HomeMy WebLinkAboutB07-0231 PlansConstruction ' Documentation for
the Tenant Improvement for
0 0
Arriesgado Clot Company
Arrabelle at Vail Square
675 Lionshead Place, Unit P1 14
Vail, Colorado 81657
� General Notes
1 CONTRACT DOCUMENTS
Contract Documents for this project are comprised of
the Draviinga the Spec and the Project Manual.
2 All work under this contract shall bein strict accordance
with applicable codes, local ordinances and public
agencies having jurisdiction over the work.
3 All materials stored on site shall beproperly
stacked and protected to prevent damage and
deterioration. Failure to protect materials may be
cause for rejection of the work.
4 The Contractor shall confine construction operations
on site 0o areas permitted by these documents.
5 PRECEDENCE:
A Generally, specifications take precedence over the
drawings and large scale details or plans shall govern
.
over small scale drawings. |n the event the
Contractor discovers discrepancies, nr the intent
uf the plans or specifications ia not clear, the
Contractor shall notify the Architect before proceeding
with the work.
8 All dimensions take precedence over scale
of drawings.
C All dimensions are hu face of stud unless otherwise
noted.
D Ceiling height dimensions are from finish floor ho
face of finish ceiling surface unless noted otherwise.
O The Contractor shall acquire and pay for all permits
inspections and approvals connected with the
work oo part of the cost ofconstruction.
7 The draw and specifications shall serve oaaguide
to the scope of this project. The Contractor shall
provide all necessary labor, materials and equipment
required for a complete project.
8 The Contractor shall do all cutting, fitting and
patching such that all parts fit together properly.
Cutting and patching shall not endanger any other
work. All patching, repairing and replacement
of surfaces or materials damaged during cutting
and patching shall be repaired Vm match surrounding
surfaces free from visible differentiation.
0 The Contractor shall provide all necessary blocking,
backing and framing for all store fixtures, all equipment
shelving, electrical devices and equipment, mechanical
devices and equipment, recessed items and other
|
items am required, whether indicated exactly ondrawings
|
.
or not.
10 Provide access panels oo required by governing codes
to all concealed spaces, equipment, and dev
Verify type required, location and size with Architect
prior toinstallation.
i1 Provide smoke detectors in accordance with
current applicable codes.
12 The General Contractor and all Contractors bidding on
this project shall visit the job site to familiarize them-
selves with the actual site conditions prior to building.
13 Field verify all conditions and dimensions with
construction documents prior hncommencing
construction nrfabrication, |f any departure from the
design intent of the contract documents iarequired,
the General Contractor shall notify the Architect
and Owner before entering into o contract with the
Owner. Failure bz provide Architect and Owner with
the aforementioned nnbfioodnnshall result inthe
specific Contractor being held responsible for all
work required to meet the design intent oythe
contract documents with no additional construction
costs incurred by the Owner.
14 The Contractor shall not commence with the work
until actual conditions are verified hob*aa set forth
in the drawings. The Contractor, by starting the work,
will ba deemed ho have accepted the existing conditions.
|t will then be the Contractor's responsibility tomake
the necessary corrections, repairs and adjustments
to make the project complete without additional
compensation.
15 The installer of each major component shall
inspect both substrate and conditions under which
work iatobeperformed. Do not proceed until
unsatisfactory conditions have been corrected
ina satisfactory manner,
16 Contractor 10 schedule construction operations inthe
sequence required to obtain the best results where
installation of one part of the Work depends nn
installation uf other components before o/ after its own
installation. Make prov 0naccommodate items
scheduled for later installation.
17 Coordinate installation of different components tu
assure maximum accessibility for required
maintenance, service and repair,
18 Clean and protect construction in progress and
adjoining materials in place during handling and
installation. Apply protective covering hoexisting
materials and assemblies when being saved and
where required tn assure protection from damage or
deterioration prior bo substantial completion,
19 Clean and provide maintenance oncompleted
construction aa frequently oa necessary through
construction. Adjust and lubricate operable
components ho assure new and existing
equipment will operate ho manufacturer's requirements
ut substantial completion.
20 Supervise construction operations to assure that
no part of the construction, completed orinprogress,
io subject Vo harmful, dangerous, damaging
exposure during construction.
21 Contractor shall replace, without cost to the Owner,
defective work or materials appearing within one
[1] year after completion of the project.
22 Contractor shall coordinate samples and materials
with Architect in order that Architect /|nhehnr
Designer may rev samples ina manner snao
not to impede the progress of the work.
23 Contractor shall prepare a construction schedule
within five [5] days after the established start of
construction. This schedule iotubocoordinated
with Architect / Interior Designer toanticipate
lead / delivery times uf items prov byArchitect
tobe installed byContractor.
24 Contractor ho prov the Architect will all
submittals and shop drawings and samples in
accordance with the Contract Documents.
25 Contractor shall provide inspections, tests and other
quality control services specified here and elsewhere
in the Contract Documents and required byauthorities
having jurisdiction over the work. The costs for
these services are hobe included in the final
construction sum.
28 Coordinate the sequence of activities toaccommodate
required services with o minimum ofdelay. Coordinate
activities tu avoid removing and replacing construction
hn accommodate inspections and tests.
27 Contractor ia responsible for scheduling inspections,
tests and similar activities inetimely fashion
oouo not to impede the progress of the work.
28 All work shall ba done by workers skilled intheir
respective trade. All work shall be done instrict
accordance with manufacturers directions
where applicable. Workmanship that does not comply
with the obvious intent nf these documents shall
be replaced at the Contractors expense. All materials
shall beof the best nf the their respective kinds
specified, new and free ofdefects.
29 Brands or names nf manufacturers specified herein
reflect o measure of quality orastandard. If the
Contractor desires to use any other brand or
manufacturer, they shall request approval from the
Architect justifying the equal substitution and shall
submit that information to the Architect for review in
such e time frame aooa not Ln impact the project
schedule.
30 FINAL ACCEPTANCE:
Before requesting final acceptance certification,
complete and provide the following:
A Submit specific warranties, workmanship bonds,
maintenance agreements, final certifications,
and similar documents.
8 Maintain o clean set of blue line prints of
construction documents, shop drawings and
specifications. Mark these documents with
locations cf"am~bui|t'assemblies.
C Change over permanent locks and transmit
keys ho Owner and Facility Manager. Advise
Owner and Architect of key / security change.
D Complete start-up and testing ofsystems.
31 FINAL CLEANING:
|n addition to periodic clean up, the contractor
at the completion of the project shall thoroughly
clean all areas of the work. Wash all windows
frames and mirrors. Clean all finished floors,
wash all fixtures and tiled surfaces, remove
any spills or spatters from finished surfaces.
Touch up and otherwise repair and restore marred,
exposed finishes.
° "
Architectural Abbreviations
AFF_ .... Above Finished Floor
AC0US .... Aocouoboa
ADD ....Addenda Addendum
ADJ .......Adjaoon
AGGR... _Aggregate
ALT_ � ... � .Ahemohe
ALUM . ...Aluminum
APPD. ...Approved
APPRO% ..Appnoxknate
ARCH ... .Arohitemt(una0
ASAP ... ..Aa Soon AaPossible
BBR . ..... . Baseboard Radiation
8M ..... Beam
BRG � � _ Bearing
BFF. � ... Below Finished Floor
BET. Between
BLK � .....Blouk
BSMT .. .Baoemen
BTU ....... BrdishThormo Unit(s)
BD. _ _ ... Board
8S . .. .BothSidoo
8O . . ... Bottom of
BLDG ...... 8uUding
CAB ....... Cabinet
CL �_� ... Center Line
OL8....... Ceiling
CER....... Ceramic
CLR ... �Clear
CL0,� ..Cboet
OLD ... ...ClothouDryer
CLVV .... .. Clothes Washer
COL ... ... .Column
CONO ... Concrete
CJ. . . . . Construction Joint
O0NT . .Contnunua
COORD ...Coonjinate
CTR ....... Counter
CIS . �. , Counter Sink
CF... ... .. Cubic Feet
DP.. . ....Domproofing
DEPT. .. Department
DTL . .DotoU
0N` . ..,Diamob*
DUN ..... .Dkn*nuion
DVV_. ..Dishwaahor
DN .. .Down
DR_ �. . ..Dnain
DWG ......Drawing
EA.... � � _ .Eaoh
EVV� ... .EaohVVay
ELECT , Electrical
EC. ,. , Electrical Contractor
EL. .. ..Bevahon
ENGR . .Engineer
EO ........ Equa
EXG ....... Existing
EJ ......... ExponoionJoind
EXP . . . . . .Expooed
EXT, � .....Ex±erior
FO . �...�Faoe Of
FIN ........ Finish
FP.. _ ...Finapronf
FPIL . .Tinsplaoe
F0(T ....... Fixture
FLR _ .Floor
FD_ _ ,. Floor Drain
FT. .... � , .Foot, Feet
FTG, � . ..Footing
FDN... . .Foundation
FURN ...... Furnish
GAL ... ..GaUon
8A .... _ .8ouge
GALV ..... .Qahinized
GC _ .... . General Contractor
6IL ......... Glaoa Glazed
GR .. ...Gnado
GYP... ...8ypoum
QVVB . ...GypaumVValboord
HDVV .. ..Hmndwam
HD� . . ...Head
HVAC ...... Heodng.VenUng&AirConditioning
HOR[Z... .HorizontaJ
HP.� .. Horse Power
HVVH... ,, Hot Water Heater
HT...... ..Haigh
/NCL .. .]ndudo(d)(ing)
INFO �.. 1nfonnaUon
|NSP ... �1nupector |nmpection
|[\... Inside Diameter
|NSUL ]naukation
|NT........ Interior
JT . .Joint
JCT� . . Junodon
KlNK .. .KUmwattHour
LAB_ � ....Labonabory
LAM ... ,.Laminate
L/A/ ..... ,Lavabory
LT.... Light
MATL . Material
MO _ _ � ... Masonry Opening
MTL . . . . Meta
MAX . . ...Moxknum
K8ECH . ..... K4eohanica
MC . .... Mechanical Contractor
K0ED ....... k8edicUmA(a0
NUN .... ...Minimum
M|GC ......K4isoelaneuuo
NOM . Nomina
NkC ....... Not In Contract
NA...... . Not App
NTG .......Not To Scale
OC_ . .... .DnCente
OPQ . . ..Opening
OPP... .,Oppoaha
ORN . ...Omim*nta
OPH ... ..0ppouheHund
OD . . . . . . Outside Diamete
PTN . ..... .PartiUon
d ...... , Penny ( Nails, Ec1
PERF ...... Perfonated
PLAST.. . Plaste
PLAS. ...PlanUc
PL..... . .Plate
PLEX ....Plexiglaoa
PLMB .... .�Plumb
PLY_ _ .�Pkxwond
PROJ ...... Project
PROP. .. .Property
OT.. .. Quarry Tile
QTY....' .Ouandty
R ..... .Rodiuo
RD_ . .RoofDnyin
RM ...... .Ronm
RS... Rough Sawn
ROB _ . Res Cove Base
RVV . . .RetainingVVoU
REF.. ..Refer
REFR ....Refrigenator
RBNF ..... Roinfonxe(d)
REBAR . .RenforcingBar(s)
RE8|L . Res
REOD.... � .Requked
R . ..... ..Riser
RD .... _Rough Open
SAN . ..Ganitayry
SECT ...... Section
SEW _ �..,Sewver
SHT �.. . .Gheet
SVF�. .... �GheetVinyRnorng
OHLV, ...Shelv(em)Ung
SUN' _ _ ..GknUor
SL . ...... ..8Uding
8TO ....... Class
SPEC .....SpecifioaUon
SQ . ..Squany
SF ...... Square Feet
S9 . . .GtanleauSteo
STD ... ...Sbandard
GTL ...... .8bee
GTRUCT ... Structural
SUB ... .Soboddve
SUPPL ...Supplemen
G4S .. _ .. Surfaced Four Sides
SUGP ...... Guupend(ed)
TEL . .Tolephone
TV.. ... .Television
TEMP.. ...Tempen»d
THK ....... Thick
TLT ........ TuUet
T&G ..... �� Tongue &Groove
T&B _ ..... Top And Bottom
TO . . ...Top Of
T � .... .Tnead
TYP ........ Typica
UG ....... .Underground
UNGL � ... Unglazed
UNRN_ ,.Unfinished
U.N.O. _ Unleaa Noted Otherwise
Li[\N. ..... Unless Otherwise Noted
UBC...... . Uniform Building Code
V1F ... �.. .VevifyhnFieN
VERT ...... Vertica
VCT �... . Vinyl Composition Tile
V . .. .. .Vok
VVH . . ...VVaberHeabe
WC ...... .VVaberCloaet
WP .... ..VVabaqpn»nf
WT __� .VVeigh
VVVVF � . .VVeldod Wire Fabric
VVDVV ...... VWndnw
NX _ ....VWth
W/O . ....Withou
WD . .._VVbod
�� ��� Reference Symbols
��� Information «�v/m��m�|
,^w��� .�y'^.��/
NAME
RoO0Nam8
=100<----- Room Number
Section / ��|x��/�f^ Symbol
|
�������� ' �-^�"=O�J� ��0O��v
44 '� t [][8VVMg Number
She8fNU[Dbe[
Detail Symbol
|
������N :��q��°���.
@ A = Sheet Number
Detail Number
Al
Keyed Note Symbol
_D_ Note Identification
Finish Material Symbol
FW Finish Identification
�4�r� �8/|i � �� ��/r��w~|
Room Wall u_�6����|���� ���.//��^�/
Elevation Number
0 A10 Sheet NU0bB[
Door Number Symbol
( )__ Door Number
Window Number Symbol
E)_ Window Number
Revision Symbol
Z�_ Revision Number
Equipment Number Symbol
Equipment Number
���o;| Type/Construction «�^'r��� [
,n�.n
���'".�O,
Wall Type Call Out
�8�FtO ��@i�� P �� F� �
' ' . ` & T
Sheet A30
��� �A��0 ��2�m/�+ Symbol
Room Wall Elevation ����l^�^^`
KJ
|� Direction OfPro North
"
����� ���*� Team
� ������»K
Project Architect / Interior Designer
@TLAN 97K8 ai Fl Street Nnit W1 04
Edwards, CO 81632
Contacts: Terry Carpenter AIA
Jeff Metheney
Shana Widmer
Phone: 970.926.2194
Fax: 970.926.2169
E ng i neers - Electrical
AEC
40801 US Hwy 6 & 24
Avon, CO 81620
Contacts: Stan Humphri /Ekec\
Phone: 970.748.8520
Fax: 970.748.8521
Engineers - Mechanical / Plumbing
AEC
40801 US Hwy 6 & 24
Avon, CO 81620
' Bob Cummings
Contacts: =°^^~^U[�O0|ngS
Owner / Tenant
Arriesgado Clothing Company
PO Box 1493
Vail, CO 81658
Co Cab Yarne
Cell: 970.331.6910
Occupancy:
��
oxn
Sq. Foot Area of Space:
Retail Sales: 644
Non 104
Total: 748
----
��+oU���� ��� �1
v�����,���u������. �_/
Storage @ 300 per SF 1
7'nta| ���[lK�� Load ��
-_� Occupancy _-_- __-
Construction ^^{J����Wwuon [ype:
I His
M I 7
A C C
INTERIOR DESIGN
GRAPHIC DESIGN
Project Data
'03 International Building Code
(with local amendments)
Mechanical:
|
xvx�~° /����|(��|[
/[�� International | �� r� ` �
w~� m .=°�������[l��/ /vx��^^ /����)����.
Code
/oo'H� local amendments)
B�I� ^���.
'03 International Plumbing
Code
(with local amendments)
'03 International Fire Code
Ll as
'05 National Electric Code
Cover . ... Notes / Index / Project Information
A10 ..... ..Floor Plan, Fixture Plan, Floor Finish
Plan & Reflected Ceiling Plan
A20 .... Interior Wall Elevations
A21 ....... Interior Wall Elevations
MP2.0 .... Partial Retail Level HVAC & Plumbing
Plan
NOTE: F Pro Documents provided by
Design Build Contractor Under separate cover.
0
C IMN
0
Floor Finish Plan
ocal-5:114" = 1' -0"
TH15 LINE OF TRACKS
PARALLEL WITH STOREFRONT
AN05OFFIT
2 (E) HEA05 MOUNTED
01 ILL,
F
F4
2 (E) HEAD5 MOUNTED
ON WALL ------ r-,
F
TH15 LINE OF TF, K5
PARALLEL WITH DACKWRAP 41 A
WALL
41
13
211
E d 0 11' AFF
'VPAINT F-1 -A
7
F
4
A
r
o 0 11'-8" AFF
A
A
A - \ G
Q5
A
IZPI
HI5 LINE OF TRACKS
PARALLEL WITH ANGLED
51 DE WALL AND SOFFIT
0711
13 oC-3 0 10'-0" AFF
PAINT P-2
Reflected Ceiling Plan
CARPET TILE PATTERN DETAIL
ocale: 1/2" =1' -0"
TH115 LINE OF TRACKS
PARALLEL WITH ANGLED
51DE WALL
MECHANICAL EQUIPMENT
ACCE55 AT LAY -IN A
CEILING
or,ale: 1/4" =1' -0"
GENERAL NOTES:
1. MAINTAIN ALL EXISTING FIRE
SEPARATIONS AT WALLS AND
CEILING; PATCH ALL PENETRATIONS
IN FIRE RATED A55EM13LIE5 WITH
UL 1_15TING FIRE STOP 5Y5TEM5,
ADD 5" LIGHTWEIGHT CONCRETE
ON TOP OF 5LA13 - COORD. T.O. FIN15H
FLOOR WITH EXISTING DOOR THRESHOLD
Fl I? F T A I I
CASEWORK UNIT PARALLEL
WITH ANGLED 5IDE WALL -
mmfflfffirl�_
=01' Ma
A, �
SHELVES 13Y
OWNER
o 5TOKAGE
2
CLEAR
Tyr,
U.N.O. A21
> A
F (34
(D
Nd
2'-0' A
0 LU � i �GLEAR 0 �'cv
Z-2
C
Ld C'
LOCATION OF EXISTING
ELETRICAL 13OX
Floor Plan
16
WALL FRAMING LEGEND:
L3 EXISTING WALL5 TO REMAIN
NEW WALL5 - RE: A/30 0
FOR WALL TYPE5 I
co N (0
a) (06
co 04 N
0)
U) 0
0 0
I r1_
C0 0)(3)
M
� 0
r-- -0 C cu
0) W CL ILL
EXISTING 2 HK
WALL
-
WD1 1ENCH;
3
RE: /A30 FOR
DETAIL
SHELVES DY
OWNER
ocale: 1/4" =1' -0"
Fixture. Plan
ocale'.. 1/4" =1' -0"
I
L 3
Project No. 07.101.aro
Date: Issue:
08.21.07 PERMIT SET
10.04.07 ASI #1
Title:
FLOOR PLAN, FIXTURE
PLAN, FLOOR FINISH
PLAN & REFLECTED
CEILING PLAN
Scale: 1/4" = V-0"
Sheet No.
Copyright @ 2007 Atlantis 1, LLC
F
F
/KS
o
•
d 0 8' AFF
'VPAINT P-5
0 -11111111111111101
E
0
0
Cm
C
0
U)
0
>
CZ
CU
C/)
00
CEO
-0
Project No. 07.101.aro
Date: Issue:
08.21.07 PERMIT SET
10.04.07 ASI #1
Title:
FLOOR PLAN, FIXTURE
PLAN, FLOOR FINISH
PLAN & REFLECTED
CEILING PLAN
Scale: 1/4" = V-0"
Sheet No.
Copyright @ 2007 Atlantis 1, LLC
F
F
/KS
o
•
d 0 8' AFF
'VPAINT P-5
0 -11111111111111101
1/4" WD -1 TR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
AROUND EDGE
WMAN
5132" CABLE
CENTER CABLE
5Y5TEM ON SHELVES
BELOW
3/4" W SHELVES;
TYF'. AT BACK WRAP
[EE CABINET
PULL
COUNTERTOP
Elevation @ North Wall
ocale: 1/2" = f-O"
---------------------
51GNAGE
PER OWNER � I
L ---------------------- I
522
10
m
4!-(5" 61-111
Elevation 0 Wcot Wall (behind Cash Wrap)
oc,alc: 1/2" = 1' - 0 ""
I fWF-0
-0
! R 31 Z
1=0
1 1/2"
MET,
ROD
ocale: 1/2" = 1' -0 ""
k1k
AROU
OF PU
EXTEN
WALL
1=
ocale :1 /2" = 1' -0 ""
AROUI
OF ru
EXTEN
WALL
10—m-1
ocale: 1/2" = 1'-0"
I .
0 ";r 0)
0') (0
N
co
(0 6
N C\1
0") 0)
U) 0 C5 b
0 1— rl-
ce 0')0)
- 2
cu m
0
0) W CL U-
N
U C-5233
Project No, 07.101.aro
Date: Issue:
08.21.07 PERMIT SET
10.04.07 ASI #1
Title:
INTERIOR WALL
ELEVATIONS
Scale: 1/2" = 1'-0"
Sheet No.
Ar20
Copyright @ 2007 Atlantis 1, LLC
mm
11
Elevation 0 Cash Wra
Elevation 0 North Wall
kale : 1 /2" = 1' -0 ""
ocale: 1/2" =1' - 0"
Elevation 0 South WAII
Elevation 0 South Wall
rE
�Ao .....................
mlr,Rvrl
Elevation 0 Eaot Wall
C
M
a-
E
0
C:
a)
-C:
0
CT
0
>
0-
4 -1
Co
0)
OT
L0
r"
<
(0 5 >
Project No, 07.101.aro
Date: Issue:
08.21.07 PERMIT SET
10.04.07 ASI #1
Title:
INTERIOR WALL
ELEVATIONS
Scale: 1/2" = 1'-0"
Sheet No.
Ar20
Copyright @ 2007 Atlantis 1, LLC
mm
11
Elevation 0 Cash Wra
Elevation 0 North Wall
kale : 1 /2" = 1' -0 ""
ocale: 1/2" =1' - 0"
Elevation 0 South WAII
Elevation 0 South Wall
rE
�Ao .....................
mlr,Rvrl
Elevation 0 Eaot Wall
EXTEND GYP. 13D
6" ABOVE CEILING
GRID
WALL ANGLE
CENTRICITEE GRID
5Y5TEM
E3.0, CEILING PANEL tik
W-8" AFFV
TRAN5LUCENT PANEL -
(FL) GRID EDGE
5/8 GYP, 51)
3 5/3" 20 GA
MTL "C" STUD
Section at bench
WALL TYPE "A"
3142V
BENCH TOP
F 13 U L L N 0 5 E
f-8 11 TRIM
a ll
TOP OF BENCH
16' AFF
1 1/2" X 1 1/2" STEEL
ANGLE
3/4!' FLY WD
11/2 WD LEDGER
2X BLOCKING
4" WD -1 BASE
F71 FLOORING
5cale,: 1 1/2"=1' -0"
5cale: 1 1/2"=V-0"
1
UNIOTRUT ANCHOR - 5ECURE
TO PECKING ABOVE WITH
ANCHOR
3 5/8" 20 GA
METAL "C" STUD
50' GY[3. 13D.
CABLE 5Y5TEM -
RE: FIXTURE SCHEDULE
Cable. Anchor 0 5tructure. K
5cale: 1 112"=1' -0" '-,A 30
DROP COUNTER FOR
� 1� _n�
r L/nAur-M
F I C(
Fw I C,
3/4 '[_W[
SHELVE
3/4
SHELF
15/6" 2(
"C" 5TUC
16 O.C.
5/5" Gyf
FIN15HEI
RE- ELEV
Wall Type, "Gil
5cale.: 1 1/2"=1' -0"
13,qGk Elevation 0 Gaohwrap rG_"�
5c,ale: 3/4"=1' -0" V307
WD -1 - C/
Ej] PAN
3 5/6" 21
"C" 5TUG
16 O.C.
5/5" GYI
FINI5HE'
RE: ELEV
Front Elevation 0 CaohwraE rF
5c'ale: 3/4"=1' -0" V,5,0)
0,
•
Project No. 07.101.aro
Date: Issue:
08.21.07 PERMIT SET
10.04.07 ASI #1
Title:
DETAILS
Scale: VARIES
Sheet No.
Ar30
- Copyright @ 2007 Atlantis 1, LLC
3 5/8" 2a
"C" STUC
16 O.C.
5/8" GYF
FIN15HEf
RE: ELEV
Wall Type. "13"
5oale.: 1 1/2"=1' -0"
Wall TyEe, "A"
5cale: 1 1/2"=1' -0"
11 1-11 411 11 11 - -11
detail at Ceiling Grid
Lil. I r"M. Vill 1 "%.10 1 1 1
1 SPECIFICATIONS
EXISTING DEVICE, RECONNECT TO CIRCUIT
ELECTRICAL LEGEND INDICATED.
(NOT ALL SYMBOLS REQUIRED FOR THIS PROJECT)
■ Generai Requirements SHOW WINDOW LIGHTING RECEPTACLE.
1. SCOPE Furnish all materials and labor required to execute this work 12. SHOP DRAWINGS AND SUBMITTAL- 0 RECESSED OR SURFACE DOWNLIGHT ABBREVIATIONS LOCATE ABOVE WINDOW.
WALL MOUNTED LIGHT FIXTURE
as indicated on drawing and as specified, as necessary to complete the AC - ABOVE COUNTER
AFF - ABOVE FINISHED FLOOR
A. Contractor shall submit shop drawings for engineer review and approval.
contract. Electrical work shall include, but not limited to, these major RECESSED FLUOR LIGHT FIXTURE ,
- ABOVE FINISHED GRADE
items:
B. Shop dravI submittal shall include: SURFACE FLUOR. LIGHT FIXTURE AL - ALUMINUM
CU -COPPER
A. Complete wiring system for new lighting and power as shown, 1. Lighting fixtures. FIXTURE DESIGNATIONS: DESIG. - DESIGNATION
including new panelboards, new conduits, new wires, new Wiring 2. Panelboard(s). UPPER CASE - FIXTURE TYPE EM -EMERGENCY
LOWER CASE - SWITCH DESIGNATION EMP - ENERGY MANAGEMENT PANEL
Lc. for a complete lighting and WC - ELECTR WA7E
IC R COOLER
and power system. 13. CONDUIT AND WIRE:
devices, new Control devices, et, SHADING ON FIXTURE INDICATES EMERG. BATTERY BACKUP
E
Em GND -GROUND
GFI GROUND FAULT INTERRUPTER
------ J FLUORESCENT STRIP FIXTURE
A. CONDUCTOR SIZES AND TYPES: Use only copper wire, 600 volt NF NOT FUSED
a. Complete feeder(s) installation as required for new and/or
insulation, stranded in sizes #8 and larger, solid in sizes` 10 and TRACK LIGHT AS INCTED OR SCHEDULED INIC -NOT IN CONTRACT
electrical apparatus as shown on single line diagram and smaller. Control wiring shall be #14, stranded. In sizes #1 and
drawings. WALL WASHER NIL - NIGHT LIGHT
NTS - NOT TO SCALE
SET EXISTING
smaller, use types TW, THHN or THW. In sizes largerthan #1, use POLE-MOUNTED FIXTURE UG -UNDERGROUND
P 1 14-3 RECEPTACLE IN
b- Complete branch circuit winng required for the connection of THW or XHHW. Use type THHN for wires entering or passing POST (BOLLARD)fIXTURE WP - WEATHER PROOF
XFMR -TRANSFORMER
emergency ligstem. hting and exit signs to existing emergency stand through fluorescent lighting fixtures.
STEP LIGHT +IT - MOUNTING HEIGHTTO CENTERLINE OF DEVICE AFF O PI 14-15
by power sy B. MC cable permitted per local codes. CEILING OR WALL MOUNTED EXIT LIGHT
EMERGENCY BATTERY LIGHTS FIRE ALARM SYSTEM
2. Complete provision, installation and connection of lighting fixtures, 14. ELECTRICAL DEVICES
DUPLEX RECEPTACLE @ IT UNLESS NOTED
exit suns FRCP FIRE ALARM CONTROL PANEL
igns and lamps as specified and as shown on drawings. a
A. Convenience receptacles will be 20 amp, commercial grade 0= DOUBLE DUPLEX RECEPTACLE @ 1$"' UNLESS NOTED P -8
�. Fire alarm system will be by others. Coordinate connectuons to the W FIRE ALARM ANNUNCIATOR PANEL
decora style. Finish per owner or architect. PARTIAL
FLUSH FLOOR DUPLEX RECEPTACLE
hood & duct detection FIRE ALARM PULL STATION
B. Light switches Will be 20 amp, commercial grade, SPECIAL OUTLET AS NOTED
ALARM HORN OR SPEAKER
4. Complete connection of HVAC/Plumbing motor(s), water heater (s), Ni
decora style. Finish per owner or architect DUPLEX RECEPTACLE HALF-SWITCHED @ IT UNLESS NOTED 0�* r-OVIABINA HORN)STROBE OR SPEAKFRSTROBE
equipment, etc. furnish by mechanical - refer to both electrical and SWITCH WITH
C. Dimm switches will be a minimum of 600w or as noted. TELE-POWER POLE
*H THERMAL HEAT DETECTOR
and mechanical drawing for scope and work and additinal infor- Provide decors style, finish per owner or architect. MULTI-OUTLET PLUG STRIP DECORATIVE,
of SMOKEIIONIZATION DETECTOR PENDANTS,
oration. 01 JUNCTION BOX IN FLOOR, CEILING OR IN WALL
D. Ail mounting heights will conform to ADA guidelines. Typical receptacle *P PHOTOELECTRIC SMOKE DE i ECTOR
heights will be +18"AFF and switch heights will be +46AFF V COMPUTERrrELEPHONE OUTLET IN FLOOR OR WALL
- --- ----- --
5. Provide grounding and bonding Facilities. 0 HIP HEATIPHOTOELECTRIC SMOKE DETECTOR
PI 14-7
u nless noted otherwise. TELEVISION OUT 08 DUCT DETECTOR
6. Complete all electrical demolition as required. E. Provide GFI type receptacles at kitchens, bathrooms, TELEPHONE BACK130ARD
SPRINKLER SYSTEM FLOW SWITCH
garages, exterior etc. as required by code. CONDUIT RUN CONCEALED IN WALL OR ABOVE CEILING 11111I SPRINKLER SYSTEM TAMPER SWITCH P 14 -5
P =-1
7. Core drilling and patching of existing building structure required for 310 CIRCUIT HOMERUN STROBE gyp 15� SUPPORT
electrical work. Gore drilling shall follow Building Standard procedures CONDUIT RLhq BELOW FLOOR OR GRADE
@ SMOKEIFIRE DAMPER CONNECTION J;
and contractor shall have written approvals from building owner prior A. Support all electrical equipment independent of accessible ceilings as 3 CONDUIT STUB-UP - CAP & MARK REMOTE INDICATOR LIGHT
'RECESS RECEPTACLE, COAX
required by NEC. LIGHT SWITCH AT 4T UNLESS NOTED
to start of any work
SUBSCRIPTS: SF2URITY SYSTEM AND DATA FOR FLAT SCREEN,
To
8. Test of entire system and work 16. ELECTRICAL BOXES 2 = 2-POLE SWITCH
3 = 3-WAY SWITCH CONTACT DOOR SWITCH IN JAMB OR HINGE
A At fire rated wall space electrical boxes at opposite sides of the wall 4 = 4-WAY SWITCH
(E4 INTRUSION MOTION DETECTORAS SPECIFIED, CORRIDORIROOM
9. Operating, Maintenance and identification instructions manuals, if so less than 24" horizontal distance. M = MOTIOWOPERATED SWITCH
K = KEY-OPERATED SWITCH CSR any.
3U' CLEAR
B. When phone, TV & power receptacles are shown on plan next to each other. TO 'THERMAL OVERLOAD SWITCH I
P �SWTCH WITH PILOT LIGHT nK KEY-OPERATED ACCESS SWITCH
Locate respective receptacles next to each other on site With no more L
10. PERMITS AND FEES: Obtain and pay for all necessary permits, inspec- SURVEILLANCE CAMERA Ulp
titans, examinations and fees or charges necessary for execution and than I" seperating cover plates. DIMMER SWITCH W/ WATTAGE, N
completion of electrical work. PUSHBUTTON CONTROL STATION DISTRIBUTION EQUIPMENT SYMBOLS
PC PHOTOELECTRIC CELL PI 14-:1
DISCONNECT SWITCH
P1 14 -9
il. REGULATIONS AND CODES. QUANTITIES PER FLOOR PLANS
FUSES
THERMOSTAT AT 60 UNLESS NOTED
1
CIRCUIT BREAKER
A. Applicable codes: National Electric Code (2005) PANEL
Conform to the prevailing edition and amendments thereto of the DIVISION 15 EQUIPMENT —kz:4 CURRENT TRANSFORMER P114 J11--
FOOD SERVICE EQUIPMENT k PROVID 4-PLEX
Town of Vail Electrical Code, pertinent NFPA publications AAAA TRANSFORMER
and to the requirements of Federal, State or other City agencies COMMUNICATION SYSTEM METER
having jurisdicfion. 7 nS, (gH SPEAKERINCE-1 ORWALL, MAGNETIC MOTOR STARTER
7"ll COAX RECEPTACLE IN a VOLLNE CONTROL AT 60 UNLESS NOTED -- Ar [:h DISCONNECT SWITCH
\-DOUBLE GANG BOX @ 18'A.F.F. *M MICROPHONE OUTLET IN FLOOR BOX OR WALL =0 7w PANEI.BOARD OR LOAD CENTER, FLUSH OR SURFACE MOUWM
UNLESS NOTED CALL-;N SWT04 SWITCHBOARD, MOTOR CONTROL CENTER OR DISTRIBUTION BOARD
@ PROGRAM BELL ul MANSFORMER
(RG6 QUAD SHIELDED CABLES)314'C 011 INTERCOM [I GROUND 7�u
CONDUIT STUBBED TO ACCESSIBLE 0- CLOCK C-1RCLnT BREAKER
CEILING, PLENUM RATED WIRE MOTOR OUTLET
tit I i i I r MM RAN TO BACK BOARD AMPLIFIER FATS AUTOMATIC TRANSFER SWITCH
'" - 41 --
191 0110011111,111
3=iiir- #6 CU G
METALLIC COLDWATER PIPE
IS,
+89'AFF S-11
IN
a
LINE DIAGRAM
NO SCALE
a n d - W
� no
I — 1— mi MiZEUMMIM-111IF -IQ%,
OWN- MT.
OXIDIC
Mi
W,
W
A
i mr
wo
gglLgaAmill
DYAORIDIM1
OXIDIC
mm
mm
ISPACE
,SPACE
SPACE
LA
PROVIDE DUAL TECHNOLOGY WALL
MOUNTED OCCUPANCY SWITCH
WATTSTOPPER #DW-100 OR EQUAL
TO PAIR OF TRACKS AT EAST WALL
�,�ANG SWITCHES IN SETS OF THREE
PROVIDE ONE SWITCH PLATE FOR
EACH SWITCHBANK OF THREE.
LOCATE SWITCHES NEXT TO DOOR
ON SAME WALL AS DOOR.
PROVIDE TIMECLOCK TO CONTROL
SHOW WINDOW LIGHTS. CONNECTCIRCUIT
FOR SHOW WINDOW LIGHTS THROUGH
TIMECLOCK, LIGHTS WILL BE CONTROLLED
THROUGH TIMECLOCK AND WALL SWITCH.
Drawn By: Checked By:
SOH AEC
Ili
[N N
WISMI
IN111116 , , - . !IMMINEHiii
A15Y. - -
MM
A J f4-
J, Mill 1111
1. GENERAL:
a. FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND /OR SPECIFIED HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS,
BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING
DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMAN -LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT THE SITE OF "WORK PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS & EXACT NATURE OF THE WORK.
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5, CODES AND PERMITS:
a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 2003 IMC CODE AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. O A ERM S INS CT ONS. C. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
1. GENERAL:
a. FURNISH ALL L LABOR SUPERVISION MATERIALS,
EQUIPMENT AND FACILITIES NECESSARY TO FURNISH, FABRICATE, DELIVER, STORE AND INSTALL ALL WORK NOTED ON THE DRAWINGS AND /OR SPECIFIED HEREIN.
b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS,
BUT WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM, EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING
DRAWINGS AS BEING INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS.
2. WORKMANSHIP:
a. THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND ND WORKMAN LIKE MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWNER AND ARCHITECT.
3. MATERIALS:
a. ALL MATERIALS AND EQUIPMENT SHALL BE NEW A T
Q AND HE BEST OF THEIR RESPECTIVE KIND, FREE FROM ALL DEFECTS AND OF THE MAKE AND QUALITY SPECIFIED.
4. SITE INSPECTION:
a. CONTRACTOR SHALL VISIT HE < SITE , F
T S O WORK PRIOR TO SUBMISSION OF HIS BID AND H
T OROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS &EXACT NATURE OF THE WORK..
b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM.
c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION.
5. CODES AND PERMITS:
a. ALL MECHANICAL EQUIPMENT, INSTALLATION, ETC., SHALL CONFORM TO THE 20031PC CODE AND ORDINANCES AS INTERPRETED BY THE TOWN OF VAIL BUILDING DEPARTMENT.
b. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS. C. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ARCHITECT.
6. AS- BUILTS: 6. AS- BUILTS:
O ET COMPLETE F -
BUILTS. DOCUMENTS WITH. ALL CHANGES ANGES NOTED THEREON AT THE COMPLETION OF THE T S AS
a. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS BUILTS DOCUMENTS WITH ALL CHANGES NOTED THEREON AT THE COMPLETION OF THE PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. a_ CONTRACTOR SHALL PROVIDE A PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
7. GUARANTEE:
7. GUARANTEE:
a_ CONTRACTOR SHALL UNCONDITIONALLY
GUARANTEE ALL LAB RAND -
O MATERIALS ON ALL WORK AGAINST O K AGA NS DEFECTS IN WORKMANSHIP AND MATERIALS P
a. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. R S FOR A PERIOD OF ONE YEAR AFTER COMPLETION:
8. SUBMITTALS: 8. SUBMITTALS:
TT
a. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH). T
a. CATALOG INFORMATION. AND CUTS OF ALL EQUIPMENT AND DEVICES SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW (SIX COPIES OF EACH).
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC,
10.CUTTING AND PATCHING:
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X -RAY SLABS PRIOR TO CORING.
I I.CLEANUP:
a. UPON COMPLETION 'OF THE WORK UNDER THIS SECTION, THE CONTRACTOR SHALL REMOVE ALL SURPLUS MATERIALS, EQUIPMENT AND DEBRIS INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND
ORDERLY.
12:DUCTWORK:
a. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE 20031.M.C. MECHANICAL CODE AND SMACNA STANDARDS.
b. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA STANDARDS. DUCTWORK SIZES INDICATED ARE FREE CLEAR DIMENSIONS.
c. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 FOR THE 2003 I.M.C.
d. ALL DUCT JOINTS SHALL BE SEALED AIR TIGHT WITH RCD CORP. # 6 MASTIC ADHESIVE WITH VERSA GRIP OR MESH.
e. FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE U.L. APPROVED, VINYL COATED, WIRE REINFORCED FIBERGLASS, WITH MAXIMUM CONDUCTANCE OF .30 AND A MAXIMUM LENGTH OF FIVE FEET.
f. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1,000 FPM1:08" PRESSURE DROP PER 100 FEET.
EACH MECHANICAL VENTILATION SYSTEM (SUPPLY AND /OR EXHAUST) SHALL BE EQUIPPED WITH A MEANS OF SHUT -OFF WHEN VENTILATION IS NOT REQUIRED, AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED
ON FAN SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND /OR DISCHARGES.
h. CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE INSTALLATION
L DOUBLE THICKNESS TURNING VANES SHALL BE USED ON ALL DUCT TURNS OF 90
.
13.INSULATION:
a. INSULATION SHALL BE U.L. LISTED IN COMPLIANCE WITH FLAME - SPREAD RATING OF NOT MORE THAN 25 AND SMOKE DENSITY NOT EXCEEDING 50, PER THE UNIFORM MECHANICAL CODE. INSTALLATION SHALL BE
IN ACCORDANCE WITH UMC REQUIREMENTS.
b. RECTANGULAR SUPPLY & RETURN,
V
0
TRANSFER DUCTWORK H -
& S UC ORK S ALL BE INTERNALLY LINED W/ 1 THICK, .75 LB. PER GU. FT. DENSITY FIBERGLASS INSULATION WITH VAPOR BARRIER {MINIMUM R -VALUE - 4A A7 75 F
MEAN TEMPERATURE). 1/2" THICK INSULATION MAY BE USED IN AREAS OF TIGHT CLEARANCE OR AS NOTED.
c. WRAP ALL CONCEALED, ROUND AND FLAT OVAL SUPPLY & OUTDOOR AIR INTAKE DUCTS W/ lYS" THICK, .75 LB. PER CU. FT. DENSITY FIBERGLASS INSULATION WITH VAPOR BARRIER (MINIMUM R -VALUE = 4.0 AT 75 °F
MEAN TEMPERATURE). 1/2" THICK INSULATION MAY BE USED IN AREAS OF TIGHT CLEARANCE OR AS NOTED.
- EXHAUST DUCTWORK DOES NOT NEED ANY INSULATION
BUT SOMETIMES WITH A ROOF MOUNTED EXHAUST FAN FOR SOUND PURPOSES WE INSULATE 5 -10 CF DUCT FROM THE FAN
- TRANSFER DUCTS SHALL HAVE 1" DUCT LINER
d. ALL PIPING ROUTED BELOW THE SLAB UNDERGROUND SHALL BE TYPE "k" COPPER AND SHALL BE INSULATED WITH ARMIFLEX TYPE INSULATION.
e. ALL CONCEALED HWS & HWR, CHWS & CHWR, AND SMS & SMR DISTRIBUTION PIPING SHALL BE INSULATED WITH ARMIFLEX TYPE INSULATION TO MINIMIZE UNCONTROLLED HEAT LOSS INTO THE BUILDING. ALL
EXPOSED PIPING SHALL BE INSULATED WITH 1 -1/2" THICK FIBERGLASS INSULATION WITH ALL SERVICE JACKETING.
f. ALL HEATING HOT WATER AND CHILLED WATER PIPING SHALL BE INSULATED USING FACTORY PREFABRICATED FIBERGLASS INSULATION WITH FACTORY APPLIED SERVICE JACKET (MIN. R =4.0). HEATING HOT
WATER AND CHILLED WATER PIPING EQUAL TO OR SMALLER THAN 1 -1/2 SHALL BE INSULATED WITH 1 THICKNESS. HEATING WATER PIPING LARGER THAN 1 -1/2 SHALL BE INSULATED WITH A 2 WALL THICKNESS.
CHILLED WATER PIPING LARGER THAN 1 -1/2" SHALL BE INSULATED WITH 1 -1/2" WALL THICKNESS.
14.13EFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, HVAC,
ELECTRICAL, FIRE PROTECTION AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO AVOID
CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER TRADES SHALL BE MADE. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF ANY-MAJOR CONFLICTS OCCUR.
15.COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL RELEVANT TRADES, AND PROVIDE WATERTIGHT FLASHINGS WHEREVER PENETRATIONS OCCUR. EXACT LOCATIONS AND SIZES
MAY BE DEPENDENT UPON EQUIPMENT SELECTIONS; COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS WITH APPROPRIATE EQUIPMENT REQUIREMENTS.
16.PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30 " CLEAR WORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF
THE EQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR.
17.ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS.
18.EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE- ADJUSTED TO INSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND
CAPACITIES, ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION.
19.TEST & BALANCING:
a. THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST AND BALANCE COMPANY.
b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL.
c. ALL REQUIRED RE- SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE CONTRACTOR.
d. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS.
20. FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS, ELEVATIONS OR AS PER FIELD REQUIREMENTS.
21. THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT.
22. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURE'S INSTALLATION OPERATION & MAINTENANCE MANUALS RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES.
23. FILTERS:
a. SHALL BE U.L. RATED AND APPROVED.
b. PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE.
9. COORDINATION:
a. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE.
b. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO PROVIDE BEST ARRANGEMENT OF ALL DUCTS, PIPES, CONDUIT, ETC.
10. CUTTING AND PATCHING
a. ALL CUTTING AND PATCHING REQUIRED OF THE STRUCTURE (NEW OR EXISTING) SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK.
b. PROVIDE NECESSARY REQUIREMENTS TO THE PROJECT SUPERINTENDENT.
c. X -RAY SLABS PRIOR TO: CORING.
11. CLEANUP:
a O
UPON COMPLETION OF THE WORK UNDER THIS SECTION, T NT
K N HE CONTRACTOR SHALL REMOVE L S URPLUS 1 P
E L U L S -MAT LSE EQUIPMENT T
P U ERA QU NT AND DEBRIS INCIDENTAL O THIS WORK AND LEAVE THE E
E P MISES CLEAN AND
ORDERLY.
12. PIPE INSULATION:
a - HOT & COLD WATER SUPPLY PIPING {EXCEPT RUN OUTS 12 FT. OR SHORTER TO INDIVIDUAL FIXTURES) TO BE INSULATED AS FOLLOWS:
INSULATION THICKNESS, 1N.
PIPE SIZE, IN. (K=0.27 BTUH- INISQ.FT. F OR LESS)
112,",314",& T' 1"
1 1/4" THROUGH 6" 1 1/2"
b. NO CW OR HWPIPING SHALL BE ROUTED IN EXTERIOR WALLS UNLESS PROPERLY INSULATED.
c. CONDENSATE PIPING SHALL BE INSULATED WITH 3/8" FOAM PLASTIC_
13. PIPING:
a. WASTE, VENT AND STORM DRAIN PIPING:
i. SHALL BE STANDARD WEIGHT CAST IRON HUB LESS TYPE.
ii. UNDERGROUND PIPING CAN ALSO BE SCHEDULE 40 PVC.
iii. VENT "PIPING "IN RETURN AIR CEILING PLENUMS SHALL BE ABS OR COPPER PIPING.
_b. WATER PIPING:
L SHALL BE TYPE "L" COPPER HARD DRAWN WITH WROUGHT COPPER FITTINGS.
ii. JOINTS SHALL BE SOLDERED WITH 95 -5 OR SILVER SOLDER.
iii. WATER PIPING CANALSO_BE WIRSBO.AQUAPEX APR, REHAU RAUPEX OREQUIVILANT PROVIDE DEDUCTALTERNATE PRICING.
c. CONDENSATE PIPING SHALL BE TYPE "M" COPPER WITH SOLDER JOINTS.
d. NATURAL GAS : PIP N
1 G
L 2 .AND MALLER L B
S SHA L E THREADED TANDARD WEIGHT SCHEDULE 40B
LACK G SC U E 40 LACK STEEL PIPE WITH SCREWED MALLEABLE IRON FITTINGS.
ii. PIPING 2 1/2" AND LARGER SHALL BE WELDED.
iii. ALL OUTDOOR EXPOSED PIPING SHALL BE PAINTED WITH OUTDOOR ENAMEL.
e. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM OR AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING, AIR INTAKE OR VENT SHAFT.
14. CLEAN -OUTS SHALL BE INSTALLED AS PER SEC. 708.8 OF THE PLUMBING CODE.
15. PROTECT ROOF RECEPTOR ON ROOF FROM RAIN WATER BY ELEVATING THE RIM 2 Y2" INCHES ABOVE ROOF SURFACE.
16. PROVIDE WATERTIGHT FLASHING G PIPES PASS THRU EXTERIOR WALLS, ROOF AND FLOORS,
17. PENETRATION IN WALLS REQUIRING PROTECTED OPENINGS SHALL BE FIRE - STOPPED. FIRE - STOPPING SHALL BE AN APPROVED MATERIAL SECURELY INSTALLED AND CAPABLE OF MAINTAINING ITS INTEGRITY
WHEN SUBJECTED TO TEST TEMPERATURE FOR SPECIFIC WALL OR PARTITION.
18. PROVIDE FELT WITH METAL BACKING VIBRATI N I
C O SOLATION SLEEVE OR :PADS AT ALL PIPE AN
S P HANGERS OR SUPPORTS AND ALL POINTS WHERE PIPING COMES IN CONTACT WITH ANY PORTION OF THE STRUCTURE.
APPLIES TO ALL WATER AND WASTE PIPING.
19. LOCATIONS OF UTILITIES` SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO STARTING WORK OF THIS SECTION. MAKE REQUIRED ADJUSTMENTS TO
CONNECT TO EXISTING UTILITIES. IF INDICATED POINTS OF CONNECTION CANNOT BE MADE TO UTILITIES AS FOUND, THE CONTRACTOR SHALL, BEFORE CONTINUING NOTIFY THE ARCHITECT PRIOR TO INSTALLING
ANY WORK WHICH MAY BE AFFECTED.
20. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AVAILABLE SPACES FOR INSTALLING THE WORK.
21. VALVES SHALL BE NIBCO, JENKINS, WALWORTH, STOCKHAM OR EQUAL. SERVICE PRESSURE SHALL BE SUITABLE FOR SERVICE INTENDED.
22. PROVIDE HANGERS AND SUPPORTS AS SCHEDULED MEETING THE 2003 iPC. PLUMBERS TAPE AND WIRE ARE NOT ACCEPTABLE.
23. CONTRACTOR SHALL AFFIX A MAINTENANCE LABEL TO ALL EQUIPMENT REQUIRING ROUTINE MAINTENANCE AND SHALL PROVIDE THREE COPIES OF MAINTENANCE AND OPERATING MANUALS TO THE
OWNER /OPERATOR:
24. CONTRACTOR SHALL ARRANGE FOR AND PAY FOR ALL UTILITY METERS AND UTILITY CONNECTIONS.
25. ALL PLUMBING LINES SHALL BE CONCEALED WITHIN THE BUILDING STRUCTURE TO A GREAT EXTENT AS POSSIBLE. ALL LINES NOT CONCEALED TO BE SECURED 6" OFF FLOOR AND 3/4" FROM WALL AND CEILINGS
USING OFFSET BRACKETS.
26. AN APPROVED BACKFLOW PREVENTER SHALL BE PROPERLY INSTALLED UPSTREAM OF ANY POTENTIAL HAZARD BETWEEN THE POTABLE WATER SUPPLY AND A SOURCE OF CONTAMINATION.
27. ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR.
Al
i
•
••
•
f
• ••
1 1 ••
•
r
• o i
1 •
A
0. 2
/ '
1
• e
•
"t i
to
•6 1 •. s
®
, • C.0 CO
i
•
• 1
i
000
i
v 6
1
• E
••
••
w
u
w
1
cr
0 ta
t
>
0
'
AEC PRO JECT#:
27834
�.IIIII I II
I,II'I�I
Checked By:
i
E 1
♦ PLUM
NO SCALE.
mploo i i
o
KEY PLAN
'SCALE: NONE
I l k ( l T
0 - NOT USED.
_ NOT USES?.
NOT USED.
COORDINATE DUCT SIZE AND ROUTE WITH CEILING BEAMS.
`RELOCATE EXISTING TSTAT SERVING FAN COIL.
NEW TSTAT LOCATION. COORDIANTE WITH STORE CABINETRY.
L:.1 EXISTING 4 PIPE FAN COIL UNIT FURNISHED & INSTALLED UNDER SHELL & CORE PHASE OF CONSTRUCTION.
PROVIDE NEW AUXILIARY DRAIN PAN UNDER UNIT AND DRAIN AS
REQUIRED BY CODE. FCU Al -01 = TRANE MODEL BCHC -36.
@ EXISTING HWS & HWR I CHWS & CHWR PIPING
\.`.J DISCONNECT AND REMOVE THE EXISTING T LENGTH OF SUPPLY
AIR DUCTWORK. PROVIDE NEW TRANSITIONAL FITTING TO DROP
DOWN UNDER BEAM.
15' °EXISTING - 1Y' OUTSIDE AIR INTAKE DUCTWORK INSTALLED
UNDER THE SHEL & CORE PHASE OF CONSTRUCTION.
BALANCE TO 400 CFM TO PROVIDE CODE REQUIRED CAPACITY
OF VENTILATION AIR.
11 EXISTING SHELL & CORE PIPING'MAINS COVER SOME AREA OF
CEILING BELOW AND AROUND FAN COIF UNIT,
CONTRACTOR TO VERIFY IN THE FIELD LOCATION AND
CLEARENCE ALLOWED TO' INSTALL DUCTWORK.
12. RELOCATE THE EXISTING SPRINKLER PIPING IN THE
SOUTHWEST CORNER OF THE SPACE TO BE ABOVE THE
13
REFERENC ARCHITECTURAL PLANS FOR
EQUIPMENT ACCESS LOCATION,
3-WAY CONTROL VALVE
4-WAY CONTROL VALVE
--I( DIFFERENTIAL BYPASS VALVE
— 1 rt STRAINER
NATURAL GAS PRESSURE REGULATOR
AIR VENT
-�
PRESSURE -TEMP. TAP
RA
PRESSURE GAUGE
- 4EED
THERMOMETER
EA
— HWS —
HEATING WATER SUPPLY
RETURN AIR DAMPER
SAD
SUPPLY AIR DAMPER
SG
SUPPLY GRILLE
RG
RETURN GRILLE
=HWR—
HEATING`WATER RETURN
SD
SUPPLY DIFFUSER
RD
RETURN DIFFUSER
TD
TRANSFER DIFFUSER
— cws
CHILLED WATER SUPPLY
—CWR—
CHILLED WATER RETURN
—SMS—
SNOWMELT SUPPLY
AEC PROJECT#: 27834
—SMR—
SNOWMELT RETURN
—RFS—
RADIANT FLOOR SUPPLY
,r
+
M
••
— RFR —
RADIANT FLOOR RETURN
PARTIAL RETAIL
M j-, UMBING P LAN
i
MP290
o
• «� • ,;! r.l �4+.• . ;1�,1 t L � r, �p;�`, «� .r_ 1,
—G—
GAS
ARRIESGADO CLOTHING
— MPG, —
MEDIUM PRESSURE NATURAL GAS
----0
PIPE RISER
O
PIPE DROP
AIR DEVICE
SCHEDULE
OR EQUIVALENT
I-
�� - -
-
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
`�
�
- -U----
PIPE TAKEOFF (FROM TOP OF MAIN)
MAX
=
— 3
PIP END CAP
UNIT
MANUFACTURER &
USE
MOUNTING
STYLE
FRAME
FINISH
SOUND
REMARKS
^`
--
PIPE CONTINUATION
TAG
MODEL NO.
LOCATION
TYPE
LVL (NC)
!
[�
1
} Jj
I I
PIPE EXPANSION GUIDE
COORD. W/
STEEL CONSTRUCTION. SEE DRAWINGS FOR LOCATIONS, SIZES, AND SPECIFIED CFMS,
--- 1�� ----
PIPE UNION
A
TITUS- CT-481
SUPPLY
CEILING
SUPPLY DIFFUSER
3
ARCH
27
PROVIDE LINED PLENUM BOX
----X
PIPE ANCHOR
- FLEXIBLE PIPE CONNECTION
B
TITUS - 350RLF2
RETURN
CEILING
3/4 SINGLE
3
COORD. W/
26
STEEL CONSTRUCTION.. SEE DRAWINGS FOR. LOCATIONS,. SIZES,. AND SPECIFIED CFMS_
( -
.. �
f
—�[} --
PIPE EXPANSION JOINT
DEFLECTION GRILLE
ARCH.
��u
�
G
POINT OF NEW CONNECTION
PERFORATED CEILING
COORD*
\
PLUG VALVE
C
TITUS - TMS
SUPPLY
CEILING
1
11
STEEL CONSTRUCTION. SEE DRAWINGS FOR LOCATIONS, SIZES, AND SPECIFIED CFMS.
- = --
DIFFUSER
ARCH
�`
_ _
--mot—
CHECK VALVE
BALL VALVE
T "
D
---- --
BALANCING VALVE
----
FLOW REGULATOR VALVE
--{ 1—.
BUTTERFLY VALVE
C
-
PRESSURE REDUCING VALVE
2-WAY CONTROL VALVE
KEY PLAN
'SCALE: NONE
I l k ( l T
0 - NOT USED.
_ NOT USES?.
NOT USED.
COORDINATE DUCT SIZE AND ROUTE WITH CEILING BEAMS.
`RELOCATE EXISTING TSTAT SERVING FAN COIL.
NEW TSTAT LOCATION. COORDIANTE WITH STORE CABINETRY.
L:.1 EXISTING 4 PIPE FAN COIL UNIT FURNISHED & INSTALLED UNDER SHELL & CORE PHASE OF CONSTRUCTION.
PROVIDE NEW AUXILIARY DRAIN PAN UNDER UNIT AND DRAIN AS
REQUIRED BY CODE. FCU Al -01 = TRANE MODEL BCHC -36.
@ EXISTING HWS & HWR I CHWS & CHWR PIPING
\.`.J DISCONNECT AND REMOVE THE EXISTING T LENGTH OF SUPPLY
AIR DUCTWORK. PROVIDE NEW TRANSITIONAL FITTING TO DROP
DOWN UNDER BEAM.
15' °EXISTING - 1Y' OUTSIDE AIR INTAKE DUCTWORK INSTALLED
UNDER THE SHEL & CORE PHASE OF CONSTRUCTION.
BALANCE TO 400 CFM TO PROVIDE CODE REQUIRED CAPACITY
OF VENTILATION AIR.
11 EXISTING SHELL & CORE PIPING'MAINS COVER SOME AREA OF
CEILING BELOW AND AROUND FAN COIF UNIT,
CONTRACTOR TO VERIFY IN THE FIELD LOCATION AND
CLEARENCE ALLOWED TO' INSTALL DUCTWORK.
12. RELOCATE THE EXISTING SPRINKLER PIPING IN THE
SOUTHWEST CORNER OF THE SPACE TO BE ABOVE THE
13
REFERENC ARCHITECTURAL PLANS FOR
EQUIPMENT ACCESS LOCATION,
3-WAY CONTROL VALVE
4-WAY CONTROL VALVE
--I( DIFFERENTIAL BYPASS VALVE
— 1 rt STRAINER
NATURAL GAS PRESSURE REGULATOR
AIR VENT
-�
PRESSURE -TEMP. TAP
RA
PRESSURE GAUGE
- 4EED
THERMOMETER
NOTE: ALL SYMBOLS SHOWN ON LEGEND
ARE NOT NECESSARILY USED.
OA
OUTDOOR AIR
RA
RETURN AIR
SA
SUPPLY AIR
EA
EXHAUSTAIR
RAD
RETURN AIR DAMPER
SAD
SUPPLY AIR DAMPER
SG
SUPPLY GRILLE
RG
RETURN GRILLE
TG
TRANSFER GRILLE
SD
SUPPLY DIFFUSER
RD
RETURN DIFFUSER
TD
TRANSFER DIFFUSER
a THERMOSTAT
g SENSOR (CALL OUT ON DRAWINGS)
01121 FIRE/SMOKE DAMPER
FIRE DAMPER
MOTOR OPERATED DAMPER (MOD)
MANUAL BALANCING DAMPER
CHANGE OF ELEVATION
(D) DROP (R) RISE
FLEXIBLE DUCT CONNECTION
L 1 5J TURNING VANES IN 90° ELBOW
DUCT SIZES ARE NET FREE AREA
1ST NO, IS DUCT WIDTH.
2ND NO. IS DUCT DEPTH.
SECTION THRU ROUND DUCT
SECTION THRU SUPPLY AIR DUCT
® SECTION THRU RETURWEXHAUST AIR DUCT
ROUND DUCT TURN DOWN
(A) SECTION CUT LINE
a (B) SHEET SHOWN ON
i
•
•
SUPPLY DUCT TURN DOWN
ca
RETURN/EXHAUST DUCT TURN DOWN
CL1
SUPPLY REGISTER/DIFFUSER/LOUVER
NECK SIIZ-R E
+
i i
• t
C F
NECKSIZE -V
RETURN REGISTER/DIFFUSER/LOUVER
CF, M -0_A -O
OUTSIDE AIR REGISTER/DIFFUSER/LOUVER
NECK�SIZE
•• •
1 ►
e
C C \_j
EC I ZE
NK S
EXHAUST REGISTER/DIFFUSER/L.OUVER
—+& CFM
DOOR UNDERCUT
(A) SECTION CUT LINE
a (B) SHEET SHOWN ON
i
•
•
.•
ca
• CO
i i ••
•
• •
•
C �� - 0 +
i .041.. b -
•
+
i i
• t
c •
i
•
•• + •• •• 1
• .• co
i
i •
+ i
iiD
•• •
1 ►
e
i
i •
•• y
•
r
RR
•
R
AEC PROJECT#: 27834
,r
+
M
••
PARTIAL RETAIL
M j-, UMBING P LAN
i
MP290
o
• «� • ,;! r.l �4+.• . ;1�,1 t L � r, �p;�`, «� .r_ 1,
SCALE: 114" =' 1'0„ NORTH