Loading...
HomeMy WebLinkAbout2023-02-07 Agenda and Supporting Documentation Town Council Afternoon Meeting Agenda1.Presentation/Discussion 1.1 VLHA Semi-Annual Update on Housing 30 min. Listen to presentation and provide feedback. Presenter(s): George Ruther, Housing Director and members of the Vail Local Housing Authority Background: The purpose of this agenda item is to present the housing results delivered during the second half of 2022 and to provide an overview of the housing solutions to be pursued by the Vail Local Housing Authority and the Town’s Housing Department in the first half of 2023. 1.2 Eagle County Housing Policy and Land Use Report 45 min. Listen to presentation and provide feedback. Presenter(s): George Ruther, Housing Director Background: In the spring of 2022, the Towns of Avon, Eagle, Gypsum, Minturn, Red Cliff and Eagle County government collaborated and funded the completion of the 2022 Eagle County Community Housing Inventory & Assessment. The objective of the assessment was to inventory properties located within the Towns and County which may have the potential for future resident housing development and to articulate the policies adopted for housing, respectively. The purpose of this agenda item is to present the conclusions and findings of the recently completed 2022 Eagle County Community Housing Inventory & Assessment. 1.3 Timber Ridge Redevelopment Committee Update 45 min. Listen to presentation and provide feedback. Presenter(s): George Ruther, Director of Housing Background: Update the Vail Town Council on progress made by the Redevelopment Committee since the earlier update on December 6. VAIL TOWN COUNCIL MEETING Afternoon Session Agenda Town Council Chambers and virtually via Zoom Zoom Meeting Link: https://us02web.zoom.us/webinar/register/WN_mL0aXa7fRJuBbehNuOJkig 12:30 PM February 7, 2023 Notes: Times of items are approximate, subject to change, and cannot be relied upon to determine what time Council will consider an item. 2023 Semi Annual Update on Housing Outline 02072023.docx 2022 Eagle County Land Inventory and Assessment Report Memorandum 02072022.docx 2022 Eagle County Workforce Housing Inventory & Assessment Presentation_Vail.pdf 1 1.4 Formal Naming Process for Public Spaces 15 min. Listen to presentation and provide feedback. Presenter(s): Kathleen Halloran, Deputy Town Manager and Lori Barnes, Director of Library Services Background: Since the incorporation of the Town of Vail in 1966, various parks, buildings, plazas, streets, and other landmarks have been named to recognize the contributions of Vail’s dreamers, builders, trailblazers, and other influences that have drawn upon Vail’s alpine setting and European roots. In anticipation of future naming opportunities, the following guidelines have been established to not only reflect practices of the past, but to provide a formal structure for future decisions. 1.5 Strategic Planning Session Recap 20 min. Listen to presentation and provide feedback. Presenter(s): Russell Forrest, Town Manager Background: On January 17, 2023 the Council met to identify high priority goals for 2023. The purpose of this discussion is to review language for those four goals and ensure that the wording meets Council’s expectations. Also provided is a matrix which includes the 27 projects identified in the Council action plan. This includes an updated time frame and status for each action. 1.6 Peer Resort and Global Friendship Exchange Discussion 20 min. Listen to presentation and provide feedback. Presenter(s): Mia Vlaar, Director of Economic Development Background: For many years, the town has taken trips to resorts around the country and around the world in order to learn more about best practices pertaining to a variety of key topics of mutual interest. Many of these trips are reciprocated when the peer resort community decides to visit Vail with the same purpose in mind. 1.7 Gore Creek Promenade Renewal Update 20 min. Listen to presentation and provide direction. Presenter(s): Todd Oppenheimer, Capital Project Manager and Gregg Barrie, Senior Landscape Architect Background: The Gore Creek Promenade is a popular public park located in the heart of Vail Village. The last major renovation to this space occurred nearly thirty years ago. The existing features of the Promenade are showing significant wear and tear that has become more and more difficult to Timber Ridge Redevelopment Committee Update 02072023.docx Timber Ridge II concept pricing set 1-15-23.pdf 230207 Naming Memo.docx Naming_ExhibitA.pdf Strategic Planning Session 020723 goals.docx Town Council Action Plan (1).xlsx Council Memo Peer Resorts 2-7-2023.pdf 2 maintain at a high level of quality. With that in mind, town staff has initiated a public input process and drafted Project Goals and Objectives for review by the Town Council. 2.DRB / PEC (5 min.) 2.1 DRB / PEC Update 3.Information Update 3.1 November 17, 2022 VLMDAC Meeting Minutes 3.2 January 4, 2023 CSE Meeting Minutes 3.3 January 10, 2023 VLHA Meeting Minutes 3.4 EHU Compliance Status Update 3.5 January Revenue Update 4.Matters from Mayor, Council and Committee Reports (10 min.) 5.Executive Session (90 min.) Executive session to: (1) have a conference with the Town Attorney to receive legal advice on specific legal questions, pursuant to C.R.S. § 24-6-402(4)(b); (2) to determine positions relative to matters that may be subject to negotiations, develop a strategy for negotiations, and/or instruct negotiators, pursuant to C.R.S. § 24-6-402(4)(e); and (3) to consider the purchase, acquisition, lease, transfer or sale of real, personal or other property, pursuant to C.R.S. § 24-6-402(4)(a); all on the topic of the acquisition of property described as East Vail Workforce Housing Subdivision, Lot 1; East Vail Workforce Housing Subdivision, Tract A, and generally referred to as the Booth Heights Land Site; and Executive session to: (1) have a conference with the Town Attorney to receive legal advice on specific legal questions, pursuant to C.R.S. § 24-6-402(4)(b); (2) to determine positions relative to matters that may be subject to negotiations, develop a strategy for negotiations, and/or instruct negotiators, pursuant to C.R.S. § 24-6-402(4)(e); and (3) to consider the purchase, acquisition, lease, transfer or sale of real, personal or other property, pursuant to C.R.S. § 24-6-402(4)(a); all on the topic of the acquisition of property that cannot be further described without compromising the purpose of the executive session; and Executive session to: (1) have a conference with the Town Attorney to receive legal advice on specific legal questions, pursuant to C.R.S. §24-6-402(4)(b) to hold a conference with the Town Attorney, to receive legal advice on specific legal questions, and C.R.S. §24-6-402(4)(e) to determine positions relative to matters that may be subject to negotiations, develop a strategy for negotiations, and/or instruct negotiators on the topic of pending litigation, Town of Vail v. TIGA Advertising, Inc. and Gregory Moffet, case number 21CV30034 Gore Creek Promenade Renewal TC Memo 2-7-23.pdf Gore Creek Promenade Renewal PP 2-7-23.pdf DRB Results 1-18-23.pdf PEC Results 1-23-23.pdf VLMDAC_Minutes_FINAL_November_17__2022.pdf 010423 CSE Meeting Minutes.pdf 2023-1-10_VLHA_Minutes.pdf EHU Compliance Status Update Memo 02072023.pdf 230207_Revenue_UpdatesFinal.pdf 3 6.Recess (5:30pm estimate) Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website www.vailgov.com. All town council meetings will be streamed live by High Five Access Media and available for public viewing as the meeting is happening. The meeting videos are also posted to High Five Access Media website the week following meeting day, www.highfivemedia.org. Please call 970-479-2136 for additional information. Sign language interpretation is available upon request with 48 hour notification dial 711. 4 AGENDA ITEM NO. 1.1 Item Cover Page DATE:February 7, 2023 TIME:30 min. SUBMITTED BY:Martha Anderson, Housing ITEM TYPE:Information Update AGENDA SECTION:Presentation/Discussion SUBJECT:VLHA Semi-Annual Update on Housing SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):George Ruther, Housing Director and members of the Vail Local Housing Authority VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 2023 Semi Annual Update on Housing Outline 02072023.docx 5 75 South Frontage Road West Housing Department Vail, Colorado 81657 970.479.2150 vailgov.com MEMORANDUM To:Vail Town Council From: Steve Lindstrom, Chair, Vail Local Housing Authority George Ruther, Housing Director Date:February 7, 2023 Re:2023 Semi-Annual Report - Delivering on Housing in Vail I.PURPOSE The purpose of this agenda item is to present the housing results delivered during the second half of 2022 and to provide an overview of the housing solutions to be pursued by the Vail Local Housing Authority and the Town’s Housing Department in the first half of 2023. Despite facing increasing headwinds from rising interest rates and the hangover of unprecedented growth in real estate values in 2022, the Vail community is making substantial progress towards achieving its adopted housing goal and will pursue numerous strategic actions going into 2023. Vail Local Housing Authority is highly optimistic leading into 2023 II. PRESENTATION TOPICS The following outline highlights the topics to be presented: A. Re-engage VailHOMEPartners initiative Schedule a special worksession meeting with the Vail Town Council and the Vail Local Housing Authority to engage on policy direction and strategies for delivering on housing. Visioning – what is going to be different in 5 to 7 years? What results will the community see? Schedule housing policy discussions with our down valley partners to strengthen relationships, identify partnership opportunities, and understand differences in housing policies and approaches. 6 Town of Vail Page 3 B. Vail InDEED - 2022 Year in Review The Vail InDEED program was impacted by the rise in interest rates with a decrease in the total number of deed restrictions acquired. Total Housing Investments made in 2022 - $582,007 Total number of deed restrictions acquired in 2022 – 4 Cost per deed restriction - $145,501.75 Cost per square foot - $101.57 Cost per bedroom - $48,500.58 Estimated total number of Vail residents provided homes since inception – 584.5 C. Funding Creates Deed-Restrictions State/Federal grant and loan opportunities o Governor Polis, Senator Roberts, Representative Lukens o Over-subscribed and under-funded o Proposition 123 Tax exempt bonds o Revenue bonds o Public activity bonds VLHA as bond issuer o Lessening the burden of the Town of Vail o Municipal Capital Market Partners o SB Clark Municipal Advisors D. Projects Eagle County Inventory of Land Availability for Housing Report Town of Vail Internal Employee Housing Program ( o Vail Heights #10 o Vail Heights #7 o Hamlet Chalets o Vail East Lodging o Homestake at Vail o Buffer Creek Condominiums o Pitkin Creek Condominiums Update commercial linkage and adopt residential linkage o April 1 – June 30 E. Developments East Vail CDOT Parcel o Disposition approved by Colorado Transportation Commission o Appraisals complete o Final Subdivision 7 Town of Vail Page 3 o Preliminary program/uses conceptual design underway o Purchase contract being drafted West Middle Creek Parcel o Continuing site feasibility and conceptual design Geotechnical investigation pending weather Civil engineering Utility layout and design CDOT ROW acquisition under consideration Contracting appraisal Preliminary subdivision mapping Topographic survey and Alta survey pending weather o Rezoning and final subdivision complete Timber Ridge Village Apartments Redevelopment o Public/Private partnership with Triumph Development o Preliminary program and uses defined o Development deal is being negotiated o Relocation and displacement planning underway o CDOT ROW acquisition under consideration o Preliminary pricing and budget development o Construction start scheduled for May, 2024 Traer Creek Parcels o Exploratory discussions underway Eagle-Vail State Land Board Parcel o SB23-001 o Master site planning and opportunity analysis o Collaborating with down valley partners o Exploratory discussions underway F. Initiatives Zoning and Development Review Process Reform - Housing Policy #5 o Top priority of the VLHA o No cost/risk to the taxpayer with substantial benefits to achieving the housing goal Develop strategies for Real Property Acquisition o Adopted seven strategies for consideration when pursuing real property acquisitions Housing Lottery opportunities o Adopted amended lottery ticket eligibility criteria o Results in greater fairness, consistency, and credibility Destination Stewardship Plan participation o West Vail Master Plan zone district objectives o No net loss of non-deed restricted homes for locals in redevelopment proposals o Amnesty program to maintain non-compliant homes 8 AGENDA ITEM NO. 1.2 Item Cover Page DATE:February 7, 2023 TIME:45 min. SUBMITTED BY:Martha Anderson, Housing ITEM TYPE:Information Update AGENDA SECTION:Presentation/Discussion SUBJECT:Eagle County Housing Policy and Land Use Report SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):George Ruther, Housing Director VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 2022 Eagle County Land Inventory and Assessment Report Memorandum 02072022.docx 2022 Eagle County Workforce Housing Inventory & Assessment Presentation_Vail.pdf 9 75 South Frontage Road West Housing Department Vail, Colorado 81657 970.479.2150 vailgov.com MEMORANDUM To: Vail Town Council Vail Local Housing Authority From: George Ruther, Housing Director Date: February 7, 2023 Re:2022 Eagle County Community Housing Inventory & Assessment Presentation I.Purpose The purpose of this agenda item is to present the conclusions and findings of the recently completed 2022 Eagle County Community Housing Inventory & Assessment. II. Background In the spring of 2022, the Towns of Avon, Eagle, Gypsum, Minturn, Red Cliff and Eagle County government collaborated and funded the completion of the 2022 Eagle County Community Housing Inventory & Assessment. The objective of the assessment was to inventory properties located within the Towns and County which may have the potential for future resident housing development and to articulate the policies adopted for housing, respectively. The team at Contour Design Collective competed in the RFP process for consultant selection and was retained by the Towns and County to complete the prescribed scope of work. The conclusions and findings from the work are now available for use to help guide and frame the decision-making process when seeking future housing solution opportunities and Town and County partner collaborations. III. Conclusions and Findings The following conclusions and findings can be derived from the inventory and assessment work: 10 Town of Vail Page 2 There are a significant number of parcels throughout the Towns and County that have development potential – as might be expected, however, many of these parcels have issues that would need to be overcome to be feasible. An accurate count or central database of housing parcels within the Towns and County, (both deed-restricted and market properties) would help the entire region understand how effective we have been at addressing the problem as well as what additional work needs to be done. Currently, some Towns track this individually (Vail, Avon, Eagle County) but we were not able to find a comprehensive database (that is regularly maintained) which would be very useful. Updates could also be compared to the 2018 Eagle County Needs and Solutions Study. Although advances have been made, all of the partners need to continue to look for more holistic solutions to the housing crisis. Not all of the employees live in the same community where they work, yet communities are taking individual approaches to addressing housing which may be more effectively addressed on a regional level. 11 2022 Eagle County Community Housing Inventory & Assessment CONTOUR DESIGN COLLECTIVE An inventory of current community housing and future expansion opportunities in Eagle County and a review of current guidelines and strategies affecting supply 12 Project Sponsor: Town of Avon Timing:RFP released in the spring of 2022 RFP Goals: •Comparative analysis of adopted housing policies and strategies within the region •Consult with partner communities to identify adopted housing policies and strategies for increasing the supply of community housing to meet the needs of each of the jurisdictions •Inventory of real property in Eagle County with potential for development as community housing •Research vacant, undeveloped real properties, or lands with redevelopment opportunities both publicly and privately held, that are within the partner communities as well as within one mile of existing bus stops, Highway 6 and I-70 in Eagle County •Identify community housing solution partnerships and opportunities for additional regional collaboration 13 Housing Policy Comparison General Policy Goals -provide immediate and long-term solutions to increasing the supply and affordability of homes for year-round residents living and working within Eagle County •Average prices in the County are well above what a family making the median income or those making well above the median can afford, creating a large affordability gap: •Eagle County’s location as a highly sought-after mountain resort area •Lack of readily available new land for development •Proliferation of short-term rentals •Difficulty in permitting and developing new projects •Neighborhoods closest to Vail and Beaver Creek typically have higher market prices and a more significant delta to what is affordable to the workforce. •Down valley communities are less dense, have more land available for additional development, and can still produce housing at prices within a closer reach of the local workforce. •Downside to affordability and location is the environmental offsets of having housing down valley and employment centers up valley. •the impacts felt from traffic •having a dependable workforce of different income levels in proximity to job centers •Variability of housing needs is reflected in the goals, land use policies, and workforce-related land use code requirements of each community; •Local variability, does not align with the reality that the County is one region, and all jurisdictions are largely dependent upon each other 14 Housing Policy Comparison •Areas feeling the most pressure (Vail, Avon and the County itself) = most stringent and comprehensive policies. •Considerably more resources than many of the other communities, allowing them to expend more resources to address the housing issue. •Red Cliff and Gypsum do not have any community housing polices and have let the natural market work within their jurisdictions (due to either location, available land resources or other circumstances) •Minturn and Eagle have code requirements for residential development but lack similar requirements for commercial development, nor have they adopted additional programs that some of the other communities have instituted. •This is likely both by design (to attract income generating commercial revenue) and necessity due to finite resources within these communities Yes 15 Housing Policy Comparison •Codes for residential and commercial projects based on formula applicable to projects with three or more units •Allow community housing in Industrial / Commercial Zones •Development bonus mechanism in Title 7 Development Standards •Deed Restriction Program –Mi Casa (35 units to date) •Funding: 2% tax on STRs –2% transfer tax on units that are not primary residences •Code Requirements only for residential Projects (no Community Housing required for commercial projects) •Eagle requires 10% of residential projects to be protected as Community Housing •Minturn requires 20% of residential projects to be projected as Community Housing •No Community Housing Code Requirements in either Gypsum or RedCliff 16 Housing Policy Comparison •The County, with greater funding, is a resource for each community and often collaborates or even operates programs for individual communities •Valley Home Store •serves as an information hub for deed restricted units throughout the county, •assists buyers and sellers in the purchase and resale of deed restricted homes, •consults with the local municipalities on policy, compliance, and best practices. •Four main Strategies 1.New Construction of Deed Restricted Housing for Owners and Renters •Affordable housing guidelines and code requirements 2.Better Utilize Current Stock of Developed Real Estate •Good Deeds –convert existing unrestricted to deed restricted •Rent Local Program –rental incentive program •Aid for ADU’s –create deed restricted ADU’s 3.Down Payment Loans and other Assistance programs •Down Payment Assistance Programs –Eagle County Load Fund, Eagle Ranch Housing Corp., Colorado Div of Housing Assist. •Locals First Program –a cash buy program to hope local residents competing with cash buyers •Rent for Locals –rental assistance for locally employed full-time, year-round renters 4.Education •Valley Home Store resources 17 Housing Policy Comparison •Homes for residents are seen as infrastructure -a community support system -not unlike roads, bridges, water and sewer and similar services delivered by municipal government •Vail Housing Department and the Vail Locals Housing Authority -advocate and advance the Town’s vision in ensuring the availability of homes for year-round Vail residents •Codes –inclusionary zoning –formulas for both residential and commercial projects •Deed Restriction Program –Vail InDeed (has acquired 170 units in the program) •Vail Housing 2027 –acquire 1000 new deed restricted units by 2027 •In total Vail currently has approximately 1050 deed restricted (rental and for sale units) in Vail 18 Housing Policy Comparison –Example Project To better understand the actual impacts of the various inclusionary housing codes we analyzed what inclusionary requirements a newly proposed mixed-use project consisting of: •100 residential units, •a restaurant and •a boutique hotel. •Town of Vail requires a developer to mitigate new residential development by providing 10% of the new Gross Residential Floor Area (GRFA) being developed as Employee Housing Units (EHU). •Commercial development has formulas to determine the number of employees generated by new development, which require the creation of EHUs to mitigate this impact. •The project above would require the developer to provide a total of 26 units to mitigate the impacts of development –the most comprehensive housing requirements in Eagle County •23,891 s.f.of GRFA (or 22 units) for the residential portion and mitigation for 11.7 employees generated by the commercial portion of the project (an additional 4 units) Yes 19 Geospatial Analysis Methods •Multi-step procedure to review and spatially analyze parcels and related data in a Geographic Information System (GIS). •Area of Interest for this study involved all parcels located within a 1-mile setback from Interstate 70, Highways 6 and 24, and all public bus stop locations within the County •First step in assessment of suitable community housing parcels involved identifying parcels as belonging to one of four broader categories, 1.existing community housing parcels, 2.currently developed parcels that could be re-developed for community housing 3.vacant parcels suitable to receiving community housing, 4.all remaining parcels that are either currently developed and/or occupied or otherwise deemed unsuitable to developing additional community housing •Develop a site suitability model to better inform parcel locations while also providing a consistent metric for scoring and ranking all parcels in consideration for community housing development. •Site suitability models are spatial models developed in a GIS that determine the best locations for a specific use given a set of user-supplied criteria for consideration 20 Geospatial Analysis Methods SITE SUITABILITY CRITERIA •Contour developed the initial criteria list and requested additional criteria for consideration from Partner Communities. •Responses were used to develop the final list of site suitability model criteria. •It should be noted that each community has varied individual priorities when assessing community housing and how and where it best fits within their individual community. •Model uses an average of the scores that were provided and do not necessarily reflect the priorities of each community. Criteria Sub-Criteria Criteria Weight Sub-Criteria Weight Proximity 0.5 To bus stop 0.24 To highways 0.15 To preschool or daycare 0.17 To elementary school 0.15 To middle or high school 0.10 To grocery store 0.12 To healthcare facility 0.07 Total 1.0 Development Potential 0.3 Developable slopes 0.44 Zoning 0.13 Within incorporated areas 0.17 Land ownership 0.26 Total 1.0 Environmental 0.2 Wetland and riparian areas 0.83 Critical big game habitats 0.17 Total 1.0 Total 1.0 21 Geospatial Analysis Findings Summary of existing community housing parcels in Eagle County Location Parcels Acres Avon 47 51.57 Eagle 55 26.33 Gypsum 476 99.12 Minturn 0 0 Red Cliff 0 0 Vail 199 115.69 Unincorporated Eagle County 231 99.12 Total: Eagle County CH Parcels 1008 391.83 22 Geospatial Analysis Findings Summary of community housing parcels and units planned, approved or under construction in Eagle County Location Parcels Acres Units Avon 2 9.3 64 Eagle 3 36.99 150 Gypsum 34 408.8 971 Minturn 0 0 0 Red Cliff 0 0 0 Vail 1 2.07 72 Unincorporated Eagle County 8 182.12 723 Total: Eagle County Planned/Approved WFH Parcels 48 639.28 1,980 23 Geospatial Analysis Findings Summary of parcels identified for potential redevelopment to support expanded community housing supplies with mean/minimum/maximum scores from the site suitability model SS Scores Location Parcels Acres Mean Min.Max. Avon 14 24.37 9.810 9.462 9.950 Eagle 1 2.10 9.476 9.476 9.476 Gypsum 0 0.00 NA NA NA Minturn 7 48.00 9.318 9.001 9.425 Red Cliff 0 0.00 NA NA NA Vail 1 17.26 8.645 8.645 8.645 Unincorporated Eagle County 6 20.72 9.324 9.114 9.627 Total: Eagle County Redevelop WFH Parcels 29 112.18 9.320 8.645 9.950 24 Geospatial Analysis Findings Summary of parcels identified as suitable for potential expanded community housing units in the study area with mean/minimum/maximum scores from the site suitability model. SS Scores Location Parcels Acres Mean Min.Max. Avon 19 267.85 9.380 8.363 9.875 Eagle 18 208.49 9.523 8.371 10.000 Gypsum 23 139.95 8.979 7.334 9.895 Minturn 4 96.88 8.543 8.435 8.642 Red Cliff 4 1.81 7.517 7.206 7.862 Vail 28 150.28 8.323 6.624 9.793 Unincorporated Eagle County 57 450.64 8.344 6.890 9.770 Total: Eagle County Suitable WFH Parcels 153 1,315.90 8.686 6.624 10.000 25 Geospatial Analysis Findings Vail Suitable Parcel Details SS Scores Ownership Parcels Acres Mean Min.Max. Private 18 36.13 8.593 7.266 9.793 Avon 10 114.15 7.838 6.624 9.257 Zoning Parcels Acres Mean Min.Max. R 2 26.49 7.361 6.807 8.454 RSM 5 11.34 8.574 8.147 8.849 Town 21 112.46 8.330 6.624 9.793 Vail Subtotal 28 150.28 8.323 6.624 9.793 26 Geospatial Analysis Findings Vail Top 10 Suitable Parcels SS Model Scores Developable Area Floodplain Wetlands Riparian Area Rank Parcel ID Mean Std. Dev. Owner Acres Acres % Acres % Acres % Acres % 1 210312119001 9.793 0.030 Private 0.72 0.72 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2 210312401022 9.658 0.058 Private 1.04 1.04 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3 210312314003 9.558 0.000 Private 0.30 0.30 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 4 210312402003 9.257 0.245 Town 3.19 3.16 99.2% 0.00 0.0% 0.00 0.0% 0.00 0.0% 5 210312100005 9.238 0.515 Private 0.96 0.87 90.9% 0.02 2.5% 0.13 13.5% 0.00 0.0% 6 210106300002 9.201 0.257 Private 1.37 1.37 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7 210301404003 9.118 0.221 Private 2.18 2.14 98.1% 0.03 1.6% 0.01 0.6% 0.00 0.0% 8 210314102027 8.849 0.467 Private 0.57 0.38 66.1% 0.00 0.0% 0.00 0.0% 0.00 0.0% 9 210312312040 8.842 0.484 Private 0.43 0.42 99.3% 0.00 0.0% 0.05 10.7% 0.00 0.0% 10 210314102028 8.729 0.246 Private 0.36 0.29 80.6% 0.00 0.0% 0.00 0.0% 0.00 0.0% 27 Geospatial Analysis Findings Vail Parcels 28 Questions Follow up 29 AGENDA ITEM NO. 1.3 Item Cover Page DATE:February 7, 2023 TIME:45 min. SUBMITTED BY:George Ruther, Housing ITEM TYPE:Presentation/Discussion AGENDA SECTION:Presentation/Discussion SUBJECT:Timber Ridge Redevelopment Committee Update SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):George Ruther, Director of Housing VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: Timber Ridge Redevelopment Committee Update 02072023.docx Timber Ridge II concept pricing set 1-15-23.pdf 30 To:Vail Town Council From:George Ruther, Housing Director Date:February 7, 2023 Subject:Timber Ridge Village Apartments Redevelopment Committee Update – Program and Uses, Preliminary Cost Estimate, & Next Steps 1.SUMMARY The purpose of this agenda item is to update the Vail Town Council on progress made by the Redevelopment Committee since the earlier update on December 6. This update will focus on the following topics: Program and Uses Preliminary Cost Estimate Next Steps 2.BACKGROUND Program and Uses The Committee contains to focus on Proposed Option C, as revised, in keeping with the direction instructed by the Vail Town Council. Revised Option C contains the following key elements: o Six buildings total (Buildings A – F) o 284 homes with 567 bedrooms o 278 total parking spaces (198 podium parking spaces and 80 surface parking spaces) for a parking ratio of 1.18 spaces per home o An added 40 parking spaces along Lions Ridge Loop with pedestrian stair access o Mix of studio,1, 2, 3, & 4 bedroom apartments o Roof top outdoor areas o Dog/bike wash o On-site leasing office o Estimated price tag of $135M - $145M total development cost o Alternate option for an additional building in the area of the CDOT right of way A seventh building (Building G) 36 additional homes with 69 additional bedrooms Mix of 2 & 3 bedroom apartments 38 additional podium parking spaces 31 Town of Vail Page 2 Preliminary Cost Estimate A preliminary cost estimate has been prepared for Revised Option C to determine the estimated total development cost. The preliminary estimate was prepared with the input of two general contractors - each with affordable housing development experience in a mountain environment. The following figures summarize the preliminary cost estimate: Total Square Feet - 393,000 gross sq ft. (256,000 net rent or 81% efficient) Land Cost - $0 Total Hard Cost - +/-$120M Total Impact Fees - $3.5M (water/sewer tap) Total Soft Cost - $11M Total Contingency - $7M Total Financing - $7M Estimated Total Development Cost Total Cost Cost/Home Cost/Foot +/- $148M $522,000 $377 The estimated cost per square foot is within +/-10% of the actual cost per square foot (+/-$355) of the Residences at Main Vail currently under construction. The reason for the difference in the estimated total development cost is driven by the size and scope of the Timber Ridge redevelopment. As proposed, the Timber Ridge development is approximately four times greater in size and scope than the Residences at Main. The Redevelopment Committee has done a good job of developing a program the achieves the adopted goals and objectives of the Timber Ridge redevelopment and is now focusing on developing an implementation plan that is financially feasible. A sizeable financial gap currently exists between the development cost and development revenue. As currently projected, based upon assumed rental revenue, there is likely to exist a +/-$75M financial gap which needs to be resolved. The Redevelopment Committee is currently meeting to explore opportunities to reduce the financial gap without compromising the intended development goals and objectives adopted by the Vail Town Council. A phased approach to development with creative solutions for financing is required. Next Steps/Follow Up The following next steps are underway to advance the redevelopment of the Timber Ridge Village Apartments: Meeting with CDOT representatives to share the Town’s interest in acquiring a ¾ acre sized portion of ROW immediately adjacent to the Timber Ridge parcel. CDOT has indicated the ROW parcel is likely to qualify for disposition. A disposition resolution is tentatively set for consideration by the Transportation Commission on March 15. Next steps include completing a preliminary plat, obtaining environmental clearances, and preparing a real estate appraisal to aid in the determination of value. The Town is likely to retain a consultant to assist in the acquisition process. Advance the civil design of the site based upon the proposed program and uses. The geotechnical report has been completed for the site. According to the report, the site is suitable for the proposed development program and uses. Opportunities exist to further refine the site grading and site elevations to avoid shallow bedrock and reduce the 32 Town of Vail Page 3 anticipated volume of soil export. Both opportunities have the potential to improve the overall site design and reduce the total development cost. A draft development budget based upon the proposed program and uses and current construction cost assumptions has been completed. The findings of the geotechnical study are being integrated into the overall site plan design. The Redevelopment Committee is meeting with the VEAC, VLHA and other stakeholders to gain feedback on the proposed program and uses. Meeting with representatives from the Public Works and Fire Department to gain feedback on the site plan design. Exploring the opportunity to reduce the width of the 40-foot wide utility easement along the North Frontage Road. A grant application has been prepared for potential grant and loan funding sources and partnership opportunities. Due to high levels of demand, the grant application process has been temporarily suspended until May, 2023. Continue to advance the draft terms of a development agreement. Update the Timber Ridge Village Apartments redevelopment schedule to reflect current progress and direct the critical path of actions and decision-making. Engage in a more detailed discussion regarding development deal terms on March 7. Continue discussions regarding transportation and mobility solutions to allow for a reduce on-site parking obligation. 33 PROJECT INFORMATION OWNER: VAIL TIMBER RIDGE, LLC C/O STEPHANIE COPELAND 345 LINCOLN AVE. - NIT 206 STEAMBOAT SPRINGS, CO 80487 OWNER REPRESENTATIVE: TRIUMPH WEST DEVELOPMENT, LLC MICHAEL O'CONNOR (970) 688-5057 12 VAIL ROAD, SUITE 700 VAIL, CO 81657 ARCHITECT: TRIUMPH CUSTOM HOMES MIKE FOSTER (303) 475-4413 12 VAIL ROAD, SUITE 700 VAIL, CO 81657 SOILS: CEASARE, INC. CIVIL / CIVIL ENGINEERING: ALPINE ENGINEERING EDWARDS, CO 80517 970 - 926-3373 LANDSCAPE DESIGN: TBD STRUCTURAL ENGINEERING: IMEG - GRAIG CARROLL 1400 GLENARM PLACE, SUITE 100 DENVER, CO 80202 (303) 807-8403 NOTES: 1. BUILDING CODES: ALL WORK SHALL COMPLY WITH THE CURRENT CODES, INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL FIRE CODE IFC 2018 INTERNATIONAL ENERGY CONSERVATION CODE IECC 2018 NATIONAL ELECTRICAL CODE NEC 2017 NATIONAL MECHANICAL CODE IMC 2018 INTERNATIONAL PLUMBIN CODE IPC 2018 BASIC BUILDING DESCRIPTION: TYPE OF CONSTRUCTION = 1A GARAGE LEVEL STORY (510.2) VA FIRST THRU FOURTH STORIES PODIUM BUILDING HAS A NFPA STANDARD 13 SPRINKLER SYSTEM. OCCUPANCIES: R-2 OCCUPANCY, APARTMENT BUILDINGS B OCCUPANCY, SMALL ASSEMBLY, ACCESSORY TO R-2 OCCUPANCE S-2 OCCUPANCY, ENCLOSED PARKING GARAGE AND STORAGE, ACCESSORY TO R-S OCCUPANCY. R-2 - 200 SF / OCCUPANT BUSINESS - 100 SF / OCCUPANT S-2 OCCUPANCY SEPARATION: R-2 / B = 1 HR. R-2 / S-2 = 3 HR. FIRE PROTECTION SYSTEM SUBMITTED SEPRATELY (SECTION 903.3) SMOKE DETECTION SHALL BE PROVIDED THROUGHOUT. FIRE ALARM SYSTEM (SECTION 907) PROVIDED THROUGHOUT 3. PROPOSED ENERGY COMPLIANCE: CLIMATE ZONE 5 WINDOW AND DOORS, U-0.32 OR LESS. R-VALUES, CEILINGS AND ROOFS, R-38 WALLS, R-21 FLOORS, R-19 SLAB PERIMETER AND DEPTH, R10/24-IN STORAGE SPACE, R-10/13 4. AREA CALCULATIONS: TIMBER RIDGE II APARTMENTS TIMBER RIDGE REDEVELOPMENT LOTS 1 AND 2, A RESUBDIVISION OF LIONSRIDGE SUBDIVISION, BLOCK C TOWN OF VAIL, CO ZONE DISTRICT: HOUSING (H) GRFA SQUARE FOOTAGE IS MEASURED TO THE OUTSIDE FACE OF THE SHEATHING OF THE EXTERIOR WALLS COMMON HALLWAY & STAIRWAY AREAS ARE EXCLUDED FROM GRFA CALCULATIONS PER SECTION 12-5-3B, 1.a.(1).(A). ROOFED OR COVERED DECKS & TERRACES MEETING THE REQUIREMENTS OF SECTION 12-5-3B, 1.a. (9) ARE EXCLUDED FROM GRFA CALCULATIONS COLORADO STATE LAW CRS 9-5-105 -272 UNITS REQUIRE A SCORE OF 116 POINTS -TYPE A MULTISTORY DWELLING UNIT = 5 POINTS -TYPE B MULTISTORY DWELLING UNIT = 3 POINTS 1280 N. FRONTAGE ROAD WEST TOWN OF VAIL, CO 81657 IBC 2018, CHAPTER 11, 1107.6.2.2.1 (R-2) -272 UNITS -2% BUT NOT LESS THAN 1 = TYPE A IBC 2018, CHAPTER 11, 1107.7.1.2 (R-2) -ELEVATOR ACCESS - TYPE B SHEET INDEX: ARCHITECTURAL AA0.0 COVER SHEET, LIST OF SHEETS, PROJECT DATA AA0.1 FINISH SCHEDULE AA1.0 SITE PLAN AA1.1 SITE ACCESSORIES AA1.2 SITE SECTIONS AA1.3 PHASED PLAN AA2.0 BUILDING A PODIUM LEVEL PLAN AA2.1 BUILDING A FIRST LEVEL PLAN AA2.2 BUILDING A 2/3/4 LEVEL PLAN AA2.3 BUILDING A ROOF PLAN AA3.1 DESIGN IMAGES AA4.0 BUILIDNG A ELEVATIONS / MATERIAL LEGEND AA4.1 BUILDING A ELEVATIONS / MATERIAL LEGEND AA5.0 BUILDING SECTIONS AA6.0 DETAILS AA8.0 TYPICAL UNIT PLANS AB2.0 BUILDING B / D PODIUM LEVEL PLAN AB2.1 BUILDING B / D TYPICAL LEVEL PLAN AC2.0 BUILDING C PODIUM LEVEL PLAN AC2.1 BUILDING C TYPICAL LEVEL PLAN AE2.0 BUILDING E PODIUM LEVEL PLAN AE2.1 BUILDING E TYPICAL LEVEL PLAN AF2.0 BUILDING F PODIUM LEVEL PLAN AF2.1 BUILDING F FIRST LEVEL PLAN AF2.2 BUILDING F 2/3/4 LEVEL PLAN AT2.0 BUILDING CDOT PODIUM LEVEL PLAN AT2.1 BUILDING CDOT TYPICAL LEVEL PLAN AA11.0 ACCESSIBLE PLANS / DETAILS CIVIL C2.0 PARTIAL GRADING PLAN - EAST C2.1 PARTIAL GRADING PLAN - WEST C2.2 PARTIAL EXCAVATION PLAN - EAST C2.3 PARTIAL EXCAVATION PLAN - WEST C2.4 AUTO TURNING SIMULATION C3.0 PARTIAL STORM SEWER - EAST C3.1 PARTIAL STORM SEWER - WEST C4.0 PARTIAL UTILITY PLAN - EAST C4.1 PARTIAL UTILITY PLAN - WEST MECHANICAL, ELECTRICAL, PLUMBING (MEP) TBD DEFERRED SUBMITTALS FIRE SPRINKLER FIRE ALARM TRUSS SHOP DRAWINGS RETAINING WALLS - RAILINGS SPECIAL INSPECTIONS EARTH WORK: OPEN HOLE INSPECTION COMPACTION TESTING PROCTOR SAMPLING PROOF ROLL CONCRETE: COMPRESSION STRENGTH TEST REBAR INSPECTION ASPHALT: MAX THRO DENSITY ASPHALT CONTENT AND GRADATION STRUCTURAL STEEL: STRUCTURAL STEEL INSPECTION SQUARE FOOTAGE CALCULATIONS BUILDING A - PODIUM = 11,750 SF - TOTAL HEATED = 45,500 SF BUILDING B - PODIUM = 13,000 SF - TOTAL HEATED = 51,480 SF BUILDING C - PODIUM = 8,900 SF - TOTAL HEATED = 35,720 SF BUILDING D - PODIUM 13,000 SF - TOTAL HEATED = 51,480 SF TOTAL UNITS -STUDIOS = 52 -ONE BED / ONE BATH = 39 -TWO BED / TWO BATH = 113 -THREE BED / TWO BATH = 52 -FOUR BED / TWO BATH = 16 BUILDING E - PODIUM = 8,100 SF - TOTAL HEATED = 31,600 SF BUILDING F - PODIUM = 11,000 SF - TOTAL HEATED = 48,000 SF CDOT - PODIUM = 13,000 SF - TOTAL HEATED = 37,950 SF TOTAL - PODIUM = 78,750 SF - TOTAL HEATED = 301,730 SF CO V E R SH E E T Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 A0.0 ME F ME F 1/ 1 6 / 2 0 2 3 34 FI N I S H SC H E D U L E Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 A0.1 ME F ME F 1/ 1 6 / 2 0 2 3 35 40' UTILITY EAS E M E N T 4 YARD DUMPSTER RECYCLE 6 YARD DUMPSTER NORTH FRONT A G E R O A D 8140 8160 8160 8160 8150 8150 8150 8150 8140 8130 8140 32 80 6 YARD DUMPSTER NORTH 0 10 30 50 BUILDING C TOV BUS STOP SEE CIVIL DRAWIN G S 8168 8162 8160 LIONS RIDGE LOOP 20'-0" S E T B A C K 2 0 ' - 0 " S E T B A C K 8092 8095 8101 8105 8106 8107 14'-0" W I D E E M E R G E N C Y A C C E S S R O A D BUILDING F 16 28 8 - UNITS PER FLOOR (4 - 4's / 4 - 2's) 4 LEVELS = 48,000SF ROOF TOP PATIO 32 UNITS = 104 TOTAL BEDROOMS 20 8 UNITS PER FLOOR (3-1's / 5-2's) 4 LEVELS = 35,720 GSF ROOF TOP PATIO 32 UNITS = 52 TOTAL BEDROOMS BUILDING E 8 UNITS PER FLOOR (2 - 1's / 4 - 2's / 2 - 3's) 4 LEVELS = 31,600 GSF ROOF TOP PATIO 32 UNITS = 64 TOTAL BEDROOMS 4 YARD DUMPSTER RECYCLE 6 YARD DUMPSTER 4 YARD DUMPSTER RECYCLE 6 YARD DUMPSTERBUILDING D 32 30 1913 19 19 1 BED / 1 BATH 610 SF 2 BED / 2 BATH 850 SF STAIR 3 BED / 2 BATH 1050 SF 1 BED / 1 BATH 610 SF 2 BED / 2 BATH 850 SF 3 BED / 2 BATH 1050 SF STAIR 8100 8090 8090 8090 8086 8084 8102 8114 8108 8120 8126 8132 8138 8144 8150 8156 8161 81028102 8098 8088 8080 8099 8097 8104 8106 REDUCE TO 20 ' U T I L I T Y E A S E M E N T ( V A R I A N C E ) 8103 PS - 6PS - 7PS - 8PS - 9PS - 10PS - 11PS - 12PS - 13PS - 14PS - 15PS - 16PS - 17PS - 18PS - 19PS - 20PS - 21PS - 22PS - 23PS - 24PS - 25 22 ' - 0 " BUILDING CDOT 12 UNITS PER FLOOR (12 -S / 3 - 1'S / 9 - 2'S / 12-3's) 3 LEVELS = 37,950 GSF (INCLUDING DECKS) 36 UNITS = 69 TOTAL BEDROOMS BUILDING A 11 UNITS PER FLOOR (16 -S / 20 - 2'S / 8-3's) 4 LEVELS = 45,500 GSF (INCLUDING DECKS) ROOF TOP DECK 44 UNITS = 80 TOTAL BEDROOMS 4 YARD DUMPSTER RECYCLE 12 UNITS PER FLOOR (16 - S / 4-1's / 20-2's / 8-3'S) 4 LEVELS = 51,480 GSF (INCLUDING DECKS) ROOF TOP DECK 48 UNITS = 84 TOTAL BEDROOMS 32 BUILDING B 12 UNITS PER FLOOR (16 - S / 4-1's / 20-2's / 8-3'S) 4 LEVELS = 51,480 GSF (INCLUDING DECKS) ROOF TOP DECK 48 UNITS = 84 TOTAL BEDROOMS PS - 25PS - 26PS - 27PS - 28PS - 29PS - 30PS - 31PS - 32PS - 33PS - 34PS - 35 8107 8109 8110.58112 8114 8106 8109 8116 8116 8120 8124 8130 8135 8140 8146 8152 8158 8162 PS - 36PS - 37PS - 38PS - 39PS - 40 TOV BUS STOP FIRE ACCESS ROAD 5'-0" SETBACK (VAR I A N C E ) TIMBER RIDGE PHASE IISITE = 210,400 SF SITE PLAN STUDY158 PODIUM PARKING 80 SURFACE PARKING 238 TOTAL PARKING SPACES 236 APARTMENT UNITS + 36 ADDITIONAL UNITS 468 BEDROOMS + 69 ADDITIONAL BEDROOMSSTUDIO UNITS = 52 1 BEDROOM UNITS = 39 2 BEDROOM UNITS = 113 3 BEDROOM UNITS = 52 4 BEDROOM UNITS = 16 ADDITIONAL APARTMENT BUILDING IN CDOT ROW - 36 UNITS / 69 BEDROOMS -12 - S / 3 - 1'S / 9 - 2'S / 12 - 3'S -32 PODIUM PARKING SPACES PR O P O S E D SI T E P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 1/ 1 6 / 2 0 2 3 ME F ME F TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1" = 30'-0"1 "A" CDOT/ROW - SCHEMATIC SITE PLAN A1.0 36 6 YARD DUMPSTER 6' W X 6' D X 4.5' T 19'-3" 6' - 6 1 / 2 " 71" X 108" 3x3 COLUMN W/ CONCRETE SONOTUBE 6 YARD DUMPSTER RECYCLE 6' W X 6' D X 4.5' T FORTRESS GATE SYSTEM 7'-2" 6' - 5 " 6X6 COLUMN W/ CONCRETE SONOTUBE FORTRESS ESTATE ENCLOSURE SYSTEM, PANELS: PALMETTO BROWN PIPE BOLLARDS AS SHOWN PAINT BLACK, 3 PER ENCLOSURE 71" X 1 0 8 " 12'-4" 6' - 3 " OPEN 6' - 6 " 2' - 6 " FORTRESS GATE SYSTEM 6X6 COLUMN W/ CONCRETE SONOTUBE FORTRESS ESTATE ENCLOSURE SYSTEM, PANELS: PALMETTO BROWN PIPE BOLLARDS AS SHOWN PAINT BLACK, 3 PER ENCLOSURE OPENING 4X12 CEDAR ROOF RAFTERS 13 ' - 6 " 4X12 CEDAR ROOF BEAM 8X8 CEDAR ROOF POST MTL CAP 21'-0" 9' - 0 " 12 ' - 0 " 22'-10" 2'-0" 12 ' - 0 " LED PARKING LOT LIGHTS, SEE SPECS 16'-0" HEIGHT TO BE STUDIED POLE, BLACK 18" FORMED CONC BASE BOLT COVER 2500 PSI CONC FINISHED GRADE SITE - ACCESSORIES N.T.S.1 MONUMENT SIGN N.T.S.2 BUILDING SIGNAGE N.T.S.3 PARKING LOT LIGHTING N.T.S.4 TRASH ENCLOSURE PLAN 5 N.T.S.6 TRASH ENCLOSURE ELEVATION N.T.S.7 BIKE RACKS N.T.S.8 TRASH ENCLOSURE N.T.S.9 TRELLIS AT COMMUNITY ROOM - BLD D N.T.S.10 MAIL BOXES - (10) TY P I C A L SI T E AC C E S S O R I E S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A A1.1 ME F ME F 1/ 1 6 / 2 0 2 3 37 BUILDING "A" VARIES CORRIDOR 9' - 0 " 2' - 0 " 9' - 0 " UNIT 401 9' - 0 " 2' - 0 " 8117 BUILDING "F" 8164 8140 8109 VARIES TIMBER RIDGE PHASE II - "A" PR O P E R T Y LI N E NO R T H FR O N T A G E PR O P E R T Y LI N E RO A D LI O N S RI D G E LO O P AC C E S S RO A D AC C E S S RO A D SOLAR PANELS 2' - 0 " 9' - 0 " 2' - 1 " VA R I E S UNIT 402 UNIT 301 UNIT 302 UNIT 201 UNIT 202 UNIT 101 UNIT 102 CORRIDOR CORRIDOR CORRIDOR PODIUM GARAGE 70'-0" 124578 4'-0"28'-0"6'-0"28'-0"4'-0" GARAGE OPENING CORRIDOR 9' - 0 " 2' - 0 " 9' - 0 " UNIT 401 9' - 0 " 2' - 0 " SOLAR PANELS 2' - 0 " 9' - 0 " 2' - 1 " VA R I E S UNIT 402 UNIT 301 UNIT 302 UNIT 201 UNIT 202 UNIT 101 UNIT 102 CORRIDOR CORRIDOR CORRIDOR PODIUM GARAGE 66'-0" 124578 2'-0"28'-0"6'-0"28'-0"2'-0" PARALLEL PARKING NEW TOV BUS STOP EXISTING RETAINING WALL TO REMAIN NEW GRADE PER CIVIL PLANS NEW FOUNDATION / RETAINING WALL 10" THICK PER TBD STRUCT. DRAWINGS NEW DRIVE LANE WITH 18' PARKING STALLS / CURB AND GUTTER / 5' SIDEWALK EACH SIDE VARIES VARIES 9' - 0 " NEW FOUNDATION / RETAINING WALL 10" THICK PER TBD STRUCT. DRAWINGS PR O P O S E D SI T E SE C T I O N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 1/ 1 6 / 2 0 2 3 ME F ME F TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 N.T.S.1 "A-F" - SITE SECTION A1.2 38 TIMBER RIDGE PHASE II PHASE I CONSTRUCTION -BUILDINGS B / C / D / G -EXISTING OCCUPANCY FOR BUILDINGS L / J / K PHASE II CONSTRUCTION -BUILDINGS A / E / F SITE = 210,400 SF SITE PLAN STUDY 40' UTILITY EAS E M E N T NORTH FRONT A G E R O A D 8140 8160 8160 8160 8150 8150 8150 8150 8140 8130 8140 NORTH 0 10 30 50 TOV BUS STOP 8168 8162 LIONS RIDGE LOOP 20'-0" S E T B A C K 8092 8100 8104 8105 8106 8107 8100 8090 8102 8114 8108 8120 8126 8132 8138 8144 8150 8156 8161 8096 8080 8103 22 ' - 0 " BUILDING L BUILDING J BUILDING K PHASED APPROACH LEAVE BUIDLINGS L / J / K IN FIRST CONSTRUCTION WINDOW OFFICE 8160 LIONS RIDGE LOOP 8161 PS - 6PS - 7PS - 8PS - 9PS - 10PS - 11PS - 12PS - 13PS - 14PS - 15PS - 16PS - 17PS - 18PS - 19PS - 20PS - 21PS - 22PS - 23PS - 24PS - 25 22 ' - 0 " PS - 25PS - 26PS - 27PS - 28PS - 29PS - 30PS - 31PS - 32PS - 33PS - 34PS - 35PS - 36PS - 37PS - 38PS - 39PS - 40 4 YARD DUMPSTER RECYCLE 6 YARD DUMPSTER 4 YARD DUMPSTER RECYCLE 6 YARD DUMPSTER BUILDING CDOT 8116 8120 8124 8130 8135 8140 8146 8152 8158 8162 BUILDING C 8 UNITS PER FLOOR (3-1's / 5-2's) 4 LEVELS = 35,720 GSF ROOF TOP PATIO 32 UNITS = 52 TOTAL BEDROOMS BUILDING D 12 UNITS PER FLOOR (16 - S / 4-1's / 20-2's / 8-3'S) 4 LEVELS = 51,480 GSF (INCLUDING DECKS) ROOF TOP DECK 48 UNITS = 84 TOTAL BEDROOMS BUILDING B 12 UNITS PER FLOOR (16 - S / 4-1's / 20-2's / 8-3'S) 4 LEVELS = 51,480 GSF (INCLUDING DECKS) ROOF TOP DECK 48 UNITS = 84 TOTAL BEDROOMS 12 UNITS PER FLOOR (12 -S / 3 - 1'S / 9 - 2'S / 12-3's) 3 LEVELS = 37,950 GSF (INCLUDING DECKS) 36 UNITS = 69 TOTAL BEDROOMS PH A S E D AP P R O A C H Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 1/ 1 6 / 2 0 2 3 ME F ME F TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1" = 30'-0"1 "A" CDOT/ROW - SCHEMATIC SITE PLAN A1.3 39 DE S I G N IM A G E S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 2 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1 DESIGN IMAGES A3.1 12 / 2 3 / 2 0 2 2 ME F ME F ROOF TOP DECK BIKE STORAGE EV CHARGING STATIONS CAR SHARE PROGRAM WORK OUT ROOM COMMUNITY ROOM TYPICAL STAIR UNIT ENTRY DOOR ELEVATOR GATHERING SPACES MASSING STUDIES TYPICAL UNIT FINISH 40 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: UP 189'-6" 11'-7" ABCDEFG 11'-8"11'-8"11'-8" LMNOPQRS 28 ' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 O EF 6' - 0 " 19 ' - 6 " 8' - 6 " 4' - 0 " T UP ST O R A G E 48 " X 6 0 " 1 PARKING 1 PARKING 2 PARKING 3 PARKING 4 PARKING 5 12X30 PRECAST COLUMN (TYP) 4" CMU WALL 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE T.O. SLAB - 89'-0" PODIUM LEVEL SLOPE 2% T.O. SLAB - 86'-0" PODIUM LEVEL (8098') (8101') 6" COLUMN, WRAP PER ELEVATIONS EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN PARKING 6 PARKING 7 EV PARKING 8 EV PARKING 9 PARKING 11 EV PARKING 12 EV PARKING 13 PARKING 14 PARKING 15 HC PARKING 16 PARKING 18 PARKING 19 PARKING 20 PARKING 21 PARKING 22 PARKING 23 PARKING 24 PARKING 25 PARKING 26 PARKING 27 PARKING 28 PARKING 30 PARKING 29 PARKING 17 STORAGE 45" X 60" 30 BUILDING A - PODIUM PLAN30 TOTAL PARKING SPACE (25 STANDARD / 1 HC / 4 EV CHARGING) PODIUM LEVEL = 11,750 SF 44 FENCES STORAGE LOCKERS BIKE STORAGE ST O R A G E 45 " X 6 0 " 41 ST O R A G E 48 " X 6 0 " 2 ST O R A G E 48 " X 6 0 " 3 ST O R A G E 48 " X 6 0 " 4 ST O R A G E 48 " X 6 0 " 5 ST O R A G E 48 " X 6 0 " 6 ST O R A G E 48 " X 6 0 " 7 ST O R A G E 48 " X 6 0 " 8 ST O R A G E 48 " X 6 0 " 9 ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 12 ST O R A G E 48 " X 6 0 " 10 ST O R A G E 48 " X 6 0 " 11 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 19 ST O R A G E 48 " X 6 0 " 17 ST O R A G E 48 " X 6 0 " 18 ST O R A G E 48 " X 6 0 " 23 STORAGE 45" X 60" 31 STORAGE 45" X 60" 32 STORAGE 45" X 60" 35 STORAGE 45" X 60" 34 STORAGE 45" X 60" 33 STORAGE 45" X 60" 40 STORAGE 45" X 60" 39 STORAGE 45" X 60" 36 STORAGE 45" X 60" 37 STORAGE 45" X 60" 38 ST O R A G E 48 " X 6 0 " 28 ST O R A G E 48 " X 6 0 " 27 ST O R A G E 48 " X 6 0 " 26 ST O R A G E 48 " X 6 0 " 24 ST O R A G E 48 " X 6 0 " 25 ST O R A G E 48 " X 6 0 " 29 BIKE STORAGE ST O R A G E 45 " X 6 0 " 42 ST O R A G E 45 " X 6 0 " 43 ST O R A G E 45 " X 6 0 " 44 10" PRECAST CONCRETE WALL 4" CMU WALL 8" PRECAST CONCRETE WALL ENTRY ABOVE WATER ENTRY ABOVE 18 ' - 0 " 3' - 0 " 12 ' - 0 " 3' - 0 " 23 ' - 2 " 24 ' - 0 " 18 ' - 1 0 " 4' - 0 " AA5.0 1 AA5.0 2 BU I L D I N G A PO D I U M L E V E L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA2.0 1/ 1 6 / 2 0 2 3 ME F ME F 41 BUILDING A - FIRST FLOOR PLAN11 UNITS PER FLOOR (8 -S / 8 - 1's / 20 - 2'S / 8-3's) 4 LEVELS = 45,500 GSF (INCLUDING DECKS) ROOF TOP DECK 44 UNITS = 80 TOTAL BEDROOMS UP 189'-6" 11'-7" ABCDEFG 11'-8"11'-8"11'-8" DN LMNO LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" PQRS W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS 70 ' - 0 " 1 2 4 5 6 7 8 PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 VENDING LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" O STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" EF W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" 4' - 0 " 28 ' - 0 " 6' - 0 " 18 ' - 6 " 9' - 6 " 4' - 0 " T UPDN LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C A / V C L O S E T WATER ENTRY ROOM WATER ENTRY ROOM, FIRST FLOOR ONLY AA5.0 1 AA5.0 2 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G A FI R S T L E V E L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA2.1 1/ 1 6 / 2 0 2 3 ME F ME F 42 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BUILDING A - 2/3/4 FLOOR PLAN11 UNITS PER FLOOR (8 -S / 8 - 1's / 20 - 2'S / 8-3's) 4 LEVELS = 45,500 GSF (INCLUDING DECKS) ROOF TOP DECK 44 UNITS = 80 TOTAL BEDROOMS UP 189'-6" 11'-7" ABCDEFG 11'-8"11'-8"11'-8" DN LMNO LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" PQRS W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS 70 ' - 0 " 1 2 4 5 6 7 8 PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 VENDING LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" O STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" EF W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" 4' - 0 " 28 ' - 0 " 6' - 0 " 18 ' - 6 " 9' - 6 " 4' - 0 " T UPDN LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C A / V C L O S E T AA5.0 1 AA5.0 2 BU I L D I N G A TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA2.2 1/ 1 6 / 2 0 2 3 ME F ME F 43 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BUILDING A - ROOF PLAN 189'-6" 11'-7" ABCDEFG 11'-8"11'-8"11'-8" DN LMNOPQRS 70 ' - 0 " 1 2 4 5 6 7 8 O EF 4' - 0 " 28 ' - 0 " 6' - 0 " 18 ' - 6 " 9' - 6 " 4' - 0 " T SLOPE SLOPE SLOPE SLOPE SLOPE R2 SLOPE ROOF DRAINS R2 SLOPE SLOPE SLOPE SL O P E SL O P E SL O P E R1 SL O P E SL O P E SL O P E 20 ' - 0 " DESIGNATION WALL / 42" TALL, FINISH W/ "S1", TO MATCH BUILDING, METAL CAP SL O P E BUILDING "A" - EXTERIOR FINISH SCHEDULE TAG ITEM MATERIAL COLOR R1 TAMKO 50 YR - PREMIUM ASPHALT SHINGLES (CLASS A REQUIRED) RUSTIC REDWOODR2 FLAT ROOF ULTRAPLY TPO ROOFING TAN SECONDARY ROOF SLOPE SL O P E SLOPE SL O P E SLOPE SL O P E SLOPE SL O P E SLOPE SL O P E SLOPESLOPE SL O P E SLOPE SL O P E SLOPE SL O P E WIND WALL / 7' TALL, FINISH W/ "S1" TO MATCH BUILDING, METAL CAP PLANTER PLANTER PLANTER R1 SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SL O P E DN SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SL O P E SLOPE SLOPE 4:12 4:12 4:12 4:12 4:12 4:12 4:12 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 COMMUNITY ROOM 38'-0" X 19'-0" 20 ' - 0 " 49'-8" TILE TECH PAVER SYSTEMS - PEDESTALS W/ STAMPTECH PAVERS - 16" X 16" TANP1ROOF TOP DECK PAVING TIMBER BARKS1HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3 4" X 7 1 4" 6" EXPOSED S1 WIND WALL / 7' TALL, FINISH W/ "S1" TO MATCH BUILDING, METAL CAP S1 S1 DESIGNATION WALL / 42" TALL, FINISH W/ "S1", TO MATCH BUILDING, METAL CAP DESIGNATION WALL / 42" TALL, FINISH W/ "S1", TO MATCH BUILDING, METAL CAP R2R2 R2R2R2R2 R2 R2 R2 R2 R2 P1 P1 P1 P1 KARNDEAN FLOORING "SICILIA" SIX DEGREES FLOORING SURFACES: IMPRESSION STAIR TREADS / PORTLAND COLOR TIMBER BARKMISC 1 PLANTER FRAMED PLANTER BOX, WITH IRRIGATION AND DRAIN W/ INSERT MISC 1MISC 1 OVER HEAD DOOR COMPANY, 511 SERIES 9'-0" X 9'-0" OVER HEAD DOOR COMPANY, 511 SERIES 9'-0" X 9'-0" SIX DEGREES FLOORING SURFACES: IMPRESSION STAIR TREADS / PORTLAND COLOR AA5.0 1 AA5.0 2 BU I L D I N G A TY P I C A L RO O F P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA2.3 1/ 1 6 / 2 0 2 3 ME F ME F 44 BUILDING A - SOUTH ELEVATION 189'-6" 11'-7" ABCDEFG 11'-8"11'-8"11'-8" LMNOPQRSO FFT 49'-8" AA5.0 1 AA5.0 2 T.O. SHEATHING - 100'-0" (8109') 1st. LEVEL T.O. CONC - VARIES (AT DOOR 8098') PODIUM LEVEL FINISHED GRADE - VARIES T.O. SHEATHING - 111'-0" 2ND. LEVEL T.O. SHEATHING - 122'-0" 3RD. LEVEL T.O. SHEATHING - 133'-0" 4TH. LEVEL T.O. SHEATHING - 143'-0" ROOF. LEVEL T.O. SHEATHING - 159'-0" COMMUNITY ROOM RIDGE S1 S3 S3 S1 S4 S3.1 S3 S3 S1 S2 S3.1 S3.1 S3.1 S3.1 S3.1 S3.1 S3S3 S1 S3 S3 S1 S1 S3 S3 S1 S3 S1 S3 S1 S3 S3 S1 S1 S3 S3 S1 S3 S1 OPENOPENOPEN OPEN OPEN OPEN OPEN OPENOPEN TRELLIS AA1.1 S1S1S1 S1 S1 S2 MTL1 MTL1 MTL1 R1 R1 R1 S3 BUILDING A - EXTERIOR FINISH SCHEDULE TAG ITEM MATERIAL COLOR R1 PRIMARY ROOF D1 DRIP EDGE ALUMINUM (PREFINISHED)MATCH ADJACENT ROOF F1 PARAPET TOP @ R1 FIBER CEMENT BOARDS - 5/4 SMOOTH x 9.25" F3 SOFFIT FIBER CEMENT SOFFIT PANELS - VENTED SMOOTH W1 DOORS AND WINDOWS PREMIUM VINYL BRONZE T1 DOORS AND WINDOWS TRIM FIBER CEMENT -4 4 SMOOTH 3.5" RAILS 4 4 SMOOTH 5.5" HEAD AND SILL T3 HORIZONTAL SIDING TRIM @ ENTRY FIBER CEMENT - 5 4 SMOOTH 9.25" / 11.25" T4 INSIDE CORNER TRIM FIBER CEMENT - 5 4 SMOOTH 3.5" T5 OUTSIDE CORNER TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" T6 FRIEZE TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" 1. IN THE CASE OF ANY DISCREPANCIES BETWEEN THIS SCHEDULE AND OTHER CONTRACT DOCUMENTS, THE INFORMATION ON THIS SCHEDULE SHALL TAKE PRECEDENCE. 2. ALL FLASHING, VENTS, FLUES, ROOFTOP MECHANICAL EQUIPMENT, UTILITY BOXES, AND SIMILAR ITEMS SHALL BE PAINTED TO MATCH ADJACENT PORTIONS OF BUILDINGS UNLESS OTHERWISE NOTED. 3. TYPICAL SIDEWALL FLASHING: ICE&WATER SHIELD 2'-6" VERT UP WALL; WRAP INTO OPENINGS, THEN APPLY TYVEK FLASHING TAPE AROUND PENETRATING PIPE. METAL FLASHING EXPOSED 6" UP WALL: TYPICAL AT ALL SIDEWALL CONDITIONS. S4 METAL SIDING PANELS METAL WALL SYSTEM - PBC T2 SIDING TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" 4. THESE ELEVATIONS ARE CONCEPTUAL IN NATURE, INDIVIDUAL BUILDING ELEVATIONS MAY VARY BUT WILL BE EVALUATED FOR COMPLIANCE WITH DESIGN STANDARDS CONTAINED WITHIN ESTES PARK CODE AT THE TIME OF SUBMITTING A BUILIDNG PERMIT APPLICATION. MTL1 METAL RAILING CUSTOM DESIGN POWDER COAT - BLACK R2 S2 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3 4" X 9 1 4" 6" EXPOSED - @ WINDOW / DOOR INFILL F2 PARAPET @ R2 FIBER CEMENT BOARDS - 5/4 SMOOTH x 6.25" BRONZE DORIAN GRAY BRONZE SLATE GREY SLATE GREY SLATE GREY SLATE GREY SLATE GREY SLATE GREY S1 BOARD AND BATTEN FIBER CEMENT VERT SIDING 3.5" OVER FIBER CEMENT PLANKS - SMOOTH SILVER POINT IRON ORE BRONZE S3 STUCCO 2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR S3.1 STUCCO OVER CONCRETE 2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR TAMKO 50 YR - PREMIUM ASPHALT SHINGLES (CLASS A REQUIRED) FLAT ROOF ULTRAPLY TPO ROOFING TAN TILE TECH PAVER SYSTEMS - PEDESTALS W/ STAMPTECH PAVERS - 16" X 16" TANP1ROOF TOP DECK PAVING TIMBER BARKMISC 1 PLANTER FRAMED PLANTER BOX, WITH IRRIGATION AND DRAIN W/ INSERT BU I L D I N G A SO U T H EL E V A T I O N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA4.0 1/ 1 6 / 2 0 2 3 ME F ME F 45 BUILDING A - EXTERIOR FINISH SCHEDULE TAG ITEM MATERIAL COLOR R1 PRIMARY ROOF D1 DRIP EDGE ALUMINUM (PREFINISHED)MATCH ADJACENT ROOF F1 PARAPET TOP @ R1 FIBER CEMENT BOARDS - 5/4 SMOOTH x 9.25" F3 SOFFIT FIBER CEMENT SOFFIT PANELS - VENTED SMOOTH W1 DOORS AND WINDOWS PREMIUM VINYL BRONZE T1 DOORS AND WINDOWS TRIM FIBER CEMENT -4 4 SMOOTH 3.5" RAILS 4 4 SMOOTH 5.5" HEAD AND SILL T3 HORIZONTAL SIDING TRIM @ ENTRY FIBER CEMENT - 5 4 SMOOTH 9.25" / 11.25" T4 INSIDE CORNER TRIM FIBER CEMENT - 5 4 SMOOTH 3.5" T5 OUTSIDE CORNER TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" T6 FRIEZE TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" 1. IN THE CASE OF ANY DISCREPANCIES BETWEEN THIS SCHEDULE AND OTHER CONTRACT DOCUMENTS, THE INFORMATION ON THIS SCHEDULE SHALL TAKE PRECEDENCE. 2. ALL FLASHING, VENTS, FLUES, ROOFTOP MECHANICAL EQUIPMENT, UTILITY BOXES, AND SIMILAR ITEMS SHALL BE PAINTED TO MATCH ADJACENT PORTIONS OF BUILDINGS UNLESS OTHERWISE NOTED. 3. TYPICAL SIDEWALL FLASHING: ICE&WATER SHIELD 2'-6" VERT UP WALL; WRAP INTO OPENINGS, THEN APPLY TYVEK FLASHING TAPE AROUND PENETRATING PIPE. METAL FLASHING EXPOSED 6" UP WALL: TYPICAL AT ALL SIDEWALL CONDITIONS. S4 METAL SIDING PANELS METAL WALL SYSTEM - PBC T2 SIDING TRIM FIBER CEMENT - 5 4 SMOOTH 5.5" 4. THESE ELEVATIONS ARE CONCEPTUAL IN NATURE, INDIVIDUAL BUILDING ELEVATIONS MAY VARY BUT WILL BE EVALUATED FOR COMPLIANCE WITH DESIGN STANDARDS CONTAINED WITHIN ESTES PARK CODE AT THE TIME OF SUBMITTING A BUILIDNG PERMIT APPLICATION. MTL1 METAL RAILING CUSTOM DESIGN POWDER COAT - BLACK R2 S2 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3 4" X 9 1 4" 6" EXPOSED - @ WINDOW / DOOR INFILL F2 PARAPET @ R2 FIBER CEMENT BOARDS - 5/4 SMOOTH x 6.25" BRONZE DORIAN GRAY BRONZE SLATE GREY SLATE GREY SLATE GREY SLATE GREY SLATE GREY SLATE GREY S1 BOARD AND BATTEN FIBER CEMENT VERT SIDING 3.5" OVER FIBER CEMENT PLANKS - SMOOTH SILVER POINT IRON ORE BRONZE S3 STUCCO 2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR S3.1 STUCCO OVER CONCRETE 2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR TAMKO 50 YR - PREMIUM ASPHALT SHINGLES (CLASS A REQUIRED) FLAT ROOF ULTRAPLY TPO ROOFING TAN TILE TECH PAVER SYSTEMS - PEDESTALS W/ STAMPTECH PAVERS - 16" X 16" TANP1ROOF TOP DECK PAVING TIMBER BARKMISC 1 PLANTER FRAMED PLANTER BOX, WITH IRRIGATION AND DRAIN W/ INSERT 70'-0" 124578 4'-0"28'-0"6'-0"28'-0"4'-0" T.O. SHEATHING - 100'-0" (8109') 1st. LEVEL T.O. CONC - VARIES (AT DOOR 8098') PODIUM LEVEL FINISHED GRADE - VARIES T.O. SHEATHING - 111'-0" 2ND. LEVEL T.O. SHEATHING - 122'-0" 3RD. LEVEL T.O. SHEATHING - 133'-0" 4TH. LEVEL T.O. SHEATHING - 143'-0" ROOF. LEVEL T.O. SHEATHING - 159'-0" COMMUNITY ROOM RIDGE 12 6 TYPICAL ROOF ASSEMBLY: ROOFING PER EXT MATLS SCHEDULE UNDERLAYMENT (GRACE I&WS OR EQ) ROOF SHEATHING (Re: STRUCT) ROOF TRUSSES (Re: STRUCT) 14" HEEL TYP R38 BATTS INSULATION CEILING & FINISH PER RCP 12 6 TR BLDG A S4 S2 12 6 S1 S3.1 S3 S3 S2 S1 S3 BUILDING A - WEST ELEVATION BU I L D I N G A WE S T / E A S T EL E V A T I O N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING A AA4.1 1/ 1 6 / 2 0 2 3 ME F ME F 46 CORRIDOR 9' - 0 " 2' - 0 " 9' - 0 " UNIT 401 9' - 0 " 2' - 0 " SOLAR PANELS 2' - 0 " 9' - 0 " 2' - 1 " VA R I E S UNIT 402 UNIT 301 UNIT 302 UNIT 201 UNIT 202 UNIT 101 UNIT 102 CORRIDOR CORRIDOR CORRIDOR PODIUM GARAGE 70'-0" 124578 4'-0"28'-0"6'-0"28'-0"4'-0" GARAGE OPENING 1" GYPCRETE OVER 1 4" SOUND MAT OVER 3 4" SHEATHING OVER TJI'S (PER STRUCTURE) WITH R-19 BATT INSULATION 1 HR. DETAIL 19/AA6.1 PREFAB TRUSSES (PER STRUCTURE) CEILING ASSEMBLY 1 HOUR, DTL 6/AA3.0 2X6 WOOD STUDS WALL W/ R-23 INSULATION, 1 HR. DTL 17/AA6.1 SLAB ON GRADE: CONCRETE SLAB (RE: STRUCT) 10 MIL UNDERSLAB VAPOR BARRIER, R-10 SUBGRADE PER GEOTECH REPORT UNDERDRAIN PER GEOTECH REPORT TYPICAL EXT WALL ASSEMBLY: SIDING PER EXT MATLS SCHEDULE WEATHER RESISTIVE BARRIER (TYVEK) WALL SHEATHING (Re: STRUCT) 2X6 STUDS (Re: STRUCT) R21 BATT INSULATION @ WALL CAVITY VAPOR RETARDER (CERTAINTEED 'MEMBRAIN') WALL FINISH PER INTERIORS 8' x 8' x 2' REINFORCED FOOTER: (RE: STRUCT) 14" REINFORCED PRECAST SLAB (2 HOUR SEPERATION) 4" CONCRETE SLAB-ON-GRADE WITH #4 @ 16" OC EW T.O. SHEATHING - 100'-0" (8109') 1st. LEVEL T.O. CONC - VARIES (AT DOOR 8098') PODIUM LEVEL FINISHED GRADE - VARIES T.O. SHEATHING - 111'-0" 2ND. LEVEL T.O. SHEATHING - 122'-0" 3RD. LEVEL T.O. SHEATHING - 133'-0" 4TH. LEVEL T.O. SHEATHING - 143'-0" ROOF. LEVEL T.O. SHEATHING - 159'-0" COMMUNITY ROOM RIDGE 10" CONCRETE WALL REINFORCED / PRECAST 12X30 PRECAST COLUMN (TYP) 10' x 10' x 2' REINFORCED FOOTER: (RE: STRUCT) 9' x 9' x 18" REINFORCED FOOTER: (RE: STRUCT) 18" REINFORCED PIER: (RE: STRUCT) FINISHED GRADE VARIES 8" X 8" CEDAR POST OPENING 3' - 0 " MECHANICAL CHASE MECHANICAL CHASE MECHANICAL CHASE MECHANICAL CHASE 9' - 0 " 12 6 TRELLIS AA1.1 TYPICAL ROOF ASSEMBLY: ROOFING PER EXT MATLS SCHEDULE UNDERLAYMENT (GRACE I&WS OR EQ) ROOF SHEATHING (Re: STRUCT) ROOF TRUSSES (Re: STRUCT) 14" HEEL TYP R38 BATTS INSULATION CEILING & FINISH PER RCP 12 4 FORTRESS RAILING SYSTEM FASTEN TO SIDING AND COLUMN CORRIDOR 9' - 0 " 2' - 0 " 9' - 0 " UNIT 401 9' - 0 " 2' - 0 " 2' - 0 " 9' - 0 " 2' - 1 " VA R I E S UNIT 402 UNIT 301 UNIT 302 UNIT 201 UNIT 202 UNIT 101 UNIT 102 CORRIDOR CORRIDOR CORRIDOR PODIUM GARAGE 70'-0" 124578 4'-0"28'-0"6'-0"28'-0"4'-0" GARAGE OPENING 1" GYPCRETE OVER 1 4" SOUND MAT OVER 3 4" SHEATHING OVER TJI'S (PER STRUCTURE) WITH R-19 BATT INSULATION 1 HR. DETAIL 19/AA6.1 PREFAB TRUSSES (PER STRUCTURE) CEILING ASSEMBLY 1 HOUR, DTL 6/AA3.0 2X6 WOOD STUDS WALL W/ R-23 INSULATION, 1 HR. DTL 17/AA6.1 SLAB ON GRADE: CONCRETE SLAB (RE: STRUCT) 10 MIL UNDERSLAB VAPOR BARRIER, R-10 SUBGRADE PER GEOTECH REPORT UNDERDRAIN PER GEOTECH REPORT TYPICAL EXT WALL ASSEMBLY: SIDING PER EXT MATLS SCHEDULE WEATHER RESISTIVE BARRIER (TYVEK) WALL SHEATHING (Re: STRUCT) 2X6 STUDS (Re: STRUCT) R21 BATT INSULATION @ WALL CAVITY VAPOR RETARDER (CERTAINTEED 'MEMBRAIN') WALL FINISH PER INTERIORS 8' x 8' x 2' REINFORCED FOOTER: (RE: STRUCT) 14" REINFORCED PRECAST SLAB (2 HOUR SEPERATION) 4" CONCRETE SLAB-ON-GRADE WITH #4 @ 16" OC EW T.O. SHEATHING - 100'-0" (8109') 1st. LEVEL T.O. CONC - VARIES (AT DOOR 8098') PODIUM LEVEL FINISHED GRADE - VARIES T.O. SHEATHING - 111'-0" 2ND. LEVEL T.O. SHEATHING - 122'-0" 3RD. LEVEL T.O. SHEATHING - 133'-0" 4TH. LEVEL T.O. SHEATHING - 143'-0" ROOF. LEVEL T.O. SHEATHING - 159'-0" COMMUNITY ROOM RIDGE 10" CONCRETE WALL REINFORCED / PRECAST 12X30 PRECAST COLUMN (TYP) 10' x 10' x 2' REINFORCED FOOTER: (RE: STRUCT) 9' x 9' x 18" REINFORCED FOOTER: (RE: STRUCT) 18" REINFORCED PIER: (RE: STRUCT) FINISHED GRADE VARIES 8" X 8" CEDAR POST OPENING 3' - 0 " MECHANICAL CHASE MECHANICAL CHASE MECHANICAL CHASE MECHANICAL CHASE T.O. SHEATHING - 133'-0" 4TH. LEVEL 142'-0" SPRING POINT12 4 18" REINFORCED PIER: (RE: STRUCT) 8" X 8" CEDAR POST CODE LEGEND 1 HR (RATED 1HR FROM EACH SIDE) REFERENCE AA6.2 FOR WALL TYPES LIFE SAFETY PLAN LEGEND COMMON PATH OF TRAVEL DISTANCE EXIT TRAVEL DISTANCE COMMON PATH OF TRAVEL DISTANCE - EXIT SYMBOL EXIT TRAVEL DISTANCE - EXIT SYMBOL FIRE DEPARTMENT CONNECTION FDC 2 HR (RATED 2HR FROM EACH SIDE) 3 HR (RATED 3HR FROM EACH SIDE) NTS TYPICAL BUILDING DETAILS TY P I C A L BU I L D I N G SE C T I O N S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 AA5.0 1/ 1 6 / 2 0 2 3 ME F ME F N.T.S.1 TYPICAL BUILDING SECTION N.T.S.2 TYPICAL BUILDING SECTION @ DECKS TYPICAL FOOTING AT COLUMN TYPICAL FOOTING AT RETAINING WALL 47 LAP SIDING, 1 X BOARD 1 X 2 1 2" BATTEN 1 X 5 1 2" CORNER BOARD SHEATHING 5 8" GYP. BOARD SEALANT BACKER ROD METAL FLASHING TYVEC CHAMFER 45 DEG 1 2" C-D EXT. PLYW'D HARDIE BOARD LAP SIDING STUCCO 40 MIL "ICE AND WATER SHEILD" 9" WIDE OVER BLDG. PAPER @ WINDOWS 2X6 WOOD STUDS WALL W/ R-21 INSULATION & VAPOR BARRIER (C) (S) & BR JAMB (HEAD SIM.) (S) & BR BLOCKING BLOCKING SILL 4" HARDIE BOARD, CEDARMILL METAL FLASHING (S) & BR 6" HARDIE BOARD, CEDARMILL METAL FLASHING (S) & BR W/ FLASHING HARDIE BOARD / BATTEN, CEDARMILL HARDIE BOARD / BATTEN, CEDARMILL (C) DRYWALL RETURNS AND HEAD, MDF SILL AND APRON (S) & BR (S) & BR SLOPE @ HEAD W/ METAL FLASHING 6" HEAD HARDIE BOARD BRONZE CLAD WINDOW 4" TRIM HARDIE BOARD INTERIOREXTERIOR UNIT OPENING (S) & BR 4" HARDIE BOARD, CEDARMILL W/ FLASHING HARDIE BOARD / BATTEN, CEDARMILL (S) & BR DOOR UNIT DOOR FRAME INTERIOR DOOR TRIM (S) & BR SLOPE @ SILL W/ METAL FLASHING 4" SILL HARDIE BOARD BRONZE CLAD WINDOW 4" TRIM HARDIE BOARD 5 8" TYPE "X" GYPSUM BOARD OVER VAPOR BARRIER OVER 2X6 WOOD STUDS WALL R-21 BATT INSULATION WALL SHEATHING RE:STRUCT.WEATHERPROOFING EXTERIOR SIDING SEE ELEVATIONS 5 8" TYPE "X" GYPSUM BOARD OVER 2X WOOD STUDS WALL W/ R-13 INSULATION (INSULATION ONLY AT BATH WALLS) PLYWOOD SHEATHING (PER STRUCTURE) 5 8" TYPE "X" GYPSUM BOARD 5 8" TYPE "X" GYPSUM BOARD OVER 2X6 WOOD STUDS WALL W/ R-21 INSULATION WATER RESISTIVE BARRIER HARDIEPLANK LAP SIDING MIN.1 1 4" OVERLAP 5 8" TYPE "X" GYPSUM BOARD OVER 2X6 WOOD STUDS WALL W/ R-21 INSULATION WATER RESISTIVE BARRIER HARDIEPLANK LAP SIDING LEAVE APPROPRIATE GAP - CAULK HARDIETRIM BOARDS LEAVE APPROPRIATE GAP - CAULK ACOUSTICAL SEALANT EACH SIDE DBL 2X CONT. TOP PLATE 2X6 STUDS @ 24" OC. 3" GLASS FIBER INSULATION FIT TIGHTLY BETWEEN STUDS AND SECURELY FASTENED TO THE STUDS (1)LAYER 5 8" TYPE "X" GYP. BD O/ SHEATHING PER STRUCTURAL WHERE OCCURS 5 8" TYPE "X" GYP BD O/ 1 2" RESILIENT FURRING CHANNEL @ 24" OC. ACOUSTICAL SEALANT EACH SIDE 2X CONT. BOTTOM PLATE, TREATED @ FIRST FLOOR FINISH FLOOR AND BASE PARTITION TYPE 1-HR BEARING, INTERIOR (UL #U305, GA FILE WP-3243, STC 50) CORRIDOR SIDE 3" GLASS FIBER INSULATION FIT TIGHTLY ACOUSTICAL SEALANT EACH SIDE 2X CONT. TOP PLATE 3" GLASS FIBER INSULATION FIT TIGHTLY BETWEEN STUDS AND SECURELY FASTENED TO THE STUDS 5 8" TYPE "X" GYP BD ACOUSTICAL SEALANT EACH SIDE 2X CONT. BOTTOM PLATE, TREATED @ FIRST FLOOR FINISH FLOOR AND BASE INTERIOR PARTITION / UNITS 1-HR MATEWALL (GA FILE WP-3370, EST. STC 55) (1)LAYER 5 8" TYPE "X" GYP. BD SHEATHING (if needed) PER STRUCTURAL DBL ROW OF 2X STUDS @ 16" OC ON SEPERATE PLATES MIN. 1" APART CONT. WD 2X (FIREBLOCKING) 2X10 @ 10" DEMISING WALL. 5 8" TYPE "X" GYPSUM BOARD OVER VAPOR BARRIER OVER 2X6 WOOD STUDS WALL W/ MINERAL WOOL R-21 INSULATION LP FLAMEBLOCK WEATHERPROOFING EXTERIOR SIDING SEE ELEVATIONS 1-HR BEARING, EXTERIOR (UL V340) VARIES SINGLE 2X BOTTOM PLATE 1" LIGHT WT CONCRETE W/ 1 4" SOUND MAT DECK SHEATHING RE: STRUCT PLANS FLOOR FRAMING RE: STRUCT PLANS 3 1 2" OF BATT INSULATION DOUBLE 2X TOP PLATES (1)LAYERS 5 8" TYPE "C" GYP BD. OVER RESILIENT CHANNELS ATTACHED TO UNDERSIDE OF STRUCTURAL MEMBERS CEMENTITIOUS SIDING R-21 BATT INSULATION LIVABLE SPACE 5 8" TYPE X GYP BD FLOOR / CEILING 1-HR (ICC-ES ESR-1153 ASSEMBLY "F", STC - 59) ZIP PANEL SYSTEM RE: STRUCTURE SHEATHING VARIES SINGLE 2X BOTTOM PLATE DECK SHEATHING RE: STRUCT PLANS TJI'S RE: STRUCT PLANS DOUBLE 2X TOP PLATES 2 COAT STUCCO SYSTEM AA6.2 7 LIVABLE SPACE 1" LIGHT WT CONCRETE W/ 1 4" SOUND MAT (1)LAYERS 5 8" TYPE "C" GYP BD. OVER RESILIENT CHANNELS ATTACHED TO UNDERSIDE OF STRUCTURAL MEMBERS 3 1 2" BATT INSULATION FLOOR / CEILING 1-HR (ICC-ES ESR-1153 ASSEMBLY "F", STC - 59) CEMENTITIOUS SIDING R-21 BATT INSULATION ZIP PANEL SYSTEM RE: STRUCTURE SHEATHING BATT INSULATION 3 1 2"5 8" TYPE "C" GYPSUM BOARD ON RC CHANNEL 16" O.C. FLOOR / CEILING 1-HR (ICC-ES ESR-1153 ASSEMBLY "B") 1" GYPCRETE OVER 1 4" SOUND MAT, OVER 3 4" SHEATHING (PER STRUCTURE) CORRIDOR SIDE PARTITION TYPE 1-HR CORRIDOR WALL (UL #U305, GA FILE WP-3243, STC 50) ACOUSTICAL SEALANT EACH SIDE DBL 2X CONT. TOP PLATE 2X6 STUDS PLATE 3" GLASS FIBER INSULATION FIT TIGHTLY BETWEEN STUDS AND SECURELY FASTENED TO THE STUDS (1)LAYER 5 8" TYPE "X" GYP. BD O/ SHEATHING PER STRUCTURAL WHERE OCCURS (1)LAYERS TYPE "X" GYP. BD ACOUSTICAL SEALANT EACH SIDE 2X6 CONT. BOTTOM PLATE, TREATED @ FIRST FLOOR FINISH FLOOR AND BASE 2X4 STAGGERED STUDS @ 16" O.C. CORRIDOR SIDE ACOUSTICAL SEALANT EACH SIDE DBL 2X CONT. TOP PLATE 2X6 STUDS PLATE 3" GLASS FIBER INSULATION FIT TIGHTLY BETWEEN STUDS AND SECURELY FASTENED TO THE STUDS (2)LAYER 5 8" TYPE "X" GYP. BD O/ SHEATHING PER STRUCTURAL WHERE OCCURS (2)LAYERS TYPE "X" GYP. BD ACOUSTICAL SEALANT EACH SIDE 2X6 CONT. BOTTOM PLATE, TREATED @ FIRST FLOOR FINISH FLOOR AND BASE PARTITION TYPE 2-HR CORRIDOR WALLS (GA FILE WP-3910, STC 54) 2X4 STAGGERED STUDS @ 16" O.C. CORRIDOR SIDE ACOUSTICAL SEALANT EACH SIDE DBL 2X CONT. TOP PLATE 3" GLASS FIBER INSULATION FIT TIGHTLY BETWEEN STUDS AND SECURELY FASTENED TO THE STUDS (2)5 8" TYPE "X" GYP BD ACOUSTICAL SEALANT EACH SIDE 2X CONT. BOTTOM PLATE, TREATED @ FIRST FLOOR FINISH FLOOR AND BASE INTERIOR PARTITION / UNITS 2-HR MATEWALL (GA FILE WP-3820, STC 55) (2)LAYER 5 8" TYPE "X" GYP. BD 0/ SHEATHING (if needed) PER STRUCTURAL DBL ROW OF 2X STUDS @ 16" OC ON SEPERATE PLATES MIN. 1" APART CONT. WD 2X (FIREBLOCKING) 2X10 @ 10" DEMISING WALL. (2)5 8" TYPE "C" GYPSUM BOARD SCREWED, ON RC CHANNEL 16" O.C. (1)5 8" "C" GYPSUM BOARD SCREWED. FLOOR / CEILING @ CORRIDORS 2-HR (ESR-1153 - ASSEMBLY G, MIN. STC 59) 1" GYPCRETE OVER 1 4" SOUND MAT, OVER 3 4" SHEATHING (PER STRUCTURE) FIBER GLASS INSULATION, 3 1 2" BOARD BATTEN3NTS SIDING / STUCCO7 NTS NTS NTS WINDOW / SIDING9 NTS DOOR JAMB 5 NTS WINDOW HEAD WINDOW SILL 10 NTS EXTERIOR WALL 6 INTERIOR WALL LAP SIDING4NTS LAP SIDING8NTS 12 13 1-HR14BEARING INT. 1-HR17MATEWALL NTS EXTERIOR WALL 1 HR RATING11 TYPICAL BUILDING DETAILS 21 FLOOR / CEILING ASSEMBLY 22 BELLY BAND DETAIL 1-HR19FLOOR / CEILING 1-HR15CORRIDOR WALL 2-HR16CORRIDOR WALL 2-HR18MATEWALL 2-HR20FLOOR / CEILING TY P I C A L DE T A I L S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 AA6.0 1/ 1 6 / 2 0 2 3 ME F ME F 48 "A" - STUDIO UNIT 460 SF 0 2'6' LIVING SPACE 13'-6" X 17'-0" W/D BATHROOM WH VT A C 14'-6" 32 ' - 0 " "B" - 1 BEDROOM UNIT 650 SF 0 2'6' LIVING SPACE 10'-10" X 13'-0" KITCHEN VTAC PANTRY TV PATIO 8'-0" X 4'-0" 11'-6"2"11'-6" 28 ' - 0 " 4' - 0 " W/ D SECONDARY BEDROOM 10'-10" X 12'-8" BATHROOM 1 WH ACCESS "C" - 2 BEDROOM UNIT 950 SF 0 2'6' PRIMARY BEDROOM 10'-10" X 15'-0" BATHROOM 2 LIVING SPACE 10'-10" X 13'-0" KITCHEN VTAC PANTRY TV PATIO 8'-0" X 4'-0" 11'-6"2"11'-6"2"11'-6" 28 ' - 0 " 4' - 0 " W/ D SECONDARY BEDROOM 10'-10" X 12'-8" BATHROOM 1 WH ACCESS "D" - 3 BEDROOM UNIT 1275 SF 0 2'6' STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN VTAC PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-8" BATHROOM 1 WH ACCESS PATIO 8'-0" X 4'-0" PRIMARY BEDROOM 10'-10" X 15'-0" BATHROOM 2 11'-6" 28 ' - 0 " 4' - 0 " 2"11'-6"2"11'-6"2"11'-6" WH DW W/D BATH #2 PANTRY LN LN BATHROOM 1 BEDROOM 1 10'-10" X 13'-6" KITCHEN LIVING SPACE 10'-10" X 12'-0" BEDROOM 2 10'-10" X 12'-6" BEDROOM 3 10'-10" X 14'-0" BEDROOM 4 11'-0" X 10'-10" "E" - 4 BEDROOM UNIT 1380 SF 0 2'6' PATIO 8'-0" X 4'-0" 11'-8" 28 ' - 0 " 4' - 0 " 2"11'-8"2"11'-8"2"11'-8" SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: SC H E M A T I C UN I T P L A N S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/4" = 1'-0"1 SCHEMATIC UNIT PLANS A8.0 1/ 1 6 / 2 0 2 3 ME F ME F 49 ACCESSIBILITY AND MOUNTING DIAGRAMS 1' - 9 " TOILET TISSUE DISPENSER FINISH FLOOR TOILET ACCESSORY TYPE CURVED SHOWER CURTAIN ROD FOLDING SHOWER SEAT ICC A1117.1 - 2009 610.3 2' - 1 0 " T O C L TOWEL BAR ROBE HOOK 1' - 5 " M I N C L 1' - 4 " FR O M C O U N T E R EQ EQ TOWEL RING (SIDE ELEVATION) 7' - 0 " UN O 32 " TO P O F S I N K , M A X 40 " MA X 4' - 0 " EQ EQ VANITY/ MIRROR/ LIGHT 8 1/8"5' - 2 3/ 8 " 5' - 3 1/ 8 " EQ EQ SHOWER HEAD 2' - 8 3/ 8 " HAND HELD SHOWER & VALVE 2' - 8 3/ 8 " EQ EQ 5' - 3 1/ 8 " 30 " M A X 38 " M I N GRAB BAR REINF AT SHOWER (TYPE A & TYPE B) ICC A117.1-2009 SECTIONS 1003 & 1004 62 " M I N 6 1/2" 48 " M A X 38 " M I N 15" MAX CL CONTROL AREA CONTROL WALL 30 " M A X 38 " M I N BACK WALL 24 " M A X 15 " M I N SEAT WALL FINISH FLOOR ACCESSIBLE MOUNTING HEIGHTS 4'-5 1/8" 2' - 9 " 2' - 6 " LIGHT SWITCH DOOR LEVER 6' - 8 " - 8 ' - 0 " 3' - 3 " DOOR & DEVICES (PUBLIC, TYPE A & TYPE B) ICC A117.1-2009 SECTIONS 703 & 308 TYP WALL OUTLET THERMOSTAT, PHONE, FIRE ALARM PULL STATION, HC DOOR BUTTON OR CARD READER, IF NOT OBSTRUCTED FIRE ALARM SPEAKER/STROBE 1' - 3 " MI N ROOM SIGN (PUBLIC) ICC A117.1-2009 SECTION 703 3' - 3 " 4' - 0 3 / 4 " TACTILE AREA OF REFUGE SIGN 9" MIN 9" MIN CL 9" MIN 48 " M I N T O B . O . L O W E S T T E X T 60 " M A X T O B . O . H I G H E S T T E X T ROOM NAME FIRE EXTINGUISHER CABINET (PUBLIC) ICC A117.1-2009 SECTION 308 3' - 2 7 / 8 " MAXIMUM REACH DEPTH 0.5 INCH 2 INCHES 5 INCHES 6 INCHES 9 INCHES 11 INCHES (13 MM)(51MM)(125MM)(150 MM)(230MM) (288 MM) MAXIMUM REACH HEIGHT 48 INCHES 46 INCHES 42 INCHES 40 INCHES 36 INCHES 34 INCHES (1220 MM)(1170 MM)(1065 MM)(1015 MM)(915 MM) (865 MM) ICC/ANSI A117.1-2009 TABLE 603.6 (OPERABLE PARTS ON TOWEL DISPENSERS AND HAND DRYERS) MAXIMUM REACH DEPTH AND HEIGHT GENERAL NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. DIMENSIONS ARE COMPLIANT WITH ICC A117.1-2009. NOT ALL FIXTURES AND DEVICES INDICATED MAY BE USED IN THE PROJECT. DEVICES MAY APPEAR ON FLOOR PLANS OR INTERIOR ELEVATIONS. MOUNTING HEIGHTS INDICATED MAY BE SUPERCEDED BY MORE SPECIFIC INFORMATION ELSEWHERE IN THE DOCUMENTS. "PUBLIC" INDICATES ELEMENTS TO COMPLY IN PUBLIC AREAS. "TYPE A" INDICATES ELEMENTS TO COMPLY IN ACCESIBLE PORTIONS OF TYPE A UNITS. "TYPE B" INDICATES ELEMENTS TO COMPLY IN ACCESSIBLE PORTIONS OF TYPE B UNITS. PROVIDE BLOCKING / REINFORCEMENT FOR ALL ACCESSORIES PER MANUFACTURER'S INSTRUCTIONS. PROVIDE BLOCKING / REINFORCEMENT FOR FUTURE INSTALLATION OF GRAB BARS IN ACCESSIBLE BATHROOMS OF "TYPE A" & "TYPE B" UNITS. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS & SHALL WITHSTAND A VERTICAL OR HORIZONTAL FORCE OF 250 LBS APPLIED TO ANY POINT ON THE GRAB BAR, FASTENEER, MOUNT, OR SUPPORT. SHOWER & BATHTUB SEATS SHALL WITHSTAND A VERTICAL OR HORIZONTAL FORCE OF 250 LBS APPLIED TO ANY POINT ON THE SEAT, FASTENER, MOUNT OR SUPPORT. ALL LIGHTING CONTROLS, PANELBOARDS, ELECTRICAL SWITCHES AND RECEPTABLE OUTLETS, ENVIRONMENTAL CONTROLS, APPLIANCE CONTROLS, OPERATING HARDWARE FOR WINDOWS, PLUMBING FIXTURE CONTROLS, AND SECURITY CONTROLS MUST COMPLY WITH APPLICABLE ANSI & ADA REQUIREMENTS. OPERABLE PARTS SHALL: 1) BE PLACED WITHIN REACH RANGE ACCORDING TO ANSI A117.1-2009 TABLE 603.6 ON THIS SHEET; 2) BE OPERABLE WITH ONE HAND, 3) NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST, AND 4) BE ACTIVATED BY NO MORE THAN 5 LBS OF FORCE. 5: HAVE 30" X 48" CLEAR FLOOR SPACE DOOR THRESHOLDS MUST HAVE A MAXIMUM HEIGHT OF 1/2" WITH A 1:2 BEVEL. TYPE A & TYPE B LAVATORY CRITERIA CABINETRY CRITERIA: (A) CABINETRY CAN BE REMOVED WITHOUT REMOVAL OR REPLACEMENT OF LAVATORY (B) FLOOR FINISH EXTENDS UNDER CABINETRY (C) WALLS BEHIND AND SURROUNDING CABINETRY ARE FINISHED WATER SUPPLY AND DRAINPIPES UNDER SINKS SHALL BE INSULATED OR CONFIGURED TO PROTECT AGAINST CONTACT 2' - 3 1 / 2 " 1'-8 1/4" MAX. GRAB BAR REINFORCEMENT AT TUB (TYPE A & TYPE B) ICC A117.1-2009 SECTIONS 1003 & 1004 GRAB BAR BLOCKING FOR TYPE A AND TYPE B DWELLING UNITS BATH TUBS 3" MAX TUB LENGTH MIN 3" MAX 6" M A X 38 " M I N SEAT 30 " M I N 4 7/8" 38 " M A X HAND-HELD SHOWER UNIT W/ 59" MIN HOSE (TYPE A AND ACCESSIBLE UNITS) 48 " M A X CL CONTROL AREA CONTROL END 1' - 1 1 1/ 2 " 7 1/ 4 " HEAD END 18" MIN 1' - 1 1 1/ 2 " 7 1/ 4 " HEAD END ALTERNATIVE SEE AXON BELOW BACK WALL BLOCKING 9 3/4" MIN CONCRETE FLOOR BLOCKING FINISH FLOOR TOILET ACCESSORY TYPE GRAB BAR REINFORCEMENT AT SWING UP GRAB BARS TYPE B ANSI 1004.11.1.1 BACK WALL BLOCKING CL 1'-3 3/4"1'-3 3/4" 2' - 4 3 / 8 " 17 " - 1 9 " T. O . S E A T 18 " M I N 1 1 / 4 " MI N 12" MAX 42" MIN. 54" MIN 33 " - 3 6 " T O T O P GRAB BARS & TOILET TISSUE DISPENSER (TYPE A & TYPE B) ICC A117.1-2009 SECTION 604 & 1003.3.1 & 1004.11.1 24" MIN*12" MIN GRAB BAR REINFORECEMENT ONLY 24" MIN 42" MAX 16" - 18" *12" MIN WHERE 24" NOT POSSIBLE HANDLE AT OPEN SIDE CL 33 " - 3 6 " T O T O P 60" MIN CLEARANCE GRAB BAR REINFORECEMENT ONLY OUTLET AT COUNTER- PARALLEL APPROACH (TYPE B) ICC A117.1-2009 SECTION 308 48 " M A X @ 1 0 " M A X C A B D E P T H 46 " M A X @ 2 4 " M A X C A B D E P T H COUNTER ALLOWED TO BE 24" DEEP (MAX) 1'-6" MIN. 1'-6" MIN. 11.ALL EXIT STAIRWAYS OR RAMPS, EXIT PASSAGEWAYS, AND THE EXIT DISCHARGE REQUIRE A SIGN IN VISUAL CHARACTERS, RAISED CHARACTERS, AND BRAILLE COMPLYING WITH ICC A1117.1 - 2009 PER SECTION 1013.4 2015 IBC. DOOR MANEUVERING CLEARANCE DIAGRAMS 60 " M I N . 18" MIN. 24" PREFERRED PULL SIDE 48 " M I N . PUSH SIDE X NOTE: X = 12" IF DOOR HAS BOTH A CLOSER AND LATCH FRONT APPROACH - SWINGING DOORS Y PULL SIDE Y 42 " M I N . PUSH SIDE NOTE: Y = 48" IF DOOR HAS BOTH A CLOSER AND LATCH HINGE SIDE APPROACH - SWINGING DOORS X NOTE: X = 36" MIN. IF Y = 60" X = 42" MIN. IF Y = 54" 12" Y 48 " M I N . PULL SIDE Y 42 " M I N . PUSH SIDE NOTE: Y = 48" IF DOOR HAS BOTH A CLOSER AND LATCH LATCH SIDE APPROACH - SWINGING DOORS 24" MIN. NOTE: Y = 54" MIN. IF DOOR HAS BOTH A CLOSER AND LATCH 24" MIN. 48 " M I N . 42 " M I N . FRONT APPROACH - SLIDING DOORS SIDE APPROACH - SLIDING DOORS 24" MIN. 42 " M I N . LATCH SIDE APPROACH - SLIDING DOORS 24" MIN. NOTE: ALL DOORS IN ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR FRONT APPROACHES 2'-8" CLEAR WIDTH @ ALL USER PASSAGE DOOR OPENINGS GENERAL USER PASSAGE FIG. 404.2.3.2 (a)FIG. 404.2.3.2 (b) FIG. 404.2.3.2 (c & d) FIG. 404.2.3.3 (a) FIG. 404.2.3.2 (f&g)FIG. 404.2.3.2 (c) MANEUVERING CLEARANCES PER TABLE 404.2.3.2 AND 404.2.3.3 22" FIG. 404.2.3.2 (e) FIG. 404.2.3.3 (c) 42 " M I N . 24" MIN. FIG. 404.2.3.3 (b) B 2'-6" MIN. 4' - 0 " MI N . 4'-0" MIN. 2' - 6 " MI N . PARALLEL APPROACH 305.5 5' - 6 " 5'-0" C A CLEARANCE WITH LAVATORY TYPE A (OVERLAP EXCEPTION) 1003.11.2.4.4 FORWARD APPROACH 305.5 5' - 5 " 5'-6" WATER CLOSET MINIMUM CLEARANCE TYPE A 1003.11.2.4 E 1' - 0 " 3' - 0 " 1' - 0 " 5' - 0 " MI N . 3'-0"2'-0" 5'-0" MIN. F T-SHAPED TURNING SPACE 304.3.2 CIRCULAR TURNING SPACE 304.3.1 D ø5'-0" 4'-0" MIN. 2' - 6 " MI N . CLEAR FLOOR SPACE 305.3 G ACCESSIBLE CLEARANCE DIAGRAMS 4' - 8 " 4'-0" H WATER CLOSET MIN CLEARANCE TYPE B 1004.11.3.1.2.2 AC C E S S I B L E DE T A I L S Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 AA11.0 1/ 1 6 / 2 0 2 3 ME F ME F 50 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: ST O R A G E 48 " X 6 0 " 1 4" CMU WALL 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE HC PARKING 18 PARKING 20 PARKING 21 PARKING 22 PARKING 23 PARKING 24 PARKING 25 PARKING 26 PARKING 27 PARKING 28 PARKING 29 PARKING 30 PARKING 32 PARKING 31 PARKING 19 STORAGE 45" X 60" 31 ST O R A G E 48 " X 6 0 " 2 ST O R A G E 48 " X 6 0 " 3 ST O R A G E 48 " X 6 0 " 4 ST O R A G E 48 " X 6 0 " 5 ST O R A G E 48 " X 6 0 " 6 ST O R A G E 48 " X 6 0 " 7 ST O R A G E 48 " X 6 0 " 8 ST O R A G E 48 " X 6 0 " 9 ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 12 ST O R A G E 48 " X 6 0 " 10 ST O R A G E 48 " X 6 0 " 11 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 19 ST O R A G E 48 " X 6 0 " 17 ST O R A G E 48 " X 6 0 " 18 ST O R A G E 48 " X 6 0 " 23 STORAGE 45" X 60" 32 STORAGE 45" X 60" 33 STORAGE 45" X 60" 36 STORAGE 45" X 60" 35 STORAGE 45" X 60" 34 STORAGE 45" X 60" 40 STORAGE 45" X 60" 41 ST O R A G E 48 " X 6 0 " 28 ST O R A G E 48 " X 6 0 " 27 ST O R A G E 48 " X 6 0 " 26 ST O R A G E 48 " X 6 0 " 24 ST O R A G E 48 " X 6 0 " 25 ST O R A G E 48 " X 6 0 " 29 BIKE STORAGE 10" PRECAST CONCRETE WALL 8" PRECAST CONCRETE WALL 18 ' - 0 " 3' - 0 " 12 ' - 0 " 3' - 0 " 204'-3" 11'-7" ABCDEFGJ 11'-8"11'-8"14'-8"11'-8" KLMNOPQRS 32 ' - 0 " 6' - 0 " 18 ' - 4 " 9' - 8 " 4' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 J J WATER ENTRY ROOM, FIRST FLOOR ONLY UP UPENTRY ABOVE WATER ENTRY ABOVE SLOPE 2% T.O. SLAB - 86'-0" PODIUM LEVEL (8098') 23 ' - 2 " 24 ' - 0 " 18 ' - 1 0 " BUILDING B/D - PODIUM PLAN32 TOTAL PARKING SPACE (27 STANDARD / 1 HC / 4 EV CHARGING) PODIUM LEVEL = 13,000 SF 48 FENCES STORAGE LOCKERS BIKE STORAGE PARKING 1 PARKING 2 PARKING 3 PARKING 4 PARKING 5 12X30 PRECAST COLUMN (TYP) EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN PARKING 6 PARKING 7 PARKING 8 PARKING 9 EV PARKING 10 EV PARKING 11 PARKING 12 EV PARKING 13 EV PARKING 14 12X30 PRECAST COLUMN (TYP) PARKING 15 PARKING 16 ST O R A G E 48 " X 6 0 " 30 STORAGE 45" X 60" 37 STORAGE 45" X 60" 38 STORAGE 45" X 60" 39 STORAGE 45" X 60" 42 STORAGE 45" X 60" 43 STORAGE 45" X 60" 44 STORAGE 45" X 60" 47 STORAGE 45" X 60" 46 STORAGE 45" X 60" 45 ST O R A G E 48 " X 6 0 " 48 PARKING 17 BU I L D I N G B TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING B/D AB2.0 ME F ME F 1/ 1 6 / 2 0 2 3 51 BUILDING B / D - TYPICAL FLOOR PLAN12 UNITS PER FLOOR (16 - S / 4-1's / 20-2's / 8-3'S) 4 LEVELS = 51,480 GSF (INCLUDING DECKS) ROOF TOP DECK 48 UNITS = 84 TOTAL BEDROOMS 204'-3" 11'-7" ABCDEFGJ 11'-8"11'-8"14'-8"11'-8" KLMNOPQRS W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS 32 ' - 0 " 6' - 0 " 19 ' - 6 " 8' - 6 " 4' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS VTAC PATIO 8'-0" X 4'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS VTAC LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" PANTRY TV VTAC PATIO 8'-0" X 4'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV VTAC PATIO 8'-0" X 4'-0" J J LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C BATHROOM 2 UP DN VENDINGUPDN A / V C L O S E T WATER ENTRY ROOM WATER ENTRY ROOM, FIRST FLOOR ONLY LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G B TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING B/D AB2.1 ME F ME F 1/ 1 6 / 2 0 2 3 52 32 ' - 0 " 6' - 0 " 19 ' - 6 " 8' - 6 " 4' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 139'-10" 11'-7" A B C D EF F I 11'-8"11'-8"11'-8"11'-8" J K LHG M ENTRY ABOVE WATER ENTRY ABOVE PARKING 11 PARKING 12 PARKING 13 PARKING 15 PARKING 16 PARKING 17 PARKING 18 PARKING 19 3' - 0 " 12 ' - 0 " 3' - 0 " T.O. SLAB - 86'-0" PODIUM LEVEL (8098') 23 ' - 2 " 24 ' - 0 " 18 ' - 1 0 " EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV PARKING 3 EV PARKING 4 PARKING 5 EV PARKING 6 EV PARKING 7 PARKING 8 PARKING 9 PARKING 10 4" CMU WALL 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE ST O R A G E 48 " X 6 0 " 2 ST O R A G E 48 " X 6 0 " 3 ST O R A G E 48 " X 6 0 " 4 ST O R A G E 48 " X 6 0 " 5 ST O R A G E 48 " X 6 0 " 6 ST O R A G E 48 " X 6 0 " 7 ST O R A G E 48 " X 6 0 " 8 ST O R A G E 48 " X 6 0 " 9 ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 12 ST O R A G E 48 " X 6 0 " 10 ST O R A G E 48 " X 6 0 " 11 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 19 ST O R A G E 48 " X 6 0 " 17 ST O R A G E 48 " X 6 0 " 18 ST O R A G E 48 " X 6 0 " 23 8" PRECAST CONCRETE WALL UP ST O R A G E 48 " X 6 0 " 28 ST O R A G E 48 " X 6 0 " 27 ST O R A G E 48 " X 6 0 " 26 ST O R A G E 48 " X 6 0 " 24 ST O R A G E 48 " X 6 0 " 25 ST O R A G E 48 " X 6 0 " 29 ST O R A G E 48 " X 6 0 " 30 PARKING 2 PARKING 1 STORAGE 48" X 60" 31 STORAGE 48" X 60" 32 HC PARKING 20 BIKE STORAGE PARKING 14 BUILDING C - PODIUM PLAN20 TOTAL PARKING SPACE (15 STANDARD / 1 HC / 4 EV CHARGING) PODIUM LEVEL = 8,900 SF 32 FENCES STORAGE LOCKERS BIKE STORAGE UP SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G C TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING C AC2.0 ME F ME F 1/ 1 6 / 2 0 2 3 53 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BUILDING C - TYPICAL FLOOR PLAN8 UNITS PER FLOOR (3-1's / 5-2's) 4 LEVELS = 35,720 GSF (INCLUDING DECKS) ROOF TOP DECK 32 UNITS = 52 TOTAL BEDROOMS 32 ' - 0 " 6' - 0 " 19 ' - 6 " 8' - 6 " 4' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 WATER ENTRY ROOM ACCESS UP DN VENDING A / V C L O S E T LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 4'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" 139'-10" 11'-7" A B C D EF F I 11'-8"11'-8"11'-8"11'-8" J K LHG WATER ENTRY ROOM, FIRST FLOOR ONLY UPDN M BU I L D I N G C TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING C AC2.1 ME F ME F 1/ 1 6 / 2 0 2 3 54 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: A B C 1 2 4 5 7 8 D E F G H 2 62 ' - 0 " 4' - 0 " 142'-0" 2'-0"41'-0"56'-0"41'-0" UPUP STORAGE 45" X 60" 21 STORAGE 45" X 60" 22 STORAGE 45" X 60" 23 STORAGE 45" X 60" 26 STORAGE 45" X 60" 25 STORAGE 45" X 60" 24 STORAGE 45" X 60" 27 STORAGE 45" X 60" 28 STORAGE 45" X 60" 29 STORAGE 45" X 60" 30 STORAGE 45" X 60" 31 STORAGE 45" X 60" 32 STORAGE 45" X 60" 20 STORAGE 45" X 60" 19 STORAGE 45" X 60" 18 PARKING 14 PARKING 15 PARKING 16 PARKING 13 PARKING 11 PARKING 10 PARKING 9 PARKING 12 PARKING 1 PARKING 2 EV PARKING 3 EV PARKING 4 PARKING 8 PARKING 7 PARKING 6 PARKING 5 STORAGE 48" X 60" 9 STORAGE 48" X 60" 8 STORAGE 48" X 60" 7 STORAGE 48" X 60" 6 STORAGE 48" X 60" 4 STORAGE 48" X 60" 5 STORAGE 48" X 60" 10 STORAGE 48" X 60" 3 STORAGE 48" X 60" 1 STORAGE 48" X 60" 2 STORAGE 48" X 60" 11 STORAGE 48" X 60" 12 BIKE STORAGE STORAGE 48" X 60" 13 STORAGE 48" X 60" 14 STORAGE 48" X 60" 15 STORAGE 48" X 60" 16 STORAGE 48" X 60" 17 BUILDING E - PODIUM PLAN16 TOTAL PARKING SPACE (13 STANDARD / 1 HC / 2 EV CHARGING) PODIUM LEVEL = 8,100 SF 32 FENCES STORAGE LOCKERS BIKE STORAGE EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE 4" CMU WALL 4" CMU WALL BU I L D I N G E TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING E AE2.0 ME F ME F 1/ 1 6 / 2 0 2 3 55 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: 2 BED / 2 BATH 850 SFKITCHEN LIVING SPACE BEDROOM #1 BEDROOM #2 STAIR 3 BED / 2 BATH 1050 SF KITCHEN LIVING SPACE BEDROOM #1 BEDROOM #2 BEDROOM #3 2 BED / 1 BATH 702 SF BEDROOM #1 LIVING SPACE KITCHEN BATHBEDROOM #2 1 BED / 1 BATH 610 SF BEDROOM #1 LIVING SPACE KITCHENBATH 2 BED / 2 BATH 850 SF KITCHEN LIVING SPACE BEDROOM #1 BEDROOM #2 STAIR 3 BED / 2 BATH 1050 SF KITCHEN LIVING SPACE BEDROOM #1 BEDROOM #2BEDROOM #3 2 BED / 1 BATH 702 SF BEDROOM #1 LIVING SPACE KITCHEN BATH BEDROOM #2 8 - UNITS MAIN LEVEL (2 - 1's / 4 - 2's / 2 - 3's) 4 LEVELS = 31,600 GSF ROOF TOP PATIO 32 UNITS = 64 TOTAL BEDROOMS BUILDING E - MAIN LEVEL FLOOR PLAN A B C 1 2 4 5 7 8 D E F G H 2 COMMUNICATING DOOR UPDN 1 BED / 1 BATH 610 SF BEDROOM #1LIVING SPACE KITCHEN BATH STAIR COMMUNICATING DOOR UP DN 62 ' - 0 " 4' - 0 " 142'-0" 2'-0"41'-0"56'-0"41'-0" BU I L D I N G E TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING E AE2.1 ME F ME F 1/ 1 6 / 2 0 2 3 56 189'-2" A B C D E F G H I J K L M N O P Q 30 ' - 3 " 5' - 6 " 28 ' - 3 " 2' - 0 " 66 ' - 0 " 1 2 4 5 7 8 UP UP BUILDING F - PODIUM PLAN28 TOTAL PARKING SPACE (23 STANDARD / 1 HC / 4 EV CHARGING) PODIUM LEVEL = 11,000 SF 32 FENCES STORAGE LOCKERS BIKE STORAGE PARKING 2 PARKING 3 3' - 0 " 12 ' - 0 " 3' - 0 " PARKING 4 PARKING 5 PARKING 1 PARKING 22 PARKING 21 PARKING 20 PARKING 19 12X30 PRECAST COLUMN (TYP) EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN PARKING 18 PARKING 15 EV PARKING 14 EV PARKING 13 PARKING 12 EV PARKING 11 EV PARKING 10 12X30 PRECAST COLUMN (TYP) PARKING 9 PARKING 8 PARKING 25 PARKING 24 PARKING 23 PARKING 28 PARKING 27 PARKING 26 4" CMU WALL 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 23 ST O R A G E 48 " X 6 0 " 28 ST O R A G E 48 " X 6 0 " 27 ST O R A G E 48 " X 6 0 " 29 ST O R A G E 48 " X 6 0 " 30 ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 23 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 23 STORAGE 45" X 60" 36 STORAGE 45" X 60" 37 STORAGE 45" X 60" 38 STORAGE 45" X 60" 39 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 23 BIKE STORAGE HC PARKING 7PARKING 6 EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV PARKING 17 EV PARKING 16 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G F TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING F AF2.0 ME F ME F 1/ 1 6 / 2 0 2 3 57 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: 8 - UNITS MAIN LEVEL (4 - 4's / 4 - 2's) 4 LEVELS = 48,000 GSF ROOF TOP PATIO 32 UNITS = 102 TOTAL BEDROOMS WH REF. DW W WH WH BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 BATH #1 BATH #2 PANTRY LN LN VTAC UP WH REF. DW W WHWH BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 BATH #1 BATH #2 PANTRY LN LN VTAC UP WH BATH #2 PANTRY LN F101 F102 F103 F104 BEDROOM #1 BEDROOM #2 BEDROOM #1 BEDROOM #2 BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 F108 F107 F106 F105 BEDROOM #1 BEDROOM #2 BEDROOM #1 BEDROOM #2 BUILDING F - MAIN LEVEL FLOOR PLAN 189'-2" A B C D E F G H I J K L M N O P Q 30 ' - 3 " 5' - 6 " 28 ' - 3 " 2' - 0 " 66 ' - 0 " 1 2 4 5 7 8 BU I L D I N G F TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING F AF2.1 ME F ME F 1/ 1 6 / 2 0 2 3 58 WHREF. DW W WH BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 BATH #1 BATH #2 PANTRY LN LN VTAC UPDN WH REF. DW W BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 BATH #1 BATH #2 PANTRY LN LN VTAC UP DN WH BATH #2 PANTRY LN F201 F202 F203 F204 BEDROOM #1 BEDROOM #2 BEDROOM #1 BEDROOM #2 BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 F208 F207 BEDROOM #1 BEDROOM #2 8 - UNITS 2/3/4 LEVELS (4 - 4's / 4 - 3's) PER FLOOR 4 LEVELS = 48,000 GSF ROOF TOP PATIO 32 UNITS = 102 TOTAL BEDROOMS WH BEDROOM #3 WH BEDROOM #2 BEDROOM #3 BEDROOM #1 BEDROOM #4 F205F206 BEDROOM #1 BEDROOM #2 WH BEDROOM #3 BUILDING F - 2/3/4 LEVEL FLOOR PLANS 189'-2" A B C D E F G H I J K L M N O P Q 30 ' - 3 " 5' - 6 " 28 ' - 3 " 2' - 0 " 66 ' - 0 " 1 2 4 5 7 8 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G F TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING F AF2.2 ME F ME F 1/ 1 6 / 2 0 2 3 59 SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: ST O R A G E 48 " X 6 0 " 1 4" CMU WALL 6" CONCRETE WALL 42" ABOVE FINISHED SLAB, OPEN ABOVE HC PARKING 18 PARKING 20 PARKING 21 PARKING 22 PARKING 23 PARKING 24 PARKING 25 PARKING 26 PARKING 27 PARKING 28 PARKING 29 PARKING 30 PARKING 32 PARKING 31 PARKING 19 STORAGE 45" X 60" 31 ST O R A G E 48 " X 6 0 " 2 ST O R A G E 48 " X 6 0 " 3 ST O R A G E 48 " X 6 0 " 4 ST O R A G E 48 " X 6 0 " 5 ST O R A G E 48 " X 6 0 " 6 ST O R A G E 48 " X 6 0 " 7 ST O R A G E 48 " X 6 0 " 8 ST O R A G E 48 " X 6 0 " 9 ST O R A G E 48 " X 6 0 " 15 ST O R A G E 48 " X 6 0 " 14 ST O R A G E 48 " X 6 0 " 13 ST O R A G E 48 " X 6 0 " 12 ST O R A G E 48 " X 6 0 " 10 ST O R A G E 48 " X 6 0 " 11 ST O R A G E 48 " X 6 0 " 16 ST O R A G E 48 " X 6 0 " 22 ST O R A G E 48 " X 6 0 " 21 ST O R A G E 48 " X 6 0 " 20 ST O R A G E 48 " X 6 0 " 19 ST O R A G E 48 " X 6 0 " 17 ST O R A G E 48 " X 6 0 " 18 ST O R A G E 48 " X 6 0 " 23 STORAGE 45" X 60" 32 STORAGE 45" X 60" 33 STORAGE 45" X 60" 36 STORAGE 45" X 60" 35 STORAGE 45" X 60" 34 STORAGE 45" X 60" 40 STORAGE 45" X 60" 41 ST O R A G E 48 " X 6 0 " 28 ST O R A G E 48 " X 6 0 " 27 ST O R A G E 48 " X 6 0 " 26 ST O R A G E 48 " X 6 0 " 24 ST O R A G E 48 " X 6 0 " 25 ST O R A G E 48 " X 6 0 " 29 BIKE STORAGE 10" PRECAST CONCRETE WALL 8" PRECAST CONCRETE WALL 18 ' - 0 " 3' - 0 " 12 ' - 0 " 3' - 0 " 204'-3" 11'-7" ABCDEFGJ 11'-8"11'-8"14'-8"11'-8" KLMNOPQRS 32 ' - 0 " 6' - 0 " 18 ' - 4 " 9' - 8 " 4' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 J J WATER ENTRY ROOM, FIRST FLOOR ONLY UP UPENTRY ABOVE WATER ENTRY ABOVE SLOPE 2% T.O. SLAB - 86'-0" PODIUM LEVEL (8098') 23 ' - 2 " 24 ' - 0 " 18 ' - 1 0 " BUILDING CDOT - PODIUM PLAN32 TOTAL PARKING SPACE (27 STANDARD / 1 HC / 4 EV CHARGING) PODIUM LEVEL = 13,000 SF 48 FENCES STORAGE LOCKERS BIKE STORAGE PARKING 1 PARKING 2 PARKING 3 PARKING 4 PARKING 5 12X30 PRECAST COLUMN (TYP) EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN EV CHARGING TOWER, MOUNT TO CONCRETE COLUMN PARKING 6 PARKING 7 PARKING 8 PARKING 9 EV PARKING 10 EV PARKING 11 PARKING 12 EV PARKING 13 EV PARKING 14 12X30 PRECAST COLUMN (TYP) PARKING 15 PARKING 16 ST O R A G E 48 " X 6 0 " 30 STORAGE 45" X 60" 37 STORAGE 45" X 60" 38 STORAGE 45" X 60" 39 STORAGE 45" X 60" 42 STORAGE 45" X 60" 43 STORAGE 45" X 60" 44 STORAGE 45" X 60" 47 STORAGE 45" X 60" 46 STORAGE 45" X 60" 45 ST O R A G E 48 " X 6 0 " 48 PARKING 17 BU I L D I N G CD O T TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING CDOT AT2.0 ME F ME F 1/ 1 6 / 2 0 2 3 60 BUILDING CDOT - TYPICAL FLOOR PLAN 12 UNITS PER FLOOR (12 -S / 3 - 1'S / 9 - 2'S / 12-3's) 4 LEVELS = 37,950 GSF (INCLUDING DECKS) ROOF TOP DECK 36 UNITS = 69 TOTAL BEDROOMS 204'-3" 11'-7" ABCDEFG 11'-8"11'-8"11'-8"14'-8"11'-8" KLMNO LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" PQRS W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 5'-0" 32 ' - 0 " 6' - 0 " 19 ' - 6 " 7' - 6 " 5' - 0 " 70 ' - 0 " 1 2 4 5 6 7 8 PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 VTAC PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS PATIO 8'-0" X 4'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH ACCESS VTAC PATIO 8'-0" X 4'-0" STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" O STORAGE BEDROOM 3 9'-0" X 12'-6" LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV W/ D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 8'-0" X 4'-0" LIVING SPACE 10'-10" X 13'-0" KITCHEN PRIMARY BEDROOM 10'-7" X 13'-0" BATHROOM 2 PANTRY TV W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH VTAC PATIO 9'-0" X 5'-0" S VENDING A / V C L O S E T LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C UPDN WATER ENTRY ROOM UP DN W/D SECONDARY BEDROOM 10'-10" X 12'-6" BATHROOM 1 WH LIVING SPACE 10'-10" X 13'-0" KITCHEN PANTRY TV VTAC PATIO 9'-0" X 4'-0" WATER ENTRY ROOM, FIRST FLOOR ONLY LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C LIVING SPACE 13'-6" X 15'-0" W/D BATHROOM WH VT A C SOFFIT FOR HVAC DUCT: MINIMIZE SIZE AND KEEP HIGH AND TIGHT AS POSSSIBLE WINDOW TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS VERTICAL FAUX WOOD BLINDS ON SLIDING DOORS FOR CABINET SYSTEM PROFILE: RE WITH OWNER IN ADVANCE COUNTERTOPS: GRANITE, EASED EDGE 2CM (3 4") , 4" H BACKSPLASH 3 4" x 12" MDF PAINTED SHELF W/ CHROME ROD @ 69" AFF (48" AFF AT ACCESSIBLE UNITS) FAN/LIGHT COMBINATION TO BE PROVIDED ACCORDING TO FOOTCANDLE REQUIREMENTS. REFER TO ELECTRICAL DRAWINGS FOR DETAILS. PROVIDE BLOCKING FOR SHELVING & ACCESSORIES PROVIDE BLOCKING AND INSTALL FOR ALL REQUIRED GRAB BARS PER ADA TYPE A GUIDELINES. ONLY PROVIDE BLOCKING FOR ALL TYPE B UNITS AT THIS TIME. ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH DRAWER PULLS INSULATE HOT WATER PIPING AND DRAIN LINE MICROWAVE W/HOOD, LIGHT AND FAN BELOW PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI RECEPTANCE COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR. ENSURE ALL DOORS TO HAVE DOOR STOPS VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE CODES PROVIDE CASING ON ALL DOOR OPENINGS 1/2" X 4" WITH EASED EDGE. PROVIDE BASE BOARD, 1 2" X 4" WITH EASED EDGE. FLOOR DRAIN, TYP @ ROLL-IN SHOWERS. VERIFY LOCAL CODES REGARDING DRAIN REQUIREMENTS. ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT) COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES, INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC. ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. SEE ELECTRICAL PLANS ALL DOORS IN TYPE A / TYPE B TO HAVE A CLEAR OPENING OF 32" ADA 2010 SECTION 404.2.7, ALL PULLS / LATCHES / HANDLES / LOCKS AND OTHER OPERABLE PARTS TO COMPLY WITH 309.4. GENERAL NOTES: BU I L D I N G CD O T TY P I C A L FL O O R P L A N Dr a w n b y : Ch e c k e d b y : Sh e e t Re v i s i o n s : S h e e t t i t l e St a m p Da t e : Pr o j e c t N o : 20 2 3 T R I U M P H ww w . t r i u m p h d e v . c o m TR I U M P H DE V E L O P M E N T WE S T 10 5 E d w a r d s V i l l a g e B l v d #C 2 0 1 Ed w a r d s C O 8 1 6 3 2 P. O . B o x 2 4 4 4 TI M B E R R I D G E - P H A S E I I VA I L , C 0 8 1 6 5 7 1/8" = 1'-0"1 BUILDING CDOT AT2.1 ME F ME F 1/ 1 6 / 2 0 2 3 61 62 63 64 65 40' U T I L I T Y E A S E M E N T NOR T H F R O N T A G E R O A D 6 YARD DUMPS T E R TOV B U S S T O P 32 RED U C E T O 2 0 ' U T I L I T Y E A S E M E N T BUIL D I N G A NOR T H F R O N T A G E R O A D TOV B U S S T O P RED U C E T O 2 0 ' U T I L I T Y E A S E M E N T BUIL D I N G A 4 YAR D DUMP S T E R RECYC L E 6 YAR D DUMP S T E R 8130 BUIL D I N G C 2 0 ' - 0 " S E T B A C K 26 BUIL D I N G D 40 BUIL D I N G C D O T 8116 8120 8124 8130 8135 8140 8146 8152 PS - 4 0 40' U T I L I T Y E A S E M E N T NOR T H F R O N T A G E R O A D 6 YARD DUMPS T E R TOV B U S S T O P 32 RED U C E T O 2 0 ' U T I L I T Y E A S E M E N T BUIL D I N G A EN G I N E E R I N G I N C . 34 5 1 0 H W Y 6 I UN I T A 9 I PO B O X 9 7 ED W A R D S C O 8 1 6 3 2 I 97 0 . 9 2 6 . 3 3 7 3 WW W . A L P I N E C I V I L .CO M O: \ V a i l \ T i m b e r R i d g e I I - 2 0 2 2 \ d w g \ M a s t e r \ A u t o t u r n - T i m b e r R i d g e . d w g , T h u J a n 1 2 1 1 : 0 1 : 4 8 2 0 2 3 , A u t o C A D P D F ( H i g h Q u a l i t y P r i n t ) . p c 3 66 67 68 69 70 AGENDA ITEM NO. 1.4 Item Cover Page DATE:February 7, 2023 TIME:15 min. SUBMITTED BY:Stephanie Bibbens, Town Manager ITEM TYPE:Presentation/Discussion AGENDA SECTION:Presentation/Discussion SUBJECT:Formal Naming Process for Public Spaces SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):Kathleen Halloran, Deputy Town Manager and Lori Barnes, Director of Library Services VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 230207 Naming Memo.docx Naming_ExhibitA.pdf 71 TO:Vail Town Council FROM:Cultural Heritage Committee DATE:February 7, 2023 SUBJECT: Resolution No. 4, Series 2023, Naming or Commemoration of town-owned properties I.SUMMARY The purpose of Resolution No. 4, Series 2023 is to establish a process regarding naming or commemoration of town-owned properties. II.BACKGROUND Since the incorporation of the Town of Vail in 1966, various parks, buildings, plazas, streets, and other landmarks have been named to recognize the contributions of Vail’s dreamers, builders, trailblazers, and other influences that have drawn upon Vail’s alpine setting and European roots. In anticipation of future naming opportunities, the following guidelines have been established to not only reflect practices of the past, but to provide a formal structure for future decisions. II.DISCUSSION The proposed process has been developed by the town’s Cultural Heritage Preservation and Programs Committee (“CHC”) over the last several months. The committee is made up of staff representing a variety of departments (Library, Environmental, Community Relations, Economic Development, Town Manager’s office) and a Town Council member (Jen Mason). To connect Vail's past, present and future, a nomination process has been established to recognize social, environmental, and economic influences for the naming or commemoration of Town-owned properties, including parks, plazas, streets, buildings, and interior spaces. The process is outlined in detail in Exhibit A, attached, and includes criteria to be evaluated for nominations submitted to the town in writing. Nomination forms are available on the town’s website. Nominations will be reviewed by members of the Town of Vail Cultural Heritage Preservation and Programs Committee and if approved, the nominations will be forwarded to the Vail Town Council for formal consideration at a public meeting. During its formal review, Town Council may choose to direct the Committee and/or town staff to continue with additional fact finding, budget and design assessments, project schedules, etc., with additional project updates to Town Council as necessary to bring closure to the nomination. It should be noted that initial 72 Town of Vail Page 2 approval of a nomination by the Town Council is preliminary and does not commit expenditures to carry out a nomination or commemoration. This action can only be completed as part of the Town’s budget adoption process. II.ACTION REQUESTED OF COUNCIL Staff recommends Town Council approve Resolution No. 4, Series 2023 in the evening’s consent agenda. A copy of the Resolution is included as an attachment for review. 73 EXHIBIT A TOWN OF VAIL CULTURAL HERITAGE PRESERVATION AND PROGRAMS COMMITTEE NOMINATION PROCESS NAMING OR COMMEMORATION OF TOWN-OWNED PROPERTIES, INCLUDING PARKS, PLAZAS, STREETS, BUILDINGS, AND INTERIOR SPACES OVERVIEW Since the incorporation of the Town of Vail in 1966, various parks, buildings, plazas, streets, and other landmarks have been named to recognize the contributions of Vail’s dreamers, builders, trailblazers, and other influences that have drawn upon Vail’s alpine setting and European roots. In anticipation of future naming opportunities, the following guidelines have been established to not only reflect practices of the past, but to provide a formal structure for future decisions. NOMINATION PROCESS To connect Vail's past, present and future, a nomination process has been established to recognize social, environmental, and economic influences for the Naming or Commemoration of Town-owned Properties, including Parks, Plazas, Streets, Buildings, and Interior Spaces. The process is as follows: Nomination Submittals for Naming/Commemoration First-time nominations may be made at any time by members of the public, including Vail Town Council members and Town staff. Town of Vail residency is not required to submit a nomination. The nomination form is available on the Town of Vail website at https://www.vailgov.com/community/cultural-heritage-preservation-programs/commemorative- naming-nomination-form Nominations must be in writing and will be evaluated based on the following criteria: Does the naming inspire future generations to celebrate a historical figure, place, event, or other instance of historical or cultural significance? Does the naming involve a natural or geological feature? Does the naming involve an individual or individuals whose legacy is well documented in how the actions have shaped Vail in the past or present and/or how it will influence Vail in the future? Does the naming honor a fallen community member in recognition of their life’s passion? Does the naming formalize a nickname or common use identification? Does the naming honor an individual or individuals as a stipulation of a donation of property or financial contribution? Is the naming timeless in that it reflects the tradition, continuity, and values of the community in perpetuity? Is there a circumstance where a renaming is warranted to address historical accuracy or a circumstance of dishonor? 74 Nomination Evaluation Process for Naming/Commemoration Once submitted by the nominator, the nomination will be evaluated by members of the Town of Vail Cultural Heritage Preservations and Programs Committee Cultural Heritage Preservation & Programs | Vail, CO (vailgov.com)with follow up research conducted as needed to complete its due diligence. Nominations approved by the Cultural Heritage Committee will be forwarded to the Vail Town Council for formal consideration to be presented at a public meeting in which the Town Council may approve, deny, or modify the recommendation. The nominator will be invited to offer comment during the public meeting in support of the nomination. During its formal review, Town Council may choose to direct the Committee and/or Town staff to continue with additional fact finding, budget and design assessments, project schedules, etc., with additional project updates to Town Council as necessary to bring closure to the nomination. It should be noted that initial approval of a nomination by the Town Council is preliminary and does not commit expenditures to carry out a nomination or commemoration. This action can only be completed as part of the Town’s budget adoption process. Nominators whose applications are not approved by the Cultural Heritage Committee and/or Town Council will be informed of the decision. Nominators may resubmit a more detailed application after three (3) months. If the revised application fails to receive support by the Cultural Heritage Committee and/or Town Council, any further attempts by the nominator will be suspended for a minimum of one (1) year. Examples of Town-owned Property Named for Individuals in Vail: Susan Knott Memorial Bridge Pulis Bridge Katsos Ranch Gerald R. Ford Park & Amphitheater Betty Ford Alpine Gardens Betty Ford Way (through Ford Park) Bill Wright Tennis Center Ben Krueger Room (Vail Golf & Nordic Center) Roger Staub Park Ted Kindel Park Eaton Plaza/Founders Plaza Seibert Circle Silfer Square John and Cissy Dobson Covered Bridge Mayors’ Park Dobson Ice Arena Zeke M. Pierce Skatepark John F. Donovan Park Stephens Park 75 Ellefson Park 76 AGENDA ITEM NO. 1.5 Item Cover Page DATE:February 7, 2023 TIME:20 min. SUBMITTED BY:Stephanie Bibbens, Town Manager ITEM TYPE:Presentation/Discussion AGENDA SECTION:Presentation/Discussion SUBJECT:Strategic Planning Session Recap SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):Russell Forrest, Town Manager VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: Strategic Planning Session 020723 goals.docx Town Council Action Plan (1).xlsx 77 To:Vail Town Council From:Russell Forrest, Town Manager Date:February 7, 2023 Subject: Strategic Planning Session _________________________________________________________________________________ 1.PURPOSE AND INTRODUCTION On January 17, 2023 the Council met to identify high priority goals for 2023. The purpose of this discussion is to review language for those four goals and ensure that the wording meets Council’s expectations. Also provided is a matrix which includes the 27 projects identified in the Council action plan. This includes an updated time frame and status for each action. 2.BACKGROUND The Town Council Priorities document includes 27 projects categorized in Council’s four Vision areas: 1. Community 2. Environment 3. Economy 4. Experience The online document was introduced in September of 2022 as a way to encapsulate projects discussed at the January 2022 Strategic Planning Town Council Meeting. This plan does not have a prioritization associated with the actions. Prioritization of projects and goals will help ensure timely implementation and that available resources are focused on the implementation of those projects. For the purposes of the meeting on January 17, the Town Manager shared what he heard from individual Council meetings as being the most important goals to achieve in the next year. On the 17th Council discussed high priority goals and identified four high priority goal areas that are summarized below. It is suggested that after the next election (or whenever Council would choose to do this) that a facilitated strategic planning session be scheduled to: 1.Identify Critical Issues: Evaluate public feedback on priority issues and identify the most critical issues to focus time and Town resources on (this step would utilize community survey information, feedback from public engagement opportunism, potential focus groups) 2.Articulate Desired Results to Address Critical Issues: After identifying the most important issues to focus time and resources on, Council would work with staff (through 78 Town of Vail Page 2 a facilitator) to identify specific time bound goals or results the Community would experience to address the high priority issues. 3.Strategies/Actions: Staff would bring forward specific strategies/actions for Council approval to achieve desired results/goals. This form of strategic planning helps transparently connect Town actions to community feedback on priorities. It also enables us to measure and even create a dashboard to show progress on achieving high priority goals so that the Town and staff are accountable to both the Council and the community in achieving those results. For the purposes of the planning meeting on January 17th the Council was asked to identify high priority goals to achieve in 2023. Again, this recognizes that ongoing work on other projects will continue. 3.Goal Area Attachment 1 includes proposed language for the four goal areas discussed on January 17th and an updated matrix for priority actions. 4.ACTION REQUESTED Review and provide feedback on the wording for the four priority goal areas. Attachment 1: Summary of Updated Priorities – Goals and Actions. 79 Priority Category Issue Statement Goals Next Steps Who 1 Housing A lack of available homes for year-round and seasonal local residents in the Eagle River Valley and Vail threatens our ability to attract and retain quality employees to maintain and sustain the Vail economy and community. The Town of Vail will acquire 1,000 additional resident housing deed restrictions by the year 2027 as compared to 2017. By October 1, 2023: 1. Complete the Residences at Main Vail. 2. Initiate the entitlement process for the Timber Ridge and West Middle Creek housing developments. 3. Acquire the East Vail CDOT parcel and initiate the design process. 4. Initiate the acquisition process for one additional parcel of land to create a significant regional housing development. 5. Amend the commercial linkage requirements and adopt residential linkage. 1. Execute management agreement with RMV property manager. 2. Develop a Letter of Intent with Timber Ridge Developer. 3. Complete conceptual site planning for West Middle Creek. 4. Acquire East Vail CDOT parcel. 5. Work with institutional partners to acquire a significant regional housing site. Housing Director lead, supported by Town Manager & Deputy Manager, Finance Dept, Public Works, Com Dev 2 Civic Hub and Town Hall The Town will have $36 million to utilize on public uses in Lionshead which could be used for the implementation of the 2018/2019 Vail Civic Area Plan and which must be spent by 2029. Dobson Ice Arena's facility systems are failing and need replacement. The Town Hall offices at 75 S. Frontage Rd are at the end of their useful life and either require an investment to renovate or they need to be replaced. By November 1, 2023: 1. Determine a program, budget, and critical path to renovate Dobson Ice Arena so that it will continue to serve Vail for another 40 to 50 years. 2. Determine whether to renovate or relocate Town of Vail offices and if relocated determine best location(s), a budget, and a timeline for relocation or renovation. Note: The Town Manager would request that he be able to work with cultural arts interests to further refine the conceptual design and programs for community uses in addition to Dobson and town offices on the hub site. 1. Execute design contract with Populous (recommended design team for Dobson). 2. Develop alternative scenarios for locating and/or refurbishing Town offices and provide recommendations to Town Council. 3. (Recommended additional task): Facilitate a discussion on high priority cultural/community uses and how they can be finically sustained over time and bring forward recommendations to the Town Council. Public Works Director - Dobson/ Town Manager & Com Dev Director 3 Excellent Customer Service The Town of Vail has the vison of being the premier mountain resort community in the world, which requires providing consistent and excellent customer service for our residents and guests. Although we have a variety of data sources related to customer service, the town does not have organizational goals or metrics for the customer service we provide. Providing excellent customer service requires defining that service and creating a working environment that supports delivering excellent service every day. By November 1, 2023: 1. Create a clear definition for providing excellent customer service to our residents and guests for town services and a means of measuring to what degree we are providing excellent customer service. 2. Identify and implement metrics for objectively measuring organizational effectiveness and health so that a baseline is developed which can be improved on in future years. Work with leadership team to develop customer service goals and metrics. Town Manager and Leadership Team 4 Land Use Regulations Support Town Goals The town directly influences retaining and creating affordable housing through its land use code. Municipalities can incentivize or disincentive the creation of affordable housing with how their land use codes are written and structured. Improving the efficiency of the development review process to ensure quality development which meets the town's standards while reducing process time will reduce costs for both public and private projects. A periodic review of the land use code is also recommended best management practice to ensure it is supporting the Town's goals By November 1, 2023: Review and analyze Title 12 Zoning, the Official Zoning Map, Title 14 Development Standards, and other pertinent land use policy language including the Town of Vail Comprehensive Plan. Bring forward recommendations for amendments to help foster the creation of affordable housing and improved efficiency of the development review process. 1. Meet with stakeholders (builders, developers, community members, PEC, DRB) and request feedback. 2. Review existing land use code and develop recommendations to achieve this goal. 3. Provide recommendations to PEC and Council for consideration and adoption. Community Development Director, Public Works Director, Fire Chief Priority Town Council Goals for 2023 80 PROJECT CURRENT STATUS MILESTONE UPDATES West Vail Master Plan Implementation Following numerous work session and a failed motion to approve (3-3 vote), returning to PEC on 2/27 with revised language and standards for the two proposed new zone districts in response to board and public comments. Phase 1, Housing: Implementation of recommendations in Chapter 3, WVMP. May 2022 April 2023. Update to Council on March 6, 2023. Phase 2, West Vail Center: Implementation of recommendations in Chapter 2, WVMP. May 2023 Sept. 2023. Update to Council May 15, 2023. Phase 3, Transportation & Mobility: Implement recommendations in Chapter 4, WVMP. Coordinate implementation timeline in context of town-wide Transportation Master Plan. Matt Gennett, Community Development Director mgennett@vailgov.com Timber Ridge Apartments Redevelopment The Town of Vail has partnered with Triumph Development to prepare a plan for the redevelopment of the Timber Ridge Village Apartments. To date, the Vail Town Council has adopted goals and objectives for the redevelopment of Timber Ridge, formed a Redevelopment Committee, provided direction to advance Revised Option C, affirmed the desired program and uses, completed a preliminary probable development cost estimate, completed a geotechnical analysis, and is now engaging with CDOT to acquire a portion of ROW adjacent to the redevelopment site. The Timber Ridge Village Apartments are on track for a spring 2024 construction start date. Aug. 1, 2023 Updated market study, design development, and entitlement approval process to redevelop Timber Ridge Village Apartments. Spring 2024 Construction begins. Feb. 1 Apr. 1, 2025 New units expected to be completed and available for phased occupancy. George Ruther, Housing Director gruther@vailgov.com Ford Park Master Plan Amendments Consultant and stakeholders had initial kick off followed by one round of additional stakeholder input. Second round of longer term issues being requested of stakeholders and this input was due at the end of January. Adoption of the updated Master Plan is anticipated by end of third quarter 2023.Todd Oppenheimer, Capital Projects Manager toppenheimer@vailgov.com Short Term Rental Policy Amendments Complete. Plan to present an update to Council mid-year 2023 on the updated program. Jan. 1, 2023 Effective implementation date of Ordinance No. 11, Series of 2022. Feb. 28, 2023 STR license renewal deadline. Carlie Smith, Finance Director csmith@vailgov.com Early Childhood Initiatives In 2022, The town supported our two Early Childhood Education programs by instituting a workforce retention grant, beginning tuition support for Vail's working families, and continued providing support for sustaining infant care within the community. This is in addition to the capital and space allocation for both centers. Throughout 2023 Continued funding in 2023 for same four identified areas including: tuition assistance for Vail s families, infant subsidy to maintain infant care in Vail (part of sustainability of ECE programs), workforce retention grants, and continuing to identify expansion opportunities for ECE options in Vail. Krista Miller, Human Resources/Risk Director kmiller@vailgov.com Cultural Heritage Preservation & Programs Ongoing - meeting bimonthly 2023 budget is $25,000. February 7 - Resolution establishing process for the Naming or Commemoration of town- owned properties. Partner on Trailblazer Award process. Continued work in 2023: Summervail Archives; Vail Valley Voices; Library's 40th Anniversary. Eagle County celebrates 140 years on February 11. CHC website in need of updates. Lori A. Barnes, Library Services Director lbarnes@vailgov.com Permanent Location for Children s Garden of Learning Town Manager has met with CGL. New location has not yet been identified. Lease at temporary location expires 2026 or earlier pending 180 days notice.Kathleen Halloran, Deputy Town Manager khalloran@vailgov.com Wildland Urban Interface Code Amendments Update coming. Spring 2023 Town Council update on 2022 Fire Free Five grant program. April-October 2023 Implement 2023 Fire Free Five grant program. Fall 2023 Fire Free Five code adoption consideration. Mark Novak, Fire Chief mnovak@vailgov.com USFS Booth Creek Fuels Reduction Project On track for completion of EA. Implementation cost/basis to begin 2024. Spring 2023 USFS driven second NEPA comment period (will require additional TOV funding). Fall 2023 USFS Record of Decision. Winter 2023/2024 Identify costs/funding based upon EA. Mark Novak, Fire Chief mnovak@vailgov.com Identify Alternative Fuel Solutions On track to release RFP winter 2023, micro-study on geothermal in Feb. 2024 2022 - First boiler replacement operational. Collecting data on usage.Kristen Bertuglia, Environmental Sustainability Director kbertuglia@vailgov.com Sustainable Strategic Plan In draft form, needs updating. Waiting for adoption of DSP.Jan. Dec. 2023 Kristen Bertuglia, Environmental Sustainability Director kbertuglia@vailgov.com Wildlife Crossing at Dowd Junction Stalled with CDOT leadership, upcoming meeting with CDOT engineering team to determine next steps. Feasibility and design RFP in 2023 to identify additional crossing opportunities in additional to Dowd.Kristen Bertuglia, Environmental Sustainability Director kbertuglia@vailgov.com Open Lands Plan Ongoing 2022-2028 - Biodiversity study to kick off winter 2023, contract to be finalized Feb 7. Field work spring/summer 2023. Deliverables early 2024. Other lands identified are being pursued for acquisition. Kristen Bertuglia, Environmental Sustainability Director kbertuglia@vailgov.com Building Code Regs & Climate Action Plan Implementation Initial 2023 building code with ICC upgrades complete. Roadmap development underway. May 2022 Phase 1 complete Adoption of 2021 ICC Codes with additions for solar and EV readiness 2023. Phase 2 Roadmap to Zero, incentives to include outdoor energy uses/snowmelt offset program. Kristen Bertuglia, Environmental Sustainability Director kbertuglia@vailgov.com Destination Marketing Organization Reorg Initiated consultant discussion on structural reorganization June 2023 - Adoption of new model by Vail Town Council with implementation to follow.Mia Vlaar, Economic Development Director mvlaar@vailgov.com Council Action Plan POINT OF CONTACT 81 Destination Stewardship Plan - Steward Vail Draft DSP roadmap will be presented to council on March 7. Resolution for adoption April 4. March - December 2023 - Adoption of plan by Vail Town Council, implementation by leadership.Mia Vlaar, Economic Development Director mvlaar@vailgov.com Global Friendship | Peer Resort Exchange Programming Ongoing Identify Vail Town Council priorities with goals for peer resort programming, create plan for future peer resort visits, consider 1-3 year plan.Mia Vlaar, Economic Development Director mvlaar@vailgov.com Economic Development Strategic Plan Update DMO structure precedes strategic plan development.Dec. 2023.Mia Vlaar, Economic Development Director mvlaar@vailgov.com Go Vail 2045 Vail Mobility & Transportation Master Plan Consultant has conducted initial community input last summer and is working through the initial specific topic area issues and possible initiatives and studies. Consultant is also looking to combine big data into mobility modeling. July 2022 May 2024.Tom Kassmel, Town Engineer tkassmel@vailgov.com Public Works Shops Expansion and Access Improvements (Potential Additional Municipal Functions beyond Public Works) Public Works portion complete. Potential other municipal functions and access improvements timeline TBD.Greg Hall, Public Works Director ghall@vailgov.com E-Vail Courier Implementation Complete Oct. 1, 2022 - Full implementation began.Ryan Kenney, Police Commander rkenney@vailgov.com Regional Transportaion Authority Formation and Future Operations Election complete with 7 of 8 entities passing the ballot initiative. Formation of the authority is in progress. Board meets monthly and the technical committees meet more often. A retreat is being scheduled for this spring. Ballot measure passed in Nov. 2022 Greg Hall, Public Works Director ghall@vailgov.com Public Parking Initiatives Parking system installed, refinements are underway. Parking program implemented and we are monitoring results. Parking Task Force meetings have resumed, focused on additional phased improvements. New parking system installed, rates and passes were implemented at the start of the 2022/23 winter season Greg Hall, Public Works Director ghall@vailgov.com Guest Experience Initiatives PrimaVail employee training and engagement, village entertainment, survey and welcome center enhancements.Winter season activation and summer season activation 2023.Mia Vlaar, Economic Development Director mvlaar@vailgov.com 82 AGENDA ITEM NO. 1.6 Item Cover Page DATE:February 7, 2023 TIME:20 min. SUBMITTED BY:Jeremy Gross, Economic Development ITEM TYPE:Presentation/Discussion AGENDA SECTION:Presentation/Discussion SUBJECT:Peer Resort and Global Friendship Exchange Discussion SUGGESTED ACTION:Listen to presentation and provide feedback. PRESENTER(S):Mia Vlaar, Director of Economic Development VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: Council Memo Peer Resorts 2-7-2023.pdf 83 To: Vail Town Council From: Economic Development Department, Mia Vlaar, Director Date: February 7, 2023 Subject: Peer Resort and Global Friendship Exchange PURPOSE The purpose of this memo is to provide information to and receive direction from Town Council on the Peer Resort and Global Friendship Exchange programs. BACKGROUND For many years, the town has taken trips to resorts around the country and around the world in order to learn more about best practices pertaining to a variety of key topics of mutual interest. Many of these trips are reciprocated when the peer resort community decides to visit Vail with the same purpose in mind. While Town Council has not taken a trip to a peer resort in the United States for over five years, the Council and town leadership have visited several international resort communities since 2018. This includes Yamanouchi Machi, Nagano Prefecture, Japan (2018 and 2019) and St. Moritz, Switzerland and St. Anton, Austria (2022) The town currently has agreements with two resort communities: Yamanouchi, Japan and St. Moritz, Switzerland. Town leadership is currently working with St. Anton, Austria leadership to align on topics of interest and to form an agreement between the parties. The two existing agreements are aligned to the four topics listed below. The agreements also include reference to “Any other area of cooperation that the Parties agree upon”. Below is a list of topics included in the agreements, with specific examples from past trips in parentheses. • Education (student exchanges with Yamanouchi) • Cultural Exchange (Park City high school auditorium as performance venue) • Tourism Promotion and Special Events (Sundance Film Festival) • Environmental Cooperation (Best Practices in education and research) Other topic of interest included in past visits: • Parking, Transit and Mobility (Ownership of lots, Nagano fast train) • Housing • Recreation The trips to selected resort communities are planned based on the interest of Town Council and are focused on alignment with unique attributes of each resort community. A variety of programs have grown out of the Yamanouchi Global Friendship Exchange including The Student Immersion and Cultural Exchange (April 14-20, 2019) and the Colorado Taiko “Gods of the Drums’ Summit performances at Vail Mountain School on September 21 and 22, 2019. 84 Town of Vail Page 2 ACTION REQUESTED As the town looks to planning future peer resort visits, staff requests feedback from Town Council on what are the most important areas of learning that will help establish goals for each visit. Please also share if there are communities Town Council already has interest in. Using that information, staff will come back with a list of communities that align with Council’s goals for outcomes of peer resort visits. 85 AGENDA ITEM NO. 1.7 Item Cover Page DATE:February 7, 2023 TIME:20 min. SUBMITTED BY:Gregg Barrie, Public Works ITEM TYPE:Presentation/Discussion AGENDA SECTION:Presentation/Discussion SUBJECT:Gore Creek Promenade Renewal Update SUGGESTED ACTION:Listen to presentation and provide direction. PRESENTER(S):Todd Oppenheimer, Capital Project Manager and Gregg Barrie, Senior Landscape Architect VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: Gore Creek Promenade Renewal TC Memo 2-7-23.pdf Gore Creek Promenade Renewal PP 2-7-23.pdf 86 To: Vail Town Council From: Department of Public Works Date: February 7, 2023 Subject: Gore Creek Promenade Renewal Update I. PURPOSE The purpose of this agenda item is to discuss the design development process for the Gore Creek Promenade Renewal project, which is budgeted in the 2022/23 Real Estate Transfer Tax Capital Projects Fund. II. BACKGROUND The Gore Creek Promenade is a popular public park located in the heart of Vail Village. Residents and guests alike frequent the busy shops, galleries, and restaurants. Families enjoy the turf area and easy access to Gore Creek. Weekly whitewater events are held each spring, Winterfest ice sculptures during the ski season, the annual GoPro Mountain Games and a busy summer season all contribute to making the Promenade one of the most regularly visited parks in Vail. The last major renovation to this space occurred nearly thirty years ago. Since then, Vail has seen increases in visitation, in the local population and in year-round special events. The existing features of the Promenade are showing significant wear and tear that has become more and more difficult to maintain at a high level of quality. With that in mind, town staff has initiated a public input process and drafted Project Goals and Objectives for review by the Town Council. III. FEATURES OF THE PROMENADE The Promenade is generally comprised of the area located between the International Bridge and Up the Creek restaurant along the south bank of Gore Creek. A heated paver sidewalk provides access to four retail shops, two art galleries, a hotel/lodge and two restaurants. Three additional restaurants and several residential units overlook the park, with access from Gore Creek Drive or from the Children’s Fountain plaza. The primary features of the park area include a 3,000 square foot turf area that serves as the main gathering space, stone steps that provide access to a small “beach” and Gore Creek, a natural gas fire pit that operates during winter, and several large planting areas with mature spruce, fir, aspen and native shrubs. There are benches along the paver walkway and a few overlooking the creek. 87 Town of Vail Page 2 Approximately half of the streambank through the promenade is vegetated with native willows/shrubs growing among the boulders. The rest of the boulder bank provides informal access to the creek as well as places for park users to sit and enjoy the space. The town’s whitewater park, well-used during the GoPro Games and the Vail Recreation District Whitewater Series, is situated between the International Bridge and a small pedestrian bridge located just upstream. A terraced viewing area provides natural seating and access to the creek. IV. CURRENT DEFICIENCIES The most significant issue with the Promenade currently is the quality of the main turf area located at the east end of the park. Town maintenance crews have difficulty sustaining the grass, and a key component of any work on the Promenade should be to resolve that issue. In addition to the condition of the turfgrass, other issues that should be addressed include streambank erosion, limited options for seating and gathering, a lack of access for those with limited mobility or a disability, and the width of the paver walkway during periods of high use. V. INITIAL PUBLIC INPUT The Promenade has many user-types. There are Vail residents and second homeowners, business owners and employees, Vail Village residents, Eagle County residents, and lots of guests. Each of these groups may have different opinions as to what may be important when it comes to this public park. Town staff developed two surveys, posted to Engage Vail, to help gauge what is important to each group. A “long” survey, consisting of eleven questions, was advertised in the paper, on social media, and provided to Promenade businesses and residents, including those who overlook the park. A “short” four-question survey was developed to quickly capture the thoughts of Promenade users, accessed from a QR code posted at the park through the holiday season. The number of survey responses was better than expected. The long survey received over 150 responses and the short survey received 30. A copy of the survey questions and a compilation of responses, including written comments, is attached. Respondents generally agreed that: • The park could use some improvements, including improved visual and physical interactions with Gore Creek along with “more and varied” seating opportunities • User’s experiences and local businesses benefit from special events, regularly scheduled events (Whitewater Series) and art installations such as Winterfest • Users prefer the natural feel and materials of the park • The fire pit was worth the cost and potential environmental impacts Respondents were generally neutral regarding: • Whether the paver walkway was wide enough 88 Town of Vail Page 3 Respondents generally disagreed that: • There is too much vegetation in the park Other takeaways: • Business owners tended to have more specific comments and suggestions perhaps due to being in the area every day. • A potentially contrary desire to improve parts of the park AND to protect/restore the area as other sections of Gore Creek have been restored/replanted • There were a similar number of responses from Vail residents (~56) over Eagle County residents (~48), suggesting that down-valley locals have a significant interest in this area. • There is support for improving/formalizing the connection from the Promenade to the Covered Bridge along the creek. However, that requires access through two private property parcels. At this time, that connection is not supported by those property owners. Generally, survey respondents felt that the Promenade does not need a major overhaul. They like the turf, they want to “keep it natural”, and they like the mature trees. There are comments about adding seating, about improving access to the creek, and about keeping/adding riparian plantings. Many recognize the heavy use and associated impacts, understanding the need to refresh and improve some elements of the park. VI. ESTABLISHING A PROJECT GOAL AND OBJECTIVES With that in mind, staff proposes the following Project Goal and Objectives: Project Goal: To preserve the established character of the Gore Creek Promenade while addressing design and maintenance deficiencies Project Objectives: 1. Establish a turf management program to promote high-quality turf areas. This may include hiring a turf management consultant, improving soil structure and drainage, establishing/improving regular maintenance protocols, evaluating seasonal short-term closures, and/or the addition of several non-turf gathering spaces. 2. Protect existing healthy mature trees and established stream bank vegetation. Evaluate opportunities to add/enhance useable shade and the vegetated riparian buffer in conjunction with other project objectives. 3. Reduce congestion on the east end by improving gathering spaces, circulation, and opportunities to interact with Gore Creek in other areas of the park. 4. Increase formal and informal seating opportunities within the park and along the paver walkway. Improve “shopper seating”, take advantage of existing shade and consider the addition small tables, Adirondack chairs and other new seating options. 5. Improve park access/egress points and provide better access throughout the park for those with a disability or limited mobility. 6. Consider how special events impact park features. Evaluate design options, special event procedures and types of activities to better accommodate those events with a goal of reducing impacts to the park’s features. 89 Town of Vail Page 4 7. Coordinate with the Art in Public Place Board for opportunities that align with the goals of the AIPP Strategic Plan Update, to be adopted in the coming months. 8. Evaluate the existing fire pit. Consider changes to location, appliance type, operation schedule and overall need. 9. Look for opportunities to work with private property owners to create a pedestrian connection between the Promenade and the Covered Bridge along Gore Creek. 10. Evaluate the existing boulder streambank to determine where erosion is occurring and how it should best be repaired. VII. DESIGN PROCESS Once the Town Council has endorsed the Project Purpose and Objectives, staff landscape architects will begin working on conceptual design options. These will be presented to the Council, the Design Review Board and the public until a final design is developed and approved. Staff intends to utilize the online Engage Vail platform to solicit public feedback during the process. VIII. BUDGET INFORMATION The 2022 budget for this project was $370,000. Staff requested and Council approved an additional $55,000 in 2023, bringing the budget total to $425,000. It will be required to reappropriate the 2022 funds during the first 2023 Budget Supplemental process. IX. PROJECT SCHEDULE Staff proposes the following project schedule: • Design Process/Approvals thru June 2023 • Construction Bidding July 2023 • Fall Construction - 2023 September 11 – November 3 • Spring Construction - 2024 April 29 – June 7 The final construction schedule will be developed to minimize disruptions to Promenade businesses and special events. It may be necessary to close new sod areas into late June 2024 to ensure proper turf establishment prior to heavy summer traffic. This may have impacts on the 2024 GoPro Mountain Games, to be determined as the design and construction schedule is developed. X. STAFF RECOMMENDATION Staff recommends the Council review and discuss the Project Objectives and proposed Project Schedule and provide input to staff regarding any requested modifications. XI. ACTION REQUESTED BY COUNCIL Staff recommends the Council review and discuss the Project Objectives and proposed Project Schedule and provide input to staff regarding any requested modifications. These will help guide the design process. 90 Town of Vail Page 5 Attachments: 1. Aerial Vicinity Map of Gore Creek Promenade 2. Photos of the existing Promenade 3. List of Survey Questions 4. Compilation of Long Survey Responses 5. Compilation of Short Survey Responses 6. Compilation of Written Comments 91 GORE CREEK PROMENADE VAIL VILLAGE MAIN TURF AREA UP THE CREEK & EL SABOR RESTAURANTS G O R E C R E E K BEACH ACCESS PAVER WALKWAY MOUNTAIN STANDARD RESTAURANT SITZMARK LODGE FIRE PITWHITEWATER PARK P E D E S T R I A N B R I D G E 92 Town of Vail Page 6 Above: Gore Creek viewed from the pedestrian bridge Below: Degraded turf area at the east end of the park 93 Town of Vail Page 7 Above: Flagstone walkways along Gore Creek Below: Informal seating area along walkways 94 Town of Vail Page 8 Above: Existing fire pit and seating area Below: Turf area on a busy summer day 95 Town of Vail Page 9 Above: The paver walkway of Gore Creek Promenade Below: Degraded flagstone walks installed in high traffic areas 96 Town of Vail Page 10 Above: Seating area above the Vail Whitewater Park Below: Social trail between GCP and the Covered Bridge, thru private property 97 Town of Vail Page 11 Survey Questions Both surveys asked respondents to rank how they felt about each statement with answers ranging from Strongly Agree to Strongly Disagree. Long Survey Questions 1. The current configuration and condition of the Gore Creek Promenade Park area is satisfactory and enhances guest experience. 2. The Gore Creek Promenade Park area needs more opportunities for guests to interact with Gore Creek physically and visually. 3. The Gore Creek Promenade Park area needs more and varying opportunities for seating and out-of-restaurant dining. 4. Special events staged on the Gore Creek Promenade Park area have a positive impact on my business, residence, or my experience in Vail. 5. The existing gas fire pit is a positive park element and is worth the cost of operation and possible environmental impact. 6. The existing social trail between the Gore Creek Promenade Park area and the Covered Bridge Pocket Park on Bridge Street should be formalized and enhanced. 7. The width of the existing paver walkway along the building façade is sufficient to accommodate the pedestrian traffic it receives. 8. Art installations, such as the Vail Winterfest ice sculptures, have a positive impact on my business, residence, or my experience in Vail. 9. There is currently too much vegetation in the Gore Creek Promenade Park area. 10. Regularly programmed events, such as the weekly kayak race series, have a positive impact on my business, residence or my experience in Vail. 11. The section of Gore Creek passing through the Gore Creek Promenade Park area should be protected and the streambanks restored similarly to what has occurred in outlying areas of town. Short Survey Questions 1. The Gore Creek Promenade Park area needs more opportunities for guests to interact with Gore Creek physically and visually. 2. The Gore Creek Promenade Park area needs more and varying opportunities for seating and gathering. 3. Removing selected trees and shrubs could have a positive impact on the park. 4. The existing gas fire pit is a positive park element and is worth the cost of operation and possible environmental impact. 98 Gore Creek Promenade Long Survey Results SURVEY RESPONSE REPORT 26 November 2018 - 03 January 2023 PROJECT NAME: Gore Creek Promenade Renewal 99 Q4 Please rank each statement below. Strongly Disagree Disagree Neutral Agree Strongly Agree Question options 25 50 75 100 125 150 175 The current configuration and condition of th... The Gore Creek Promenade Park area needs more... The Gore Creek Promenade Park area needs more... Special events staged on the Gore Creek Prome... The existing gas fire pit is a positive park ... The existing social trail between the Gore Cr... The width of the existing paver walkway along... Art installations, such as the Vail Winterfes... There is currently too much vegetation in the... Regularly programmed events, such as the week... The section of Gore Creek passing through the... 31 36 37 44 27 68 22 45 7 64 40 48 43 39 42 46 42 47 67 15 50 47 44 28 31 44 48 16 25 25 39 25 34 21 29 23 12 15 17 45 8 49 8 20 8 15 21 9 15 8 10 5 42 2 11 Optional question (152 response(s), 0 skipped) Question type: Likert Question Gore Creek Promenade Survey : Survey Report for 26 November 2018 to 03 January 2023 Page 5 of 26 100 Q1 I am 118 (77.6%) 118 (77.6%) 19 (12.5%) 19 (12.5%)14 (9.2%) 14 (9.2%)1 (0.7%) 1 (0.7%) A resident Affiliated with a business A guest Neither Question options Mandatory Question (152 response(s)) Question type: Dropdown Question Gore Creek Promenade Survey : Survey Report for 26 November 2018 to 03 January 2023 Page 2 of 26 101 Q2 If a resident 10 (8.1%) 10 (8.1%) 52 (42.3%) 52 (42.3%) 61 (49.6%) 61 (49.6%) Live in Vail Village Other areas of Vail Eagle County resident Question options Optional question (123 response(s), 29 skipped) Question type: Dropdown Question Gore Creek Promenade Survey : Survey Report for 26 November 2018 to 03 January 2023 Page 3 of 26 102 Q3 If affiliated with a business (check all that apply) Business owner Employee Located on Gore Creek Promenade Located in Vail Village Located in other areas of Vail Restaurant Shop or gallery Question options 5 10 15 20 25 30 35 40 45 50 18 44 9 22 17 13 5 Optional question (67 response(s), 85 skipped) Question type: Checkbox Question Gore Creek Promenade Survey : Survey Report for 26 November 2018 to 03 January 2023 Page 4 of 26 103 Gore Creek Promenade Short Survey Results SURVEY RESPONSE REPORT 26 November 2018 - 29 January 2023 PROJECT NAME: Gore Creek Promenade Renewal Public Survey 104 Q4 Please rank each statement below. Strongly Disagree Disagree Neutral Agree Strongly Agree Question options 5 10 15 20 25 30 35 The Gore Creek Promenade Park area needs more... The Gore Creek Promenade Park area needs more... Removing selected trees and shrubs could have... The existing gas fire pit is a positive park ... 3 5 2 7 6 9 10 7 2 1 9 7 7 6 3 8 8 22 2 Mandatory Question (31 response(s)) Question type: Likert Question Gore Creek Promenade Public Survey : Survey Report for 26 November 2018 to 29 January 2023 Page 5 of 10 105 Q1 Are you a resident or guest of Vail? 16 (51.6%) 16 (51.6%) 12 (38.7%) 12 (38.7%) 3 (9.7%) 3 (9.7%) Resident Guest Other Question options Mandatory Question (31 response(s)) Question type: Dropdown Question Gore Creek Promenade Public Survey : Survey Report for 26 November 2018 to 29 January 2023 Page 2 of 10 106 Q2 If a guest, how often do you visit? 2 (13.3%) 2 (13.3%) 4 (26.7%) 4 (26.7%) 9 (60.0%) 9 (60.0%) 0 (0.0%) 0 (0.0%) Several previous visits/Every few years Once per year More than once per year First time visitor Question options Optional question (15 response(s), 16 skipped) Question type: Dropdown Question Gore Creek Promenade Public Survey : Survey Report for 26 November 2018 to 29 January 2023 Page 3 of 10 107 Q3 How do you use the Gore Creek Promenade Park? (Check all that apply) Shopping/dining During special events such as Winterfest or GoPro Mountain Games Accessing Gore Creek (wading, tubing, rafting/kayaking)Gathering with friends/family Gathering at the fire pit Quiet relaxation/nice place to hang out/people watching During the winter During the summer Question options 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 26 11 13 23 14 23 27 27 Mandatory Question (31 response(s)) Question type: Checkbox Question Gore Creek Promenade Public Survey : Survey Report for 26 November 2018 to 29 January 2023 Page 4 of 10 108 Town of Vail Page 12 Gore Creek Promenade Renewal Written Survey Comments by Demographic January 2023 Note: Comments are copied verbatim from the survey. Grammar and spelling have not been corrected. Vail Village Residents •Concrete WIDE full parkside stairs that allow easy access / egress to river and seating and flood control would enhance park side and usage •This area has been a great multiuser area, including tubing with my kids. Let's also make it non- smoking! •It would be great if both sides of the creek were accessible •The Gore Creek at the end of Meadow Dr. along the path to Lionshead should also be enhanced at the same time . This section has a lot of foot and bike traffic and needs the same attention as the Promenade Park. Vail Village Business Owners •Do not remove trees. Improve bank of creek. Get better cover for area than grass do not cut off access to businesses when you do whatever you do •It would be nice to formalize the path by Up the Creek. I see kids using this path all the time to go tubing from the cover bridge down to the international bridge. In the last few years I have seen more and more people using the grassy area of the GCPP. It seems to have turned into a swimming hole, kayak zone and tubing area for families to enjoy. The addition of picnic tables would be a nice touch. The grassy area does has poor drainage and seems to never dry out after a rain. This can tear up the grass when there is heavy use. Maybe you could grate the area in a way that prevents this or lay down a turf type of material •Having watched the rapid decline of the turf this summer, clearly another option is needed. As a business owner, my first concern is the loss of guest experience and that would be the aesthetic and view. I would want to make sure that any improvements are just that, enhancements to the current offering, not detracting from the natural beauty that is offered. A balance of hard surfaces and natural elements seems ideal. The current vegetation, trees, and layout of the promenade forces a lot of people into a small area, that is clear. This is an area that is heavily used by families looking to relax and cool off in the creek. It has also become a popular meeting place for young locals and visitors alike to gather and be social. It would seem that better seating opportunities would be welcomed by all. Can there be areas designated for restaurant take-away use? Beer Garden type access, where guests can be social but in a designated space for alcohol? I am also sensitive to the environmental impact that all of the "traffic" is having on the creek and watershed. However, the easy access to the creek has made this a popular destination for water-goers. How do we continue to provide a fun guest experience while minimizing the environmental piece? Spreading out the access may help, giving guests more "shoreline" to enjoy and reducing the traffic on the current space? Looking forward to see what the plans entail and how this can improve a space that is rapidly gaining popularity. •We own the Sweet Basil and Mountain Standard restaurants in Vail, so we have a very nice "front row" view of the park. It is one of the only places in the Village that guests can access the creek easily, so no surprise that it gets lots of traffic. The natural grass is nice in theory, however it clearly doesn't have a chance with the significant year round traffic the area receives. Artificial grass would likely hold up, but aesthetically I cannot see this fitting the area. So I guess this is where the landscape architects earn their $$. I suppose some configuration of wood and stone, likely remove some vegetation to the 109 Town of Vail Page 13 west of us to include more diverse and comfortable seating/picnic areas. The large pines towards the east side of the promenade....beautiful trees for sure, however a pollen storm nightmare in the summer, and a lot of real estate occupied. Maybe remove and replace with more aspens? I believe the walkway adjacent to the shops is more than ample for the traffic we see. I can honestly say after all the years we have been here, a day or two over the Go Pro Games are the only times I've seen the walkway maxed out for a few hours. And while of course we want to protect the river, I hope access will still be allowed as it is a highlight for the kids throughout the summer for wading/tubing after the peak run-off has subsided. Bottom line, some tough choices to make, but I'm glad the TOV is looking into it. The park is a true gem in Vail and a favorite of our guests and locals alike. Let's make it as terrific as it can be. Thank you, Matt Morgan • I am opposed to doing something that would provide a permanent walkway from the area in front of the Creekside building so as to provide access to Bridge Street. The whole purpose of the stairway into the area past Fuzziwigs and The Raitman Gallery is to provide a flow to and from the village to that area. There is no purpose in providing a paved path to Bridge Street. Actually I would propose some barrier to prevent entrance or exit traffic from this area along the Creek to Bridge Street if the idea is to go behind the Creekside Building and Pepi's. It would have to be some odd ball design because it would be much to close to the patio at Up The Creek, too close to the Creek, and pass under the decks on the rear of Pepi's. It would be a shame to destroy the trees in this area. I would be opposed to additional out of restaurant dining in this area unless it is for the restaurants that presently exist in this area. The Town has already made it as difficult as possible for the existing restaurants with the new regulations regarding deliveries. Additional competition and access to businesses other than those that presently exist in the buildings surrounding this area is inappropriate and unfair. I believe that we presently have enough "manufactured areas" (snow melted streets and sidewalks, Bellagio type fountain near the Red Lion, fake grass in front of Solaris) and the natural bank that presently exists to the Gore Creek is a refreshing change to the "Disney Land" approach to the village. The original idea was to make Vail Village similar to the quaint villages in Europe. What was wrong with that idea? Peter Switzer • We have faith in whatever you decide for the promenade. We love that you are putting so much attention on the area and consideration into how to improve the space. We are very blessed to have our business in such a beautiful setting by the creek. We would love to add a sculpture to the area and one of our clients is ready to donate a piece to the town. The sculpture they envision features a group of kids jumping into the water. It would look amazing somewhere in the park by the creek. We welcome the opportunity to discuss their vision as they would love to work with the town to facilitate the donation and plan for the sculpture. There are several other spaces that the piece would look great in around Vail and we figure that given the attention given to the park at the moment this would be a wonderful thing to consider. The piece, to be donated entirely by the clients, is $250,000 so it is a significant donation. We love where we get to operate our business and we appreciate the thought that is being put into such a special spot in Vail! I primarily operate our galleries in Breckenridge and I am constantly envious of the view my brother has out of our windows and onto the creek from his desk! Sincerely, Brian Raitman • I love the area as is. People utilize it everyday with their families. The improvements might be cleaning up the park. We have enough bike and ski racks. I don't think we need anymore trees or flowers. I feel the landscape people are doing a great job. One of my clients want to put a magnificent sculpture somewhere in Vail, so maybe a significant sculpture might be good there. Raitman Art Galleries 110 Town of Vail Page 14 Vail Village Employee • The winter ice sculptures and summer kayak series, as well as the music are so integral to this zone. Whereas by Solaris it’s all hard scaping it loses the charm of being outdoors. There’s a happy medium. I think it makes it more like a village with greenery and a walking path. • Green spaces that allow people to interact with the environment and facilitate activity are vital. Just because it's not making money doesn't mean it's not valuable. • I think natural beauty is what draws so many people to this area (both tourists and locals). It is very important to keep these green spaces as natural and native as possible to have them stay for longer and attract natural wildlife as well. I think having a green space by the gore is wonderful and allows myself and my dog to regularly wade in during the summer. It’s a social area and quite beautiful • Whatever you do make it environmently sustainable. No out of place vegetation/ plants. Create a way do identify water access points and add signs about problems with erosion educate • It is one of the prettiest places in the Village and it is right in the heart of the village. I think it should be more of a focal point and should be maintained as such. • Please leave Gore Creek as natural as possible! The work that's been done to restore it is fantastic. Increasing traffic along the creek will only ruin those efforts. Vail Resident • I hope that the creek areas that are accessible to people can be made more durable and that protected areas to protect the health of the creek are made more off limits so that the creeksides are not degraded. • Vail should formalize and improve the trail along the river east of the promenade area. There should be creek access to the kayak arena on the south side creek I think the fireplace could be removed/improved, more and better access to the river perhaps add some shade structures or trees to the east corner • I hope that the creek areas that are accessible to people can be made more durable and that protected areas to protect the health of the creek are made more off limits so that the creeksides are not degraded. • This survey seems to infer that I either need to live in the village or own or work at a business in the village which I do not. I feel that all residents of Vail have a valid opinion on this topic. While this area obviously needs more and better thought out seating I am not in favor of expanding the restaurant seating into this area which I believe should be preserved as green space and I want to be clear about that. It's a terrific space to utilize for Art in Public Spaces and would like to see more guest interactions surrounding that year round. • Please retain as much grassy area as possible. Too much concrete and/or stone detracts from the village • Please do not “improve” this area with pavers and remove the grass. It should be restored to a natural state. Not developed with wasted $$! Spend money of grass seed and native stream bank plantings. • Use boulders and natural features to eliminate turf and grass issues • I am concerned about water quality for Gore Creek. • More seating areas would be great and also shade. It’s so sunny and hot in vail in the summer, when I have friends/family visit and we’re wondering town we are constantly seeking shade. • More riparian buffer for ecosystem health! • I like the current configuration, it just needs refreshing • VR should pay for any enhancements since they killed every fish in that stretch of the creek 111 Town of Vail Page 15 • Better area for picnics (often the grass is to muddy to sit on), more river access and some sort of shaded structure. Better path from there to the covered bridge. Natural play structure would also be fun for families • I personally love setting up a blanket and hanging by the creek in the summer, as well as many of my friends. I also participate in the white water series and have for the past 4 years and it’s always a great community turn out! I love the park feel and hope that we can preserve the river bank and ensure a little slice of nature next to the beauty of our mountain creek. • Please protect the existing gorgeous vegetation and existing green space. We are turning out town too commercial and are forgetting about outdoor space • not really sure what you mean by protected like other areas. If that means wild bushes and vegetation obstructing child paddling and other river access or pedestrian access for that stretch i would strongly disagree. With boulders as bank it seems pretty natural at moment and a fairly short part of the stream. I'd say keep the willows etc if as much as possible if you formalize the social path up to Bridge street. • The trees in Gore Creek Promenade Park are overgrown and could thinned to allow more sun in the park. The park should remain as natural as possible and should not include any additional art, signage, tables, benches etc. Let it me a nice picnic area in the warm weather months. The temporary ice sculptures are an a asset during snow season. Please clean up the overgrowth and otherwise leave the park alone. It does NOT need to be gentrified! • definitely more seating, maybe on both sides of the creek • Use of the promenade is foundational to the Vail experience, there are already thousands of linear feet of stream bank in Vail that are in a natural state, don’t fall for a false environmental agenda and ruin the very experience people come here for. • In the summer…There should be safe spots for children to enter and float with inner tubes on the gore creek. In winter the fire pit should have a larger paved circular area with at least 20 Adirondack type chairs to enjoy on sunny Apres ski afternoons where kids and parents can enjoy s’mores station offered from a wagon or similar concept. Eagle County Resident • Use boulders and natural features to eliminate turf and grass issues • This project is of a different scale but is a wonderful example of how to blend natural areas with pedestrian areas and increase the usability of our beautiful area. https://www.traverseticker.com/news/design-unveiled-for-new-downtown-riverwalk-pedestrian- plaza/ • Please keep it as natural as it was couple years ago, keep the vegetation and minimize the use of it for events. Guests can enjoy the Gore Creek and his beauty by Ford Park. • A riparian area needs to be maintained but that can also be done to enjoy it more • It is great to be able to interact with that particular stretch of Gore Creek Guest • Every effort should be made for a natural landscape that allows human accessability, observation, appreciation, education. Art that enhances, embellishes wildlife to be encouraged • We are frequent guests in Vail, and I would hate to see this little area become even more over used. I would like to see it restored back to a more natural look and feel in keeping with the rest of Gore Creek • The creek needs more easy access points for recreational uses. The big grassy lawn area could have a better beach, with additional levels or an amphitheater type of vibe but still green grass. 112 February 7, 2023 The Gore Creek Promenade Renewal Project 113 The Gore Creek Promenade Renewal 2February 7, 2023 Discussion Goals •Outline Current Park Deficiencies •Overview of Public Feedback and Comments •Discuss and Adopt Project Objectives •Town Council Feedback 114 The Gore Creek Promenade Renewal 3February 7, 2023 115 The Gore Creek Promenade Renewal 4February 7, 2023 Features of the Promenade •Shops, restaurants, galleries and a hotel/lodge •Open turf area •Access to Gore Creek –both physical and visual •Heated paver walkway 116 The Gore Creek Promenade Renewal 5February 7, 2023 Features of the Promenade •Fire pit •Mature vegetation •Benches/seating •Flagstone walkways 117 The Gore Creek Promenade Renewal 6February 7, 2023 Current Park Deficiencies •Turfgrass health/maintenance •Streambank erosion •Limited seating options •Lack of access for those with limited mobility or a disability •Narrow width of the paver walk during periods of high use 118 The Gore Creek Promenade Renewal 7February 7, 2023 Public Input •Reached out to Promenade businesses and residents •Launched two survey opportunities on Engage Vail… •“Long Survey” –11 questions •“Short Survey” –4 questions •150 Long Survey responses •30 Short Survey responses •45 written comments 119 The Gore Creek Promenade Renewal 8February 7, 2023 Long Survey Responses… Strongly Disagree Strongly AgreeNeutral Strongly Disagree Neutral Strongly Agree 120 The Gore Creek Promenade Renewal 9February 7, 2023 Short Survey Responses… Strongly Disagree Neutral Strongly Agree 12 (38.7%) 3 (9.7%) 16 (51.6%) Long Survey Respondents… Short Survey Respondents… 121 The Gore Creek Promenade Renewal 10February 7, 2023 Respondents generally agreed that: •The park could use some improvements, including improved visual and physical interactions with Gore Creek and “more and varied” seating opportunities. •User’s experiences and local businesses benefit from regularly scheduled events (Whitewater Series), special events, and art installations such as Winterfest. •Users prefer the natural feel and materials of the park. •The fire pit is worth the cost and potential environmental impacts. 122 The Gore Creek Promenade Renewal 11February 7, 2023 Respondents were generally neutral regarding: •Whether the paver walkway was wide enough. Respondents generally disagreed that: •There is too much vegetation in the park. Other takeaways: •Business owners tended to have more specific comments and suggestions perhaps due to being in the area every day. •A potentially contrary desire to improve some parts of the park AND to protect/restore the area as other sections of Gore Creek have been restored/replanted. 123 The Gore Creek Promenade Renewal 12February 7, 2023 There is support for improving/formalizing the connection between the Promenade and the Covered Bridge along the creek. However, that requires access through two private property parcels. At this time, that connection is not supported by those property owners. 124 The Gore Creek Promenade Renewal 13February 7, 2023 Project Goal: To preserve the established character of the Gore Creek Promenade while addressing design and maintenance deficiencies Project Objectives: 1.Establish a turf management program to promote high-quality turf areas. This may include hiring a turf management consultant, improving soil structure and drainage, establishing/improving regular maintenance protocols, evaluating seasonal short-term closures, and/or the addition of several non-turf gathering spaces. 2.Protect existing healthy mature trees and established stream bank vegetation. Evaluate opportunities to add/enhance useable shade and the vegetated riparian buffer in conjunction with other project objectives. 3.Reduce congestion on the east end by improving gathering spaces, circulation, and opportunities to interact with Gore Creek in other areas of the park. 4.Increase formal and informal seating opportunities within the park and along the paver walkway. Improve “shopper seating”, take advantage of existing shade and consider the addition small tables, Adirondack chairs or other new seating options. 5.Improve park access/egress points and provide better access throughout the park for those with a disability or limited mobility. Project Goal and Ten Project Objectives 125 The Gore Creek Promenade Renewal 14February 7, 2023 Project Objectives (continued): 6.Consider how special events impact park features. Evaluate design options, special event procedures and types of activities to better accommodate those events with a goal of reducing impacts to the park’s features. 7.Coordinate with the Art in Public Place Board for opportunities that align with the goals of the AIPP Strategic Plan Update, to be adopted in the coming months. 8.Evaluate the existing fire pit. Consider changes to location, appliance type, operation schedule and overall need. 9.Look for opportunities to work with private property owners to create a pedestrian connection between the Promenade and the Covered Bridge along Gore Creek. 10.Evaluate the existing boulder streambank for erosion issues and determine how it should best be repaired. Project Goal and Ten Project Objectives 126 AGENDA ITEM NO. 2.1 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Jamie Leaman-Miller, Community Development ITEM TYPE:DRB/PEC Update AGENDA SECTION:DRB / PEC (5 min.) SUBJECT:DRB / PEC Update SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: DRB Results 1-18-23.pdf PEC Results 1-23-23.pdf 127 Present:Kathryn Middleton Kit Austin Erin Iba Peter Cope Doug Cahill 1.Virtual Meeting Link Register to attend Design Review Board Meetings. Once registered, you will receive a confirmation email containing information about joining this webinar. 2.Call to Order 3.Main Agenda Final review of an exterior alteration (siding/chimney) Address/ Legal Description: 1012 Eagles Nest Circle/Lot 2A, Block 6, Vail Village Filing 7 Planner: Jonathan Spence Applicant Name: JPSSE Eagles Nest, represented by OCG Design and Construction 3.1 DRB22-0404 - JPSSE Eagles Nest LLC Conceptual review of new construction (duplex) Address/ Legal Description: 826 Forest Road/Lot 15, Block 1, Vail Village Filing 6 Planner: Jonathan Spence Applicant Name: Mexamer Forest Road, represented by KH Webb Architects 3.2 DRB22-0482 - Mexamer Forest Road LLC 2021 Conceptual application only. No action taken. Final review of an exterior alteration (Building 5 - materials/railings/windows) Address/ Legal Description: 4496, 4500, 4504, 4507, 4508 Meadow Drive/Timber Falls Condominiums Planner: Jamie Leaman-Miller Applicant Name: Timber Falls Condos, represented by Pierce Austin Architects 3.3 DRB22-0476 - Timber Falls Condos (Austin recused) Conditions: Design Review Board Minutes Wednesday, January 18, 2023 2:00 PM Vail Town Council Chambers DRB22-0404 Plan Set.pdf Erin Iba made a motion to Table to a date uncertain; Peter Cope seconded the motion Passed (5 - 0). 826 W Forest Road TOV Conceptual Set 2022 1221.pdf Existing Photos.pdf DRB22-0476 Plans.pdf 1 Design Review Board Meeting Minutes of January 18, 2023 128 1. Approval for building five is for plan version #1 as labelled in the application. 2. Prior to permit approval, the applicant shall demonstrate the railing type on building five will match those on buildings one through four. 4.Staff Approvals Final review of change to approved plans (roof) Address/ Legal Description: 82 West Meadow Drive B/Lot 1, Vail Village Filing 2 4.1 DRB20-0204.003 - Bingle Residence Planner: Jonathan Spence Applicant Name: Jonathan Bernstein, represented by KH Webb Architects Final review of change to approved plans (windows/slider/deck) Address/ Legal Description: 794 Potato Patch Drive B/Lot 10, Block 1, Vail Potato Patch Filing 1 4.2 DRB21-0329.001 - Johnson Residence Planner: Greg Roy Applicant Name: James Johnson, represented by Mountain CAD Services Final review of change to approved plans (enclosure materials) Address/ Legal Description: 616 West Lionshead Circle/Lot 1, Vail Lionshead Filing 4 4.3 DRB21-0485.001 - Concert Hall Plaza Planner: Jonathan Spence Applicant Name: Concert Hall Plaza, represented by The Little Diner Final review of a change to approved plans (windows) Address/ Legal Description: 272 West Meadow Drive A/Lot 9, Vail Village Filing 2 4.4 DRB21-0539.003 - Owens Residence Planner: Jamie Leaman-Miller Applicant Name: James & Virginia Owens, represented by Berglund Architects Final review of an addition (garage) Address/ Legal Description: 4320 Glen Falls Lane/Lot 12, Forest Glen Subdivision 4.5 DRB22-0070 - Virnich Residence Planner: Greg Roy Applicant Name: Daniel E. Virnich Final review of change to approved plans (patio) Address/ Legal Description: 4014 Bighorn Road/Lot 1, Gore Creek Park Subdivision 4.6 DRB22-0180.001 - Breaux Residence Planner: Jonathan Spence Applicant Name: Kerry Breaux, represented by Nedbo Construction Final review of a tree removal 4.7 DRB22-0456 - Frommer Residence Erin Iba made a motion to Approve with conditions and the findings that the applications meets 14-10-2 and 14-10-5; Peter Cope seconded the motion Passed (4 - 0). 2 Design Review Board Meeting Minutes of January 18, 2023 129 Address/ Legal Description: 789 Potato Patch Drive/Lot 23, Block 1, Vail Potato Patch Filing 1 Planner: Heather Knight Applicant Name: Beth & Glenn Frommer Final review of an exterior alteration (balconies/stairs/entry) Address/ Legal Description: 4590 Vail Racquet Club Drive/Vail Racquet Club Condominiums 4.8 DRB22-0473 - Vail Racquet Club Planner: Jonathan Spence Applicant Name: Vail Racquet Club, represented by Victor Mark Donaldson Architects Final review of an exterior alteration (windows) Address/ Legal Description: 2094 Zermatt Lane A/Vail Commons Residential Condominiums 4.9 DRB22-0474 - Desseauve Residence Planner: Greg Roy Applicant Name: Christofer & Erika Desseauve, represented by Home Depot Final review of an addition (elevator) Address/ Legal Description: 1461 Greenhill Court A/Lot 7, Glen Lyon Subdivision 4.10 DRB22-0478 - Dunning Residence Planner: Heather Knight Applicant Name: Peter & Lucy Dunning, represented by Pierce Austin Architects Final review of an exterior alteration (windows) Address/ Legal Description: 1885 Buffehr Creek Road 8/Lot 41, Buffehr Creek Resubdivision 4.11 DRB23-0013 - Soohoo Residence Planner: Jamie Leaman-Miller Applicant Name: Megan & Jeffrey Soohoo, represented by Home Depot 5.Staff Denials 6.Adjournment (Austin absent) Erin Iba made a motion to Adjourn ; Peter Cope seconded the motion Passed (4 - 0). 3 Design Review Board Meeting Minutes of January 18, 2023 130 Present:Bobby Lipnick Karen Perez John Rediker Henry Pratt Bill Jensen Reid Phillips Brian Judge 1.Virtual Link Register to attend the Planning and Environmental Commission meeting. Once registered, you will receive a confirmation email containing information about joining this webinar. 2.Call to Order 3.Main Agenda Planner: Jamie Leaman-Miller Applicant Name: Town of Vail, represented by Matt Gennett 3.1 PEC22-0032 A request for a recommendation to the Vail Town Council for a Prescribed Regulation Amendment pursuant to Section 12-3-7 Amendment, Vail Town Code to amend Section 12-3-3 Appeals, to simplify and clarify the procedures for land use appeals and setting forth details in regard thereto. Planner Leaman-Miller gives a short presentation on the item and the proposal. The proposal amends the Town Code section on Land Use Appeals. Minor changes are proposed to bring the section up to date with current legal requirements. A summary of the proposed changes is presented by staff. Criteria for review are shown and staff is recommending approval of the application. Rediker has questions on some of the changes. He wants to make sure that the right to appeal is preserved. He has a question on 12-3-3(C) and requests existing and proposed to be pulled up. The existing code today doesn't state if a majority is needed to call up a decision where the proposed code does state the majority is needed. What do we do today? Planner Roy states that a majority is needed today and that is not changing. Rediker brings up the omission of the "aggrieved person" and why the Town is proposing to remove that section. Planner Roy states that it is a legally gray area and to make it clear and defensible the proposed language omits that. Town Attorney Matt Mire goes over some additional information and adds that one of the reasons for changing the language is because the word "aggrieved" is antiquated. Planning and Environmental Commission Minutes Monday, January 23, 2023 1:00 PM Vail Town Council Chambers Staff Memorandum PEC22-0032_1-23-23.pdf Attachment A. Draft Ordinance Amendment Title 12-3-3.pdf 1 Planning and Environmental Commission Meeting Minutes of January 23, 2023 131 Perez asks why we don't add a definition to that affect. Mire states there is one today. Rediker questions if it is that big of an issue that we need to change it? Mire states it is harder to draw a line who does or does not have standing today. Rediker brings up an example appeal and how that appeal was addressed. He questions why people are bringing the appeals to certain projects. Mire notes that some have been found to have been aggrieved but not all of those aggrieved had legal standing. Rediker questions the effect that this new code would have had on previous appeals. Mire says we can open up adjacent to be a bit more inclusive, as the example case had at least 10 appeals that did not have legal standing. Rediker, we want to not promote frivolous litigation, but the public should have the ability to appeal. Mire, we can see that Vail is unique and perhaps we allow a few more people to have ability to appeal. We can expand the definition of "aggrieved". Rediker and Mire go back and forth on who can appeal or not. Mire notes staff is not proposing this as the only option and that the language can change if the PEC so desires. Perez sent a redlined version to staff and other commission members. Discussion on who can appeal or not is continued. Perez has a question on the "De Novo" portion of the language. A quote from the language on the relevant section is read. Mire says it was a combination of a couple sections in the existing ordinance of the code. The other option is a record approach which is not seen as adequate. De Novo is the standard for communities. A transcript and following only the transcript without hearing any more information is generally not done. Perez understands that instead of interpreting it as de novo the proposed language now explicitly states such. Mire confirms. Rediker brings up the aggrieved person again to see if anyone else has comments on it. Mire reiterates that can be changed. Pratt agrees that aggrieved is pretty overly broad and open-ended, but also wants it to be more open than adjacent. Can we raise the bar but not shut out the people that have a legitimate conflict? Does "materially affected" make it more narrow? Perez suggests materially affected or aggrieved. Discussion between the various terms that could be used ensues. 2 Planning and Environmental Commission Meeting Minutes of January 23, 2023 132 Mire can do more research on another way to do that. Phillips agrees with staff and legal, that it needs to be narrowed down. He likes the adjacent property owners. There is concern about how broad it is today and aggrieved seems arbitrary and archaic. It can bring a lack of surety to projects and development with the amount of general public that can make appeals. It can bring upon frivolous grievances and stall development progress. Mire says that it goes back to the fact that there is a public process through the public hearings that take place. This tries to separate public right to comment from legal standing to appeal a decision. Who from the crowd that has opinions actually has legal standing. Phillips thinks the existing language is old and needs changing. Lipnick thinks the new language does a good job of tightening things up. Does the dates for appealing or determining standing change? Commissioner Jensen and Judge were online and were unable to hear due to technical issues with the Zoom meeting. At this point they have joined the meeting with audio and video. Rediker recaps the discussion to that point. Jensen states that they have missed the first 35 minutes of the meeting and does not feel comfortable voting after missing the discussion. Rediker states this will likely be tabled for changes and goes over the different points of the discussion made previously. He recommends that they will review the video and they can comment on the next meeting. Would like to move this forward and open up the floor to other portions of the language for comments. Mire summarizes what he heard to this point on aggrieved persons. Adjacent is too narrow but aggrieved is too open. He refers to those who have legal standing and will try to narrow down to those who are materially or adversely affected. Phillips doesn't like aggrieved, but it could be "adversely affected" and adjacent property owners. Rediker notes he is not there at this point and has concerns about the previous appeals heard in the recent years such as Booth Heights. Members of the community should have the ability to appeal decisions that affects the whole community. Not a fan of frivolous lawsuits, but doesn't want to be too narrow either way. Mire reminds that it is a legal process and who has property rights affected by decisions. Rediker notes that committee will move on and brings up another section on findings. The existing code has provisions that specific findings must be found by the board hearing the appeal. The new language states "preponderance of evidence" that doesn't seem to be in the existing code. New code also only states criteria and Town Code but not Master Plans. Should we have that included so we can bring those into the decision making. Rediker comments that the committee shouldn't limit to Code, but look at Master Plans, too. Mire answers that it has always been done by a preponderance of evidence even if not stated. Will add something for master plans that have been adopted. Rediker clarifies that preponderance of evidence means that it is more likely than not that an application is meeting the criteria. Wants to make sure that everyone else understood what that meant. Brings up "conduct of hearing". What does it mean that town council can set standards by "administrative rule"? 3 Planning and Environmental Commission Meeting Minutes of January 23, 2023 133 Mire states that this goes back to a recent appeal at Booth Heights where a resolution to set rules was required because the public comment situation was confusing. If a judge were to look at a transcript of the hearing of an appeal, he would have to ignore all the public comment as they have no standing. This allows them to set rules around time of speaking and procedure of how to handle the appeal meeting. Rediker confirms his understanding of what Mire stated. That this is only for appeals, and not for general public comments as this commission has not set limits on public comment in the past.12-3-3E is quoted. There is a change in explicit right to appeal that is dropped. Mire comments that this is only a restating of the CO state law and we don't control that. Removing it from our code does not preclude anyone from using that right. Those are state rights, not controlled by our code. Rediker reiterates that changing the language in our code does not take away the state statute of the right of appeal. Perez has questions on Section 3 procedure and the language on noticing that was removed. In this community there are a lot of condos that may require some additional noticing. The existing language on who must be noticed should be re-added, specifically the reference to notifying condominium associations. She is concerned that individual residents do not receive noticing and this is not wise to remove this specific language. Staff notes that language can be added back in. Perez questions appeals for sign regulations. Staff notes that is in the purpose statement that it applies to Title 11. Rediker asks about the timeline of the dates related to hearing an appeal. Staff answers that it was simplified by going from 30 or 40 days with an option for continuance; is now changing to 60 days with no continuance. Pratt asks about not allowing the standing determined by the administrator to be appealed. Mire answers that it is subject to legal appeal outside of the Town process, but not inside the Town. Rediker clarifies that today the appellant can appeal the administrators determination of standing and it will go to the relevant board or council for determination. Mire says we can include that language to allow that as well. It is very rare we get an appeal on whether standing was accurately determined. Discussion takes place on when the PEC could hear an appeal and what that would look like. Rediker would like to have it handled in the Town and that this section should be added to the new language. Jensen appreciates the detail of the discussion and looks forward to the next meeting with the feedback given and the language that will come back to the Commission. Judge concurs with Jensen. There was a general feeling that it was removing opportunity to appeal and glad to see that is being discussed and revised moving forward. 4 Planning and Environmental Commission Meeting Minutes of January 23, 2023 134 Mire states that we can take the comments and come back with some revised language. More than one option may be presented next time, he recognizes that it is important for options and voices to be heard but also legal rights to be identified. Rediker reiterates that it doesn't need to be frivolous but needs to remain somewhat open. Perez would like to see two redlined versions. One from current and one from proposed today. Discussion around providing redlined versions ensues. Pratt appreciated the summary of changes in table form. It was easy to understand from a non-legal background perspective. Public comment is opened, no one in the room, no hands raised on Zoom for public comment. Public comment is closed. No further discussion. 4.Approval of Minutes 4.1 PEC Results 1-9-23 5.Information Update 6.Adjournment Karen Perez made a motion to Continue to the next regularly scheduled meeting.; Henry Pratt seconded the motion Passed (7 - 0). Bobby Lipnick made a motion to Approve (Phillips abstained due to absence at the last meeting); Karen Perez seconded the motion Passed (6 - 0). PEC Results 1-9-23.pdf Karen Perez made a motion to Adjourn ; Henry Pratt seconded the motion Passed (7 - 0). 5 Planning and Environmental Commission Meeting Minutes of January 23, 2023 135 AGENDA ITEM NO. 3.1 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Abby Oliveira, Economic Development ITEM TYPE:Information Update AGENDA SECTION:Information Update SUBJECT:November 17, 2022 VLMDAC Meeting Minutes SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: VLMDAC_Minutes_FINAL_November_17__2022.pdf 136 Vail Local Marketing District Advisory Council Monthly Meeting November 17th, 2022, 8:30 am In person Grand View Room & Virtual Zoom VLMDAC member attendees: In Person- Liana Moore (Antlers), Jana Morgan (Sweet Basil), Michael Holton (Vail Health), Esmarie Faessler (Sonnenalp) Zoom- Lauren Barotz (Vail Resorts), Douglas Kessler (Home Owner), Theron Gore (East West) Additional attendees: In Person- Mia Vlaar (Town of Vail), Kristin Yantis (MYPR), Ainslie Fortune (Cactus), Jeremy Gross (Town of Vail), Carlie Smith (Town of Vail), Meggen Kirkham(SITE Marketing), Mark Herron (Lodging Liaison), Chris Romer (Vail Valley Partnership), Abby Oliveira (Town of Vail), Slade Cogswell (970 Design), Bob Brown (BAAG), Jeremy Coleman (BAAG) Zoom- Kim Brussow (Vail Valley Partnership), Ali Longwell (Vail Daily), Jenna Luberto, Shun-Luoi Fong (Cactus), Matthew Stontz (Cactus), Charlie Herrington, Michaella Hader (Cactus), Robert Troller, Parker Owens (Bravo), Naveen Chandra, Kelly Ladyga (pineapple digital) Call to Order Esmarie called meeting to order 8:37am I. MONTHLY FINANCIAL REPORT – September collections are $313,000 which is 3.3% up from 2021 and way above 2019 at 8% Year to Date is $4.25m which is up 39% from 2021 and 50% from 2019 and 19.3% above budget 2022 Amended Budget-Lodging Tax Collections: $5,350,000 - Revenue increase of $915,000 - Projected ending fund balance is now $3,175,898, 59% of annual revenues II. APPROVALS - VLMDAC October 20 Minute Approval 137 Approval Liana/ ??? second/ unanimous III. INFORMATION & DISCUSSION UPDATES - Board Orientation & Training Mia explained the role of the Board members - Year to Date Recap & Learnings Cactus went over “life is but a dream” campaign Spring, Summer, Fall and overall year results Paid Media Results, web results Dream trip influencer test- Macro vs. Mega - CRM and Analytics Update Presented end of year results and accomplishments -see presentation for details - Travel Classics Recap There were 14 editors and 40 freelance writers attending There were over 30 local partners that participated The BIG event was a Vail Village History Tour & Taste of Vail Dinner - 2023 Loyalty Program/Bucket List Personalized Bucket List Campaign- create a campaign that provides engaging and unique personalized content to potential Vail visitors in exchange for in-depth customer data that can be used for future targeted marketing Schedule/Timeline was shared - Video Film Episodes Shared two videos that are on the website There are six videos and two more in production - Town of Vail Updates Current push is our Revelry activities Vail Holidays starts December 17th with Santa 138 - Other Business Several Board Members are up- Douglas and Esmarie have turned in their applications Presenting the budget on December 6th but it may be the 20th or January Hold December 20th for interviews - Adjournment Motion to adjourn by ?? / ?? second/ unanimous 11:24AM Upcoming Meetings: VLMDAC Board Meeting, Thursday, December 15, 2022, Grand View Room 139 AGENDA ITEM NO. 3.2 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Abby Oliveira, Economic Development ITEM TYPE:Information Update AGENDA SECTION:Information Update SUBJECT:January 4, 2023 CSE Meeting Minutes SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 010423 CSE Meeting Minutes.pdf 140 Present:Douglas Smith Nick Conover Alison Wadey Kim Newbury Rediker Marco Valenti 1.Event Recaps Time: 10 Min 1.a Mountain Youth Event Recap Presented by: Michelle Stecher of Mountain Youth Time: 10 Min 1.b Vail Veterans Program Recap Presented by: Jen Brown of Vail Veterans Time: 10 Mins 1.c Vail Gymnastics Event Recap 2.Meeting Reports 3.Information Update 3.a 2023 Event Sponsorship Budget Update 3.b Early Season Visitation Reporting 4.Approval of the Minutes 4.a Approval of the Minutes from December 7, 2022. Committee on Special Events Minutes Wednesday, January 4, 2023 8:30 AM Vail Town Council Chambers EE 2022 Event Recap No Survey Mtn Youth_Combined.pdf Nick Conover made a motion to Release final funding for the Mountain Youth Educational Programming.; Marco Valenti seconded the motion Passed (5 - 0). VVP TOV Event Recap for 2022 1.4.23 CSE.pdf Kim Newbury Rediker made a motion to Release final funding for the Vail Veterans Program.; Marco Valenti seconded the motion Passed (5 - 0). 2022 Event Recap Vail Gymnastics.pdf CSE Budget Update 1-4-23.pdf TOV Visitation Report 1-4-22 CSE.pdf CSE Minutes 12-7-2022 Marco Valenti made a motion to Approve the minutes from the December CSE meeting. ; Kim Newbury Rediker seconded the motion Passed (5 - 0). 1 Committee on Special Events Meeting Minutes of January 4, 2023 141 5.New Business 5.a CSE Facilitator Selection 6.Adjournment Kim Newbury Rediker made a motion to Confirm Motion to Alison Wadley as CSE Chair and Douglas Smith as Vice Chair.; Marco Valenti seconded the motion Passed (5 - 0). Kim Newbury Rediker made a motion to Adjourn ; Douglas Smith seconded the motion Passed (5 - 0). 2 Committee on Special Events Meeting Minutes of January 4, 2023 142 AGENDA ITEM NO. 3.3 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Missy Johnson, Housing ITEM TYPE:Approval of Minutes AGENDA SECTION:Information Update SUBJECT:January 10, 2023 VLHA Meeting Minutes SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 2023-1-10_VLHA_Minutes.pdf 143 Vail Local Housing Authority Minutes January 10, 2023 3:00 PM Town Council Chambers and Virtually via Zoom 75 S. Frontage Road - Vail, Colorado, 81657 PRESENT ABSENT Steve Lindstrom James Wilkins Craig Denton Kristin Williams Dan Godec STAFF Martha Anderson, Housing Coordinator Missy Johnson, Housing Coordinator 1.Call to Order 1.1.Call to Order at 3:03 p.m. with a quorum present. 2.Citizen Participation 2.1.Citizen Participation There are no comments. 3.Approval of Minutes 3.1.VLHA December 13, 2022 Minutes MOTION:WILLIAMS SECOND:GODEC VOTE:4-0 APPROVED 4.Main Agenda 4.1 Resolution No. 1 Series of 2023, A Resolution Adopting a Budget and Making Appropriations to Pay the costs, Expenses and Liabilities of the Vail Local Housing Authority, for its Fiscal Year January 1 through December 31, 2023 Presenter(s): Carlie Smith Finance Director Smith presented the 2023 budget for Authority approval. She answered questions from the Authority regarding specific budget buckets and confirmed that the Authority may increase or decrease the budgeted expenses in the future. Smith confirmed that she would follow-up by providing the budget of estimated hours pertaining to the fees and quarterly updates. 144 The group agreed to edit the 2023 Budgeted Transactions in Professional Fees so the Municipal Capital Market Group Tim Zarlingo is changed to reflect a general placeholder for the topic, as a guestimate, as the group continues to explore opportunities in banking and bonds. Discussion ensued around the budget and top priorities for 2023. The entitlement streamlining is the top priority as it is happening across the state and the country. The group is committed to working with community development and an outside professional for assistance. but if the Authority were to issue bonds in the future, that would be part of an audit. A motion was passed to approve the budget for 2023. MOTION:DENTON SECOND:WILLIAMS VOTE:4-0 APPROVED 4.2 Timber Ridge Redevelopment and West Middle Creek Parcel Update Presenter(s): George Ruther, Housing Director Ruther was unavailable for the meeting so Steve Lindstrom, Chairman, provided a quick overview. As of now, West Middle Creek passed second reading at Town Council. Next items include soil samples and site prep work. Timber Ridge is moving through a budgeting process with an update to Council in two weeks. 4.3 Cooperative Housing Information Update Presenter(s): Steve Lindstrom, Chairman and Dan Godec, VLHA Board Member Godec, Lindstrom, Ruther and Coggin met with Rich Morris who is a local resident with experience in co-ops and discussed additional ways to bridge ownership issues. He is willing to volunteer his time to further educate the Authority. Godec explained the background of the co-op building ownership and benefits possibly provided for tenants. Discussion ensued around the variance between HOA and a co-op which would lessening the financial commitment and lessening the risk in residential ownership. 5.Matters from the Chairman and Authority Members 5.1.Matters from the Chairman and Authority Members Presenter: Steve Lindstrom, Chairman Williams reminded the group to watch for additional information as follow-up to the implementation of the additional sales tax passing and the formation of an RTA transit system. January 1, 2023. Dylan Roberts, the new State Senator has hit the ground running introducing some new 145 housing legislation and the desire to be a leader in refining the entitlement process. Denton, met with Amy Reid, Director and Mike Seguin, new Chairman of the Vail Board of Realtors and discussed the opportunity for collaborative efforts. Sequin comes to the board with desire to help with residential housing. Reid has good ideas and they understand the value of being more vocal about what is needed for residential/work force housing. The authority will look to a presentation and collaborative discussion in the future. Williams reminded the group about the desire to schedule a presentation from Tm McGuire with Elevate at a future Authority meeting. The data would likely be very good for VBR to understand as well. at Grand Hyatt-Vail. Habitat is going from 8 home starts to 24 home starts in 2023. Godec reminds the group to be aware of the funding sources, be in the queue and understanding criteria. Private equity groups are interested in workforce housing to meet demand. 6.Adjournment 6.1 Adjournment 3:40 p.m. MOTION:WILLIAMS SECOND:GODEC VOTE:5-0 APPROVED 7. Future Agenda Items Vail Strategic Housing Plan 2027 Land Banking Investment Banker Discussion Vail Board of Realtors (VBR) Discussion Eagle County GIS Analysis by Elevate Cross Harbor Capital 8. Next Meeting Date 8.1 January 24, 2023 Meeting agendas and materials can be accessed prior to meeting day on the Town of Vail website www.vailgov.com. All housing authority meetings are open to the public. Times and order of agenda are approximate, subject to change, and cannot be relied upon to determine at what time the Vail Local Housing Authority will discuss an item. Please call (970) 479-2150 for additional information. Please call 711 for sign language interpretation 48 hours prior to meeting time. 146 AGENDA ITEM NO. 3.4 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Missy Johnson, Housing ITEM TYPE:Information Update AGENDA SECTION:Information Update SUBJECT:EHU Compliance Status Update SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: EHU Compliance Status Update Memo 02072023.pdf 147 Memorandum To: Vail Town Council From: Martha Anderson, Housing Coordinator Date: February 7, 2023 Subject: 2022 Deed-Restricted Employee Housing Compliance Status Report I. SUMMARY The Town of Vail Housing Department is charged with verifying compliance for 949 deed- restricted properties in the Town of Vail, annually. As a courtesy, Housing staff sent letters to deed-restricted property owners on December 15, 2022 and January 6, 2023, as well as email blasts on December 16, 2022 and January 6, 2023 reminding each of their obligation to provide documentation demonstrating compliance by no later than February 1, 2023, per the terms of the recorded deed-restrictions. As a result, 904 deed-restricted property owners, or 95%, submitted the required documentation by the February 1st deadline. This is a decrease of 1% over the previous year’s compliance. Out of the 45 non-compliant properties, 4 are repeat offenders. On February 3, 2023, Housing staff mailed 23 letters for non-compliance to 45 deed- restricted property owners. Owners were granted a deadline of February 28, 2023 to pay the $250 late fee and submit compliance. If owners do not respond by the required deadline, a summons to appear in municipal court will be issued by the Police Department. II. NEXT STEPS Beginning March 1, 2023, the Housing staff, in collaboration with the Police Department, will prepare evidentiary files in anticipation of issuing summons for failure to comply with the deed restriction terms. Once a summons has been written, the issue of non - compliance will transition from a comp liance matter to an enforcement matter. 148 AGENDA ITEM NO. 3.5 Item Cover Page DATE:February 7, 2023 SUBMITTED BY:Alex Jakubiec, Finance ITEM TYPE:Information Update AGENDA SECTION:Information Update SUBJECT:January Revenue Update SUGGESTED ACTION: VAIL TOWN COUNCIL AGENDA ITEM REPORT ATTACHMENTS: 230207_Revenue_UpdatesFinal.pdf 149 1 TOWN OF VAIL REVENUE UPDATE February 7, 2023 4.0% Sales Tax Upon receipt of all sales tax returns, December collections are estimated to be $5,603,459 down (2.5)% from last year and up 2.7% compared to amended budget. December collections are up 32.3% from 2019. Year to date collections of $40,795,487 are up 18.1% from prior year and up 39.5% from 2019. Compared to amended budget, collections are up 2.1%. Inflation as measured by the consumer price index was up 6.5% for December. The annual budget totals $39.95 million. 0.5% Housing Fund Sales Tax Upon receipt of all sales tax returns, December collections of the 0.5% housing sales tax are estimated to be $668,392 and the YTD total collections are estimated to be $4,953,027. The 2022 amended budget for the housing fund sales tax totals $4.8 million. Real Estate Transfer Tax (RETT) RETT collections through December 31 total $9,577,356 down (28.4)% from this time last year. The 2022 amended RETT budget totals $9,707,414. Construction Use Tax Use Tax collections through December 31 total $2,189,230 compared to $3,682,745 from this time last year. 2021 collections were significantly higher due to several large single-family residential projects and an interior hotel renovation. The 2022 amended budget totals $1,965,000. Lift Tax 2022 YTD lift tax collections total $6,473,618 up 17.3% or $954,728 from the same time last year. Daily Parking Sales Daily sales from the parking structures from November through December 31 total approximately $1,689,297, up $208,773, or 14.1% from this time last year. Parking Pass Revenue Pass sales for the 22/23 ski season (November through December 31) total $1,491,526 up $308,694 or 26.1% from prior winter season. A detailed chart of approximate passes sold by type is shown below. 21/22 ski season numbers represent passes sold or used throughout the entire prior ski season. 150 2 2022/23 Passes YTD Sold 2021/22 Passes Total Season Sold Premier 21 Gold 66 Vail Village Business Premier 65 Silver - Vail Village 60 Lionshead Business Premier 11 Silver - Lionshead 6 Employee Plus 359 Blue 358 Employee 495 Pink 690 Eagle County Local 1,602 Eagle County Value Card 1,699* Vail Local 1,578 Vail Value Card 2,303* Total 4,131 Total 5,182 *During the 2021/2022 season Value Cards were not recertified. The total number sold is estimated based on the number of individual Value Cards scanned in the parking structures during the entire 2021/2022 winter season. Value cards in prior seasons we often used in conjunction with other passes, such as the Blue pass, to utilize discount parking in the structures on days that the parker’s other pass did not grant access. This year, discounted parking is included with employee and business passes, reducing the need for multiple passes. Summary Across all funds, year-to-date total revenue of $92.3 million is down (0.3)% from amended budget and up 7.9% from prior year. Excluding the new 0.5% housing sales tax, total revenue is up 2.1% from prior year. Increased revenues from prior year are due to higher sales tax collections, higher lift tax collections, and higher daily parking fees. These increases were partially offset by decreases in RETT and Construction Use Taxes. 151 2022 Budget % change % change % change 2017 2018 2019 2020 Amended Budget Variance from 2021 from 2019 from Budget January 3,725,212$ 3,597,610$ 4,079,994$ 4,076,145$ 3,422,209$ 5,202,457$ 5,216,351$ 13,894$ 52.43% 27.85% 0.27% February 3,692,592 3,818,356 4,137,087 4,285,633 3,691,850 5,670,176 5,682,891$ 12,715 53.93% 37.36% 0.22% March 3,642,407 4,167,880 4,237,933 2,243,518 4,364,797 5,905,456 5,949,858$ 44,402 36.31% 40.40% 0.75% April 1,386,780 1,233,474 1,445,071 427,518 1,751,528 2,108,005 2,233,230$ 125,225 27.50% 54.54% 5.94% May 659,475 830,193 763,756 503,828 1,061,516 1,112,035 1,231,196$ 119,161 15.98% 61.20% 10.72% June 1,389,982 1,648,443 1,606,748 1,023,517 2,149,312 2,149,300 2,317,132$ 167,832 7.81% 44.21% 7.81% July 2,215,649 2,412,425 2,480,292 2,084,644 3,491,668 3,491,700 3,506,228$ 14,528 0.42% 41.36% 0.42% August 1,863,949 2,195,175 2,237,050 2,138,838 2,877,550 2,877,600 2,996,481$ 118,881 4.13% 33.95% 4.13% September 1,385,462 1,540,490 1,600,100 1,767,393 2,359,528 2,359,500 2,439,752$ 80,252 3.40% 52.47% 3.40% October 936,954 1,106,596 1,165,176 1,371,727 1,734,964 1,735,000 1,730,445$ (4,555) -0.26% 48.51% -0.26% November 997,716 1,264,600 1,260,314 1,425,461 1,880,397 1,880,400 1,888,465$ 8,065 0.43% 49.84% 0.43% December 3,695,305 4,070,870 4,237,178 3,625,189 5,749,365 5,458,371 5,603,459$ 145,088 -2.54% 32.25% 2.66% Total 25,591,483$ 27,886,112$ 29,250,698$ 24,973,411$ 34,534,683$ 39,950,000$ 40,795,487$ 845,487$ 18.13% 39.47% 2.12% 2022 Budget % change Amended Budget Variance from Budget January 643,700$ 645,390$ 1,690$ 0.26% February 700,700 702,268 1,568 0.22% March 721,900 724,442 2,542 0.35% April 260,300 268,884 8,584 3.30% May 146,400 147,059 659 0.45% June 280,000 280,360 360 0.13% July 420,000 424,383 4,383 1.04% August 360,000 361,051 1,051 0.29% September 290,000 294,664 4,664 1.61% October 190,000 207,508 17,508 9.21% November 200,000 228,626 28,626 14.31% December 600,000 668,392 68,392 11.40% Total 4,813,000$ 4,953,027$ 140,029$ 2.91% 0.5% Collected Sales Tax 0.5% HOUSING SALES TAX COLLECTIONS Balance Actual Collections 4.0% Collected Sales Tax2021 Town of Vail Revenue Update February 7, 2023 4.0% SALES TAX 2022 Budget Comparison 15 2 Town of Vail Revenue Update February 7, 2023 YTD 4% Sales Tax Collections By Year Through December 31 December 4% Sales Tax Collections By Year Through December 31 • YTD collections of $40.8M are up 18.1% from prior year and up 2.1% from amended budget. YTD collections are up 39.5%from 2019, the last year not impacted by Covid-19. • Inflation as measured by the consumer price index was up 6.5% in December. $27,886,112 $29,250,698 $24,973,411 $34,534,683 $40,795,487 $0 $10,000,000 $20,000,000 $30,000,000 $40,000,000 2018 2019 2020 2021 2022 $4,070,870 $4,237,178 $3,625,189 $5,749,365 $5,603,459 $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 2018 2019 2020 2021 2022 • December 2022 collections of $5.6M are down (2.5)% from prior year and up 2.7% from the amended budget. December collections are up 32.2% from 2019. 153 Town of Vail Revenue Update February 7, 2023 YTD 0.5% Housing Fund Sales Tax Collections Real Estate Transfer Tax by Year YTD Through December 2022 Through December 31 • This chart shows YTD collections of 1% RETT, segmented by real property values. 2022 collections are down (28.4)% from the prior year. $0 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 2018 2019 2020 2021 2022 Sales Less Than $2.5 Million Sales $2.5 to $5 Million Sales $5 to $10 Million Sales Over $10 Million $7,649,014 $7,224,668 $10,448,526 $13,371,555 $9,577,356 • This chart shows monthly collections of the Town of Vail 0.5% housing fund sales tax and cumulative YTD totals. • The 0.5% sales tax was approved by voters in 2021 with an effective date of January 1, 2022. $645,390  $702,268 $724,442  $268,884  $147,059  $280,360  $424,383 $361,051  $294,664  $207,508 $228,626  $668,392   $‐  $1,000,000  $2,000,000  $3,000,000  $4,000,000  $5,000,000  $‐  $100,000  $200,000  $300,000  $400,000  $500,000  $600,000  $700,000  $800,000 Monthly YTD Monthly Total YTD Total YTD Total: $4,953,027 154 Town of Vail Revenue Update February 7, 2023 Construction Use Tax by Year YTD Through December 2022 Lift Tax Collections YTD Through December 31 • Use Tax collections through December 31 total $2,189,230 compared to $3,682,745 from this time last year. This is a decrease of (40.6)%. •2021 collections were significantly higher due to a number of large single-family residential projects and the interior renovation of the Sonnenalp Hotel. $3,689,131 $2,467,928 $2,078,577 $3,682,745 $2,189,230 $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 2018 2019 2020 2021 2022 • 2022 YTD lift tax collections of $6.5M are up 17.3% or $954,728 from the same time last year. $5,103,480 $5,341,369 $4,095,812 $5,518,890 $6,473,618 $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 2018 2019 2020 2021 2022 155 Vail Business Review November 2022 February 1, 2023 The Vail Business Review breaks down the four percent sales tax collected for the month of November 2022. Overall, November sales tax was in line with prior year, up 0.2%. Retail increased 6.0%, lodging decreased (10.7%), food and beverage remained flat, and utilities/other increased 11.1%. Excluding the out-of-town category, sales tax for the month of November was down (3.2%). Town of Vail sales tax forms, the Vail Business Review, and sales tax worksheets are available on the internet at www.vailgov.com. You can subscribe to have the Vail Business Review and the sales tax worksheet emailed to you automatically from www.vailgov.com. Please remember when reading the Vail Business Review that it is produced from sales tax collections as opposed to actual gross sales. If you have any questions or comments, please feel free to call me at (970) 479-2125 or Carlie Smith, Finance Director, at (970) 479-2119. Sincerely, Lauren Noll Town of Vail Sales Tax Administrator 156 Town of Vail Business Review November 4.0% Tax Collections by Year November Sales Tax November 2021November 2022 Sales Tax Collections by Business Type $863,404 Lodging $515,497 Food & Beverage $334,341 Utilities & Other $175,222 $0 $200,000 $400,000 $600,000 $800,000 6.0%(0.1%)11.1% Retail RLFU -$8,000,000 $12,000,000 $1,268,974 $1,260,472 $1,430,471 $1,884,419 $1,888,465 $0 $500,000 $1,000,000 $1,500,000 $2,000,000 2018 2019 2020 2021 2022 (10.7%) • This report represents collections of Town of Vail 4.0% sales tax, as opposed to actual gross sales. • On January 1st, 2022, Town of Vail sales tax increased from 4.0% to 4.5% on all items except food for home consumption. 2022 results in this report only include the 4.0% general sales tax collected on all items for accuracy of comparison to prior years. •Overall, November 2022 4.0% sales tax collections were flat with the prior year, up 0.2%. • November 2022 retail sales increased 6.0%, lodging decreased (10.7%), food and beverage remained flat (0.1%), and utilities and other increased 11.1%. Retail $814,587 Lodging $577,494 Food & Beverage $334,674 Utilities & Other $157,664 $0 $200,000 $400,000 $600,000 $800,000 157 Town of Vail Business Review November 2021November 2022 Geographic Area Trends by Year November Sales Tax by Year Sales Tax by Location November Sales Tax Other Areas 14% Lionshead 11% Out of Town 43% Vail Village 32% Other Areas 13% Lionshead 12% Out of Town 40% Vail Village 35% • Vail Village sales tax decreased (7.9%), Lionshead decreased (3.0%), Other Areas increased 9.7%, and Out of Town increased 5.2%. Excluding Out of Town collections, all areas were down (3.2%). $233,941 $215,328 $247,481 $238,067 $261,064 $200,389 $182,605 $164,969 $219,160 $212,635 $340,000 $365,144 $561,352 $765,736 $805,555 $494,644 $497,395 $456,670 $661,456 $609,211 $0 $200,000 $400,000 $600,000 $800,000 2018 2019 2020 2021 2022 Other Areas Lionshead Out of Town Vail Village • This chart shows November sales tax collections by geographic area over time. 158 Retail Business Sales Tax Detail November Sales Tax Town of Vail Business Review November 4.0% Sales Tax Accommodation Services Sales Tax by Year Apparel $124,881 Grocery $102,292 Gallery $7,545 Gifts $3,243 Jewelry $23,501 Retail Liquor $32,064 Retail Other $367,076 Sporting Goods $136,010 Online Retailers $66,584 Retail Home Occupation $208 • Overall, November 2022 accommodations services decreased (10.7%). Short-term rentals decreased (10.5)% from prior year and hotels and lodges decreased (10.9%). • Short-term rental sales tax collection numbers include online marketplace facilitators like Airbnb and VRBO. Revenue collections from facilitators may include some hotels and lodges. Facilitators first began collecting and remitting sales taxes on behalf of individual owners in October of 2020. $230,434 $148,773 $324,721 $252,773 $289,294 $226,203 $0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 Hotel and Lodges Short-Term Rentals 2022 2021 2020 159 Retail 141,137.58 120,756.92 16.88% Lodging 64,358.99 69,869.00 ‐7.89% F & B 50,710.52 41,730.28 21.52% Other 4,857.26 5,710.92 ‐14.95% Total 261,064.35 238,067.12 9.66% Retail 74,000.52 68,333.12 8.29% Lodging 77,586.37 90,514.39 ‐14.28% F & B 60,167.22 58,766.79 2.38% Other 880.75 1,545.25 ‐43.00% Total 212,634.86 219,159.55 ‐2.98% Retail 406,819.24 352,831.47 15.30% Lodging 231,473.06 266,116.10 ‐13.02% F & B 657.00 807.01 ‐18.59% Other 166,605.47 145,980.96 14.13% Total 805,554.76 765,735.54 5.20% Retail 241,446.81 272,665.01 ‐11.45% Lodging 142,078.73 150,994.56 ‐5.90% F & B 222,806.73 233,370.11 ‐4.53% Other 2,878.77 4,426.73 ‐34.97% Total 609,211.04 661,456.41 ‐7.90% Retail 863,404.15 814,586.52 5.99% Lodging 515,497.16 577,494.04 ‐10.74% F & B 334,341.47 334,674.19 ‐0.10% Other 175,222.24 157,663.86 11.14% Total 1,888,465.01 1,884,418.61 0.21% Retail Apparel 124,881.30 136,052.83 ‐8.21% Retail Food 102,292.02 100,452.05 1.83% Retail Gallery 7,545.38 16,502.00 ‐54.28% Retail Gift 3,242.87 3,977.54 ‐18.47% Retail Home Occupation 208.14 228.94 ‐9.09% Retail Jewelry 23,500.63 23,600.42 ‐0.42% Retail Liquor 32,064.36 37,487.44 ‐14.47% Retail Other 367,075.62 290,276.40 26.46% Retail Sport 136,010.17 139,673.47 ‐2.62% Retail Online Retailer 66,583.66 66,335.44 0.37% Total 863,404.15 814,586.52 5.99% Cascade Village / East Vail / Sandstone / West Vail Town of Vail Business Review November Sales Tax 2022 Collections   2021 Collections YoY % Change Total ‐ All Areas Lionshead Out of Town Vail Village Retail Summary 160