October 26, 2007 ഀ
ഀ
Fritzlen Pierce Architects ഀ
Attn: Bill Pierce ഀ
1650 E. Vail Valley Drive ഀ
Fallridge, Unit C-1 ഀ
Vail, CO. 81657 ഀ
ഀ
RE: Bridge Street Building – Building Permit Submittal Comments ഀ
File No. B070307 ഀ
ഀ
Bill, ഀ
ഀ
Planning Staff has completed a review of your submittal for a building permit for the ഀ
Rucksack building and has identified the following issues and concerns relative to the ഀ
overall completeness of the submittal. Specifically, certain required information is either ഀ
missing from the submittal, or is requested in order to allow Staff to carry out an ഀ
adequate and complete review of the plans and all final detailing for the proposed ഀ
building. ഀ
ഀ
Issues/Information Requested ഀ
ഀ
Site Plan ഀ
ഀ
While different sheets of the plans depict general existing and proposed site ഀ
improvements, please be reminded that the Site Plan should include all existing and ഀ
proposed site improvements, property lines, easements, utility routing, spot elevations ഀ
and proposed hardscape materials. Specifically: ഀ
ഀ
- Label all proposed hardscapes and specify proposed materials; provide details as to ഀ
limits of disturbance, as well as the transition from existing streetscape ഀ
improvements to proposed improvements. ഀ
- Provide legend/key for all proposed line weights and symbols, as well as general ഀ
notes for all proposed site work. ഀ
- Revise the plan to insure that proposed structural walls at the east side of the ഀ
building for new stairwell and stair support are within the property boundary (i.e. ഀ
remove encroachment of wall and any helical pier from Tract G). ഀ
ഀ
Architectural Plans ഀ
ഀ
Sheet DR200: ഀ
ഀ
- Verify status of “existing storm drain” located to the north of the existing Rucksack ഀ
Building; Staff is of the understanding that this drain is non-functional and does not ഀ
tie into TOV storm sewer. ഀ
- Clarify drainage plan on south side of property at roof and deck; where is drainage ഀ
from scuppers being routed? ഀ
- Clarify drainage plan for north side of property; will gutters be added at eave of ഀ
existing and proposed roof sections overhanging adjacent property to north? ഀ
rd ഀ
- Clarify drainage plan/details for new “deck in roof” for 3 Floor residential unit; where ഀ
is drainage being routed? ഀ
ഀ
Sheet A200: ഀ
ഀ
- Revise plan to eliminate encroachment of structural wall and/or helical piers at east ഀ
side of property from Tract G. ഀ
ഀ
Sheet A201: ഀ
ഀ
- Clarify extent of demo/remodel; provide greater details and/or notes on plans ഀ
specifying locations of new and existing construction to match details and/or notes to ഀ
be provided on elevations and demo plans. ഀ
- Label all exterior materials (per key provided) and provide notes/call-outs for all ഀ
dimensions. ഀ
ഀ
Sheet A202: ഀ
ഀ
- Clarify extent of demo/remodel; provide greater details and/or notes on plans ഀ
specifying locations of new and existing construction to match details and/or notes to ഀ
be provided on elevations and demo plans. ഀ
- Label all exterior materials (per key provided on elevation sheets) and provide ഀ
notes/call-outs for all dimensions; specifically, provide information on materials and ഀ
construction method for proposed storage closets located on south side of deck. ഀ
ഀ
Sheet A203: ഀ
ഀ
- Clarify details (materials and slope of roof) for proposed storage closets located on ഀ
south side of deck. ഀ
- Clarify on plans where snow shed protection is located over decks, balconies and ഀ
other areas of pedestrian activity, if applicable. ഀ
ഀ
Sheet A204: No comment ഀ
ഀ
Sheet A205: No comment ഀ
ഀ
Sheet A206: No comment ഀ
2 ഀ
ഀ
Sheet A301: ഀ
ഀ
- Make application for “Changes to Approved Plans” for addition of stucco at northeast ഀ
corner of building. ഀ
- Show all proposed gutters and downspout locations/routing. ഀ
- Clarify extent of demo/remodel; provide greater details and/or notes on plans ഀ
specifying locations of new and existing construction. ഀ
ഀ
Sheet A302: ഀ
ഀ
- Make application for “Changes to Approved Plans” for revisions to south façade deck ഀ
wall enclosure; wall height and design has been modified. ഀ
- Revise apparent detailing conflict between proposed ridge beam and arched stucco ഀ
detail at main entry to second level. ഀ
- Clarify extent of demo/remodel; provide greater details and/or notes on plans ഀ
specifying locations of new and existing construction. ഀ
ഀ
Sheet A303: ഀ
ഀ
- Make application for “Changes to Approved Plans” for revisions to east façade ഀ
exterior materials (addition of stucco). ഀ
ഀ
Sheet A304: ഀ
ഀ
- Clarify structural support detailing (wood corbel) and detailing of underside of ഀ
cantilevered balcony at northwest corner of building on second level; structural plans ഀ
(Sheet S4) call out “10x Lookout” in this location. ഀ
ഀ
Sheet A800: Provide details and/or sections as follows: ഀ
ഀ
- “New Deck in Roof”; section should be provided detailing construction of new deck in ഀ
roof. ഀ
- Decorative hand rail/new balcony construction; detailing for proposed rail ഀ
connections, specifically at 90 degree angle at northwest corner of balcony at second ഀ
level. ഀ
- Rake detail; clarify detailing for exposed ridge and shoulder beams relative to ഀ
rake/fascia detail. ഀ
- Window and door assemblies; detail all proposed window and door (wall) ഀ
assemblies, inclusive of header, sill and trim details for windows and doors proposed ഀ
in stucco and wood exterior walls. ഀ
- Trash enclosure and elevator door assemblies; detail door assemblies, inclusive of ഀ
header and trim details. ഀ
- Stucco-to-wood siding detail/transition wrapping northeast corner of building; show ഀ
transition from proposed stucco to existing wood siding. ഀ
- New wood post and beam “trellis”; provide details for construction of trellis structure. ഀ
- Column supports at west façade, at existing stairwell to Joe’s Deli. ഀ
- Arched entry (stucco) detail; clarify detailing/assembly for arched stucco detail at ഀ
main entry on second level. ഀ
- New balcony at northwest corner of second level; provide detailing for underside ഀ
assembly of proposed balcony and clarify use of 2x6” T&G; soffit details provided on ഀ
Sheet A801 show 1x4” T&G. ഀ
3 ഀ
ഀ
- Storage closet construction and assemblies; provide more details regarding exterior ഀ
materials, roof assembly. ഀ
ഀ
Sheet A801: Provide details and/or revisions as follows: ഀ
ഀ
- Revise section 5; show detail/section of cut stone band within column, as well as ഀ
detail/section of proposed signage for “Retail Listings” element. ഀ
- Provide new detail/section showing column-to-balcony assembly and detailing. ഀ
ഀ
Structural Plans ഀ
ഀ
Sheet S1: ഀ
ഀ
- Clarify placement of helical piers within existing “Trash” storage area at landing of ഀ
existing stairwell to Joe’s Deli; demonstrate how placement of proposed piers will not ഀ
compromise existing trash storage. ഀ
- Revise plan to eliminate encroachment of structural wall and/or helical piers at east ഀ
side of property from Tract G. ഀ
ഀ
Sheet S4: ഀ
ഀ
- Clarify detailing/finish of “10x Lookout” proposed underneath cantilevered balcony on ഀ
northwest corner of building on second level. ഀ
ഀ
Sheet S5: ഀ
ഀ
- Clarify proposed “Detail J”; is this detail to match “wood corbel” shown on ഀ
elevations? If so, ensure that structural and architectural plans match. ഀ
ഀ
Sheet E201: ഀ
ഀ
- Clarify proposed finish for fixtures ‘D’ and ‘E’ ഀ
ഀ
Additional Issues and Concerns ഀ
ഀ
Pedestrian Bridge ഀ
Regarding the required Site Plan, Staff suggests that further details are needed to ഀ
adequately assess the appropriateness of any proposed pedestrian bridge over West ഀ
Mill Creek. As these improvements are shown to comply with applicable building and/or ഀ
fire code(s), more detailed information will be required prior to any further review ഀ
pertaining to construction of the proposed bridge at or near the identified 100-year ഀ
floodplain, as well as details of how such pedestrian connection will integrate with ഀ
existing grades on the east side of Mill Creek. In this regard, please also address the ഀ
viability of providing enhanced and/or required egress over portions of Lots A, B, and C ഀ
to the north of Parcel 1. ഀ
4 ഀ
ഀ
Changes to Approved Plans ഀ
In addition to submitting an application for “Change to Approved Plans” for items listed ഀ
within this document, please be advised that any and all changes made by the Applicant ഀ
in response to Town of Vail Building and/or Fire Department comments made regarding ഀ
plans dated 9/06/07, which affect the use, bulk, mass, height or exterior appearance of ഀ
the building, will require an application for “Change to Approved Plans”. ഀ
ഀ
Please don’t hesitate to contact me at (970) 477-3551 or shunn@vailgov.com if you ഀ
have any questions regarding these comments or require clarification of submittal ഀ
requirements. ഀ
ഀ
Regards, Cc: Warren Campbell ഀ
Highland Builders ഀ
File ഀ
ഀ
Scot Hunn ഀ
Senior Planner ഀ