HomeMy WebLinkAboutDRB090470TOM
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.vailgov.com
Project Name: ANTLERS EXTERIOR RENOVATIONS DRB Number: DRB090470
Project Description:
COMMON ELEMENT: EXTERIOR RENOVATIONS INCLUDING RE -ROOF, REPLACING FLUE CAPS,
ADDING STUCCO TO EAST AND WEST ENDS OF BUILDING AND INSTALLING SOLAR THERMAL
(HYDRONIC) PANELS. A TOTAL OF 56 SOLAR PANELS ARE TO BE INSTALLED ON THE ROOF.
Participants:
OWNER VAIL / LIONSHEAD CORP 09/28/2009
680 W LIONSHEAD PL
VAI L
CO 81657
APPLICANT ARCHITECTURAL SERVICES 09/28/2009
PO BOX 385
EDWARDS
CO 81632
Project Address: 680 LIONSHEAD PL VAIL Location: ANTLERS
Legal Description: Lot: 3 Block: Subdivision: ANTLERS CONDO
Parcel Number: 2101- 072 - 0600 -1
Comments: See conditions
Motion By: DuBois
Second By: Plante
Vote: 5 -0 -0
Conditions:
BOARD /STAFF ACTION
Action: APPROVED
Date of Approval: 10/07/2009
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and /or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS.
Cond: 202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Cond: CON0011103
The aplicant shall conceal all hydronic piping and associated wiring by either
painting the items to match the roof color of constructing enclosures to match the
facde material.
Cond: CON0011104
The applicant shall install sheet metal around all the solar collector assemblies to
shield the supporting structure and piping from view. The color will be a flat black
or other color to blend in with the roof material.
Planner: Warren Campbell DRB Fee Paid: $250.00
.+
1C3epartment of Community Develop"ment
75 South Frontage ;a,
S
*i
Application for Design Review
Minor Exterior Alteration SEP 28 2009
General Information: This application is required for all proposals involving minor c ang Ifli� s. site im-
provements, such as roofing, painting, window additions, landscaping, fences, retainin , e4e: Replica Vait
Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects re-
quiring design review must receive approval prior to submitting a building permit application. An application for Design
Review cannot be accepted until all required information is received by the Community Development Department, as
outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Plan-
ning and Environmental Commission. Design review approval expires one year from the date of approval, unless a
building permit is issued and construction commences.
Fee: X$250 for Multi - Family /Commercial
$20 for Single Family /Duplex
Single Family
Duplex '�*/ Multi- Family
Commercial
Description of the Request: SEE ATTA CJ4 MF_Wr 1U-r00jP ;_ "la (L _NL& .. C�°S,
Physical Address: & bO WrSY LIONS HEAP PL.AGE
Parcel Number: 210107iZO(o o ool TO 097 (Contact Eagle Co. Assessor at 970 - 328 -8646 for parcel no.)
Property Owner: ANTLIERS C- 01400MINIUM ASSOc- lATION r ROB l.tV114- �"Eii MaNA►4A%4
ER
Mailing Address: 46-0 "5.ST L„t014S HEAV PLACE , VA II. , GO 61(o.57
r-_ , /J f Phone: 0-16) 474 - Z 4 7 l
Owner's Signature:
Primary Contact/ Owner Representative: AR G H 17M GT O R Ad• SOW I CE S 1w.4.
Mailing Address: P.O. 13OX 3 8 5 rWWA !ti> S , e-o 814 3 Z
E -Mail: ASK- 05 E GENTURY M- . µEY
Phone:
Fax: 6-470)
(q70) 11Z4-7405
q2G- 740 10
FS&E P.
For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Auth # Check #1 qsLt _
Fee Paid: q4a . W Received From: 10 S ay V ict
Meeting Date: _ 2i _. DRB No.: TD r A010 q-1 0
Planner: _ Project No: o� `j o-3
Zoning: _ Land Use: ��
Location of the Proposal: Lot: _ Block:l Subdivision: he Uf
APPLICATION FOR DESIGN REVIEW
DESCRIPTION OF THE REQUEST
Address — Antlers Condominiums
Lot -3, Block -1, Vail / Lionshead Third Filing
680 West Lionshead Place
Parcel No. - 210107206001 through 097
The improvements described below are to occur at the original portion of the existing building.
1. Replace all the existing built -up roofing and gravel surface with a similar roofing system
and gray gravel.
2. Replace the existing sloped metal roof element above the central stair and elevator
shaft with new standing seam metal roofing with the color to be dark bronze.
3. Install roof access hatch at roof above existing east stair tower.
4. Replace all the existing fireplace flue enclosures and caps with stucco enclosures and
copper caps to be similar in design to the ones on the new portion of the existing
building.
5. Apply stucco to the stone imbedded precast concrete wall panels at the east and west
ends of the building. The stucco will match the texture and color used on other portions
of the existing building. It is possible that the stucco work will be phased, with the
fireplace flue enclosures to be done in Phase -1 and the general wall area to be done in
Phase -2. Refer to Photographs 2 and 6 for extent of stucco work and 11 for stucco
colors.
6. Install a hydronic solar panel system on the roof of the building consisting of (56) 4'x10'
panels installed at a 40 degree angle.
PROPOSED MATERIALS
Building Materials
Type of Material
Color
STANptNG SEAM MIETAIL
BROW 2S
Roof
(jRAVEL oµ ISutLr- or Root = %w(A
GsRA`�
Siding
S'[u C. G o
MATCH EX15TItyG�
Other Wall Materials
"IAA
Fascia
K /A
Soffits
WA
Windows
11,4 /A
Window Trim
1.4 /A
Doors
µ /A
Door Trim
"/A
Hand or Deck Rails
13 /A
Flues
1411,
Flashing
GC P PH Iz
NA -r V tZ A L
capplrm Gi►p
NATvRAt-
Chimneys
STU440 WA" S
{hgTGN �Y.ISTtW4
Trash Enclosures
14 /A
Greenhouses
W /A
Retaining Walls
N /A
Exterior Lighting
W /A•
NATURAL - 4LASS
Other
SOLAR J'gIJE t. s
Ft.AT Of-ACK
Notes:
Please specify the manufacturer's name, the color name and number and attach a color chip
PROPOSED LANDSCAPING
4.
Minimum Requirements for Landscaping: Deciduous Trees — Z" Caliper
Coniferous Trees — 6' in height
Shrubs — 5 Gal.
Type Square Footage
GROUND COVER /V //4
SOD Iq 1A
SEED 't4 1A
IRRIGATION
TYPE OF EROSION CONTROL N�
Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
Botanical Name
Common Name
Quantity
Size
POPU 'LuS
PROPOSEDTREES
�E vL01PeF5
2��QS
AND SHRUBS
P I PEP-OSA
P I Ar6c' o S p
O/
Pop ULvS
EXISTING TREES
7REMvLolyes
ASPS/.!
7
2���
Flu u5
Po,cJpER05/q
2
/- Zd/
TO BE REMOVED
�bNDEROSiq
Pi NE
/ - 4a/
Minimum Requirements for Landscaping: Deciduous Trees — Z" Caliper
Coniferous Trees — 6' in height
Shrubs — 5 Gal.
Type Square Footage
GROUND COVER /V //4
SOD Iq 1A
SEED 't4 1A
IRRIGATION
TYPE OF EROSION CONTROL N�
Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
�RCH���CTURAL SERVICES, Po Co
210 Edwards Village Blvd. • C -202 • P.O. Box 385
Edwards, Colorado 81632
Phone: 970.926.7605 • Fax: 970.926.7610
September 28, 2009
Town of Vail, Design Review Board
75 South Frontage Road
Vail, Colorado 81657
Re: Antlers Condominiums — Roof and Other Exterior Improvements
Parcel No. - 210107206001 through 097
Dear Board Members:
D ECIE �MCE�
aFP 28 2009
TOWN OF iJAIL.
Attached please find our clients submittal for the above referenced project. In an effort to resolve
some maintenance issues and improve the appearance of the original portion of the existing
building they would like to replace the existing roofing and fireplace flue enclosures and caps. The
new roofing would be similar to the existing with the gravel color to be changed from red to gray and
the new enclosures and caps are to be similar in design to the ones on the newer portion of the
existing building. At the same time they will be increasing the thickness of the roof insulation to
reduce heat loss and decrease energy use.
Another exterior improvement involves a continued effort to eliminate more of the stone embedded
precast concrete exterior wall panels by covering them with an EIFS type stucco system. At various
times in the past they have done this same thing to other elements of the original portion of the
existing building and hope to eventually eliminate all the exposed stone panels. This improvement
also adds insulation to reduce heat loss and decrease energy use.
For many years the Antlers Condominium Association has endeavored to conserve on energy use
and has implemented many Green policies into their everyday operations. In 2008 they were
named the Green Business of the Year for the Vail Valley. In keeping with this effort to reduce
energy use they are proposing the addition of a hydronic solar panel system on the roof of the
original portion of the existing building consisting of (56) panels. This system will provide hot water
for the newer portion of the existing building with overflow heat to be used to assist with the heating
of the existing swimming pool.
We are hopeful that the Board will see the value of these improvements both from an aesthetic as
well as an environmental perspective and will approve our clients request.
Sincerely,
ARCHITECTURAL SE IC S, P.C.
Danny Swe eger
Copy to: Rob LeVine
Antlers Condominiums Association General Manager
TOWN OF VAIL, COLORADO Statement
Statement Number: R090001316 Amount: $250.00 09/28/200902:53 PM
Payment Method: Check Init: JLE
Notation: 1484
ARCHTIECTURAL SERVICES
-----------------------------------------------------------------------------
Permit No: DRB090470 Type: DRB -Minor Alt,Comm /Multi
Parcel No: 2101- 072 - 0600 -1
Site Address: 680 LIONSHEAD PL VAIL
Location: ANTLERS
Total Fees: $250.00
This Payment: $250.00 Total ALL Pmts: $250.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
DR 00100003112200 DESIGN REVIEW FEES 250.00
ql I
17- V, .
wk
j. IA -
ic
JI
STUCCO
ANTLERS CONDOMINIUMS
PROPOSED - VIEW FROM SOUTH EAST
i Mia rnU 1 U"KAVM UlbVLAYS VVHA 1
WOULD BE DONE IF STUCCO WORK IS
PHASED, WITH FIREPLACE FLUE
ENCLOSURES DONE IN PHASE -1 AND
AREAS LABELED TO BE STUCCO TO
TOWN OF VAIL
DESIGN REVIEW BOARD 2
DATE: .-7 - 0 _� 9 -28 -09
PLANNER: ._ _. W -
kn
• =9�
ANTLERS CONDOMINIUMS
EXISTING - VIEW FROM SOUTH WEST
TOWN OF VAIL
DESIGN REVIEW BOARD 3
DATE: 10- 1 - 0 1 9-28-09
MANNER: wc,
ANTLERS CONDOMINIUMS
PROPOSED - VIEW FROM SOUTH WEST
TOWN OF VAIL
DESIGN REVIEW BOARD 4
DATE: 10'-7'0 9 9 -28-09
PLANNER: W
—
STUCCO
,��
A.
i ..
Ae ..
ANTLERS CONDOMINIUMS
PROPOSED - VIEW FROM SOUTH WEST
TOWN OF VAIL
DESIGN REVIEW BOARD 4
DATE: 10'-7'0 9 9 -28-09
PLANNER: W
APPROVED BY THE
TOWN OF VAIL
DESIGN
/rREVIEW BOARD
ANTLERS CONDOMINIUMS 5
EXISTING - FIREPLACE FLUE ENCLOSURE TO BE REPLACED 9 -28-09
m
z
n
r
O
ch
c
m
L�e
o0
m
0
m
v
n
z
m
c
m
x
z
i
mn
TO
m
-o
r
0
m
mn
r
c
m
mi 0
p.
z
r
m
n
O
z
v
O
m
z
c
Z
z h
m -�
z 0:g
O 7 *o
® M
aT"n�
<
d
EXISTING STUCCO COLORS
APPROVED I3Y THE
TOWN OF VAIL
DESIGN REVIEW BOARD
DATE: 10-1-20
PLANNER° _ -
7
9 -28 -09
mill w
L07 515LOCK -11 VAIL / LICNSHEAI:� 7HIR=� I=ILIN&
&aOLIONSH;=A=� P
A-0 COVER
A -1 EXISTING ROOF PLAN
wwj- _t
F.&lFzJWmlbi
AROH I TEOTURAL SERV l OEc,.,,t.' , F -0.
P.0, BOX 505
EDNARDS, COLORADO 81632
(cl-70) c126-1605
(q-70) q2 (o- -7610 (FAX)
+ t r 1, 1
A -3 EXI5TIN6 PARTIAL BUILDING ELEVATIONS
A -4 PR.OP05ED PARTIAL BUILDING ELEVATION5
TYPICAL rrtr, M FIREPLACE r PLAN 4 A
As PANEL ARRAY
PHOTO(SKAPHS INDEX
I EXI5TING - VIEW FROM 50UTH EA5T
KAM920�r��� r� i
3 EXI5TING - VIEW FROM 5OUTH WEST
4 PROP05ED - VIEW FROM 50UTH WE5T
5 EXISTING - FIREPLACE FLUE ENGL05URE TO BE REPLACED
b EXI5TING - FIREPLACE FLUE ENGL05URE TO BE MATCHED AT NEW LOCATIONS
-7 EXISTING - 5TUC60 GOLOR5 TO BE MATCHED
Fn
ID
In
2009
u w.
TO W a
:
► ' I
rr"�
EX15TIN6 R00f= PLAN
FA
ly"Imm"O
?n
v
v
0
a
50'-0"
FACE OF NALL ON
ADJACENT ATTACHED
BUILDING
NEN ROOFING TO
REPLACE EXISTING
(TYPICAL)
NALKNAY AND
RAILING AT FLOOR
BELOW ( TYPIGAL)
INSULATED PIPES TO
EXTEND DONN FACE
OF BUILDING
EXI5TIN6 ASPEN TREES BELOW TO
BE REMOVED TO ALLON FOR
INSTALLATION OF NEN 5TUGCO NALL
FINISH ( TYPIGAL OF (4) LOCATIONS)
(SEE NOTE NO. 2 BELON)
O
c�v
c}
c�
NEW COPPER METAL
ROOFING TO REPLACE
EXISTING
NEW CHIMNEY ENCLOSURE
AT EXISTING ELEVATOR
SHAFT SMOKE RELIEF
VENT DUCT
EXISTING GLASS
ENCLOSURE BELON TO
REMAIN
4 O
cV
cv
FLUE ENCLOSURE TO BE a
INCREASED IN LENGTH
TO ALLON FOR ROUTING
NEN ROOFING TO OF SOLAR PANEL PIPING
REPLACE EXISTING
(TYPICAL)
a T.O. ROOF (VARIES) ri►
EL. +/- 145' -0" (AT THIS LOCATION)
EX15TING FLUE ENCLOSURE AND
FLUES AT TH15 LOCATION ARE
TO BE LONERED TO BE THE
SAME HEIGHT ABOVE ROOF AS
OTHER LOCATIONS
5TUGGO ADDED TO FACE OF PRECAST
CONCRETE NALL PANEL BELON WITH 6"
PROJECTION AT FIREPLACE FLUE
ENCLOSURE (SEE BUILDING ELEVATION
ON SHEET A -4)
501-0"
o F o
T.O. ROOF (VARIES) a
EL. +/- 172' -0" (AT THIS LOCATION)
INSULATED SUPPLY AND RETURN
PIPING PAINTED TO MATCH
GRAVEL SURFACE OF NEW
ROOFING KITH VERTICAL PIPING
AT TRANSITION FROM UPPER TO
LONER ROOF TO BE KITH --IN NEW
FIREPLACE FLUE ENCLOSURE
NEW 4'xIO' HYDRONIG 50LAR
PANELS AT 40- ANGLE (56)
PANELS TOTAL
PRECAST CONCRETE PAVERS IN
COLOR TO MATCH GRAVEL
SURFACE OF NEN ROOFING
501 -0'
O O
� � v
i
, r.`� .2�; a ,r``t S �, �:�^..
a ,�',- �N�, r`„�, si �"'�r..
;•r,�.k ,. - z"" *3 wi v.'i -v ,...•s 2 ..:3+ 2 ^f.' :< r::: �a.,, :r `. " .. .,.;T,t < ,:Fi,tS : ..j .,; k ,. r, r. a,.
S .,:{.'. ,;✓k 2 a �*,. -> r.,rczx .`� .�
�` �' , \ \
_.7h. n ys 4ir
_....-. ;N. x;h. �, vl �` s.. ,,;. ,; •,i - wy;c'g .-:..
•.; �'.. E� , ./ 'zS2. `�rx. v'. '�. .x�?�.,,F ✓..} P+.:,.i x,;�° c" ,u. .a >. 4. 'm ,;, ... >... k.. w+Y.. ',�.. ,A,r^.�-',9 ,. 3„ ... ?.Jm?v .. :.: };. ,.:.,..1: t
w.,. ;�� f75'"„"+ a.- r.. {`{+``.,� y�. r''�2 xn`; +'' Via,,. �,s r��,r, �,s' ¢� :-7Tr .rs2. i�`r "` t�; � g ?:`�.�'z L'�,�,'''�,'"+. ..e✓�,"� r ;�• "<. c, d .P WIN
'-.
)':...3 ,, " ,.. `yore:',., .. ,; x•+ _, < _Ya`'`-a.. +.s�. _, x a, ..;, t:rs. �':.r rs :s..:x,!rt :u ,5`. ,...;N.n I. ,.r. �i
c t^�..?,,:
{, �,..i � ,..;. �x ,:k :.� .�:;.. , z,',rr. ',:. t. `�•;',,�,. �„ "- ,."`,.:.h ._ +...,, c ,$ ,.5. <r'kw.t, ,a �:. ,. ,r z � • ro"- '.t:.t > >. _r,..r r.;T.,;.+6 x
� �,.^�., r «,�'>F � s pn* . �. ±y ^`E .. ro :�.` :"C � z ; x, 3r �n•^a ,h, h b+. 4 <` ,�Fa,s ¢ � +.,-.. g �
_+...:.'" #" sa,; vtY- ..-¢_. e �,•. Wit^ -psi �.'^..;x ze .r„ .*�.;ae`.z£,:.. >a•r i.Xrt i`.. ..,LU. ,rr 3«"''>s�. " " ^iY,."- ...''�v...�xv:x.f ,.,�•,nrw =i k`r -�r-S .¢.,.
A-a
TYP.
IIGH ROOF
EXISTING GONT.
COPPER GUTTER KITH
COPPER DONNSPOUT5
TO REMAIN (TYPICAL)
210' -b'
=4d
IWA13
NEW 5TUGGO FIREPLACE FLUE ENCLOSURE
KITH COPPER GAP TO REPLACE EXI5TINC
AND TO BE 51MILAR IN DE516N TO EXISTING
ENCLOSURES KITH CAPS AT FLUES ON
ADJACENT SLOPPED ROOFS (TYPICAL)
NTPS «
flies
N
\ 1
}
\ \
\.r l
EXISTING TILE
ROOFING ON
ADJACENT ATTAGHED
BUILDING TO REMAIN -
NEW ROOFING TO
REPLACE EXISTING
(TYPICAL)
NEW ROOF ACCESS
HATCH TO BE
INSTALLED
EXISTING MEMBRANE
ROOFING ON
ADJACENT ATTACHED
BUILDING TO REMAIN-
NEW ROOFING TO
REPLACE EXISTING
(TYPICAL)
EDGE OF ROOFING
(TYPICAL
4
A-5a
30,-0.
0. �
O 1 O
NEN ROOFING TO
REPLACE EXISTING
(TYPICAL)
I. EXCEPT INHERE NOTED OTHERNI5E NEW ROOFING TO
REPLACE EXISTING 15 TO BE BUILT -UP ROOFING KITH
GRAY.
2. TREES REMOVED FOR 5TUGCO INSTALLATION HILL
BE REPLAGED WITH AN EQUAL NUMBER OF THE SAME
SPECIES AND IN 51MILAR LOCATION.
5. NEN SMALLER PINE TREES TO BE ADDED TO
COMPENSATE FOR LOSS OF TALLER EXISTING TREE
THE EXACT LOCATIONS FOR TREES ARE TO BE
DETERMINED IN THE FIELD.
'1'—o"
iv
0
4
a
EXISTING ASPEN TREES
BELOW TO BE REMOVED TO
ALLOW FOR INSTALLATION
OF NEW STUCCO WALL FIN15H
(TYPICAL OF (3) LC.X`,ATION5)
(SEE NOTE NO. 2 BELON)
0
0
.— STUCCO ADDED TO FACE OF PRECAST
CONCRETE NALL PANEL BELOW WITH b"
PROJECTION AT FIREPLACE FLUE
ENCLOSURE (SEE BUILDING ELEVATION
ON SHEET A -4)
X�
EXISTING PINE TREES BELON
TO BE REMOVED TO ALLOW
FOR INSTALLATION OF NEN
STUCCO NALL FINISH (TYPICAL
OF (2) LOCATIONS) (SEE NOTE
NO, 2 BELON)
W A"
�r
�1
t*
I�
•r •.mil
•
i
i
M
�
4
•
s
i
Ilr
t�
1
•r •.mil
i
i
�
4
t�
11
s
•r •.mil
c x
GRAVEL 07N BUILT —UP
GRAVEL ON BUILT —UP ROOFIN&
ROOFIN&
COPPER &UTTER
COPPER &UTTER
FIREPLACE FLUE
ENCLOSURE
FIREPLACE FLUE
ENCLOSURE
151614TH LEVEL EIGHTH LEVEL
— EL.
— SEVENTH LEVEL 5EVENTH LEVEL — _ —
EL. 154' -0" EL. 154' -0"
STUCCO'
51XTH LEVEL dk 51XTH LEVEL — —
EL. 145' -0" EL. 145' -0"
PRECAST CONCRETE
PANELS WITH IMBEDDED COPPER DOM5POUT
STONE FACING
OIL FIFTH LEVEL J, FIFTH LEVEL
— T EL. 156-0" EL. 136-0" -- —
STUCCO PRECAST CONCRETE
PANELS WITH IMBEDDED
STONE FACING
El�"EVATION-
FOURTH LEVEL FOURTH LEVEL —
EL. 12 -7' -0" `CEL. 12-7' -0"
THIRD LEVEL
EL. 118' —O"
SECOND LEVEL
EL. 10q' —O'"
OL GROUND LEVEL
EL. 1007' —O"
,lk THIRD LEVEL
EL. 118' —O"
, ,, SECONp LEVEL — —
EL. IOC' —O'"
&ROUND LEVEL .._
EL. 1007' -0"
EXISTING f"Mm"AR"TIAL EAST ELEVATION
MAN
..,t
El'
w•X ~
H
ih
•tip M.�
NEW ROOFING TO REPLACE
EX15TIN& GRAVEL ON BUILT-UP
ROOFING
NEW HYDRONIG 50LAR PANEL
ARRAY EX15TIN& COPPER OUTTER TO
REMAIN
— EX15TIN& COPPER GUTTER TO NEW HYPRONIG 50LAR PANEL
REMAIN ARRAY
— NEW ROOFING TO REPLACE METAL CLAD END PANEL
EXISTING GRAVEL ON BUILT-UP PAINTED FLAT BLACK
ROOFING NEW FIREPLACE FLUE
NEW FIREPLACE FLUE FNCL05URE TO REPLACE T-T
ENCLOSURE TO REPLACE EXISTING WITH NEW GAP TO
MATCH 1?E!31&N OF TH05E ON
EXISTING PqITH NEW CAP TO
THE NEA PORTION OF THE
MATCH DESIGN OF THOS E ON
EX15TIN& :a BUILDIN&
THE NEW. PORTION OF THE
EXISTING BUILDINC7
EIGHTH LEVEL E16HTH LEVEL
EL. 1651-01, T EL. lb3'-O'
NEW 6" PROJECTION OF 5TUCGO NEVq (9" PROJECTION OF 5TUGGO wi
ON IN5ULATION E30ARD (5EE ON IN5ULATION E30ARD (SEE: .. .. ..
NOTE NO. 2 BELON) NOTE NO. 2 BELON)
SEVENTH LEVEL OL 5EVENTH LEVEL
EL. 154'-0" -0
EX15TINO 5TUGA:�,O TO REMAIN EXISTIN6 5TUGGO ON lNeULATION
BOARD TO REMAIN
51XTH LEVEL 51XTH LEVEL
T EL. 145'-0"
EL. 14!5'-0"
EXISTING COPPER DOWNSPOUT
TO REMAIN
•JI
FIFTH LEVEL FIFTH LEVEL
EL. 136-0" EL. 136'-0"
NEW 5TUCCO TO MATCH F-Xl5T]NCv ON NEV4!5TUCCO TO MATCH EX15TINO ON z,
INSULATION BOARD TO BE APP LIEP INSULATION BOARD TO BE APPLIED
TO EXISTING PRE6A5T CONCRETE TO EXISTING PRECAST GONGRETE
P^NELS (51EE NOTE NO. I BEI-Okq) PANEL5 (5EE NOTE NO. I BELOYI)
rY
OL FOURTH LEVEL OIL FOURTH LEVEL
T EL. 12-l'-O" T EL, 12-t'-O"
EX15TINO PRE0A5T CONCRETE
WALL PANEL PqITH!5TONE
IMBEDDED IN FACE
OIL THIRD LEVEL THIRD LEVEL
EL. 115 -0" EL. 115'-0"
EXISTING 5LIDIN6 OLA55 POOR EX15TIN& 5LIDINC7 &LA55 DOOR
TO REMAIN (TYPIGAL)
TO REMAIN (T*,(PIGAL)
5EGOND LEVEL
k SECOND LEVEL
EL. 10ci'-O" EL. loci,-01,
FFI-li •
EXISTING METAL RAINING TO EXISTING METAL RAINING TO
REMAIN (TYPICAL) REMAIN (TYPICAL)
-, ROUN
GROUND LEVEL OL C P LEVEL
'f EL. 100'-0" T EL. 100'-0"
f- -.m-
PAR" T I AL.... Z"'"70UTH ELEVAT I ON"
;',;lW*TUCC0 COLOR` NOTEE15:
I. MAIN WALL AREA COLOR TO BE NO. I (5EE PHOTOGRAPH NO. 5)
2. FIREPLACE FLUE ENCLOSURE 6" PROJECTION COLOR TO BE NO. 2 (SEE PHOTOGRAPH NO. -1)
V .-L
r0omwo*'Aomom`TlAL EAZBT ELEVATION-
r--w�W]p
Im
COPPER FA5GIA TO
MATCH FA5GIA ON
EXISTING CHIMNEY CAP5
AT NEN PORTION OF
BUILDING
3"x3" 5TEEL P05T (PAINT)
GOPPER FLUE GAPS AND
EXTENSION5
5TUGGO ON INSULATION
BOARD (COLOR NO. 2)
NEN ROOFING ON
INEULATION-
EX15TIN6 PRECA5T
CONCRETE BEARING
HALL
Ij II
J,
'N"
5TANDINO 5EAM COPPER
ROOFING TO MATCH
ROOFING ON EX15TING
CHIMNEY CAPE, AT NEN
PORTION OF BUILDING
COPPER E-NGLO5URE CAP
COPPER FLASHING WITH
COUNTER FLA5HINC7
EX15TIN6 PREGA5T
CONCRETE DOUBLE TEE
ROOF PANEL
7**loof"mo'hlCAL
co�
LUE ENCLO Uoom"E ELE /ATI A"N4
50ALE: 142 = 1*--0"
STANDING SEAM COPPER
3x3 5TEEL P05T IN
ROOFING TO MATCH
LINE OF CHIMNEY CAP
10
ROOFING ON EX15TIN&
1 10;
CHIMNEY GAP5 AT NEW
BOARD
PORTION OF BUILDING
GYP. 5HEATHIN6
DI 10
3 51b" METAL 5TUD
FRAMING
—LINE OF EX15TINO GAP TO
COPPER FA501A TO
FACE OF EX15TIN,67
BE REMOVED
MATCH FASCIA ON
LEG OF PREGA5T
EXISTING CHIMNEY GAP5
ROOF PANEL 13ELON
AT NEVNI PORTION OF
L
EX15TINC-7 FIREPLACE
—
BUILDING
5"x3" STEEL P05T (PAINT)
(
GOPPER FLUE CAP5 AND
EXTEN51ON5
I NJ
ell
Ir"
LINE OF EXISTING
JT,
FIREPLACE FLUE
COPPER ENCL05URE GAP
ENCLOSURE TO BE
MODIFIED AND 5TUCCO
AND CAP TO BE
577UCGO ON IN50LATION
REMOVED
BOARD (COLOR NO. 2)
NEW ROOFING ON
IN5ULATION
LINE OF EX15TIN6
ROOFING TO BE
REMOVED
COPPER FLA5HING WITH
COUNTER FLA5HIN&
EX15TIW--., PRECAST
GONGRETE DOUBLE TEE
ROOF PANEL
FLUE �NGLOSURE ELEVATION
50ALE. 1/2 = 1'-0"
L(-,_1 _ . -- -1 . -
LINE OF ROOF ABOVE
3x3 5TEEL P05T IN
CORNERS (TYPICAL)
LINE OF CHIMNEY CAP
10
ABOVE
1 10;
5TXCO ON IN50LATION
BOARD
51b" TYPE "X" EXTERIOR
GYP. 5HEATHIN6
DI 10
3 51b" METAL 5TUD
FRAMING
FACE OF EX15TIN,67
SHEATHING
LEG OF PREGA5T
CONCRETE DOUBLE TEE
ROOF PANEL 13ELON
L
EX15TINC-7 FIREPLACE
—
FLUE5
PRECAST CONCRETE
(
I.
10
1 10;
DI 10
I
10
� r i..
SEARING HALL BELOW
A-5
LUE ENCL050* URO"E PLAN U�
5CAIX=: 1/2 = 1'-0"
o'
0 Asuft
500-LAK f"ll"ANEL A"Kw'&m`A)oo ZBECTION-_
LINE OF 5ORFACE OF NEN
ROOFING
TOP OF COPPER
ROOFING TERMINATION
FLA5HIN&
EXISTING FASCIA
EXISTING PRECAST
CONCRETE--- DOUBLE TEE
ROOF PANEL
(2" OF RIGID IN50LATION,
TO BE ADDED WITH NEN
ROOFING
PLAN
NeWT"
APPROVED BY THE
TOWN OF VAIL
•
N it