Loading...
HomeMy WebLinkAboutB02-0358 expiredTOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Job Address.: 2958 S FRONTAGE RD WEST VAIL Location......: Interlocken Condos all buidlings Parcel No....: 201314308000 Project No...: OWNER Interlchen Condo Association10/28/2002 2958 S Frontage Rd W Vail Co. 81657 License: CONTRACTOR INTERLOCKENHOMEOWNERS ASSOCI10/28/2002 143 E MEADOW DR VAIL, CO 81657 License: 193-L APPLICANT INTERLOCKENHOMEOWNERS ASSOCI10/28/2002 143 E MEADOW DR VAIL, CO 81657 License: 193-L Desciption: Tear off and rebuild exterior decks. Same locations and same size Occupancy: RI Multi-Family Type Construction: V1-HR Type V 1-Hour Type Occupancy: Valuation: $100,000.00 Permit B02-0358 Status.....: ISSUED Applied...: 10/28/2002 Issued 12/10/2002 Expires...: 06/08/2003 Phone: 970-476-4262 Phone: 970-476-4262 V"-~ 4A L 5 Phone: 970-476-4262 Xpir~11 Add Sq Ft: 0 Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 ss***sss#**s***#ss*s*#**s****s*s*s#*s****s#**ss*#*************#*****s FEE SUMMARY *********s******sss#****s*#**ss#ss*s#s#**#**s**#*#ssss*ss*** Building----> $740.00 Restuarant Plan Review-> $0.00 Total Calculated Fees-> $1,224.00 Plan Check--> $481.00 DRB Fee-----------> $0.00 Additional Fees-----> $0.00 Investigation-> $0.00 Recreation Fee----------> $0.00 Total Permit Fee---> $1,224.00 Will Call----> $3.00 Clean-up Deposit-----> $0.00 Payments------ > $1,224.00 TOTAL FEES------> $1,224.00 BALANCE DUE--- $0.00 ###################################################################s#*#s###*#########*t#i# #*#s######s#######s#i##*##s### #####*i#######s########## Approvals: Item: 05100 BUILDING DEPARTMENT 11/08/2002 cdavis Action: AP Item: 05400 PLANNING DEPARTMENT 11/08/2002 Matt Gennett Action: AP Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS PAGE 2 CONDITIONS OF APPROVAL Permit B02-0358 as of 12-10-2002 Status: ISSUED Permit Type: ADD/ALT MF BUILD PERMIT Applicant: INTERLOCKENHOMEOWNERS ASSOCIATION 970-476-4262 Job Address: 2958 S FRONTAGE RD WEST VAIL Location: Interlocken Condos all buidlings Parcel No: 201314308000 Description: Tear off and rebuild exterior decks. Same locations and same size Conditions: Applied: 10/28/2002 Issued: 12/10/2002 To Expire: 06/08/2003 Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ***s**s****s*s****ss******sss**s****ss*s*****+**~*s***s***s*s*s*ss****s*s**s*s*******s*ss****s*s*s*********ss***s******s****ss*s*s*ss*s********** See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY 149 OR AT OUR-OP51CE-BROM 8:00 AM - 4 PM TURE OF OWNER OR CONTRXCTOR FOR HIMSELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: R000003535 Amount: $1,224.00 12/10/200209:10 AM Payment Method: Check Init: DDG Notation: Vail Management Company 30499 Permit No: B02-0358 Type: ADD/ALT MF BUILD PERMIT Parcel No: 201314308000 Site Address: 2958 S FRONTAGE RD WEST VAIL Location: Interlocken Condos all buidlings Total Fees: $1,224.00 This Payment: $1,224.00 Total ALL Pmts: $1,224.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts BP 00100003111100 BUILDING PERMIT FEES 740.00 PF 00100003112300 PLAN CHECK FEES 481.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 J APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED a - I Project v Building Permit 041 OF Mt. M I h-u-N a I'd 91) rim ?OWN IM TOWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! 75 S. Frontage Rd. Vail, Colorado 81657 C CONTRACTOR INFORMATION L.J L7 General Contractor: Town of Vail Reg. No.: Contact L970) Phone #'s: ~o o~ -L '70-0,,9, bed Email address: BG 0FIT E-5 6? v COMPLETE VALUATIONS FOR BUILDING PERMIT C~ O~ri.e1 A ~!nnf~nf Cftn1e /'nunf t Acceccnrc n#ire mf 07n_39R.91Sdn nr vicif www Panle-rnllntV_rnm PPS. ~ 2,10 31~! ~OY~ DO Z1~031y3o~o3q Job Name: Job Address: ~q S~ S• ~O/`I Q~' Legal Description Lot:: Block: Filing: Subdivision: c.f I OG~c-~ Owners Name: 4A Address: a95~ s Fib, w. Phone: 34?0_0%-9Z Architect/Designer: Address: Phone: Engineer: vv\ Address: 101 ' Phone: (74q- q3 q j Detailed description of work: 0;J1 be + " re b0 i I ,N JC~CLS Work Class: New Addition( ) Remodel( ) Repair ) Demo( ) Other Doc S I ) Work Type: Interior ( ) Exterior Both( ) 11 Does an EHU exist at this location: Yes( ) No( _J1 Type of Bldg.: Single-family( ) Two-family( ) Multi-family oo Commercial( ) Restaurant( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: Gi No/TyR2 of Fireplaces Existin : Gas liances Gas Logs Wood/Pellet Wood Burning No/Tyg2 of Fire laces Pro osed: Gas Appliances Gas Los Bumin NOT ALLOWED Does a Fire Alarm Exist: Yes( ) No Dos xist: Yes( ) No ) tU **************************************FOR OFFICE USE ONLY* t***" Other Fees: Type of Constructio" : Cc ted B DRB Fees. Occupancy Grou er Si n-aff. Public Way Permit Fee: Date Received: \\Vaihdata\cdev\FORMS\PERMITS\BLDGPERM.DOC 07/2612002 0m, M the r mueller.co., inc. 28 November 2001 Mr. Bobby Coates VAIL:MANAGEMEN'T CO 143 East Meadow Drive Suite 395, Vail, Colorado 81657 S ibj-Oct. Site Inspect; ons Interlochen Condominium Decks Vail, Colorado Dear Bobby: The purpose of,this letter is to-confirm the following inspections by, this office on.. 20 November. 2001 and 21 November 2001. The purpose of the inspections were to address the letter by Michael 'McGee-Town of`. Vail. Fire Marshall dated November 19: 2001. Present ates-VAIL MANAGEMENT at the inspections were Mark -Mueller, Bobby Co Co.-.,, Dan'Zollo-President of.Interlochen.Condominium :Association, and Michael. MCGee-TOV (21 November 2001 only).. The following items ,are to be noted: a) EXISTING CONDITIONS OF UNIT B6 AND B16 DECKS The previously mentioned report, required an immediate: structural inspection of the exterior decks of Units B6 (referenced asUnit B4 in.report),. and B16, for life safety concerns. The decks are supported by 3 cantilevered spruce 8 x-16 -beams, the balance of the beams project into the unit, and eliminated the need for exterior columns to support the exterior dicks. 2 of the 3 bealmiG of each, 4ock., were severely rotted for over once-half of, their depths. The beams when subjected to the load of one person, deflected up. to 1".. These, beams'placed any deck user, in imminent danger;due'to the threat of collapse of the deck, b) DECK,REPLACEMENT OPTIONS FOR UNIT B6 AND B16 DECKS The decks can be replaced with a cantilevered deck to match the original decks,.or columns can be added.to'make the deck a self supported deck. The cantilevered deck option requires that . the, Entire cantilevered beam be replaced (both interior and exteror-portions;of the same beau,). The "self supported deck option requires addition of a ledger along the exterior face of the building, installation of 2 frost protected pier foundations, 2 columns with a beam between-the columns, and civil architectural and structural engineering 0 p.o. box 2747 wail, colorado 81658.476-2627 476-2637 (FAX) joists between the ledger and the beam. It is the experience of this office, that the self supporting deck, is less expensive to construct than the cantilevered deck. The deck for Unit B6 is required inorder to access the unit. A temporary 4' wide, deck can be installed for temporary access this winter, or a final replacement deck can be installed. The unrotted- timber on the west side of the' deck has been left intact allowing construction of J the cantilevered' deck or . , support 0 01. 4 tc".x.~C t'~i4 y accezz ~K ck . - c) TEMPORARY SHORING OF UNIT B6 AND B16 DECKS The previously mentioned report, required installation of temporary shoring to support the deck until the rotted members could be removed. All parties involved, agreed that it would be less expensive to remove the decks immediately, and save the cost.of installing and removing temporary shoring. The savings can be put towards construction of new decks. d) CODE`UPGRADE$ SINCE ORIGINAL CONSTRUC'T'ION Current- Town, of. Vail building, codes require that decks be designed for 100'psf live loads. The--timber decks of Units 6 and 16-as originally constructed, are very close to being capable of supporting the 100, psf live load. Slight adjustments in. the length of the cantilever, and lumber species, will accommodate current loading requirements The 1997 Uniform Building code requires a 4° space. between intermediate rails of guardrails. The existing-intermediate rails have been constructed with a 6" space between rails. e) BUILDING C AND D_DECKS The previously mentioned report, describes three balconies.of the A building that show sighs of structural failure. After meeting with Michael McGee at the site, it was confirmed that the referenced decks are actually on the C and D'Buildings .The decks of Building C and D require' additional inspection bya structural engineer, and can be addressed in a future report. In conclusion,-the cantilevered beams supporting the decks of Units 86 and B16 are-rotted beyond repair. The rotting is so-_advanced, that the rot extends into the interior portion of some of the cantilevered beams. The 3-8x16 beams with interior rot, must have the interior portions of the beams replaced, to prevent the s. • Page 3 Mr. ' Bobby Coates 28 November 2001 settlement'-of the roof columns above the rotted beams. Replacement of these beams, including the cantilevered portions, would easily facilitate reconstruction of the-deck to the original conditions. This office recommends that the top of the cantilevered portions of the beams be protected from moisture and future rotting. Addition -of new -exterior piers, and columns, would allow construction of a self-supported deck,.that may be less expensive to construct than the cantilevered decks. Current code requires that. the :deck handrails be redesigned. The existing handrails around c®mglex, are, in various stages of rot .aina decay.A I iiAilir handrail can be . constructed that will . have `a relatively short life expectancy. As an option, a. steel handrail could be installed that would have a longer life expectancy, and require less maintenance. Upon selection of the construction options previously described, a structural plan for replacement of the decks of Units B6 and B16 can be prepared by this office The decks of the A and C buildings require a future visual inspection and report by a structural engineer. If you have any questions,regarding this inspection-and report, or require additional services, please contact this office at the phone number shown on the cover sheet. 0., INC. PE cc:"'Michael McGee'-TOV Fire Marshall Charlie.Davis-TOV Building Official TOWN OF VAIL iy Department of Community Development 75 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www ci. vail. co. us November 29, 2001 Ms. Cecelia Fenton Interlocken Condo Unit D-8 Fax Number: 949-5749 Dear Ms. Fenton, The action taken earlier this week on all Interlocken Condominium balconies was done under the 1997 Uniform Fire Code. Specifically, Section 103.4.1.2 was used. Enclosed with this fax is a copy of this section and the adopting section of the Town of Vail Municipal Code. I hope this information is helpful to you. Feel free to contact me with any other questions at 970- 479-2142. I am under the understanding that the Interlocken Condo Association is working with the Vail Fire Department t faci~it~te this matter. I S'' erely . ~arlie Davis Acting Building Official JL4 RECYCLEDPAPER Nov-27-2001 1 :36 From-TOWN OF AVON COIMN ITY DEVELOPMENT 9709495749 T-679 P.001/001 F-150 i Mr. Charles Davis Acting Building Official Town of Vail Please provide faxed copies of the codes you are utilizing that permitted you to come to the Interlochen to inspect all unit decks on all the buildings when just one or two decks on B building were called in to the Town of Vail with concern of their safety' Secondly, liwould like to have a copy of the code you are following that allows the Building Department and the Fire Department to unilaterally declare all decks unsafe andcondemned without adequate proof that all the structures are unsafe. Thirdly, please include copies of the inspections that have been made. Would you please have this information to me by 4:00 tomorrow, November 28. Thank you for your time end consideration. I ~ Cecelia Fenton Fax: 949-5749 1k1 /2701 4:25 p.m. I I I } i I ~ i. TOWN OF VAIL Vail Fire & Emergency Services 42 West Meadow Drive Vail, Colorado 81657 970-479-2250 November 21, 2001 Interlocken Condominium Association clo Vail Management 201 Gore Creek Drive Vail, Colorado 81657 Re: Follow Up on Assessment of Balconies Dear Interlocken Condominium Association: First we would like to express our appreciation for your quick response and cooperation. The two most seriously deficient conditions have been abated. The balconies on Units B-16 and B-6 have been removed Given the single means of pedestrian access and egress to Unit B-6 was through the balcony, we appreciate the significance On Wednesday, November 21, 2001, we did a brief survey of the existing condition of several balconies with Mark Mueller, structural engineer, Bobby Coates from Vail Management and Dan Zollo. It is apparent the exterior elements are in need of a detailed structural assessment and many are in need of repair or replacement. The results of the brief survey indicate some balconies are unsafe. Based on the findings from the demolition of the balconies if Units B-16 and B-6, certain problems may not be visible or easily detected. The Association has generally complied with the orders issued November 19, 2001, and such cooperation is sincerely appreciated. It is however, based on the findings, in accordance with the Town of Vail Municipal Code, Article 10-1-2, Uniform Fire Code, 1997 edition, Article 1, Section 103.4.1.2, necessary to issue an order to cease and desist using the balconies. Firewood, lawn furniture, gas grills, bicycles, and all other storage is hereby prohibited, effective immediately. Snow accumulation in excess of 12 inches is prohibited. Balconies must be cleared of recurrent snow accumulation to prevent structural failure. Occupants to stay off the balconies. At such time as detailed assessments are conducted, hazards are specifically identified, and plans are submitted to abate the identified hazards, the Town will expedite review andpermit issuance. Such plans shall bear the stamp of a registered professional engineer. Building permits are required. Review of permanent replacements and repairs are subject to Town of Vail Design Review Board. Emergency repairs may be made to Unit B-6 to provide access and egress. Plans for the temporary stairs must have a PE stamp and a Town of Vail Building Permit is required. Design of the stairs should reflect existing architecture as much as is practical. Use of the temporary stair will be allowed until a permanent solution is in effect, but not beyond July 1, 2002. Interlocken Condominiums Page 2 In consideration of the life safety issues, the technical nature of conducting structural assessments, the detailed planning required to make such repairs, bid document preparation, bid solicitations, contract issues, impending winter weather, logistical aspects, and the potential costs of abatement, the Town of Vail will allow the Association permission to simply abandon the use of the balconies for the winter. A complete and detailed structural assessment of each balcony, both front and rear, is required on or before May 1, 2002. Such report must be stamped by a Colorado Registered Professional Engineer. The report must include as a minimum, an assessment of each balcony with a structural load carrying capacity of less than 100 P.S.F.. The assessment should identify whether the suspect balcony does or does not meet current code requirements as adopted by the Town of Vail A copy of said report is to be furnished to the Town of Vail Building Department by the Association or their agent. Plans should be developed and submitted to the Town of Vail, indicating the design, materials, color, finish and related elements, as well as all code compliant requirements, for the repair and/or replacement of identified deficiencies, on or before June 15, 2002. The Association should plan to execute contract documents such that will allow all remedial work to be completed on or before August 30, 2002. . Timelines may be amended for due cause. Communication is critical. The scope of the repairs may be significant. The problems are serious. Protection of the occupants and guests is imperative. Please contact us if you need assistance, clarification, or additional information in this matter and again, Thank You for your cooperation. Sincerely, Michael McGee Deputy Chief/Fire Marshal Vail Fire & Emergency Services (970) 479-2135 cc: Chief John Gulick Lt. Mike Vaughan, Fire Prevention Officer Russell Forrest, Director, Community Development Charlie Davis, Acting Chief Building Official J.R. Mondragon, Building Inspector Matt Mire, Town Attorney Pam Brandmeyer, Assistant Town Manager TOWN Vail Fire & Emergency Services 42 West Meadow Drive Vail, Colorado 81657 970-479-2250 November 28, 2001 Interlocken Condominium Association c% Vail Management 201 Gore Creek Drive Vail, Colorado 81657 Re: Evaluation of Balconies by Town of Vail Building Department Dear Interlocken Condominium Association: On Tuesday, November 27, 2001, we placed a phone call to Dan Zollo, President of the Association, to advise him we were attempting to fulfill a request by one of the resident owners, to have the balconies assessed by the Town of Vail Building Department. We left a message on Mr. Zollo's message machine. We then contacted Vail Management Company and spoke to Mary Beth. I advised her as to the nature of our request and obtained her permission to enter upon the common grounds to conduct the assessment. Charlie Davis, acting Chief Building Official and I went to the Interlocken Condominiums at about 11 A.M.. I escorted Mr. Davis to the south side of the complex and showed him where the balconies had been removed from Units B-16 and B-6. Mr. Davis made some cursory notes and performed some quick depth assessments on the exposed remains of the ends of the structural timbers. Photos were taken for documentation. Mr. Davis and I walked through the courtyard and looked at exterior portions of the balconies. Mr. Davis has sent an internal response, from which I quote in part: "Per Mike's request, I visited the site at 11 AM Nov. 27th. I looked at a few decks on B building and a few decks on the D building. There is evidence of degradation to the existing structural members on both buildings. Two decks have been removed on B building. The exposed ends of the cantilevered members have dry rot located in the upper third to the full core of these members. This dry rot also appears to be moving into the building. Building D is constructed in a different fashion (post and beam) however there is evidence of degradation on the south facing decks also. Lag bolts are pulling out of structural members, guardrails and fascia board in which the guardrails are attached are cupping and pulling away from the decks. Based on what I witnessed, the means and methods of construction and the age of the structures, I believe the Fire Dept and Mike Mcgee has acted in an appropriate and prudent manner. INTERLOCKEN CONDOMINIUMS ASSESSMENT BY TOV BUILDING OFFICIAL PAGE 2 Mike has used Section 103.4.1.2 of the 1997 Edition of the Uniform Fire Code to justify the action being taken. In review of this section, my interpretation agrees with Mike's. I have no jurisdiction in enforcing the Fire Code. I do want everyone to understand I agree with the action taken. " It appears therefore, on the basis of the response from acting Chief Building Official Charlie Davis, that the request to have the balconies evaluated by a structural engineer and the advisement to remove existing live loads and dead loads, as recommended by Mark Mueller, P.E., stands as issued. Please be advised we have heard complaints from one owner and one person who appears to be an unaffiliated contractor. We have also spoken with four owners who have expressed an understanding and spirit of cooperation, which is greatly appreciated. It was never and is not now, the Fire Department's intent to unnecessarily disrupt the owners and tenants right to use the balconies. Our primary concern is life safety with a secondary concern for protection of property. The issues we have identified do appear to be potentially significant. The initial issue of the integrity of the balcony on Unit B-16, has lead to the discovery of the structural failure of the timbers beneath the balcony on Unit B-6, to the identification of additional suspect balconies, loose handrails, a staircase which appears to be sloping away from the building, a bond beam which appears to be bending away from the building and fascia boards, to which upper deck handrails are attached, bending and breaking away from the decks. The problems identified to date have been found on several buildings and in both heavy timber and post and beam construction. Observations of the ends of the exposed timbers indicate the degradation extends into the interior of some units. Issues extend beyond the interior of any specific condominium. The aggregate effect of the imposed risks extends to the individually owned property of others as well as into the common element. The Uniform Fire Code, 1997 edition, as adopted by the Town of Vail, in Part 1, Article 1, Section 103.4.3, gives guidance as to the responsibility for compliance. Changes that become "real estate" are under the provisions of the Code, to be complied with by the owner. To date, the Fire Department has directed comments and instructions to the Association and the owners of Unit B-16. Verbal warnings of immediate hazard were given to two occupants of Unit B-10. We asked they advise the third tenant of their unit and they agreed to do so. The balcony above Unit-10 has since been removed. In the two letters issued to the Association dated November 19 and 21, 2001, we required an assessment by a structural engineer. A preliminary assessment has been conducted. The basis for such a requirement is based on a section of the Uniform Fire Code, specifically Article 1, Section 103.1.1. INTERLOCKEN CONDOMINIUMS ASSESSMENT BY TOV BUILDING OFFICIAL PAGE 3 This section states in part, "To determine the acceptability of facilities, materials, and uses attending the design, operation or use of a building ...the chief is authorized to require the owner or the person in possession or control of the building ...provide, without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer (with) recommended necessary changes. The chief is authorized to require design submittals to bear the stamp of a professional engineer." In summary, it appears the exterior wood framing, structural timbers, balconies, handrails, bond beams, and similar and related elements, do in fact, need to be evaluated throughout the entire complex. It appears the north side of the buildings are in better condition than the south side, but every building appears to be in need of at least some evaluation. We, the Town, do not want to see the Association expend fiscal resources where they are not needed. It is our hope those specific elements that are in good condition can be identified and cleared rather quickly. We do not see any need to spend time and effort conducting a structural evaluation on any specific element that cannot bear the minimum weight and loads prescribed by code. If a structural member cannot bear the load, stop with the evaluation and put it on the "repair / replace" list. We would like to see the results of such an assessment, not to develop grounds for further action but more to assist the Association in protecting lives and property. I believe we are in this together. We each have different roles to play, but the goal is the same. While I cannot commit the Town will spend resources or engage professional services on behalf of the Association, we will provide whatever assistance we can in terms of reaching a mutually agreeable solution and timetable for remediation. Please contact us if we can be of assistance. Sincerely, Michael McGee Deputy Chief/Fire Marshal cc: John Gulick, Fire Chief Mike Vaughan, Fire Prevention Officer Charlie Davis, Acting Chief Building Official Russ Forrest, Director of Community Development Matt Mire, Town Attorney Pam Brandmeyer, Assistant Town Manager Bob McLaurin, Town Manager Charlie Davis - Interlocken Balconies Page Jjl, From: Mike Mcgee To: Charlie Davis Date: 11/27/01 10:14AM Subject: Interlocken Balconies We received a "complaint" last night from an owner/tennant at Interlocken. She returned home from the holidays and found the Board had placed a notice on her door indicating the tennats were to remove the contents from the balconies by Monday (yesterday). The notice allegedly included threats of loss of certificate of occupancy for non-compliance. Perhaps the approach needed to be changed, but that was an action of the Board, not the Town of Vail. The issue of due process was brought up by the complaintant. She claims she is employed by the Avon Building Department. She wants "Charlie, the Chief Building Official," to come out and personally investigate and make a determination as to the structural integrity of each balcony, at the Town's expense. We did explain a structural engineer had been on site and the letters we issued reflect an agreement between the Town and the Association. Part of the basis for my approach was the balconies are exterior of the condos and include common access and egress. The hazards impose a risk to areas beyond the immediate property line of any specific balcony. The balconies below are at risk from hazards above. Improvements that become real estate are generally the responsibility of the association. Mark Mueller tells me his rate is $110/hr. I estimate the cost of a detailed assessmentmay be as high as $9,000 - $10,000 for his services over an estimated 36 balconies. We would also need a high lift, some labor, and a plan. Maybe the Town should front the costs of the assessment? Would you call me? CC: John Gulick; Matt Mire; Mike Vaughan; Russ Forrest Charlie bavis - Interlocken Balconies _ Page 1 From: Mike Mcgee To: Charlie Davis; Fire-Officers; JR Mondragon; Matt Mire; Pam Brandmeyer; Russ Forrest Date: 11/21/01 4:57PM Subject: Interlocken Balconies This letter is the result of three days of assessment. The content has been agreed upon in consultation with Mark Mueller, structural engineer, and Bobby Coates of Vail Management. Elements were specifically requested by the condo assn. president, Dan Zollo (476-8024). Please review and let me know your comments Monday 11/26/01. Thank You!