HomeMy WebLinkAboutB06-0252 Plans" . 0 p6- 0 Zi S e--., I-- r'adA Z 23.3' 6 ROOF OVERHANG '0% A-4.3' A 4. A 4.1 COVERED 0.6, A:� 4,3' A ENTRY NOTES: 1) DATE OF SURVEY: 3/02/07 UPDATE: 6/22/07 ROOF PEAKS: "A" 8037 7 TOP FRAMING "B" 8041.6 TOP FRAMING "C" 8034.8 TOP PLYWOOD "D" 80314 TOP PLYWOOD "E" 8046.1 TOP PLYWOOD 80,37.9 TOP PLYWOOD 8052.8 TOP PLYWOOD I m 41199 HIGHWAY 6 & 24, EAGLE-V P.O. i ll x 1230 EDWRS, CO. 81632 (970 A )949-1406 UPDATE: 6/27/07 KPJ 298• 1LO.DWG 3/30/07 KPJ lift Al EWNX�l 01 U1 U I a 1 0 1 - 4 1 -1 0 19 Hubbard - StMoritz Lot 8 Lot 8, Vail Heights Filling 1 St. Moritz Drive, Vail, Colorado 77 s: ;r AO n E46�] 3 e s P a / r� / / ` // CONTRACTOR NOTES / / / , -'�/ / / / / oN Construction Documents Note: These Construction Documents including Architectural 5heets Al to A and 5tructural 5heet5 51 to 54 have been prepared in response to the specific Basic Services requested by the Owner contemplating continued involvement, selections and decision making by the General Contractor and Owner through completion of construction. These documents indicate the scope of architectural design concepts approved by the Owner and include dimensions of the building, the types of structural systems and an outline of the architectural and structural engineering elements of construction. These Construction Documents provide the scope of services as outlined in the Agreement for Architectural 5ervice5 and therefore do not necessarily indicate or describe all materials required for full perfomance and completion of the Work. It is the understanding of the Architect and Engineer that the General Contractor shall furnish all Work required for proper completion of the Work and that the Work shall be of sound and duality construction in accordance with industry standards and all manufacturers specifications, instructions, and worronty requirements. The Contractor, based on the foregoing, shall prepare for Owner review a realistic budget with a latitude of prices based on assumptions of scope of Work and Owner product selections. Contractor's Responsibilities: The Contractor shall be responsible for field verifying all existing conditions, Construction Documents, 5tructural Documents, municipal and /or county zoning codes, pertinent IBC 2005 code requirements, and General Specifications. The Contractor shall be responsible for all Mechanical and Electrical engineering, design, specifications and drawings as required for building permit and approval by Owner and Architect. , -Z/ / /rr�,', 00 0 , CP /mac / �'� / C) Z K IT STORM DRAINAGE DETAIL 6' BOULDER RETAINING WALL (1YP) FINISHED GRADE CONCRETE PAN AND COMBINED 4' RETAINING WALL BUILDING FOUNDATION WALL r ° *2 : � , r 93 \'0 r/'� / /� / / / / / 22 / 000, V\ X Z' 20 r / � �,, �� / ,, '' �,, / / �. � "/ 33.0 / O / / GENERAL NOTES: TS"� �� //G 3' \ / / tl(Il .� ' I I ��IFt'; �✓'/ '�.. { s .. �,r1�, .. »` >'./.'i�.'. « . « « .'i f y AMY / �' 1 J �' b' ARCHITECTURAL DRAWING6 AO COVER SHEET Al 51TE PLAN A2 LOWER LEVEL FLOOR PLAN A3 MAIN LEVEL FLOOR PLAN A4 UPPER LEVEL FLOOR PLAN A5 ROOF PLAN A6 5OUTH (ENTRY) ELEVATION A EA5T ELEVATIION A8 NORTH ELEVATION Acl WE5T ELEVATION A10 5OUTHEA5T ELEV / SCHEDULE5 All BUILDING SECTION Al2 BUILDIN6 5EGTION A13 BUILDIN6 5EGTION A14 BUILDIN6 SECTION A15 DETAIL5 61 6RFA DIA6RAM LANDSCAPE DRAWINCa6 LI LAN05CAPE PLAN / LI6HTIN6 PLAN STRUCTURAL DRAWING& 51 FOUNDATION PLAN 52 MAIN LEVEL FRAMIN6 PLAN 53 UPPER LEVEL � ROOF FRAMIN6 PLAN 54 H16H ROOF FRAMING PLAN 55 FOUNDATION 5ECTION5 56 FRAMING DETAIL5 /6ENERAL NOTE5/5PEG5 • ZONING: PRIMARY /5EGONDARY LOT AREA = .55 A6RE5 = 23,858 5.F. 51TE GOVERA&E: MAXIMUM (15 %) OF LOT AREA = 3,583 5.F. PROPOSED 51TE GOVERAGE = 3,588 S.F. 6RFA: 6RFA MAXIMUM ALLOWED = 7,664 5.F. 6RFA TOTAL PROPOSED = 6,418 S.F. LAN05GAPE AREA: MINIMUM 609'6 OF LOT AREA = 14,870 5.F PROP05ED LANDSCAPE AREA = N.A. DRIVEWAY GOVERAC)E: MAXIMUM (201 OF LOT AREA = 4,781 5.F. PROP05ED DRIVEWAY COVERAGE = 3,027 5.F. BUILDING HEIGHT: BUILDIN6 HEIGHT MAXIMUM = 33' -0" BUILDIN6 HEIGHT PROP05ED = 2g' -10" �4111'_ oil 11 Ila 6RFA GALGULATED AS ADOPTED 6RFA REVISIONS x l ORDINANC NO. 14, 5ERIE5 2004. LOWER LEVEL: 3,051 S.F. 6ARA6E: -600 5.F. SUB - TOTAL: 2,451 5.17. LOWER LEVEL %: 53% LOWER LEVEL TOTAL: 1,2gg S.F. MAIN FLOOR: 2,830 S.F. UPPER LEVEL: 1,238 5.F. -I. 16 VAULTED: 1,052 S.F. TOTAL: 6,41c{ 5.F. (N.T.E.: 7,664 5.F) W ... 2 FIRE SUPPRESSION 5Y5TEM: YES i -HR FLOOR /GE I L I N6 ASSEMBLY: FIRE RE515TENGE DE516N MANUAL, LOTH ADD. NO. FG -5108, OR APPROVED ALTERNATE. i -HR WALL ASSEMBLY: FiRE RE515TENGE DE516N MANUAL, IOTH ADD. NO. WP -3510, OR APPROVED ALTERNATE. UTILITY LEGEND 5 5EWER ALL UTILITY LOGATiON5, W WATER HOOK -UP5, AND LiNES TO METER CLO5ET SHALL BE G 6A5 FIELD VERIFIED BY E ELECTRICITY CONTRACTOR BEFORE COMMENCEMENT OF TV GABLE TV CON5TRUCTION PH TELEPHONE ,d. N C> N r Lo 00 N i N � i i N a, a° 7' -4" 29' -0" 1' -112 11' -24" 10' -92" 26'- / All Ag Al2 -- d d 4 ' d d d Lu_ n All 23' -4" 2' -11" IN ME pis l l AS Al2 18' -11j 97'- 1 i 1 GONG 5TAIR5: 13 R15ER5 @ 7.43" = b' -I" TREADS ® II" - NA ORAII-5 PER 2003 I RG. F FRONT STAIR —sznn� _n 19' -5j" FLOOR PLAN LEGEND O INDICATES SMOKE DETECTOR, GEILING INDICATES WINDOW LOCATION 0 LOCATION RE: IRC 2003 (CURRENT SEE WINDOW SCHEDULE CODE AND LOCAL JUR15DIGTION FOR SIZE AND DATA. REQUIREMENTS) " AM - 0 a1� R OM �, 4� INDICATES DOOR LOCATION 1 110 INDICATES EXHAUST GEILING FAN ,w 2 LOCATION RE: LOCAL CODE FOR 51ZE AND DATA. d INDICATES H05E BIB d INDICATES FLOOR DRAIN LOCATION. LOCATION. II - .=�N Al4 _._. d d 4 °" tz II i LO ER LEVEL ' -11" \ 1 /2'_8A" � a d a T. CONC =8906 - Tim' ^ V= 88 -0 DATU i , UNDER F A BARREL STAIRS: 103 I 108 �/ \ '�' VAULT ARCI AND la RISERS @ 7 3/4" = 12' -3" Cp BARREL VAULT ° d TREADS Q 11" HANDRAILS AR P, TO WI PER 2003 IRG. STEP -- 4-6 _ 100 SPRING POINT\AT 8' -b" A.E.F. ° ° T.O. GAR 8 =8005 -O' ELEV SIZ BASED ON E WINE FAMILY ROOM THY55EN KRU P 'LE V' FINAL DESIGN 3bx4b G NR, 1 41 TH BY OTHERS. ° a d HYDROLI D IVE �� — — — — — — — Lu OL a ° 1 o STOR LOW CEILING T- i fEQUIO c e r j} 2 10 4'_6 2'- 82 " _ L 2 6 , 5 �„ 2 1O ,_ 5 » 3 —CAR GARAGE 12' -2j" 26' -54 �1 — z 3 -6z» WL d d d d Lu_ n All 23' -4" 2' -11" IN ME pis l l AS Al2 18' -11j 97'- 1 i 1 GONG 5TAIR5: 13 R15ER5 @ 7.43" = b' -I" TREADS ® II" - NA ORAII-5 PER 2003 I RG. F FRONT STAIR —sznn� _n 19' -5j" FLOOR PLAN LEGEND O INDICATES SMOKE DETECTOR, GEILING INDICATES WINDOW LOCATION 0 LOCATION RE: IRC 2003 (CURRENT SEE WINDOW SCHEDULE CODE AND LOCAL JUR15DIGTION FOR SIZE AND DATA. REQUIREMENTS) INDICATES DOOR LOCATION INDICATES EXHAUST GEILING FAN SEE DOOR SCHEDULE LOCATION RE: LOCAL CODE FOR 51ZE AND DATA. REQUIREMENT5 OR DESIRED LOCATION. INDICATES H05E BIB d INDICATES FLOOR DRAIN LOCATION. LOCATION. V s a 1 r , 40 0 r l ort,"'ca" LOWER LEVEL FLOOR PLAN 1/4 = 11-011 CO a 0 0 r A IL STAINED CONCRETE SLAB (PATTERN T.B.D) ON GRANULAR FILL ON GRADE . � �' -- GARAGE (FRONT) \ T.Q. CONC= 8005'- IVIL N • ;t co L0 'co CfJ 11 -4" Lo C 5GUPPER 7' -4" 29 All Ag Al2 2 13'-2 10 BE SELECTED OMER. F ill ����������..r �r _ .., .....,., 11 4 VT.O. CONC= 8013'-- (WATERPROOF DECK RE: DETAIL 51M) FIN151-1:5TAINEC CONCRETE SLAB YVPATTERN T B.D. FRONT DOOR LANQIhG AT EDGE T.O. CONC= 8013'+1" cpl, 8017 9 \t' t-91 io 3711 1 wommismom . i t 1 13 XH01 21 23 24 i 1 � � � �� li !] I i t I. If 11 ( 11 1 T 22 I ' S� AI N "i2 � AB 2Q � T. HOT TUB DECK 5'-91" 'VT.O. CONC=8017'-9" GONG STAIRS: T.O. PLYWD=8017'-0" 13 P,15ER5 @ IA& ANDRAIL5 FLOOR PLAN LEGEND x\ " al-111 H BOTTOM OF FRONT STAIR TRI=ADS @ 11" 1 OTT >/ 8'- 9 T.O. ',ONC=8005'-O" PER 2003 IR6. <\ INDIGATE5 5MOKE DETEC 5EE NINDON 5CHEVULE IND16ATE5 WINDOW LOCATION X/ LOCATION RE: IRC 2005 ti CODE AND LOCAL JUR FOR 51ZE AND DATA. REQUIREMENTS) T.O. INDIGATE5 DOOR LOCATION HOT TUB DECK INDIGATE5 EXHAUST GEILIN6 FAN HOT TUB DECK T.O. ( A 5EE DOOR 5GHFOULE T.O. CONC=8017'-6" T.O. CONC=8017'-7 1/2" d 1 Afi 1 LOCATION RE: LOCAL CODE FOR 51ZE AND DATA. All Al2 REQUIREMENTS OR DE51RED LOGATION5. INDICATES HOSE BIB INDIGATE5 FLOOR DRAIN LOCATION. LOCATION. 6 1-9 2 11, " ' 12'-5 11 ) -o )) 6 ) -1 Vp 3 05)y 1 " 14-6 7'- 11 1 -6 ) ? 19'- 8 2 2 2 2 r 7 r ; f 0 0 L 87'-18" 1, 1 WN DECK .0. CONC=8017'-5 1/2" 1.6 11�� lowl 1/4 = 1' -O"' M. 15'-6" S C -I . It nn) n 1/411 .`.°. 1 1 - 011 N I i PATIO BELOW 2. PONN5POUT5 UNDERDRAIN 5Y5TEM 15 TO ROOF SHEATHING 5:12 PITCH) BE RUN IN 50LID PIPE AND EXTEND TO DAYLIGHT FOR 015GHAR6E. HEAT TAPE SHOULD RUN IN DOWN SPOUT AND TO 4'-0" BELOW FIN15HED GRADE. 3. PLUMBIN&VENT5 5HOULD BE GROUPED TOGETHER BEFORE PENETRATING ROOF WHERE PRACTIGAL TO MINIMZE ROOF PENETRATION5. ALL VENTING AND Al2 MECHANICAL PENETRATION5 5HOUL0 BE A11 Ag LOGATED IN LE55 \/15IBLE LOGATION5. d I ROOF PLAN" bt'. 33 FOOT HEIGHT LIMIT LINE ( SHOWN AT FRONT HALL OF GARAGE ONLY) TIMBER TRUSS AND POSTS (OVERSIZED ROUGH — SAWN MEMBERS) - N/ DECORATIVE CUTS AND JOINERY 8X- KNEE BRACES N/ DECORATIVE END CUTS (T'(P NHERE SHOWN) NIN50 (NITHIN STUCCO NALL): 2X8 WOOD HEADER AND 2x6 TRIM, NI SLOPED GUT -HOOD SILL AND 2X6 SKIRT. SHED ROOFING SYSTEM: 5TANDIN6 SEAM COPPER ON NATERPROOF MEMBRANE ON ROOF SHEATHING 5:12 PITGH) 6ERE SYSTEM ON - THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING bXb TIMBER P05T ---------- RAILING GON5TRUGTION: SEE DETAILS 14" TIMBER HEADER OVER - 6ARA6E DOORS l�l� p llp Nlll�f 1 4 A15 00 - 4�­ `9 t 9� ....... nio, I c LONER LEVEL T.O. GO NG. 8006, -0" REV =88 - (DATUM) COORDINATE EAVE LENGTH KITH NINDON PLACEMENT CHIMNEY GON5TRUGTION: STONE VENEER N1 GUT -STONE CAP AND GOPPER5HROUD ROOF CONSTRUCTION: 40 YEAR ASPHALT SHINGLES OVER HATERPROOF MEMBRANE OVER PLY. SHEATHING OVER INSULATED RAFTERS. FASCIA GON5TRUGTION: N.P. MEMBRANE TO LAP PAINT-LOK. MTL. FLASHING OVER 2X6 FASCIA 130. OVER 2XI2 SUB - FASCIA 130. N1 ci" REVEAL. SOFFIT GON5TRUGTION: IX(b T$6 CEDAR SOFFIT 4 VENTS KITH IN5EGT5GREEN5 L - L L P:a' L CE 11---'c= Et .-1- ----------- :1 —JC iX E c DEI � c� T.O. PLY. 802ci'-I 3/4" O M 3X8 HORIZ. BELLY BAND u HOOD 510IN6: VERT. BOARD 4 BATTEN OVER THERMAL AND AIR INFILTRATION BARRIER OVER 1 H r C) k-� z NINDON TRIM WITHIN HOOD SIDING Lu -1 3X5 HOOD HEADER, 0 COORDINATE EAVE LENGTH KITH NINDON PLACEMENT CHIMNEY GON5TRUGTION: STONE VENEER N1 GUT -STONE CAP AND GOPPER5HROUD ROOF CONSTRUCTION: 40 YEAR ASPHALT SHINGLES OVER HATERPROOF MEMBRANE OVER PLY. SHEATHING OVER INSULATED RAFTERS. FASCIA GON5TRUGTION: N.P. MEMBRANE TO LAP PAINT-LOK. MTL. FLASHING OVER 2X6 FASCIA 130. OVER 2XI2 SUB - FASCIA 130. N1 ci" REVEAL. SOFFIT GON5TRUGTION: IX(b T$6 CEDAR SOFFIT 4 VENTS KITH IN5EGT5GREEN5 L - L L P:a' L CE 11---'c= Et .-1- ----------- :1 —JC iX E c DEI � jj �L il 0 L 7J jL- - A f, PLATE HE16HT '-F =E503b'-2 3/4" SHINGLE SIDING: SHINGLE NALL 510IN6 (VERTICAL APPLICATION) ON THERMAL AND AIR INFILTRATION BARRIER ON - cy) 5HEATHIN6 —JL --- Hllo= 7cf LJL---)L-- L IE )L =3 – --- --- 1— IL I j— j Trm - - - - - - - - - - - - 01 t -- - -- - - - - - - - - - - - - - - - - - - -- T I FINISH GRADE: SLOPE TO DRAIN ANAY FROM BUILDING PERIMETER. – — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- - -- — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — EX15TIN6 6RAPE: APPROX. LOCATION SHOWN DASHED. SHED ROOFING SYSTEM: CUSTOM GARAGE CUSTOM ENTRY POOP, N/ STAMPED AND STONE NALL CAP: t -- STONE VENEER: STANDIN6 SEAM ON DOORS VV 6LA55 51DELITE5 SELECTION BY COLORED CONCRETE GUT -STONE GAP - COLO. BUFF STONE VENEER, "TELLURIDE WATERPROOF MEMBRANE ON LITE5. OWNER PATIO AND STAIRS OR CAST STONE (BUUF COLOR) 1­116HILAN05" ON THERMAL AND ROOF 5HEATHIN6. 3x8 WITH SLOPED TO DRAIN TOP. AIR INFILTRATION BARRIER TIMBER RAFTER TAILS AT SHED ROOFS ....... ..... I UPPER LEVEL T.O. PLY. 802ci'-I 3/4" 3X8 HORIZ. BELLY BAND li HOOD 510IN6: VERT. BOARD 4 BATTEN OVER THERMAL AND AIR INFILTRATION BARRIER OVER 1 H r 5HEATHIN6. k-� z NINDON TRIM WITHIN HOOD SIDING ):8 -1 3X5 HOOD HEADER, 5x6 TRIM, 3X6 SKIRT jj �L il 0 L 7J jL- - A f, PLATE HE16HT '-F =E503b'-2 3/4" SHINGLE SIDING: SHINGLE NALL 510IN6 (VERTICAL APPLICATION) ON THERMAL AND AIR INFILTRATION BARRIER ON - cy) 5HEATHIN6 —JL --- Hllo= 7cf LJL---)L-- L IE )L =3 – --- --- 1— IL I j— j Trm - - - - - - - - - - - - 01 t -- - -- - - - - - - - - - - - - - - - - - - -- T I FINISH GRADE: SLOPE TO DRAIN ANAY FROM BUILDING PERIMETER. – — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- - -- — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — EX15TIN6 6RAPE: APPROX. LOCATION SHOWN DASHED. SHED ROOFING SYSTEM: CUSTOM GARAGE CUSTOM ENTRY POOP, N/ STAMPED AND STONE NALL CAP: t -- STONE VENEER: STANDIN6 SEAM ON DOORS VV 6LA55 51DELITE5 SELECTION BY COLORED CONCRETE GUT -STONE GAP - COLO. BUFF STONE VENEER, "TELLURIDE WATERPROOF MEMBRANE ON LITE5. OWNER PATIO AND STAIRS OR CAST STONE (BUUF COLOR) 1­116HILAN05" ON THERMAL AND ROOF 5HEATHIN6. 3x8 WITH SLOPED TO DRAIN TOP. AIR INFILTRATION BARRIER TIMBER RAFTER TAILS AT SHED ROOFS ....... ..... I UPPER LEVEL T.O. PLY. 802ci'-I 3/4" 3X8 HORIZ. BELLY BAND TRIM HOOD 510IN6: VERT. BOARD 4 BATTEN OVER THERMAL AND AIR INFILTRATION BARRIER OVER 1 H r 5HEATHIN6. k-� z NINDON TRIM WITHIN HOOD SIDING ):8 -1 3X5 HOOD HEADER, 5x6 TRIM, 3X6 SKIRT N1 SLOPED 2X- SILL. o jL MAIN L EVEL T.O. P OIE5 -0 EE PLY. 01�1 14" TIMBER HEADER OVER NINDON5 IN STONE fflli � 1 ATE HEI6HT 05(5' -2 5/4' i cs� 'ER LEVEL PLY. E502q' —I 3/4" - -11' -1 J "- OA-PJ4) :► ♦ 1 si i fry c� i NER LEVEL GON ( . 800' —O" =88 —0 {DATUM) 1/411 = 1 ,`Off t ! � , ' | | / / A m a x umazat I - as] lo I 1/4n= 1 I-O^ = | | | | �-------�--^ | | 1-4=1- Li t=i I it= RIDGE ,It -------------- I AM 1/4 = 1 1-011 EIGHT 2 3/4" VEL a02cf'-1 5/4" --�L (DATUMS :-=\/EL 4 06 0 DATUM) I I I - - - - - - - - - - I - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - - - R I I D OOR SCHED WINDOW # STYLE SIZE WIDTH HEIGHT 1 CASEMENT 2' -8" 4' -0" 2 CASEMENT 2' -8" 4' -0" 3 CASEMENT 2' -8" 4' -0" 4 PICTURE + VERT MULLION 2' -8" 1' - 8" 5 PICTURE 2' -O" 8' -0" 6 PICTURE + VERT MULLION 3' -0" 2' -0" 7 CASEMENT I = ©©MIM 4' -0" 8 PICTURE + VERT MULLION 3' -0" 2' -0" 9 CASEMENT 3' -0" 4' -0" 14 CASEMENT 3' -0" 4' -6" 15 CASEMENT - DOUBLE 5' -4" 4' -6" 16 AWNING + MULLIONS 2' -6" 2' -6" 17 AWNING + MULLIONS �WEATHER STRIPPING AND THRESHOLD 2' -6" 18 PICTURE 2' -8" 4' -0" 20 CASEMENT 2' -6" 5' -0" 21 PICTURE + MULLIONS 2' -6" 2' -6" 22 PICTURE 5' -0" 5' -0" 23 PICTURE + MULLIONS 2' -6" 2' -6" 24 CASEMENT 2' -6" 5' -0" 26 CASEMENT - DOUBLE 4' -0" 3' -0" 27 CASEMENT - DOUBLE 6' -O" ' 28 PICTURE + MULLIONS 2' -6" 2' -6" 29 PICTURE 1' -0" 8' -0" 30 PICTURE + MULLIONS 2' -6" 2' -6" 31 PICTURE 1' - 0" 8' - 0" 32 mom= 2' -8" 2' -0" 33 PICTURE 2' -8" 5' -0" 34 AWNING + VERT MULLION 2' -8" 2' -0" 35 PICTURE + VERT MULLION 2' -8" 2' -O" 36 PICTURE 2' -8" 5' -0" 37 AWNING + VERT MULLION 2' -8" 2' -0" 38 PICTURE + VERT MULLION 2' -8" 2' -0" 39 PICTURE 2' -8" 5' -0" 40 AWNING + VERT MULLION 2' -8" 2' -0" 41 PICTURE + VERT MULLION 2' -8" 2' -0" 42 PICTURE 2' -8" 5' -0" 43 AWNING + VERT MULLION 2' -8" 2' -0" 44 CASEMENT 3' -O" 5' -0" 45 PICTURE + VERT MULLION 3' -0" 2' -0" 46 PICTURE + MULLIONS 3' -0" 3' -0" 47 PICTURE + MULLIONS 3' -0" 3' -0" 48 CASEMENT 3' -O" 5' -0" 49 PICTURE + VERT MULLION 3' -0" 2' -0" 50 CASEMENT 3' -O" 5' -0" 51 PICTURE 2' -6" 1 5' -0" 52 PICTURE + MULLIONS 2' -6" 2' -6" 53 PICTURE 2' -6" 5' -O" 54 PICTURE + MULLIONS 2' -6" 2' -6" 55 PICTURE + MULLIONS 2' -8" 2' -6" 56 PICTURE + MULLIONS 2' -8" 2' -6" 57 PICTURE + MULLIONS 2' -8" 2' -6" 58 PICTURE + MULLIONS 2' -8" 2' -6" 59 PICTURE 2' -6" 5' -0" 60 PICTURE + MULLIONS 2' -6" 2' -6" 61 PICTURE 2' -6" 5' -0" 62 PICTURE + MULLIONS 2' -6" 2' -6" 63 PICTURE + MULLIONS 2' -6" 2' -6" 64 PICTURE 2' -6" 5' -O" 65 PICTURE + MULLIONS 2' -6" 2' -6" 66 PICTURE 2' -6" 5' -0" 67 PICTURE + MULLIONS 2' -6" 2' -6" 68 PICTURE + MULLIONS 2' -6" 2' -6" 69 PICTURE + MULLIONS 2' -6" 2' -6" 70 PICTURE + MULLIONS 2' -6" 2' -6" 71 PICTURE + MULLIONS 2' -6" 2' -6" 72 AWNING + MULLIONS 2' -6" 2' -6" 73 AWNING + MULLIONS 2' -6" 2' -6" 74 PICTURE + MULLIONS 4' -O" 4' -0" 75 CASEMENT 2' -4" 4' -0" GENERAL WINDOW AND DOOR NOTES: I REFER TO EXTERIOR ELEVATIONS ANO PROVIDE WINDOWS 5HONN MULLED TOGETHER AS MULLED UNITS. 2 EXTERIOR PATIO DOORS ARE TO BE PROVIDED BY THE WINDOW MANUFACTURE. REFER TO ELEVATIONS. 3 WHEN GALLED OUT SIZE 15 NOT AVAILABLE, REVIEN THE NEXT LARGER STANDARD 51ZE BEFORE 5PECIFYING CUSTOM. COORDINATE KITH STRUCTURAL ENGINEER AS NEEDED. 4 NINDON5 AND PATIO DOORS SHOULD BE ORDERED WITH 6a" JAMBS. 5 REFER TO EXTERIOR ELEVATIONS FOR MUNTIN5 AND MUNTIN PATTERNS. 6 NINDON HEADS SHOULD BE GENERALLY LOCATED TO ALIGN WITH THE PATIO DOOR HEAD ELEVATION {ROUGHLY V -O" A.F.F. OR W -3" ABOVE SUBFLOOR, VERIFY THESE HEIGHTS KITH NINDON MANUFACTURES STANDARD PATIO DOOR HEI(5HT5). INTERIOR NINDOW AND DOOR CA51NG SHOULD ALIGN WHERE PRATICAL, NINDON CALLOUTS IO, II ,12 ,13, iq, AND 24 ARE NOT USED. 2 SCHEDULES WINDOW SCHEDULE WINDOW # STYLE SIZE WIDTH HEIGHT 1 CASEMENT 2' -8" 4' -0" 2 CASEMENT 2' -8" 4' -0" 3 CASEMENT 2' -8" 4' -0" 4 PICTURE + VERT MULLION 2' -8" 1' - 8" 5 PICTURE 2' -O" 8' -0" 6 PICTURE + VERT MULLION 3' -0" 2' -0" 7 CASEMENT 3' -0" 4' -0" 8 PICTURE + VERT MULLION 3' -0" 2' -0" 9 CASEMENT 3' -0" 4' -0" 14 CASEMENT 3' -0" 4' -6" 15 CASEMENT - DOUBLE 5' -4" 4' -6" 16 AWNING + MULLIONS 2' -6" 2' -6" 17 AWNING + MULLIONS 2' -6" 2' -6" 18 PICTURE 2' -8" 4' -0" 20 CASEMENT 2' -6" 5' -0" 21 PICTURE + MULLIONS 2' -6" 2' -6" 22 PICTURE 5' -0" 5' -0" 23 PICTURE + MULLIONS 2' -6" 2' -6" 24 CASEMENT 2' -6" 5' -0" 26 CASEMENT - DOUBLE 4' -0" 3' -0" 27 CASEMENT - DOUBLE 6' -O" 4' -O" 28 PICTURE + MULLIONS 2' -6" 2' -6" 29 PICTURE 1' -0" 8' -0" 30 PICTURE + MULLIONS 2' -6" 2' -6" 31 PICTURE 1' - 0" 8' - 0" 32 PICTURE + VERT MULLION 2' -8" 2' -0" 33 PICTURE 2' -8" 5' -0" 34 AWNING + VERT MULLION 2' -8" 2' -0" 35 PICTURE + VERT MULLION 2' -8" 2' -O" 36 PICTURE 2' -8" 5' -0" 37 AWNING + VERT MULLION 2' -8" 2' -0" 38 PICTURE + VERT MULLION 2' -8" 2' -0" 39 PICTURE 2' -8" 5' -0" 40 AWNING + VERT MULLION 2' -8" 2' -0" 41 PICTURE + VERT MULLION 2' -8" 2' -0" 42 PICTURE 2' -8" 5' -0" 43 AWNING + VERT MULLION 2' -8" 2' -0" 44 CASEMENT 3' -O" 5' -0" 45 PICTURE + VERT MULLION 3' -0" 2' -0" 46 PICTURE + MULLIONS 3' -0" 3' -0" 47 PICTURE + MULLIONS 3' -0" 3' -0" 48 CASEMENT 3' -O" 5' -0" 49 PICTURE + VERT MULLION 3' -0" 2' -0" 50 CASEMENT 3' -O" 5' -0" 51 PICTURE 2' -6" 1 5' -0" 52 PICTURE + MULLIONS 2' -6" 2' -6" 53 PICTURE 2' -6" 5' -O" 54 PICTURE + MULLIONS 2' -6" 2' -6" 55 PICTURE + MULLIONS 2' -8" 2' -6" 56 PICTURE + MULLIONS 2' -8" 2' -6" 57 PICTURE + MULLIONS 2' -8" 2' -6" 58 PICTURE + MULLIONS 2' -8" 2' -6" 59 PICTURE 2' -6" 5' -0" 60 PICTURE + MULLIONS 2' -6" 2' -6" 61 PICTURE 2' -6" 5' -0" 62 PICTURE + MULLIONS 2' -6" 2' -6" 63 PICTURE + MULLIONS 2' -6" 2' -6" 64 PICTURE 2' -6" 5' -O" 65 PICTURE + MULLIONS 2' -6" 2' -6" 66 PICTURE 2' -6" 5' -0" 67 PICTURE + MULLIONS 2' -6" 2' -6" 68 PICTURE + MULLIONS 2' -6" 2' -6" 69 PICTURE + MULLIONS 2' -6" 2' -6" 70 PICTURE + MULLIONS 2' -6" 2' -6" 71 PICTURE + MULLIONS 2' -6" 2' -6" 72 AWNING + MULLIONS 2' -6" 2' -6" 73 AWNING + MULLIONS 2' -6" 2' -6" 74 PICTURE + MULLIONS 4' -O" 4' -0" 75 CASEMENT 2' -4" 4' -0" 76 CASEMENT 2' -2" 4' -6" 77 PICTURE + MULLIONS 2' -6" 2' -6" 78 PICTURE 5' -0" 4' -6" 79 PICTURE + MULLIONS 2' -6" 2' -6" 80 CASEMENT 2' -2" 4' -6" 81 AWNING + MULLIONS 2' -0" 2' -0" 82 AWNING + MULLIONS 2' -0" 2' -0" 83 AWNING + MULLIONS 2' -0" 2' -0" 84 CASEMENT 2' -4" 4' -0" 85 CASEMENT 2' -4" 4' -O" 86 CASEMENT - DOUBLE 5' -O" 5' -0" 87 AWNING + MULLIONS 2' -6" 2' -6" 88 AWNING + MULLIONS 2' -6" 2' -6" 114" = 1' - 0 " i 1 A15 i i 3/811= 1 1-011 EXI5TIN6 ORAPE: APPROX. LOCATION bx12 TIMBER R.I D6E EAM5- 33' -0" HT LIMIT PROFI bX TIMF FRS AL PLAT HE16HT 8058' -2 514" CORBEL OUT STONE TO CREATE HANGH U NDER, TI MBER . i21 D6E �. TIMBER RI DOE 15 TO EXTEND UNDER. MAIN ROOF RI DGE AND TO TIMBER. GE I L I NCB BEAM RAFTER ON OTHER. 51 DE OF ROO � UPPER LEVEL i T.O. PLY. 8O2q' -I 314" ----- WATERPR.00F DECK. i MAIM LEVEL T.O. PLY. 8018' -O" LOWER LEVEL cz C) Q O i -- z i O i Lu 6 th i z =rte uu C-, u- Lu kl) i MAIM LEVEL T.O. PLY. 8018' -O" LOWER LEVEL L� O i -- °o C) z th i u =rte uu C-, `� z z C) -.i La �U � ur 55'-0" FIT LIMIT k ' ' | | | | | | | | 11 US PR,_ GORNER 5HINGLE5 AT GORNER CONDITIONS WOOD SHINGLE WALL 5I0ING ON THERMAL AND AIR INFILTRATION BARRIER OVER SHEATHING. FLASHING --� 2 � "X 5 � " ROUGH SAWN BOARD AND BATTED SIDING BASE TRIM ° WOOD BOARD AND _ BATTEN SIDING ON THERMAL AND AIR INFILTRATION BARRIER OVER SHEATHING. GEDAR SHINGLE WALL SIDING 1 M BOARD AND BATTEN SIDING VENTILATION BAFFLE GEMENT 5TUGGO SYSTEM ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD 5HEATHING ON 2Xb WOOD STUDS ROUND 5TUGGO CORNER j . 1 1/2 it = 1' -0 518 " TYPE 'X" GWB OVER VAPOR BARRIER/RETARDER ON WOOD JOISTS WITH R -38G BATT INSULATION BETWEEN JOISTS 5/8 " TYPE "X' GWB OVER VAPOR BARRIER/RETARDER ON 2Xb W000 STUDS WITH R -21 BATT INSULATION BETWEEN 5TUD5 STANDING SEAM METAL ROOFING ON FULL GOVERAGE WATERPROOF MEMBRANE i, SEE ROQ" 12 g " GWB ON VAOR BARRIER/RETARDER ON 2x ROOF FRAMING WITH R -38G IN5UL BETWEEN J015T ROOF VENT AT WALL 1 1/2 if = 1 ° 0 " VENTILATION BAFFLE 40 YEAR ASPHALT SHINGLE ROOFING ON FULL COVERAGE WATERPROOF MEMBRANE 12 VENT BETWEEN J015T VENTILATION SLOT 8 — VENTILATION SLOT 2xb T AND G DEGKING (50UARE SHOULDER I EXPOSED TO VIEW) 2 REFER TO ROOF PLAN - FLASHING 'lj ` I" MIN r e \� 4-+- RIDGE POINT SEE EVA' REFER TO 5TRUGTURAL FOB``° RIDGE 5TRU6TURE AND HANGERS rf r r r r r r ROLL -VENT MATERIAL GUT BACK 3" FROM RIDGE FLASHING OVER SHEET WATER PROOFING ON ROOF SHEATHING ASPHALT SHINGLE ON FULL COVERAGE WATER PROOF MEMBRANE J015T SPACE VENTIALTION BAFFLE AT 2x ROOF FRAMING mil WOOD 5I0IN6 OR CEMENT STUCCO WOOD 130ARD AND BATTEN 51DI NG ON 518 " TYPE "X' GWB ~` BATTEN SIDING ON INFILTRATION BARRIER 5PRIN6 POINT OVER VAPOR - INFILTRATION BARRIER ON PLYWOOD THERMAL AND AIR FLASHING BARRI ER/RETARDER 2 � "X 5 � "" ROUGH SAWN SHEATHING ON 2X6 WOOD STUDS INFILTRATION BARB BOARD AND BATTED (WATERPROOF MEMBRANE FROM ROOF 2Xb FASCIA ON WOOD JOISTS WITH R -38G BATT PROOF MEMBRANE 70 CONTINE TO 2' -b "" 3 � "X 2 � "" WOOD 15 TO CONTINUE TO 2' -b" ABOVE ROOF 5TUGGO GAP TRIM BOARD INSULATION CEMENT 5TUGGO SYSTEM ON SURFACE) THERMAL AND AIR INFILTRATION TO EXTEND FROM 8 BELOW FIN15H GRADE TO BETWEEN JOISTS FLASHING AND SHEATHING ON 2X6 WOOD STUDS 3x8 TIMBER WOOD BOARD COUNTER FLASHING RAFTER TAIL 5/8" TYPE "X' GWB FOUNDATION DRAIN INSTEAD OF GOMPOSITE OVER VAPOR 2 � "X 5 � "' ROUGH 5AWN WOOD 5I0ING ON BARRIERIRETARDER MATERIAL BOARD AND BATTED THERMAL AND AIR 2Xb WOOD JOINT � GRADE. INFILTRATION BARRIER 5T STUDS WITH R -21 I GRAVEL SLAB 4 ON PLYWOOD BATT INSULATION a SHEATHING ON 2X6 BETWEEN STUDS it M FROM WALL WOOD STUDS 'lj ` I" MIN r e \� 4-+- RIDGE POINT SEE EVA' REFER TO 5TRUGTURAL FOB``° RIDGE 5TRU6TURE AND HANGERS rf r r r r r r ROLL -VENT MATERIAL GUT BACK 3" FROM RIDGE FLASHING OVER SHEET WATER PROOFING ON ROOF SHEATHING ASPHALT SHINGLE ON FULL COVERAGE WATER PROOF MEMBRANE J015T SPACE VENTIALTION BAFFLE AT 2x ROOF FRAMING mil WOOD 5I0IN6 OR CEMENT STUCCO WOOD 130ARD AND BATTEN 51DI NG ON SYSTEM ON THERMAL AND AIR BATTEN SIDING ON INFILTRATION BARRIER GOMP051TE DRAINAGE BOARD WITH FILTER INFILTRATION BARRIER ON PLYWOOD THERMAL AND AIR FLASHING PROOFING OR WATER PROOFING ON 2 � "X 5 � "" ROUGH SAWN SHEATHING ON 2X6 WOOD STUDS INFILTRATION BARB BOARD AND BATTED (WATERPROOF MEMBRANE FROM ROOF OVER SHEATHING. PROOF MEMBRANE 70 CONTINE TO 2' -b "" 3 � "X 2 � "" WOOD 15 TO CONTINUE TO 2' -b" ABOVE ROOF 5TUGGO GAP TRIM f CEMENT 5TUGGO SYSTEM ON SURFACE) THERMAL AND AIR INFILTRATION TO EXTEND FROM 8 BELOW FIN15H GRADE TO BARRIER ON PLYWOOD FLASHING AND SHEATHING ON 2X6 WOOD STUDS 2 DRAIN AND DRY BOARD EXTENDING FROM WOOD BOARD COUNTER FLASHING FLASHING ---� FOUNDATION DRAIN INSTEAD OF GOMPOSITE ROLL -VENT 2 � "X 5 � "' ROUGH 5AWN MATERIAL BOARD AND BATTED WITH HABITABLE SPACE BELOW FINISHED JOINT � GRADE. SIDING BASE TRIM I GRAVEL SLAB 4 OUT BACK SHEATHING a it M FROM WALL SLOPED FLASHING OVER SANDSTONE GAP SHEET WATER 12 PROOFING ON ROOF SHEATHING STONE VENEER ON ROOFING ON THERMAL AND AIR WATERPROOF INFILTRATION BARRIER -� MEMBRANE ON ON PLYWOOD SHEATHING ROOF SHEATHING ON 2Xb WOOD STUDS T. J 5T SPACE E TIALTION BA FLE / ST ONE / WOO WOOD ('''� D " GWB ON VAOR BARRIER /RETARDER ON 2x ROOF FRAMING WITH R -386 IN5UL BETWEEN J015T WOOD BOARD AND BATTEN 51DI NG ON THERMAL AND AIR INFILTRATION BARRIER GOMP051TE DRAINAGE BOARD WITH FILTER OVER SHEATHING. r , FLASHING PROOFING OR WATER PROOFING ON 2 � "X 5 � "" ROUGH SAWN I i WALL (DAMP PROOFING TO BOARD AND BATTED CONTINUE TO TOP OF CONCRETE WALL, WATER 5IDING BASE TRIM PROOF MEMBRANE 70 CONTINE TO 2' -b "" 3 � "X 2 � "" WOOD ABOVE FIN5HED GRADE, AND DRAINAGE 5TUGGO GAP TRIM f CEMENT 5TUGGO SYSTEM ON 8" BELOW FINISH GRADE). (2 " RIGID INSULATION THERMAL AND AIR INFILTRATION TO EXTEND FROM 8 BELOW FIN15H GRADE TO BARRIER ON PLYWOOD ( 4'-b" BELOW FINISH GRADE) ALTERNATE: USE SHEATHING ON 2X6 WOOD STUDS 2 DRAIN AND DRY BOARD EXTENDING FROM WOOD BOARD AND BATTEN 1 STUCCO TRANSITION GEMENT 5TUGGO SYSTEM ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING ON 2Xb WOOD STUDS GEMENT 5TUG60 BASE FLA5HING AND WALL FLASHING SLOPED 5AND5TONE GAP STONE VENEER ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING ON 2Xb WOOD 5TUD5 ^ d l � I - '_� X11 t ►. �- � NOTE: AT DROPPED THE INSULATION AND VAPOR BARRIER/RETARDER 15 AT THE DROPPED FRAMING , 191019 REFER TO 1 1/2 1 1-011 STRUCTURAL J CONTINUOUS SPRING POINT SOFFIT VENT 1 BLOCK AS REQUIRED - - _ FLA5HIN6 GEMENT STUCCO SYSTEM OR WOOD SIDING ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING ON 2Xb WOOD STUDS TYPICAL SAVE 1 1/2 = 1' - 1 1 /211 1 1 - 0 11 GEMENT 5TUGGO 5Y5TEM OR WOOD 5IDING OR STONE VENEER ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING ON 2Xb WOOD 5TUD5 GEMENT STUCCO SYSTEM OR STONE VENEER IS TO EXTEND TO BELOW FINISHED GRADE Q t a 4 4 D GOMP051TE DRAINAGE BOARD WITH FILTER FABRIC, ON 2 " RIGID INSULATION OVER DAMP PROOFING OR WATER PROOFING ON r I i WALL (DAMP PROOFING TO V 5/8" TYPE 'X' GWB CONTINUE TO TOP OF CONCRETE WALL, WATER PROOF MEMBRANE 70 CONTINE TO 2' -b "" OVER VAPOR ABOVE FIN5HED GRADE, AND DRAINAGE RI BAR RIER /RETARDER �..,. BOARD TO CONTINUE FROM FOOTING TO WITHIN ON WQQD STUDS 8" BELOW FINISH GRADE). (2 " RIGID INSULATION WITH R -11 BATT INSULATION BETWEEN ` TO EXTEND FROM 8 BELOW FIN15H GRADE TO STUDS ( 4'-b" BELOW FINISH GRADE) ALTERNATE: USE 2 DRAIN AND DRY BOARD EXTENDING FROM 8" BELOW FINISHED GRADE TO FOOTING AND FOUNDATION DRAIN INSTEAD OF GOMPOSITE DRAINAGE BOARD AND 2 " RIGID INSULATION. a WATERPROOFING 15 TO BE USED AT AREAS 150LATION a WITH HABITABLE SPACE BELOW FINISHED JOINT � GRADE. CONCRETE I GRAVEL SLAB 4 FILTER FABRIC a 0 0 TOP OF GONG ``- 5" HALF ROUND Q ° 00 0 Q a 0 0 GUTTER, REFER f 9,) o 0 o TO ROOF PLAN o 0 0 0 ' o 0 0 6.0 0 0 o o 0 FOR LOCATIONS o ° o a °0 0 0 0 0 �° a ° d O 0 00 (� a oQ�oa 00 0 , 300 0 4 © ° o 0 o 000 }° 2Xb FASCIA o 00 ° 0° °0 � 6 BOARD �a o 0 0000 000 4 0 0 0 o 2x12 SUB- FA5GIA ` O 90 00 BOARD Q 4 d O ° a 0 ° 00 °O IX6 T&G WOOD GRANULAR FILL SOFFIT NOTE: ALL CONGRETE WALL5 AND REFER TO STRUCTURAL FOOTINGS ARE TO HAVE A DRAWING 5 FOR FOUNDATION DRAIN - INCLUDING THE VAPOR BARRIER FOUNDATION /FOOTING DE516N INTERIOR FOUNDATION WALLS. AND REINFORCING SLOPED 4 RE: SOILS REPORT PERFORATED PIPE. TYPICA F O U N �Tl 0 �E: SOI REPORT BOARD AND BATTEN SIDING EXTERIOR 518" TYPE 'X' C OVER VAPOR BAR.RIER/RET,4 ON 2X6 WOOD STUDS WITH R -.' BATT INSULATI( BETWEEN STUD'. WOOD GASIN, PROFILE TBE: BACKER ROI AND SEALAN SHIM SPACE HEAD R.O. = UNIT SIZE + 1/2" STONE SILL SHIM SPACE BAGKER ROE AND SEALAN 1 1/4" THICK SILL PROFILE TBD WOOD APR0 PROFILE TBE: WATERPROOI MEMBRANE T OVERLAP All INFILTRATION BARRIER AN] EXTEND OVE ROUGH SILL SILL STONE SILL STONE VENEER ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD SHEATHING ON 2X6 WOOD STUDS (WATERPROOF MEMBRANE FROM FOUNDATION WALLS AND ROOFS IS TO CONTINUE TO 2' -b" ABOVE FINISHED GRADE, TERRACE, OR ROOF SURFAGE) 0 1 1/2 11 1 1 -011 FLASHING 2 � "X 5 �" ROUGH SAWN BOARD AND BATTED SIDIN6 BASE TRIM @ A BOARD AND B WOOD SIDING THERMAL AND INFILTRATION E ON PLYWOOD co SHEATHING ON WOOD STUDS E I 2X6 REDWOOE; W/ 3/16" GAPS BOARDS TIMBER TRIM T CONGEAL J015 HAN6ER5 AS STONE VENEER OVER THERMAL AND AIR INFILTRATION BARRIER F=LASHING 8x14 TIMBER LINTEL E: "AIL SIMILAR AT RAGE DOOR tiD 5/8" TYPE 'X' GWB OVER VAPOR BARRIER/RETARDER ON 2X6 WOOD STUDS WITH R -21 BATT INSULATION BETWEEN STUDS STONE VENEER / I OVER THERMAL AND AIR INFILTRATION BARRIER LINE OF 8x14 TIMBER - LINTEL ABOVE .» I AIR INFILTRA7 BARRIER TO OVERLAP WATERPROOF MEMBRANE A] HEAD WOOD GASING PROFILE TBD BACKER ROD AND SEALANT SHIM SPACE �,Ii�uE'3�T• BACKER ROD AND SEALANT 1 1/4" THICK — SILL PROFILE TBD WOOD APRON- PROFILE TBD WATERPROOF MEMBRANE TO OVERLAP AIR _ INFILTRATION BARRIER AND EXTEND OVER ROUGH SILL Lqqt N w N z �w O !X 518" TYPE 'X' 61^113 OVER VAPOR 518" TYPE 'X' GWB OVER BARRIER/RETARDER ON 2X6 WOOD STUDS VAPOR BARRIER/RETARDER WITH R -21 BATT INSULATION BETWEEN R.O. = UNIT SIZE + 1/2" ON 2X6 WOOD STUDS WITH R -21 STUDS BATT INSULATION BETWEEN STUDS WOOD SIDING OVER AIR INFILTRATION BARRIER ROUGH SAWN WOODJAMB TRIM WOOD SILL WITH 2 I/2 "x5 112 " SLOPED TOP WOOD WINDOW TRIM 1 Fly, WOOD SILL WITH SLOPED TOP DRIP CEMENT STUCCO SYSTEM ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD 5HEATHIN6 ON 2X(b WOOD STUDS (WATERPROOF MEMBRANE FROM FOUNDATION WALLS AND ROOFS IS TO CONTINUE TO 2' -6" ABOVE FINISHED GRADE, TERRACE, OR ROOF SURFAGE) 10 i� i ' Ls 1 1/21f _ 11 " GWB ON VAPOR RETARDER ON 2xb STUDS W/ R -21 BATT INSUL WOOD SIDING BASE TRIM 2 � "X 5 �" ROUGH SAWN BOARD AND -- BATTED 51 DI N6 BASE TRIM FIN FLOOR WOOD SIDING OR SHIM SPACE BACKER ROE AND SEALAN 1 1/4" THICK SILL PROFILE TBD WOOD AFRO' PROFILE TBI< WATERPROOI MEMBRANE T OVERLAP All INF I LTRAT ION BARRIER AN] EXTEND OVE ROUGH SILL SILL HOOD SILL WITH SLOPED TOP AND DRIP AT BOTTOM :RTIGAL BOARD AND \TTEN WOOD SIDING OVER :;,' INFILTRATION BARRIER NTERPROOF MEMBRANE :OM ROOF 15 TO WNTINUE TO 2' -6" ABOVE ROOF SURFACE) A LT ••i 0 PATNA 1 1/2 = 1'_0" 6Xb TIMBER NEWEL P W/ " STOP GHAMFERS 2 "X6 1/2" W1 SLOPED TOP RAIL GAP 2X4 TOP SKIRT ALIGN FACE OF NEWEL WITH FACE OF WALL STUD OF LEVEL BELOW NYLON WEEPS AT 2' -0" O.G. SPAGING WATERPROOF MEMBRANE TO WRAP OVER PROTRUDING PLYWOOD AND BACK TO WALL EXTERIOR FINISH VARIES VERTICAL BOARD AND _ BATTEN WOOD SIDING OVER AIR INFILTRATION 518" TYPE 'X' 6WB BARRIER OVER VAPOR SAME DETAIL AT BARRIER /RETARDER SHINGLE SIDING CEMENT STUCCO SYSTEM ON THERMAL ON 2X6 WOOD ' AND AIR INFILTRATION BARRIER ON STUDS WITH R -21 2 �' PLYWOOD SHEATHING ON 2X6 WOOD BATT INSULATION — FLASHING STUDS BETWEEN STUDS FLASHING 2 1 /2 "x 1/4" WOOD WINDOW TRIM WOOD GA51 NG TM Q HEADER PROFILE TBD LE = REFER TO A3.0 AND A3.1 ROUGH SAWN WOOD HEADER BACKER ROD AND SEALANT - + w N SHIM SPACE HEAD 518" TYPE 'X' 61^113 OVER VAPOR 518" TYPE 'X' GWB OVER BARRIER/RETARDER ON 2X6 WOOD STUDS VAPOR BARRIER/RETARDER WITH R -21 BATT INSULATION BETWEEN R.O. = UNIT SIZE + 1/2" ON 2X6 WOOD STUDS WITH R -21 STUDS BATT INSULATION BETWEEN STUDS WOOD SIDING OVER AIR INFILTRATION BARRIER ROUGH SAWN WOODJAMB TRIM WOOD SILL WITH 2 I/2 "x5 112 " SLOPED TOP WOOD WINDOW TRIM 1 Fly, WOOD SILL WITH SLOPED TOP DRIP CEMENT STUCCO SYSTEM ON THERMAL AND AIR INFILTRATION BARRIER ON PLYWOOD 5HEATHIN6 ON 2X(b WOOD STUDS (WATERPROOF MEMBRANE FROM FOUNDATION WALLS AND ROOFS IS TO CONTINUE TO 2' -6" ABOVE FINISHED GRADE, TERRACE, OR ROOF SURFAGE) 10 i� i ' Ls 1 1/21f _ 11 " GWB ON VAPOR RETARDER ON 2xb STUDS W/ R -21 BATT INSUL WOOD SIDING BASE TRIM 2 � "X 5 �" ROUGH SAWN BOARD AND -- BATTED 51 DI N6 BASE TRIM FIN FLOOR WOOD SIDING OR SHIM SPACE BACKER ROE AND SEALAN 1 1/4" THICK SILL PROFILE TBD WOOD AFRO' PROFILE TBI< WATERPROOI MEMBRANE T OVERLAP All INF I LTRAT ION BARRIER AN] EXTEND OVE ROUGH SILL SILL HOOD SILL WITH SLOPED TOP AND DRIP AT BOTTOM :RTIGAL BOARD AND \TTEN WOOD SIDING OVER :;,' INFILTRATION BARRIER NTERPROOF MEMBRANE :OM ROOF 15 TO WNTINUE TO 2' -6" ABOVE ROOF SURFACE) A LT ••i 0 PATNA 1 1/2 = 1'_0" 6Xb TIMBER NEWEL P W/ " STOP GHAMFERS 2 "X6 1/2" W1 SLOPED TOP RAIL GAP 2X4 TOP SKIRT ALIGN FACE OF NEWEL WITH FACE OF WALL STUD OF LEVEL BELOW NYLON WEEPS AT 2' -0" O.G. SPAGING WATERPROOF MEMBRANE TO WRAP OVER PROTRUDING PLYWOOD AND BACK TO WALL EXTERIOR FINISH VARIES �,O / / Do , lz� / / , / / / 0--1 Ix / J / ,• , / / , , / � / �►! ,, / // / �/ / / // / / / �, / �i / / /� 0 4 A I F / X X Jo z co d, �, A Jo Z Z ./ / �, / / / / / / / ' /... / ! / / A • X t " +*t � .+'+'a'c'r' +'+'r + '' ,' r'` , ,r / ,,- ./�• ,'� , / (3) / / / / ,� ` RD PF / o" .',/ .' , ter' / co o / LIMIT Cos / ,r / / / ,EENGE 8 . / -X 8004 '' / ,' / / - '� ♦ 4 m; . ;:4 + ° # ° tx, ++ Wit' . r - / / r • - - A PF PF (3)Q / .' ( Ju f / / `, JU + + t + s + , ♦- ° ♦ < ' " > ;, ' r r i / / t 1 / (3)QA ++ o 0 4 A A, �' -- .4 V ,��' , j , " �' "t , a A ♦' ' t + t ♦ + ',' + '' 1004 ol ol N X9,9 ,�' / / -' 0g) LANDSCAPING AND LIGHTING PLAN ollu L AND &CAFE SYMBOL NAME LEGEND 51ZE QUANTITY EVERGREEN5 A LIGHT FIXTURE COLORADO BLUE SPRUCE (POPULU5 ANOU5TIEOLIA) 6', 8' ,TALL 8 DECIDUOUS TREES cA FLOWERING GRAB APPLE (MALU5 CENTURION) 2.5" GAL. 2 o OUAKING ASPEN (AGER GLABRUM) 2.5 "- 4" GAL. 27 SHRUBS F POTENTILLA/CINGUEFOIL POTENTILLA FRUTIG05A 5 GAL. 24 JU JUNIPER (JUNIPER HORIZONTALI5) 5 GAL. 14 PURPLE LEAF 5ANDGHERRY (PRUNU5 CI5TENA) 5 GAL. Ib REDTWIG DOGWOOD GORNU5 SERICEA 5 GAL 15 WILD 6RA55E5 - SHOWN HATCHED WG 1 WILD 6RA55E5 AREA = 800 S.F. D O T - SRONN RATCRED c PERIWINKLE V INGA MINOR) - AREA - I,200 S.F. MONEYWORT /GREEPING JENNY Y IM MIA N MM RIA 5NOW ON THE MOUNTAIN (AEGOPODIUM PODAGRARIA) GREEPING OREGON HOLLY MAHONIA REPENS SWEET WOODRUFF GALIUM ODORATUM LAN05GAPE NOTES: ALL AREAS OF SHRUBS AND GROUND GOVER5 SHALL RECEIVE A PROPER CONTROLLED FLOW DRIP IRRIGATIONS SYSTEM. ALL IRRIGATION 5Y5TEM5 TO BE DESIGNED AND SUBMITTED TO ARCHITECT BY LANDSCAPE CONTRACTOR FOR APPROVAL PRIOR TO SUBMITTAL TO FINAL ORB. ALL DISTURBED AREAS SHALL RECEIVE REVEGETATION 5EEDING Wt WILDFLOWER MIX. EROSION CONTROL SHALL BE MAINTAINED BY PLACEMENT OF SILT FENCE ALONG DRAINAGE AREAS AND DOWNHILL PROPERTY LINES. LIGHTING LEGEND WALL MOUNTED A LIGHT FIXTURE CEILING MOUNTED B REGE55ED CAN FIXTURE 2 a ° 1, The Contractor ahoU provide erosion control in conformance with Town of Vail Master Drainage Study. 2. The Construction limit ||no is the contract limit line. Do not disturb any existing trees or vegetation designated to remain or located outside of the construction ||nn|t line without approval of the Owner and the Town of Vail. 3. Contractor to verify existing site information, including structures, utilities lines, |bnDa of roadways, and curbs and gutters, that may effect the scope of work prior to beginning site construction. 4. Existing utilities are indicated for information only and not intended to show exact location. The Engineer is not responsible for the location of underground utilities or structures or not shown or detailed and installed by any other contract. The Contractor ehoU |noote all utilities and maintain the location during all ph0000 of the work' Contractor shall be posPona|b|w for any donnope to utilities or structures and any 11' These drawings do not specify safety materials, equipment, methods or sequencing, to protect persons and property. It ahoU be the Contractor's sole responsibility to direct and implement operations and procedures to protect the Owner, other Contractors, the public and others. 12. All work nho|| comply with all app codes and ordinances 13. Contractor(s) shall employ licensed surveyor to estab all work lines. 14` Contractor(s) shall stoke out all areas, including wa pavements, walls, poo and fences and oho|| obtain the approval of the Architect prior to proceeding with the work. 15. Notes and details on specific drawings take precedence over general notes and typical details. 16- Conflintg or discrenancies with arades shall be brouaht to the attention of the IWO ( IN BEET ) Rkffis�� WOUR ffl� LNW � � � � ,s TOF =86-4 "" 5TEP TOW 5TEP TOF - 55 t ih 5TEP TOW TOW = 104' -O" TOF= 1' -O" 5TEP TOF TO =100' -b" N ": A bit N 5TEP TOW 55 TOW =q5' -O " C 55 I I TOF =bb' -O" 5TEP TOF rm - 5TEP TOW im ZAX I T S5 ` TOW =85 -40 " TOW 06-6 TOF= 83 " -O" 5TEP TOW STEP TOW TOW =85 " -b" 12' -I V2 " 1 23 1 - 4 11 5TEP T NLwc- y P �- OF b3' -0" m 1 1 r r I * L MARK 51ZE REINFORGIN6 1/4"' = I" -O"" l! 2' -O" x 2 -0" x 10 " 3 #4 E.W. NOTE: 2" -6" x.2'-&" x 10" 3 #5 E.W. ELEVATION 100' -0" = U.5.6.5. DATUM ELEVATION= bOlb.O' 5 - 0" x 5 -0 " x 10"' 4 #5 E.N. ALL EXTERIOR WALL FOOTIN65 ARE 10 " x 16" GONGENTRIGALLY LOADED TYPICAL U.N.O. 0=4 INDIGATE5 A 5TEP IN THE FOOTING CE 4 " -O" x 4' -O" x IO" 5 #5 E.W. 5UPPORT 5TONE VENEER ON bxbx % " 5TEEL LEDGER ANGLE. BOLT TO WALL WITH V2" DIAMETER x4" EX,P4N51ON BOLT5 24" O.G. STEP TOF 5TEP TOW o r M[i� 0 55 r� TOF =Bb " -4 "' S5 + � �. � i r 'C7 5TEP TOW � � , TdW =b7' -b "` STEP TOF -° h 51M D I { ti -0" 5TEP TOF -- TOW =b - t' -6" - STEP TOW --___ / �,_ „ ✓' ✓ ti -i -��" TOF= 83' -10" 24 °' x 24" PILA TER5 l ,' i W/ (4) #5 VERTIG L 1 G2 p s # 5 a 12" 0. TOW= B6' -4" 55 p ON G PAD WITH C� (4) OWEL5 18 f ,, m 8 STEP TOF 5TEP TOW TOF =83' -10" TOW= ' - O „ TOW= b - 1" -6" TOF= bI' -6" 2 14965_ f` DATE. Obll&10(9 FILE 5t.Moritzb-52 DRAWN: ADM REVI6E0- RZVISED; NOTE: Z--,7 INr,>icATr=!5 DIRECTION Of= ilk, TJ1210,JOl5T5*1(o"O.C,. TYPICAL I)14LF55 NOTED OTHt=f;,>Nl5r=. ALL EXTERIOR WALL HEADER5 ARE 3 - 2 x 10 W 5IN6LE 2x6 TRIMMER5. TYPICAL UNLE55 NOTED OTHER"15E TOP OF PLYNOOP ELEVATION= 100'-0" U.5.6.5 DATUM e018ff TYPICAL ONLF55 NOTED THUS +Xxx'-X". HANG J015T5 FROM FLU5H f3EAM5, LED6ER5 4 MLV511-1-5 WITH ITT 2.1/11.88 HANC71HR5 TYPICAL ALL BEAM5 ARE FLU5H TYPICAL U.N.0 vt 14965 a • NOTE: INDICATE5 DIRECTION OF 2 x 12 RAFTER5 a 24" O.C. TYPICAL UNLE55 NOTED OTHERN15E. ALL EXTERIOR HALL HFAr?ER5 ARE 3 - 2 x 10 WITH 51N&LF 2 x 6 TRIMMER5. TYPICAL UNLE55 NOTED OTHERN15E. TO PLYNOOD AT UPPER LEVEL = 002ci'-13/ = 111-1 CONNECT RAFTER5 TO EXTERIOR Y4ALL5 NITH H2.5 HURRICANE CLIF HAN& J015T5 FROM FLUSH BEAMS, LEDOER5 $ MUD511-1-5 NITH ITT 2.1/11.88 HAN6ER5 HAN& RAFTER5 FROM FLUSH f3EAM5 WITH LU5210 HAN&ER5 DA TE- O a • •. • i R r REVISED- OWNW, r + r 114 = 11-011 NINE. INDICATES DIRECTION OF 2 x 12 RAFTERS ® 24" O.G. TYPICAL UNLE55 NOTED OTHERWISE. ALL EXTERIOR WALL HEADERS ARE 3 - 2 x 10 WITH 51N6LE 2 x 6 TRIMMERS. TYPICAL UNLE55 NOTED OTHERWISE. CONNECT RAFTERS TO EXTERIOR WALLS WITH H2.5 HURRICANE CUPS. LcIO_/ 2 X 12 5UBFA561A 2 X 12 5UBFA501A N\-L11O L NCT i I CAT I ON All framing lumber to be #2 Doug -Ftr or better. This structure has been designed to meet the requirements of the 2003 All bx and greater timbers to be #1 Doug -Fir or better. International Residential Code wlth amendments as adopted by the Town of Vail. All Micro =lam "s t0 be manufactured by Trus Joist MacMglan and conform to the All omissions or conflicts between various elements of the working drawings allowable stress requirements for a 1 314" 1.80F Micro =Lam LVL. and/or specifications shall be brought to the attention of the Structural Engineer All TJI Joists to be manufactured by Trus Joist MacMillan. before proceeding with any work so involved. The General Contractor shall verify oil dimensions and conditions at the Job site and shall be responsible for the All Glue -lam beams to conform to the allowable stress means, methods, techniques, sequences and procedures associated with this requirements for a F24 -V4 combination beam. project. Furthermore, he shall be responsible for coordination of all work and materials including those furnished by subcontractors. The Structural Engineer All connection hardware to be by the Simpson Company. shall be contacted during the construction phase to make the job site inspections necessary to confirm that the actual field conditions are consistenet with the All roof decking to be 518" C -C Ext -APA 52116 plywood. Nall with design assumptions and that the construction Is proceeding according to the 10d o 6" o.c. at panel edges and o 12" o.c in the field plans and specifications. All floor decking to be 5 /4" C - D lnt - APA 42120 T$G plywood. Glue Live Loads Used in Design. sheathing to Joists with PL400 and nail with 10d a 6" O.C. at panel edges Roof 80 psf and 12" a.c. in the field. Floors 40 p5f All exterior walls to be sheathed with 1�?" 0.513. Nail with 8d 0 6" ox- at panel Decks 100 psf edges and 12" o.c. in the field. Earthquake Seismic Zone C Wind CIO mph, 5 Second Gust All concrete to attain a compressive strength of 3000 psi in 28 days. The foundation design for this residence i5 based upon Preliminary Foundation De5lq All reinforcing bars to be Grade 60. and Construction Recommendations No. 06 -006 prepared by Koechlein Consulting All steel beams shall conform to ASTM Acia2 -50 Specifications. Engineers, Inc. on January 20, 2006. The Solis Engineer shall be contacted during excavation to inspect the site and confirm that conditions are consistent with these All steel plates and angles shall conform to ASTM A56 Specifications. recommendations. The General Contractor should revlew the 50115 Engineer's report All tube steel columns shall conform to ASTM A500 Specifications. and follow its recommendations for excavation, backfilling, grading and drainage systems. OWNW, r + r 114 = 11-011 NINE. INDICATES DIRECTION OF 2 x 12 RAFTERS ® 24" O.G. TYPICAL UNLE55 NOTED OTHERWISE. ALL EXTERIOR WALL HEADERS ARE 3 - 2 x 10 WITH 51N6LE 2 x 6 TRIMMERS. TYPICAL UNLE55 NOTED OTHERWISE. CONNECT RAFTERS TO EXTERIOR WALLS WITH H2.5 HURRICANE CUPS. LcIO_/ 2 X 12 5UBFA561A 2 X 12 5UBFA501A N\-L11O 2 #5 GONT. V2" TOP 4 E30T STONE LEDGER 4" 5LAB� BOLT TO WALL OVER WALL N1 %"(P x 4" 4" GRAVE EXPANSION BOLTS POUR SLAB a 24" O.C. OVER HALL 18 NI #4 DOWELS I #4 POIAEL5 o24 IS II it it LTF #4 * 24" O.G. 10 #4 o 24" O.G. 15 - -A, #4 o 16" O.C. Lu 2 #5 GONT.--- DRAIN - SEE 4 IL 5011-5 REPORT c �� fi ION # NO 50ALE • 2 #5 CONT. TOP 4 BOT < #5 a O.C. #5 @ 10 O.C. NO SCALE #4 NOSING BARS TYPICAL POUR SLAB V2" A.B. STONE LEDGER STONE VENEER BOLT TO WALL OVER WALL N1 %"(P x 4" SHEATHING EXPANSION BOLTS a 24" O.C. V2" A.B. @ NI #4 DOWELS 4' Q.G. 2 #5 CONT. 10 a 24 O.C. e-\ #4 o 16" O.C. #4 a 18" O.G. !/2 " EXPANSION 4'" 4 SLAB SLAB � �w 24 b it 14 MATERIAL 4" SLAB z BOLT TO WALL • a i #4 24 O.G. V2" EXPANSION < MATERIAL (3 � } 4. DRAIN - SEE fQ SOILS REPORT 5 I ON C :,-, 4 a Il 4 SLAB EACH HAY L4" GRAVEL 4 GRAVEL I #4 o 12" O.G. #4 @ 24" 2 #5 GONT. 2 #5 GONT. 4" GRAVEL El 12 -"' • • C T I0 N / bit 2 #5 CONT.— NO SCALE NO 50ALE STONE VENEER 6xbx ANGLE WHERE OCCURS STONE LEDGER STONE VENEER BOLT TO WALL !/2' " 0.5.8. N1 %"(P x 4" SHEATHING EXPANSION BOLTS a 24" O.C. V2" A.B. @ 4' O.G. 2 #5 CONT. — STONE VENEER TOP 4 130T e-\ #4 o 16" O.C. #4 a 18" O.G. bxbx%" ANGLE z < 24 b it #4 o 16" O.C. Lu 4" SLAB z BOLT TO WALL • a i 4" 6RAVELI V2" EXPANSION < MATERIAL (3 � } _O,, ® � DRAIN - SEE fQ SOILS REPORT 5 I ON C NO 50ALE � j/2" A.B. a 4' O.G. 2 #5 CONT. TOP 4 BOT SEE FRAMINC7 --� ���� PLAN 4 211 611 #4 o lb" O.G. #4 @ 16" O.C. #4 @ 16 O.C. SOILS REPORT !/2" EXPANSION MATERIAL E C T 10 N T 4" 5LA8 � NO SCALE 10 V2" EXPANSION MATERIAL #4 007L5 24 G @ 12 C. 24 - 4" SLAB 4" GRAVEL w 4 GR AVE L L I 2 #5 CONT. , « SOILS REPORT SEECTION L NO SCALE 12- #4 12" O.C. • /2" EXPAN51ON MATERIAL • 4" 5LA13 IF 74" MIN. 2 #5 CONT. 4" GRAVEL • NO SCALE SCALE DRAIN SEE SOILS REPORT STONE CAP STONE V EER NO 50ALE &x&x%" ANGLE STONE LEDGER BOLT TO WALL I W(P x 4" EXPANSION BOLTS 24" O.C. 0 a ll b it 2 #5 CONT. SE fiION 0. NO SCALE • 50IL5 REPORT - T STONE VENEER WHERE OCCURS 4' O.G. h" A.B. 2 #5 GONT. TOP 4 130T • STONE LEDGER &x(bx%" ANGLE BOLT TO WALL W %"(P x 4" EXPANSION BOLTS 24" O.G. SEE FRAMINC-7 PLAN z 211 < T #4 o 14" O.G. Lu #5 a 12 O.C. 24 #4 a 12 O.C. a !/2" EXPANSION • MATERIAL 4" 5LAB� 4 61:;ZA\,TL 2 #5 CONT. —I 1 STONE VENEER j/2" A.B. 0 4'0.6. 1/2" EXPANSION- MATERIAL 4 SLAB Ii 4' GRAVEL FJ 2 #5 CONT. TOP 4 130T #4 a 24" O.C. #4 a 24" O.C. N050ALE lz�fl A tn NO 50ALE #4 voNEL5 F— 24 NO SCALE 4 4 4 ► I • O DRAIN -SEE 5011-5 REPORT -,EE 50I L5 REPORT bx6x%" ANGLE STONE LEDGER BOLT TO WALL N %"cP x 4" EXPANSION 601 24" O.G. if • STONE CAP STONE VENEER 2 #5 CONT. TOP 4 BOT STONE VENEER O #4 N05IN6 BARS #4 o 24" 0.6. I — STONE VENEER STAIRS - 4" MIN. e-\ u- bxbx%" ANGLE THICKNESS STONE LEDGER I z BOLT TO WALL • a i < N/ %"(P x 4" � } EXPANSION BOLTS fQ �-- u► @ 24" O.G. #4 12" O.C. � EACH HAY #4 o 12" O.G. #4 @ 24" O.G. 12 -"' • • DRAIN SEE SOILS REPORT STONE CAP STONE V EER NO 50ALE &x&x%" ANGLE STONE LEDGER BOLT TO WALL I W(P x 4" EXPANSION BOLTS 24" O.C. 0 a ll b it 2 #5 CONT. SE fiION 0. NO SCALE • 50IL5 REPORT - T STONE VENEER WHERE OCCURS 4' O.G. h" A.B. 2 #5 GONT. TOP 4 130T • STONE LEDGER &x(bx%" ANGLE BOLT TO WALL W %"(P x 4" EXPANSION BOLTS 24" O.G. SEE FRAMINC-7 PLAN z 211 < T #4 o 14" O.G. Lu #5 a 12 O.C. 24 #4 a 12 O.C. a !/2" EXPANSION • MATERIAL 4" 5LAB� 4 61:;ZA\,TL 2 #5 CONT. —I 1 STONE VENEER j/2" A.B. 0 4'0.6. 1/2" EXPANSION- MATERIAL 4 SLAB Ii 4' GRAVEL FJ 2 #5 CONT. TOP 4 130T #4 a 24" O.C. #4 a 24" O.C. N050ALE lz�fl A tn NO 50ALE #4 voNEL5 F— 24 NO SCALE 4 4 4 ► I • O DRAIN -SEE 5011-5 REPORT -,EE 50I L5 REPORT bx6x%" ANGLE STONE LEDGER BOLT TO WALL N %"cP x 4" EXPANSION 601 24" O.G. if • STONE CAP STONE VENEER II SHEET ; 5 it O e-\ u- I uJ � } O fQ �-- -i � O � II SHEET ; 5 it WIDE FLANGE BEAM COPE FLANGE �`° IRWIN NO SCALE NO 5GALE 3/4" BASE PLATE NO 5GALE NON NO 5GALE I � � 1/4" END PLATE WIDE FLANGE FLOOR 1 --%" (P. A325 EACH 51DE WIDE FLANGE BEAM NO 5GALE 44 WEB 5TIFFENER5 NO 5GALE PAIR 3x3x%4"4 5 _ 3 ROW5 3 /4 "d> I A325 BOLT5 WIDE FLANGE BEAMS 1 114" 3" 3" If If_ % x 5 9 /4" x I' —O" 4 —fig" (P A325 TUBE STEEL COLUMN H55 4 X 4 X I/4 COLUMN 3/4" NON- 51-IRINK GROUT NO 5GALE FOUNDATION WALL J J L5 O au U a � a NO SCALE 0 F1554 A.B. 10 x IO P05T 1/4" KNIFE PLATE 2 —Z /'"N ALLTHREAD lnr rr "n 31b"tx II /I i LJ x LJ BASE PLATE 4" I �it I off CONCRETE PIER I r� 2 -518" (P EPDXY ANCHORS x 4 x 0' -7" BEARING PLA1 L WITH 2 #4 x 12" EMBED BARS NO 5GALE BEAM POGKET WIDE FLANGE BEAM CONCRETE FOUNDATION WALL 0 /4" NON — SHRINK GROUT 1/4" END PLATE WIDE FLANGE BEAM 311 ``—GAP PLATE V2" x bf x U' —ci" 2-5/0" fi A325 I TUBE 5TEEL COLUMN E STEEL LUMN "d>x5" LA65 1/4" x O' —IO" PLATE MORTI5E 8 x 12 TRAN5FER GIRDER 4" INTO IO x 10 P05T _ —E LVL BEAM 'IL NO SCALE E " 1 Y'LE LVl NO 5GALE 1 0 + 4) 44 x 12" LAO = - BOTH END5 'LATE VILE , "dPx5" 1 5TEEl UMN e4 "(P x 12" LAG COUNTER51NK 4 lzil inil�i.2 t_^ TiG��L.1�LS -PLAN 1011 N4 EMMA A Y41 I Y42 K3 N4 N5 Surface = 57 s.f. 5urface = 158 s.f. Surface = 100 s.f. 5urFace = 333 s.f. Surface = '76 s.f. Unexposed = 51 s.f. Unexposed = l58 s.f. Unexposed = 100 s.f. Unexposed = 215 s.f. Unexposed = 0 s.f. LOWER LEVEL WEST WALLS , m GRAHL517AGE El E2 E3 E4 5urface, = 150 51. 5urface = 334 s.f. 5urfoce = 65 5.f. 5urface = 58 al. Unexposed = 0 9-f- Unexposed = 63 9-F. Unexposed = 65 91. Unexposed = 58 s.f. LOWER LEVEL EAST WALLS Total evrface, = 3,241 s.f. Tota Unexposed = 1,525 e percent of unexposed to surface = 415 percent expaaed to Surf ace = 55% NI N2 N3 N4 N5 Nb 5urface, = 43 s.f. 5urface, = c18 s.f. Surface = 165 s.f. 5urface = 145 9S. 5urface, = 5191. Surface = 155 s.f. Unexposed = 0 5S. Unexposed = cib 5S. Unexposed = 165 s.f. Unexposed = 145 5T. Unexposed = M s.f. Unexposed = 155 51. LOWER LEVEL NORTH WALLS m"' Surface = 158 51. Unexposed = 0 5S. A A Upper Level 1 238.63 SF 3384.83 SF (5140HN DA5HED) • ZONING: PRIMARY /5EGONDARY LOT AREA = .55 AORE5 = 25,858 5.F. 51TE GO\/ERA6E-. MAXIMUM (15%) OF LOT AREA = 5,5q3 5.F. PROP05EI? 51TE GOVERAC7E = 5,588 5.F. 6RFA MAXIMUM ALLOWED = 1,664 5.F. 6RFA TOTAL PROP05EI? = 6,41 5.F. LANE)5( AREA- MINIMUM 60% OF LOT AREA = I4,bJO 5F ?*'I;ZOP05EE) LAND50APE AREA = N.A. DRIVEMY GOVERA6E: MAXIMUM (20%) OF LOT AREA = 4,1qI 5.F. PROP05ED DRIVENAY GOVERA6E = 5,021 5.1 BUILDING HEIGHT: BUILDING HEIGHT MAXIMUM = 331 BUILDING HEIGHT PROP05150 = 2q'-10" 67RFA GALOULATED A5 ADOPTED 6RFA REV151005 ORDINANGE NO. 14,5ERIE5 2004. LONER LEVEL: 3,051 5.F. GARAGE: -600 5.F. 5UB-TOTAL: 2,451 5.F. LONER LEVEL %: 53% LONER LEVEL TOTAL: 1,24141 5.F. MAIN FLOOR: 2,830 5.F. UPPER LEVEL: 1,238 5.F. + 16 VAULTED: 1,052 5.F. TOTAL-. 6,4 5F. (N.T.E.: 1,664 5.F) �OT TO SCALE Main Level SITE COVERAGE -� 2830.51 SF 51 52 55 54 55 Surface = 145 s.f. Surface = 215 s.f. Surface = 231 51. Surface = 112 s.f. Surface = 286 s.f. Unexposed = 0s.f. Unexposed = 0 s.f. Unexposed = LVI 5S. Unexposed = 0 5S. Unexposed = 0 5S. LOWER LEVEL SOUTH WALLS I E i r Construction Documents Note: These Gon5truction Documents including Architectural 5heet5 have been prepared in response to the Specific Basic Services requested by the Owner contemplating continued involvement, 5election5 and decision making by the General Contractor and Owner through completion of construction. These documents indicate the Scope of architectural design concepts approved by the Owner and include dimen5ion5 of the building, the types of Structural 5y5tem5 and on outline of the architectural and Structural engineering elements of construction. These Gon5truction Documents provide the Scope of 5ervice5 o5 outlined in the Agreement for Architectural Services and therefore do not nece55orily indicate or describe all materials required for full perfomonce and completion of the Nark. It i5 the understanding of the Architect and Engineer that the General Contractor shall furnish all Work required for proper completion of the Work and that the Work Shall be of Sound and quality construction in accordance with Industry 5tondord5 and all manufacturers 5pecificotion5, in5truction5, and warranty requirements. The Contractor, based on the foregoing, Shall prepare for Owner review a realistic budget with a latitude of prices based on as5umption5 of Scope of Work and Owner product Select ions. it Contractor's Re5pon5ibilitie5: The Contractor Shall be re5pon5ible for field verifying all existing conditions, Construction Documents, Structural Documents, municipal and /or county zoning codes, pertinent IRG 2003 code requirements, and General Specifications. The Contractor Shall be responsible for all Mechanical and I Electrical engineering, design, 5pecificotion5 and drawings I o5 required for building permit and approval by Owner and l Architect. I � 1 01 Do not scale drawings. 02 Verify all dimensions, conditions and utility locations on the job site prior to beginning any work or ordering any materials. Notify Architect of any conflicts or discrepancies in the documents immediately. 03 Areas of conflicts or dlscrepancles must be fully resolved with written approval from the Architect before construction continues In those areas. 04 Plan dimenslons are to face of stud or face of concrete unless otherwise noted. Section and elevation dimenslons are to top of concrete, top of plywood, or top of wall plates or top of wall plates or beams unless otherwise noted. 05 Provide all necessary blocking in stud walls and ceilings. Locations include but are not limited to ceiling and wall - mounted fixtures, toilets, toilet accessories, cabinetry, countertops, shelves, closet rods, handrails, and fake beams. 06 xx denotes doors. refer to floor plans for door o tons. Door Hardware to be selected by owner. 0-7 �„ r' denotes wlndows: refer to elevations for window locations, muntins, and swinq Refer to Window Schedule - for window sized and types. 08 Coordinate all electrical and mechanical fixtures to fit within ceiling, floor and woll spaces. Verify with Architect when diverting from drawings. Oa In the event that additional details or guidance is needed by the contractor for construction of any aspects of this project, he shall immediately notify the Architect. Failure to give ample notice shall relieve Architect of responsibility. 10 The General Contractor shall be responsible for satisfying all applicable codes and obtaining all permits and required approvals This project 15 governed by the IRG 2003. Code compliance is mandatory. The Construction Documents shall not permit work that does not conform to all relevant codes including IRG 2003 and all local and regional codes. 11 The Generoi Contractor and Subcontractors shall field coordinate and obtain approval from the Architect/ Engineer before any cutting, notching or drilling of any cast - - place concrete steel framing, or any other structural elements which may affect the structural integrity of the building. 12 Substitutions of "Equal" products will be acceptable only with Owner's written approval. Unique specified items are intended as quality speclficotions only. 13 it is the intent and meaning of these documents that the Contractor and each Subcontractor provide all labor, materials, transportation, supplies, equipment, etc., to obtain a complete job within the recognized standards of the industry. \ / 8070' Olt ` �A ---------------------------------- ------ UNP L4 TT cot -------- _ -___ _ ---------- - - - - -- - - - - - -- _ 1 fi -Q ' J — ______ ___ _ __ _ CRF --- - - - - -- _ r- _-& _ _1 _- - ----------------------- - - - - -- — - - --------------------------- ----------------- - - - - -- ------------------ ___ _ - A----------- - - - - -- _ _ - �" _ _ - rrrr r -r' _____________________ __ ____ __ - _ - ' - ____ -_ -_- °-� C� ---------- \ ° - _ - ----------------------- - - - - -- °- ------ - - - - -- (-" _ _ ____ __ _� - - _ LIMITS OF - `__-_-- ____----- __ - - - -- ,- - C> r 0� ----- - - - - -- r" - ' ,` - _ I _ ------------------------------ - - - - -- -- - DISTURB ---- FENCE--- - - - - -- A 1210A ~ `o `� " -"' -------- - - - - -- - -- - ------- - - - - -- - -------------------------------- - -------- { - � __ - - -- 30.0 ----------- - - - - -- - -- ¢ __________ - Co _______ ___ ` _ ! 1 _ - -t ------ ----- ------ - �- ' _ -- ------ " - _ - 29. 5� _ - 4 �_-- - - - - -� - - -_ ----------- - - - - -- - - - -- _ - - - r O - 6 9.8 23 � - _ CX�i r� s - 1` \ \1 ' corner`P - R'E 20.3 , 4 * 4 s3' 802.0 �O l 28 ' e`0261 � U PE L u -------- C - - -____ '- ----------- -------- -__- r _ �\ - - T T.O. 8024' _? 3 / 4 '- - - - -- '�i v - - - -- a . �, • `' 22 6 - Q l ___`� _____ ____ 2b _i. _ _° ~ d,M�iN LEVEL o - - -- ' 9 0 - - - -° _____ _ -_ _ ELEVATION= 8013' -b" ° !a > °(}" _ _ _ 1 :,.- r 1 ' atia L 7 _1_- - - 5024' -6° - -- - - -____ `� 2 T t�1 °' f rt T T�- 0 7 � 'fE1 - - -- ride to O _ 6 24 ` 5ET - -- T.O. GONG. 8001' -b" - - - - - -- - ___--- ___,_ �______ __ ridge �_E3143' =Z3 _ _ _ - 22 ___ ______ - - -- - -- - _ _ -- - - - _ - - -- ___ - - - - -- ---------- 2U 8020 - - - - - -- - �o j 1 '~ _ r - -- - - -° '° __ _ _ _ _ _____ _______ �, - - o „ s; c <fi�� „ ; ` ._ cs ., - v_ -------- �- __- _°__ -__ d r -v t -i 0 � � • �{� i\1 i atio T.O. GONG. r° 3 t S - -� "� �� � �� � � � T.O. GONG. � - -___ t�- i. l -- -. ,,, -� I 1 { _ - -- - -- - -- ------------- 6-81- ------------ _ - - -_- - 06 ~a r -� r ARCHITECT DRAUJiNGz5 AO COVER SHEET GI CIVIL PLAN OF LOT - 1 AND 8 (PREPARED >3r MARGIN Al SITE PLAN A2 LOWER LEVEL FLOOR PLAN A3 MAIN LEVEL FLOOR PLAN A4 UPPER LEVEL FLOOR PLAN A5 ROOF PLAN A6 SOUTH (ENTRY) ELEVATION A EAST ELEVATI ION A8 NORTH ELEVATION Aq WE5T ELEVATION A10 BUILDING 5EGTION All BUILDING SECTION Al2 BUILDING 5ECTION5 A15 SCHEDULES A14 DETAILS A15 DETAILS GI GRFA DIAGRAM LANDSCAPE DRAWINGS LI LANDSCAPE PLAN / LIGHTING PLAN 5TRUCTURAL DRAWING 6 51 FOUNDATION PLAN 52 MAIN LEVEL FRAMING PLAN 53 UPPER LEVEL 8 ROOF FRAMING PLAN 54 HIGH ROOF FRAMING PLAN 55 FOUNDATION 5EGTION5 56 FRAMING DETAILS /GENERAL NOTE5 /5PEG5 I / � ZONING: PRIMARY /SECONDARY LOT AREA = .56 AGRE5 = 24,464 S.F. 51TE COVERAGE: MAXIMUM (1596) OF LOT AREA = 3,658 5.F. PROP05ED 51TE COVERAGE = 3,2 S.F. GRFA: GRFA MAXIMUM ALLOWED = 1,121 5.F. GRFA TOTAL PROPOSED = 5,315 5.F. rea WNUM GRFA CALCULATED A5 ADOPTED GRFA REVI51ON5 ORDINANC NO. 14, 5ER1 E5 2004. LOWER LEVEL: 2,386 5.F. GARAGE: -600 5.F. 5UB- TOTAL: 1,186 5.F. LOWER LEVEL %: 53% LOWER LEVEL TOTAL: 0 146 5.F. MAIN FLOOR: 2,661 S.F. UPPER LEVEL: 1,301 5.F. + 16' VAULTED: 455 5.F. TOTAL: 5,3 5F. con (N.T.E.: 1,121 5.F.) FIRE PROTECTION FIRE 5UPPRE55ION 5Y5TEM: YE5 O i -HR FLOOR /CEILING A55EMB1-Y: FIRE RE515TENGE DESIGN MANUAL, IOTH ADD. NO. ° FG -5108, OR APPROVED ALTERNATE. ! I -HR. NALL A55EMBLY: FIRE RE515TEN6E DE51GN MANUAL, IOTH ADD. NO. _ WP- -3510, OR APPROVED ALTERNATE. UTILITY LEGEND --- 5 5EWER. ALL UTILITY LOCATiON5, HOOK -UP5, AND LINES TO 1N] #4 R _ 7 99 SHOWN HATCHED CUMULATIVE AREAS = - I20 S.F. 2402 5.F. DRIVEWAY) r .- r r r' r! rr �C�R�EDiI___ ' r- CONTROL 5HOWN HATCHED ` -` -°— -- t W WATER METER CLOSET SHALL BE G 6A5 FIELD VERIFIED BY E ELECTRICITY CONTRACTOR BEFORE N COMMENCEMENT OF Tv-_ -- GABLE TV CONSTRUCTION �� k f J J r-� r • STORM DRAINAGE DETAIL 4 : E t" � 6' BOULDER RETAINING WAL (TYP) FINISHED GRADE CONCRETE PAN AND COMBINED 4' RETAINING WALL BUILDING FOUNDATION WALL r • No i i Coln F—.' O p 1 own t�xt N N 1 1 0 I CD o con Q I I o G+ � 0 O � w W >° M 0 w IY 0� IY G1 r n c� 0 0 N 00 1 P 0 1 rorl 0 W ry Coln F—.' i� a 'TS W own t�xt cc r— > ICU 40) con G+ ~ GIB O C i� a �I 'TS W own t�xt cc r— > ICU 40) con O C �I 3 1, 7' -0" 56' -34» 45' -94 i t C14 6 t cca ODE AND LOGAL JURI5DICTION J tco 3 1, 7' -0" 56' -34» 45' -94 10,_ » "gv" 1 ' 26' -34» 22' - 6" 8 22' - 6" ODE AND LOGAL JURI5DICTION J EOUIREMENT5) co Q0 o INDIGATES DOOR LOCATION o INDICATES EXHAUST GEILING FAN 5EE DOOR 5GHEDULE O LOCATION RE: LOGAL GODS FOR SIZE AND DATA. A10 A11 A8 a 4r,�, -}- HB LOGATION. V_ tl 1 4 4 4a d d4 a °4 a° d d a d a4 4 d< d.. d a° tl 4 ' .,<. 4. u r �',�ry I A o ! 4 o O - CO o r-� O IL UNE�CCAVATED MEGH. CHASE 4' -2 " 5-g» 4 ' w ° d ABOVE o� 7 g° I -HR FIRE RATED U LL I 5TUD FURRING WITH A55EMBLY AT MEGH. 0 ♦`' 4 GAP AT STAIR W ROOM WALLS GEILIN IF BOILER Is OVER rt"ry AGAINST GO TE ELEV 51ZE B 5ED ON THY55EN KR PP 'LEV' 400,000 BTUs ` FOUND N 36x4b GAR, ITH C ' n I on' HYDPnl Ir. D IVY �n'_aZ_" _� �3 �� 4d 93' -34» t FLOOR PLAN LEGEND F (�)INPIGATE5 SMOKE DETEGTOR, GEILING CATION RE: IRG 2003 (CURRENT INDIGATES WINDOW LOCATION (q } SEE WINDOW SCHEDULE ODE AND LOGAL JURI5DICTION �- / FOR SIZE AND DATA. EOUIREMENT5) co Q0 o INDIGATES DOOR LOCATION o INDICATES EXHAUST GEILING FAN 5EE DOOR 5GHEDULE O LOCATION RE: LOGAL GODS FOR SIZE AND DATA. — -- –` __- REOUIREMENT5 OR DESIRED LOCATION INDIGATES H05E BIB a INDIGATES FLOOR DRAIN LOCATION. -}- HB LOGATION. LOWER 1/4 11 = 1 1 - 011 co 0 co Q0 o O O N 0 O I A o ! C I o CO o r-� O IL Cori &i w 77 UJ U LL m 0 w ry rt"ry own O O a • CO .PW* o w rit D • -y � -y a.a CIL ��y o o �J O � W 0- 25 . Q C C 40 pwmmm4 CC3 ,4ww� • cti „� O t 1 INDICATES WINDOW LOCATION n 1 1 SEE WINDOW 5GHEDULE Q0 i FOR 51ZE AND DATA. 5T OE GAP REQUIREMENTS) ° 1 1 N F(J 1 1 l 4, f co co ' h ip I� -� ' 6 , -2 �" ( t� WOOD D IP THRU DECK V i 79' 7' -0" U :, 18' -9" 45' -94" 4' -7 6' -4 15-2 4 10' -4" 15' -11" N. o0 1 ° THY55EN' KRUPP 'LEV' 4' - 6 51" _ � I 36x48 BAR, WITH a ~'` � �7 TOP OF GONG. d - �� 7 _" _ HYDRQL I G D� r-�,. .r-�..•� -� �. ■r -r�.. v n.1 _ n _, -. , . _ _ . _ . -- .. M � 01, EL VATION= 8012-6" (cm -O" DATUM) A 0 2' -9" 1, 5' -3" 1 1 t l 5' -3" 1, 2' -9 16' -0" 1. 1o' = zls� I Mi 90imp 1 All 2 ` e- 219 22 �'�� 30 1' /0 , r qrr 5'- ;^ f �, J� h Tyr a AT TH15 5TUCC0 WALL, PROVDE 3" BUILD -OUT TO CRETE WALL PLANE BREAK AT EXTERIOR MATERIAL CHANGE POINT FLo 6R PLAN LEGEND h , f d f i f f T� t 10' -0" Q INDICATES SMOKE DETEGTOR, GEILING INDICATES WINDOW LOCATION (4) 8 X8 TIMBER LOCATION RE: I RG 2003 (CURRENT SEE WINDOW 5GHEDULE CODE AND LOCAL JURISDICTION FOR 51ZE AND DATA. 5T OE GAP REQUIREMENTS) (TYPICAL) 1 1 INDICATE5 DOOR LOCATION F(J INDICATES EXHAUST GEILING FAN OOb SEE DOOR 5GHEDULE LOCATION RE: LOCAL CODE FOR 51ZE AND DATA. N REQUIREMENTS OR DESIRED LOCATION INDIGATE5 H05E BIB O INDICATES FLOOR DRAIN LOCATION. -} H LOCATION. 8x8 TIMBER COLUMN CEMENT 5TUGGO FINISH ON GONG RET WALL t f r i l A15 A7 Cb i 1 4 � f f/ ro f 1 f 4^j "• f f / f / IMBER TRU55 - RE: 5TRUGT IJ 1/4 1 f-off i 1 1 1 I I I I I 1 1 1 1 1 I I 5 i J 1, , IJ a (4) 8 X8 TIMBER COL�MN5 ON STU GO PIER WITH 5T OE GAP (TYPICAL) 1 1 1/4 1 f-off i 1 1 1 I I I I I 1 1 1 1 1 I I 5 i J 1, , IJ Q0 b 00 N O 1 N N �j y 1 1 O I o I o I o O O F- ran W Z W ry 5 0 ry m O w ry r ry © 0- a. Q0 C3 N Cott o W ry Q F� • c v ei O GCt cts G-i W C Fil w 4 con? a COD 9 cs c • • • • a INDIGATE5 SMOKE DETECTOR, GEILINC7 LOGATION RE: I RG 2003 (CURRENT GODS AND LOGAL JUR15DIGTION REGUIREMENT5) INDIGATE5 EXHAUST GEILING FAN LOGATION RE: LOGAL GODS REGUIREMENT5 OR DESIRED LOGATION. O INDIGATE5 FLOOR DRAIN LOGATION. INDIGATE5 WINDOW LOGATION SEE WINDOW 5GHEOULE �-t FOR 51ZE AND DATA. INDIGATE5 DOOR LOGATION 006 SEE DOOR 5GHEOULE FOR 51ZE AND DATA. INDIGATE5 H05F 83113 - � -H � LOGATION. r r r ! it r 1/411 y 1 1-011 4 6 i i e i 1 i b a 9 m no WINDOW TRIM (WOOD): 2X8 WOOD HEADER 2x6 TRIM, 2x6 SILL (SLOPED CUT ON SILL) RIDGE s�n.Ltn_ i FLOWER BOX W/ ,METAL PAN AND DRAIN PLUG - BOX TO BE CONSTRUCTED OF 2x MATERIAL AND ANCHORED TO BLOCKIN6 WITHIN WAI I PLATE HE 16H = 8033' -8 3/' SHED ROOFING SYSTEM: STANDING SEAM COPPER ON WATERPROOF MEMBRANE ON ROOF 5HEATHIN6 4:12 PITCH) SHED SAVE CONSTRUCTION: 3x8 TIMBER RAFTERS AT EAVES 515TERED TO 2X ROOF J01 STS. 2X6 WOOD DECKING AND — —ROOF SHEATWW6 2X6 WOOD FA51GA STONE HEADER OVER ARCHED WINDOWS, STUGGO HEADER OVER RECTANGULAR WINDOWS, STONE SILL • i .1 IIIIIIIII��II!I�wllllll�ll__I Lj I STONE TO EXPEND TO UNDERSIDE OIL GONC SLAB OF DECK I 1 I L — — — _ — e T CD co cb o 0 0 N 1 N N y I I o I A o I o I a cv CD o r� o F- cry w U) U) F-- � m � Lj I STONE TO EXPEND TO UNDERSIDE OIL GONC SLAB OF DECK I 1 I EXISTING 6RADE: APPROX. LOCATION SHOWN DASHED. FINISH 6RADE: SLOPE TO DRAIN AWAY FROM BUILDING PERIMETER. Jl Jib t1C J A _ l I _ _- r r 1 it i � 5 �t �f - ir Jr CUSTOM ENTRY DOOR TO BE SELECTED BY APPROXIMATE LOCATION CONTRACTOR OF FOUNDATION WALLS STONE VENEER: AND FOOTINGS SHOWN STONE VENEER ON THERMAL DASHED AND AIR INFILTRATION BARRIER ON PLYWOOD 5HEATHIN6. RANDOM ASHLAR PATTERN, COLORADO BUFF SANDSTONE WALL GAPS. 6AI2 35 FT. HEIGHT LIMIT LINE. Z AT 9 - WA�ROVDE 3" IB� 6 OUT TO CRETE WALL PLANE BREAK AT EXTERIOR MATERIAL GHAN&E POINT / -I -II" ROOF CONSTRUCTION: 40 YEAR ASPHALT SHINGLES OVER WATERPROOF MEMBRANE OVER PLY. SHEATHING OVER INSULATED RAFTERS. FASCIA CONSTRUCTION: W.P. MEMBRANE TO LAP PAINT -LOK. MTL. FLASHING OVER 2X6 FASCIA BD. OVER RIDGE 2X12 5UB- FA5CIA BD. W/ cl" 8032 -3 ° RE P AF €�_ I G = 8033' -8 3/4" u l ' E R LEVEL X ` U' `i � `� • � 3". � fi' � '" f� � � ' }g• ' ` 'r� �{'� � I � � I fi ��° �f,�.�.��$ � I yt�a�'��y,.�I� r —! � pp. qq I q, � .� �� >7 +'Yn�� � ��'+ aF £�„;:�m��' �: �' 1 1'`�'t�A:,z'� 1 t �� w 1p �� • r yz I I ® -■ MAIN LEVEL w t �w I• ! I i� ter■ ; t�� awiaw�• ■r wwtr rrrrr��rwrrrrr�w ` ■w�rwfwrrrrrrrw�w ■1r 7w ,��, � + �w� � ww��r�� �rs �w►.rw� r �P Anil •oFa� a I' 1 � ♦ • a • • a I • II I I ,11�I N 4 V I � ®, ' III- r• a • • A M • � r � • _ _ __ • LO NER &AR I STONE WALL GAP: GUT -STONE GAP - COLO. BUFF OR CAST STONE (BUUF COLOR) WITH SLOPED TO DRAIN TOP. GUSTOM OVERHEAD 6ARA6E DOOR R01 ITN (FNITRY) Fl FVATION] 1 WOOD SIDING WALL CONSTRUCTION: I WOOD HORIZONTAL SIDING (SHIP -LAP All JOINT) WITH 10" EXP05ED TO VIEW WIDTH OVER THERMAL AND AIR INFILTRATION BARRIER (LAPPED TO DRAIN) OVER SHEATHING. L — — — _ — e T EXISTING 6RADE: APPROX. LOCATION SHOWN DASHED. FINISH 6RADE: SLOPE TO DRAIN AWAY FROM BUILDING PERIMETER. Jl Jib t1C J A _ l I _ _- r r 1 it i � 5 �t �f - ir Jr CUSTOM ENTRY DOOR TO BE SELECTED BY APPROXIMATE LOCATION CONTRACTOR OF FOUNDATION WALLS STONE VENEER: AND FOOTINGS SHOWN STONE VENEER ON THERMAL DASHED AND AIR INFILTRATION BARRIER ON PLYWOOD 5HEATHIN6. RANDOM ASHLAR PATTERN, COLORADO BUFF SANDSTONE WALL GAPS. 6AI2 35 FT. HEIGHT LIMIT LINE. Z AT 9 - WA�ROVDE 3" IB� 6 OUT TO CRETE WALL PLANE BREAK AT EXTERIOR MATERIAL GHAN&E POINT / -I -II" ROOF CONSTRUCTION: 40 YEAR ASPHALT SHINGLES OVER WATERPROOF MEMBRANE OVER PLY. SHEATHING OVER INSULATED RAFTERS. FASCIA CONSTRUCTION: W.P. MEMBRANE TO LAP PAINT -LOK. MTL. FLASHING OVER 2X6 FASCIA BD. OVER RIDGE 2X12 5UB- FA5CIA BD. W/ cl" 8032 -3 ° RE P AF €�_ I G = 8033' -8 3/4" u l ' E R LEVEL X ` U' `i � `� • � 3". � fi' � '" f� � � ' }g• ' ` 'r� �{'� � I � � I fi ��° �f,�.�.��$ � I yt�a�'��y,.�I� r —! � pp. qq I q, � .� �� >7 +'Yn�� � ��'+ aF £�„;:�m��' �: �' 1 1'`�'t�A:,z'� 1 t �� w 1p �� • r yz I I ® -■ MAIN LEVEL w t �w I• ! I i� ter■ ; t�� awiaw�• ■r wwtr rrrrr��rwrrrrr�w ` ■w�rwfwrrrrrrrw�w ■1r 7w ,��, � + �w� � ww��r�� �rs �w►.rw� r �P Anil •oFa� a I' 1 � ♦ • a • • a I • II I I ,11�I N 4 V I � ®, ' III- r• a • • A M • � r � • _ _ __ • LO NER &AR I STONE WALL GAP: GUT -STONE GAP - COLO. BUFF OR CAST STONE (BUUF COLOR) WITH SLOPED TO DRAIN TOP. GUSTOM OVERHEAD 6ARA6E DOOR R01 ITN (FNITRY) Fl FVATION] 1 WOOD SIDING WALL CONSTRUCTION: I WOOD HORIZONTAL SIDING (SHIP -LAP All JOINT) WITH 10" EXP05ED TO VIEW WIDTH OVER THERMAL AND AIR INFILTRATION BARRIER (LAPPED TO DRAIN) OVER SHEATHING. (D CD co cb o 0 0 N 1 N N y I I o I A o I o I a cv CD o r� o F- cry w U) U) F-- � m � m O w m cl� ty n n D- CD 0 N w fy ect C z..3 -::i> -g> a C1 0 o s� R=, W V.L F-4 z% Ltd rr�� l PLATE HEIGHT W55' -g 3/4" �. PLY. E3024' - 3/4" O \/IL DRANING5 FOR 10 FINAL GRADING � �►- HOME 0 C) O LL fiAIN LEVEL ".0. PLY. 8013' -6" r r- kb w r z .i `w V W I M <� tV O � J � V �)NER LEVEL EAST ELEVATION i 1 /4 11 1 1r0�1 ,J I I I I i co co co O O p N O O 1 N N f i o 0 0 1 A I 1 0 � � h O O I- Con w � < Cri U) � w � FT o- co 0 w r ry o cL n co O O N .. 1 w cy Co 4 T FwT ry ass cyo a � a cM°-- u � a c,.a zes C �w �.a act � n LT Irr-" o T �T x� as STUCCO WALL CONSTRUCTION: 5TUGGO (3-LAYER SYSTEM OR All EQUAL) OVER "TYVEK" (OR EQUAL) VAPOR BARRIER (LAPPED TO DRAIN) OVER SHEATHING. I lm� t,r,oy SINGLE WALL PLATE TO RUN GONTINUOU5LY ABOVE WINDOW HEADER K - - - - - - - - - - X111 -1i -�' REFER TO CIVIL DRAWINGS FOR RETAINING AND FIN GR ADIN G AT REAR OF HOME 10) WINDOW TRIM (STUCCO): 3XI0 WOOD HEADER, N/ SLOPED GUT-5TONE,. 5TUGGO WRAP JAME35 _j ,j - - - - - - - - - - - - - - ------ ----------- --------------- - - - - - - - - - - - T - - - - -- - T_T__ I EXISTING GRADE: APPROX. LOCATION SHOWN DASHED. ----- - - - - -- — — -- f - — — — — — — — — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — — - - — — — — — — — I -j- - - - - - - - - - - - - _-- - - - - -- - - - - - - - - - --- - - - - - - - - - - - - - - - - - - -- APPROXIMATE LOCATION OF FOUNDATION HALLS AND FOOT INC75 SHOWN DASHED REFER TO STRUCTURAL DRAWINGS FOR FOUNDATION DESIGN, TOP — — — — — — — — — - BOTT - OPI OFTTALT5 7 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — --- - - - - -- - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------- -L - - - - - - - - PLATE HEIGHT 033'-8 5/4" PATIO IN FOREGROUND 2 C3 A j­,,IJPPER LEVEL ' P�LY. 8024' -1 5TUGGO ON RETAINI WALL W SANDSTONE GAP k ' ---------- - - - 1- 7 ------- e._._. -- 0 1r w (V C) 7 Lu :I- - - - - - - - - - - X111 -1i -�' REFER TO CIVIL DRAWINGS FOR RETAINING AND FIN GR ADIN G AT REAR OF HOME 10) WINDOW TRIM (STUCCO): 3XI0 WOOD HEADER, N/ SLOPED GUT-5TONE,. 5TUGGO WRAP JAME35 _j ,j - - - - - - - - - - - - - - ------ ----------- --------------- - - - - - - - - - - - T - - - - -- - T_T__ I EXISTING GRADE: APPROX. LOCATION SHOWN DASHED. ----- - - - - -- — — -- f - — — — — — — — — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — — - - — — — — — — — I -j- - - - - - - - - - - - - _-- - - - - -- - - - - - - - - - --- - - - - - - - - - - - - - - - - - - -- APPROXIMATE LOCATION OF FOUNDATION HALLS AND FOOT INC75 SHOWN DASHED REFER TO STRUCTURAL DRAWINGS FOR FOUNDATION DESIGN, TOP — — — — — — — — — - BOTT - OPI OFTTALT5 7 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — --- - - - - -- - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------- -L - - - - - - - - PLATE HEIGHT 033'-8 5/4" PATIO IN FOREGROUND 2 C3 A j­,,IJPPER LEVEL ' P�LY. 8024' -1 5TUGGO ON RETAINI WALL W SANDSTONE GAP k ' ---------- - - - 1- 7 ------- e._._. -- 0 1r w w C) u- C) C) _j U- 'T.O. GONG. bOO1 J LEVEL (V C) 7 Lu :I- C) :3 C) Lu u j w C) u- C) C) _j U- 'T.O. GONG. bOO1 J LEVEL I II I II RI EAST TRUSS ELEVATION 51NOLE WALL PLATE TO RUN CONTINUOUSLY ABOVE WINDOW HEADER 35 FT. HEIGHT LIMIT LINE.�\ 2 w am T.O. PLY. 8024'- 5/4" _U � fAIN LEVEL .0. PLY. E5013'-b" 5TONE TO EXTEND TO F- UNDERSIDE OF GONG SLAB - - - - - - - - - - - - - - - - - - - - OF DECK I II I al - �C q- --L:- I z 1a 7=1zi E D L C C : CD u- C) 2 C) - fl/ (D C) 7 C) CONG� E500l'-b" L ------- 1------ - - -__ - - - - - - - -- - - - - --- — — — — — r -J T (D Qo - - - - C) oj L6ARA6E LEVEL \- FT.O. GONG. 0 N C) :i Lu WEST ELEVATION CD u- C) 2 C) - (D L0NER LEVEL " 7 CONG� E500l'-b" L ------- 1------ - - -__ - - - - - - - -- - - - - --- — — — — — r -J (D Qo - - - - - - - - - - - - oj L6ARA6E LEVEL \- FT.O. GONG. 0 N 0 0 WEST ELEVATION O 1 /4 = 1 1-011 CD I (D 0 (D Qo 0 0 0 N 0 0 O 0 I CD I o LD 0 r-, CD I .:-: con �i U) cn Cr 0 ry m 0 bi rlK ry CY 0 n n Qo CD 0 N 00 Lu ly- COD �p M Con o � ME • � c,> c P = con cu as