March 2, 2009
Planner: Warren Campbell
The information contained in this file pertains to the
discussion which occurred regarding the collocation of a
transit center and employee housing on the North Day Lot.
After several design iterations and multiple public reviews it
was determined that the Town did not want to pursue
anything more than skier drop-off and employee housing on
the site, both of which were obligation of Vail resorts from
the Arabelle project. These items are included with the
approved plans for the North Day Lot simply to serve as a
history for future inquiries regarding the North Day Lot.
ARCHITECTURE
~~~~~ URBAN DESIGN
~ INTERIOR DESIGN
PROJECT: North Day LOt
NOTES BY: Brlan Lopez
NEXT MEETING:
ATTENDEES: Greg Hall
Stan Zemler
George Ruther
Warren Campbell
Will Hentschel
Brian Lopez
MEETING MINUTES
DATE: June 23, 2008
PROJECT #: 17030.01 MEETING #: 3A
FILE N:
DISTRIBUTION: Attendees
The aforementioned minutes constitute our understanding of the items discussed. If this is not an accurate written description of the
intent and results of this meeting, please contact this office with comments. The minutes will stand as a record of the meeting unless
corrections are received within seven (7) days after receipt.
ITEM #
DPCC'RIPTInN
RFCDl1~ICI RII ITV 11FA nl ILIC
3A-1 Greg -overview of previous meetings
discussion regarding Option 1 and Option 5.
• Option 1 -Originally submitted in
PEC Submittal #1 on 2.21.08 with
east portion of site retained for
future development.
• Option 5 -Study of full transit
development across entire site as
directed by Vail Town Council.
3A-2 Will -explained Option 5 podium level.
• This podium layout was taken from
the Option 4 layout of a 120 bed
EHU building and used for the
pricing exercise by Swinerton
including a structural feasibility
study by SA Miro.
3A-3 George spoke about the Master Plan
Amendment by the Vail Town Council.
• Council directed the use of the
entire parcel of land at the surface
level for transit. This was agreed
upon previous to the multiple
transit study options. The exercise
forward was meant to study what
the best options were even if it
meant not utilizing the entire site.
3A-4 Brian and Will presented the new Option 1
Alternative plan.
,, ,
DENVER BOULDER COLORADO sPHNGS LAS VEGAS LAKETAHOE
BOULDER PHONE: 303449.8900
1805 29TH sTREET, SUITE 2054 FAX: 303.449.3886
BOULDER COLORAD080301 WWW.OZARCH.COM
ARCHITECTURE
~~~~~~ URBAN DESIGN
® INTERIOR DESIGN
ITEM # DESCRIPTION
RESPONSIBILITY DEADLINE
• This plan incorporated a shift of the
hammerhead bus stop to the north
similar to that of Option 5 to allow
increased relief from Landmark and
a potential enclosure along the
southside of the transit center.
• The above was accomplished by
flipping the circulation cores for the
building above. This allows the skier
drop-off parking to shift to the
northwest tucking under the berm.
• Additional clarification of the
existing utility locations is needed
to evaluate the impact of this
option along the northside.
• This option increased the distance
from the nearest bus to the
property line from 14'-3" to 20'-
11 ". This could allow all pedestrian
circulation to be under the podium
above.
• Stan raised a general concern of any
additional cost that may come out
of these options over the $19
million proposed.
3A-5 Any modifications to the stair and elevator
cores for the building above will need to be
approved by VRDC.
3A-6 Will presented the edge condition sketches
for the various options.
• Section studies were presented for
Option A, A Alternate, and 5.
• These sketches showed different
solutions for pedestrian access and
potential screening and snow
retaining strategies along the
southside of the transit level.
Including Use by Right and Variance
options.
3A-7 General studies to be addressed in near
future once an Option is decided upon:
• Evaluate ventilation strategies for
the transit level, especially if an
enclosed south wall is chosen, and
the influence of this strategy as it
pertains to an environmental
review.
• Evaluate all electrical, mechanical,
BOULDER
1 BOS 29TH STREET, SURE 2054
DENVER BOULDER COLORADO SPRNGS LAS VEGAS LAKE TAHOE BOULDER COLORADO 80301
MEETING MINUTES
PHONE: 303 449,8900
FAX: 303.449.3886
V/W W.OZARCH. COM
ARCHITECTURE
M~~~.~~ URBAN DESIGN
~ INTERIOR DESIGN
ITEM # DESCRIPTION
RESPONSIBILITY DEADLINE
structural, civil, fire protection,
and utility relocation costs
associated with the option chosen.
• Study % of open air/enclosure wall
along south elevation of the transit
level.
• Additional plan studies for wall
enclosure, pedestrian pathway,
snow management, and landscaping
along south edge.
3A-8 For TOV meeting with NDL neighbors at 1 pm OZ 06.24.08
on 06.24.08 - OZ to compose a package of at 12pm
the current options and their associated
pedestrian studies as reviewed in this
meeting.