge਍ഀ 458 Vail Valley Drive਍ഀ Unit #1਍ഀ Vail, CO. 81657਍ഀ REPORT PREPARED BY:਍ഀ John R. Peterman਍ഀ Inspector Manager਍ഀ Certificate No. 6601਍ഀ 2਍ഀ E-d e2O:ii BO La 2nd਍ഀ A & D Asbestos Testing and Consulting਍ഀ John R. Peterman਍ഀ Asbestos Testing, Project Design, and Consulting਍ഀ INTRODUCTION:਍ഀ On August 18`h, 2008 an inspection/survey was conducted and 5 bulk਍ഀ samples were collected from:਍ഀ Golden Peak Lodge਍ഀ 458 Vail Valley Drive਍ഀ Unit #1਍ഀ Vail, CO. 81657਍ഀ The purpose of the inspection/survey was to locate and sample਍ഀ suspected Asbestos containing materials that might be present in the area of਍ഀ the Residence that is planned for Renovation.਍ഀ The inspection was made, and the samples were collected by John R.਍ഀ Peterman, an A.H.E.R.A. and State of Colorado Certified Asbestos਍ഀ Inspector. Great care was taken during the inspection and sampling to be as਍ഀ accurate as possible. It should be noted that minimal damage was done to਍ഀ the existing building structures during the inspection so there is no਍ഀ documentation for unseen conditions or stored items.਍ഀ All samples were analyzed by DCM Science Lab in Wheatridge, CO.਍ഀ This laboratory is deemed "Proficient" in the E.P.A.Quality Assurance (QA)਍ഀ program for the determination of asbestos in bulk materials, and is਍ഀ accredited by the American Hygiene Association (AHA).਍ഀ SAMPLING PROTOCOL:਍ഀ A random sampling scheme was used to sample the suspect materials that਍ഀ were designated. If during any future demolition or renovation work,਍ഀ suspect material is discovered that hasn't been sampled and would be਍ഀ disturbed, work should be halted until the material has been tested.਍ഀ • d eeo : T T 80 La 2nki਍ഀ A & D Asbestos Testing and Consulting਍ഀ John R. Peterman਍ഀ Asbestos Testing, Project Design, and Consulting਍ഀ Golden Peak Lodge਍ഀ 458 Vail Valley Drive਍ഀ Unit #I਍ഀ Vail, CO. 81657਍ഀ RENOVATION AREA DESCRIPTION:਍ഀ Golden Peak Lodge, Unit #1, is planned for selective interior renovation.਍ഀ The interior walls are covered in textured sheetrock, and the ceilings are਍ഀ covered in sheetrock like the walls. The floors are covered in finished wood,਍ഀ carpet, and ceramic floor tiles.਍ഀ CONCLUSIONS & RECOMMENDATIONS:਍ഀ Laboratory analysis of the composite sheetrock samples indicate that no਍ഀ Asbestos was detected in any of the bulk samples.਍ഀ 4਍ഀ eco:11 eo La 2nd਍ഀ S•d਍ഀ D਍ഀ P-਍ഀ CO਍ഀ T਍ഀ 00਍ഀ 0਍ഀ U਍ഀ >਍ഀ T਍ഀ r਍ഀ 'i਍ഀ a਍ഀ CD਍ഀ Ri਍ഀ CO਍ഀ LO਍ഀ mr਍ഀ 4)਍ഀ O਍ഀ J਍ഀ Y਍ഀ co਍ഀ co 4)਍ഀ CL਍ഀ N 4)਍ഀ .'O _਍ഀ O਍ഀ 00਍ഀ T LL਍ഀ r਍ഀ Q O਍ഀ 0਍ഀ G J਍ഀ w਍ഀ J਍ഀ m 0 0 0 0 0਍ഀ Q Z Z Z Z Z਍ഀ LL਍ഀ L i m 0਍ഀ 3 3 0 3 3਍ഀ K x x X T(਍ഀ t਍ഀ 3 3 3 3 3਍ഀ Y Y Y Y Y਍ഀ V O V V V਍ഀ O O O O O਍ഀ d ~ d d਍ഀ Z਍ഀ t t t t t਍ഀ O਍ഀ cn cn cn cn cn਍ഀ _਍ഀ CL਍ഀ '਍ഀ H H਍ഀ a► in u,਍ഀ V਍ഀ c਍ഀ n਍ഀ EEEEE਍ഀ a਍ഀ UVVUU਍ഀ 2਍ഀ O਍ഀ LL਍ഀ -਍ഀ W਍ഀ 0਍ഀ E E਍ഀ W਍ഀ - - O਍ഀ J਍ഀ $ m਍ഀ a਍ഀ E E ~z3਍ഀ Q਍ഀ G O~: O Z਍ഀ O਍ഀ ICI਍ഀ a਍ഀ !L਍ഀ c Im਍ഀ m਍ഀ ? > « efl Q.਍ഀ Q਍ഀ J J Y ~L ~਍ഀ V਍ഀ m਍ഀ O਍ഀ W਍ഀ a਍ഀ ~਍ഀ r- N M !f Ln਍ഀ O O O O O਍ഀ W਍ഀ O O O p 0਍ഀ a਍ഀ Z਍ഀ ~਍ഀ w਍ഀ mmmmm਍ഀ a਍ഀ ~਍ഀ J J J J J਍ഀ CL IL IL CL CL਍ഀ ~਍ഀ ~਍ഀ C7 C3 C7 C7 C3਍ഀ 9'd uco:ll BO LZ 2nd਍ഀ O O O O O਍ഀ c 0 0 0 0 0਍ഀ O O O C C਍ഀ ti਍ഀ Cfl਍ഀ T਍ഀ U਍ഀ a਍ഀ N਍ഀ cococ਍ഀ aaaaQ਍ഀ 0਍ഀ z z z z z਍ഀ T਍ഀ Cl)਍ഀ w਍ഀ N਍ഀ to਍ഀ Q਍ഀ 'i਍ഀ A਍ഀ d਍ഀ co਍ഀ >਍ഀ d N O d d਍ഀ L L L V L਍ഀ •c਍ഀ 3 3 7 7 3਍ഀ r਍ഀ c਍ഀ r r r.਍ഀ r r਍ഀ x x x x x਍ഀ d d d d d਍ഀ co਍ഀ ttttt਍ഀ 3 3 3 3 3਍ഀ L਍ഀ Y Y Y Y Y਍ഀ d਍ഀ 0 0 0 0 0਍ഀ r « « « «਍ഀ d d d O V਍ഀ C਍ഀ J਍ഀ Z਍ഀ t t=Z.NC਍ഀ O਍ഀ tntntAtnN਍ഀ Y਍ഀ d d d਍ഀ m d਍ഀ ਍ഀ d਍ഀ 4਍ഀ N N N N N਍ഀ 00 a਍ഀ ac਍ഀ 00000਍ഀ N d਍ഀ W਍ഀ 0 0 0 0 0਍ഀ = a਍ഀ a਍ഀ o਍ഀ UUUUU਍ഀ co °਍ഀ °਍ഀ ~਍ഀ m਍ഀ T਍ഀ v~਍ഀ w਍ഀ ~਍ഀ c~਍ഀ ~਍ഀ to਍ഀ cm m LO਍ഀ o°਍ഀ °਍ഀ oo਍ഀ F-਍ഀ p਍ഀ j਍ഀ o਍ഀ o਍ഀ 7 • .਍ഀ ਍ഀ z਍ഀ Q o਍ഀ a਍ഀ w਍ഀ mmmmm਍ഀ v਍ഀ a਍ഀ ~਍ഀ JJJJJ j-਍ഀ J਍ഀ CL IL a. M CL LU਍ഀ C/~਍ഀ N਍ഀ (਍ഀ 30a00 Y਍ഀ .a਍ഀ d਍ഀ r਍ഀ d਍ഀ «਍ഀ d਍ഀ N਍ഀ d਍ഀ .o਍ഀ 0਍ഀ z਍ഀ Q਍ഀ Z਍ഀ L•d eEO:TT 80 La 2nd਍ഀ n਍ഀ ti਍ഀ L1 l਍ഀ ca਍ഀ T਍ഀ 0਍ഀ V਍ഀ T਍ഀ D਍ഀ 'i਍ഀ eo਍ഀ ao਍ഀ Ln਍ഀ d'਍ഀ m਍ഀ a~਍ഀ 0਍ഀ J਍ഀ Y਍ഀ 4)਍ഀ a਍ഀ 00਍ഀ °o c਍ഀ N਍ഀ 0਍ഀ Go (3਍ഀ r਍ഀ Q Q਍ഀ w਍ഀ d to਍ഀ 0 J਍ഀ w਍ഀ 0਍ഀ Q਍ഀ Q਍ഀ o QQQQ਍ഀ U. Qz~zzzz਍ഀ w਍ഀ a਍ഀ 00000਍ഀ o਍ഀ O o 0 0 0਍ഀ oocco਍ഀ (;f਍ഀ 00000਍ഀ Q਍ഀ z z z z z਍ഀ Q਍ഀ 0਍ഀ z਍ഀ 0਍ഀ z਍ഀ 0਍ഀ V਍ഀ J਍ഀ J਍ഀ 0 0 0 0 0਍ഀ 00000਍ഀ w਍ഀ 00000਍ഀ >਍ഀ 00000਍ഀ O਍ഀ J਍ഀ Q਍ഀ rA਍ഀ a਍ഀ Q਍ഀ o਍ഀ ~਍ഀ v਍ഀ aaaaa਍ഀ o਍ഀ U਍ഀ cn਍ഀ o਍ഀ d~਍ഀ a਍ഀ F-਍ഀ w਍ഀ m਍ഀ r-NMa 1t>਍ഀ O O O O O਍ഀ O O O O O਍ഀ U਍ഀ z਍ഀ W਍ഀ Q਍ഀ q਍ഀ J਍ഀ mmmmm਍ഀ mmmmm਍ഀ 000C.70 Y਍ഀ LT਍ഀ C਍ഀ 3਍ഀ N਍ഀ e'd eto:ll 80 LZ 9nd਍ഀ Aug 2S 08 01:07p DCM Science Laboratory 303-463-8267 P•2਍ഀ Q਍ഀ J਍ഀ s਍ഀ >਍ഀ v aZ਍ഀ 0਍ഀ SW਍ഀ «4਍ഀ z~P਍ഀ oooA<F਍ഀ N N N ~ N਍ഀ ~ m m 00 Q <਍ഀ Z m <਍ഀ w F਍ഀ <A z਍ഀ Z (OaZQ0' f o~Ve਍ഀ $ _ 0 OFU a.਍ഀ O਍ഀ D਍ഀ J W H m਍ഀ O਍ഀ ZCA uf m4 <gCV96 O਍ഀ <਍ഀ vui3~ ~ y਍ഀ vi 0਍ഀ S ~਍ഀ m਍ഀ V਍ഀ <਍ഀ F਍ഀ Z਍ഀ u1਍ഀ U਍ഀ cr਍ഀ 0਍ഀ is਍ഀ F਍ഀ U.਍ഀ z਍ഀ 0਍ഀ o਍ഀ W o਍ഀ F n਍ഀ 0 m਍ഀ O਍ഀ H M਍ഀ WV਍ഀ ~ m F਍ഀ r < a U਍ഀ y਍ഀ G - d਍ഀ LU0w eooo 0000 ooCgo 0000 ooeo਍ഀ OW.4 o88S 8888 8888 eo_g$$ °1_88°85਍ഀ ~s9਍ഀ gr I Oeoo 00'00 a0e0 0000 00e0਍ഀ wo z 80' 88 oe8e0' o8 8088 e0'2 o਍ഀ O y਍ഀ Z O਍ഀ OF 0'004 000a 0IR o,oooL oeoa਍ഀ Z o=01- ago!- ego F 0'g dF 411E਍ഀ mFi_1਍ഀ vv਍ഀ F 0਍ഀ O V਍ഀ o z zz z zz z਍ഀ omCa਍ഀ zzzzz z°zzzz z°zzz zzzzzz zzzz਍ഀ z਍ഀ y਍ഀ h਍ഀ F Co o e o 0 \.a a o਍ഀ oo,e o bq 000 oo਍ഀ W lw N r4 IM N 1~ N 'f N^ 11 V1 N h N c਍ഀ U਍ഀ W N਍ഀ C਍ഀ O਍ഀ r਍ഀ Z a ~~.~L [2 C਍ഀ d aL਍ഀ 0 J J< 0 << < 4 r਍ഀ 14 &1਍ഀ 9 Lo਍ഀ z :03 S G G 891਍ഀ O a< y Q C o C c Q m G ~ O਍ഀ "46 >਍ഀ t t: t: 0਍ഀ tz~C33F 2HC fa-FCrz<-3਍ഀ 3tz<- z c਍ഀ ~ v਍ഀ 1O C8,਍ഀ m m Go .40 of F਍ഀ a0' ~e a0' e0' p W਍ഀ O਍ഀ N eq h <਍ഀ O S v o z -਍ഀ I O0' FO m 9 S! O W਍ഀ R Um,਍ഀ J J ..2 .a < <਍ഀ Vl p I 0 C7 C~7 la7 C7 -j਍ഀ Z਍ഀ of < y਍ഀ N y aD I - N n V' of L' Z਍ഀ ebO:TT 80 LZ 9nd਍ഀ E਍ഀ c਍ഀ d਍ഀ a~਍ഀ c਍ഀ N਍ഀ 00000਍ഀ O਍ഀ Zzzzz਍ഀ d~਍ഀ ti਍ഀ eo਍ഀ u਍ഀ to਍ഀ ~਍ഀ O਍ഀ J਍ഀ T਍ഀ O਍ഀ U਍ഀ c਍ഀ m c਍ഀ 3333਍ഀ aw਍ഀ 00000਍ഀ CL਍ഀ a਍ഀ as਍ഀ D਍ഀ m c਍ഀ 00000਍ഀ J J J J J਍ഀ C ~਍ഀ .00਍ഀ Lr)਍ഀ U਍ഀ ਍ഀ (50000਍ഀ 0਍ഀ =xxx=਍ഀ 1਍ഀ CL਍ഀ J਍ഀ Y਍ഀ r~਍ഀ C13਍ഀ 0਍ഀ CL਍ഀ yZ਍ഀ wwwww਍ഀ CM- m਍ഀ a਍ഀ a਍ഀ R਍ഀ O਍ഀ L਍ഀ T਍ഀ a਍ഀ W਍ഀ r N M V O਍ഀ U) t਍ഀ 0 0 0 0 0਍ഀ ~਍ഀ ਍ഀ Z਍ഀ Q o਍ഀ W਍ഀ d਍ഀ m m m m m਍ഀ 0਍ഀ CL CL CL CL IL਍ഀ -1਍ഀ 00000਍ഀ OT 'd eb0:ii BO La gnu਍ഀ 02.20.09਍ഀ Gold Peak Unit #1਍ഀ Permit # B08-0280਍ഀ Bunk Room Egress Exemption਍ഀ According to the 2003 International Building Code, Section 1025 Emergency Escape and਍ഀ Rescue conditions apply only to sleeping rooms in the basement and below the fourth਍ഀ floor.਍ഀ 1025.1 General. In addition to the means of egress required by਍ഀ this chapter, provisions shall be made for emergency escape਍ഀ and rescue in Group R as applicable in Section 101.2 and Group਍ഀ 1-1 occupancies. Basements and sleeping rooms below the਍ഀ fourth story above grade plane shall have at least one exterior਍ഀ emergency escape and rescue opening in accordance with this਍ഀ section.਍ഀ ti਍ഀ c~਍ഀ s਍ഀ 1-1਍ഀ The Bunk Room located in the Gold Peak Base Facility Building on Level 229 is a fourth਍ഀ floor sleeping room, and therefore exempt.਍ഀ 710 WEST LIOHSHEAD CIRCLE, SUITE A VAIL COLORADO 81657਍ഀ 970.477.2990 9 7 0 . 4 7 7 . 2 9 6 5 ( I I www.kbwebb.com਍ഀ MEMBER OF THE AMERICAN INSTITUTE OF ARCHITECTS਍ഀ 02.20.09 r , }਍ഀ Gold Peak Unit #1਍ഀ Permit # B08-0280 r''਍ഀ Bunk Room Egress Exemption਍ഀ sAccording to the 2003 International Building Code, Section 1025 Emergency Escape and਍ഀ Rescue conditions apply only to sleeping rooms in the basement and below the fourth਍ഀ floor.਍ഀ 1025.1 General. In addition to the means of egress required by਍ഀ this chapter, provisions shall be made for emergency escape਍ഀ and rescue in Group R as applicable in Section 101.2 and Group਍ഀ I-1 occupancies. Basements and sleeping rooms below the਍ഀ fourth story above grade plane shall have at least one exterior਍ഀ emergency escape and rescue opening in accordance with this਍ഀ section.਍ഀ The Bunk Room located in the Gold Peak Base Facility Building on Level 229 is a fourth਍ഀ floor sleeping room, and therefore exempt.਍ഀ ~~pF COtp਍ഀ KYLE H. °਍ഀ 3 * WE ~►r਍ഀ ~ ~D ARC`S`਍ഀ 710 WEST LIONS HEAD CIRCLE, SUITE A VAIL COLORADO 81657਍ഀ 970.477.2990 970.411.2965( E) www.khwebb.com਍ഀ AITM BER Of THE Ab+ERi(AN ;NSTfTUTE Of AP(hiTEETS਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ ' MWNO M਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149਍ഀ ADD/ALT MF BUILD PERMIT Permit B08-0280਍ഀ Project਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location......: GOLDEN PEAK UNIT ONE਍ഀ Parcel No....: 210108109005਍ഀ OWNER VAIL CORP 08/15/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT GEORGE SHAEFFER CONSTRUCTION 08/15/2008 Phone: 845-5656਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ CONTRACTOR GEORGE SHAEFFER CONSTRUCTION 08/15/2008 Phone: 845-5656਍ഀ PO BOX 373਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 302-A਍ഀ ARCHITECT K.H. WEBB ARCHITECTS PC 08/15/2008 Phone: 970-477-2990਍ഀ 710 WEST LIONSHEAD CIR, UNIT A਍ഀ VAIL਍ഀ CO 81657਍ഀ License: 0000001627਍ഀ Description:਍ഀ INTERIOR FINISH REMODEL, WINDOW AND PATIO DOOR REMODEL, AND਍ഀ EXTERIOR HOT TUB REPLACEMENT਍ഀ Occupancy: R2਍ഀ Type Construction:IIA਍ഀ Status :਍ഀ Applied :਍ഀ Issued :਍ഀ Expires...:਍ഀ PRJ08-0399਍ഀ ISSUED਍ഀ 08/15/2008਍ഀ 09/04/2008਍ഀ 03/03/2009਍ഀ Valuation: $500,000.00਍ഀ Total Sq Ft Added: 0਍ഀ FEE SUMMARY #*#*kk********k********kk***#*#k**kk*k**kkkkkkk*k*#k***kk**k##k###***k44***44**਍ഀ Building Permit Fee------ > $3,233.75 Will Cal Fee--------------------- > $4.00 Total Calculated Fees > $15,249.69਍ഀ Plan Check--------------------> $2,101.94 Use Tax Fee--------------------- > $9,800.00 Additional Fees-----------------------> $0.00਍ഀ Add'I Plan Check Hours-> $110.00 Restua rant Plan Review-----> $0.00 TOTAL PERMIT FEES--------------> $15,249.69਍ഀ Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00਍ഀ Payments > $15,249.69਍ഀ Total Calculated Fees--------> $15,249.69 BALANCE DUE------------------------ > $0.00਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ REQUESTS FORINSP਍ഀ IONS ALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM਍ഀ 8:00 AM - 4:0਍ഀ ignature of Owner or Contractor Date਍ഀ kA਍ഀ Print Name਍ഀ bld_alt_construction_perm it_041908਍ഀ APPROVALS਍ഀ Permit B08-0280 as of 11-14-2008 Status: ISSUED਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 09/03/2008 cgunion Action: AP਍ഀ 11/14/2008 cgunion Action: AP APPROVED਍ഀ STRUCTURAL REVISION AND UPDATED FLOOR PLAN FOR BUNK ROOM਍ഀ Item: 05600 FIRE DEPARTMENT਍ഀ 08/21/2008 drhoades Action: COND Approved with਍ഀ conditions.਍ഀ See the Conditions section of this Document for any that may apply.਍ഀ b I d_a It_co n stru ct i o n_p a rm it_041908਍ഀ CONDITIONS OF APPROVAL਍ഀ Permit B08-0280 as of 11-14-2008 Status: ISSUED਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE਍ഀ COMPLIANCE.਍ഀ Cond: 14਍ഀ (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO਍ഀ BE SEALED WITH AN APPROVED FIRE MATERIAL.਍ഀ Cond: 1਍ഀ (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY਍ഀ WORK CAN BE STARTED.਍ഀ Cond: 40਍ഀ (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72.਍ഀ Cond: CON0010258਍ഀ Separate permits required for Fire Alarm system and for਍ഀ Fire Sprinkler System. Detectors shall not be bagged or਍ഀ covered. Contact the building's alarm contractor to have਍ഀ smoke detectors changed to heat detectors prior to any work਍ഀ occurring.਍ഀ Cond: CON0010288਍ഀ MAINTAIN ALL EXISTING FIRE RESISTIVE ASSEMBLIES PER IBC਍ഀ b I d_a It_co n st ru ct i o n_pe rm it_041908਍ഀ ਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080002192 Amount: $110.00 11/14/200801:40 PM਍ഀ Payment Method: Check Init: LC਍ഀ Notation: #095126/GEORGE਍ഀ SHAEFFER CONSTRUCTION਍ഀ ਍ഀ Permit No: B08-0280 Type: ADD/ALT MF BUILD PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $15,249.69਍ഀ This Payment: $110.00 Total ALL Pmts: $15,249.69਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ PF 00100003112300 PLAN CHECK FEES 110.00਍ഀ Development Review Coordinator਍ഀ 75 South Frontage Road਍ഀ Vail, CO 81657਍ഀ Phone: 970-479-2128਍ഀ Fax: 970-479-2452਍ഀ Inspections, 970-479-2149਍ഀ WIN oy&਍ഀ Transmittal Form਍ഀ Revision Submittals:਍ഀ 1. "Field Set" of approved plans MUST accompany revisions਍ഀ 2. No further inspections will be performed until the revisions are approved & the permit is re-issued.਍ഀ 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.਍ഀ Q Revisions਍ഀ Permit #(s) information applies to: Attention: Response to Correction Letter਍ഀ -attached copy of correction letter਍ഀ D -07 Q O Deferred Submittal਍ഀ O Other਍ഀ Project Address: Description / List of Changes:਍ഀ L.15g Ual Uq)ley ~•r~'U-z 1 CA) S\- VCVY41 Amwew,,S w ck wev(਍ഀ Contact Information਍ഀ Company:਍ഀ Company Phg11~- yS-S(o✓0 Fax: 61 7U'b15--1013਍ഀ Contact Name: 4eveorerh਍ഀ Contact Ph:gb- 5qo 1Y Cell: y70- Z/9P4111W਍ഀ E-Mail: Il0n S (W °vr- COe\Cr7. C-OVVI਍ഀ Town of Vail Contractor Registration No: 3,o2.-A਍ഀ X਍ഀ Sig tt re (required)਍ഀ ਍ഀ Revised ADDITIONAL Valuations (Labor & Materials)਍ഀ 0A a ua (1la ))e 40 - Pe VIM 4 se4਍ഀ ( '~A l -t I a y. a-F I7y'Y1 k 10o4 6਍ഀ z਍ഀ as SN c,wv, av~ A1OZ o; kqw਍ഀ 6VAW('Hgg,਍ഀ (DO NOT include original valuation)਍ഀ Building $਍ഀ 2 s002°਍ഀ Plumbing $਍ഀ Electrical $਍ഀ Mechanical $਍ഀ Fire Sprinkler/Alarm $਍ഀ Total $਍ഀ i 1()0o-5,਍ഀ soo਍ഀ kl 500Q~t਍ഀ (Use additional sheet it necessary)਍ഀ Date Receive : IF I C਍ഀ D਍ഀ n Nov 13 2008਍ഀ TOWN OF VAIL਍ഀ AUG.11.2008 1:56PM GOLD PK HOME OWE਍ഀ August 8, 2008਍ഀ Att: Town Of Vail਍ഀ This letter is to clan਍ഀ aware of and approves਍ഀ penthouse # 1. Please਍ഀ project.਍ഀ That k you Golden Pei਍ഀ Manager Carrie Delair਍ഀ Gp1'or'NASSOCIATION MINruM਍ഀ NO. 153! P.1਍ഀ Town of Vail਍ഀ OFFICE COPY਍ഀ It that the Golden Peak Condominium Association is਍ഀ -:e pending project involving Charles Schwab's਍ഀ me emy permits needed to move :forward with this਍ഀ Condominium Association.਍ഀ 158 VAII. VAI-I-P.Y DRIVE VAIN, CO 81657਍ഀ P.O. ROXI7, VATI., C.0 81658 970-479.3035 PAX 970.479.808;਍ഀ i਍ഀ s਍ഀ Town of Vail਍ഀ OFFICE COPY਍ഀ GEORGE SHAEFFER਍ഀ CONSTRUCTION COMPANY V1.1਍ഀ P.O. Box 373਍ഀ Vail, Colorado 81658਍ഀ (970) 845-5656਍ഀ August 13, 2008਍ഀ Golden Peak Unit 1 Staging Plan਍ഀ 1. Parkin- All parking will take place in the Vail public parking garages. GSCC਍ഀ will also provide subcontractor employees shuttles to the job site.਍ഀ 2. Restrooms- All workers will be required to use the designated restroom in unit 1.਍ഀ 3. Trash Removal- Propose placing a trash truck on the north side of the garage਍ഀ doors at a two hour intermittent time line during demolition (September). All਍ഀ demolition debris will be placed in the trash truck through the unit 1 bedroom਍ഀ window. Once demolition is completed trash will be removed via pick-up trucks਍ഀ loaded on the north side of the buildings garage.਍ഀ 4. Hot Tub Removal & Installation- GSCC will coordinate/schedule the਍ഀ removal/installation of the existing/new hot tub via crane the hot tub company.਍ഀ Town of Vail. Right of Way permits will be obtained and flaggers will be used for਍ഀ the removal/installation.਍ഀ 5. Flow of Materials- Demolition debris and daily trash removal will be taken from਍ഀ the unit in trash receptacles down the stairs to the GPR lobby/garage level and਍ഀ loaded into dumpster/pick-up trucks. Construction materials will be unloaded into਍ഀ the GPR garage and taken up the stairs as necessary. Larger items which will not਍ഀ fit through the stairway door will be taken up the elevator and will be completely਍ഀ wrapped for protection.਍ഀ 6. Deliveries- GSCC will coordinate/schedule deliveries with the GPR. Flaggers will਍ഀ be used for deliveries as necessary.਍ഀ 7. Worker Access- Worker access will be via the entry gate & stairwell to the third਍ഀ level to the unit. Workers will be required to wear booties when leaving the unit਍ഀ to keep dust levels down in the hallways. (see photo)਍ഀ 8. Storage of Materials- GSCC will use 2 of the GPR Unit 1 garage parking spaces਍ഀ enclosed with a lockable screened chain link fence for storage of materials during਍ഀ construction (see photo).਍ഀ \ / /਍ഀ I ' -਍ഀ 1 I I ! .I u਍ഀ i਍ഀ i / .਍ഀ Ate,; ~਍ഀ I '਍ഀ ~a R, 1਍ഀ 11 i਍ഀ P~OLV਍ഀ -g U N IT਍ഀ i਍ഀ mss' EXH OBIT-B਍ഀ F਍ഀ J਍ഀ i਍ഀ _ I਍ഀ FAC11L਍ഀ Acte55਍ഀ Cwt ~ i-obb~਍ഀ T-B਍ഀ 1 i਍ഀ I! I਍ഀ p਍ഀ 111 ~ '਍ഀ PARKING,਍ഀ II it GORE CREEK DJMrE਍ഀ f~਍ഀ y ,਍ഀ - -਍ഀ t°਍ഀ Mtn਍ഀ I਍ഀ ■਍ഀ sQ• ~1਍ഀ °*R਍ഀ e k਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080001406 Amount: $2,000.00 08/15/200804:51 PM਍ഀ Payment Method: Check Init: RLF਍ഀ Notation: 94071 GOERGE਍ഀ SHAEFFER CONSTRUCTION COMPANY਍ഀ ਍ഀ Permit No: B08-0280 Type: ADD/ALT MF BUILD PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $15,139.69਍ഀ This Payment: $2,000.00 Total ALL Pmts: $2,000.00਍ഀ Balance: $13,139.69਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ PF 00100003112300 PLAN CHECK FEES 2,000.00਍ഀ TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT਍ഀ 75 S. FRONTAGE ROAD਍ഀ VAIL, CO 81657਍ഀ 970-479-2135਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ ALARM PERMIT਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ Project No਍ഀ OWNER VAIL CORP 10/21/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT COMMERCIAL SPECIALISTS OF 10/21/2008਍ഀ WESTERN COLORADO, LLC਍ഀ PO BOX 3913਍ഀ EAGLE਍ഀ CO 81631਍ഀ License: 161-S਍ഀ CONTRACTOR COMMERCIAL SPECIALISTS OF 10/21/2008਍ഀ WESTERN COLORADO, LLC਍ഀ PO BOX 3913਍ഀ EAGLE਍ഀ CO 81631਍ഀ License: 161-S਍ഀ Permit A08-0090਍ഀ _6਍ഀ Status਍ഀ ISSUED਍ഀ Applied..:਍ഀ 10/21/2008਍ഀ Issued .਍ഀ 12/08/2008਍ഀ Expires.਍ഀ 06/06/2009਍ഀ Phone: (970) 328-1951਍ഀ Phone: (970) 328-1951਍ഀ Desciption: INSTALL 10 NEW SMOKE DETECTORS AND 7 NEW SPEAKER ONLY, NEW਍ഀ WIRE THROUGHOUT਍ഀ Valuation: $5,690.00਍ഀ FEE SUMMARY਍ഀ Electrical >਍ഀ $0.00 Total Calculated Fees-->਍ഀ $445.38਍ഀ DRB Fee--------- >਍ഀ $0. 00 Additional Fees >਍ഀ $0.00਍ഀ Investigation >਍ഀ $0.00 Total Permit Fee-------->਍ഀ $445. 38਍ഀ Will Call >਍ഀ $0 . 00 Payments >਍ഀ $445.38਍ഀ TOTAL FEES-->਍ഀ $445.38 BALANCE DUE-------->਍ഀ $0.00਍ഀ ਍ഀ ਍ഀ Approvals:਍ഀ Item: 05਍ഀ 600 FIRE DEPARTMENT਍ഀ 12਍ഀ /03/2008 drhoades਍ഀ Action: AP਍ഀ CONDITIONS OF APPROVAL਍ഀ ਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,਍ഀ and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all਍ഀ Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review਍ഀ approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.਍ഀ REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS IN ADVANCE BY TELEPHONE AT 970-479-2252 FROM 8:00 AM - 5 PM.਍ഀ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080002321 Amount: $445.38 12/08/200812:59 PM਍ഀ Payment Method: Check Init: SAB਍ഀ Notation: 10977਍ഀ COMMERCIAL SPECIALISTS਍ഀ ਍ഀ Permit No: A08-0090 Type: ALARM PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $445.38਍ഀ This Payment: $445.38 Total ALL Pmts: $445.38਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ BP 00100003111100 FIRE ALARM PERMIT FEES 213.38਍ഀ PF 00100003112300 PLAN CHECK FEES 232.00਍ഀ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLET OR #NSIGNED 401K-6਍ഀ Building Permit $C7਍ഀ Alarm Permit਍ഀ 970-479-2135 pnspections~਍ഀ TPWWN'OFYAL TOWN OF VAIL FIRE ALARM PERMIT APPLICATION਍ഀ Commercial & Residential Fire Alarm shop drawings are required at time of 75 S.਍ഀ Frontage Rd. application submittal and must include information listed on the Vail, Colorado਍ഀ 81657 2"° page of this form. Application will not be accepted without this਍ഀ information.਍ഀ CONTRACTOR INFORMATION਍ഀ Fire Alarm Contractor: Town of Vail Reg. No.: 11 Contact and Phone #'s:਍ഀ E-Mail Address: S ; rvl ei~, Ce"-r , T L _ rA eT਍ഀ Contractor Signature: FI.਍ഀ fG ~I \n r਍ഀ I j 1਍ഀ COMPLETE VALUATIONS FOR ALARM PERMIT Lab Materials k + I"਍ഀ Fire Alarm: $਍ഀ 51 OWN 11-..,1F I਍ഀ Contact Eaale County AssPSSnrs DfficP at 971)-39R-R9dn nr vicif 1nnnnn1 Ganlo_rn1 rnfv rnm fnr Dtbrnnl If਍ഀ -਍ഀ Parcel # -Z'10 o v 05-਍ഀ Job Name:਍ഀ Job Address:਍ഀ Legal Description Lot: Block: Filing: Subdivision:਍ഀ Owners Name:਍ഀ Address: {fib ink z \(A« ,Gn &uf Phone:਍ഀ Engineer: CSw~਍ഀ Address: Pb cbe,,r ~਍ഀ 34u3 ,c1'~ co Phone:਍ഀ ~ $t~~~ 32c~. f i਍ഀ Detailed Location of work: (i.e., floor, unit bldg.਍ഀ L::;rJ ' Niq p_ 1-਍ഀ Detailed description of work:਍ഀ rye vv z n6e~k%'~~a>~'_ p~t1Y s l~l w~P cj਍ഀ [Work Class: New( ) Addition( ) Remodel Repair ( ) Retro-fit ( ) Other ( )਍ഀ Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family M Commercial ( Restaurant ( ) Other ( )਍ഀ No. of Existing Dwelling Units in this building: No. of Accommodation units in this building:਍ഀ Does a Fire Alarm Exist: Yes No( ) Does a Fire Sprinkler System Exist: Yes No ( )਍ഀ x******FOR OFFICE USE ONLY r ~x******~r r*****x*****਍ഀ Other Fees:਍ഀ Jk1w Public Way Permit Fee:਍ഀ Occupancy Group: In." ON in 4"UtINd਍ഀ By: fix' L5t~1਍ഀ F:\Users\cdev\FORMS\PERMITS\Alarmperm.doc nut EJ I W_- )1A)SeEr TOR 08/23/2004਍ഀ Oft 12 - 22 -QS?਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ MWNOFVAI! '਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149਍ഀ ELECTRICAL PERMIT Permit E08-0237਍ഀ AMF਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ OWNER VAIL CORP਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT SHAW ELECTRIC਍ഀ P0BOX1451਍ഀ AVON CO਍ഀ CO 81620਍ഀ License: 106-E਍ഀ CONTRACTOR SHAW ELECTRIC਍ഀ P0BOX1451਍ഀ AVON CO਍ഀ CO 81620਍ഀ License: 106-E਍ഀ 10/06/2008਍ഀ 10/06/2008 Phone: 970-926-3358਍ഀ 10/06/2008 Phone: 970-926-3358਍ഀ Desciption: WIRING FOR REMODEL, HOT TUB REPLACEMENT਍ഀ Valuation: $15,000.00 Square feet: 2700਍ഀ Status...:਍ഀ Applied :਍ഀ Issued . . .਍ഀ Expires.਍ഀ PRJ08-0399਍ഀ ISSUED਍ഀ 10/06/2008਍ഀ 10/07/2008਍ഀ 04/05/2009਍ഀ FEE SUMMARY਍ഀ Electrical Permit Fee--------- > $118.45 Total Calculated Fees--> $122.45਍ഀ Investigation Fee--------------> $0.00 Additional Fees > $0.00਍ഀ Will Call Fee--------------------> $4.00਍ഀ Use Tax Fee------------------- > $0.00 TOTAL PERMIT FEE---> $122.45਍ഀ Total Calculated Fees > $122.45 Payments-----------------> $122.45਍ഀ BALANCE DUE---------- > $0.00਍ഀ APPROVALS਍ഀ Item: 06000 ELECTRICAL DEPARTMENT਍ഀ 10/06/2008 JLE Action: AP਍ഀ CONDITIONS OF APPROVAL਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that਍ഀ all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state਍ഀ laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and਍ഀ Residential Codes and other ordinances of the Town applicable thereto.਍ഀ REQUESTS FOR SPECTION SHALL਍ഀ OFFICE FRO 00 AM - 4 PM.,---)਍ഀ TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR਍ഀ Sig ature of Owner or Contractor਍ഀ 21 ~਍ഀ Print Name਍ഀ Project਍ഀ to -਍ഀ Date਍ഀ elec_prm_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080001878 Amount: $122.45 10/07/200802:27 PM਍ഀ Payment Method: Check Init: DDG਍ഀ Notation: Shaw Electric਍ഀ 16244਍ഀ ਍ഀ Permit No: E08-0237 Type: ELECTRICAL PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $122.45਍ഀ This Payment: $122.45 Total ALL Pmts: $122.45਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ EP 00100003111100 ELECTRICAL PERMIT FEES 118.45਍ഀ WC 00100003112800 WILL CALL INSPECTION FEE 4.00਍ഀ FROM :SHAW ELECTRIC FAX NO. :9709263358 Oct. 03 2008 03:55PM P1਍ഀ Reaaurant C ) -Quw.( )਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ MWWOFVAIL਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149਍ഀ ELECTRICAL PERMIT Permit E08-0268਍ഀ ASFR਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ OWNER VAIL CORP਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT MD MOLLER CO਍ഀ PO BOX 1508਍ഀ EDWARDS਍ഀ CO 81632਍ഀ License: 355-E਍ഀ CONTRACTOR MD MOLLER CO਍ഀ PO BOX 1508਍ഀ EDWARDS਍ഀ CO 81632਍ഀ License: 355-E਍ഀ 10/31/2008਍ഀ 10/31/2008 Phone: (970) 569-3913਍ഀ 10/31/2008 Phone: (970) 569-3913਍ഀ Desciption: WIRING FOR REMODEL਍ഀ Valuation: $50,000.00 Square feet: 2500਍ഀ Project਍ഀ Status਍ഀ Applied. .਍ഀ Issued. . .਍ഀ Expires.਍ഀ PRJ08-0399਍ഀ ISSUED਍ഀ 10/31/2008਍ഀ 11/05/2008਍ഀ 05/04/2009਍ഀ ......,...,.,.<,..,.,,,.,w.,.,,,,,<,,..,,*.*...,.,.,..*. FEE SUMMARY਍ഀ Electrical Permit Fee--------- > $109.25 Total Calculated Fees--> $113.25਍ഀ Investigation Fee--------------> $0.00 Additional Fees > $0.00਍ഀ Will Call Fee--------------------> $4.00਍ഀ Use Tax Fee------------------- > $0.00 TOTAL PERMIT FEE---> $113.25਍ഀ Total Calculated Fees > $113.25 Payments-----------------> $113.25਍ഀ BALANCE DUE---------- > $0.00਍ഀ APPROVALS਍ഀ Item: 06000 ELECTRICAL DEPARTMENT਍ഀ 10/31/2008 JLE Action: AP਍ഀ CONDITIONS OF APPROVAL਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that਍ഀ all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state਍ഀ laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and਍ഀ Residential Codes and other ordinances of the Town applicable thereto.਍ഀ DR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR਍ഀ 4 8:00 4 P 7- it਍ഀ Si wner or Contractor Date਍ഀ Print Name਍ഀ elec_prm_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080002131 Amount: $113.25 11/05/200804:06 PM਍ഀ Payment Method: Check Init: SAB਍ഀ Notation: 8728 and moller਍ഀ Permit No: E08-0268 Type: ELECTRICAL PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $113.25਍ഀ This Payment: $113.25 Total ALL Pmts: $113.25਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ EP 00100003111100 ELECTRICAL PERMIT FEES 109.25਍ഀ WC 00100003112800 WILL CALL INSPECTION FEE 4.00਍ഀ =1G-30-08;08:52AM;਍ഀ # 2/ 3਍ഀ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UN D਍ഀ Project਍ഀ Building Permit*: -Q2਍ഀ *VK' Electrical Permit ISAIZ C3਍ഀ TOWN 970-479-2149 (Inspections)਍ഀ 75 S. Frontage Rd.਍ഀ Vail, Colorado 81657਍ഀ TOWN OF VAIL ELECTRICAL PERMIT APPLICATION਍ഀ CONTRACTOR INFORMATION਍ഀ of Vail Reg. No.:਍ഀ COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials)਍ഀ AMOUNT OF SQ Ff IN STRUCTURE: ELECTRICAL VALUATION: $਍ഀ Contact Eagle Coun Assessors Office at 970-328-8540 or visit www.ea /e-cmun .com for Parcel0਍ഀ Parcel #਍ഀ S਍ഀ Job Name:਍ഀ LL~4& At~ t਍ഀ )਍ഀ 1 b Add ess: VU;1 _ V00leu,br .਍ഀ Legal Description 11 Lot:਍ഀ Block: Filing:਍ഀ Subdivision:਍ഀ Owners Name: ;਍ഀ Address:਍ഀ 2 \[a- I 11 Phone:਍ഀ Engineer:਍ഀ Address:਍ഀ Phone:਍ഀ Detailed description wk:਍ഀ Work Class: New Addition( )਍ഀ Remodel਍ഀ Repair ( ) Temp Power ( ) Other ( )਍ഀ Work Type: Interior (4-*- Exterior (਍ഀ ) Both ( )਍ഀ 11 Does an EHU exist at this location: Yes ( ) No ( )਍ഀ Type of Bldg.: Single-family (Duplex (਍ഀ ) Multi-family ( )਍ഀ Commercial ( ) Restaurant ( ) Other ( )਍ഀ No. of Existing Dwelling Units In this building:਍ഀ No. of Accommodation Units in this building:਍ഀ Is this permit for a hot tub: Yes਍ഀ No਍ഀ Does a Fire Alarm Exist: Yes ( No( )਍ഀ Does a Fire sprinkler system Exist: Yes ( No(਍ഀ )਍ഀ 111-3.2,5਍ഀ **a,v k** ******************FOR OFFICE USE਍ഀ Other Fees:਍ഀ Date Received:਍ഀ DRS Fees:਍ഀ Accepted B :਍ഀ Planner Si n-off:਍ഀ F:\cdev\FORMS\Permits\Bullding\electlcal_ermiLll-23-2005.DOC Page 1 or 2 11/23/2005਍ഀ TOWN OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT਍ഀ 75 S. FRONTAGE ROAD਍ഀ VAIL, CO 81657਍ഀ 970-479-2135਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ SPRINKLER PERMIT Permit F08-0108਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: UNIT 1, GOLD PEAK਍ഀ Parcel No...: 210108109005਍ഀ Project No਍ഀ OWNER VAIL CORP 12/09/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT ALL STATE FIRE PROTECTION, I 12/09/2008਍ഀ 6045 E 76TH #12਍ഀ COMMERCE CITY਍ഀ CO 80022਍ഀ License: 370-S਍ഀ Status ISSUED਍ഀ Applied..: 12/09/2008਍ഀ Issued. 01/12/2009਍ഀ Expires.਍ഀ Phone: 303-288-3901਍ഀ CONTRACTOR ALL STATE FIRE PROTECTION, I 12/09/2008 Phone: 303-288-3901਍ഀ 6045 E 76TH #12਍ഀ COMMERCE CITY਍ഀ CO 80022਍ഀ License: 370-S਍ഀ Desciption: INSTALL NEW FIRE SPRINKLER SYSTEM਍ഀ Valuation: $14,934.90਍ഀ FEE SUMMARY਍ഀ Mechanical਍ഀ $0 . 00 Restuarant Plan Review-->਍ഀ $0.00਍ഀ Total Calculated Fees਍ഀ $984.਍ഀ 73਍ഀ Plan Check਍ഀ $350.00 DRB Fee--------------------- >਍ഀ $0.00਍ഀ Additional Fees----------->਍ഀ $0.਍ഀ 00਍ഀ Investigation->਍ഀ $0. 00 TOTAL FEES-------------->਍ഀ $984. 73਍ഀ Total Permit Fee---------- >਍ഀ $984 .਍ഀ 73਍ഀ Will Call >਍ഀ $0.00਍ഀ Payments >਍ഀ $984.਍ഀ 73਍ഀ BALANCE DUE--------- >਍ഀ $0.਍ഀ 00਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ Item: 05600 FIRE਍ഀ DEPARTMENT਍ഀ 01/07/2009਍ഀ drhoades Action: AP਍ഀ Approved਍ഀ as noted:਍ഀ 1. Heads in 2nd tloor bunk room can be਍ഀ a maximum਍ഀ of 8 teet off of਍ഀ any wall਍ഀ (See g(਍ഀ #6). Plans਍ഀ show them further than that.਍ഀ CONDITION OF APPROVAL਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ ਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,਍ഀ and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all਍ഀ Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review਍ഀ approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.਍ഀ REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS IN ADVANCE BY TELEPHONE AT 970-479-2252਍ഀ FROM 8:00 AM - 5 PM.਍ഀ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER਍ഀ TOWN OF VAIL, COLORADO਍ഀ Statement਍ഀ Statement Number: R090000030 Amount: $984.73 01/12/200910:05਍ഀ AM਍ഀ Payment Method: Check Init: DDG਍ഀ Notation: All਍ഀ State Fire਍ഀ Protection 22596਍ഀ -਍ഀ ਍ഀ ਍ഀ Permit No: F08-0108 Type: SPRINKLER PERMIT਍ഀ ਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: UNIT 1, GOLD PEAK਍ഀ Total Fees:਍ഀ $984.73਍ഀ This Payment: $984.73 Total ALL Pmts:਍ഀ $984.73਍ഀ Balance:਍ഀ $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ BP 00100003111100 SPRINKLER PERMIT FEES਍ഀ ਍ഀ 634.73਍ഀ PF 00100003112300 PLAN CHECK FEES਍ഀ ਍ഀ 350.00਍ഀ ਍ഀ TOWN(P V਍ഀ FIRE SPRINKLER PERMIT਍ഀ Commercial & Residential Fire Alarm shop drawings are required at the time of਍ഀ application submittal and must include the following information:਍ഀ A Colorado Registered Engineer's stamp or N.I.C.E.T. level III (min)਍ഀ stamp਍ഀ Equipment cut sheets of materials਍ഀ Hydraulic calculations਍ഀ A State of Colorado Plan Registration form਍ഀ Plans must be submitted by a Registered Fire Protection Contractor਍ഀ Development Review Coordinator਍ഀ 75 South Frontage Road਍ഀ Vail, CO 81657਍ഀ Phone: 970-479-2128਍ഀ Fax: 970-479-2172਍ഀ Inspections'-'970-479-'2149਍ഀ Project/Street Address(21O~&VA P_Cak਍ഀ V", Df Project਍ഀ - 6਍ഀ Contractor Informat~ion Building Permit M਍ഀ -਍ഀ Company: 11 ~~T(~ 1~~ ~QC id►'1 Sprinkler Permit M 10 a਍ഀ D਍ഀ Company Address: `JC1 ~5 E 20'k 4y2 2਍ഀ Detailed Description of Work:਍ഀ City: State: _ Zip: t~~ ~l~ i2਍ഀ M i 1L-e k. k,1e,►~-਍ഀ Contact Name:਍ഀ Contact Ph: C=_ Cell: (use additional sheet if necessary)਍ഀ E-Mail ~m I 1~-~ [L i~ i~ ( ~'I~~'~ P C ti [iYly✓l r~਍ഀ Detailed Location of Work:਍ഀ c,਍ഀ Town of Vail Contractor Registration No.:਍ഀ oe~਍ഀ X 12, ~ 7਍ഀ Contractor Sig tune (required) (use additional sheet if necessary)਍ഀ Property Information n p਍ഀ i Value of Fire Sprinkler:਍ഀ Parcel (Labor & Materials)਍ഀ Legal Description: Lot਍ഀ Block਍ഀ Work Class:਍ഀ New( ) Addition( ) Remodel ( Retro-Fit ( )਍ഀ Subdivision: Repair ( ) Other(਍ഀ )਍ഀ Building/Complex Name: Type of Building:਍ഀ Owner Name: n 4 IL[en~hyvdoo Single-Family ( ) Duplex ( ) Multi-Family (fi਍ഀ (For parcel contact Eagle County Assessors Office at 970-328-8640 or visit Commercial( ) Restaurant( ) Other(਍ഀ )਍ഀ www.eaglecouty.us/patie)਍ഀ Does a Fire Alarm Exist? Yes਍ഀ Does a Sprinkler SVAN.਍ഀ Date Received਍ഀ )਍ഀ No(਍ഀ D਍ഀ 0d DEC 0 8 2008਍ഀ Two-. FRF hSf ,cam tiog 5,q7਍ഀ f,Ya-਍ഀ Haste:਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT਍ഀ MROVKJ•਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149਍ഀ ALL TIMES਍ഀ -BaK -o,4 MECHANICAL PERMIT਍ഀ ACOM਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ OWNER VAIL CORP 11/24/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT SKYLINE MECHANICAL਍ഀ P.O. BOX 1258਍ഀ GYPSUM਍ഀ CO 81637਍ഀ License: 121-M਍ഀ CONTRACTOR SKYLINE MECHANICAL਍ഀ P.O. BOX 1258਍ഀ GYPSUM਍ഀ CO 81637਍ഀ License: 121-M਍ഀ 11/24/2008 Phone: 970-524-6809਍ഀ 11/24/2008 Phone: 970-524-6809਍ഀ Desciption: MECHANICAL WORK PER PLANS਍ഀ Valuation: $12,000.00਍ഀ Permit M08-0297਍ഀ Project PRJ08-0399਍ഀ Status਍ഀ ISSUED਍ഀ Applied਍ഀ 11/24/2008਍ഀ Issued.਍ഀ 01/15/2009਍ഀ Expires .਍ഀ 07/14/2009਍ഀ t..»...>.........>*FEE SUMMARY*.........#.......,...*».....,.«<«..,...........,..,...«.«..............,,.,,.<.<਍ഀ Mechanical Permit Fee---> $240.00 Will Call > $4.00 Total Calculated Fees $304.00਍ഀ Plan Check > $60.00 Use Tax Fee------ > $0.00 Additional Fees-----------> $0.00਍ഀ Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $304.00਍ഀ Total Calculated Fees--> $304.00 Payments-----------------> $304.00਍ഀ BALANCE DUE--------- > $0.00਍ഀ APPROVALS਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 11/24/2008 cgunion Action: CR CALLED CONTRACTOR NEED (2) SETS OF PLANS TO BE਍ഀ SUBMITTED. NO PLANS WERE PROVIDED WITH APPLICATION਍ഀ 12/16/2008 cgunion Action: AP APPROVED MECHANICAL PLANS DATED 11/7/08਍ഀ CONDITION OF APPROVAL਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ Cond: 22਍ഀ (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION਍ഀ 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.਍ഀ Cond: 23਍ഀ (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND਍ഀ CHAPTER 10 OF THE 2003 IMC.਍ഀ Cond: 25਍ഀ (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.਍ഀ Cond: 29਍ഀ (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003਍ഀ IMC AND CHAPTER 3 OF THE 2003 IFGC..਍ഀ Cond: 31਍ഀ (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS਍ഀ LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.਍ഀ Cond: 32਍ഀ (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR਍ഀ TO AN INSPECTION REQUEST.਍ഀ Cond: 30਍ഀ (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED਍ഀ MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.਍ഀ mechca nical_permit_041908਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ AM - 4਍ഀ ECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(਍ഀ ature of Owner or Contractor਍ഀ ~asSe- /~~YlfG~਍ഀ Print Name਍ഀ Date਍ഀ m e c h ca n i ca I_p a rm it_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R090000044 Amount: $304.00 01/15/200911:07 AM਍ഀ Payment Method: Check Init: LC਍ഀ Notation: 414608/SKYLINE਍ഀ MECHANICAL਍ഀ Permit No: M08-0297 Type: MECHANICAL PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $304.00਍ഀ This Payment: $304.00 Total ALL Pmts: $304.00਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ MP 00100003111100 MECHANICAL PERMIT FEES 240.00਍ഀ PF 00100003112300 PLAN CHECK FEES 60.00਍ഀ WC 00100003112800 WILL CALL INSPECTION FEE 4.00਍ഀ "Development Review Coordinator਍ഀ 75 South Frontage Road਍ഀ Vail, CO81657਍ഀ Phone: 970-479-2128਍ഀ Fax: 970-479-2452਍ഀ Inspections: 970-479-2149਍ഀ O਍ഀ Transmittal Form਍ഀ Revision Submittals:਍ഀ 1. "Field Set" of approved plans MUST accompany revisions਍ഀ 2. No further inspections will be performed until the revisions are approved & the permit is re-issued.਍ഀ 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.਍ഀ Revisions਍ഀ Permit #(s) information applies to: Attention: Response to Correction Letter਍ഀ _attached copy of correction letter਍ഀ /T n OR% daC(~ Y,, 5 Lill Deferred Submittal਍ഀ O Other਍ഀ Project Address:਍ഀ Contact Information਍ഀ Company:__ Kai/rev1~ ~c-AA.Jr~ 0k਍ഀ Cso~਍ഀ Company Ph: -51V - *vOW- Fax: 0( 6 v਍ഀ Contact Name: ~ugrrs A-.)-i JV,_,਍ഀ Contact Ph:??O - 3- ~L- - C-60 `1 Cell:਍ഀ E-Mail: Tc~sri/ li.v r«c+~uv c ~s l ~~rK਍ഀ Town of Vail Contractor Registration No:਍ഀ X਍ഀ Signat re (required)਍ഀ Revised ADDITIONAL Valuations (Labor & Materials)਍ഀ (DO NOT include original valuation)਍ഀ Building $਍ഀ Plumbing $਍ഀ Electrical $਍ഀ Mechanical $਍ഀ Fire Sprinkler/Alarm $਍ഀ Total $਍ഀ Description / List of Changes:਍ഀ .1 4,aw 1-1-c "r-1- / wv, Z A-- l-L11A-C-਍ഀ (use aaamonai sneet it necessary਍ഀ Date Received:਍ഀ DEC 10 2008਍ഀ TOWN OF VAIL਍ഀ NO TE; THIS PERMIT MUS T BE POS TED ON JOBS/ TE A T਍ഀ MEOFVE਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970-479-2139 f. 970.479.2452 inspections. 970.479.2149਍ഀ ALL TIMES਍ഀ MECHANICAL PERMIT਍ഀ AMF਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ OWNER VAIL CORP 12/02/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT WESTERN FIREPLACE SUPPLY, IN 12/02/2008਍ഀ 1685 PAONIA਍ഀ COLO SPRINGS, CO 80915਍ഀ PO BOX 670਍ഀ MINTURN, CO 81645਍ഀ License: 323-M਍ഀ CONTRACTOR WESTERN FIREPLACE SUPPLY, IN 12/02/200਍ഀ 1685 PAONIA਍ഀ COLO SPRINGS, CO 80915਍ഀ PO BOX 670਍ഀ MINTURN, CO 81645਍ഀ License: 323-M਍ഀ Phone: 668-3760਍ഀ Phone: 668-3760਍ഀ Desciption: INSTALL GAS FIREPLACE (GAS PIPING BY OTHERS)਍ഀ Valuation: $4,987.77਍ഀ Permit M08-0307਍ഀ Project PRJ08-0399਍ഀ Status਍ഀ ISSUED਍ഀ Applied਍ഀ 12/02/2008਍ഀ Issued .਍ഀ 12/02/2008਍ഀ Expires.਍ഀ 05/31/2009਍ഀ *.»...............*..*.......t~......:......««FEE SUMMARY**.........*............~~..................................~.*........਍ഀ Mechanical Permit Fee---> $100.00 Will Call > $4.00 Total Calculated Fees਍ഀ $229.00਍ഀ Plan Check > $25.00 Use Tax Fee------ >਍ഀ $0.00 Additional Fees-----------> $0 $0.00਍ഀ Investigation-----------------> $100.00 TOTAL PERMIT FEE---> $229.00਍ഀ Total Calculated Fees--> $229.00 Payments-----------------> $229.00਍ഀ BALANCE DUE--------- > $0.00਍ഀ APPROVALS਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 12/02/2008 JLE Action: AP਍ഀ CONDITION OF APPROVAL਍ഀ Cond: 12਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ Cond: 22਍ഀ (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION਍ഀ 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.਍ഀ Cond: 25਍ഀ (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.਍ഀ Cond: CON0010483਍ഀ SEPARATE PERMIT FOR GAS PIPING REQUIRED਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ REQUESTS FOR NS TI SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(਍ഀ AM - 4 PM.਍ഀ mechcanical_perm it_041908਍ഀ of Owner or Contractor਍ഀ la/u(11਍ഀ Date਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080002296 Amount: $229.00 12/02/200802:31 PM਍ഀ Payment Method: Check Init: JLE਍ഀ Notation: 2176 WESTERN਍ഀ FIREPLACE਍ഀ Permit No: M08-0307 Type: MECHANICAL PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $229.00਍ഀ This Payment: $229.00 Total ALL Pmts: $229.00਍ഀ Balance: $0.00਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ MP 00100003111100 MECHANICAL PERMIT FEES 100.00਍ഀ PF 00100003112300 PLAN CHECK FEES 25.00਍ഀ PN 00100003153000 INVESTIGATION FEE (BLDG) 100.00਍ഀ WC 00100003112800 WILL CALL INSPECTION FEE 4.00਍ഀ r਍ഀ gal Room Layout drawn si਍ഀ Mechanical Room Dimensions਍ഀ _ Combustion Air Duct Size and Location਍ഀ Flue, Vent and Gas Line Size and Location਍ഀ Heat Loss Calculations਍ഀ Equipment Cut / Spec Sheets਍ഀ ProiectAd਍ഀ 4i'58 VALL V441U' AW. aViT਍ഀ Pro)਍ഀ -਍ഀ n਍ഀ Building Permit M਍ഀ 626- 0 -86਍ഀ Contractor Informatio਍ഀ s਍ഀ -਍ഀ 1਍ഀ '਍ഀ 5਍ഀ Mechanical Permit਍ഀ Company਍ഀ c 1f S਍ഀ U਍ഀ I਍ഀ t਍ഀ Company Address: P, n. &W਍ഀ Detailed Description of Work:਍ഀ Clty: i d JLA CIA Stater Zip: 0 c 6 y 5਍ഀ .਍ഀ 1 R MA l 1A I O(~(਍ഀ -਍ഀ ark sG`lu/~e਍ഀ Contact Name਍ഀ f਍ഀ ਍ഀ Contact Ph:~7j :ell:਍ഀ 1 IAC.~਍ഀ 'E-Nleil:਍ഀ 3਍ഀ -਍ഀ (Use additional sheet if necessary)਍ഀ a਍ഀ Town of Vail In4clor Regis on No:਍ഀ Complete Valuation for Mechanical Permit:਍ഀ Mechanical y 1਍ഀ Contractor Signature (required)਍ഀ !਍ഀ Property Inforrnation਍ഀ Work Class:਍ഀ /ry਍ഀ Parcel 2101 .0al og oo t;਍ഀ New O Addition ( ) Remodel 06 Repair O Other ( )਍ഀ Legal Description: Lot# Bik #਍ഀ Boiler Location:਍ഀ Interior ( ) Exterior ( ) Other ( )਍ഀ Subdivision:਍ഀ J਍ഀ GoWd PEAK਍ഀ No/Type Existing Fireplaces:਍ഀ ob Name: _਍ഀ Gas Appliances( ) Gas Logs ( ) Wood/Pellet ( )਍ഀ Owner Name:਍ഀ No/Type Proposed Fireplaces:਍ഀ Mailing Address: P0 7 UA਍ഀ 81 O਍ഀ Gas Appliances( Gas Logs( ) Wood/Pellet ( )਍ഀ (For Parcel # Contact Eagle County assessors Office at 970-528-8840 or visit਍ഀ seglecounty.us/palle)'਍ഀ Type:਍ഀ ਍ഀ Architect O Designer( Engineer(਍ഀ Single-Famiy ( ) Two-Family ( ) Multi-Family਍ഀ Name:਍ഀ Commercial( Townhome ( Other(਍ഀ !਍ഀ Phone:਍ഀ Date Received:਍ഀ Fax਍ഀ E-Mail:਍ഀ I 2".. 00਍ഀ III[E ~਍ഀ DEC 02 2008਍ഀ TOWN OF VAIL਍ഀ The following Items MUST be attached to this permit application਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ 1MWNOVIEd਍ഀ Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657਍ഀ p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149਍ഀ PLUMBING PERMIT਍ഀ AMF਍ഀ Job Address: 458 VAIL VALLEY DR VAIL਍ഀ Location.....: GOLDEN PEAK UNIT ONE਍ഀ Parcel No...: 210108109005਍ഀ OWNER VAIL CORP 09/26/2008਍ഀ PO BOX 7਍ഀ VAIL਍ഀ CO 81658਍ഀ APPLICANT KAIBAB PLUMBING INC਍ഀ P.O. BOX 1451਍ഀ EAGLE਍ഀ CO 81631਍ഀ License: 282-P਍ഀ CONTRACTOR KAIBAB PLUMBING INC਍ഀ P.O. BOX 1451਍ഀ EAGLE਍ഀ CO 81631਍ഀ License: 282-P਍ഀ 09/26/2008 Phone: 970-390-7735਍ഀ 09/26/2008 Phone: 970-390-7735਍ഀ Desciption: RELOCATE BATH, LAUNDRY, POWDER ROOM, KITCHEN਍ഀ Valuation: $20,000.00਍ഀ Permit਍ഀ Project਍ഀ Status...:਍ഀ Applied਍ഀ Issued. . .਍ഀ Expires .਍ഀ P08-0121 ~oz਍ഀ PRJ08-0399਍ഀ ISSUED਍ഀ 09/26/2008਍ഀ 10/02/2008਍ഀ 03/31/2009਍ഀ 4*#****4***#444+*******fi4#******44********44444********44#4*#**#*###***#******** FEE SUMMARY ********#fi44******#**44******4*44444*#***44*4#44*4******************444***********਍ഀ Plumbing Permit Fee---> $300.00 Will Call > $4.00 Total Calculated Fees $379.00਍ഀ Plan Check > $75.00 Use Tax Fee > $0.00 Additional Fees >਍ഀ Investigation--------------> $0.00 $0.00਍ഀ TOTAL PERMIT FEES--> $379.00਍ഀ Total Calculated Fees--> $379.00 Payments > $379.00਍ഀ BALANCE DUE-----------> $0.00਍ഀ 44fi***#*444***#*#44*******#4#**##**4***#**44444***********4****#4***44*4#444*********44****#**##*******#*##***********#***4444*fF***#*#**4*********#44#******#*44********4#***.00 44****਍ഀ APPROVALS਍ഀ Item: 05100 BUILDING DEPARTMENT਍ഀ 09/26/2008 RE Action: AP਍ഀ rtrtrtrt****+4rtrtfi****444***k4*44****4rtrtfifi******rtfi**fi*4*4rtrtrtrtfifi+*4rtrtfifi*+*4rtrtrtrtrt*****rtrt4fi*******4rtrtfifi****44rt*+*****rtrtfifi****rt*rt4fi****#*rtrtrt44****44**44fifi******rtrtrt*fi*****4rtrtfi*****4*rtrtrt+*fi*****4rt਍ഀ Cond: 12 CONDITION OF APPROVAL਍ഀ (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ +****4444***4444***44444***44444****4444***4444*4*4*44444***4444***4444444****4444444***4444444#*44444fi*******+******4444*******444fi*****4*rt444******444*****4*44444*******44444*****444*਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information਍ഀ as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure਍ഀ according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town਍ഀ applicable thereto.਍ഀ REQUESTS਍ഀ AM - 4 PM.਍ഀ HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(਍ഀ OfVWner or Contractor Date਍ഀ Print Name਍ഀ plmbpermt1_041908਍ഀ TOWN OF VAIL, COLORADO Statement਍ഀ Statement Number: R080001819 Amount: $379.00 10/02/200808:57 AM਍ഀ Payment Method:Credit Crd Init: DDG਍ഀ Notation: credit card -਍ഀ James Sutherland਍ഀ ਍ഀ Permit No: P08-0121 Type: PLUMBING PERMIT਍ഀ Parcel No: 2101-081-0900-5਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ Location: GOLDEN PEAK UNIT ONE਍ഀ Total Fees: $379.00਍ഀ This Payment: $379.00 Total ALL Pmts: $379.00਍ഀ Balance: $0.00਍ഀ ਍ഀ ACCOUNT ITEM LIST:਍ഀ Account Code Description Current Pmts਍ഀ ਍ഀ PF 00100003112300 PLAN CHECK FEES 75.00਍ഀ PP 00100003111100 PLUMBING PERMIT FEES 300.00਍ഀ WC 00100003112800 WILL CALL INSPECTION FEE 4.00਍ഀ ਍ഀ •਍ഀ Development Review Coordinator਍ഀ 75 South Frontage Road਍ഀ Vail; CO. 81657਍ഀ Phone: 9170-479-2126਍ഀ Fax: 9.70-479`2172਍ഀ ~/Q~~~ MY Inspections: 970-479-2149਍ഀ TOWN OF VAIL PLUMBING PERMIT APPLICATION਍ഀ Project Address:਍ഀ 445-0 AL Yk,,L-eY w w&਍ഀ 6 a-D PEAK uN / r -el਍ഀ VA-tL, Co.਍ഀ Project PR -TO g -03.7c)਍ഀ Building Permit bob o26o਍ഀ Plumbing Permit 1 '9 r) I l਍ഀ Contractor Information਍ഀ Company: 06A6 FUA46JAJ6 SIN CL਍ഀ Company Address: RO. 66X I g 51਍ഀ City: F'kI.C State: Cm ~ zip: 8163 1਍ഀ Contact Name: :J--W • 5ur74SR t,A-,+4?਍ഀ Contact Ph: 117V 390.773,5' Cell: t i✓਍ഀ E-Mail: K ibeLbO1UM_ bj4~~Llg~r2lOV C:VM਍ഀ Town o mill C'ontt r Re stra " oo: ~Z/v P਍ഀ X I`AJ //L%~~aL "਍ഀ Contbactor Signature (required)਍ഀ Plumbing Valuation (Labor & Material)਍ഀ Plumbing $ 204 i਍ഀ Property Information਍ഀ Parcel 210/00I d9do,-਍ഀ Architect X) Designer( ) Engineer ( )਍ഀ Name: K l-I. W6਍ഀ Phone: 70, ti77 - 29 9 0਍ഀ Fax:਍ഀ E-Mail:਍ഀ Detailed Description of Work: RaJ26A~M਍ഀ (I ) aA-rH 6 > Lflv)jba(I Potom5e ea7A-t਍ഀ K,rc !40,t i ~N~77NvE਍ഀ QREUJOU-5 La44-I o kj 5 -਍ഀ (Use additional sheet if necessary)਍ഀ Work Class:਍ഀ New ( ) Addition ( ) Remodel (X Repair ( ) Other ( )਍ഀ Building Type:਍ഀ Single-Family 0 Two-Family ( ) Multi-Family਍ഀ Commercial Y4 Townhome ( ) Other( )਍ഀ Legal Description: Lot # Blk #਍ഀ Subdivision:਍ഀ Job Name: 6 L' J> Pr, f rg- 9FMOb CI-਍ഀ Owner Name: UR1 L 601T਍ഀ Mailing Address: •D L Ce l਍ഀ (For Parcel # Contact Eagle County assessors Office at 970-328-8640 or visit਍ഀ www. eaglecounty.us/patie)਍ഀ 'C it inc਍ഀ ( o਍ഀ Date Received:਍ഀ D L~OMF~ D਍ഀ SEP 2 - 2008਍ഀ TOWN OF VAIL I਍ഀ it .਍ഀ 07-10-2009 Inspection Request Reporting Page 5਍ഀ 4:88 pm Vail, CO - City ()f਍ഀ Requested Inspect Date: Monday, July 13, 2009਍ഀ Site Address: 458 VAIL VALLEY DR VAIL਍ഀ GOLDEN PEAK UNIT ONE਍ഀ A/P/D Information਍ഀ Activity:਍ഀ B08-0280 Type: A-MF਍ഀ Sub Type:਍ഀ AMF Status: ISSUED਍ഀ Const Type:਍ഀ Occupancy:਍ഀ Use:਍ഀ IIA Insp Area:਍ഀ Owner:਍ഀ VAIL CORP਍ഀ Contractor:਍ഀ GEORGE SHAEFFER CONSTRUCTION਍ഀ Phone:਍ഀ 845-5656਍ഀ Architect:਍ഀ K.H. WEBB ARCHITECTS PC਍ഀ Phone:਍ഀ 970-477-2990਍ഀ Description:਍ഀ INTERIOR FINISH REMODEL, WINDOW AND PATIO DOOR REMODEL਍ഀ AND EXTERIOR HOT TUB਍ഀ REPLACEMENT਍ഀ ,਍ഀ Requested Inspe਍ഀ Item:਍ഀ Requestor:਍ഀ Comments:਍ഀ Assigned To:਍ഀ Action:਍ഀ ction s਍ഀ 90 BLDG-Final਍ഀ JOHN / GEORGE SHAEFFER਍ഀ CONSTRUCTION਍ഀ 390-6141, WILL CALL਍ഀ JMONDRAGON਍ഀ Time਍ഀ Requested Time: 08:00 AM਍ഀ Phone: 845-5656਍ഀ Entered By: JELIUK K਍ഀ 00਍ഀ Inspection History਍ഀ i਍ഀ 2, 7਍ഀ Item: 30 BLDG-Framing Approved "਍ഀ 11/12/08਍ഀ Inspector: shahn Action: DN DENIED਍ഀ Comment:਍ഀ provide approved structural srawings for inspection.਍ഀ 11/17/08਍ഀ Comment:਍ഀ Inspector: shahn Action: PI PARTIAL INSPECTION਍ഀ BAY WINDOW FRAMING PER APPROVED PLANS਍ഀ 02/13/09਍ഀ Comment:਍ഀ .਍ഀ Inspector: cg Action: CR CORRECTION REQUIRED਍ഀ 1) FIRESTOP AROUND ALL TOP OF WALL TO BEAMS AND AT BEAM THOUGH਍ഀ ENETRATIONS AT SEPARATION WALLS NEAR UNIT ENTRY. APPROVED FIRESTOP਍ഀ REQUIRED ALSO FOR COMMUNICATIONS CABLES਍ഀ 2 FIRESTOP UPPER LEVEL PATCH DRYWALL CHECK ON ABANDONED MC CABLE਍ഀ 3 ADD SECOND LAYER OF bRYWALL AND EXtEND TO STRUCTURAL DECK, FIRESTOP਍ഀ ALL PIPES AND DUCTS IN LAUNDRY ROOM਍ഀ 4) PROVIDE FIRE RATED ACCESS PANEL FOR DRYER BOOSTER FAN AND STUDOR VENT਍ഀ IN LAUNDRY ROOM਍ഀ 5) BACK-BOX DRYER VENT WITH DRYWALL IN THE FIRE RATED SEPARATION WALL IN਍ഀ THE਍ഀ PL਍ഀ 6) P ER ROCK CORNER WALL IN਍ഀ AUNDRY ROOM TO COMPLETE THE FIRE RATED WALL਍ഀ ASSEMBLY਍ഀ 7 CHECK ON MC CABLE ABANDONED IN BEDROOM TOWER਍ഀ 8 PROVIDE EGRESS WITH 44" MAXIMUM SILL HEIGHT IN BEDROOM TOWER਍ഀ OKAY TO INSULATE EXTERIOR WALLS AND NON-RATED INTERIOR WALLS ONLY਍ഀ CALL਍ഀ .਍ഀ FOR FRAMING REINSPECTION WHEN ITEMS ARE COMPLETE਍ഀ 02/20/09਍ഀ Comment:਍ഀ Inspector: cg Action: COND APPROVED/CONDITIONS਍ഀ ITEMS 1਍ഀ 7 COMPLETED਍ഀ NE਍ഀ -਍ഀ .਍ഀ ED LETTER FROM ARCHITECT ON ITEM 8 PER MARTIN਍ഀ HAEBERLE਍ഀ Item: 50 BLDG-Insulation A proved਍ഀ p਍ഀ 02/25/09਍ഀ Comment:਍ഀ Inspector: JRM਍ഀ Action: AP APPROVED਍ഀ Item: 60 BLDG-Sheetrock Nail Approved਍ഀ 12/01/08਍ഀ Comment:਍ഀ Inspector: GCD Action: PI PARTIAL INSPECTION਍ഀ EXTERIOR GYP SHEATHING AT NEW WALL਍ഀ 02/27/09਍ഀ Comment:਍ഀ Inspector: JRM Action: PA PARTIAL APPROVAL਍ഀ UPPER MAIN LEVEL਍ഀ REPT131਍ഀ Run Id: 10013਍ഀ P08 -0121 : Entries for Item:290 - PLMB -Final 09:48 01/24/2013 Action Comments By Date Unique_ Ke AP shahn 06/25/2009 A000125 386 Total Rows: 1 Page 1 M08 -0307: Entries for Item-390 - MECH -Final 09:48 01/24/2013 Action Comments By Date Unique_ Key NO NO ACCESS JRM 07/02/2009 A000125 503 AP shahn 07/07/2009 A000125 —A Total Rows: 2 Page 1 M08 -0297: Entries for Item-.390 - MECH -Final 09:49 01/24/2013 Action Comments AP Total Rows: 1 By Date Unique_ Key shahn 06/25/2009 A000125 387 Page 1 E08 -0268: Entries for Item: 190 - ELEC -Final 09:49 01/24/2013 Action Comments By Date Unique_ Key AP shahn 06/25/2009 A000125 385 Total Rows: 1 Page 1 E08 -0237: Entries for Item: 190 - ELEC -Final 09:49 01/24/2013 Action Comments By Date Unique_ Key AP shahn 07/13/2009 A000125 708 Total Rows: 1 Page 1