HomeMy WebLinkAboutSolaris Phase II TCO notesApril 19, 2010
Solaris Project
Phase II TCO Inspection
Notes:
Fourth Floor West Trash Room
Room not labeled
No lock on door (finger opening)
Trash Chute not done
Sprinkler head not trimmed
Exit sign to stairs missing
Light trims missing
Unit 4A West
Electrical sub-panel still has lock on it
Stair 3, between levels 3 & 4
Indicator valve not visible (originally turned up, was turned down but is now a clearance issue
Keys to fireplaces need to be secured near the shut-offs and accessible
Level 4 West mechanical chase/room
Room not labeled
Door closer was disconnected
Unit 4F West
Sprinkler trim missing
Mechanical access cover missing
Grease duct access panel missing
Unit 4H West
Workers in unit, unable to test
Detectors were bagged
Unit 4A West
Missing escutcheon in the entry hall
Trash chute door not functioning properly
Trash room ceiling has a penetration that has not been fire caulked
Trash room damper motor access doors don’t close correctly due to paint and the lack of closing springs.
Stair 1
No light in vestibule
Sprinkler head loaded at top of stairs