BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS:
TO: Contractor /Applicant
Hyder Construction
Chris Knight
FAX /Email #: 303.825.3223
Architect
4240
proj #20693.08
none given
NUMBER OF PAGES:
FROM:
DATE:
BUILDING PERMIT #:
OWNERS NAME:
SITE ADDRESS:
OCCUPANCY GROUP:
TYPE OF CONSTRUCTION:
NUMBER OF STORIES:
BUILDING AREA:
2
Chris Gunion, Building Plans Examiner
06/20/2006
B06 -0015
Lodge at Vail
174 Gore Creek Drive
R /M /B /S
?
The documents submitted for this project have been reviewed for compliance with the 2003
International Building Code, 2003 International Residential Code, 2003 International Mechanical
Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International
Energy Conservation Code and 2002 National Electrical Code as modified and adopted by the Town of
Vail.
The following comments will need to be addressed prior to issuance of a building permit:
For processing;
• Please submit four complete sets of revised construction documents containing the requested
information with all plan revision items clouded or otherwise identified
• r • Please respond in writing to each comment by marking the attached list or creating a response
letter. Indicate which plan sheet detail specification or calculation shows the requested
information. Please send revisions to the attention of the plans examiner with the building
permit application number noted.
• Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp signature
registration number and date on the cover page of any structural calculations all structural
details and structural sheets of the plans For commercial or multi - family projects all sheets of
the plans must be stamped.
1 An application for Design Review for the exterior alteration is required.
An application is in progress between VRDC and ToV as requested.
2 An asbestos test and report is required per TOV ordinance.
The asbestos test and report was submitted to the ToV under the original Vail's Front Door Permit application.
Please refer to Charlie Davis/ToV for this document.
Architectural Comments:
3 Please provide (2) complete sets of plans with all sheets stamped by the architect, or engineer of record.
5 signed and sealed sets will be submitted.
4 Clearly identify proposed room on the plans. Include all information that was shown on the original drawing
et.
gee sheet AM101 for added Room tags, Door tags, and other information.
9. Include new wall construction details and information on the existing and proposed ceiling. IBC ch. 6
See 1 /AM101 for wall tags and 3 /AM101 for a wall type detail on the revised drawing submission. Existing
drywall ceiling to remain.
6 Include specifications for new door. Door shall be large enough to remove the largest piece of mechanical
equipment. IFGC
See sheet AM101 for door schedule and hardware information.
7 Include means of egress plan for the exiting in the area of remodel. Show occupant loads and exit widths
where double doors and corridor are being removed. IBC ch. 10
Per previously submitted, "Electrical Room Plan" AE101 (dated 02/17/06) Issue 01A, and "Emergency Exiting
Plan(s) CEP01 & CEP01 (dated 05/23/06), the current exit path thru the adjacent Banquet Storage room is
maintained and is not negatively impacted by the change from two 3' -0" doors to one 3' -0" door (exit capacity
of 3' -0" door = 200 Occupants).
Structural Comments:
8 Include structural plans for framing of openings in the exterior wall for the new vents.
See note on sheet AM101 regarding structural angles supporting flue pipe.
Comments:
9 Provide a floor drain in the mechanical room. IMC 1004.6
See 1 /DP101, revised keynote # 10 for floor drain information.
10 Include a gas piping plan for all fuel burning equipment. 2003 IFGC
See 1/DP101 for gas piping schematic.
Mechanical Comments:
11 Include a complete equipment schedule and plan for all equipment proposed in the mechanical room.
See sheet M001 for equipment schedules. See 1/M010 for equipment /piping schematic.
12 Include sizing calculations for the combustion air duct.
See revised DM101P for combustion air calculations.
-13'- Amend plans to show gas vent termination per IFGC 503.6.6. Vents must terminate a minimum of 8' from a
vertical wall or similar obstruction. Vents must terminate per Figure 503.6.6.
See sheet AM101 for note regarding Balconies being at least 14' -0" away from newly placed flue pipes. See
r sheet DM101P, keynotes 3 and 4 for revised termination compliance.
14 Amend plans to provide gas vents with a listed termination cap per IFGC 503.6.6. Plans specify vents to
terminate in a "gooseneck ".
See sheet AM101 for note regarding gooseneck termination, typical. See sheet DM101P, keynotes 3 and 4 for
revised termination compliance.
Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in
issuance of a permit, please check all requested information is included with the resubmitted
plans. Please submit revised plans as a complete set. Partial plan resubmittals will not be
reviewed.
12.0) (11.2) (10.5
a
�r
s i
6-1/4" AT 4" STUD + +
8 -1 AT 6" STUD
4-3/4 AT C: >
2 -1/2" STUD
- STRUCTURE
-MTL J- RUNNER
`FIRE RATED SEALANT
HEAD NOTE CONSTRUCT HEAD PER UL
SYSTEM #HW -0042 & HW -0049
AYER OF 1" SHAFT LINER GWB
C -H /C -T STUD
1/2" BATT INSULATION
1/2" BATT AT WALL 7B
LAYERS TYPE "X" 5/8" GWB
RATED SEALANT
J- RUNNER
SILL r " 7
21-IR FIRE RATED:
UL U415
C T1 r- n a A . /%A IAIM - 7nC 4
USE 6" MTL. STUDS
USE 2 1/2" MTL. STUDS
1:1:3►ZiTc
TERMINATI
TY
0 IN I ON"$ 04 N
DWG. DRAWING TITLE
ARCHITECTURAL
AM 101 Temporary Mechanical Plan, Elevation &e Sheet Index
07.14.06
MECHANICAL
DM101 P Mechanical Temporary Services Plan 07.14.06
M001 Mechanical Notes, Legend &c Schdules 07,14,06
M010 Mechanical Schematics 07.14.06
PLUMBING
DP101 Plumbing Demolition Plan 07.14.06
ELECTRICAL
E101 Electrical Level 1 Power 07.14.06
DOOR
SCHEDU
DOOR #
DOOR
LOCATION
DOOR
FRAME
DOOR
MIN
HDWR
REMARKS
WIDTH
HEIGHT
THICK
TYPE
MAT'L
FINISH
TYPE
MAT'L
FINISH
Z001 a
Temp
Mech Rm
3' -0"
7' -0"
1 3/4"
A
HM
PT
A
HM
PT
90
A08
SEE
BLDG.
B
SET
FOR
TYPE
INFO.
Z001 b
Temp
Mech Rm
3' -0"
7'-0"
1 3 /4"
A
HM
PT
A
HM
PT
90
A08
SEE
BLDG.
B
SET
FOR
TYPE
INFO.
Z001 c
Temp
Mech Rm
3'-0"
7' -0"
1 3/4"
A
HM
PT
A
HM
PT
90
A08
SEE
BLDG.
B
SET
FOR
TYPE
INFO.
Z002a
Electrical
Room
3' -0"
7' -0"
1 3/4 ))
A
HM
PT
A
HM
PT
90
A08
SEE
BLDG.
B
SET
FOR
TYPE
INFO.
Z002b
Electrical
Room
3' -0"
7' -0"
1 3/4"
A
HM
PT
A
HM
PT
90
A08
SEE
BLDG.
B
SET
FOR
TYPE
INFO.
(V
O
I
O
0
0
W
, Q
v '
W
IZ
kD
W
Z
W
IL
Elm
I KE *rN0TE 6 I
13 TEMPORARY LOCATION OF INTERNATIONAL WING HEATING WATER PLANT.
RELOCATE EX15TINO BOILERS, HEAT EXCHANGER AND PUMPS A5 56HEDULED.
ALL RELATED ACCE55ORIE5 (EXPAN51ON TANK5, AIR 5EPARATOR5, ETC) TO
BE RELOCATED A5 HELL TO PROVIDE TEMPORARY OPERATION OF THE
HEATINS AND SNOHMELT 5Y5TEM5 5ERVIN62 THE INTERNATIONAL WING.
V ROUTE 12"4 PVG COMBUSTION AIR INTAKE UP TO MAIN DUCT. INTAKE DUCT
TO TERMINATE AT LOUVER, MIN. 4' ABOVE GRADE. TYP. (3) FOR HEATING
HEATING WATER BOILERS, (2) FOR DOME5TIC WATER BOILERS.
ROUTE IT B -VENT (ACCEPTABLE FOR TEMPORARY PLANT ONLY) OUT
THROUGH HALL. ROUTE FLUE BEYOND OVERHANG AND UP ABOVE DORMER
ROOF. TERMINATE WITH A L15TED CAP, MIN. 3' ABOVE FORGED AIR INTAKE
(ABOVE DOOR), 3' HORIZONTALLY FROM ANY PORTION OF THE ROOF AND
V FROM A VERTICAL HALL (PER IFS, 503.6.6). TYP. (3) FOR HEATING
WATER BOILER5.
G ROUTE IONP B -VENT (ACCEPTABLE FOR TEMPORARY PLANT ONLY) OUT
THROUGH WALL. ROUTE FLUE BEYOND OVERHANG AND UP ABOVE DORMER
ROOF. TERMINATE WITH A L15TED GAP, MIN. 3' ABOVE FORCED AIR INTAKE
(ABOVE DOOR), 3' HORIZONTALLY FROM ANY PORTION OF THE ROOF AND
8' FROM A VERTICAL HALL (PER IFGC 503.6.6). TYP. (2) FOR DOME5TI6
\ _ HATER BOILERS.
0 DOMESTIC, HATER BOILERS- RE: PLBS,
Q ROUTE PIPING INTO BANQUET 5TORAGE ROOM AND CONNECT TO EXI5TIN5
INTERNATIONAL HING PIPIN5 MAINS. PROVIDE ISOLATION VALVES UPSTREAM
AND DOHN5TREAM OF NEW CONNECTION LOGATION5.
V RELOCATE EXISTING UNIT HEATER.
GOMBU5TION AIR GALCULATION
PER MANUFACTURER, EACH BOILER REQUIRES A 12" DIAMETER
COMBU5TION AIR DUCT, WHIGH 15 113.1 50 INGHE5 OF FREE AREA.
113.1 50 INGHE5 X 5 BOILERS = 565.5 50 INGHE5 OF TOTAL GOMBU5TION
AIR FREE AREA.
DUGT AREA PROVIDED: 28" X 22" = 616 50 INGHE5
LOUVER AREA PROVIDED: 28" X 42" X 50% FREE AREA = 588 50
I NCHE5
�" l i
GUEST L-- -- +
ROOM I t i ,
C71 (f
i It i c`
1 1_ - F. F. EL.
' 1 11 tl 1 1 GUEST L'
l
111 t STORAGE
— MEN'S LOCKER
- 1 ROOM / 1
HR OFFICE I t 1 i ; _ 4500
102
/ WOMEN'S tt
i
- ' ` R ELEV.
LOCKER U i 1 UP '
ROOM 8172' -0"1 1 ; WALK IN MACH.
NR F.F. EL. ROOM
� 1 } i f REFER — �
a
(E)P -5-2
t 1 LOCKERS
N � ,� CAIN FAN I (E)P - B - 4
— _ t 4^JAl_K IN STORAG
REFER �_ `�
MEN'S LOCKER 1 6
ROOM i t R — ` ' f C)
I � r11 1 1 a I n
WALK IN
} 1 1 1 t t REFER
o ,
1 1 NR STORAGE ; ;
1 1
I t 1 1
)HX -B -1
WINE STORAGE
PURCHASING /RECEIVING/ r r ~ + ' '
FOOD STORAGE E B - - ' 28 x22
E B -L 3
B I
LEC. ROOM C - ' 8 "x42" LOUVER
TO REMAIN} u , L_
k_
LOADING /TRASH
R 1
O P17
HOUSEKEEPING 1
,
A4,
BOIL MK1-ETR— I t \— — 1 1
t
3 _,_..._. -- — 1-'� �
1 c HOUSEi {EEP NG 1
LOWER LEV L
1 1 1� 1 it \� � t .� •
t 1 11 1
t 1 ELECTRI AL 1 1 1 1 1
,
, 111
' 12.
1
14
1
NO
tl
`rte♦
i i 1 • •
C
AVON /R D/
ARCHITECT OF RECORD
42140
ARCHITECTURE
Denver, Colorado
STRUCTURAL ENGINEER
YONROE do NEWELL ENGINEERS, INC
AVON, COLORADO
YEP ENGINEERS
ALTS CONSULTANTS, INC
DENVER, COLORADO
LANDSCAPE ARCHITECT
HARTJHOWERTON
NEW YORK, NEW YORK
CIVIL ENGINEER
ALPINE ENGINEERING, INC.
VAIL, COLORADO
LAND SURVEYOR
PEAK LAND CONSULTANT, INC
VAIL, COLORADO
I PROJECT NO: 2001 - 134 -03 1
N0. I DATE I DESCRIPTION
1 1 9.1 5.05 IELECTRICAL RELOCATION
I I I FOR PERMIT I
06.14.06
07.14.06
L odge a
/. i G uestr oo m
A dditio n
r---
O
O
O
v-
O
W
u.j
Q
2
u:s
O
Q
D-
vf)
Q
O
O
`J
i
Q
I
CD
Q
Q
m
O
m
0
O
N
i
lu
z
I
LL
MECHANIC A5 5R E V I A TIONS
A/C,
AIR CONDITIONING
IC
INSIDE CLEAR
AG
AIR COMPRESSOR
ID
IN51DE DIAMETER
AGGH
AIR COOLED CHILLER
IN
INCH
ADJ
ADJUSTABLE
IN50L
INSULATION
AF
AIR FILTER
INT
INTERNAL, INTERIOR
AFG
ABOVE FINISHED CEILING
IRH
INFRARED RADIANT
AFF
ABOVE FINISHED FLOOR
1 - 760
HEATER
AFG
ABOVE FINISHED GRADE
I
(E)P -B -4
AHU
AIR HANDLING UNIT
KEG
KITCHEN EQUIPMENT
AP
AGGE55 PANEL
3,0
CONTRACTOR
APP
AIR PRESSURE DROP
KW
KILOWATT
ARI
AMERICAN REFRIGERANT
--
--
1
INSTITUTE
L
LENGTH
ARCH
ARCHITECTURAL)
LAT
LEAVING AIR
AS
AIR SEPARATOR
21
TEMPERATURE
A5HRAE
AMERICAN 50GIETY OF
LF
LINEAR FEET
PIPE GAP
HEATING, REFRIGERATION
LRA
LOCKED ROTOR AMPS
AND AIR- GONPITIONING
LWB
LEAVING WET BULB
ENGINEERS
LHGO
LOW WATER GUT OFF
A5ME
AMERICAN 50GIETY OF
LHT
LEAVING WATER
c4
MECHANICAL ENGINEERS
TCV2
TEMPERATURE
A5TM
AMERIGAN 50GIETY OF
BUTTERFLY VALVE
TESTING AND MATERIALS
MAT
MIXED AIR TEMPERATURE
AV
AVERAGE
MAX
MAXIMUM
AUX
AUXILIARY
MBH
THOUSAND BTU PER HOUR
PV
MG
MECHANICAL
B
BOILER
I I
CONTRACTOR
BAS
BUILDING AUTOMATION
MGA
MINIMUM CIRCUIT AMPS
SYSTEM
MEGH
MECHANICAL
BLDG
BUILDING
MFR
MANUFACTURER
B05
130TTOM OF STRUCTURE
MIN
MINIMUM
BTU
BRITISH THERMAL UNIT
MOGP
MAXIMUM OVERGURRENT
1
PRESSURE 5WITGH
P5H
PROTECTION
G
GEL51U5
MTP
MOUNTED
GFM
CUBIC FEET PER MINUTE
MUA
MAKEUP AIR
CH
WATER GOOLED GHILLER
GHP
CHILLED WATER PUMP
NC,
NORMALLY CLOSED
GIRG
GIRGULATING
NFPA
NATIONAL FIRE PROTECTION
GL
CENTER LINE
-
A550GIATION
GLG
GEILING
NIG
NOT IN CONTRACT
CMU
CONCRETE MA50NRY UNIT
NO
NORMALLY OPEN
GPVG
CHLORINATED POLYVINYL
NO.
NUMBER
CHLORIDE
NT5
NOT TO SCALE
CONN
CONNECTION
-. TP
CONT
CONTINUOUS, CONTINUATION
OBD
OPF05ED BLADE DAMPER
GRAG
GOMPUTER ROOM AIR
OG
ON CENTER
GONDITIONING UNIT
OP
OUTSIDE DIAMETER
GT
GOOLI NG TOWER
GU
CONDENSING UNIT
P
PUMP
CHP
CONDENSER WATER PUMP
PC
PLUMBING CONTRACTOR
PIPE ANGHOR
PD
PRESSURE DROP
DB
PRY BULB
PH
PHASE
006
DIRECT DIGITAL CONTROL
PLBG
PLUMBING
PIA
DIAMETER
PPM
PARTS PER MILLION
DIFF
DIFFUSER
P5F
POUNP5 PER SQUARE FOOT
ON
DOWN
P51
POUNDS PER SQUARE INCH
DWG
DRAWING
P510
POUNDS PER SQUARE INCH
PX
DIRECT EXPAN5ION
GAUGE
PVC
POLYVINYL GHLORIPE
(E)
EXISTING
EA
EACH
QTY
QUANTITY
EAT
ENTERING AIR
TEMPERATURE
RAT
RETURN AIR TEMPERATURE
EG
ELECTRICAL CONTRACTOR
RGP
REFLECTED CEILING PLAN
EGG
ECCENTRIC
RE
REFERENGE, REFER
EPB
ENTERING DRY BULB
REAP
REQUIRED
EPH
ELECTRIC, DUCT HEATER
REV
REVISION, REVISE
EF
EXHAUST FAN
RH
RELATIVE HUMIDITY
EFF
EFFICIENCY
RLA
RUNNING LOAD AMPS
ELEG
ELECTRICAL
RPM
REVOLUTIONS PER MINUTE
ENGR
ENGINEER
RTU
ROOFTOP UNIT
EQ
EQUAL
EQUIP
EQUIPMENT
5CHED
5GHEDULE
ESP
EXTERNAL STATIC
5F
SQUARE FEET
PRESSURE
5H
SENSIBLE HEAT
ET
EXPANSION TANK
SIM
51MILAR
ETR
EXISTING TO REMAIN
5P
STATIC PRESSURE
EVAP
EVAPORATOR
SPEC
SPECIFICATION
EHB
ENTERING NET BULB
50
SQUARE
ENT
ENTERING WATER
555G
501-10 5TATE SPEED
TEMPERATURE
CONTROL
STD
STANDARD
F
FARENHEIT
FGU
FAN COIL UNIT
TC
TEMPERATURE CONTROL
FP
FIRE DAMPER
TF
TRANSFER FAN
FLA
FULL LOAD AMPS
TSP
TOTAL STATIC PRESSURE
FLEX
FLEXIBLE
T5TAT
THERM05TAT
FOB
FLAT ON BOTTOM
TXV
THERMOSTATIC EXPAN5ION
FOT
FLAT ON TOP
VALVE
FT
FAN TERMINAL, FEET
TYP
TYPICAL
GAL
GALLON
UGD
UNDERCUT DOOR
GALV
GALVANIZED
UH
UNIT HEATER
GG
GENERAL CONTRACTOR
UL
UNPERI�IRITER5
GPH
GALLONS PER HOUR
LABORATORIES, ING.
GPM
GALLONS PER MINUTE
UNO
UNLE55 NOTED OTHERWISE
GROS
GRILLES, RE6I5TER5 AND
DIFFUSERS
VAV
VARIABLE AIR VOLUME
VERT
VERTIGAL
H
HEIGHT
VFD
VARIABLE FREQUENCY
HD
HEAD
DRIVE
HORIZ
HORIZONTAL
HP
HOR5EPOHER, HEAT PUMP
W
WIDTH
H5TAT
HUMIPI5TAT
W/
KITH
HX
HEAT EXCHANGER
N/O
W i THOUT
WB
NET BULB
WG
WATER COLUMN
HG
WATER GAUGE
WPD
WATER PRESSURE DROP
XFER
TRANSFER
EX I ST I Na
PUMP SCHEC LC-
GWS
GHR-- -
GHILLEP WATER RETURN
CHR
CS
CONDENSER WATER SUPPLY
05
PLAN
CODE
CONDENSER WATER RETURN
SERVICE
QUANTITY
GPM
TPH
(FT)
RPM
HP
VOLTAGE
4 PHASE
MANUFAGTURER
t MODEL NO.
NOTES
(E)P -6-2
HHR- --
HEATING WATER
2
Iq2
50
1 - 760
5.0
208/5
B46 1510 -2 BG
I
(E)P -B -4
5M5
5NOHMELT
2
65
50
1160
3,0
208/3
546 1510 - 1 - 1/2 AB
I
(E)P -13-5
STEAM GONDENSATE
GLYCOL
3
--
--
1
1.0
20W3
OBERPORFER cIgIMF -01
I
(E)P -6-6
- - (E)- - - -
1301LER GIRG.
3
160
21
1 - 160
1.5
20813
5RUNPFO5 UPGO65 - 160
I
PIPE GAP
PIPE BREAK
FLOW ARROW
BALL VALVE
NOTES:
1. PUMP TO BE USED FOR TEMPORARY OPERATING CONDITION ONLY.
GATE OR 150LATION VALVE
GV
c4
2 -WAY TEMPERATURE GONTROL VALVE
TCV2
3 -WAY TEMPERATURE CONTROL VALVE
TCV3
BUTTERFLY VALVE
EX I ST I NC EOU I PMENTI NEA SYSTEMS NARRATIVE
I ALL EXISTING MECHANICAL EQUIPMENT LOCATED IN THE EXISTING INTERNATIONAL WING MECHANICAL ROOM
15 TO BE RELOCATED TO THE TEMPORARY LOCATION IN THE TEMPORARY MECHANICAL BUILDING AND
RECONNECTED TO THE EXI5TIN67 INTERNATIONAL WING PIPING FOR TEMPORARY OPERATION.
2 THE EX15T1NG INTERNATIONAL WING EQUIPMENT AS NOTED ON THE 5CHEDULE5 AND 5GHEMATIG5 SHALL BE
MOVED FROM THE TEMPORARY LOCATION TO ITS PERMANENT LOCATION IN THE BUILDING B CENTRAL PLANT
OR THE BUILDING G CENTRAL PLANT.
3 THE BOILERS CURRENTLY 5ERVING THE INTERNATIONAL WING SHALL CONTINUE TO SERVE THE INTERNATIONAL
WING HEATING WATER AND 5NOWMELT DURING TEMPORARY OPERATION, AND SHALL SERVE BUILDING G
HEATING WATER AND 5NOHMELT DURING PERMANENT OPERATION.
4 THE NEW BOILERS PROVIDED IN THE BUILDING B CENTRAL PLANT SHALL SERVE THE NEW SPA AREAS HEATING
WATER AND DOMESTIC HOT MATER, AND THE NEW 5NOHMELT AREAS.
N OTE: NOT .• ON r••
► L 0_ 5CRIPTION A M EVIATION
GW5
CHILLED WATER SUPPLY
GWS
GHR-- -
GHILLEP WATER RETURN
CHR
CS
CONDENSER WATER SUPPLY
05
GR- --
CONDENSER WATER RETURN
CR
HPH5
HEAT PUMP WATER SUPPLY
HPH5
HPHR- -
HEAT PUMP WATER RETURN
HPWR
HH5
HEATING WATER SUPPLY
HW5
HHR- --
HEATING WATER RETURN
HHR
RL
REFRIGERANT LIQUID
RL
RS- --
REFRIGERANT SUGTION
RS
5M5
5NOHMELT SUPPLY
5M5
5MR-- --
5NOHMELT RETURN
5MR
LPS
LOW PRESSURE STEAM SUPPLY
LP5
HP5
HIGH PRESSURE STEAM SUPPLY
HP5
180.0
STEAM GONDENSATE
5G
SV- -
STEAM VENT
5V
PG- --
PUMPED GONDENSATE
PC
(E)
EXISTING SUPPLY PIPING
(E)
- - (E)- - - -
EXISTING RETURN PIPING
(E)
N.G.
PIPE UP
140.0
0.0
PIPE DOWN
550
3
PIPE GAP
PIPE BREAK
FLOW ARROW
BALL VALVE
BV
GATE OR 150LATION VALVE
GV
c4
2 -WAY TEMPERATURE GONTROL VALVE
TCV2
3 -WAY TEMPERATURE CONTROL VALVE
TCV3
BUTTERFLY VALVE
BFV
BALANGING VALVE
BLV
GHEGK VALVE
CV
s
PLUG VALVE
PV
UNION
U
I I
STRAINER
STIR
T
AQUA5TAT
ASTAT
•
4
FLOW SWITCH
F5H
Q
1
PRESSURE 5WITGH
P5H
n
T
TEMPERATURE SENSOR
T5EN
PUMP
p
THERM05TAT
TSTAT
PRESSURE GAUGE
PG
-
STEAM TRAP
5T
PRESSURE REDUCING VALVE
PRV
TEMPERATURE AND PRE55URE RELIEF VALVE
T� P
VACUUM BREAKER
VB
� MAV, AAV
MANUAL AIR VENT, AUTOMATIC AIR VENT
MAV, AAV
-. TP
TEMPERATURE AND PRESSURE TEST PLUG
TP
THERM05TATIG EXPANSION VALVE
TXV
CONCENTRIC REDUGER
EGGENTRIG REPUGER
EXPANSION JOINT
EJ
FLEXIBLE GONNEGTION
PIPE ANGHOR
MECHANIC D UCTWO R K
N OTE: NO APPE ON r..
ABBREVIATION
SUPPLY OR OUTSIDE AIR UP
MANUAL VOLUME DAMPER
FIRE DAMPER
FIRE /SMOKE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
$ BACKDRAFT DAMPER
- SMOKE DETECTOR
RETURN OR EXHAUST AIR UP
RI5E IN DUCT
5A, OA
r
r
r
r
s
'srr
r
0
FALL IN DUCT
RECTANGULAR BRANCH TAP (SINGLE LINE)
RETURN OR EXHAUST AIR GRILLE
DUCT END (SINGLE LINE)
m
51DENALL RETURN OR EXHAUST AIR GRILLE RAG
RETURN OR EXHAUST AIRFLOW
ROUND ELBOW
RETURN OR EXHAUST AIR PORN
1 � f---- DIFFUSER TAG
\ A 10' DIFFUSER NECK 51 ZE
26Q DIFFUSER GFM
SUPPLY AIR DIFFUSER
SPIN -IN WITH MVP
DUCT BREAK (SINGLE LINE)
TRANSITION (SINGLE LINE)
SPIN IN WITHOUT MVD
Z - FLEXIBLE DUCTWORK
SLOT DIFFUSER
- RECTANGULAR BRANCH TAP
(E) SUPPLY AIR DIFFUSER
74� (E) FLEXIBLE DUGTHORK
(E) SPIN IN WITH MVP
(E)20xl6 1 X -(E) SUPPLY AIR DOWN
(E) DUCT DIMENSIONS, LxH
(E) SPIN -IN WITHOUT MVP
POINT OF CONNECTION TO EXISTING
d
x
fl
PUGTHORK DIMENSIONS, LxW
51PEHALL SUPPLY AIR GRILLE
SUPPLY OR OUTSIDE AIRFLOW
FLEXIBLE DUCTWORK GONNEGTION
RECTANGULAR DUCT BREAK
NEH PUGTNORK
TRANSITION
RECTANGULAR ELBOW WITH TURNING VANES
SQUARE TO ROUND TRANSITION
ROUND DUCT BREAK
ROUND DUGTHORK DOHN
ROUND DUGTWORK UP
M.
SAG
EX I ST I NC BOI LER SGHF=QULr=
lm� ME
m"I'mmly-
0
ISSUE
DESCRIPTION
0
a
mom
�i
H
i i ! .
PLAN
COPE
MBH HEATNG
o
VENT
TYPE/
51ZE(IN)
GPM
GAS
PRE5.
(IN. HC)
VOLTAGE
t PHASE
BLOWER
HP
TOTAL
AMPS
FUEL
TYPE
ENT
( °F)
1
LHT
( °F)
%
P.G.
HPD
(FT HP)
OPER
WEIGHT
(1-135)
MANUFACTURER
4 MODEL NO.
NOTES
INPUT
(SL).
OUTPUT
(ALT)
(E)B -13 -1,2,3
Ig00.0
1300.0
B- VENT /12
160.0
4 TO 14
120/1
0.75
12.0
N.G.
1 160.0
180.0
1 - 7.0
13.5
865
P -K THERMIFIG SN -IgOO
I
(E)B -B -4,5
1200.0
820.0
B- VENT /10
16.4
4 TO 14
120/1
050
X1.0
N.G.
40.0
140.0
0.0
2.0
550
P -K THERMIFIG SN -1200
1,2
NOTES:
1.
2.
1301LER TO BE RE -USED FOR TEMPORARY ANP PERMANENT OPERATING CONDITIONS.
DOMESTIC HOT HATER BOILERS.
EXISTI HEAT EXCHANer =R SCHEPUL E - PLATE 4 FRAME
HEAT LOSS WATER SIDE HEAT GAIN WATER 51DE
PLAN SERVIGE CAPACITY EHT LHT I FLOH % HPD EWT LHT I FLOH % HPD
COPE (MBH) OF OF (GPM) PG (P51) OF OF (GPM) PG (P51)
(E)HX -6 -1 5NONMELT 1400.0 180.0 160.0 146.0 17.0
NOTES:
1. HEAT EXCHANGER TO BE RE -USED FOR TEMPORARY OPERATING CONDITIONS.
2.
MANUFACTURER
t MODEL NO.
540 6PX -151
MECHANICAL LEGEND- GENER
NOTE: ALL ITEMS MAY NOT APPEAR ON DRAWINGS
5Y�30L DESCRIPTION
$ 5WITGH
HUM1015TAT WITH CONTROL WIRING
T THERMOSTAT WITH CONTROL WIRING
Ef MEGHANIGAL EQUIPMENT
XXX -( EQUIPMENT PLAN CODE INDICATOR
XXX-( I EQUIPMENT PLAN CODE INDICATOR
XXXX W/ GFM, GPM OR KW
XXX -I EQUIPMENT PLAN CODE INDICATOR
XXXX W/ GFM t GPM OR KW
XXXX
XXX -I
XXXX EQUIPMENT PLAN COPE INDICATOR
XXXX W/ (2)GFM5 4 GPM OR KW
XXXX
X DENOTES PUCTWORK, PIPING, ETC. TO BE REMOVED
M ACCESS PANEL
1 SECTION REFERENCE INDICATOR
M -I
DETAIL REFERENCE INDIGATOR
M - 1
I MECHANICAL KEYNOTE
Mr=GHAN I CAL 6C 1. NOTES
I ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITIONS
OF THE RULES, REGULATIONS AND CODES OF THE STATE OF COLORADO AND
THE LOCAL JURISDICTIONAL AUTHORITY.
2 TH15 CONTRACTOR 15 RE5PON5113LE FOR COORDINATING ALL WORK UNDER
HIS/HER CONTRACT WITH ALL OTHER BUILDING TRADES.
3 ALL DUCTWORK TO BE HELD TIGHT TO STRUCTURE UNLE55 NOTED OTHERWISE.
4 TH15 CONTRACTOR SHALL REVIEW EXI5TIN6 FIELD CONDITIONS PRIOR TO THE
PURCHASE, FABRICATION AND INSTALLATION OF ANY EQUIPMENT, DUCTWORK,
PIPING, ETC., AND SHALL INFORM THE ARCHITECT OR GENERAL CONTRACTOR
OF ANY DISCREPANCIES FOR RESOLUTION.
5 TH15 CONTRAGTOR SHALL PROVIDE ALL MANUAL AND AUTOMATIC STARTERS
FOR THE EQUIPMENT INDICATED ON THE DRAWINGS.
b THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT SHOW EVERY
DUCTWORK AND PIPING OFFSET REQUIRED. THIS CONTRACTOR SHALL
COORDINATE WITH THE EXISTING, AND OR NEW, STRUCTURE, ELECTRICAL,
MECHANICAL, PLUMBING, FIRE PROTECTION AND CEILING TO PROVIDE OFFSETS
AS REQUIRED AND APPROPRIATE. DO NOT SCALE DRAWINGS.
7 GEILING SPACE IS TO BE USED AS A RETURN AIR PLENUM. ALL CONSTRUCTION
SHALL CONFORM TO NFPA CIOA FOR FIRE AND SMOKE RATINGS. MATERIALS
EXPOSED WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A
FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A 5MOKE- DEVELOPED
INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E M.
5 THIS CONTRACTOR SHALL PROVIDE ACCESS TO ALL EQUIPMENT, VALVES,
DAMPERS, ETC., ABOVE ALL NON -LAYIN CEILINGS AND IN OTHER CONCEALED
I
SPACES FOR 5ERVICING AND MAINTENANCE.
q ALL RECTANGULAR AND ROUND DUCTWORK SHALL BE CONSTRUCTED OF
GALVANIZED SHEET METAL IN ACCORDANCE WITH 5MACNA HVAC DUCT
STANDARDS. DUCTS TO BE SEALED PER 5MACNA PRESSURE CLA55
REQUIREMENTS.
10 ALL NEW RECTANGULAR DUCTWORK SHALL HAVE DUCT LINER IN COMPLIANCE
WITH NFPA =IOA AND AS DEFINED IN KEYNOTES OR THE SPECIFICATION. SHEET
METAL 51ZE SHALL BE IN(REA5ED TO ACCOMMODATE THICKNESS OF LINER,
DUCT SIZE INDICATED ON DRAWINGS 15 THE INSIDE CLEAR DIMENSION.
II RUNOUT DUCTS TO SUPPLY AIR DIFFUSERS SHALL MATCH DIFFUSER NECK SIZE.
FAGTORY -MADE FLEXIBLE DUCTWORK SHALL BE USED, TRIM TO THE LENGTH
REQUIRED FOR PROPER CONNECTION. INSTALL PER MANUFACTURERS
RECOMMENDATIONS AND APPLICABLE LOCAL CODES. MAXIMUM LENGTH OF
FLEXIBLE DUCTWORK SHALL BE N0 MORE THAN 6-0". SHEET METAL DUCTWORK
WITH 1 - 1/2" WRAP INSULATION SHALL BE PROVIDED FOR LONGER DISTANCES.
12 PROVIDE SPIN - FITTINGS WITH MANUAL VOLUME DAMPERS (MVD) AT ALL
RUNOUT DUCTS TO DIFFUSERS FROM RECTANGULAR DUCTWORK. PROVIDE IN-
LINE MANUAL VOLUME DAMPERS WHERE A 5PIN -IN FITTING WITH A MVD IS NOT
FEASIBLE.
13 FACTORY -MARE FLEXIBLE DUCTWORK SHALL BE L15TED CLA55 I FOR USE
WITHIN AIR CEILING PLENUMS AND SHALL HAVE INTEGRAL INSULATION WITH
A THERMAL RE515TANGE OF R-4 FOR THE TOTAL THIGKNE55 AND A MOISTURE
BARRIER,
14 COMBINATION FIRE /SMOKE DAMPERS SHALL BE INSTALLED AT ALL REQUIRED
RATED WALL PENETRATIONS AND BE WIRED INTO THE FIRE ALARM PANEL A5
A SUPERVISORY SIGNAL BY THE ELECTRICAL AND /OR FIRE ALARM
CONTRACTOR. COORDINATE TO PROVIDE MOTOR VOLTAGE TO MATCH THAT OF
THE FIRE ALARM PANEL. INSTALL PER THE MANUFACTURER'S INSTRUCTIONS AND
THE LOCAL CODE, PROVIDING REMOTE RESET CAPABILITY IF REQUIRED.
15 FIRE DAMPERS AND FIRE SMOKE DAMPERS SHALL BE UL 1-15TED AND
INSTALLED PER THE MANUFAGTURER5 INSTRUCTIONS AND THE LOCAL CODE.
PROVIDE ALL NECESSARY ACCESS TO LINKS AND ACTUATORS.
16 THERMOSTATS SHALL BE MOUNTED AT 45" ABOVE FINISHED FLOOR ELEVATION
WHERE INDICATED, UNLE55 NOTED OTHERWISE.
11 TESTING, ADJUSTING AND BALANCING SHALL BE PERFORMED BY A
SUBCONTRACTOR, CURRENTLY CERTIFIED BY EITHER AABC, NEBB OR TABIC
AGENCIE5. SUBMIT COPY OF DATED CERTIFICATE TO ARCHITECT. PROVIDE
THREE COPIES OF TESTING, ADJUSTING AND BALANCING REPORTS TO
ARCHITECT FOR REVIEW.
IS ANY AIR HANDLING DEVICE THAT EXCEEDS 2000 GFM OF SUPPLY AIR 15
REQUIRED TO HAVE A SMOKE DETECTOR IN THE DUCT OR UNIT TO DISABLE THE
UNIT WHEN ACTIVATED.
Iq MECHANICAL CONTRACTOR TO COORDINATE SPACE REQUIREMENTS WITH
ELECTRICAL CONTRACTOR IN SUPPLY (UNIFORM CODE) OR RETURN
INTERNATIONAL CODE) DUCTWORK FOR DUCT SMOKE DETECTION INSTALLATION.
DETECTOR 15 TO BE MOUNTED BY MECHANICAL CONTRACTOR WITH POWER
WIRING BY ELECTRICAL CONTRACTOR AND CONTROL WIRING BY MECHANICAL
CONTRACTOR.
20 THIS CONTRACTOR 15 50LELY RESPONSIBLE FOR THE SPATIAL REQUIREMENTS,
ACOUSTICAL, THERMAL, AND ELECTRICAL PERFORMANCE CHARACTERISTICS
AND COORDINATION OF ALL INSTALLATION REQUIREMENTS FOR EQUIPMENT
SUBSTITUTIONS FROM THAT DEFINED AS THE BA515 FOR DESIGN. REVIEW AND
APPROVAL BY THE PE516N TEAM DOES NOT ALTER OR MITIGATE TH15
RESPONSIBILITY.
21 TH15 CONTRACTOR SHALL V151T THE PROJECT SITE TO BECOME ACQUAINTED
WITH EXISTING CONDITIONS. FAILURE TO 0050 SHALL NOT RELIEVE
CONTRACTOR FROM THE RESPONSIBILITY FOR PERFORMING THE WORK
PROPERLY.
22 ALL AIR HANDLING EQUIPMENT SHALL HAVE FLEXIBLE CONNECTIONS WHERE
CONNECTED TO DUCTWORK.
23 MAINTAIN ALL REQUIRED SERVICE AND ACCESS CLEARANCES REQUIRED BY
CODE OR THE MANUFACTURER FOR ALL EQUIPMENT, INCLUDING THE 3b"
ELEGTRIGAL CLEARANCE WHERE REQUIRED BY NEC.
N
ne
lm� ME
m"I'mmly-
0
ISSUE
DESCRIPTION
0
a
mom
�i
H
i i ! .
1 • Mi � �IIII� �IV� �
o
z
�
Q
w
# 1 # • '
COM
AVON COLORADO
D#
ARCHITECT OF RECORD
42140
ARCHITECTURE
Denver, Colorodo
STRUCTURAL ENGINEER
YONROE & NEWELL ENGINEERS, INC
AVON, COLORADO
YEP ENGINEERS
ABS CONSULTANTS, INC
DENVER, COLORADO
LANDSCAPE ARCHITECT
HART /HOWERTON
NEW YORK, NEW YORK
CIVIL ENGINEER
ALPINE ENGINEERING, INC.
VAIL, COLORADO
LAND SURVEYOR
PEAK LAND CONSULTANT, INC
PAIL, COLORADO
- -• •• 2001-134-03
lm� ME
m"I'mmly-
ISSUE
DESCRIPTION
mom
i i ! .
1 • Mi � �IIII� �IV� �
Lodge at Vail
Spa & Guestroom
Addition
i � s
A A
A � �
oLkl
r-
O
Q
O
m
O
O
C)
Q
Lij
CL
Q
CL
Lip
Q
Q
O
0
_O
O
u
CL
i
CD
Q
Q
m
O
m
CNI
O
n
u�
4
z
W
LL
L/\I:J 1 IVU7 FlYI L-^F rNIZ tVIY I rWir-,
b" PRIMARY LOOP
1 L S.Yl l_
SCALE: NONE
I I
NOTE: ALL EQUIPMENT USED FOR TEMPORARY
INTERNATIONAL HIND HEATING 5Y5TEM 15
EXISTING TO BE RE -USED U.N.O. REF. E.X15TING
INTERNATIONAL HIND DRAHIN65 FOR ADDITIONAL
INFORMATION. HEATING HATER 5Y5TEM 15 TO BE
RELOCATED AND RE -PIPED TO MATCH EXISTING
INSTALLATION.
DDG TEMP
r 5EN5OR
It MAX. /-12" MAX.
3 11 , TYP. 1 --
BGP -B -I
RE: 5/MO30, TYP.
R !I►
6" PRIMARY LOOP
12" MAX. RE: 3/MO3O, TYP,
DDG TEMP
5EN5OR
AS -B -I
RE: 15/MO30, TYP.
RE: 3/MO30, TYP.
B -B -3
STATIC PRE55URE
5EN50R LOCATION (o"
311
6 U 511
,r ti
ti
HH5 (180 °F)
I (110) (230)
/ f --- -GPM, TYP.
/ 411 f 3" HH5/R TO 5PA ADDITION 4" EHHS /R TO INT'L WINO
(INGLUDINO MAIN POOL
EQUIPMENT ROOM)
ET -B-1
Tv
NEW GLYCOL HHP -B -1 NWP -B -2 CHEMICAL
FEED A55EMBLY, RE: 6/MO3O, TYP. POT FEEDER,
RE: 14/MOIO. RE: 13/M030, TYP.
0 ' oi
emNimplil
r!r
Vw" IN
PROVIDE VACUUM BREAKER
AND MANUAL GATE VALVE TO
ALLOW DRAINING OF GLO5ED
LOOP PIPING DURING 5EA5ONAL
SHUTDOHN FOR FREEZE
PROTEG
2" GH5 /R TO 5KI CLUB
I
I GH5
r
4" GW5 /R TO EXISTING INT'L HING r RE: 3/MO30, TYP.
PIPING AND 5PA ADDITION
r-------- T - -- - -- -----,..... —_...----- -._` HR- — I- ---_..
I f (ECONO)
j---- _.._. - - - --# N.O. N.O. .—
i I ' 4 „ 1
4 11 4„ 4 ,1 �----- - - . — �i II 4" 411
°
DIFFERENTIAL PRE55UREJ
1 4 "S' .
BYPA55 CONTROL VALVE
RE: 3/MO3O, TYP.
GHP -B -! GHP -6-2 RE: 16/MO30, TYP.
RE: 6/MO30, TYP.
A 11
-------
I C5
GT -B -I
RE: 4/MO30
I
1
1,
�I
.m
3 ) SCA LE: NONE
CHILLED W,
WATERSIDE ECONOMIZER
4 DDG TEMP CONTROL VALVE, TYP.
5EN50R I N.C.
GH5 GH5
N.C.
411 (o il (EGONO)
we
— —HHR 0320F)— I
1 f
DDG TEMP 2" MAX.
SENSOR
I 7 t' 260) 611 3,1 IiWP -B -3
I
✓ 211
� � I
HWP -B -S I
! L
u HHP -B -6
5PA ADDITION
DOMESTIG HOT
HATER HEAT
EXGHANOER-
RE: PLBO.
II
CONDENSER HATER
BYPA55 CONTROL
VALVES
11
D
r --5
I I
5" 5M5/R TO NEW
f SNOHMELT AREAS
f I
A5 -B -2
! f
4 ,1 411 f
- 511
I
Ic I f
T -2 1
• •
' NEH HEAT
f EXCHANC -DER
f
NEH OLYGOL� 5MP -B -i 5MP -B -2 CHEMICAL
FEED A55EMBLY POT FEEDER
I
f
f
f
f
I
EX15TING SNOHMELT
EXPAN51ON TANK
EXISTING SNOWMELT AIR
SEPARATOR
EX15TINO GLYCOL
FEED A55EMBLY
3" E5M5/R TO EXISTING INTERNATIONAL
f WING SNOHMELT
5MP -B -3 5MP -B -4 CHEMICAL
POT FEEDER
sii
OWNER /DEVELOPER
VAIL RESORTS
DEVELOPMENT
COMPANY
AVON, COLORADO
ARCHITECT OF RECORD
4240
ARCHITECTURE
Denver, Colorado
STRUCTURAL ENGINEER
YONROE do NEWELL ENGINEERS, INC
AVON. COLORADO
YEP ENGINEERS
ABS CONSULTANTS. INC
DENVER, COLORADO
LANDSCAPE ARCHITECT
HART/HOWERTON
NEW YORK, NEW YORK
CIVIL ENGINEER
ALPINE ENGINEERING. INC.
VAIL, COLORADO
LAND SURVEYOR
PEAK LAND CONSULTANT, INC
VAIL, COLORADO
PROJECT NO: 2001 - 134 -03
ISSUE ISSUE ISSUE
NO. DATE i DESCRIPTION
- 08.25.03 DD PWNG
- 09.15.03 FINN. DD
01 01,10.06 FOR CONSTRUCTION
-R 07.14.06 wornr / Ac! o_nr
Go,, CgVBY DBIYg
Lodge at Vail
Spa & Guestroom
Addition
r
C)
d) O
O
O
Cz
HI
n
LU
CL
0
Z:
CL
L
Jl
CI]
n
Q)
n
Q)
Lj
z
IFGC PIPE SIZING CALCULATOR FOR
PRESSURES GREATER THAN 1.5 PSI
Meter Discharge Pressure {PSI} 12.0
Allowable Pressure Drop (PSI)=`1.5
Total Equivalent Length of Pipe {feet) 290
Nominal Schd, 40 Steel Pipe size (inches)
Capacity (cfh)
0.5
319
0.75
668
0.
1258
1.25
2584
1.5
3873
2
-----------
7462
2.5
11896
3
21038
4
42930
5
7769�
6
125849
*Pipe capacity is calculated using formula for high pressure
gas equation (More than 1.5 psi) IFGC 402.4 Equation 4-2
Q = ((D*l 8.93) *((((((Pj) +1 4.7)A 2)-((((Pi)-(P2))+14.7)A2))*Y)/(Cr*L))Ao .206)A 2.6247
i nsi d e Pi pe Diame
-
Upstream - p - re - s — su - re, psis (P1 +14.7)
P2 = Downstream pressure, psia (P2 +14.7)
- dr - = — Fac — to - r - F - o - r - V - i - sc -, o - sit - y - ,
D
Y Factor for superexpansibility = 0. 9992
L Equivalent Length of Pipe (feet)
I KE*rNOTE6 I
REMOVE EXISTING FIXTURES. GAP SERVIGE5 AT MAINS.
SERVICES TO REMAIN FOR 0UE5T ROOMS ABOVE.
REMOVE EXISTING GREASE INTERCEPTOR. REFER TO SHEET
A/P104 FOR NEW GREASE INTERCEPTOR LOCATION AND PIPE
ROUTING
EX15TINC-7 RATER SOFTENER. RELOCATE TO NEW TEMPORARY
CONTROL PLANT.
REMOVE EXISTING SHOWER. CAP SERVICES AT MAINS.
AT COMPLETION OF THE INSTALLATION OF NEW GHILLED
HATER GONDEN51NO UNITS FOR FREEZER AND COOLER, THE
FLOOR SINK AND DOMESTIC, HATER5UPPLY TO THE EXISTING
CONDENSERS SHALL BE REMOVED. SERVICES TO BE CAPPED
AT THE MAINS.
GAP EXISTING SANITARY. PROVIDE 4"&G0 AT CAPPED MAIN
EXISTING HATER HEATERS, PUMP5,5TORA6E TANK AND
3-HAY VALVE TO BE RELOCATED To NEH TEMPORARY
GONTROL PLANT. RE: DETAIL 6/P002
PROVIDE NEH PIPING TAPS TO NEH TEMPORARY BOILER
PLANT AND RECONNECT ALL PIPING TO EXISTING EQUIPMENT
IN THE SAME CONFIGURATION A5 1 PREVIOUSLY PIPED.
PIPING TO BE SIZED AND INSULATED SIMILAR TO EXISTING
PIPING.
WHEN THE NEW CENTRAL PLANT 15 INSTALLED AND READY
FOR U5E, CAP PIPING AT THE TEMPORARY PLANT AND
REGONNE6T NEH PIPING FROM NEH CENTRAL PLANT AT TH15
LOCATION.
VERIFY FLOOR DRAIN LOCATION. RELOCATE DRAIN INTO
TEMPORARY MECHANICAL ROOM AND EXTEND DRAIN PIPING
IF EXISTING DRAIN LOCATION 15 OUTSIDE OF MECHANICAL
ROOM.
P15GONNECT ALL PIPING TO EXISTING EQUIPMENT.
IFGC PIPE SIZING CALCULATOR FOR
PRESSURES LESS THAN 1.5 PSI
Meter Discharge Pressure (
owabTe Pressure Drop ("W.C.)=10.5
Total Equivalent Length • Pipe (feet)=
135
K11
0.
184
o
346
ii
3270
• 2051
4
5
2134
Q AH)/(Cr*L))A .206))A2.624)
apal kCTn)
Insi
4 Fressure rop ("W.C.)
Cr = Factor For Viscosity, Density, and Temp. 0. 60••
1 1 = Equival of Pipe (feet)
LEOEND
Y.1---
RE:X/PXXX
BUILDING \ SHEET NUMBER
EXAMPLE:
RE:P/PIOI
BUILDING 'r,>'-/ \ \-5HEET PIOI
SKIER SERVICES
� &—)j 1� 0, 1 ` i `,
0
FA. 6 4
4�
- �6
GUEST
ROOM
11 Il 1 1 1 1 11 � _.- — _`'-� 1 ; ,, �
Lk
0
8169-0"
1 2" HN
GUEST
! tl ! ! _ - l f 1 13
STORAGE
J-
2
'_ - - 1 MEN'S LOCKER
ROOM 11 X5 1; 1
_' �_ - " - f 1 1 4
HR OFFICE 00#
VC 1 11 45
° 1 - _ , � ! 1 111 ._-,- ._-_ ..-- '.�� -- ' -- -� t i "t, 8i"12' � , ' j }- 4 WOMEN' I 11 n ELEV.
LOCKER oe
ROOM J�8172' 01 1 MACH
-- 7 F. F. E L. WALK IN ROOM'
HR F, n REFER
X
LOCKERS
CURTAIN PANEL
WALK IN STORAGE
REFER
(E) 2
MEN'S LOCKER
ROOM
2
7
0
WALK IN
REFER
HR STORAGE ZI 1 % 1 J
(E) 3" S
0
WINE STORAGE tf k
PURCH ING
- ------ — - ------- a
�T LEC. ROOM V)
0 REMAIN)
4--
A�- -
LOADING /TRASH
R04 -gem-
HOUSEKEEPING
R o l k
1 � ,
U
BOILERASPRIN -7
1 11
HOUSEKEEP NG
LOWER LE, L k
7
ELECTRI AL
t i ! t � ___ ___.t 1 ti
EXISTING CAS (2 P51 --
------
= ER To INTERNATIONA ' __-- __--
16 EXISTING DRAN
) R MORE INFORMATION.
TOTAL GAS LOAD = 0.9
4,388,000 BTU/H 0
�7
F 0 - . - I I
AVON, COLORADO
ARCHITECT OF RECORD
42140
ARCHITECTURE
Denver, Colorado
STRUCTURAL ENGINEER
MONROE & NEWELL ENGINEERS, INC
AVON. COLORADO
MEP ENGINEERS
ABS CONSULTANTS, INC
DENVER, COLORADO
LANDSCAPE ARCHITECT
HART/HOWERTON
NEW YORK. NEW YORK
CIVIL ENGINEER
ALPINE ENGINEERING, INC.
VAIL COLORADO
LAND SURVEYOR
PEAK LAND CONSULTANT, INC
VAIL, COLORADO
1PROJECT NO: 2001-134-03 1
r
0
0
z
�
o
z
L
AVON, COLORADO
ARCHITECT OF RECORD
42140
ARCHITECTURE
Denver, Colorado
STRUCTURAL ENGINEER
MONROE & NEWELL ENGINEERS, INC
AVON. COLORADO
MEP ENGINEERS
ABS CONSULTANTS, INC
DENVER, COLORADO
LANDSCAPE ARCHITECT
HART/HOWERTON
NEW YORK. NEW YORK
CIVIL ENGINEER
ALPINE ENGINEERING, INC.
VAIL COLORADO
LAND SURVEYOR
PEAK LAND CONSULTANT, INC
VAIL, COLORADO
1PROJECT NO: 2001-134-03 1
r
N
O
m
�0
O
a
}
Q
c
LiJ
Q
CL
t1�
v
Q
n
Lij
Z
W
u.
I. CONNECT ALL CIRCUIT NUMBERS SHOWN IN NON - TREATMENT AREAS TO PANEL
"5PA1" UNLE55 OTHERWISE NOTED.
2. 5EE 5TO DE516K GROUP WATER50APE PLANS iN 51TE DEVELOPMENT PACKAGE
FOR ELECTRICAL REQUIREMENT5 AT POOL, OUTDOOR 5PA5, MATER FEATURES
AND ASSOCIATED PUMPS, LIGHTING AND C.ONTROL5.
MOUNT DEVICE IN MILLWORK. COORDINATE LOCATION, CONDUIT ROUTING
AND INSTALLATION REQUIREMENTS WITH MILLWORK INSTALLER. ALL
CONDUIT SHALL BE CONGEALED.
2 PROVIDE FLUSH FLOOR POKE -THRU DUPLEX RECEPTACLE. 13OX SHALL
BE WIREMOLD /WALKER #R07ATG5K.
3 PROVIDE FLUSH FLOOR POKE -THRU DOUBLE DUPLEX RECEPTACLE. BOX
SHALL BE WIREMOLD /WALKER #R6gA15T65K.
4 FIELD COORDINATE LOCATION OF PANEL "TEMP" WITH TEMPORARY
INTERNATIONAL WING HEATING WATER PLANT AND ALL OTHER TRADES.
PROVIDE (2) 20A/IP CIRCUITS WITH 30MA EQUIPMENT PROTECTION GFGI
CIRCUIT BREAKERS FOR CONNECTION TO PIPING HEAT TRACE.
COORDINATE HEAT TRACE CONNECTION QUANTITIES AND CONNECTION
POINT LOCATIONS WITH PLUMBING INSTALLER. GONNEGT TO GIRUIT5
TEMP -31 4 33.
5 PROVIDE (b) TEMPORARY 4' STRIP LIGHTS, TYPE J4 AND WALL
MOUNTED 5WITGH FOR LIGHTING CONTROL. COORDINATE LIGHTING
LOCATIONS WITH OTHER TRADES. SPACE EVENLY THROUGHOUT
TEMPORARY HEATING WATER PLANT. PROVIDE (4) DUPLEX
RECEPTACLES, ONE ON EACH WALL, MOUNTED 48" A.F.F. CIRCUITS
TEMPORARY LIGHTS AND REGEPTAGLE5 TO TEMP -35.
6 PROVIDE POWER CONNECTION TO GAS FIREPLACE IGNITION AND
POWERED DRAFT VENT. CONNECT VIA WALL MOUNTED TIMER SWITCH
AND ON/OFF SWITCH. PROVIDE A TIMER SWITCH FOR GAS FIREPLACE IN
ACCORDANCE WITH TOWN OF VAIL BUILDING CODE. TIMER 5WITCH
SHALL BE 516NLINE MODEL 362. PROVIDE AN ON/OFF SWITCH IN
ADDITION TO THE TIMER 5WITGH. COORDINATE INSTALLATION WITH THE
FIREPLACE PROVIDER, ARCHITECT AND OWNER.
7 PROVIDE FLUSH MOUNTED J -BOX IN WALL FOR AUDIO SYSTEM
CONNECTIONS. PROVIDE 3/4 "G FROM J -BOX TO ACGE551BLE CEILING.
5 PROVIDE DUPLEX GFI RECEPTACLE FOR CORRIDOR 6121 HATER
FEATURE PUMP. COORDINATE LOCATION AND MOUNTING HEIGHT WITH
HATER FEATURE INSTALLER.
g PROVIDE DUPLEX RECEPTACLE FOR CORRIDOR E3121 WATER FEATURE
FIBER OPTIC, GENERATOR. FIBER OPTIC GENERATOR AND COMPONENTS
SHALL PROVIDE AND INSTALLED BY WATER FEATURE INSTALLER.
COORDINATE LOCATION AND MOUNTING HEIGHT WITH WATER FEATURE
INSTALLER.
10 PROVIDE FLUSH FLOOR POUR- IN -PLAGE DUPLEX RECEPTACLE. BOX
SHALL BE HUBBELL #35FBG- 35FBGBKA- 355FBRP- 35FBB.
11 PROVIDE SAUNA ENCLOSED GIRCUIT BREAKER, FLUSH MOUNTED IN WALL
WITH 25A3P CIRCUIT BREAKER. PROVIDE (3 #10, 1 #106, g0 °C
GONDU0TOR5) IN 3/4 "G. TO SAUNA CONTACTOR.
12 SAUNA CONTROL 5WITGH, PROVIDED WITH SAUNA, INSTALLED AND
HIRED BY CONTRACTOR. PROVIDE LINE VOLTAGE WIRING CONNECTIONS
TO SAUNA CONTACTOR AND SAUNA LIGHT PER MANUFACTURER'S
RECOMMENDATIONS. ALL WIRING SHALL BE g0 °G RATED, RUN IN
CONDUIT.
13 SAUNA GONTAGTOR, PROVIDED WITH SAUNA, INSTALLED AND WIRED BY
CONTRACTOR. PROVIDE LINE VOLTAGE WIRING TO SAUNA HEATER AND
SAUNA GONTROL 5WITGH PER MANUFACTURER'S RECOMMENDATIONS.
ALL WIRING 5HALL BE g0°`G, RUN IN CONDUIT.
14 SAUNA HEATER, PROVIDED WITH SAUNA, INSTALLED BY 5AUNA
INSTALLER AND WIRED BY CONTRACTOR. PROVIDE (3 #10, 1 #106, g0 °G)
IN 3 14 "C LIQUID TIGHT FLEXIBLE CONDUIT FROM SAUNA GONTAGTOR,
PER MANUFAGTURER'5 RECOMMENDATION5.
15 SAUNA LI6HT, PROVIDED WITH SAUNA. INSTALL IN CENTER OF SAUNA
CEILING. PROVIDE (2 #12, 1 #120, g0 °G) IN 314" TO SAUNA SWITCH.
INSTALL FIXTURE AND WIRING PER SAUNA MANUFACTURER'S
RECOMMENDATIONS.
16 POOL PANEL PROVIDED BY POOL CONTRACTOR. PROVIDE FEEDER
AND CONNECTION TO PANEL, SEE ELECTRICAL ONE LINE DIAGRAM ON
E002. COORDINATE ADDITIONAL ELECTRICAL REQUIREMENTS FOR
POOL AND SPA EQUIPMENT WITH EQUIPMENT INSTALLER AND
WATERSGAPE PLANS AND 5PECIFIGATION5.
1 PROVIDE ELEVATOR DISCONNECT 5WITCH (SHUNT TRIP) AND ELEVATOR
GAB 015GONNEGT.
18 PROVIDE I" CONDUIT TO CENTRAL J -BOX ON STUB -UP, 4" AFF TO
BOTTOM OF J -BOX. C{RGUIT5 FOR KITCHEN EQUIPMENT #14 4 14g
SHALL BE EXTENDED TO J -BOX AND THEN CONNECTED TO
REGEPTAGLE5 MOUNTED IN KITCHEN EQUIPMENT RACK. 5AH GUT FLOOR
AS REQUIRED TO EXTEND I" CONDUIT FROM NEAREST WALL TO J -BOX.
PATCH AND REPAIR FLOOR AS DIRECTED BY ARCHITECT.
KITCHEN
EQUIPMENT 56HEDULE
KEY
EQUIPMENT
LOAD
VOLTS
4)
BRANCH GKT.
GOND.
DI5GONNEGT OR REG
HP,KW,FLA
5W / REG
FU5E
2006
ii
CONDUGTOR5
140
HEATED SHELF
10.14A
208
1
2 #12, 1 #126.
1/2"
6-20R
(VERIFY)
141
ROLL IN
IO.6A
120
1
2 #12, 1 #126.
1/2"
DPLXIC -Fl
REFRIIERATOR
5 -20R
142
ROLL IN
115A
120
1
2 #12, 1 #125.
1/2
DPLX/GFI
+: +
DD PRI !A
FREEZER
5 -20R
i i .
144
ICE MACHINE
25.IA
120/
1
3#8, I #IOC.
I"
bOA/2P
35A
Will
208
146
DE55ERT5 SERVING
6.qA
120
1
2 #12, 1 #126.
1/2"
OPLX/GF€
COUNTER
5 -20R
141
SALADS SERVING
&AA
120
1
2 #12, 1 #126.
1/2"
DPLX/GFI
COUNTER
5 -20R
148
HOT FOOD 5ERVING
125A
120
1
2 #12, 1 #126.
1/2"
OPLXIGFI
COUNTER
5 -20R
14q
SOUP COUNTER
15A
120
1
2 #12, 1 #126.
1/2"
0PLX/6FI
5 -20R
Ibq
MILK DISPENSER
25A
120
1
2 #12, 1 #126.
1/2"
DPLX/GF€
5 -20R
110
MICROWAVE
IOOOW
120
1
2 # €2, 1 #126.
1/2"
DPLX/GF1
5 -20R
112
BEVERAGE COUNTER
20A CIRCUIT
120
1
2 #12, 1 #126.
1/2"
DPLX/GFI
(UNDER CNTR. RACK)
5 -20R
113
COFFEE MACHINE
25.8A
120/
1
3#8, 1 #106.
in
bOAl2P
35A
208
114
50DA/IGE DISPENSER
20A CIRCUIT
120
1
2 #12, 1 #126.
1/2
DPLX/6FI
5 -20R
115
50PA DI5PEN5ING
20A CIRCUIT
120
1
2 #12, 1 #€26.
112
DPLX/_FI
SYSTEM
5 -2OR
IBOa
VENDING
20A CIRCUIT
120
1
2 #12, 1 #126.
€/2"
DPLX/GFI
5 -20R
180b
VENDING
20A CIRCUIT
120
1
2 #12, 1 #126.
1/2"
DPLX/GFI
5 -20R
1110c
VENDING
20A CIRCUIT 1
120
1
2 #12, 1 #126.
1/2" 1
DPLX/6FI
5 -20R
NOTES:
I. VERIFY LOAD, VOLTAGE, PHASE, RECEPTACLE TYPE, MOUNTING HEIGHT AND CONNECTION REQUIREMENTS WITH KITCHEN CONSUL
2. PROVIDE HARD WIRE CONNECTION FROM RECEPTACLE TO J -BOX AT FLOOR.
F."
Wl
i i
( ( SCALE: 1 1) = 1' -0"
2006
ii
F."
Wl
i i
( ( SCALE: 1 1) = 1' -0"
ii
,
--• • 0* •
ISSUE
DESC
+: +
DD PRI !A
M C I
i i .
iii «� ►�Ci� +�i
RAM
IA
F A
Will
®®
F."
Wl
i i
( ( SCALE: 1 1) = 1' -0"