HomeMy WebLinkAboutB06-0018-Building Department CommentsVail, Coloradoഀ
Denver, Coloradoഀ
Frisco, Coloradoഀ
Monroe & Newellഀ
Engineers, Inc.ഀ
September 11, 2006ഀ
4240 Architectureഀ
1621 Eighteenth Street, Suite 200ഀ
Denver, CO 80202ഀ
Attn: Randy Hartഀ
Re: Vail's Front Door (M&N # 5500.02) Building A and Siteഀ
BUILDING PERMIT B06-0018ഀ
Dear Mr. Hart:ഀ
The following are our responses to the structural portions of The Town of Vail Buildingഀ
Department comments for the above building, dated August 22, 2006. We have included theഀ
original comment with each response. Our September 6, 2006 responses are noted with "M&Nഀ
Response (9/6/06)" and are shown in red.ഀ
BUILDING DEPARTMENT COMMENTS:ഀ
ASI A-001, dated 6/15/06: Parking garage entry way modificationsഀ
1. S002: Conventionally reinforced concrete beam schedule: it is not clear where theഀ
beams B13 through B16 have changed, none of these beams have changed onഀ
the plans resubmitted, Please clarify. IBC 1603.1.ഀ
M&N Response (9/6/06)ഀ
This was clouded because the "entry" wall beams changed to Post-Tensioned.ഀ
Beams were not eliminated from schedule in case they may be used elsewhere.ഀ
2. 1/S102: verify dowel spacing at 2'-0" on center: this provides footing flexural steelഀ
at 4'-0" on center each side of the wall for this fairly heavily loaded wall foundation,ഀ
which does not appear to meet factored flexural requirements. ACI 318 15.4.2.ഀ
~`7 ors:ഀ
2006 Platinum Sponsor S~~ Z ZoQ~ഀ
The Colorado Chapter ofഀ
The American Institute of Architectsഀ
www.monroe-newel1.comഀ
1701 Wynkoop Street • Suite 200 • Denver, Colorado 80202ഀ
(303) 623-4927 • FAX (303) 623-6602 • email: denver®monroe-newell.comഀ
M&N Response (9/6/06)ഀ
VS102 will be modified to indicate #5 at 2'-0" transverse reinforcing. Transverseഀ
reinforcing not required at 3'-0" wide footing.ഀ
3. 1/S102: This detail shows the wall retaining approximately 5 ft of soil, which doesഀ
not appear to be considered in vertical steel design, please check. If this wall isഀ
retaining 5 ft of soil, verify upper slab should not be doweled into wall to provideഀ
lateral restraint and limit lateral span. Check development at vertical dowels intoഀ
footing and into wall for shear friction capacity. Note, architectural section 4/A203ഀ
appears to show less than 1 ft of retained height. IBC 1604.4.ഀ
M&N Response (9/6/06)ഀ
Wall is adequately reinforced for elevation offset. Where offset occurs bottom ofഀ
wall is braced by slab. Reaction at top of wall is 100 Ibs/ft and dowels are notഀ
required. Development of dowels for shear friction is not required. Architecturalഀ
Section is generic section.ഀ
4. S102: Plan view at new ramp modifications: Verify slab on grade construction isഀ
indicated on the drawings: thickness, reinforcing, etc. Complete detailing ofഀ
concrete wall opening jambs at the garage entry way north wall, dimensions areഀ
missing, provide ties for column construction as required by ACI 318 14.2.5 andഀ
ACI 318 Ch. 10. Provide a detail to show concrete walls and footings connectingഀ
to concrete wall on line R, footings appear to stop short of future wall construction.ഀ
ACI 318 14.2.6.ഀ
M&N Response (9/6/06)ഀ
Slab-on-Grade to be 5 inch reinforced with #5 at 1'-4" each way at mid- depth. Re:ഀ
ASI A001 for dimensions. Walls do not require column ties. All horizontal wallഀ
reinforcing to be continuous per General Notes. Footings are held back to notഀ
interfere with or block shoring. Re: Detail 8/S004 for connection of walls atഀ
intersectionഀ
5. S109: Plan view at new lid modifications over new ramp below: Verifyഀ
superimposed dead loading is sufficient in this area, structural calculations haveഀ
not been submitted and loads can not be verified. Section 3 & 4/A203 show severalഀ
feet of soil overtop, along with planter / site walls, topping slabs throughout, andഀ
the concrete and CMU shaft wall around the exhaust shaft. IBC 1604.4.ഀ
M&N Response (9/6/06)ഀ
The loads have been verified. Refer to the attached calculations for the design ofഀ
R13, R14 and R15 Beams.ഀ
6. S109: A detail seems required at cantilevered end of new post tensioned beams,ഀ
verify vertical deflection tolerance has been considered, such that new beams orഀ
slab do not bear on existing walls at full dead plus live loading, to become a 2-spanഀ
simple support condition. Verify deflections due to prestress loss / creep andഀ
shrinkage have been considered. ACI 318 18.2.4.ഀ
M&N Response (9/6/06)ഀ
Design is based on 2" open joint at existing Lodge Tower. There will be no supportഀ
at this location. Deflection calculations as noted have been verified. Refer toഀ
attached calculations for beams.ഀ
7. S109: Show new section 15/S303 on plan. Call out concrete beam to the north ofഀ
the new shaft on plan, verify support at West end for this beam, slab system has aഀ
cantilevered end at this edge, it appears the beam may be unstable. Verify slabഀ
edge support at north-west corner of the new 8" slab on grade, appears bothഀ
edges are cantilevers and unsupported which would require additional reinforcingഀ
and/ or a detail. Verify additional reinforcing / trim bars are not required aroundഀ
shaft opening, none are shown on plan. IBC 1604.4, 1603.1.ഀ
M&N Response (9/6/06)ഀ
Beam at north side shaft is 12" x 24" reinforced with (3) - #6 top and bottom and #4ഀ
stirrups at 12 inches. The west end of it frames into 8" x 24" beam reinforced withഀ
(4) - #6 top and bottom and #4 stirrups at 12" which is supported on PB13 andഀ
PB15. Refer to attached SSK A030. Trim bars to be provided per typical Detailഀ
1/S301.ഀ
8. 15/S303: Steel beams are shown in section, concrete beams are shown on plan. Itഀ
appears there may be a slab step in the lid, based on the graphics of detail 15ഀ
either side of the shaft, no step is shown on plan, please verify. CMU wall belowഀ
the lid, south of the shaft does not appear to be on plan. Please coordinate planഀ
and section.ഀ
M&N Response (9/6/06)ഀ
See revised section 15/S303 (SSK A031). The step is not required. The CMU wallഀ
below has been deleted.ഀ
9. 15/S303: Show connection at top of CMU shaft walls for positive structuralഀ
attachment to roof purlins by others, and for wind load resistance at this exteriorഀ
wall. Note, 9" vertical length of slab dowels per note on S109 does not appearഀ
sufficient development for shear or moment at the bottom of shaft wall, pleaseഀ
check. IBC 1603.1, 1604.4.ഀ
M&N Response (9/6/06)ഀ
See revised Section 15/S303 (SSK A031). The dowels have been revisedഀ
accordingly.ഀ
10. 16/S303: steel columns are not called out on plan, verify small shed roof snowഀ
loads have been considered in the design of columns, header, and supporting slabഀ
and other structure below. IBC 1604.4, 1603.1ഀ
M&N Response (9/6/06)ഀ
Columns to be TS 4x4x1/4. Loads from shed roof and building above have beenഀ
considered in design of structure below.ഀ
11. 18/S303: It appears that some moment may be transferred to the 8" concrete wallഀ
below, due to cantilevered post tensioned beam rotation at cantilever support point.ഀ
Slab to wall is certainly intended to be monolithically connected as shown in detailഀ
18, however beam to wall connection is not shown. Please show beam to wallഀ
detail or provide instructions regarding dowels in detail 18. Verify flexural plus axialഀ
loading has been considered in the 8" concrete wall. ACI 318 14.2.1 thoughഀ
14.2.5.ഀ
M&N Response (9/6/06)ഀ
The dowels that connect the slab to the wall are not intended to monolithicallyഀ
connect the slab and wall. The intent is a pinned connection. The intent is theഀ
same for the connection of the beams where they bear on the wall. Similar toഀ
Section 5/S303. The axial loading on the 8" wall has been verified per ACI 318ഀ
Section 14.5. Refer to the attached calculations.ഀ
12. 19&20/S303: Please verify shear friction capacity at slab construction joint: asഀ
required by analysis, provide notes to remove form oil, clean and roughen slab jointഀ
prior to casting future slab pour against the existing slab joint. Consider trim barsഀ
around corners in first slab pour as shown on S109. Show required lap length inഀ
detail 19. ACI 318 11.7.9., IBC 1603.1.ഀ
M&N Response (9/6/06)ഀ
See attached calculations for shear friction capacity. Other requirements regardingഀ
construction joints are listed in specifications. Trim bars to be provided at cornersഀ
per Detail 1/S301. Re: Revised Section 19/S303 (SSK A032) for lap length.ഀ
End of Comment Responses.ഀ
If you have any questions or comments, please call our office.ഀ
Very truly yours,ഀ
MONROE &,NEWELL ENGINEERS, INC.ഀ
[Ulu U%, a- }~yഀ
cഀ
ഀ
- C O R. ~ഀ
fill,ഀ
CP i I ' 'ഀ
1 I ~ rn 0ഀ
CO 3Eഀ
1_ Nഀ
00ഀ
Iഀ
1ഀ
1 L z zഀ
1 r , ~Nഀ
rഀ
Aഀ
rn ; 0ഀ
- ~ 1ഀ
1 ,ഀ
qc- I ,ഀ
1 ,ഀ
r-- ----L-I-------ഀ
1 ~ Iഀ
1 1 I 1ഀ
L I 1 ; Iഀ
QO - II - -ഀ
1 ~ഀ
Aഀ
4- 0-0 OAഀ
=Q rnrn DDc~ഀ
Dഀ
~I N Z~ N~ (l:r PQ;Qഀ
~vഀ
Q1 rഀ
0 IM M -n 0 - ~ RO ~ ~ Lx 200ഀ
1 , Iഀ
1 ,I 1 r IjX ~ CP AA - .0 VZഀ
Iv 1 , 1 N ~Q1 rn-rnഀ
1 1V,1 A ''r N\ഀ
Nഀ
r H Y 0ഀ
, 1 1 _ 1 y " 1 1 , DD , Iഀ
' i t 1 1 ~I i i (QD~ ~0 L I I0>ഀ
11ഀ
1 'I ' ~ ~1 i~ 1 I r~ I 1 1 1 ~1ഀ
rjiഀ
zഀ
Fl».ഀ
\ ' ' 1 1 1ഀ
1 - --r-------r-T-------ഀ
-ഀ
r -ഀ
--r--------,- \ -r--- -----r--ഀ
CA it iN N iഀ
1- 1 I 1 I ~ i~~ഀ
1 1ഀ
0 , , 1 I 1 ~ഀ
1ഀ
1 z l 0 1 1 I 1 g / , ,Q~ഀ
1 0 1 1 , ' 1 ~ 1 1ഀ
A+,„ഀ
1 ~1 rഀ
' , J 1 V 1 I 1 1 1f ' \ 1 1 _ഀ
~ 1 1 0ഀ
' 1 1 1 ~ ~ ' ~ 1 1 1 -Qഀ
' , 1 1 1 I 1 ~ I ❑ 1 1ഀ
, 1 1 1 1 1 1 1ഀ
> LPഀ
' II 1 I ' ' / 1 1 0~ഀ
jഀ
1 A I 1 1 1 ~ r 1 1 rn~ rn 3ഀ
1 rn -n 0ഀ
0ഀ
rn IMഀ
I I 1 Aഀ
- -r- _ , I 1 1 1ഀ
, _1 - TI 1 i 1 1 1 , , ~ ~ 3ഀ
IATGHLINE RE.510q I I I 1ഀ
IATGHLINE RE~5108 E E . 13~_q~~ഀ
ഀ
'ഀ
Iഀ
- 1ഀ
1 ~ഀ
Iഀ
1 ~ഀ
r i iഀ
1ഀ
1ഀ
11,ഀ
Architect of Recordഀ
4240ഀ
Denver, Coloradoഀ
Vails Front Doorഀ
Building Aഀ
Owner / Developerഀ
Vail Resortsഀ
Development Companyഀ
Avon, Coloradoഀ
❑ഀ
OXZഀ
vഀ
M T,ഀ
AzAഀ
~Ornഀ
rNഀ
~13Aഀ
~rnഀ
0ഀ
1$rn0ഀ
rഀ
DOഀ
-4ഀ
rഀ
0D0ഀ
0ഀ
rnഀ
rx-ഀ
rഀ
r3ഀ
<Ozz0ഀ
~Aഀ
-Di0"nഀ
-iiഀ
ZZ Mഀ
05-1ഀ
Mഀ
„AUMഀ
Aഀ
1-ഀ
.flഀ
DRAWING No: SSK-A030ഀ
REFERENCE: S109ഀ
ISSUE: ASI A-001oഀ
DATE: 09/11/06ഀ
SCALE: l /B" = l'-0"ഀ
DRAWN BY: CLHഀ
L. RE, L.ഀ
Pwrn~ഀ
A 1mഀ
0 Nഀ
z gഀ
a.ഀ
REഀ
PLഀ
Pഀ
Pഀ
Pഀ
2'-6' LAPഀ
rni Pഀ
ZQGഀ
(ഀ
zഀ
rrn dഀ
z -ziഀ
Nഀ
rഀ
3ഀ
Iഀ
Nisഀ
'ഀ
iഀ
Aഀ
?nഀ
Dഀ
OrAഀ
A+ഀ
vkഀ
1ഀ
rnഀ
mrഀ
3mul,ഀ
aഀ
f.-1ഀ
mഀ
0ഀ
m~ഀ
zഀ
miഀ
Aഀ
Ag-*' sN=ഀ
m N 1 t~ _ Umഀ
m 1 jr xഀ
iഀ
mmr z i O R c rTpഀ
Aഀ
mDN~~' ~ ~mm~Cഀ
~iZe k i NZ mഀ
0ഀ
iഀ
Dഀ
N_ഀ
Dഀ
8ഀ
013ഀ
Nymyഀ
Aഀ
Ir~ \ m m1zഀ
Dഀ
\ \ഀ
\ \ AN0ഀ
\ vഀ
m~ഀ
\ \ 0ഀ
\ \ rnNഀ
\ \ഀ
\ \ mഀ
S \ഀ
\ഀ
\ഀ
\ A \ഀ
DN \ m \ഀ
13 D \ഀ
Rmഀ
Z Zഀ
\ഀ
Oഀ
~ Nഀ
Dഀ
8ഀ
Awsa era~.aഀ
4240ഀ
Vails Front Doorഀ
B$ഀ
Aഀ
D~n~!>e~1Opc~ഀ
Vail FCs rt8ഀ
DPAwiNC NO: SSK A-031ഀ
REFER[ CE: A-,ഀ
ISSUES ASI A-0(]1aഀ
GATE: 9/11/06ഀ
DC ellpment Companyഀ
Awe, Coloradoഀ
SCALE 3/a'=r-0"ഀ
,ഀ
uanwN Gv Cuiഀ
rഀ
ASI A-001ഀ
REi PLAN FORഀ
SLAB REINFORCINGഀ
zഀ
REi PLAN Qഀ
Jഀ
aഀ
45ഀ
e sഀ
edഀ
oഀ
W Q 44o.ഀ
IyJ dഀ
aഀ
'-2Xb KEYWAYഀ
BEAM REINFORCINGഀ
EXTEND REINFORCING OMITTED FOR CLARITYഀ
THRU JOINT (OR PROVIDEഀ
FULL TENSION MECHANICALഀ
SPLICE)ഀ
SECT f Oil 1eഀ
3/4" = I'-0"ഀ
Aഀ
hiഀ
f Rഀ
Vans Front Doorഀ
rcഀ
tect oഀ
ecordഀ
DRAINING No: SSK A-032ഀ
2ഀ
0ഀ
Building Aഀ
4ഀ
4ഀ
Owner / Developerഀ
REFERENCE:ഀ
ISSUE: ASIഀ
ASI A-001aഀ
Vail Resortsഀ
DATE: 09/ 1 1 /06ഀ
Denver, Coloradoഀ
Development Companyഀ
SCALE: 3/4"=1'-0"ഀ
Avon, Coloradoഀ
DRAWN BY: CLHഀ