Loading...
HomeMy WebLinkAboutB06-0020 Plans Rev. #1. .°.•.r„ f I w..� �`^' -.,,.y .`r � ... °s. � . � - q'K.,'t'"�4 �''s ro �ti. , � ,.� w "�� s }. -. � ; . � � r ��." . 4M "ING I T I A D R KIN N A Y u J L bYe .7 E L ADE) v North fli xr s 91 mm%mmemm=06���� i t ; t I 1 40' 80 160 v 0 1, " y R( Cot Asse-m- bly ��.��1IIYJ 6 VAIL S FR 111_ '� /A11 COLORADO A VON, VAIL RESORTS DEVELOPMENT COMPANY COLO VO LUME SITE S105 Mid Level Garage Plan - West (8169' -0 " ) DWG. DRAWING TITLE Date No. GENERAL G001 Index of Drawings 05115 04 G002 Index of Drawings 05115106 04 G003 Index of Drawings 05115 04 G004 Index of Drawings 051 15106 04 G005 General Information 01/10/06 01 6010 Architectural Reference Site Plan 01/10/06 01 G011 Site Grid Reference Plan 01/10/06 01 SURVEY 5001 Existing Conditions 01/10/06 01 CIVIL C01.0 Civil Cover Sheet 05115106 04 Proposed Easemenls - Access & Hardscape 05115106 04 Proposed Easemenls - haler, Sanr`lary & Drainage 05115106 04 Proposed Easements - Shallow Ulilily 05115106 04 CO2.0 Property Line & Easement Plan 01/10/06 01 CO3.0 Existing Conditions Plan 01/10/06 01 C04.0 Bedrock and Bore Hole Location Plan 01/10/06 01 CO5.0 Roadways Layout and Geometries Plan 04/03/06 03 C06.A Erosion & Sediment Control Plan 1 04/03/06 03 C06.13 Erosion & Sediment Control Plan 04/03/06 03 C06.0 Erosion & Sediment Control Plan 2 04/03/06 03 C07.0 Site Demolition Plan 04/03/06 03 C08.0 Garage Roof Drain Plan ( +HORIZ. SUBDRAINS) 04/03/06 03 C09.0 Overall Grading Plan 04/03/06 03 C10.A North Grading Plan 05115106 04 C10.B North Grading Plan 04/03 /06 03 C O.0 North Grading Plan 04/03/06 03 C1 O.D North Grading Plan 04/03 /06 03 C1 1.A Center Grading Plan 04/03 /06 03 C1 1.13 Center Grading Plan 04/03/06 03 C1 1.0 Center Grading Plan 04/03/06 03 C 2.A South Grading Plan 04/03/06 03 C1 2.13 South Grading Plan 04/03 /06 03 C12.0 South Grading Plan 04/03/06 03 C13.A Storm Sewer Plan and Profiles (East) 05115106 04 C13.B Storm Sewer Plan and Profiles (East) 05115106 04 C14.A Storm Sewer Plan and Profiles (West) 05115106 04 C14.B Chalets Storm Drain Plan 05115106 04 C1 4.0 Storm Sewer Ownership Plan 04/03/06 03 6'14 D Storm Sewer Ownership Plan 05115106 04 C15.0 Grading and Drainage Details 05115106 04 C16.0 Grading and Drainage Details 05115106 04 C17.0 Sanitary Sewer 04/03/06 03 C18.0 Sanitary Sewer Profiles 04/03/06 03 C1 9.A ERW & SD 12" Upgrade Plan & Profile 04/03/06 03 C1 9.0 Water 04/03/06 03 C20.0 Water Plan and Profiles 04/03/06 03 C21.0 Fire Hydrant and FDC Location Plan 04/03/06 03 C22.0 Fire Truck Access Plan 04/03/06 03 023.0 Snowmaking Plan 04/03/06 03 C24.0 Holy Cross Electric Plan 04/03/06 03 C25.0 Gas and CAN Plan 04/03/06 03 C26.0 Qwest Telephone Plan 04/03/06 03 C27.0 VA Phone and Race Phone Plan 04/03/06 03 C28.0 Water and Sewer Details 04/03/06 03 C29.0 Shallow Utility Details 04/03/06 03 030.0 Storm Sewer Details 04/03/06 03 C31.0 Storm Sewer Details 05115106 04 C32.0 Tunnel /Mtn. Road Plan and Profile 04/03/06 03 C33.0 Forest and Vail Road Plan and Profile 04/03/06 03 034.0 Residence Driveway Plan and Profile 04/03/06 03 C35.0 Checkpoint Charlie Utilities & Drainage Plan 051151'06 04 C36.0 Site Hardscape Plan 05115106 04 C37.0 Site Signage Plan 04/03/06 03 C38.0 Site Distance Plan 04/03/06 03 C39.0 Loading Dock Grades & Profile 04/03/06 03 C40.A Loading Dock Grades & Profile 04/03 /06 03 C40.13 Loading Dock Grades & Profile 04/03/06 03 C41.0 Snow Storage Area Plan 04/03/06 03 DEWATERING. DW100 Dewatering Plan 04/03/06 03 DW101 Dewatering Details 04/03/06 03 STRUCTURAL FILL SF100 EPS Limits 05115105 04 SF101 EPS Total Depth 01/10/06 01 SF102 EPS Layer 1 01/10/06 01 SF103 EPS Layer 1 01/10/06 01 SF104 EPS Layer 2 01/10/06 01 SF105 EPS Layer 2 01/10/06 01 SF106 EPS Layer 3 01/10/06 01 SF107 EPS Layer 4 01/10/06 01 SF108 EPS Layer 5 01/10/06 01 SF109 EPS Layer 6 01/10/06 01 SF1 10 EPS Layer 7 01/10/06 01 V OLUME cont. SITE S105 Mid Level Garage Plan - West (8169' -0 " ) DWG. DRAWING TITLE Date No. STRUCTURAL FILL SF11 1 EPS Layer 8 01/10/06 01 SF112 EPS Layer 9 01/10/06 01 SF113 EPS Layer 10 01/10/06 01 SF114 EPS Layer 11 01/10/06 01 SF115 EPS Layer 12 01/10/06 01 SF116 EPS Layer 13 01/10/06 01 LANDSCAPE Chalets at the Lodge at Vail 01 GO1 1 Site Grid Reference Plan L101 General Notes and Finish Schedule 04/03 /06 03 L102 Site Layout, Lighting and Material Plan 04/03/06 03 L103 Planting Plan 01/10/06 01 L104 Irrigation Plan 04/03/06 03 L105 Not Used 01/20/06 02 L106 Site Details 04/03/06 03 L107 Site Details 04/03/06 03 Vail Ski Club 01 0032 Exiting Plan - Upper Level L201 General Notes and Finish Schedule 04/03/06 03 L202 Site Layout, Lighting and Material Plan 04/03/06 03 L203 Planting Plan 01/10/06 01 L204 irrigation Plan 04/03/06 03 L205 Not Used 01/20/06 02 L206 Site Details 04/03/06 03 L207 Site Details 04/03/06 03 L208 Site Details 05115106 04 L209 Site Details 01/20/06 02 Skier Services /Vista Bahn Park 04 G057 Accessibllily Delalls L301 General Notes and Finish Schedule 01/10/06 01 L302 Site Layout, Lighting and Material Plan 04/03/06 03 L303 Planting Plan 01/10/06 01 L304 Irrigation Plan 04/03/06 03 L305 Not Used 01/20/06 02 L306 Site Details 01/20/06 02 L307 Site Details 05115106 04 L308 Site Details 05115106 04 Landscape Details 03 A104a Mid Level Garage Plan - North (Alternate Bid) L401 Landscape Demolition Plan 01/10/06 01 L402 Planting List, Notes and Details 01/10/06 01 L403 Irrigation Details 01/10/06 01 L404 Gore Valley Trail Signage Plan 04/03/06 03 WATERSCAPE WT Cover Sheet 04/03/06 03 W0.0 Overall Area Plan 04/03/06 03 W0.1 Structural Depression Drain Plan 04/03 /06 03 W1.0 Vail Ski Club Main Pool Piping Plan 04/03/06 03 W1.1 Spa #1 Piping Plan 04/03/06 03 W1.2 Spa #2 Piping Plan 04/03/06 03 W1.3 Skier Services Water Feature Piping Plan 04/03/06 03 W1.4 Health Club Men's Spa Piping Plan 04/03/06 03 W1.5 Health Club Women's Spa Piping Plan 04/03/06 03 W1.6 Health Club Foundation Piping Plan 04/03/06 03 W2.0 Health / Vail Ski Club Equipment Room 04/03/06 03 W2.1 Skier Services Equipment Room 04/03 /06 03 W3.0 Equipment Sections 01/10/06 01 W3.1 Equipment Sections 04/03/06 03 W3.2 Equipment Sections 04/03/06 03 W3.3 Equipment Sections 01/10/06 01 W3.4 Equipment Sections 01/10/06 01 W3.5 Equipment Sections 04/03/06 03 W3.6 Equipment Sections 01/10/06 01 W4.0 Pool and Spa Sections 04/03/06 03 W4.1 Pool and Spa Sections 04/03/06 03 W4.2' Pool and Spa Sections 04/03/06 03 W4.3 Pool and Spa Sections 04/03/06 03 W4.4 Pool and Spa Sections 01/10/06 01 W4.5 Pool and Spa Sections 04/03/06 03 W4.6 Pool and Spa Sections 04/03/06 03 W4.7 Pool and Spa Sections 01/10/06 01 W4.8 Pool and Spa Sections 04/03/06 03 W4.9 Pool and Spa Sections 04/03/06 03 W5.0 Water Feature Sections 04/03 /06 03 W5.1 Water Feature Sections 04/03/06 03 W6.0 Water Feature Electrical Drawings 01/10/06 01 W6.1 Water Feature Electrical Drawings 01/10/06 01 W6.2 Water Feature Electrical Drawings 01/10/06 01 W6.3 Water Feature Electrical Drawings 01/10/06 01 W6.4 Water Feature Electrical Drawings 04/03/06 03 FIRE ALARM / FIRE PROTECTION FDA 1 Fire Department Access and Fire Protection Plan 04/03/06 03 04 VOLUME 1I BUILDING A- PARKING- GARAGE & LOADING DOCK S105 Mid Level Garage Plan - West (8169' -0 " ) DWG, DRAWING TITLE Date No. ARCHITECTURAL G001 Index of Drawings 051 04 G002 Index of Drawings 05115106 04 G003 Index of Drawings 05115106 04 G004 Index of Drawings 05115106 04 G005 General Information 01/10/06 01 G006 Code Analysis & Summary 04/03/06 03 G010 Architectural Reference Site Plan 01/10/06 01 GO1 1 Site Grid Reference Plan 01/10/06 01 G015 Code Summary - Lower Level 05115106 04 G016 Code Summary - Lower -Mid Level 05115106 04 G017 Code Summary - Upper -Mid Level 05115106 04 G018 Code Summary - Grade Level 05115106 04 G019 Code Summary - Upper Level 05115106 04 G030 Exiting Plan - Lower Level 04/03/06 03 G031 Exiting Plan - Mid Level 01/10/06 01 0032 Exiting Plan - Upper Level 01/10/06 01 G033 Exiting Plan - Grade Level 01/10/06 01 G034 Exiting Plan - Grade Level 01/10/06 01 G050 Accessibllily Plan - Z o wer Z e vel 05115106 04 G051 Accessibllily Plan - Lower -Yld Zevel 05115106 04 G052 Accessibllily Plan - Upper -titid Z e vel 05115106 04 G053 Accessr"blIlly Plan - Grade Z e vel 05115106 04 G054 Accessibility Plan - Upper Level 05115106 04 G055 Accessible Guesl Rooms 05115106 04 G056 Accessibllily Delar'ls 05115106 04 G057 Accessibllily Delalls 05115106 04 D101 Demolition Plans - Lodge South Condominium 04/03/06 03 D102 Demolition Refelected Ceiling Plans - Lodge South Condominium 04/03/06 03 D103 Demolition Photos & Notes - Lodge South Condominium 04/03/06 03 Al 00 Key Plans 01/10/06 01 A101 Lower Level Garage Plan - East 05115106 04 Al 02 Lower Level Garage Plan - West 04/03/06 03 Al 03 Lower Level Garage Plan - South 04/03/06 03 Al 04 Mid Level Garage Plan - North (Base Bid) 04/03/06 03 A104a Mid Level Garage Plan - North (Alternate Bid) 04/03/06 03 Al 05 Mid Level Garage Plan - South 04/03 /06 03 A106 Upper Level Garage Plan 05115106 04 Al 07 Garage Lid Plan 04/03/06 03 A200 Building Elevations & Enlarged Plans (NW Tunnel) 04/03/06 03 A201 Building Elevations & Enlarged Plans (Gallery "Bridge ") 04/03/06 03 A202 Southeast Tower Slab 04/03/06 03 A203 Southeast Tower Slab 04/03/06 03 A210 Building Sections 01/10/06 01 A21 1 Building Sections 01/10/06 01 A212 Building Sections 01/10/06 01 A401 Interior Elevations - Loading Dock 01/10/06 01 A500 Details 01/10/06 01 A501 Details 01/10/06 01 A550 Firestopping Details 01/10/06 01 A551 Firestopping Details 01/10/06 01 A552 Firestopping Details 01/10/06 01 A560 Waterproofing Details 01/10/06 01 A561 Waterproofing Details 01/10/06 01 A600 Wall Types 05115106 04 A601 Wall Types 05115106 04 A602 Floor, Roof & Ceiling Types 04/03/06 03 A610 Door Types & Details 01/10/06 01 A700 Enlarged Plans 04/03/06 03 A701 Enlarged Plans 04/03/06 03 A702 Stair Sections & Details 01/10/06 01 A901 Lower Level Garage Reflected Ceiling Plan - East 01/10/06 01 A902 Lower Level Garage Reflected Ceiling Plan - West 01/10/06 01 A903 Lower Level Garage Reflected Ceiling Plan - South 04/03/06 03 A904 Mid Level Garage Reflected Ceiling Plan - North 01/10/06 01 A905 Mid Level Garage Reflected Ceiling Plan - South 01/10/06 01 A906 Upper Level Garage Reflected Ceiling Plan 04/03/06 03 STRUCTURAL 5001 General Notes and Schedules 05115106 04 5002 Sections and Schedules 05115106 04 5003 Sections and Schedules 05115106 04 S004 Foundation Sections 04/03/06 03 S005 Sections 05115106 04 5101 Partial Foundation Plan - East (8153' -0 ") 05115106 04 5101.5 Partial Foundation Plan - East (8153' -0 ") 04/03/06 03 S102 Partial Foundation Plan - West (8153 -0 ") 04/03 /06 03 5103 Partial Foundation Plan - South (8153' -0 ") 04/03/06 03 S104 Spa Level / Partial Lid Plan - East (8169' -0 ") 05115106 04 i ffi DWG. DRAWING TITLE Date No. STRUCTURAL S105 Mid Level Garage Plan - West (8169' -0 " ) 04/03/06 03 S106 Upper Level Garage Plan - South 04/03 /06 03 S107 Ski Club Lower Level / Partial Lid Plan - East 05115106 04 S108 Partial Lid Plan - East 05115106 04 S109 Partial Lid Plan - West 05115106 04 5110 Partial Lid Plan - South 05115106 04 5201 Wall Beams 05115106 04 S202 Wall Beams 05115106 04 5203 Wall Beams 04/03/06 03 S301 Sections 05115106 04 S302 Sections 05115106 04 S303 Sections 04/03/06 03 MECHANICAL Partial Lower Garage Plan - East P102 M001 Mechanical Notes, Legend and Schedules 04/03/06 03 M101 Lower Level Garage Plan - East 04/03/06 03 M102 Lower Level Garage Plan - West 01/10/06 01 M103 Lower Level Garage Plan - South 01/10/06 01 M104 Mid Level Garage Plan - North 01/10/06 01 M104.A Mid Level Garage Plan - North (Alternate) 01/10/06 01 M105 Mid Level Garage Plan - South 04/03/06 03 M106 Upper Level Garage Plan 03 04/03 /06 03 PLUMBING P001 Plumbing Notes and Details 04/03/06 1 03 ,0 ' 040 Plumbing Site Plan P101 Partial Lower Garage Plan - East P102 Partial Lower Garage Plan - West P103 Partial Lower Garage Plan - South P104 Mid Level Garage Plan - North P105 Mid Level Garage Plan - South P106 Upper Level Garage Plan Service P107 Roof Plan - East P201 Natural Gas Riser Diagram i i i• i► 04/03/06 03 01/10/06 01 01/10/06 01 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06103 i ELECTRICAL E001 Electrical Legend and Schedules E002 Electrical One -Line Diagram E003 Electrical Panelboard Schedules E004 Electrical Panelboard Schedules E101 Lower Level Garage Plan - East E102 Lower Level Garage Plan - West E103 Lower Level Garage Plan - South E104 Mid Level Garage Plan - North E105 Mid Level Garage Plan - South El 06 Upper Level Garage Plan Service E201 Enlarged Lower Level Garage Plan i i i. llm 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06103 FOOD SERVICE FS1.1 Food Service Equipment Plan & Schedule FS1.2 Food Service Building Conditions & Ventilation Plan FS1.3 Food Service Plumbing Rough -In Plan FS1.4 Food Service Electrical Rough -In Plan FS6.1 Food Service Equipment Coldzone Detail FS7.1 Food Service Equipment Standard Details i i• IIE 04/03/06 03 04/03/06 03 01/10/06 01 04/03/06103 i i i• ! LAUNDRY LD1.1 Laundry Equipment Plan .& Schedule LD1.2 Laundry Building Conditions & Ventilation Plan LD1.3 Laundry Plumbing Rough -In Plan LD1.4 Laundry Electrical Rough -In Plan i i i• i� i i i• i i i i• i i i is i FIRE ALARM / FIRE PROTECTION C n0P FA100 Fire Alarm System o D ° 04/03/06 03 FA101 Lower Level Garage Fire Alarm Plan - East 04/03 /06 03 FA102 Lower Level Garage Fire Alarm Plan - West H� 04/03/06 03 FA103 Lower Level Garage Fire Alarm Plan - South VAIL RESORTS 04/03/06 03 FA104 Lower Level Garage Fire Alarm Plan - North LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK 04/03/06 03 FA105 Mid Level Garage Fire Alarm Plan - South 08,25.03 04/03 /06 03 FA106 Upper Level Garage Fire Alarm Plan - 05.02.05 04/03/06 03 FP100 Fire Sprinkler System 02 01.20.06 ADDENDUM NO. 01 04/03/06 03 FP101 Lower Level Garage Fire Protection Plan - East 04/03/06 03 FP102 Lower Level Garage Fire Protection Plan - West I /06 03 FP103 Lower Level Garage Fire Protection Plan - South /06 03 FP104 Lower Level Garage Fire Protection Plan - North /06 03 FP105 Mid Level Garage Fire Protection Plan - South /06 jjq4/ 03 FP106 Upper Level Garage Fire Protection Plan /06 03 SAFEbuilt Col GDRV' CSBKK D RIVE� ) - - -� C n0P o D ° E mmllm 4 General a, H� OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJECT NO: 20693.08 ISSUE NO. ISSUE DATE ISSUE DESCRIPTION - 08,25.03 DD PRICING - 09.15.03 FINAL DD - 10.31.03 FINAL DD SUPT - 05.02.05 VE FINAL DD 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 03 04.03.46 E:' DEPT RESP FINAL 04 45.15.06 BM DEPTDEPT R ESP FINAL GDRV' CSBKK D RIVE� ) - - -� C n0P o D ° General VO I II BUILDING- D -SPA & GUESTROOM SUITE ADDITION DWG. DRAWING TITLE Date No.. ARCHITECTURAL. G001 Index of Drawings 05/15/06 04 G002 Index of Drawings 08122106 6002 G003 Index of Drawings 05/15/06 04 G004 Index of Drawings 05/15/06 04 6005 General Information 01/10/06 01 G006 Code Analysis & Summary 04/03/06 03 G010 Architectural Reference Site Plan 01/10/06 01 G01 1 Site Grid Reference Pan 01/10/06 01 G015 Code Summary — Lower Level 05/15/06 04 G016 Code Summary — Lower —Mid Level 05/15/06 04 G017 Code Summary — Upper —Mid Level 05/15/06 04 G018 Code Summary — Grade Level 05/15/06 04 G019 Code Summary — Upper Level 05/15/06 04 G030 Exiting Plan — Lower Level 04/03/06 03 G031 Exiting Plan — Mid Level 01/10/06 01 G032 Exiting Plan — Upper Level 01/10/06 01 G033 Exiting Plan — Grade Level 01/10/06 01 G034 Exiting Plan — Grade Level 01/10/06 01 G050 Accessibility Pan — Lower Level 05/15/06 04 6051 Accessibility Plan — Lower —Mid Level 05/15/06 04 G052 Accessibility Plan — Upper —Mid Level 05/15/06 04 G053 Accessibility Plan — Grade Level 05/15/06 04 G054 Accessibility Plan — Upper Level 05/15/06 04 G055 Accessible Guest Rooms 05/15/06 04 G056 Accessibility Details 05/15/06 04 G057 Accessibility Details 05/15/06 04 D101 Demolition Plans — Lodge at Vail 04/03/06 03 D102 Demolition Plans — Lodge at Vail 04/03/06 03 D150 Demolition Plans Cucina Kllchen - Level 2 08/09106 8002 A101 Spa Floor Plan — Level 1 05/15/06 04 A102 Spa /Guestroom Suites Floor Plans — Levels 2 & 3 05/15/06 04 A103 Guestroom Suites Roof Plan 04/03/06 03 A200 Spa / Guestroom Suites Building Elevations 08122106 6002 A201 Spa / Guestroom Suites Building Elevations 09122106 8002 A220 Spa / Guestroom Suites Building Sections 01/10/06 01 A221 Spa j Guestroom Suites Building Sections 01/10/06 01 A222 Spa j Guestroom Suites Building Sections 01/10/06 01 A223 Spa / Guestroom Suites Building Sections 01/10/06 01 A301 Spa Enlarged Partial Floor Plan — South — Level 1 04/03/06 03 A302 Spa Enlarged Partial Floor Plan — Level 1 04/03/06 03 A303 Spa Enlarged Partial Floor Plan — North — Level 1 04/03/06 03 A304 Spa / Guestroom Suites Enlarged Floor Pan — Level 2 05/15/06 04 A305 Spa j Guestroom Suites Enlarged Floor Plan — Level 3 05/15/06 04 A350 Enlarged Plans Cucina Kitchen - Level 2 08109106 8002 A400 Spa / Guestroom Suites Wall Sections 04/03/06 03 A401 Spa / Guestroom Suites Wall Sections 01/10/06 01 A402 Spa / Guestroom Suites Wall Sections 01/10/06 01 A403 Spa / Guestroom Suites Wail Sections 01/10/06 01 A404 Spa / Guestroom Suites Wall Sections 04/03/06 03 A405 Spa / Guestroom Suites Wall Sections 01/10/06 01 A406 Spa / Guestroom Suites Wall Sections 01/10/06 01 A500 Gallery Plans, Sections and Elevations 04/03/06 03 A501 Spa / Guestroom Suites Roof Details 04/03/06 03 A502 Spa / Guestroom Suites Section Details 01/10/06 01 A503 Spa / Guestroom Suites Section Details 01/10/06 01 A504 Spa / Guestroom Suites Section Details 01/10/06 01 A505 Spa / Guestroom Suites Section Details 01/10/06 01 A506 Spa / Guestroom Suites Section Details 04/03/06 03 A507 Spa / Guestroom Suites Section Details 04/03/06 03 A508 Spa / Guestroom Miscellaneous Details 01/10/06 01 A511 Enlarged Plan Details 04/03/06 03 A530 Balcony Details at Level 8195' 01/10/06 01 A531 Exhaust 517afl at Cucin Kitchen Details 08122106 6002 A550 Firestopping Details 01/10/06 01 A551 Firestopping Details 01/10/06 01 A552 Firestopping Details 01/10/06 01 A560 Waterproofing Details 01/10/06 01 A561 Waterproofing Details 01/10/06 01 A600 Wall Types 08109106 8002 A601 Wall Types 05/15/06 04 A602 Floor, Roof & Ceiling Types 04/03 /06 03 A610 Window & Door Schedule & Elevations 04/03/06 03 A611 Spa /Guestroom Suites Window Details 01/10/06 01 A612 Spa /Guestroom Suites Window Details 01/10/06 01 A613 Spa /Guestroom Suites Window Details 01/10/06 01 A614 Spa /Guestroom Suites Door Details 01/10/06 01 A700 Stair Plans & Sections 05/15/06 04 A701 Stair Plans & Sections 04/03/06 03 A710 Guestroom Suites Stair Plans & Sections 04/03/06 03 A720 Exterior Stair Plan & Section 04/03/06 03 A750 Elevator Plans & Sections 04/03/06 03 A901 Spa Enlarged Partial Reflected Ceiling Plan — North — Level 1 04/03/06 03 A902 Spa Enlarged Partial Reflected Ceiling Plan - South — Level 1 04/03/06 03 A903 Spa /Guestroom Enlarged Reflected Ceiling Plan — Level 2 04/03/06 03 A904 Guestroom Enlarged Reflected Ceiling Plan — Level 3 04/03/06 03 A950 Enlarged Reflected Ceiling Plan Cucr"na Kitchen - Level 2 08109106 6002 VOLUME II co n t . BUILDING D -SPA & GUE TROOM SUITE ADDITION DWG. _ DRAWING TITLE Date No. INTERIOR DESIGN CO ID101 Spa Enlarged Partial Finish Plan — North — Level 1 01/10/06 01 ID102 Spa Enlarged Partial Finish Plan — South — Level 1 01/10/06 01 ID103 Spa \Guestroom Suites Enlarged Finish Plan — Level 2 01/10/06 01 ID 104 Not Used 01/20/06 02 ID105 Guestroom Floor Finish Plans 04/03/06 03 ID106 Guestroom Enlarged Floor Plans 04/03/06 03 ID200 Spa Foyer Interior Elevations 04/03/06 03 ID201 Spa Corridor Interior Elevations 04/03/06 03 ID202 Spa Lobby Interior Elevations and Sections 04/03 /06 03 ID203 Spa Lightbox, Cove, Molding and Soffit Details 04/03/06 03 ID204 Spa Water Feature Details 01/10/06 01 ID205 Spa Treatment, Wet, and Facial Room Interior Elevations 04/03/06 03 ID206 Spa Couple's Treatment Room and Corridor Interior Elevations 04/03/06 03 ID207 Spa Community and Women's Lounge Interior Elevations 04/03/06 03 ID208 Spa Men's and Women's Locker Room interior Elevations 04/03/06 03 ID209 Spa Men's and Women's Locker Room Interior Elevations 04/03/06 03 ID210 Spa Steam and Spa Room Interior Elevations 04/03/06 03 ID211 Spa Movement Studio Interior Elevations 04/03/06 03 ID212 Spa Fitness Interior Elevations 04/03/06 03 ID213 Spa Fitness Vestibule, Foyer, Bathroom Interior Elevations 04/03 /06 03 ID214 Spa Back of House Interior Elevations 04/03/06 03 ID215 Lodge Back of House Interior Elevations 04/03/06 03 ID216 Additional Interior Details 04/03/06 03 ID220 Guestroom Interior Elevations 04/03/06 03 ID221 Guestroom interior Elevations 04/03/06 03 ID222 Guestroom interior Sections & Details 01/20/06 02 ID223 Not Used 01/20/06 02 iD224 Not Used 01/20/06 02 ID900 Spa Enlarged Partial Furniture Plan — North — Level 1 01/10/06 01 ID901 Spa Enlarged Partial Furniture Plan — South — Level 1 04/03/06 03 ID902 Spa Fitness Enlarged Furniture Plan — Level 2 01/10/06 01 ID903 Guestroom Furniture Plans 01/20/06 02 STRUCTURAL S001 Foundation Sections and General Notes 05/15/06 04 5002 . Floor Framing Sections 04/03/06 03 S003 Roof Framing Sections 05/15/06 04 5101 Foundation Plan — Level 8169' -0" 04/03/06 03 5102 Level 2 and Level 3 Framing Plans 04/03/06 03 S103 Roof Framing Plans — 8195' -0" 04/03/06 03 S104 Upper Level Framing Plans — 8205' -0" 04/03/06 03 5350 Enlarged Plans Cucina Kitchen 08122106 8002 5701 Stair Plans and Sections 04/03/06 03 MECHANICAL DM101 P Mechanical Temporary Services Plan 04/03/06 03 DY150 Mechanical Demolition Kitchen Plan - Level 2 08109106 8002 M001 Mechanical Notes, Legend and Schedules 01/10/06 01 M002 Mechanical Schedules 04/03/06 03 M003 Mechanical Schedules 05/15/06 04 M010 Mechanical Schematics 01/10/06 01 M030 Mechanical Details 01/10/06 01 M031 Mechanical Details 01/10/06 01 M040 Mechanical Snowmelt System 04/03/06 03 M041 Mechanical Snowmelt Details 01/10/06 01 M101 Mechanical Level One Floor Plan 05/15/06 04 M101 P Mechanical Level One Piping Plan 05/15/06 04 M102 Mechanical Levels 2 & 3 Floor Plans 04/03/06 03 M102P Mechanicla Levels 2 & 3 Piping Plans 04/03/06 03 M103 Mechanical Partial Lower Garage Plan 04/03/06 03 M104 Mechanical Partial Site Plan 01/10/06 01 M150 Mechanical Kitchen Plan - Level 2 08109106 8002 M151 Mechanical Kitchen Schedules and Notes 08109106 8002 03 VOLUME 1 cont. BUILDING D -SPA & GUESTROOM SUITE ADDITION DWG. _ DRAWING TITLE Date No. PLUMBING P001 Plumbing Legend and Fixtures 04/03/06 03 P002 Plumbing Details 01/10/06 01 DP 01 Plumbing Demolition Plan — Lodge Level 01/10/06 01 DP102 Plumbing Demolition Plan — Upper Level 01/10/06 01 DP150 Plumbing Demolition Kitchen Plan - Level 2 08109106 8002 P101 Plumbing Level One Floor Pans 01/10/06 01 P102 Plumbing Levels 2 & 3 Floor Plans 04/03/06 03 P103 Plumbing Partial Lower Garage Plan 04/03/06 03 P104 Plumbing Roof Plan 04/03/06 03 P150 Plumbing Kitchen Plan - Level 2 08/09106 8002 P151 Plumbing Kitchen Schedules, Legend, Notes P201 Plumbing Enlarged Plans 04/03/06 03 P202 Plumbing Enlarged Plans 04/03/06 03 P203 Plumbing Enlarged Plans 01/10/06 01 P301 Natural Gas Riser Diagram 01/10/06 01 ELECTRICAL DE101 Electrical Demolition Level 1 Plan 04/03/06 03 DE102 Electrical Demolition Level 2 Plan 01/10/06 01 DE150 Electrical Demolilion Kitchen Plant - Level 2 08109106 8002 E001 Electrical Notes and Schedules 05/15/06 04 E002 Electrical One —Line Diagram and Legend 04/03/06 03 E003 Electrical Panel Schedules & Tele. Risers 04/03/06 03 E004 Electrical Panel Schedules 05/15/06 04 E040 Electrical Site Lighting Plan 01/10/06 01 E101 Electrical Level 1 Power Plan 05/15/06 04 E102 Electrical Levels 2 & 3 Power Plans 04/03/06 03 E103 Electrical Roof Power Plan 04/03/06 03 1 ClecIrical Kitchen Power Plan - Level 2 08109106 8002 1-151 Electrical Kitchen Lighlr'ng Plan - Level 2 08109106 8002 1-152 Electrical Kitchen One -&6 and Schedules 08109106 8002 1-153 Electrical Kltchen Schedules and Legend 08109106 8002 E201 Electrical Level 1 Lighting Plan 05/15/06 04 E202 Electrical Levels 2 & 3 Lighting Plans 04/03/06 03 E301 Lighting Details and Enlarged Plan 01/10/06 01 FOOD SERVICE FS3.1 Foodservice Equipment Pan and Schedule 01/10/06 01 FS3.2 Foodservice Equipment Building Condition & Ventilation Plan 01/10/06 01 FS3.3 Foodservice Equipment Plumbing Rough —In Plan 01/10/06 01 FS3.4 Foodservice Equipment Electrical Rough —In Plan 01/10/06 01 FS5.1 Foodservice Equipment Plan and Schedule 04/03/06 03 FS7.1 Food Service Equipment Standard Details 01/10/06 01 F58.1 Food Service Kitchen Equipment Layout and Schedule 08109106 6002 F58,2 Food Service Kitchen Plumbing Rough -In Plan and Schedule 08109106 8002 F58.3 Food Service Kitchen Electrical Rough -in Plan and Schedule 08109106 8002 F58, 4 Food Service Kitchen Building Conditions Plan and Schedule 08109106 8002 F58, 5 Food Service Kitchen irentilatlon Plan and Schedule 08109106 8002 LAUNDRY LD2.1 Laundry Equipment Plan and Schedule 01/10/06 01 LD2.2 Laundry Building Condition & Ventilation Plan 01/10/06 01 LD2.3 Laundry Plumbing Rough —In Pan 01/10/06 01 LD2.4 Laundry Electrical Rough —In Plan 01/10/06 01 VERTICAL TRANSPORTATION VT101 General Elevator Information 01/10/06 01 VT102 Pit, Hoistway, Machine Room Pans and Hoistway Section — Elevator 2 01/10/06 01 VT103 Pit, Hoistway, Machine Room Plans and Hoistway Section — Elevator 6 01/10/06 01 FIRE ALARM / FIRE PROTECTION FA100 Fire Alarm System 04/03/06 03 FA101 Spa Fire Alarm Plan — Level 1 04/03/06 03 FA102 Spa /Guestroom Suites Fire Alarm Plans — Levels 2 & 3 04/03/06 03 FA 150 Kitchen Fire Alarm Plans - Level 2 08109106 6002 FP 00 Fire Sprinkler System 04/03/06 03 FP101 Spa Fire Protection Plan — Level 1 — North 04/03/06 03 FP102 Spa Fire Protection Plan — Level 1 - South 04/03/06 03 FP103 Spa Fitness Fire Protection Pan — Level 2 04/03/06 03 FP150 Kitchen Fire Protection Plans - Level 2 08109106 8002 I N WO SA TA N� 4 , r� E mom,74 - OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ADS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJECT NO: 20693.08 ISSUE NO. ISSUE DATE ISSUE DESCRIPTION - 08.25,03 DD PRICING - 09,15.03 FINAL DD 10.31.03 FINAL DD SUPT 05.02.05 VE FINAL DD 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 03 04.03.06 'M DEPT R'S' FINAL COt+1Si. 04 05.15.06 BLDG DEPT RESP FINAL 01119. - 08.09.06 - - 08,22.06 ASI B -002.1 I N WO SA TA N� 4 , r� VOLUME IV 13 UILDING C VAIL SKI CLUB 5001 General Notes and Sections DWG. DRAWING TITLE Date No. ARCHITECTURAL. GOO Index of Drawings 05/15/06 04 G002 Index of Drawings 05/15/06 04 G003 Index of Drawings 09106106 x'002 G004 index of Drawings 05/15/06 04 G005 General Information 01/10/06 01 G006 Code Analysis & Summary 04/03/06 03 G010 Architectural Reference Site Plan 01/10/06 01 G01 1 Site Grid Reference Plan 01/10/06 01 G015 Code Summary — Lower Level 05/15/06 04 G016 Code Summary — Lower —Mid Level 05/15/06 04 G017 Code Summary — Upper —Mid Level 05/15/06 04 G018 Code Summary — Grade Level 05/15/06 04 G019 Code Summary — Upper Level 05/15/06 04 G030 Exiting Plan — Lower Level 04/03/06 03 G031 Exiting Plan — Mid Level 01/10/06 01 G032 Exiting Plan — Upper Level 01/10/06 01 6033 Exiting Plan — Grade Level 01/10/06 01 G034 Exiting Plan — Grade Level 01/10/06 01 G050 Accessibility Plan — Lower Level 05/15/06 04 G051 Accessibility Plan — Lower —Mid Level 05/15/06 04 G052 Accessibility Plan — Upper —Mid Level 05/15/06 04 0053 Accessibility Plan — Grade Level 05/15/06 04 G054 Accessibility Plan — Upper Level 05/15/06 04 G,055 Accessible Guest Rooms 05/15/06 04 G056 Accessibility Details 05/15/06 04 G057 Accessibility Details 05/15/06 04 A101 Ski Club Floor Plan — Lower Level 04/03/06 03 A102 Ski Club Floor Plan — Mid Level 04/03/06 03 A103 Ski Club Floor Plan — Ground Level 04/03/06 03 A104 Ski Club Roof Plan 04/03/06 03 A200 Ski Club Building Elevations 04/03/06 03 A201 Ski Club Building Elevations 04/03 /06 03 A210 Ski Club Building Sections 09106106 x'002 A211 Ski Club Building Sections 09106106 0002 A212 Ski Club Building Sections 09105106 x'002 A213 Ski Club Building Sections 09106106 0002 A214 Ski Club Building Sections 09106106 0'002 A215 Ski Club Building Sections 09106106 x'002 A216 Ski Club Building Sections 09106106 x'002 A217 Ski Club Building Sections 09106106 0002 A300 Ski Club Enlarged Toilet Plans 04/03/06 03 A500 Ski Club Details 04/03/06 03 A501 Ski Club Details 09106106 x`002 A502 Ski Club Details 09106106 x'002 A503 Ski Club Truss Details 09106106 0002 A550 Firestopping Details 1/10/06 01 A551 Firestopping Details 1/10/06 01 A552 Firestopping Details 1/10/06 01 A560 Waterproofing Details 1/10/06 01 A561 Waterproofing Details 1/10/06 01 A600 Wall Types 05/15/06 04 A601 Wall Types 05/15/06 04 A602 Floor, Roof & Ceiling Types 04/03/06 03 A610 Ski Club Window Types — Elevations 04/03/06 03 A611 Ski Club Window & Louver Types — Elevations 04/03/06 03 A612 Ski Club Window Details 04/03/06 03 A613 Ski Club Window Details 04/03/06 03 A620 Ski Club Door Types 04/03/06 03 A621 Ski Club Door Details 04/03/06 03 A700 Ski Club Stair Plans and Sections 09106106 x'002 A701 Ski Club Stair Plans and Sections 04/03/06 03 A800 Ski Club Fireplace — Enlarged Plan & Details 09105106 x'002 A901 Ski Club Reflected Ceiling Plan — Lower Level 04/03/06 03 A902 Ski Club Reflected Ceiling Plan — Mid Level 04/03/06 03 A903 Ski Club Reflected Ceiling Plan — Ground Level 04/03 /06 03 INTERIOR DESIGN ID101 Upper Level Floor Finish Plan 04/03/06 03 ID102 Lower Level Floor Finish Plan 04/03/06 03 ID103 Upper Level Furniture Plan 1/20/06 02 ID104 Lower Level Furniture Plan 04/03/06 03 ID105 Enlarged Floor Plans 04/03/06 03 ID106 Enlarged Floor Plans 04/03 /06 03 iD200 Interior Elevations 04/03/06 03 ID201 Interior Elevations 04/03/06 03 ID202 Interior Elevations 04/03/06 03 ID203 Interior Elevations 04/03/06 03 ID204 Interior Elevations 1/20/06 02 ID300 Details & Sections 1/20/06 02 ID301 Details & Sections 04/03/06 03 ID302 Details & Sections 04/03/06 03 VOLUME IV coast. � BUDDING C - VAIL SKI CLUB DWG. DRAWING TITLE Date No. STRUCTURAL 5001 General Notes and Sections 05/15/06 04 S002 Main Level Framing Sections 05/15/06 04 5003 Roof Framing Sections 05/15/06 04 S101 Lower Level Plan — 8157' -0" 04/03 /06 03 5102 Mid Level Plan — 8177' -0" 04/03/06 03 S103 Ground Level Plan — 8188' -6" 05/15/06 04 5104 Roof Framing Plan 09106106 0002 S105 Truss Details 04/03/06 03 MECHANICAL Plumbing Level 8157' — Lower Level Plan P102 M001 Mechanical Legend and General Notes 01/10/06 01 M002 Mechanical Schedules 04/03/06 03 M030 Mechanical Details 04/03/06 03 M040 Mechanical Snowmelt System 01/10/06 01 M041 Mechanical Snowmelt Details 04/03/06 03 M101 Mechanical Level 8157' 04/03/06 03 M102 Mechanical Level 8177' 04/03/06 03 M103 Mechanical Level 81885 04/03/06 03 PLUMBING P001 Plumbing Schedules, Legends, Notes P101 Plumbing Level 8157' — Lower Level Plan P102 Plumbing Level 8177.5 — Mid Level Plan P103 Plumbing Level 8188.5' — Ground Level Plan P104 Plumbing Roof Plan P201 Waste and Vent Isometric P202 Waste and Vent Isometric P301 Natural Gas Riser Diagram I ELECTRICAL E001 Electrical Legend and Schedules E002 Electrical One —Line Diagram E003 Electrical Panel Schedules E040 Electrical Site Plan E101 Electrical Level 8157' E102 Electrical Level 8177.5' E103 EiectricalLevel 8188.5' E104 Electrical Roof Plan I FOOD SERVICE 04/03/06103 04/03/06 03 04/03/06 03 04/03/06 03 01/10/06 01 04/03/06 03 04/03/06 03 or " 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 04/03/06 03 01/10/06 01 04/03/06 03 04/03/06 03 FS2.1 Food Service Equipment Plan and Schedule ARCHITECTURAL 04/03/06 03 FS2.2 Food Service Building Conditions and Ventilation Plan Ski 04/03/06 03 FS2.3 Food Service Plumbing Rough —In Plan Club 04/03/06 03 FS2.4 Food Service Electrical Rough —In Plan Fire Alarm Plan — Ground Level 04/03 /06 03 FS7.1 Food Service Equipment Standard Details VERTICAL TRANSPORTATION VT101 General Elevator Information VT102 Pit, Hoistway, Machine Room Plans and Hoistway Section — Elevator 1 VT103 Pit, Hoistway, Machine Room Plans and Hoistway Section — Elevator 5 01/10/06101 01/10/06 01 01/10/06 01 01/10/06 01 FIRE ALARM / FIRE PROTECTION DWG. W DRAWING TITLE _ Date No. ARCHITECTURAL FA100 Fire Alarm System 04/03/06 03 FA101 Ski Club Fire Alarm Plan — Lower Level 04/03/06 03 FA102 Ski Club Fire Alarm Plan — Mid Level 04/03/06 03 FA103 Ski Club Fire Alarm Plan — Ground Level 04/03/06 03 FA104 Smoke Management Panel Detail 04/03/06 03 FA105 FA Riser Diagram 04/03/06 03 FP100 Fire Sprinkler System 04/03/06 03 FP101 Ski Cub Fire Protection Plan — Lower Level 04/03/06 03 FP102 Ski Club Fire Protection Plan — Mid Level 04/03/06 03 FP103 Ski Club Fire Protection Plan — Ground Level 04/03 /06 03 VOLUME V BUILDING D SKIER SERVICES Garage Plan — North DWG. W DRAWING TITLE _ Date No. ARCHITECTURAL G001 Index of Drawings 05/15/06 04 G002 Index of Drawings 05/15/06 04 G003 Index of Drawings 09106 x;'002 G004 Index of Drawings 05/15/06 04 G005 General Information 01/10/06 01 6006 Code Analysis & Summary 04/03/06 03 G010 Architectural Reference Site Plan 01/10/06 01 G01 1 Site Grid Reference Plan 01/10/06 01 G015 Code Summary — Lower Level 05/15/06 04 6016 Code Summary — Lower —Mid Level 05/15/06 04 G017 Code Summary — Upper —Mid Level 05/15/06 04 G018 Code Summary — Grade Level 05/15/06 04 G019 Code Summary — Upper Level 05/15/06 04 G030 Exiting Plan — Lower Level 04/03/06 03 G031 Exiting Plan — Mid Level 01/10/06 01 G032 Exiting Plan — Upper Level 01/10/06 01 G033 Exiting Plan — Grade Level 01/10/06 01 G034 Exiting Plan — Grade Level 01/10/06 01 G050 Accessibility Plan — Lower Level 05/15/06 04 G051 Accessibility Plan — Lower —Mid Level 05/15/06 04 G052 Accessibility Plan — Upper —Mid Level 05/15/06 04 6053 Accessibility Plan — Grade Level 05/15/06 04 6054 Accessibility Plan — Upper Level 05/15/06 04 G055 Accessible Guest Rooms 05/15/06 04 G056 Accessibility Details 05/15/06 04 G057 Accessibility Details 05/15/06 04 D101 Demolition Plan — One Vail Place — Lower Level 04/03/06 03 D102 Demolition Plan — One Vail Place — Lower Level 01/10/06 01 A101 Skier Services Floor Plan — Lower Level — South 05/15/06 04 A102 Skier Services Floor Plan — Lower Level — North 05/15/06 04 A103 Skier Services Floor Plan — Ground Level — South 05/15/06 04 A104 Skier Services Floor Plan — Ground Level — North 05/15/06 04 A105 Skier Services Roof Plan 04/03/06 03 A200 Skier Services Building Elevations 04/03/06 03 A201 Skier Services Building Elevations 04/03/06 03 A210 Skier Services Building Sections 08/23/06 D003 A211 Skier Services Building Sections 08/23/06 D003 A212 Skier Services Building Sections 08/23/06 D003 A213 Skier Services Building Sections 08/23/06 D003 A214 Skier Services Building Sections 08/23 /06 D003 A215 Skier Services Building Sections 08/23/06 D003 A216 Skier Services Building Sections 08/23/06 D003 A217 Skier Services Building Sections 08/23/06 D003 A300 Skier Services Enlarged Restroom Plans 08/23/06 D003 A500 Skier Services Details 04/03/06 03 A501 Skier Services Details 04/03/06 03 A502 Skier Services Details 08/23/06 D003 A503 Skier Services Details 08/23/06 D003 A504 Skier Services Details 08/23/06 D003 A550 Firestopping Details 1/10/06 01 A551 Firestopping Details 1/10/06 01 A552 Firestopping Details 1/10/06 01 A560 Waterproofing Details 1/10/06 01 A561 Waterproofing Details 1/10/06 01 A600 Wall Types 05/15/06 04 A601 Wall Types 05/15/06 04 A602 Floor, Roof & Ceiling Types 04/03/06 03 A610 Skier Services Window Types — Elevations 04/03/06 03 A611 Skier Services Window Details 04/03/06 03 A612 Skier Services Window Details 04/03/06 03 A620 Skier Services Door & Louver Types — Elevations 1/10/06 01 A621 Skier Services Door Details 04/03/06 03 A700 Skier Services Enlarged Plans — Stair Plans & Sections 08/23/06 D003 A701 Skier Services Enlarged Plans — Stair Plans & Sections 05/15/06 04 A702 Skier Services Enlarged Plans — Stair Plans & Sections 04/03/06 03 A703 Skier Services Enlarged Plans — Stair Plans & Sections 08/23/06 D003 A800 Skier Services Fireplace — Enlarged Pland & Details 08/23/06 D003 A901 Skier Services Reflected Ceiling Plan — Lower Level — South 04/03 /06 03 A902 Skier Services Reflected Ceiling Plan — Lower Level — North 04/03/06 03 A903 Skier Services Reflected Ceiling Plan — Ground Level — South 04/03 /06 03 INTERIOR DESIGN ID101 Skier Services Lower Level Finish Plan 1/20/06 02 iD102 Not Used 1/20/06 02 ID200 Not Used 1/20/06 02 ID201 Skier Services Restroom Interior Elevations 1/20/06 02 ID202 Skier Services Interior Elevations 04/03/06 03 ID203 Not Used 1/20/06 02 ID204 Not Used 1/20/06 02 ID205 Not Used 1/20/06 02 ID901 Not Used 1/20/06 02 VOLUME V, coast. � BI1ILDING D - SKIER SERVICES DWG._ DRAWING TITLE_ _ Date No. STRUCTURAL Demolition Garage Plan — North 04/03/06 M001 Mechanical Legend and Notes 04/03/06 104/03/06 S001 General Notes & Sections Schedules Fixtures 03 05/15/06 04 5002 Vista Bahn Plaza / Skier Services Foundation Sections 05/15/06 04 5003 Vista Bahn Plaza / Skier Services Foundation Sections 04/03/06 03 5101 Vista Bahn Plaza / Skier Services Foundation Plan 05/15/06 04 5102 Skier Services Floor Framing — Main Level South 05/15/06 04 5103 Vista Bahn Plaza / Skier Services Roof Plan 05/15/06 04 S201 Vista Bohn Plaza / Skier Services Framing Sections 04/03/06 03 5202 Details Plan — Lower Level North 01.20.06 04/03/06 03 FP103 04/03/06 03 5301 Vista Bahn Plaza / Skier Services Roof Framing Sections 05/15/06 04 S302 Details I VIA 05/15/06 04 S303 Details 04/03/06 03 MECHANICAL Demolition Garage Plan — North 04/03/06 M001 Mechanical Legend and Notes 04/03/06 104/03/06 03 M002 Mechanical Schedules Fixtures 03 M010 Enlarged Boiler Room Plan 04/03/06 03 M030 Mechanical Details 01/10/06 01 M040 Mechanical Snowmelt System 04/03 /06 03 M041 Mechanical Snowmelt Details 04/03/06 03 M101 Mechanical Lower Level 04/03/06 03 M102 Mechanical Lower Level Piping 04/03/06 03 M103 Mechanical Ground Level South 04/03/06 03 M104 Mechanical Ground Level Piping 04/03/06 03 alli [ 1 DP101 Demolition Garage Plan — North 04/03/06 03 DP102 Demolition Main Level Plaza Plan 04/03/06 03 P001 Plumbing Fixtures 04/03/06 03 P101 Plumbing Lower Level — South 04/03/06 03 P102 Plumbing Lower Level — North 04/03/06 03 P103 Plumbing Partial Main Level — South 05/15/06 04 P104 Plumbing Main Level — North 01/10/06 01 P105 Plumbing Roof Plan 01/10/06 01 P201 Plumbing Enlarged Plans 04/03/06 03 P202 Plumbing Enlarged Plans 01/10/06 01 P301 Plumbing Isometrics & Diagrams 1 04/03/06 1 03 XWjXHj* DE101 Demolition Garage Plan — North 01/10/06 01 DE201 Demolition Garage Plan — North 01/10/06 01 E001 Electrical Legend and Schedules 04/03/06 03 E002 Electrical One —Line Diagram 04/03/06 03 E003 Electrical Panel Schedules 04/03/06 03 E004 Electrical Panel Schedules 04/03/06 03 E040 Electrical Site Plan 01/10/06 01 E101 Electrical Lower Level — South 01/10/06 01 E102 Electrical Lower Level — North 01/10/06 01 E103 Electrical Main Level — South 04/03/06 03 E105 Electrical Roof Plan 04/03/06 03 E201 Electrical Lower Level — South 04/03 /06 03 E202 Electrical Lower Level — North 01/10/06 01 E203 Electrical Main Level — South 04/03/06 03 E301 Electrical Main Level — South 104/03/06103 1 FS4.1 Food Service Equipment Plan and Schedule 01/10/06 01 FS4.2 Food Service Building Conditions and Ventilation Plan 01/10/06 01 FS4.3 Food Service Plumbing Plan 01/10/06 01 FS4.4 Food Service Electrical Plan 101/10/06101 Services FS7.1 Food Service Equipment Standard Details 01/10/06 01 FS8.1 Food Service Equipment Elevations 01/10/06 01 VERTICAL TRANSPORTATION VT101 General Elevator Information 01/10/06 01 VT102 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 3 & 4 01/10/06 01 VT103 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 21 & 22 01/10/06 01 FIRE ALARM / FIRE PROTECTION FA100 Fire Alarm System 04/03/06 03 FA101 Skier Services Fire Alarm Plan — Lower Level South h 04/03/06 03 FA102 Skier Services Fire Alarm Plan — Lower Level North 04/03/06 03 FA103 Skier Services Fire Alarm Plan — Ground Level South 04/03 /06 03 FA104 Skier Services Fire Alarm Plan — Ground Level North Denver, Colorado 04/03/06 03 FP100 Fire Sprinkler System ISSUE N0, ISSUE DATE 04/03/06 03 FP101 Skier Services Fire Protection Plan — Lower Level South 10.31.03 04/03/06 03 FP102 Skier Services Fire Protection Plan — Lower Level North 01.20.06 04/03/06 03 FP103 Skier Services Fire Protection Plan — Ground Level South 08.21.06 04/03/06 03 09.06.06 ASI -CO02 I VIA IIA2 r�! rr i 1 �"�M * l Ce�lI�j ti✓ h OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 42AO Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJECT NO: 20693.08 ISSUE N0, ISSUE DATE ISSUE DESCRIPTION -- 08.25.03 DD PRICING - 09.15.03 FINAL DD - 10.31.03 FINAL DD SUPT 05.02.05 VE FINAL DD 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 03 04.03.06 B M DEPT RESP FINAL OW. 04 05.15.06 MI X D EPT FINAL cONSc -- 08.21.06 ASI -DO03 -- 09.06.06 ASI -CO02 �"�M * l Ce�lI�j VOLUME V ]BUILDING E -- The Chalets at the Lodge at Vail DWG. DRAWING TITLE LE Date No ARCHITECTURAL G001 Index of Drawings 05/15/06 04 G002 Index of Drawings 05/15/06 04 G003 Index of Drawings 05/15/06 04 G004 Index of Drawings 0802106 1-001 G005 General Information 01/10/06 01 G010 Architectural Reference Site Plan 01/10/06 01 G011 Site Grid Reference Plan 01/10/06 01 G020 Code Anaylisis & Summary 04/03/06 03 G021 Code Anaylisis & Summary 01/20/06 02 G022 Code Summary, Garage Lower Exit Level 05/15/06 04 G023 Code Summary, Garage Parking Level 05/15/06 04 G024 Code Summary, Mezzanine Level 05/15/06 04 G025 Code Summary, Garage Upper Exit Level 05/15/06 04 G026 Code Summary, Residence Floor Plans 05/15/06 04 6027 Code Summary, Residence Roof Plans 05/15/06 04 G028 Code Summary, Sectional Separation Diagram 05/15/06 04 G029 Code Summary, Travel Distance at Grade 04/03/06 03 A001 Reference Floor Plans 04/03/06 03 A002 Reference Roof Plans 04/03 /06 03 A003 Garage & Elevator Grids 04/03/06 03 A101 Garage Lower Exit Level Plan (8185') 05/15/06 04 A102 Garage Reflected Ceiling Plan 04/03/06 03 Al 03 Garage Parking Level Plan (8195) 05/15/06 04 A104 Garage Parking Level Refelected Ceiling Plan (8195') 04/03/06 03 Al 05 Garage Mezzanine Level Plan (8205') 05/15/06 04 Al 06 Garage Mezzanine Level Reflected Ceiling Plan (8205') 04/03 /06 03 Al 07 Garage Upper Exit Level Plan 04/03/06 03 A111 Building 1 Floor and Reflected Ceiling Plans 04/03/06 03 Al 12 Building 1 Floor and Reflected Ceiling Plans 05/15/06 04 Al 13 Building 1 Floor and Reflected Ceiling Plans 05/15/06 04 Al 14 Building 1 Floor and Reflected Ceiling Plans 05/15/06 04 A115 Building 1 Floor and Reflected Ceiling Plans 04/03/06 03 Al 16 Building 1 Roof Plan 04/03/06 03 Al21 Building 2 Floor and Reflected Ceiling Plans 04/03/06 03 Al 22 Building 2 Floor and Reflected Ceiling Plans 04/03/06 03 Al23 Building 2 Floor and Reflected Ceiling Plans 05/15/06 04 Al24 Building 2 Floor and Reflected Ceiling Plans 04/03/06 03 Al 25 Building 2 Roof Plan 04/03 /06 03 A131 Building 3 Floor and Reflected Ceiling Plans 05/15/06 04 Al 32 Building 3 Floor and Reflected Ceiling Plans 05/15/06 04 Al 33 Building 3 Floor and Reflected Ceiling Plans 05/15/06 04 Al 34 Building 3 Floor and Reflected Ceiling Plans 05/15/06 04 A135 Building 3 Floor and Reflected Ceiling Plans 04/03/06 03 Al 36 Building 3 Roof Plan 04/03/06 03 Al 41 Building 4 Floor and Reflected Ceiling Plans 04/03 /06 03 Al 42 Building 4 Floor and Reflected Ceiling Plans 04/03/06 03 Al 43 Building 4 Floor and Reflected Ceiling Plans 04/03/06 03 A144 Building 4 Floor and Reflected Ceiling Plans 04/03/06 03 Al 45 Building 4 Roof Plan 04/03/06 03 Al 51 Building 5 Floor Plan 05/15/06 04 A152 Building 5 Reflected Ceiling Plan 05/15/06 04 A153 Building 5 Floor Plan 05/15/06 04 Al 54 Building 5 Reflected Ceiling Plan 04/03/06 03 Al 55 Building 5 Floor Plan 05/15/06 04 Al 56 Building 5 Reflected Ceiling Plan 04/03/06 03 Al 57 Building 5 Floor Plan 05/15/06 04 Al 58 Building 5 Reflected Ceiling Plan 04/03/06 03 Al 59 Building 5 Roof Plan 04/03/06 03 A161 Building 6 Floor and Reflected Ceiling Plans 04/03/06 03 Al 62 Building 6 Floor Plan 05/15/06 04 A163 Building 6 Reflected Ceiling Plan 05/15/06 04 Al 64 Building 6 Floor and Reflected Ceiling Plans 05/15/06 04 A165 Building 6 Floor and Reflected Ceiling Plans 04/03/06 03 Al 66 Building 6 Roof Plan 04/03/06 03 Al 71 ANSI Compliant Bathroom Plans (Type B) 05/15/06 04 A211 Building 1 Elevations 04/03/06 03 A212 Building 1 Elevations 04/03/06 03 A221 Building 2 Elevations 04/03/06 03 A222 Building 2 Elevations 04/03/06 03 A231 Building 3 Elevations 04/03/06 03 A232 Building 3 Elevations 04/03/06 03 A241 Building 4 Elevations 04/03/06 03 A242 Building 4 Elevations 04/03/06 03 A251 Building 5 Elevations 05/15/06 04 A252 Building 5 Elevations 05/15/06 04 A261 Building 6 Elevations 05/15/06 04 A262 Building 6 Elevations 05/15/06 04 A301 Buildings 1 & 2 and Buildings 3 & 4 — Reference Sections 08102106 E001 A302 Building 5 & 6 — Reference Sections 08102106 1001 A303 Buildings 1, 2 & 3 — Reference Sections A304 Buildings 2 & 4 and Buildings 5 & 6 — Reference Sections 08102106 08102106 1-001 1001 A311 Building 1 Sections 08102106 E001 A312 Building 1 Sections 08102106 1001 A313 Building 1 Sections 08102106 1 A314 Building 1 Sections 08102109 E001 A321 Building 2 Sections 08102106 '1001 A322 Building 2 Sections 08102106 1001 A323 Building 2 Sections 08102106 1001 A324 Building 2 Sections 08102106 1 ,1001 01 A331 Building 3 Sections 08102106 E001 A332 Building 3 Sections 08102106 '1001 A333 Building 3 Sections 0$102106 1-001 A334 Building 3 Sections 08102106 '1001 A341 Building 4 Sections 08102106 1-001 A342 Building 4 Sections 08102106 1-001 A343 Building 4 Sections 08102106 1-001 A344 Building 4 Sections 08102106 1-001 VO V1, c i nt. BUILDING E — The Cbalets at the Lod at Vail DWG. DRAWING TITLE _ _ Date NQ. ARCHITECTURAL A351 Building 5 Sections 08102106 1001 A352 Building 5 Sections 08102106 1-001 A353 Building 5 Sections 08102106 1001 A361 Building 6 Sections 08102106 E001 A362 Building 6 Sections 08102106 1001 A363 Building 6 Sections 08102106 1 A364 Building 6 Sections 08102106 1-001 A401 Wall Sections 08102106 1001 A402 Wall Sections 0802106 ON A403 Wall Sections 08102106 1-001 A404 Wall Sections 08102106 '1001 A405 Wall Sections 08102106 1001 A406 Wall Sections 08102106 1-001 A451 Garage — Enlarged Plan, Section, and Elevations 04/03 /06 03 A452 Garage Exhaust 01/10/06 01 A461 Residences — Enlarged Plan, Section, and Elevations 04/03/06 03 A462 Residences — Enlarged Plan, Section, and Elevations 04/03/06 03 A463 Residences — Enlarged Plan, Section, and Elevations 04/03/06 03 A471 Fireplace Plan, Section, and Elevations 08102106 1001 A521 Residences — Details 08102106 1001 A522 Residences — Details 08102106 E001 A523 Residences — Details 08102106 E001 A524 Residences — Details 04/03/06 03 A525 Residences — Details 04/03/06 03 A526 Residences — Details 01/10/06 01 A527 Residences — Details 01/10/06 01 A528 Residences — Details 04/03/06 03 A550 Firestopping Details 01/10/06 01 A551 Firestopping Details 01/10/06 01 A552 Firestopping Details 01/10/06 01 A570 Waterproofing Details 01/10/06 01 A600 Residences — Wall Types 08102106 1001 A610 Window Types — Elevations 08102106 1001 A611 Window Details 04/03/06 03 A620 Door Types — Elevations 04/03/06 03 A621 Door Details 05/15/06 04 A700 Garage — Stair ES01 05/15 /06 04 A701 Garage — Stair ES02 04/03 /06 03 A720 Residences — Stair Typical A 04/03/06 03 A721 Residences — Stair Typical B 04/03/06 03 A722 Residences — Stair Building 5/6 Unit A 04/03/06 03 INTERIOR DESIGN ID101 A Unit, All Levels — Floor Finish Plan 01/10/06 01 ID102 B Unit, All Levels — Floor Finish Plan 01/10/06 01 ID102A Interior Elevations, Unit 3B 05/15/06 04 ID103 A Unit — Enlarged Plans 04/03/06 Q3 ID104 B Unit — Enlarged Plans 04/03 /06 03 ID104A Enlarged Floor Plans, Unit 3B 05/15/06 04 10200 A Unit — Kitchen & Powder Room Elevations 01/10/06 01 ID201 B Unit — Kitchen & Powder Room Elevations 01/10/06 01 ID202 A Unit — Senior & Junior Master Bath Elevations 04/03/06 03 iD203 B Unit — Senior & Junior Master Both Elevations 04/03 /06 03 ID203A Interior Elevations, Unit 3B 05/15/06 04 ID204 A Unit — Secondary Both, Laundry Room, Elevator & Closet Elevations 01/10/06 01 ID205 B Unit — Secondary Both, Laundry Room, Elevator & Closet Elevations 04/03/06 03 ID205A Interior Elevations, Unit 3B 05/15/06 04 ID220 Details 04/03 /06 03 ID220A Details 05/15/06 04 ID221 Details 01/10/06 01 STRUCTURAL 5001 General Notes and Sections 05/15/06 04 5002 Sections 04/03/06 03 S003 Sections 05/15/06 04 5004 Sections 04/03/06 03 S011 Sections 04/03/06 03 S012 Sections 04/03/06 03 S013 Sections 05/15/06 04 S101W Partial Foundation Plan — West 05/15/06 04 S101 E Partial Foundation Plan — East 05/15/06 04 S103W Garage Lid / Mezzanine — West 04/03/06 03 S103E Garage Lid — East 04/03/06 03 5105 Mezzanine Lid 04/03/06 03 S110 Building 1 Foundation Plan & First Level Framing Plan — 8188' 05/15/06 04 5111 Building 1 Foundation Plan & First Level Framing Plan — 8188' 05/15/06 04 5112 Building 1 Second Level Framing Plan — Unit 1A — 8198' 05/15/06 04 Building 1 First Level Framing Plan — Unit 1B — 8198' M001 5113 Building 1 Third Level Framing Plan — Unit 1A — 8208' 05/15/06 04 Building 1 Second Level Framing Plan — Unit 1B — 8213' 03 M002 S114 Building 1 Fourth Level Framing Plan — Unit 1A - 8218' 04/03/06 03 Building 1 Third Level Framing Plan — Unit 1 B — 8223' 03 M010 S115 Building 1 Fourth Level Framing Plan — Unit 1B — 8233' 04/03/06 03 5116 Building 1 Roof Framing Plan 04/03/06 03 S120 Building 2 Foundation Plan 04/03/06 03 5121 Building 2 First Level Framing Plan — 8220'/8225' 04/03/06 03 5122 Building 2 Second Level Framing Plan — 8230'/8235' 04/03/06 03 S123 Building 2 Third Level Framing Plan — 8240' /8245' 04/03/06 03 S124 Building 2 Fourth Level Framing Plan — 8250'/8255' 04/03/06 03 S125 Building 2 Roof Framing Plan 05/15/06 04 System VO V1 ctints BUILDING E -- The Chalets at the Lod a t Vail B UILDING E -- The Chalets a t the Lod at Vail E001 Electrical Legend and Schedules 04/03/06 03 E002 Electrical One —Line Diagram 04/03/06 03 DW 04/03 /06 DRAINING TITLE Date No. STRUCTURAL E005 Electrical Load Calculations 04/03 /06 03 E040 Electrical Site Lighting Plan S130 Building 3 Foundation Plan & First Level Framing Plan — 8180' 05/15/06 04 S132 Building 3 Second Level Framing Plan — Unit 3A — 8190' 05/15/06 04 E104 Overall Electrical Plan Building 3 First Level Framing Plan — Unit 3B — 8190' 04/03 /06 03 5133 Building 3 Third Level Framing Plan — Unit 3A — 8200' 05/15/06 04 El 22 Building 2 Unit 213 Electrical Plans Building 3 Second Level Framing Plan — Unit 3B — 8200' 05/15/06 04 S134 Building 3 Fourth Level Framing Plan — Unit 3A — 8210' 05/15/06 04 El 42 Building 4 Unit 413 Electrical Plans Building 3 Third Level Framing Plan — Unit 3B — 8210' 04/03 /06 03 S135 Building 3 Fourth Level Framing Plan — Unit 3B — 8220' 04/03/06 03 S136 Building 3 Roof Framing Plan El 62 Building 6 Unit 613 Electrical Plans 04/03/06 03 S140 Building 4 Foundation Plan ``VERTICAL TRANSPORTATI 04/03/06 03 S141 Building 4 First Level Framing Plan — 8205'/8210' 04/03/06 03 S142 Building 4 Second Level Framing Plan — 8215'/8220' 04/03/06 03 S143 Building 4 Third Level Framing Plan — 8225'/8230' 04/03/06 03 5144 Building 4 Fourth Level Framing Plan — 8235'/8240' 04/03/06 03 S145 Building 4 Roof Framing Plan 04/03/06 05/15/06 04 5150 Building 5 Foundation Plan & First Level Framing Plan — 8190' 05/15/06 04 S153 Building 5 Second Level Framing Plan — Unit 5A — 8200' 05/15/06 04 04/03/06 Building 5 Second Level Framing Plan — Unit 5B — 8200' 03 FAFP112 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 Building 5 Second Level Framing Plan — Unit 5C — 8205' 03 FAFP114 Building 1 Fire Alarm / Fire Protection Plans S155 Building 5 Third Level Framing Plan — Unit 5A — 8210' 04/03/06 03 04/03/06 Building 5 Third Level Framing Plan — Unit 5B — 8210' 03 FAFP123 Building 2 Fire Alarm / Fire Protection Plans 04/03 /06 Building 5 Third Level Framing Plan — Unit 5C — 8215' 03 FAFP131 Building 3 Fire Alarm / Fire Protection Plans 5157 Building 5 Roof Framing Plan — Unit 5A 04/03/06 03 05/15/06 Building 5 Fourth Level Framing Plan — Unit 5B — 8220' 03 FAFP135 Building 3 Fire Alarm / Fire Protection Plans 04/03/06 Building 5 Fourth Level Framing Plan — Unit 5C — 8225' 03 FAFP142 Building 4 Fire Alarm / Fire Protection Plans S159 Building 5 Roof Framing Plan — Unit 5B & 5C 05/15/06 04 S160 Building 6 Foundation Plan & First Level Framing Plan — 8182' 05/15/06 04 S162 Building 6 First Level Framing Plan — Unit 6A — 8187' 05/15/06 04 FP154 Building 5 Fire Protection Plan Building 6 Second Level Framing Plan — Unit 6B — 8192' 04/03/06 03 5164 Building 6 Second Level Framing Plan — Unit 6A — 8197' 05/15/06 04 FP158 Building 5 Fire Protection Plan Building 6 Third Level Framing Plan — Unit 6B — 8202' 04/03/06 03 S165 Building 6 Third Level Framing Plan — Unit 6A — 8207' 04/03/06 03 FAFP164 Building 6 Fire Alarm / Fire Protection Plans Building 6 Fourth Level Framing Pan — Unit 6B — 8212' 04/03/06 03 S166 Building 6 Roof Framing Plan 04/03/06 03 MECHANICAL M001 Notes, Legend and Schedules 04/03/06 03 M002 Mechanical Schedules 04/03/06 03 M010 Enlarged Boiler Room Plans 04/03/06 03 M01 1 Mechanical Hot Water Schematics 01/10/06 01 M030 Mechanical Details 01/10/06 01 M031 Mechanical Details 01/10/06 01 M040 Snowmelt System 01/10/06 01 M041 Snowmelt Details 01/10/06 01 M101 Level 8185' Mechanical Plan 01/10/06 01 M102 Level 8195' Mechanical Plan 04/03/06 03 M103 Level 8205' Mechanical Plan 01/10/06 01 M104 Overall Mechanical Pan 01/10/06 01 M111 Building 1 Unit 1A Mechanical Plans 04/03/06 03 M 112 Building 1 Unit 1B Mechanical Plans 04/03/06 03 M121 Building 2 Unit 2A Mechanical Plans 04/03/06 03 M122 Building 2 Unit 213 Mechanical Plans 04/03/06 03 M131 Building 3 Unit 3A Mechanical Plans 05/15/06 04 M132 Building 3 Unit 3B Mechanical Plans 05/15/06 04 M141 Building 4 Unit 4A Mechanical Plans 04/03/06 03 M142 Building 4 Unit 4B Mechanical Plans 04/03/06 03 M151 Building 5 Unit 5A Mechanical Plans 04/03/06 03 M152 Building 5 Unit 5B Mechanical Plans 04/03/06 03 M153 Building 5 Unit 5C Mechanical Plans 04/03/06 03 M161 Building 6 Unit 6A Mechanical Plans 05/15/06 04 M162 Building 6 Unit 6B Mechanical Plans 04/03/06 03 M163 Building 6 Unit 613 Mechanical Plans 04/03/06 03 PLUMBING P001 Plumbing Schedules, Legends, & Notes 01/10/06 01 P002 Plumbing Details 01/10/06 01 P101 Level 8185' Plumbing Plan 01/10/06 01 P102 Level 8195' Plumbing Plan 05/15/06 04 P103 Level 8205' Plumbing Plan 01/10/06 01 P104 Overall Plumbing Plan 01/10/06 01 P111 Building 1 Unit 1A Plumbing Plans 04/03/06 03 P1 12 Building 1 Unit 1 B Plumbing Plans 05/15/06 04 P121 Building 2 Unit 2A Plumbing Plans 04/03/06 03 P122 Building 2 Unit 2B Plumbing Plans 01/10/06 01 P131 Building 3 Unit 3A Plumbing Plans 05/15/06 04 P132 Building 3 Unit 3B Plumbing Plans 05/15/06 04 P141 Building 4 Unit 4A Plumbing Plans 01/10/06 01 P142 Building 4 Unit 4B Plumbing Plans 01/10/06 01 P151 Building 5 Unit 5A Plumbing Pans 01/10/06 01 P152 Building 5 Unit 5B Plumbing Plans 01/10/06 01 P153 Building 5 Unit 5C Plumbing Plans 04/03/06 03 P161 Building 6 Unit 6A Plumbing Plans 05/15/06 04 P162 Building 6 Unit 6B Plumbing Plans 01/10/06 01 P163 Building 6 Unit 6B Plumbing Plans 01/10/06 01 P201 Enlarged Boiler Room Plumbing Plan 01/10/06 01 P301 Typical Unit Gas Piping Diagrams 01/10/06 01 P401 Waste & Vent Isometrics 01/10/06 01 P402 Waste & Vent Isometrics 01/10/06 01 P403 Waste & Vent isometrics 01/10/06 01 P404 Waste & Vent Isometrics 01/10/06 01 VO V c ont. BUILDING E -- The Chalets at the Lod a t Vail DWG. _ DRAWING TITLE __ _ Date No. ELECTRICAL E001 Electrical Legend and Schedules 04/03/06 03 E002 Electrical One —Line Diagram 04/03/06 03 E003 Electrical Panel Schedule 04/03 /06 03 E004 Electrical Load Center Schedule 04/03/06 03 E005 Electrical Load Calculations 04/03 /06 03 E040 Electrical Site Lighting Plan 01/10/06 01 E101 Level 8185' Electrical Plan 01/10/06 01 E102 Level 8195' Electrical Plan 04/03/06 03 E103 Level 8205' Electrical Plan 04/03/06 03 E104 Overall Electrical Plan 04/03/06 03 E111 Building 1 Unit 1A Electrical Plans 04/03 /06 03 E1 12 Building 1 Unit 1 B Electrical Plans 04/03/06 03 El 21 Building 2 Unit 2A Electrical Plans 04/03/06 03 El 22 Building 2 Unit 213 Electrical Plans 01/10/06 01 E131 Building 3 Unit 3A Electrical Plans 05/15/06 04 E132 Building 3 Unit 3B Electrical Plans 05/15/06 04 El 41 Building 4 Unit 4A Electrical Plans 04/03/06 03 El 42 Building 4 Unit 413 Electrical Plans 04/03/06 03 E151 Building 5 Unit 5A Electrical Plans 04/03 /06 03 E152 Building 5 Unit 513 Electrical Plans 04/03/06 03 E153 Building 5 Unit 5C Electrical Plans 04/03/06 03 E161 Building 6 Unit 6A Electrical Plans 05/15/06 04 El 62 Building 6 Unit 613 Electrical Plans 04/03/06 03 El 63 Building 6 Unit 6B Electrical Plans 04/03/06 03 ``VERTICAL TRANSPORTATI VT101 General Elevator Information 01/10/06 01 VT102 Pit, Hoistway, Machine Room . Plans & Hoistway Section — Elevs. 8 & 9 01/10/06 01 VT103 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 10 & 11 04/03 /06 03 VT104 Pit, Hoistway, Control Room Plans — Elevs. 12 & 13 01/10/06 01 VT105 Hoistway Sections — Elevs. 12 & 13 04/03/06 03 VT106 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 14 & 15 04/03/06 03 VT107 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 16 & 17 04/03/06 03 VT108 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevator 18 01/10/06 01 VT109 Pit, Hoistway, Machine Room Plans & Hoistway Section — Elevs. 19 & 20 01/10/06 01 FIRE ALARM f FIRE PROTECTION FA100 Fire Alarm System 04/03/06 03 FP100 Fire Sprinkler System 04/03/06 03 FA103 Garage Parking Level Fire Alarm Plan — Level 8195' 04/03 /06 03 FP104 Garage Parking Level Fire Protection Plan — Level 8195' 04/03 /06 03 FA105 Residence Garage Mezzanine Fire Alarm Plan — Level 8205' 04/03 /06 03 FP106 Residence Garage Mezzanine Fire Protection Plan — Level 8205' 04/03/06 03 FAFP111 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP112 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP113 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP114 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP115 Building 1 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP121 Building 2 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP122 Building 2 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP123 Building 2 Fire Alarm / Fire Protection Plans 04/03 /06 03 FAFP124 Building 2 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP131 Building 3 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP132 Building 3 Fire Alarm / Fire Protection Plans 05/15/06 04 FAFP133 Building 3 Fire Alarm / Fire Protection Plans 05/15/06 04 FAFP134 Building 3 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP135 Building 3 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP141 Building 4 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP142 Building 4 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP143 Building 4 Fire Alarm i Fire Protection Plans 04/03/06 03 FAFP144 Building 4 Fire Alarm / Fire Protection Plans 04/03/06 03 FA151 Building 5 Fire Alarm Plan 04/03/06 03 FP152 Building 5 Fire Protection Plan 04/03/06 03 FA153 Building 5 Fire Alarm Plan 04/03 /06 03 FP154 Building 5 Fire Protection Plan 04/03/06 03 FA155 Building 5 Fire Alarm Plan 04/03/06 03 FP156 Building 5 Fire Protection Plan 04/03/06 03 FA157 Building 5 Fire Alarm Plan 04/03/06 03 FP158 Building 5 Fire Protection Plan 04/03/06 03 FAFP 161 Building 6 Fire Alarm / Fire Protection Plans 04/03/06 03 FA162 Building 6 Fire Alarm Plan 05/15/06 04 FP163 Building 6 Fire Protection Plan 05/15/06 04 FAFP164 Building 6 Fire Alarm / Fire Protection Plans 04/03/06 03 FAFP165 Building 6 Fire Alarm / Fire Protection Plans 04/03/06 03 EVI 'E- 14 t �_` AFEbullt Colorado R- I f4 I�� a " f � II M � on=; oil P ;T4 .n OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 -2— �� Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ADS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJECT NO: 20693.08 ISSUE N0. ISSUE DATE ISSUE DESCRIPTION - 08.25.03 DD PRICING - 09.15.03 ANAL DD - 10.31.03 FINAL. DD SUPT - 05.02.05 NE FINAL DD 01 01.10.66 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 03 04.03.06 BtflG APT REIP FINAL CONST. 04 05.15.06 ac D ' P T R ESP FINAL CONST. - , 07.26.06 CONSTRILMON FtEVISKNiS II M � SKI CLUB TERRACE LANDSCAPE PAYING (RE: LANDSCAPE DWGS) HORIZ & VERT WATERPROOFING MEMBRANE & SUBSURFACE DRAINAGE SYSTEM, TYP REFER TO: A560 X561 J.O. SLAB — — — RE: BLDG. A STRUCT. COMMON GRID H. J.7 K. L.4 M.4 X1.1 18'-0" 16'-0" 18'-0" 20'-3" qt—on om--CLUB - BUILDING C SKI. CLUB BUILDING SECTIONS A210 SCMZ: 1/4" = I' � k'fTG�+a � Ct OWNER/DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART/HOWERTON NEW YORK, bMW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT NO: 20695.05 ISSUE ISSUE ISSUE NO. DATE DESORIPTION — 08.25.03 DD PRICING — 09.15.03 FINAL DD 01 01.10.06 FOR CONSTRUCTION 01.20.06 ADDENDUM NO. 01 04.03.06 KW DE P'5' FINAL CW. 09.06.06 ASI—CO02 BUILDING C SKI. CLUB BUILDING SECTIONS A210 SCMZ: 1/4" = I' "A lC���►i SECTIONS A 211 I -Si by, k w i Y OWNER /DEVELOPER. VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHTTECT OF RECORD 4 2A--- u - 0 Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART/ HOWERTON NEW YORK, N$W YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. PAIL, COLORADO LAND SDRYBYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJEOT NO: 20696.05 ISSUE ISSUE ISSUE NO. DATE DESORIPTION - 08.25.03 DD PRICING - 09.15.03 FINAL DD 05.02.05 VE FINAL DD 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 0 04.03.06 KD(; ter RNAL 09.06.06 ASI -0002 SECTIONS A 211 I /A , d # COMPANY AVON, COLORADO COMMON GRID .(15.4) 15.2 14.4 13.5 12.7 11.8 5'-3)/2" 14'-5" 21'-0' 14'-5 17'-10" H . ARC=CT OF RECORD 4 r'W.�...®. Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, 06LOPADO LANDSCAPE ARCHITECT HART/HOWERTON NEW YORK, NEW YORK CBU ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO C �770R 5 s1 � "+��1�� b s r� Oh II SCALE: 1/4" = 1'-0" 1 FOR CONSTRUCTION j 40 ADDENDUM? .1 0 C �770R 5 s1 � "+��1�� b s r� Oh II SCALE: 1/4" = 1'-0" 1 15.2 14.4 13.5 12.7 11.8 14' -5" 21' -0" 14' -5" 17' - 10" fffim GORE CBRRR ABIYs' a c3 Ci ro Vail Ski Club 11 MOM Buis I i wsmfwswz� 1 r.` OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO} ARCHITECT OF RECORD 4 2- 4 0— Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, VOLSRAm@ LANDSCAPE ARCHMCT HART /HOWERTON NEW YORK, NEW Y*RK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PR00EOT DEC}: 20695.03 ISSUE ISSUE ISSUE MO. DATE DESORIPTIOM - 08.25.03 DD PRICING - 09.15.03 FINAL DD 01 41.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 0 04.03.06 B6 DE" RW HN& CON9. -- 09.06.06 ASI -CO02 GORE CBRRR ABIYs' a c3 Ci ro Vail Ski Club 11 MOM Buis I i wsmfwswz� | ,6T.O. RIDGE _ Z � nO2 HORIZ & YB MEMBRANE & SUB SYSTEM T` AT.O. SLAB AT.O. SLAB L. 4) M. 4) "m "m a -0 VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCMTECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER AVON, COLORADO MEP ENGINEERS DENVER, COLORADO LANDSCAPE ARCBMCT NEW YORK, NNW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT NO: 20693.05 ISSUE ISSUE ISSUE NO.. DATE DESORIPTION — 08.25.03 DD PRICING — 09.15.03 FINAL DD 01 01.10.06 FOR CONSTRUCTION 01.20.06 ADDENDUM NO. 01 04.03.06 8= DEPT REIP 1 09.06.06 ASI—CO02 a -0 COMMON GRID (15.4) 15- 5' -3y" CVDAKIMM IM tDAT[kttl AO OE7f AO 1 n44 n1,3. 5 1 n2. 7 1 n18 Jd k 17'-10" & STAI DE � SKI CLUB BUILDING SECTIONS A215 SCALE: 1/4 V 4m OWNER/DEVELOPER VAIN RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 42AO F- Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ADS CONSULTANTS, INC DENVER, OOLGRADe LANDSCAPE ARCHITECT IIART/HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC PAIL, COLORADO PROdEOT NO: 20696.05 ISSUE NO. ISSUE DATE ISSUE DESORIPTION 01 01.10.06 FOR CONSTRUCTION 04.03.06 BLW DM RESP ANk COW. 09.06.06 ASI—CO02 � SKI CLUB BUILDING SECTIONS A215 SCALE: 1/4 m N Asomm"m FAI IVIL-%A I cl ( CLUB B I F-od / MITIMINF6.01, STRUCT. ffERPROOFING 6URFACE Typ. �u� OWNER/DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCEMCT OF RECORD 4- - A-- - Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ADS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART/HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJEOT NO: 20693.05 ISSUE ISSUE ISSUE NO. DATE DESORIPTION 01 01.10.06 FOR CONSTRUCTION 04.03.06 BM DO FBP FINAL Mm. 09.06.06 ASI-0002 T'7 SLAB - 1' 7- R — E- BLDG. A STRUCT. LANDSCAPE PAVING (RE- LANDS) HORIZ & VERT WATERPROOFING MEMBRANE & SUBSURFACE DRAINAGE SYSTEM, TYP REFER TO: A560 A561 PARKING GARAGE CONC. LID (RE: BLDG A) � ,T.O. SLAB 'V RE: BLDG. A STRUCT. j SLAB IV RE: BLDG. A ST2UCT. P OOBS a sp zy Imz �3 D Vail Ski Club Num pi I COMMON GRID i �l �1� I I�I� . . . . . . . . . . OWNER/DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 - Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HART/HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJEOT NO: 20693.05 ISSUE NO. ISSUE DATE ISSUE DESORIPTIOM 01 01.10.06 FOR CONSTRUCTION 01.20.06 ADDENDUM NO. 01 04.03.06 BM DE" REII FINAL CONS. 09.06.06 ASI-CO02 OOBS a sp zy Imz �3 D Vail Ski Club Num pi I COMMON GRID i �l �1� I I�I� 6� 1 " -1 FLAT CONCRETE TILE ROOFING FROOF EACH SIDE OF VALLEY LL POLYURETHANE 8" MINIMUM LAP JOINT IN (6" THICK) ALLEY FLASHING HING 24" WIDE, 16 OZ. COPPER .) R VALLEY FLASHING __ - -- -_ METAL CLEATS AT 24" ON CENTER / LAYER OF "VICOR ULTRA" ICE AND WATER SHEILD OVER 6' LAYER OF "VICOR" ICE AND 5j GYPSUM WALL BOARD WATER SHIELD BELOW VALLEY THERMAL BARRIER CONFORMING FLASHING r- ~- - WIT 2003 IBC SECTION 2603 _ v 2x6 T &G V- GROOVE DECKING ROOF SHEATHING - -... -• � ^n -�,. ice. -^ 1 7 C OPP E R FL PRO FILE IM AT AREAS WHE R IGID WILL EXCEED 4' IN DE CONST O VE RFR A MING WITH 3/4' EXTE G RADE PLYWOOD OVER ST ANDARD i �/4" CRIMP EACH SIDE 1 " CRIMP RIDGE 1 •i i i i i ROO PLAN) � t r T. 0. RE: S t ! 1 { t i t 1 ! I t t 1 i t I t it t ,t { ,1 { r� I 1 , t 1 1 1 ,t t ,! } {t 1 Ka 0 0 • S?� EET ffiEMB WATE H ORIZONTAL BA TTEN 777 7T • a a C ONCRETE ROO TILE G FL i ii! • 3X10 WOOD TRIM TYP. A -1x6 T&G V- GROOVE DECKING RIDGE BEAM/BEAM BEY OND W R E: ELEVS. NOTE: SEE DETAIL 1/A501 FOR TYPICAL INFORMATION. (RE: STRUCT) TYP EXTERIOR WALL CONSTRUCTION, SEE 1/A500 CONTINUOUS BLOCKING (RE: STRUCT). SPECIES, CUT & FINISH TO MATCH BEAMS iif • 1 .ROM HEAVY TIMBER BEAM (RE: STRUCT.) EXTERIOR SIDING, SEE ELEVS. TRIM @ CORNERS SEE ELEV & DETAILS A O EXTERIOR WALL CONSTRUCTION BEYOND, SHOWN DASHED 2x6 I &G V GROOVE DECKING HEAVY TIMBER BEAM /PURLIN (RE: STRUCT) HEAVY TIMBER TRUSS BEYOND (RE: STRUCT) 2x OUTRIGGER, (DASHED) SEE STRUCT 1 ., j t fj , �f OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, oior� ado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HARTJHOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. PAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT 640: 20696.03 ISSUE ISSUE ISSUE 640. DATE DESORIPTION 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 0 04.03.06 IM DEPT RESP RNAL CONS. -- 09.06.06 ASI -CO02 s s � t r T. 0. RE: S t ! 1 { t i t 1 ! I t t 1 i t I t it t ,t { ,1 { r� I 1 , t 1 1 1 ,t t ,! } {t 1 Ka 0 0 • S?� EET ffiEMB WATE H ORIZONTAL BA TTEN 777 7T • a a C ONCRETE ROO TILE G FL i ii! • 3X10 WOOD TRIM TYP. A -1x6 T&G V- GROOVE DECKING RIDGE BEAM/BEAM BEY OND W R E: ELEVS. NOTE: SEE DETAIL 1/A501 FOR TYPICAL INFORMATION. (RE: STRUCT) TYP EXTERIOR WALL CONSTRUCTION, SEE 1/A500 CONTINUOUS BLOCKING (RE: STRUCT). SPECIES, CUT & FINISH TO MATCH BEAMS iif • 1 .ROM HEAVY TIMBER BEAM (RE: STRUCT.) EXTERIOR SIDING, SEE ELEVS. TRIM @ CORNERS SEE ELEV & DETAILS A O EXTERIOR WALL CONSTRUCTION BEYOND, SHOWN DASHED 2x6 I &G V GROOVE DECKING HEAVY TIMBER BEAM /PURLIN (RE: STRUCT) HEAVY TIMBER TRUSS BEYOND (RE: STRUCT) 2x OUTRIGGER, (DASHED) SEE STRUCT SKI E D ET A ILS F1 .%J[ I I SCALE: 1" = 1 ' -0" 1 ., j t fj , OWNER /DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, oior� ado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, COLORADO LANDSCAPE ARCHITECT HARTJHOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. PAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT 640: 20696.03 ISSUE ISSUE ISSUE 640. DATE DESORIPTION 01 01.10.06 FOR CONSTRUCTION 02 01.20.06 ADDENDUM NO. 01 0 04.03.06 IM DEPT RESP RNAL CONS. -- 09.06.06 ASI -CO02 SKI E D ET A ILS F1 .%J[ I I SCALE: 1" = 1 ' -0" STONE VENEER WALL - WITH WEEP HOLES SHELF ANGLE W/ FLASHING OVER TOP, SEE STRUCTURAL SHEET MTL COUNTER FLASHING CORRUGATED VENTING - SS SCREW & NEOPRENE WASHER @ 18' O,C, TO STUD 2Yp' SS SCREW & — NEOPRENE WASHER THROUGH EVERY OTHER NAIL HOLE FLAT CONCRETE TILES - ON Ix BATTENS OVER 2X COUNTER BATTENS I � � •�.-ss.� =�� .iir - �� WALL SHEATHING ■ • ♦ • � , r r r 15 —1 —0 iir r 1 * * a a • i • M a - • - • � a iir r y ! • GYP. BD. --- WOOD TRIM (RE: ID) STONE FLOORING - (RE: ID) CONC. TOPPING — SLAB (RE: STRUC) ry �� ! ' • =00, 0 ILI A . i 4-` ° 4 0 0 co • a r • a a r i • • �� i'• of 1 i 1� BALL S E A TI O N �DT��O, STUCCO WALL SYSTEM - OR WOOD SIDING OVER WALL SHEATHING SHEET MTL COUNTER -- FLASHING CORRUGATED VENTING - SS SCREW & NEOPRENE WASHER @ 18' D.C. TO STUD 2Y SS SCREW & NEOPRENE WASHER THROUGH EVERY OTHER NAIL HOLE FLAT CONCRETE TILES - O 2X COUNTER BATTENS N 1x BATTENS OVER UNDERLAYMENT —i a EXTERIOR SHEA HING SET IN FULL BED (RE STRUC) OF SEALANT AIR BARRIER OVER STONE 2x8 TIMBER SIDING VENEER (RE: ELEVATIONS) ;`EXTERIOR WALL DETAIL -- PLAN JL JL I " =1' -0" ROOF DETAILS CONC WALL - (RE: STRUC) 21" MTL STUD, 24" O.C. DOOR & FRAME, i Q 2x8 TIMBER SIDING SEE SCHEDULE TO CAST -IN -PLACE CONC (RE: ELEVATIONS) SLOPE CONC WALL � (RE: STRUC) STAIR FIRE EPDM MEMBRANE FULLY µ•••5. CS01 0227 d ' ADHERED TO CONC 2j" MTL STUD, SLOPED STONE SILL 24" O.C. r - ti' ` ::' Eft GYP BD OVER VAPOR t5 THRU WALL FLASHING BARRIER =� w /DRIP EDGE EACH ARCHITECTURAL PRE -CAST TOP -OF -SILL , DE TAIL 2x6 FRAMED WALL STONE CAP W /ANCHORS TO R 2" HIGH DENSITY w /BATT INSULATION STEEL COLUMNS BEYOND 1 1 0 RIGID INSULATION 4 z ° DRIP KERFS IN CAP - - - -__ r T.Q. CONC SLAB BATTERED STONE VENEER DEVELC}PIVMENT COMPANY LU WE SLOPE Y4' PER FT 4 Denver, Colorado I DI! I I I Pird I I !H_ METAL COPING EXTERIOR SHEA HING SET IN FULL BED (RE STRUC) OF SEALANT AIR BARRIER OVER STONE 2x8 TIMBER SIDING VENEER (RE: ELEVATIONS) ;`EXTERIOR WALL DETAIL -- PLAN JL JL I " =1' -0" ROOF DETAILS CONC WALL - (RE: STRUC) 21" MTL STUD, 24" O.C. FORMED METAL COPING W /CONTINUOUS CLEAT FASTENED TO TREATED BLOCKING W/ 4 WATERPROOFING MEMBRANE UNDER METAL COPING 4 . ° AMMENT MR 2" HIGH DENSITY RIGID INSULATION z : rv-�IV • O O O Q • WALL SHEATHING r -• i• i r • ♦ i•• i/i r • :7 Ir i � i ♦ ♦ r/i R ♦ r ♦• / i 1 UNDERLAYMENT --\ r U13 CONC. TOPPING SLABW/ SNOWMELT SYSTEM CONC. SLAB ON 2" MTL. DEC} HORIZ & VERT WATERPROOFING i IMM I I I I G Y v 13 A621 --WALL BEYOND METAL BEAMS MEMBRANE & SUBSURFACE DRAINAGE (RE: STRUC) SYSTEM TYP.RE: A560 A561 8184' - 6 _' OIL F.F. �'\NEE .. 8184'- 4" CONC. WALL ` : x ` i T.O. SLAB BEAM;. (RE: BLDG A) NOTE: �. 1. SEE 4/A561 FOR ADD'L NOTES :r NEOPRENE @ CORNERS Hi A. FOAM FILL VARIES CONC. LID (RE: STRUC) VARIES PARKING GARAGE OF WALL BEYOND _LIDS METAL DECK SECTION 1 4 1 1 " =1' " CDTDOOR01 SLOPE T. 0. PAR ET 8206'— 1 O" ° I SEALANT FLASHING 4'x8' PRE - FORMED METAL SCUPPER / FLASHING ° ' STONE VENEER s CONC WALL TYP, TAPERED RIGID INSULATION RE A560 A561 OVER SLAB ON MTL, DECK NOTE p & BEAMS (RE STRUC) REFER TO SMACNA FIGURE <.. CONC LID (RE: STRUC) 1 -26 FOR ADDITIONAL A INFORMATION (TERIOR WALL DETAIL -- SECTION SCTJP ROOF DETAILS CT 1 "= 1' —it" STUCCO WALL SYSTEM- FASTENED TO WALL SHEATHING COUNTERFLASHING OVER SIDEWALL FLASHING 2x6 WOOD BLOCKING SIDEWALL FLASHING FLAT CONCRETE TILES ON 1x BATTENS OVER 2x COUNTER BATTENS ICE & WATER SHIELD, LAP ONTO SIDEWALL FLASHING UNDERLAYMENT --\ i `ILE RAI�EWALL c WALL SHEATHING & BUILDING WRAP STONE VENEER WALL- - WITH WEEP HOLES SHELF ANGLE W/ FLASHING OVER TOP, SEE STRUCT, COUNTERFLASHING OVER SIDEWALL FLASHING 2x6 WOOD BLOCKING SIDEWALL FLASHING FLAT CONCRETE TILES ON 1x BATTENS OVER 2x COUNTER BATTENS ICE & WATER SHIELD; LAP ONTO SIDEWALL FLASHING UNDERLAYMENT ----s • -• •ii r .• ♦ r • r rl • r • r , � r ♦ • r � • a mom i • rr . r lr �u i • �i1 i ,. • r r i •: ! a 1 i : s a a a a , AIR BARRIER i 2x8 TIMBER SIDING EACH SIDE, W /ANCHORS TO CAST -IN -PLACE CONC (RE: ELEVATIONS) WALL SLOPE MTL FLASHING SET T.Q. PA RAPET EPDM MEMBRANE FULLY µ•••5. IN BED OF SEALANT 8206 - 10 33 - `� - ADHERED TO CONC SLOPED STONE SILL WALE RUN mEMBTTANL OVER TOP OF WALL ° ti' ` FULL MORTAR BED ON Eft t5 THRU WALL FLASHING EPDM SINGLE PLY w /DRIP EDGE EACH ROOFING TOP -OF -SILL , DE TAIL ° SIDE R EL= VARIES (RE: ELEV.) 1 1 0 - - - -__ r T.Q. CONC SLAB BATTERED STONE VENEER DEVELC}PIVMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER MONROE do NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ASS CONSULTANTS, INC DENVER, 06L@RAD* WP SYSTEM, SEE NOTES ON A501 .. D• fj // 8205 ! 205 — 4 VAIL, COLORADO PROdEOT NO: 20696.06 ISSOE ° SCUPPER BEYOND % DATE STONE VENEER ANCHOR 02 01.20.06 ° 0 STONE VENEER _ EXTERIOR SHEATHING 09.06.06 ° (RE STRUC) ° ° • t e / / SOLID GROUT _ EPDM MEMBRANE FULLY- a CONC WALL 2" CONTINUOUS RIGID INSULATION - ADHERED TO CONC °. INSULATION OVER CONC FULL HEIGHT OF BASEMENT WALL WALL, RUN MEMBRANE SLAB ON METAL DECK & (TYP. WHEN GRADE IS LEVEL WITH OVER TOP DE WALL FLOOR SLAB SEALANT —.., d ` '. I ..� -. -.. -• EPDM SINGLE PLY ROOFING FINISH GRADE — � 11= EL= VARIES (RE: CIVIL) : 4 °a ° p • p � a . HORIZ & VERT 4 ' ° ° ° WATERPROOFING ° a MEMBRANE & SUBSURFACE 44 • 4 °. ° 4 DRAINAGE SYSTEM FORMED METAL COPING W /CONTINUOUS CLEAT FASTENED TO TREATED BLOCKING W/ 4 WATERPROOFING MEMBRANE UNDER METAL COPING 4 . ° AMMENT MR 2" HIGH DENSITY RIGID INSULATION z : rv-�IV • O O O Q • WALL SHEATHING r -• i• i r • ♦ i•• i/i r • :7 Ir i � i ♦ ♦ r/i R ♦ r ♦• / i 1 UNDERLAYMENT --\ r U13 CONC. TOPPING SLABW/ SNOWMELT SYSTEM CONC. SLAB ON 2" MTL. DEC} HORIZ & VERT WATERPROOFING i IMM I I I I G Y v 13 A621 --WALL BEYOND METAL BEAMS MEMBRANE & SUBSURFACE DRAINAGE (RE: STRUC) SYSTEM TYP.RE: A560 A561 8184' - 6 _' OIL F.F. �'\NEE .. 8184'- 4" CONC. WALL ` : x ` i T.O. SLAB BEAM;. (RE: BLDG A) NOTE: �. 1. SEE 4/A561 FOR ADD'L NOTES :r NEOPRENE @ CORNERS Hi A. FOAM FILL VARIES CONC. LID (RE: STRUC) VARIES PARKING GARAGE OF WALL BEYOND _LIDS METAL DECK SECTION 1 4 1 1 " =1' " CDTDOOR01 SLOPE T. 0. PAR ET 8206'— 1 O" ° I SEALANT FLASHING 4'x8' PRE - FORMED METAL SCUPPER / FLASHING ° ' STONE VENEER s CONC WALL TYP, TAPERED RIGID INSULATION RE A560 A561 OVER SLAB ON MTL, DECK NOTE p & BEAMS (RE STRUC) REFER TO SMACNA FIGURE <.. CONC LID (RE: STRUC) 1 -26 FOR ADDITIONAL A INFORMATION (TERIOR WALL DETAIL -- SECTION SCTJP ROOF DETAILS CT 1 "= 1' —it" STUCCO WALL SYSTEM- FASTENED TO WALL SHEATHING COUNTERFLASHING OVER SIDEWALL FLASHING 2x6 WOOD BLOCKING SIDEWALL FLASHING FLAT CONCRETE TILES ON 1x BATTENS OVER 2x COUNTER BATTENS ICE & WATER SHIELD, LAP ONTO SIDEWALL FLASHING UNDERLAYMENT --\ i `ILE RAI�EWALL c WALL SHEATHING & BUILDING WRAP STONE VENEER WALL- - WITH WEEP HOLES SHELF ANGLE W/ FLASHING OVER TOP, SEE STRUCT, COUNTERFLASHING OVER SIDEWALL FLASHING 2x6 WOOD BLOCKING SIDEWALL FLASHING FLAT CONCRETE TILES ON 1x BATTENS OVER 2x COUNTER BATTENS ICE & WATER SHIELD; LAP ONTO SIDEWALL FLASHING UNDERLAYMENT ----s • -• •ii r .• ♦ r • r rl • r • r , � r ♦ • r � • a mom i • rr . r lr �u i • �i1 i ,. • r r i •: ! a 1 i : s a a a a , SLOPE {, yl C AP 09' -9 DRIP KERFS, TYP, @ Ao3 EACH SIDE, W /ANCHORS TO CAST -IN -PLACE CONC WALL SLOPE T.Q. PA RAPET EPDM MEMBRANE FULLY µ•••5. Yh ciJ 8206 - 10 33 - `� - ADHERED TO CONC WALE RUN mEMBTTANL OVER TOP OF WALL F ti' ` FULL MORTAR BED ON t5 THRU WALL FLASHING EPDM SINGLE PLY w /DRIP EDGE EACH ROOFING �J .1 SIDE R - - - -__ r T.Q. CONC SLAB VAIL RESORTS DEVELC}PIVMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER MONROE do NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ASS CONSULTANTS, INC DENVER, 06L@RAD* .p. <a " A a .•. 'ao ,. .. D• fj // 8205 ! 205 — 4 VAIL, COLORADO PROdEOT NO: 20696.06 ISSOE ISSOE SCUPPER BEYOND NO. DATE DFSORIPTION 02 01.20.06 ° 0 STONE VENEER BIDG »t R111 -- 09.06.06 ASI -0002 o • CONC WALL TAPERED RIGID °. INSULATION OVER CONC SLAB ON METAL DECK & BEAM (RE SLOPE {, yl C AP 09' -9 Vail Ski Club i F �J .1 R OWNER /DEVELOPER VAIL RESORTS DEVELC}PIVMENT COMPANY AVON, COLORADO ARCHITECT OF RECORD 4 Denver, Colorado STRUCTURAL ENGINEER MONROE do NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ASS CONSULTANTS, INC DENVER, 06L@RAD* LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT NO: 20696.06 ISSOE ISSOE ISSOE NO. DATE DFSORIPTION 02 01.20.06 ADDENDUM N0. 01 0 04.03.06 BIDG »t R111 -- 09.06.06 ASI -0002 Vail Ski Club 6 15.2 14.4 i 2x6 T &G V- GROOVE j DECKING WOOD TRIM WALL, FLUSH Wf TIMBER BEAM, BETW. BEAMS & CHORDS ROUGH SAWN TIMBER BEAM ---- -' BEYOND, SHOWN DASHED BEAD SECTION DETAIL WALL 1 1/2" - 1' -t3" TRUSSDETAIL 13.5 A503 4 I'_ Z A503 ° --''" - a a a a a a i � STEEL TIE ROD �,,,, ......► a c a (RE: STRUCT.) ° I I I I I I ROUGH SAWN COLUMN I I I I (RE: STRUCT.) ( I I I i I I I I II I I I I I I I I I I I I I I ( L nA& K im iii/ • �: • � i _ _ _ EXT. WALL SHEATHING TOP PLATES BEYOND, SHOWN DASHED TUBE STEEL COLUMN (RE: STRUC) Ii VERT. WOOD NAILER) GYP. BD. >IZE & 3 SIZE & CLOSED -CELL POLYURETHANE INSULATION (6" THICK) 0 PROFILE OF ROOF TILES CONT. PLATE &STEEL BEAM BENT (RE: STRUC) STRUCTURAL ROOF SHEATHING (RE: STRUC) (RE: STRUC) M;Jr I F! M ROUGH SAWN TIMBER COL /� BEYOND (RE: STRUCT.) NOTE: SI�I CLUB TRUSS �FOR R 1. RE: STRUCTURAL DWG'S FOR 1/2 TR sDErA� TRUSS PROFILES, LAYOUT, & DETAILS. 11 TRUSS CHORD PROFILE (TYP) A-1 I1 /2" = 1' -0" TRUSSDETAII TRUSSDEfAlL I \ --BLOCKING BETWEEN JOISTS @ 2' `.../ O.G. TO SUPPORT T&G CLG. 1 I %# GYPSUM WALL BOARD M, Irv.) THERMAL BARRIER N� CONFORMING WITH 2003 IBC OWNER/ DEVELOPER VAIL RESORTS DEVELOPMENT SECTION 2603 AVON, COLORADO ARCHITECT OF RECORD 4 0 Denver, olorado_ STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO} T NG E G OO E NEIL G, LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. PAIL, COLORADO I PROJEOT NO: 20696.05 ISSUE NO. RUN PARALLEL TO TRUSSES ISSUE DESORIPTIOM 01 01.10.06 FOR CONSTRUCTION rr 74 04.03.06 M-DG D RSp FWAL C ON9. 09.06.06 ASI -0002 ROUGH SAWN TIMBER BEAM BEYOND I (RE: STRUCT.) TOP CHORD T.O. STEEL BEAM BENT NOTCHED TOP TRUSS PROFILE OF ROOF TILE CHORDS (RE: STRUC) rr LINE OF TONGUE & GROOVE CLG. 5� 2 BLOCKING BETW. END OF I TIMBER BEAM & VERTICAL CONTINUOUS BLOCKING TO TRUSS MEMBER MATCH BEAM (RE: STRUCT.) ROUGH SAWN TIMBER BEAM WOOD TRIM TO MATCH T &G (RE: STRUCT.) CLG. BETWEEN TRUSS CHORDS �- -- O I BELOW STEEL BEAM/ BENT VERTICAL TRUSS MEMBER BEYOND (RE: STRUCT.) MIDDLE CHORD r / VERTICAL TRUSS MEMBER BEYOND I (RE: STRUCT.) THRU -BOLT, COUNTERSINK & r5 PLUG, TYP. (RE: STRUCT.) M;Jr I F! M ROUGH SAWN TIMBER COL /� BEYOND (RE: STRUCT.) NOTE: SI�I CLUB TRUSS �FOR R 1. RE: STRUCTURAL DWG'S FOR 1/2 TR sDErA� TRUSS PROFILES, LAYOUT, & DETAILS. 11 TRUSS CHORD PROFILE (TYP) A-1 I1 /2" = 1' -0" TRUSSDETAII TRUSSDEfAlL SKI i T D ET A ILS 22 V 7 L TT! tL.6^ L.""L TS ! IIYILJL.1 \ I.JL_f LIYI I `.../ I 4 M, Irv.) N� OWNER/ DEVELOPER VAIL RESORTS DEVELOPMENT CO AVON, COLORADO ARCHITECT OF RECORD 4 0 Denver, olorado_ STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO} MEP ENGINEERS ABS CONSULTANTS, INC DENVER, VOLORADO LANDSCAPE ARCHITECT HART /HOWERTON NEW YORK, NEW YORK CIVIL ENGINEER ALPINE ENGINEERING, INC. PAIL, COLORADO LANK BVRVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROJEOT NO: 20696.05 ISSUE NO. ISSUE DATE ISSUE DESORIPTIOM 01 01.10.06 FOR CONSTRUCTION 0 04.03.06 M-DG D RSp FWAL C ON9. 09.06.06 ASI -0002 SKI i T D ET A ILS 22 V 7 L TT! tL.6^ L.""L TS ! IIYILJL.1 \ I.JL_f LIYI lsfsm • • = fflsm RE: STRUCT. FOR STAIR & LANDING FRAMING r C> 3'-8 cq C:> /-i& T.O. SLAB -4- COMMON GRID 00 O R 15.6 (15.4) 15.2 14.4 cti QO GARAW /'EXHAU")' SHAFT GYPSUM WALL BOARD THERMAL c I > BARRIER CONFORMING WITH 2003 7 IrN V .2 Wk IBC SECTION 2603 OWNER/DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCMTECT OF RECORD 4 I-, Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, VOL➢ LANDSCAPE ARCMTECT HART/HOWERTON NEW YORK, NM Y*RK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROIJEOT NO: 20693.05 ISSUE LSF—C-1 I GE OF CH. RASE NO. DATE DESORIPTION — 08.25.03 DD PRICING — 09.15.03 ANAL DD O1 1 01.10.06 FOR CONSTRUCTION (RE: MECH) 1 I WALL BEYOND ADAENOUi� NO, 01 04.03,06 6= DEPT RESP MW. 05.15.06 DA DEPT RESP RM 09.06. 06 ASI— 2 SIMPSON STRONG CfIE TRANSFER AIR-- - (RE: STRUCT.) DUCT (RE: MECH) I I I T.O. SLAB PROVIDE 3'X3' 8195-2" STAIR CONC. SLAB ON METAL DECK W/ 2—HOUR PLENUM ACCESS DOOR CS01 RATED CEMENTITIOUS FIREPROOFING APPLIED TO UNDERSIDE, SEE A/602. PAINTED METAL HANDRAIL, ri M RAILING & GUARDRAIL POOL ST. 0219 - j STEP IN CUR 3 BEYOND c:) (RE: STRUCT) 00 T .O. SLAB � °o 8187'_ } � i��.i�. i. ni .iwi.isini..i•ef.i.iuf..lr II t PAINTED METAL STAIR, 00 STRINGERS & SUPPORTS st 13 o : CD A621 SIM WATER VALVE RM. r cq 01 06 Of 2 HR. SOFFIT, - SEE D/A602 SKI STORAGE T_ C104 3 -8y2" co T.O. SLAB 8177'-0" r NOTES: to cq 1. STAIRS TO BE STEEL PAN STAIRS W/ CLOSED RISERS & / —DOOR CS01c 2" DEEP PANS FILLED WITH CONC, (SEE SPEC SECTION T 05510) 2. STAIRS TO HAVE A CONIC. CD I FINISH lsfsm • • = fflsm RE: STRUCT. FOR STAIR & LANDING FRAMING r C> 3'-8 cq C:> /-i& T.O. SLAB -4- 21 1 3TO 11 R 4— Ar 4 PAINTED METAL HANDRAILS 4 -4 L- j & GU I 00 J. STAIR U E csol 00 6 T.O. Sd6 2 8185 - J N T.O. SLAB V 8187'-4" co 5 — t r —I— V,-0- A700 L CA A� IVI — r I '1 — — — — — — — — — — — — — — — FIRE CONT OL 0227 ea EL #1 SEE S 1 1421 & ID SP CS FIN HES f 9 8188-6" \ A GE PA RKIN AR I G E 5' XHAU SHAFT . Sim. 15a4 1 a2 (4 14.4 4 SKI CLUB — ROTJNI LEVEL STAIR 8c ELEV. PLAN EL, 818,8.5 cuss NEW 00 O R cci cti PAf(KING GARAW /'EXHAU")' SHAFT c I > 21 1 3TO 11 R 4— Ar 4 PAINTED METAL HANDRAILS 4 -4 L- j & GU I 00 J. STAIR U E csol 00 6 T.O. Sd6 2 8185 - J N T.O. SLAB V 8187'-4" co 5 — t r —I— V,-0- A700 L CA A� IVI — r I '1 — — — — — — — — — — — — — — — FIRE CONT OL 0227 ea EL #1 SEE S 1 1421 & ID SP CS FIN HES f 9 8188-6" \ A GE PA RKIN AR I G E 5' XHAU SHAFT . Sim. 15a4 1 a2 (4 14.4 4 SKI CLUB — ROTJNI LEVEL STAIR 8c ELEV. PLAN EL, 818,8.5 cuss NEW SKI CLUB STAIR SECTION—CS01 8177 CSCST go FIN E NOTE: 6 EL ATOR DOORS/ OPENINGS T BE go MINUTE RATED 00 tCi Ix PAf(KING GARAW /'EXHAU")' SHAFT SKI CLUB STAIR SECTION—CS01 8177 CSCST go FIN E NOTE: 6 EL ATOR DOORS/ OPENINGS T BE go MINUTE RATED P4 Ix PAf(KING GARAW /'EXHAU")' SHAFT \ SKI CLUB STAIR SECTION—CS01 8177 CSCST go FIN E NOTE: 6 EL ATOR DOORS/ OPENINGS T BE go MINUTE RATED PROVIDE CONTINUOUS HORITONTAL METAL RAIL @ 18" A.F.F. UNDER THE STAIR a. ELEV LOBBY x76 — --- - - -.-- -- .2 !STRETCHER Go C) Vail Ski Club 1 1 = P4 7 IrN V .2 Wk OWNER/DEVELOPER VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ARCMTECT OF RECORD 4 I-, Denver, Colorado STRUCTURAL ENGINEER MONROE & NEWELL ENGINEERS, INC AVON, COLORADO MEP ENGINEERS ABS CONSULTANTS, INC DENVER, VOL➢ LANDSCAPE ARCMTECT HART/HOWERTON NEW YORK, NM Y*RK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL COLORADO LAND SURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROIJEOT NO: 20693.05 ISSUE ISSUE ISSUE NO. DATE DESORIPTION — 08.25.03 DD PRICING — 09.15.03 ANAL DD O1 1 01.10.06 FOR CONSTRUCTION 02 01,20.06 ADAENOUi� NO, 01 04.03,06 6= DEPT RESP MW. 05.15.06 DA DEPT RESP RM 09.06. 06 ASI— 2 PROVIDE CONTINUOUS HORITONTAL METAL RAIL @ 18" A.F.F. UNDER THE STAIR a. ELEV LOBBY x76 — --- - - -.-- -- .2 !STRETCHER Go C) Vail Ski Club 1 1 = INN# MW (a— _ LINE OF STONE ROOF@ LINE OF PRE—CAST CHIMNEY CAP ABOVE SHOWN D/SHEC OUTLINE OF STONE 0 GRADE PRECAST STONE SILL CONC. BELOW SHOWN DASHED 14" METAL FLUE STONE VENEER GROUTED SOLID 1011001 GUTTE ROOF EAVE (R— _ 1�� �TL �AC E 61 n—FIREPLACE (a] rA GOV C iro Vail Ski Club BUILDING C SKI CLUB FIREPLACE DETAILS A800 SCALE: VAMES VAIL RESORTS DEVELOPMENT COMPANY AVON, COLORADO ,OCMMCT OF RECORD 42AO Denver, Colorado STRUCTURAL ENGINEER AVON, COLORADO MEP ENGINEERS DENVER, VOLOM0 LANDSCAPE ARCIIITECT NEW YORK, NEW Y*RK CIVIL ENGINEER ALPINE ENGINEERING, INC. VAIL, COLORADO LAND SIURVEYOR PEAK LAND CONSULTANT, INC VAIL, COLORADO PROdEOT NO: 20693.05 ISSUE NO. ISSUE DATE ISSUE DESORIPTION — 08.25.03 DD PRICING — 09.15.03 FINAL DD 01.20.06 ADDENDUM NO. 01 FINk COW. 09.06.06 ASI—CO02 GOV C iro Vail Ski Club BUILDING C SKI CLUB FIREPLACE DETAILS A800 SCALE: VAMES � - VA I To weev- V A - %OtA 14 (w , ,4 ,. r vql- �5b . I- 0S6 5 1/2 " A jr 7 1/2 1% >( I/A C �v t`,g 130 o " o r- e' . C.05 p� *= tOt ol . v A roiz i pd�D � ^I'tCP�� k) Ike paw ( I r -,Z%-O Z -2x& 'a, 'A 7°, ' � + � a t 3.1 i i Mll UNLE55 NOTED OTHERN15E, ALL EXTERIOR KALLS REGUIRE 1/2" PLYNOOD5HEATHINe ONE SIDE AITH Scl AT 6" E00155 AND V INTERIOR WITH 1/2" 4 ANCHOR 5OLT5 AT 4!-0". ATTACH WALL PLATES TO BLOCKING OR RIM BOARD I^IITH51MP5ON A55 CLIP5 AT 2'-0". ALL EXTERIOR TOP PLATE LAP SPLICE CONNECTIONS SHALL BE ATTACHED KITH (14)-Ibd NAIL5 SHEAR WALL &CHE�ULE k4ALL SHEATHIN6 AND HOLD DOWNS FOR ANCHOR 501-TS ,�,,. _ 1 � Tyf:l= FASTENER PATTEf;ZN, FOUNDATION IZ2" PLirP4000 SHEATHIN6 51"=50N STHD14 1/2n 0 X 10" ANCHOR BOLT KTH e�d AT 4" A PANEL EDGES AT AT 2 N=5; A l t _ _ - --'' ' � J i I. ALL SHEAR AALL EDGES BLOCKED NITH 2" NOMINAL OR LARGER PRAMIN6 (f3L0CKZD). FASTEN SHEATHINGS TO INTERIOR FIRAMINO WITH &d AT 1'-0". 2. ALL HOLD-00k TO BE INSTALLED IN STRICT ACCORDANCE WITH MANUf:ACnlReR5 INSTALLATION INSTRUCTIONS. 4• EXTENT OF 5HEAR KALL DENOTED 5Y-- . -- . -- . - i ' S. STUD SPACING is DETERMINED BY spAcme OF JOI5TS/TRU5SE5 BEARINe ON WALL. AND SHALL BE AT 2'-0" MAXIMUM. 6. PLYWOOD WALL SHEATHING SHALL EXTEND 8 Ile" BELOW WALL BOTTOM PLATE OF UPPER WALL AND SHALL EXTEND 7" ABOVE �!1- �gp,Ea �-�"� _ - 1 1 TOP PLATE OF I-OkeR k4ALL. TO 5>66 o)-t.55 GO 1ST y � i t 4 � - 0 � :p. N 'T clol- . ........... �� t � � I 1/4" co #IT --0 ' o" L ROOF UJO02 FRAMIN<3p NOT17=61. I. ROOF SHEATHING 5/&' (40/20 SPAN RATING). STAC,6ER PANEL END JOINTS AND FASTEN WITH 10cl NAILS AT 6" MAXIMUM ALL EDGES AND MAXIMUM OTHER Suppofp-Ts (sm ROOF DIAPHRAGM NAILING SHEET 5100). 2. RE; ARCHITECT FOR ROOF 5LOPE5 AND BEARINE, PLATE HE1644T5 NOT NOTED. 5- ALL HEADERS SHALL BE (5) -2>(8 KITH HUC 5IMP50N HANGER, AS REQUIRED UNLESS OTHERH15E NOTED. ALL HEADERS SHALL BE BUILT OUT TO 5 1/2" OR 5 1/2 AIPTH BY ADDING PLYWOOD SHIMS AS REQUIRED. 4. ALL HEADERS LONGER THAN &'-0" SHALL REQUIRE TWO TRIM STUDS AND TWO KING STUDS EACH SIDE. 5. ALL J015T HAN&ER5 SHALL BE SIMPSON LUP, NP OR L95U TYPE UNLE55 NOTED OTHERWISE. 6. ALL BEAM TO COLUMN CONNEC TIONS, BOTH TOP AND BOTTOM SHALL USE SIMPSON PLATE OONNECTOf;L5 UNLE55 NOT OTHERWISE ON DETAILS. - I. ALL EXTERIOR k4ALL5 SHALL HAVE CONTINUOUS STUDS FROM FLOOR TO ROOF (INCLUDING RAKE KALL5). a. < > INDICATES TOP OF ROOF BEAM, OR TOP OF STEEL HEIGHT OR TOP OF CORE. -q- SEE SHEET 5001 FOR GENERAL NOTES. 10. RE ARCHITECT FOR CHIMNEY SIZES AND LOCATIONS NOT NOTED ON STRUCTURAL PLANS. 11. OVER FRAMING SHALL BE 2X6 MINIMUM AND SHALL BE POSTED DOWN TO MAIN TRUSSES ON A 6RIP NOT TO EXCEED 4'-0" X 4'-0" (Iro FT 12. ALL COLUMNS SHALL BE (5) -2X6 UNLE55 OTHERK515 NOTED. 15. FOR ROOF DIAPHRAM NAILING SCHEDULE SEE SHEET 5001. 14. "LVL" INDICATES VERSA-LAM BEAMS, AS MANUFACTURED BY BOISE CASCADE CORPORATION. ALTERNATES SHALL HAVE THE SAME OR 6REATER CAPACITY AS LISTED IN THE STRUCTURAL 6ENERAL NOTES. 15. D INDICATES ooLumN DOWN ONLY- MULTIPLE 2X FRAMING NOTED ON PLANS. 16. E INDICATES COLUMN UP AND DOWN UNLESS IT BEARS ON CONCRETE WALL OR FOOTING BELOW, OR IT 15 LABELED UP ONLY. 17. + INDICATES TOP OF STRUCTURAL FLOOR. 15. WOOD COLUMNS SHALL BE CONTINUOUS FROM FLOOR TO FLOOR OR FLOOR TO ROOF. TRIMMERS SHALL BE ADDED TO NOTED COLUMN 51ZE AS REQUIRED. Ict. ALL EXTERIOR KA%LL5 SHALL BE CONSTRUCTED U51N6 2X6 STUDS. REFER TO EXTERIOR WALL DETAILS FOR ADDITIONAL INFORMATION. EXTERIOR STUDS CAN BE SPACED 2'-0" FOR WALLS SHORTER THAN 10'-0". STUVSSHALI- BE SPACED 1 FOR WALL SHORTER THAN 14'-0" AND TALLER THAN 10'-0". 20. ALL BEAM/BEAM AND 5EAMACOLUMN CONNECTIONS SHALL BE MADE .WITH SIMPSON STEEL PLATE CONNECTORS UNLESS NOTED OTHERWISE. 21. RE: ARCHITECTURAL DRAHIN65 FOR LOCATION AND 517F OF ROUGH OPENINGS IN WOOD STUD KALL5. 22. RE: ARCHITECTURAL DRAWINGS FOR HANDRAIL AND STAIR FRAMING DETAILS. 25. ALL WALLS SHALL HAVE CONTINUOUS STUDS FROM FLOOR TO FLOOR OR FLOOR TO ROOF (INCLUDING RAKE WALLS). 24. 0 (INCLUDING INPICATE5 SHEAR MALL RE: 501-115J:OULE. 25. ALL ROOF SLOPES SHALL BE 4112 U.N.O. 26. ALL TIMBER BEAMS AND TRUSS MEMBERS SHALL BE STRUCTURAL #1 64ZADE OR BETTER DOU&LAS-FIR. 27. RE: SHEET 9105 FOR TRUSS ELEVATIONS / DETAILS. 25. = INDICATES EMBED PLATE IN CAST IN PLACE WALL. f;zr--, 5002 2q. ALL DOUGLAS FIR LARCH SELECT STRUCTURAL COLUMNS SHALL HAVE Fc. = 1150 P51 AND Fb = 1500 f"51. �� 40 � Wo-K m a:� 00 A q BUILDING C 1�