"Community participants expressed a strong preference for a locally relevant
development serving the local community as well as destination visitors " &0&7% 4
Lionshead Redevelopment Master Plan 5.1.2
OPRA F r 6 •t2-o8
The Open Hospitality Partners & Hillwood Capital [Open I Hillwood] Partnership
The Town of Vail Conference Center
The Vail Conference Center will be designed in a way to ensure that it will be similar to or better than the following facilities in terms of quality of design, materials, finishes,
furnishings, and equipment: Banff Centre, Monterey Conference Center, Snowmass Conference Center, Telluride Conference Center, Keystone Conference Center, and
Whistler Conference Center.
The quality of the finishes incorporated into the Ballroom will be appropriate for the Town's finest formal dinners and social functions. The entire space will have an
attractive and durable carpet and appear like a high-end ballroom instead of less attractive exhibit space. The movable partitions will be high quality, providing excellent
sound attenuation between partitioned spaces. The space will be outfitted with sophisticated sound and audio-visual systems.
The Town of Vail Conference Center facilities program has been created to maximize flexibility in order to be in a position to accommodate the widest range of types and
sizes of events while continuing to limit the size of the facility to 34,000 as contemplated in the Development Agreement. The centerpiece of the facility is a 16,000 SF ballroom
that will be divisible into a number of different configurations, including 4,000 SF and 8,000 SF meeting and banquet spaces, as well as eight separate 1,000 SF breakout
spaces.
The Conference Center facility will also include a 3,500 SF, 200-seat auditorium that will include fixed, raked seating, and a sound and projection booth.
Additionally, the Conference Center will include three, approximately 800 SF dedicated hard-walled meeting rooms.
If an event requires more breakout space than is provided within the Conference Center, additional meeting space in the two hotels can easily accessed from the
Conference Center. The St. Regis Hotel function space, located a short walk away and on the same level as the main Conference Center ballroom, includes a 3,600 SF
ballroom which will be divisible into three 1,200 SF rooms plus two approximately 800 SF meeting rooms, and another approximately 600 SF meeting room. The W Hotel
function space, located a short distance away and one level above the main Conference Center ballroom, includes a 3,300 SF ballroom which will be divisible into three 1,100
SF rooms plus three approximately 800 SF meeting rooms, a 1,500 SF screening room, and another approximately 600 SF meeting room.
By augmenting the approximately 3,000 SF of dedicated Conference Center breakout space with additional hotel meeting space that is easily accessed directly from the
Conference Center, we are able to include both the 16,000 SF ballroom and the 3,500 SF Auditorium, continue to limit the total square footage of the Conference Center to
34,000 SF, and be able to provide for events that might require up to another 16,000 SF of breakout space which is separate and distinct from the main ballroom.
The main St. Regis Hotel Kitchen has been enlarged to nearly 8,000 SF in order that it can function as the main hotel kitchen and as the banquet kitchen on those
occasions that food will be served at the conference center. There is access from the kitchen by means of a back of house corridor, enabling servers to access the ballroom
and meeting rooms without going out into the public pre-function or circulation space. Additionally, a 1,500 SF warming kitchen has been located immediately adjacent to the
main ballroom in order to facilitate final preparation of plates prior to delivery to the guests.
DR,477
664mace n~ - e 04
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership page " W: 4240 Froject Plan Submittal
Level G1 (seepage 13 for Conference Program Summary)
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
ToV Conf. ; St. Regis
LEGEND
0 BACK OF HOUSE
Q CIRCULATION
CIRCULATION-VERTICAL
Q RESIDENTIAL UNIT
Z);Z+707
page 2
Q FRACTIONALS
Q HOTEL
Q W SUITES
Q PUBLIC
Q PARKING - HOTEL/CONDO/VALET
Q PARKING -PUBLIC
Q PARKING -SPEED RAMP
Q PARKING - SERVICE TRUCK/ECO BUS
0 RETAIL
Q TRANSIT HUB
Q TOV CONFERENCE 0- 32' 64'
4240
Project Plan Submittal
y 4V
Loading : ToV Conf.
Parking Area Floor Plate Elevation: 8,154'
All Other Floor Nate Elewtions: 8,157'
Garage Level a
Level G2 (see page 13 for Conference Program Summary)
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
LEGEND
ToV Conf. ; St. Regis
Q BACK OF HOUSE
Q FRACTIONALS
Q CIRCULATION
Q HOTEL
CIRCULATION-VERTICAL
0 WSUITES
0 RESIDENTIAL UNIT
0 PUBLIC
V;Z.4~77
page 3
0 PARKING - HOTEL/CONDO/VALET
Q PARKING -PUBLIC
Q PARKING-SPEED RAMP
0 PARKING - SERVICE TRUCK/ECO BUS
Q RETAIL
0 TRANSIT HUB
0 TOV CONFERENCE p 321 641
w -7-
4240 Project Plan Submittal
ToV Conf. St. Regis
W : ToV Conf. AA
ToV Storage/
Cont. Mgmt.
Torn ~f Vail
ballroom
EL = 8154'
I ~r
t,
Board Center
Room
{
:LJ30W St. Regis
Kitchen
EL = 8173'
Upper Retail Street
EL = 8155' • 9n
Conference - Level G1 (see page 13 for Conference Program Summary)
The Open Hillwood Partnership
Z);Z+77
page 4
EL = 8171'
St. Regis Lower Terrace
BB 1,
66apwwe 6ewt - 6&Vth 04
' 4240 Project Plan Submittal
ToV Conf. ; St. Regis
BB,
St. Regis'.
B. 0. H.
St. Regis
B.O.H.
.ecture Ballroom
kl all EL = 8154'
St. RE
is Meeting Rooms Pre-fun
ublic parking
_ do_wn -_top' . .
H,tir hNri~hpp
hA
pp YYrr
BOH
Retail
&*wow &Mtm - &A&rm 04
4240 Project Plan Submittal
Section `AA' Looking Through Town of Vail Conference
2);Z477
Lions) lead Par~l„y Struciure Redzve opmenll. The Open I Hillwood Partnership page 6
4240
& 0~ 04
Project Plan Submittal
Section through Conference and Transit Center
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
The Transit Center serves as a connection between the Conference
Center and the public pedestrian and vehicular circulation...
'It will be important that the civic facilities complex be connected to all three circulation
networks in Lionshead vehicular, pedestrian, and public transit."
Lionshead Redevelopment Master Plan 5.1.3.1
Z);Z+77
page 7
&*team &Arm
4240
&aA&n p¢
Project Plan Submittal
47,
■
■
l
1 - I - _ To Town of Vail
From Porte
Conference
Public Circulation
Z);Z477
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership page 8
III ' i I' M~ III 'I I j I I I I Ij I 1 ; u I i
From Porte i . II' `r I
III 4 I ~ ~j III i III 41 i ~ ; l ~ i ~ ~I I
Cochere lI!°
I I I II I 1 1 I I i
1•~ ~ _ I - -e _ III I I I ( I ' ~ of '
II,
11 1 ~ I I i l ~ i t
r"'. 1,1 14 III ' I III III { ; I U~
■ I III i III III II ! it 4, 1 pl
11111 I I ~ I I+ . I iJ i I
■ ~i _ I III I III III ICI ! I III X11
1 I ,
~ Ili III III I i I I Ni i I I li~l
■ ~ i l i I I of ~ o ,
. I ~ I . III I I !T
■
~ i I
To Upper m~
I y hi , ,
i I II III I I I'' '
;
Terrace, Pre-
" ■ 4 41 I iI
i V ■ function +
~ I
Porte I,
I I ;i III I i I 1' I
Cochere
I I~I -
ii I~ I I C I Ir t i yl I~,T,~-v
. 1. I I I I 6 I
11 I II { I I j I I
{ I I I
~ 1 1 I I I I I 1
it "
11 - 1
1~ ,yr
Retail
i
To Upper
Terrace +
re-function • ,
tillage, Retail
and Dobson
Arena
X04
4240 " roject Plan Submittal
From Loading /
Receiving
Service CoMO'
Bat
LionsHead Parking Structure Redevelopment The Open ( Hillwood Partnership
%);Z4707
page 9
4240
6lr~ p¢
Project Plan Submittal
Service Circulation - Level G2
Entry from Pre-function Level
uonsHeaa Larking Stru~iure Redeve opnrien The Open Hillwood Partnership
V;Z.4~77
page 10
, iPI
604
4240 "roject Plan Submittal
I Iki
(-r
24'
there is agrowing need for additional conference space in Lionshead, especially as the
local economy seeks to diversify and provide a wider range of destination resort activities
in addition to skiing, "
Lionshead Redevelopment Master Plan 3.2.4
Town of Vail Conference - Main Ballroom
Z);Z4;77
LionsHead Parking Structure Redeveiopmeni The Open Hillwood Partnership page 11
y
1
t
" 04
- 4240 roject Plan Submittal
From Town of Vail Pre-Function
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
Z);Z,4;77
page 12
4240
- 6&sA&4 04
Project Plan Submittal
Town of Vail Conference Center Program Comparison
Description Program Dated 03.24.08 Current Plan
Ballroom
16,000
16,005
Meeting Space A
1,000
815
Meeting Space B
1,000
815
Meeting Space C
1,000
815
Meeting Space D
1,000
0
Pre-Function Space
4,750
5,350
Storage
2,000
2,000
AN Storage
500
240
Warming Kitchen
1,530
Auditorium
3,500
3,465
Pre-Function
875
1,690
Storage
400
400
AN Storage
250
240
Restrooms
1,000
1,100
Business Center
500
600
Conference Manager
600
440
Board Room
500
Circulation
5,891
Total
34,375
41,896
Breakout Spaces
St. Regis Hotel Breakout Space
Meeting Room #1
795
Meeting Room #2
795
Meeting Room #3
620
Board Room
500
Subtotal
2,710
W Hotel Breakout Space
Studio #1
800
Studio #2
800
Studio #3
800
Screening Room
1,500
Board Room
600
Subtotal
4,500
ToV Breakout Space
2,445
Total Available Breakout Space
9,655
Ballroom Capacity
Standing Room Only
Lecture
Banquet
Program Summary
Development Agreement
September 2007
Project Plan
Jul 2008
Ballroom
17,500
16,005
Auditorium
3,465
Pre-function / Breakout
8,000
9,985
General Circulation
included
5,891
Back of House / Support
8,590
6,550
Total
34,090
41,896
2);Z+707
66o4awwe &a&n - j?AaA&t 04T
13 REL. 4240 Project Plan Submittal
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership page
4
•7rr„
fWMMM,
l M ~ tl a
sC '
s.
.
! i
~ $f
Y
e" c
"The structure is conveniently located between the civic center on the east and the main
portal to the Lionshead pedestrian mall on the west, No other location offers visitors such 65
ease of access " LRMP 4.8.3.3 e&A&I't
DRAfT 6•n•og
The Open Hospitality Partners & Hillwood Capital [Open I Hillwood] Partnership
f.
y
1
1 low
l
rr 1 I
I
I
I
4 I I
a
y ~l
1.70 R.O.W.
south frontage road
I
I
'
I
r
~I
/j
garage access plan
ru , r , The Open Hillwood Partnership
residences / hotel valet operations
public parking
high bay service and delivery
page 4240 project Plan Submittal
1
%.1
use diagram
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
onto
OD;Z+77 paj&.,~ &
page 2 y' 4240 Project Plan Submittal
parking count
level G2-
loading and bus only
level G3-
386 private stalls
160 short term stalls
level G4-
571 long term stalls
level G5-
665 long term stalls
level G6-
369 long term stalls
Description
Number of Units
Parking
Requirements per
Unit
Number of
Spaces
Required
Number of
Spaces
Provided
Additional Information
Private Parking
Required by Zoning
Hotel Uses
240 keys
.7 per 1 key
168
160 W + 80 SR
Dwelling Units
111 units
1.4 per 1 unit
155
53 W+ 58 SR
Fraction Fee Units (25 fractionals)
22 units
.7 per 1 unit
16
22 SR
Employee Housing Units
0
Private Meeting Space
11,885 sf
1 per 330 sf
36
6085 W + 5800 SR - hotel conf spaces
Spas
17,960 sf
1.3 per 1,000 sf
41
7500 W + 10,460 SR - hotel spas
Total Private Parking
417
Parking Reduction
17.50%
73
per 12-10.12 for 701.800 parking spaces
Total Private Parking After
Reduction
344
386
Public Parking
Required by Zoning
Retail
75,000 sf
2.3 per 1,000 sf
173
private stalls in public garage
Restaurants
13,210 sf
1 per 250 sf
53
(1770+2450+2400+3700+2890) within hotels
Civic Center
22,990 sf
1 per 165 sf
139
(3940+15930+3120)
Not-Far-Profit Office Space
3,000 sf
2.3 per 1,000 sf
7
public stalls
Information Center
2,400 sf
2.3 per 1,000 sf
5
public stalls
Vail Recreation District Space
2,500 sf
2.3 per 1,000 sf
5
public stalls
Total Required by Zoning
382
Parking Reduction
17.50%
67
per 12-10-12 for 701-800 parking spaces
Total Required by Zoning After
Reduction
315
315
Replacement
Longterm
1,290
1,290
Short term
160
160
Total Replacement Stalls
1,450
1,450
1150 replacement, 300 Gin to Town
Total Public Parking
1,765
1,765
Grand Total Parking (Public+
Private)
2,109
2,151
VR477
;V41&V sr4uc~ / zQa~ & orl&" - &A&&4 5
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership page 3 RE i 4240 Project Plan Submittal
Entn
Access to
G3 level
Access to
G4 level
speed ramp diagram
u ; ctn. F - r~ ~r The Open I Hillwood Partnership
Access to
G5 level y I
and I'
G6 Level
page 4 4240 Project Plan Submittal
I"1NVGJJ lV
G5 level Entry from Frontage
Road (East)
level 01-Porte Cochere
-2 hotel shuttle drop-off
residences I hotel valet operations ~ M'
01 level - flow diagram
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
pedestrian stairway to
retail level and
Conference Center
Z);Z.477
page 5
4240
- eltoth 5
Project Plan Submittal
level G2
-5 loading/delivery bays
-5 eco-bus drop-off stalls
-3 hotel shuttle drop-off
Valet to hotels above
Freight elevator
Down to G3 -
shuttle parking
loading dock
s transit
long term exit/entry
shoes x~ntry
eco bus
G2 level - flow diagram
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
pedestrian exit to
upper retail
ZMP~?
page 6
south frontal
proposed derpass
sly
term ®n ! .
Retail loading dock
Vy exit
eco bus exit
residences / hotel valet operations
public parking
high bay service and delivery
4240 Project Plan Submittal
valet parking entrance
level G3
-386 valet stalls
-160 short term stalls
eXlk
vatetpa~K
r
Freight elevator .r
Down from
G2
o'~teCm
sr
rr11 ~
rr
rrr
rs
rr
As
s
■
evov\ 9~ ycramp
exltIef
0,0
c ,n
i l { rl ~r
pedestrian exit to
lower retail
1
retail delivery spy e
pedestrian exit to
lower retail
G3 level - flow diagram
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
~
~
1~
- ~VIIONaw
VR477
page 7
L~
pedestrian exit to
lower retail
residences / hotel valet operations
public parking
high bay service and delivery
4240 Project Plan Submittal
level G4
-571 public parking stalls
G4 level - flow diagram
The Open Hillwood Partnership
V;Z.4~77
page 8
4240 Project Plan Submittal
level G5
-665 public parking stalls
e~tr t
Lwes
r
a r
•
exit
est
exit from G6
ramp to ° r'~
Gro
r
•
entN to G6
r
.y
O
residences / hotel valet operations
public parking
high bay service and delivery
G5 level - flow diagram
LionsHead Parking Structure Redevelopment The Open ( Hillwood Partnership
Z);z4;77
page 9
4240 Project Plan Submittal
level G6
-369 public parking stalls
a
to
am
.
r
from
G6 level - flow diagram
The Open I HiIIwood Partnership
midences I hotel valet operations
page 10 4240 Project Plan Submittal
VALETRAMPZ4
a a o 0
WPURCHASING/
RECEIVING
1-71
LL
V
-
TI SERV K
r
4
L DOCK Docx
L
I
~
a
rn
t
'
LL
1
SKIER IL SHORT
TERM EMIT
y
7►-~
y
SKIER ENTRY
_
_ _
SHOITTTERM ENTRY
TOWN OFVAIL
' _ - CONFERENCE
1EL-hs4'
- - -i
_ -------Rr fCO AUS/HO7Fl SHUTiIE
-"a_ RCP OFF
CAFE TRANSITSTAT10N ,
W-SPA 4.M ST
EL-3,s4'
RETAIL Lo IY .c.."
WB-65 truck at entry
VALET RAMP- I
o a a 0
W-PURCHASING/
RECEIVING
1 I r- Ti
11`U'II L L
TI SfAY TRUCK
~ Lr L DOCK
4 O
y SKIER A, SHORT E-
\ TEAM DIR
y y SKIER ENTRY
y \y SHORT TERM ENTRY - c
y
w-sPA
RETAIL WIRY
- - a
TOWN OF VAIL
CONFERENCE
fi S.F.
EL-hs4'
- - - -1
ROPOFF nuiiu - -
CAR TRANSIT STATION ,
4.M SF.
EL•RFS4'
WB-65 truck at second bay
loading dock - truck maneuvering
_ w 4 ~a arr The Open I Hillwood Partnership
DR477
page 11
W-PURCHASING/
RECEIVING
VALET RAMPS T
o a 0 0
-n
-L
TI SERVICE TRUCK
L DOCK
s' TOWN OF MAIL
J CONFERENCE
16." S F-
i El•hs4'
4~J
0
Ya
Jll~-
y
.
SKIER &SHORT
TEAM EMIT E-
\
y
y
?
y
%
F
WS
RE7AIL
W-PURCHASING/
RECEIVING
CAFE TRANSIT STATION ,
M.SA S.F.
EL•hs4'
P WB-40 truck at first bay
VALET RAMP-)
L3 a a U
4 ~
II
a
y
SKIER&SHORT
TEAM EMIT F-
\
y
y
y
TO.OFVAIL
s '
- J CONFERENCE
FER
i EL-SIKH
CAFE TRANSIT STATION ,
4.sosSF. I
~~pj~•.Q] EL-8111
I\ 1
WB-65 truck at fourth bay
4240 Project Plan Submittal
MEMORANDUM
LEVEL OF SERVICE APPROACH TO PARKING DESIGN
WALKER
MEMORANDUM WALKER
LEVEL OF SERVICE APPROACH TO PARKING DESIGN
PAGE 1
PAGE 2
5350 S. Roslyn Street, Suite 220
DATE:
May 19, 2008
Greenwood Village, CO 80111
To
Louis Bieker
AIA
V
i
694
303
6622
The goal for the Vail Lionshead project, with a large population of skier parking in the winter and visitor
:
,
.
o
ce:
.
Fax: 303.694.6667
and shopper parking in the summer, should be LOS B. Understanding the desire of our client to provide
COMPANY:
4240 Architecture Inc
www.walkerparking.com
a higher than average level of service, we strived for a design closer to LOS B+ or A% We have
ADDRESS:
3003 Lorimer Street
achieved this for most of the design criteria and exceeded it for some key elements, like the flow capacity
CITY/STATE:
Denver, CO 80205
of the system or the speed with which people are able to enter and exit the facility. Let's review the
CC:
Benjamin Gray - 4240 Architecture
individual components.
HARD COPY TO FOLLOW:
Yes
Parking stalls in the public areas are typically 9'-0" wide by 18'-0" deep, and the two-way drive aisles
FROM:
Larry W. Hofmockel
are 24'-0" wide. All stalls are "full size"; there are no "compact only" parking stalls. This equates to an
PROJECT NAME:
Vail Lionshead Redevelopment
overall parking module of 60'-0". WPC's LOS A is 61'-6", and LOS B is 59'-9", so this design is about
an LOS B+ for parking geometry.
PROJECT NUMBER:
23.7076.00
SUBJECT: Level of Service Design
The following memo addresses recent questions raised about the overall level of service provided by our
proposed design of the parking areas associated with the Vail Lionshead Redevelopment project.
In 1989 Walker Parking Consultants (WPC) pioneered an approach to parking design termed the "Level
of Service" (LOS) approach. Prior to this time parking designers used a number of "rules of thumb" for
various elements of functional design. The LOS approach recognizes that different types of users
(employees, visitors, patients, shoppers, residents, etc.) have varying needs related to their parking
experience, and a more customized approach to parking design better serves the needs of an owner's
specific clientele at an appropriate cost to the owner.
Along the some lines as a traffic engineer's approach to roadway and intersection design, WPC
developed four levels of service (LOS A to D, high to low) for a host of key design parameters essential to
good parking planning. LOS B generally applies to facilities used by infrequent porkers unfamiliar with
the particular venue they're attending (visitors, patients, shoppers, etc.) and where parking spaces turn
over multiple times throughout the day (short-term parking). LOS C applies where people frequent the
some facility on a regular basis (employees, residents, etc.) and where spaces may be occupied by the
some vehicle all day long (long-term parking). LOS A might be considered by a few owners wanting to
provide a very high level of service for their clientele, such as casinos, theme parks, high end condos,
etc. LOS D is generally not recommended, but is sometimes used by developers needing to achieve a
high parking count at a low cost or by an owner whose property just is not of a size to allow more
comfortable parking design.
LOS design parameters include such things as stall width, clear height, ramp slope, walking distances,
lighting levels and a host of other criteria. Each of these can individually be categorized into LOS A, B,
C or D. While the owner and parking designer's overall goal will be a certain level of service, it is rare
that any facility will or can achieve the same LOS for each design parameter. For example, an airport
may provide an LOS A or B design for almost all criteria, but it may not be economically feasible to
provide a large enough toll plaza with enough staffed exit lanes to limit the wait time to an LOS A or B
level.
M:\21014 • Vail Lionshead Park ing\Received\WaIkerPorking\20080521 \MEM051908-Vail Lionshead LOS Approach.doc
parking report
By using the express ramp concept to circulate between parking floors, all parking stalls are on "flat"
(except for gentle slopes for drainage) floors. LOS A is 90% on the flat, so this project is LOS A+ from
that perspective.
The number of spaces per floor in an express ramp design is an indication of the time it will take to
search for and find an available parking space. Parking Level G4 contains about 600 stalls, Level G5
about 700 and level G6 about 400. LOS B is 500 stalls for 90 degree parking, and LOS C is 750, so
this project is about an LOS B- or C+ on the two larger floors and an LOS B+ on Level G6.
Long uninterrupted rows of parking are a more efficient use of space, but they tend to increase the time to
search for available parking and also the time to circulate back to the exit. Parking rows longer than
400' should contain a "crossover" to be able to "short circuit" the drive between parking rows. The
north/south parking rows in our design are typically about 270' long on Levels G4 and G5. LOS A is
250', and LOS B is 300', so we are at LOS B+. The two east/west parking rows on level G6 are nearly
500' long, and we should consider adding a crossover at this level.
The floor-to-floor height between parking levels is 11'-0". Depending on the final structural design, that
should result in an internal clear height of about 8'-6" to 9'-0". A minimum of 8'-2" is required to
accommodate accessible van parking. LOS A clear height is 9'-0", and LOS B is 8'-4". Our design is
again in the LOS B+ range.
The slope of the express ramps from the street to the first parking level and between the parking levels is
in the range of 14%. LOS C is 13.3 a/o-, and LOS D is 16%, so this design is about LOS C- for ramp
slope. The ramp is a little steeper than we would prefer, be we are limited by the length of the garage
available to achieve the straight cascading ramp concept that is desired to most efficiently move the large
volume of vehicles expected. To achieve an LOS B ramp slope of 10.67% would require changing to a
"stacked" system of express ramps where ramps between levels are stacked over top of each other and
drivers must circulate each floor to get back to the next ramp up or down. Another alternative could be a
spiral helix concept similar to what is seen at some large airport parking structures. The straight
cascading express ramp is superior to these other alternatives in terms of quickly moving vehicles in and
out, and it's my opinion that an LOS C- slope is a minor inconvenience to achieve this superior design.
M:\21014 • Vail Lionshead Park ing\Received\WolkerParking\20080521 \MEM051908-Vail Lionshead LOS Approach.doc
Z);Z+77
;Va7&r y spz ~ / zm&lf & no-"
tt': 4240 Project Plan Submittal
page 12
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership t1111
MEMORANDUM WALKER
LEVEL OF SERVICE APPROACH TO PARKING DESIGN
PAGE 3
The current design incorporates two separate express ramps, one from the east and one from the west.
Both ramps have one inbound and one outbound lane. The flow capacity of an unobstructed straight
express ramp is 1,850 vehicles per hour (vph). The total public parking count is about 1,800 stalls on
levels G3 (short-term) and G4/5/6 (long-term). The Kimley-Horn traffic study projected the highest
volume condition as 775 vehicles entering from the east in the peak hour. Clearly our express ramp
concept can easily accommodate this volume. The flow capacity of the primary ramp system is LOS A.
When partial level G6 was recently added to increase the total parking stall count, we did have to use a
stacked ramp concept between G5 and G6 because there was not enough space to continue the
cascading ramp. We have provided as short a circuit as possible to get off on Level G5 and circulate
around to the express ramp down to G6. This will increase the travel time slightly for patrons who park
on G6, however G6 likely will be the last parking stalls to get used and only when the garage is at or
near full capacity. People who park on Level G6 probably have an LOS B experience in terms of their
travel time in their vehicle, where people parked on G4 or G5 have an LOS A experience.
Our design uses a pay-on-foot operation where the long-term public porkers will pull a ticket at one of the
entrance lanes before proceeding to park on levels G4/5/6. After a day of skiing or shopping and
prior to returning to their car, patrons pay for their parking at one of several pay stations conveniently
located throughout the development. Then the validated ticket is used at one of the exit lanes to open the
exit gate and let you onto the express ramp out. Enough entrance and exit lanes are provided at the
various levels such that the queue of vehicles waiting in line at peak times does not exceed six vehicles,
and the average queue throughout the day is two vehicles or less. Ticket verifying machines at the exits
have a processing rate of 360 vph or six per minute. The longest anyone should have to wait in line to
process through an exit gate and get onto the express ramp is a minute or two. The entering and exiting
process is an LOS A as currently planned.
There are several banks of elevators spaced throughout the parking floors. A walking distance of 300'
from anywhere in the garage to an elevator equates to an LOS A, and 600' is LOS B. I estimate about
90% of the parking area is within 300' of an elevator bank, and 100% is within 350'. 1 believe this
criterion qualifies as LOS A%
The final design parameter presented here is the lighting level inside the garage. For safety and security
reasons and for the overall comfort level of the patrons, we plan to provide LOS A lighting in the typical
parking areas, which is 4 foot-candles minimum illuminance and 10 foot-candles average illuminance,
with higher levels used at other key locations like entry/exits, pedestrian towers, pedestrian cross walks
and the like.
So these are the primary design criteria, and as one can see, most fall into the range of LOS A to LOS
B+. The two exceptions are the number of parking stalls on Level G5 and the express ramp slope, both
of which are in the LOS C range. None of the design parameters are LOS D. To sum it all up and give
the parking an overall rating, it's my opinion that this project overall rates LOS B+.
M:\21014 • Vail lionshead Parking\Received\WalkerParking\20080521 \MEM051908-Vail lionshead LOS Approach.doc
parking report
MEMORANDUM WALKER
TRUCK DOCK REVIEW
PAGE 1
5350 S. Roslyn Street, Suite 220
DATE:
May 21, 2008
Greenwood Village, CO 80111
TO:
Louis Bieker, AIA
Voice: 303.694.6622
COMPANY:
4240 Architecture Inc
: 303 667
Fax
www.walkerpararkinking.com
ADDRESS:
3003 Larimer Street
CITY/STATE:
Denver, CO 80205
CC:
Benjamin Gray - 4240 Architecture
HARD COPY TO FOLLOW: Yes
FROM:
Larry W. Hofmockel
PROJECT NAME:
Vail lionshead Redevelopment
PROJECT NUMBER:
23.7076.00
SUBJECT: Truck Dock Concept Design
Per your request, we reviewed the concept level plan prepared by 4240 Architecture of the truck dock
area located north of the west vehicular entry/exit portal on level G2. While we do not consider
ourselves truck dock experts, and we recommend you eventually have this reviewed by another consultant
more experienced in this field, Walker Parking Consultants (WPC) does have a commercial software
package called "AutoTurn" by Transoft Solutions that contains the ability to check turning maneuvers for
all kinds of vehicles, including various sizes of trucks.
We emailed to Ben on May 5 some visual representations of truck maneuvers in and out of the proposed
loading dock area. A hard copy of those is attached. There are six truck bays proposed in the current
dock configuration. For purposes of this memo, I will label those 1 to 6, south to north.
It appears that a semi tractor trailer as large as a WB65 (73.5' length) should be able to maneuver in
and out of Bay 2 if there is a smaller truck in Bay 1 and a large truck in Bay 3. A WB65 should be able
to maneuver in and out of Bays 3, 4 and 5 even if there are large trucks in the adjacent bays. A WB65
should be able to maneuver in and out of Bay 6 if there is a small truck in Bay 5.
Bay 1 will be limited to smaller trucks, WB40 (45.5' length) or shorter, due to the lack of maneuvering
room next to the automobile exit ramp.
We did identify a minor issue with the truck entry ramp from the west. It appears as currently laid out,
the curve in the ramp is too tight and too narrow to allow a WB65 truck. However, it appears that a
slight adjustment in the layout of the auto and truck ramps at the west portal can be made to allow more
maneuvering room.
M:\21014 -Vail lionshead Pork ing\Received\WalkerParking\20080521 \MEM052108-Vail Lionshead Truck Maneuvers.doc
V R.9#77
13 L R1-I 4240 rroject Plan Submittal
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership page ~
Kimley-Horn Mr. Greg Hall, Town of Vail, May 5, 2003, Page 2
~ Kimley-Horn
and Associates, Inc. and Associates, Inc.
Technical Memorandum
To: Greg Hall, P.E.
Town of Vail
From: Curtis Rowe, P.E., PTOE
Kimley-Horn and Associates, Inc.
Date: May 5, 2008
Subject: Lionshead Parking Structure Redevelopment Project
Porte Cochere Traffic Analysis
The Lionshead Parking Structure Redevelopment Project is a proposed mixed-
use development located along the south side of the South Frontage Road at the
existing Lionshead Parking Structure site in Vail, Colorado. The redevelopment
project would include replacement of the existing parking structure with a new
parking structure below grade and new development above. The redevelopment
project is proposed to include two (2) hotels with 120 rooms each, 146 units of
condominiums, approximately 75,000 square feet of retail space, and a 42,000
square foot community center. In addition, public skier drop-off, buses, and
delivery vehicles would be accommodated below grade as part of the parking
structure improvements.
The purpose of this technical memorandum is to evaluate the adequacy of the
proposed porte cochere for the Lionshead Parking Structure Redevelopment
Project to determine its ability to accommodate arriving/departing vehicles. The
porte-cochere will be used by the hotel and condominium guests for
registration/check-in and check-out. Peak hour of the generator trip generation
calculations were conducted for these two uses to determine the peak traffic
volume anticipated at the porte-cochere during the peak hour. Based on the ITE
Trip Generation equations (calculations attached), the hotel and condominium
uses are anticipated to generate 218 trips during the peak hour of the generator, in
which 120 vehicles would be entering and 98 exiting. Since there will be
effectively two porte-cochere operations occurring, the entering traffic was
divided equally for each hotel porte-cochere.
Studies and observations were conducted at porte cocheres within Las Vegas,
Nevada at resort hotel and timeshare condominiums. It was found that the
average check-in/registration time was 2 minutes and 40 seconds at these
port. cochere analysis
VR477
facilities. For purposes of this evaluation, average wait times within the
registration/check-in area was assumed to be three minutes. Based on an average
registration/check-in time of 3 minutes, the 60 vehicles per hour entering each
porte cochere were found to require 75 feet of vehicles storage (3 passenger
cars). Therefore, the proposed approximate 100 feet of storage for each hotel
porte cochere is believed to be adequate to serve the hotel and condominium
guest demand. In fact, as long as the registration/check-in time average is less
than 4 minutes, the amount of storage proposed on site is expected to be
adequate.
This analysis resulted in the following recommendations:
Since separate porte cochere operations are proposed for each hotel, it is
important that the areas be well designated and signed for the arriving guests.
Average wait times for vehicles at registration/check-in should be minimized
with a goal of providing service within an average of 3 minutes. As
identified, an average wait time of less than 4 minutes is anticipated to be
sufficient service for adequate operations of the porte cochere.
The access in from the eastbound left turn along the South Frontage Road
and the left turn out should be configured so that they are in close proximity
to each other to facilitate improved operations and vehicle movements at the
proposed access along the South Frontage Road. The proposed porte cochere
configuration is shown on the attached exhibit.
Pai&q Srh ~ / Zaa&,ej~ & Z)&~zeV ~7 - &A&4n 5
page 14
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership 424 Project Plan Submittal
M / 1 and Associates, Inc.
Project _
Subject _
Designed b3
Checked by
Lionshead
Peak Hour
king Structure Redevelopment Porte Cochere
Generator for Residential Condominiu
CDR
Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 7th Edition, Average Rate Equations
Land Use Code - Residential Condominium/Townhouse (230)
Independant Variable - Dwelling Units (X)
X = 146
T = Average Vehicle Trip Ends
Peak Hour of Generator, Weekday PM Peak (page 371)
Directional Distribution: 64% ent. 36% exit.
T = 0.52' X T = 76 Average Vehicle Trip Ends
T = 0.52 ` 146.0 49 entering 27 exiting
49 + 27 = 76
Land Use Code - Resort Hotel (330)
Independant Variable - Occupied Rooms (X)
X = 240
T = Average Vehicle Trip Ends
Peak Hour of Generator, Weekday PM Peak (page 371)
Directional Distribution: 50% ent. 50% exit.
T = 0.59 ` X T = 142 Average Vehicle Trip Ends
T = 0.59' 146.0 71 entering 71 exiting
71 + 71 = 142
Total Peak Hour of Generator Trip Generation Through Porte Cochere
In Out Total
146 Condominiums 49 27 76
240 Hotel Rooms 71 71 142
Total 120 98 218
porte cochere analysis
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
Z);ZA?;77
page 15
4240 .-roject Plan Submittal
P,q,.49r (04PIZOP08
&40~ 6
The Open Hospitality Partners & Hillwood Capital [Open I Hillwood] Partnership
view from public square
IF
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
DR,477
page 1
? - &A&rm 06
4240 -'roject Plan Submittal
/ /
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
VRW77
page 2
Ca
.10
?gat - &O&t 06
- - 4240 Project Plan Submittal
visitors and employees coming to lionshead by regional bus will arrive at a defined portal
instead of the current "back door" on Lionshead Place"
Lionshead Redevelopment Master Plan 4.5.2.1
- - - - - - - - -
' /1 ~eco-bus shuttle drop-off
-I F-71 L_
C' rill
a,
U 0
M
W
stair/elevator
servicing
parking below
RETAIL
- ~1
To Mountain and Retail
user flow / plan adjacencies
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
Z);ZO?7?
page 3
sµ~
elevator servicing porte
cochere level to G3
(short-term parking
RETAIL
ut
Reteffl and Dobson Arena
PEDESTRIAN
MOVEMENT
06
4240 !project Plan Subrnittal
M
circulation to/from transit station
LionsHead Parking Structure Pedeveloprnenr The Open Hillwood Partnership
V;Z.4707
page 4
a ~
4
d
1-
PORTE
~pp,~~ ♦ COcHERE
A I A91
CONFERENCE
?uada &x~ - &4#rm 06
4240 Project Plan Submittal
sectional view / circulation core
V;Z477
&14A~ od
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership page 5 1 y11~ 4240 Project Plan Submittal
Feature wall to
introduce natural
daylight and texture
to the lower levels
of the parking
garage
I
ossible feature wall elements
feature wall
LionSHead Parking Structure Ptedeveiopmen The Open I Hillwood Partnership
Z);Z.477
page 6
06
4240 -'roject Plan Submittal
!j
-The Transit
Station will be clean
and simple, utilizing
white subway the
walls similar to
traditional train and--
bus stations
throughout Europe
and the United
States.
-Natural light will
penetrate through
the storefront
glazing in the Cafe
and waiting area.
-Ventilation systems
will be designed to
eliminate exhaust
and fumes from the
station.
transit arrival
Bus and ho tel van drop-o f f is in tegra ted into the below grade parking garage in order to alle via to
vehicular traffic in the pedestrian oriented areas of Lionshead...
"The congested and confused main Lionshead pedestrian portal is the most in need of corrective action... vehicular traffic, skier
drop-off, local and regional shuttle vans, and service and delivery vehicles should be removed from this location"
Lionshead Redevelopment Master Plan 4.6.3.3
LionsHead Parking Structure Redevelopment The Open I Hillwood Partnership
r);Zj?;7?
page 7
- 06
- ' 4240 Project Plan Submittal
Glass block floor above to allow
light to penetrate Transit
Station..:
ib~
I
L
" r
L
view to eco-bus drop-off beyond
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
V;Z4577
page 8
ti
?uuja &,arm - &40t,Qti 06
LL.Kt, ` M %v,! k" ul 4240 Project Plan Submittal
LionsHead Parking Structure Redevelopment The Open Hillwood Partnership
f);ZW?;7?
page 9
4240
&WZm 06
Project Plan Submittal
view to main plaza and mountain beyond