Loading...
HomeMy WebLinkAboutDRB090628Design Review Board ACTION FORM 661114(1 Department of Community Development 75 South Frontage Road, Vail, Colorado 81557 tel: 970.479.2139 fax: 976.479.2457 web: www.vailgov.com Project Name: LE VARN ADDITION Project Description: Participants: ADDITION & REMODEL OWNER LE VARN, MARIA A. & MARC 12/28/2009 PO BOX 214 VAIL CO 81658 APPLICANT SHARKA REID 12/28/2009 DESIGN CONCEPTS INC PO BOX 4414 EAGLE CO 81631 DRB Number: DRB090628 Project Address: 1817 MEADOW RIDGE RD VAIL Location: UNIT 4, CAPSTONE CONDOS Legal Description: Lot: 21 Block: Subdivision: CAPSTONE TOWNHOUSES Parcel Number: 2103-123-0400-4 Comments: SEE CONDITIONS BOARD/STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 01/22/2010 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond:202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: 6 (PLAN): PRIOR TO THE TOWN'S ISSUANCE OF A TEMPORARY CERTIFICATE OF OCCUPANCY, ALL EXTERIOR FINISHES SHALL BE COMPLETED (I.E. STUCCO, PAINT, ETC.). Cond: 51 MONITORED FIRE ALARM SYSTEM REQUIRED AND SHALL COMPLY WITH NFPA 72(2007) AND VFES STANDARDS. Planner: RACHEL FRIEDE 131113 Fee Paid: $300.00 Application for Design Additions - Residential or ~n9 General Information: This application is required for all proposals involving the addlition of any 11CRI net floor area and/or gross residential floor area (GRFA). This also includes proposals for'residential 250 additions' and 'interior conversions'. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information - Town Code Online. All projects requiring design review must receive approval prior to submitting a building permit ap- plication. An application for Design Review cannot be accepted until all required information is received by the Commu- nity Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: $300 Single Family Duplex Multi-Family 4wwv %,\O tnX+,Y?iCA a- ~ IZk~-►Z o~•t I&A of- ill (T6 A 3 + Descrip on of the Request: - r 4 HA-11.1 r-Wbp R JJpkk_ M.A_TC01t i, Ir~t~ Addition of ~-1sq ft of GRFA (Residential) or sq ft of ne/t' floor area (Commercial/ Office) Physical Address: 1 /t W c k. cv (11_ ~i C'Ic l 1 Parcel Number: f ~l ~1 12- U 4 UV 4- (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: +411 14, 2 C 4» J M k~ U Li r-11 Mailing Address: I' J M fo G u~~ ~ ' I% L• P /2 c a t ( Phone: C.i? Owner's Signature: l 7 Primary Contact/ Owner Representative: G N C_ :~C 4 I~~ a~~1 -il 14 Mailing Address. ~,1HPl>1rb~~i~,+~Ct C `f~itdL • (at''~ Phone: AID. E-Mail: I1~ C L e~~r~~~~/~~ I G_ l ~~ax: For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # Auth # _ Fee Paid: • Received From: N_Q, 6a__ Meeting Date: ZP~ LO DRB No.: Project N07 A_ J Q.--1_- Planner: - ~ Zoning: Location of the Proposal: Lot: Block: Land Use: Check # Subdivision: Lf-eR -DEvoq- 0001 TOWN OF VAIL, COLORADO Statement Statement Number: R090001810 Amount: $300.00 12/28/200901:51 PM Payment Method: Check Init~: JLE Notation: 429 MARIA CASSIDY LEVARN Permit No: DRB090628 Type: DRB - Addition of GRFA Parcel No: 2103-123-0400-4 Site Address: 1817 MEADOW RIDGE RD VAIL Location: UNIT 4, CAPSrrONE CONDOS This Payment: ACCOUNT ITEM LIST: Account Code DR 00100003112200 Total F es: $300.00 $300.00 Total ALL P ts: $300.00 Bala ce: $0.00 I DescXiption Current Pmts ------------------------------i DESI(DN REVIEW FEES 300.00 ,r Ralph W. Hajosy 18 17 Meadow Ridge Road #5 Vail, CO 81657 September 29, 2009 To Whom It May Concern: The Ralph W. Hajosy Revocable Trust, owner of Unit 6 in the Capstone Townhome Association has reviewed the proposed addition plans for units 3 & 4 of Capstone Townhomes and approves these plans. Sincerely, Ralph Hajosy for the Ralph W. Hajosy Revocable Trust Marc and Maria LeVarn 1817 Meadow Ridge Rd Unit 4 Vail, CO 81657 10/15/09 To Whom It May Concern: We have reviewed the planned expansion for Unit 3 of 1817 Meadow Ridge Road (Capstone Townhomes) and approve the plans. Sincerely, Marc and Maria LeVarn Dr. Nelson & Diane Prager 1817 Meadow Ridge Rd Unit 2 Vail, CO 81657 10/3/09 To Whom It May Concern: I have reviewed the planned expansion for Units 3 & 4 of 1817 Meadow Ridge Road (Capstone Townhomes) and approve the plans. Sincerely, Ne n Prager John E Nadler 1817 Meadow Ridge Rd Unit 3 Vail, CO 81657 10/16/09 To Whom It May Concern: I have reviewed the planned expansion for Unit 4 of 1817 Meadow Ridge Road (Capstone Townhomes) and approve the plans. Ms. Phyllis Dickson 1817 Meadow Ridge Road #I Vail, CO 81657 To Whom It May Concern: I, Phyllis Dickson, owner of Unit 1 in the Capstone Townhome Association have reviewed the proposed addition plans for units 3 & 4 of Capstone Townhomes and approve these plans. Sincerely, 1.0 I`Z~ & Phyllis Dickson, Treasurer, Capstone Townhome Association Robert Boymer 1817 Meadow Ridge Road #6 Vail, CO 81657 To Whom It May Concern: I, Robert Boymer, owner of Unit 6 in the Capstone Townhome Association have reviewed the proposed addition plans for units 3 & 4 of Capstone Townhomes and approve these plans. Sincerely, A~~~~' Robert Boymer Secretary, Capstone Townhome Association JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER This form is applicable to all Design Review applicants that share ownership of the subject property. For exam- ple, the subject property where construction is occurring is a duplex, condominium or multi-tenant building. This form shall be completed by the applicant's neighbor/ joint property owner. In the case of a multiple-family dwell- ing or multi-tenant building, the authority of the association shall complete this form and mail to: Community Development Department, 75 South Frontage Road, Vail, CO 81657 or fax to 970.479.2452. I, (print name) 4 e , a joint owner, or authority of the association, of property located at ; ( C ! , 1- r, k: provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the ad- dress noted above. I understand that the proposed improvements include: (Signature) (Date) Additionally, please check the statement below which is most applicable to you: I understand that minor modifications may be made to the plans over the course of the review process to en- sure compliance with the Town's applicable codes and regulations. (Initial here) 1 request that all modifications, minor or otherwise, which are made to the plans over the course of the re- view process, be brought to my attention by the applicant for additional approval before undergoing further re- view by the Town. (Initial here) EAGLE RIVER WATER & SANITATION DISTRICT 846 Forest Road • Vail, Colorado 81657 (970) 477-5451 0 FAX (970) 476-8357 ACCOUNT CHECKLIST Submittals required for New Construction /Demos /Rebuilds/ and Additions: Assessment Form- (Check the Property type): [ ] Residential [ ] Commercial* Mixed [ ] Letter from a Mechanical Engineer or master riurnmr Required for Mixed & Commercial account types and meters 2" and greater in size. This letter should support and accompany the Detailed Fixture Count Form. The meter size requested should be supported by the Intemational Plumbing Code. [ ] Detailed Fixture Count Form Required for all requests of meters 1.5" and greater in size. [ ] Floor & Site Plans All floor and site plans need to be submitted (AutoCAD) in dwg or.dwf format ONLYII Plans submitted in any other format will not be accepted.! [ ] E-Mail plans to: Pcarter0-erwsd.org Allow one week after the date of all submittals received by the District for the new account process to be completed. Internal Use Only: CFS Rep: Date Entered U02000: ACCOUNT # EAGLE RIVER WATER & SANITATION DISTRICT 846 Forest Road • Vail, Colorado 81657 (970) 477-5451 0 FAX (970) 476-8357 RESIDENTIAL ASSESSMENT FORM Legal Description: Lot Block Filing Subdivision: Service Address District: - City, Zip Code: Structure Type: As owner or architect/building representative for the above-mentioned property, I verify that the residential square footage is the following: Square Footage: Upper Meter Size: Upper Total Fixture Count: Main Lower Total Square Feet: Total # of Floors in Structure: I verify that the above stated is in compliance with Appendix B of the Eagle River Water & Sanitation District's Rules and Regulations Effective Jan 1, 2006. 1 realize that the square footage stated above is based on the residential floor area; the measurement of the outside walls including concrete basements (finished or unfinished), but excluding garages, attics, and mind-unit common space. I understand that Eagle River Water & Sanitation District has the final judgment on the properties meter size and square footage calculation. Owner Name: Mailing Builder Name: Mailing Address: Address: Telephone: Telephone: Fax: Fax: E-Mail: E-Mall: I confirm I have received Appendix A from the Rules & Regulations for the Eagle River Water & Sanitation Districts / Upper Eagle River Water Authority for the applicable Water District and governing authority associated with the above property. Print Name Office Use Onto: Signature CSI REP Date 1817 Meadow Ridge Rd #3 & #4 - Yahoo! Mail MAIL Y,&14COOF we C 1817 Meadow Ridge Rd #3 & #4 Frnrr,: "Peggy Carter" <pcarter@erwsd.org> To: simpledesignconcepts@yahoo.com 2 Files (254KB) 1 ME! ) In Page 1 of 1 I have been notified that you are designing an addition at the above referenced property involving an addition of approximately 385 square feet to each unit. Additional Tap Fees may be due to Eagle River Water & Sanitation District, however I don't believe that will be the case on this project. Please supply the following to the District within 30 days after the Design Review Board approval so that we may ascertain if additional tap fees are indeed due: • Copy of the floor plans for the addition in AutoCad - dwg file Copy of the Eagle County Building Permit. For your review, the District's current Rules and Regulations are accessible on our website at erwsd.org. I have also attached a New Account Checklist to help guide you through the paperwork for the additions. I will need the floor & site plans e-mailed in AutoCAD to me for measurements (we cannot measure from the pdfs that you e-mailed), and the Residential Assessment form completed & returned to me along with a copy of the building permit. We will continue to stay in touch throughout the project so that if you have any questions, I will be familiar enough with the project to answer any questions or put you in contact with someone here at the District that can. Peggy Carter Customer Service Specialist Eagle River Water & Sanitation District 846 Forest Road Vail, Colorado 81657 (970) 477-5458 (970) 476-8357 fax UTILITY APPROVAL A VERIFICATION This form serves to verity that the proposed improvements will not Impact any ads" or proposed utility vrvices, and also to veify service availability and location for new consbuctim and should be used in conjunction with preparing your uttbty plan and schedul- ing instaNatlons. A site plan, including gractng plan, floor plan, and elevatiore;,, shall be submitted to the knowing utilities for ap- proval and verificabon. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain comments within that timeframe please contact The Town of vail. Swdea Prop" Address: 1 7 Wn VW 'P. Lon If mock Subdivislat:CdPsta~iK"~7 Primary I Oprier Represenbdve" Phone: 9 t° 44* &4t Plans Dated:;y Prim oanw0woerRepreseatttiveSiVWare n ~ M-9. 3 of /L 1CA KE]_ bv '••~►M fity-*-S AutAorind Slanaturs coammints Date W ST ~/Q E FsPa~i$~1' 970.468.6860(tel) ~ 970.468.0672(tax) l l T S 1K 7W t* oo ey amue Contacts: corn 1 XCEL HMH PRESSURE GAS 970.262.4076 (W) 970.468.1401 (fax) Contact Rich SGneros richard-M& HOLY CROSS ENERGY , 978.947.5425 (ten 970.945.4081 (fax) Contort: Jeff Vroom ivroometoiaosr.com XCEL Eeenpy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: 10t Bogert EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tei) 970.476.4089 (fax) Contact: Fred Hadee OOMCAST CJ►RLE 970.205.5432 (tel) 970.930.4713 (fax) tact: Miehad 3ohnson C or mi- chael ' ble.wnricast.eom CDOT (0nly in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel. roussin(ldcit.state.co.us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of--Way Permit may be required for any improvements within a street right-afwvay. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner R presentative is required to sutxrdt any revised drawings to the above agencies for re-approval & rervenficatlon 9 the submitted plans are altered in any way after the auffionzed signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed nixvvoements will not impact any adaV or proposed utility services, and also to verify service amiability and location for new oonshuction and should be used in co*nction with preparing your utility plan and sdw1ul- ing installadons. A site plan, tndudkng grading plan, floor plan, and elevabms„ shall be submitted to the foU=ft utllitlees for w prowal and verdcadon. PLEASE ALLOW UP To 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- MIES. W you are unable to obtain ~o-o~mrnents within that timeframe please cor ad The Town of Vall. n ~ , Subject Property Address: ! Lj~ 6 a. Lot "yI Btodc ~ 5u~b{divi don: C.•rapmN/~- =4,7, er Repregwft"w&- ~ D Phone: - { I - to'bW5 Plans Dabsd: 1. Utility bcatlons must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improverrrents within a street right-of-way. Confect the Public Works Department for verification 970.479.2196. 3. R Is the responsIbliity of the ufty oornpany and the applicant to resolve problems identified above. 4 . The Primary Qmtacf/Owner Repfesentative is required bo submit any revised drawings to the above agencies for re-approval A rye-verification 9 the submkted plans are WAmed in any weeny after the autt wized signature dale. UTILITY APPROVAL & VERIFICATION Thb form saves to mh that the proposed kgxavmm is YM not Impact any adsdng or proposed utNity servkes, and a150 to verify service avokbay and lomWn for new aorrsbudion and dxKM be used in w unction with preparing your Y Plan and 9cteduF ino kWAliadorm A site plan, including grading; plan. floor plan, and elevations, shah be submitted m the *Movring uNies for ap- P WM and verMcatim. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL. OR COMMENTS FROM THE UTILITY COMPA- NIES. N you are unable to obtain comnerrts Wd* Ubhot Unw*ame please contact The Town of WN. 5ubfect Properh Add: I W F• ~ Lok_j~I flock Subdivision: , T { - &W-b PrlarnaTy / OPraer tilr~ ~ t~'~ Phone: `4t;:;rr4k~ !L Plans Dated: 5 1. Ufty locadons must be obtained before digging. 2. A Revocable Right-of-Way Permit maybe required for any improvements wkhin a street r%O t d way. Ccmtad the pubik Works Department for verffka m 970.479.2198. 3. It Is the respor y of the utiNtjr company and the applkant to resolve problems ideati W above. 4. The Primary Contact/OM W Rgr+eminim is required to submit any msvlsed dram" to the above aW. agencies for re-a~ppraval & ~n If the subntbedd plar>s are altered In any way after the authorized a d date. UTILTrY APPROVAL & VERIFICATION rnrm :eves Ir, :cli*'i that if'i prowol-d nnpruvilmrrdc w-11 nit impact any ovq;r, cx "Posoj trtllitr ietvik-e;, dnd dl.: rn verfy +~I~p~ity ar r ati ::n f(r M-A r~nn;t-udicm .1W chrftiki he aced !r, :13nJUnctt(x with Preparsrk; yLiur Grit y Galan an ,Cheevl- ;'Teri, 1`100- p4n, and eievalmws., s.'rall nr: u". 1ted W the falk_,w!.N i;t.litres for aC PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- .il, ni'le to OtAd!rl (;xnrrent,, wdrm that timefrarrw pleaSe cm.tact The Town of Vail •rbject Proper[„ Address: -1 k I. I~aCp _ Lot_ Bloc[ 'r - subawiscl r,: . it Phone: i c 7 :J ~jJ~ Prin wy Coast i OWner Representative: Platys Dated: !rL ~20- Prrimars Cowfaet f)w ntr R!p►t~entrti.e ~rYrutur! 1Aki +TL> 1 4 Aulhatized Signature C!n_ n fl QWEST 970.468 Wx:+041 970 468 0y 7: r fa. Co!Kacts: Samm-1 ' '"e. XCEL WGM PRESSURE GAS 9!0.252.4076 (tell 970.466.1401 (faxI 0)ntac,~ Rich 5rsnerm rx't; r .si r WAY CROSS ENERGY 970.947 5415 (lei; 970.94] 4081 (fair) Curt l: )e ff Woof" OOmi~f'fil ~OSS.ram _ XCEL Energy 970.262.4038 (fax; a u.262.4024 (tel) C-L-tact's: Kit B9e' hr r air L`'tr R -Y C02 EAGLE RIVER WATER & SANITA- W TION DISTRICT f~7n_475.7480 (tel) 97+;.4764039 (fax; b cn-rac,- Fred Haslep • :-vi rr A rI y. CASTCAL COM S~f =Tc'a'1 ' O , 1 L i t ~t C l t a- gblt? Nd[f~,i ~Z ? .7t _ 40.4113 (fax) V.- el?ohn5on h C t t i , ~►DdtO yy,ki NreJ Tc~ c a .m. ac ' • ~'ti ~,ti~ S n ,aP• n:,rsn+~iYabie.::cmca~'.co _ iCDOT (()nly in CDOT w u"t of way) f,)ntart Dan Roussie .a, I . NOTES_ 1. Kit~ry icX atidrls m~lsf be obtained before digging. A Revocable Right-Of-Way Permit may by rr~quired for any improvements within a street right of way. Contact the Public Wrrks Depa'tment for vertfrcation 97{).479.2198. i. it is the resporr'bility of the utility company and the applicant to resolve problems Identified above. s. The Primary C_^ntwVOwner Representative is required to submit any revised drawings, to the above agencies for re-arroval & re-v&iriration d the suhrrxttwi plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves tp vatry that the proposed its will not impact any existing or proposed utllty senloes, and also to verify service availability and location for new consin:ctlon and drortld be used In conjunction with preparing your uUky plan and sdWul- ing Insbiladorm A sits plan, including grading plan, floor plan, and elevations, shall be submitted to the foNowing ut #Uw lbr ap- proval and verMka0w. PLEASE ALLOW UP TO 1 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPA- NIES. If you are unable to obtain aarmterds wtthtin that timeframe *-ase gontad The Town of Val. Suite Property Add mm g 7 YuOw ~+d42 yLol„_ Bbdc SubdlMan: Primwy Contact I Owner Rapt+aaerrhtlww. Phony. Plans Dahd: Prhmry Conew0owner Reprwatatlve Sttnaftre Com=nts QWwr 970.468.69Wtel) 970.468.0672(fox) Cantacts: Samuel Tolley XCEL t#RM PRESSURE falls 970262.4076 (td) 970.46L1401 (fox) Corte Ridr Slsneros HOLY CRM ENERGY 970.94.1) 1.1 ct 970.945.4064061 9(faor) Oarfmmt" Diana Galls XCEL Eoarry 410262.4028 (tax) 1/11262.4024 M Oxaft K tBogert Sam ERM RIVER WATER & SANITA- TWO mraFF4= 970.476.7480 0d) 970.476.4069 (fax) Oontat Fed Ha dee 000ICAST OAtiLtH 970.619.0752 970AW2672 (fax) Contact Tony F"-. CDOIT (Only in CWT Right d-way) 970.683XQB4" COFJLK : Dan Rorasin Daniel nre e d r @dot slAe an us 1. Utility locations must be obtained before digging. 2. A P evocable Right-of=Way Permit may be required for any impnovernents within a street right-of-way. Contact the Public Work; Deparbnent for verifieadw 970.479.2148. 3. ft Is the report 6lity of the utility company and the applicant to resolve problems identified above. 4. The Primary Cor t KVOwner Reeve Is required to Submit any revised drawings to the above agencJes for re-approval a re-v Mcdlon If the subtnitted plans are altered In any way after the autlwrized signature date. To: Design Review Board From: Design Concepts, Inc. - Sharka Reid P. O. Box 2743, Venice, CA 90294 970.331.6333 RE: John Nadler 1817 Meadow Ridge Road # 3 Vail, CO 81657 Marc & Maria LeVarn 1817 Meadow Ridge Road # 4 Vail, CO 81657 Scope of work: One story and basement to be added to the back of both units on the North side of the town homes. As per Community Development Department memorandum dated 05/14/2007 each unit is allowed to add 616 sq. ft GRFA per unit. Main floor in this case is 352 sq. ft. Lower floor to add 35.2 sq. ft. = 10% of exposed wall of lower floor. Total area added per unit is 387.2 sq. ft. Color scheme Roofing and siding to match existing. Window trim to match existing. 2 Scope of work Unit # 3 All windows and doors to be replaced with the same, type, size and color, upgraded to current trends and high energy efficiency. North side addition • new window configuration for the main level • prefab window well at the basement level • new window to replace the egress window into the window well New addition to be 16'x 22'at main level and extending the basement to the same size to support the new structure. Replace wooden deck w/ new stone patio, min 10' deep. Scope of work Unit # 4 North side addition • new window configuration for the main level • roof on the added portion to accommodate 3 new skylights • prefab window well at the basement level • new window to replace the egress window into the window well New addition to be 16'x 22'at main level and extending the basement to the same size to support the new structure. Upper level windows, and front elevation windows to remain the same. Replace stone patio with new one, min 10' deep. (2) new concrete or stone planters on the East and West sides of the patio. 3 Existinz Structure: North Elevation South Elevation 5 3. Proposed Elevation: 04 Outdoor Lighting,com Sh utdoeorL ghting,comt 3. All ProdtrKts > Outdoor Lighting s KMkham a 11r Wide Dark Sky Qtr Wam light SN i1YrG fiASKE T j 1.1141CHA ` Rrtum to Product Search Kirkham 8 112" Wade Dark Sky Outdoor Wall Ught . mm oL4*w tight the night, but nc the night sky, 111* Dent Sky nilguliliWn aWoved wall bglht. A bent arm extends the ft ft hoLghV &way ft m the wad and df+ e= Ngfrt doMt~. i -0. Rand fbr f A cart-W the din f'eetzm a wRo haeerrered Aspen bmm fMnlah- Ffwn Mkaka's Kirkhem tighMV coNeCtion. Our Prig $52.99 QTY, 1 MINK A LAVER' About Minka Laverq Key Features • Hammered Aspen bronze tiFtosb, . Takes am 64 watt A1S bib (not In~). * 6' high. a 8 1! widt_ E rtencis 10 1/2" hvm der waAl_ Thews something for evwy + r and budget in the Minka Lavery line of outdoor Kgftng fixtures. Part of the Mltnka Group of lighting a ffpanig#, Minka Lavery is kmmn fix f*lr flair with desbgn. quallitf► and w rlumn". From classic Art% and Craft $ designs with a Missim flair to ornarte, cwmage stole traditional deslpgns. tberes something here for evtqone. OuUkW Lighting TIP One of the m st vW:de features of outdocw hghmV at roght is the type of glass used in the f xhwe. Seam types of glass ofd on ate, trati9 n l look, wh#e others are more Sf ftk and Ord y. Seedy glass,, which has air btibb*s rn the gees ti►aR Muse the light. and water glans wkb Its shorn . nave-like pattern, have an anbq a kook. Tkftny style outdoor bghU, have cok wed glass panels arranged in gwometrlc dllddes. Alabaster gWs lfhKlt to look Met ailaboster avible w4 while frosted glass we more ofd uen in oor nrPararr~r outdoor and landscape fights, You May Also Like; A00 Selected to Wish List I Add Se ted to Basket PROPOSED LANDSCAPING QmMG Name Qmmuft so PROPOSED TREES 10l'ilLkl'-i Azz-;, F li~ItAk~ Z~LA~.i~c. h AND SHRUBS IR&HO IM EXISTING TREES TO BE REMOVED TQH -)IML7 Minimum Requirements for La ping: Deciduous Trees - 2" Caliper Coniferous Trees - 6' in helght Shnibs - S Gal. I= Sauer* Footaas GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL TC MAIWW19tt~l~ IF DMeP WA LL WE Please specify otter landscape features (i.e. retaining walls, fences, swimming pools, etc.) A -X-09 PROPOSED MATERIALS Building Materials Type of Material Color Roof -~-7 ^ Siding ~ ~G7\ 1 Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: Please specify the manufacturer's name, the color name and number and attach a color chip. Planning and Environmental Commisson ACTION FORM TOW OF V,% M _1 r{ %£LOPWtff Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: CAPSTONE CONDOS REZONING PEC Number: PECO70018 Project Description: FINAL APPROVAL FOR REZONING FROM PRIMARY/SECONDARY TO LOW DENSITY MULTIPLE- FAMILY. SEVERAL COMMISSIONERS STATED THAT THEY WOULD NOT SUPPORT VARIANCES WHICH INCREASED THE ENCROACHMENT INTO THE SIDE AND REAR SETBACKS. Participants: OWNER CAPSTONE TOWNHOUSE ASSOCIATI03/19/2007 Phone: 479-0436 GO MARK LEVARN 1817 MEADOWRIDGE RD VAIL CO 81657 APPLICANT CAPSTONE TOWNHOUSE ASSOCIATI03/19/2007 Phone: 479-0436 C/O MARK LEVARN 1817 MEADOWRIDGE RD VAIL CO 81657 Project Address: 1994 MEADOW RIDGE RD VAIL Location: CAPSTONE TH Legal Description: Lot: 21 Block: Subdivision: CAPSTONE TOWNHOUSES Parcel Number: 2103-123-0400-1 Comments: See Conditions BOARD/STAFF ACTION Motion By: Rollie Kjesbo Action: APPROVED Second By: David Viele Vote: 7-0-0 Date of Approval: 05/1412007 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: CON0008962 That Lot 21, Buffehr Creek Subdivision, shall be limited to no more that six (6) dwelling units regardless of that allowable under Low-Density Multiple Family District zoning. Planner: Warren Campbell PEC Fee Paid: $1,300,00 1/k- rLp- IYPE iAl MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: May 14, 2007 SUBJECT: A request for a recommendation to the Vail Town Council for a zone district boundary amendment, pursuant to Section 12-3-7, Amendments, Vail Town Code, to allow for a rezoning from Two-Family Primary/Secondary District (P/S) to Low Density Multiple Family District (LDMF), located at 1817 Meadow Ridge Road/Lot 21, Buffehr Creek Subdivision, and setting forth details in regard thereto. (PEC07-0018) Applicant: Capstone Townhome Association, represented by Marc Levam, President of the H.O.A. Planner. Warren Campbell 1. SUMMARY The applicant, Capstone Townhome Association, represented by Marc Levam, President of the H.OA, has submitted a development review application to the Town of Vail Community Development Department to allow for the rezoning of Lot 21, Buffehr Creek Subdivision, from Two-Family Primary/Secondary District (P/S) to Low Density Multiple Family District (LDMF). The applicant has submitted the application in anticipation of the desire to perform several small residential additions to the y existing units and ossible new itched roof. Staff is recommending that the Planning and Environments m sron o ids a recommendation of approval of the applicant's development review application. It. DESCRIPTION OF REQUEST The applicant, Capstone Townhome Association, represented by Marc Levam, President of the H.OA, has submitted a development review application to the Town of Vail Community Development Department. The purpose of the application is to amend the Official Zoning Map of the Town of Vail whereby Lot 21, Buffehr Creek Subdivision, is rezoned from Two-Family Primary/Secondary District (P/S) to Low Density Multiple Family District (LDMF). According to the applicant the rezoning is intended to facilitate the renovation and additions many of the owners are contemplating for their units and possibly a new pitched roof to alleviate leak problems associated with the flat roof. There are currently six (6) dwelling units located upon Lot 21 of the Buffehr Creek Subdivision, which is four (4) additional dwelling units than permitted on the property according to the Two-family Primary/Secondary District. As this property is legally nonconforming, the limits as.to what can be done on the property are severely Vail Town Council Attachment: B restricted. Any change to the units on the property, other than regular maintenance, requires one or more variances for density, Gross Residential Floor Area (GRFA), setbacks, depending on which unit and what is being proposed. The proposed rezoning of Lot 21 to Low Density Multiple-Family District would result in a maximum of seven (7) dwelling units on the lot and the ability to have total of 16,970 square feet of GRFA for the six existing units. There is currently 13,272 feet that could be split amongst the A vicinity map of the development site and surrounding area has been attached for reference. (Attachment A) The Capstone Condominiums were granted a Certificate of Occupancy on December 1. 1978, under Eagle County jurisdiction for six (6) dwelling units and were zoned Residential Multiple Family. On January 29, 1986, the Capstone Condominiums was annexed into the Town of Vail by Ordinance No. 1, Series of 1986. At that time the property was rezoned to Two-Family Primary/Secondary District, which made the property legally non- conforming. On June 8, 1987, Staff recommended denial of a density variance for Unit 2 to enclose a deck which added 79 square feet of GRFA to a project which was already over on number of units and GRFA for the lot. Staff cited that it would be a grant of special privilege. as no hardship was present. By a vote of 3-1-0 the Planning and Environmental Commission approved the density variance request for Unit 2. On July 7, 1987, the Town Council heard an appeal (called up by Council Member) on the Planning and Environmental Commission approval of a density approval for Unit 2 of the Capstone Condominiums. A motion was made to uphold the Planning and Environmental Commission approval and by a vote of 2-2-0 the motion failed and resulted in the overturning of the Planning and Environmental Commission approval. There have been several applications for new windows, retaining walls, and roof replacements since the 1987 applications. IV. ROLES OF THE REVIEWING BODIES Rezoning/Zone District Boundary Amendment Planning and Environmental Commission: The Planning and Environmental Commission is advisory to the Town Council. The P18ftfihq and Environmental Commission shall review the proposal and make a omnowdation to the Town Council on the compatibility of the proposed zoning GenFlex Termination Bar GenFlex Termin GenFiex Water See We #1 GenFlex BoncW See Note #3 1. Compression ft details that incorporate GenFlex Water Stop must have all eAs" flashing removed to the bare substrate. e.g. masonry block. 2. When arced flashing Is used on wall or curb flashing, vertkel seams must be stripped-In at the base of angle charge with 6- (152.40 mm) strip of FW*Iash E. or r (177.80 mm) Peel & Stick. See Detail E-3.01. 3. AN parapet walls and roof curba must be suitable for flashing, i.e. dean, Wit smooth, no cracks, etc. 4. Arry approved pre-drilled fastener for axb and parapet terminations must have a minimum 125 lb (556.03 N) pullout. See approved fastener Get. Wall Termination ► Detail E-1.01 GenFlex Cured EPDM Membrane See Note #2 GenFlex Fasteners On Reroof Projects 6' (20320 mm) o.c. On New Construction 1Y (304.80 mm) o.c. With Neoprene/Metal Washer or Cauk See Note #4 C&nflex Roofing Systems EPDM Systems Existing Metal Cou ter-Fiashing See mote #2 GenFlex Bar Anchor with Approved Fasteners 12' (304.80 mm) o.c. / See Note #3 -fl~ 3' (76.20 mm) Minimum GenFlex Cued EPDM Membrane See Note #4 See Note #1 GenFlex Bonding Adhesive - See Note #5 1. Compfession fit details that kXxxporate GenFlex Water Stop must have all existing flashing removed to the bare substrate, e.g. masonry block. 2. Metal coping cap, expansion joint, and edge delak are typical only. AN metalwork should be Installed to sheet metal codes (SMACNA). Clean all metal prior to installation of GenFiex materials. 3. Polymer batten strips cannot be used for attachments into masonry wall substrates. Use only on smooth surfaces, e.g. wood or insulation. 4. VVhen cured flashing is used on wall or cub flashing, vertical seams must be abipped4n at the base of angle charge with &'(152.40 mm) ship of FlexFlash E, 7' (177.80 mm) Peel & Stick. See Detail E-3.01. or Genfkmx 5. AN parapet walls and roof curbs must be suitable for flashing, i.e. dean, tight, smooth, no cracks, etc. Roofing Systems I Wall Termination with C_nr rnfer_frl Detail E-1.02 EPDM Systems ~ahinn ' Metal Coping see Note #1 _ or Interior Securement Continuous Metal Cleat Fasteners ced 1(304.80 mm) Neoprene Washer Wood Nailer - See Note #2 or Sealed with Caulk GenFlex EPDM Bonding Adhesive - See Note $3 GenFlex EPDM Membrane See Note 04 1. Metal coping cap, expansion joint, and edge details are typical only. AN metalwork should be installed to sheet metal codes (SMACNA). Clean all metal prior to installation of GenFlex materials. 2. AN wood milers to be approved material. Attachment of wood nailer to be accomplished by using fasteners providing no less than 128 Ile (556.03 N) of pullout resistance per linear foot, with fastener spacing no greater than 24" (609.60 mm) between fasteners. 3. AN parapet walls and roof orbs must be suitable for flashing. Le. dean, light, smooth, no cracks, etc. 4. When field membrane is used as wall or curb flashing, vertical seams must be stripped-In at base of angle change with a 8" (152.40 mm) wide strip of FlexFlash E, or r (177.80 mm) Peel & Stick Flashing. See Detail E-101. CjenfLmx Roofing Systems Coping Termination I Detail E-1.04 I EPDM Systems Over Membrane Flashing GenFlex EPDM swing ~ Adhesive See Note #1 GeWiex 2"(50.80 mm) Plate or Bar Anchor with Approved Fasteners 12" (304.80 mm) o.c. See Nate #2 8" (152.40 mm) Wide GenFlex Peel & Stick RPS Strips See Note #3 GenFlex Primer Applied to kkderside of EPDM. Thoroughly Clean the EPDM with GenFlex EPDM Cleow Prior to Applying GenFlex Primer. GenFlex ISO 1. AN parapet waft and roof curbs must be suitable for flag", dean, tight, smooth, no cracks, etc. 2. Polymer betten strips cannot be used for alladwmr is into masonry wall Ge ' substrates. Use only on smooth surfaces, e.g. wood or insulation. 3. Instead of Peel & Stick RPS stgp, standard RPS strip may be used In conjunction with 6-400 Seam Adhesive following GenFW Spice application methods. Roofing Systems Vertica Secu Pee al Stick RPS I Detail E-2.08 I EPDM Systems Continuous Bead GenFlex Cured EPDM Membrane High Profile Edge See Note 02 Caulk See Note #3 a-wn (M.20 nun) FlexFlash E (Uncured EPDM) See Note #4 GenFlex Water Stop 4 » yi yyb Wood Nailer y y GenFlex EPDM " Bonding GenFlex EPDM Adhesive Membrane See Note #1 QBSpf ~ GenFlex 6-400 Seam Adhesive See Note #4 GenFlex ISO Approved Substrate 1. AN parapet waft must be suitable for flashing, i.e. dean, tight, smooth, no cracks. an acceplable substrate_ 2. When aced flashing is used on wall or cab flashing, vertical seams must be stripped-in at the base of angle dumps with a 6" (152.40 mm) strip of FlexFlash E, or 7" (177.80 mm) Peel b Stick. See Dot" E3.01. 3. For seems assembled with GenFiex G-400 Seam Adhesive, a bead of GenFlex Edge Caulk is required on all exposed edges, following a pre-cleaning of the seam ares with GenFiex Cleaner. For scuppers flashed4n with GenFlex 7" (177.80 mm) Peel & Stick Flashing or Bar Anchor Cover Tape, all transitions, T-joints, and overlaps must have an application of GenFlex Edge Caulk extending 3" (16.20 ran) from the transition, overlap, or T-joint in all directions. 4. Flash wall in accordance with GenFlex specification, and cut wall flashing at scupper opening. Mount scupper with 3" (76.20 mm) wide metal mounting flange and continuous. rounded comers onto the wall substrate, with a bead of Gerflex Water Stop between the metal flange and the wall flashing membrane. Secure per SMACNA recommendations and as required to hold Water Stop under constant compression. Flash the scupper assembly with a large enough piece of FkkWlash E to cover the entire assembly, and extend 3" (76.20 mm) beyond the flange In all directions. Cut the FlexFlesh E at the scupper opening and turn flashing 1 1/2" to 2" (38.10 mm to 50.80 mm) into the scupper outlet tube. If outlet tube seam is not soldered extend FlexFlash E to outer edge of outlet tube. Caulk all FlexFlash E edges with properly applied GenFlex Edge Caulk. Genflex Roofing Systems Scupper Detail E-10.01 EPDM Systems PLANNING CHECK SHEET Property Information Property Address 1817 Meadow Ridge Rd Units 3 and 4 Parcel # 210312304003 Legal Description Lot 21 Buffer Creek Development Site Area Ac 1.207 Sq Ft 52577 Buildable 38568 Zoning / SDD # LDMF Land Use Designation Known Non-Conformities None Previous Approvals Hazard Zones Snow Avalanche Na Sections 12-12, 12-21, 14-6 & 14-7 Debris Flow Na Rockfall Na Excessive Slopes Na (Site Disturbance 12-21-14) Floodplain Na Wetlands Y/N No Creeks, Streams n/a Setback Proposed Section 12-14-17 Sidewalks/ Trails n/a Contact Information Planner/ Date Owner Contact Info Primary Contact/ Owner Representative Info Project Information Project Description Additions on units 3 and 4 Land Use Application(s) # DRB090626 DRB090628 Permitted, Conditional, Proposed Uses residential Permitted Prohibited? (As defined by Zoning) Date Routed/ DRT Meeting Commercial Floor Area Existing na Proposed na Gross Residential Floor Area (Chapter 15) Total Allowed 16970 -Existing 13272 -Proposed 13932 +Credits none Primary Allowed -Existing -Proposed +Credits Secondary Allowed -Existing -Proposed +Credits Total 3038 Primary Total Secondary Total Remaining Remaining Remaining 250 or Interior Conversion? Zoning District Standards Front 20 Proposed or Y/N >required Setbacks (perimeter) Side 15 Proposed or Y/N >required Projections 14-10-4 Rear 15 Proposed or Y/N >required Minimum Lot Area/ Width Required Proposed or Y/N Site Coverage % Allowed 35%/18401 % Proposed 4874/ 9.27% Building Height Allowed Proposed Landscaping % Required 40% % Proposed 34283/ 65.21% Sections 14-10-8 & 14-10-9 Plant size Proposed Fences Proposed Height Allowed Proposed Retaining Walls Setback Proposed Sec. 14-6-7 Driveway Max Curb-cuts Proposed Sections 14-3-1 & 14-3-2 Max-Min Slope Proposed Max-Min Width Proposed Heated Y/N Drive Material Snow Storage % Proposed Parking Stalls Required Proposed Sections 12-10 & 14-5 Loading Proposed Lighting Allowed Proposed Section 14-10-7 Waste Management Wildlife Proof/ Screened Section 5-9 Resistant Screening Required Proposed Sections 14-10-9 & 14-10-10 Roof Material Complies Y/N Sections 12-11-3C & 14-10-5 Building Separation Complies Y/N Section 14-10-6 Adopted View Corridors Complies Y/N Utilities (Location, easements) Section 14-10-10 Grading (Less than 2:1) Section 14-6 Development Impact Fees / Employee Housing Mitigation Traffic Impact Art In Public Places Notes