Loading...
HomeMy WebLinkAboutDRB0601681~q TOWN OF VE C01%WJWrr OEVELOPWNr Design Review Board ACTION FORM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: VAILS FRONT DOOR CHANGE DRB Number: DRB060168 Project Description: Change to approved plans as documented on the revised building permit plan set. Participants: OWNER LODGE PROPERTIES INC C/O THE LODGE AT VAIL 174 E GORE CREEK DR VAIL CO 81657 APPLICANT BRAUN ASSOCIATES, INC 225 MAIN STREET, SUITE G - 002 EDWARDS CO 81632 License: 0000001546 05/18/2006 05/18/2006 Phone: 970-926-7575 Project Address: 174 GORE CREEK DR VAIL Location: VAILS FRONT DOOR Legal Description: Lot: A Block: 5-C Subdivision: VAIL VILLAGE FILING 1 Parcel Number: 2101-082-2300-9 Comments: BOARD/STAFF ACTION Motion By: Action: STAFFAPR Second By: Vote: Date of Approval: 06/01/2006 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond:201 DRB approval shall not become valid for 20 days following the date of approval. Cond:202 Approval of this project shall lapse and become void one (1) year following the date C of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: George Ruther DRB Fee Paid: $20.00 - Application for Design Review Department of Community Development - - 75 South Frontage Road, Vail, Colorado 81657 TO11A, OF li11L tel: 970.479.2139 fax: 970.479.2452 web: www.ci.vail.co.us General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Descr'ption~of the Request: IY\Lrc rc~,` ~ev" e f, Location of the Proposal: Lot: Block: Subdivision: Physical Address: Parcel No.: 2- k t.) 012-7 Sad Z~ (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Zoning: S ~G s e--~ SS Name(s) of Owner(s): k s AP%k Mailing Address: o d o Owner(s) Signature(s): Name of Applicant: Mailing Address: is kto Phone: `6-151335 Fax: E-mail Address: A Type of Review and Fee: ❑ Signs ❑ Conceptual Review ❑ New Construction ❑ Addition ❑ Minor Alteration (multi-family/commercial) ❑ Minor Alteration (single-family/duplex) m- Changes to Approved Plans ❑ Separation Request eSsr{SI L e-aO.inAA Gs $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction of a new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, reroofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For minor changes to buildings and site improvements, such as, reroofing, painting, window additions, landscaping, fences and retaining walls, etc. 520 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee For Office-Use Only: (I~q -t Fee Paid: Check No : - 45 - By- Application Date: • c~~a r jZ Planner: ~ie t u : - - - - - $ Phone: %'A S Z3 S S V I-Iri 0 r D col n -B RAL I N \tiS0 LA rrS, INC. LAND PLANNING & COMMUNITY DEVELOPMENT May 1, 2006 Mr. George Ruther, Chief of Planning Town of Vail Department of Community Development 75 South Frontage Road Vail, CO 81632 RE: Vail's Front Door Dear George: The purpose of this letter is to follow-up on our meeting of April 271" at which time we reviewed the latest plans for Vail's Front Door. Specifically, we reviewed construction plans which in many cases depicted details that varied from approved DRB plans. In virtually every case these refinements were either minor in nature or were consistent with the originally design intent of approved DRB plans. In this regard, attached you will find a DRB application for changes to approved plans for the Front Door. All proposed changes are reflected on the plan set titled TOV Review Submittal dated April 24, 2006. Please do not hesitate to contact me with any questions you may have. Thank you again for your ongoing assistance with this project. Sincerely, Thomas A. Braun CC: Jack Hunn Jay Peterson Robert Fitzgerald Opal Building • 225 Main Street • Suite G-2 • Edwards, CO 81632 970-926-7575 • 970-926-7576 fax • www.braunassociates.com TOWN OF VAIL, COLORADO Statement Statement Number: R060000627 Amount: $20.00 05/18/200601:15 PM Payment Method: Check Init: JS Notation: 4298/BRAUN ASSOCIATES Permit No: DRB060168 Type: DRB-Chg to Appr Plans Parcel No: 2101-082-2300-9 Site Address: 174 GORE CREEK DR VAIL Location: VAILS FRONT DOOR Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts DR 00100003112200 DESIGN REVIEW FEES 20.00 C C c DRB - Resubmittal Architectural keynotes: General - Cover Sheet G1. Revised sheet index G2. Updated code summary G3. Updated square footage summaries General - Site S I. Revised Chalets walls, stairs, walkways, drainage and grading to accommodate fire protection egress S2. Revised Chalets transformer location S3. Revised site drainage along the west side of the Chalets and south to the mountain road S4. Revised site drainage along the south end of the ski yard Sheet SD 1.03A\B\C 1. Stairs added/ walk realigned 2. Stairs removed 3. Walk realigned/ stairs to southern patio moved to south 4. Fire access stairs added between walkways 5. Stair added/ connection to walkway north of building 1 6.. Patio reconfigured/ entrance location moved (Patios were redesigned on a 4'-0" module and as to accommodate structural columns) Patio elevations adjusted as a result of finish floor elevations; stairs adjusted accordingly. 7. Walk realigned/ stairs redistributed 8. Patio reconfigured/ entrance location moved 9. Retaining wall added 10. Retaining wall added/ egress well created at unit 5B 1.1. Patio reconfigured 12. Patio reconfigured 13. Patio entrance location moved 14. Walkway added along road 15. Patio entrance location moved 16. Stairs removed 17. Patio reconfigured/ entrance location moved 18. Retaining wall added AP*NI 19. Walk realigned/ stairs redistributed 20. Patio reconfigured 21. Patio reconfigured 22. Electrical transformer moved across the road from unit 3A 23. Patio reconfigured 24. Walkway added 25. Retaining wall moved to perimeter of patio 26. Retaining wall realigned/ railing added 27. Balcony shape adjusted; depth reduced 28. Patio/ planting area/ egress stairs added 29. Electrical transformer added 30. Safety rail added/ moved 31. Ventilation louvers added 32. Retaining wall added 33. Second hot tub located west of pool 34. Elevated planter bed removed 35. Railing added 36. Retaining wall/ stairs reconfigured 37. Walkway removed 38. Cooling tower added 39. Mechanical exhaust grate added 40. Mechanical louver added 41. Building 6 moved 2'-9" to east 42. Hot tub shape and location adjusted 43. Stairs along service road redesigned with regular steps 44. Pool patio elevation adjusted to accommodate new restroom finish floor elevations 45. Retaining wall added 46. Stairs removed 47. Planting island reconfigured/ ramp removed 48. Gate removed 49. Additional stairs added 50. Entrance area rearranged/ ramp added 51. Planter reconfigured/ planter wall relocated 52. Fence/ trees relocated 53. Road/ garage entry realigned 54. Planting reconfigured 55. Planting reconfigured 56. Planting reconfigured 57. Fire hydrant added 58. New egress added Sheet SD 1.05A\B\C 1. Street light added 2. Stair lights added 3. Stair lights added 4. Street lights removed 5. Street light removed 6. Lights added 7. Lights added/ locations adjusted 8. Lights added to retaining wall 9. Lights added to retaining wall 10. Stair lights added 11. Walkway lights moved south of walk 12. Walkway lights moved north of walk 13. Walkway lights moved north of walk 14. Lights added 15. Light added 16. Light added 17. Light moved 18. Light moved Building A - Parking Garage & Loading Dock Al. Revised plan layout. A2. Added gallery connection between Lodge at Vail and Lodge Tower. See sheets S2.01 and S2.02 A3. Added additional information A4. Revised stone cap sloping due to coordination with grading. A5. Revised stone veneer walls from two to one. (Previously approved by DRB) Building B - Lodge at Vail Spa and Guestroom Addition B l. Revised plan layout. B2. Added gallery connection between Lodge at Vail and Lodge Tower. See sheets 52.01 and S2.02 B3. Added additional information B4. Revised ridge height due to constructability issues. B5. Added copper gutter and downspout. B6. Continuation of stucco in lieu of wood siding. B7. Replaced fireplace chimney with direct vent system. B8. Deleted window. (to comply with Code requirement - proximity to relocated Transformer) B9. Revised windows layout. B 10. Revised door layout. B 11. Removed wood balcony railing due to constructability issues. B 12. Revised wood railing decoration and trim, see added info on S2.02. B13. Proposed grease exhaust stack in existing chase. B14. Removed Utility add-on. B15. Updated scope of work this area. (added doors in existing guestrooms at proposed Balcony) B16. Added door. C C Building C - Vail Alpine Ski Club C 1. Revised plan layout. C2. Added additional information. 7 C3. Added copper gutter and downspout and snow guards.' C4. Revised chimney location. C5. Removed chimney. C6. Added chimney element to account for clear hoistway of elevator. C7. Revised/updated exposed timber rafters / beams. C8. Revised windows layout. GG~- C9. Revised door layout. 00-1 t G C 10. Refined design and details. C11. Coordination with DRB approved material's Board. C 12. Coordinated with Landscaping / Civil. C 13. Coordinated with Structural. C14. Coordinated with Mechanical. C 15. Added architectural exterior lighting. C 16. Lowered roof ridge to coordinate with building elevations. C 17. Added enclosed space for fire control room. Buildin D - Skier Services / Vista Bahn Park D 1 a. Revised plan to coordinate with exterior building elevations. Dlb. Added exterior door. D2. Added additional information. D3. Added prefinished metal gutter and downspout. D4. Not used. D5. Revised windows layout to coordinate with plans. D6. Revised door layout to coordinate with plans. D7. Added exposed timber rafters / beams. D8. Not used. D9. Refined to coordinate with building elevations and/or details. D10. Coordinated with DRB approved material's Board. D 11. Coordinated with Landscaping / Civil. D12. Coordinated with Structural. D 13. Coordinated with Mechanical. D 14. Updated portion of exterior building elevation to coordinate with the plan and other building elevations. D 15. Lowered ATMs to comply with accessibility requirements. D 16. Coordinated exhaust (mechanical) chimney on northwest elevation with southwest elevation. Building E - The Chalets at the Lodge at Vail E 1. Revised garage entry. P& to E2. Revised plan layout. CA E3. Revised eave and ridge heights per grading (revisions). E4. Revised roof drainage. E5. Revised copper chimney cap. E6. Revised structural system and faux structure. E7. Revised transom location. E8. Added copper kitchen exhaust vent. E9. Revised elevator smoke relief vent. E10. Added mechanical vent. E11. Revised window size. E12. Revised elevation to show wall beyond. E13. Revised elevation to show lower level egress door. E14. Added light fixture location, fixture previously approved by DRB. E15. Revised entry door elevation. E16. Revised grade line per grading revisions. E17. Added boiler flue exhaust. E18. Added egress/light well. E 19. Revised roof per elevator coordination. E20. Added boiler intake louver. E21. Added window. E22. Revised Duplex 6 garage entry. E23. Added mechanical air intake. E24. Added garage exhaust. E25. Added modified bitumen roof material at large crickets. E26. USFS land exchange. E27. Added additional information. E28. Revised ridge height per venting detail of roof tile. E29. Added garage egress corridor. U Page 1 of 2 Tom Bi From: To: Sent: Attach: Subject: ,aun "Mary Hart" <MHart@harthowerton.com> "Tom Braun" <tom@braunassociates.com> Wednesday, April 26, 2006 2:20 PM Louvers.pdf VFD Tom, here is an 11x17 pdf of the louvers. Also we tallied the landscaping and hexes where we are (due to VRDC VE efforts and weight challenges for the evergreens, please note there are some quantities that are LESS than what DRB approved.) It wouldnt bother me to have to add some material ! drb approved CD set Total Evergreens: 63 55 Total Aspens: 235 291 Total Shrubs: 565 1,114 Total perennials: 5054 4056 On Marabou, have you had a chance to think about how is the color designation of the lots can be shown? Please let Andrew know we would need it by tomorrow afternoon for hte meeting on Friday. Thanks Mary Mary Hart Associate HART HOWERTON PO Box 38 (K61) 0140 Ida Belle Drive Silvermill Building Suite F3 Keystone, CO 80435 Tel: 970-496-4552 Fax: 970-496-4473 4/26/2006