HomeMy WebLinkAbout2020-51 IGA with CDOT Grant AmendmentRESOLUTION NO. 51
Series of 2020
A RESOLUTION APPROVING AN AMENDMENT TO A GRANT AGREEMENT
BETWEEN THE TOWN OF VAIL AND THE STATE OF COLORADO DEPARTMENT
OF TRANSPORTATION
WHEREAS, The Town and the Colorado Department of Transportation (CDOT
are parties to a certain STER funds dated February 26,
2020 ; and
WHEREAS, the parties wish to amend the Original Agreement to extend the
Original Agreement and to provide for revisions to the statement of work as set forth in
the State of Colorado Amendment, attached hereto as Exhibit A and made a part hereof
by this reference Amendment .
NOW THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE
TOWN OF VAIL, COLORADO THAT:
Section 1. The Town Council hereby approves the Amendment in substantially
the same form as attached hereto as Exhibit A, and in a form approved by the Town
attorney, and authorizes the Town Manager to execute the Amendment on behalf of the
Town.
Section 2. This Resolution shall take effect immediately upon its passage.
INTRODUCED, PASSED AND ADOPTED at a regular meeting of the Town
Council of the Town of Vail held this 15th day of December 2020.
_________________________
Dave Chapin, Town Mayor
ATTEST:
_____________________________
Tammy Nagel, Town Clerk
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 1 of 9
STATE OF COLORADO AMENDMENT (1)
SIGNATURE AND COVER PAGE
State Agency
Department of Transportation
Grant Amendment Number / PO Number
20-HTR-ZL-03179-M0002 / 491002132
Grantee
TOWN OF VAIL
Original Grant Agreement Number / PO Number
20-HTR-ZL-03179 / 491002132
Current Grant Agreement Amount Grant Agreement Performance Beginning Date
February 26, 2020
Amended Agreement Expiration Date
December 31, 2021
FASTER Funds
Maximum Amount (80%)
Local Funds
Local Match Amount (20%)
Agreement Total
$1,099,920.00
$274,980.00
$1,099,920.00
Amended Fund Expenditure End Date
December 31, 2021
THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT
Each person signing this Amendment represents and warrants that he or she is duly authorized to execute this
Amendment and to bind the Party authorizing his or her signature.
GRANTEE
TOWN OF VAIL
____________________________________________
By: ,
Date:_______________________________________
STATE OF COLORADO
Jared S. Polis, Governor
Department of Transportation
Shoshana M. Lew, Executive Director
By: _________________________________________
Shoshana M. Lew, CDOT Executive Director
____________________________________________
Signature*
Signatory avers to the State Controller or delegate that,
except as specified herein, Grantee has not begun
performance or that a Statutory Violation waiver has
been requested under Fiscal Rules
Date:_______________________________________
In accordance with §24-30-202 C.R.S., this Amendment is not valid until signed and dated below by the State
Controller or an authorized delegate.
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
By:___________________________________________
Department of Transportation
Effective Date:_____________________
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 2 of 9
1) PARTIES
This Amendment (the “Amendment”) to the Original Grant shown on the Signature and Cover Page for this
Amendment (the “Grant”) is entered into by and between the Grantee, and the State.
2) TERMINOLOGY
Except as specifically modified by this Amendment, all terms used in this Amendment that are defined in the
Grant shall be construed and interpreted in accordance with the Grant.
3) EFFECTIVE DATE AND ENFORCEABILITY
A. Amendment Effective Date
This Amendment shall not be valid or enforceable until the Amendment Effective Date shown on the Signature
and Cover Page for this Amendment. The State shall not be bound by any provision of this Amendment before
that Amendment Effective Date, and shall have no obligation to pay Grantee for any Work performed or
expense incurred under this Amendment either before or after of the Amendment term shown in §3.B of this
Amendment
B. Amendment Term
The Parties’ respective performances under this Amendment and the changes to the Grant contained herein shall
commence on the Amendment Effective Date shown on the Signature and Cover Page for this Amendment and
shall terminate on the termination of the Grant.
4) PURPOSE
The purpose for this Amendment is to extend the agreement, and revise Exhibit A - Statement of Work and
Budget as described in Section 5.
5) MODIFICATIONS
The Grant and all prior amendments thereto, if any, are modified as follows:
A. The Initial Agreement Expiration Date on the Grant Agreement’s Cover Page is hereby deleted and replaced
with the Amended Agreement Expiration Date shown on the Signature and Cover Page for this Amendment.
B. The Fund Expenditure End Date on the Grant Agreement’s Cover Page is hereby deleted and replaced with
the Amended Fund Expenditure End Date shown on the Signature and Cover Page for this Amendment.
C. Exhibit A is hereby deleted and replaced with Exhibit A.1.
D. All references to Exhibit A in the Grant and any amendments are hereby deleted in its entirety and replaced
with Exhibit A.1.
6) LIMITS OF EFFECT
This Amendment is incorporated by reference into the Grant, and the Grant and all prior amendments or other
modifications to the Grant, if any, remain in full force and effect except as specifically modified in this
Amendment. Except for the Special Provisions contained in the Grant, in the event of any conflict,
inconsistency, variance, or contradiction between the provisions of this Amendment and any of the provisions
of the Grant or any prior modification to the Grant, the provisions of this Amendment shall in all respects
supersede, govern, and control. The provisions of this Amendment shall only supersede, govern, and control
over the Special Provisions contained in the Grant to the extent that this Amendment specifically modifies those
Special Provisions.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 3 of 9
EXHIBIT A.1 – STATEMENT OF WORK AND BUDGET
Project Description 2020-FASTER: Transit Facility Electric Svc Upgrades & Install Chargers
Project End Date December 31, 2021
Sub-recipient Vail, Town of DUNS #075753293
Contact Name Greg Hall Vendor #2000003
Address 75 S Frontage Rd
Vail, CO 81657-5096
USA
Phone (970) 479-2160
Email ghall@vailgov.com Indirect Rate N/A
WBS*23273.10.50 ALI
Total Project Budget $1,374,900.00
State FASTER Funds (at 80% or less) $1,099,920.00
Local Funds (at 20% or more) $274,980.00
Total Project Amount Encumbered via this Grant Agreement $1,099,920.00
*The WBS numbers may be replaced without changing the amount of the grant at CDOT’s discretion.
A. Project Description
The Town of Vail is in the process of a seven (7) bus replacement project which will begin fleet transition to battery
electric buses through established fleet replacement schedules. This project is currently being supported with a 2017
FTA Low or No Emissions Section 5339(c) award of electric battery buses and is part of a long-term fleet
replacement plan. This specific project relates to the infrastructure needed to upgrade the Town of Vail bus barn to
support depot charging of a battery-electric bus fleet. Currently, the bus barn houses diesel and hybrid buses and
needs significant electrical upgrades to accommodate fleet-scale charging of battery electric buses. The Town of
Vail will use the 2020 FASTER funds, along with local matching funds, to support the upgrade of the power supply
and installation of chargers at the bus barn facility.
The project will support the goals of the Statewide Transit Plan.
Salient features for this project are:
Consultant selection process, design and entitlement process, including approval from the electric utility provider,
contractor selection process and procurement, construction of approved improvements, project turnover and
closeout.
Procurement /Project Delivery Method:
The project will utilize the Design-Bid-Build method of delivery. The town may select CM/GC as a contractor
selection process. Town of Vail will select a construction firm within six months of the execution of this grant
agreement.
Project Location: 1289 Elkhorn Drive, Vail, CO 81657
National Environmental Policy Act (NEPA):
The Town of Vail must ensure that the environmental consequences of its transportation project have been
adequately considered and that required mitigation measures can be completed within the time frame and budget
described in the application. An environmental clearance is required before final design, right-of-way acquisition
and construction funds are authorized. Contact the CDOT Project Manager for guidance concerning the
environmental requirements. Among those requirements, Environmental Justice considerations should be analyzed
and documented, if applicable. For more information see Chapter 9.15 of the CDOT NEPA Manual, found
at: https://www.codot.gov/programs/environmental/nepa-program/nepa-manual .
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 4 of 9
Right of Way:
Even though the Town of Vail does not anticipate additional Right of Way needed for this project at the time of
execution of this grant agreement, the Town of Vail shall consult the CDOT Region 3 Right of Way Manager and
determine whether the Town of Vail shall submit information sufficient to demonstrate the entirety of the Project,
including but not limited to the vault, transformer and service line installations, can be implemented entirely on
property owned and/or controlled by the Town of Vail. In the event it is determined the Project requires the
acquisition of real estate interests, whether permanent or temporary, the acquisition of such interests must be
conducted in compliance with the Uniform Relocation & Real Property Acquisition Policies Act of 1970, as
amended (Uniform Act), applicable Colorado state statutes, and the CDOT Right of Way Manual. Persons or firms
involved in the valuation and acquisition of real estate interests required for the Project must be qualified by CDOT
to perform those functions. Please direct all right of way related communications to:
Tim Woodmansee
CDOT Region 3 Right of Way Manager
222 S. 6th Street, Room 317
Grand Junction, CO 81501
Phone: 970-683-6224
Email: tim.woodmansee@state.co.us
Utilities:
The project is required to comply with CRS 9-.5-101 through 108 regarding subsurface utility engineering (SUE). If
the project meets the four criteria listed within the aforementioned Colorado Revised Statute, a SUE investigation
will be required. For more additional information, please relay your questions to:
Joe Carter
CDOT Region 3 Utility Engineering Program Manager
222 S. 6th Street, Room 317
Grand Junction, CO 81501
Phone: 970-683-6209
Email: joseph.carter@state.co.us
Design:
Work including preliminary design or final design (the "Construction Plans"), design work sheets, or special
provisions and estimates (collectively referred to as the "Plans"), requires that the Grantee comply with the
following requirements, as applicable:
a. perform or provide the Plans, to the extent required by the nature of the Work;
b. prepare final design (Construction Plans) in accord with the requirements of the latest edition of the
American Association of State Highway Transportation Officials (AASHTO) manual or other standard,
such as the Uniform Building Code, as approved by COOT;
c. prepare special provisions and estimates in accord with the State's Roadway and Bridge Design Manuals
and Standard Specifications for Road and Bridge Construction or Grantee specifications if approved by
COOT;
d. include details of any required detours in the Plans, in order to prevent any interference of the construction
Work and to protect the traveling public;
e. stamp the Plans produced by a Colorado Registered Professional Engineer;
f. provide final assembly of Plans and Grant documents;
g. be responsible for the Plans being accurate and complete; and
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 5 of 9
h. make no further changes in the Plans following the award of the construction contract except in writing
approved by all the Parties. The Plans shall be considered final when approved and accepted by the Parties
hereto, and when final they shall be deemed incorporated herein.
Construction:
1. Work including construction requires that, the Town of Vail perform the construction and construction
administration in accordance with the approved Plans and CDOT oversight. Such administration shall include
Project inspection and testing; performing required plant and shop inspections; documentation of grant
payments, testing and inspection activities; preparing and approving pay estimates; preparing, approving and
securing the funding for Grant modification orders and minor subgrant revisions; processing Subgrantee claims;
construction supervision;
2. The State shall have the authority to suspend the Work, wholly or in part, by giving written notice thereof to the
Grantee, due to the failure of the Grantee or its Subgrantee to correct Project conditions which are unsafe for
workers or for such periods as the State may deem necessary due to unsuitable weather, or for conditions
considered unsuitable for the prosecution of the Work, or for any other condition or reason deemed by the State
to be in the public interest.
3. Grantee- Town of Vail:
a. shall appoint a qualified professional engineer, licensed in the State of Colorado, as the Grantee Project
Engineer ("LAPE"), to perform that administration. The LAPE shall administer the Project in accordance
with this Grant, the requirements of the construction sub grant and applicable State procedures.
b. if bids are to be let for the construction of the Project, it shall advertise the call for bids upon approval by
the State and award the construction subgrant(s) to the low responsible bidder(s) upon approval by the
State.
(l) In advertising and awarding the bid for the construction, the Grantee shall comply with applicable
requirements of 23 USC § 112, 23 CFR Parts 633 and 635, and CRS §24-92-10 I et seq. Those
requirements include, without limitation, that the Grantee/Subgrantee shall comply with terms and
conditions as required by 23 CFR §633.102(e).
(2) The Grantee has the option to accept or reject the proposal of the apparent low bidder for work on
which competitive bids have been received. The Grantee must declare the acceptance or rejection
within 15 working days after said bids are publicly opened.
(3) By indicating its concurrence in such award, the Grantee, acting by or through its duly authorized
representatives, agrees to provide additional funds, subject to their availability and appropriation for
that purpose, if required to complete the Work under this Project if no additional State funds will be
made available for the Project. This paragraph also applies to Projects advertised and awarded by the
State.
Project Administration and Approvals:
Town of Vail and/or consultant will provide day to day oversight of the plans and construction. CDOT will provide
oversight of the project, including Procurement and Invoice Approval.
Key Tasks/Deliverables:
Obtain CDOT approval for procurement /advertisement (PCR) for Design Consultant
Advertise for bids for Design Consultant
Obtain CDOT approval of Procurement Authorization (PA) for award for Design Consultant (Design
consultant should subcontract a SUE consultant as a SUE investigation is required for the project. Utility
coordination shall be performed by the Design Consultant.) This should be reflected in the Milestone Table
below in Section B
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 6 of 9
Award Selected Design Consultant
Complete the final design (Town of Vail shall notify CDOT two weeks in advance so CDOT staff can
review the final design along with Town of Vail)
Conduct environmental clearance process
Obtain utility agreements
Prepare construction cost estimates
Obtain CDOT approval for procurement /advertisement (PCR) for Construction Contractor
Advertise for bids for Construction Contractor
Obtain CDOT approval of Procurement Authorization (PA) for Construction Contractor
Award selected construction contractor
Conduct pre-construction conference (CDOT staff will participate in the conference along with Town of
Vail)
Monitor construction process
Conduct Final Project Inspection (CDOT staff will participate in the inspection along with Town of Vail)
Submit monthly reimbursement requests to CDOT.
Process the final reimbursement request upon project closeout
CDOT, or a CDOT-authorized Construction PE Consultant, will be involved in some manner in most of the
activities listed above.
B. Performance Standards
1. Project Milestones
2. Town of Vail shall use the Capital Asset(s) purchased for its transit operations and shall perform regularly
recurring maintenance with specific performance measures tied to Town of Vail’s written maintenance plans,
including manufacturer’s recommendations and warranty program(s). Town of Vail will measure whether this
project is successful and improves the efficiency, effectiveness, and safety of transportation.
3. Performance will be reviewed throughout the duration of this Grant Agreement. Town of Vail shall report to the
CDOT Project Manager whenever one or more of the following occurs:
a. Budget or schedule changes;
b. Scheduled milestone or completion dates are not met;
c. Identification of problem areas and how the problems will be resolved; and/or
d. Expected impacts and the efforts to recover from delays.
Milestone Description Original Estimated
Complete Date
Design Consultant RFP Issued 1/31/2020
Select Design Contractor 2/26/2020
Award Design Contract (Including SUE Contractor) 3/3/2020
Design Complete 6/12/2020
RFP Construction Contractor 6/15/2020
Award Construction Contract 7/7/2020
Notice to Proceed 7/10/2020
Substantial Completion 2/28/2021
Project Close Out 4/30/2021
Final Reimbursement Request 6/15/2021
IMPORTANT NOTE: All milestones in this Statement of Work (except for the final reimbursement requests)
must be completed no later than the expiration date of this Subaward Agreement: December 31, 2021.
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 7 of 9
4. Town of Vail must comply and submit all reimbursements and associated reports, including the assignment of
“Colorado Department of Transportation” as the lienholder on the Capital Asset(s), as a condition of project
closeout.
C. Project Budget
1. The detail of project cost is listed on the following table:
Vault & Transformer installation $35,000
Service Installation cost- 800' to building $175,000
Main distribution switch and 1600 Amp service $250,000
Electrical room retrofit, code updates, fire suppression $120,000
Run 1,200' service line to bus barn $215,000
Service to each charger location (7 X18,000) $126,000
Back-up Power Generation $154,000
Building, electrical, and utility permits $25,000
Engineering and design $100,000
Construction Administration $50,000
Project Contingency (10%) $124,900
Total $1,374,900
2. The Total Project Budget is $1,374,900.00. The State will pay no more than 80% of the eligible, actual project
costs, up to the maximum amount of $1,099,920.00. The State will retain any remaining balance of the state
share of FASTER Funds. Town of Vail shall be solely responsible for all costs incurred in the project in excess
of the amount paid by the State from FASTER Funds for the state share of eligible, actual costs. For CDOT
accounting purposes, the FASTER Funds of $1,099,920.00 will be encumbered for this Grant Agreement.
3. No refund or reduction of the amount of Town of Vail’s share to be provided for the project will be allowed
unless there is at the same time a refund or reduction of the state share of a proportionate amount.
4. Town of Vail may use eligible federal funds for the Local Funds share. Town of Vail’s share, together with the
State FASTER Funds share, must be enough to ensure payment of the Total Project Budget.
5. Per the terms of this Grant Agreement, the State shall have no obligation to provide state funds for use on this
project. The State will administer FASTER funds for this project under the terms of this Grant Agreement,
provided that the state share of FASTER funds to be administered by the State are made available and remain
available. Town of Vail shall initiate and prosecute to completion all actions necessary to enable Town of Vail
to provide its share of the Total Project Budget at or prior to the time that such funds are needed to meet the
Total Project Budget.
D. Procurement
Procurement of this Capital Asset(s) will comply with state procurement procedures and the DTR Quick
Procurement Guide. In addition to the state requirements outlined below, state procedures for purchase of this
Capital Asset(s) must be followed and will be outlined prior to selecting Design Contractor and Construction
Contractor.
1. The first step in the procurement process will be to obtain an Independent Cost Estimate (ICE).
2. The second step will be to obtain a Procurement Concurrence Request (PCR) approval from the CDOT Project
Manager through COTRAMS.
3. Prior to entering into a purchasing agreement with the selected vendor, Town of Vail shall request a Purchase
Authorization (PA), and submit a purchase order for the Capital Asset(s) in COTRAMS.
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 8 of 9
4. Once the Purchase Authorization (PA) is approved by the CDOT Project Manager, and the Capital Asset(s)
is/are ordered, the CDOT Project Manager shall be notified by Town of Vail in COTRAMS of the agreed upon
delivery date.
5. Upon delivery, Town of Vail shall be responsible for having the Capital Asset(s) inspected and accepted within
fifteen (15) calendar days of delivery. If defects prevent acceptance of the Capital Asset(s), Town of Vail will
contact the vendor to resolve any defects and notify CDOT.
6. Town of Vail shall be responsible for reimbursing the selected vendor within forty-five (45) calendar days
after acceptance of the Capital Asset(s).
E. Allowable Costs
Town of Vail shall agree to adhere to the provisions for allowable and unallowable costs cited in the following
regulations: 2 CFR 200.420 through 200.475 and 2 CFR 200.102. Other applicable requirements for cost
allowability not cited previously, shall also be considered.
F. Reimbursement Eligibility
Requests for reimbursement for eligible project costs will be paid to Town of Vail upon submission of a complete
reimbursement packet in COTRAMS for those eligible costs incurred during the Grant Agreement effective dates.
Town of Vail will submit monthly reimbursement requests to CDOT and bill up to 95% of the FASTER total
eligible amount, which is $1,306,155, then submit a final invoice of $68,745 upon the project closeout.
Accepted reimbursement packets will include the following completed documents:
Independent Cost Estimate (ICE) (with the first reimbursement requests for the design consultant and the
construction contractor)
Procurement Concurrence Request (PCR) (with the first reimbursement requests for the design consultant
and the construction contractor)
Purchase Authorization (PA) (with the first reimbursement requests for the design consultant and the
construction contractor)
Invoice
Proof of Payment
Any Relevant Supporting Documents
Monthly Project Progress Report
Town of Vail must submit the final invoice within sixty (60) calendar days of acceptance of the Capital Asset(s),
and submit a Grant Closeout and Liquidation (GCL) Form in COTRAMS within fifteen (15) calendar days of
issuance of the final reimbursement payment.
G. State Interest--Service Life
CDOT maintains its share of the remaining state interest upon disposition of state assisted property before the end of
its useful life or for a value greater than $5,000 after the useful life has been met, according to the provisions of the
State Management Plan.
The useful life of the purchased equipment begins on the date it is placed into service and continues until it is
removed from service.
Minimum useful life is determined by years of service, in accordance with the State Management Plan. The
minimum useful life of each equipment component shall be obtained from each manufacturer and shall be
documented with the State.
Town of Vail shall not dispose or otherwise release the Capital Asset(s) to any other party while there is state
interest in the Capital Asset(s) without approval from the CDOT Project Manager.
PO # / SRM #: 491002132 / 20-HTR-ZL-03179
Routing #: 20-HTR-ZL-03179-M0002
Document Builder Generated
Rev. 12/09/2016
Page 9 of 9
Town of Vail is responsible for making the request to the CDOT Project Manager in a timely manner, providing
appropriate documentation, if indicated, when a lien release is being requested in order to allow CDOT to process
the release of a lien.
H. Training
In an effort to enhance transit safety, Town of Vail and any subrecipients and subcontractors shall make a good faith
effort to ensure that appropriate training of agency and contracted personnel is occurring and that personnel are up to
date in appropriate certifications.
I. Restrictions on Lobbying
Town of Vail is certifying that it complies with 2 CFR 200.450 by entering into this Subaward Agreement.
J. Special Conditions
1. Town of Vail will comply with all requirements imposed by CDOT on Town of Vail so that the state award is
used in accordance with state statutes, regulations, and the terms and conditions of the state award.
2. Town of Vail must permit CDOT and their auditors to have access to Town of Vail’s records and financial
statements as necessary, with reasonable advance notice.
3. Except as provided in this Grant Agreement, Town of Vail shall not be reimbursed for any purchase, issued
purchase order, or leased capital equipment prior to the execution of this Grant Agreement.
4. Town of Vail shall document any loss, damage, or theft of FTA- or state-funded property, equipment, or rolling
stock in COTRAMS.
5.Town of Vail shall ensure that it does not exclude from participation in, deny the benefits of, or subject to
discrimination any person in the United States on the ground of race, color, national origin, sex, age or disability
in accordance with Title VI of the Civil Rights Act of 1964.
6.Town of Vail shall seek to ensure non-discrimination in its programs and activities by developing and
maintaining a Title VI Program in accordance with the “Requirements for FTA Subrecipients” in CDOT’s Title
VI Program Plan and Federal Transit Administration Circular 4702.1B, “Title VI Requirements and Guidelines
for FTA Recipients.” The Party shall also facilitate FTA’s compliance with Executive Order 12898 and DOT
Order 5610.2(a) by incorporating the principles of environmental justice in planning, project development and
public outreach in accordance with FTA Circular 4703.1 “Environmental Justice Policy Guidance for Federal
Transit Administration Recipients.”
7. Town of Vail will provide transportation services to persons with disabilities, in accordance with Americans
with Disabilities Act of 1990, as amended, 42 U.S.C. § 12101 et seq.
8.Town of Vail shall develop and maintain an ADA Program in accordance with 28 CFR Part 35,
Nondiscrimination on the Basis of Disability in State and Local Government Services, FTA Circular 4710.1,
and any additional requirements established by CDOT for FTA subrecipients.
9.Town of Vail shall ensure that it will comply with the Americans with Disabilities Act, Section 504 of the
Rehabilitation Act, FTA guidance, and any other federal, state, and/or local laws, rules and/or regulations. In
any contract utilizing federal funds, land, or other federal aid, Town of Vail shall require its subrecipients and/or
contractors to provide a statement of written assurance that they will comply with Section 504 and not
discriminate on the basis of disability.
10. Town of Vail shall agree to produce and maintain documentation that supports compliance with the Americans
with Disabilities Act to CDOT upon request.